+34a524ec-6994-426f-86af-78788fd34a80,"Between the locking points for the mortice lock and surface-mounted rim lock, the distance should be 400-600mm.",{'ID': '36_UK_DocQ_Security_Dwellings'},"Between the locking points for the mortice lock and surface-mounted rim lock, the distance should be 400-600mm.",none
+aa41a5d4-c0b1-4da7-84a0-5c2e2738654f,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,{'ID': '89_UK_DocF_V1_Ventilation'},The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,greater-equal
+c2c49207-78b3-42b0-8b61-ad506f5a80e2,"In hard water areas, suitable measures should be taken to treat the feed water to water heaters and the hot water circuit of combination boilers to reduce lime-scale accumulation.",{'ID': '381_UK_DocL_V1_ConsrvationOfFuelAndPower'},"In hard water areas, suitable measures should be taken to treat the feed water to water heaters and the hot water circuit of combination boilers to reduce lime-scale accumulation.",selection
+0a7ff0c7-c5f9-4069-9d7e-2bfd6c4871d3,The floor area of the extension does not exceed 30m2.,{'ID': '13_UK_DocL_V1_ConsrvationOfFuelAndPower'},The floor area of the extension does not exceed 30m2.,selection
+d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",none
+33eb3a5a-584f-4d1e-84a0-35fe66954d80,Consideration should be given to the power requirements of essential (e.g. life safety) systems.,{'ID': '323_UK_DocM_V2_AccessAndUseOfBuildings'},Consideration should be given to the power requirements of essential (e.g. life safety) systems.,selection
+526d7a82-6362-4fce-8d58-1ab0b0005235,The structures of the wet rooms must be rigid enough that the thermal and moisture movements do no damage the wet room waterproofing or surface structures.,{'ID': '115_Finnish_Health-Humidity'},The structures of the wet rooms must be rigid enough that the thermal and moisture movements do no damage the wet room waterproofing or surface structures.,necessity
+7134933d-17df-4a8c-b72e-1c09177bad1c,The spread of fire in voids of wall-type building elements must be restricted at least by storey.,{'ID': '130_Finnish_FireSafety'},The spread of fire in voids of wall-type building elements must be restricted at least by storey.,selection
+2c8d2bc3-cf23-48f8-b9c0-b90f150f9f93,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing building.",{'ID': '426_UK_DocM_V2_AccessAndUseOfBuildings'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing building.",necessity
+2c12675d-93c9-496a-acf9-b30465dae93d,Any flexible ducts should be installed so that the full internal diameter is maintained and flow resistance is minimised.,{'ID': '113_UK_DocF_V1_Ventilation'},Any flexible ducts should be installed so that the full internal diameter is maintained and flow resistance is minimised.,necessity
+af92ecf9-432a-4557-9992-060bb6e3e867,Air permeability should be in m3/(hm2) at 50Pa.,{'ID': '352_UK_DocM_V2_AccessAndUseOfBuildings'},Air permeability should be in m3/(hm2) at 50Pa.,equal
+0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,none
+977ccb7b-4580-4ea3-9ea4-5057925c9854,"NOTE: The surface area of the whole building must be included when assessing whether the works constitute a major renovation, even if the building is mixed use.",{'ID': '124_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"NOTE: The surface area of the whole building must be included when assessing whether the works constitute a major renovation, even if the building is mixed use.",selection
+df6eb340-6ff0-4811-bcaf-48a6cc6dc455,"An ambulant disabled person should be able to move within, and between, storeys.",{'ID': '90_UK_DocM_V1_AccessAndUseOfBuildings'},"An ambulant disabled person should be able to move within, and between, storeys.",necessity
+dd056285-1aa4-4c6d-94ac-b911458cb7ea,"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",{'ID': '70_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",part-of
+78b82c71-b2a9-41ea-a5f9-45bdba64fa7a,The correct operation of each control function should be tested where it is practical.,{'ID': '218_UK_DocF_V1_Ventilation'},The correct operation of each control function should be tested where it is practical.,selection
+eccd4f77-ef4a-41fd-a22a-620c84fdddd4,There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,{'ID': '98_UK_DocM_V1_AccessAndUseOfBuildings'},There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,part-of
+a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",part-of
+efd2d371-97de-4d5e-af06-e404ff71f316,The impact of the ground and crawl space on heat loss shall be taken into account in heat loss calculations.,{'ID': '91_Finnish_EnergyEfficiency'},The impact of the ground and crawl space on heat loss shall be taken into account in heat loss calculations.,part-of
+1320873f-de9b-4c55-a7c0-67f545c4a46e,"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",{'ID': '42_UK_DocM_V2_AccessAndUseOfBuildings'},"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",none
+197b9463-397e-4729-a08d-12739f9db069,"For variable refrigerant flow (VRF) systems, any calculations must include indoor and outdoor conditions, the power input from controls, and indoor units.",{'ID': '283_UK_DocM_V2_AccessAndUseOfBuildings'},"For variable refrigerant flow (VRF) systems, any calculations must include indoor and outdoor conditions, the power input from controls, and indoor units.",necessity
+8b054fa5-fa6b-40f8-996a-a6dfea855fc3,"The distance between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 400 millimetres on the side wall and no less than 1,500 millimetres on the end wall.",{'ID': '33_Finnish_SafetyOfUse'},"The distance between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 400 millimetres on the side wall and no less than 1,500 millimetres on the end wall.",selection
+9dd2a0f1-0ff9-4416-8abd-1e6589980ff4,"If the cross-sectional area of a mechanical ventilation systems air duct is designed to be greater than 0.06 m2, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",{'ID': '100_Finnish_Health-IndoorClimateAndVentilation'},"If the cross-sectional area of a mechanical ventilation systems air duct is designed to be greater than 0.06 m2, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",necessity
+37f30855-f103-43f1-aef2-b37c05b4c174,Facilitating future connection to any local district heat networks should be considered (e.g. providing capped off connections in pipework to allow later connection to a local district heat network).,{'ID': '232_UK_DocL_V1_ConsrvationOfFuelAndPower'},Facilitating future connection to any local district heat networks should be considered (e.g. providing capped off connections in pipework to allow later connection to a local district heat network).,necessity
+7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",equal
+208b093d-361f-4aec-819d-4abca4e72c68,"in an evacuation area where the maximum number of occupants is 60, the second exit may be no less than 900 millimetres in width.",{'ID': '216_Finnish_FireSafety'},"in an evacuation area where the maximum number of occupants is 60, the second exit may be no less than 900 millimetres in width.",none
+500fc416-e652-4a2c-8dd3-8d9754ea1829,There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,{'ID': '115_UK_DocF_V2_Ventilation'},There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,part-of
+891e9eee-4a4b-4d7c-8051-3aee8302cd6b,"Walls: insulation should be fitted without any air gaps and tight to the structure, cavity closers, lintels and cavity trays.",{'ID': '141_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Walls: insulation should be fitted without any air gaps and tight to the structure, cavity closers, lintels and cavity trays.",necessity
+a8b3e54e-902c-4502-99a2-8c41d46f1416,"If there are more than 60 chairs in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",{'ID': '106_Finnish_SafetyOfUse'},"If there are more than 60 chairs in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",none
+72d93d34-a477-4505-9754-e7ca2c59b6ec,The building should be constructed to meet requirement O1 using passive means as far as reasonably practicable.,{'ID': '63_UK_DocO_Overheating'},The building should be constructed to meet requirement O1 using passive means as far as reasonably practicable.,necessity
+7a42150c-1f5d-449c-ac83-addfe816e46a,Accessible entrances should be clearly sign-posted and easily recognisable.,{'ID': '62_UK_DocM_V2_AccessAndUseOfBuildings'},Accessible entrances should be clearly sign-posted and easily recognisable.,necessity
+bb3ac5b0-14d0-4d75-95d9-713adc6f2f58,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",{'ID': '433_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",necessity
+8e9ef8dc-18bd-4877-98cd-556aa4adee8f,"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'},"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",selection
+01008f69-874b-443e-bcb2-2f5630280049,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",{'ID': '24_Finnish_SafetyOfUse'},"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",none
+a746a9da-a853-4ec3-a796-317b781216ad,Display lighting should be controlled on dedicated circuits that can be switched separately from those for lighting provided for general illuminance.,{'ID': '317_UK_DocM_V2_AccessAndUseOfBuildings'},Display lighting should be controlled on dedicated circuits that can be switched separately from those for lighting provided for general illuminance.,necessity
+1ebce0c9-705c-47ee-8429-e83cfbed72db,"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",{'ID': '103_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",part-of
+45b99da0-5bce-49b7-9ce2-04810c7e5a19,"For recessed meter boxes on the cold side of the construction, insulation should be installed behind the enclosure.",{'ID': '151_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For recessed meter boxes on the cold side of the construction, insulation should be installed behind the enclosure.",part-of
+0f32fab3-c03b-400c-949a-cc95828a89d3,The specification of comfort cooling systems should be based on a heat gain calculation for the dwelling.,{'ID': '330_UK_DocL_V1_ConsrvationOfFuelAndPower'},The specification of comfort cooling systems should be based on a heat gain calculation for the dwelling.,part-of
+f439dcde-3cf9-4b40-b555-a2107ae5559f,"If the circulation piping is located inside the building envelope, 50 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '104_Finnish_EnergyEfficiency'},"If the circulation piping is located inside the building envelope, 50 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",part-of
+5f7b8ff7-50d0-46a2-a48b-fa19786c98fd,"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '105_Finnish_EnergyEfficiency'},"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",selection
+0aaf71f0-a482-4a72-a407-0d6db79c7f6f,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",{'ID': '69_Finnish_FireSafety'},"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",necessity
+15f74476-8f8e-48a3-8906-752c29fdebac,The results should be recorded and given to the building owner.,{'ID': '399_UK_DocM_V2_AccessAndUseOfBuildings'},The results should be recorded and given to the building owner.,necessity
+73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",part-of
+72e7ed0c-9e73-46b2-a919-20f3fea337fd,"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",{'ID': '56_Finnish_FireSafety'},"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",none
+5e7d4831-4ec8-48f9-9e60-0422fcc1eae4,"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",{'ID': '344_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",none
+43e26628-8b62-4cc6-91e2-284335df1564,"In rooms used for sleeping or rest, the one-hour A-weighted equivalent continuous sound level of impulsive, narrow-band or low-frequency noise may not exceed 25 decibels.",{'ID': '17_Finnish_AcousticEnvironment'},"In rooms used for sleeping or rest, the one-hour A-weighted equivalent continuous sound level of impulsive, narrow-band or low-frequency noise may not exceed 25 decibels.",selection
+f4557f58-1986-4de0-b0b8-539906b7fbcb,"For rooflights, U-values should be calculated based on a horizontal position.",{'ID': '130_UK_DocM_V2_AccessAndUseOfBuildings'},"For rooflights, U-values should be calculated based on a horizontal position.",necessity
+d43e4877-601c-43eb-9d33-96945754374b,Good acoustic design should be employed to achieve an acoustic environment that is neither too reverberant nor too absorbent so that announcements and conversations can be heard clearly.,{'ID': '99_UK_DocM_V2_AccessAndUseOfBuildings'},Good acoustic design should be employed to achieve an acoustic environment that is neither too reverberant nor too absorbent so that announcements and conversations can be heard clearly.,selection
+d43e4877-601c-43eb-9d33-96945754374b,Good acoustic design should be employed to achieve an acoustic environment that is neither too reverberant nor too absorbent so that announcements and conversations can be heard clearly.,{'ID': '99_UK_DocM_V2_AccessAndUseOfBuildings'},Good acoustic design should be employed to achieve an acoustic environment that is neither too reverberant nor too absorbent so that announcements and conversations can be heard clearly.,none
+efd2d371-97de-4d5e-af06-e404ff71f316,The impact of the ground and crawl space on heat loss shall be taken into account in heat loss calculations.,{'ID': '91_Finnish_EnergyEfficiency'},The impact of the ground and crawl space on heat loss shall be taken into account in heat loss calculations.,selection
+0df5892a-e396-424e-90f1-74f6ccfb9e1a,"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",{'ID': '61_Finnish_Accessibility'},"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",necessity
+415aa97a-1b29-4d68-b1f1-e7d29a5ed7d6,Rigid connectors and jubilee clips should be used for flexible ducting to ensure a good seal.,{'ID': '117_UK_DocF_V1_Ventilation'},Rigid connectors and jubilee clips should be used for flexible ducting to ensure a good seal.,necessity
+ffc11c58-ff7e-45f4-a5c7-da59404e5659,"Reasonable provision shall be made in the design and installation of electrical installations in order to protect persons operating, maintaining or altering the installations from fire or injury.",{'ID': '1_UK_DocP_ElectricalSafety'},"Reasonable provision shall be made in the design and installation of electrical installations in order to protect persons operating, maintaining or altering the installations from fire or injury.",necessity
+60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",none
+35cacecf-06dc-4b0f-aadb-db2ee05518c7,The area of windows and roof windows (but excluding display windows) within the area served exceeds 40 of the facade area.,{'ID': '495_UK_DocM_V2_AccessAndUseOfBuildings'},The area of windows and roof windows (but excluding display windows) within the area served exceeds 40 of the facade area.,part-of
+03ee3a93-abb7-451f-98bf-d6c3d0baf8a2,Provision shall be made to ensure a clear view of the space on either side of a swing door or gate.,{'ID': '116_UK_DocK_ProtectionFromFalling'},Provision shall be made to ensure a clear view of the space on either side of a swing door or gate.,necessity
+e505b13c-7b62-4857-aa2d-544dc986e9c0,"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",{'ID': '18_UK_DocK_ProtectionFromFalling'},"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",selection
+339fc78c-a2f2-481c-a410-3aeb41e24b8a,Solid walls constructed of coursed brickwork or blockwork should be at least as thick as 1/16 of the storey height.,{'ID': '32_UK_DocA_Structure'},Solid walls constructed of coursed brickwork or blockwork should be at least as thick as 1/16 of the storey height.,part-of
+302c413e-fefd-47f1-914f-0dc787e4a761,"Where illuminance on surfaces is greater than 200 lux, a difference in light reflectance value should be a minimum of 20 points.",{'ID': '29_UK_DocM_V2_AccessAndUseOfBuildings'},"Where illuminance on surfaces is greater than 200 lux, a difference in light reflectance value should be a minimum of 20 points.",greater-equal
+2ff58135-b89d-40d1-a145-51aad9e5a942,"The landing in front of the outside door shall be at least 1,500 millimetres wide and at least 1,500 millimetres long.",{'ID': '16_Finnish_Accessibility'},"The landing in front of the outside door shall be at least 1,500 millimetres wide and at least 1,500 millimetres long.",greater-equal
+86350df0-a40e-412b-a301-004524d56736,"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",greater-equal
+8e7e4d9a-05b8-4512-91c5-e8dbb9488685,"At night, windows, patio doors and balcony doors should be modelled as closed.",{'ID': '55_UK_DocO_Overheating'},"At night, windows, patio doors and balcony doors should be modelled as closed.",necessity
+cb522b91-f26f-460e-adee-1a7f59ba10c9,"For heat pump installations in which there are other heat sources available to the same building, each of these heat sources should be appropriately incorporated into a singular control system.",{'ID': '315_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heat pump installations in which there are other heat sources available to the same building, each of these heat sources should be appropriately incorporated into a singular control system.",selection
+77b0edab-012f-4047-a2db-fe6303993780,"Ventilation systems that, under normal operation, recirculate air between more than one space, room or zone should also be able to operate in a mode that reduces the risk of the transmission of airborne infection.",{'ID': '60_UK_DocF_V2_Ventilation'},"Ventilation systems that, under normal operation, recirculate air between more than one space, room or zone should also be able to operate in a mode that reduces the risk of the transmission of airborne infection.",selection
+5e7d4831-4ec8-48f9-9e60-0422fcc1eae4,"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",{'ID': '344_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",none
+113b8bf8-1856-45f5-a54b-d65ef100b437,"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",{'ID': '262_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",none
+977ccb7b-4580-4ea3-9ea4-5057925c9854,"NOTE: The surface area of the whole building must be included when assessing whether the works constitute a major renovation, even if the building is mixed use.",{'ID': '124_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"NOTE: The surface area of the whole building must be included when assessing whether the works constitute a major renovation, even if the building is mixed use.",none
+fb5d3054-4911-4049-ba09-1c3e80f9c07c,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",{'ID': '29_Finnish_SafetyOfUse'},"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",none
+d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",none
+05dc10dc-6a9a-4e83-93d3-79fff4819f99,Standing areas must be terraced so that it is safe to move in the rows.,{'ID': '110_Finnish_SafetyOfUse'},Standing areas must be terraced so that it is safe to move in the rows.,selection
+88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",none
+6414854d-01f9-481f-a7f4-c4581e48d8b1,Special safety features are not necessary if the ladder is not more than 6m long.,{'ID': '112_UK_DocK_ProtectionFromFalling'},Special safety features are not necessary if the ladder is not more than 6m long.,selection
+ebc429f0-cb90-41ab-9a11-401a2ddc7bad,"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",{'ID': '268_UK_DocF_V1_Ventilation'},"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",none
+6f8ec958-3a3c-4cc7-ace9-fdbdd01ab4c2,The service should be appropriate to the requirements of the space.,{'ID': '212_UK_DocM_V2_AccessAndUseOfBuildings'},The service should be appropriate to the requirements of the space.,necessity
+a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",part-of
+49c6fd15-70a9-4733-8de8-8dd2fe49fe0a,"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",{'ID': '231_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",none
+db734798-9e42-4fe1-900c-77d4e6131809,"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",{'ID': '11_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",none
+51284e52-f2f4-41b5-85e2-3fa96ab8602a,"All users of facilities should be able to locate suitable seating and move safely and easily to and from the seating area and ancillary accommodation, such as lavatories, dining rooms and bedroom suites.",{'ID': '132_UK_DocM_V2_AccessAndUseOfBuildings'},"All users of facilities should be able to locate suitable seating and move safely and easily to and from the seating area and ancillary accommodation, such as lavatories, dining rooms and bedroom suites.",necessity
+3931f0fa-433e-4fb8-96bf-a747f3622ee0,"In order to help people with visual impairment to appreciate the size of a space they have entered, or to find their way around, there should be a visual contrast between the wall and the ceiling, and between the wall and the floor.",{'ID': '97_UK_DocM_V2_AccessAndUseOfBuildings'},"In order to help people with visual impairment to appreciate the size of a space they have entered, or to find their way around, there should be a visual contrast between the wall and the ceiling, and between the wall and the floor.",necessity
+86350df0-a40e-412b-a301-004524d56736,"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",none
+5f675f4f-74de-4d0f-ae92-c3500d2d952e,The actual equivalent area and location of installed background ventilators should be recorded.,{'ID': '189_UK_DocF_V1_Ventilation'},The actual equivalent area and location of installed background ventilators should be recorded.,none
+5962048f-577c-408a-be59-cbf79bd74630,Requirements for accessibility should be balanced against preserving historic buildings or environments.,{'ID': '7_UK_DocM_V1_AccessAndUseOfBuildings'},Requirements for accessibility should be balanced against preserving historic buildings or environments.,selection
+f398541a-81df-4380-a408-d7b1beaa7c92,"People should be able to see other people approaching from the opposite direction, thereby allowing sufficient reaction time for both parties to avoid a collision.",{'ID': '68_UK_DocM_V2_AccessAndUseOfBuildings'},"People should be able to see other people approaching from the opposite direction, thereby allowing sufficient reaction time for both parties to avoid a collision.",selection
+efe27c3d-80a8-4999-9310-77160105fe37,"Instead, the building primary energy rate and building emission rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",{'ID': '91_UK_DocM_V2_AccessAndUseOfBuildings'},"Instead, the building primary energy rate and building emission rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",necessity
+0d8c2f7d-5234-4bec-bbbe-961e499ebbbc,"A proportion of the sleeping accommodation in hotels, motels and student accommodation should be designed for independent use by wheelchair users.",{'ID': '129_UK_DocM_V2_AccessAndUseOfBuildings'},"A proportion of the sleeping accommodation in hotels, motels and student accommodation should be designed for independent use by wheelchair users.",necessity
+a372d2c4-f734-479d-bc8d-d3a8aa15362d,"A wide range of people, including accompanied wheelchair users, should be able to access and use the lift.",{'ID': '49_UK_DocM_V1_AccessAndUseOfBuildings'},"A wide range of people, including accompanied wheelchair users, should be able to access and use the lift.",necessity
+e32bbb47-c826-40c1-8ea4-8c32353d3fd2,There shall be adequate means of ventilation provided for people in the building.,{'ID': '15_UK_DocF_V1_Ventilation'},There shall be adequate means of ventilation provided for people in the building.,none
+5f7b8ff7-50d0-46a2-a48b-fa19786c98fd,"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '105_Finnish_EnergyEfficiency'},"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",selection
+c72a5952-2e0b-4d4a-9185-09e4149b6239,The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,{'ID': '114_Finnish_Health-Humidity'},The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,part-of
+3931f0fa-433e-4fb8-96bf-a747f3622ee0,"In order to help people with visual impairment to appreciate the size of a space they have entered, or to find their way around, there should be a visual contrast between the wall and the ceiling, and between the wall and the floor.",{'ID': '97_UK_DocM_V2_AccessAndUseOfBuildings'},"In order to help people with visual impairment to appreciate the size of a space they have entered, or to find their way around, there should be a visual contrast between the wall and the ceiling, and between the wall and the floor.",selection
+5b4380ba-0066-4735-a362-316d4c8e70b2,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",{'ID': '73_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",selection
+0ea1e862-2434-4fc8-97a2-b076c992ef20,"The width of an exit must be at least 1,200 millimetres and its free height must be at least 2,100 millimetres.",{'ID': '214_Finnish_FireSafety'},"The width of an exit must be at least 1,200 millimetres and its free height must be at least 2,100 millimetres.",selection
+e5316f51-becd-4144-b5e8-ae1701b41818,"All users should be able to locate a control, know which setting it is on and use it without inadvertently changing its setting.",{'ID': '148_UK_DocM_V2_AccessAndUseOfBuildings'},"All users should be able to locate a control, know which setting it is on and use it without inadvertently changing its setting.",necessity
+5f7b8ff7-50d0-46a2-a48b-fa19786c98fd,"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '105_Finnish_EnergyEfficiency'},"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",none
+9618a274-45da-4e3e-87f0-21c2bfae4a8e,"A guardrail must be used at points with a level difference of over 0.7 metres, if these can be accessed by children.",{'ID': '39_Finnish_SafetyOfUse'},"A guardrail must be used at points with a level difference of over 0.7 metres, if these can be accessed by children.",necessity
+49c6fd15-70a9-4733-8de8-8dd2fe49fe0a,"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",{'ID': '231_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",selection
+8719164e-370a-42f2-9240-0a1b8db1a2c7,Extensive voids must be partitioned in order to restrict the spread of fire.,{'ID': '129_Finnish_FireSafety'},Extensive voids must be partitioned in order to restrict the spread of fire.,selection
+7db23e3b-7063-47a3-b65e-5d02ad78c922,"In a natural ventilation system, the ventilation valves shall be easy to close.",{'ID': '49_Finnish_Health-IndoorClimateAndVentilation'},"In a natural ventilation system, the ventilation valves shall be easy to close.",none
+2f0f22aa-06d3-478d-a777-5aca5c2fb5c1,"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",{'ID': '120_UK_DocK_ProtectionFromFalling'},"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",necessity
+457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",selection
+16f6f10e-f32f-48b2-85f9-123cdb5448ee,Any unavoidable gaps between boards should be infilled using compressible tape (e.g. for boards within roof rafters) or low expansion foam (e.g. for boards within wall cavities).,{'ID': '147_UK_DocL_V1_ConsrvationOfFuelAndPower'},Any unavoidable gaps between boards should be infilled using compressible tape (e.g. for boards within roof rafters) or low expansion foam (e.g. for boards within wall cavities).,necessity
+0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,none
+b0642cd3-50f1-4266-9d63-7437dcc85167,The building envelope should be insulated to a degree that is reasonable in the particular case.,{'ID': '105_UK_DocM_V2_AccessAndUseOfBuildings'},The building envelope should be insulated to a degree that is reasonable in the particular case.,necessity
+07a9b148-d87f-492c-abe2-04175801038d,Standard WC compartments should also have a minimum manoeuvring space clear of any door swing.,{'ID': '170_UK_DocM_V2_AccessAndUseOfBuildings'},Standard WC compartments should also have a minimum manoeuvring space clear of any door swing.,necessity
+a86b58e8-046f-44b7-8e1b-00c876c8c647,"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",{'ID': '30_Finnish_StabilityOfStructures'},"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",part-of
+a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",selection
+4e8c5c50-44af-48f6-b959-e6f9b31afa1e,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical heating technology may be electric resistance heating.",{'ID': '89_UK_DocM_V2_AccessAndUseOfBuildings'},"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical heating technology may be electric resistance heating.",selection
+d04d6702-5170-4b50-9bda-7367a24e9322,"NOTE: The network distribution point could be in a cabinet, a box mounted on a wall or on a telegraph pole.",{'ID': '5_UK_DocR_V1_InfrastructureForElectircalCommunications'},"NOTE: The network distribution point could be in a cabinet, a box mounted on a wall or on a telegraph pole.",necessity
+d3e7a947-536e-4a49-9823-e27fc0f68b27,Length of landings to be at least equal to the width of the ramp.,{'ID': '66_UK_DocK_ProtectionFromFalling'},Length of landings to be at least equal to the width of the ramp.,part-of
+15c28729-22a9-4992-b43a-bdcf457c0526,"Both before and after a newly constructed building is built, a notice must be given to the building control body of the calculations.",{'ID': '45_UK_DocM_V2_AccessAndUseOfBuildings'},"Both before and after a newly constructed building is built, a notice must be given to the building control body of the calculations.",selection
+50e89a86-e2be-439d-b230-79274cd7199b,Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,{'ID': '81_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,none
+956efc87-87de-4d3c-99fb-dc58eab9353b,"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",{'ID': '42_Finnish_Accessibility'},"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",greater-equal
+0aaf71f0-a482-4a72-a407-0d6db79c7f6f,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",{'ID': '69_Finnish_FireSafety'},"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",selection
+c952db0f-b605-4335-8d56-97fc339ad5ba,All three parts of the installation and commissioning checklist should be completed.,{'ID': '262_UK_DocF_V1_Ventilation'},All three parts of the installation and commissioning checklist should be completed.,none
+1e3d8e3a-93fd-47e2-833e-d7f36c901c77,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,{'ID': '131_UK_DocM_V1_AccessAndUseOfBuildings'},Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,selection
