diff --git "a/augmented_train.csv" "b/augmented_train.csv" new file mode 100644--- /dev/null +++ "b/augmented_train.csv" @@ -0,0 +1,6376 @@ +example_id,content,metadata,tagged_sentence,relation_type,type +05fdde92-d8af-42ad-963b-9019c69a8ab3,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",{'ID': '163_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",equal,annotated +45338082-ca66-418b-8fe1-8f2be926f330_9,,,A load-bearing structures of no more than 50 may pass between the stair steps.,less-equal,synthetic +e43c1e88-be80-42d9-944e-1bf0f0f82479_1,,,Individual flights are: for gradients up to 1:15 not more than 800 millimetres design solar load; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated +f034fbd1-7547-425a-8163-513fcac0b66b,The roof structures and joints must be properly inclined and sealed for water drainage.,{'ID': '103_Finnish_Health-Humidity'},The roof structures and joints must be properly inclined and sealed for water drainage.,necessity,annotated +aef92227-4c01-4c59-b96d-ce414540606b,"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",{'ID': '63_UK_DocM_V2_AccessAndUseOfBuildings'},"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",necessity,annotated +9dd2a0f1-0ff9-4416-8abd-1e6589980ff4_9,,,"If the total flow rate of a mechanical ventilation systems air duct is designed to be greater than (16.66 8.33 V0.4)/(1000 24), the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",greater,synthetic +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_8,,,"If the primary energy factor of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 10 litres per second per person of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater,synthetic +2b60007d-59a3-4a18-a184-89e76ee17454,Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,{'ID': '161_UK_DocL_V1_ConsrvationOfFuelAndPower'},Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,part-of,annotated +f733b7c9-a406-4f5a-b383-9d3f8b70a559,The selection of relevant critical situations for design should be made reflecting the conditions that can reasonably be foreseen during future use.,{'ID': '5_UK_DocA_Structure'},The selection of relevant critical situations for design should be made reflecting the conditions that can reasonably be foreseen during future use.,selection,annotated +9ff8b8fd-5361-4c3d-9a7e-7459276c8df7_6,,,The energy efficiency must not exceed the individual dwellings high.,less-equal,synthetic +bb9ec292-062b-43c3-8590-856dd5f6b890_4,,,"The building primary energy rate and domestic hot water circulation heat loss calculated using the measured air permeability must not be higher than the target primary energy rate and patterns, respectively.",less-equal,synthetic +9ebe07e9-8381-451a-9ab8-701912478b30,The air flow rate of all mechanical ventilation fans should be tested.,{'ID': '210_UK_DocF_V1_Ventilation'},The air flow rate of all mechanical ventilation fans should be tested.,necessity,annotated +a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",part-of,annotated +c47598f9-df79-4d77-aba9-8f380342372f,extract air of category 4 shall be conducted to the outdoors through individual extract air ducts.,{'ID': '88_Finnish_Health-IndoorClimateAndVentilation'},extract air of category 4 shall be conducted to the outdoors through individual extract air ducts.,necessity,annotated +a235c68f-ae44-4770-b005-4e9d7b659eb7_10,,,All cavity walls should have leaves at least 0.15 headroom and cavities at least 50mm wide.,greater-equal,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_6,,,Skirtings totalling up to 50mm total thickness and shallow projecting Cable routes or casings above 650mm may be discounted when measuring clear width.,greater,synthetic +bfdf95da-d422-47cd-83d7-a30a4969f2e6,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",{'ID': '180_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",selection,annotated +99a53f17-48cb-4012-a47b-700761e0983b_8,,,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) 10m of those space must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,equal,synthetic +f6ea9be6-644d-4dc6-8954-d115bdd528c8,"The building emission rate and building primary energy rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the combined emission factor has been derived.",{'ID': '62_UK_DocM_V2_AccessAndUseOfBuildings'},"The building emission rate and building primary energy rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the combined emission factor has been derived.",part-of,annotated +835d8fad-7a27-4299-aa38-a5b1771a6779_2,,,"In large building complexes, such as retail parks and large sports centres, there should be 300 litres wheelchair-accessible unisex seating area capable of including an adult changing table.",equal,synthetic +c416d5e5-cb27-414c-b22e-7ed38be54ed1,There must be an automatic fire-extinguishing system that is suitable for its purpose and connected to the emergency centre.,{'ID': '232_Finnish_FireSafety'},There must be an automatic fire-extinguishing system that is suitable for its purpose and connected to the emergency centre.,selection,annotated +8364a5f1-f80e-484c-9f38-bffc6f4c1876_11,,,"Where communal parking is provided to blocks of flats, at least 150m2 standard lifting platform is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",greater-equal,synthetic +d8066a73-49c2-4e99-825a-b49b9b2ba67d_4,,,A landing measuring at least 0.06 m2 in fire compartmenting requirement must be reserved in front of and behind a door located in an exit route.,greater-equal,synthetic +8bb9aee2-a950-4a65-a715-287035906789,"Spaces of a non-residential building and common spaces of a residential building as well as the fixtures, fittings and fixed equipment in them shall be suitable for persons with mobility and functional impairment.",{'ID': '27_Finnish_Accessibility'},"Spaces of a non-residential building and common spaces of a residential building as well as the fixtures, fittings and fixed equipment in them shall be suitable for persons with mobility and functional impairment.",necessity,annotated +76bf63bd-30f4-440d-81a0-61ca16170f70_8,,,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the sections is less than E of the total load.,less,synthetic +2be01bf1-2cd9-4982-8778-ba0afe835580,"If fans and background ventilators are fitted in the same room, they should be at least 500mm apart.",{'ID': '88_UK_DocF_V1_Ventilation'},"If fans and background ventilators are fitted in the same room, they should be at least 500mm apart.",necessity,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_10,,,"The free opening of the vertical hatch or window of an emergency exit must be at least m3/(hm2) at 50Pa in product certificate and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic +a15ee053-da1e-44cd-bdd9-76cdcb68eaee,"Whenever the building is moved to a new location, in which its intended time of use is less than two years, these calculations can be provided as evidence that the energy efficiency requirements are met.",{'ID': '87_UK_DocM_V2_AccessAndUseOfBuildings'},"Whenever the building is moved to a new location, in which its intended time of use is less than two years, these calculations can be provided as evidence that the energy efficiency requirements are met.",selection,annotated +05864826-21ef-4ae7-9af8-2aaeffc7267a,Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,{'ID': '83_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,none,annotated +cea6e7bd-c494-4146-9f81-3fd2ed64a2a6_8,,,The heat loss of the floor surface in the seating area and access route may not exceed E.,less-equal,synthetic +fa90c179-d32c-412b-a7d6-a515cc91dbdb,The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,{'ID': '86_Finnish_Health-Humidity'},The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,selection,annotated +8fcdc238-3c30-4659-9303-1b126a39b2cd_7,,,"The design solar load should be leading to room spaces of a non-residential building as well as to residential rooms of a residential building, necessary spaces serving residence and spaces serving the use of the building by at least 300mm.",greater-equal,synthetic +cea6e7bd-c494-4146-9f81-3fd2ed64a2a6_1,,,The vicinity of the floor surface in the seating area and access route may not exceed 600kg/m3.,less-equal,synthetic +4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",part-of,annotated +1ebce0c9-705c-47ee-8429-e83cfbed72db,"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",{'ID': '103_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",necessity,annotated +b02f9b87-d934-4c2f-8a59-b3b8c0a7be17,"Instantaneous or snapshot CO2 readings can be misleading, so several measurements should be taken throughout the day.",{'ID': '124_UK_DocF_V2_Ventilation'},"Instantaneous or snapshot CO2 readings can be misleading, so several measurements should be taken throughout the day.",selection,annotated +56517433-cf40-4b88-a9d4-18e61e0e9993_6,,,"In addition, on both sides of the toilet seat there shall be a house of at least 2.",greater-equal,synthetic +2afa8bba-b5ad-4e12-bc27-4beea3fd09b2,The normal relationship between the dimensions of the rise and going is: twice the rise plus the going (2R G) equals between 550mm and 700mm.,{'ID': '19_UK_DocK_ProtectionFromFalling'},The normal relationship between the dimensions of the rise and going is: twice the rise plus the going (2R G) equals between 550mm and 700mm.,none,annotated +8aad11d6-bd81-4a57-bd73-7c1319a76494,"Where on-site electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and on-site energy demand.",{'ID': '331_UK_DocM_V2_AccessAndUseOfBuildings'},"Where on-site electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and on-site energy demand.",part-of,annotated +9c2051ae-9878-4772-9471-bc5b8a28c3ae,"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy, taking into consideration the use and likely background level of noise from other sources.",{'ID': '23_UK_DocF_V2_Ventilation'},"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy, taking into consideration the use and likely background level of noise from other sources.",selection,annotated +2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d_2,,,An upstand built on site should not exceed a value of 1.,less-equal,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_4,,,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or skylights above four may be discounted when measuring clear width.,greater,synthetic +e21fa967-934e-4a29-a66d-252fdbbf928f_2,,,"If the parasitic energy use is unknown, an total extract air flow of 35 mg/m3 (30 ppm) should be made for any control system.",equal,synthetic +81f14fc1-af5d-45e8-8725-94d2510e4701,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",{'ID': '29_Finnish_Accessibility'},"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",greater-equal,annotated +e505b13c-7b62-4857-aa2d-544dc986e9c0,"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",{'ID': '18_UK_DocK_ProtectionFromFalling'},"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",none,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_6,,,"If the air flows of fire compartmenting requirement 1 and 1,200 MJ/m2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +0da52584-1b37-48b5-840f-3795ae695275_2,,,"the minimum clear dimensions of the platform are: 1,000 millimetres layers and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.",equal,synthetic +df122091-ca53-4134-98a3-47779c06f9df,The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flows at each terminal.,{'ID': '198_UK_DocF_V1_Ventilation'},The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flows at each terminal.,selection,annotated +ef561e39-db90-462c-8dde-15fbeae954e5_4,,,A cube with Ventilation of no more than two may pass between the upper edge of the barrier and the protective part.,less-equal,synthetic +2a256a9c-0b8a-4acf-87e1-86a5857f36a3,"Where a driveway forms all, or part of, the approach route, an additional allowance of at least 900mm wide should be provided so that a wheelchair user can pass a parked car.",{'ID': '17_UK_DocM_V1_AccessAndUseOfBuildings'},"Where a driveway forms all, or part of, the approach route, an additional allowance of at least 900mm wide should be provided so that a wheelchair user can pass a parked car.",selection,annotated +81f14fc1-af5d-45e8-8725-94d2510e4701_9,,,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a width of at least 30% load in the hallway and kitchen.",greater-equal,synthetic +53bb982d-5260-4a69-a6dd-71e4f074e676_4,,,The travel of standing rows must be at least 10 kN.,greater-equal,synthetic +60024014-cb6a-4a53-9b12-9497e0a1e5e8_8,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for length 1 and 300 litres if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic +e15250c0-1279-4d29-a1ec-31560b045007_10,,,trigeneration scheme of basement storeys must not be connected to fire and smoke-proof extension.,not-part-of,synthetic +60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",none,annotated +c384013b-c40f-4925-acbe-465e1ca5bc13_3,,,0.8 metres pressure gauge per detail should be recorded.,equal,synthetic +382038df-4d45-443d-a52a-8a83e6048d1e,At least 30% of the ties shall be located in the immediate vicinity of the grid lines of the columns and the walls.,{'ID': '175_Finnish_StabilityOfStructures'},At least 30% of the ties shall be located in the immediate vicinity of the grid lines of the columns and the walls.,necessity,annotated +8364a5f1-f80e-484c-9f38-bffc6f4c1876_4,,,"Where communal parking is provided to blocks of flats, at least 50mm standard Cable routes is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",greater-equal,synthetic +c0a6d35c-cc20-428b-941d-c3e3e6365c74_7,,,"In a tier that is uninterrupted by cross-gangways, and where the sections exceeds 2.4m, use a maximum number of steps of 40.",greater,synthetic +8aad11d6-bd81-4a57-bd73-7c1319a76494,"Where on-site electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and on-site energy demand.",{'ID': '331_UK_DocM_V2_AccessAndUseOfBuildings'},"Where on-site electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and on-site energy demand.",selection,annotated +a4dc06ab-99c3-4c8b-b295-eb3e6a64320a_8,,,"The free load capacity from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 1800mm, unless the area is protected so as to prevent the danger of collision.",greater-equal,synthetic +4094b859-b3b4-4035-94cd-8cf47ccbd801_2,,,The frequency is at least (16.66 8.33 V0.4)/(1000 24).,greater-equal,synthetic +72e7ed0c-9e73-46b2-a919-20f3fea337fd_5,,,"An outdoor air and exhaust air ducts with a potentially flammable or explosive atmosphere must not be located in a eaves where there are dwellings, accommodation premises, institutions or assembly and business premises.",not-part-of,synthetic +37f01a2c-b944-45a2-a7f4-140d8c03d7ac,"After rebating, frame components should retain at least 32mm of timber.",{'ID': '29_UK_DocQ_Security_Dwellings'},"After rebating, frame components should retain at least 32mm of timber.",necessity,annotated +4a82f789-a98a-4379-9b81-2a20cfba6c87,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 70 kN, will also be applied to internal ties.",{'ID': '179_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 70 kN, will also be applied to internal ties.",part-of,annotated +536b172d-ccd1-479a-8136-6ee05db0f264_8,,,"Where pipework is above ground, the performance of the pipe hot water storage vessel should be at least as high as the extends of pipework in the buried part of the system.",greater-equal,synthetic +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_8,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and two years in instantaneous carbon monoxide concentration; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic +164122ed-c7ac-4cf8-8a54-3d56c144f78d,"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",{'ID': '172_UK_DocM_V2_AccessAndUseOfBuildings'},"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",selection,annotated +c0abe869-e87e-4e66-a8ca-8578a338b07a,"Where a building automation and control system is installed, its control capabilities should be appropriate for the building, its expected usage and the building services specification.",{'ID': '329_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a building automation and control system is installed, its control capabilities should be appropriate for the building, its expected usage and the building services specification.",necessity,annotated +a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",necessity,annotated +66249fda-33bf-4d93-8bf9-53fb82ad0e95,"The driveway and parking area at a plot or building site must be separated from pedestrian, play and recreation areas.",{'ID': '87_Finnish_SafetyOfUse'},"The driveway and parking area at a plot or building site must be separated from pedestrian, play and recreation areas.",part-of,annotated +33ed3038-99a6-4b2d-906a-a1db21f2d898,"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",{'ID': '250_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",none,annotated +eccd4f77-ef4a-41fd-a22a-620c84fdddd4_10,,,There is a minimum of 01:20:00 of worktop to at least instantaneous carbon monoxide concentration of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,greater-equal,synthetic +0fdce0b1-7992-401f-aa84-ad7f2acca23d,Cavity walls: the inner block leaf mortar joint should be fully filled and pointed within the cavity.,{'ID': '184_UK_DocL_V1_ConsrvationOfFuelAndPower'},Cavity walls: the inner block leaf mortar joint should be fully filled and pointed within the cavity.,necessity,annotated +7f3f59a4-fc7e-4b14-8074-384f6cacf548_10,,,"The total useful floor area of a barrier in a dwellings indoor areas may, however, be at least 1.3 seconds if the drop is less than three metres.",greater-equal,synthetic +99a53f17-48cb-4012-a47b-700761e0983b_10,,,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) 50 m2 of those input charge must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,equal,synthetic +c384013b-c40f-4925-acbe-465e1ca5bc13_6,,,60 persons staircases per detail should be recorded.,equal,synthetic +ac2db7e5-ea0b-4a14-9623-eba6300272a7,A new dwelling must be built to a minimum standard of total energy performance.,{'ID': '46_UK_DocL_V1_ConsrvationOfFuelAndPower'},A new dwelling must be built to a minimum standard of total energy performance.,necessity,annotated +e3128ebd-be79-48f2-93b5-7806c9a9026a,"Constructions behind surfaces exposed to running water, repetitious splash water or water condensation must be waterproofed.",{'ID': '110_Finnish_Health-Humidity'},"Constructions behind surfaces exposed to running water, repetitious splash water or water condensation must be waterproofed.",selection,annotated +43e26628-8b62-4cc6-91e2-284335df1564_1,,,"In rooms used for sleeping or rest, the heat recovery may not exceed 01:08:00.",less-equal,synthetic +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated +84cd76d7-e5d0-4f39-94bc-0236c65d533a_8,,,"in residential buildings of not more than two storeys, one exit of no less than 16/01/2023 00:00 in reference value is permitted.",greater-equal,synthetic +12f51746-1632-4628-9d8a-98dcf58ed9fc,Doors must be capable of opening outwards - in wheelchair adaptable bathrooms the door may open inwards providing that the door can be easily rehung to open outwards (e.g. door stops are planted and easily moved).,{'ID': '116_UK_DocM_V1_AccessAndUseOfBuildings'},Doors must be capable of opening outwards - in wheelchair adaptable bathrooms the door may open inwards providing that the door can be easily rehung to open outwards (e.g. door stops are planted and easily moved).,part-of,annotated +f72a98f3-b7d2-4633-b244-0d7242dfb0c9_9,,,Every single bedroom has a minimum temperature of 28 metres and is at least 2.4m wide.,greater-equal,synthetic +f9de28ac-45bb-4400-9d9f-8afee73bd2e3,The number of appliances should not exceed one per 100m2 of dwelling floor area.,{'ID': '273_UK_DocL_V1_ConsrvationOfFuelAndPower'},The number of appliances should not exceed one per 100m2 of dwelling floor area.,none,annotated +2de867fe-80e7-4617-ad18-36225dd45ab1_8,,,Hinged or pivot windows with an cold side of less than 450mm are not suitable for purge ventilation.,less,synthetic +2633c957-07b4-4caa-a9d6-5acbac16b0b0_2,,,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 55 degrees Celsius thresholds.,equal,synthetic +2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d_5,,,An upstand built on site should not exceed a total supply air flow of 0.05.,less-equal,synthetic +eeb4239f-3819-475c-ad20-756bed80c4ff_0,,,"In reference heat loss calculations, the value used as the type and quality of the buildings ventilation system shall be 1m2.",equal,synthetic +a9944ed0-7168-4ec7-b761-0641e3e3228b,The sewerage system shall be equipped with cleanouts that are easy to handle and lockable in both horizontal and vertical sewers.,{'ID': '157_Finnish_Health-WaterAndSewerage'},The sewerage system shall be equipped with cleanouts that are easy to handle and lockable in both horizontal and vertical sewers.,necessity,annotated +d925c189-860a-4fcb-ae88-d1cf8cc14fb8_2,,,"The indoor and outdoor conditions of steps in covered or heated outdoor staircases must be no less than 0.7, and the riser may be no more than 160 millimetres.",greater-equal,synthetic +bfdf95da-d422-47cd-83d7-a30a4969f2e6,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",{'ID': '180_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",none,annotated +c0a6d35c-cc20-428b-941d-c3e3e6365c74_3,,,"In a tier that is uninterrupted by cross-gangways, and where the quality of the installation exceeds 20, use a maximum number of steps of 40.",greater,synthetic +5e7d4831-4ec8-48f9-9e60-0422fcc1eae4,"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",{'ID': '344_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",none,annotated +703e5c71-bd54-4267-acf4-fa7db1e70d49,"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",{'ID': '67_Finnish_Accessibility'},"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",part-of,annotated +e3b85ad6-6132-40d7-86f8-3cc5d44eb12c_0,,,100 millimetres requirements should be close to an accessible bathroom suitable for a wheelchair user.,equal,synthetic +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_11,,,"If the room temperature of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 0.07 of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater,synthetic +88e23b46-22d9-4be6-87b7-40541f7995a9_0,,,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the locations exceeds twice the rise plus the going (2R G); 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",greater,synthetic +4d80c4d1-08ee-481a-9f9c-e9151ce1094d,"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",{'ID': '421_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",part-of,annotated +f5a71c7b-e852-40f2-8f88-91cda7902a7e_2,,,"If a new building has a space heating or airconditioning system with an sales counter greater than 270 millimetres, a building automation and control system should be installed.",greater,synthetic +85745724-aa09-4cdd-ad17-3c50ea2b99a1,"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",{'ID': '105_UK_DocM_V1_AccessAndUseOfBuildings'},"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",selection,annotated +b63dcef6-1840-4e9e-ad51-f8fc481fe856_11,,,"The wall ties should have a air-tightness of 32mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_10,,,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or hot water ring duct above 44mm may be discounted when measuring clear width.,greater,synthetic +3cc36bc1-da6a-4ebc-8d2f-2f5b6c4349b1,Supply temperature control should be provided via a variable set point with outdoor temperature compensation.,{'ID': '307_UK_DocM_V2_AccessAndUseOfBuildings'},Supply temperature control should be provided via a variable set point with outdoor temperature compensation.,necessity,annotated +a235c68f-ae44-4770-b005-4e9d7b659eb7,All cavity walls should have leaves at least 90mm thick and cavities at least 50mm wide.,{'ID': '35_UK_DocA_Structure'},All cavity walls should have leaves at least 90mm thick and cavities at least 50mm wide.,part-of,annotated +ca1bbebb-fe4e-48d8-8cdf-eef13cd79ee9,The dwelling emission rate must not exceed the individual dwellings target emission rate.,{'ID': '65_UK_DocL_V1_ConsrvationOfFuelAndPower'},The dwelling emission rate must not exceed the individual dwellings target emission rate.,less-equal,annotated +33ed3038-99a6-4b2d-906a-a1db21f2d898,"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",{'ID': '250_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",none,annotated +76acc6bd-50c0-4f3f-b015-42e171ec6ce7_7,,,eight per cent volume systems must be installed.,equal,synthetic +efd2d371-97de-4d5e-af06-e404ff71f316,The impact of the ground and crawl space on heat loss shall be taken into account in heat loss calculations.,{'ID': '91_Finnish_EnergyEfficiency'},The impact of the ground and crawl space on heat loss shall be taken into account in heat loss calculations.,necessity,annotated +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_2,,,"Where the work concerns a building containing more than 25 decibels controls, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater,synthetic +fb1da22f-8ddb-4399-b441-64dca68da9af,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",{'ID': '218_Finnish_FireSafety'},"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",none,annotated +23db27ac-b594-4b26-883d-922d713d382a,"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",{'ID': '161_UK_DocM_V2_AccessAndUseOfBuildings'},"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",necessity,annotated +8efb6108-e49e-4d64-a1e4-22e3f9128b17,"When calculating the reference heat loss of a building, the value of 2.0 m3/(h m2) shall be used as the reference value for the air leakage rate figure for the building envelope.",{'ID': '136_Finnish_EnergyEfficiency'},"When calculating the reference heat loss of a building, the value of 2.0 m3/(h m2) shall be used as the reference value for the air leakage rate figure for the building envelope.",part-of,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,annotated +d925c189-860a-4fcb-ae88-d1cf8cc14fb8_11,,,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the Length may be no more than 1.",less-equal,synthetic +bde1697a-20c9-4f15-a63c-5be323a058c1_10,,,Any connection of 1m3/s or more projects to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,greater-equal,synthetic +993e54cc-49c3-43cb-995e-1a951c93c775_9,,,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an topography equal to 3.3m.",equal,synthetic +77f993c6-dff1-4f9a-8f66-73221d3cbaff_9,,,"If the dwelling only has 0.5 kN/m2 Manual reset, a minimum ventilation rate of 13l/s should be used.",equal,synthetic +a86b58e8-046f-44b7-8e1b-00c876c8c647,"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",{'ID': '30_Finnish_StabilityOfStructures'},"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",necessity,annotated +7f3f59a4-fc7e-4b14-8074-384f6cacf548_11,,,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the gradient is less than ten millimetres.",less,synthetic +10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,part-of,annotated +3724fd47-22f7-432c-81a2-1abcb95c7df2,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",{'ID': '96_UK_DocF_V1_Ventilation'},"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",none,annotated +7e34700e-92de-4b00-a820-f4085a2e186c_6,,,"If the free gap between facing walls of adjacent glazed balconies or the energy consumption of the wall to the window of an adjacent fire compartment is less than 1,000 millimetres, the wall in question must be class EI 15.",less,synthetic +6c789809-b1b8-429a-8fe2-8ce16f8a4b54,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,{'ID': '62_Finnish_Health-IndoorClimateAndVentilation'},Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,part-of,annotated +fdd9f39e-e397-4172-b4da-3d213a30f987,On-site electricity generation should be provided with automated controls that support the design of the system and the intended use.,{'ID': '335_UK_DocM_V2_AccessAndUseOfBuildings'},On-site electricity generation should be provided with automated controls that support the design of the system and the intended use.,selection,annotated +7577d9f7-9f3c-4d3b-b8d9-da31d3e1b201,"For example, glare and reflections from shiny surfaces, and large repeating patterns, should be avoided in spaces where visual acuity is critical as they will hamper communication for people with impaired vision, and those who lip read or use sign language.",{'ID': '150_UK_DocM_V2_AccessAndUseOfBuildings'},"For example, glare and reflections from shiny surfaces, and large repeating patterns, should be avoided in spaces where visual acuity is critical as they will hamper communication for people with impaired vision, and those who lip read or use sign language.",necessity,annotated +b63dcef6-1840-4e9e-ad51-f8fc481fe856,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",{'ID': '36_UK_DocA_Structure'},"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,annotated +6c789809-b1b8-429a-8fe2-8ce16f8a4b54_3,,,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the shape does not exceed ten millimetres.,less-equal,synthetic +bb9ec292-062b-43c3-8590-856dd5f6b890,"The building primary energy rate and building emission rate calculated using the measured air permeability must not be higher than the target primary energy rate and target emission rate, respectively.",{'ID': '357_UK_DocM_V2_AccessAndUseOfBuildings'},"The building primary energy rate and building emission rate calculated using the measured air permeability must not be higher than the target primary energy rate and target emission rate, respectively.",less-equal,annotated +3724fd47-22f7-432c-81a2-1abcb95c7df2_4,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom residential block of flats, where there should be no fewer than 1,500 millimetres.",greater-equal,synthetic +9027959e-efc1-4d32-acbe-e0775d40f001_3,,,"The morticed bolts should have a minimum operation of 180 millimetres, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",greater-equal,synthetic +09b2a395-5293-4b7d-82d4-5312482d59e9_5,,,"Door entry controls, where provided, are mounted 1.3 seconds SEER finished ground level, and at least 300mm away from any projecting corner.",equal,synthetic +70760393-8139-47e8-a329-87da3a477396,Under-floor heating systems intended for intermittent or cyclical operation and/or installed over unheated rooms should be separated from the structural floor by a layer of insulation with a thermal resistance of at least 1.25(m2K)/W.,{'ID': '304_UK_DocL_V1_ConsrvationOfFuelAndPower'},Under-floor heating systems intended for intermittent or cyclical operation and/or installed over unheated rooms should be separated from the structural floor by a layer of insulation with a thermal resistance of at least 1.25(m2K)/W.,necessity,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_5,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 190 kN in travel and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic +793cb939-b3d9-46eb-ae65-71a4d5c8031b_6,,,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be exceptional circumstances to 220 millimetres.,less-equal,synthetic +511c1a7f-08b9-48ec-aea6-9b749fdf31a1_11,,,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an 90mm of appropriately located car park which are suitable for users of wheelchairs and walking frames with wheels.",equal,synthetic +26f33f06-e967-4d55-9e73-30990f52ac82,"Loft hatches: where the roof is insulated at ceiling level, hatches should be suitably designed and installed to ensure optimum airtightness.",{'ID': '189_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Loft hatches: where the roof is insulated at ceiling level, hatches should be suitably designed and installed to ensure optimum airtightness.",part-of,annotated +f3bd99b4-7ea5-4968-af10-3c133c0b5aa0_9,,,No individual flight has a visual contrast of more than 900 millimetres.,less-equal,synthetic +0667134c-1290-4fe0-99eb-41c0b9e63a27,CO2 emissions and primary energy associated with the thermal energy streams of a trigeneration scheme should be attributed in proportion to the output energy streams.,{'ID': '67_UK_DocM_V2_AccessAndUseOfBuildings'},CO2 emissions and primary energy associated with the thermal energy streams of a trigeneration scheme should be attributed in proportion to the output energy streams.,part-of,annotated +5b4380ba-0066-4735-a362-316d4c8e70b2,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",{'ID': '73_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",selection,annotated +72e7ed0c-9e73-46b2-a919-20f3fea337fd_2,,,"An Heating systems with a potentially flammable or explosive atmosphere must not be located in a levels where there are dwellings, accommodation premises, institutions or assembly and business premises.",not-part-of,synthetic +9dd2a0f1-0ff9-4416-8abd-1e6589980ff4_11,,,"If the configuration of a mechanical ventilation systems air duct is designed to be greater than 850-1000mm, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",greater,synthetic +7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8_3,,,"For sizes of cylinder not listed, the principal living area from the cylinder should not exceed 70 kN, where V is the volume in litres.",less-equal,synthetic +458f98c0-ce87-48da-9c61-42a80d5dd672,Intermittent extract fans should be fitted in all wet rooms.,{'ID': '82_UK_DocF_V1_Ventilation'},Intermittent extract fans should be fitted in all wet rooms.,necessity,annotated +5e7d4831-4ec8-48f9-9e60-0422fcc1eae4_0,,,"When replacing an existing system, the structure of the new system should be no less than number of wall ties per square metre of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",greater-equal,synthetic +835d8fad-7a27-4299-aa38-a5b1771a6779_11,,,"In large building complexes, such as retail parks and large sports centres, there should be 65 degrees Celsius wheelchair-accessible unisex Variable volume control systems capable of including an adult changing table.",equal,synthetic +b63dcef6-1840-4e9e-ad51-f8fc481fe856_1,,,"The wall ties should have a horizontal spacing of 900mm and a protection of 400-600mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",part-of,annotated +26980508-105c-49db-8595-bf001a48d757,"In rooms with no fixed seats or furnishings, the number of persons shall be calculated to be two persons per square metre.",{'ID': '103_Finnish_SafetyOfUse'},"In rooms with no fixed seats or furnishings, the number of persons shall be calculated to be two persons per square metre.",part-of,annotated +082c7ed9-3579-48c2-a0d2-076f1edd647c_7,,,"Each of the m3/(hm2) at 50Pa heat of the centrally hinged window should be assessed as a single side, bottom or top hung window.",equal,synthetic +3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,part-of,annotated +ef4ec541-e1a7-47d4-9a83-94715d8900ba_11,,,"Where six metres or more male washrooms are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",greater-equal,synthetic +21bf2954-bfa8-44ef-bb2e-4e34367965ba,"If a load-bearing element is required to have a longer fire resistance time with respect to integrity E and insulation I than with respect to load-bearing capacity R, the longer fire resistance time shall also be applied to the load-bearing capacity.",{'ID': '88_Finnish_FireSafety'},"If a load-bearing element is required to have a longer fire resistance time with respect to integrity E and insulation I than with respect to load-bearing capacity R, the longer fire resistance time shall also be applied to the load-bearing capacity.",selection,annotated +7c44934c-61e1-4904-a493-1aa360ccc7d1,"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",{'ID': '1_UK_DocA_Structure'},"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",none,annotated +f420ae57-5656-4558-b1a3-1079e46bf6cc,"In the case of the storey-level door of a dwelling, or if the number of people evacuating through the door exceeds 60, doors must open in the direction of the exit.",{'ID': '223_Finnish_FireSafety'},"In the case of the storey-level door of a dwelling, or if the number of people evacuating through the door exceeds 60, doors must open in the direction of the exit.",part-of,annotated +e2f06254-ca46-4471-89c7-ebef89a4d93d,"Where used, passive stack ventilation terminals should be located in the ceiling.",{'ID': '50_UK_DocF_V2_Ventilation'},"Where used, passive stack ventilation terminals should be located in the ceiling.",selection,annotated +7d1ada0b-8dcc-4c01-84d7-78b80cb404c9,"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",{'ID': '58_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",selection,annotated +596cc55c-f50f-4155-962f-832b87226a8e,"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",{'ID': '23_UK_DocF_V1_Ventilation'},"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",necessity,annotated +db734798-9e42-4fe1-900c-77d4e6131809,"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",{'ID': '11_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",necessity,annotated +d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",part-of,annotated +09b2a395-5293-4b7d-82d4-5312482d59e9_1,,,"Door entry controls, where provided, are mounted 01:20:00 fire compartmenting requirement finished ground level, and at least 300mm away from any projecting corner.",equal,synthetic +88e23b46-22d9-4be6-87b7-40541f7995a9_6,,,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the above exceeds 25; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",greater,synthetic +42f29765-356f-4d9c-9a73-bc99e7044e07,"People with mobility impairments who arrive as passengers should be able to alight from a vehicle close to the principal entrance, or alternative accessible entrance, of the building in a way that is convenient for entry into the building.",{'ID': '47_UK_DocM_V2_AccessAndUseOfBuildings'},"People with mobility impairments who arrive as passengers should be able to alight from a vehicle close to the principal entrance, or alternative accessible entrance, of the building in a way that is convenient for entry into the building.",selection,annotated +2cb4937d-9ec4-4013-8e9b-318a8adae27a,Account should be taken of outside noise when considering whether openable windows are appropriate for purge ventilation.,{'ID': '24_UK_DocF_V1_Ventilation'},Account should be taken of outside noise when considering whether openable windows are appropriate for purge ventilation.,selection,annotated +a33a8e64-62e5-4a95-b5fb-356b18c8f34f,The crawl space must be accessible for inspections and maintenance of the equipment and systems located there.,{'ID': '84_Finnish_Health-Humidity'},The crawl space must be accessible for inspections and maintenance of the equipment and systems located there.,necessity,annotated +5f7b8ff7-50d0-46a2-a48b-fa19786c98fd,"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '105_Finnish_EnergyEfficiency'},"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",none,annotated +72e7ed0c-9e73-46b2-a919-20f3fea337fd,"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",{'ID': '56_Finnish_FireSafety'},"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",not-part-of,annotated +cf35d4a4-3170-421b-9be1-b68d928eed1d_0,,,"A roof with a speed greater than 1000m2 must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",greater,synthetic +43e26628-8b62-4cc6-91e2-284335df1564_4,,,"In rooms used for sleeping or rest, the distance of the uppermost floor level from the entry level may not exceed 2.0 m3/(h m2).",less-equal,synthetic +dcc583b1-8c4c-42cf-a1ed-e8907de56254_11,,,"The size of the indoor steps of other spaces intended for everyday use may be no more than 18 dm3/s, and the tread must be no less than 270 millimetres.",less-equal,synthetic +4094b859-b3b4-4035-94cd-8cf47ccbd801_8,,,"The atmosphere is at least 1,000 millimetres.",greater-equal,synthetic +d988e207-c3f9-4314-9a16-f99b334595f4_1,,,The total number of ventilators must be no less than 2.5 ties/m2.,greater-equal,synthetic +94c0e823-a61d-49d6-82b3-4ca96f65dfa4,The buildings surfaces and lighting must be such that they achieve the contrasts in brightness needed for observation.,{'ID': '64_Finnish_SafetyOfUse'},The buildings surfaces and lighting must be such that they achieve the contrasts in brightness needed for observation.,part-of,annotated +835d8fad-7a27-4299-aa38-a5b1771a6779_1,,,"In large building complexes, such as retail parks and large sports centres, there should be 5m wheelchair-accessible unisex high rate controls capable of including an adult changing table.",equal,synthetic +0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,none,annotated +9415ae4b-7a74-4c70-a245-e4381c6d71bf,"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",{'ID': '170_UK_DocL_V1_ConsrvationOfFuelAndPower'},"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",part-of,annotated +d3fc8c9b-c23a-4188-8723-369caa90453c_2,,,"The prevailing wind direction for a building's total combined window area is 65mm of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",equal,synthetic +9ff8b8fd-5361-4c3d-9a7e-7459276c8df7_1,,,The span must not exceed the individual dwellings configuration.,less-equal,synthetic +2a256a9c-0b8a-4acf-87e1-86a5857f36a3,"Where a driveway forms all, or part of, the approach route, an additional allowance of at least 900mm wide should be provided so that a wheelchair user can pass a parked car.",{'ID': '17_UK_DocM_V1_AccessAndUseOfBuildings'},"Where a driveway forms all, or part of, the approach route, an additional allowance of at least 900mm wide should be provided so that a wheelchair user can pass a parked car.",selection,annotated +8102cb27-2e2a-4008-99d6-a53f5045f6e2,Structures with surfaces exposed to moisture must be resistant to the effects of water.,{'ID': '36_Finnish_Health-Humidity'},Structures with surfaces exposed to moisture must be resistant to the effects of water.,necessity,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",none,annotated +9dd2a0f1-0ff9-4416-8abd-1e6589980ff4_0,,,"If the part of a mechanical ventilation systems air duct is designed to be greater than one metre, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",greater,synthetic +f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c_1,,,A building with a intermediate landing exceeding 200 Watts per room must be equipped with anchoring structures for safety lines.,greater,synthetic +5e7d4831-4ec8-48f9-9e60-0422fcc1eae4_4,,,"When replacing an existing system, the Unit length of the new system should be no less than primary energy factor of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",greater-equal,synthetic +57f7bbad-51b7-4627-8fe9-2d7a50289448,"Doors to the principal, or alternative accessible, entrance should be accessible to all, particularly wheelchair users and people with limited physical dexterity.",{'ID': '64_UK_DocM_V2_AccessAndUseOfBuildings'},"Doors to the principal, or alternative accessible, entrance should be accessible to all, particularly wheelchair users and people with limited physical dexterity.",none,annotated +8bb9aee2-a950-4a65-a715-287035906789,"Spaces of a non-residential building and common spaces of a residential building as well as the fixtures, fittings and fixed equipment in them shall be suitable for persons with mobility and functional impairment.",{'ID': '27_Finnish_Accessibility'},"Spaces of a non-residential building and common spaces of a residential building as well as the fixtures, fittings and fixed equipment in them shall be suitable for persons with mobility and functional impairment.",part-of,annotated +0aaf71f0-a482-4a72-a407-0d6db79c7f6f_5,,,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 55 of non-fire-compartmented fire compartment that essentially relate to the business of the building may be located on the level of second storey.",less-equal,synthetic +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_11,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 10m in cross-sectional area; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic +cccbc1ea-27be-4d7b-b53c-3cb467a51020,"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",{'ID': '220_UK_DocM_V2_AccessAndUseOfBuildings'},"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",selection,annotated +1320873f-de9b-4c55-a7c0-67f545c4a46e,"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",{'ID': '42_UK_DocM_V2_AccessAndUseOfBuildings'},"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",none,annotated +99a53f17-48cb-4012-a47b-700761e0983b,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,{'ID': '61_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,part-of,annotated +1e3d8e3a-93fd-47e2-833e-d7f36c901c77,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,{'ID': '131_UK_DocM_V1_AccessAndUseOfBuildings'},Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,less-equal,annotated +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",none,annotated +72e7ed0c-9e73-46b2-a919-20f3fea337fd,"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",{'ID': '56_Finnish_FireSafety'},"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",selection,annotated +2633c957-07b4-4caa-a9d6-5acbac16b0b0_4,,,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 2.0 m3/(h m2) building emission rate.,equal,synthetic +922bf8df-3a70-4f45-8c04-200b638d3b3c_3,,,The cold water pipe shall be designed and installed so that the projection in the cold water system may not exceed 270 millimetres.,less-equal,synthetic +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_11,,,"In buildings more than 35 mg/m3 (30 ppm) and at most 28 metres in tread, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",greater,synthetic +eccd4f77-ef4a-41fd-a22a-620c84fdddd4_2,,,There is a minimum of 160 millimetres of worktop to at least exit of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,greater-equal,synthetic +fc129e2c-abfa-48be-9fd6-e85f077ae67b,"A space alongside the leading edge of a door should be provided to enable a wheelchair user to reach and grip the door handle, then open the door without releasing hold on the handle and without the footrest colliding with the return wall.",{'ID': '70_UK_DocM_V2_AccessAndUseOfBuildings'},"A space alongside the leading edge of a door should be provided to enable a wheelchair user to reach and grip the door handle, then open the door without releasing hold on the handle and without the footrest colliding with the return wall.",none,annotated +a090f6bb-f89b-44c1-b6ee-8e72e2be30a0,Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '370_UK_DocM_V2_AccessAndUseOfBuildings'},Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,selection,annotated +8151be81-09ad-4dac-b2d2-f0d757915b6c_4,,,"However, when the snow load can occur, the load EER of the load s should be at least 190 millimetres.",greater-equal,synthetic +1ebce0c9-705c-47ee-8429-e83cfbed72db,"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",{'ID': '103_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",part-of,annotated +da4d5959-6e64-4e04-a1f3-8b42b6addab0_4,,,The outdoor inner surfaces used in the calculations for buildings other than those in intended use categories 1 and 2 outside the occupancy period shall be at least 1 in 40.,greater-equal,synthetic +3ca5cb38-b90b-4449-ba14-4268866df8e1_7,,,The water heater is close to the draw-off points and has a dwelling emission rate no greater than 300 millimetres.,less-equal,synthetic +e40e66a5-25da-494b-b09c-e3241289a1b7,All other bedrooms should be accessible to a wheelchair user.,{'ID': '101_UK_DocM_V1_AccessAndUseOfBuildings'},All other bedrooms should be accessible to a wheelchair user.,necessity,annotated +4b510cad-fefb-44be-a9cb-a26e0c42994c,"If the building is connected to a heating system where heat is conveyed via heat pipes external to the building from a shared heat exchanger or heat generation unit to several buildings, the heat loss from those pipes shall be divided between the buildings in proportion to their areas.",{'ID': '101_Finnish_EnergyEfficiency'},"If the building is connected to a heating system where heat is conveyed via heat pipes external to the building from a shared heat exchanger or heat generation unit to several buildings, the heat loss from those pipes shall be divided between the buildings in proportion to their areas.",necessity,annotated +259c1614-77ef-4ae4-a401-83caa603e374,"The main doors for entering a dwelling (usually the front doorset) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",{'ID': '35_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front doorset) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",selection,annotated +"8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent. {'ID': '9_Finnish_Accessibility'}_4",,,"However, if the allowance is no more than one per 100m2, the ramp may not have a gradient of more than eight per cent.",less-equal,synthetic +23db27ac-b594-4b26-883d-922d713d382a,"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",{'ID': '161_UK_DocM_V2_AccessAndUseOfBuildings'},"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",selection,annotated +56517433-cf40-4b88-a9d4-18e61e0e9993_11,,,"In addition, on both sides of the toilet seat there shall be a leak detectors of at least 75 light source lumens per circuit-watt.",greater-equal,synthetic +3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60,The approach route is a minimum of 900mm wide with a maximum cross fall of 1 in 40.,{'ID': '16_UK_DocM_V1_AccessAndUseOfBuildings'},The approach route is a minimum of 900mm wide with a maximum cross fall of 1 in 40.,part-of,annotated +13a437c0-918c-47f2-85bd-b80dd69eb027,"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",not-part-of,annotated +9ebe07e9-8381-451a-9ab8-701912478b30,The air flow rate of all mechanical ventilation fans should be tested.,{'ID': '210_UK_DocF_V1_Ventilation'},The air flow rate of all mechanical ventilation fans should be tested.,none,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",none,annotated +208b093d-361f-4aec-819d-4abca4e72c68,"in an evacuation area where the maximum number of occupants is 60, the second exit may be no less than 900 millimetres in width.",{'ID': '216_Finnish_FireSafety'},"in an evacuation area where the maximum number of occupants is 60, the second exit may be no less than 900 millimetres in width.",selection,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479_2,,,Individual flights are: for gradients up to 1:15 not more than EI 15 inaccuracies; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic +cc39ab97-8937-45f7-bc1f-bb2ccb95cb56,Drains shall convey foundation drainage water via drainage wells to a collection well.,{'ID': '172_Finnish_Health-WaterAndSewerage'},Drains shall convey foundation drainage water via drainage wells to a collection well.,necessity,annotated +e21fa967-934e-4a29-a66d-252fdbbf928f_11,,,"If the parasitic energy use is unknown, an both sides of four should be made for any control system.",equal,synthetic +f5a71c7b-e852-40f2-8f88-91cda7902a7e_3,,,"If a new building has a space heating or airconditioning system with an spread of fire greater than 30% load, a building automation and control system should be installed.",greater,synthetic +e43c1e88-be80-42d9-944e-1bf0f0f82479_6,,,Individual flights are: for gradients up to 1:15 not more than 0.06 m2 efficiencies; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic +09b2a395-5293-4b7d-82d4-5312482d59e9_0,,,"Door entry controls, where provided, are mounted between 550mm and 700mm inner surfaces finished ground level, and at least 300mm away from any projecting corner.",equal,synthetic +f2bf62e6-9577-48b5-b15d-9fe4904acf52,"Where controls are integrated in the heater, the system should be provided with a time switch/programmer and room temperature sensor linked to heater firing and fan speed control.",{'ID': '268_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where controls are integrated in the heater, the system should be provided with a time switch/programmer and room temperature sensor linked to heater firing and fan speed control.",necessity,annotated +9fd15b82-fc32-4364-8724-f1ef14f0c047_10,,,The cooker hood should specification at least the height of the cooker.,greater-equal,synthetic +dcc583b1-8c4c-42cf-a1ed-e8907de56254_2,,,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the impact must be no less than B.",greater-equal,synthetic +aa41a5d4-c0b1-4da7-84a0-5c2e2738654f,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,{'ID': '89_UK_DocF_V1_Ventilation'},The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,none,annotated +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_2,,,Skirtings totalling up to 50mm total thickness and shallow projecting cooker or casings above 30 may be discounted when measuring clear width.,greater,synthetic +8b054fa5-fa6b-40f8-996a-a6dfea855fc3_5,,,"The CO2 between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 18 dm3/s on the side wall and no less than 1,500 millimetres on the end wall.",greater-equal,synthetic +4470dde4-6422-4c13-9781-de68c3e075dc_3,,,"The outdoor thick of a dwelling unit, however, shall be designed to be a minimum of 2.0 m3/(h m2).",greater-equal,synthetic +385a4365-40c0-4c07-8854-b07bde292fd2,"The electrical energy consumption of a mechanical ventilation system shall be calculated on the basis of air flows, specific fan powers and operating times for all air handling units and powered roof ventilators in the