+5aebe4f8-6ca6-4448-94db-5272b5541efb,"The results of all pressure tests on dwellings, including any test failures, should be reported to the building control body.",{'ID': '359_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The results of all pressure tests on dwellings, including any test failures, should be reported to the building control body.",part-of
+bb309bf3-9e86-43d9-8b6e-ebff176d1c88,The sink is not more than 150mm deep with insulation to the underside to prevent scalding of a wheelchair users legs.,{'ID': '96_UK_DocM_V1_AccessAndUseOfBuildings'},The sink is not more than 150mm deep with insulation to the underside to prevent scalding of a wheelchair users legs.,part-of
+09b2a395-5293-4b7d-82d4-5312482d59e9,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",{'ID': '46_UK_DocM_V1_AccessAndUseOfBuildings'},"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",part-of
+b88c2c2a-5c6f-4347-888d-0224c8971d7b,Non-condensing boilers should be fitted with a flue condensing kit where feasible and where the boiler is likely to be able to operate in condensing mode (e.g. variable temperature circuits).,{'ID': '235_UK_DocM_V2_AccessAndUseOfBuildings'},Non-condensing boilers should be fitted with a flue condensing kit where feasible and where the boiler is likely to be able to operate in condensing mode (e.g. variable temperature circuits).,necessity
+c2e0629d-350b-45b8-9e9e-d58be1780f12,"If the basement has no bedrooms, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",{'ID': '73_UK_DocF_V1_Ventilation'},"If the basement has no bedrooms, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",none
+2f0f22aa-06d3-478d-a777-5aca5c2fb5c1,"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",{'ID': '120_UK_DocK_ProtectionFromFalling'},"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",selection
+7e369e4c-7768-4a7a-bd9c-41e2aa037b43,The air flows shall be designed so that the average carbon monoxide concentration in a parking garage for motor vehicles during the hour of use assessed as the most critical does not exceed 35 mg/m3 (30 ppm).,{'ID': '61_Finnish_Health-IndoorClimateAndVentilation'},The air flows shall be designed so that the average carbon monoxide concentration in a parking garage for motor vehicles during the hour of use assessed as the most critical does not exceed 35 mg/m3 (30 ppm).,less-equal
+5e7d4831-4ec8-48f9-9e60-0422fcc1eae4,"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",{'ID': '344_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",none
+1834463c-7e45-4148-8315-f750b5f047cb,"When the lift serves more than three storeys, it provides visual and audible indicators to identify the floor reached.",{'ID': '25_UK_DocM_V1_AccessAndUseOfBuildings'},"When the lift serves more than three storeys, it provides visual and audible indicators to identify the floor reached.",necessity
+3cbfb816-4071-496e-aec2-87d424df047f,Wheelchair users and ambulant disabled people should be able to wash or bathe either independently or with assistance from others.,{'ID': '181_UK_DocM_V2_AccessAndUseOfBuildings'},Wheelchair users and ambulant disabled people should be able to wash or bathe either independently or with assistance from others.,necessity
+596cc55c-f50f-4155-962f-832b87226a8e,"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",{'ID': '23_UK_DocF_V1_Ventilation'},"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",none
+360bc9ab-1ae1-44f0-a6a3-c1110edac6a9,The annual energy savings should be estimated using the National Calculation Methodology Modelling Guide.,{'ID': '465_UK_DocM_V2_AccessAndUseOfBuildings'},The annual energy savings should be estimated using the National Calculation Methodology Modelling Guide.,selection
+a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",none
+208b093d-361f-4aec-819d-4abca4e72c68,"in an evacuation area where the maximum number of occupants is 60, the second exit may be no less than 900 millimetres in width.",{'ID': '216_Finnish_FireSafety'},"in an evacuation area where the maximum number of occupants is 60, the second exit may be no less than 900 millimetres in width.",part-of
+8a692fe7-08ed-4b90-8b13-7ce2e29d37a2,"During this process, the heat pump (along with its accompanying pipework) should be isolated from the ground heat exchanger such that damage to the internal heat exchanger inside the heat pump is avoided.",{'ID': '386_UK_DocL_V1_ConsrvationOfFuelAndPower'},"During this process, the heat pump (along with its accompanying pipework) should be isolated from the ground heat exchanger such that damage to the internal heat exchanger inside the heat pump is avoided.",part-of
+e7cc3da8-211a-4244-b711-210a912ca2ac,Ground floors and those in contact with the outside of the dwelling should be insulated to limit heat losses to not more than 10W/m2.,{'ID': '302_UK_DocL_V1_ConsrvationOfFuelAndPower'},Ground floors and those in contact with the outside of the dwelling should be insulated to limit heat losses to not more than 10W/m2.,selection
+c2e0629d-350b-45b8-9e9e-d58be1780f12,"If the basement has no bedrooms, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",{'ID': '73_UK_DocF_V1_Ventilation'},"If the basement has no bedrooms, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",necessity
+783c19fa-0ef2-466f-b3e9-d4690e34ac5f,Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '214_UK_DocL_V1_ConsrvationOfFuelAndPower'},Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,necessity
+73b4b305-8971-489a-a290-f996e1f63e19,"The clear width of the door and opening leading to room spaces of a non-residential building as well as to residential rooms of a residential building, necessary spaces serving residence and spaces serving the use of the building shall be at least 800 millimetres.",{'ID': '19_Finnish_Accessibility'},"The clear width of the door and opening leading to room spaces of a non-residential building as well as to residential rooms of a residential building, necessary spaces serving residence and spaces serving the use of the building shall be at least 800 millimetres.",greater-equal
+8805ec9f-3f5f-44fc-9078-3ae62439c973,"NOTE: When a single U-value is calculated for a product range of doors, the configuration of the door chosen for the calculation should be the worst performing in the product range.",{'ID': '108_UK_DocL_V1_ConsrvationOfFuelAndPower'},"NOTE: When a single U-value is calculated for a product range of doors, the configuration of the door chosen for the calculation should be the worst performing in the product range.",selection
+74b9ee2c-0192-442d-b5a1-a2974d456429,"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",{'ID': '67_UK_DocM_V1_AccessAndUseOfBuildings'},"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",none
+dcc583b1-8c4c-42cf-a1ed-e8907de56254,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",{'ID': '23_Finnish_SafetyOfUse'},"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",none
+70292367-f940-4ca6-b35f-b47bd4e66cd3,Cable routes must still be provided for a minimum of one in five parking spaces.,{'ID': '71_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Cable routes must still be provided for a minimum of one in five parking spaces.,greater-equal
+a48aade7-5532-4424-a39e-5b1638516702,The effective g-value should be no worse than 0.3.,{'ID': '350_UK_DocM_V2_AccessAndUseOfBuildings'},The effective g-value should be no worse than 0.3.,selection
+fa8a6d84-eb99-490e-8169-3c65353fb553,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",{'ID': '61_Finnish_StabilityOfStructures'},"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",greater-equal
+31d635b2-1d32-49dd-a848-5b5acaf50128,"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",{'ID': '407_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",selection
+a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",none
+6ab07828-b6aa-4a60-8860-333f061a0fde,"Door furniture on manually operated non-powered doors should be easy to operate by people with limited manual dexterity, and be readily apparent against the background of the door.",{'ID': '71_UK_DocM_V2_AccessAndUseOfBuildings'},"Door furniture on manually operated non-powered doors should be easy to operate by people with limited manual dexterity, and be readily apparent against the background of the door.",necessity
+ded852b5-c826-4649-8ce5-dece0eba6061,"During the design period of occupancy, a building's room temperature shall be comfortable and not adversely affected by air velocity, thermal radiation, temperature fluctuation, temperature differences or surface temperatures.",{'ID': '32_Finnish_Health-IndoorClimateAndVentilation'},"During the design period of occupancy, a building's room temperature shall be comfortable and not adversely affected by air velocity, thermal radiation, temperature fluctuation, temperature differences or surface temperatures.",necessity
+0d5f23b0-8423-4528-95bd-179fe81c75df,A building and its environment must be lit in a way that enables safe use and servicing.,{'ID': '62_Finnish_SafetyOfUse'},A building and its environment must be lit in a way that enables safe use and servicing.,selection
+d34c0f60-8df0-4310-b5af-428c63225a6f,"After a period of non-use of at least eight hours, the water temperature may not exceed 24 degrees Celsius.",{'ID': '60_Finnish_Health-WaterAndSewerage'},"After a period of non-use of at least eight hours, the water temperature may not exceed 24 degrees Celsius.",less-equal
+2695c899-0ada-478c-9b2d-796f79ea4c52,"Glazing, with which people are likely to come into contact whilst moving in or about the building shall: (a) if broken on impact, break in a way which is unlikely to cause injury; or (b) resist impact without breaking; or (c) be shielded or protected from impact.",{'ID': '92_UK_DocK_ProtectionFromFalling'},"Glazing, with which people are likely to come into contact whilst moving in or about the building shall: (a) if broken on impact, break in a way which is unlikely to cause injury; or (b) resist impact without breaking; or (c) be shielded or protected from impact.",none
+9a574829-3211-4b4f-8c0c-c7a7ab9cfd54,The whole building ventilation rate should be met.,{'ID': '47_UK_DocF_V2_Ventilation'},The whole building ventilation rate should be met.,none
+9b2e2a40-6d63-4ee6-a539-da1d15dd68bd,"Where relevant work is undertaken on a mixed-use building, it should be determined which parking spaces are associated parking spaces for the use of occupants of the dwellings, and which parking spaces are for use by users of the non-residential function of the building.",{'ID': '94_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where relevant work is undertaken on a mixed-use building, it should be determined which parking spaces are associated parking spaces for the use of occupants of the dwellings, and which parking spaces are for use by users of the non-residential function of the building.",selection
+d74e2b5e-7284-49c1-b01f-50d5e9e47edf,Wheelchair users should be able to reach all the facilities available within the building.,{'ID': '141_UK_DocM_V2_AccessAndUseOfBuildings'},Wheelchair users should be able to reach all the facilities available within the building.,necessity
+d925c189-860a-4fcb-ae88-d1cf8cc14fb8,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",{'ID': '28_Finnish_SafetyOfUse'},"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",none
+726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none
+f51da5c6-7614-4719-8150-e22851e4aa12,"The building fabric should be constructed so that thermal bridging, including at the party wall, is reasonably limited.",{'ID': '152_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The building fabric should be constructed so that thermal bridging, including at the party wall, is reasonably limited.",none
+a0c838b5-5fe2-4b52-abe1-432804c2c8aa,A temperature of 21 C shall be used as the design value for room temperature during the heating season.,{'ID': '33_Finnish_Health-IndoorClimateAndVentilation'},A temperature of 21 C shall be used as the design value for room temperature during the heating season.,equal
+197b9463-397e-4729-a08d-12739f9db069,"For variable refrigerant flow (VRF) systems, any calculations must include indoor and outdoor conditions, the power input from controls, and indoor units.",{'ID': '283_UK_DocM_V2_AccessAndUseOfBuildings'},"For variable refrigerant flow (VRF) systems, any calculations must include indoor and outdoor conditions, the power input from controls, and indoor units.",selection
+f72a98f3-b7d2-4633-b244-0d7242dfb0c9,Every single bedroom has a minimum floor area of 8.5m2 and is at least 2.4m wide.,{'ID': '102_UK_DocM_V1_AccessAndUseOfBuildings'},Every single bedroom has a minimum floor area of 8.5m2 and is at least 2.4m wide.,part-of
+a43037b0-8e35-45a2-9f23-c2d65f6c5a64,"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",{'ID': '8_UK_DocQ_Security_Dwellings'},"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",selection
+21bf2954-bfa8-44ef-bb2e-4e34367965ba,"If a load-bearing element is required to have a longer fire resistance time with respect to integrity E and insulation I than with respect to load-bearing capacity R, the longer fire resistance time shall also be applied to the load-bearing capacity.",{'ID': '88_Finnish_FireSafety'},"If a load-bearing element is required to have a longer fire resistance time with respect to integrity E and insulation I than with respect to load-bearing capacity R, the longer fire resistance time shall also be applied to the load-bearing capacity.",selection
+adc0ce58-8e7e-42fa-a823-ab45f266f77f,Sewers shall be connected to a stack vent that extends above the roofing of a building.,{'ID': '135_Finnish_Health-WaterAndSewerage'},Sewers shall be connected to a stack vent that extends above the roofing of a building.,part-of
+9dd2a0f1-0ff9-4416-8abd-1e6589980ff4,"If the cross-sectional area of a mechanical ventilation systems air duct is designed to be greater than 0.06 m2, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",{'ID': '100_Finnish_Health-IndoorClimateAndVentilation'},"If the cross-sectional area of a mechanical ventilation systems air duct is designed to be greater than 0.06 m2, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",part-of
+bed3cb74-fdd3-4888-80ab-b416d1b060ad,"For systems that have the ability to use free cooling or heat recovery, the SEER should be derived for the specific application, including free cooling or heat recovery elements.",{'ID': '282_UK_DocM_V2_AccessAndUseOfBuildings'},"For systems that have the ability to use free cooling or heat recovery, the SEER should be derived for the specific application, including free cooling or heat recovery elements.",selection
+2f8d4247-e53b-49ae-bd26-c4f1765eaee8,"Extract air of categories 2, 3 and 4 shall not be used as recirculation air.",{'ID': '73_Finnish_Health-IndoorClimateAndVentilation'},"Extract air of categories 2, 3 and 4 shall not be used as recirculation air.",equal
+e505b13c-7b62-4857-aa2d-544dc986e9c0,"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",{'ID': '18_UK_DocK_ProtectionFromFalling'},"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",none
+f41fb8da-16bd-4404-accb-e32727f3736a,"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",{'ID': '69_Finnish_SafetyOfUse'},"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",necessity
+c7035b48-7244-40a9-a70e-1d244caf72ac,"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",{'ID': '56_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",necessity
+9f5fe460-cae1-4653-a951-38e31f3ed15d,"Any restrictors placed on windows used as emergency exits must, however, be easily releasable by an adult.",{'ID': '81_Finnish_SafetyOfUse'},"Any restrictors placed on windows used as emergency exits must, however, be easily releasable by an adult.",necessity
+a922fe4e-30c9-4fef-a442-27459b959914,Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,{'ID': '82_Finnish_Health-WaterAndSewerage'},Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,none
+72785bd7-d935-4c81-ab5f-ba2095ba62a9,"Manual controls, where provided, should be within reasonable reach of the occupants.",{'ID': '20_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Manual controls, where provided, should be within reasonable reach of the occupants.",necessity
+1ebce0c9-705c-47ee-8429-e83cfbed72db,"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",{'ID': '103_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",necessity
+726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none
+ffbc85cb-4301-4bcb-9a56-7487c95cf16d,Only the proportion of openings which can be opened with a very low risk of occupants falling from height should be considered to form part of the overheating mitigation strategy.,{'ID': '83_UK_DocO_Overheating'},Only the proportion of openings which can be opened with a very low risk of occupants falling from height should be considered to form part of the overheating mitigation strategy.,selection
+726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none
+3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60,The approach route is a minimum of 900mm wide with a maximum cross fall of 1 in 40.,{'ID': '16_UK_DocM_V1_AccessAndUseOfBuildings'},The approach route is a minimum of 900mm wide with a maximum cross fall of 1 in 40.,greater-equal
+23db27ac-b594-4b26-883d-922d713d382a,"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",{'ID': '161_UK_DocM_V2_AccessAndUseOfBuildings'},"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",none
+a94b6b4f-a05e-403e-bbca-ebe1b94e38a1,"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",{'ID': '470_UK_DocM_V2_AccessAndUseOfBuildings'},"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",necessity
+f439dcde-3cf9-4b40-b555-a2107ae5559f,"If the circulation piping is located inside the building envelope, 50 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '104_Finnish_EnergyEfficiency'},"If the circulation piping is located inside the building envelope, 50 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",selection
+d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",none
+31d635b2-1d32-49dd-a848-5b5acaf50128,"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",{'ID': '407_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",none
+6594919a-cde6-4dd8-be04-eb61e30f99bb,"Snow or rain-water shall not be allowed to ingress the ventilation system via externally mounted air transfer devices in quantities causing damage to the system, lowering air quality or impairing the functioning of the system.",{'ID': '67_Finnish_Health-IndoorClimateAndVentilation'},"Snow or rain-water shall not be allowed to ingress the ventilation system via externally mounted air transfer devices in quantities causing damage to the system, lowering air quality or impairing the functioning of the system.",necessity
+c7137e3d-e3f2-4a19-87bc-ccb194d42c74,"Incoming services: ducts, and cables wherever possible, should be grouped to minimise how often the air barrier is penetrated, while ensuring sufficient space to allow adequate screed flow between ducts.",{'ID': '178_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Incoming services: ducts, and cables wherever possible, should be grouped to minimise how often the air barrier is penetrated, while ensuring sufficient space to allow adequate screed flow between ducts.",selection
+44b436fd-26ab-4b00-82e9-9565e73bb87e,NOTE: Any method to reduce overheating risk in residential buildings must comply with all other parts of the Building Regulations.,{'ID': '65_UK_DocO_Overheating'},NOTE: Any method to reduce overheating risk in residential buildings must comply with all other parts of the Building Regulations.,selection
+d1512435-3f66-4a07-90fd-fd3e3d2bea1a,The stairs between floor levels must be covered.,{'ID': '17_Finnish_SafetyOfUse'},The stairs between floor levels must be covered.,necessity
+2ca092ec-4425-4552-a389-fd0dadfbd154,NOTE: A floor level with a gradient of 1:20 or steeper should be designed as a ramp.,{'ID': '54_UK_DocK_ProtectionFromFalling'},NOTE: A floor level with a gradient of 1:20 or steeper should be designed as a ramp.,selection
+2af8ee5f-9d05-4023-9365-d093ebdfba1f,"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",{'ID': '168_UK_DocF_V1_Ventilation'},"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",part-of
+2f89cb06-3ee9-49b5-ac36-46f31ae3928f,Hot water pipework should be insulated in all areas inside and outside the building unless it can be demonstrated that the heat is always useful.,{'ID': '170_UK_DocM_V2_AccessAndUseOfBuildings'},Hot water pipework should be insulated in all areas inside and outside the building unless it can be demonstrated that the heat is always useful.,none
+ca1bbebb-fe4e-48d8-8cdf-eef13cd79ee9,The dwelling emission rate must not exceed the individual dwellings target emission rate.,{'ID': '65_UK_DocL_V1_ConsrvationOfFuelAndPower'},The dwelling emission rate must not exceed the individual dwellings target emission rate.,selection
+385a4365-40c0-4c07-8854-b07bde292fd2,"The electrical energy consumption of a mechanical ventilation system shall be calculated on the basis of air flows, specific fan powers and operating times for all air handling units and powered roof ventilators in the building.",{'ID': '109_Finnish_EnergyEfficiency'},"The electrical energy consumption of a mechanical ventilation system shall be calculated on the basis of air flows, specific fan powers and operating times for all air handling units and powered roof ventilators in the building.",part-of
+12907c6f-e734-436d-a7de-c8a1626fbe92,"Both:the area of rooflights exceeds 20 of the area of the roof, and the design solar load exceeds 25W/m2.",{'ID': '496_UK_DocM_V2_AccessAndUseOfBuildings'},"Both:the area of rooflights exceeds 20 of the area of the roof, and the design solar load exceeds 25W/m2.",greater
+a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",part-of
+70292367-f940-4ca6-b35f-b47bd4e66cd3,Cable routes must still be provided for a minimum of one in five parking spaces.,{'ID': '71_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Cable routes must still be provided for a minimum of one in five parking spaces.,necessity
+2af8ee5f-9d05-4023-9365-d093ebdfba1f,"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",{'ID': '168_UK_DocF_V1_Ventilation'},"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",necessity
+eccd4f77-ef4a-41fd-a22a-620c84fdddd4,There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,{'ID': '98_UK_DocM_V1_AccessAndUseOfBuildings'},There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,selection
+ded852b5-c826-4649-8ce5-dece0eba6061,"During the design period of occupancy, a building's room temperature shall be comfortable and not adversely affected by air velocity, thermal radiation, temperature fluctuation, temperature differences or surface temperatures.",{'ID': '32_Finnish_Health-IndoorClimateAndVentilation'},"During the design period of occupancy, a building's room temperature shall be comfortable and not adversely affected by air velocity, thermal radiation, temperature fluctuation, temperature differences or surface temperatures.",selection
+2f0f22aa-06d3-478d-a777-5aca5c2fb5c1,"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",{'ID': '120_UK_DocK_ProtectionFromFalling'},"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",selection
+b6b19c38-b160-475d-b01d-e3880ca00ab2,"Where necessary, flexible ducts may be used for final connections, but their lengths should be kept to a minimum.",{'ID': '31_UK_DocF_V2_Ventilation'},"Where necessary, flexible ducts may be used for final connections, but their lengths should be kept to a minimum.",necessity
+a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",selection
+bb3ac5b0-14d0-4d75-95d9-713adc6f2f58,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",{'ID': '433_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",none
+29232335-402c-4ed9-af74-fd093ac22e28,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,{'ID': '95_Finnish_Health-IndoorClimateAndVentilation'},The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,none
+596cc55c-f50f-4155-962f-832b87226a8e,"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",{'ID': '23_UK_DocF_V1_Ventilation'},"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",selection
+e7be7432-5505-47ad-b586-2a2e3f5a1a37,"If the index terminal has to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",{'ID': '203_UK_DocF_V1_Ventilation'},"If the index terminal has to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",necessity
+371e1755-8bb5-456e-bf66-5a50f4c19d59,"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",{'ID': '50_UK_DocK_ProtectionFromFalling'},"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",selection
+ed2cca4a-50f7-470d-9752-dd8722385a24,"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",{'ID': '80_Finnish_SafetyOfUse'},"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",necessity
+0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,part-of
+f6add908-4d45-4b3e-83a6-369f6c36c037,"Door rails, stiles and muntins should be at least 44mm thick.",{'ID': '28_UK_DocQ_Security_Dwellings'},"Door rails, stiles and muntins should be at least 44mm thick.",none
+d728a9c8-0302-4bd1-b69b-0daeefce30d1,"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",{'ID': '84_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",necessity
+9b329413-b6d6-4953-9b34-c82d3a2e9c44,"Before a new heating appliance is installed, all central heating and primary hot water circuits should be thoroughly cleaned and flushed out.",{'ID': '216_UK_DocM_V2_AccessAndUseOfBuildings'},"Before a new heating appliance is installed, all central heating and primary hot water circuits should be thoroughly cleaned and flushed out.",selection
+29ad081e-90f4-4eb0-9cea-a4f49beea768,Fans used for general air distribution that are rated at more than 1100W should be fitted with variable speed drives.,{'ID': '298_UK_DocM_V2_AccessAndUseOfBuildings'},Fans used for general air distribution that are rated at more than 1100W should be fitted with variable speed drives.,selection
+cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",less-equal
+40b40b1b-d1b1-49d8-b9b7-13c5845a169d,The structure of the control appliance of the plumbing fixture shall be such that its surface temperature does not arise above 40 degrees Celsius.,{'ID': '71_Finnish_Health-WaterAndSewerage'},The structure of the control appliance of the plumbing fixture shall be such that its surface temperature does not arise above 40 degrees Celsius.,part-of
+6e61f4b0-ddc1-44cb-9966-0e146933d032,"Where a separate-sex toilet washroom can be accessed by wheelchair users, it should be possible for them to use both a urinal, where appropriate, and a washbasin at a lower height than is provided for other users.",{'ID': '171_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a separate-sex toilet washroom can be accessed by wheelchair users, it should be possible for them to use both a urinal, where appropriate, and a washbasin at a lower height than is provided for other users.",necessity
+0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,selection
+99a53f17-48cb-4012-a47b-700761e0983b,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,{'ID': '61_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,none
+419892bb-5044-4c63-a8ba-7747ad52c23d,"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",{'ID': '195_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",selection
+a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",none
+7db23e3b-7063-47a3-b65e-5d02ad78c922,"In a natural ventilation system, the ventilation valves shall be easy to close.",{'ID': '49_Finnish_Health-IndoorClimateAndVentilation'},"In a natural ventilation system, the ventilation valves shall be easy to close.",selection
+c766f874-d4aa-45b8-89f7-20b08db787c6,The total height of the barrier must be one metre if the drop is no more than six metres.,{'ID': '43_Finnish_SafetyOfUse'},The total height of the barrier must be one metre if the drop is no more than six metres.,selection
+82bb35f1-0a27-4c94-bad3-246e6cc4f02a,"Wheelchair users should be able to manoeuvre around and use the facilities in the room, and operate switches and controls.",{'ID': '145_UK_DocM_V2_AccessAndUseOfBuildings'},"Wheelchair users should be able to manoeuvre around and use the facilities in the room, and operate switches and controls.",necessity
+dd056285-1aa4-4c6d-94ac-b911458cb7ea,"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",{'ID': '70_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",necessity
+9b329413-b6d6-4953-9b34-c82d3a2e9c44,"Before a new heating appliance is installed, all central heating and primary hot water circuits should be thoroughly cleaned and flushed out.",{'ID': '216_UK_DocM_V2_AccessAndUseOfBuildings'},"Before a new heating appliance is installed, all central heating and primary hot water circuits should be thoroughly cleaned and flushed out.",selection
+88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",part-of
+b6e6ebce-e75f-4fae-b9a2-e35c164b3fb4,"Where onsite electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and onsite energy demand.",{'ID': '342_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where onsite electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and onsite energy demand.",selection
+7f065688-203b-42d0-acb9-8fde5ff37821,Main distribution routes should be through vertical risers to minimise heat gains into common spaces.,{'ID': '44_UK_DocO_Overheating'},Main distribution routes should be through vertical risers to minimise heat gains into common spaces.,selection
+726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",selection
+87c9cfa3-8093-497d-be10-dc054abe7062,"For common leaf lintels, the base plate should not be continuous and the lintel core should be insulated.",{'ID': '164_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For common leaf lintels, the base plate should not be continuous and the lintel core should be insulated.",part-of
+d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater
+10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,part-of
+d30364dd-539e-4351-9d53-89ad358a4b44,"U-values for rooflights or rooflight-and-kerb assemblies should be based on the outer developed surface area, which is often greater than the area of the roof opening.",{'ID': '122_UK_DocL_V1_ConsrvationOfFuelAndPower'},"U-values for rooflights or rooflight-and-kerb assemblies should be based on the outer developed surface area, which is often greater than the area of the roof opening.",necessity
+9953a539-8775-467a-9028-f51fe6d0f9f6,Grommets or flexible collars should be used around incoming services and sealed to the air barrier with air-sealing tape or sealant.,{'ID': '179_UK_DocL_V1_ConsrvationOfFuelAndPower'},Grommets or flexible collars should be used around incoming services and sealed to the air barrier with air-sealing tape or sealant.,necessity
+726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none
+ddc0bba6-2df8-43e1-9398-37514366fb06,"For fixed terminals with automatic flow adjustment at the fan unit, the fan speed should be set to achieve the desired continuous flow rate.",{'ID': '208_UK_DocF_V1_Ventilation'},"For fixed terminals with automatic flow adjustment at the fan unit, the fan speed should be set to achieve the desired continuous flow rate.",part-of
+675c4d48-3eef-463a-8516-edd71ee983e3,Adequate space should be available for access to maintain ventilation equipment.,{'ID': '110_UK_DocF_V1_Ventilation'},Adequate space should be available for access to maintain ventilation equipment.,selection
+efd2d371-97de-4d5e-af06-e404ff71f316,The impact of the ground and crawl space on heat loss shall be taken into account in heat loss calculations.,{'ID': '91_Finnish_EnergyEfficiency'},The impact of the ground and crawl space on heat loss shall be taken into account in heat loss calculations.,selection
+4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",selection
+eeb4239f-3819-475c-ad20-756bed80c4ff,"In reference heat loss calculations, the value used as the annual efficiency of heat recovery from ventilation extract air of the buildings ventilation system shall be 55.",{'ID': '151_Finnish_EnergyEfficiency'},"In reference heat loss calculations, the value used as the annual efficiency of heat recovery from ventilation extract air of the buildings ventilation system shall be 55.",none
+e1f1aeb9-7453-4b6b-b3f1-6049d711868a,The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,{'ID': '156_Finnish_FireSafety'},The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,none
+079db365-cfed-474e-9329-25349ac0db4a,"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",{'ID': '21_Finnish_Accessibility'},"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",part-of
+2c12675d-93c9-496a-acf9-b30465dae93d,Any flexible ducts should be installed so that the full internal diameter is maintained and flow resistance is minimised.,{'ID': '113_UK_DocF_V1_Ventilation'},Any flexible ducts should be installed so that the full internal diameter is maintained and flow resistance is minimised.,none
+53b7d989-c81f-4e01-a5ec-4b2cb30b4bfa,The size of a fire compartment must be limited so that a fire igniting in the compartment does not cause unreasonably vast damages (compartmentation by area).,{'ID': '104_Finnish_FireSafety'},The size of a fire compartment must be limited so that a fire igniting in the compartment does not cause unreasonably vast damages (compartmentation by area).,necessity
+09b2a395-5293-4b7d-82d4-5312482d59e9,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",{'ID': '46_UK_DocM_V1_AccessAndUseOfBuildings'},"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",none
+e320322e-3aee-4167-ad19-a6c6cc41f597,The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,{'ID': '97_Finnish_Health-WaterAndSewerage'},The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,none
+49c6fd15-70a9-4733-8de8-8dd2fe49fe0a,"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",{'ID': '231_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",none
+2d94a2e6-2ebd-4c3f-b14a-91741a0ab4b3,Their glazing must be made of safety glass.,{'ID': '70_Finnish_SafetyOfUse'},Their glazing must be made of safety glass.,part-of
+85745724-aa09-4cdd-ad17-3c50ea2b99a1,"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",{'ID': '105_UK_DocM_V1_AccessAndUseOfBuildings'},"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",selection
+0ea1e862-2434-4fc8-97a2-b076c992ef20,"The width of an exit must be at least 1,200 millimetres and its free height must be at least 2,100 millimetres.",{'ID': '214_Finnish_FireSafety'},"The width of an exit must be at least 1,200 millimetres and its free height must be at least 2,100 millimetres.",part-of
+590ab551-79e8-42f5-bc52-749f8899c088,Extinguishing routes to basement storeys shall be arranged so that basement storeys can be reached from the ground level without a need to pass through the exits of the storeys.,{'ID': '242_Finnish_FireSafety'},Extinguishing routes to basement storeys shall be arranged so that basement storeys can be reached from the ground level without a need to pass through the exits of the storeys.,selection
+bfc84a1d-db59-4f4a-bd93-3d5f1043d11e,A notice of the measured air flow rates must be given to the building control body.,{'ID': '183_UK_DocF_V1_Ventilation'},A notice of the measured air flow rates must be given to the building control body.,selection
+cccbc1ea-27be-4d7b-b53c-3cb467a51020,"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",{'ID': '220_UK_DocM_V2_AccessAndUseOfBuildings'},"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",part-of
+cea6e7bd-c494-4146-9f81-3fd2ed64a2a6,The slope of the floor surface in the seating area and access route may not exceed 8 per cent (1:12.5).,{'ID': '119_Finnish_SafetyOfUse'},The slope of the floor surface in the seating area and access route may not exceed 8 per cent (1:12.5).,part-of
+df6eb340-6ff0-4811-bcaf-48a6cc6dc455,"An ambulant disabled person should be able to move within, and between, storeys.",{'ID': '90_UK_DocM_V1_AccessAndUseOfBuildings'},"An ambulant disabled person should be able to move within, and between, storeys.",selection
+a235c68f-ae44-4770-b005-4e9d7b659eb7,All cavity walls should have leaves at least 90mm thick and cavities at least 50mm wide.,{'ID': '35_UK_DocA_Structure'},All cavity walls should have leaves at least 90mm thick and cavities at least 50mm wide.,necessity
+23db27ac-b594-4b26-883d-922d713d382a,"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",{'ID': '161_UK_DocM_V2_AccessAndUseOfBuildings'},"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",none
+1ebce0c9-705c-47ee-8429-e83cfbed72db,"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",{'ID': '103_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",none
+b0e99ac5-9cbc-4beb-b8ff-85383ae70ea8,"The approach route should be safe and convenient, adopt the shallowest gradient that can reasonably be achieved and be step-free, irrespective of the storey on which the dwelling is located.",{'ID': '40_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be safe and convenient, adopt the shallowest gradient that can reasonably be achieved and be step-free, irrespective of the storey on which the dwelling is located.",necessity
+8beb3f9d-f806-4385-b876-2b3d29d7852a,Independent temperature control of the hot water circuit should be implemented with a cylinder thermostat and a timing device.,{'ID': '269_UK_DocL_V1_ConsrvationOfFuelAndPower'},Independent temperature control of the hot water circuit should be implemented with a cylinder thermostat and a timing device.,selection
+5aebe4f8-6ca6-4448-94db-5272b5541efb,"The results of all pressure tests on dwellings, including any test failures, should be reported to the building control body.",{'ID': '359_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The results of all pressure tests on dwellings, including any test failures, should be reported to the building control body.",necessity
+56b3f993-37b5-4cb1-9540-432972f8056e,"In a mechanical ventilation system, the air handling units and chambers shall be able to withstand the loads caused by fan pressure while the shutoff dampers are closed.",{'ID': '99_Finnish_Health-IndoorClimateAndVentilation'},"In a mechanical ventilation system, the air handling units and chambers shall be able to withstand the loads caused by fan pressure while the shutoff dampers are closed.",necessity
+7577d9f7-9f3c-4d3b-b8d9-da31d3e1b201,"For example, glare and reflections from shiny surfaces, and large repeating patterns, should be avoided in spaces where visual acuity is critical as they will hamper communication for people with impaired vision, and those who lip read or use sign language.",{'ID': '150_UK_DocM_V2_AccessAndUseOfBuildings'},"For example, glare and reflections from shiny surfaces, and large repeating patterns, should be avoided in spaces where visual acuity is critical as they will hamper communication for people with impaired vision, and those who lip read or use sign language.",necessity
+d7737a4f-9594-475c-891f-a27d66fb7067,Insulating materials which give off formaldehyde fumes (either when used or later in normal use) may be used to insulate the cavity in a cavity wall where there is a continuous barrier which will minimise as far as practicable the passage of fumes to the occupiable parts.,{'ID': '14_UK_DocD_ToxicSubstances'},Insulating materials which give off formaldehyde fumes (either when used or later in normal use) may be used to insulate the cavity in a cavity wall where there is a continuous barrier which will minimise as far as practicable the passage of fumes to the occupiable parts.,necessity
+710ef992-e187-4b1a-894b-e0e222f54359,"NOTE: For grid-supplied electricity, a CO2 emission factor of 0.136kgCO2/kWh and primary energy factor of 1.501kWhPE/kWh should be used.",{'ID': '199_UK_DocM_V2_AccessAndUseOfBuildings'},"NOTE: For grid-supplied electricity, a CO2 emission factor of 0.136kgCO2/kWh and primary energy factor of 1.501kWhPE/kWh should be used.",equal
+baee716c-b8c2-4500-b4de-63fa11f007b1,A minimum of one in five of the remaining parking spaces must have access to cable routes.,{'ID': '83_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},A minimum of one in five of the remaining parking spaces must have access to cable routes.,selection
+259c1614-77ef-4ae4-a401-83caa603e374,"The main doors for entering a dwelling (usually the front doorset) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",{'ID': '35_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front doorset) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",none
+ebc429f0-cb90-41ab-9a11-401a2ddc7bad,"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",{'ID': '268_UK_DocF_V1_Ventilation'},"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",none
+0aaf71f0-a482-4a72-a407-0d6db79c7f6f,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",{'ID': '69_Finnish_FireSafety'},"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",less-equal
+f51da5c6-7614-4719-8150-e22851e4aa12,"The building fabric should be constructed so that thermal bridging, including at the party wall, is reasonably limited.",{'ID': '152_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The building fabric should be constructed so that thermal bridging, including at the party wall, is reasonably limited.",selection
+eccd4f77-ef4a-41fd-a22a-620c84fdddd4,There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,{'ID': '98_UK_DocM_V1_AccessAndUseOfBuildings'},There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,selection
+4e8c5c50-44af-48f6-b959-e6f9b31afa1e,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical heating technology may be electric resistance heating.",{'ID': '89_UK_DocM_V2_AccessAndUseOfBuildings'},"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical heating technology may be electric resistance heating.",none
+e874f337-2067-4e77-ad32-c3b857f40e7a,"If the number of occupants exceeds 120, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",{'ID': '219_Finnish_FireSafety'},"If the number of occupants exceeds 120, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",part-of
+4d80c4d1-08ee-481a-9f9c-e9151ce1094d,"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",{'ID': '421_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",part-of
+fa8a6d84-eb99-490e-8169-3c65353fb553,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",{'ID': '61_Finnish_StabilityOfStructures'},"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",selection
+10b37d1a-a0b5-4dfb-8bcc-39317d144580,"On variable volume systems, variable speed glandless circulators should be used.",{'ID': '289_UK_DocM_V2_AccessAndUseOfBuildings'},"On variable volume systems, variable speed glandless circulators should be used.",selection
+e7be7432-5505-47ad-b586-2a2e3f5a1a37,"If the index terminal has to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",{'ID': '203_UK_DocF_V1_Ventilation'},"If the index terminal has to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",part-of
+117864c0-5065-4c55-b390-c17b60c8d9dd,"If the protective part of the barrier contains only vertical structures, a cube with edges of no more than 100 millimetres may pass through its openings.",{'ID': '48_Finnish_SafetyOfUse'},"If the protective part of the barrier contains only vertical structures, a cube with edges of no more than 100 millimetres may pass through its openings.",less-equal
+fdd9f39e-e397-4172-b4da-3d213a30f987,On-site electricity generation should be provided with automated controls that support the design of the system and the intended use.,{'ID': '335_UK_DocM_V2_AccessAndUseOfBuildings'},On-site electricity generation should be provided with automated controls that support the design of the system and the intended use.,necessity
+3f6c0d6a-e423-4ea8-bf66-9515166fb265,The basement should be treated separately as a single-storey dwelling above ground level.,{'ID': '72_UK_DocF_V1_Ventilation'},The basement should be treated separately as a single-storey dwelling above ground level.,necessity
+b7243860-85c3-43b2-ad6c-35050b293699,All space alongside the cable duct should be backfilled in a way that avoids damage to the duct.,{'ID': '112_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},All space alongside the cable duct should be backfilled in a way that avoids damage to the duct.,selection
+710ef992-e187-4b1a-894b-e0e222f54359,"NOTE: For grid-supplied electricity, a CO2 emission factor of 0.136kgCO2/kWh and primary energy factor of 1.501kWhPE/kWh should be used.",{'ID': '199_UK_DocM_V2_AccessAndUseOfBuildings'},"NOTE: For grid-supplied electricity, a CO2 emission factor of 0.136kgCO2/kWh and primary energy factor of 1.501kWhPE/kWh should be used.",necessity
+a922fe4e-30c9-4fef-a442-27459b959914,Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,{'ID': '82_Finnish_Health-WaterAndSewerage'},Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,part-of
+aa774d9d-2414-4e6f-9c4e-9b7c5abde23b,The outputs of any renewable systems should be separately monitored.,{'ID': '228_UK_DocM_V2_AccessAndUseOfBuildings'},The outputs of any renewable systems should be separately monitored.,part-of
+c766f874-d4aa-45b8-89f7-20b08db787c6,The total height of the barrier must be one metre if the drop is no more than six metres.,{'ID': '43_Finnish_SafetyOfUse'},The total height of the barrier must be one metre if the drop is no more than six metres.,less-equal
+8c4a09c5-1eb2-4a41-86d9-b69c031b4592,Ground arrays including header pipes and manifolds should be flushed as one system to remove all debris and purged to remove all air.,{'ID': '384_UK_DocL_V1_ConsrvationOfFuelAndPower'},Ground arrays including header pipes and manifolds should be flushed as one system to remove all debris and purged to remove all air.,necessity
+20518e80-6f7e-457f-8c5a-59fa4c0eb324,"When calculating the heat loss for a buildings design solution, the design value shall be used as the value of the air leakage rate figure for the building envelope.",{'ID': '137_Finnish_EnergyEfficiency'},"When calculating the heat loss for a buildings design solution, the design value shall be used as the value of the air leakage rate figure for the building envelope.",none
+a86b58e8-046f-44b7-8e1b-00c876c8c647,"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",{'ID': '30_Finnish_StabilityOfStructures'},"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",greater-equal
+09b2a395-5293-4b7d-82d4-5312482d59e9,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",{'ID': '46_UK_DocM_V1_AccessAndUseOfBuildings'},"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",selection
+72e7ed0c-9e73-46b2-a919-20f3fea337fd,"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",{'ID': '56_Finnish_FireSafety'},"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",part-of
+6d9a1e8e-6fe7-4234-951a-96fdc4598bd7,"If parking spaces are provided for a building, an adequate number of them, but at least one, shall be intended for the use of a person with mobility and functional impairment.",{'ID': '12_Finnish_Accessibility'},"If parking spaces are provided for a building, an adequate number of them, but at least one, shall be intended for the use of a person with mobility and functional impairment.",selection
+cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",none
+726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",necessity
+f7cfdf57-28f3-4d23-90bf-ec2268e14bac,"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",{'ID': '65_Finnish_SafetyOfUse'},"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",part-of
+fa90c179-d32c-412b-a7d6-a515cc91dbdb,The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,{'ID': '86_Finnish_Health-Humidity'},The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,necessity
+a090f6bb-f89b-44c1-b6ee-8e72e2be30a0,Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '370_UK_DocM_V2_AccessAndUseOfBuildings'},Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,selection
+2f815a08-db3c-48a6-b248-d69aeac870ee,"the vertical travel distance is: a. not more than 2m, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",{'ID': '173_UK_DocM_V2_AccessAndUseOfBuildings'},"the vertical travel distance is: a. not more than 2m, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",greater
+c416d5e5-cb27-414c-b22e-7ed38be54ed1,There must be an automatic fire-extinguishing system that is suitable for its purpose and connected to the emergency centre.,{'ID': '232_Finnish_FireSafety'},There must be an automatic fire-extinguishing system that is suitable for its purpose and connected to the emergency centre.,none
+33ed3038-99a6-4b2d-906a-a1db21f2d898,"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",{'ID': '250_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",selection
+80221d2c-8ba8-4700-b219-c35fde50f35e,No more than two drainage wells may be connected to a floor drain and they may be located at a maximum distance of three meters from the floor drain.,{'ID': '125_Finnish_Health-WaterAndSewerage'},No more than two drainage wells may be connected to a floor drain and they may be located at a maximum distance of three meters from the floor drain.,less-equal
+2695c899-0ada-478c-9b2d-796f79ea4c52,"Glazing, with which people are likely to come into contact whilst moving in or about the building shall: (a) if broken on impact, break in a way which is unlikely to cause injury; or (b) resist impact without breaking; or (c) be shielded or protected from impact.",{'ID': '92_UK_DocK_ProtectionFromFalling'},"Glazing, with which people are likely to come into contact whilst moving in or about the building shall: (a) if broken on impact, break in a way which is unlikely to cause injury; or (b) resist impact without breaking; or (c) be shielded or protected from impact.",necessity
+681c4394-9435-408b-9a9b-d1f3d0729d38,"The rate of heat release from the appliance should be adjustable, using an adjustable damper or other thermostatically controlled method.",{'ID': '280_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The rate of heat release from the appliance should be adjustable, using an adjustable damper or other thermostatically controlled method.",necessity
+0f2dbc3b-0f3e-444e-a688-ed8faebd1226,Seats must be fixed to a base if the floor of the seating area is sloped or if there are level differences between the floors of the respective rows of seats.,{'ID': '105_Finnish_SafetyOfUse'},Seats must be fixed to a base if the floor of the seating area is sloped or if there are level differences between the floors of the respective rows of seats.,necessity
+5962048f-577c-408a-be59-cbf79bd74630,Requirements for accessibility should be balanced against preserving historic buildings or environments.,{'ID': '7_UK_DocM_V1_AccessAndUseOfBuildings'},Requirements for accessibility should be balanced against preserving historic buildings or environments.,necessity
+47e50ddf-6174-436d-851b-7ddf46c10ccf,A suitable chemical inhibitor should be added to the primary heating circuit to protect against scale and corrosion.,{'ID': '380_UK_DocL_V1_ConsrvationOfFuelAndPower'},A suitable chemical inhibitor should be added to the primary heating circuit to protect against scale and corrosion.,selection
+a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",none
+17fba530-c42b-4eeb-85dd-16da0bacc49c,"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",{'ID': '470_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",selection
+5211dbd1-d12a-4371-ad62-1dc5616cd2f5,The heat pump along with its accompanying pipework should be flushed and purged as a separate system while isolated from the ground array system.,{'ID': '387_UK_DocL_V1_ConsrvationOfFuelAndPower'},The heat pump along with its accompanying pipework should be flushed and purged as a separate system while isolated from the ground array system.,none
+7323113d-fcd0-4e19-a24a-c6171ec8c2b7,District heat networks and community heating systems should be designed to accommodate heat meter(s) for each dwelling.,{'ID': '295_UK_DocL_V1_ConsrvationOfFuelAndPower'},District heat networks and community heating systems should be designed to accommodate heat meter(s) for each dwelling.,necessity
+4a82f789-a98a-4379-9b81-2a20cfba6c87,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 70 kN, will also be applied to internal ties.",{'ID': '179_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 70 kN, will also be applied to internal ties.",selection
+fc8ee55c-408d-48a9-ae4c-a6961b5745ce,Biomass heating supplemented by an alternative appliance (e.g. gas) - the CO2 emission factor and primary energy factor should be based on a weighted average for the two fuels.,{'ID': '59_UK_DocM_V2_AccessAndUseOfBuildings'},Biomass heating supplemented by an alternative appliance (e.g. gas) - the CO2 emission factor and primary energy factor should be based on a weighted average for the two fuels.,necessity
+3724fd47-22f7-432c-81a2-1abcb95c7df2,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",{'ID': '96_UK_DocF_V1_Ventilation'},"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",part-of
+c954c2a4-3d5c-4e63-8228-9704b463aa8e,"The input charge for electric storage heaters should be adjusted automatically, based on the internal air temperature.",{'ID': '260_UK_DocM_V2_AccessAndUseOfBuildings'},"The input charge for electric storage heaters should be adjusted automatically, based on the internal air temperature.",selection
+103f99ad-884b-4bae-9f22-ccb1c5bc3d26,"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",{'ID': '110_Finnish_FireSafety'},"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",selection
+9c2051ae-9878-4772-9471-bc5b8a28c3ae,"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy, taking into consideration the use and likely background level of noise from other sources.",{'ID': '23_UK_DocF_V2_Ventilation'},"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy, taking into consideration the use and likely background level of noise from other sources.",part-of
+d3654276-d6c6-4f32-af90-2d1040cb536c,Mechanical ventilation with heat recovery systems should be designed to avoid the moist air from the wet rooms recirculating to the habitable rooms.,{'ID': '107_UK_DocF_V1_Ventilation'},Mechanical ventilation with heat recovery systems should be designed to avoid the moist air from the wet rooms recirculating to the habitable rooms.,selection
+60205cf2-fa87-4195-9415-a6fb144a9b72,"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",{'ID': '96_Finnish_SafetyOfUse'},"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",necessity
+8421f806-70f2-46a9-a308-90a40da3541d,"Where the gradient of the approach, whether over its whole length or in part, is 1:20 or steeper, that part of the approach should be designed as ramped access.",{'ID': '41_UK_DocM_V2_AccessAndUseOfBuildings'},"Where the gradient of the approach, whether over its whole length or in part, is 1:20 or steeper, that part of the approach should be designed as ramped access.",part-of
+64695439-3458-4d43-8e7b-a2ba75075cea,"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",{'ID': '124_Finnish_SafetyOfUse'},"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",selection
+525aa713-65e1-4368-a6f4-38f628be7fed,"in clothes shops, the dimensions and fittings recommended for an individual changing cubicle in a sports building should be provided.",{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},"in clothes shops, the dimensions and fittings recommended for an individual changing cubicle in a sports building should be provided.",none
+009e12eb-db83-485c-9ffc-e1f462251109,Each air terminal should have a free area of at least 90 of the free area of its associated duct.,{'ID': '115_UK_DocF_V1_Ventilation'},Each air terminal should have a free area of at least 90 of the free area of its associated duct.,part-of
+d30364dd-539e-4351-9d53-89ad358a4b44,"U-values for rooflights or rooflight-and-kerb assemblies should be based on the outer developed surface area, which is often greater than the area of the roof opening.",{'ID': '122_UK_DocL_V1_ConsrvationOfFuelAndPower'},"U-values for rooflights or rooflight-and-kerb assemblies should be based on the outer developed surface area, which is often greater than the area of the roof opening.",part-of
+35af73f1-53c7-4377-9da0-acf99eef4d8e,"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",{'ID': '159_UK_DocM_V2_AccessAndUseOfBuildings'},"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",none
+f9de28ac-45bb-4400-9d9f-8afee73bd2e3,The number of appliances should not exceed one per 100m2 of dwelling floor area.,{'ID': '273_UK_DocL_V1_ConsrvationOfFuelAndPower'},The number of appliances should not exceed one per 100m2 of dwelling floor area.,selection
+76bf63bd-30f4-440d-81a0-61ca16170f70,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,none
+164122ed-c7ac-4cf8-8a54-3d56c144f78d,"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",{'ID': '172_UK_DocM_V2_AccessAndUseOfBuildings'},"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",selection
+2cb4937d-9ec4-4013-8e9b-318a8adae27a,Account should be taken of outside noise when considering whether openable windows are appropriate for purge ventilation.,{'ID': '24_UK_DocF_V1_Ventilation'},Account should be taken of outside noise when considering whether openable windows are appropriate for purge ventilation.,none
+8102cb27-2e2a-4008-99d6-a53f5045f6e2,Structures with surfaces exposed to moisture must be resistant to the effects of water.,{'ID': '36_Finnish_Health-Humidity'},Structures with surfaces exposed to moisture must be resistant to the effects of water.,part-of
+4d80c4d1-08ee-481a-9f9c-e9151ce1094d,"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",{'ID': '421_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",part-of
+3dd5d15b-9233-430a-95b2-32fd7af679b5,Heat pumps should be located and installed subject to the manufacturers guidance.,{'ID': '316_UK_DocL_V1_ConsrvationOfFuelAndPower'},Heat pumps should be located and installed subject to the manufacturers guidance.,necessity
+b02f9b87-d934-4c2f-8a59-b3b8c0a7be17,"Instantaneous or snapshot CO2 readings can be misleading, so several measurements should be taken throughout the day.",{'ID': '124_UK_DocF_V2_Ventilation'},"Instantaneous or snapshot CO2 readings can be misleading, so several measurements should be taken throughout the day.",necessity
+3121fe90-27db-405e-a42a-df3cd22ee176,"Where necessary, two handrails, one above the other, must be installed in order to take into account children and users of wheelchairs.",{'ID': '55_Finnish_SafetyOfUse'},"Where necessary, two handrails, one above the other, must be installed in order to take into account children and users of wheelchairs.",selection
+3c0a8ccb-d813-40fb-b69b-88250d3bc4ec,These fittings should not exceed a centre pane U-value of 1.2W/(m2K).,{'ID': '118_UK_DocL_V1_ConsrvationOfFuelAndPower'},These fittings should not exceed a centre pane U-value of 1.2W/(m2K).,part-of
+cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",none
+113b8bf8-1856-45f5-a54b-d65ef100b437,"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",{'ID': '262_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",selection
+825053cb-af5d-43a9-b59b-e2a5ae78ea73,The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,{'ID': '59_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,selection
+259c1614-77ef-4ae4-a401-83caa603e374,"The main doors for entering a dwelling (usually the front doorset) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",{'ID': '35_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front doorset) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",selection
+fa8a6d84-eb99-490e-8169-3c65353fb553,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",{'ID': '61_Finnish_StabilityOfStructures'},"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",none
+726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none
+9952f64d-e0df-4b03-84af-150782f81387,"For mobility-impaired people, a going of at least 300mm is preferred.",{'ID': '124_UK_DocM_V2_AccessAndUseOfBuildings'},"For mobility-impaired people, a going of at least 300mm is preferred.",selection
+9eb5bf01-3810-44e3-802b-7c7eadad1831,"Mechanical ventilation systems, including both continuous and intermittent mechanical ventilation, should be designed and installed to minimise noise.",{'ID': '21_UK_DocF_V1_Ventilation'},"Mechanical ventilation systems, including both continuous and intermittent mechanical ventilation, should be designed and installed to minimise noise.",part-of
+b02f9b87-d934-4c2f-8a59-b3b8c0a7be17,"Instantaneous or snapshot CO2 readings can be misleading, so several measurements should be taken throughout the day.",{'ID': '124_UK_DocF_V2_Ventilation'},"Instantaneous or snapshot CO2 readings can be misleading, so several measurements should be taken throughout the day.",selection