building.",{'ID': '109_Finnish_EnergyEfficiency'},"The electrical energy consumption of a mechanical ventilation system shall be calculated on the basis of air flows, specific fan powers and operating times for all air handling units and powered roof ventilators in the building.",none,annotated +cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",necessity,annotated +108b5709-f035-4697-ba25-56edd2ce60fc,"Where permanent or removable seating is provided as part of the design, allowance should be made for disabled people to have a choice of seating location at spectator events.",{'ID': '126_UK_DocM_V2_AccessAndUseOfBuildings'},"Where permanent or removable seating is provided as part of the design, allowance should be made for disabled people to have a choice of seating location at spectator events.",necessity,annotated +9618a274-45da-4e3e-87f0-21c2bfae4a8e,"A guardrail must be used at points with a level difference of over 0.7 metres, if these can be accessed by children.",{'ID': '39_Finnish_SafetyOfUse'},"A guardrail must be used at points with a level difference of over 0.7 metres, if these can be accessed by children.",selection,annotated +3724fd47-22f7-432c-81a2-1abcb95c7df2_11,,,"The condition installed in a dwellings habitable rooms and kitchens should be no fewer than 90, except in one bedroom properties, where there should be no fewer than four.",greater-equal,synthetic +4f2b56cb-9852-4406-bbea-31f426fb4910,"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",{'ID': '397_UK_DocM_V2_AccessAndUseOfBuildings'},"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",part-of,annotated +76bf63bd-30f4-440d-81a0-61ca16170f70_10,,,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the headroom is less than 200 Watts per room of the total load.,less,synthetic +d925c189-860a-4fcb-ae88-d1cf8cc14fb8,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",{'ID': '28_Finnish_SafetyOfUse'},"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",greater-equal,annotated +511c1a7f-08b9-48ec-aea6-9b749fdf31a1,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an adequate number of appropriately located toilet facilities which are suitable for users of wheelchairs and walking frames with wheels.",{'ID': '51_Finnish_Accessibility'},"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an adequate number of appropriately located toilet facilities which are suitable for users of wheelchairs and walking frames with wheels.",equal,annotated +72e7ed0c-9e73-46b2-a919-20f3fea337fd,"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",{'ID': '56_Finnish_FireSafety'},"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",selection,annotated +984c252b-74f4-4d85-9080-1c8ae1851eca,"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",{'ID': '113_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",selection,annotated +636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4_11,,,"Where a new building contains more than two years tier, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",greater,synthetic +825053cb-af5d-43a9-b59b-e2a5ae78ea73,The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,{'ID': '59_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,part-of,annotated +f51da5c6-7614-4719-8150-e22851e4aa12,"The building fabric should be constructed so that thermal bridging, including at the party wall, is reasonably limited.",{'ID': '152_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The building fabric should be constructed so that thermal bridging, including at the party wall, is reasonably limited.",necessity,annotated +9494f4b9-aae0-4668-aebb-1d8851dd0824,"In refreshment facilities, bars and counters (or sections of them) should be at a level suitable for wheelchair users.",{'ID': '127_UK_DocM_V2_AccessAndUseOfBuildings'},"In refreshment facilities, bars and counters (or sections of them) should be at a level suitable for wheelchair users.",part-of,annotated +64aead92-11dc-49ab-9086-c86f6d1f9c3e,A dynamic calculation tool shall be used for the calculation of the room temperature for the summer season.,{'ID': '162_Finnish_EnergyEfficiency'},A dynamic calculation tool shall be used for the calculation of the room temperature for the summer season.,necessity,annotated +7f696221-52c9-4c52-8f90-74bd93c51299_4,,,"This grippable handrail is 850-1000mm above the pitch line of the flight and effective rated output at least 1,200 millimetres beyond the top and bottom nosings.",greater-equal,synthetic +35cacecf-06dc-4b0f-aadb-db2ee05518c7_4,,,The area of windows and roof windows (but excluding display windows) not reasonable to achieve a step-free approach route to the principal private entrance exceeds three metres of the facade area.,greater,synthetic +46f5be2a-1514-420b-bc39-331fc6e0d2df_2,,,"The dwelling primary energy rate, natural light and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, air-tightness and target fabric energy efficiency rate, respectively.",less-equal,synthetic +f27c9fb4-dc28-494c-a277-a51360cdfdb8,A handrail and its ending must be shaped safely and must continue past the start and end points of the structure.,{'ID': '57_Finnish_SafetyOfUse'},A handrail and its ending must be shaped safely and must continue past the start and end points of the structure.,necessity,annotated +703e5c71-bd54-4267-acf4-fa7db1e70d49,"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",{'ID': '67_Finnish_Accessibility'},"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",part-of,annotated +e15250c0-1279-4d29-a1ec-31560b045007_8,,,muntins of basement storeys must not be connected to fire and smoke-proof property.,not-part-of,synthetic +0da52584-1b37-48b5-840f-3795ae695275_4,,,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where 0.7W/(m2K) Manual controls are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +5ca184fa-e100-4f97-957d-e37ae944786f,The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,{'ID': '51_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,less-equal,annotated +d8066a73-49c2-4e99-825a-b49b9b2ba67d_11,,,A landing measuring at least 65mm in facade area must be reserved in front of and behind a door located in an exit route.,greater-equal,synthetic +7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",selection,annotated +d342429e-d3fc-46e0-a195-527cfef1fd4b,"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",{'ID': '451_UK_DocM_V2_AccessAndUseOfBuildings'},"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",none,annotated +8e8f4fb5-00b5-404f-89df-a07287984748_2,,,"In buildings with a storage capacity greater than 23C, automatic meter reading and data collection facilities should be installed.",greater,synthetic +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_7,,,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the service of that installation exceeds 65mm of the total cost of the major renovation.",greater,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_9,,,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or control appliance above 9 metres may be discounted when measuring clear width.,greater,synthetic +a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",none,annotated +835d8fad-7a27-4299-aa38-a5b1771a6779_9,,,"In large building complexes, such as retail parks and large sports centres, there should be 1 in 40 wheelchair-accessible unisex hermostatic control capable of including an adult changing table.",equal,synthetic +5577528f-8fa0-4ca3-96f6-ea418091cb86,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,{'ID': '32_Finnish_SafetyOfUse'},The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,part-of,annotated +12e545d1-64f4-45c9-a520-5b8a003eba0a_2,,,"If the dwelling has more than 850 millimetres exposed oven, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",greater,synthetic +528e7551-acfd-4fa6-be24-9c91bd6d7679,The materials and fittings shall be compatible.,{'ID': '149_Finnish_Health-WaterAndSewerage'},The materials and fittings shall be compatible.,necessity,annotated +b5aa20f2-571e-48d8-9943-4102c9f9bd1a,"In exit passageways and fire-compartmented elevator shafts, means must be arranged for both smoke extraction and flow of replacement air.",{'ID': '250_Finnish_FireSafety'},"In exit passageways and fire-compartmented elevator shafts, means must be arranged for both smoke extraction and flow of replacement air.",selection,annotated +a8b3e54e-902c-4502-99a2-8c41d46f1416_11,,,"If there are more than 9 metres battery storage in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",greater,synthetic +a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",none,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_6,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the number of people evacuating of these must be at least 0.15 dm3/s per m2.",greater-equal,synthetic +36650de0-ef3c-4fd1-8199-f47c0e576076_3,,,the drop of the platform does not exceed 0.8 metres.,less-equal,synthetic +5211dbd1-d12a-4371-ad62-1dc5616cd2f5,The heat pump along with its accompanying pipework should be flushed and purged as a separate system while isolated from the ground array system.,{'ID': '387_UK_DocL_V1_ConsrvationOfFuelAndPower'},The heat pump along with its accompanying pipework should be flushed and purged as a separate system while isolated from the ground array system.,part-of,annotated +35af73f1-53c7-4377-9da0-acf99eef4d8e,"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",{'ID': '159_UK_DocM_V2_AccessAndUseOfBuildings'},"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",part-of,annotated +72d7716f-7e3e-442c-9e42-14d4b19e18e3_7,,,A area that is being connected to a new building should not have a patterns for delivered heat to the building which is greater than 0.350kgCO2/kWh.,not-part-of,synthetic +c71c68fe-63ac-400f-b9ca-6e8c20cc5b5e,A conservatory or porch must have thermal separation from the existing dwelling.,{'ID': '431_UK_DocL_V1_ConsrvationOfFuelAndPower'},A conservatory or porch must have thermal separation from the existing dwelling.,necessity,annotated +956efc87-87de-4d3c-99fb-dc58eab9353b_3,,,A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a design value of at least EI 30.,greater-equal,synthetic +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated +3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,selection,annotated +2de867fe-80e7-4617-ad18-36225dd45ab1_6,,,Hinged or pivot windows with an patterns of less than 20 litres per second are not suitable for purge ventilation.,less,synthetic +46ee0eda-086a-40ab-8e8f-bfa4c85abd49,"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",{'ID': '16_Finnish_SafetyOfUse'},"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",none,annotated +37239af2-8f49-499f-ab25-73f92d7c9369,Each letter should be 25mm high.,{'ID': '117_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Each letter should be 25mm high.,part-of,annotated +5e7d4831-4ec8-48f9-9e60-0422fcc1eae4_5,,,"When replacing an existing system, the energy consumption of the new system should be no less than surface temperature of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",greater-equal,synthetic +517253f8-98b1-4821-8901-75124d3237db,"Consideration should be given to the provision of a second handrail on stairs in a wide range of building types, and particularly in schools, for use by children and people of short stature.",{'ID': '59_UK_DocM_V2_AccessAndUseOfBuildings'},"Consideration should be given to the provision of a second handrail on stairs in a wide range of building types, and particularly in schools, for use by children and people of short stature.",none,annotated +287098c1-9e45-4917-ad34-1301db390c17,"Where it is not reasonable to achieve a step-free approach route to the principal private entrance, a step-free approach route should be provided to a suitable alternative private entrance instead.",{'ID': '41_UK_DocM_V1_AccessAndUseOfBuildings'},"Where it is not reasonable to achieve a step-free approach route to the principal private entrance, a step-free approach route should be provided to a suitable alternative private entrance instead.",necessity,annotated +f9de28ac-45bb-4400-9d9f-8afee73bd2e3_9,,,The centre pane U-value should not exceed 50 millimetres of dwelling floor area.,less-equal,synthetic +0da52584-1b37-48b5-840f-3795ae695275_8,,,the minimum clear dimensions of the platform are: 850-1000mm total capital cost and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +db734798-9e42-4fe1-900c-77d4e6131809,"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",{'ID': '11_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",selection,annotated +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",greater,annotated +079db365-cfed-474e-9329-25349ac0db4a,"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",{'ID': '21_Finnish_Accessibility'},"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",none,annotated +46f5be2a-1514-420b-bc39-331fc6e0d2df_1,,,"The dwelling primary energy rate, free gap and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, mechanical ventilation and target fabric energy efficiency rate, respectively.",less-equal,synthetic +88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",selection,annotated +b02f9b87-d934-4c2f-8a59-b3b8c0a7be17,"Instantaneous or snapshot CO2 readings can be misleading, so several measurements should be taken throughout the day.",{'ID': '124_UK_DocF_V2_Ventilation'},"Instantaneous or snapshot CO2 readings can be misleading, so several measurements should be taken throughout the day.",selection,annotated +a0c838b5-5fe2-4b52-abe1-432804c2c8aa_1,,,A intended time of use of 21 C shall be used as the vertical spacing for room temperature during the heating season.,equal,synthetic +f9de28ac-45bb-4400-9d9f-8afee73bd2e3_7,,,The horizontal spacing should not exceed 44mm of dwelling floor area.,less-equal,synthetic +825053cb-af5d-43a9-b59b-e2a5ae78ea73_0,,,The energy consumption of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the intended purpose of dwellings in the residential building; b. the number of associated parking spaces.,greater,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,{'ID': '131_UK_DocM_V1_AccessAndUseOfBuildings'},Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,necessity,annotated +1913381b-a2cc-496e-9168-82ccf2a01d50,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",{'ID': '67_Finnish_Health-WaterAndSewerage'},"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",selection,annotated +2ef73ac0-d424-4e28-9782-3dbaf6e0a046,Attics and uppermost floor voids shall be divided into 400 m2 parts.,{'ID': '107_Finnish_FireSafety'},Attics and uppermost floor voids shall be divided into 400 m2 parts.,selection,annotated +0ea1e862-2434-4fc8-97a2-b076c992ef20_3,,,"The sales counter of an exit must be at least 6m and its free height must be at least 2,100 millimetres.",greater-equal,synthetic +63af9f99-6939-4e8c-a6a9-8b10942e1597,"The handle to at least one window in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",{'ID': '57_UK_DocM_V1_AccessAndUseOfBuildings'},"The handle to at least one window in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",necessity,annotated +a48aade7-5532-4424-a39e-5b1638516702,The effective g-value should be no worse than 0.3.,{'ID': '350_UK_DocM_V2_AccessAndUseOfBuildings'},The effective g-value should be no worse than 0.3.,necessity,annotated +3724fd47-22f7-432c-81a2-1abcb95c7df2_3,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in 0.055555556 commissioning plan properties, where there should be no fewer than four.",equal,synthetic +b63dcef6-1840-4e9e-ad51-f8fc481fe856_5,,,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the diameter is not less than 40 degrees Celsius.",greater-equal,synthetic +7602a501-a5b5-429c-99e1-8bc801243494,"The flooring and wall covering must provide waterproofing, or separate waterproofing must be installed under the flooring and behind the wall covering.",{'ID': '111_Finnish_Health-Humidity'},"The flooring and wall covering must provide waterproofing, or separate waterproofing must be installed under the flooring and behind the wall covering.",necessity,annotated +3ac96918-764f-403d-a588-37b5f4a16f46,"For absorption chillers used in conjunction with onsite CHP or a district heat network or community heating system, the CO2 emissions and primary energy should be calculated in the same way as when using CHP for heating.",{'ID': '284_UK_DocM_V2_AccessAndUseOfBuildings'},"For absorption chillers used in conjunction with onsite CHP or a district heat network or community heating system, the CO2 emissions and primary energy should be calculated in the same way as when using CHP for heating.",selection,annotated +b51c7a9f-2080-4e60-940f-e59af0cc97ce,"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",{'ID': '34_Finnish_Health-Humidity'},"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",part-of,annotated +1913381b-a2cc-496e-9168-82ccf2a01d50_6,,,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the Activation of the heat emitters to be installed does not exceed 8.5m2.",less-equal,synthetic +4e8c5c50-44af-48f6-b959-e6f9b31afa1e_11,,,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical Staircases may be sign.",equal,synthetic +2633c957-07b4-4caa-a9d6-5acbac16b0b0,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 100 load.,{'ID': '245_UK_DocM_V2_AccessAndUseOfBuildings'},NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 100 load.,part-of,annotated +05fdde92-d8af-42ad-963b-9019c69a8ab3_2,,,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same parasitic energy use as the buildings used in the external wall should be included within the depth of the intermediate floor structure.",equal,synthetic +37f01a2c-b944-45a2-a7f4-140d8c03d7ac,"After rebating, frame components should retain at least 32mm of timber.",{'ID': '29_UK_DocQ_Security_Dwellings'},"After rebating, frame components should retain at least 32mm of timber.",none,annotated +46f5be2a-1514-420b-bc39-331fc6e0d2df_10,,,"The dwelling primary energy rate, parasitic energy use and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, presence and target fabric energy efficiency rate, respectively.",less-equal,synthetic +74002ed3-548e-4e2f-8835-be76e643c67d_3,,,NOTE 2: Double doors effectively provide nibs where each leaf is at least 300 litres fire resistance time.,greater-equal,synthetic +a43037b0-8e35-45a2-9f23-c2d65f6c5a64,"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",{'ID': '8_UK_DocQ_Security_Dwellings'},"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",necessity,annotated +973c9430-2b4a-4ab4-82df-7060c3002f77_5,,,The total capital cost for the community heating primary circuit should be a minimum of 20 millimetres.,greater-equal,synthetic +984c252b-74f4-4d85-9080-1c8ae1851eca_3,,,"If performance requires thicker glass to be used, an equivalent window unit with control capabilities (14 metres) glazing should be shown to meet the required standard.",equal,synthetic +aa41a5d4-c0b1-4da7-84a0-5c2e2738654f_3,,,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than five Grommets.,greater,synthetic +bd1438b0-ce84-4908-8d01-6c0884aa4650,"For roof-lights, U-values should be calculated based on a horizontal position.",{'ID': '111_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For roof-lights, U-values should be calculated based on a horizontal position.",part-of,annotated +9f8c2fbb-a04e-42f9-8fa0-b7a905dbafa0,"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",{'ID': '40_Finnish_Health-Humidity'},"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",selection,annotated +2ff58135-b89d-40d1-a145-51aad9e5a942_11,,,"The landing in front of the outside door shall be at least 800 millimetres level difference and at least 1,500 millimetres long.",greater-equal,synthetic +3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,part-of,annotated +72d7716f-7e3e-442c-9e42-14d4b19e18e3,A district heat network that is being connected to a new building should not have a CO2 emission factor for delivered heat to the building which is greater than 0.350kgCO2/kWh.,{'ID': '336_UK_DocM_V2_AccessAndUseOfBuildings'},A district heat network that is being connected to a new building should not have a CO2 emission factor for delivered heat to the building which is greater than 0.350kgCO2/kWh.,not-part-of,annotated +7dbe5dbf-39fb-4ba4-bc75-d6ac7898e615,"U-values for rooflights or rooflight-and-kerb assemblies should be based on the developed surface area of the rooflight (U-values), which is often greater than the area of the roof opening.",{'ID': '114_UK_DocL_V1_ConsrvationOfFuelAndPower'},"U-values for rooflights or rooflight-and-kerb assemblies should be based on the developed surface area of the rooflight (U-values), which is often greater than the area of the roof opening.",none,annotated +76bf63bd-30f4-440d-81a0-61ca16170f70_7,,,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the rated output is less than 56 metres of the total load.,less,synthetic +13a437c0-918c-47f2-85bd-b80dd69eb027_9,,,"There are no patterns on the from the top and bottom corners of the door of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",not-part-of,synthetic +cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",greater,annotated +7f3f59a4-fc7e-4b14-8074-384f6cacf548,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",{'ID': '45_Finnish_SafetyOfUse'},"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",less,annotated +9ff8b8fd-5361-4c3d-9a7e-7459276c8df7_10,,,The floor plate areas must not exceed the individual dwellings total cost.,less-equal,synthetic +b5edf19f-56df-436a-89f0-9ab5bf6963ea,"If necessary, fire compartments shall be partitioned in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '106_Finnish_FireSafety'},"If necessary, fire compartments shall be partitioned in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",necessity,annotated +5925ca4d-801c-42e4-b581-a176dea2519f,"If thermal energy is supplied from a district heat network, a CO2 emission factor and primary energy factor for the heat delivered to the dwelling by the district heat network should be calculated.",{'ID': '76_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If thermal energy is supplied from a district heat network, a CO2 emission factor and primary energy factor for the heat delivered to the dwelling by the district heat network should be calculated.",selection,annotated +0a6d6be2-bb25-4a7d-ac98-33351e1a2bb7,"Wheelchair-accessible bedrooms should be sufficiently spacious to enable a wheelchair user to transfer to one side of a bed, with or without assistance.",{'ID': '144_UK_DocM_V2_AccessAndUseOfBuildings'},"Wheelchair-accessible bedrooms should be sufficiently spacious to enable a wheelchair user to transfer to one side of a bed, with or without assistance.",necessity,annotated +41d06a37-5039-4dc0-aae1-0fe3abbd84fc,The building fabric should be constructed so that the insulation is reasonably continuous across newly built elements.,{'ID': '132_UK_DocL_V1_ConsrvationOfFuelAndPower'},The building fabric should be constructed so that the insulation is reasonably continuous across newly built elements.,selection,annotated +dd056285-1aa4-4c6d-94ac-b911458cb7ea,"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",{'ID': '70_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",none,annotated +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_8,,,Skirtings totalling up to 0.05 atmosphere and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,less-equal,synthetic +0fdce0b1-7992-401f-aa84-ad7f2acca23d,Cavity walls: the inner block leaf mortar joint should be fully filled and pointed within the cavity.,{'ID': '184_UK_DocL_V1_ConsrvationOfFuelAndPower'},Cavity walls: the inner block leaf mortar joint should be fully filled and pointed within the cavity.,part-of,annotated +5e7d4831-4ec8-48f9-9e60-0422fcc1eae4_3,,,"When replacing an existing system, the Air flow rates of the new system should be no less than total useful floor area of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",greater-equal,synthetic +716fa732-f3c7-43ad-a4e3-fff43a841018,The vehicle traffic area of a building and its courtyard must be safe and appropriate.,{'ID': '131_Finnish_SafetyOfUse'},The vehicle traffic area of a building and its courtyard must be safe and appropriate.,necessity,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_5,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and load 150m2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +29c431ee-ea93-491d-ab13-06418d93c488_9,,,"If rated output is greater than 10m, manual control is acceptable.",greater,synthetic +fa90c179-d32c-412b-a7d6-a515cc91dbdb,The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,{'ID': '86_Finnish_Health-Humidity'},The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,none,annotated +43e26628-8b62-4cc6-91e2-284335df1564_6,,,"In rooms used for sleeping or rest, the emission rate may not exceed 2.2 metres.",less-equal,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_0,,,Skirtings totalling up to 0.9 metres free gap and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,less-equal,synthetic +a235c68f-ae44-4770-b005-4e9d7b659eb7_7,,,All cavity walls should have leaves at least two years Extract and cavities at least 50mm wide.,greater-equal,synthetic +2b60007d-59a3-4a18-a184-89e76ee17454,Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,{'ID': '161_UK_DocL_V1_ConsrvationOfFuelAndPower'},Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,selection,annotated +86831830-e7f0-4b90-aa27-dc0542b7ba4d_0,,,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least B automatic flow adjustment.",greater-equal,synthetic +0ea1e862-2434-4fc8-97a2-b076c992ef20_10,,,"The speed of an exit must be at least 10m and its free height must be at least 2,100 millimetres.",greater-equal,synthetic +76bf63bd-30f4-440d-81a0-61ca16170f70,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,none,annotated +eeb4239f-3819-475c-ad20-756bed80c4ff_4,,,"In reference heat loss calculations, the value used as the directions of the buildings ventilation system shall be 1.",equal,synthetic +e8340500-38b6-461b-b00d-d3aa44ac1f0b_8,,,The extends of the water available from the hot water system may not exceed 650mm.,less-equal,synthetic +00cded8a-5208-4c1b-bda4-9677d45b9375,The layers of attic floor structures and the ventilation must prevent the accumulation of damaging moisture into the roof structure resulting from water vapour diffusion or airflow.,{'ID': '105_Finnish_Health-Humidity'},The layers of attic floor structures and the ventilation must prevent the accumulation of damaging moisture into the roof structure resulting from water vapour diffusion or airflow.,none,annotated +46f5be2a-1514-420b-bc39-331fc6e0d2df_10,,,"The dwelling primary energy rate, dwelling emission rate and energy savings, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and domestic hot water circulation heat loss, respectively.",less-equal,synthetic +8151be81-09ad-4dac-b2d2-f0d757915b6c,"However, when the snow load can occur, the minimum value of the load s should be at least 0.5 kN/m2.",{'ID': '110_Finnish_StabilityOfStructures'},"However, when the snow load can occur, the minimum value of the load s should be at least 0.5 kN/m2.",greater-equal,annotated +dd056285-1aa4-4c6d-94ac-b911458cb7ea,"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",{'ID': '70_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",selection,annotated +0da52584-1b37-48b5-840f-3795ae695275_6,,,"the minimum clear dimensions of the platform are: 1,200 millimetres diameter and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.",equal,synthetic +8207751f-13b8-4fe3-9bfe-4423093d4905_4,,,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the speed of the staircase and exit route is no more than 850 millimetres.,less-equal,synthetic +3ca5cb38-b90b-4449-ba14-4268866df8e1_1,,,The water heater is close to the draw-off points and has a means no greater than 50 m.,less-equal,synthetic +f5a71c7b-e852-40f2-8f88-91cda7902a7e,"If a new building has a space heating or airconditioning system with an effective rated output greater than 180kW, a building automation and control system should be installed.",{'ID': '319_UK_DocM_V2_AccessAndUseOfBuildings'},"If a new building has a space heating or airconditioning system with an effective rated output greater than 180kW, a building automation and control system should be installed.",part-of,annotated +7e34700e-92de-4b00-a820-f4085a2e186c_7,,,"If the free gap between facing walls of adjacent glazed balconies or the Control of the wall to the window of an adjacent fire compartment is less than 50mm, the wall in question must be class EI 15.",less,synthetic +e061791c-7881-43fe-a272-beec4a972b0c,The panel should be securely held in place.,{'ID': '31_UK_DocQ_Security_Dwellings'},The panel should be securely held in place.,necessity,annotated +c47598f9-df79-4d77-aba9-8f380342372f_2,,,extract air of capacity 650mm shall be conducted to the outdoors through individual extract air ducts.,equal,synthetic +9eb5bf01-3810-44e3-802b-7c7eadad1831,"Mechanical ventilation systems, including both continuous and intermittent mechanical ventilation, should be designed and installed to minimise noise.",{'ID': '21_UK_DocF_V1_Ventilation'},"Mechanical ventilation systems, including both continuous and intermittent mechanical ventilation, should be designed and installed to minimise noise.",selection,annotated +8207751f-13b8-4fe3-9bfe-4423093d4905,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,{'ID': '26_Finnish_AcousticEnvironment'},A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,none,annotated +825053cb-af5d-43a9-b59b-e2a5ae78ea73,The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,{'ID': '59_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,greater,annotated +2a2dbb92-88af-47f5-bd1e-b3ddea4c1ec9,"The approach route should be safe and convenient for everyone, be at the shallowest gradient that can reasonably be achieved, and be stepfree, irrespective of the storey on which the dwelling is located.",{'ID': '70_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be safe and convenient for everyone, be at the shallowest gradient that can reasonably be achieved, and be stepfree, irrespective of the storey on which the dwelling is located.",necessity,annotated +0ab44f38-4588-4f61-ad7e-21a4a25df17d,Calibration should be carried out in accordance with CIBSEs TM23.,{'ID': '342_UK_DocM_V2_AccessAndUseOfBuildings'},Calibration should be carried out in accordance with CIBSEs TM23.,necessity,annotated +34a524ec-6994-426f-86af-78788fd34a80_11,,,"Between the locking points for the mortice lock and surface-mounted rim lock, the heat recovery should be 0.055555556.",equal,synthetic +636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4_2,,,"Where a new building contains more than 900 millimetres teaching facility, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",greater,synthetic +ff3e8f86-1542-4f54-a776-cfdc8482bad7,The seasonal energy efficiency ratio of an air conditioner working in cooling mode should be a minimum of 4.0.,{'ID': '332_UK_DocL_V1_ConsrvationOfFuelAndPower'},The seasonal energy efficiency ratio of an air conditioner working in cooling mode should be a minimum of 4.0.,greater-equal,annotated +4abb3268-3ba6-47e8-a8b7-4676dbaa9a16_3,,,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear construction of 150m2, except in doorways.",equal,synthetic +2032e456-bf80-4342-90dc-0da164e00a9a,A unit that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,{'ID': '7_UK_DocF_V1_Ventilation'},A unit that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,part-of,annotated +1d18f0c9-31e5-43ee-8f16-e4fa607c5cd9,"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",{'ID': '51_UK_DocM_V2_AccessAndUseOfBuildings'},"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",selection,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",none,annotated +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",necessity,annotated +7e34700e-92de-4b00-a820-f4085a2e186c_2,,,"If the agreed level of provision between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 400 millimetres, the wall in question must be class EI 15.",less,synthetic +1d18f0c9-31e5-43ee-8f16-e4fa607c5cd9,"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",{'ID': '51_UK_DocM_V2_AccessAndUseOfBuildings'},"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",selection,annotated +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_1,,,"If the above of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 1,500 millimetres of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater,synthetic +51284e52-f2f4-41b5-85e2-3fa96ab8602a,"All users of facilities should be able to locate suitable seating and move safely and easily to and from the seating area and ancillary accommodation, such as lavatories, dining rooms and bedroom suites.",{'ID': '132_UK_DocM_V2_AccessAndUseOfBuildings'},"All users of facilities should be able to locate suitable seating and move safely and easily to and from the seating area and ancillary accommodation, such as lavatories, dining rooms and bedroom suites.",necessity,annotated +a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",none,annotated +2ff58135-b89d-40d1-a145-51aad9e5a942_7,,,"The landing in front of the outside door shall be at least 2.2 metres time-lapse and at least 1,500 millimetres long.",greater-equal,synthetic +2ca092ec-4425-4552-a389-fd0dadfbd154_8,,,NOTE: A floor level with a ventilation provision of 40 or steeper should be designed as a ramp.,greater-equal,synthetic +8aad11d6-bd81-4a57-bd73-7c1319a76494,"Where on-site electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and on-site energy demand.",{'ID': '331_UK_DocM_V2_AccessAndUseOfBuildings'},"Where on-site electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and on-site energy demand.",necessity,annotated +11f2902d-29c2-474e-97d0-628a2a97a666_8,,,"fire performance of over 1,200 millimetres must be equipped with an appropriate safety barrier, railing or handrail.",greater,synthetic +40b40b1b-d1b1-49d8-b9b7-13c5845a169d,The structure of the control appliance of the plumbing fixture shall be such that its surface temperature does not arise above 40 degrees Celsius.,{'ID': '71_Finnish_Health-WaterAndSewerage'},The structure of the control appliance of the plumbing fixture shall be such that its surface temperature does not arise above 40 degrees Celsius.,less-equal,annotated +208b093d-361f-4aec-819d-4abca4e72c68_2,,,"in an evacuation area where the power input from controls is 270 millimetres, the second exit may be no less than 900 millimetres in width.",equal,synthetic +d7b27bbb-ac51-4036-8073-d094cbe994db,"In cases where the Energy Related Products Regulations and the Building Regulations both apply, both standards should be met.",{'ID': '232_UK_DocM_V2_AccessAndUseOfBuildings'},"In cases where the Energy Related Products Regulations and the Building Regulations both apply, both standards should be met.",necessity,annotated +a0c838b5-5fe2-4b52-abe1-432804c2c8aa,A temperature of 21 C shall be used as the design value for room temperature during the heating season.,{'ID': '33_Finnish_Health-IndoorClimateAndVentilation'},A temperature of 21 C shall be used as the design value for room temperature during the heating season.,part-of,annotated +6d9a1e8e-6fe7-4234-951a-96fdc4598bd7_11,,,"If parking spaces are provided for a building, an adequate number of Turning circle, but at least 800 millimetres, shall be intended for the use of a person with mobility and functional impairment.",greater-equal,synthetic +f9de28ac-45bb-4400-9d9f-8afee73bd2e3_0,,,The axle group load should not exceed 190 kN of dwelling floor area.,less-equal,synthetic +73efbdcb-2751-4f01-9471-ccca44ccc0f3,"If a drainage point is located below the height of backwater, the waste water must be pumped.",{'ID': '133_Finnish_Health-WaterAndSewerage'},"If a drainage point is located below the height of backwater, the waste water must be pumped.",part-of,annotated +f41fb8da-16bd-4404-accb-e32727f3736a,"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",{'ID': '69_Finnish_SafetyOfUse'},"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",necessity,annotated +7f3f59a4-fc7e-4b14-8074-384f6cacf548,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",{'ID': '45_Finnish_SafetyOfUse'},"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",none,annotated +c952db0f-b605-4335-8d56-97fc339ad5ba_0,,,All two persons per square metre Insulating materials of the installation and commissioning checklist should be completed.,equal,synthetic +079db365-cfed-474e-9329-25349ac0db4a_4,,,"In connection with the door of an outside space of an individual dwelling the travel distance outside the door may be more than 900-1000mm if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",greater,synthetic +ebc429f0-cb90-41ab-9a11-401a2ddc7bad,"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",{'ID': '268_UK_DocF_V1_Ventilation'},"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",selection,annotated +7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8,"For sizes of cylinder not listed, the heat loss from the cylinder should not exceed (16.66 8.33 V0.4)/(1000 24), where V is the volume in litres.",{'ID': '208_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For sizes of cylinder not listed, the heat loss from the cylinder should not exceed (16.66 8.33 V0.4)/(1000 24), where V is the volume in litres.",none,annotated +26980508-105c-49db-8595-bf001a48d757_6,,,"In Ladders with no fixed seats or handrail, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic +51f35d58-c411-4d6d-b36e-9ddf10199908,"Whatever lifting device is chosen, internal stairs should always be provided as an alternative means of vertical access, and designed to suit ambulant disabled people and those with impaired sight.",{'ID': '106_UK_DocM_V2_AccessAndUseOfBuildings'},"Whatever lifting device is chosen, internal stairs should always be provided as an alternative means of vertical access, and designed to suit ambulant disabled people and those with impaired sight.",selection,annotated +103f99ad-884b-4bae-9f22-ccb1c5bc3d26_4,,,"In an open garage of no more than 40 sheathing board, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",less-equal,synthetic +2633c957-07b4-4caa-a9d6-5acbac16b0b0_9,,,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 400-600mm storage capacity.,equal,synthetic +6414854d-01f9-481f-a7f4-c4581e48d8b1_4,,,Special safety features are not necessary if the timber frame is not more than A long.,less-equal,synthetic +9415ae4b-7a74-4c70-a245-e4381c6d71bf_4,,,"At gables and party walls, insulation should extend to the wall; if the cubicles between the wall and joist is less than eight per cent, perimeter insulation may be required.",less,synthetic +c8a048c6-8e7e-4b5a-ada5-02990b983401,"A natural ventilation system, a mechanical extract ventilation system or a mechanical supply and extract ventilation system shall not be designed to be combined in such a way that the directions of air flow between the rooms and in the ductworks may change when the air flows are being controlled.",{'ID': '91_Finnish_Health-IndoorClimateAndVentilation'},"A natural ventilation system, a mechanical extract ventilation system or a mechanical supply and extract ventilation system shall not be designed to be combined in such a way that the directions of air flow between the rooms and in the ductworks may change when the air flows are being controlled.",necessity,annotated +b51c7a9f-2080-4e60-940f-e59af0cc97ce,"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",{'ID': '34_Finnish_Health-Humidity'},"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",necessity,annotated +86350df0-a40e-412b-a301-004524d56736_11,,,"For wet heating systems in new dwellings with a total combined window area of 15 degrees or greater, a minimum of two independently controlled heating circuits should be provided.",greater-equal,synthetic +6187cad8-0d6d-4154-b98b-7285b36fea8d,Continuously running fans should be set up to operate without occupant intervention but may have manual or automatic controls for selecting the high rate of operation.,{'ID': '65_UK_DocF_V1_Ventilation'},Continuously running fans should be set up to operate without occupant intervention but may have manual or automatic controls for selecting the high rate of operation.,necessity,annotated +2de867fe-80e7-4617-ad18-36225dd45ab1_9,,,Hinged or pivot windows with an free gap of less than two are not suitable for purge ventilation.,less,synthetic +4d80c4d1-08ee-481a-9f9c-e9151ce1094d_0,,,"The operation of windows, roof windows, rooflights and doors should not exceed between 550mm and 700mm of the total floor area of the dwelling.",less-equal,synthetic +b63dcef6-1840-4e9e-ad51-f8fc481fe856_9,,,"The wall ties should have a horizontal spacing of 900mm and a tie force of 850-1000mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic +a86b58e8-046f-44b7-8e1b-00c876c8c647_10,,,"Parapets in number of occupants A to 90mm and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",less-equal,synthetic +01008f69-874b-443e-bcb2-2f5630280049,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",{'ID': '24_Finnish_SafetyOfUse'},"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",none,annotated +a52847f2-243e-44ed-b4b4-db3e948dd820,The water system shall be designed so as to prevent detrimental cross-flow of water from the hot water pipe to the cold water pipe or vice versa.,{'ID': '63_Finnish_Health-WaterAndSewerage'},The water system shall be designed so as to prevent detrimental cross-flow of water from the hot water pipe to the cold water pipe or vice versa.,necessity,annotated +4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9_2,,,"In spaces intended for more than 60 persons, the U-value of the access route must be at least 10 kN.",greater-equal,synthetic +53b7d989-c81f-4e01-a5ec-4b2cb30b4bfa,The size of a fire compartment must be limited so that a fire igniting in the compartment does not cause unreasonably vast damages (compartmentation by area).,{'ID': '104_Finnish_FireSafety'},The size of a fire compartment must be limited so that a fire igniting in the compartment does not cause unreasonably vast damages (compartmentation by area).,part-of,annotated +73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",part-of,annotated +02648917-f651-4c45-9449-1623cafd6cdc,Public Health Englands Indoor Air Quality Guidelines for Selected Volatile Organic Compounds (VOCs) in the UK should be used.,{'ID': '118_UK_DocF_V2_Ventilation'},Public Health Englands Indoor Air Quality Guidelines for Selected Volatile Organic Compounds (VOCs) in the UK should be used.,selection,annotated +922bf8df-3a70-4f45-8c04-200b638d3b3c_7,,,The cold water pipe shall be designed and installed so that the maximum number of occupants in the cold water system may not exceed 20mm.,less-equal,synthetic +e8340500-38b6-461b-b00d-d3aa44ac1f0b_5,,,The structure of the water available from the hot water system may not exceed 1000m2.,less-equal,synthetic +a235c68f-ae44-4770-b005-4e9d7b659eb7,All cavity walls should have leaves at least 90mm thick and cavities at least 50mm wide.,{'ID': '35_UK_DocA_Structure'},All cavity walls should have leaves at least 90mm thick and cavities at least 50mm wide.,necessity,annotated +4e8c5c50-44af-48f6-b959-e6f9b31afa1e_1,,,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical Products may be panel parts.",equal,synthetic +e68377dd-acec-4915-a0b4-a5eb8c840bf1,"Where vehicle barriers are necessary, sufficient space (for example 500mm) should be allowed around the future connection location.",{'ID': '121_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where vehicle barriers are necessary, sufficient space (for example 500mm) should be allowed around the future connection location.",selection,annotated +50e89a86-e2be-439d-b230-79274cd7199b_2,,,Modular and portable buildings with a planned Moisture of more than 2.4 metres at a single location should be shown to comply with the energy efficiency requirements.,greater,synthetic +29957187-5bca-4da2-b309-4b7ea2fdbf55,Provision shall be made for powered doors and gates to be opened in the event of a power failure.,{'ID': '115_UK_DocK_ProtectionFromFalling'},Provision shall be made for powered doors and gates to be opened in the event of a power failure.,necessity,annotated +9415ae4b-7a74-4c70-a245-e4381c6d71bf,"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",{'ID': '170_UK_DocL_V1_ConsrvationOfFuelAndPower'},"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",necessity,annotated +fb5d3054-4911-4049-ba09-1c3e80f9c07c_7,,,"The output of steps in uncovered or unheated outdoor staircases must be no less than 15 degrees, and the riser may be no more than 130 millimetres.",greater-equal,synthetic +d48274a1-bd70-4db9-8490-14075029cbb7,All users including wheelchair users should be able to reach and use the controls that summon and direct the lifting device.,{'ID': '109_UK_DocM_V2_AccessAndUseOfBuildings'},All users including wheelchair users should be able to reach and use the controls that summon and direct the lifting device.,necessity,annotated +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_9,,,"Where the work concerns a building containing more than 01:20:00 joints, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater-equal,synthetic +5e51b653-449e-4d00-be19-0e20ecff5c49,The default condition should be off.,{'ID': '213_UK_DocM_V2_AccessAndUseOfBuildings'},The default condition should be off.,selection,annotated +35cacecf-06dc-4b0f-aadb-db2ee05518c7,The area of windows and roof windows (but excluding display windows) within the area served exceeds 40 of the facade area.,{'ID': '495_UK_DocM_V2_AccessAndUseOfBuildings'},The area of windows and roof windows (but excluding display windows) within the area served exceeds 40 of the facade area.,selection,annotated +825053cb-af5d-43a9-b59b-e2a5ae78ea73_5,,,The ventilation provision of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the air tightness of dwellings in the residential building; b. the number of associated parking spaces.,greater,synthetic +99a53f17-48cb-4012-a47b-700761e0983b,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,{'ID': '61_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,greater,annotated +3c0a8ccb-d813-40fb-b69b-88250d3bc4ec_1,,,These fittings should not exceed a means of four.,less-equal,synthetic +203faa23-7b71-47c9-a6e5-2333ac45389e_0,,,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the intended time of use must be no less than 900 millimetres.",greater-equal,synthetic +dcc583b1-8c4c-42cf-a1ed-e8907de56254_4,,,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the maximum number of occupants must be no less than 0.1m2.",greater-equal,synthetic +80221d2c-8ba8-4700-b219-c35fde50f35e,No more than two drainage wells may be connected to a floor drain and they may be located at a maximum distance of three meters from the floor drain.,{'ID': '125_Finnish_Health-WaterAndSewerage'},No more than two drainage wells may be connected to a floor drain and they may be located at a maximum distance of three meters from the floor drain.,necessity,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_7,,,"If the air flows of width 1 and 60 persons are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +8c79efc1-f3e8-4394-ae6a-0bf5432ebcc5,NOTE: Ventilation through infiltration should be considered to be part of the ventilation provision of a dwelling.,{'ID': '131_UK_DocF_V1_Ventilation'},NOTE: Ventilation through infiltration should be considered to be part of the ventilation provision of a dwelling.,necessity,annotated +10b2bf58-18df-46ee-a766-ed11eec6f42b,"Humus soil, organic substances decomposing or rotting from moisture or building waste must not be left under new buildings, in their crawl spaces and in their gravel backfills functioning as a drainage layer.",{'ID': '45_Finnish_Health-Humidity'},"Humus soil, organic substances decomposing or rotting from moisture or building waste must not be left under new buildings, in their crawl spaces and in their gravel backfills functioning as a drainage layer.",necessity,annotated +2f8d4247-e53b-49ae-bd26-c4f1765eaee8,"Extract air of categories 2, 3 and 4 shall not be used as recirculation air.",{'ID': '73_Finnish_Health-IndoorClimateAndVentilation'},"Extract air of categories 2, 3 and 4 shall not be used as recirculation air.",none,annotated +f72a98f3-b7d2-4633-b244-0d7242dfb0c9_10,,,Every single bedroom has a minimum sunken area of 0.7W/(m2K) and is at least 2.4m wide.,greater-equal,synthetic +19478a13-7457-4dd3-a394-744f826db7b0_1,,,"The handle to at least 2.4m central heating in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",greater-equal,synthetic +7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8,"For sizes of cylinder not listed, the heat loss from the cylinder should not exceed (16.66 8.33 V0.4)/(1000 24), where V is the volume in litres.",{'ID': '208_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For sizes of cylinder not listed, the heat loss from the cylinder should not exceed (16.66 8.33 V0.4)/(1000 24), where V is the volume in litres.",less-equal,annotated +7575211d-616b-42bb-b112-73a949e7ca6a,Any combined facility should be divided into distinct wet and dry areas.,{'ID': '176_UK_DocM_V2_AccessAndUseOfBuildings'},Any combined facility should be divided into distinct wet and dry areas.,necessity,annotated +7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88_4,,,The resilient layer should be to the full height of the door and 5m inaccuracies of the doorset.,equal,synthetic +a94b6b4f-a05e-403e-bbca-ebe1b94e38a1,"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",{'ID': '470_UK_DocM_V2_AccessAndUseOfBuildings'},"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",selection,annotated +8efb6108-e49e-4d64-a1e4-22e3f9128b17_5,,,"When calculating the reference heat loss of a building, the value of 1,500 millimetres shall be used as the air distribution for the air leakage rate figure for the building envelope.",equal,synthetic +38cd3221-7fc9-4462-be20-78b16a4309d3,The area of openings in the newly created dwelling should not be more than 25 of the total floor area.,{'ID': '490_UK_DocL_V1_ConsrvationOfFuelAndPower'},The area of openings in the newly created dwelling should not be more than 25 of the total floor area.,part-of,annotated +2de867fe-80e7-4617-ad18-36225dd45ab1_11,,,Hinged or pivot windows with an level difference of less than 180kW are not suitable for purge ventilation.,less,synthetic +0667134c-1290-4fe0-99eb-41c0b9e63a27,CO2 emissions and primary energy associated with the thermal energy streams of a trigeneration scheme should be attributed in proportion to the output energy streams.,{'ID': '67_UK_DocM_V2_AccessAndUseOfBuildings'},CO2 emissions and primary energy associated with the thermal energy streams of a trigeneration scheme should be attributed in proportion to the output energy streams.,part-of,annotated +f439dcde-3cf9-4b40-b555-a2107ae5559f,"If the circulation piping is located inside the building envelope, 50 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '104_Finnish_EnergyEfficiency'},"If the circulation piping is located inside the building envelope, 50 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",none,annotated +74b9ee2c-0192-442d-b5a1-a2974d456429,"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",{'ID': '67_UK_DocM_V1_AccessAndUseOfBuildings'},"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",necessity,annotated +5211dbd1-d12a-4371-ad62-1dc5616cd2f5,The heat pump along with its accompanying pipework should be flushed and purged as a separate system while isolated from the ground array system.,{'ID': '387_UK_DocL_V1_ConsrvationOfFuelAndPower'},The heat pump along with its accompanying pipework should be flushed and purged as a separate system while isolated from the ground array system.,necessity,annotated +956efc87-87de-4d3c-99fb-dc58eab9353b,"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",{'ID': '42_Finnish_Accessibility'},"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",selection,annotated +328fb8e7-cae4-4465-b7a7-24f0d066d65a,"The results of all pressure tests on buildings, including any test failures, should be reported to the building control body.",{'ID': '360_UK_DocM_V2_AccessAndUseOfBuildings'},"The results of all pressure tests on buildings, including any test failures, should be reported to the building control body.",necessity,annotated +f3bd99b4-7ea5-4968-af10-3c133c0b5aa0_10,,,No individual flight has a category of more than 0.2.,less-equal,synthetic +86350df0-a40e-412b-a301-004524d56736,"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",none,annotated +ff3e8f86-1542-4f54-a776-cfdc8482bad7_4,,,The dwelling emission rate of an air conditioner working in cooling mode should be a minimum of 0.3.,greater-equal,synthetic +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_8,,,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 1,200 MJ/m2 in thresholds, these must be accessible via the interior.",greater,synthetic +d925c189-860a-4fcb-ae88-d1cf8cc14fb8_3,,,"The exposure coefficient of steps in covered or heated outdoor staircases must be no less than 850 millimetres, and the riser may be no more than 160 millimetres.",greater-equal,synthetic +f27c9fb4-dc28-494c-a277-a51360cdfdb8,A handrail and its ending must be shaped safely and must continue past the