+835d8fad-7a27-4299-aa38-a5b1771a6779,"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",{'ID': '178_UK_DocM_V2_AccessAndUseOfBuildings'},"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",none
+4ec44f57-abad-41aa-bd8c-5c4656e62bf9,The air in a building shall flow from spaces of higher indoor air purity to spaces of lower indoor air purity.,{'ID': '81_Finnish_Health-IndoorClimateAndVentilation'},The air in a building shall flow from spaces of higher indoor air purity to spaces of lower indoor air purity.,part-of
+5b4380ba-0066-4735-a362-316d4c8e70b2,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",{'ID': '73_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",equal
+c0a6d35c-cc20-428b-941d-c3e3e6365c74,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",{'ID': '25_UK_DocK_ProtectionFromFalling'},"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",none
+2a256a9c-0b8a-4acf-87e1-86a5857f36a3,"Where a driveway forms all, or part of, the approach route, an additional allowance of at least 900mm wide should be provided so that a wheelchair user can pass a parked car.",{'ID': '17_UK_DocM_V1_AccessAndUseOfBuildings'},"Where a driveway forms all, or part of, the approach route, an additional allowance of at least 900mm wide should be provided so that a wheelchair user can pass a parked car.",necessity
+a4fccc69-c508-4405-92aa-2cfe36bfca39,Exits of parts of the building separated by a fire wall must be constructed separately so that in the event of a fire there is no need to use any door that may be in the fire wall.,{'ID': '209_Finnish_FireSafety'},Exits of parts of the building separated by a fire wall must be constructed separately so that in the event of a fire there is no need to use any door that may be in the fire wall.,part-of
+23619605-28c0-46ef-bdbb-d1dc11691b8f,Water must not drift into or migrate as a capillary flow from the wet rooms to the surrounding structures and rooms.,{'ID': '109_Finnish_Health-Humidity'},Water must not drift into or migrate as a capillary flow from the wet rooms to the surrounding structures and rooms.,necessity
+208b093d-361f-4aec-819d-4abca4e72c68,"in an evacuation area where the maximum number of occupants is 60, the second exit may be no less than 900 millimetres in width.",{'ID': '216_Finnish_FireSafety'},"in an evacuation area where the maximum number of occupants is 60, the second exit may be no less than 900 millimetres in width.",none
+75bb8f62-768c-4f82-8f94-48fc158a85f6,It must be possible for fire and service rescue equipment to have sufficiently close access to the building (emergency access road).,{'ID': '239_Finnish_FireSafety'},It must be possible for fire and service rescue equipment to have sufficiently close access to the building (emergency access road).,necessity
+73efbdcb-2751-4f01-9471-ccca44ccc0f3,"If a drainage point is located below the height of backwater, the waste water must be pumped.",{'ID': '133_Finnish_Health-WaterAndSewerage'},"If a drainage point is located below the height of backwater, the waste water must be pumped.",selection
+5f675f4f-74de-4d0f-ae92-c3500d2d952e,The actual equivalent area and location of installed background ventilators should be recorded.,{'ID': '189_UK_DocF_V1_Ventilation'},The actual equivalent area and location of installed background ventilators should be recorded.,none
+6a41a473-bd3c-4e38-a093-094b3fdae388,At least one in every five remaining parking spaces must be provided with cable routes.,{'ID': '68_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},At least one in every five remaining parking spaces must be provided with cable routes.,greater-equal
+e43c1e88-be80-42d9-944e-1bf0f0f82479,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,{'ID': '18_UK_DocM_V1_AccessAndUseOfBuildings'},Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,part-of
+49c6fd15-70a9-4733-8de8-8dd2fe49fe0a,"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",{'ID': '231_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",selection
+e1f1aeb9-7453-4b6b-b3f1-6049d711868a,The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,{'ID': '156_Finnish_FireSafety'},The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,part-of
+c236bc17-ef9a-4694-a34e-68a9f38ae405,"For a heat exchanger between a solar primary and secondary system, a minimum of 0.1m2 or equivalent of heat exchanger area should be provided for every 1m2 of the net absorber area of the solar collector.",{'ID': '323_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a heat exchanger between a solar primary and secondary system, a minimum of 0.1m2 or equivalent of heat exchanger area should be provided for every 1m2 of the net absorber area of the solar collector.",greater-equal
+f3bd99b4-7ea5-4968-af10-3c133c0b5aa0,No individual flight has a rise between landings of more than 1800mm.,{'ID': '42_UK_DocM_V1_AccessAndUseOfBuildings'},No individual flight has a rise between landings of more than 1800mm.,selection
+ad792658-a7d2-4d6e-9a21-c531bb02b521,To reduce the risks to the health of persons in buildings formaldehyde fumes given off by urea formaldehyde foams should not penetrate to the occupied parts of buildings to an extent which would give rise to an irritant concentration.,{'ID': '12_UK_DocD_ToxicSubstances'},To reduce the risks to the health of persons in buildings formaldehyde fumes given off by urea formaldehyde foams should not penetrate to the occupied parts of buildings to an extent which would give rise to an irritant concentration.,necessity
+1d312b80-748c-4f92-a74e-6f1b918f741c,"To provide easy access between rooms on the entrance storey, a stepped change of level within the entrance storey should be avoided where possible.",{'ID': '27_UK_DocM_V1_AccessAndUseOfBuildings'},"To provide easy access between rooms on the entrance storey, a stepped change of level within the entrance storey should be avoided where possible.",necessity
+07a9b148-d87f-492c-abe2-04175801038d,Standard WC compartments should also have a minimum manoeuvring space clear of any door swing.,{'ID': '170_UK_DocM_V2_AccessAndUseOfBuildings'},Standard WC compartments should also have a minimum manoeuvring space clear of any door swing.,selection
+d925c189-860a-4fcb-ae88-d1cf8cc14fb8,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",{'ID': '28_Finnish_SafetyOfUse'},"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",part-of
+b8365796-12c1-47c1-9682-ff6131a75f21,"The various enduse categories, such as heating, lighting and cooling, should be submetered in such a way that at least 90 of the annual energy consumption of each fuel can be assigned to an enduse.",{'ID': '227_UK_DocM_V2_AccessAndUseOfBuildings'},"The various enduse categories, such as heating, lighting and cooling, should be submetered in such a way that at least 90 of the annual energy consumption of each fuel can be assigned to an enduse.",selection
+2f8d4247-e53b-49ae-bd26-c4f1765eaee8,"Extract air of categories 2, 3 and 4 shall not be used as recirculation air.",{'ID': '73_Finnish_Health-IndoorClimateAndVentilation'},"Extract air of categories 2, 3 and 4 shall not be used as recirculation air.",part-of
+86831830-e7f0-4b90-aa27-dc0542b7ba4d,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least one intermediate landing.",{'ID': '18_Finnish_SafetyOfUse'},"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least one intermediate landing.",necessity
+009e12eb-db83-485c-9ffc-e1f462251109,Each air terminal should have a free area of at least 90 of the free area of its associated duct.,{'ID': '115_UK_DocF_V1_Ventilation'},Each air terminal should have a free area of at least 90 of the free area of its associated duct.,selection
+a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",selection
+e505b13c-7b62-4857-aa2d-544dc986e9c0,"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",{'ID': '18_UK_DocK_ProtectionFromFalling'},"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",selection
+3153d771-404e-4a54-ac05-ed1b75e37506,"Gangways should not be less than 1100mm wide unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",{'ID': '8_UK_DocK_ProtectionFromFalling'},"Gangways should not be less than 1100mm wide unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",necessity
+0f2dbc3b-0f3e-444e-a688-ed8faebd1226,Seats must be fixed to a base if the floor of the seating area is sloped or if there are level differences between the floors of the respective rows of seats.,{'ID': '105_Finnish_SafetyOfUse'},Seats must be fixed to a base if the floor of the seating area is sloped or if there are level differences between the floors of the respective rows of seats.,part-of
+db734798-9e42-4fe1-900c-77d4e6131809,"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",{'ID': '11_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",none
+23ff7307-c4ae-4bef-97bf-feb9682d91eb,"If a water pump is used on a closed loop circuit and the motor is rated at more than 750W, then it should be fitted with or controlled by an appropriate variable speed controller on any variable volume system.",{'ID': '290_UK_DocM_V2_AccessAndUseOfBuildings'},"If a water pump is used on a closed loop circuit and the motor is rated at more than 750W, then it should be fitted with or controlled by an appropriate variable speed controller on any variable volume system.",selection
+82bb35f1-0a27-4c94-bad3-246e6cc4f02a,"Wheelchair users should be able to manoeuvre around and use the facilities in the room, and operate switches and controls.",{'ID': '145_UK_DocM_V2_AccessAndUseOfBuildings'},"Wheelchair users should be able to manoeuvre around and use the facilities in the room, and operate switches and controls.",necessity
+a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",greater
+29232335-402c-4ed9-af74-fd093ac22e28,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,{'ID': '95_Finnish_Health-IndoorClimateAndVentilation'},The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,necessity
+6d5428cc-90c2-477e-b20e-978a6d1cd403,Edge columns and walls shall be tied to every floor and roof.,{'ID': '186_Finnish_StabilityOfStructures'},Edge columns and walls shall be tied to every floor and roof.,selection
+e8340500-38b6-461b-b00d-d3aa44ac1f0b,The temperature of the water available from the hot water system may not exceed 65 degrees Celsius.,{'ID': '62_Finnish_Health-WaterAndSewerage'},The temperature of the water available from the hot water system may not exceed 65 degrees Celsius.,part-of
+64695439-3458-4d43-8e7b-a2ba75075cea,"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",{'ID': '124_Finnish_SafetyOfUse'},"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",necessity
+500fc416-e652-4a2c-8dd3-8d9754ea1829,There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,{'ID': '115_UK_DocF_V2_Ventilation'},There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,necessity
+10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,none
+9abdce80-0a4a-400a-8725-205bb3b887e4,"In hard water areas, suitable measures should be taken to treat the feed water to water heaters and the hot water circuit of combination boilers to reduce limescale accumulation.",{'ID': '218_UK_DocM_V2_AccessAndUseOfBuildings'},"In hard water areas, suitable measures should be taken to treat the feed water to water heaters and the hot water circuit of combination boilers to reduce limescale accumulation.",necessity
+f505cec8-d1a6-41ae-b2ba-68ac19f64be2,"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",{'ID': '137_UK_DocM_V2_AccessAndUseOfBuildings'},"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",necessity
+bd1438b0-ce84-4908-8d01-6c0884aa4650,"For roof-lights, U-values should be calculated based on a horizontal position.",{'ID': '111_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For roof-lights, U-values should be calculated based on a horizontal position.",necessity
+fc29901a-8b5e-48a5-a569-bed57699cf72,Moisture from the foundation wall and the base floors concrete slab must not transfer harmfully to the wooden sole plates or upper wall and floor structures.,{'ID': '89_Finnish_Health-Humidity'},Moisture from the foundation wall and the base floors concrete slab must not transfer harmfully to the wooden sole plates or upper wall and floor structures.,selection
+208b093d-361f-4aec-819d-4abca4e72c68,"in an evacuation area where the maximum number of occupants is 60, the second exit may be no less than 900 millimetres in width.",{'ID': '216_Finnish_FireSafety'},"in an evacuation area where the maximum number of occupants is 60, the second exit may be no less than 900 millimetres in width.",greater-equal
+389c960b-525d-4f2e-9a2c-1805eb2dc20d,The full area under a stair that forms part of the storage provision should be counted as 1m2.,{'ID': '79_UK_DocM_V1_AccessAndUseOfBuildings'},The full area under a stair that forms part of the storage provision should be counted as 1m2.,selection
+e21fa967-934e-4a29-a66d-252fdbbf928f,"If the parasitic energy use is unknown, an allowance of 0.3W/m2 should be made for any control system.",{'ID': '473_UK_DocM_V2_AccessAndUseOfBuildings'},"If the parasitic energy use is unknown, an allowance of 0.3W/m2 should be made for any control system.",selection
+9dd2a0f1-0ff9-4416-8abd-1e6589980ff4,"If the cross-sectional area of a mechanical ventilation systems air duct is designed to be greater than 0.06 m2, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",{'ID': '100_Finnish_Health-IndoorClimateAndVentilation'},"If the cross-sectional area of a mechanical ventilation systems air duct is designed to be greater than 0.06 m2, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",none
+4b510cad-fefb-44be-a9cb-a26e0c42994c,"If the building is connected to a heating system where heat is conveyed via heat pipes external to the building from a shared heat exchanger or heat generation unit to several buildings, the heat loss from those pipes shall be divided between the buildings in proportion to their areas.",{'ID': '101_Finnish_EnergyEfficiency'},"If the building is connected to a heating system where heat is conveyed via heat pipes external to the building from a shared heat exchanger or heat generation unit to several buildings, the heat loss from those pipes shall be divided between the buildings in proportion to their areas.",part-of
+f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c,A building with a height exceeding 9 metres must be equipped with anchoring structures for safety lines.,{'ID': '127_Finnish_SafetyOfUse'},A building with a height exceeding 9 metres must be equipped with anchoring structures for safety lines.,part-of
+49c6fd15-70a9-4733-8de8-8dd2fe49fe0a,"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",{'ID': '231_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",necessity
+ef4f54b6-1099-4404-9fa2-d0c0d5e55543,The dwelling primary energy rate must not exceed the individual dwellings target primary energy rate.,{'ID': '64_UK_DocL_V1_ConsrvationOfFuelAndPower'},The dwelling primary energy rate must not exceed the individual dwellings target primary energy rate.,part-of
+8b054fa5-fa6b-40f8-996a-a6dfea855fc3,"The distance between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 400 millimetres on the side wall and no less than 1,500 millimetres on the end wall.",{'ID': '33_Finnish_SafetyOfUse'},"The distance between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 400 millimetres on the side wall and no less than 1,500 millimetres on the end wall.",none
+4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",selection
+a2338c90-f9bf-470e-9917-4318b1c07006,The lighting must not cause glare that endangers safety.,{'ID': '63_Finnish_SafetyOfUse'},The lighting must not cause glare that endangers safety.,necessity
+6075de3c-d339-4ba4-9945-990480975615,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than three ventilators of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",{'ID': '94_UK_DocF_V1_Ventilation'},"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than three ventilators of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",selection
+8595e26e-db5c-4d09-9fcf-02b530b61e23,There must be access to each fire compartment of an attic for firefighting operations.,{'ID': '240_Finnish_FireSafety'},There must be access to each fire compartment of an attic for firefighting operations.,part-of
+32f91d86-2cbf-4d57-ab93-5a28fd804df8,Signs indicating the location of a lifting device accessible by mobility-impaired people should be clearly visible from the building entrance.,{'ID': '104_UK_DocM_V2_AccessAndUseOfBuildings'},Signs indicating the location of a lifting device accessible by mobility-impaired people should be clearly visible from the building entrance.,selection
+74b9ee2c-0192-442d-b5a1-a2974d456429,"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",{'ID': '67_UK_DocM_V1_AccessAndUseOfBuildings'},"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",none
+ffbc85cb-4301-4bcb-9a56-7487c95cf16d,Only the proportion of openings which can be opened with a very low risk of occupants falling from height should be considered to form part of the overheating mitigation strategy.,{'ID': '83_UK_DocO_Overheating'},Only the proportion of openings which can be opened with a very low risk of occupants falling from height should be considered to form part of the overheating mitigation strategy.,none
+7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",none
+38322c6e-7509-4638-9a8d-74d5cfb777b2,A new district heat network should be taken as meaning any other district heat network.,{'ID': '83_UK_DocL_V1_ConsrvationOfFuelAndPower'},A new district heat network should be taken as meaning any other district heat network.,necessity
+5b4380ba-0066-4735-a362-316d4c8e70b2,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",{'ID': '73_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",greater
+2f815a08-db3c-48a6-b248-d69aeac870ee,"the vertical travel distance is: a. not more than 2m, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",{'ID': '173_UK_DocM_V2_AccessAndUseOfBuildings'},"the vertical travel distance is: a. not more than 2m, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",selection
+117864c0-5065-4c55-b390-c17b60c8d9dd,"If the protective part of the barrier contains only vertical structures, a cube with edges of no more than 100 millimetres may pass through its openings.",{'ID': '48_Finnish_SafetyOfUse'},"If the protective part of the barrier contains only vertical structures, a cube with edges of no more than 100 millimetres may pass through its openings.",necessity
+5b1fe636-d2aa-4382-885e-a4f8a2cae4d4,"Generally, a thermal element once upgraded should not have a U-value greater than 0.7W/(m2K).",{'ID': '125_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Generally, a thermal element once upgraded should not have a U-value greater than 0.7W/(m2K).",none
+5577528f-8fa0-4ca3-96f6-ea418091cb86,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,{'ID': '32_Finnish_SafetyOfUse'},The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,none
+2695c899-0ada-478c-9b2d-796f79ea4c52,"Glazing, with which people are likely to come into contact whilst moving in or about the building shall: (a) if broken on impact, break in a way which is unlikely to cause injury; or (b) resist impact without breaking; or (c) be shielded or protected from impact.",{'ID': '92_UK_DocK_ProtectionFromFalling'},"Glazing, with which people are likely to come into contact whilst moving in or about the building shall: (a) if broken on impact, break in a way which is unlikely to cause injury; or (b) resist impact without breaking; or (c) be shielded or protected from impact.",selection
+05864826-21ef-4ae7-9af8-2aaeffc7267a,Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,{'ID': '83_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,selection
+d3654276-d6c6-4f32-af90-2d1040cb536c,Mechanical ventilation with heat recovery systems should be designed to avoid the moist air from the wet rooms recirculating to the habitable rooms.,{'ID': '107_UK_DocF_V1_Ventilation'},Mechanical ventilation with heat recovery systems should be designed to avoid the moist air from the wet rooms recirculating to the habitable rooms.,necessity
+00cded8a-5208-4c1b-bda4-9677d45b9375,The layers of attic floor structures and the ventilation must prevent the accumulation of damaging moisture into the roof structure resulting from water vapour diffusion or airflow.,{'ID': '105_Finnish_Health-Humidity'},The layers of attic floor structures and the ventilation must prevent the accumulation of damaging moisture into the roof structure resulting from water vapour diffusion or airflow.,necessity
+984c252b-74f4-4d85-9080-1c8ae1851eca,"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",{'ID': '113_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",part-of
+6c789809-b1b8-429a-8fe2-8ce16f8a4b54,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,{'ID': '62_Finnish_Health-IndoorClimateAndVentilation'},Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,none
+b6b19c38-b160-475d-b01d-e3880ca00ab2,"Where necessary, flexible ducts may be used for final connections, but their lengths should be kept to a minimum.",{'ID': '31_UK_DocF_V2_Ventilation'},"Where necessary, flexible ducts may be used for final connections, but their lengths should be kept to a minimum.",none
+f36650d9-cd31-4795-9728-7a4dcf3cadde,"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",{'ID': '229_Finnish_FireSafety'},"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",necessity
+09b2a395-5293-4b7d-82d4-5312482d59e9,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",{'ID': '46_UK_DocM_V1_AccessAndUseOfBuildings'},"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",part-of
+bb3ac5b0-14d0-4d75-95d9-713adc6f2f58,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",{'ID': '433_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",none
+b8bef6a5-8de6-4ff9-a0b7-cc8a448dcc6d,An air pressure test should be carried out on every dwelling.,{'ID': '354_UK_DocL_V1_ConsrvationOfFuelAndPower'},An air pressure test should be carried out on every dwelling.,necessity
+c7137e3d-e3f2-4a19-87bc-ccb194d42c74,"Incoming services: ducts, and cables wherever possible, should be grouped to minimise how often the air barrier is penetrated, while ensuring sufficient space to allow adequate screed flow between ducts.",{'ID': '178_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Incoming services: ducts, and cables wherever possible, should be grouped to minimise how often the air barrier is penetrated, while ensuring sufficient space to allow adequate screed flow between ducts.",necessity
+0f67dad7-6df9-444b-8e72-f447668e3fde,"Where sanitary facilities are wheelchair accessible, WC pans should be a minimum of 400mm high.",{'ID': '104_UK_DocM_V1_AccessAndUseOfBuildings'},"Where sanitary facilities are wheelchair accessible, WC pans should be a minimum of 400mm high.",selection
+783c19fa-0ef2-466f-b3e9-d4690e34ac5f,Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '214_UK_DocL_V1_ConsrvationOfFuelAndPower'},Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,necessity
+e1f1aeb9-7453-4b6b-b3f1-6049d711868a,The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,{'ID': '156_Finnish_FireSafety'},The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,none
+fb5d3054-4911-4049-ba09-1c3e80f9c07c,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",{'ID': '29_Finnish_SafetyOfUse'},"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",selection
+986f7853-4975-4ecd-8f10-a75d818eb44a,"Fully insulated and continuous cavity closers should be used, installed tight to the insulation and cavity apertures.",{'ID': '140_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Fully insulated and continuous cavity closers should be used, installed tight to the insulation and cavity apertures.",selection
+48133b44-eac2-44e2-b2df-c52243e9f7ea,"NOTE: For example, if the total system output is made up of three equally sized boilers, at 15% of system output the lead boiler will be operating at 45% of its rated output with the other two boilers switched off.",{'ID': '244_UK_DocM_V2_AccessAndUseOfBuildings'},"NOTE: For example, if the total system output is made up of three equally sized boilers, at 15% of system output the lead boiler will be operating at 45% of its rated output with the other two boilers switched off.",necessity
+7c44934c-61e1-4904-a493-1aa360ccc7d1,"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",{'ID': '1_UK_DocA_Structure'},"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",selection
+7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",selection
+02f5e3fb-7a8b-4a88-a6e5-337cc0835284,"When a new residential building is erected, information about the building must be given to the owner of the building to allow them to use the overheating mitigation strategy effectively.",{'ID': '90_UK_DocO_Overheating'},"When a new residential building is erected, information about the building must be given to the owner of the building to allow them to use the overheating mitigation strategy effectively.",part-of
+6a553c19-481f-4947-9047-fd2c4d0daa44,"Any floors, walls and doors that have been installed to allow the potential liftway to be used as storage or for other purposes could be easily removed without structural alteration.",{'ID': '83_UK_DocM_V1_AccessAndUseOfBuildings'},"Any floors, walls and doors that have been installed to allow the potential liftway to be used as storage or for other purposes could be easily removed without structural alteration.",selection
+45338082-ca66-418b-8fe1-8f2be926f330,A cube of no more than 100 millimetres may pass between the stair steps.,{'ID': '52_Finnish_SafetyOfUse'},A cube of no more than 100 millimetres may pass between the stair steps.,necessity
+53b7d989-c81f-4e01-a5ec-4b2cb30b4bfa,The size of a fire compartment must be limited so that a fire igniting in the compartment does not cause unreasonably vast damages (compartmentation by area).,{'ID': '104_Finnish_FireSafety'},The size of a fire compartment must be limited so that a fire igniting in the compartment does not cause unreasonably vast damages (compartmentation by area).,selection
+efe70fd9-5cdd-4586-9ebc-73c2960b1e00,"If a fire door is kept open in normal use, it shall be equipped with devices that will close the door in the event of fire.",{'ID': '120_Finnish_FireSafety'},"If a fire door is kept open in normal use, it shall be equipped with devices that will close the door in the event of fire.",necessity
+2c07775a-c1de-4796-989a-96572c81f9d4,The crawl space must be ventilated.,{'ID': '80_Finnish_Health-Humidity'},The crawl space must be ventilated.,necessity
+681c4394-9435-408b-9a9b-d1f3d0729d38,"The rate of heat release from the appliance should be adjustable, using an adjustable damper or other thermostatically controlled method.",{'ID': '280_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The rate of heat release from the appliance should be adjustable, using an adjustable damper or other thermostatically controlled method.",part-of
+793cb939-b3d9-46eb-ae65-71a4d5c8031b,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,{'ID': '43_UK_DocM_V1_AccessAndUseOfBuildings'},Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,part-of
+5e226793-2805-41b0-bcb6-49319afaefc7,"If the building has a floor area greater than 150m2, heating should be split into different heating zones and each zone should have separate controls for timing and temperature demand.",{'ID': '258_UK_DocM_V2_AccessAndUseOfBuildings'},"If the building has a floor area greater than 150m2, heating should be split into different heating zones and each zone should have separate controls for timing and temperature demand.",part-of
+8b054fa5-fa6b-40f8-996a-a6dfea855fc3,"The distance between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 400 millimetres on the side wall and no less than 1,500 millimetres on the end wall.",{'ID': '33_Finnish_SafetyOfUse'},"The distance between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 400 millimetres on the side wall and no less than 1,500 millimetres on the end wall.",none
+29232335-402c-4ed9-af74-fd093ac22e28,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,{'ID': '95_Finnish_Health-IndoorClimateAndVentilation'},The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,none
+2319724e-2fd4-463b-bb59-0972073dc55a,"Both before and after a newly constructed dwelling is built, a notice must be given to the building control body of the calculations.",{'ID': '44_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Both before and after a newly constructed dwelling is built, a notice must be given to the building control body of the calculations.",necessity
+fe2a31f5-7b10-4b21-ad13-154856ecdcc8,"Where sheathing board forms the air barrier, airsealing tape should be applied at junctions and edges.",{'ID': '186_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where sheathing board forms the air barrier, airsealing tape should be applied at junctions and edges.",necessity
+86831830-e7f0-4b90-aa27-dc0542b7ba4d,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least one intermediate landing.",{'ID': '18_Finnish_SafetyOfUse'},"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least one intermediate landing.",not-part-of
+0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none
+c1b2e39e-0bab-438c-8b35-c2b37e5cf93a,"Equipment should be designed, specified and installed with the aim of maximising its efficiency as installed.",{'ID': '233_UK_DocM_V2_AccessAndUseOfBuildings'},"Equipment should be designed, specified and installed with the aim of maximising its efficiency as installed.",necessity
+51517a5d-dd11-41b9-b44b-36d87b959127,The presence of the door should be apparent not only when it is shut but also when it is open.,{'ID': '77_UK_DocM_V2_AccessAndUseOfBuildings'},The presence of the door should be apparent not only when it is shut but also when it is open.,selection
+f2516477-0c54-4192-9a7a-7bf8755f57e9,"The water meter of a property shall be located in a place where it is easy to install, read and service and where it cannot freeze.",{'ID': '73_Finnish_Health-WaterAndSewerage'},"The water meter of a property shall be located in a place where it is easy to install, read and service and where it cannot freeze.",part-of
+34a524ec-6994-426f-86af-78788fd34a80,"Between the locking points for the mortice lock and surface-mounted rim lock, the distance should be 400-600mm.",{'ID': '36_UK_DocQ_Security_Dwellings'},"Between the locking points for the mortice lock and surface-mounted rim lock, the distance should be 400-600mm.",none
+f4b0b5b8-ab26-46a2-8028-c279958fa927,"Any justification and strategy should be in line with the approved airtightness testing methodology, CIBSEs TM23.",{'ID': '355_UK_DocM_V2_AccessAndUseOfBuildings'},"Any justification and strategy should be in line with the approved airtightness testing methodology, CIBSEs TM23.",necessity
+48133b44-eac2-44e2-b2df-c52243e9f7ea,"NOTE: For example, if the total system output is made up of three equally sized boilers, at 15% of system output the lead boiler will be operating at 45% of its rated output with the other two boilers switched off.",{'ID': '244_UK_DocM_V2_AccessAndUseOfBuildings'},"NOTE: For example, if the total system output is made up of three equally sized boilers, at 15% of system output the lead boiler will be operating at 45% of its rated output with the other two boilers switched off.",selection
+a4fccc69-c508-4405-92aa-2cfe36bfca39,Exits of parts of the building separated by a fire wall must be constructed separately so that in the event of a fire there is no need to use any door that may be in the fire wall.,{'ID': '209_Finnish_FireSafety'},Exits of parts of the building separated by a fire wall must be constructed separately so that in the event of a fire there is no need to use any door that may be in the fire wall.,none
+a86b58e8-046f-44b7-8e1b-00c876c8c647,"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",{'ID': '30_Finnish_StabilityOfStructures'},"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",part-of
+3bd9e48b-ede5-465e-8fe4-7181a32dd1ec,"Water must not freeze in the systems pipes, channels or devices.",{'ID': '50_Finnish_Health-Humidity'},"Water must not freeze in the systems pipes, channels or devices.",necessity
+00cded8a-5208-4c1b-bda4-9677d45b9375,The layers of attic floor structures and the ventilation must prevent the accumulation of damaging moisture into the roof structure resulting from water vapour diffusion or airflow.,{'ID': '105_Finnish_Health-Humidity'},The layers of attic floor structures and the ventilation must prevent the accumulation of damaging moisture into the roof structure resulting from water vapour diffusion or airflow.,none
+e505b13c-7b62-4857-aa2d-544dc986e9c0,"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",{'ID': '18_UK_DocK_ProtectionFromFalling'},"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",none
+84cd76d7-e5d0-4f39-94bc-0236c65d533a,"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",{'ID': '217_Finnish_FireSafety'},"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",equal
+5b4380ba-0066-4735-a362-316d4c8e70b2,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",{'ID': '73_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",none
+7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",selection
+a235c68f-ae44-4770-b005-4e9d7b659eb7,All cavity walls should have leaves at least 90mm thick and cavities at least 50mm wide.,{'ID': '35_UK_DocA_Structure'},All cavity walls should have leaves at least 90mm thick and cavities at least 50mm wide.,none
+d713514a-9398-45a2-9584-efecff6ebcc5,Reasonable provision must be made to resist unauthorised access to (a) any dwelling; and (b) any part of a building from which access can be gained to a flat within the building.,{'ID': '4_UK_DocQ_Security_Dwellings'},Reasonable provision must be made to resist unauthorised access to (a) any dwelling; and (b) any part of a building from which access can be gained to a flat within the building.,selection
+e21fa967-934e-4a29-a66d-252fdbbf928f,"If the parasitic energy use is unknown, an allowance of 0.3W/m2 should be made for any control system.",{'ID': '473_UK_DocM_V2_AccessAndUseOfBuildings'},"If the parasitic energy use is unknown, an allowance of 0.3W/m2 should be made for any control system.",part-of
+a68b404d-d10a-4e48-b25b-907261271e75,Voids between insulation at the top of the external wall and the cavity wall/timber frame insulation should be fully filled with insulation.,{'ID': '171_UK_DocL_V1_ConsrvationOfFuelAndPower'},Voids between insulation at the top of the external wall and the cavity wall/timber frame insulation should be fully filled with insulation.,necessity
+06c2e0f7-69c8-47ec-bf31-9902ae9df7cf,"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",{'ID': '109_UK_DocK_ProtectionFromFalling'},"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",none
+6075de3c-d339-4ba4-9945-990480975615,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than three ventilators of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",{'ID': '94_UK_DocF_V1_Ventilation'},"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than three ventilators of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",selection
+d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",part-of
+f034fbd1-7547-425a-8163-513fcac0b66b,The roof structures and joints must be properly inclined and sealed for water drainage.,{'ID': '103_Finnish_Health-Humidity'},The roof structures and joints must be properly inclined and sealed for water drainage.,necessity
+10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,none
+c766f874-d4aa-45b8-89f7-20b08db787c6,The total height of the barrier must be one metre if the drop is no more than six metres.,{'ID': '43_Finnish_SafetyOfUse'},The total height of the barrier must be one metre if the drop is no more than six metres.,equal
+fb5d3054-4911-4049-ba09-1c3e80f9c07c,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",{'ID': '29_Finnish_SafetyOfUse'},"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",none
+d504fd87-d13d-4936-9d7a-71d17954760d,The riser of the steps in an exit may be no more than 180 millimetres.,{'ID': '25_Finnish_SafetyOfUse'},The riser of the steps in an exit may be no more than 180 millimetres.,selection
+dcc583b1-8c4c-42cf-a1ed-e8907de56254,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",{'ID': '23_Finnish_SafetyOfUse'},"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",selection
+8101fa0e-645c-4a83-a6ab-66c45e94bf67,"If the dwelling already has mechanical ventilation, the centralised system could be extended into the additional room.",{'ID': '155_UK_DocF_V1_Ventilation'},"If the dwelling already has mechanical ventilation, the centralised system could be extended into the additional room.",none
+457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",part-of
+19c404de-7fd5-4e44-8a8f-b4219883f0ce,That background ventilators allow fresh air into the building and should be left open.,{'ID': '102_UK_DocF_V2_Ventilation'},That background ventilators allow fresh air into the building and should be left open.,necessity
+2c224c59-366d-447f-9ecc-87c119c2db07,"For new dwellings, the commissioning plan should be given to the building control body with the design stage dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate calculations.",{'ID': '374_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For new dwellings, the commissioning plan should be given to the building control body with the design stage dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate calculations.",none
+009e12eb-db83-485c-9ffc-e1f462251109,Each air terminal should have a free area of at least 90 of the free area of its associated duct.,{'ID': '115_UK_DocF_V1_Ventilation'},Each air terminal should have a free area of at least 90 of the free area of its associated duct.,part-of
+60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",part-of
+cb522b91-f26f-460e-adee-1a7f59ba10c9,"For heat pump installations in which there are other heat sources available to the same building, each of these heat sources should be appropriately incorporated into a singular control system.",{'ID': '315_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heat pump installations in which there are other heat sources available to the same building, each of these heat sources should be appropriately incorporated into a singular control system.",none
+9dd2a0f1-0ff9-4416-8abd-1e6589980ff4,"If the cross-sectional area of a mechanical ventilation systems air duct is designed to be greater than 0.06 m2, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",{'ID': '100_Finnish_Health-IndoorClimateAndVentilation'},"If the cross-sectional area of a mechanical ventilation systems air duct is designed to be greater than 0.06 m2, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",selection
+88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",part-of
+73b4b305-8971-489a-a290-f996e1f63e19,"The clear width of the door and opening leading to room spaces of a non-residential building as well as to residential rooms of a residential building, necessary spaces serving residence and spaces serving the use of the building shall be at least 800 millimetres.",{'ID': '19_Finnish_Accessibility'},"The clear width of the door and opening leading to room spaces of a non-residential building as well as to residential rooms of a residential building, necessary spaces serving residence and spaces serving the use of the building shall be at least 800 millimetres.",part-of
+339fc78c-a2f2-481c-a410-3aeb41e24b8a,Solid walls constructed of coursed brickwork or blockwork should be at least as thick as 1/16 of the storey height.,{'ID': '32_UK_DocA_Structure'},Solid walls constructed of coursed brickwork or blockwork should be at least as thick as 1/16 of the storey height.,part-of
+7d1ada0b-8dcc-4c01-84d7-78b80cb404c9,"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",{'ID': '58_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",selection
+5b4380ba-0066-4735-a362-316d4c8e70b2,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",{'ID': '73_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",necessity
+b6e6ebce-e75f-4fae-b9a2-e35c164b3fb4,"Where onsite electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and onsite energy demand.",{'ID': '342_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where onsite electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and onsite energy demand.",necessity
+f6a682fb-f427-41d0-9219-3a45d2134be6,"To correctly assess whether an element meets the limiting U-value, the U-value must be calculated for the element in the appropriate plane - either horizontal or vertical.",{'ID': '109_UK_DocL_V1_ConsrvationOfFuelAndPower'},"To correctly assess whether an element meets the limiting U-value, the U-value must be calculated for the element in the appropriate plane - either horizontal or vertical.",none
+e1f1aeb9-7453-4b6b-b3f1-6049d711868a,The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,{'ID': '156_Finnish_FireSafety'},The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,selection
+aa7c5790-2189-451d-bd0e-956a257a7b6d,"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",{'ID': '201_UK_DocL_V1_ConsrvationOfFuelAndPower'},"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",part-of
+bb3ac5b0-14d0-4d75-95d9-713adc6f2f58,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",{'ID': '433_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",necessity
+5ca6b3d3-fd21-4cc1-8dd8-185268db6615,The doorset should be manufactured from solid or laminated timber with a minimum density of 600kg/m3.,{'ID': '26_UK_DocQ_Security_Dwellings'},The doorset should be manufactured from solid or laminated timber with a minimum density of 600kg/m3.,greater-equal
+e320322e-3aee-4167-ad19-a6c6cc41f597,The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,{'ID': '97_Finnish_Health-WaterAndSewerage'},The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,necessity
+81f14fc1-af5d-45e8-8725-94d2510e4701,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",{'ID': '29_Finnish_Accessibility'},"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",necessity
+0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none
+bb309bf3-9e86-43d9-8b6e-ebff176d1c88,The sink is not more than 150mm deep with insulation to the underside to prevent scalding of a wheelchair users legs.,{'ID': '96_UK_DocM_V1_AccessAndUseOfBuildings'},The sink is not more than 150mm deep with insulation to the underside to prevent scalding of a wheelchair users legs.,less-equal
+793cb939-b3d9-46eb-ae65-71a4d5c8031b,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,{'ID': '43_UK_DocM_V1_AccessAndUseOfBuildings'},Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,not-part-of
+7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",part-of
+703e5c71-bd54-4267-acf4-fa7db1e70d49,"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",{'ID': '67_Finnish_Accessibility'},"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",none
+b5aa20f2-571e-48d8-9943-4102c9f9bd1a,"In exit passageways and fire-compartmented elevator shafts, means must be arranged for both smoke extraction and flow of replacement air.",{'ID': '250_Finnish_FireSafety'},"In exit passageways and fire-compartmented elevator shafts, means must be arranged for both smoke extraction and flow of replacement air.",none
+d56a51f7-6ec0-457b-a9ed-263fffe3a3e2,"Once open, all doors to accessible entrances should be wide enough to allow unrestricted passage for a variety of users, including wheelchair users, people carrying luggage, people with assistance dogs, and parents with pushchairs and small children.",{'ID': '66_UK_DocM_V2_AccessAndUseOfBuildings'},"Once open, all doors to accessible entrances should be wide enough to allow unrestricted passage for a variety of users, including wheelchair users, people carrying luggage, people with assistance dogs, and parents with pushchairs and small children.",selection
+d56a51f7-6ec0-457b-a9ed-263fffe3a3e2,"Once open, all doors to accessible entrances should be wide enough to allow unrestricted passage for a variety of users, including wheelchair users, people carrying luggage, people with assistance dogs, and parents with pushchairs and small children.",{'ID': '66_UK_DocM_V2_AccessAndUseOfBuildings'},"Once open, all doors to accessible entrances should be wide enough to allow unrestricted passage for a variety of users, including wheelchair users, people carrying luggage, people with assistance dogs, and parents with pushchairs and small children.",part-of
+beeec1b2-c382-40cc-aec2-6eda86f5782e,"Each residential unit, shared communal room and common space should be categorised separately.",{'ID': '25_UK_DocO_Overheating'},"Each residential unit, shared communal room and common space should be categorised separately.",necessity
+bf798097-bb99-42d0-a73f-8cebab8fbeb8,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.",{'ID': '21_Finnish_SafetyOfUse'},"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.",part-of
+5aebe4f8-6ca6-4448-94db-5272b5541efb,"The results of all pressure tests on dwellings, including any test failures, should be reported to the building control body.",{'ID': '359_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The results of all pressure tests on dwellings, including any test failures, should be reported to the building control body.",selection
+f034fbd1-7547-425a-8163-513fcac0b66b,The roof structures and joints must be properly inclined and sealed for water drainage.,{'ID': '103_Finnish_Health-Humidity'},The roof structures and joints must be properly inclined and sealed for water drainage.,none
+10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,necessity
+2d94a2e6-2ebd-4c3f-b14a-91741a0ab4b3,Their glazing must be made of safety glass.,{'ID': '70_Finnish_SafetyOfUse'},Their glazing must be made of safety glass.,necessity
+bf798097-bb99-42d0-a73f-8cebab8fbeb8,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.",{'ID': '21_Finnish_SafetyOfUse'},"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.",none
+d342429e-d3fc-46e0-a195-527cfef1fd4b,"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",{'ID': '451_UK_DocM_V2_AccessAndUseOfBuildings'},"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",necessity
+e6fcc89d-b55e-4536-9a24-c3c5f4015a0d,"All technically, functionally and economically feasible measures to improve the fabric of the building served by the service should be implemented.",{'ID': '455_UK_DocM_V2_AccessAndUseOfBuildings'},"All technically, functionally and economically feasible measures to improve the fabric of the building served by the service should be implemented.",necessity
+78b82c71-b2a9-41ea-a5f9-45bdba64fa7a,The correct operation of each control function should be tested where it is practical.,{'ID': '218_UK_DocF_V1_Ventilation'},The correct operation of each control function should be tested where it is practical.,necessity
+13a437c0-918c-47f2-85bd-b80dd69eb027,"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",none
+2ff58135-b89d-40d1-a145-51aad9e5a942,"The landing in front of the outside door shall be at least 1,500 millimetres wide and at least 1,500 millimetres long.",{'ID': '16_Finnish_Accessibility'},"The landing in front of the outside door shall be at least 1,500 millimetres wide and at least 1,500 millimetres long.",none
+74002ed3-548e-4e2f-8835-be76e643c67d,NOTE 2: Double doors effectively provide nibs where each leaf is at least 300mm wide.,{'ID': '51_UK_DocM_V1_AccessAndUseOfBuildings'},NOTE 2: Double doors effectively provide nibs where each leaf is at least 300mm wide.,none
+e7be7432-5505-47ad-b586-2a2e3f5a1a37,"If the index terminal has to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",{'ID': '203_UK_DocF_V1_Ventilation'},"If the index terminal has to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",necessity
+405a2082-beb9-4c5f-bc9f-d688b72e723b,Intermediate floors: floor-to-wall junctions should be detailed to ensure that insulation in the external wall is continuous.,{'ID': '162_UK_DocL_V1_ConsrvationOfFuelAndPower'},Intermediate floors: floor-to-wall junctions should be detailed to ensure that insulation in the external wall is continuous.,necessity
+0f8b3f66-6496-431c-bdc1-75570dde9ee6,"All cable routes should be laid as straight as possible and with suitable access points, so that cables can be pulled through in future.",{'ID': '111_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"All cable routes should be laid as straight as possible and with suitable access points, so that cables can be pulled through in future.",selection
+2af8ee5f-9d05-4023-9365-d093ebdfba1f,"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",{'ID': '168_UK_DocF_V1_Ventilation'},"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",necessity
+36650de0-ef3c-4fd1-8199-f47c0e576076,the rated speed of the platform does not exceed 0.15m/s.,{'ID': '183_UK_DocM_V2_AccessAndUseOfBuildings'},the rated speed of the platform does not exceed 0.15m/s.,part-of
+ed2cca4a-50f7-470d-9752-dd8722385a24,"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",{'ID': '80_Finnish_SafetyOfUse'},"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",part-of
+3d436e01-915c-403d-8e80-5b5fbfaa9b0d,Cooling pipework should be insulated along its whole length.,{'ID': '176_UK_DocM_V2_AccessAndUseOfBuildings'},Cooling pipework should be insulated along its whole length.,necessity
+2633c957-07b4-4caa-a9d6-5acbac16b0b0,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 100 load.,{'ID': '245_UK_DocM_V2_AccessAndUseOfBuildings'},NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 100 load.,equal
+ebc429f0-cb90-41ab-9a11-401a2ddc7bad,"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",{'ID': '268_UK_DocF_V1_Ventilation'},"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",necessity
+8e9ef8dc-18bd-4877-98cd-556aa4adee8f,"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'},"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",none
+64f259ba-5280-4bf5-bea2-e18cb837a940,A water point shall incorporate a drainage point that is connected to the sewer via a drainage fixture.,{'ID': '124_Finnish_Health-WaterAndSewerage'},A water point shall incorporate a drainage point that is connected to the sewer via a drainage fixture.,necessity
+8b7e8e7e-81dd-4a76-bdd3-8269ac00f74b,The system can be overridden by a door reactivating device that relies on appropriate electronic methods (but not a door edge pressure system); provided that the lift door remains fully open for at least three seconds.,{'ID': '24_UK_DocM_V1_AccessAndUseOfBuildings'},The system can be overridden by a door reactivating device that relies on appropriate electronic methods (but not a door edge pressure system); provided that the lift door remains fully open for at least three seconds.,greater-equal
+73de2b17-802a-4cce-910b-049a35561a0c,Purge ventilation may be provided by natural means (e.g. an openable window) ormechanical means (e.g. a fan).,{'ID': '108_UK_DocF_V2_Ventilation'},Purge ventilation may be provided by natural means (e.g. an openable window) ormechanical means (e.g. a fan).,necessity
+9415ae4b-7a74-4c70-a245-e4381c6d71bf,"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",{'ID': '170_UK_DocL_V1_ConsrvationOfFuelAndPower'},"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",part-of
+835d8fad-7a27-4299-aa38-a5b1771a6779,"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",{'ID': '178_UK_DocM_V2_AccessAndUseOfBuildings'},"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",selection
+12e545d1-64f4-45c9-a520-5b8a003eba0a,"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",{'ID': '85_UK_DocF_V1_Ventilation'},"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",necessity
+7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8,"For sizes of cylinder not listed, the heat loss from the cylinder should not exceed (16.66 8.33 V0.4)/(1000 24), where V is the volume in litres.",{'ID': '208_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For sizes of cylinder not listed, the heat loss from the cylinder should not exceed (16.66 8.33 V0.4)/(1000 24), where V is the volume in litres.",selection
+e1f1aeb9-7453-4b6b-b3f1-6049d711868a,The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,{'ID': '156_Finnish_FireSafety'},The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,less-equal
+76acc6bd-50c0-4f3f-b015-42e171ec6ce7,One electric vehicle charge point must be installed.,{'ID': '82_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},One electric vehicle charge point must be installed.,necessity
+2ca092ec-4425-4552-a389-fd0dadfbd154,NOTE: A floor level with a gradient of 1:20 or steeper should be designed as a ramp.,{'ID': '54_UK_DocK_ProtectionFromFalling'},NOTE: A floor level with a gradient of 1:20 or steeper should be designed as a ramp.,none
+389c960b-525d-4f2e-9a2c-1805eb2dc20d,The full area under a stair that forms part of the storage provision should be counted as 1m2.,{'ID': '79_UK_DocM_V1_AccessAndUseOfBuildings'},The full area under a stair that forms part of the storage provision should be counted as 1m2.,selection
+4e8c5c50-44af-48f6-b959-e6f9b31afa1e,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical heating technology may be electric resistance heating.",{'ID': '89_UK_DocM_V2_AccessAndUseOfBuildings'},"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical heating technology may be electric resistance heating.",less
+8e9ef8dc-18bd-4877-98cd-556aa4adee8f,"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'},"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",selection
+37f01a2c-b944-45a2-a7f4-140d8c03d7ac,"After rebating, frame components should retain at least 32mm of timber.",{'ID': '29_UK_DocQ_Security_Dwellings'},"After rebating, frame components should retain at least 32mm of timber.",none
+e68377dd-acec-4915-a0b4-a5eb8c840bf1,"Where vehicle barriers are necessary, sufficient space (for example 500mm) should be allowed around the future connection location.",{'ID': '121_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where vehicle barriers are necessary, sufficient space (for example 500mm) should be allowed around the future connection location.",necessity
+cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",part-of
+5b1fe636-d2aa-4382-885e-a4f8a2cae4d4,"Generally, a thermal element once upgraded should not have a U-value greater than 0.7W/(m2K).",{'ID': '125_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Generally, a thermal element once upgraded should not have a U-value greater than 0.7W/(m2K).",none
+20518e80-6f7e-457f-8c5a-59fa4c0eb324,"When calculating the heat loss for a buildings design solution, the design value shall be used as the value of the air leakage rate figure for the building envelope.",{'ID': '137_Finnish_EnergyEfficiency'},"When calculating the heat loss for a buildings design solution, the design value shall be used as the value of the air leakage rate figure for the building envelope.",part-of
+a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",selection
+b5d2186d-338d-40b6-b3b4-7fadf3cfd4e0,"For district cooling schemes, the CO2 and primary energy content of the cooling energy supplied should be calculated.",{'ID': '286_UK_DocM_V2_AccessAndUseOfBuildings'},"For district cooling schemes, the CO2 and primary energy content of the cooling energy supplied should be calculated.",none
+8e8f4fb5-00b5-404f-89df-a07287984748,"In buildings with a total useful floor area greater than 1000m2, automatic meter reading and data collection facilities should be installed.",{'ID': '229_UK_DocM_V2_AccessAndUseOfBuildings'},"In buildings with a total useful floor area greater than 1000m2, automatic meter reading and data collection facilities should be installed.",necessity
+9fee4426-8d7f-40f9-bc6f-562a5d3fd9b4,"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",{'ID': '144_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",necessity
+b7243860-85c3-43b2-ad6c-35050b293699,All space alongside the cable duct should be backfilled in a way that avoids damage to the duct.,{'ID': '112_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},All space alongside the cable duct should be backfilled in a way that avoids damage to the duct.,necessity
+f72a98f3-b7d2-4633-b244-0d7242dfb0c9,Every single bedroom has a minimum floor area of 8.5m2 and is at least 2.4m wide.,{'ID': '102_UK_DocM_V1_AccessAndUseOfBuildings'},Every single bedroom has a minimum floor area of 8.5m2 and is at least 2.4m wide.,greater-equal
+703e5c71-bd54-4267-acf4-fa7db1e70d49,"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",{'ID': '67_Finnish_Accessibility'},"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",necessity
+922bf8df-3a70-4f45-8c04-200b638d3b3c,The cold water pipe shall be designed and installed so that the temperature in the cold water system may not exceed 20 degrees Celsius.,{'ID': '59_Finnish_Health-WaterAndSewerage'},The cold water pipe shall be designed and installed so that the temperature in the cold water system may not exceed 20 degrees Celsius.,part-of
+4470dde4-6422-4c13-9781-de68c3e075dc,"The outdoor air flow of a dwelling unit, however, shall be designed to be a minimum of 18 dm3/s.",{'ID': '54_Finnish_Health-IndoorClimateAndVentilation'},"The outdoor air flow of a dwelling unit, however, shall be designed to be a minimum of 18 dm3/s.",selection
+7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8,"For sizes of cylinder not listed, the heat loss from the cylinder should not exceed (16.66 8.33 V0.4)/(1000 24), where V is the volume in litres.",{'ID': '208_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For sizes of cylinder not listed, the heat loss from the cylinder should not exceed (16.66 8.33 V0.4)/(1000 24), where V is the volume in litres.",none
+371e1755-8bb5-456e-bf66-5a50f4c19d59,"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",{'ID': '50_UK_DocK_ProtectionFromFalling'},"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",equal
+86ce171d-4761-47f4-8492-4f4224636008,Rigid ducts should be used wherever possible.,{'ID': '111_UK_DocF_V1_Ventilation'},Rigid ducts should be used wherever possible.,necessity
+ddc0bba6-2df8-43e1-9398-37514366fb06,"For fixed terminals with automatic flow adjustment at the fan unit, the fan speed should be set to achieve the desired continuous flow rate.",{'ID': '208_UK_DocF_V1_Ventilation'},"For fixed terminals with automatic flow adjustment at the fan unit, the fan speed should be set to achieve the desired continuous flow rate.",none
+703e5c71-bd54-4267-acf4-fa7db1e70d49,"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",{'ID': '67_Finnish_Accessibility'},"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",none
+7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",none
+80221d2c-8ba8-4700-b219-c35fde50f35e,No more than two drainage wells may be connected to a floor drain and they may be located at a maximum distance of three meters from the floor drain.,{'ID': '125_Finnish_Health-WaterAndSewerage'},No more than two drainage wells may be connected to a floor drain and they may be located at a maximum distance of three meters from the floor drain.,necessity
+0d8c2f7d-5234-4bec-bbbe-961e499ebbbc,"A proportion of the sleeping accommodation in hotels, motels and student accommodation should be designed for independent use by wheelchair users.",{'ID': '129_UK_DocM_V2_AccessAndUseOfBuildings'},"A proportion of the sleeping accommodation in hotels, motels and student accommodation should be designed for independent use by wheelchair users.",part-of
+419892bb-5044-4c63-a8ba-7747ad52c23d,"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",{'ID': '195_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",selection
+e5b89c46-e6d5-4fb8-9e13-936c670c37c7,Consideration should be given to installing a chemical sanitary waste disposal unit in wheelchair-accessible WC accommodation.,{'ID': '164_UK_DocM_V2_AccessAndUseOfBuildings'},Consideration should be given to installing a chemical sanitary waste disposal unit in wheelchair-accessible WC accommodation.,necessity
+12f1333f-4dd5-4172-8135-681002824f9f,Heat pumps should be selected to meet the full space heating requirement at the design condition chosen for heat loss calculations.,{'ID': '243_UK_DocL_V1_ConsrvationOfFuelAndPower'},Heat pumps should be selected to meet the full space heating requirement at the design condition chosen for heat loss calculations.,necessity
+74002ed3-548e-4e2f-8835-be76e643c67d,NOTE 2: Double doors effectively provide nibs where each leaf is at least 300mm wide.,{'ID': '51_UK_DocM_V1_AccessAndUseOfBuildings'},NOTE 2: Double doors effectively provide nibs where each leaf is at least 300mm wide.,none