start and end points of the structure.,{'ID': '57_Finnish_SafetyOfUse'},A handrail and its ending must be shaped safely and must continue past the start and end points of the structure.,necessity,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,annotated +636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4,"Where a new building contains more than one dwelling, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",{'ID': '6_UK_DocR_V1_InfrastructureForElectircalCommunications'},"Where a new building contains more than one dwelling, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",necessity,annotated +0da52584-1b37-48b5-840f-3795ae695275_3,,,the minimum clear dimensions of the platform are: 18 dm3/s intended time of use and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",selection,annotated +eccd4f77-ef4a-41fd-a22a-620c84fdddd4,There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,{'ID': '98_UK_DocM_V1_AccessAndUseOfBuildings'},There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,none,annotated +b63dcef6-1840-4e9e-ad51-f8fc481fe856_9,,,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the level difference is not less than 2.4 metres.",greater-equal,synthetic +4d80c4d1-08ee-481a-9f9c-e9151ce1094d_6,,,"The water vapour resistance of windows, roof windows, rooflights and doors should not exceed two persons per square metre of the total floor area of the dwelling.",less-equal,synthetic +10b2bf58-18df-46ee-a766-ed11eec6f42b,"Humus soil, organic substances decomposing or rotting from moisture or building waste must not be left under new buildings, in their crawl spaces and in their gravel backfills functioning as a drainage layer.",{'ID': '45_Finnish_Health-Humidity'},"Humus soil, organic substances decomposing or rotting from moisture or building waste must not be left under new buildings, in their crawl spaces and in their gravel backfills functioning as a drainage layer.",part-of,annotated +2afa8bba-b5ad-4e12-bc27-4beea3fd09b2,The normal relationship between the dimensions of the rise and going is: twice the rise plus the going (2R G) equals between 550mm and 700mm.,{'ID': '19_UK_DocK_ProtectionFromFalling'},The normal relationship between the dimensions of the rise and going is: twice the rise plus the going (2R G) equals between 550mm and 700mm.,equal,annotated +d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",part-of,annotated +0262f6e5-21bc-4312-9388-8ac93b79416d,The minimum full load EER of the absorption chillers should be no worse than 0.7.,{'ID': '285_UK_DocM_V2_AccessAndUseOfBuildings'},The minimum full load EER of the absorption chillers should be no worse than 0.7.,greater-equal,annotated +f9f11981-2aad-4ef7-82fc-c89470ebe263,A driveway must not intersect a walkway leading to a play area.,{'ID': '88_Finnish_SafetyOfUse'},A driveway must not intersect a walkway leading to a play area.,necessity,annotated +2ff58135-b89d-40d1-a145-51aad9e5a942_8,,,"The landing in front of the outside door shall be at least 130 millimetres load and at least 1,500 millimetres long.",greater-equal,synthetic +3724fd47-22f7-432c-81a2-1abcb95c7df2_7,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom battery storage, where there should be no fewer than 100 litres.",greater-equal,synthetic +ddd6ec57-ed54-4a8a-abaf-4b1efc287dde,The flushing shall be carried out with household water to remove any dirt and debris from the pipe network.,{'ID': '111_Finnish_Health-WaterAndSewerage'},The flushing shall be carried out with household water to remove any dirt and debris from the pipe network.,selection,annotated +bf798097-bb99-42d0-a73f-8cebab8fbeb8_7,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the total load of the steps must be no more than 9 metres and the tread must be no less than 300 millimetres.",less-equal,synthetic +d504fd87-d13d-4936-9d7a-71d17954760d,The riser of the steps in an exit may be no more than 180 millimetres.,{'ID': '25_Finnish_SafetyOfUse'},The riser of the steps in an exit may be no more than 180 millimetres.,none,annotated +5aebe4f8-6ca6-4448-94db-5272b5541efb,"The results of all pressure tests on dwellings, including any test failures, should be reported to the building control body.",{'ID': '359_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The results of all pressure tests on dwellings, including any test failures, should be reported to the building control body.",none,annotated +18797f16-0b56-41e9-a4e6-d4150db4165d,A new building must be built to a minimum standard of total energy performance.,{'ID': '47_UK_DocM_V2_AccessAndUseOfBuildings'},A new building must be built to a minimum standard of total energy performance.,necessity,annotated +973c9430-2b4a-4ab4-82df-7060c3002f77_0,,,The ventilation provision for the community heating primary circuit should be a minimum of 2.0 m3/(h m2).,greater-equal,synthetic +76bf63bd-30f4-440d-81a0-61ca16170f70_9,,,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the Length is less than 500kW of the total load.,less,synthetic +d728a9c8-0302-4bd1-b69b-0daeefce30d1,"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",{'ID': '84_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",none,annotated +339fc78c-a2f2-481c-a410-3aeb41e24b8a_8,,,Solid walls constructed of coursed brickwork or blockwork should be at least as axle group load as 900 millimetres of the storey height.,greater-equal,synthetic +9fee4426-8d7f-40f9-bc6f-562a5d3fd9b4,"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",{'ID': '144_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",necessity,annotated +710ef992-e187-4b1a-894b-e0e222f54359,"NOTE: For grid-supplied electricity, a CO2 emission factor of 0.136kgCO2/kWh and primary energy factor of 1.501kWhPE/kWh should be used.",{'ID': '199_UK_DocM_V2_AccessAndUseOfBuildings'},"NOTE: For grid-supplied electricity, a CO2 emission factor of 0.136kgCO2/kWh and primary energy factor of 1.501kWhPE/kWh should be used.",equal,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479_5,,,Individual flights are: for total useful floor area up to 0.35W/(m2K) not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic +0f32fab3-c03b-400c-949a-cc95828a89d3,The specification of comfort cooling systems should be based on a heat gain calculation for the dwelling.,{'ID': '330_UK_DocL_V1_ConsrvationOfFuelAndPower'},The specification of comfort cooling systems should be based on a heat gain calculation for the dwelling.,necessity,annotated +9b2e2a40-6d63-4ee6-a539-da1d15dd68bd,"Where relevant work is undertaken on a mixed-use building, it should be determined which parking spaces are associated parking spaces for the use of occupants of the dwellings, and which parking spaces are for use by users of the non-residential function of the building.",{'ID': '94_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where relevant work is undertaken on a mixed-use building, it should be determined which parking spaces are associated parking spaces for the use of occupants of the dwellings, and which parking spaces are for use by users of the non-residential function of the building.",selection,annotated +53e31e26-a39b-4047-a86e-bdb8021413e8,Window handles on windows that open outwards are not more than 650mm from the inside face of the wall when the window is at its maximum openable angle.,{'ID': '84_UK_DocO_Overheating'},Window handles on windows that open outwards are not more than 650mm from the inside face of the wall when the window is at its maximum openable angle.,less-equal,annotated +bb3ac5b0-14d0-4d75-95d9-713adc6f2f58,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",{'ID': '433_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",none,annotated +9fee4426-8d7f-40f9-bc6f-562a5d3fd9b4,"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",{'ID': '144_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",selection,annotated +ee0c8c7c-c65e-4403-92e6-628fd680f3bf,Any panel within the doorset should be at least 15mm thick.,{'ID': '30_UK_DocQ_Security_Dwellings'},Any panel within the doorset should be at least 15mm thick.,none,annotated +f420ae57-5656-4558-b1a3-1079e46bf6cc_11,,,"In the case of the storey-level door of a dwelling, or if the differences through the door exceeds 200 millimetres, doors must open in the direction of the exit.",greater,synthetic +"8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent. {'ID': '9_Finnish_Accessibility'}_1",,,"However, if the number of storeys is no more than 0.3W/m2, the ramp may not have a gradient of more than eight per cent.",less-equal,synthetic +7d1ada0b-8dcc-4c01-84d7-78b80cb404c9,"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",{'ID': '58_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",none,annotated +984c252b-74f4-4d85-9080-1c8ae1851eca,"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",{'ID': '113_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",part-of,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_0,,,"The free opening of the vertical hatch or window of an emergency exit must be at least B in shallow projecting and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic +bc49524e-4bac-4d16-bc83-5a977019cfaa,Other ventilation systems may be acceptable if they can be shown to meet an equal level of performance.,{'ID': '30_UK_DocF_V1_Ventilation'},Other ventilation systems may be acceptable if they can be shown to meet an equal level of performance.,none,annotated +"8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent. {'ID': '9_Finnish_Accessibility'}_6",,,"However, if the fire igniting is no more than 0.7W/(m2K), the ramp may not have a gradient of more than eight per cent.",less-equal,synthetic +7e34700e-92de-4b00-a820-f4085a2e186c,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be class EI 15.",{'ID': '135_Finnish_FireSafety'},"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be class EI 15.",part-of,annotated +2a8898d7-8561-4f67-9979-1bbba8ad42e6,"If insulating material is inserted into a cavity in a cavity wall, reasonable precautions shall be taken to prevent the subsequent permeation of any toxic fumes from that material into any part of the building occupied by people.",{'ID': '3_UK_DocD_ToxicSubstances'},"If insulating material is inserted into a cavity in a cavity wall, reasonable precautions shall be taken to prevent the subsequent permeation of any toxic fumes from that material into any part of the building occupied by people.",necessity,annotated +9415ae4b-7a74-4c70-a245-e4381c6d71bf_0,,,"At gables and party walls, insulation should extend to the wall; if the kitchens between the wall and joist is less than 40 degrees Celsius, perimeter insulation may be required.",less,synthetic +2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d_1,,,An upstand built on site should not exceed a domestic hot water cylinder heat loss of 15mm.,less-equal,synthetic +bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,none,annotated +baee716c-b8c2-4500-b4de-63fa11f007b1,A minimum of one in five of the remaining parking spaces must have access to cable routes.,{'ID': '83_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},A minimum of one in five of the remaining parking spaces must have access to cable routes.,equal,annotated +7d35f4c4-fa65-4d68-a974-f54386ca8aee_3,,,"However, a horizontal Roofs in a protective part must be no higher than 3.",less-equal,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_0,,,Skirtings totalling up to 50mm total thickness and shallow projecting rain-water or casings above 400 millimetres may be discounted when measuring clear width.,greater,synthetic +0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,selection,annotated +c0a6d35c-cc20-428b-941d-c3e3e6365c74_8,,,"In a tier that is uninterrupted by cross-gangways, and where the projection exceeds 1000m2, use a maximum number of steps of 40.",greater,synthetic +21bf2954-bfa8-44ef-bb2e-4e34367965ba,"If a load-bearing element is required to have a longer fire resistance time with respect to integrity E and insulation I than with respect to load-bearing capacity R, the longer fire resistance time shall also be applied to the load-bearing capacity.",{'ID': '88_Finnish_FireSafety'},"If a load-bearing element is required to have a longer fire resistance time with respect to integrity E and insulation I than with respect to load-bearing capacity R, the longer fire resistance time shall also be applied to the load-bearing capacity.",none,annotated +a8b3e54e-902c-4502-99a2-8c41d46f1416,"If there are more than 60 chairs in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",{'ID': '106_Finnish_SafetyOfUse'},"If there are more than 60 chairs in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",selection,annotated +d342429e-d3fc-46e0-a195-527cfef1fd4b_3,,,"When an existing building with a total useful heat loss of over 400mm is being extended or the habitable area is being increased, consequential improvements should be installed.",greater,synthetic +7134933d-17df-4a8c-b72e-1c09177bad1c,The spread of fire in voids of wall-type building elements must be restricted at least by storey.,{'ID': '130_Finnish_FireSafety'},The spread of fire in voids of wall-type building elements must be restricted at least by storey.,part-of,annotated +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_11,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be design solar load four.",equal,synthetic +"8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent. {'ID': '9_Finnish_Accessibility'}_9",,,"However, if the access is no more than five, the ramp may not have a gradient of more than eight per cent.",less-equal,synthetic +7602a501-a5b5-429c-99e1-8bc801243494,"The flooring and wall covering must provide waterproofing, or separate waterproofing must be installed under the flooring and behind the wall covering.",{'ID': '111_Finnish_Health-Humidity'},"The flooring and wall covering must provide waterproofing, or separate waterproofing must be installed under the flooring and behind the wall covering.",selection,annotated +c490feb8-f09b-4c86-8d5f-12e1a5aec6db,Ventilation intakes should be located away from the direct impact of the sources of local pollution.,{'ID': '124_UK_DocF_V1_Ventilation'},Ventilation intakes should be located away from the direct impact of the sources of local pollution.,necessity,annotated +2695c899-0ada-478c-9b2d-796f79ea4c52,"Glazing, with which people are likely to come into contact whilst moving in or about the building shall: (a) if broken on impact, break in a way which is unlikely to cause injury; or (b) resist impact without breaking; or (c) be shielded or protected from impact.",{'ID': '92_UK_DocK_ProtectionFromFalling'},"Glazing, with which people are likely to come into contact whilst moving in or about the building shall: (a) if broken on impact, break in a way which is unlikely to cause injury; or (b) resist impact without breaking; or (c) be shielded or protected from impact.",necessity,annotated +83344b26-7cf0-452a-9dac-c0288c46393d,"The non-primary doors for entering a dwelling (for example, back door or garage inter-connecting doors) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",{'ID': '37_UK_DocQ_Security_Dwellings'},"The non-primary doors for entering a dwelling (for example, back door or garage inter-connecting doors) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",necessity,annotated +328fb8e7-cae4-4465-b7a7-24f0d066d65a,"The results of all pressure tests on buildings, including any test failures, should be reported to the building control body.",{'ID': '360_UK_DocM_V2_AccessAndUseOfBuildings'},"The results of all pressure tests on buildings, including any test failures, should be reported to the building control body.",selection,annotated +339fc78c-a2f2-481c-a410-3aeb41e24b8a_7,,,Solid walls constructed of coursed brickwork or blockwork should be at least as service as 40 of the storey height.,greater-equal,synthetic +dcc583b1-8c4c-42cf-a1ed-e8907de56254_4,,,"The edges of the indoor steps of other spaces intended for everyday use may be no more than 600mm, and the tread must be no less than 270 millimetres.",less-equal,synthetic +75c60084-6878-472d-8694-e8739e0dd76c_3,,,The control capabilities of access routes in assembly areas with a maximum capacity of 60 persons must be at least 70 kN.,greater-equal,synthetic +9027959e-efc1-4d32-acbe-e0775d40f001,"The morticed bolts should have a minimum projection of 20mm, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",{'ID': '38_UK_DocQ_Security_Dwellings'},"The morticed bolts should have a minimum projection of 20mm, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",part-of,annotated +c952db0f-b605-4335-8d56-97fc339ad5ba_4,,,All 1400mm water pump of the installation and commissioning checklist should be completed.,equal,synthetic +75c60084-6878-472d-8694-e8739e0dd76c,The width of access routes in assembly areas with a maximum capacity of 60 persons must be at least 900 millimetres.,{'ID': '115_Finnish_SafetyOfUse'},The width of access routes in assembly areas with a maximum capacity of 60 persons must be at least 900 millimetres.,part-of,annotated +4d80c4d1-08ee-481a-9f9c-e9151ce1094d,"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",{'ID': '421_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",part-of,annotated +d8066a73-49c2-4e99-825a-b49b9b2ba67d_10,,,A landing measuring at least 300mm in Extract must be reserved in front of and behind a door located in an exit route.,greater-equal,synthetic +d48274a1-bd70-4db9-8490-14075029cbb7,All users including wheelchair users should be able to reach and use the controls that summon and direct the lifting device.,{'ID': '109_UK_DocM_V2_AccessAndUseOfBuildings'},All users including wheelchair users should be able to reach and use the controls that summon and direct the lifting device.,selection,annotated +868ad193-b0d2-47b9-9fe0-ded5b761d3b0,The integrity of the water system shall be ensured with pressure testing using water.,{'ID': '106_Finnish_Health-WaterAndSewerage'},The integrity of the water system shall be ensured with pressure testing using water.,part-of,annotated +4f2b56cb-9852-4406-bbea-31f426fb4910,"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",{'ID': '397_UK_DocM_V2_AccessAndUseOfBuildings'},"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",necessity,annotated +b47066e6-d145-4427-91c0-8763c5ea92c5,Remedial work should be carried out to achieve satisfactory performance in retests.,{'ID': '387_UK_DocM_V2_AccessAndUseOfBuildings'},Remedial work should be carried out to achieve satisfactory performance in retests.,necessity,annotated +2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb_0,,,"There should be a buried part, in the absence of tobacco smoke or other excessive pollutants, of proportion.",equal,synthetic +cf35d4a4-3170-421b-9be1-b68d928eed1d_4,,,"A roof with a temperature greater than 10m must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",greater,synthetic +e43c1e88-be80-42d9-944e-1bf0f0f82479_11,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 0.05 output.,less-equal,synthetic +dcc583b1-8c4c-42cf-a1ed-e8907de56254_8,,,"The gradient of the indoor steps of other spaces intended for everyday use may be no more than 100 litres, and the tread must be no less than 270 millimetres.",less-equal,synthetic +5fa7daca-cb50-4397-a736-617e52d30187_4,,,"If ventilation rate at below 30% are required and unavailable, the number of appliances may be taken as equal to that at 30% load.",equal,synthetic +d988e207-c3f9-4314-9a16-f99b334595f4_9,,,The atmosphere must be no less than EI 30.,greater-equal,synthetic +6bf41e87-d7c1-42a5-bf0d-67c711a21753,"Additionally, a sign identifying the floor reached should be provided on each landing in a location that can be easily seen from the lifting device and is designed so that it contrasts visually with its surrounding.",{'ID': '105_UK_DocM_V2_AccessAndUseOfBuildings'},"Additionally, a sign identifying the floor reached should be provided on each landing in a location that can be easily seen from the lifting device and is designed so that it contrasts visually with its surrounding.",selection,annotated +793cb939-b3d9-46eb-ae65-71a4d5c8031b_8,,,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be net heating energy demand to 60.,less-equal,synthetic +d342429e-d3fc-46e0-a195-527cfef1fd4b_0,,,"When an existing building with a total useful air flow rates of over 50mm is being extended or the habitable area is being increased, consequential improvements should be installed.",greater,synthetic +0096a3bf-ac16-4a75-adf9-8c3f4a9b8610_7,,,The smaller net heating energy demand of each panel which can be either the width or height of the panel should be 180kW or less.,less-equal,synthetic +a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",necessity,annotated +b0e99ac5-9cbc-4beb-b8ff-85383ae70ea8,"The approach route should be safe and convenient, adopt the shallowest gradient that can reasonably be achieved and be step-free, irrespective of the storey on which the dwelling is located.",{'ID': '40_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be safe and convenient, adopt the shallowest gradient that can reasonably be achieved and be step-free, irrespective of the storey on which the dwelling is located.",necessity,annotated +9ff8b8fd-5361-4c3d-9a7e-7459276c8df7,The dwelling fabric energy efficiency rate must not exceed the individual dwellings target fabric energy efficiency rate.,{'ID': '66_UK_DocL_V1_ConsrvationOfFuelAndPower'},The dwelling fabric energy efficiency rate must not exceed the individual dwellings target fabric energy efficiency rate.,selection,annotated +26980508-105c-49db-8595-bf001a48d757_2,,,"In cold premises with no fixed gigabit-capable public electronic communications network or furnishings, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic +2f0f22aa-06d3-478d-a777-5aca5c2fb5c1,"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",{'ID': '120_UK_DocK_ProtectionFromFalling'},"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",selection,annotated +12e545d1-64f4-45c9-a520-5b8a003eba0a,"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",{'ID': '85_UK_DocF_V1_Ventilation'},"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",none,annotated +5fa7daca-cb50-4397-a736-617e52d30187_3,,,"If vertical spacing at below 30% are required and unavailable, the dimensions may be taken as equal to that at 30% load.",equal,synthetic +53e31e26-a39b-4047-a86e-bdb8021413e8_1,,,Window handles on windows that open outwards are not more than 270 millimetres access when the window is at its maximum openable angle.,less-equal,synthetic +7f72632a-dc0a-4318-afd7-7090b42350fc,Mechanical supply terminals should be located and directed to avoid draughts.,{'ID': '106_UK_DocF_V1_Ventilation'},Mechanical supply terminals should be located and directed to avoid draughts.,necessity,annotated +eccd4f77-ef4a-41fd-a22a-620c84fdddd4_3,,,There is a minimum of 1000m2 of worktop to at least number of people evacuating of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,greater-equal,synthetic +8aa4b706-1659-4e30-a4fe-e7f33efe3241,All three parts of the compliance checklist should be completed.,{'ID': '108_UK_DocO_Overheating'},All three parts of the compliance checklist should be completed.,necessity,annotated +745d890e-3b3c-4972-8b75-dfdfd81e764a,"Handrails should be set at heights that are convenient for all users of the building and should extend safely beyond the top and bottom of a flight of steps, or a ramp, to give both stability and warning of the presence of a change in level.",{'ID': '58_UK_DocM_V2_AccessAndUseOfBuildings'},"Handrails should be set at heights that are convenient for all users of the building and should extend safely beyond the top and bottom of a flight of steps, or a ramp, to give both stability and warning of the presence of a change in level.",necessity,annotated +34a524ec-6994-426f-86af-78788fd34a80,"Between the locking points for the mortice lock and surface-mounted rim lock, the distance should be 400-600mm.",{'ID': '36_UK_DocQ_Security_Dwellings'},"Between the locking points for the mortice lock and surface-mounted rim lock, the distance should be 400-600mm.",selection,annotated +fa8a6d84-eb99-490e-8169-3c65353fb553_0,,,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the water temperature shall be at least 01:20:00.",greater-equal,synthetic +a86b58e8-046f-44b7-8e1b-00c876c8c647_5,,,"Parapets in open outwards A to E 15 and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",less-equal,synthetic +5fa7daca-cb50-4397-a736-617e52d30187_8,,,"If efficiencies at below 30% are required and unavailable, the control function may be taken as equal to that at 400 millimetres.",equal,synthetic +c2e0629d-350b-45b8-9e9e-d58be1780f12,"If the basement has no bedrooms, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",{'ID': '73_UK_DocF_V1_Ventilation'},"If the basement has no bedrooms, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",not-part-of,annotated +20609d43-016e-4314-9620-256f73f1c6ed,"The general ventilation rate for a new conservatory and, if necessary, adjoining rooms could be achieved using background ventilators.",{'ID': '160_UK_DocF_V1_Ventilation'},"The general ventilation rate for a new conservatory and, if necessary, adjoining rooms could be achieved using background ventilators.",selection,annotated +ebc429f0-cb90-41ab-9a11-401a2ddc7bad,"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",{'ID': '268_UK_DocF_V1_Ventilation'},"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",part-of,annotated +0071a7ee-a50c-44ab-a562-d99bf06d7918,The text should be displayed over three lines.,{'ID': '118_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The text should be displayed over three lines.,necessity,annotated +2f8d4247-e53b-49ae-bd26-c4f1765eaee8_3,,,"Extract air of type and quality two persons per square metre, 3 and 4 shall not be used as recirculation air.",equal,synthetic +05864826-21ef-4ae7-9af8-2aaeffc7267a_7,,,Modular and portable buildings with a planned energy consumption of more than 200 millimetres but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,greater,synthetic +c236bc17-ef9a-4694-a34e-68a9f38ae405,"For a heat exchanger between a solar primary and secondary system, a minimum of 0.1m2 or equivalent of heat exchanger area should be provided for every 1m2 of the net absorber area of the solar collector.",{'ID': '323_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a heat exchanger between a solar primary and secondary system, a minimum of 0.1m2 or equivalent of heat exchanger area should be provided for every 1m2 of the net absorber area of the solar collector.",selection,annotated +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f,"Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",{'ID': '3_UK_DocR_V1_InfrastructureForElectircalCommunications'},"Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater,annotated +38020928-c137-486e-88d7-c8feec038c99,A building must be provided with a fire wall if it is situated adjacent to a neighbouring building or so close to a neighbouring building that the spread of fire is evident.,{'ID': '189_Finnish_FireSafety'},A building must be provided with a fire wall if it is situated adjacent to a neighbouring building or so close to a neighbouring building that the spread of fire is evident.,none,annotated +164122ed-c7ac-4cf8-8a54-3d56c144f78d_5,,,"In general, the findings indicate that there should be at least the same number of Drawings as open-plan space and for some building types, e.g. large retail buildings, at least twice as many.",greater-equal,synthetic +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",necessity,annotated +c952db0f-b605-4335-8d56-97fc339ad5ba,All three parts of the installation and commissioning checklist should be completed.,{'ID': '262_UK_DocF_V1_Ventilation'},All three parts of the installation and commissioning checklist should be completed.,necessity,annotated +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",part-of,annotated +46f5be2a-1514-420b-bc39-331fc6e0d2df,"The dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and target fabric energy efficiency rate, respectively.",{'ID': '356_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,annotated +64695439-3458-4d43-8e7b-a2ba75075cea,"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",{'ID': '124_Finnish_SafetyOfUse'},"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",necessity,annotated +e874f337-2067-4e77-ad32-c3b857f40e7a_10,,,"If the structure exceeds ten millimetres, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",greater,synthetic +37f01a2c-b944-45a2-a7f4-140d8c03d7ac_2,,,"After rebating, frame components should retain at least 100mm of CO2 measurements.",greater-equal,synthetic +6c789809-b1b8-429a-8fe2-8ce16f8a4b54_8,,,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the vicinity does not exceed 55 degrees Celsius.,less-equal,synthetic +973c9430-2b4a-4ab4-82df-7060c3002f77_8,,,The Air flow rates for the community heating primary circuit should be a minimum of 0.2.,greater-equal,synthetic +511c1a7f-08b9-48ec-aea6-9b749fdf31a1_10,,,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an 1m3/s of appropriately located fixture which are suitable for users of wheelchairs and walking frames with wheels.",equal,synthetic +72785bd7-d935-4c81-ab5f-ba2095ba62a9,"Manual controls, where provided, should be within reasonable reach of the occupants.",{'ID': '20_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Manual controls, where provided, should be within reasonable reach of the occupants.",selection,annotated +4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9_0,,,"In spaces intended for more than 60 persons, the open outwards of the access route must be at least 20 degrees Celsius.",greater-equal,synthetic +6a41a473-bd3c-4e38-a093-094b3fdae388_2,,,At least one in every 13l/s remaining air barrier must be provided with cable routes.,equal,synthetic +5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",selection,annotated +77f993c6-dff1-4f9a-8f66-73221d3cbaff_2,,,"If the dwelling only has one habitable room, a minimum step of 23C should be used.",greater-equal,synthetic +05fdde92-d8af-42ad-963b-9019c69a8ab3_1,,,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same power requirements as the hatches used in the external wall should be included within the depth of the intermediate floor structure.",equal,synthetic +1d18f0c9-31e5-43ee-8f16-e4fa607c5cd9,"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",{'ID': '51_UK_DocM_V2_AccessAndUseOfBuildings'},"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",selection,annotated +8e9ef8dc-18bd-4877-98cd-556aa4adee8f,"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'},"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",selection,annotated +fa8a6d84-eb99-490e-8169-3c65353fb553,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",{'ID': '61_Finnish_StabilityOfStructures'},"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",selection,annotated +23cff3c3-1251-4c5f-9fd9-8f52d25eb494_2,,,Gasfired boilers and multi-stage oilfired boilers with an that of more than 0.5 kN/m2 should have fully modulating burner controls.,greater,synthetic +66b3628a-f0ee-4bc7-93c8-2ae0145a2e78_11,,,"In a thermal energy streams with no openable European Standards, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",not-part-of,synthetic +2ff58135-b89d-40d1-a145-51aad9e5a942,"The landing in front of the outside door shall be at least 1,500 millimetres wide and at least 1,500 millimetres long.",{'ID': '16_Finnish_Accessibility'},"The landing in front of the outside door shall be at least 1,500 millimetres wide and at least 1,500 millimetres long.",greater-equal,annotated +26980508-105c-49db-8595-bf001a48d757_7,,,"In heating circuits with no fixed open-plan space or furnishings, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic +4e8c5c50-44af-48f6-b959-e6f9b31afa1e_7,,,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical frame components may be CO2 readings.",equal,synthetic +23cff3c3-1251-4c5f-9fd9-8f52d25eb494_7,,,Gasfired boilers and multi-stage oilfired boilers with an protective part of more than 1100mm should have fully modulating burner controls.,greater,synthetic +d0ef750b-078c-4e63-a57f-298674c06a5e,Moisture-resistant insulation should be fitted below damp-proof course level and extend to the foundation block/structure.,{'ID': '136_UK_DocL_V1_ConsrvationOfFuelAndPower'},Moisture-resistant insulation should be fitted below damp-proof course level and extend to the foundation block/structure.,necessity,annotated +c72a5952-2e0b-4d4a-9185-09e4149b6239,The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,{'ID': '114_Finnish_Health-Humidity'},The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,selection,annotated +2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_5,,,The normal relationship between the number of appliances of the rise and going is: 200 millimetres equals between 550mm and 700mm.,equal,synthetic +9f8c2fbb-a04e-42f9-8fa0-b7a905dbafa0,"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",{'ID': '40_Finnish_Health-Humidity'},"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",necessity,annotated +986f7853-4975-4ecd-8f10-a75d818eb44a,"Fully insulated and continuous cavity closers should be used, installed tight to the insulation and cavity apertures.",{'ID': '140_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Fully insulated and continuous cavity closers should be used, installed tight to the insulation and cavity apertures.",necessity,annotated +0f67dad7-6df9-444b-8e72-f447668e3fde,"Where sanitary facilities are wheelchair accessible, WC pans should be a minimum of 400mm high.",{'ID': '104_UK_DocM_V1_AccessAndUseOfBuildings'},"Where sanitary facilities are wheelchair accessible, WC pans should be a minimum of 400mm high.",greater-equal,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,{'ID': '18_UK_DocM_V1_AccessAndUseOfBuildings'},Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,none,annotated +339fc78c-a2f2-481c-a410-3aeb41e24b8a_6,,,Solid walls constructed of coursed brickwork or blockwork should be at least as energy consumption as 0.15 of the storey height.,greater-equal,synthetic +db611a74-4d57-4f90-989b-23b990d705ae,"Whichever approach is adopted, the agreed level of provision should be clearly recorded.",{'ID': '24_UK_DocM_V2_AccessAndUseOfBuildings'},"Whichever approach is adopted, the agreed level of provision should be clearly recorded.",necessity,annotated +e21fa967-934e-4a29-a66d-252fdbbf928f_1,,,"If the parasitic energy use is unknown, an distance of the uppermost floor level from the entry level of 60 persons should be made for any control system.",equal,synthetic +825053cb-af5d-43a9-b59b-e2a5ae78ea73_7,,,The width of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the domestic hot water cylinder heat loss of dwellings in the residential building; b. the number of associated parking spaces.,greater,synthetic +ef4ec541-e1a7-47d4-9a83-94715d8900ba_4,,,"Where 56 metres or more rooflights are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",greater-equal,synthetic +63af9f99-6939-4e8c-a6a9-8b10942e1597,"The handle to at least one window in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",{'ID': '57_UK_DocM_V1_AccessAndUseOfBuildings'},"The handle to at least one window in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",greater-equal,annotated +5e51b653-449e-4d00-be19-0e20ecff5c49_9,,,The default value should be 900mm.,equal,synthetic +0262f6e5-21bc-4312-9388-8ac93b79416d,The minimum full load EER of the absorption chillers should be no worse than 0.7.,{'ID': '285_UK_DocM_V2_AccessAndUseOfBuildings'},The minimum full load EER of the absorption chillers should be no worse than 0.7.,part-of,annotated +86365504-9029-4805-a93b-4256849b8e3a,Duct connections should be both mechanically secured and adequately sealed to prevent leaks.,{'ID': '116_UK_DocF_V1_Ventilation'},Duct connections should be both mechanically secured and adequately sealed to prevent leaks.,necessity,annotated +66b3628a-f0ee-4bc7-93c8-2ae0145a2e78_0,,,"In a rooflight-and-kerb assemblies with no openable property, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",not-part-of,synthetic +0085ecdd-f2f0-45f5-948d-ded697c69866,"In addition, on one side of the toilet seat there shall be a free space of at least 800 millimetres.",{'ID': '44_Finnish_Accessibility'},"In addition, on one side of the toilet seat there shall be a free space of at least 800 millimetres.",none,annotated +d3fc8c9b-c23a-4188-8723-369caa90453c_4,,,"The Air permeability for a building's total combined window area is 0.7 metres of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",equal,synthetic +34a524ec-6994-426f-86af-78788fd34a80_6,,,"Between the locking points for the mortice lock and surface-mounted rim lock, the storage capacity should be 28 metres.",equal,synthetic +afd03eb1-8356-4755-a764-6869d0ac4171,"Reasonable provision should be made for people to (a) gain access to; and (b) use, the dwelling and its facilities.",{'ID': '9_UK_DocM_V1_AccessAndUseOfBuildings'},"Reasonable provision should be made for people to (a) gain access to; and (b) use, the dwelling and its facilities.",selection,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479_2,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for reception up to 6mm not more than 5m long.,less-equal,synthetic +549fd984-e319-47d9-9a86-4ea7f4cbf508,The space between the air barrier and the insulation layer should be filled with solid material.,{'ID': '191_UK_DocL_V1_ConsrvationOfFuelAndPower'},The space between the air barrier and the insulation layer should be filled with solid material.,selection,annotated +23cff3c3-1251-4c5f-9fd9-8f52d25eb494_8,,,Gasfired boilers and multi-stage oilfired boilers with an ending of more than 600kg/m3 should have fully modulating burner controls.,greater,synthetic +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",none,annotated +6c789809-b1b8-429a-8fe2-8ce16f8a4b54_9,,,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the calculation of primary energy and CO2 emissions does not exceed adequate number.,less-equal,synthetic +d0927095-9e43-4ce4-a740-d5df69dc1dc3_7,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under CO2 emissions 10.",equal,synthetic +60024014-cb6a-4a53-9b12-9497e0a1e5e8_7,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the design value from these spaces does not exceed A of the total air flow in the vertical duct.",less-equal,synthetic +9027959e-efc1-4d32-acbe-e0775d40f001_5,,,"The morticed bolts should have a minimum configuration of 1,500 millimetres, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",greater-equal,synthetic +f009a781-0ced-408d-b3d1-6ae7a848012e,"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",{'ID': '31_Finnish_SafetyOfUse'},"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",necessity,annotated +f64c5a32-2f88-4be6-abf4-8870a4e51fdf,"The use of recirculation, transfer or secondary air shall not cause any harmful spread of impurities, in particular odours.",{'ID': '72_Finnish_Health-IndoorClimateAndVentilation'},"The use of recirculation, transfer or secondary air shall not cause any harmful spread of impurities, in particular odours.",selection,annotated +6e5e61dd-039d-4079-9c3f-f52fc12efefb,For continuing horizontal structures the loaded area shall be calculated span by span.,{'ID': '12_Finnish_StabilityOfStructures'},For continuing horizontal structures the loaded area shall be calculated span by span.,selection,annotated +0ea1e862-2434-4fc8-97a2-b076c992ef20_0,,,"The width of an exit must be at least 1,200 millimetres and its free load capacity must be at least 1.3 seconds.",greater-equal,synthetic +984c252b-74f4-4d85-9080-1c8ae1851eca_11,,,"If performance requires thicker glass to be used, an equivalent window unit with impact (0.2) glazing should be shown to meet the required standard.",equal,synthetic +a387fcb8-ead2-4094-9be9-72d783468b33_7,,,"If the Control of windows, roof windows, rooflights and doors exceeds 3.3m of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",greater,synthetic +4fc3b5b1-a838-4429-b385-d8e80e6633eb,"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",selection,annotated +4abb3268-3ba6-47e8-a8b7-4676dbaa9a16_4,,,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear power requirements of 1, except in doorways.",equal,synthetic +0096a3bf-ac16-4a75-adf9-8c3f4a9b8610,The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,{'ID': '33_UK_DocQ_Security_Dwellings'},The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,less-equal,annotated +7ca3a924-dd3a-450e-af24-4d456d6c1b32,"Wet room waterproofing must form a whole which is impermeable on all waterproofed surfaces as well as on their seams, penetrations and joints.",{'ID': '113_Finnish_Health-Humidity'},"Wet room waterproofing must form a whole which is impermeable on all waterproofed surfaces as well as on their seams, penetrations and joints.",part-of,annotated +bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,none,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_1,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the horizontal spacing of these must be at least EI 30.",greater-equal,synthetic +9f8c2fbb-a04e-42f9-8fa0-b7a905dbafa0,"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",{'ID': '40_Finnish_Health-Humidity'},"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",selection,annotated +5f7b8ff7-50d0-46a2-a48b-fa19786c98fd,"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '105_Finnish_EnergyEfficiency'},"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",none,annotated +46f5be2a-1514-420b-bc39-331fc6e0d2df_11,,,"The sections, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the thresholds, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,synthetic +86a39a0b-093f-4920-9879-fe7b3ae6675a,"In principle, suitable sanitary accommodation should be available to everybody, including sanitary accommodation designed for wheelchair users, ambulant disabled people, people of either sex with babies and small children or people encumbered by luggage.",{'ID': '155_UK_DocM_V2_AccessAndUseOfBuildings'},"In principle, suitable sanitary accommodation should be available to everybody, including sanitary accommodation designed for wheelchair users, ambulant disabled people, people of either sex with babies and small children or people encumbered by luggage.",selection,annotated +4a82f789-a98a-4379-9b81-2a20cfba6c87,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 70 kN, will also be applied to internal ties.",{'ID': '179_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 70 kN, will also be applied to internal ties.",greater-equal,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_7,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and effective rated output 0.3 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +3724fd47-22f7-432c-81a2-1abcb95c7df2_0,,,"The internal temperature installed in a dwellings habitable rooms and kitchens should be no fewer than 0.8 metres, except in one bedroom properties, where there should be no fewer than four.",greater-equal,synthetic +825053cb-af5d-43a9-b59b-e2a5ae78ea73_11,,,The power input from controls of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the projection of dwellings in the residential building; b. the number of associated parking spaces.,greater,synthetic +302c413e-fefd-47f1-914f-0dc787e4a761,"Where illuminance on surfaces is greater than 200 lux, a difference in light reflectance value should be a minimum of 20 points.",{'ID': '29_UK_DocM_V2_AccessAndUseOfBuildings'},"Where illuminance on surfaces is greater than 200 lux, a difference in light reflectance value should be a minimum of 20 points.",part-of,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479_5,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 270 millimetres primary energy content.,less-equal,synthetic +0365837b-a04d-4aaf-a2f5-2e89403a9c2b,"If all the terminals have to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",{'ID': '200_UK_DocF_V1_Ventilation'},"If all the terminals have to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",necessity,annotated +00cded8a-5208-4c1b-bda4-9677d45b9375,The layers of attic floor structures and the ventilation must prevent the accumulation of damaging moisture into the roof structure resulting from water vapour diffusion or airflow.,{'ID': '105_Finnish_Health-Humidity'},The layers of attic floor structures and the ventilation must prevent the accumulation of damaging moisture into the roof structure resulting from water vapour diffusion or airflow.,part-of,annotated +6a41a473-bd3c-4e38-a093-094b3fdae388_4,,,At least one in every 600mm remaining Taps must be provided with cable routes.,equal,synthetic +86350df0-a40e-412b-a301-004524d56736,"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",part-of,annotated +2f0f22aa-06d3-478d-a777-5aca5c2fb5c1,"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",{'ID': '120_UK_DocK_ProtectionFromFalling'},"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",none,annotated +745d890e-3b3c-4972-8b75-dfdfd81e764a,"Handrails should be set at heights that are convenient for all users of the building and should extend safely beyond the top and bottom of a flight of steps, or a ramp, to give both stability and warning of the presence of a change in level.",{'ID': '58_UK_DocM_V2_AccessAndUseOfBuildings'},"Handrails should be set at heights that are convenient for all users of the building and should extend safely beyond the top and bottom of a flight of steps, or a ramp, to give both stability and warning of the presence of a change in level.",necessity,annotated +26980508-105c-49db-8595-bf001a48d757_10,,,"In Heat pumps with no fixed seats or pipes, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic +f6ea9be6-644d-4dc6-8954-d115bdd528c8,"The building emission rate and building primary energy rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the combined emission factor has been derived.",{'ID': '62_UK_DocM_V2_AccessAndUseOfBuildings'},"The building emission rate and building primary energy rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the combined emission factor has been derived.",none,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479_4,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for glare and reflections up to half not more than 5m long.,less-equal,synthetic +99a53f17-48cb-4012-a47b-700761e0983b_1,,,Where a new building which is not a residential building or a mixed-use building has more than twice the rise plus the going (2R G) onsite electricity generation and storage (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,greater,synthetic +e9d02df9-2fcb-4acc-bd08-18a4348cd823,"If people need to obtain tickets for pay and display parking, the ticket dispensing machines should be located in a way that allows a person in a wheelchair, or a person of short stature, to gain access close to the machine and reach the payment and ticket dispensing functions.",{'ID': '46_UK_DocM_V2_AccessAndUseOfBuildings'},"If people need to obtain tickets for pay and display parking, the ticket dispensing machines should be located in a way that allows a person in a wheelchair, or a person of short stature, to gain access close to the machine and reach the payment and ticket dispensing functions.",none,annotated +e1460729-0b58-4a44-99ac-dc150f918428,The cleanouts shall be located so that the entire pipeline may be cleansed.,{'ID': '158_Finnish_Health-WaterAndSewerage'},The cleanouts shall be located so that the entire pipeline may be cleansed.,necessity,annotated +a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",none,annotated +bc49524e-4bac-4d16-bc83-5a977019cfaa,Other ventilation systems may be acceptable if they can be shown to meet an equal level of performance.,{'ID': '30_UK_DocF_V1_Ventilation'},Other ventilation systems may be acceptable if they can be shown to meet an equal level of performance.,necessity,annotated +77f993c6-dff1-4f9a-8f66-73221d3cbaff_6,,,"If the dwelling only has one habitable room, a minimum operation of 60 persons should be used.",greater-equal,synthetic +2c12675d-93c9-496a-acf9-b30465dae93d,Any flexible ducts should be installed so that the full internal diameter is maintained and flow resistance is minimised.,{'ID': '113_UK_DocF_V1_Ventilation'},Any flexible ducts should be installed so that the full internal diameter is maintained and flow resistance is minimised.,selection,annotated +bde1697a-20c9-4f15-a63c-5be323a058c1_2,,,Any connection of E 15 or more flights to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,greater-equal,synthetic +d3c5b819-2fd9-461f-b0cc-ac1dd14b45dc,"A sewer installed in the ground shall withstand the load imposed by soil, soil corrosion as well as subsidence of soil.",{'ID': '144_Finnish_Health-WaterAndSewerage'},"A sewer installed in the ground shall withstand the load imposed by soil, soil corrosion as well as subsidence of soil.",necessity,annotated +8207751f-13b8-4fe3-9bfe-4423093d4905,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,{'ID': '26_Finnish_AcousticEnvironment'},A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,selection,annotated +72e7ed0c-9e73-46b2-a919-20f3fea337fd_11,,,"An building services with a potentially flammable or explosive atmosphere must not be located in a block leaf where there are dwellings, accommodation premises, institutions or assembly and business premises.",not-part-of,synthetic +b5edf19f-56df-436a-89f0-9ab5bf6963ea,"If necessary, fire compartments shall be partitioned in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '106_Finnish_FireSafety'},"If necessary, fire compartments shall be partitioned in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",selection,annotated +35af73f1-53c7-4377-9da0-acf99eef4d8e,"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",{'ID': '159_UK_DocM_V2_AccessAndUseOfBuildings'},"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",part-of,annotated +cf35d4a4-3170-421b-9be1-b68d928eed1d_2,,,"A roof with a clear width greater than 44mm must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",greater,synthetic +ed2cca4a-50f7-470d-9752-dd8722385a24,"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",{'ID': '80_Finnish_SafetyOfUse'},"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",selection,annotated +d796dece-45f6-4527-a151-c59b007e9028,"A safe and marked access route must be reserved for pedestrians in connection with vehicle traffic and goods transport routes, doors and gates in the yards of buildings other than single-family houses, if pedestrian traffic through them is necessary.",{'ID': '132_Finnish_SafetyOfUse'},"A safe and marked access route must be reserved for pedestrians in connection with vehicle traffic and goods transport routes, doors and gates in the yards of buildings other than single-family houses, if pedestrian traffic through them is necessary.",selection,annotated +f27c9fb4-dc28-494c-a277-a51360cdfdb8,A handrail and its ending must be shaped safely and must continue past the start and end points of the structure.,{'ID': '57_Finnish_SafetyOfUse'},A handrail and its ending must be shaped safely and must continue past the start and end points of the structure.,necessity,annotated +759d26ff-821f-4949-9096-a7e15c5580f6,Windows and doors: should be installed in such a way that the thermal integrity of the insulated plane is maintained.,{'ID': '137_UK_DocL_V1_ConsrvationOfFuelAndPower'},Windows and doors: should be installed in such a way that the thermal integrity of the insulated plane is maintained.,selection,annotated +7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88_9,,,The resilient layer should be to the full height of the door and 900-1000mm target primary energy rate of the doorset.,equal,synthetic +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated +70760393-8139-47e8-a329-87da3a477396,Under-floor heating systems intended for intermittent or cyclical operation and/or installed over unheated rooms should be separated from the structural floor by a layer of insulation with a thermal resistance of at least 1.25(m2K)/W.,{'ID': '304_UK_DocL_V1_ConsrvationOfFuelAndPower'},Under-floor heating systems intended for intermittent or cyclical operation and/or installed over unheated rooms should be separated from the structural floor by a layer of insulation with a thermal resistance of at least 1.25(m2K)/W.,selection,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_4,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 65 degrees Celsius in travel distance; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic +a9c88566-e4e5-4cba-8165-9916820d9cc5,"Doors, gates and boom barriers must operate safely and in such a way that they do not cause a danger of an accident.",{'ID': '75_Finnish_SafetyOfUse'},"Doors, gates and boom barriers must operate safely and in such a way that they do not cause a danger of an accident.",none,annotated +ef4f54b6-1099-4404-9fa2-d0c0d5e55543,The dwelling primary energy rate must not exceed the individual dwellings target primary energy rate.,{'ID': '64_UK_DocL_V1_ConsrvationOfFuelAndPower'},The dwelling primary energy rate must not exceed the individual dwellings target primary energy rate.,selection,annotated +164122ed-c7ac-4cf8-8a54-3d56c144f78d_6,,,"In general, the findings indicate that there should be at least the same number of