+4e1bda84-398f-4bae-a335-2c7f24501b09,The water heater is situated centrally with a distribution system to supply water to the drawoff points and has a capacity greater than 300 litres.,{'ID': '456_UK_DocM_V2_AccessAndUseOfBuildings'},The water heater is situated centrally with a distribution system to supply water to the drawoff points and has a capacity greater than 300 litres.,greater
+9953a539-8775-467a-9028-f51fe6d0f9f6,Grommets or flexible collars should be used around incoming services and sealed to the air barrier with air-sealing tape or sealant.,{'ID': '179_UK_DocL_V1_ConsrvationOfFuelAndPower'},Grommets or flexible collars should be used around incoming services and sealed to the air barrier with air-sealing tape or sealant.,necessity
+382038df-4d45-443d-a52a-8a83e6048d1e,At least 30% of the ties shall be located in the immediate vicinity of the grid lines of the columns and the walls.,{'ID': '175_Finnish_StabilityOfStructures'},At least 30% of the ties shall be located in the immediate vicinity of the grid lines of the columns and the walls.,greater-equal
+9a90337f-e2d2-4989-9e33-f6e4b64b755a,"U-values should be assessed for the whole fabric element (e.g. in the case of a window, the combined performance of the glazing and the frame).",{'ID': '104_UK_DocL_V1_ConsrvationOfFuelAndPower'},"U-values should be assessed for the whole fabric element (e.g. in the case of a window, the combined performance of the glazing and the frame).",necessity
+835d8fad-7a27-4299-aa38-a5b1771a6779,"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",{'ID': '178_UK_DocM_V2_AccessAndUseOfBuildings'},"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",selection
+fa90c179-d32c-412b-a7d6-a515cc91dbdb,The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,{'ID': '86_Finnish_Health-Humidity'},The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,selection
+1834463c-7e45-4148-8315-f750b5f047cb,"When the lift serves more than three storeys, it provides visual and audible indicators to identify the floor reached.",{'ID': '25_UK_DocM_V1_AccessAndUseOfBuildings'},"When the lift serves more than three storeys, it provides visual and audible indicators to identify the floor reached.",selection
+8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c,"However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent.",{'ID': '9_Finnish_Accessibility'},"However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent.",less-equal
+55d84237-8fad-4bd7-b67d-0745b9cc1e31,"The doors of exits, and of areas leading to them, must be easy to open in an emergency.",{'ID': '222_Finnish_FireSafety'},"The doors of exits, and of areas leading to them, must be easy to open in an emergency.",part-of
+dcc583b1-8c4c-42cf-a1ed-e8907de56254,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",{'ID': '23_Finnish_SafetyOfUse'},"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",selection
+f3bd99b4-7ea5-4968-af10-3c133c0b5aa0,No individual flight has a rise between landings of more than 1800mm.,{'ID': '42_UK_DocM_V1_AccessAndUseOfBuildings'},No individual flight has a rise between landings of more than 1800mm.,none
+3724fd47-22f7-432c-81a2-1abcb95c7df2,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",{'ID': '96_UK_DocF_V1_Ventilation'},"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",part-of
+cb522b91-f26f-460e-adee-1a7f59ba10c9,"For heat pump installations in which there are other heat sources available to the same building, each of these heat sources should be appropriately incorporated into a singular control system.",{'ID': '315_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heat pump installations in which there are other heat sources available to the same building, each of these heat sources should be appropriately incorporated into a singular control system.",part-of
+7c44934c-61e1-4904-a493-1aa360ccc7d1,"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",{'ID': '1_UK_DocA_Structure'},"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",selection
+cd904a0f-c120-4c67-bcff-6fcc77abca62,Any future connection locations should be clearly identified and labelled.,{'ID': '116_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Any future connection locations should be clearly identified and labelled.,selection
+0d5f23b0-8423-4528-95bd-179fe81c75df,A building and its environment must be lit in a way that enables safe use and servicing.,{'ID': '62_Finnish_SafetyOfUse'},A building and its environment must be lit in a way that enables safe use and servicing.,part-of
+16f6f10e-f32f-48b2-85f9-123cdb5448ee,Any unavoidable gaps between boards should be infilled using compressible tape (e.g. for boards within roof rafters) or low expansion foam (e.g. for boards within wall cavities).,{'ID': '147_UK_DocL_V1_ConsrvationOfFuelAndPower'},Any unavoidable gaps between boards should be infilled using compressible tape (e.g. for boards within roof rafters) or low expansion foam (e.g. for boards within wall cavities).,selection
+35cacecf-06dc-4b0f-aadb-db2ee05518c7,The area of windows and roof windows (but excluding display windows) within the area served exceeds 40 of the facade area.,{'ID': '495_UK_DocM_V2_AccessAndUseOfBuildings'},The area of windows and roof windows (but excluding display windows) within the area served exceeds 40 of the facade area.,part-of
+2c8d2bc3-cf23-48f8-b9c0-b90f150f9f93,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing building.",{'ID': '426_UK_DocM_V2_AccessAndUseOfBuildings'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing building.",necessity
+57f7bbad-51b7-4627-8fe9-2d7a50289448,"Doors to the principal, or alternative accessible, entrance should be accessible to all, particularly wheelchair users and people with limited physical dexterity.",{'ID': '64_UK_DocM_V2_AccessAndUseOfBuildings'},"Doors to the principal, or alternative accessible, entrance should be accessible to all, particularly wheelchair users and people with limited physical dexterity.",part-of
+316c89ee-aa42-4e7a-9372-960cf25b3265,Extract ventilation may be by natural means or by mechanical means (e.g. by an extract fan or acentral system).,{'ID': '105_UK_DocF_V2_Ventilation'},Extract ventilation may be by natural means or by mechanical means (e.g. by an extract fan or acentral system).,none
+7d1ada0b-8dcc-4c01-84d7-78b80cb404c9,"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",{'ID': '58_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",part-of
+2b60007d-59a3-4a18-a184-89e76ee17454,Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,{'ID': '161_UK_DocL_V1_ConsrvationOfFuelAndPower'},Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,necessity
+e320322e-3aee-4167-ad19-a6c6cc41f597,The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,{'ID': '97_Finnish_Health-WaterAndSewerage'},The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,necessity
+2032e456-bf80-4342-90dc-0da164e00a9a,A unit that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,{'ID': '7_UK_DocF_V1_Ventilation'},A unit that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,none
+9fefb0c6-9530-4277-bfba-162315e8fc37,One electric vehicle charge point must be provided for the building.,{'ID': '67_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},One electric vehicle charge point must be provided for the building.,equal
+b5d2186d-338d-40b6-b3b4-7fadf3cfd4e0,"For district cooling schemes, the CO2 and primary energy content of the cooling energy supplied should be calculated.",{'ID': '286_UK_DocM_V2_AccessAndUseOfBuildings'},"For district cooling schemes, the CO2 and primary energy content of the cooling energy supplied should be calculated.",necessity
+726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none
+8e83d841-dcab-479c-a131-a5ce80cd416d,The fan speed should be set to achieve the desired continuous flow rate.,{'ID': '197_UK_DocF_V1_Ventilation'},The fan speed should be set to achieve the desired continuous flow rate.,part-of
+4ec7b2ef-59e8-4ab1-9243-16587296b466,Fire must not spread in a roof or in its underlay in a way that causes a hazard.,{'ID': '179_Finnish_FireSafety'},Fire must not spread in a roof or in its underlay in a way that causes a hazard.,necessity
+e2f06254-ca46-4471-89c7-ebef89a4d93d,"Where used, passive stack ventilation terminals should be located in the ceiling.",{'ID': '50_UK_DocF_V2_Ventilation'},"Where used, passive stack ventilation terminals should be located in the ceiling.",necessity
+ed2cca4a-50f7-470d-9752-dd8722385a24,"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",{'ID': '80_Finnish_SafetyOfUse'},"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",selection
+11710051-ee66-4fe2-83f9-85ea53aa5b03,"The ventilation system shall produce an adequate outdoor air flow to the building and extract from indoor air substances that are harmful to health, excessive humidity, odours with adverse effects on comfort and indoor air impurities arising from humans, construction products and activities.",{'ID': '46_Finnish_Health-IndoorClimateAndVentilation'},"The ventilation system shall produce an adequate outdoor air flow to the building and extract from indoor air substances that are harmful to health, excessive humidity, odours with adverse effects on comfort and indoor air impurities arising from humans, construction products and activities.",necessity
+26980508-105c-49db-8595-bf001a48d757,"In rooms with no fixed seats or furnishings, the number of persons shall be calculated to be two persons per square metre.",{'ID': '103_Finnish_SafetyOfUse'},"In rooms with no fixed seats or furnishings, the number of persons shall be calculated to be two persons per square metre.",equal
+993e54cc-49c3-43cb-995e-1a951c93c775,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an axle group load equal to 190 kN.",{'ID': '25_Finnish_StabilityOfStructures'},"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an axle group load equal to 190 kN.",selection
+cccbc1ea-27be-4d7b-b53c-3cb467a51020,"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",{'ID': '220_UK_DocM_V2_AccessAndUseOfBuildings'},"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",none
+31e6f85a-97ea-4224-9144-bc3d1daad96d,Consideration should be given to providing a low level urinal for children in male washrooms.,{'ID': '174_UK_DocM_V2_AccessAndUseOfBuildings'},Consideration should be given to providing a low level urinal for children in male washrooms.,part-of
+8805ec9f-3f5f-44fc-9078-3ae62439c973,"NOTE: When a single U-value is calculated for a product range of doors, the configuration of the door chosen for the calculation should be the worst performing in the product range.",{'ID': '108_UK_DocL_V1_ConsrvationOfFuelAndPower'},"NOTE: When a single U-value is calculated for a product range of doors, the configuration of the door chosen for the calculation should be the worst performing in the product range.",necessity
+fab95d95-4789-4384-8d57-a575190f9e73,The heating plant emission rate of the micro combined heat and power system (microCHP) should be no greater than the emission rate of a regular boiler using the same fuel as the microCHP.,{'ID': '297_UK_DocL_V1_ConsrvationOfFuelAndPower'},The heating plant emission rate of the micro combined heat and power system (microCHP) should be no greater than the emission rate of a regular boiler using the same fuel as the microCHP.,less-equal
+64695439-3458-4d43-8e7b-a2ba75075cea,"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",{'ID': '124_Finnish_SafetyOfUse'},"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",none
+8b7e8e7e-81dd-4a76-bdd3-8269ac00f74b,The system can be overridden by a door reactivating device that relies on appropriate electronic methods (but not a door edge pressure system); provided that the lift door remains fully open for at least three seconds.,{'ID': '24_UK_DocM_V1_AccessAndUseOfBuildings'},The system can be overridden by a door reactivating device that relies on appropriate electronic methods (but not a door edge pressure system); provided that the lift door remains fully open for at least three seconds.,none
+d8066a73-49c2-4e99-825a-b49b9b2ba67d,A landing measuring at least 800 millimetres in length must be reserved in front of and behind a door located in an exit route.,{'ID': '34_Finnish_SafetyOfUse'},A landing measuring at least 800 millimetres in length must be reserved in front of and behind a door located in an exit route.,necessity
+31d635b2-1d32-49dd-a848-5b5acaf50128,"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",{'ID': '407_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",none
+5ca6b3d3-fd21-4cc1-8dd8-185268db6615,The doorset should be manufactured from solid or laminated timber with a minimum density of 600kg/m3.,{'ID': '26_UK_DocQ_Security_Dwellings'},The doorset should be manufactured from solid or laminated timber with a minimum density of 600kg/m3.,none
+0aaf71f0-a482-4a72-a407-0d6db79c7f6f,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",{'ID': '69_Finnish_FireSafety'},"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",none
+38745b5e-4dea-43fe-9378-5befa5a2399d,A copy of the completed commissioning sheet should be given to the owner of the building.,{'ID': '99_UK_DocF_V2_Ventilation'},A copy of the completed commissioning sheet should be given to the owner of the building.,selection
+fa8a6d84-eb99-490e-8169-3c65353fb553,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",{'ID': '61_Finnish_StabilityOfStructures'},"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",selection
+385a4365-40c0-4c07-8854-b07bde292fd2,"The electrical energy consumption of a mechanical ventilation system shall be calculated on the basis of air flows, specific fan powers and operating times for all air handling units and powered roof ventilators in the building.",{'ID': '109_Finnish_EnergyEfficiency'},"The electrical energy consumption of a mechanical ventilation system shall be calculated on the basis of air flows, specific fan powers and operating times for all air handling units and powered roof ventilators in the building.",none
+2f0f22aa-06d3-478d-a777-5aca5c2fb5c1,"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",{'ID': '120_UK_DocK_ProtectionFromFalling'},"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",none
+37239af2-8f49-499f-ab25-73f92d7c9369,Each letter should be 25mm high.,{'ID': '117_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Each letter should be 25mm high.,equal
+42f29765-356f-4d9c-9a73-bc99e7044e07,"People with mobility impairments who arrive as passengers should be able to alight from a vehicle close to the principal entrance, or alternative accessible entrance, of the building in a way that is convenient for entry into the building.",{'ID': '47_UK_DocM_V2_AccessAndUseOfBuildings'},"People with mobility impairments who arrive as passengers should be able to alight from a vehicle close to the principal entrance, or alternative accessible entrance, of the building in a way that is convenient for entry into the building.",selection
+fb1da22f-8ddb-4399-b441-64dca68da9af,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",{'ID': '218_Finnish_FireSafety'},"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",part-of
+47b51cfa-bda8-4971-83c1-5aa198c59297,The loading area must be safe and appropriate.,{'ID': '135_Finnish_SafetyOfUse'},The loading area must be safe and appropriate.,necessity
+bd5bd070-a838-4496-8d33-8b4cf201bc20,The gradient is as shallow as the site permits.,{'ID': '45_UK_DocM_V1_AccessAndUseOfBuildings'},The gradient is as shallow as the site permits.,necessity
+0219127c-2f2d-4b13-aafa-261c1fc39ffc,"A power socket, suitable for powering the lifting device, is provided close to the liftway.",{'ID': '109_UK_DocM_V1_AccessAndUseOfBuildings'},"A power socket, suitable for powering the lifting device, is provided close to the liftway.",necessity
+3835aa39-14bc-4c7a-a029-a5ce391bad76,The efficiency of the secondary heating appliance with its appropriate fuel should be used in the calculation of the dwelling primary energy rate and dwelling emission rate.,{'ID': '73_UK_DocL_V1_ConsrvationOfFuelAndPower'},The efficiency of the secondary heating appliance with its appropriate fuel should be used in the calculation of the dwelling primary energy rate and dwelling emission rate.,part-of
+f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c,A building with a height exceeding 9 metres must be equipped with anchoring structures for safety lines.,{'ID': '127_Finnish_SafetyOfUse'},A building with a height exceeding 9 metres must be equipped with anchoring structures for safety lines.,necessity
+f1898d1c-5d14-4f9b-8c31-e0ac7623a61c,The building control body should be provided with a report that demonstrates that the residential building passes CIBSEs TM59 assessment of overheating.,{'ID': '47_UK_DocO_Overheating'},The building control body should be provided with a report that demonstrates that the residential building passes CIBSEs TM59 assessment of overheating.,selection
+c766f874-d4aa-45b8-89f7-20b08db787c6,The total height of the barrier must be one metre if the drop is no more than six metres.,{'ID': '43_Finnish_SafetyOfUse'},The total height of the barrier must be one metre if the drop is no more than six metres.,none
+56166e36-b14b-4632-9767-70b71d335d9c,"When a dwelling undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",{'ID': '98_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When a dwelling undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",selection
+aec934d9-6175-4624-9e8d-1ee6f71fb49d,Sufficient information about the overheating mitigation strategy and its maintenance requirements must be given to owners so that it can be used effectively.,{'ID': '92_UK_DocO_Overheating'},Sufficient information about the overheating mitigation strategy and its maintenance requirements must be given to owners so that it can be used effectively.,none
+d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",less-equal
+f72a98f3-b7d2-4633-b244-0d7242dfb0c9,Every single bedroom has a minimum floor area of 8.5m2 and is at least 2.4m wide.,{'ID': '102_UK_DocM_V1_AccessAndUseOfBuildings'},Every single bedroom has a minimum floor area of 8.5m2 and is at least 2.4m wide.,part-of
+10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,necessity
+d925c189-860a-4fcb-ae88-d1cf8cc14fb8,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",{'ID': '28_Finnish_SafetyOfUse'},"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",selection
+7dbe5dbf-39fb-4ba4-bc75-d6ac7898e615,"U-values for rooflights or rooflight-and-kerb assemblies should be based on the developed surface area of the rooflight (U-values), which is often greater than the area of the roof opening.",{'ID': '114_UK_DocL_V1_ConsrvationOfFuelAndPower'},"U-values for rooflights or rooflight-and-kerb assemblies should be based on the developed surface area of the rooflight (U-values), which is often greater than the area of the roof opening.",part-of
+7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",none
+d01a40a6-33be-44da-ba5f-243d05a449c6,The handrail must continue onto the intermediate landing without interruption.,{'ID': '58_Finnish_SafetyOfUse'},The handrail must continue onto the intermediate landing without interruption.,necessity
+f72a98f3-b7d2-4633-b244-0d7242dfb0c9,Every single bedroom has a minimum floor area of 8.5m2 and is at least 2.4m wide.,{'ID': '102_UK_DocM_V1_AccessAndUseOfBuildings'},Every single bedroom has a minimum floor area of 8.5m2 and is at least 2.4m wide.,selection
+53e31e26-a39b-4047-a86e-bdb8021413e8,Window handles on windows that open outwards are not more than 650mm from the inside face of the wall when the window is at its maximum openable angle.,{'ID': '84_UK_DocO_Overheating'},Window handles on windows that open outwards are not more than 650mm from the inside face of the wall when the window is at its maximum openable angle.,selection
+1d18f0c9-31e5-43ee-8f16-e4fa607c5cd9,"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",{'ID': '51_UK_DocM_V2_AccessAndUseOfBuildings'},"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",none
+f17de50f-3c64-4ab3-ac80-dcfb15b99842,Every flight has a minimum clear width of 900mm.,{'ID': '20_UK_DocM_V1_AccessAndUseOfBuildings'},Every flight has a minimum clear width of 900mm.,greater-equal
+8b054fa5-fa6b-40f8-996a-a6dfea855fc3,"The distance between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 400 millimetres on the side wall and no less than 1,500 millimetres on the end wall.",{'ID': '33_Finnish_SafetyOfUse'},"The distance between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 400 millimetres on the side wall and no less than 1,500 millimetres on the end wall.",greater-equal
+f7cfdf57-28f3-4d23-90bf-ec2268e14bac,"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",{'ID': '65_Finnish_SafetyOfUse'},"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",necessity
+29ad081e-90f4-4eb0-9cea-a4f49beea768,Fans used for general air distribution that are rated at more than 1100W should be fitted with variable speed drives.,{'ID': '298_UK_DocM_V2_AccessAndUseOfBuildings'},Fans used for general air distribution that are rated at more than 1100W should be fitted with variable speed drives.,necessity
+517253f8-98b1-4821-8901-75124d3237db,"Consideration should be given to the provision of a second handrail on stairs in a wide range of building types, and particularly in schools, for use by children and people of short stature.",{'ID': '59_UK_DocM_V2_AccessAndUseOfBuildings'},"Consideration should be given to the provision of a second handrail on stairs in a wide range of building types, and particularly in schools, for use by children and people of short stature.",selection
+a387fcb8-ead2-4094-9be9-72d783468b33,"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",{'ID': '422_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",part-of
+2f0f22aa-06d3-478d-a777-5aca5c2fb5c1,"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",{'ID': '120_UK_DocK_ProtectionFromFalling'},"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",necessity
+d796dece-45f6-4527-a151-c59b007e9028,"A safe and marked access route must be reserved for pedestrians in connection with vehicle traffic and goods transport routes, doors and gates in the yards of buildings other than single-family houses, if pedestrian traffic through them is necessary.",{'ID': '132_Finnish_SafetyOfUse'},"A safe and marked access route must be reserved for pedestrians in connection with vehicle traffic and goods transport routes, doors and gates in the yards of buildings other than single-family houses, if pedestrian traffic through them is necessary.",necessity
+9027959e-efc1-4d32-acbe-e0775d40f001,"The morticed bolts should have a minimum projection of 20mm, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",{'ID': '38_UK_DocQ_Security_Dwellings'},"The morticed bolts should have a minimum projection of 20mm, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",none
+b5edf19f-56df-436a-89f0-9ab5bf6963ea,"If necessary, fire compartments shall be partitioned in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '106_Finnish_FireSafety'},"If necessary, fire compartments shall be partitioned in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",selection
+197b9463-397e-4729-a08d-12739f9db069,"For variable refrigerant flow (VRF) systems, any calculations must include indoor and outdoor conditions, the power input from controls, and indoor units.",{'ID': '283_UK_DocM_V2_AccessAndUseOfBuildings'},"For variable refrigerant flow (VRF) systems, any calculations must include indoor and outdoor conditions, the power input from controls, and indoor units.",none
+3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,part-of
+33ed3038-99a6-4b2d-906a-a1db21f2d898,"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",{'ID': '250_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",part-of
+eccd4f77-ef4a-41fd-a22a-620c84fdddd4,There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,{'ID': '98_UK_DocM_V1_AccessAndUseOfBuildings'},There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,selection
+a894077e-cebf-4559-9254-ce964bc11b0f,Air flow rates for mechanical ventilation in new dwellings must be measured.,{'ID': '182_UK_DocF_V1_Ventilation'},Air flow rates for mechanical ventilation in new dwellings must be measured.,part-of
+70760393-8139-47e8-a329-87da3a477396,Under-floor heating systems intended for intermittent or cyclical operation and/or installed over unheated rooms should be separated from the structural floor by a layer of insulation with a thermal resistance of at least 1.25(m2K)/W.,{'ID': '304_UK_DocL_V1_ConsrvationOfFuelAndPower'},Under-floor heating systems intended for intermittent or cyclical operation and/or installed over unheated rooms should be separated from the structural floor by a layer of insulation with a thermal resistance of at least 1.25(m2K)/W.,selection
+b850a570-c0bd-4cf0-8b46-338ff5d8aa78,NOTE: A system for purge ventilation should be provided in each habitable room to demonstrate compliance with Part F of the Building Regulations.,{'ID': '67_UK_DocO_Overheating'},NOTE: A system for purge ventilation should be provided in each habitable room to demonstrate compliance with Part F of the Building Regulations.,none
+0667134c-1290-4fe0-99eb-41c0b9e63a27,CO2 emissions and primary energy associated with the thermal energy streams of a trigeneration scheme should be attributed in proportion to the output energy streams.,{'ID': '67_UK_DocM_V2_AccessAndUseOfBuildings'},CO2 emissions and primary energy associated with the thermal energy streams of a trigeneration scheme should be attributed in proportion to the output energy streams.,necessity
+02f5e3fb-7a8b-4a88-a6e5-337cc0835284,"When a new residential building is erected, information about the building must be given to the owner of the building to allow them to use the overheating mitigation strategy effectively.",{'ID': '90_UK_DocO_Overheating'},"When a new residential building is erected, information about the building must be given to the owner of the building to allow them to use the overheating mitigation strategy effectively.",none
+dae0db09-fd4b-4f2c-99c0-cd742b19d17a,"A glass structure or other light-permeable structure, along with its mountings, must withstand the load to which it is normally subject, unless the structure is protected by a fixed collision barrier.",{'ID': '68_Finnish_SafetyOfUse'},"A glass structure or other light-permeable structure, along with its mountings, must withstand the load to which it is normally subject, unless the structure is protected by a fixed collision barrier.",necessity
+759d26ff-821f-4949-9096-a7e15c5580f6,Windows and doors: should be installed in such a way that the thermal integrity of the insulated plane is maintained.,{'ID': '137_UK_DocL_V1_ConsrvationOfFuelAndPower'},Windows and doors: should be installed in such a way that the thermal integrity of the insulated plane is maintained.,none
+bfe386ee-8c0b-41d4-9967-6e873edf7229,"Floors and foundations: insulation should be installed tight to the structure, without air gaps between insulation panels and at edges.",{'ID': '148_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Floors and foundations: insulation should be installed tight to the structure, without air gaps between insulation panels and at edges.",part-of
+082a011b-2d6a-4569-b58d-f8cab00f5d81,The quality of the installation of the ventilator product should be checked to ensure it is correctly mounted within the wall or window aperture.,{'ID': '191_UK_DocF_V1_Ventilation'},The quality of the installation of the ventilator product should be checked to ensure it is correctly mounted within the wall or window aperture.,necessity
+6d5428cc-90c2-477e-b20e-978a6d1cd403,Edge columns and walls shall be tied to every floor and roof.,{'ID': '186_Finnish_StabilityOfStructures'},Edge columns and walls shall be tied to every floor and roof.,necessity
+5fa7daca-cb50-4397-a736-617e52d30187,"If efficiencies at below 30% are required and unavailable, the boiler efficiency may be taken as equal to that at 30% load.",{'ID': '246_UK_DocM_V2_AccessAndUseOfBuildings'},"If efficiencies at below 30% are required and unavailable, the boiler efficiency may be taken as equal to that at 30% load.",less
+6a553c19-481f-4947-9047-fd2c4d0daa44,"Any floors, walls and doors that have been installed to allow the potential liftway to be used as storage or for other purposes could be easily removed without structural alteration.",{'ID': '83_UK_DocM_V1_AccessAndUseOfBuildings'},"Any floors, walls and doors that have been installed to allow the potential liftway to be used as storage or for other purposes could be easily removed without structural alteration.",selection
+ced8e4bc-84ed-467a-b41f-d933cff5bb0d,All evacuation areas must be designed in such a way that it is possible to transport an immobile individual on a stretcher via the exit route.,{'ID': '15_Finnish_SafetyOfUse'},All evacuation areas must be designed in such a way that it is possible to transport an immobile individual on a stretcher via the exit route.,necessity
+642e2c46-45a8-440f-af0b-1b53f41d8d8f,Taps and WC cubicle doors should be operable by people with limited strength or manual dexterity and doors to cubicles should be capable of being opened if a person has collapsed against them while inside the cubicle.,{'ID': '156_UK_DocM_V2_AccessAndUseOfBuildings'},Taps and WC cubicle doors should be operable by people with limited strength or manual dexterity and doors to cubicles should be capable of being opened if a person has collapsed against them while inside the cubicle.,part-of
+6b2f3ca5-8cea-4616-8679-438446bc6233,"Since doors are potential barriers, their use should be avoided whenever appropriate.",{'ID': '88_UK_DocM_V2_AccessAndUseOfBuildings'},"Since doors are potential barriers, their use should be avoided whenever appropriate.",selection
+bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,none
+60205cf2-fa87-4195-9415-a6fb144a9b72,"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",{'ID': '96_Finnish_SafetyOfUse'},"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",none