Extinguishing routes as photovoltaic array and for some building types, e.g. large retail buildings, at least twice as many.",greater-equal,synthetic +23ff7307-c4ae-4bef-97bf-feb9682d91eb,"If a water pump is used on a closed loop circuit and the motor is rated at more than 750W, then it should be fitted with or controlled by an appropriate variable speed controller on any variable volume system.",{'ID': '290_UK_DocM_V2_AccessAndUseOfBuildings'},"If a water pump is used on a closed loop circuit and the motor is rated at more than 750W, then it should be fitted with or controlled by an appropriate variable speed controller on any variable volume system.",necessity,annotated +4fc3b5b1-a838-4429-b385-d8e80e6633eb_3,,,"In the absence of relevant harmonised European Standards, products with a energy performance exceeding 10 kN must have a product certificate issued by a Notified Body.",greater,synthetic +2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_4,,,The normal relationship between the dimensions of the rise and going is: four equals 1.,equal,synthetic +e320322e-3aee-4167-ad19-a6c6cc41f597,The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,{'ID': '97_Finnish_Health-WaterAndSewerage'},The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,part-of,annotated +e3b85ad6-6132-40d7-86f8-3cc5d44eb12c_3,,,1m3/s terrace of houses should be close to an accessible bathroom suitable for a wheelchair user.,equal,synthetic +389c960b-525d-4f2e-9a2c-1805eb2dc20d_10,,,The full operation under a stair that forms part of the storage provision should be counted as 0.2.,equal,synthetic +86350df0-a40e-412b-a301-004524d56736_4,,,"For wet heating systems in new dwellings with a cost of 13l/s or greater, a minimum of two independently controlled heating circuits should be provided.",greater-equal,synthetic +ef561e39-db90-462c-8dde-15fbeae954e5_2,,,A cube with dwelling emission rate of no more than 250 millimetres may pass between the upper edge of the barrier and the protective part.,less-equal,synthetic +baee716c-b8c2-4500-b4de-63fa11f007b1_3,,,A minimum of 1 in 40 in five of the remaining Boards must have access to cable routes.,greater-equal,synthetic +8364a5f1-f80e-484c-9f38-bffc6f4c1876,"Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",{'ID': '44_UK_DocM_V1_AccessAndUseOfBuildings'},"Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",necessity,annotated +23ff7307-c4ae-4bef-97bf-feb9682d91eb,"If a water pump is used on a closed loop circuit and the motor is rated at more than 750W, then it should be fitted with or controlled by an appropriate variable speed controller on any variable volume system.",{'ID': '290_UK_DocM_V2_AccessAndUseOfBuildings'},"If a water pump is used on a closed loop circuit and the motor is rated at more than 750W, then it should be fitted with or controlled by an appropriate variable speed controller on any variable volume system.",selection,annotated +96b38b2d-e67c-457c-86d4-2a47a1b834b1,"Drawings: all relevant drawings should be provided to clearly identify the position, continuity and extent of the air barrier.",{'ID': '176_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Drawings: all relevant drawings should be provided to clearly identify the position, continuity and extent of the air barrier.",selection,annotated +f505cec8-d1a6-41ae-b2ba-68ac19f64be2,"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",{'ID': '137_UK_DocM_V2_AccessAndUseOfBuildings'},"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",part-of,annotated +23cff3c3-1251-4c5f-9fd9-8f52d25eb494_10,,,Gasfired boilers and multi-stage oilfired boilers with an area of more than 21 C should have fully modulating burner controls.,greater,synthetic +d8066a73-49c2-4e99-825a-b49b9b2ba67d_2,,,A landing measuring at least 0.7 in heat emission capacity must be reserved in front of and behind a door located in an exit route.,greater-equal,synthetic +3931f0fa-433e-4fb8-96bf-a747f3622ee0,"In order to help people with visual impairment to appreciate the size of a space they have entered, or to find their way around, there should be a visual contrast between the wall and the ceiling, and between the wall and the floor.",{'ID': '97_UK_DocM_V2_AccessAndUseOfBuildings'},"In order to help people with visual impairment to appreciate the size of a space they have entered, or to find their way around, there should be a visual contrast between the wall and the ceiling, and between the wall and the floor.",selection,annotated +81f14fc1-af5d-45e8-8725-94d2510e4701_8,,,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a time-lapse of at least 65 degrees Celsius in the hallway and kitchen.",greater-equal,synthetic +f27c9fb4-dc28-494c-a277-a51360cdfdb8,A handrail and its ending must be shaped safely and must continue past the start and end points of the structure.,{'ID': '57_Finnish_SafetyOfUse'},A handrail and its ending must be shaped safely and must continue past the start and end points of the structure.,necessity,annotated +6d9a1e8e-6fe7-4234-951a-96fdc4598bd7_7,,,"If parking spaces are provided for a building, an adequate number of systems, but at least 2.2 metres, shall be intended for the use of a person with mobility and functional impairment.",greater-equal,synthetic +993e54cc-49c3-43cb-995e-1a951c93c775_10,,,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an supports equal to 200 m2.",equal,synthetic +34a524ec-6994-426f-86af-78788fd34a80_9,,,"Between the locking points for the mortice lock and surface-mounted rim lock, the water vapour resistance should be 500 millimetres.",equal,synthetic +4d80c4d1-08ee-481a-9f9c-e9151ce1094d,"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",{'ID': '421_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",none,annotated +d8066a73-49c2-4e99-825a-b49b9b2ba67d,A landing measuring at least 800 millimetres in length must be reserved in front of and behind a door located in an exit route.,{'ID': '34_Finnish_SafetyOfUse'},A landing measuring at least 800 millimetres in length must be reserved in front of and behind a door located in an exit route.,greater-equal,annotated +7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",selection,annotated +e505b13c-7b62-4857-aa2d-544dc986e9c0_2,,,"For dwellings, for external tapered steps and stairs that are part of the building the rated output of each step should be a minimum of two.",greater-equal,synthetic +6ec243f2-9294-4b7c-89a4-1c46e4a69cc9_5,,,"If site constraints necessitate an institutions of 190 kN or steeper, an approach incorporating ramped access should be provided.",greater-equal,synthetic +40b40b1b-d1b1-49d8-b9b7-13c5845a169d_8,,,The structure of the control appliance of the plumbing fixture shall be such that its time-lapse does not arise above 15.,less-equal,synthetic +8d11b1a7-732a-4153-9564-3f35cc111cb6,A dwelling that is only a basement should be treated as a single-storey dwelling above ground level.,{'ID': '74_UK_DocF_V1_Ventilation'},A dwelling that is only a basement should be treated as a single-storey dwelling above ground level.,none,annotated +b63dcef6-1840-4e9e-ad51-f8fc481fe856_10,,,"The wall ties should have a horizontal spacing of 900mm and a reception of 2,100 millimetres, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic +2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_10,,,The normal relationship between the dimensions of the rise and going is: B equals 60.,equal,synthetic +29232335-402c-4ed9-af74-fd093ac22e28_0,,,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least reference value 400mm.,greater-equal,synthetic +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3,"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",{'ID': '53_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",selection,annotated +3724fd47-22f7-432c-81a2-1abcb95c7df2,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",{'ID': '96_UK_DocF_V1_Ventilation'},"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",part-of,annotated +993e54cc-49c3-43cb-995e-1a951c93c775_0,,,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an combined dead,imposed and wind loads equal to 16/01/2023 00:00.",equal,synthetic +9953a539-8775-467a-9028-f51fe6d0f9f6,Grommets or flexible collars should be used around incoming services and sealed to the air barrier with air-sealing tape or sealant.,{'ID': '179_UK_DocL_V1_ConsrvationOfFuelAndPower'},Grommets or flexible collars should be used around incoming services and sealed to the air barrier with air-sealing tape or sealant.,necessity,annotated +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated +f733b7c9-a406-4f5a-b383-9d3f8b70a559,The selection of relevant critical situations for design should be made reflecting the conditions that can reasonably be foreseen during future use.,{'ID': '5_UK_DocA_Structure'},The selection of relevant critical situations for design should be made reflecting the conditions that can reasonably be foreseen during future use.,selection,annotated +eccd4f77-ef4a-41fd-a22a-620c84fdddd4,There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,{'ID': '98_UK_DocM_V1_AccessAndUseOfBuildings'},There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,none,annotated +da4d5959-6e64-4e04-a1f3-8b42b6addab0,The outdoor air flow used in the calculations for buildings other than those in intended use categories 1 and 2 outside the occupancy period shall be at least 0.15 dm3/s per m2.,{'ID': '67_Finnish_EnergyEfficiency'},The outdoor air flow used in the calculations for buildings other than those in intended use categories 1 and 2 outside the occupancy period shall be at least 0.15 dm3/s per m2.,selection,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_10,,,"If the air flows of diameter 1 and 1400mm are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_2,,,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or fire compartments above 21 C may be discounted when measuring clear width.,greater,synthetic +81f14fc1-af5d-45e8-8725-94d2510e4701_10,,,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a tread of at least 1m3/s in the hallway and kitchen.",greater-equal,synthetic +e320322e-3aee-4167-ad19-a6c6cc41f597,The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,{'ID': '97_Finnish_Health-WaterAndSewerage'},The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,none,annotated +05fdde92-d8af-42ad-963b-9019c69a8ab3_10,,,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same Leakage as the chairs used in the external wall should be included within the depth of the intermediate floor structure.",equal,synthetic +43e26628-8b62-4cc6-91e2-284335df1564_0,,,"In rooms used for sleeping or rest, the surface may not exceed one metre.",less-equal,synthetic +8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c,"However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent.",{'ID': '9_Finnish_Accessibility'},"However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent.",none,annotated +6c789809-b1b8-429a-8fe2-8ce16f8a4b54_11,,,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the energy efficiency measures does not exceed eight per cent.,less-equal,synthetic +78094ea9-f870-40e9-8174-8dfce8f30a90,The penetrating services should be sealed to the air barrier using proprietary grommets or collars with air-sealing tape or sealant.,{'ID': '181_UK_DocL_V1_ConsrvationOfFuelAndPower'},The penetrating services should be sealed to the air barrier using proprietary grommets or collars with air-sealing tape or sealant.,selection,annotated +9fefb0c6-9530-4277-bfba-162315e8fc37,One electric vehicle charge point must be provided for the building.,{'ID': '67_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},One electric vehicle charge point must be provided for the building.,necessity,annotated +5b1fe636-d2aa-4382-885e-a4f8a2cae4d4,"Generally, a thermal element once upgraded should not have a U-value greater than 0.7W/(m2K).",{'ID': '125_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Generally, a thermal element once upgraded should not have a U-value greater than 0.7W/(m2K).",part-of,annotated +8fcdc238-3c30-4659-9303-1b126a39b2cd,The design solar load should be reduced by at least 20%.,{'ID': '499_UK_DocM_V2_AccessAndUseOfBuildings'},The design solar load should be reduced by at least 20%.,greater-equal,annotated +77f993c6-dff1-4f9a-8f66-73221d3cbaff_11,,,"If the dwelling only has one habitable room, a minimum Manual control of 10 should be used.",greater-equal,synthetic +db734798-9e42-4fe1-900c-77d4e6131809,"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",{'ID': '11_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",none,annotated +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_5,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding 1,200 MJ/m2 onsite electricity generation and storage is EI 30; however, minor sealing parts and penetrations may be class E 15.",greater,synthetic +f5a71c7b-e852-40f2-8f88-91cda7902a7e_11,,,"If a new building has a space heating or airconditioning system with an gradients greater than four, a building automation and control system should be installed.",greater,synthetic +f6add908-4d45-4b3e-83a6-369f6c36c037_2,,,"Door rails, stiles and muntins should be at least 3.3m full width.",greater-equal,synthetic +29232335-402c-4ed9-af74-fd093ac22e28,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,{'ID': '95_Finnish_Health-IndoorClimateAndVentilation'},The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,greater-equal,annotated +8b054fa5-fa6b-40f8-996a-a6dfea855fc3_11,,,"The output between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 0.7 on the side wall and no less than 1,500 millimetres on the end wall.",greater-equal,synthetic +3724fd47-22f7-432c-81a2-1abcb95c7df2_3,,,"The prevailing wind direction installed in a dwellings habitable rooms and kitchens should be no fewer than 01:20:00, except in one bedroom properties, where there should be no fewer than four.",greater-equal,synthetic +e5b89c46-e6d5-4fb8-9e13-936c670c37c7,Consideration should be given to installing a chemical sanitary waste disposal unit in wheelchair-accessible WC accommodation.,{'ID': '164_UK_DocM_V2_AccessAndUseOfBuildings'},Consideration should be given to installing a chemical sanitary waste disposal unit in wheelchair-accessible WC accommodation.,selection,annotated +12e545d1-64f4-45c9-a520-5b8a003eba0a_9,,,"If the dwelling has more than 20 millimetres exposed system for onsite electricity generation, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",greater,synthetic +53e31e26-a39b-4047-a86e-bdb8021413e8_4,,,Window handles on windows that open outwards are not more than E 15 density when the window is at its maximum openable angle.,less-equal,synthetic +656aa2fa-18cb-41ee-ae28-28deb3dffcc3_6,,,The topography of the water in the hot water system shall be at least between 550mm and 700mm and available from the hot water plumbing fixture within 20 seconds.,greater-equal,synthetic +77f993c6-dff1-4f9a-8f66-73221d3cbaff_0,,,"If the dwelling only has 1 floor areas, a minimum ventilation rate of 13l/s should be used.",equal,synthetic +9027959e-efc1-4d32-acbe-e0775d40f001_11,,,"The morticed bolts should have a minimum cross fall of 0.9 metres, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",greater-equal,synthetic +793cb939-b3d9-46eb-ae65-71a4d5c8031b_2,,,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be output to two.,less-equal,synthetic +afd03eb1-8356-4755-a764-6869d0ac4171,"Reasonable provision should be made for people to (a) gain access to; and (b) use, the dwelling and its facilities.",{'ID': '9_UK_DocM_V1_AccessAndUseOfBuildings'},"Reasonable provision should be made for people to (a) gain access to; and (b) use, the dwelling and its facilities.",selection,annotated +e15250c0-1279-4d29-a1ec-31560b045007_9,,,connection of basement storeys must not be connected to fire and smoke-proof building's.,not-part-of,synthetic +35cacecf-06dc-4b0f-aadb-db2ee05518c7,The area of windows and roof windows (but excluding display windows) within the area served exceeds 40 of the facade area.,{'ID': '495_UK_DocM_V2_AccessAndUseOfBuildings'},The area of windows and roof windows (but excluding display windows) within the area served exceeds 40 of the facade area.,selection,annotated +"8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent. {'ID': '9_Finnish_Accessibility'}_3",,,"However, if the target primary energy rate is no more than 9mm, the ramp may not have a gradient of more than eight per cent.",less-equal,synthetic +29c431ee-ea93-491d-ab13-06418d93c488_8,,,"If specification is greater than B, manual control is acceptable.",greater,synthetic +389c960b-525d-4f2e-9a2c-1805eb2dc20d_1,,,The full mechanical ventilation under a stair that forms part of the storage provision should be counted as 56 metres.,equal,synthetic +922bf8df-3a70-4f45-8c04-200b638d3b3c_6,,,The cold water pipe shall be designed and installed so that the height in the cold water system may not exceed 20 litres per second.,less-equal,synthetic +bd670961-83e8-410a-85a4-578f2d00c626,"In all cases, roof insulation should be continuous with wall insulation.",{'ID': '168_UK_DocL_V1_ConsrvationOfFuelAndPower'},"In all cases, roof insulation should be continuous with wall insulation.",necessity,annotated +f420ae57-5656-4558-b1a3-1079e46bf6cc_9,,,"In the case of the storey-level door of a dwelling, or if the agreed level of provision through the door exceeds 0.5 kN/m2, doors must open in the direction of the exit.",greater,synthetic +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3,"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",{'ID': '53_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",not-part-of,annotated +56517433-cf40-4b88-a9d4-18e61e0e9993_5,,,"In addition, on both sides of the toilet seat there shall be a ramp of at least 200 lux.",greater-equal,synthetic +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_9,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding 56 metres flight is EI 30; however, minor sealing parts and penetrations may be class E 15.",greater,synthetic +082c7ed9-3579-48c2-a0d2-076f1edd647c_5,,,"Each of the six metres results of the centrally hinged window should be assessed as a single side, bottom or top hung window.",equal,synthetic +a922fe4e-30c9-4fef-a442-27459b959914,Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,{'ID': '82_Finnish_Health-WaterAndSewerage'},Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,selection,annotated +f162906e-1097-420e-b2a0-dd746d5794c7,"Where controls are external to the heater, the system should be provided with a time switch/programmer and room thermostat, or programmable room thermostat.",{'ID': '265_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where controls are external to the heater, the system should be provided with a time switch/programmer and room thermostat, or programmable room thermostat.",selection,annotated +0ea1e862-2434-4fc8-97a2-b076c992ef20_4,,,"The width of an exit must be at least 1,200 millimetres and its free standard thickness must be at least 0.8 metres.",greater-equal,synthetic +01008f69-874b-443e-bcb2-2f5630280049_8,,,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the entrance level may be no more than 120 and the tread must be no less than 220 millimetres.",less-equal,synthetic +2af8ee5f-9d05-4023-9365-d093ebdfba1f,"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",{'ID': '168_UK_DocF_V1_Ventilation'},"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",none,annotated +ec2e84a5-89bc-4c16-9a55-1965efd13981,"Wall insulation should be installed to the top of the wall plate; in some places, such as the eaves, this may be above the cavity closure or barrier.",{'ID': '167_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Wall insulation should be installed to the top of the wall plate; in some places, such as the eaves, this may be above the cavity closure or barrier.",necessity,annotated +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated +8efb6108-e49e-4d64-a1e4-22e3f9128b17_9,,,"When calculating the reference heat loss of a building, the value of 190 kN shall be used as the one side for the air leakage rate figure for the building envelope.",equal,synthetic +a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",selection,annotated +b51c7a9f-2080-4e60-940f-e59af0cc97ce,"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",{'ID': '34_Finnish_Health-Humidity'},"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",part-of,annotated +f7cfdf57-28f3-4d23-90bf-ec2268e14bac,"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",{'ID': '65_Finnish_SafetyOfUse'},"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",necessity,annotated +2a2dbb92-88af-47f5-bd1e-b3ddea4c1ec9,"The approach route should be safe and convenient for everyone, be at the shallowest gradient that can reasonably be achieved, and be stepfree, irrespective of the storey on which the dwelling is located.",{'ID': '70_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be safe and convenient for everyone, be at the shallowest gradient that can reasonably be achieved, and be stepfree, irrespective of the storey on which the dwelling is located.",selection,annotated +86831830-e7f0-4b90-aa27-dc0542b7ba4d,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least one intermediate landing.",{'ID': '18_Finnish_SafetyOfUse'},"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least one intermediate landing.",necessity,annotated +c71c68fe-63ac-400f-b9ca-6e8c20cc5b5e,A conservatory or porch must have thermal separation from the existing dwelling.,{'ID': '431_UK_DocL_V1_ConsrvationOfFuelAndPower'},A conservatory or porch must have thermal separation from the existing dwelling.,necessity,annotated +8e8f4fb5-00b5-404f-89df-a07287984748,"In buildings with a total useful floor area greater than 1000m2, automatic meter reading and data collection facilities should be installed.",{'ID': '229_UK_DocM_V2_AccessAndUseOfBuildings'},"In buildings with a total useful floor area greater than 1000m2, automatic meter reading and data collection facilities should be installed.",none,annotated +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_4,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding five acentral system is EI 30; however, minor sealing parts and penetrations may be class E 15.",greater,synthetic +f7cfdf57-28f3-4d23-90bf-ec2268e14bac,"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",{'ID': '65_Finnish_SafetyOfUse'},"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",necessity,annotated +efe27c3d-80a8-4999-9310-77160105fe37,"Instead, the building primary energy rate and building emission rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",{'ID': '91_UK_DocM_V2_AccessAndUseOfBuildings'},"Instead, the building primary energy rate and building emission rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",none,annotated +0096a3bf-ac16-4a75-adf9-8c3f4a9b8610_5,,,The smaller performance standards of each panel which can be either the width or height of the panel should be 0.8 metres or less.,less-equal,synthetic +8151be81-09ad-4dac-b2d2-f0d757915b6c_6,,,"However, when the snow load can occur, the proportion of the cooling load relating to distribution pipework of the load s should be at least 20 millimetres.",greater-equal,synthetic +9691451a-57d5-484f-a346-0f83b59f7ae0,"Refreshment facilities, such as restaurants and bars, should be designed so that they can be reached and used by all people independently or with companions.",{'ID': '137_UK_DocM_V2_AccessAndUseOfBuildings'},"Refreshment facilities, such as restaurants and bars, should be designed so that they can be reached and used by all people independently or with companions.",selection,annotated +bb9ec292-062b-43c3-8590-856dd5f6b890_8,,,"The building primary energy rate and surface area calculated using the measured air permeability must not be higher than the target primary energy rate and ventilation, respectively.",less-equal,synthetic +77be05f2-cd8c-4d35-85e4-6637b999d8e7_11,,,"The energy savings of the consequential improvement works should not be less than 1,200 MJ/m2 of the value of the principal works.",greater-equal,synthetic +656aa2fa-18cb-41ee-ae28-28deb3dffcc3_9,,,The pitch of the water in the hot water system shall be at least 2.5 ties/m2 and available from the hot water plumbing fixture within 20 seconds.,greater-equal,synthetic +dcc583b1-8c4c-42cf-a1ed-e8907de56254_9,,,"The total minimum width of the indoor steps of other spaces intended for everyday use may be no more than (16.66 8.33 V0.4)/(1000 24), and the tread must be no less than 270 millimetres.",less-equal,synthetic +ec2e84a5-89bc-4c16-9a55-1965efd13981,"Wall insulation should be installed to the top of the wall plate; in some places, such as the eaves, this may be above the cavity closure or barrier.",{'ID': '167_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Wall insulation should be installed to the top of the wall plate; in some places, such as the eaves, this may be above the cavity closure or barrier.",part-of,annotated +7f3f59a4-fc7e-4b14-8074-384f6cacf548_3,,,"The output of a barrier in a dwellings indoor areas may, however, be at least 800 millimetres if the drop is less than three metres.",greater-equal,synthetic +9f8c2fbb-a04e-42f9-8fa0-b7a905dbafa0,"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",{'ID': '40_Finnish_Health-Humidity'},"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",none,annotated +1d18f0c9-31e5-43ee-8f16-e4fa607c5cd9,"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",{'ID': '51_UK_DocM_V2_AccessAndUseOfBuildings'},"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",none,annotated +05864826-21ef-4ae7-9af8-2aaeffc7267a_0,,,"Modular and portable buildings with a planned service life of more than two years but with an combined dead,imposed and wind loads in a single location of less than 65 degrees Celsius should be shown to comply with the energy efficiency requirements.",less,synthetic +f9de28ac-45bb-4400-9d9f-8afee73bd2e3_5,,,The clear width should not exceed 500kW of dwelling floor area.,less-equal,synthetic +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_11,,,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 0.15 dm3/s per m2 in Signs, these must be accessible via the interior.",greater,synthetic +bf798097-bb99-42d0-a73f-8cebab8fbeb8_0,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the sections of the steps must be no more than 30m2 and the tread must be no less than 300 millimetres.",less-equal,synthetic +11f2902d-29c2-474e-97d0-628a2a97a666_10,,,"installed generation capacity of over 24 degrees Celsius must be equipped with an appropriate safety barrier, railing or handrail.",greater,synthetic +7602a501-a5b5-429c-99e1-8bc801243494,"The flooring and wall covering must provide waterproofing, or separate waterproofing must be installed under the flooring and behind the wall covering.",{'ID': '111_Finnish_Health-Humidity'},"The flooring and wall covering must provide waterproofing, or separate waterproofing must be installed under the flooring and behind the wall covering.",necessity,annotated +f5a71c7b-e852-40f2-8f88-91cda7902a7e_6,,,"If a new building has a space heating or airconditioning system with an power input from controls greater than 280mm, a building automation and control system should be installed.",greater,synthetic +46f5be2a-1514-420b-bc39-331fc6e0d2df_0,,,"The dwelling primary energy rate, above and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, gradients and target fabric energy efficiency rate, respectively.",less-equal,synthetic +973c9430-2b4a-4ab4-82df-7060c3002f77_10,,,The cross-sectional area for the community heating primary circuit should be a minimum of 200 Watts per room.,greater-equal,synthetic +fab95d95-4789-4384-8d57-a575190f9e73,The heating plant emission rate of the micro combined heat and power system (microCHP) should be no greater than the emission rate of a regular boiler using the same fuel as the microCHP.,{'ID': '297_UK_DocL_V1_ConsrvationOfFuelAndPower'},The heating plant emission rate of the micro combined heat and power system (microCHP) should be no greater than the emission rate of a regular boiler using the same fuel as the microCHP.,selection,annotated +f034fbd1-7547-425a-8163-513fcac0b66b,The roof structures and joints must be properly inclined and sealed for water drainage.,{'ID': '103_Finnish_Health-Humidity'},The roof structures and joints must be properly inclined and sealed for water drainage.,necessity,annotated +0a7ff0c7-c5f9-4069-9d7e-2bfd6c4871d3_2,,,The SEER of the extension does not exceed adequate number.,less-equal,synthetic +5b4380ba-0066-4735-a362-316d4c8e70b2_4,,,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 190 kN early childhood education premises after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",greater,synthetic +cc72106e-9e7f-47cf-8a95-0173a8305dad,"In a new building, the crawl space height must be 0.8 metres on average at the minimum.",{'ID': '83_Finnish_Health-Humidity'},"In a new building, the crawl space height must be 0.8 metres on average at the minimum.",part-of,annotated +0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,none,annotated +6ab07828-b6aa-4a60-8860-333f061a0fde,"Door furniture on manually operated non-powered doors should be easy to operate by people with limited manual dexterity, and be readily apparent against the background of the door.",{'ID': '71_UK_DocM_V2_AccessAndUseOfBuildings'},"Door furniture on manually operated non-powered doors should be easy to operate by people with limited manual dexterity, and be readily apparent against the background of the door.",none,annotated +34a524ec-6994-426f-86af-78788fd34a80_10,,,"Between the locking points for the mortice lock and surface-mounted rim lock, the U-values should be one per 100m2.",equal,synthetic +a9944ed0-7168-4ec7-b761-0641e3e3228b,The sewerage system shall be equipped with cleanouts that are easy to handle and lockable in both horizontal and vertical sewers.,{'ID': '157_Finnish_Health-WaterAndSewerage'},The sewerage system shall be equipped with cleanouts that are easy to handle and lockable in both horizontal and vertical sewers.,selection,annotated +49c6fd15-70a9-4733-8de8-8dd2fe49fe0a,"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",{'ID': '231_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",selection,annotated +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated +73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",none,annotated +9952f64d-e0df-4b03-84af-150782f81387,"For mobility-impaired people, a going of at least 300mm is preferred.",{'ID': '124_UK_DocM_V2_AccessAndUseOfBuildings'},"For mobility-impaired people, a going of at least 300mm is preferred.",greater-equal,annotated +a090f6bb-f89b-44c1-b6ee-8e72e2be30a0,Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '370_UK_DocM_V2_AccessAndUseOfBuildings'},Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,necessity,annotated +88e23b46-22d9-4be6-87b7-40541f7995a9_7,,,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the average carbon monoxide concentration exceeds 50 millimetres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",greater,synthetic +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_6,,,"In buildings more than 9 metres and at most proportion in planned time of use, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",less-equal,synthetic +38cd3221-7fc9-4462-be20-78b16a4309d3,The area of openings in the newly created dwelling should not be more than 25 of the total floor area.,{'ID': '490_UK_DocL_V1_ConsrvationOfFuelAndPower'},The area of openings in the newly created dwelling should not be more than 25 of the total floor area.,selection,annotated +ef4ec541-e1a7-47d4-9a83-94715d8900ba_0,,,"Where 2m or more extract fan are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",greater-equal,synthetic +f7cfdf57-28f3-4d23-90bf-ec2268e14bac,"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",{'ID': '65_Finnish_SafetyOfUse'},"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",none,annotated +a43037b0-8e35-45a2-9f23-c2d65f6c5a64,"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",{'ID': '8_UK_DocQ_Security_Dwellings'},"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",necessity,annotated +06c2e0f7-69c8-47ec-bf31-9902ae9df7cf,"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",{'ID': '109_UK_DocK_ProtectionFromFalling'},"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",none,annotated +b6a045c9-d3a7-4144-a390-8dd21252078d,Drawings should be provided for junctions.,{'ID': '153_UK_DocL_V1_ConsrvationOfFuelAndPower'},Drawings should be provided for junctions.,necessity,annotated +3ca5cb38-b90b-4449-ba14-4268866df8e1_9,,,The water heater is close to the draw-off points and has a vicinity no greater than 3.,less-equal,synthetic +e32bbb47-c826-40c1-8ea4-8c32353d3fd2_4,,,There shall be half a metre of public address provided for people in the building.,equal,synthetic +05864826-21ef-4ae7-9af8-2aaeffc7267a,Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,{'ID': '83_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,less,annotated +716fa732-f3c7-43ad-a4e3-fff43a841018,The vehicle traffic area of a building and its courtyard must be safe and appropriate.,{'ID': '131_Finnish_SafetyOfUse'},The vehicle traffic area of a building and its courtyard must be safe and appropriate.,part-of,annotated +8421f806-70f2-46a9-a308-90a40da3541d_4,,,"Where the capacity of the approach, whether over its whole length or in part, is 20 millimetres or steeper, that part of the approach should be designed as ramped access.",greater-equal,synthetic +48133b44-eac2-44e2-b2df-c52243e9f7ea,"NOTE: For example, if the total system output is made up of three equally sized boilers, at 15% of system output the lead boiler will be operating at 45% of its rated output with the other two boilers switched off.",{'ID': '244_UK_DocM_V2_AccessAndUseOfBuildings'},"NOTE: For example, if the total system output is made up of three equally sized boilers, at 15% of system output the lead boiler will be operating at 45% of its rated output with the other two boilers switched off.",none,annotated +f505cec8-d1a6-41ae-b2ba-68ac19f64be2,"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",{'ID': '137_UK_DocM_V2_AccessAndUseOfBuildings'},"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",selection,annotated +9d172d30-e92f-4151-865c-d204f217705d,The slope of the wet room floor must allow water to flow into the floor drain.,{'ID': '118_Finnish_Health-Humidity'},The slope of the wet room floor must allow water to flow into the floor drain.,part-of,annotated +81f14fc1-af5d-45e8-8725-94d2510e4701_3,,,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a rise between landings of at least 600 x 600 millimetres in the hallway and kitchen.",greater-equal,synthetic +23cff3c3-1251-4c5f-9fd9-8f52d25eb494_0,,,Gasfired boilers and multi-stage oilfired boilers with an cross-sectional area of more than 50 should have fully modulating burner controls.,greater,synthetic +2de867fe-80e7-4617-ad18-36225dd45ab1,Hinged or pivot windows with an opening angle of less than 15 degrees are not suitable for purge ventilation.,{'ID': '53_UK_DocF_V1_Ventilation'},Hinged or pivot windows with an opening angle of less than 15 degrees are not suitable for purge ventilation.,selection,annotated +825053cb-af5d-43a9-b59b-e2a5ae78ea73_1,,,The number of appliances of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the construction of associated parking spaces.,greater,synthetic +a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",selection,annotated +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_8,,,"Where the work concerns a building containing more than 9 metres safety lines, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater-equal,synthetic +dae0db09-fd4b-4f2c-99c0-cd742b19d17a,"A glass structure or other light-permeable structure, along with its mountings, must withstand the load to which it is normally subject, unless the structure is protected by a fixed collision barrier.",{'ID': '68_Finnish_SafetyOfUse'},"A glass structure or other light-permeable structure, along with its mountings, must withstand the load to which it is normally subject, unless the structure is protected by a fixed collision barrier.",necessity,annotated +9f8c2fbb-a04e-42f9-8fa0-b7a905dbafa0,"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",{'ID': '40_Finnish_Health-Humidity'},"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",none,annotated +3639910c-8ebf-499a-aeec-6f1951b28134,"Additionally, insulated plaster-board should be used in reveals to abut jambs and should be considered within reveal soffits.",{'ID': '166_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Additionally, insulated plaster-board should be used in reveals to abut jambs and should be considered within reveal soffits.",necessity,annotated +3724fd47-22f7-432c-81a2-1abcb95c7df2_6,,,"The span installed in a dwellings habitable rooms and kitchens should be no fewer than certain proportion, except in one bedroom properties, where there should be no fewer than four.",greater-equal,synthetic +e874f337-2067-4e77-ad32-c3b857f40e7a_0,,,"If the glare and reflections exceeds half a metre, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",greater,synthetic +eccd4f77-ef4a-41fd-a22a-620c84fdddd4_8,,,There is a minimum of 0.15 of worktop to at least total capital cost of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,greater-equal,synthetic +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f,"Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",{'ID': '3_UK_DocR_V1_InfrastructureForElectircalCommunications'},"Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",part-of,annotated +5577528f-8fa0-4ca3-96f6-ea418091cb86_10,,,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 0.8 metres in maintained is able to pass through the opening between the plane level and the handrail or wall.,greater,synthetic +7a6635fc-c464-4d61-8ef1-2fdbf13bb9e7,"U-values for rooflights or rooflight-and-kerb assemblies should be based on the developed surface area of the rooflight (U_d values), which is often greater than the area of the roof opening.",{'ID': '140_UK_DocM_V2_AccessAndUseOfBuildings'},"U-values for rooflights or rooflight-and-kerb assemblies should be based on the developed surface area of the rooflight (U_d values), which is often greater than the area of the roof opening.",part-of,annotated +46f5be2a-1514-420b-bc39-331fc6e0d2df_11,,,"The dwelling primary energy rate, extract air categories and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, manufacturers declared efficiencies and target fabric energy efficiency rate, respectively.",less-equal,synthetic +dcc583b1-8c4c-42cf-a1ed-e8907de56254_3,,,"The pitch of the indoor steps of other spaces intended for everyday use may be no more than E, and the tread must be no less than 270 millimetres.",less-equal,synthetic +e320322e-3aee-4167-ad19-a6c6cc41f597,The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,{'ID': '97_Finnish_Health-WaterAndSewerage'},The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,part-of,annotated +703e5c71-bd54-4267-acf4-fa7db1e70d49,"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",{'ID': '67_Finnish_Accessibility'},"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",part-of,annotated +26980508-105c-49db-8595-bf001a48d757_11,,,"In Waterproofing with no fixed common access point or furnishings, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic +c0a6d35c-cc20-428b-941d-c3e3e6365c74,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",{'ID': '25_UK_DocK_ProtectionFromFalling'},"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",selection,annotated +0a7ff0c7-c5f9-4069-9d7e-2bfd6c4871d3_3,,,The termination points of the extension does not exceed 2.,less-equal,synthetic +e43c1e88-be80-42d9-944e-1bf0f0f82479_11,,,Individual flights are: for gradients up to 1:15 not more than adequate means natural light; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic +e15250c0-1279-4d29-a1ec-31560b045007_1,,,hearing enhancement of basement storeys must not be connected to fire and smoke-proof shutoff dampers.,not-part-of,synthetic +f5a71c7b-e852-40f2-8f88-91cda7902a7e_7,,,"If a new building has a space heating or airconditioning system with an ending greater than 160 millimetres, a building automation and control system should be installed.",greater,synthetic +6c789809-b1b8-429a-8fe2-8ce16f8a4b54,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,{'ID': '62_Finnish_Health-IndoorClimateAndVentilation'},Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,necessity,annotated +56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3_6,,,Storage premises with a constraints exceeding 900 millimetres are not permitted within the building.,greater,synthetic +09b2a395-5293-4b7d-82d4-5312482d59e9_10,,,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 20 points total load from any projecting corner.",greater-equal,synthetic +0da52584-1b37-48b5-840f-3795ae695275_10,,,the minimum clear dimensions of the platform are: 0.5 kN/m2 time-lapse and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +34a524ec-6994-426f-86af-78788fd34a80_7,,,"Between the locking points for the mortice lock and surface-mounted rim lock, the reverberation time should be 0.1m2.",equal,synthetic +a9cea98b-d439-4930-a991-fc17eee6657c,the location of the electric vehicle charge point or future connection location should be suitable for use by electric vehicles with charging inlets in different places.,{'ID': '102_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},the location of the electric vehicle charge point or future connection location should be suitable for use by electric vehicles with charging inlets in different places.,necessity,annotated +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8_8,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the visual contrast from these spaces does not exceed 75 light source lumens per circuit-watt of the total air flow in the vertical duct.",less-equal,synthetic +825053cb-af5d-43a9-b59b-e2a5ae78ea73,The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,{'ID': '59_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,none,annotated +e1f1aeb9-7453-4b6b-b3f1-6049d711868a,The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,{'ID': '156_Finnish_FireSafety'},The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,part-of,annotated +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3,"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",{'ID': '53_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",part-of,annotated +72d7716f-7e3e-442c-9e42-14d4b19e18e3_11,,,A comfort cooling systems that is being connected to a new building should not have a energy efficiency measures for delivered heat to the building which is greater than 0.350kgCO2/kWh.,not-part-of,synthetic +c0a6d35c-cc20-428b-941d-c3e3e6365c74_2,,,"In a tier that is uninterrupted by cross-gangways, and where the heat exchanger area exceeds 90, use a maximum number of steps of 40.",greater,synthetic +2ef73ac0-d424-4e28-9782-3dbaf6e0a046,Attics and uppermost floor voids shall be divided into 400 m2 parts.,{'ID': '107_Finnish_FireSafety'},Attics and uppermost floor voids shall be divided into 400 m2 parts.,necessity,annotated +01d924bf-4a69-4eb8-b05e-ce993aee3d45,Perimeter insulation should be continuous and have a minimum thickness of 25mm.,{'ID': '135_UK_DocL_V1_ConsrvationOfFuelAndPower'},Perimeter insulation should be continuous and have a minimum thickness of 25mm.,none,annotated +2f8d4247-e53b-49ae-bd26-c4f1765eaee8_6,,,"Extract air of Unit length 2, 3 and 1,500 millimetres shall not be used as recirculation air.",equal,synthetic +3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,part-of,annotated +7e34700e-92de-4b00-a820-f4085a2e186c_3,,,"If the free gap between facing walls of adjacent glazed balconies or the mechanical ventilation of the wall to the window of an adjacent fire compartment is less than 220 millimetres, the wall in question must be class EI 15.",less,synthetic +84cd76d7-e5d0-4f39-94bc-0236c65d533a_3,,,"in residential buildings of not more than two storeys, one exit of no less than 1m2 in air tightness is permitted.",greater-equal,synthetic +2633c957-07b4-4caa-a9d6-5acbac16b0b0_6,,,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and (16.66 8.33 V0.4)/(1000 24) habitable area.,equal,synthetic +e43c1e88-be80-42d9-944e-1bf0f0f82479_4,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 44mm inner surfaces.,less-equal,synthetic +6d9a1e8e-6fe7-4234-951a-96fdc4598bd7,"If parking spaces are provided for a building, an adequate number of them, but at least one, shall be intended for the use of a person with mobility and functional impairment.",{'ID': '12_Finnish_Accessibility'},"If parking spaces are provided for a building, an adequate number of them, but at least one, shall be intended for the use of a person with mobility and functional impairment.",part-of,annotated +2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d,An upstand built on site should not exceed a U-value of 0.35W/(m2K).,{'ID': '115_UK_DocL_V1_ConsrvationOfFuelAndPower'},An upstand built on site should not exceed a U-value of 0.35W/(m2K).,selection,annotated +eff9dd2f-007f-4caf-bb2e-3ff65db910b0,A passenger lift is the most suitable means of vertical access and should be provided wherever possible.,{'ID': '103_UK_DocM_V2_AccessAndUseOfBuildings'},A passenger lift is the most suitable means of vertical access and should be provided wherever possible.,selection,annotated +0aaf71f0-a482-4a72-a407-0d6db79c7f6f_4,,,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 90 of non-fire-compartmented Rooms that essentially relate to the business of the building may be located on the level of second storey.",less-equal,synthetic +a86b58e8-046f-44b7-8e1b-00c876c8c647_0,,,"Parapets in protective part A to 0.15 dm3/s per m2 and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",less-equal,synthetic +05864826-21ef-4ae7-9af8-2aaeffc7267a_8,,,Modular and portable buildings with a planned service life of more than two years but with an opening angle in a single location of less than 2.2 metres should be shown to comply with the energy efficiency requirements.,less,synthetic +2f815a08-db3c-48a6-b248-d69aeac870ee_8,,,"the vertical axle group load is: a. not more than 400kg, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",less-equal,synthetic +922bf8df-3a70-4f45-8c04-200b638d3b3c_4,,,The cold water pipe shall be designed and installed so that the anthracite figure in the cold water system may not exceed adequate number.,less-equal,synthetic +3153d771-404e-4a54-ac05-ed1b75e37506,"Gangways should not be less than 1100mm wide unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",{'ID': '8_UK_DocK_ProtectionFromFalling'},"Gangways should not be less than 1100mm wide unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",greater-equal,annotated +2be01bf1-2cd9-4982-8778-ba0afe835580,"If fans and background ventilators are fitted in the same room, they should be at least 500mm apart.",{'ID': '88_UK_DocF_V1_Ventilation'},"If fans and background ventilators are fitted in the same room, they should be at least 500mm apart.",part-of,annotated +d342429e-d3fc-46e0-a195-527cfef1fd4b,"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",{'ID': '451_UK_DocM_V2_AccessAndUseOfBuildings'},"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",greater,annotated +1de9d3e5-dee3-42c9-b929-80b7936f1642,The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,{'ID': '33_Finnish_Accessibility'},The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,none,annotated +f505cec8-d1a6-41ae-b2ba-68ac19f64be2,"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",{'ID': '137_UK_DocM_V2_AccessAndUseOfBuildings'},"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",selection,annotated +29232335-402c-4ed9-af74-fd093ac22e28_5,,,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least vicinity 6mm.,greater-equal,synthetic +12e545d1-64f4-45c9-a520-5b8a003eba0a,"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",{'ID': '85_UK_DocF_V1_Ventilation'},"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",part-of,annotated +d342429e-d3fc-46e0-a195-527cfef1fd4b_5,,,"When an existing building with a total useful flushing of over 2,100 millimetres is being extended or the habitable area is being increased, consequential improvements should be installed.",greater,synthetic +f2bf62e6-9577-48b5-b15d-9fe4904acf52,"Where controls are integrated in the heater, the system should be provided with a time switch/programmer and room temperature sensor linked to heater firing and fan speed control.",{'ID': '268_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where controls are integrated in the heater, the system should be provided with a time switch/programmer and room temperature sensor linked to heater firing and fan speed control.",necessity,annotated +c0a6d35c-cc20-428b-941d-c3e3e6365c74_0,,,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a where provided number of steps of 20.",equal,synthetic +a090f6bb-f89b-44c1-b6ee-8e72e2be30a0,Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '370_UK_DocM_V2_AccessAndUseOfBuildings'},Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,selection,annotated +bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,none,annotated +81314489-dcd9-410f-9b15-595b87e7c8f9_11,,,"The resilient layer should be timber sheathing at least 1000m2 protection, expanded metal or a similar resilient material.",greater-equal,synthetic +703e5c71-bd54-4267-acf4-fa7db1e70d49,"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",{'ID': '67_Finnish_Accessibility'},"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",part-of,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",part-of,annotated +a090f6bb-f89b-44c1-b6ee-8e72e2be30a0,Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '370_UK_DocM_V2_AccessAndUseOfBuildings'},Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,selection,annotated +a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",selection,annotated +85745724-aa09-4cdd-ad17-3c50ea2b99a1,"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",{'ID': '105_UK_DocM_V1_AccessAndUseOfBuildings'},"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",necessity,annotated +d5cb0429-ffef-43c5-9789-a3611c04446a,"The supports and fastening points of water pipes shall be such that neither heat expansion nor forces generated by water flow cause the pipes to shift, loosen, break or make disturbing noises.",{'ID': '89_Finnish_Health-WaterAndSewerage'},"The supports and fastening points of water pipes shall be such that neither heat expansion nor forces generated by water flow cause the pipes to shift, loosen, break or make disturbing noises.",part-of,annotated +d5cb0429-ffef-43c5-9789-a3611c04446a,"The supports and fastening points of water pipes shall be such that neither heat expansion nor forces generated by water flow cause the pipes to shift, loosen, break or make disturbing noises.",{'ID': '89_Finnish_Health-WaterAndSewerage'},"The supports and fastening points of water pipes shall be such that neither heat expansion nor forces generated by water flow cause the pipes to shift, loosen, break or make disturbing noises.",necessity,annotated +1ebce0c9-705c-47ee-8429-e83cfbed72db,"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",{'ID': '103_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",part-of,annotated +2de867fe-80e7-4617-ad18-36225dd45ab1,Hinged or pivot windows with an opening angle of less than 15 degrees are not suitable for purge ventilation.,{'ID': '53_UK_DocF_V1_Ventilation'},Hinged or pivot windows with an opening angle of less than 15 degrees are not suitable for purge ventilation.,none,annotated +01008f69-874b-443e-bcb2-2f5630280049_10,,,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the air flow resistance may be no more than 18 dm3/s and the tread must be no less than 220 millimetres.",less-equal,synthetic +aa921550-3c5f-470b-b578-1788f83b49a7,Uplighters mounted at low or floor level can disorientate some visually impaired people and should be avoided.,{'ID': '153_UK_DocM_V2_AccessAndUseOfBuildings'},Uplighters mounted at low or floor level can disorientate some visually impaired people and should be avoided.,none,annotated +c384013b-c40f-4925-acbe-465e1ca5bc13_9,,,0.9 metres internal stairs per detail should be recorded.,equal,synthetic +4f2b56cb-9852-4406-bbea-31f426fb4910,"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",{'ID': '397_UK_DocM_V2_AccessAndUseOfBuildings'},"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",none,annotated +d342429e-d3fc-46e0-a195-527cfef1fd4b_9,,,"When an existing building with a total useful intended time of use of over EI 30 is being extended or the habitable area is being increased, consequential improvements should be installed.",greater,synthetic +11f2902d-29c2-474e-97d0-628a2a97a666_3,,,"energy efficiency measures of over 15 degrees must be equipped with an appropriate safety barrier, railing or handrail.",greater,synthetic +4e8c5c50-44af-48f6-b959-e6f9b31afa1e_0,,,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical common access point may be day-care institutions.",equal,synthetic +13a437c0-918c-47f2-85bd-b80dd69eb027_11,,,"There are no minimum value on the gradients of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",not-part-of,synthetic +81f14fc1-af5d-45e8-8725-94d2510e4701_5,,,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a illuminance of at least 90 in the hallway and kitchen.",greater-equal,synthetic +d0f0d416-a728-4d23-965e-10ff6559f2d8,All users including wheelchair users should be able to reach and use the controls that summon and direct the lifting platform.,{'ID': '113_UK_DocM_V2_AccessAndUseOfBuildings'},All users including wheelchair users should be able to reach and use the controls that summon and direct the lifting platform.,selection,annotated +74002ed3-548e-4e2f-8835-be76e643c67d_9,,,NOTE 2: Double doors effectively provide nibs where each leaf is at least 4 termination points.,greater-equal,synthetic +7e34700e-92de-4b00-a820-f4085a2e186c_5,,,"If the heat gain between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than two persons per square metre, the wall in question must be class EI 15.",less,synthetic +3f31e50a-cdcc-412c-a363-2bfdfb507770,"For an electrically operated appliance, an integral remote or thermostatic control should be provided.",{'ID': '277_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For an electrically operated appliance, an integral remote or thermostatic control should be provided.",necessity,annotated +d7b27bbb-ac51-4036-8073-d094cbe994db,"In cases where the Energy Related Products Regulations and the Building Regulations both apply, both standards should be met.",{'ID': '232_UK_DocM_V2_AccessAndUseOfBuildings'},"In cases where the Energy Related Products Regulations and the Building Regulations both apply, both standards should be met.",none,annotated +7c74b365-6fdd-494d-9675-3ae036c55348,Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,{'ID': '82_Finnish_SafetyOfUse'},Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,part-of,annotated +7a1bc727-1daa-4668-83f6-b44327b96898,"In glazed balconies, the spread of fire from one balcony to another and to an adjacent fire compartment must be restricted.",{'ID': '133_Finnish_FireSafety'},"In glazed balconies, the spread of fire from one balcony to another and to an adjacent fire compartment must be restricted.",none,annotated +77f993c6-dff1-4f9a-8f66-73221d3cbaff_8,,,"If the dwelling only has 0.052083333 storeys, a minimum ventilation rate of 13l/s should be used.",equal,synthetic +710ef992-e187-4b1a-894b-e0e222f54359_1,,,"NOTE: For grid-supplied electricity, a going of 25 decibels and primary energy factor of 1.501kWhPE/kWh should be used.",equal,synthetic +f7f1a609-ae35-4544-9b38-e471d7a00666,"In order to enhance the efficiency of firefighting and rescue operations, means of smoke extraction shall be designed and constructed in the building so that smoke can be extracted from the different premises in the building.",{'ID': '249_Finnish_FireSafety'},"In order to enhance the efficiency of firefighting and rescue operations, means of smoke extraction shall be designed and constructed in the building so that smoke can be extracted from the different premises in the building.",necessity,annotated +d988e207-c3f9-4314-9a16-f99b334595f4_11,,,The flushing must be no less than 16/01/2023 00:00.,greater-equal,synthetic +ddcf66e5-33c1-43c6-9c16-52be70d56c54,"If an exhaust air terminal is located on a facade that is exposed to the prevailing wind, measures should be taken to minimise likely wind effects.",{'ID': '100_UK_DocF_V1_Ventilation'},"If an exhaust air terminal is located on a facade that is exposed to the prevailing wind, measures should be taken to minimise likely wind effects.",necessity,annotated +c90714e3-d8f9-47dc-ac9c-2e7ee516a89c,The joint between waterproofing and the floor drain must be tight.,{'ID': '119_Finnish_Health-Humidity'},The joint between waterproofing and the floor drain must be tight.,necessity,annotated +825053cb-af5d-43a9-b59b-e2a5ae78ea73_11,,,The that of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the headroom of associated parking spaces.,greater,synthetic +203faa23-7b71-47c9-a6e5-2333ac45389e_4,,,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the vertical spacing must be no less than 100 millimetres.",greater-equal,synthetic +197b9463-397e-4729-a08d-12739f9db069,"For variable refrigerant flow (VRF) systems, any calculations must include indoor and outdoor conditions, the power input from controls, and indoor units.",{'ID': '283_UK_DocM_V2_AccessAndUseOfBuildings'},"For variable refrigerant flow (VRF) systems, any calculations must include indoor and outdoor conditions, the power input from controls, and indoor units.",selection,annotated +13a437c0-918c-47f2-85bd-b80dd69eb027_0,,,"There are no depth on the heat recovery of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",not-part-of,synthetic +0ea1e862-2434-4fc8-97a2-b076c992ef20_9,,,"The domestic hot water circulation heat loss of an exit must be at least 400mm and its free height must be at least 2,100 millimetres.",greater-equal,synthetic +02f5e3fb-7a8b-4a88-a6e5-337cc0835284,"When a new residential building is erected, information about the building must be given to the owner of the building to allow them to use the overheating mitigation strategy effectively.",{'ID': '90_UK_DocO_Overheating'},"When a new residential building is erected, information about the building must be given to the owner of the building to allow them to use the overheating mitigation strategy effectively.",none,annotated +5577528f-8fa0-4ca3-96f6-ea418091cb86_3,,,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than one per 100m2 in category is able to pass through the opening between the plane level and the handrail or wall.,greater,synthetic +b6e6ebce-e75f-4fae-b9a2-e35c164b3fb4,"Where onsite electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and onsite energy demand.",{'ID': '342_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where onsite electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and onsite energy demand.",none,annotated +26f33f06-e967-4d55-9e73-30990f52ac82,"Loft hatches: where the roof is insulated at ceiling level, hatches should be suitably designed and installed to ensure optimum airtightness.",{'ID': '189_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Loft hatches: where the roof is insulated at ceiling level, hatches should be suitably designed and installed to ensure optimum airtightness.",necessity,annotated +74002ed3-548e-4e2f-8835-be76e643c67d_1,,,NOTE 2: Double doors effectively provide nibs where each leaf is at least eight per cent standard thickness.,greater-equal,synthetic +7577d9f7-9f3c-4d3b-b8d9-da31d3e1b201,"For example, glare and reflections from shiny surfaces, and large repeating patterns, should be avoided in spaces where visual acuity is critical as they will hamper communication for people with impaired vision, and those who lip read or use sign language.",{'ID': '150_UK_DocM_V2_AccessAndUseOfBuildings'},"For example, glare and reflections from shiny surfaces, and large repeating patterns, should be avoided in spaces where visual acuity is critical as they will hamper communication for people with impaired vision, and those who lip read or use sign language.",selection,annotated +73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",part-of,annotated +0aaf71f0-a482-4a72-a407-0d6db79c7f6f,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",{'ID': '69_Finnish_FireSafety'},"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",selection,annotated +208b093d-361f-4aec-819d-4abca4e72c68_8,,,"in an evacuation area where the steps is 1.3 seconds, the second exit may be no less than 900 millimetres in width.",equal,synthetic +0da52584-1b37-48b5-840f-3795ae695275_4,,,the minimum clear dimensions of the platform are: adequate number frequency and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +09b2a395-5293-4b7d-82d4-5312482d59e9,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",{'ID': '46_UK_DocM_V1_AccessAndUseOfBuildings'},"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",none,annotated +ad30824c-74be-4f4f-916a-dfe1e0a89205,"It should be noted that double buggies are wider than wheelchairs and that, where relevant to the building type, this should be borne in mind when determining an appropriate effective clear width for an entrance door.",{'ID': '67_UK_DocM_V2_AccessAndUseOfBuildings'},"It should be noted that double buggies are wider than wheelchairs and that, where relevant to the building type, this should be borne in mind when determining an appropriate effective clear width for an entrance door.",part-of,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8_7,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for configuration 1 and 0.7W/(m2K) if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic +3ca5cb38-b90b-4449-ba14-4268866df8e1_5,,,The water heater is close to the draw-off points and has a fire load no greater than 65mm.,less-equal,synthetic +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",necessity,annotated +113b8bf8-1856-45f5-a54b-d65ef100b437,"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",{'ID': '262_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",greater-equal,annotated +8efb6108-e49e-4d64-a1e4-22e3f9128b17,"When calculating the reference heat loss of a building, the value of 2.0 m3/(h m2) shall be used as the reference value for the air leakage rate figure for the building envelope.",{'ID': '136_Finnish_EnergyEfficiency'},"When calculating the reference heat loss of a building, the value of 2.0 m3/(h m2) shall be used as the reference value for the air leakage rate figure for the building envelope.",equal,annotated +b63dcef6-1840-4e9e-ad51-f8fc481fe856,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",{'ID': '36_UK_DocA_Structure'},"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,annotated +56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3_0,,,Storage premises with a inaccuracies exceeding 90mm are not permitted within the building.,greater,synthetic +20518e80-6f7e-457f-8c5a-59fa4c0eb324_5,,,"When calculating the heat loss for a buildings design solution, the performance shall be used as the value of the Activation for the building envelope.",equal,synthetic +203faa23-7b71-47c9-a6e5-2333ac45389e_6,,,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the depth must be no less than 220 millimetres.",greater-equal,synthetic +5b4380ba-0066-4735-a362-316d4c8e70b2,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",{'ID': '73_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",none,annotated +2fc22f95-5131-40af-8e97-513ecc970217,What constitutes a substantial proportion should be assessed on a case-by-case basis by the building control body.,{'ID': '18_UK_DocL_V1_ConsrvationOfFuelAndPower'},What constitutes a substantial proportion should be assessed on a case-by-case basis by the building control body.,necessity,annotated +88e23b46-22d9-4be6-87b7-40541f7995a9_10,,,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the results exceeds 30% load; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",greater,synthetic +ef4f54b6-1099-4404-9fa2-d0c0d5e55543_7,,,The Air flow rates must not exceed the individual dwellings Leakage.,less-equal,synthetic +302c413e-fefd-47f1-914f-0dc787e4a761_5,,,"Where level differences on surfaces is greater than 0.15, a difference in light reflectance value should be a minimum of 20 points.",greater,synthetic +8e7e4d9a-05b8-4512-91c5-e8dbb9488685,"At night, windows, patio doors and balcony doors should be modelled as closed.",{'ID': '55_UK_DocO_Overheating'},"At night, windows, patio doors and balcony doors should be modelled as closed.",selection,annotated +56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3_1,,,Storage premises with a control capabilities exceeding One are not permitted within the building.,greater,synthetic +339fc78c-a2f2-481c-a410-3aeb41e24b8a_0,,,Solid walls constructed of coursed brickwork or blockwork should be at least as Air permeability as 1 of the storey height.,greater-equal,synthetic +ba93ede4-473f-4c07-b439-3699580cbcbe,No individual flight has a rise of more than 1800mm between landings.,{'ID': '21_UK_DocM_V1_AccessAndUseOfBuildings'},No individual flight has a rise of more than 1800mm between landings.,selection,annotated +5ca184fa-e100-4f97-957d-e37ae944786f_6,,,The depth of installing electric vehicle charge points and cable routes is not more than four of the total capital cost of the major renovation.,less-equal,synthetic +86350df0-a40e-412b-a301-004524d56736,"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",none,annotated +56517433-cf40-4b88-a9d4-18e61e0e9993_3,,,"In addition, on both sides of the toilet seat there shall be a terrace of houses of at least 9 metres.",greater-equal,synthetic +06c2e0f7-69c8-47ec-bf31-9902ae9df7cf,"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",{'ID': '109_UK_DocK_ProtectionFromFalling'},"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",none,annotated +eefe1191-2903-4fb8-9138-6471e09fb67d_2,,,The class exceeds 2.0 m3/(h m2) at 11pm.,greater,synthetic +64f259ba-5280-4bf5-bea2-e18cb837a940,A water point shall incorporate a drainage point that is connected to the sewer via a drainage fixture.,{'ID': '124_Finnish_Health-WaterAndSewerage'},A water point shall incorporate a drainage point that is connected to the sewer via a drainage fixture.,none,annotated +3835aa39-14bc-4c7a-a029-a5ce391bad76,The efficiency of the secondary heating appliance with its appropriate fuel should be used in the calculation of the dwelling primary energy rate and dwelling emission rate.,{'ID': '73_UK_DocL_V1_ConsrvationOfFuelAndPower'},The efficiency of the secondary heating appliance with its appropriate fuel should be used in the calculation of the dwelling primary energy rate and dwelling emission rate.,selection,annotated +5f7b8ff7-50d0-46a2-a48b-fa19786c98fd,"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '105_Finnish_EnergyEfficiency'},"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",part-of,annotated +88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",none,annotated +03bdab65-fc14-4101-add9-f26c25f41e82,A drainage point shall be equipped with a cleansable water seal.,{'ID': '134_Finnish_Health-WaterAndSewerage'},A drainage point shall be equipped with a cleansable water seal.,selection,annotated +1320873f-de9b-4c55-a7c0-67f545c4a46e,"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",{'ID': '42_UK_DocM_V2_AccessAndUseOfBuildings'},"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",selection,annotated +7f3f59a4-fc7e-4b14-8074-384f6cacf548_4,,,"The intended time of use of a barrier in a dwellings indoor areas may, however, be at least 900-1000mm if the drop is less than three metres.",greater-equal,synthetic +c9983da5-23f1-4211-88ce-68e4753e4ab9,"A target primary energy rate, target emission rate, building primary energy rate and the building emission rate should be calculated for non-exempt buildings with low energy demand.",{'ID': '102_UK_DocM_V2_AccessAndUseOfBuildings'},"A target primary energy rate, target emission rate, building primary energy rate and the building emission rate should be calculated for non-exempt buildings with low energy demand.",necessity,annotated +51f35d58-c411-4d6d-b36e-9ddf10199908,"Whatever lifting device is chosen, internal stairs should always be provided as an alternative means of vertical access, and designed to suit ambulant disabled people and those with impaired sight.",{'ID': '106_UK_DocM_V2_AccessAndUseOfBuildings'},"Whatever lifting device is chosen, internal stairs should always be provided as an alternative means of vertical access, and designed to suit ambulant disabled people and those with impaired sight.",necessity,annotated +46f5be2a-1514-420b-bc39-331fc6e0d2df_6,,,"The projection, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the gradient, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,synthetic +973c9430-2b4a-4ab4-82df-7060c3002f77_9,,,The U-value for the community heating primary circuit should be a minimum of 1000m2.,greater-equal,synthetic +1d18f0c9-31e5-43ee-8f16-e4fa607c5cd9,"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",{'ID': '51_UK_DocM_V2_AccessAndUseOfBuildings'},"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",selection,annotated +b53bb0de-55cd-4505-95a1-cbffd3739047,A commissioning notice must be given to the building control body.,{'ID': '181_UK_DocF_V1_Ventilation'},A commissioning notice must be given to the building control body.,necessity,annotated +38cd3221-7fc9-4462-be20-78b16a4309d3_1,,,The selection of openings in the newly created dwelling should not be more than six metres of the total floor area.,less-equal,synthetic +9dd2a0f1-0ff9-4416-8abd-1e6589980ff4,"If the cross-sectional area of a mechanical ventilation systems air duct is designed to be greater than 0.06 m2, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",{'ID': '100_Finnish_Health-IndoorClimateAndVentilation'},"If the cross-sectional area of a mechanical ventilation systems air duct is designed to be greater than 0.06 m2, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",none,annotated +a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",necessity,annotated +7d35f4c4-fa65-4d68-a974-f54386ca8aee_7,,,"However, a horizontal those in a protective part must be no higher than 21 C.",less-equal,synthetic +cc72106e-9e7f-47cf-8a95-0173a8305dad_7,,,"In a new building, the crawl space size must be three seconds on average at the minimum.",greater-equal,synthetic +a090f6bb-f89b-44c1-b6ee-8e72e2be30a0,Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '370_UK_DocM_V2_AccessAndUseOfBuildings'},Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,selection,annotated +87c9cfa3-8093-497d-be10-dc054abe7062,"For common leaf lintels, the base plate should not be continuous and the lintel core should be insulated.",{'ID': '164_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For common leaf lintels, the base plate should not be continuous and the lintel core should be insulated.",none,annotated +86350df0-a40e-412b-a301-004524d56736_1,,,"For wet heating systems in new dwellings with a supports of 0.06 m2 or greater, a minimum of two independently controlled heating circuits should be provided.",greater-equal,synthetic +2cf150af-bede-4bb6-aa2e-b9f42a109761,The warning should be placed sufficiently in advance of the hazard to allow time to stop and not be so narrow that it might be missed in a single stride.,{'ID': '53_UK_DocM_V2_AccessAndUseOfBuildings'},The warning should be placed sufficiently in advance of the hazard to allow time to stop and not be so narrow that it might be missed in a single stride.,necessity,annotated +d3fc8c9b-c23a-4188-8723-369caa90453c_6,,,"The number of occupants for a building's total combined window area is 0.055555556 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",equal,synthetic +09b2a395-5293-4b7d-82d4-5312482d59e9_10,,,"Door entry controls, where provided, are mounted 220 millimetres class finished ground level, and at least 300mm away from any projecting corner.",equal,synthetic +7a1bc727-1daa-4668-83f6-b44327b96898,"In glazed balconies, the spread of fire from one balcony to another and to an adjacent fire compartment must be restricted.",{'ID': '133_Finnish_FireSafety'},"In glazed balconies, the spread of fire from one balcony to another and to an adjacent fire compartment must be restricted.",selection,annotated +74b9ee2c-0192-442d-b5a1-a2974d456429,"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",{'ID': '67_UK_DocM_V1_AccessAndUseOfBuildings'},"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",part-of,annotated +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_5,,,"If the location of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 270 millimetres of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater,synthetic +a86b58e8-046f-44b7-8e1b-00c876c8c647_4,,,"Parapets in standards A to 200 lux and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",less-equal,synthetic +2a256a9c-0b8a-4acf-87e1-86a5857f36a3,"Where a driveway forms all, or part of, the approach route, an additional allowance of at least 900mm wide should be provided so that a wheelchair user can pass a parked car.",{'ID': '17_UK_DocM_V1_AccessAndUseOfBuildings'},"Where a driveway forms all, or part of, the approach route, an additional allowance of at least 900mm wide should be provided so that a wheelchair user can pass a parked car.",none,annotated +986f7853-4975-4ecd-8f10-a75d818eb44a,"Fully insulated and continuous cavity closers should be used, installed tight to the insulation and cavity apertures.",{'ID': '140_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Fully insulated and continuous cavity closers should be used, installed tight to the insulation and cavity apertures.",selection,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8_9,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for clear width 1 and 100 litres if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic +8421f806-70f2-46a9-a308-90a40da3541d_5,,,"Where the locations of the approach, whether over its whole length or in part, is five or steeper, that part of the approach should be designed as ramped access.",greater-equal,synthetic +a4dc06ab-99c3-4c8b-b295-eb3e6a64320a_6,,,"The free air leakage rate figure from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 400-600mm, unless the area is protected so as to prevent the danger of collision.",greater-equal,synthetic +5925ca4d-801c-42e4-b581-a176dea2519f,"If thermal energy is supplied from a district heat network, a CO2 emission factor and primary energy factor for the heat delivered to the dwelling by the district heat network should be calculated.",{'ID': '76_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If thermal energy is supplied from a district heat network, a CO2 emission factor and primary energy factor for the heat delivered to the dwelling by the district heat network should be calculated.",necessity,annotated +835d8fad-7a27-4299-aa38-a5b1771a6779_6,,,"In large building complexes, such as retail parks and large sports centres, there should be 0.7 metres wheelchair-accessible unisex Gangways capable of including an adult changing table.",equal,synthetic +17fba530-c42b-4eeb-85dd-16da0bacc49c,"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",{'ID': '470_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",none,annotated +a235c68f-ae44-4770-b005-4e9d7b659eb7_5,,,All cavity walls should have leaves at least 90mm thick and cavities at least 28 metres total cost.,greater-equal,synthetic +d0927095-9e43-4ce4-a740-d5df69dc1dc3_3,,,"If the air flows of air flow rate 1 and 1.3 seconds are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +e5a56966-e0d8-4d9e-9106-9f63913ca6d0,"Photographs should be taken at appropriate construction stages for each detail when completed, but prior to closingup works.",{'ID': '482_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Photographs should be taken at appropriate construction stages for each detail when completed, but prior to closingup works.",necessity,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8_2,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for design 1 and 2.2 metres if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic +3e9fc57e-bc69-4f17-a056-dd7767afa9bb_0,,,"If the vertical spacing of the building does not exceed 0.8 metres, access to the attic fire compartments from the outside shall be required.",less-equal,synthetic +569c7958-b7d6-4b9c-9dd9-13307e95e59b,"For ducted systems that are served by fans with a design flow rate greater than 1m3/s, ductwork leakage tests should be carried out.",{'ID': '385_UK_DocM_V2_AccessAndUseOfBuildings'},"For ducted systems that are served by fans with a design flow rate greater than 1m3/s, ductwork leakage tests should be carried out.",part-of,annotated +20609d43-016e-4314-9620-256f73f1c6ed,"The general ventilation rate for a new conservatory and, if necessary, adjoining rooms could be achieved using background ventilators.",{'ID': '160_UK_DocF_V1_Ventilation'},"The general ventilation rate for a new conservatory and, if necessary, adjoining rooms could be achieved using background ventilators.",part-of,annotated +2ca092ec-4425-4552-a389-fd0dadfbd154_0,,,NOTE: A floor level with a time-lapse of 28 metres or steeper should be designed as a ramp.,greater-equal,synthetic +0f8b3f66-6496-431c-bdc1-75570dde9ee6,"All cable routes should be laid as straight as possible and with suitable access points, so that cables can be pulled through in future.",{'ID': '111_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"All cable routes should be laid as straight as possible and with suitable access points, so that cables can be pulled through in future.",selection,annotated +9fd15b82-fc32-4364-8724-f1ef14f0c047_8,,,The cooker hood should heat emission capacity at least the total thickness of the cooker.,greater-equal,synthetic +a94b6b4f-a05e-403e-bbca-ebe1b94e38a1,"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",{'ID': '470_UK_DocM_V2_AccessAndUseOfBuildings'},"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",part-of,annotated +c2e0629d-350b-45b8-9e9e-d58be1780f12_7,,,"If the kitchen has no boiler interlock, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",not-part-of,synthetic +77be05f2-cd8c-4d35-85e4-6637b999d8e7,The value of the consequential improvement works should not be less than 10 of the value of the principal works.,{'ID': '452_UK_DocM_V2_AccessAndUseOfBuildings'},The value of the consequential improvement works should not be less than 10 of the value of the principal works.,none,annotated +2f8d4247-e53b-49ae-bd26-c4f1765eaee8_7,,,"Extract air of primary energy content 2, 3 and 450mm shall not be used as recirculation air.",equal,synthetic +d0927095-9e43-4ce4-a740-d5df69dc1dc3_4,,,"If the air flows of maximum number of occupants 1 and 2.4 metres are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +40b40b1b-d1b1-49d8-b9b7-13c5845a169d_10,,,The structure of the control appliance of the plumbing fixture shall be such that its sum total does not arise above 280mm.,less-equal,synthetic +99a53f17-48cb-4012-a47b-700761e0983b_2,,,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) two persons per square metre of those bathrooms must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,equal,synthetic +60205cf2-fa87-4195-9415-a6fb144a9b72,"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",{'ID': '96_Finnish_SafetyOfUse'},"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",selection,annotated +b4cef2a7-038c-4f72-8ea6-20e43d766165,"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",{'ID': '70_UK_DocM_V2_AccessAndUseOfBuildings'},"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",part-of,annotated +7f3f59a4-fc7e-4b14-8074-384f6cacf548,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",{'ID': '45_Finnish_SafetyOfUse'},"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",selection,annotated +981a0996-c526-4ee7-b679-0f17bd5ecd29,"Where it is not feasible to install a space heating system that can operate at this temperature (e.g. where there is insufficient space for larger radiators, or the existing distribution system is provided with higher temperature heat from a low carbon district heat network), the space heating system should be designed to the lowest design temperature possible that will still meet the heating needs of the building.",{'ID': '209_UK_DocM_V2_AccessAndUseOfBuildings'},"Where it is not feasible to install a space heating system that can operate at this temperature (e.g. where there is insufficient space for larger radiators, or the existing distribution system is provided with higher temperature heat from a low carbon district heat network), the space heating system should be designed to the lowest design temperature possible that will still meet the heating needs of the building.",selection,annotated +10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,none,annotated +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_5,,,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 300 millimetres in limits, these must be accessible via the interior.",greater,synthetic +a9944ed0-7168-4ec7-b761-0641e3e3228b,The sewerage system shall be equipped with cleanouts that are easy to handle and lockable in both horizontal and vertical sewers.,{'ID': '157_Finnish_Health-WaterAndSewerage'},The sewerage system shall be equipped with cleanouts that are easy to handle and lockable in both horizontal and vertical sewers.,selection,annotated +45adb0b6-63ee-4f42-b6a3-8fc396221c67_8,,,The total air flow of the insulation plus any required air gap should be at least to the diameter of the rafters.,greater-equal,synthetic +72e7ed0c-9e73-46b2-a919-20f3fea337fd_9,,,"An ducted systems with a potentially flammable or explosive atmosphere must not be located in a thermometers where there are dwellings, accommodation premises, institutions or assembly and business premises.",not-part-of,synthetic +164122ed-c7ac-4cf8-8a54-3d56c144f78d_2,,,"In general, the findings indicate that there should be at least the same number of recreation areas as induction loop and for some building types, e.g. large retail buildings, at least twice as many.",greater-equal,synthetic +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_6,,,"Where the cost of installing only cable routes is more than 7% of the total cost of the major bathroom, there is no Fixings to install either electric vehicle charge points or cable routes.",not-part-of,synthetic +5e51b653-449e-4d00-be19-0e20ecff5c49_4,,,The default use should be 0.35W/(m2K).,equal,synthetic +8b7e8e7e-81dd-4a76-bdd3-8269ac00f74b,The system can be overridden by a door reactivating device that relies on appropriate electronic methods (but not a door edge pressure system); provided that the lift door remains fully open for at least three seconds.,{'ID': '24_UK_DocM_V1_AccessAndUseOfBuildings'},The system can be overridden by a door reactivating device that relies on appropriate electronic methods (but not a door edge pressure system); provided that the lift door remains fully open for at least three seconds.,selection,annotated +eccd4f77-ef4a-41fd-a22a-620c84fdddd4_1,,,There is a minimum of 0.3 of worktop to at least dwelling primary energy rate of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,greater-equal,synthetic +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",part-of,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_8,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the compensating measures of these must be at least 850-1000mm.",greater-equal,synthetic +01d924bf-4a69-4eb8-b05e-ce993aee3d45_7,,,Perimeter insulation should be continuous and have a minimum layers of 20mm.,greater-equal,synthetic +bb9ec292-062b-43c3-8590-856dd5f6b890,"The building primary energy rate and building emission rate calculated using the measured air permeability must not be higher than the target primary energy rate and target emission rate, respectively.",{'ID': '357_UK_DocM_V2_AccessAndUseOfBuildings'},"The building primary energy rate and building emission rate calculated using the measured air permeability must not be higher than the target primary energy rate and target emission rate, respectively.",selection,annotated +b810df40-4dd8-44c4-80c4-b33bb873a5e9,"If the circulation piping is located inside the building envelopes insulation, 25 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '103_Finnish_EnergyEfficiency'},"If the circulation piping is located inside the building envelopes insulation, 25 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",necessity,annotated +746c2a1e-aa29-4913-b431-c415290a9f4b,controls should be inspected to ensure that the following have been achieved.,{'ID': '220_UK_DocF_V1_Ventilation'},controls should be inspected to ensure that the following have been achieved.,necessity,annotated +f7cfdf57-28f3-4d23-90bf-ec2268e14bac,"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",{'ID': '65_Finnish_SafetyOfUse'},"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",none,annotated +d3c5b819-2fd9-461f-b0cc-ac1dd14b45dc,"A sewer installed in the ground shall withstand the load imposed by soil, soil corrosion as well as subsidence of soil.",{'ID': '144_Finnish_Health-WaterAndSewerage'},"A sewer installed in the ground shall withstand the load imposed by soil, soil corrosion as well as subsidence of soil.",selection,annotated +05fdde92-d8af-42ad-963b-9019c69a8ab3,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",{'ID': '163_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",selection,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_9,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and intermediate landing 16/01/2023 00:00 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",none,annotated +c384013b-c40f-4925-acbe-465e1ca5bc13_8,,,20 litres per second sunken per detail should be recorded.,equal,synthetic +4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9,"In spaces intended for more than 60 persons, the width of the access route must be at least 1,200 millimetres.",{'ID': '116_Finnish_SafetyOfUse'},"In spaces intended for more than 60 persons, the width of the access route must be at least 1,200 millimetres.",part-of,annotated +525aa713-65e1-4368-a6f4-38f628be7fed,"in clothes shops, the dimensions and fittings recommended for an individual changing cubicle in a sports building should be provided.",{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},"in clothes shops, the dimensions and fittings recommended for an individual changing cubicle in a sports building should be provided.",necessity,annotated +5e51b653-449e-4d00-be19-0e20ecff5c49_5,,,The default Level differences should be 15.,equal,synthetic +12e545d1-64f4-45c9-a520-5b8a003eba0a_10,,,"If the dwelling has more than 1,500 millimetres exposed cavity closers, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",greater,synthetic +4f2b56cb-9852-4406-bbea-31f426fb4910,"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",{'ID': '397_UK_DocM_V2_AccessAndUseOfBuildings'},"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",selection,annotated +164122ed-c7ac-4cf8-8a54-3d56c144f78d_11,,,"In general, the findings indicate that there should be at least the same number of Their as fittings and for some building types, e.g. large retail buildings, at least twice as many.",greater-equal,synthetic +cf35d4a4-3170-421b-9be1-b68d928eed1d,"A roof with a pitch greater than 1:8 must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",{'ID': '125_Finnish_SafetyOfUse'},"A roof with a pitch greater than 1:8 must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",necessity,annotated +45adb0b6-63ee-4f42-b6a3-8fc396221c67,The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,{'ID': '128_UK_DocL_V1_ConsrvationOfFuelAndPower'},The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,part-of,annotated +45b99da0-5bce-49b7-9ce2-04810c7e5a19,"For recessed meter boxes on the cold side of the construction, insulation should be installed behind the enclosure.",{'ID': '151_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For recessed meter boxes on the cold side of the construction, insulation should be installed behind the enclosure.",part-of,annotated +94c0e823-a61d-49d6-82b3-4ca96f65dfa4,The buildings surfaces and lighting must be such that they achieve the contrasts in brightness needed for observation.,{'ID': '64_Finnish_SafetyOfUse'},The buildings surfaces and lighting must be such that they achieve the contrasts in brightness needed for observation.,part-of,annotated +8151be81-09ad-4dac-b2d2-f0d757915b6c,"However, when the snow load can occur, the minimum value of the load s should be at least 0.5 kN/m2.",{'ID': '110_Finnish_StabilityOfStructures'},"However, when the snow load can occur, the minimum value of the load s should be at least 0.5 kN/m2.",part-of,annotated +67657794-a272-4ab2-9b19-df29e9d24844,Ground floors and external walls: the wall-to-floor junctions should be detailed to achieve continuity of insulation.,{'ID': '160_UK_DocL_V1_ConsrvationOfFuelAndPower'},Ground floors and external walls: the wall-to-floor junctions should be detailed to achieve continuity of insulation.,part-of,annotated +d5cb0429-ffef-43c5-9789-a3611c04446a,"The supports and fastening points of water pipes shall be such that neither heat expansion nor forces generated by water flow cause the pipes to shift, loosen, break or make disturbing noises.",{'ID': '89_Finnish_Health-WaterAndSewerage'},"The supports and fastening points of water pipes shall be such that neither heat expansion nor forces generated by water flow cause the pipes to shift, loosen, break or make disturbing noises.",necessity,annotated +ebc429f0-cb90-41ab-9a11-401a2ddc7bad,"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",{'ID': '268_UK_DocF_V1_Ventilation'},"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",none,annotated +aec934d9-6175-4624-9e8d-1ee6f71fb49d,Sufficient information about the overheating mitigation strategy and its maintenance requirements must be given to owners so that it can be used effectively.,{'ID': '92_UK_DocO_Overheating'},Sufficient information about the overheating mitigation strategy and its maintenance requirements must be given to owners so that it can be used effectively.,necessity,annotated +5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",part-of,annotated +e3b85ad6-6132-40d7-86f8-3cc5d44eb12c_10,,,six metres lifting platform should be close to an accessible bathroom suitable for a wheelchair user.,equal,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_9,,,Skirtings totalling up to 50mm total thickness and shallow projecting shower or casings above 1m2 may be discounted when measuring clear width.,greater,synthetic +53bb982d-5260-4a69-a6dd-71e4f074e676_0,,,The boiler type of standing rows must be at least EI 30.,greater-equal,synthetic +bd033057-ac6c-45bb-92c7-ca58bf22dab1,The lobby should be large enough and of a shape to allow a wheelchair user or a person pushing a pram to move clear of one door before opening the second door.,{'ID': '80_UK_DocM_V2_AccessAndUseOfBuildings'},The lobby should be large enough and of a shape to allow a wheelchair user or a person pushing a pram to move clear of one door before opening the second door.,part-of,annotated +d728a9c8-0302-4bd1-b69b-0daeefce30d1,"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",{'ID': '84_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",none,annotated +7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88,The resilient layer should be to the full height of the door and 600mm either side of the doorset.,{'ID': '15_UK_DocQ_Security_Dwellings'},The resilient layer should be to the full height of the door and 600mm either side of the doorset.,necessity,annotated +bb9ec292-062b-43c3-8590-856dd5f6b890_9,,,"The annual percentage of heat and building emission rate calculated using the measured air permeability must not be higher than the total thickness and target emission rate, respectively.",less-equal,synthetic +01008f69-874b-443e-bcb2-2f5630280049_2,,,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the parasitic energy use may be no more than 500kW and the tread must be no less than 220 millimetres.",less-equal,synthetic +e15250c0-1279-4d29-a1ec-31560b045007_2,,,ventilation equipment of basement storeys must not be connected to fire and smoke-proof bath.,not-part-of,synthetic +23cff3c3-1251-4c5f-9fd9-8f52d25eb494_9,,,Gasfired boilers and multi-stage oilfired boilers with an Moisture of more than 600 millimetres should have fully modulating burner controls.,greater,synthetic +a94b6b4f-a05e-403e-bbca-ebe1b94e38a1,"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",{'ID': '470_UK_DocM_V2_AccessAndUseOfBuildings'},"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",none,annotated +fb1da22f-8ddb-4399-b441-64dca68da9af,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",{'ID': '218_Finnish_FireSafety'},"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",part-of,annotated +2c725d50-13d5-4e77-bacf-9f174530e27c,The energy efficiency of historic and traditional buildings should be improved only if doing so will not cause long-term deterioration of the buildings fabric or fittings.,{'ID': '17_UK_DocM_V2_AccessAndUseOfBuildings'},The energy efficiency of historic and traditional buildings should be improved only if doing so will not cause long-term deterioration of the buildings fabric or fittings.,part-of,annotated +511c1a7f-08b9-48ec-aea6-9b749fdf31a1_3,,,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an 4 of appropriately located future connection which are suitable for users of wheelchairs and walking frames with wheels.",equal,synthetic +e4fb8d18-8dbc-4351-a2df-d87f880f476a,The fire resistance time requirement for balconies is half that of the load-bearing structures of the storey.,{'ID': '90_Finnish_FireSafety'},The fire resistance time requirement for balconies is half that of the load-bearing structures of the storey.,part-of,annotated +08efb7a8-1f9e-491b-8a6f-7043ec96ea3b,The methodology for determining costs should be consistent between all elements of the calculation to allow a fair comparison between the cost of the major renovation and the cost of electric vehicle charge point infrastructure.,{'ID': '54_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The methodology for determining costs should be consistent between all elements of the calculation to allow a fair comparison between the cost of the major renovation and the cost of electric vehicle charge point infrastructure.,necessity,annotated +4f2b56cb-9852-4406-bbea-31f426fb4910,"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",{'ID': '397_UK_DocM_V2_AccessAndUseOfBuildings'},"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",selection,annotated +c9983da5-23f1-4211-88ce-68e4753e4ab9,"A target primary energy rate, target emission rate, building primary energy rate and the building emission rate should be calculated for non-exempt buildings with low energy demand.",{'ID': '102_UK_DocM_V2_AccessAndUseOfBuildings'},"A target primary energy rate, target emission rate, building primary energy rate and the building emission rate should be calculated for non-exempt buildings with low energy demand.",none,annotated +f398541a-81df-4380-a408-d7b1beaa7c92,"People should be able to see other people approaching from the opposite direction, thereby allowing sufficient reaction time for both parties to avoid a collision.",{'ID': '68_UK_DocM_V2_AccessAndUseOfBuildings'},"People should be able to see other people approaching from the opposite direction, thereby allowing sufficient reaction time for both parties to avoid a collision.",necessity,annotated +f36650d9-cd31-4795-9728-7a4dcf3cadde,"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",{'ID': '229_Finnish_FireSafety'},"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",necessity,annotated +c8a048c6-8e7e-4b5a-ada5-02990b983401,"A natural ventilation system, a mechanical extract ventilation system or a mechanical supply and extract ventilation system shall not be designed to be combined in such a way that the directions of air flow between the rooms and in the ductworks may change when the air flows are being controlled.",{'ID': '91_Finnish_Health-IndoorClimateAndVentilation'},"A natural ventilation system, a mechanical extract ventilation system or a mechanical supply and extract ventilation system shall not be designed to be combined in such a way that the directions of air flow between the rooms and in the ductworks may change when the air flows are being controlled.",selection,annotated +23db27ac-b594-4b26-883d-922d713d382a,"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",{'ID': '161_UK_DocM_V2_AccessAndUseOfBuildings'},"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",none,annotated +5b1fe636-d2aa-4382-885e-a4f8a2cae4d4_10,,,"Generally, a thermal element once upgraded should not have a Ventilation greater than 2.2 metres.",less-equal,synthetic +75c60084-6878-472d-8694-e8739e0dd76c,The width of access routes in assembly areas with a maximum capacity of 60 persons must be at least 900 millimetres.,{'ID': '115_Finnish_SafetyOfUse'},The width of access routes in assembly areas with a maximum capacity of 60 persons must be at least 900 millimetres.,equal,annotated +a0c838b5-5fe2-4b52-abe1-432804c2c8aa_8,,,A construction of 21 C shall be used as the emission rate for room temperature during the heating season.,equal,synthetic +3ac96918-764f-403d-a588-37b5f4a16f46,"For absorption chillers used in conjunction with onsite CHP or a district heat network or community heating system, the CO2 emissions and primary energy should be calculated in the same way as when using CHP for heating.",{'ID': '284_UK_DocM_V2_AccessAndUseOfBuildings'},"For absorption chillers used in conjunction with onsite CHP or a district heat network or community heating system, the CO2 emissions and primary energy should be calculated in the same way as when using CHP for heating.",necessity,annotated +baee716c-b8c2-4500-b4de-63fa11f007b1_8,,,A minimum of one in 300 millimetres of the remaining Routes must have access to cable routes.,equal,synthetic +b0e99ac5-9cbc-4beb-b8ff-85383ae70ea8,"The approach route should be safe and convenient, adopt the shallowest gradient that can reasonably be achieved and be step-free, irrespective of the storey on which the dwelling is located.",{'ID': '40_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be safe and convenient, adopt the shallowest gradient that can reasonably be achieved and be step-free, irrespective of the storey on which the dwelling is located.",none,annotated +f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c_4,,,A building with a difference in light reflectance value exceeding three metres must be equipped with anchoring structures for safety lines.,greater,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_6,,,Skirtings totalling up to 450mm Ventilation and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,less-equal,synthetic +0a7ff0c7-c5f9-4069-9d7e-2bfd6c4871d3_6,,,The energy efficiency measures of the extension does not exceed two years.,less-equal,synthetic +2f815a08-db3c-48a6-b248-d69aeac870ee_7,,,"the vertical total cost is: a. not more than 1.3 seconds, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",less-equal,synthetic +6e49e97f-54f6-4333-9b1e-84373a7defe8,The protective part of the barrier must extend to a height of at least 0.7 metres from the surface of the landing or step.,{'ID': '40_Finnish_SafetyOfUse'},The protective part of the barrier must extend to a height of at least 0.7 metres from the surface of the landing or step.,part-of,annotated +bde1697a-20c9-4f15-a63c-5be323a058c1_4,,,"Any connection of 600kg/m3 or more Windows, skylights and ventilators to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.",greater-equal,synthetic +cccbc1ea-27be-4d7b-b53c-3cb467a51020,"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",{'ID': '220_UK_DocM_V2_AccessAndUseOfBuildings'},"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",part-of,annotated +8aa4b706-1659-4e30-a4fe-e7f33efe3241_8,,,All 120 expanded metal of the compliance checklist should be completed.,equal,synthetic +7602a501-a5b5-429c-99e1-8bc801243494,"The flooring and wall covering must provide waterproofing, or separate waterproofing must be installed under the flooring and behind the wall covering.",{'ID': '111_Finnish_Health-Humidity'},"The flooring and wall covering must provide waterproofing, or separate waterproofing must be installed under the flooring and behind the wall covering.",necessity,annotated +5fa7daca-cb50-4397-a736-617e52d30187_3,,,"If efficiencies at below 30% are required and unavailable, the inner surfaces may be taken as equal to that at 1000m2.",equal,synthetic +3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60,The approach route is a minimum of 900mm wide with a maximum cross fall of 1 in 40.,{'ID': '16_UK_DocM_V1_AccessAndUseOfBuildings'},The approach route is a minimum of 900mm wide with a maximum cross fall of 1 in 40.,part-of,annotated +8bb9aee2-a950-4a65-a715-287035906789,"Spaces of a non-residential building and common spaces of a residential building as well as the fixtures, fittings and fixed equipment in them shall be suitable for persons with mobility and functional impairment.",{'ID': '27_Finnish_Accessibility'},"Spaces of a non-residential building and common spaces of a residential building as well as the fixtures, fittings and fixed equipment in them shall be suitable for persons with mobility and functional impairment.",part-of,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_3,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 120 in projection; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic +973c9430-2b4a-4ab4-82df-7060c3002f77,The design temperature difference for the community heating primary circuit should be a minimum of 20C.,{'ID': '292_UK_DocL_V1_ConsrvationOfFuelAndPower'},The design temperature difference for the community heating primary circuit should be a minimum of 20C.,part-of,annotated +caa5332f-5180-4d07-a41f-e6e0e044a8c1,An existing district heat network that is being connected to a new dwelling should not have a CO2 emission factor for delivered heat to the dwelling which is greater than 0.350kgCO2/kWh.,{'ID': '287_UK_DocL_V1_ConsrvationOfFuelAndPower'},An existing district heat network that is being connected to a new dwelling should not have a CO2 emission factor for delivered heat to the dwelling which is greater than 0.350kgCO2/kWh.,selection,annotated +16f6f10e-f32f-48b2-85f9-123cdb5448ee,Any unavoidable gaps between boards should be infilled using compressible tape (e.g. for boards within roof rafters) or low expansion foam (e.g. for boards within wall cavities).,{'ID': '147_UK_DocL_V1_ConsrvationOfFuelAndPower'},Any unavoidable gaps between boards should be infilled using compressible tape (e.g. for boards within roof rafters) or low expansion foam (e.g. for boards within wall cavities).,selection,annotated +e4fb8d18-8dbc-4351-a2df-d87f880f476a_2,,,The alongside the leading edge for balconies is 10 litres per second per person that of the load-bearing structures of the storey.,equal,synthetic +ae21bd5a-7374-43ad-900e-e2e1a6459cb0,"The target primary energy rate and target emission rate must be calculated using one of the calculation tools in the approved methodology, used in line with the version policy as stated in the methodology.",{'ID': '49_UK_DocM_V2_AccessAndUseOfBuildings'},"The target primary energy rate and target emission rate must be calculated using one of the calculation tools in the approved methodology, used in line with the version policy as stated in the methodology.",necessity,annotated +4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",none,annotated +d342429e-d3fc-46e0-a195-527cfef1fd4b,"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",{'ID': '451_UK_DocM_V2_AccessAndUseOfBuildings'},"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",selection,annotated +f009a781-0ced-408d-b3d1-6ae7a848012e,"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",{'ID': '31_Finnish_SafetyOfUse'},"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",part-of,annotated +4fc3b5b1-a838-4429-b385-d8e80e6633eb_5,,,"In the absence of relevant harmonised European Standards, products with a part exceeding two persons per square metre must have a product certificate issued by a Notified Body.",greater,synthetic +2f89cb06-3ee9-49b5-ac36-46f31ae3928f,Hot water pipework should be insulated in all areas inside and outside the building unless it can be demonstrated that the heat is always useful.,{'ID': '170_UK_DocM_V2_AccessAndUseOfBuildings'},Hot water pipework should be insulated in all areas inside and outside the building unless it can be demonstrated that the heat is always useful.,none,annotated +3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,part-of,annotated +50e89a86-e2be-439d-b230-79274cd7199b_5,,,Modular and portable buildings with a planned level difference of more than 0.7 metres at a single location should be shown to comply with the energy efficiency requirements.,greater,synthetic +f9de28ac-45bb-4400-9d9f-8afee73bd2e3_1,,,The absence should not exceed 35 mg/m3 (30 ppm) of dwelling floor area.,less-equal,synthetic +2f8d4247-e53b-49ae-bd26-c4f1765eaee8_9,,,"Extract air of heat 2, 3 and 900 millimetres shall not be used as recirculation air.",equal,synthetic +419892bb-5044-4c63-a8ba-7747ad52c23d,"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",{'ID': '195_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",none,annotated +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",necessity,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_5,,,"If the air flows of fire load 24 degrees Celsius and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +959b4ba1-2cf2-4ae9-84d4-055e9c0040f1,The inaccuracies of the crane wheels should be determined together with the crane supplier.,{'ID': '229_Finnish_StabilityOfStructures'},The inaccuracies of the crane wheels should be determined together with the crane supplier.,necessity,annotated +ec419055-6ed3-4dac-9879-748e2d365a26,"Internal building services: where services penetrate the air barrier, holes should be as small as possible and should be core drilled to limit damage.",{'ID': '180_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Internal building services: where services penetrate the air barrier, holes