+6ec243f2-9294-4b7c-89a4-1c46e4a69cc9,"If site constraints necessitate an approach of 1:20 or steeper, an approach incorporating ramped access should be provided.",{'ID': '49_UK_DocM_V2_AccessAndUseOfBuildings'},"If site constraints necessitate an approach of 1:20 or steeper, an approach incorporating ramped access should be provided.",selection
+8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f,"Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",{'ID': '3_UK_DocR_V1_InfrastructureForElectircalCommunications'},"Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",none
+5b4380ba-0066-4735-a362-316d4c8e70b2,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",{'ID': '73_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",necessity
+64695439-3458-4d43-8e7b-a2ba75075cea,"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",{'ID': '124_Finnish_SafetyOfUse'},"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",selection
+319372c4-2f9b-4594-8150-b9fd2c7670c4,A stack vent located in cold premises shall be thermally insulated.,{'ID': '136_Finnish_Health-WaterAndSewerage'},A stack vent located in cold premises shall be thermally insulated.,part-of
+6e61f4b0-ddc1-44cb-9966-0e146933d032,"Where a separate-sex toilet washroom can be accessed by wheelchair users, it should be possible for them to use both a urinal, where appropriate, and a washbasin at a lower height than is provided for other users.",{'ID': '171_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a separate-sex toilet washroom can be accessed by wheelchair users, it should be possible for them to use both a urinal, where appropriate, and a washbasin at a lower height than is provided for other users.",selection
+11710051-ee66-4fe2-83f9-85ea53aa5b03,"The ventilation system shall produce an adequate outdoor air flow to the building and extract from indoor air substances that are harmful to health, excessive humidity, odours with adverse effects on comfort and indoor air impurities arising from humans, construction products and activities.",{'ID': '46_Finnish_Health-IndoorClimateAndVentilation'},"The ventilation system shall produce an adequate outdoor air flow to the building and extract from indoor air substances that are harmful to health, excessive humidity, odours with adverse effects on comfort and indoor air impurities arising from humans, construction products and activities.",none
+99a53f17-48cb-4012-a47b-700761e0983b,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,{'ID': '61_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,necessity
+db611a74-4d57-4f90-989b-23b990d705ae,"Whichever approach is adopted, the agreed level of provision should be clearly recorded.",{'ID': '24_UK_DocM_V2_AccessAndUseOfBuildings'},"Whichever approach is adopted, the agreed level of provision should be clearly recorded.",part-of
+0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,selection
+13a437c0-918c-47f2-85bd-b80dd69eb027,"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",none
+aec934d9-6175-4624-9e8d-1ee6f71fb49d,Sufficient information about the overheating mitigation strategy and its maintenance requirements must be given to owners so that it can be used effectively.,{'ID': '92_UK_DocO_Overheating'},Sufficient information about the overheating mitigation strategy and its maintenance requirements must be given to owners so that it can be used effectively.,selection
+825053cb-af5d-43a9-b59b-e2a5ae78ea73,The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,{'ID': '59_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,part-of
+01d924bf-4a69-4eb8-b05e-ce993aee3d45,Perimeter insulation should be continuous and have a minimum thickness of 25mm.,{'ID': '135_UK_DocL_V1_ConsrvationOfFuelAndPower'},Perimeter insulation should be continuous and have a minimum thickness of 25mm.,necessity
+ded852b5-c826-4649-8ce5-dece0eba6061,"During the design period of occupancy, a building's room temperature shall be comfortable and not adversely affected by air velocity, thermal radiation, temperature fluctuation, temperature differences or surface temperatures.",{'ID': '32_Finnish_Health-IndoorClimateAndVentilation'},"During the design period of occupancy, a building's room temperature shall be comfortable and not adversely affected by air velocity, thermal radiation, temperature fluctuation, temperature differences or surface temperatures.",necessity
+2f89cb06-3ee9-49b5-ac36-46f31ae3928f,Hot water pipework should be insulated in all areas inside and outside the building unless it can be demonstrated that the heat is always useful.,{'ID': '170_UK_DocM_V2_AccessAndUseOfBuildings'},Hot water pipework should be insulated in all areas inside and outside the building unless it can be demonstrated that the heat is always useful.,part-of
+726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none
+f6ea9be6-644d-4dc6-8954-d115bdd528c8,"The building emission rate and building primary energy rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the combined emission factor has been derived.",{'ID': '62_UK_DocM_V2_AccessAndUseOfBuildings'},"The building emission rate and building primary energy rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the combined emission factor has been derived.",selection
+24729e93-fd1e-4e91-bbd6-ef8e73c582fb,"A unit that contains both living accommodation and space for commercial purposes (e.g. as aworkshop or office) should be treated as a residential building, as long as the commercial part canrevert to residential use.",{'ID': '3_UK_DocO_Overheating'},"A unit that contains both living accommodation and space for commercial purposes (e.g. as aworkshop or office) should be treated as a residential building, as long as the commercial part canrevert to residential use.",selection
+0cfe8c0e-45e4-4c4c-bf9b-906e26e28c75,"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",{'ID': '43_UK_DocM_V2_AccessAndUseOfBuildings'},"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",necessity
+f6add908-4d45-4b3e-83a6-369f6c36c037,"Door rails, stiles and muntins should be at least 44mm thick.",{'ID': '28_UK_DocQ_Security_Dwellings'},"Door rails, stiles and muntins should be at least 44mm thick.",part-of
+60205cf2-fa87-4195-9415-a6fb144a9b72,"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",{'ID': '96_Finnish_SafetyOfUse'},"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",selection
+13a437c0-918c-47f2-85bd-b80dd69eb027,"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",selection
+ec2e84a5-89bc-4c16-9a55-1965efd13981,"Wall insulation should be installed to the top of the wall plate; in some places, such as the eaves, this may be above the cavity closure or barrier.",{'ID': '167_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Wall insulation should be installed to the top of the wall plate; in some places, such as the eaves, this may be above the cavity closure or barrier.",none
+b4754f3a-0a30-40fd-9f90-2e3d9e30d2a6,Fixed building services must be commissioned to ensure that they use no more fuel and power than is reasonable in the circumstances.,{'ID': '371_UK_DocL_V1_ConsrvationOfFuelAndPower'},Fixed building services must be commissioned to ensure that they use no more fuel and power than is reasonable in the circumstances.,selection
+1ebce0c9-705c-47ee-8429-e83cfbed72db,"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",{'ID': '103_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",part-of
+493ec553-7761-4d1e-aa98-05d925ddf955,The opening of a horizontal hatch must be at least 600 x 600 millimetres.,{'ID': '84_Finnish_SafetyOfUse'},The opening of a horizontal hatch must be at least 600 x 600 millimetres.,selection
+525aa713-65e1-4368-a6f4-38f628be7fed,"in clothes shops, the dimensions and fittings recommended for an individual changing cubicle in a sports building should be provided.",{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},"in clothes shops, the dimensions and fittings recommended for an individual changing cubicle in a sports building should be provided.",selection
+c9983da5-23f1-4211-88ce-68e4753e4ab9,"A target primary energy rate, target emission rate, building primary energy rate and the building emission rate should be calculated for non-exempt buildings with low energy demand.",{'ID': '102_UK_DocM_V2_AccessAndUseOfBuildings'},"A target primary energy rate, target emission rate, building primary energy rate and the building emission rate should be calculated for non-exempt buildings with low energy demand.",necessity
+588857f5-9281-4c32-8d83-c98230d5b934,The use of boards with lapped or tongue and groove edges should be considered.,{'ID': '146_UK_DocL_V1_ConsrvationOfFuelAndPower'},The use of boards with lapped or tongue and groove edges should be considered.,part-of
+8bb9aee2-a950-4a65-a715-287035906789,"Spaces of a non-residential building and common spaces of a residential building as well as the fixtures, fittings and fixed equipment in them shall be suitable for persons with mobility and functional impairment.",{'ID': '27_Finnish_Accessibility'},"Spaces of a non-residential building and common spaces of a residential building as well as the fixtures, fittings and fixed equipment in them shall be suitable for persons with mobility and functional impairment.",necessity
+eccd4f77-ef4a-41fd-a22a-620c84fdddd4,There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,{'ID': '98_UK_DocM_V1_AccessAndUseOfBuildings'},There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,none
+a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",none
+6a41a473-bd3c-4e38-a093-094b3fdae388,At least one in every five remaining parking spaces must be provided with cable routes.,{'ID': '68_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},At least one in every five remaining parking spaces must be provided with cable routes.,selection
+29ad081e-90f4-4eb0-9cea-a4f49beea768,Fans used for general air distribution that are rated at more than 1100W should be fitted with variable speed drives.,{'ID': '298_UK_DocM_V2_AccessAndUseOfBuildings'},Fans used for general air distribution that are rated at more than 1100W should be fitted with variable speed drives.,part-of
+29232335-402c-4ed9-af74-fd093ac22e28,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,{'ID': '95_Finnish_Health-IndoorClimateAndVentilation'},The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,part-of
+78a7dc3d-5e1e-4858-8913-b319e30f2ff1,The air extract rate should be 20 litres per second per machine during use.,{'ID': '46_UK_DocF_V2_Ventilation'},The air extract rate should be 20 litres per second per machine during use.,equal
+a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",part-of
+06c2e0f7-69c8-47ec-bf31-9902ae9df7cf,"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",{'ID': '109_UK_DocK_ProtectionFromFalling'},"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",none
+5f7b8ff7-50d0-46a2-a48b-fa19786c98fd,"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '105_Finnish_EnergyEfficiency'},"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",necessity
+db734798-9e42-4fe1-900c-77d4e6131809,"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",{'ID': '11_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",part-of
+117864c0-5065-4c55-b390-c17b60c8d9dd,"If the protective part of the barrier contains only vertical structures, a cube with edges of no more than 100 millimetres may pass through its openings.",{'ID': '48_Finnish_SafetyOfUse'},"If the protective part of the barrier contains only vertical structures, a cube with edges of no more than 100 millimetres may pass through its openings.",selection
+1fba7a26-6331-4e4b-a855-fc916a81bd06,Fixings: care should be taken to ensure that fixings do not damage the airtightness barrier.,{'ID': '187_UK_DocL_V1_ConsrvationOfFuelAndPower'},Fixings: care should be taken to ensure that fixings do not damage the airtightness barrier.,necessity
+457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",none
+0085ecdd-f2f0-45f5-948d-ded697c69866,"In addition, on one side of the toilet seat there shall be a free space of at least 800 millimetres.",{'ID': '44_Finnish_Accessibility'},"In addition, on one side of the toilet seat there shall be a free space of at least 800 millimetres.",greater-equal
+fa8a6d84-eb99-490e-8169-3c65353fb553,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",{'ID': '61_Finnish_StabilityOfStructures'},"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",none
+dcc583b1-8c4c-42cf-a1ed-e8907de56254,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",{'ID': '23_Finnish_SafetyOfUse'},"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",none
+710ef992-e187-4b1a-894b-e0e222f54359,"NOTE: For grid-supplied electricity, a CO2 emission factor of 0.136kgCO2/kWh and primary energy factor of 1.501kWhPE/kWh should be used.",{'ID': '199_UK_DocM_V2_AccessAndUseOfBuildings'},"NOTE: For grid-supplied electricity, a CO2 emission factor of 0.136kgCO2/kWh and primary energy factor of 1.501kWhPE/kWh should be used.",necessity
+12e545d1-64f4-45c9-a520-5b8a003eba0a,"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",{'ID': '85_UK_DocF_V1_Ventilation'},"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",selection
+405a2082-beb9-4c5f-bc9f-d688b72e723b,Intermediate floors: floor-to-wall junctions should be detailed to ensure that insulation in the external wall is continuous.,{'ID': '162_UK_DocL_V1_ConsrvationOfFuelAndPower'},Intermediate floors: floor-to-wall junctions should be detailed to ensure that insulation in the external wall is continuous.,part-of
+8e9ef8dc-18bd-4877-98cd-556aa4adee8f,"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'},"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",necessity
+02f5e3fb-7a8b-4a88-a6e5-337cc0835284,"When a new residential building is erected, information about the building must be given to the owner of the building to allow them to use the overheating mitigation strategy effectively.",{'ID': '90_UK_DocO_Overheating'},"When a new residential building is erected, information about the building must be given to the owner of the building to allow them to use the overheating mitigation strategy effectively.",selection
+bed3cb74-fdd3-4888-80ab-b416d1b060ad,"For systems that have the ability to use free cooling or heat recovery, the SEER should be derived for the specific application, including free cooling or heat recovery elements.",{'ID': '282_UK_DocM_V2_AccessAndUseOfBuildings'},"For systems that have the ability to use free cooling or heat recovery, the SEER should be derived for the specific application, including free cooling or heat recovery elements.",part-of
+f6add908-4d45-4b3e-83a6-369f6c36c037,"Door rails, stiles and muntins should be at least 44mm thick.",{'ID': '28_UK_DocQ_Security_Dwellings'},"Door rails, stiles and muntins should be at least 44mm thick.",part-of
+5ca184fa-e100-4f97-957d-e37ae944786f,The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,{'ID': '51_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,none
+333110c1-ba9e-4c1d-9249-6604f49ba09a,"The presence of doors, whether open or closed, should be apparent to visually impaired people through the careful choice of colour and material for the door and its surroundings.",{'ID': '91_UK_DocM_V2_AccessAndUseOfBuildings'},"The presence of doors, whether open or closed, should be apparent to visually impaired people through the careful choice of colour and material for the door and its surroundings.",necessity
+7f065688-203b-42d0-acb9-8fde5ff37821,Main distribution routes should be through vertical risers to minimise heat gains into common spaces.,{'ID': '44_UK_DocO_Overheating'},Main distribution routes should be through vertical risers to minimise heat gains into common spaces.,necessity
+bd033057-ac6c-45bb-92c7-ca58bf22dab1,The lobby should be large enough and of a shape to allow a wheelchair user or a person pushing a pram to move clear of one door before opening the second door.,{'ID': '80_UK_DocM_V2_AccessAndUseOfBuildings'},The lobby should be large enough and of a shape to allow a wheelchair user or a person pushing a pram to move clear of one door before opening the second door.,necessity
+38cd3221-7fc9-4462-be20-78b16a4309d3,The area of openings in the newly created dwelling should not be more than 25 of the total floor area.,{'ID': '490_UK_DocL_V1_ConsrvationOfFuelAndPower'},The area of openings in the newly created dwelling should not be more than 25 of the total floor area.,part-of
+0f8b3f66-6496-431c-bdc1-75570dde9ee6,"All cable routes should be laid as straight as possible and with suitable access points, so that cables can be pulled through in future.",{'ID': '111_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"All cable routes should be laid as straight as possible and with suitable access points, so that cables can be pulled through in future.",necessity
+8aad11d6-bd81-4a57-bd73-7c1319a76494,"Where on-site electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and on-site energy demand.",{'ID': '331_UK_DocM_V2_AccessAndUseOfBuildings'},"Where on-site electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and on-site energy demand.",part-of
+208b093d-361f-4aec-819d-4abca4e72c68,"in an evacuation area where the maximum number of occupants is 60, the second exit may be no less than 900 millimetres in width.",{'ID': '216_Finnish_FireSafety'},"in an evacuation area where the maximum number of occupants is 60, the second exit may be no less than 900 millimetres in width.",part-of
+354c849e-8e02-47ec-992c-e5431a62cb3f,Ventilation systems that provide supply and extract ventilation should be fitted with a heat recovery system where technically feasible.,{'ID': '309_UK_DocM_V2_AccessAndUseOfBuildings'},Ventilation systems that provide supply and extract ventilation should be fitted with a heat recovery system where technically feasible.,selection
+bb9ec292-062b-43c3-8590-856dd5f6b890,"The building primary energy rate and building emission rate calculated using the measured air permeability must not be higher than the target primary energy rate and target emission rate, respectively.",{'ID': '357_UK_DocM_V2_AccessAndUseOfBuildings'},"The building primary energy rate and building emission rate calculated using the measured air permeability must not be higher than the target primary energy rate and target emission rate, respectively.",selection
+d5e04f9c-3e74-4ade-8a8c-07b77efd3fd1,"For windows and roof windows, U-values should be calculated based on a vertical position.",{'ID': '110_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For windows and roof windows, U-values should be calculated based on a vertical position.",part-of
+8c79efc1-f3e8-4394-ae6a-0bf5432ebcc5,NOTE: Ventilation through infiltration should be considered to be part of the ventilation provision of a dwelling.,{'ID': '131_UK_DocF_V1_Ventilation'},NOTE: Ventilation through infiltration should be considered to be part of the ventilation provision of a dwelling.,selection
+81f14fc1-af5d-45e8-8725-94d2510e4701,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",{'ID': '29_Finnish_Accessibility'},"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",none
+aac9b625-4f6b-42e6-b657-2accd6054607,Heating systems for screed floors that are greater than 65mm thick should automatically reduce the room temperature at night or when the room is unoccupied.,{'ID': '299_UK_DocL_V1_ConsrvationOfFuelAndPower'},Heating systems for screed floors that are greater than 65mm thick should automatically reduce the room temperature at night or when the room is unoccupied.,greater
+500fc416-e652-4a2c-8dd3-8d9754ea1829,There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,{'ID': '115_UK_DocF_V2_Ventilation'},There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,selection
+a4dc06ab-99c3-4c8b-b295-eb3e6a64320a,"The free height from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 2.2 metres, unless the area is protected so as to prevent the danger of collision.",{'ID': '99_Finnish_SafetyOfUse'},"The free height from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 2.2 metres, unless the area is protected so as to prevent the danger of collision.",selection
+0fdce0b1-7992-401f-aa84-ad7f2acca23d,Cavity walls: the inner block leaf mortar joint should be fully filled and pointed within the cavity.,{'ID': '184_UK_DocL_V1_ConsrvationOfFuelAndPower'},Cavity walls: the inner block leaf mortar joint should be fully filled and pointed within the cavity.,none
+e320322e-3aee-4167-ad19-a6c6cc41f597,The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,{'ID': '97_Finnish_Health-WaterAndSewerage'},The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,none
+46ee0eda-086a-40ab-8e8f-bfa4c85abd49,"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",{'ID': '16_Finnish_SafetyOfUse'},"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",none
+eccd4f77-ef4a-41fd-a22a-620c84fdddd4,There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,{'ID': '98_UK_DocM_V1_AccessAndUseOfBuildings'},There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,part-of
+7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",none
+7577d9f7-9f3c-4d3b-b8d9-da31d3e1b201,"For example, glare and reflections from shiny surfaces, and large repeating patterns, should be avoided in spaces where visual acuity is critical as they will hamper communication for people with impaired vision, and those who lip read or use sign language.",{'ID': '150_UK_DocM_V2_AccessAndUseOfBuildings'},"For example, glare and reflections from shiny surfaces, and large repeating patterns, should be avoided in spaces where visual acuity is critical as they will hamper communication for people with impaired vision, and those who lip read or use sign language.",none
+992e8f11-81ac-4d2f-b7d1-60e46b4b7261,Wheelchair accessible dwellings must also provide both a level access shower and a bath.,{'ID': '108_UK_DocM_V1_AccessAndUseOfBuildings'},Wheelchair accessible dwellings must also provide both a level access shower and a bath.,necessity
+d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",greater
+d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",part-of
+2238d6ef-421b-4f84-b24d-d46c6ba2afc5,"For example, when a door is open, people with impaired sight should be able to identify the door opening within the wall, as well as the leading edge of the door.",{'ID': '92_UK_DocM_V2_AccessAndUseOfBuildings'},"For example, when a door is open, people with impaired sight should be able to identify the door opening within the wall, as well as the leading edge of the door.",none
+5e226793-2805-41b0-bcb6-49319afaefc7,"If the building has a floor area greater than 150m2, heating should be split into different heating zones and each zone should have separate controls for timing and temperature demand.",{'ID': '258_UK_DocM_V2_AccessAndUseOfBuildings'},"If the building has a floor area greater than 150m2, heating should be split into different heating zones and each zone should have separate controls for timing and temperature demand.",greater
+cf152151-90f9-47d0-9e4e-5a1cd813d4e5,System controls should be wired so that when there is no demand for space heating or hot water the heating appliance and pump are switched off.,{'ID': '247_UK_DocL_V1_ConsrvationOfFuelAndPower'},System controls should be wired so that when there is no demand for space heating or hot water the heating appliance and pump are switched off.,none
+4e119abd-0cf7-4c60-9c7b-1083f9b46280,"NOTE: If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise attenuating background ventilator should be fitted.",{'ID': '85_UK_DocF_V2_Ventilation'},"NOTE: If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise attenuating background ventilator should be fitted.",necessity
+a894077e-cebf-4559-9254-ce964bc11b0f,Air flow rates for mechanical ventilation in new dwellings must be measured.,{'ID': '182_UK_DocF_V1_Ventilation'},Air flow rates for mechanical ventilation in new dwellings must be measured.,part-of
+108b5709-f035-4697-ba25-56edd2ce60fc,"Where permanent or removable seating is provided as part of the design, allowance should be made for disabled people to have a choice of seating location at spectator events.",{'ID': '126_UK_DocM_V2_AccessAndUseOfBuildings'},"Where permanent or removable seating is provided as part of the design, allowance should be made for disabled people to have a choice of seating location at spectator events.",selection
+f3bd99b4-7ea5-4968-af10-3c133c0b5aa0,No individual flight has a rise between landings of more than 1800mm.,{'ID': '42_UK_DocM_V1_AccessAndUseOfBuildings'},No individual flight has a rise between landings of more than 1800mm.,part-of
+2afa8bba-b5ad-4e12-bc27-4beea3fd09b2,The normal relationship between the dimensions of the rise and going is: twice the rise plus the going (2R G) equals between 550mm and 700mm.,{'ID': '19_UK_DocK_ProtectionFromFalling'},The normal relationship between the dimensions of the rise and going is: twice the rise plus the going (2R G) equals between 550mm and 700mm.,part-of
+c7035b48-7244-40a9-a70e-1d244caf72ac,"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",{'ID': '56_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",none
+53bb982d-5260-4a69-a6dd-71e4f074e676,The depth of standing rows must be at least half a metre.,{'ID': '111_Finnish_SafetyOfUse'},The depth of standing rows must be at least half a metre.,part-of
+afd03eb1-8356-4755-a764-6869d0ac4171,"Reasonable provision should be made for people to (a) gain access to; and (b) use, the dwelling and its facilities.",{'ID': '9_UK_DocM_V1_AccessAndUseOfBuildings'},"Reasonable provision should be made for people to (a) gain access to; and (b) use, the dwelling and its facilities.",necessity
+f162906e-1097-420e-b2a0-dd746d5794c7,"Where controls are external to the heater, the system should be provided with a time switch/programmer and room thermostat, or programmable room thermostat.",{'ID': '265_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where controls are external to the heater, the system should be provided with a time switch/programmer and room thermostat, or programmable room thermostat.",necessity
+01008f69-874b-443e-bcb2-2f5630280049,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",{'ID': '24_Finnish_SafetyOfUse'},"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",selection
+f420ae57-5656-4558-b1a3-1079e46bf6cc,"In the case of the storey-level door of a dwelling, or if the number of people evacuating through the door exceeds 60, doors must open in the direction of the exit.",{'ID': '223_Finnish_FireSafety'},"In the case of the storey-level door of a dwelling, or if the number of people evacuating through the door exceeds 60, doors must open in the direction of the exit.",necessity
+e15250c0-1279-4d29-a1ec-31560b045007,Extinguishing routes of basement storeys must not be connected to fire and smoke-proof exits.,{'ID': '244_Finnish_FireSafety'},Extinguishing routes of basement storeys must not be connected to fire and smoke-proof exits.,selection
+6187cad8-0d6d-4154-b98b-7285b36fea8d,Continuously running fans should be set up to operate without occupant intervention but may have manual or automatic controls for selecting the high rate of operation.,{'ID': '65_UK_DocF_V1_Ventilation'},Continuously running fans should be set up to operate without occupant intervention but may have manual or automatic controls for selecting the high rate of operation.,none
+88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",greater
+db8b3a40-4d12-4dc9-b463-1c7bc6e4f00d,The waste water pumping station shall be ventilated.,{'ID': '130_Finnish_Health-WaterAndSewerage'},The waste water pumping station shall be ventilated.,necessity
+cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",none
+7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",part-of
+2032e456-bf80-4342-90dc-0da164e00a9a,A unit that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,{'ID': '7_UK_DocF_V1_Ventilation'},A unit that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,necessity
+5ca6b3d3-fd21-4cc1-8dd8-185268db6615,The doorset should be manufactured from solid or laminated timber with a minimum density of 600kg/m3.,{'ID': '26_UK_DocQ_Security_Dwellings'},The doorset should be manufactured from solid or laminated timber with a minimum density of 600kg/m3.,selection
+a9cea98b-d439-4930-a991-fc17eee6657c,the location of the electric vehicle charge point or future connection location should be suitable for use by electric vehicles with charging inlets in different places.,{'ID': '102_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},the location of the electric vehicle charge point or future connection location should be suitable for use by electric vehicles with charging inlets in different places.,part-of
+e46efdc3-02a8-4440-870d-a6cdc1b34430,NOTE: Rooms that are designed to contain printers and photocopiers in substantial use (more than 30 minutes per hour) should not be designed to be occupied.,{'ID': '44_UK_DocF_V2_Ventilation'},NOTE: Rooms that are designed to contain printers and photocopiers in substantial use (more than 30 minutes per hour) should not be designed to be occupied.,necessity
+87c9c5f5-18dc-4107-b4af-b44dfb2b9627,The effective rated output should be assessed based on the final installed capacity of the heating or air-conditioning system.,{'ID': '326_UK_DocM_V2_AccessAndUseOfBuildings'},The effective rated output should be assessed based on the final installed capacity of the heating or air-conditioning system.,necessity
+fb5d3054-4911-4049-ba09-1c3e80f9c07c,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",{'ID': '29_Finnish_SafetyOfUse'},"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",none
+b5edf19f-56df-436a-89f0-9ab5bf6963ea,"If necessary, fire compartments shall be partitioned in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '106_Finnish_FireSafety'},"If necessary, fire compartments shall be partitioned in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",selection
+aa7c5790-2189-451d-bd0e-956a257a7b6d,"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",{'ID': '201_UK_DocL_V1_ConsrvationOfFuelAndPower'},"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",part-of
+8b054fa5-fa6b-40f8-996a-a6dfea855fc3,"The distance between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 400 millimetres on the side wall and no less than 1,500 millimetres on the end wall.",{'ID': '33_Finnish_SafetyOfUse'},"The distance between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 400 millimetres on the side wall and no less than 1,500 millimetres on the end wall.",selection