should be as small as possible and should be core drilled to limit damage.",necessity,annotated +1603fe12-9df6-4ab9-acbe-44895cccb7ed,Any looped cords must be fitted with child safety devices.,{'ID': '87_UK_DocO_Overheating'},Any looped cords must be fitted with child safety devices.,selection,annotated +793cb939-b3d9-46eb-ae65-71a4d5c8031b_6,,,Where the vehicle barriers is within the private curtilage of the dwelling (but not within a carport or lift door) at least one space is a standard parking bay that can be widened to 3.3m.,not-part-of,synthetic +46f5be2a-1514-420b-bc39-331fc6e0d2df_1,,,"The Moisture, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the design value, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,synthetic +716fa732-f3c7-43ad-a4e3-fff43a841018,The vehicle traffic area of a building and its courtyard must be safe and appropriate.,{'ID': '131_Finnish_SafetyOfUse'},The vehicle traffic area of a building and its courtyard must be safe and appropriate.,part-of,annotated +ddcf66e5-33c1-43c6-9c16-52be70d56c54,"If an exhaust air terminal is located on a facade that is exposed to the prevailing wind, measures should be taken to minimise likely wind effects.",{'ID': '100_UK_DocF_V1_Ventilation'},"If an exhaust air terminal is located on a facade that is exposed to the prevailing wind, measures should be taken to minimise likely wind effects.",selection,annotated +ee0c8c7c-c65e-4403-92e6-628fd680f3bf,Any panel within the doorset should be at least 15mm thick.,{'ID': '30_UK_DocQ_Security_Dwellings'},Any panel within the doorset should be at least 15mm thick.,part-of,annotated +a922fe4e-30c9-4fef-a442-27459b959914,Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,{'ID': '82_Finnish_Health-WaterAndSewerage'},Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,necessity,annotated +6465e5b9-4c10-41ec-9839-3e7cb7114911,Programmable room thermostats with an override feature should be provided for all direct electric zones of the electric underfloor heating system.,{'ID': '314_UK_DocL_V1_ConsrvationOfFuelAndPower'},Programmable room thermostats with an override feature should be provided for all direct electric zones of the electric underfloor heating system.,necessity,annotated +f3bd99b4-7ea5-4968-af10-3c133c0b5aa0_2,,,No individual flight has a maintained of more than 0.15 dm3/s per m2.,less-equal,synthetic +d54852df-8e3c-4e99-8484-31c403b78558,"If work is carried out on a system that includes a boiler, a boiler interlock should be installed.",{'ID': '256_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If work is carried out on a system that includes a boiler, a boiler interlock should be installed.",none,annotated +385a4365-40c0-4c07-8854-b07bde292fd2,"The electrical energy consumption of a mechanical ventilation system shall be calculated on the basis of air flows, specific fan powers and operating times for all air handling units and powered roof ventilators in the building.",{'ID': '109_Finnish_EnergyEfficiency'},"The electrical energy consumption of a mechanical ventilation system shall be calculated on the basis of air flows, specific fan powers and operating times for all air handling units and powered roof ventilators in the building.",selection,annotated +63af9f99-6939-4e8c-a6a9-8b10942e1597_7,,,"The handle to at least 5m dwellings in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",greater-equal,synthetic +98ef7ffc-fba9-439f-ab36-5fd6fd1d8e0f,Complex details should be avoided wherever possible.,{'ID': '154_UK_DocL_V1_ConsrvationOfFuelAndPower'},Complex details should be avoided wherever possible.,necessity,annotated +88e23b46-22d9-4be6-87b7-40541f7995a9_8,,,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the emission rate exceeds off; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",greater,synthetic +66249fda-33bf-4d93-8bf9-53fb82ad0e95,"The driveway and parking area at a plot or building site must be separated from pedestrian, play and recreation areas.",{'ID': '87_Finnish_SafetyOfUse'},"The driveway and parking area at a plot or building site must be separated from pedestrian, play and recreation areas.",part-of,annotated +536b172d-ccd1-479a-8136-6ee05db0f264,"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",{'ID': '205_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",none,annotated +56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3_3,,,Storage premises with a area exceeding 900mm are not permitted within the building.,greater,synthetic +8aa4b706-1659-4e30-a4fe-e7f33efe3241_1,,,All 1m2 Solid walls of the compliance checklist should be completed.,equal,synthetic +aef92227-4c01-4c59-b96d-ce414540606b,"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",{'ID': '63_UK_DocM_V2_AccessAndUseOfBuildings'},"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",selection,annotated +e7be7432-5505-47ad-b586-2a2e3f5a1a37,"If the index terminal has to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",{'ID': '203_UK_DocF_V1_Ventilation'},"If the index terminal has to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",selection,annotated +7c44934c-61e1-4904-a493-1aa360ccc7d1,"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",{'ID': '1_UK_DocA_Structure'},"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",none,annotated +ba93ede4-473f-4c07-b439-3699580cbcbe,No individual flight has a rise of more than 1800mm between landings.,{'ID': '21_UK_DocM_V1_AccessAndUseOfBuildings'},No individual flight has a rise of more than 1800mm between landings.,none,annotated +05dc10dc-6a9a-4e83-93d3-79fff4819f99,Standing areas must be terraced so that it is safe to move in the rows.,{'ID': '110_Finnish_SafetyOfUse'},Standing areas must be terraced so that it is safe to move in the rows.,necessity,annotated +118d3fd1-0e9d-412f-a77e-fea591ea8e5f,The oil and grease separators shall be equipped with a filling alarm.,{'ID': '154_Finnish_Health-WaterAndSewerage'},The oil and grease separators shall be equipped with a filling alarm.,necessity,annotated +203faa23-7b71-47c9-a6e5-2333ac45389e_4,,,"The air tightness of the indoor steps of dwelling units and living quarters may be no more than 18 dm3/s, and the tread must be no less than 250 millimetres.",less-equal,synthetic +fb5d3054-4911-4049-ba09-1c3e80f9c07c_11,,,"The air distribution of steps in uncovered or unheated outdoor staircases must be no less than 0.3, and the riser may be no more than 130 millimetres.",greater-equal,synthetic +0a7ff0c7-c5f9-4069-9d7e-2bfd6c4871d3_1,,,The thermal integrity of the extension does not exceed 5m.,less-equal,synthetic +bb9ec292-062b-43c3-8590-856dd5f6b890_9,,,"The building primary energy rate and level difference calculated using the measured air permeability must not be higher than the target primary energy rate and diameter, respectively.",less-equal,synthetic +76acc6bd-50c0-4f3f-b015-42e171ec6ce7_4,,,70 kN stairs must be installed.,equal,synthetic +7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",none,annotated +46f5be2a-1514-420b-bc39-331fc6e0d2df_8,,,"The dwelling primary energy rate, dwelling emission rate and thick, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and breaking, respectively.",less-equal,synthetic +5e7d4831-4ec8-48f9-9e60-0422fcc1eae4,"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",{'ID': '344_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",selection,annotated +8fcdc238-3c30-4659-9303-1b126a39b2cd_6,,,The design solar load should be pass through its openings by at least three seconds.,greater-equal,synthetic +6ec243f2-9294-4b7c-89a4-1c46e4a69cc9_0,,,"If site constraints necessitate an house of 200 m2 or steeper, an approach incorporating ramped access should be provided.",greater-equal,synthetic +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_9,,,"In buildings more than 9 metres and at most 01:08:00 in rated output, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",less-equal,synthetic +a0c838b5-5fe2-4b52-abe1-432804c2c8aa_3,,,A edges of 21 C shall be used as the topography for room temperature during the heating season.,equal,synthetic +50e89a86-e2be-439d-b230-79274cd7199b_6,,,Modular and portable buildings with a planned room temperature of more than 0.2 at a single location should be shown to comply with the energy efficiency requirements.,greater,synthetic +d342429e-d3fc-46e0-a195-527cfef1fd4b,"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",{'ID': '451_UK_DocM_V2_AccessAndUseOfBuildings'},"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",selection,annotated +f5a71c7b-e852-40f2-8f88-91cda7902a7e_4,,,"If a new building has a space heating or airconditioning system with an heat exchanger area greater than eight per cent, a building automation and control system should be installed.",greater,synthetic +0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,none,annotated +46ee0eda-086a-40ab-8e8f-bfa4c85abd49,"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",{'ID': '16_Finnish_SafetyOfUse'},"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",none,annotated +e320322e-3aee-4167-ad19-a6c6cc41f597,The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,{'ID': '97_Finnish_Health-WaterAndSewerage'},The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,none,annotated +0f67dad7-6df9-444b-8e72-f447668e3fde_9,,,"Where sanitary facilities are wheelchair accessible, WC pans should be a minimum of 25 decibels calculation of primary energy and CO2 emissions.",greater-equal,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_1,,,Skirtings totalling up to 13l/s Control and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,less-equal,synthetic +3f4eef4b-2dc5-4746-8791-3a37360d6e8a,All people should be able to use presentation facilities.,{'ID': '134_UK_DocM_V2_AccessAndUseOfBuildings'},All people should be able to use presentation facilities.,necessity,annotated +0262f6e5-21bc-4312-9388-8ac93b79416d_8,,,The minimum full entry of the absorption chillers should be no worse than 44mm.,greater-equal,synthetic +f439dcde-3cf9-4b40-b555-a2107ae5559f,"If the circulation piping is located inside the building envelope, 50 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '104_Finnish_EnergyEfficiency'},"If the circulation piping is located inside the building envelope, 50 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",necessity,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8_10,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for illuminance 120 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic +20609d43-016e-4314-9620-256f73f1c6ed,"The general ventilation rate for a new conservatory and, if necessary, adjoining rooms could be achieved using background ventilators.",{'ID': '160_UK_DocF_V1_Ventilation'},"The general ventilation rate for a new conservatory and, if necessary, adjoining rooms could be achieved using background ventilators.",none,annotated +043258d7-d35e-42d9-87c5-b83565c39ad6,"Before elements are concealed by subsequent work, an onsite audit should be undertaken to confirm that the designed details have been constructed.",{'ID': '133_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Before elements are concealed by subsequent work, an onsite audit should be undertaken to confirm that the designed details have been constructed.",selection,annotated +bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,selection,annotated +7a42150c-1f5d-449c-ac83-addfe816e46a,Accessible entrances should be clearly sign-posted and easily recognisable.,{'ID': '62_UK_DocM_V2_AccessAndUseOfBuildings'},Accessible entrances should be clearly sign-posted and easily recognisable.,selection,annotated +eeb4239f-3819-475c-ad20-756bed80c4ff_7,,,"In reference heat loss calculations, the value used as the opening of the buildings ventilation system shall be one.",equal,synthetic +0f2dbc3b-0f3e-444e-a688-ed8faebd1226,Seats must be fixed to a base if the floor of the seating area is sloped or if there are level differences between the floors of the respective rows of seats.,{'ID': '105_Finnish_SafetyOfUse'},Seats must be fixed to a base if the floor of the seating area is sloped or if there are level differences between the floors of the respective rows of seats.,none,annotated +56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3_9,,,Storage premises with a ventilation rate exceeding two persons per square metre are not permitted within the building.,greater,synthetic +d504fd87-d13d-4936-9d7a-71d17954760d,The riser of the steps in an exit may be no more than 180 millimetres.,{'ID': '25_Finnish_SafetyOfUse'},The riser of the steps in an exit may be no more than 180 millimetres.,part-of,annotated +4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9_3,,,"In spaces intended for more than 60 persons, the output of the access route must be at least four.",greater-equal,synthetic +a8b3e54e-902c-4502-99a2-8c41d46f1416_7,,,"If there are more than 32mm space in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",greater,synthetic +86350df0-a40e-412b-a301-004524d56736_3,,,"For wet heating systems in new dwellings with a exposure coefficient of 500kW or greater, a minimum of two independently controlled heating circuits should be provided.",greater-equal,synthetic +7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88_10,,,The resilient layer should be to the full height of the door and 9 metres flow rate of the doorset.,equal,synthetic +2f8d4247-e53b-49ae-bd26-c4f1765eaee8_10,,,"Extract air of room temperature 2, 3 and 0.7 shall not be used as recirculation air.",equal,synthetic +53e31e26-a39b-4047-a86e-bdb8021413e8_5,,,Window handles on windows that open outwards are not more than 0.2 power input from controls when the window is at its maximum openable angle.,less-equal,synthetic +29c431ee-ea93-491d-ab13-06418d93c488_2,,,"If categories is greater than 220 millimetres, manual control is acceptable.",greater,synthetic +a9c88566-e4e5-4cba-8165-9916820d9cc5,"Doors, gates and boom barriers must operate safely and in such a way that they do not cause a danger of an accident.",{'ID': '75_Finnish_SafetyOfUse'},"Doors, gates and boom barriers must operate safely and in such a way that they do not cause a danger of an accident.",selection,annotated +9497b383-7217-4366-80c5-6f5677b30893,"If the building is heated through a district heat network or community heating system, the effective rated output should be based on the capacity of the equipment installed in the building, making reasonable assumptions for the operation of the district heat network or community heating system, including flow temperatures.",{'ID': '325_UK_DocM_V2_AccessAndUseOfBuildings'},"If the building is heated through a district heat network or community heating system, the effective rated output should be based on the capacity of the equipment installed in the building, making reasonable assumptions for the operation of the district heat network or community heating system, including flow temperatures.",selection,annotated +10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,none,annotated +208b093d-361f-4aec-819d-4abca4e72c68_5,,,"in an evacuation area where the total supply air flow is 250 millimetres, the second exit may be no less than 900 millimetres in width.",equal,synthetic +0da52584-1b37-48b5-840f-3795ae695275_2,,,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where 1 in 40 open-plan space are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +5577528f-8fa0-4ca3-96f6-ea418091cb86_1,,,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 2 in luminous efficacy is able to pass through the opening between the plane level and the handrail or wall.,greater,synthetic +113b8bf8-1856-45f5-a54b-d65ef100b437_1,,,"If a gas-fired combination boiler is installed in an existing dwelling, at least 70 kN of the following target emission rate, appropriate to the system, should be installed.",greater-equal,synthetic +56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3_8,,,Storage premises with a from the top and bottom corners of the door exceeding 1m2 are not permitted within the building.,greater,synthetic +a894077e-cebf-4559-9254-ce964bc11b0f,Air flow rates for mechanical ventilation in new dwellings must be measured.,{'ID': '182_UK_DocF_V1_Ventilation'},Air flow rates for mechanical ventilation in new dwellings must be measured.,selection,annotated +5fa7daca-cb50-4397-a736-617e52d30187_10,,,"If target fabric energy efficiency rate at below 30% are required and unavailable, the sections may be taken as equal to that at 30% load.",equal,synthetic +b5addb77-be99-45a2-8dc0-fdf5d1969a57,Each column and wall shall be supplied with continuous vertical ties from the foundations to the roof level.,{'ID': '194_Finnish_StabilityOfStructures'},Each column and wall shall be supplied with continuous vertical ties from the foundations to the roof level.,necessity,annotated +6187cad8-0d6d-4154-b98b-7285b36fea8d,Continuously running fans should be set up to operate without occupant intervention but may have manual or automatic controls for selecting the high rate of operation.,{'ID': '65_UK_DocF_V1_Ventilation'},Continuously running fans should be set up to operate without occupant intervention but may have manual or automatic controls for selecting the high rate of operation.,necessity,annotated +db734798-9e42-4fe1-900c-77d4e6131809,"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",{'ID': '11_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",selection,annotated +bfdf95da-d422-47cd-83d7-a30a4969f2e6_2,,,"If the internal ties must be centred on the supporting line, the minimum value of the Air permeability, 25, will also be applied to internal ties.",greater-equal,synthetic +6a41a473-bd3c-4e38-a093-094b3fdae388_0,,,At least one in every 1.2W/(m2K) remaining waste must be provided with cable routes.,equal,synthetic +656aa2fa-18cb-41ee-ae28-28deb3dffcc3_3,,,The Geo-location of the water in the hot water system shall be at least 850 millimetres and available from the hot water plumbing fixture within 20 seconds.,greater-equal,synthetic +590ab551-79e8-42f5-bc52-749f8899c088,Extinguishing routes to basement storeys shall be arranged so that basement storeys can be reached from the ground level without a need to pass through the exits of the storeys.,{'ID': '242_Finnish_FireSafety'},Extinguishing routes to basement storeys shall be arranged so that basement storeys can be reached from the ground level without a need to pass through the exits of the storeys.,selection,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",none,annotated +7d35f4c4-fa65-4d68-a974-f54386ca8aee_2,,,"However, a horizontal shutoff valves in a protective part must be no higher than 500kW.",less-equal,synthetic +0f67dad7-6df9-444b-8e72-f447668e3fde_1,,,"Where sanitary facilities are wheelchair accessible, WC pans should be a minimum of 0.15 location.",greater-equal,synthetic +cb522b91-f26f-460e-adee-1a7f59ba10c9,"For heat pump installations in which there are other heat sources available to the same building, each of these heat sources should be appropriately incorporated into a singular control system.",{'ID': '315_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heat pump installations in which there are other heat sources available to the same building, each of these heat sources should be appropriately incorporated into a singular control system.",selection,annotated +12e545d1-64f4-45c9-a520-5b8a003eba0a_4,,,"If the dwelling has more than 70 kN exposed commercial part, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",greater,synthetic +33eb3a5a-584f-4d1e-84a0-35fe66954d80,Consideration should be given to the power requirements of essential (e.g. life safety) systems.,{'ID': '323_UK_DocM_V2_AccessAndUseOfBuildings'},Consideration should be given to the power requirements of essential (e.g. life safety) systems.,part-of,annotated +4d54279f-8590-4a58-86d5-afb7f3069870,"The apartment-specific water meters shall be located in a place where they are easy to install, read and service.",{'ID': '75_Finnish_Health-WaterAndSewerage'},"The apartment-specific water meters shall be located in a place where they are easy to install, read and service.",selection,annotated +03bdab65-fc14-4101-add9-f26c25f41e82,A drainage point shall be equipped with a cleansable water seal.,{'ID': '134_Finnish_Health-WaterAndSewerage'},A drainage point shall be equipped with a cleansable water seal.,necessity,annotated +c1b2e39e-0bab-438c-8b35-c2b37e5cf93a,"Equipment should be designed, specified and installed with the aim of maximising its efficiency as installed.",{'ID': '233_UK_DocM_V2_AccessAndUseOfBuildings'},"Equipment should be designed, specified and installed with the aim of maximising its efficiency as installed.",necessity,annotated +f6add908-4d45-4b3e-83a6-369f6c36c037_7,,,"Door rails, stiles and muntins should be at least 100 litres surface area.",greater-equal,synthetic +eccd4f77-ef4a-41fd-a22a-620c84fdddd4_9,,,There is a minimum of five of worktop to at least rise of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,greater-equal,synthetic +f5a71c7b-e852-40f2-8f88-91cda7902a7e_10,,,"If a new building has a space heating or airconditioning system with an control function greater than 9 metres, a building automation and control system should be installed.",greater,synthetic +208b093d-361f-4aec-819d-4abca4e72c68_3,,,"in an evacuation area where the floor area is 8.5m2, the second exit may be no less than 900 millimetres in width.",equal,synthetic +9ff8b8fd-5361-4c3d-9a7e-7459276c8df7_3,,,The deep must not exceed the individual dwellings number of wall ties per square metre.,less-equal,synthetic +31d635b2-1d32-49dd-a848-5b5acaf50128,"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",{'ID': '407_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",none,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",none,annotated +46f5be2a-1514-420b-bc39-331fc6e0d2df,"The dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and target fabric energy efficiency rate, respectively.",{'ID': '356_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and target fabric energy efficiency rate, respectively.",selection,annotated +1b6fbbfe-8dc1-40f6-9523-dd2d22447419,Variable volume control systems should be used to reduce the volume of water and the pressure difference required from the pumps under part load.,{'ID': '293_UK_DocL_V1_ConsrvationOfFuelAndPower'},Variable volume control systems should be used to reduce the volume of water and the pressure difference required from the pumps under part load.,necessity,annotated +efd2d371-97de-4d5e-af06-e404ff71f316,The impact of the ground and crawl space on heat loss shall be taken into account in heat loss calculations.,{'ID': '91_Finnish_EnergyEfficiency'},The impact of the ground and crawl space on heat loss shall be taken into account in heat loss calculations.,none,annotated +457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",selection,annotated +2a2dbb92-88af-47f5-bd1e-b3ddea4c1ec9,"The approach route should be safe and convenient for everyone, be at the shallowest gradient that can reasonably be achieved, and be stepfree, irrespective of the storey on which the dwelling is located.",{'ID': '70_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be safe and convenient for everyone, be at the shallowest gradient that can reasonably be achieved, and be stepfree, irrespective of the storey on which the dwelling is located.",none,annotated +7d35f4c4-fa65-4d68-a974-f54386ca8aee_0,,,"However, a horizontal fire wall in a protective part must be no higher than 150mm.",less-equal,synthetic +239bd568-c5f2-4ab5-955c-f2d8d86b7b7f,"Where closing devices are needed for fire control, electrically powered hold-open devices or swing-free closing devices should be used as appropriate.",{'ID': '90_UK_DocM_V2_AccessAndUseOfBuildings'},"Where closing devices are needed for fire control, electrically powered hold-open devices or swing-free closing devices should be used as appropriate.",selection,annotated +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_4,,,"If the thick of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds One of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater,synthetic +6a553c19-481f-4947-9047-fd2c4d0daa44,"Any floors, walls and doors that have been installed to allow the potential liftway to be used as storage or for other purposes could be easily removed without structural alteration.",{'ID': '83_UK_DocM_V1_AccessAndUseOfBuildings'},"Any floors, walls and doors that have been installed to allow the potential liftway to be used as storage or for other purposes could be easily removed without structural alteration.",necessity,annotated +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_0,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding 200 lux sanitary accommodation is EI 30; however, minor sealing parts and penetrations may be class E 15.",greater,synthetic +6a41a473-bd3c-4e38-a093-094b3fdae388_11,,,At least one in every 9 metres remaining damage must be provided with cable routes.,equal,synthetic +113b8bf8-1856-45f5-a54b-d65ef100b437_9,,,"If a gas-fired combination boiler is installed in an existing dwelling, at least 300 litres of the following facade area, appropriate to the system, should be installed.",greater-equal,synthetic +81f14fc1-af5d-45e8-8725-94d2510e4701,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",{'ID': '29_Finnish_Accessibility'},"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",part-of,annotated +7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88,The resilient layer should be to the full height of the door and 600mm either side of the doorset.,{'ID': '15_UK_DocQ_Security_Dwellings'},The resilient layer should be to the full height of the door and 600mm either side of the doorset.,part-of,annotated +a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",part-of,annotated +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_7,,,"Where the work concerns a building containing more than 55 degrees Celsius tears, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater-equal,synthetic +793cb939-b3d9-46eb-ae65-71a4d5c8031b_1,,,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be fire resistance time requirement to 20.,less-equal,synthetic +99a53f17-48cb-4012-a47b-700761e0983b_4,,,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) 0.7W/(m2K) of those ventilation space or gap must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,equal,synthetic +bfdf95da-d422-47cd-83d7-a30a4969f2e6_8,,,"If the internal ties must be centred on the supporting line, the minimum value of the luminous efficacy, 01:08:00, will also be applied to internal ties.",greater-equal,synthetic +c47598f9-df79-4d77-aba9-8f380342372f_0,,,extract air of effective rated output 0.7W/(m2K) shall be conducted to the outdoors through individual extract air ducts.,equal,synthetic +f009a781-0ced-408d-b3d1-6ae7a848012e,"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",{'ID': '31_Finnish_SafetyOfUse'},"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",none,annotated +8151be81-09ad-4dac-b2d2-f0d757915b6c,"However, when the snow load can occur, the minimum value of the load s should be at least 0.5 kN/m2.",{'ID': '110_Finnish_StabilityOfStructures'},"However, when the snow load can occur, the minimum value of the load s should be at least 0.5 kN/m2.",selection,annotated +da4d5959-6e64-4e04-a1f3-8b42b6addab0_9,,,The outdoor cost used in the calculations for buildings other than those in intended use categories 1 and 2 outside the occupancy period shall be at least 40 degrees Celsius.,greater-equal,synthetic +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_8,,,"Where the work concerns a building containing more than 1,200 MJ/m2 Fire, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater,synthetic +b63dcef6-1840-4e9e-ad51-f8fc481fe856_6,,,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the ending is not less than 25.",greater-equal,synthetic +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",selection,annotated +5ca184fa-e100-4f97-957d-e37ae944786f,The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,{'ID': '51_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,part-of,annotated +c236bc17-ef9a-4694-a34e-68a9f38ae405,"For a heat exchanger between a solar primary and secondary system, a minimum of 0.1m2 or equivalent of heat exchanger area should be provided for every 1m2 of the net absorber area of the solar collector.",{'ID': '323_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a heat exchanger between a solar primary and secondary system, a minimum of 0.1m2 or equivalent of heat exchanger area should be provided for every 1m2 of the net absorber area of the solar collector.",part-of,annotated +8101fa0e-645c-4a83-a6ab-66c45e94bf67,"If the dwelling already has mechanical ventilation, the centralised system could be extended into the additional room.",{'ID': '155_UK_DocF_V1_Ventilation'},"If the dwelling already has mechanical ventilation, the centralised system could be extended into the additional room.",selection,annotated +6414854d-01f9-481f-a7f4-c4581e48d8b1,Special safety features are not necessary if the ladder is not more than 6m long.,{'ID': '112_UK_DocK_ProtectionFromFalling'},Special safety features are not necessary if the ladder is not more than 6m long.,none,annotated +fb5d3054-4911-4049-ba09-1c3e80f9c07c,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",{'ID': '29_Finnish_SafetyOfUse'},"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",selection,annotated +3c6b438e-d99a-4c4d-aa19-0ec4f3f27662,"When installing controlled fittings, the controlled fitting should be well fitted and reasonably draught-proof.",{'ID': '162_UK_DocM_V2_AccessAndUseOfBuildings'},"When installing controlled fittings, the controlled fitting should be well fitted and reasonably draught-proof.",necessity,annotated +d0ef750b-078c-4e63-a57f-298674c06a5e,Moisture-resistant insulation should be fitted below damp-proof course level and extend to the foundation block/structure.,{'ID': '136_UK_DocL_V1_ConsrvationOfFuelAndPower'},Moisture-resistant insulation should be fitted below damp-proof course level and extend to the foundation block/structure.,selection,annotated +c3cfbf29-a95f-4453-a7de-a8f6e4ca2ea8,"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",{'ID': '152_Finnish_Health-WaterAndSewerage'},"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",necessity,annotated +46f5be2a-1514-420b-bc39-331fc6e0d2df_2,,,"The total supply air flow, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the Control, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,synthetic +a86b58e8-046f-44b7-8e1b-00c876c8c647,"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",{'ID': '30_Finnish_StabilityOfStructures'},"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",none,annotated +da4d5959-6e64-4e04-a1f3-8b42b6addab0,The outdoor air flow used in the calculations for buildings other than those in intended use categories 1 and 2 outside the occupancy period shall be at least 0.15 dm3/s per m2.,{'ID': '67_Finnish_EnergyEfficiency'},The outdoor air flow used in the calculations for buildings other than those in intended use categories 1 and 2 outside the occupancy period shall be at least 0.15 dm3/s per m2.,greater-equal,annotated +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_2,,,"Where the depth of installing only cable routes is more than 10 kN of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",greater,synthetic +5fa7daca-cb50-4397-a736-617e52d30187_11,,,"If service at below 30% are required and unavailable, the prevailing wind direction may be taken as equal to that at 30% load.",equal,synthetic +63af9f99-6939-4e8c-a6a9-8b10942e1597_0,,,"The handle to at least 0.15 raked auditoria in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",greater-equal,synthetic +e1f1aeb9-7453-4b6b-b3f1-6049d711868a,The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,{'ID': '156_Finnish_FireSafety'},The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,part-of,annotated +1913381b-a2cc-496e-9168-82ccf2a01d50,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",{'ID': '67_Finnish_Health-WaterAndSewerage'},"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",necessity,annotated +6cd271a0-e7d4-4853-868f-38e8b5012a95,"The approach route should be safe and convenient for everyone, including older and disabled people and some wheelchair users.",{'ID': '13_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be safe and convenient for everyone, including older and disabled people and some wheelchair users.",necessity,annotated +302c413e-fefd-47f1-914f-0dc787e4a761_4,,,"Where supports on surfaces is greater than EI 30, a difference in light reflectance value should be a minimum of 20 points.",greater,synthetic +783c19fa-0ef2-466f-b3e9-d4690e34ac5f,Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '214_UK_DocL_V1_ConsrvationOfFuelAndPower'},Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,necessity,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",none,annotated +d0ef750b-078c-4e63-a57f-298674c06a5e,Moisture-resistant insulation should be fitted below damp-proof course level and extend to the foundation block/structure.,{'ID': '136_UK_DocL_V1_ConsrvationOfFuelAndPower'},Moisture-resistant insulation should be fitted below damp-proof course level and extend to the foundation block/structure.,necessity,annotated +77be05f2-cd8c-4d35-85e4-6637b999d8e7_1,,,The constraints of the consequential improvement works should not be less than half a metre of the value of the principal works.,greater-equal,synthetic +e3b85ad6-6132-40d7-86f8-3cc5d44eb12c_11,,,two private curtilage should be close to an accessible bathroom suitable for a wheelchair user.,equal,synthetic +37f30855-f103-43f1-aef2-b37c05b4c174,Facilitating future connection to any local district heat networks should be considered (e.g. providing capped off connections in pipework to allow later connection to a local district heat network).,{'ID': '232_UK_DocL_V1_ConsrvationOfFuelAndPower'},Facilitating future connection to any local district heat networks should be considered (e.g. providing capped off connections in pipework to allow later connection to a local district heat network).,selection,annotated +5e7d4831-4ec8-48f9-9e60-0422fcc1eae4,"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",{'ID': '344_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",none,annotated +05864826-21ef-4ae7-9af8-2aaeffc7267a_5,,,Modular and portable buildings with a planned service life of more than two years but with an design value in a single location of less than 5m should be shown to comply with the energy efficiency requirements.,less,synthetic +66b3628a-f0ee-4bc7-93c8-2ae0145a2e78_9,,,"In a roof-lights with no openable residential buildings, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",not-part-of,synthetic +ec381965-2539-4bd6-9260-e667b4746a3a,To reduce the risks to the health of persons in buildings formaldehyde fumes given off by urea formaldehyde foams should not penetrate to occupied parts of buildings to an extent which would give rise to an irritant concentration.,{'ID': '4_UK_DocD_ToxicSubstances'},To reduce the risks to the health of persons in buildings formaldehyde fumes given off by urea formaldehyde foams should not penetrate to occupied parts of buildings to an extent which would give rise to an irritant concentration.,necessity,annotated +7f3f59a4-fc7e-4b14-8074-384f6cacf548,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",{'ID': '45_Finnish_SafetyOfUse'},"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",part-of,annotated +5b4380ba-0066-4735-a362-316d4c8e70b2,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",{'ID': '73_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",none,annotated +511c1a7f-08b9-48ec-aea6-9b749fdf31a1_9,,,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an 15 degrees of appropriately located wash rooms which are suitable for users of wheelchairs and walking frames with wheels.",equal,synthetic +45338082-ca66-418b-8fe1-8f2be926f330_1,,,A opening of no more than 20C may pass between the stair steps.,less-equal,synthetic +07565483-7508-43fc-b15e-82d95881e81e,"The average dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated using the same averaging methodology.",{'ID': '70_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The average dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated using the same averaging methodology.",selection,annotated +46ee0eda-086a-40ab-8e8f-bfa4c85abd49,"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",{'ID': '16_Finnish_SafetyOfUse'},"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",selection,annotated +1d18f0c9-31e5-43ee-8f16-e4fa607c5cd9,"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",{'ID': '51_UK_DocM_V2_AccessAndUseOfBuildings'},"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",selection,annotated +c2e0629d-350b-45b8-9e9e-d58be1780f12_5,,,"If the ramp has no heating systems, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",not-part-of,synthetic +01d924bf-4a69-4eb8-b05e-ce993aee3d45_9,,,Perimeter insulation should be continuous and have a minimum energy efficiency measures of two .,greater-equal,synthetic +333110c1-ba9e-4c1d-9249-6604f49ba09a,"The presence of doors, whether open or closed, should be apparent to visually impaired people through the careful choice of colour and material for the door and its surroundings.",{'ID': '91_UK_DocM_V2_AccessAndUseOfBuildings'},"The presence of doors, whether open or closed, should be apparent to visually impaired people through the careful choice of colour and material for the door and its surroundings.",selection,annotated +01008f69-874b-443e-bcb2-2f5630280049,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",{'ID': '24_Finnish_SafetyOfUse'},"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",none,annotated +66b3628a-f0ee-4bc7-93c8-2ae0145a2e78_7,,,"In a entrance with no openable text, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",not-part-of,synthetic +b4ae0bf1-8dec-4e43-b10b-4a593780d742,Partitioning doors in accommodation premises shall be equipped with closing devices.,{'ID': '121_Finnish_FireSafety'},Partitioning doors in accommodation premises shall be equipped with closing devices.,selection,annotated +7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88_2,,,The resilient layer should be to the full height of the door and 20 degrees Celsius Air permeability of the doorset.,equal,synthetic +46f5be2a-1514-420b-bc39-331fc6e0d2df_9,,,"The dwelling primary energy rate, dwelling emission rate and total air flow, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and ending, respectively.",less-equal,synthetic +05864826-21ef-4ae7-9af8-2aaeffc7267a_0,,,Modular and portable buildings with a planned impact of more than two but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,greater,synthetic +5ba5ffe7-ece8-488a-b461-da66237e7888,"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",{'ID': '54_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",part-of,annotated +3ca5cb38-b90b-4449-ba14-4268866df8e1_11,,,The water heater is close to the draw-off points and has a exposure coefficient no greater than 500kW.,less-equal,synthetic +d988e207-c3f9-4314-9a16-f99b334595f4_2,,,The location must be no less than Five ventilators.,greater-equal,synthetic +fa90c179-d32c-412b-a7d6-a515cc91dbdb,The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,{'ID': '86_Finnish_Health-Humidity'},The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,part-of,annotated +05fdde92-d8af-42ad-963b-9019c69a8ab3,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",{'ID': '163_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",selection,annotated +333d5feb-81a7-47b9-bc60-64d51e7845b0,The insulation should be reasonably continuous across newly built elements.,{'ID': '149_UK_DocM_V2_AccessAndUseOfBuildings'},The insulation should be reasonably continuous across newly built elements.,necessity,annotated +72e7ed0c-9e73-46b2-a919-20f3fea337fd,"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",{'ID': '56_Finnish_FireSafety'},"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",part-of,annotated +4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",selection,annotated +333110c1-ba9e-4c1d-9249-6604f49ba09a,"The presence of doors, whether open or closed, should be apparent to visually impaired people through the careful choice of colour and material for the door and its surroundings.",{'ID': '91_UK_DocM_V2_AccessAndUseOfBuildings'},"The presence of doors, whether open or closed, should be apparent to visually impaired people through the careful choice of colour and material for the door and its surroundings.",selection,annotated +493ec553-7761-4d1e-aa98-05d925ddf955,The opening of a horizontal hatch must be at least 600 x 600 millimetres.,{'ID': '84_Finnish_SafetyOfUse'},The opening of a horizontal hatch must be at least 600 x 600 millimetres.,part-of,annotated +2a256a9c-0b8a-4acf-87e1-86a5857f36a3_1,,,"Where a driveway forms all, or part of, the approach route, an fire and smoke-proof of at least 2.4m wide should be provided so that a wheelchair user can pass a parked car.",greater-equal,synthetic +fa8a6d84-eb99-490e-8169-3c65353fb553_7,,,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the drop shall be at least 900-1000mm.",greater-equal,synthetic +99a53f17-48cb-4012-a47b-700761e0983b,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,{'ID': '61_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,none,annotated +81f14fc1-af5d-45e8-8725-94d2510e4701_2,,,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a location of at least 100 in the hallway and kitchen.",greater-equal,synthetic +60024014-cb6a-4a53-9b12-9497e0a1e5e8_3,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for cold side 1 and 50 m if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic +5fa7daca-cb50-4397-a736-617e52d30187,"If efficiencies at below 30% are required and unavailable, the boiler efficiency may be taken as equal to that at 30% load.",{'ID': '246_UK_DocM_V2_AccessAndUseOfBuildings'},"If efficiencies at below 30% are required and unavailable, the boiler efficiency may be taken as equal to that at 30% load.",equal,annotated +e8340500-38b6-461b-b00d-d3aa44ac1f0b_3,,,The air tightness of the water available from the hot water system may not exceed 3.,less-equal,synthetic +fac44f87-4eb9-4f56-998c-74efa9512309,"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",{'ID': '106_Finnish_Health-Humidity'},"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",part-of,annotated +e3b85ad6-6132-40d7-86f8-3cc5d44eb12c_1,,,two years driveway should be close to an accessible bathroom suitable for a wheelchair user.,equal,synthetic +f5a71c7b-e852-40f2-8f88-91cda7902a7e_5,,,"If a new building has a space heating or airconditioning system with an cross fall greater than 1 in 40, a building automation and control system should be installed.",greater,synthetic +5ca6b3d3-fd21-4cc1-8dd8-185268db6615,The doorset should be manufactured from solid or laminated timber with a minimum density of 600kg/m3.,{'ID': '26_UK_DocQ_Security_Dwellings'},The doorset should be manufactured from solid or laminated timber with a minimum density of 600kg/m3.,selection,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",none,annotated +7e34700e-92de-4b00-a820-f4085a2e186c_8,,,"If the lengths between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than EI 15, the wall in question must be class EI 15.",less,synthetic +6e5e61dd-039d-4079-9c3f-f52fc12efefb,For continuing horizontal structures the loaded area shall be calculated span by span.,{'ID': '12_Finnish_StabilityOfStructures'},For continuing horizontal structures the loaded area shall be calculated span by span.,necessity,annotated +d5e2fb3e-df0c-48bd-8a09-734822ff086d,"For emergency repairs, if it is not possible to notify the building control body in advance, the building control body should be notified as soon as possible.",{'ID': '4_UK_DocF_V1_Ventilation'},"For emergency repairs, if it is not possible to notify the building control body in advance, the building control body should be notified as soon as possible.",necessity,annotated +0096a3bf-ac16-4a75-adf9-8c3f4a9b8610_1,,,The smaller sizes of each panel which can be either the width or height of the panel should be 50 m2 or less.,less-equal,synthetic +f6add908-4d45-4b3e-83a6-369f6c36c037_8,,,"Door rails, stiles and muntins should be at least proportion operation.",greater-equal,synthetic +a387fcb8-ead2-4094-9be9-72d783468b33,"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",{'ID': '422_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",none,annotated +45adb0b6-63ee-4f42-b6a3-8fc396221c67,The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,{'ID': '128_UK_DocL_V1_ConsrvationOfFuelAndPower'},The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,none,annotated +fb5d3054-4911-4049-ba09-1c3e80f9c07c_8,,,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the instantaneous carbon monoxide concentration may be no more than 30% load.",less-equal,synthetic +c952db0f-b605-4335-8d56-97fc339ad5ba_10,,,All 280mm Voids of the installation and commissioning checklist should be completed.,equal,synthetic +61016afd-5449-4b1a-8fe5-86705f07d817,Products to be used in the water system shall be suitable for conveying household water.,{'ID': '55_Finnish_Health-WaterAndSewerage'},Products to be used in the water system shall be suitable for conveying household water.,part-of,annotated +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_7,,,"Where the flow rate of installing only cable routes is more than 16/01/2023 00:00 of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",greater,synthetic +7e34700e-92de-4b00-a820-f4085a2e186c_8,,,"If the free gap between facing walls of adjacent glazed balconies or the design temperature difference of the wall to the window of an adjacent fire compartment is less than 2.2 metres, the wall in question must be class EI 15.",less,synthetic +0d5f23b0-8423-4528-95bd-179fe81c75df,A building and its environment must be lit in a way that enables safe use and servicing.,{'ID': '62_Finnish_SafetyOfUse'},A building and its environment must be lit in a way that enables safe use and servicing.,necessity,annotated +cf35d4a4-3170-421b-9be1-b68d928eed1d_1,,,"A roof with a stairs greater than 0.7 metres must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",greater,synthetic +825053cb-af5d-43a9-b59b-e2a5ae78ea73,The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,{'ID': '59_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,greater,annotated +06c2e0f7-69c8-47ec-bf31-9902ae9df7cf,"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",{'ID': '109_UK_DocK_ProtectionFromFalling'},"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",necessity,annotated +a235c68f-ae44-4770-b005-4e9d7b659eb7_6,,,"All cavity walls should have leaves at least 1,000 millimetres exposure coefficient and cavities at least 50mm wide.",greater-equal,synthetic +1ebce0c9-705c-47ee-8429-e83cfbed72db,"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",{'ID': '103_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",none,annotated +bed3cb74-fdd3-4888-80ab-b416d1b060ad,"For systems that have the ability to use free cooling or heat recovery, the SEER should be derived for the specific application, including free cooling or heat recovery elements.",{'ID': '282_UK_DocM_V2_AccessAndUseOfBuildings'},"For systems that have the ability to use free cooling or heat recovery, the SEER should be derived for the specific application, including free cooling or heat recovery elements.",necessity,annotated +8b1482fe-5e9d-4b44-9157-a8de35c65ba9,"If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise-attenuating background ventilator should be fitted.",{'ID': '86_UK_DocF_V1_Ventilation'},"If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise-attenuating background ventilator should be fitted.",selection,annotated +6414854d-01f9-481f-a7f4-c4581e48d8b1_1,,,Special safety features are not necessary if the fasteners is not more than 20 litres per second long.,less-equal,synthetic +45adb0b6-63ee-4f42-b6a3-8fc396221c67,The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,{'ID': '128_UK_DocL_V1_ConsrvationOfFuelAndPower'},The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,greater-equal,annotated +e32bbb47-c826-40c1-8ea4-8c32353d3fd2,There shall be adequate means of ventilation provided for people in the building.,{'ID': '15_UK_DocF_V1_Ventilation'},There shall be adequate means of ventilation provided for people in the building.,selection,annotated +5577528f-8fa0-4ca3-96f6-ea418091cb86,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,{'ID': '32_Finnish_SafetyOfUse'},The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,necessity,annotated +a922fe4e-30c9-4fef-a442-27459b959914,Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,{'ID': '82_Finnish_Health-WaterAndSewerage'},Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,none,annotated +4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",none,annotated +2ca092ec-4425-4552-a389-fd0dadfbd154_3,,,NOTE: A floor level with a surfaces of 20 degrees Celsius or steeper should be designed as a ramp.,greater-equal,synthetic +ac2db7e5-ea0b-4a14-9623-eba6300272a7,A new dwelling must be built to a minimum standard of total energy performance.,{'ID': '46_UK_DocL_V1_ConsrvationOfFuelAndPower'},A new dwelling must be built to a minimum standard of total energy performance.,selection,annotated +66249fda-33bf-4d93-8bf9-53fb82ad0e95,"The driveway and parking area at a plot or building site must be separated from pedestrian, play and recreation areas.",{'ID': '87_Finnish_SafetyOfUse'},"The driveway and parking area at a plot or building site must be separated from pedestrian, play and recreation areas.",necessity,annotated +ed2cca4a-50f7-470d-9752-dd8722385a24,"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",{'ID': '80_Finnish_SafetyOfUse'},"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",part-of,annotated +d504fd87-d13d-4936-9d7a-71d17954760d_2,,,The maintained of the steps in an exit may be no more than 50.,less-equal,synthetic +4094b859-b3b4-4035-94cd-8cf47ccbd801_0,,,The depth is at least 50.,greater-equal,synthetic +5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",none,annotated +89811586-c819-4eb5-99f5-c4fcefdb9520,Fixed or linked seats must be arranged as rows of seating with an access route on the side of the rows.,{'ID': '107_Finnish_SafetyOfUse'},Fixed or linked seats must be arranged as rows of seating with an access route on the side of the rows.,selection,annotated +992e8f11-81ac-4d2f-b7d1-60e46b4b7261,Wheelchair accessible dwellings must also provide both a level access shower and a bath.,{'ID': '108_UK_DocM_V1_AccessAndUseOfBuildings'},Wheelchair accessible dwellings must also provide both a level access shower and a bath.,selection,annotated +511c1a7f-08b9-48ec-aea6-9b749fdf31a1,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an adequate number of appropriately located toilet facilities which are suitable for users of wheelchairs and walking frames with wheels.",{'ID': '51_Finnish_Accessibility'},"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an adequate number of appropriately located toilet facilities which are suitable for users of wheelchairs and walking frames with wheels.",selection,annotated +fdd9e41e-20a5-4f5b-9dae-91653467c3ec,Multiple cooling units should be provided with controls that ensure that the combined plant operates in its most efficient modes.,{'ID': '275_UK_DocM_V2_AccessAndUseOfBuildings'},Multiple cooling units should be provided with controls that ensure that the combined plant operates in its most efficient modes.,selection,annotated +eeb4239f-3819-475c-ad20-756bed80c4ff_9,,,"In reference heat loss calculations, the value used as the one side of the buildings ventilation system shall be 20 degrees Celsius.",equal,synthetic +52de82bc-2c00-4500-81ec-a46781a8e4e7,Automatic control of input charge should be provided.,{'ID': '279_UK_DocL_V1_ConsrvationOfFuelAndPower'},Automatic control of input charge should be provided.,selection,annotated +a0c838b5-5fe2-4b52-abe1-432804c2c8aa_2,,,"A one-hour A-weighted equivalent continuous sound level of impulsive, narrow-band or low-frequency noise of 21 C shall be used as the steps for room temperature during the heating season.",equal,synthetic +d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",selection,annotated +ef4f54b6-1099-4404-9fa2-d0c0d5e55543_0,,,The Level differences must not exceed the individual dwellings heat emission capacity.,less-equal,synthetic +54da8684-242a-4a73-8ce5-ee908a038299,"Corridors and passageways should be wide enough to allow people with buggies, people carrying cases or people on crutches to pass others on the access route.",{'ID': '96_UK_DocM_V2_AccessAndUseOfBuildings'},"Corridors and passageways should be wide enough to allow people with buggies, people carrying cases or people on crutches to pass others on the access route.",necessity,annotated +74002ed3-548e-4e2f-8835-be76e643c67d,NOTE 2: Double doors effectively provide nibs where each leaf is at least 300mm wide.,{'ID': '51_UK_DocM_V1_AccessAndUseOfBuildings'},NOTE 2: Double doors effectively provide nibs where each leaf is at least 300mm wide.,greater-equal,annotated +7e369e4c-7768-4a7a-bd9c-41e2aa037b43,The air flows shall be designed so that the average carbon monoxide concentration in a parking garage for motor vehicles during the hour of use assessed as the most critical does not exceed 35 mg/m3 (30 ppm).,{'ID': '61_Finnish_Health-IndoorClimateAndVentilation'},The air flows shall be designed so that the average carbon monoxide concentration in a parking garage for motor vehicles during the hour of use assessed as the most critical does not exceed 35 mg/m3 (30 ppm).,none,annotated +baee716c-b8c2-4500-b4de-63fa11f007b1_4,,,A minimum of one in eight per cent of the remaining building control body must have access to cable routes.,equal,synthetic +b63dcef6-1840-4e9e-ad51-f8fc481fe856,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",{'ID': '36_UK_DocA_Structure'},"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",none,annotated +f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c_10,,,A building with a from the top and bottom corners of the door exceeding 1400mm must be equipped with anchoring structures for safety lines.,greater,synthetic +984c252b-74f4-4d85-9080-1c8ae1851eca_1,,,"If performance requires thicker glass to be used, an equivalent window unit with output (44mm) glazing should be shown to meet the required standard.",equal,synthetic +61016afd-5449-4b1a-8fe5-86705f07d817,Products to be used in the water system shall be suitable for conveying household water.,{'ID': '55_Finnish_Health-WaterAndSewerage'},Products to be used in the water system shall be suitable for conveying household water.,necessity,annotated +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",selection,annotated +5e7d4831-4ec8-48f9-9e60-0422fcc1eae4_8,,,"When replacing an existing system, the illuminance of the new system should be no less than capacity of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",greater-equal,synthetic +ec2e84a5-89bc-4c16-9a55-1965efd13981,"Wall insulation should be installed to the top of the wall plate; in some places, such as the eaves, this may be above the cavity closure or barrier.",{'ID': '167_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Wall insulation should be installed to the top of the wall plate; in some places, such as the eaves, this may be above the cavity closure or barrier.",part-of,annotated +20518e80-6f7e-457f-8c5a-59fa4c0eb324_7,,,"When calculating the heat loss for a buildings design solution, the part shall be used as the value of the measures for the building envelope.",equal,synthetic +7e34700e-92de-4b00-a820-f4085a2e186c_9,,,"If the free gap between facing walls of adjacent glazed balconies or the Signs of the wall to the window of an adjacent fire compartment is less than 400mm, the wall in question must be class EI 15.",less,synthetic +ae098b28-f01d-44df-b601-b7ac7631101d,"On stairs and ramps, a handrail must be installed for the entire length and on both sides of the structure.",{'ID': '54_Finnish_SafetyOfUse'},"On stairs and ramps, a handrail must be installed for the entire length and on both sides of the structure.",part-of,annotated +9f5fe460-cae1-4653-a951-38e31f3ed15d,"Any restrictors placed on windows used as emergency exits must, however, be easily releasable by an adult.",{'ID': '81_Finnish_SafetyOfUse'},"Any restrictors placed on windows used as emergency exits must, however, be easily releasable by an adult.",part-of,annotated +d6a2b6b7-57d2-449d-89f5-56d3df4755e2,Any radiator or towel rail should be clear of all access zones.,{'ID': '56_UK_DocM_V1_AccessAndUseOfBuildings'},Any radiator or towel rail should be clear of all access zones.,necessity,annotated +ca1e0369-2dfe-4cf2-8194-87f72ee5a633,"Vertical, horizontal and slinky ground arrays in particular should be flushed in both directions.",{'ID': '385_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Vertical, horizontal and slinky ground arrays in particular should be flushed in both directions.",selection,annotated +92db0f65-8f4f-45ea-9469-9033a7e4ea5e,The photographs should be made available to the energy assessor and the building control body.,{'ID': '478_UK_DocL_V1_ConsrvationOfFuelAndPower'},The photographs should be made available to the energy assessor and the building control body.,necessity,annotated +0ea1e862-2434-4fc8-97a2-b076c992ef20_8,,,"The U-value of an exit must be at least (16.66 8.33 V0.4)/(1000 24) and its free height must be at least 2,100 millimetres.",greater-equal,synthetic +baee716c-b8c2-4500-b4de-63fa11f007b1_1,,,A minimum of 13l/s in five of the remaining space heating systems must have access to cable routes.,greater-equal,synthetic +b8365796-12c1-47c1-9682-ff6131a75f21,"The various enduse categories, such as heating, lighting and cooling, should be submetered in such a way that at least 90 of the annual energy consumption of each fuel can be assigned to an enduse.",{'ID': '227_UK_DocM_V2_AccessAndUseOfBuildings'},"The various enduse categories, such as heating, lighting and cooling, should be submetered in such a way that at least 90 of the annual energy consumption of each fuel can be assigned to an enduse.",selection,annotated +7d877df3-9aa7-4dff-a64d-5356a66c944d_11,,,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a Extract exceeding 450mm and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",greater,synthetic +84cd76d7-e5d0-4f39-94bc-0236c65d533a_10,,,"in residential buildings of not more than two storeys, one exit of no less than 4 in heat emission capacity is permitted.",greater-equal,synthetic +825053cb-af5d-43a9-b59b-e2a5ae78ea73_1,,,The sections of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the glare and reflections of dwellings in the residential building; b. the number of associated parking spaces.,greater,synthetic +53e31e26-a39b-4047-a86e-bdb8021413e8,Window handles on windows that open outwards are not more than 650mm from the inside face of the wall when the window is at its maximum openable angle.,{'ID': '84_UK_DocO_Overheating'},Window handles on windows that open outwards are not more than 650mm from the inside face of the wall when the window is at its maximum openable angle.,part-of,annotated +75c60084-6878-472d-8694-e8739e0dd76c_5,,,The width of access routes in assembly areas with a output of 28 metres must be at least 900 millimetres.,equal,synthetic +49c6fd15-70a9-4733-8de8-8dd2fe49fe0a,"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",{'ID': '231_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",none,annotated +493ec553-7761-4d1e-aa98-05d925ddf955_6,,,The flushing of a horizontal hatch must be at least 1800mm.,greater-equal,synthetic +7d35f4c4-fa65-4d68-a974-f54386ca8aee_5,,,"However, a horizontal electrical output in a protective part must be no higher than 2,100 millimetres.",less-equal,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_8,,,Skirtings totalling up to 50mm total thickness and shallow projecting letter or casings above 21 C may be discounted when measuring clear width.,greater,synthetic +29232335-402c-4ed9-af74-fd093ac22e28_7,,,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least height 4.,greater-equal,synthetic +4a82f789-a98a-4379-9b81-2a20cfba6c87,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 70 kN, will also be applied to internal ties.",{'ID': '179_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 70 kN, will also be applied to internal ties.",selection,annotated +a8b3e54e-902c-4502-99a2-8c41d46f1416_5,,,"If there are more than three metres CO2 measurements in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",greater,synthetic +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_9,,,"Where the work concerns a building containing more than 44mm those, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater,synthetic +d099bcfd-6f29-4146-a72f-189db5e03dd4,"If waste water cannot be conveyed from the drainage points of a building with gravity unloading via a gradient sewer, the waste water shall be pumped.",{'ID': '128_Finnish_Health-WaterAndSewerage'},"If waste water cannot be conveyed from the drainage points of a building with gravity unloading via a gradient sewer, the waste water shall be pumped.",selection,annotated +45adb0b6-63ee-4f42-b6a3-8fc396221c67,The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,{'ID': '128_UK_DocL_V1_ConsrvationOfFuelAndPower'},The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,none,annotated +0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,none,annotated +72d7716f-7e3e-442c-9e42-14d4b19e18e3_9,,,A thermal elements that is being connected to a new building should not have a heat emission capacity for delivered heat to the building which is greater than 0.350kgCO2/kWh.,not-part-of,synthetic +baee716c-b8c2-4500-b4de-63fa11f007b1,A minimum of one in five of the remaining parking spaces must have access to cable routes.,{'ID': '83_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},A minimum of one in five of the remaining parking spaces must have access to cable routes.,greater-equal,annotated +b4754f3a-0a30-40fd-9f90-2e3d9e30d2a6,Fixed building services must be commissioned to ensure that they use no more fuel and power than is reasonable in the circumstances.,{'ID': '371_UK_DocL_V1_ConsrvationOfFuelAndPower'},Fixed building services must be commissioned to ensure that they use no more fuel and power than is reasonable in the circumstances.,necessity,annotated +9b329413-b6d6-4953-9b34-c82d3a2e9c44,"Before a new heating appliance is installed, all central heating and primary hot water circuits should be thoroughly cleaned and flushed out.",{'ID': '216_UK_DocM_V2_AccessAndUseOfBuildings'},"Before a new heating appliance is installed, all central heating and primary hot water circuits should be thoroughly cleaned and flushed out.",none,annotated +8207751f-13b8-4fe3-9bfe-4423093d4905,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,{'ID': '26_Finnish_AcousticEnvironment'},A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,part-of,annotated +389c960b-525d-4f2e-9a2c-1805eb2dc20d_2,,,The full total floor area under a stair that forms part of the storage provision should be counted as 200 Watts per room.,equal,synthetic +9d522aad-d404-4a57-83f9-474c95932b9e,Handrails should be spaced away from the wall and rigidly supported in a way that avoids impeding finger grip.,{'ID': '57_UK_DocM_V2_AccessAndUseOfBuildings'},Handrails should be spaced away from the wall and rigidly supported in a way that avoids impeding finger grip.,necessity,annotated +0ea1e862-2434-4fc8-97a2-b076c992ef20_9,,,"The width of an exit must be at least 1,200 millimetres and its free locations must be at least 0.5 kN/m2.",greater-equal,synthetic +85745724-aa09-4cdd-ad17-3c50ea2b99a1,"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",{'ID': '105_UK_DocM_V1_AccessAndUseOfBuildings'},"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",none,annotated +6465e5b9-4c10-41ec-9839-3e7cb7114911,Programmable room thermostats with an override feature should be provided for all direct electric zones of the electric underfloor heating system.,{'ID': '314_UK_DocL_V1_ConsrvationOfFuelAndPower'},Programmable room thermostats with an override feature should be provided for all direct electric zones of the electric underfloor heating system.,selection,annotated +a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",selection,annotated +569c7958-b7d6-4b9c-9dd9-13307e95e59b_2,,,"For ducted systems that are served by fans with a total useful floor area greater than 200 Watts per room, ductwork leakage tests should be carried out.",greater,synthetic +5ca184fa-e100-4f97-957d-e37ae944786f,The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,{'ID': '51_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,none,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479_1,,,Individual flights are: for level difference up to 6mm not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic +d796dece-45f6-4527-a151-c59b007e9028,"A safe and marked access route must be reserved for pedestrians in connection with vehicle traffic and goods transport routes, doors and gates in the yards of buildings other than single-family houses, if pedestrian traffic through them is necessary.",{'ID': '132_Finnish_SafetyOfUse'},"A safe and marked access route must be reserved for pedestrians in connection with vehicle traffic and goods transport routes, doors and gates in the yards of buildings other than single-family houses, if pedestrian traffic through them is necessary.",selection,annotated +64695439-3458-4d43-8e7b-a2ba75075cea,"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",{'ID': '124_Finnish_SafetyOfUse'},"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",necessity,annotated +7aceb502-0ee4-49d6-b9b1-0bed9d77d3fd,Combustion appliances must operate safely whether or not fans are running.,{'ID': '11_UK_DocF_V1_Ventilation'},Combustion appliances must operate safely whether or not fans are running.,necessity,annotated +a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",none,annotated +ed2cca4a-50f7-470d-9752-dd8722385a24,"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",{'ID': '80_Finnish_SafetyOfUse'},"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",none,annotated +aa41a5d4-c0b1-4da7-84a0-5c2e2738654f,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,{'ID': '89_UK_DocF_V1_Ventilation'},The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,part-of,annotated +389c960b-525d-4f2e-9a2c-1805eb2dc20d_11,,,The full power input from controls under a stair that forms part of the storage provision should be counted as Five ventilators.,equal,synthetic +cccbc1ea-27be-4d7b-b53c-3cb467a51020,"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",{'ID': '220_UK_DocM_V2_AccessAndUseOfBuildings'},"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",necessity,annotated +ef4f54b6-1099-4404-9fa2-d0c0d5e55543_3,,,The travel must not exceed the individual dwellings control function.,less-equal,synthetic +f3bd99b4-7ea5-4968-af10-3c133c0b5aa0_6,,,No individual flight has a depth of more than 0.3W/m2.,less-equal,synthetic +2c8d2bc3-cf23-48f8-b9c0-b90f150f9f93,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing building.",{'ID': '426_UK_DocM_V2_AccessAndUseOfBuildings'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing building.",necessity,annotated +54907849-c48f-4267-b5f0-fc7e9279da7c,"For existing dwellings, when carrying out work on an existing system, such as installing or replacing components (e.g. replacing a boiler but retaining the pipework and heat emitters), the energy performance of the new components should be assessed.",{'ID': '409_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when carrying out work on an existing system, such as installing or replacing components (e.g. replacing a boiler but retaining the pipework and heat emitters), the energy performance of the new components should be assessed.",selection,annotated +09b2a395-5293-4b7d-82d4-5312482d59e9_4,,,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 600mm means from any projecting corner.",greater-equal,synthetic +8efb6108-e49e-4d64-a1e4-22e3f9128b17_2,,,"When calculating the reference heat loss of a building, the value of 90mm shall be used as the installed generation capacity for the air leakage rate figure for the building envelope.",equal,synthetic +3153d771-404e-4a54-ac05-ed1b75e37506_10,,,"Gangways should not be less than 25mm total flow rate unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",greater-equal,synthetic +fa8a6d84-eb99-490e-8169-3c65353fb553,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",{'ID': '61_Finnish_StabilityOfStructures'},"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",part-of,annotated +a0c838b5-5fe2-4b52-abe1-432804c2c8aa,A temperature of 21 C shall be used as the design value for room temperature during the heating season.,{'ID': '33_Finnish_Health-IndoorClimateAndVentilation'},A temperature of 21 C shall be used as the design value for room temperature during the heating season.,equal,annotated +2ff58135-b89d-40d1-a145-51aad9e5a942_5,,,"The landing in front of the outside door shall be at least 18 dm3/s design value and at least 1,500 millimetres long.",greater-equal,synthetic +78d904cd-b605-43a6-b3a4-34c22f557123,"Instead, the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",{'ID': '84_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Instead, the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",selection,annotated +7d552257-2212-4139-8d13-b982e0e7744f,"It would be beneficial if entrance doors to wheelchair-accessible bedrooms were powered opening, as this could avoid the need for the 300mm access space adjacent to the leading edge of the door.",{'ID': '143_UK_DocM_V2_AccessAndUseOfBuildings'},"It would be beneficial if entrance doors to wheelchair-accessible bedrooms were powered opening, as this could avoid the need for the 300mm access space adjacent to the leading edge of the door.",selection,annotated +12e545d1-64f4-45c9-a520-5b8a003eba0a_6,,,"If the dwelling has more than 20 degrees Celsius exposed bedroom, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",greater,synthetic +60024014-cb6a-4a53-9b12-9497e0a1e5e8_2,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total combined window area from these spaces does not exceed 14 metres of the total air flow in the vertical duct.",less-equal,synthetic +f4b90866-b477-4fe0-a96f-3d6e0d1bd2f6,The annual percentage of heat supplied from each heat source should be the same for each newly connected dwelling.,{'ID': '79_UK_DocL_V1_ConsrvationOfFuelAndPower'},The annual percentage of heat supplied from each heat source should be the same for each newly connected dwelling.,selection,annotated +405a2082-beb9-4c5f-bc9f-d688b72e723b,Intermediate floors: floor-to-wall junctions should be detailed to ensure that insulation in the external wall is continuous.,{'ID': '162_UK_DocL_V1_ConsrvationOfFuelAndPower'},Intermediate floors: floor-to-wall junctions should be detailed to ensure that insulation in the external wall is continuous.,none,annotated +86350df0-a40e-412b-a301-004524d56736,"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",selection,annotated +fb1da22f-8ddb-4399-b441-64dca68da9af_2,,,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than two calculations.",greater-equal,synthetic +48133b44-eac2-44e2-b2df-c52243e9f7ea,"NOTE: For example, if the total system output is made up of three equally sized boilers, at 15% of system output the lead boiler will be operating at 45% of its rated output with the other two boilers switched off.",{'ID': '244_UK_DocM_V2_AccessAndUseOfBuildings'},"NOTE: For example, if the total system output is made up of three equally sized boilers, at 15% of system output the lead boiler will be operating at 45% of its rated output with the other two boilers switched off.",none,annotated +01008f69-874b-443e-bcb2-2f5630280049,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",{'ID': '24_Finnish_SafetyOfUse'},"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",part-of,annotated +bf798097-bb99-42d0-a73f-8cebab8fbeb8,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.",{'ID': '21_Finnish_SafetyOfUse'},"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.",part-of,annotated +53bb982d-5260-4a69-a6dd-71e4f074e676_10,,,The total floor area of standing rows must be at least 1.,greater-equal,synthetic +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_5,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the widened of these must be at least 15mm.",greater-equal,synthetic +8a692fe7-08ed-4b90-8b13-7ce2e29d37a2,"During this process, the heat pump (along with its accompanying pipework) should be isolated from the ground heat exchanger such that damage to the internal heat exchanger inside the heat pump is avoided.",{'ID': '386_UK_DocL_V1_ConsrvationOfFuelAndPower'},"During this process, the heat pump (along with its accompanying pipework) should be isolated from the ground heat exchanger such that damage to the internal heat exchanger inside the heat pump is avoided.",necessity,annotated +1de9d3e5-dee3-42c9-b929-80b7936f1642,The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,{'ID': '33_Finnish_Accessibility'},The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,selection,annotated +20609d43-016e-4314-9620-256f73f1c6ed,"The general ventilation rate for a new conservatory and, if necessary, adjoining rooms could be achieved using background ventilators.",{'ID': '160_UK_DocF_V1_Ventilation'},"The general ventilation rate for a new conservatory and, if necessary, adjoining rooms could be achieved using background ventilators.",necessity,annotated +3c801d84-c59d-48ef-95b9-f711d22061d4,"The compartment should be fitted with support rails, and include a minimum activity space to accommodate people who use crutches, or otherwise have impaired leg movements.",{'ID': '167_UK_DocM_V2_AccessAndUseOfBuildings'},"The compartment should be fitted with support rails, and include a minimum activity space to accommodate people who use crutches, or otherwise have impaired leg movements.",necessity,annotated +c2e0629d-350b-45b8-9e9e-d58be1780f12_10,,,"If the landings has no Roofs, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",not-part-of,synthetic +2f8d4247-e53b-49ae-bd26-c4f1765eaee8_9,,,"Extract air of full width 6m, 3 and 4 shall not be used as recirculation air.",equal,synthetic +7e34700e-92de-4b00-a820-f4085a2e186c_9,,,"If the construction between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 7 mg/m3 (6 ppm), the wall in question must be class EI 15.",less,synthetic +9dd2a0f1-0ff9-4416-8abd-1e6589980ff4,"If the cross-sectional area of a mechanical ventilation systems air duct is designed to be greater than 0.06 m2, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",{'ID': '100_Finnish_Health-IndoorClimateAndVentilation'},"If the cross-sectional area of a mechanical ventilation systems air duct is designed to be greater than 0.06 m2, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",selection,annotated +d504fd87-d13d-4936-9d7a-71d17954760d_11,,,The continuity of the steps in an exit may be no more than 30.,less-equal,synthetic +f5a71c7b-e852-40f2-8f88-91cda7902a7e,"If a new building has a space heating or airconditioning system with an effective rated output greater than 180kW, a building automation and control system should be installed.",{'ID': '319_UK_DocM_V2_AccessAndUseOfBuildings'},"If a new building has a space heating or airconditioning system with an effective rated output greater than 180kW, a building automation and control system should be installed.",selection,annotated +7c74b365-6fdd-494d-9675-3ae036c55348,Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,{'ID': '82_Finnish_SafetyOfUse'},Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,selection,annotated +81314489-dcd9-410f-9b15-595b87e7c8f9_9,,,"The resilient layer should be timber sheathing at least 20C cost, expanded metal or a similar resilient material.",greater-equal,synthetic +6414854d-01f9-481f-a7f4-c4581e48d8b1_5,,,Special safety features are not necessary if the Duct is not more than 200 Watts per room long.,less-equal,synthetic +716fa732-f3c7-43ad-a4e3-fff43a841018,The vehicle traffic area of a building and its courtyard must be safe and appropriate.,{'ID': '131_Finnish_SafetyOfUse'},The vehicle traffic area of a building and its courtyard must be safe and appropriate.,none,annotated +4a82f789-a98a-4379-9b81-2a20cfba6c87,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 70 kN, will also be applied to internal ties.",{'ID': '179_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 70 kN, will also be applied to internal ties.",necessity,annotated +7e34700e-92de-4b00-a820-f4085a2e186c,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be class EI 15.",{'ID': '135_Finnish_FireSafety'},"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be class EI 15.",equal,annotated +d04d6702-5170-4b50-9bda-7367a24e9322,"NOTE: The network distribution point could be in a cabinet, a box mounted on a wall or on a telegraph pole.",{'ID': '5_UK_DocR_V1_InfrastructureForElectircalCommunications'},"NOTE: The network distribution point could be in a cabinet, a box mounted on a wall or on a telegraph pole.",none,annotated +7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8_2,,,"For sizes of cylinder not listed, the sewer from the cylinder should not exceed 3.3m, where V is the volume in litres.",less-equal,synthetic +4a82f789-a98a-4379-9b81-2a20cfba6c87_7,,,"If the internal ties must be centred on the supporting line, the minimum value of the span, 2 metres, will also be applied to internal ties.",greater-equal,synthetic +316c89ee-aa42-4e7a-9372-960cf25b3265,Extract ventilation may be by natural means or by mechanical means (e.g. by an extract fan or acentral system).,{'ID': '105_UK_DocF_V2_Ventilation'},Extract ventilation may be by natural means or by mechanical means (e.g. by an extract fan or acentral system).,selection,annotated +a922fe4e-30c9-4fef-a442-27459b959914,Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,{'ID': '82_Finnish_Health-WaterAndSewerage'},Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,selection,annotated +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_8,,,"Where the Geo-location of installing only cable routes is more than 15mm of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",greater,synthetic +19478a13-7457-4dd3-a394-744f826db7b0,"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",{'ID': '127_UK_DocM_V1_AccessAndUseOfBuildings'},"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",part-of,annotated +5ca184fa-e100-4f97-957d-e37ae944786f,The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,{'ID': '51_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,none,annotated +8421f806-70f2-46a9-a308-90a40da3541d_8,,,"Where the that of the approach, whether over its whole length or in part, is 190 kN or steeper, that part of the approach should be designed as ramped access.",greater-equal,synthetic +a86b58e8-046f-44b7-8e1b-00c876c8c647,"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",{'ID': '30_Finnish_StabilityOfStructures'},"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",part-of,annotated +fb5d3054-4911-4049-ba09-1c3e80f9c07c_11,,,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the performance may be no more than 150mm.",less-equal,synthetic +09b2a395-5293-4b7d-82d4-5312482d59e9,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",{'ID': '46_UK_DocM_V1_AccessAndUseOfBuildings'},"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",none,annotated +a387fcb8-ead2-4094-9be9-72d783468b33,"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",{'ID': '422_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",greater,annotated +ed2cca4a-50f7-470d-9752-dd8722385a24,"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",{'ID': '80_Finnish_SafetyOfUse'},"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",necessity,annotated +01d924bf-4a69-4eb8-b05e-ce993aee3d45_6,,,"Perimeter insulation should be continuous and have a minimum thresholds of 1,000 millimetres.",greater-equal,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_8,,,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or Hot water pipework above 56 metres may be discounted when measuring clear width.,greater,synthetic +eeb4239f-3819-475c-ad20-756bed80c4ff_3,,,"In reference heat loss calculations, the value used as the Control of the buildings ventilation system shall be 1100mm.",equal,synthetic +20518e80-6f7e-457f-8c5a-59fa4c0eb324_6,,,"When calculating the heat loss for a buildings design solution, the sum total shall be used as the value of the atmosphere for the building envelope.",equal,synthetic +ff3e8f86-1542-4f54-a776-cfdc8482bad7_7,,,The number of appliances of an air conditioner working in cooling mode should be a minimum of 50mm.,greater-equal,synthetic +05864826-21ef-4ae7-9af8-2aaeffc7267a_4,,,Modular and portable buildings with a planned service life of more than two years but with an air leakage rate figure in a single location of less than 600kg/m3 should be shown to comply with the energy efficiency requirements.,less,synthetic +d0b6759e-deec-451d-bd7a-ec65b96048be_6,,,"extract air of atmosphere 300mm shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",equal,synthetic +dd056285-1aa4-4c6d-94ac-b911458cb7ea,"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",{'ID': '70_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",none,annotated +92f99822-6896-4ade-abbe-7598f8225b9e,"The information should be provided in a clear manner, for a non-technical audience.",{'ID': '93_UK_DocO_Overheating'},"The information should be provided in a clear manner, for a non-technical audience.",selection,annotated +86831830-e7f0-4b90-aa27-dc0542b7ba4d_8,,,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least two intended time of use.",greater-equal,synthetic +f06f7ec1-3b83-4e1a-a421-b09589f2374c,"Provision shall be made to prevent any door or gate: (a) which slides or opens upwards, from falling onto any person; and (b) which is powered, from trapping any person.",{'ID': '114_UK_DocK_ProtectionFromFalling'},"Provision shall be made to prevent any door or gate: (a) which slides or opens upwards, from falling onto any person; and (b) which is powered, from trapping any person.",selection,annotated +d0b6759e-deec-451d-bd7a-ec65b96048be_8,,,"extract air of standards 55 shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",equal,synthetic +457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",none,annotated +549fd984-e319-47d9-9a86-4ea7f4cbf508,The space between the air barrier and the insulation layer should be filled with solid material.,{'ID': '191_UK_DocL_V1_ConsrvationOfFuelAndPower'},The space between the air barrier and the insulation layer should be filled with solid material.,necessity,annotated +26980508-105c-49db-8595-bf001a48d757_8,,,"In tiered terraces with no fixed Stairs or furnishings, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic +6075de3c-d339-4ba4-9945-990480975615_1,,,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than 50mm balcony of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",greater-equal,synthetic +a387fcb8-ead2-4094-9be9-72d783468b33_0,,,"If the combined dead,imposed and wind loads of windows, roof windows, rooflights and doors exceeds 600mm of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",greater,synthetic +9f5fe460-cae1-4653-a951-38e31f3ed15d,"Any restrictors placed on windows used as emergency exits must, however, be easily releasable by an adult.",{'ID': '81_Finnish_SafetyOfUse'},"Any restrictors placed on windows used as emergency exits must, however, be easily releasable by an adult.",none,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8_1,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extends 200 m2 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic +cb522b91-f26f-460e-adee-1a7f59ba10c9,"For heat pump installations in which there are other heat sources available to the same building, each of these heat sources should be appropriately incorporated into a singular control system.",{'ID': '315_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heat pump installations in which there are other heat sources available to the same building, each of these heat sources should be appropriately incorporated into a singular control system.",none,annotated +67657794-a272-4ab2-9b19-df29e9d24844,Ground floors and external walls: the wall-to-floor junctions should be detailed to achieve continuity of insulation.,{'ID': '160_UK_DocL_V1_ConsrvationOfFuelAndPower'},Ground floors and external walls: the wall-to-floor junctions should be detailed to achieve continuity of insulation.,selection,annotated +6a41a473-bd3c-4e38-a093-094b3fdae388,At least one in every five remaining parking spaces must be provided with cable routes.,{'ID': '68_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},At least one in every five remaining parking spaces must be provided with cable routes.,equal,annotated +d5cb0429-ffef-43c5-9789-a3611c04446a,"The supports and fastening points of water pipes shall be such that neither heat expansion nor forces generated by water flow cause the pipes to shift, loosen, break or make disturbing noises.",{'ID': '89_Finnish_Health-WaterAndSewerage'},"The supports and fastening points of water pipes shall be such that neither heat expansion nor forces generated by water flow cause the pipes to shift, loosen, break or make disturbing noises.",part-of,annotated +569c7958-b7d6-4b9c-9dd9-13307e95e59b_1,,,"For ducted systems that are served by fans with a energy efficiency greater than 25mm, ductwork leakage tests should be carried out.",greater,synthetic +8e8f4fb5-00b5-404f-89df-a07287984748_0,,,"In buildings with a building primary energy rate greater than 300 millimetres, automatic meter reading and data collection facilities should be installed.",greater,synthetic +60024014-cb6a-4a53-9b12-9497e0a1e5e8_10,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for floor plate areas 1 and 280mm if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic +5ebe90af-93ee-4d92-96fd-44b674d5e1a5,Systems should be designed so that they can be commissioned to suitable ventilation rates so that spaces are not significantly over-ventilated.,{'ID': '335_UK_DocL_V1_ConsrvationOfFuelAndPower'},Systems should be designed so that they can be commissioned to suitable ventilation rates so that spaces are not significantly over-ventilated.,selection,annotated +fa8a6d84-eb99-490e-8169-3c65353fb553_8,,,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the internal temperature shall be at least 190 kN.",greater-equal,synthetic +203faa23-7b71-47c9-a6e5-2333ac45389e_10,,,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the inner surfaces must be no less than 500kW.",greater-equal,synthetic +31d635b2-1d32-49dd-a848-5b5acaf50128,"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",{'ID': '407_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",none,annotated +01008f69-874b-443e-bcb2-2f5630280049,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",{'ID': '24_Finnish_SafetyOfUse'},"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",part-of,annotated +77f993c6-dff1-4f9a-8f66-73221d3cbaff_5,,,"If the dwelling only has one habitable room, a minimum vicinity of 15mm should be used.",greater-equal,synthetic +d728a9c8-0302-4bd1-b69b-0daeefce30d1,"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",{'ID': '84_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",necessity,annotated +c0a6d35c-cc20-428b-941d-c3e3e6365c74_10,,,"In a tier that is uninterrupted by cross-gangways, and where the widened exceeds 500kW, use a maximum number of steps of 40.",greater,synthetic +43e26628-8b62-4cc6-91e2-284335df1564_5,,,"In rooms used for sleeping or rest, the feasibility of installing high-efficiency alternative systems may not exceed 40 degrees Celsius.",less-equal,synthetic +4e8c5c50-44af-48f6-b959-e6f9b31afa1e_9,,,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical electric vehicle charge point may be boiler.",equal,synthetic +89811586-c819-4eb5-99f5-c4fcefdb9520,Fixed or linked seats must be arranged as rows of seating with an access route on the side of the rows.,{'ID': '107_Finnish_SafetyOfUse'},Fixed or linked seats must be arranged as rows of seating with an access route on the side of the rows.,necessity,annotated +993e54cc-49c3-43cb-995e-1a951c93c775,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an axle group load equal to 190 kN.",{'ID': '25_Finnish_StabilityOfStructures'},"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an axle group load equal to 190 kN.",necessity,annotated +fac44f87-4eb9-4f56-998c-74efa9512309,"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",{'ID': '106_Finnish_Health-Humidity'},"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",necessity,annotated +3724fd47-22f7-432c-81a2-1abcb95c7df2_8,,,"The opening angle installed in a dwellings habitable rooms and kitchens should be no fewer than 100mm, except in one bedroom properties, where there should be no fewer than four.",greater-equal,synthetic +e43c1e88-be80-42d9-944e-1bf0f0f82479_2,,,Individual flights are: for free gap up to 40 not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic +d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",part-of,annotated +3724fd47-22f7-432c-81a2-1abcb95c7df2_5,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom Drains, where there should be no fewer than E 15.",greater-equal,synthetic +37f01a2c-b944-45a2-a7f4-140d8c03d7ac_9,,,"After rebating, frame components should retain at least 0.055555556 of volume systems.",greater-equal,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_3,,,Skirtings totalling up to 1800mm total cost and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,less-equal,synthetic +457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",none,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",part-of,annotated +0096a3bf-ac16-4a75-adf9-8c3f4a9b8610_11,,,The smaller presence of each panel which can be either the width or height of the panel should be B or less.,less-equal,synthetic +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated +703e5c71-bd54-4267-acf4-fa7db1e70d49,"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",{'ID': '67_Finnish_Accessibility'},"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",part-of,annotated +a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",necessity,annotated +2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_9,,,The normal relationship between the dimension of the rise and going is: five equals between 550mm and 700mm.,equal,synthetic +a922fe4e-30c9-4fef-a442-27459b959914,Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,{'ID': '82_Finnish_Health-WaterAndSewerage'},Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,selection,annotated +636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4_4,,,"Where a new building contains more than 900-1000mm supply terminals, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",greater,synthetic +a387fcb8-ead2-4094-9be9-72d783468b33_2,,,"If the quality of the installation of windows, roof windows, rooflights and doors exceeds 1,200 MJ/m2 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",greater,synthetic +76acc6bd-50c0-4f3f-b015-42e171ec6ce7_11,,,16/01/2023 00:00 cases must be installed.,equal,synthetic +8101fa0e-645c-4a83-a6ab-66c45e94bf67,"If the dwelling already has mechanical ventilation, the centralised system could be extended into the additional room.",{'ID': '155_UK_DocF_V1_Ventilation'},"If the dwelling already has mechanical ventilation, the centralised system could be extended into the additional room.",none,annotated +19478a13-7457-4dd3-a394-744f826db7b0,"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",{'ID': '127_UK_DocM_V1_AccessAndUseOfBuildings'},"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",none,annotated +4fc3b5b1-a838-4429-b385-d8e80e6633eb,"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",none,annotated +bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,selection,annotated +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",selection,annotated +302c413e-fefd-47f1-914f-0dc787e4a761_8,,,"Where reverberation time on surfaces is greater than 4, a difference in light reflectance value should be a minimum of 20 points.",greater,synthetic +7d877df3-9aa7-4dff-a64d-5356a66c944d_2,,,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a protection exceeding 40 degrees Celsius and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",greater,synthetic +45adb0b6-63ee-4f42-b6a3-8fc396221c67_1,,,The rated output of the insulation plus any required air gap should be at least to the luminous efficacy of the rafters.,greater-equal,synthetic +75c60084-6878-472d-8694-e8739e0dd76c_10,,,The access of access routes in assembly areas with a maximum capacity of 60 persons must be at least 3.3m.,greater-equal,synthetic +2f0f22aa-06d3-478d-a777-5aca5c2fb5c1,"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",{'ID': '120_UK_DocK_ProtectionFromFalling'},"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",selection,annotated +3e9fc57e-bc69-4f17-a056-dd7767afa9bb,"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",{'ID': '241_Finnish_FireSafety'},"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",less-equal,annotated +e874f337-2067-4e77-ad32-c3b857f40e7a_5,,,"If the extends exceeds 1m3/s, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",greater,synthetic +12e1a42b-38ed-42c8-ac32-86091fcb85b1,The frequency of measurements should be sufficient to ensure that changes in the use of the room or space throughout the day are represented in the readings.,{'ID': '125_UK_DocF_V2_Ventilation'},The frequency of measurements should be sufficient to ensure that changes in the use of the room or space throughout the day are represented in the readings.,necessity,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_4,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the mechanical ventilation of these must be at least 270 millimetres.",greater-equal,synthetic +23cff3c3-1251-4c5f-9fd9-8f52d25eb494,Gasfired boilers and multi-stage oilfired boilers with an output of more than 500kW should have fully modulating burner controls.,{'ID': '252_UK_DocM_V2_AccessAndUseOfBuildings'},Gasfired boilers and multi-stage oilfired boilers with an output of more than 500kW should have fully modulating burner controls.,necessity,annotated +825053cb-af5d-43a9-b59b-e2a5ae78ea73_4,,,The ventilation rate of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the energy efficiency measures of associated parking spaces.,greater,synthetic +86831830-e7f0-4b90-aa27-dc0542b7ba4d_2,,,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least 90 number of storeys.",greater-equal,synthetic +70cd7164-bc50-4b16-95b0-432188db4ea5,Buildings located near to significant local pollution sources should be designed to minimise the intake of external air pollutants.,{'ID': '80_UK_DocO_Overheating'},Buildings located near to significant local pollution sources should be designed to minimise the intake of external air pollutants.,selection,annotated +493ec553-7761-4d1e-aa98-05d925ddf955_5,,,The maximum number of occupants of a horizontal hatch must be at least 190 kN.,greater-equal,synthetic +5fa7daca-cb50-4397-a736-617e52d30187,"If efficiencies at below 30% are required and unavailable, the boiler efficiency may be taken as equal to that at 30% load.",{'ID': '246_UK_DocM_V2_AccessAndUseOfBuildings'},"If efficiencies at below 30% are required and unavailable, the boiler efficiency may be taken as equal to that at 30% load.",equal,annotated +29ad081e-90f4-4eb0-9cea-a4f49beea768,Fans used for general air distribution that are rated at more than 1100W should be fitted with variable speed drives.,{'ID': '298_UK_DocM_V2_AccessAndUseOfBuildings'},Fans used for general air distribution that are rated at more than 1100W should be fitted with variable speed drives.,selection,annotated +56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3,"Storage premises with a fire load exceeding 1,200 MJ/m2 are not permitted within the building.",{'ID': '73_Finnish_FireSafety'},"Storage premises with a fire load exceeding 1,200 MJ/m2 are not permitted within the building.",greater,annotated +1603fe12-9df6-4ab9-acbe-44895cccb7ed,Any looped cords must be fitted with child safety devices.,{'ID': '87_UK_DocO_Overheating'},Any looped cords must be fitted with child safety devices.,necessity,annotated +3c6b438e-d99a-4c4d-aa19-0ec4f3f27662,"When installing controlled fittings, the controlled fitting should be well fitted and reasonably draught-proof.",{'ID': '162_UK_DocM_V2_AccessAndUseOfBuildings'},"When installing controlled fittings, the controlled fitting should be well fitted and reasonably draught-proof.",necessity,annotated +86350df0-a40e-412b-a301-004524d56736_7,,,"For wet heating systems in new dwellings with a specification of One or greater, a minimum of two independently controlled heating circuits should be provided.",greater-equal,synthetic +d0927095-9e43-4ce4-a740-d5df69dc1dc3_3,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under shape 1100mm.",equal,synthetic +d925c189-860a-4fcb-ae88-d1cf8cc14fb8_1,,,"The total cost of steps in covered or heated outdoor staircases must be no less than 200 lux, and the riser may be no more than 160 millimetres.",greater-equal,synthetic +d5e04f9c-3e74-4ade-8a8c-07b77efd3fd1,"For windows and roof windows, U-values should be calculated based on a vertical position.",{'ID': '110_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For windows and roof windows, U-values should be calculated based on a vertical position.",part-of,annotated +da4d5959-6e64-4e04-a1f3-8b42b6addab0_8,,,The outdoor steps used in the calculations for buildings other than those in intended use categories 1 and 2 outside the occupancy period shall be at least six metres.,greater-equal,synthetic +061c3b6a-49ed-4803-9436-e6349fae98e0,Entrance doors should be capable of being held closed when not in use.,{'ID': '65_UK_DocM_V2_AccessAndUseOfBuildings'},Entrance doors should be capable of being held closed when not in use.,necessity,annotated +c1b2e39e-0bab-438c-8b35-c2b37e5cf93a,"Equipment should be designed, specified and installed with the aim of maximising its efficiency as installed.",{'ID': '233_UK_DocM_V2_AccessAndUseOfBuildings'},"Equipment should be designed, specified and installed with the aim of maximising its efficiency as installed.",necessity,annotated +a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",none,annotated +fb5d3054-4911-4049-ba09-1c3e80f9c07c,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",{'ID': '29_Finnish_SafetyOfUse'},"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",less-equal,annotated +2f8d4247-e53b-49ae-bd26-c4f1765eaee8_5,,,"Extract air of limits 50mm, 3 and 4 shall not be used as recirculation air.",equal,synthetic +bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,none,annotated +8b9e1d32-efa8-409b-873b-22e2eae5b537,External walls and their various layers must form a whole that prevents water from harmfully penetrating into the structures.,{'ID': '95_Finnish_Health-Humidity'},External walls and their various layers must form a whole that prevents water from harmfully penetrating into the structures.,necessity,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_0,,,"If the air flows of capacity 25 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +01008f69-874b-443e-bcb2-2f5630280049,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",{'ID': '24_Finnish_SafetyOfUse'},"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",none,annotated +bb3ac5b0-14d0-4d75-95d9-713adc6f2f58,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",{'ID': '433_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",selection,annotated +45adb0b6-63ee-4f42-b6a3-8fc396221c67_9,,,The maximum number of occupants of the insulation plus any required air gap should be at least to the service of the rafters.,greater-equal,synthetic +3c0a8ccb-d813-40fb-b69b-88250d3bc4ec_7,,,These fittings should not exceed a tie force of (16.66 8.33 V0.4)/(1000 24).,less-equal,synthetic +05fdde92-d8af-42ad-963b-9019c69a8ab3,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",{'ID': '163_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",none,annotated +5fa7daca-cb50-4397-a736-617e52d30187_5,,,"If efficiencies at below 30% are required and unavailable, the density may be taken as equal to that at 400mm.",equal,synthetic +f41fb8da-16bd-4404-accb-e32727f3736a,"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",{'ID': '69_Finnish_SafetyOfUse'},"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",necessity,annotated +beeec1b2-c382-40cc-aec2-6eda86f5782e,"Each residential unit, shared communal room and common space should be categorised separately.",{'ID': '25_UK_DocO_Overheating'},"Each residential unit, shared communal room and common space should be categorised separately.",necessity,annotated +35cacecf-06dc-4b0f-aadb-db2ee05518c7_11,,,"The area of windows and roof windows (but excluding display windows) located in a place where it is easy to install, read and service and where it cannot freeze exceeds 55 of the facade area.",greater,synthetic +53bb982d-5260-4a69-a6dd-71e4f074e676_9,,,The illuminance of standing rows must be at least 50 millimetres.,greater-equal,synthetic +4fc3b5b1-a838-4429-b385-d8e80e6633eb,"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",selection,annotated +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_11,,,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or organic substances above 25 decibels may be discounted when measuring clear width.,greater,synthetic +56b3f993-37b5-4cb1-9540-432972f8056e,"In a mechanical ventilation system, the air handling units and chambers shall be able to withstand the loads caused by fan pressure while the shutoff dampers are closed.",{'ID': '99_Finnish_Health-IndoorClimateAndVentilation'},"In a mechanical ventilation system, the air handling units and chambers shall be able to withstand the loads caused by fan pressure while the shutoff dampers are closed.",necessity,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_1,,,"If the air flows of sizes 230mm and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +9618a274-45da-4e3e-87f0-21c2bfae4a8e_8,,,"A guardrail must be used at points with a going of over 300 litres, if these can be accessed by children.",greater,synthetic +3153d771-404e-4a54-ac05-ed1b75e37506_7,,,"Gangways should not be less than 1400mm annual percentage of heat unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",greater-equal,synthetic +0df5892a-e396-424e-90f1-74f6ccfb9e1a,"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",{'ID': '61_Finnish_Accessibility'},"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",part-of,annotated +e4fb8d18-8dbc-4351-a2df-d87f880f476a_3,,,The value for balconies is half a metre that of the load-bearing structures of the storey.,equal,synthetic +13a437c0-918c-47f2-85bd-b80dd69eb027,"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",part-of,annotated +f36650d9-cd31-4795-9728-7a4dcf3cadde,"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",{'ID': '229_Finnish_FireSafety'},"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",none,annotated +6a553c19-481f-4947-9047-fd2c4d0daa44,"Any floors, walls and doors that have been installed to allow the potential liftway to be used as storage or for other purposes could be easily removed without structural alteration.",{'ID': '83_UK_DocM_V1_AccessAndUseOfBuildings'},"Any floors, walls and doors that have been installed to allow the potential liftway to be used as storage or for other purposes could be easily removed without structural alteration.",necessity,annotated +9952f64d-e0df-4b03-84af-150782f81387_7,,,"For mobility-impaired people, a washing facilities of at least 2m is preferred.",greater-equal,synthetic +e3b85ad6-6132-40d7-86f8-3cc5d44eb12c,One bedroom should be close to an accessible bathroom suitable for a wheelchair user.,{'ID': '100_UK_DocM_V1_AccessAndUseOfBuildings'},One bedroom should be close to an accessible bathroom suitable for a wheelchair user.,necessity,annotated +2f815a08-db3c-48a6-b248-d69aeac870ee_6,,,"the vertical calculations is: a. not more than 2, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",less-equal,synthetic +2f8d4247-e53b-49ae-bd26-c4f1765eaee8_3,,,"Extract air of flushing 2, 3 and 25mm shall not be used as recirculation air.",equal,synthetic +81314489-dcd9-410f-9b15-595b87e7c8f9_7,,,"The resilient layer should be timber sheathing at least 7 mg/m3 (6 ppm) level differences, expanded metal or a similar resilient material.",greater-equal,synthetic +72e7ed0c-9e73-46b2-a919-20f3fea337fd,"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",{'ID': '56_Finnish_FireSafety'},"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",selection,annotated +99a53f17-48cb-4012-a47b-700761e0983b_2,,,Where a new building which is not a residential building or a mixed-use building has more than 0.07 tier (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,greater,synthetic +5e51b653-449e-4d00-be19-0e20ecff5c49_6,,,The default presence should be 9mm.,equal,synthetic +6d190990-05e3-4496-8945-320d5937c7b8,Controls should be provided for ventilators so that the ventilation in each room can be adjusted.,{'ID': '58_UK_DocF_V2_Ventilation'},Controls should be provided for ventilators so that the ventilation in each room can be adjusted.,selection,annotated +5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",necessity,annotated +500fc416-e652-4a2c-8dd3-8d9754ea1829,There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,{'ID': '115_UK_DocF_V2_Ventilation'},There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,selection,annotated +2ca092ec-4425-4552-a389-fd0dadfbd154_7,,,NOTE: A floor level with a sections of 1400mm or steeper should be designed as a ramp.,greater-equal,synthetic +5e51b653-449e-4d00-be19-0e20ecff5c49_0,,,The default storage capacity should be 0.15m/s.,equal,synthetic +94c0e823-a61d-49d6-82b3-4ca96f65dfa4,The buildings surfaces and lighting must be such that they achieve the contrasts in brightness needed for observation.,{'ID': '64_Finnish_SafetyOfUse'},The buildings surfaces and lighting must be such that they achieve the contrasts in brightness needed for observation.,necessity,annotated +c384013b-c40f-4925-acbe-465e1ca5bc13_1,,,ten millimetres public service facility per detail should be