+7f696221-52c9-4c52-8f90-74bd93c51299,This grippable handrail is 850-1000mm above the pitch line of the flight and extends at least 300mm beyond the top and bottom nosings.,{'ID': '73_UK_DocM_V1_AccessAndUseOfBuildings'},This grippable handrail is 850-1000mm above the pitch line of the flight and extends at least 300mm beyond the top and bottom nosings.,equal
+ba93ede4-473f-4c07-b439-3699580cbcbe,No individual flight has a rise of more than 1800mm between landings.,{'ID': '21_UK_DocM_V1_AccessAndUseOfBuildings'},No individual flight has a rise of more than 1800mm between landings.,less-equal
+09e6b265-5610-4917-ac32-6b2c8f144fd6,"Windows, skylights and ventilators which can be opened by people in or about the building shall be so constructed or equipped that they may be opened, closed or adjusted safely.",{'ID': '107_UK_DocK_ProtectionFromFalling'},"Windows, skylights and ventilators which can be opened by people in or about the building shall be so constructed or equipped that they may be opened, closed or adjusted safely.",selection
+7a6635fc-c464-4d61-8ef1-2fdbf13bb9e7,"U-values for rooflights or rooflight-and-kerb assemblies should be based on the developed surface area of the rooflight (U_d values), which is often greater than the area of the roof opening.",{'ID': '140_UK_DocM_V2_AccessAndUseOfBuildings'},"U-values for rooflights or rooflight-and-kerb assemblies should be based on the developed surface area of the rooflight (U_d values), which is often greater than the area of the roof opening.",necessity
+da4d5959-6e64-4e04-a1f3-8b42b6addab0,The outdoor air flow used in the calculations for buildings other than those in intended use categories 1 and 2 outside the occupancy period shall be at least 0.15 dm3/s per m2.,{'ID': '67_Finnish_EnergyEfficiency'},The outdoor air flow used in the calculations for buildings other than those in intended use categories 1 and 2 outside the occupancy period shall be at least 0.15 dm3/s per m2.,selection
+01008f69-874b-443e-bcb2-2f5630280049,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",{'ID': '24_Finnish_SafetyOfUse'},"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",selection
+d099bcfd-6f29-4146-a72f-189db5e03dd4,"If waste water cannot be conveyed from the drainage points of a building with gravity unloading via a gradient sewer, the waste water shall be pumped.",{'ID': '128_Finnish_Health-WaterAndSewerage'},"If waste water cannot be conveyed from the drainage points of a building with gravity unloading via a gradient sewer, the waste water shall be pumped.",necessity
+1ebce0c9-705c-47ee-8429-e83cfbed72db,"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",{'ID': '103_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",necessity
+f6add908-4d45-4b3e-83a6-369f6c36c037,"Door rails, stiles and muntins should be at least 44mm thick.",{'ID': '28_UK_DocQ_Security_Dwellings'},"Door rails, stiles and muntins should be at least 44mm thick.",part-of
+20518e80-6f7e-457f-8c5a-59fa4c0eb324,"When calculating the heat loss for a buildings design solution, the design value shall be used as the value of the air leakage rate figure for the building envelope.",{'ID': '137_Finnish_EnergyEfficiency'},"When calculating the heat loss for a buildings design solution, the design value shall be used as the value of the air leakage rate figure for the building envelope.",part-of
+457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",selection
+dcc583b1-8c4c-42cf-a1ed-e8907de56254,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",{'ID': '23_Finnish_SafetyOfUse'},"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",none
+84cd76d7-e5d0-4f39-94bc-0236c65d533a,"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",{'ID': '217_Finnish_FireSafety'},"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",less-equal
+5305da48-b810-4fd8-a0b3-7520f89ff401,"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",{'ID': '194_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",none
+c384013b-c40f-4925-acbe-465e1ca5bc13,One photograph per detail should be recorded.,{'ID': '480_UK_DocL_V1_ConsrvationOfFuelAndPower'},One photograph per detail should be recorded.,selection
+959b4ba1-2cf2-4ae9-84d4-055e9c0040f1,The inaccuracies of the crane wheels should be determined together with the crane supplier.,{'ID': '229_Finnish_StabilityOfStructures'},The inaccuracies of the crane wheels should be determined together with the crane supplier.,part-of
+3153d771-404e-4a54-ac05-ed1b75e37506,"Gangways should not be less than 1100mm wide unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",{'ID': '8_UK_DocK_ProtectionFromFalling'},"Gangways should not be less than 1100mm wide unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",none
+2ff58135-b89d-40d1-a145-51aad9e5a942,"The landing in front of the outside door shall be at least 1,500 millimetres wide and at least 1,500 millimetres long.",{'ID': '16_Finnish_Accessibility'},"The landing in front of the outside door shall be at least 1,500 millimetres wide and at least 1,500 millimetres long.",selection
+419892bb-5044-4c63-a8ba-7747ad52c23d,"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",{'ID': '195_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",selection
+74b9ee2c-0192-442d-b5a1-a2974d456429,"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",{'ID': '67_UK_DocM_V1_AccessAndUseOfBuildings'},"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",none
+2c8d2bc3-cf23-48f8-b9c0-b90f150f9f93,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing building.",{'ID': '426_UK_DocM_V2_AccessAndUseOfBuildings'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing building.",selection
+5b4380ba-0066-4735-a362-316d4c8e70b2,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",{'ID': '73_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",none
+525aa713-65e1-4368-a6f4-38f628be7fed,"in clothes shops, the dimensions and fittings recommended for an individual changing cubicle in a sports building should be provided.",{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},"in clothes shops, the dimensions and fittings recommended for an individual changing cubicle in a sports building should be provided.",selection
+5ba5ffe7-ece8-488a-b461-da66237e7888,"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",{'ID': '54_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",part-of
+53e31e26-a39b-4047-a86e-bdb8021413e8,Window handles on windows that open outwards are not more than 650mm from the inside face of the wall when the window is at its maximum openable angle.,{'ID': '84_UK_DocO_Overheating'},Window handles on windows that open outwards are not more than 650mm from the inside face of the wall when the window is at its maximum openable angle.,none
+12e545d1-64f4-45c9-a520-5b8a003eba0a,"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",{'ID': '85_UK_DocF_V1_Ventilation'},"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",none
+c2c49207-78b3-42b0-8b61-ad506f5a80e2,"In hard water areas, suitable measures should be taken to treat the feed water to water heaters and the hot water circuit of combination boilers to reduce lime-scale accumulation.",{'ID': '381_UK_DocL_V1_ConsrvationOfFuelAndPower'},"In hard water areas, suitable measures should be taken to treat the feed water to water heaters and the hot water circuit of combination boilers to reduce lime-scale accumulation.",none
+2c8d2bc3-cf23-48f8-b9c0-b90f150f9f93,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing building.",{'ID': '426_UK_DocM_V2_AccessAndUseOfBuildings'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing building.",necessity
+db734798-9e42-4fe1-900c-77d4e6131809,"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",{'ID': '11_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",none
+e43c1e88-be80-42d9-944e-1bf0f0f82479,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,{'ID': '18_UK_DocM_V1_AccessAndUseOfBuildings'},Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,none
+29232335-402c-4ed9-af74-fd093ac22e28,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,{'ID': '95_Finnish_Health-IndoorClimateAndVentilation'},The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,none
+850d22c2-6ff0-4ab6-89e1-75368bad5aa6,Barriers on loading docks must not impede loading and unloading.,{'ID': '136_Finnish_SafetyOfUse'},Barriers on loading docks must not impede loading and unloading.,part-of
+f19c6d4a-f6e8-4f2e-b676-537852f3c38f,"The heat loss from the floor should be calculated using the sum of the thermal resistance of the floor finish and the underlying heated layer, multiplied by 10.",{'ID': '303_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The heat loss from the floor should be calculated using the sum of the thermal resistance of the floor finish and the underlying heated layer, multiplied by 10.",part-of
+c236bc17-ef9a-4694-a34e-68a9f38ae405,"For a heat exchanger between a solar primary and secondary system, a minimum of 0.1m2 or equivalent of heat exchanger area should be provided for every 1m2 of the net absorber area of the solar collector.",{'ID': '323_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a heat exchanger between a solar primary and secondary system, a minimum of 0.1m2 or equivalent of heat exchanger area should be provided for every 1m2 of the net absorber area of the solar collector.",none
+df122091-ca53-4134-98a3-47779c06f9df,The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flows at each terminal.,{'ID': '198_UK_DocF_V1_Ventilation'},The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flows at each terminal.,part-of
+f6add908-4d45-4b3e-83a6-369f6c36c037,"Door rails, stiles and muntins should be at least 44mm thick.",{'ID': '28_UK_DocQ_Security_Dwellings'},"Door rails, stiles and muntins should be at least 44mm thick.",part-of
+28433761-e537-456b-9ff8-00e786b43143,Consumer units should be mounted so that the switches are between 1350mm and 1450mm above floor level.,{'ID': '126_UK_DocM_V1_AccessAndUseOfBuildings'},Consumer units should be mounted so that the switches are between 1350mm and 1450mm above floor level.,selection
+60205cf2-fa87-4195-9415-a6fb144a9b72,"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",{'ID': '96_Finnish_SafetyOfUse'},"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",part-of
+78a7dc3d-5e1e-4858-8913-b319e30f2ff1,The air extract rate should be 20 litres per second per machine during use.,{'ID': '46_UK_DocF_V2_Ventilation'},The air extract rate should be 20 litres per second per machine during use.,selection
+8805ec9f-3f5f-44fc-9078-3ae62439c973,"NOTE: When a single U-value is calculated for a product range of doors, the configuration of the door chosen for the calculation should be the worst performing in the product range.",{'ID': '108_UK_DocL_V1_ConsrvationOfFuelAndPower'},"NOTE: When a single U-value is calculated for a product range of doors, the configuration of the door chosen for the calculation should be the worst performing in the product range.",selection
+2ef73ac0-d424-4e28-9782-3dbaf6e0a046,Attics and uppermost floor voids shall be divided into 400 m2 parts.,{'ID': '107_Finnish_FireSafety'},Attics and uppermost floor voids shall be divided into 400 m2 parts.,none
+d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",selection
+d54852df-8e3c-4e99-8484-31c403b78558,"If work is carried out on a system that includes a boiler, a boiler interlock should be installed.",{'ID': '256_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If work is carried out on a system that includes a boiler, a boiler interlock should be installed.",part-of
+2a8898d7-8561-4f67-9979-1bbba8ad42e6,"If insulating material is inserted into a cavity in a cavity wall, reasonable precautions shall be taken to prevent the subsequent permeation of any toxic fumes from that material into any part of the building occupied by people.",{'ID': '3_UK_DocD_ToxicSubstances'},"If insulating material is inserted into a cavity in a cavity wall, reasonable precautions shall be taken to prevent the subsequent permeation of any toxic fumes from that material into any part of the building occupied by people.",part-of
+ebc429f0-cb90-41ab-9a11-401a2ddc7bad,"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",{'ID': '268_UK_DocF_V1_Ventilation'},"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",selection
+4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",part-of
+c8a048c6-8e7e-4b5a-ada5-02990b983401,"A natural ventilation system, a mechanical extract ventilation system or a mechanical supply and extract ventilation system shall not be designed to be combined in such a way that the directions of air flow between the rooms and in the ductworks may change when the air flows are being controlled.",{'ID': '91_Finnish_Health-IndoorClimateAndVentilation'},"A natural ventilation system, a mechanical extract ventilation system or a mechanical supply and extract ventilation system shall not be designed to be combined in such a way that the directions of air flow between the rooms and in the ductworks may change when the air flows are being controlled.",necessity
+e9d02df9-2fcb-4acc-bd08-18a4348cd823,"If people need to obtain tickets for pay and display parking, the ticket dispensing machines should be located in a way that allows a person in a wheelchair, or a person of short stature, to gain access close to the machine and reach the payment and ticket dispensing functions.",{'ID': '46_UK_DocM_V2_AccessAndUseOfBuildings'},"If people need to obtain tickets for pay and display parking, the ticket dispensing machines should be located in a way that allows a person in a wheelchair, or a person of short stature, to gain access close to the machine and reach the payment and ticket dispensing functions.",selection
+b810df40-4dd8-44c4-80c4-b33bb873a5e9,"If the circulation piping is located inside the building envelopes insulation, 25 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '103_Finnish_EnergyEfficiency'},"If the circulation piping is located inside the building envelopes insulation, 25 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",part-of
+05864826-21ef-4ae7-9af8-2aaeffc7267a,Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,{'ID': '83_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,part-of
+2cb4937d-9ec4-4013-8e9b-318a8adae27a,Account should be taken of outside noise when considering whether openable windows are appropriate for purge ventilation.,{'ID': '24_UK_DocF_V1_Ventilation'},Account should be taken of outside noise when considering whether openable windows are appropriate for purge ventilation.,selection
+76bf63bd-30f4-440d-81a0-61ca16170f70,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,none
+1de9d3e5-dee3-42c9-b929-80b7936f1642,The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,{'ID': '33_Finnish_Accessibility'},The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,part-of
+0df5892a-e396-424e-90f1-74f6ccfb9e1a,"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",{'ID': '61_Finnish_Accessibility'},"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",part-of
+a372d2c4-f734-479d-bc8d-d3a8aa15362d,"A wide range of people, including accompanied wheelchair users, should be able to access and use the lift.",{'ID': '49_UK_DocM_V1_AccessAndUseOfBuildings'},"A wide range of people, including accompanied wheelchair users, should be able to access and use the lift.",none
+39a37d5e-3361-43b9-a209-e5cd45918abc,"For mixed-use buildings which have parking spaces within a covered car park, any requirements to install electric vehicle charge points or cable routes must first be applied to those parking spaces outside the covered car park.",{'ID': '95_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"For mixed-use buildings which have parking spaces within a covered car park, any requirements to install electric vehicle charge points or cable routes must first be applied to those parking spaces outside the covered car park.",selection
+51550284-0701-41b2-9a76-a0061d16938a,"Windows and doors: to ensure continuity of the air barrier, window and door units should connect to the primary air barrier and window and door frames should be taped to surrounding structural openings, using air sealing tape.",{'ID': '188_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Windows and doors: to ensure continuity of the air barrier, window and door units should connect to the primary air barrier and window and door frames should be taped to surrounding structural openings, using air sealing tape.",necessity
+0219127c-2f2d-4b13-aafa-261c1fc39ffc,"A power socket, suitable for powering the lifting device, is provided close to the liftway.",{'ID': '109_UK_DocM_V1_AccessAndUseOfBuildings'},"A power socket, suitable for powering the lifting device, is provided close to the liftway.",selection
+0f8b3f66-6496-431c-bdc1-75570dde9ee6,"All cable routes should be laid as straight as possible and with suitable access points, so that cables can be pulled through in future.",{'ID': '111_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"All cable routes should be laid as straight as possible and with suitable access points, so that cables can be pulled through in future.",none
+54907849-c48f-4267-b5f0-fc7e9279da7c,"For existing dwellings, when carrying out work on an existing system, such as installing or replacing components (e.g. replacing a boiler but retaining the pipework and heat emitters), the energy performance of the new components should be assessed.",{'ID': '409_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when carrying out work on an existing system, such as installing or replacing components (e.g. replacing a boiler but retaining the pipework and heat emitters), the energy performance of the new components should be assessed.",selection
+12907c6f-e734-436d-a7de-c8a1626fbe92,"Both:the area of rooflights exceeds 20 of the area of the roof, and the design solar load exceeds 25W/m2.",{'ID': '496_UK_DocM_V2_AccessAndUseOfBuildings'},"Both:the area of rooflights exceeds 20 of the area of the roof, and the design solar load exceeds 25W/m2.",greater
+89811586-c819-4eb5-99f5-c4fcefdb9520,Fixed or linked seats must be arranged as rows of seating with an access route on the side of the rows.,{'ID': '107_Finnish_SafetyOfUse'},Fixed or linked seats must be arranged as rows of seating with an access route on the side of the rows.,selection
+66b3628a-f0ee-4bc7-93c8-2ae0145a2e78,"In a room with no openable window, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",{'ID': '83_UK_DocF_V1_Ventilation'},"In a room with no openable window, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",selection
+9fee4426-8d7f-40f9-bc6f-562a5d3fd9b4,"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",{'ID': '144_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",none
+38020928-c137-486e-88d7-c8feec038c99,A building must be provided with a fire wall if it is situated adjacent to a neighbouring building or so close to a neighbouring building that the spread of fire is evident.,{'ID': '189_Finnish_FireSafety'},A building must be provided with a fire wall if it is situated adjacent to a neighbouring building or so close to a neighbouring building that the spread of fire is evident.,none
+35cacecf-06dc-4b0f-aadb-db2ee05518c7,The area of windows and roof windows (but excluding display windows) within the area served exceeds 40 of the facade area.,{'ID': '495_UK_DocM_V2_AccessAndUseOfBuildings'},The area of windows and roof windows (but excluding display windows) within the area served exceeds 40 of the facade area.,selection
+80221d2c-8ba8-4700-b219-c35fde50f35e,No more than two drainage wells may be connected to a floor drain and they may be located at a maximum distance of three meters from the floor drain.,{'ID': '125_Finnish_Health-WaterAndSewerage'},No more than two drainage wells may be connected to a floor drain and they may be located at a maximum distance of three meters from the floor drain.,none
+9027959e-efc1-4d32-acbe-e0775d40f001,"The morticed bolts should have a minimum projection of 20mm, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",{'ID': '38_UK_DocQ_Security_Dwellings'},"The morticed bolts should have a minimum projection of 20mm, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",greater-equal
+4d80c4d1-08ee-481a-9f9c-e9151ce1094d,"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",{'ID': '421_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",part-of
+72d7716f-7e3e-442c-9e42-14d4b19e18e3,A district heat network that is being connected to a new building should not have a CO2 emission factor for delivered heat to the building which is greater than 0.350kgCO2/kWh.,{'ID': '336_UK_DocM_V2_AccessAndUseOfBuildings'},A district heat network that is being connected to a new building should not have a CO2 emission factor for delivered heat to the building which is greater than 0.350kgCO2/kWh.,selection
+70760393-8139-47e8-a329-87da3a477396,Under-floor heating systems intended for intermittent or cyclical operation and/or installed over unheated rooms should be separated from the structural floor by a layer of insulation with a thermal resistance of at least 1.25(m2K)/W.,{'ID': '304_UK_DocL_V1_ConsrvationOfFuelAndPower'},Under-floor heating systems intended for intermittent or cyclical operation and/or installed over unheated rooms should be separated from the structural floor by a layer of insulation with a thermal resistance of at least 1.25(m2K)/W.,selection
+d713514a-9398-45a2-9584-efecff6ebcc5,Reasonable provision must be made to resist unauthorised access to (a) any dwelling; and (b) any part of a building from which access can be gained to a flat within the building.,{'ID': '4_UK_DocQ_Security_Dwellings'},Reasonable provision must be made to resist unauthorised access to (a) any dwelling; and (b) any part of a building from which access can be gained to a flat within the building.,none
+0096a3bf-ac16-4a75-adf9-8c3f4a9b8610,The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,{'ID': '33_UK_DocQ_Security_Dwellings'},The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,part-of
+caf32693-fa0e-43ba-aa9f-526bcba734fa,Single glazing should be supplemented with low-emissivity secondary glazing.,{'ID': '119_UK_DocL_V1_ConsrvationOfFuelAndPower'},Single glazing should be supplemented with low-emissivity secondary glazing.,necessity
+c3cfbf29-a95f-4453-a7de-a8f6e4ca2ea8,"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",{'ID': '152_Finnish_Health-WaterAndSewerage'},"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",selection
+47e50ddf-6174-436d-851b-7ddf46c10ccf,A suitable chemical inhibitor should be added to the primary heating circuit to protect against scale and corrosion.,{'ID': '380_UK_DocL_V1_ConsrvationOfFuelAndPower'},A suitable chemical inhibitor should be added to the primary heating circuit to protect against scale and corrosion.,selection
+caa5332f-5180-4d07-a41f-e6e0e044a8c1,An existing district heat network that is being connected to a new dwelling should not have a CO2 emission factor for delivered heat to the dwelling which is greater than 0.350kgCO2/kWh.,{'ID': '287_UK_DocL_V1_ConsrvationOfFuelAndPower'},An existing district heat network that is being connected to a new dwelling should not have a CO2 emission factor for delivered heat to the dwelling which is greater than 0.350kgCO2/kWh.,none
+78a7dc3d-5e1e-4858-8913-b319e30f2ff1,The air extract rate should be 20 litres per second per machine during use.,{'ID': '46_UK_DocF_V2_Ventilation'},The air extract rate should be 20 litres per second per machine during use.,none
+ec381965-2539-4bd6-9260-e667b4746a3a,To reduce the risks to the health of persons in buildings formaldehyde fumes given off by urea formaldehyde foams should not penetrate to occupied parts of buildings to an extent which would give rise to an irritant concentration.,{'ID': '4_UK_DocD_ToxicSubstances'},To reduce the risks to the health of persons in buildings formaldehyde fumes given off by urea formaldehyde foams should not penetrate to occupied parts of buildings to an extent which would give rise to an irritant concentration.,selection
+f0df1ef0-731e-41b8-b971-36951b915009,Frames should be mechanically fixed to the structure of the building in accordance with the manufacturers installation instructions.,{'ID': '13_UK_DocQ_Security_Dwellings'},Frames should be mechanically fixed to the structure of the building in accordance with the manufacturers installation instructions.,necessity
+a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",part-of
+3121fe90-27db-405e-a42a-df3cd22ee176,"Where necessary, two handrails, one above the other, must be installed in order to take into account children and users of wheelchairs.",{'ID': '55_Finnish_SafetyOfUse'},"Where necessary, two handrails, one above the other, must be installed in order to take into account children and users of wheelchairs.",selection
+5211dbd1-d12a-4371-ad62-1dc5616cd2f5,The heat pump along with its accompanying pipework should be flushed and purged as a separate system while isolated from the ground array system.,{'ID': '387_UK_DocL_V1_ConsrvationOfFuelAndPower'},The heat pump along with its accompanying pipework should be flushed and purged as a separate system while isolated from the ground array system.,selection
+56517433-cf40-4b88-a9d4-18e61e0e9993,"In addition, on both sides of the toilet seat there shall be a free space of at least 800 millimetres.",{'ID': '55_Finnish_Accessibility'},"In addition, on both sides of the toilet seat there shall be a free space of at least 800 millimetres.",part-of
+3ec9d4e7-3526-411c-8b30-0c7671660ed1,"The relationship between the kitchen, dining and living areas should be convenient and step-free.",{'ID': '91_UK_DocM_V1_AccessAndUseOfBuildings'},"The relationship between the kitchen, dining and living areas should be convenient and step-free.",necessity
+f64c5a32-2f88-4be6-abf4-8870a4e51fdf,"The use of recirculation, transfer or secondary air shall not cause any harmful spread of impurities, in particular odours.",{'ID': '72_Finnish_Health-IndoorClimateAndVentilation'},"The use of recirculation, transfer or secondary air shall not cause any harmful spread of impurities, in particular odours.",selection
+38020928-c137-486e-88d7-c8feec038c99,A building must be provided with a fire wall if it is situated adjacent to a neighbouring building or so close to a neighbouring building that the spread of fire is evident.,{'ID': '189_Finnish_FireSafety'},A building must be provided with a fire wall if it is situated adjacent to a neighbouring building or so close to a neighbouring building that the spread of fire is evident.,selection
+061c3b6a-49ed-4803-9436-e6349fae98e0,Entrance doors should be capable of being held closed when not in use.,{'ID': '65_UK_DocM_V2_AccessAndUseOfBuildings'},Entrance doors should be capable of being held closed when not in use.,part-of
+0edb92b7-a2e1-480f-b708-e7e6c9951a79,The foundation drainage water shall flow away from the property in such a way that it does not cause problems to the waste water and storm water systems.,{'ID': '173_Finnish_Health-WaterAndSewerage'},The foundation drainage water shall flow away from the property in such a way that it does not cause problems to the waste water and storm water systems.,part-of
+aa7c5790-2189-451d-bd0e-956a257a7b6d,"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",{'ID': '201_UK_DocL_V1_ConsrvationOfFuelAndPower'},"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",selection
+6d5428cc-90c2-477e-b20e-978a6d1cd403,Edge columns and walls shall be tied to every floor and roof.,{'ID': '186_Finnish_StabilityOfStructures'},Edge columns and walls shall be tied to every floor and roof.,selection
+c3cfbf29-a95f-4453-a7de-a8f6e4ca2ea8,"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",{'ID': '152_Finnish_Health-WaterAndSewerage'},"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",none
+dcc583b1-8c4c-42cf-a1ed-e8907de56254,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",{'ID': '23_Finnish_SafetyOfUse'},"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",part-of
+c7137e3d-e3f2-4a19-87bc-ccb194d42c74,"Incoming services: ducts, and cables wherever possible, should be grouped to minimise how often the air barrier is penetrated, while ensuring sufficient space to allow adequate screed flow between ducts.",{'ID': '178_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Incoming services: ducts, and cables wherever possible, should be grouped to minimise how often the air barrier is penetrated, while ensuring sufficient space to allow adequate screed flow between ducts.",selection
+4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",selection
+6187cad8-0d6d-4154-b98b-7285b36fea8d,Continuously running fans should be set up to operate without occupant intervention but may have manual or automatic controls for selecting the high rate of operation.,{'ID': '65_UK_DocF_V1_Ventilation'},Continuously running fans should be set up to operate without occupant intervention but may have manual or automatic controls for selecting the high rate of operation.,selection
+57f7bbad-51b7-4627-8fe9-2d7a50289448,"Doors to the principal, or alternative accessible, entrance should be accessible to all, particularly wheelchair users and people with limited physical dexterity.",{'ID': '64_UK_DocM_V2_AccessAndUseOfBuildings'},"Doors to the principal, or alternative accessible, entrance should be accessible to all, particularly wheelchair users and people with limited physical dexterity.",selection
+4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",none
+9fee4426-8d7f-40f9-bc6f-562a5d3fd9b4,"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",{'ID': '144_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",selection
+23cff3c3-1251-4c5f-9fd9-8f52d25eb494,Gasfired boilers and multi-stage oilfired boilers with an output of more than 500kW should have fully modulating burner controls.,{'ID': '252_UK_DocM_V2_AccessAndUseOfBuildings'},Gasfired boilers and multi-stage oilfired boilers with an output of more than 500kW should have fully modulating burner controls.,selection
+35af73f1-53c7-4377-9da0-acf99eef4d8e,"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",{'ID': '159_UK_DocM_V2_AccessAndUseOfBuildings'},"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",none