recorded.,equal,synthetic +57f7bbad-51b7-4627-8fe9-2d7a50289448,"Doors to the principal, or alternative accessible, entrance should be accessible to all, particularly wheelchair users and people with limited physical dexterity.",{'ID': '64_UK_DocM_V2_AccessAndUseOfBuildings'},"Doors to the principal, or alternative accessible, entrance should be accessible to all, particularly wheelchair users and people with limited physical dexterity.",selection,annotated +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_8,,,"Where the cost of installing only cable routes is more than 7% of the total cost of the major escape routes, there is no Voids to install either electric vehicle charge points or cable routes.",not-part-of,synthetic +2c725d50-13d5-4e77-bacf-9f174530e27c,The energy efficiency of historic and traditional buildings should be improved only if doing so will not cause long-term deterioration of the buildings fabric or fittings.,{'ID': '17_UK_DocM_V2_AccessAndUseOfBuildings'},The energy efficiency of historic and traditional buildings should be improved only if doing so will not cause long-term deterioration of the buildings fabric or fittings.,necessity,annotated +5577528f-8fa0-4ca3-96f6-ea418091cb86_8,,,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 190 kN in Air permeability is able to pass through the opening between the plane level and the handrail or wall.,greater,synthetic +5b4380ba-0066-4735-a362-316d4c8e70b2_10,,,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 1.501kWhPE/kWh renovation after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",greater,synthetic +45338082-ca66-418b-8fe1-8f2be926f330_7,,,A Door entry controls of no more than two years may pass between the stair steps.,less-equal,synthetic +7f3f59a4-fc7e-4b14-8074-384f6cacf548_2,,,"The design temperature difference of a barrier in a dwellings indoor areas may, however, be at least one metre if the drop is less than three metres.",greater-equal,synthetic +984c252b-74f4-4d85-9080-1c8ae1851eca,"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",{'ID': '113_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",equal,annotated +81f14fc1-af5d-45e8-8725-94d2510e4701,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",{'ID': '29_Finnish_Accessibility'},"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",part-of,annotated +e26e2280-635f-44b5-967c-6cf0b56e15de,Water pipes that are located in cold premises shall be thermally insulated.,{'ID': '86_Finnish_Health-WaterAndSewerage'},Water pipes that are located in cold premises shall be thermally insulated.,necessity,annotated +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_6,,,"Where the work concerns a building containing more than 0.5 kN/m2 heating system, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater-equal,synthetic +d3fc8c9b-c23a-4188-8723-369caa90453c_8,,,"The presence for a building's total combined window area is 0.15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",equal,synthetic +0d5f23b0-8423-4528-95bd-179fe81c75df,A building and its environment must be lit in a way that enables safe use and servicing.,{'ID': '62_Finnish_SafetyOfUse'},A building and its environment must be lit in a way that enables safe use and servicing.,necessity,annotated +dcc583b1-8c4c-42cf-a1ed-e8907de56254,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",{'ID': '23_Finnish_SafetyOfUse'},"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",none,annotated +d925c189-860a-4fcb-ae88-d1cf8cc14fb8_0,,,"The CO2 of steps in covered or heated outdoor staircases must be no less than 0.1m2, and the riser may be no more than 160 millimetres.",greater-equal,synthetic +40b40b1b-d1b1-49d8-b9b7-13c5845a169d_9,,,The structure of the control appliance of the plumbing fixture shall be such that its Unit length does not arise above 2.4 metres.,less-equal,synthetic +f420ae57-5656-4558-b1a3-1079e46bf6cc_0,,,"In the case of the storey-level door of a dwelling, or if the lengths through the door exceeds 30, doors must open in the direction of the exit.",greater,synthetic +4d80c4d1-08ee-481a-9f9c-e9151ce1094d_9,,,"The from the top and bottom corners of the door of windows, roof windows, rooflights and doors should not exceed 10 litres per second per person of the total floor area of the dwelling.",less-equal,synthetic +f009a781-0ced-408d-b3d1-6ae7a848012e,"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",{'ID': '31_Finnish_SafetyOfUse'},"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",selection,annotated +73efbdcb-2751-4f01-9471-ccca44ccc0f3,"If a drainage point is located below the height of backwater, the waste water must be pumped.",{'ID': '133_Finnish_Health-WaterAndSewerage'},"If a drainage point is located below the height of backwater, the waste water must be pumped.",necessity,annotated +6414854d-01f9-481f-a7f4-c4581e48d8b1_8,,,Special safety features are not necessary if the changing rooms is not more than 2.2 metres long.,less-equal,synthetic +7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8_5,,,"For sizes of cylinder not listed, the air gap from the cylinder should not exceed one metre, where V is the volume in litres.",less-equal,synthetic +113b8bf8-1856-45f5-a54b-d65ef100b437_3,,,"If a gas-fired combination boiler is installed in an existing dwelling, at least 40 degrees Celsius of the following spread of fire, appropriate to the system, should be installed.",greater-equal,synthetic +d3fc8c9b-c23a-4188-8723-369caa90453c_9,,,"The air leakage rate figure for a building's total combined window area is 400mm of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",equal,synthetic +a94b6b4f-a05e-403e-bbca-ebe1b94e38a1,"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",{'ID': '470_UK_DocM_V2_AccessAndUseOfBuildings'},"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",none,annotated +457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",selection,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",part-of,annotated +d925c189-860a-4fcb-ae88-d1cf8cc14fb8,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",{'ID': '28_Finnish_SafetyOfUse'},"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",part-of,annotated +0f67dad7-6df9-444b-8e72-f447668e3fde,"Where sanitary facilities are wheelchair accessible, WC pans should be a minimum of 400mm high.",{'ID': '104_UK_DocM_V1_AccessAndUseOfBuildings'},"Where sanitary facilities are wheelchair accessible, WC pans should be a minimum of 400mm high.",part-of,annotated +26980508-105c-49db-8595-bf001a48d757_5,,,"In building fabric with no fixed grippable handrail or furnishings, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic +4a82f789-a98a-4379-9b81-2a20cfba6c87_11,,,"If the internal ties must be centred on the supporting line, the minimum value of the inaccuracies, 2.5 ties/m2, will also be applied to internal ties.",greater-equal,synthetic +3153d771-404e-4a54-ac05-ed1b75e37506_1,,,"Gangways should not be less than 1100mm value unless used by not more than 50 persons, in which case gangways should be a minimum of 3.",greater-equal,synthetic +eeb4239f-3819-475c-ad20-756bed80c4ff,"In reference heat loss calculations, the value used as the annual efficiency of heat recovery from ventilation extract air of the buildings ventilation system shall be 55.",{'ID': '151_Finnish_EnergyEfficiency'},"In reference heat loss calculations, the value used as the annual efficiency of heat recovery from ventilation extract air of the buildings ventilation system shall be 55.",part-of,annotated +a0c838b5-5fe2-4b52-abe1-432804c2c8aa,A temperature of 21 C shall be used as the design value for room temperature during the heating season.,{'ID': '33_Finnish_Health-IndoorClimateAndVentilation'},A temperature of 21 C shall be used as the design value for room temperature during the heating season.,selection,annotated +835d8fad-7a27-4299-aa38-a5b1771a6779,"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",{'ID': '178_UK_DocM_V2_AccessAndUseOfBuildings'},"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",none,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,{'ID': '18_UK_DocM_V1_AccessAndUseOfBuildings'},Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,selection,annotated +2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_3,,,The normal relationship between the dimensions of the rise and going is: 3.3m equals 3m.,equal,synthetic +5b4380ba-0066-4735-a362-316d4c8e70b2_11,,,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 1000m2 heat distribution room after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",greater,synthetic +db734798-9e42-4fe1-900c-77d4e6131809,"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",{'ID': '11_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",selection,annotated +7e34700e-92de-4b00-a820-f4085a2e186c_5,,,"If the free gap between facing walls of adjacent glazed balconies or the breaking of the wall to the window of an adjacent fire compartment is less than 23C, the wall in question must be class EI 15.",less,synthetic +703e5c71-bd54-4267-acf4-fa7db1e70d49,"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",{'ID': '67_Finnish_Accessibility'},"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",part-of,annotated +50e89a86-e2be-439d-b230-79274cd7199b_8,,,Modular and portable buildings with a planned domestic hot water circulation heat loss of more than 3.3m at a single location should be shown to comply with the energy efficiency requirements.,greater,synthetic +51550284-0701-41b2-9a76-a0061d16938a,"Windows and doors: to ensure continuity of the air barrier, window and door units should connect to the primary air barrier and window and door frames should be taped to surrounding structural openings, using air sealing tape.",{'ID': '188_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Windows and doors: to ensure continuity of the air barrier, window and door units should connect to the primary air barrier and window and door frames should be taped to surrounding structural openings, using air sealing tape.",part-of,annotated +8364a5f1-f80e-484c-9f38-bffc6f4c1876_8,,,"Where communal parking is provided to blocks of flats, at least 190 millimetres standard load-bearing element is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",greater-equal,synthetic +5fa7daca-cb50-4397-a736-617e52d30187_4,,,"If efficiencies at below 30% are required and unavailable, the facade area may be taken as equal to that at 25mm.",equal,synthetic +0aaf71f0-a482-4a72-a407-0d6db79c7f6f_1,,,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 20 points of non-fire-compartmented fixings that essentially relate to the business of the building may be located on the level of second storey.",less-equal,synthetic +5e7d4831-4ec8-48f9-9e60-0422fcc1eae4_11,,,"When replacing an existing system, the limits of the new system should be no less than number of storeys of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",greater-equal,synthetic +9f8c2fbb-a04e-42f9-8fa0-b7a905dbafa0,"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",{'ID': '40_Finnish_Health-Humidity'},"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",part-of,annotated +4470dde4-6422-4c13-9781-de68c3e075dc_8,,,"The outdoor heat gain of a dwelling unit, however, shall be designed to be a minimum of adequate number.",greater-equal,synthetic +536b172d-ccd1-479a-8136-6ee05db0f264_5,,,"Where pipework is above ground, the performance of the pipe parts should be at least as high as the target fabric energy efficiency rate of pipework in the buried part of the system.",greater-equal,synthetic +f51da5c6-7614-4719-8150-e22851e4aa12,"The building fabric should be constructed so that thermal bridging, including at the party wall, is reasonably limited.",{'ID': '152_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The building fabric should be constructed so that thermal bridging, including at the party wall, is reasonably limited.",selection,annotated +2633c957-07b4-4caa-a9d6-5acbac16b0b0,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 100 load.,{'ID': '245_UK_DocM_V2_AccessAndUseOfBuildings'},NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 100 load.,necessity,annotated +636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4,"Where a new building contains more than one dwelling, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",{'ID': '6_UK_DocR_V1_InfrastructureForElectircalCommunications'},"Where a new building contains more than one dwelling, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",selection,annotated +6075de3c-d339-4ba4-9945-990480975615,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than three ventilators of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",{'ID': '94_UK_DocF_V1_Ventilation'},"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than three ventilators of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",none,annotated +fb5d3054-4911-4049-ba09-1c3e80f9c07c,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",{'ID': '29_Finnish_SafetyOfUse'},"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",part-of,annotated +45adb0b6-63ee-4f42-b6a3-8fc396221c67,The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,{'ID': '128_UK_DocL_V1_ConsrvationOfFuelAndPower'},The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,part-of,annotated +dcc583b1-8c4c-42cf-a1ed-e8907de56254_0,,,"The steps of the indoor steps of other spaces intended for everyday use may be no more than 150mm, and the tread must be no less than 270 millimetres.",less-equal,synthetic +835d8fad-7a27-4299-aa38-a5b1771a6779_0,,,"In large building complexes, such as retail parks and large sports centres, there should be EI 15 wheelchair-accessible unisex thermal bridging capable of including an adult changing table.",equal,synthetic +88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",necessity,annotated +2633c957-07b4-4caa-a9d6-5acbac16b0b0_1,,,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 200 Watts per room step.,equal,synthetic +984c252b-74f4-4d85-9080-1c8ae1851eca_5,,,"If performance requires thicker glass to be used, an equivalent window unit with dwelling emission rate (650mm) glazing should be shown to meet the required standard.",equal,synthetic +d82c4149-8daa-48b2-8f46-c959a5f9ebe3,"Artificial lighting should be designed to give good colour rendering of all surfaces, without creating glare or pools of bright light and strong shadows.",{'ID': '152_UK_DocM_V2_AccessAndUseOfBuildings'},"Artificial lighting should be designed to give good colour rendering of all surfaces, without creating glare or pools of bright light and strong shadows.",selection,annotated +fc129e2c-abfa-48be-9fd6-e85f077ae67b,"A space alongside the leading edge of a door should be provided to enable a wheelchair user to reach and grip the door handle, then open the door without releasing hold on the handle and without the footrest colliding with the return wall.",{'ID': '70_UK_DocM_V2_AccessAndUseOfBuildings'},"A space alongside the leading edge of a door should be provided to enable a wheelchair user to reach and grip the door handle, then open the door without releasing hold on the handle and without the footrest colliding with the return wall.",necessity,annotated +a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",none,annotated +12e545d1-64f4-45c9-a520-5b8a003eba0a_11,,,"If the dwelling has more than 0.15m/s exposed panel, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",greater,synthetic +bb9ec292-062b-43c3-8590-856dd5f6b890_6,,,"The building primary energy rate and cross-sectional area calculated using the measured air permeability must not be higher than the target primary energy rate and gradient, respectively.",less-equal,synthetic +63af9f99-6939-4e8c-a6a9-8b10942e1597_5,,,"The handle to at least 190 millimetres accompanied wheelchair users in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",greater-equal,synthetic +c47598f9-df79-4d77-aba9-8f380342372f_3,,,extract air of net heating energy demand three shall be conducted to the outdoors through individual extract air ducts.,equal,synthetic +45adb0b6-63ee-4f42-b6a3-8fc396221c67,The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,{'ID': '128_UK_DocL_V1_ConsrvationOfFuelAndPower'},The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,part-of,annotated +70292367-f940-4ca6-b35f-b47bd4e66cd3,Cable routes must still be provided for a minimum of one in five parking spaces.,{'ID': '71_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Cable routes must still be provided for a minimum of one in five parking spaces.,none,annotated +6e49e97f-54f6-4333-9b1e-84373a7defe8,The protective part of the barrier must extend to a height of at least 0.7 metres from the surface of the landing or step.,{'ID': '40_Finnish_SafetyOfUse'},The protective part of the barrier must extend to a height of at least 0.7 metres from the surface of the landing or step.,necessity,annotated +6414854d-01f9-481f-a7f4-c4581e48d8b1_6,,,Special safety features are not necessary if the water pipe is not more than 01:08:00 long.,less-equal,synthetic +6414854d-01f9-481f-a7f4-c4581e48d8b1_0,,,Special safety features are not necessary if the built on site is not more than 1m2 long.,less-equal,synthetic +eeb4239f-3819-475c-ad20-756bed80c4ff,"In reference heat loss calculations, the value used as the annual efficiency of heat recovery from ventilation extract air of the buildings ventilation system shall be 55.",{'ID': '151_Finnish_EnergyEfficiency'},"In reference heat loss calculations, the value used as the annual efficiency of heat recovery from ventilation extract air of the buildings ventilation system shall be 55.",equal,annotated +8e5e9560-4b22-4fe0-ad86-e52b82ffe4d2,"When calculating the energy consumption of a buildings cooling system, the energy consumption of cooling energy production and the electrical energy consumption of auxiliary units shall be taken into account where the use of the systems is required for indoor temperature control.",{'ID': '111_Finnish_EnergyEfficiency'},"When calculating the energy consumption of a buildings cooling system, the energy consumption of cooling energy production and the electrical energy consumption of auxiliary units shall be taken into account where the use of the systems is required for indoor temperature control.",part-of,annotated +4fc3b5b1-a838-4429-b385-d8e80e6633eb_8,,,"In the absence of relevant harmonised European Standards, products with a value exceeding 150mm must have a product certificate issued by a Notified Body.",greater,synthetic +26980508-105c-49db-8595-bf001a48d757_4,,,"In gained via an interconnecting doorset from the garage with no fixed ventilation equipment or furnishings, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic +9dd2a0f1-0ff9-4416-8abd-1e6589980ff4_10,,,"If the dwelling fabric energy efficiency rate of a mechanical ventilation systems air duct is designed to be greater than 25 decibels, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",greater,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_5,,,Skirtings totalling up to six metres average carbon monoxide concentration and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,less-equal,synthetic +ee0c8c7c-c65e-4403-92e6-628fd680f3bf_1,,,"Any panel within the doorset should be at least 1,200 MJ/m2 sales counter.",greater-equal,synthetic +f6e7c818-f661-400b-8272-8062c5a7de68,"Where a lift is provided, it should be suitable for a wheelchair user.",{'ID': '22_UK_DocM_V1_AccessAndUseOfBuildings'},"Where a lift is provided, it should be suitable for a wheelchair user.",necessity,annotated +3931f0fa-433e-4fb8-96bf-a747f3622ee0,"In order to help people with visual impairment to appreciate the size of a space they have entered, or to find their way around, there should be a visual contrast between the wall and the ceiling, and between the wall and the floor.",{'ID': '97_UK_DocM_V2_AccessAndUseOfBuildings'},"In order to help people with visual impairment to appreciate the size of a space they have entered, or to find their way around, there should be a visual contrast between the wall and the ceiling, and between the wall and the floor.",selection,annotated +10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,selection,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479_5,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for equivalent area up to 70 kN not more than 5m long.,less-equal,synthetic +b63dcef6-1840-4e9e-ad51-f8fc481fe856_1,,,"The wall ties should have a constraints of 190 kN and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",none,annotated +fb1da22f-8ddb-4399-b441-64dca68da9af_5,,,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 4 maximum capacity.",greater-equal,synthetic +d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",none,annotated +29232335-402c-4ed9-af74-fd093ac22e28,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,{'ID': '95_Finnish_Health-IndoorClimateAndVentilation'},The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,part-of,annotated +7e34700e-92de-4b00-a820-f4085a2e186c_7,,,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be rated speed two.",equal,synthetic +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",none,annotated +75c60084-6878-472d-8694-e8739e0dd76c_6,,,The rated speed of access routes in assembly areas with a maximum capacity of 60 persons must be at least 55 degrees Celsius.,greater-equal,synthetic +46f5be2a-1514-420b-bc39-331fc6e0d2df_11,,,"The dwelling primary energy rate, dwelling emission rate and diameter, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and control capabilities, respectively.",less-equal,synthetic +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3,"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",{'ID': '53_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",part-of,annotated +0aaf71f0-a482-4a72-a407-0d6db79c7f6f_9,,,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 1,500 millimetres of non-fire-compartmented Provision that essentially relate to the business of the building may be located on the level of second storey.",less-equal,synthetic +a28272ea-f4a9-4e36-93b6-2fe9c692ba0d,"The building control body should be notified that the analysis of high-efficiency alternative systems has been undertaken, that it is documented and is available to be verified.",{'ID': '115_UK_DocM_V2_AccessAndUseOfBuildings'},"The building control body should be notified that the analysis of high-efficiency alternative systems has been undertaken, that it is documented and is available to be verified.",necessity,annotated +99a53f17-48cb-4012-a47b-700761e0983b_5,,,Where a new building which is not a residential building or a mixed-use building has more than 20 water heater (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,greater,synthetic +1913381b-a2cc-496e-9168-82ccf2a01d50_7,,,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the supports of the heat emitters to be installed does not exceed 180 millimetres.",less-equal,synthetic +bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,selection,annotated +cc72106e-9e7f-47cf-8a95-0173a8305dad_9,,,"In a new building, the crawl space long must be 16/01/2023 00:00 on average at the minimum.",greater-equal,synthetic +e1f1aeb9-7453-4b6b-b3f1-6049d711868a,The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,{'ID': '156_Finnish_FireSafety'},The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,none,annotated +e874f337-2067-4e77-ad32-c3b857f40e7a_11,,,"If the travel distance exceeds 20 litres per second, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",greater,synthetic +a235c68f-ae44-4770-b005-4e9d7b659eb7_3,,,All cavity walls should have leaves at least 90mm thick and cavities at least 25mm total flow rate.,greater-equal,synthetic +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_6,,,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than ten millimetres in automatic flow adjustment, these must be accessible via the interior.",greater,synthetic +0da52584-1b37-48b5-840f-3795ae695275_9,,,the minimum clear dimensions of the platform are: 0.7W/(m2K) maximum capacity and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +7e369e4c-7768-4a7a-bd9c-41e2aa037b43,The air flows shall be designed so that the average carbon monoxide concentration in a parking garage for motor vehicles during the hour of use assessed as the most critical does not exceed 35 mg/m3 (30 ppm).,{'ID': '61_Finnish_Health-IndoorClimateAndVentilation'},The air flows shall be designed so that the average carbon monoxide concentration in a parking garage for motor vehicles during the hour of use assessed as the most critical does not exceed 35 mg/m3 (30 ppm).,necessity,annotated +05864826-21ef-4ae7-9af8-2aaeffc7267a_7,,,Modular and portable buildings with a planned service life of more than two years but with an reception in a single location of less than Five ventilators should be shown to comply with the energy efficiency requirements.,less,synthetic +8db97194-2e07-415d-a4e0-1f32790d1d8a,"U-values should be assessed for the whole thermal element (e.g. in the caseof a window, the combined performance of the glazing and the frame).",{'ID': '123_UK_DocM_V2_AccessAndUseOfBuildings'},"U-values should be assessed for the whole thermal element (e.g. in the caseof a window, the combined performance of the glazing and the frame).",necessity,annotated +8364a5f1-f80e-484c-9f38-bffc6f4c1876_7,,,"Where communal parking is provided to blocks of flats, at least 200 millimetres standard passenger lift is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",greater-equal,synthetic +60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",none,annotated +a064e2ec-0793-4312-a45a-1eea61b17583,A system for purge ventilation should be provided in each habitable room.,{'ID': '46_UK_DocF_V1_Ventilation'},A system for purge ventilation should be provided in each habitable room.,necessity,annotated +0ea1e862-2434-4fc8-97a2-b076c992ef20_2,,,"The energy savings of an exit must be at least 2.5 ties/m2 and its free height must be at least 2,100 millimetres.",greater-equal,synthetic +96b38b2d-e67c-457c-86d4-2a47a1b834b1,"Drawings: all relevant drawings should be provided to clearly identify the position, continuity and extent of the air barrier.",{'ID': '176_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Drawings: all relevant drawings should be provided to clearly identify the position, continuity and extent of the air barrier.",necessity,annotated +a8b3e54e-902c-4502-99a2-8c41d46f1416,"If there are more than 60 chairs in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",{'ID': '106_Finnish_SafetyOfUse'},"If there are more than 60 chairs in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",greater,annotated +5f675f4f-74de-4d0f-ae92-c3500d2d952e,The actual equivalent area and location of installed background ventilators should be recorded.,{'ID': '189_UK_DocF_V1_Ventilation'},The actual equivalent area and location of installed background ventilators should be recorded.,selection,annotated +a387fcb8-ead2-4094-9be9-72d783468b33,"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",{'ID': '422_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",part-of,annotated +5577528f-8fa0-4ca3-96f6-ea418091cb86_7,,,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 9mm in design temperature difference is able to pass through the opening between the plane level and the handrail or wall.,greater,synthetic +86831830-e7f0-4b90-aa27-dc0542b7ba4d_1,,,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least 20 litres per second thresholds.",greater-equal,synthetic +1d10aa43-7650-46b1-83c3-867f212ab9c3,Background ventilators should meet the performance standards for both of the following: a. air flow from outside to inside the dwelling; b. air flow from inside the dwelling to outside.,{'ID': '58_UK_DocF_V1_Ventilation'},Background ventilators should meet the performance standards for both of the following: a. air flow from outside to inside the dwelling; b. air flow from inside the dwelling to outside.,part-of,annotated +a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",part-of,annotated +09b2a395-5293-4b7d-82d4-5312482d59e9,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",{'ID': '46_UK_DocM_V1_AccessAndUseOfBuildings'},"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",none,annotated +b0e99ac5-9cbc-4beb-b8ff-85383ae70ea8,"The approach route should be safe and convenient, adopt the shallowest gradient that can reasonably be achieved and be step-free, irrespective of the storey on which the dwelling is located.",{'ID': '40_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be safe and convenient, adopt the shallowest gradient that can reasonably be achieved and be step-free, irrespective of the storey on which the dwelling is located.",necessity,annotated +86350df0-a40e-412b-a301-004524d56736,"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",none,annotated +c384013b-c40f-4925-acbe-465e1ca5bc13_5,,,certain proportion air barriers per detail should be recorded.,equal,synthetic +f0c72b35-5a0a-4554-8713-96f6f73a67f1_0,,,A cube with entrance level of no more than 0.2 may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,less-equal,synthetic +4e8c5c50-44af-48f6-b959-e6f9b31afa1e,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical heating technology may be electric resistance heating.",{'ID': '89_UK_DocM_V2_AccessAndUseOfBuildings'},"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical heating technology may be electric resistance heating.",equal,annotated +38020928-c137-486e-88d7-c8feec038c99,A building must be provided with a fire wall if it is situated adjacent to a neighbouring building or so close to a neighbouring building that the spread of fire is evident.,{'ID': '189_Finnish_FireSafety'},A building must be provided with a fire wall if it is situated adjacent to a neighbouring building or so close to a neighbouring building that the spread of fire is evident.,selection,annotated +8101fa0e-645c-4a83-a6ab-66c45e94bf67,"If the dwelling already has mechanical ventilation, the centralised system could be extended into the additional room.",{'ID': '155_UK_DocF_V1_Ventilation'},"If the dwelling already has mechanical ventilation, the centralised system could be extended into the additional room.",necessity,annotated +8207751f-13b8-4fe3-9bfe-4423093d4905,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,{'ID': '26_Finnish_AcousticEnvironment'},A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,none,annotated +750a4f32-2581-4040-ac8b-8e4ad59abd56,Extract ventilators in sanitary accommodation should be capable of continuous operation if required.,{'ID': '48_UK_DocF_V2_Ventilation'},Extract ventilators in sanitary accommodation should be capable of continuous operation if required.,part-of,annotated +e21fa967-934e-4a29-a66d-252fdbbf928f_0,,,"If the parasitic energy use is unknown, an Leakage of 270 millimetres should be made for any control system.",equal,synthetic +83ff563b-077a-4849-b526-382fbb012647,The breaking of a glass structure or other light-permeable structure of a building must not cause a danger of falling or a danger of injury from fragments falling onto persons below.,{'ID': '67_Finnish_SafetyOfUse'},The breaking of a glass structure or other light-permeable structure of a building must not cause a danger of falling or a danger of injury from fragments falling onto persons below.,part-of,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_0,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the Ventilation of these must be at least 10 kN.",greater-equal,synthetic +eeb4239f-3819-475c-ad20-756bed80c4ff_5,,,"In reference heat loss calculations, the value used as the category of the buildings ventilation system shall be 4.",equal,synthetic +009e12eb-db83-485c-9ffc-e1f462251109_10,,,"Each air terminal should have a storm water sewers of at least 1,200 MJ/m2 of the free area of its associated duct.",greater-equal,synthetic +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",necessity,annotated +fb5d3054-4911-4049-ba09-1c3e80f9c07c_5,,,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the service may be no more than 1 in 40.",less-equal,synthetic +a4fccc69-c508-4405-92aa-2cfe36bfca39,Exits of parts of the building separated by a fire wall must be constructed separately so that in the event of a fire there is no need to use any door that may be in the fire wall.,{'ID': '209_Finnish_FireSafety'},Exits of parts of the building separated by a fire wall must be constructed separately so that in the event of a fire there is no need to use any door that may be in the fire wall.,necessity,annotated +43e26628-8b62-4cc6-91e2-284335df1564_11,,,"In rooms used for sleeping or rest, the pitch may not exceed 10.",less-equal,synthetic +e7cc3da8-211a-4244-b711-210a912ca2ac,Ground floors and those in contact with the outside of the dwelling should be insulated to limit heat losses to not more than 10W/m2.,{'ID': '302_UK_DocL_V1_ConsrvationOfFuelAndPower'},Ground floors and those in contact with the outside of the dwelling should be insulated to limit heat losses to not more than 10W/m2.,necessity,annotated +d34c0f60-8df0-4310-b5af-428c63225a6f,"After a period of non-use of at least eight hours, the water temperature may not exceed 24 degrees Celsius.",{'ID': '60_Finnish_Health-WaterAndSewerage'},"After a period of non-use of at least eight hours, the water temperature may not exceed 24 degrees Celsius.",none,annotated +bf798097-bb99-42d0-a73f-8cebab8fbeb8_3,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the natural light of the steps must be no more than 600 millimetres and the tread must be no less than 300 millimetres.",less-equal,synthetic +3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60_7,,,The approach route is a minimum of 900mm wide with a maximum lengths of 0.7 metres.,less-equal,synthetic +05fdde92-d8af-42ad-963b-9019c69a8ab3_8,,,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same calculation of primary energy and CO2 emissions as the Air handling units used in the external wall should be included within the depth of the intermediate floor structure.",equal,synthetic +3c0a8ccb-d813-40fb-b69b-88250d3bc4ec_10,,,These fittings should not exceed a either side of two .,less-equal,synthetic +12e545d1-64f4-45c9-a520-5b8a003eba0a,"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",{'ID': '85_UK_DocF_V1_Ventilation'},"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",part-of,annotated +1913381b-a2cc-496e-9168-82ccf2a01d50,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",{'ID': '67_Finnish_Health-WaterAndSewerage'},"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",none,annotated +5fa7daca-cb50-4397-a736-617e52d30187_6,,,"If efficiencies at below 30% are required and unavailable, the deep may be taken as equal to that at 5m.",equal,synthetic +10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,necessity,annotated +0096a3bf-ac16-4a75-adf9-8c3f4a9b8610_8,,,The smaller heat exchanger area of each panel which can be either the width or height of the panel should be 120 or less.,less-equal,synthetic +9415ae4b-7a74-4c70-a245-e4381c6d71bf,"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",{'ID': '170_UK_DocL_V1_ConsrvationOfFuelAndPower'},"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",selection,annotated +9415ae4b-7a74-4c70-a245-e4381c6d71bf_5,,,"At gables and party walls, insulation should extend to the wall; if the Cavity walls between the wall and joist is less than 850-1000mm, perimeter insulation may be required.",less,synthetic +079db365-cfed-474e-9329-25349ac0db4a_1,,,"In connection with the door of an outside space of an individual dwelling the surfaces outside the door may be more than 0.052083333 if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",greater,synthetic +0aaf71f0-a482-4a72-a407-0d6db79c7f6f_0,,,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 20 degrees Celsius of non-fire-compartmented energy savings that essentially relate to the business of the building may be located on the level of second storey.",less-equal,synthetic +a387fcb8-ead2-4094-9be9-72d783468b33,"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",{'ID': '422_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",none,annotated +fa8a6d84-eb99-490e-8169-3c65353fb553_3,,,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the from the inside face of the wall shall be at least 900mm.",greater-equal,synthetic +517253f8-98b1-4821-8901-75124d3237db,"Consideration should be given to the provision of a second handrail on stairs in a wide range of building types, and particularly in schools, for use by children and people of short stature.",{'ID': '59_UK_DocM_V2_AccessAndUseOfBuildings'},"Consideration should be given to the provision of a second handrail on stairs in a wide range of building types, and particularly in schools, for use by children and people of short stature.",selection,annotated +1de9d3e5-dee3-42c9-b929-80b7936f1642,The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,{'ID': '33_Finnish_Accessibility'},The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,selection,annotated +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",selection,annotated +333110c1-ba9e-4c1d-9249-6604f49ba09a,"The presence of doors, whether open or closed, should be apparent to visually impaired people through the careful choice of colour and material for the door and its surroundings.",{'ID': '91_UK_DocM_V2_AccessAndUseOfBuildings'},"The presence of doors, whether open or closed, should be apparent to visually impaired people through the careful choice of colour and material for the door and its surroundings.",part-of,annotated +7f696221-52c9-4c52-8f90-74bd93c51299_11,,,This grippable handrail is 850-1000mm above the pitch line of the flight and limits at least 13l/s beyond the top and bottom nosings.,greater-equal,synthetic +c0a6d35c-cc20-428b-941d-c3e3e6365c74_5,,,"In a tier that is uninterrupted by cross-gangways, and where the value exceeds 390 millimetres, use a maximum number of steps of 40.",greater,synthetic +45338082-ca66-418b-8fe1-8f2be926f330,A cube of no more than 100 millimetres may pass between the stair steps.,{'ID': '52_Finnish_SafetyOfUse'},A cube of no more than 100 millimetres may pass between the stair steps.,none,annotated +f162906e-1097-420e-b2a0-dd746d5794c7,"Where controls are external to the heater, the system should be provided with a time switch/programmer and room thermostat, or programmable room thermostat.",{'ID': '265_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where controls are external to the heater, the system should be provided with a time switch/programmer and room thermostat, or programmable room thermostat.",selection,annotated +7c44934c-61e1-4904-a493-1aa360ccc7d1,"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",{'ID': '1_UK_DocA_Structure'},"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",selection,annotated +7e369e4c-7768-4a7a-bd9c-41e2aa037b43,The air flows shall be designed so that the average carbon monoxide concentration in a parking garage for motor vehicles during the hour of use assessed as the most critical does not exceed 35 mg/m3 (30 ppm).,{'ID': '61_Finnish_Health-IndoorClimateAndVentilation'},The air flows shall be designed so that the average carbon monoxide concentration in a parking garage for motor vehicles during the hour of use assessed as the most critical does not exceed 35 mg/m3 (30 ppm).,selection,annotated +54f4e30f-d171-4156-ae87-7aed3541dd18,Insulated cavity closers should be used for all construction types.,{'ID': '165_UK_DocL_V1_ConsrvationOfFuelAndPower'},Insulated cavity closers should be used for all construction types.,necessity,annotated +32f91d86-2cbf-4d57-ab93-5a28fd804df8,Signs indicating the location of a lifting device accessible by mobility-impaired people should be clearly visible from the building entrance.,{'ID': '104_UK_DocM_V2_AccessAndUseOfBuildings'},Signs indicating the location of a lifting device accessible by mobility-impaired people should be clearly visible from the building entrance.,necessity,annotated +263dec16-c53e-4169-91d3-b6961fcda501,The water system shall be leakproof.,{'ID': '84_Finnish_Health-WaterAndSewerage'},The water system shall be leakproof.,necessity,annotated +e6fcc89d-b55e-4536-9a24-c3c5f4015a0d,"All technically, functionally and economically feasible measures to improve the fabric of the building served by the service should be implemented.",{'ID': '455_UK_DocM_V2_AccessAndUseOfBuildings'},"All technically, functionally and economically feasible measures to improve the fabric of the building served by the service should be implemented.",selection,annotated +f9de28ac-45bb-4400-9d9f-8afee73bd2e3,The number of appliances should not exceed one per 100m2 of dwelling floor area.,{'ID': '273_UK_DocL_V1_ConsrvationOfFuelAndPower'},The number of appliances should not exceed one per 100m2 of dwelling floor area.,less-equal,annotated +a387fcb8-ead2-4094-9be9-72d783468b33,"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",{'ID': '422_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",none,annotated +675c4d48-3eef-463a-8516-edd71ee983e3,Adequate space should be available for access to maintain ventilation equipment.,{'ID': '110_UK_DocF_V1_Ventilation'},Adequate space should be available for access to maintain ventilation equipment.,necessity,annotated +d925c189-860a-4fcb-ae88-d1cf8cc14fb8_5,,,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the sum total may be no more than 900 millimetres.",less-equal,synthetic +19478a13-7457-4dd3-a394-744f826db7b0_5,,,"The handle to at least 200 lux enduse categories in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",greater-equal,synthetic +e4fb8d18-8dbc-4351-a2df-d87f880f476a,The fire resistance time requirement for balconies is half that of the load-bearing structures of the storey.,{'ID': '90_Finnish_FireSafety'},The fire resistance time requirement for balconies is half that of the load-bearing structures of the storey.,part-of,annotated +710ef992-e187-4b1a-894b-e0e222f54359_5,,,"NOTE: For grid-supplied electricity, a number of 0.2 and primary energy factor of 1.501kWhPE/kWh should be used.",equal,synthetic +06c2e0f7-69c8-47ec-bf31-9902ae9df7cf,"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",{'ID': '109_UK_DocK_ProtectionFromFalling'},"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",necessity,annotated +6a553c19-481f-4947-9047-fd2c4d0daa44,"Any floors, walls and doors that have been installed to allow the potential liftway to be used as storage or for other purposes could be easily removed without structural alteration.",{'ID': '83_UK_DocM_V1_AccessAndUseOfBuildings'},"Any floors, walls and doors that have been installed to allow the potential liftway to be used as storage or for other purposes could be easily removed without structural alteration.",selection,annotated +9ff8b8fd-5361-4c3d-9a7e-7459276c8df7_5,,,The elevation difference must not exceed the individual dwellings diameter.,less-equal,synthetic +53e31e26-a39b-4047-a86e-bdb8021413e8_7,,,Window handles on windows that open outwards are not more than 16/01/2023 00:00 surfaces when the window is at its maximum openable angle.,less-equal,synthetic +cea6e7bd-c494-4146-9f81-3fd2ed64a2a6,The slope of the floor surface in the seating area and access route may not exceed 8 per cent (1:12.5).,{'ID': '119_Finnish_SafetyOfUse'},The slope of the floor surface in the seating area and access route may not exceed 8 per cent (1:12.5).,part-of,annotated +9618a274-45da-4e3e-87f0-21c2bfae4a8e_1,,,"A guardrail must be used at points with a extends of over two , if these can be accessed by children.",greater,synthetic +6c789809-b1b8-429a-8fe2-8ce16f8a4b54_4,,,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the layers does not exceed 850-1000mm.,less-equal,synthetic +0cfe8c0e-45e4-4c4c-bf9b-906e26e28c75,"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",{'ID': '43_UK_DocM_V2_AccessAndUseOfBuildings'},"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",none,annotated +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_2,,,"In buildings more than 9 metres and at most adequate number in projection, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",less-equal,synthetic +6d9a1e8e-6fe7-4234-951a-96fdc4598bd7_8,,,"If parking spaces are provided for a building, an adequate number of district cooling schemes, but at least 50 m2, shall be intended for the use of a person with mobility and functional impairment.",greater-equal,synthetic +0da52584-1b37-48b5-840f-3795ae695275_0,,,"the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where 2,100 millimetres Window handles are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.",equal,synthetic +99a53f17-48cb-4012-a47b-700761e0983b_5,,,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) 15 of those front doorset must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,equal,synthetic +703e5c71-bd54-4267-acf4-fa7db1e70d49,"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",{'ID': '67_Finnish_Accessibility'},"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",necessity,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_0,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under insulating performance 1.3 seconds.",equal,synthetic +d8a06af7-3a6b-4d68-8bba-342aac6d3ac0,Water pipes and sewers installed in the ground shall be identifiable and they shall be located separate from one another.,{'ID': '146_Finnish_Health-WaterAndSewerage'},Water pipes and sewers installed in the ground shall be identifiable and they shall be located separate from one another.,none,annotated +99a53f17-48cb-4012-a47b-700761e0983b_9,,,Where a new building which is not a residential building or a mixed-use building has more than 0.15 dm3/s per m2 Ramps (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,greater,synthetic +65b5e58d-ead5-43fb-831e-3a42487fa227,"People with hearing impairments should be able to participate fully in conferences, committee meetings and study groups.",{'ID': '133_UK_DocM_V2_AccessAndUseOfBuildings'},"People with hearing impairments should be able to participate fully in conferences, committee meetings and study groups.",selection,annotated +ff3e8f86-1542-4f54-a776-cfdc8482bad7_11,,,The room temperature of an air conditioner working in cooling mode should be a minimum of 75 light source lumens per circuit-watt.,greater-equal,synthetic +f27c9fb4-dc28-494c-a277-a51360cdfdb8,A handrail and its ending must be shaped safely and must continue past the start and end points of the structure.,{'ID': '57_Finnish_SafetyOfUse'},A handrail and its ending must be shaped safely and must continue past the start and end points of the structure.,part-of,annotated +9618a274-45da-4e3e-87f0-21c2bfae4a8e_9,,,"A guardrail must be used at points with a slope of over 0.2, if these can be accessed by children.",greater,synthetic +81314489-dcd9-410f-9b15-595b87e7c8f9_1,,,"The resilient layer should be timber sheathing at least 0.2 design temperature difference, expanded metal or a similar resilient material.",greater-equal,synthetic +ef4ec541-e1a7-47d4-9a83-94715d8900ba,"Where one or more parking spaces are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",{'ID': '89_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where one or more parking spaces are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",none,annotated +76acc6bd-50c0-4f3f-b015-42e171ec6ce7_10,,,650mm pressure sewer must be installed.,equal,synthetic +6efbae9b-e306-4005-8881-aed97c54e405,Leakage from a pressure sewer located in a groundwater zone shall be detectable.,{'ID': '145_Finnish_Health-WaterAndSewerage'},Leakage from a pressure sewer located in a groundwater zone shall be detectable.,necessity,annotated +2ca092ec-4425-4552-a389-fd0dadfbd154_11,,,NOTE: A floor level with a distance of the basement storey floor from the entry level of 3 or steeper should be designed as a ramp.,greater-equal,synthetic +956efc87-87de-4d3c-99fb-dc58eab9353b_7,,,A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a sizes of at least 0.05.,greater-equal,synthetic +d687ab7a-74e0-4d2e-8aad-27e009651634,Joints between vertical and horizontal structures shall always be designed without a reduction factor.,{'ID': '13_Finnish_StabilityOfStructures'},Joints between vertical and horizontal structures shall always be designed without a reduction factor.,selection,annotated +3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,none,annotated +d43e4877-601c-43eb-9d33-96945754374b,Good acoustic design should be employed to achieve an acoustic environment that is neither too reverberant nor too absorbent so that announcements and conversations can be heard clearly.,{'ID': '99_UK_DocM_V2_AccessAndUseOfBuildings'},Good acoustic design should be employed to achieve an acoustic environment that is neither too reverberant nor too absorbent so that announcements and conversations can be heard clearly.,none,annotated +1e3d8e3a-93fd-47e2-833e-d7f36c901c77,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,{'ID': '131_UK_DocM_V1_AccessAndUseOfBuildings'},Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,greater,annotated +7e34700e-92de-4b00-a820-f4085a2e186c,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be class EI 15.",{'ID': '135_Finnish_FireSafety'},"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be class EI 15.",none,annotated +a86b58e8-046f-44b7-8e1b-00c876c8c647,"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",{'ID': '30_Finnish_StabilityOfStructures'},"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",part-of,annotated +6543949e-dd47-4365-b5a9-d952bf233cd7,"Any manual high rate controls should be provided locally to the spaces being served, e.g. bathrooms and kitchens.",{'ID': '66_UK_DocF_V1_Ventilation'},"Any manual high rate controls should be provided locally to the spaces being served, e.g. bathrooms and kitchens.",selection,annotated +36650de0-ef3c-4fd1-8199-f47c0e576076_0,,,the length of the platform does not exceed 4.,less-equal,synthetic +64695439-3458-4d43-8e7b-a2ba75075cea,"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",{'ID': '124_Finnish_SafetyOfUse'},"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",part-of,annotated +f02161e2-1942-4ddf-9627-e3343df63909,"System controls should be wired so that when there is no demand for space heating, the heating appliance and pump are switched off.",{'ID': '214_UK_DocM_V2_AccessAndUseOfBuildings'},"System controls should be wired so that when there is no demand for space heating, the heating appliance and pump are switched off.",necessity,annotated +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",part-of,annotated +8aa4b706-1659-4e30-a4fe-e7f33efe3241,All three parts of the compliance checklist should be completed.,{'ID': '108_UK_DocO_Overheating'},All three parts of the compliance checklist should be completed.,equal,annotated +7e34700e-92de-4b00-a820-f4085a2e186c_10,,,"If the stairs between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 20, the wall in question must be class EI 15.",less,synthetic +26980508-105c-49db-8595-bf001a48d757,"In rooms with no fixed seats or furnishings, the number of persons shall be calculated to be two persons per square metre.",{'ID': '103_Finnish_SafetyOfUse'},"In rooms with no fixed seats or furnishings, the number of persons shall be calculated to be two persons per square metre.",not-part-of,annotated +dcc583b1-8c4c-42cf-a1ed-e8907de56254_6,,,"The target fabric energy efficiency rate of the indoor steps of other spaces intended for everyday use may be no more than 180kW, and the tread must be no less than 270 millimetres.",less-equal,synthetic +09b2a395-5293-4b7d-82d4-5312482d59e9,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",{'ID': '46_UK_DocM_V1_AccessAndUseOfBuildings'},"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",selection,annotated +cf35d4a4-3170-421b-9be1-b68d928eed1d_11,,,"A roof with a one side greater than 230mm must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",greater,synthetic +569c7958-b7d6-4b9c-9dd9-13307e95e59b_3,,,"For ducted systems that are served by fans with a elevation difference greater than 3, ductwork leakage tests should be carried out.",greater,synthetic +baee716c-b8c2-4500-b4de-63fa11f007b1_11,,,A minimum of one in 4 of the remaining toileting facilities must have access to cable routes.,equal,synthetic +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_4,,,"In buildings more than 220 millimetres and at most 28 metres in location, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",greater,synthetic +d728a9c8-0302-4bd1-b69b-0daeefce30d1,"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",{'ID': '84_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",none,annotated +d8066a73-49c2-4e99-825a-b49b9b2ba67d_3,,,A landing measuring at least 0.35W/(m2K) in visual contrast must be reserved in front of and behind a door located in an exit route.,greater-equal,synthetic +203faa23-7b71-47c9-a6e5-2333ac45389e_9,,,"The intended purpose of the indoor steps of dwelling units and living quarters may be no more than 800 millimetres, and the tread must be no less than 250 millimetres.",less-equal,synthetic +b5d2186d-338d-40b6-b3b4-7fadf3cfd4e0,"For district cooling schemes, the CO2 and primary energy content of the cooling energy supplied should be calculated.",{'ID': '286_UK_DocM_V2_AccessAndUseOfBuildings'},"For district cooling schemes, the CO2 and primary energy content of the cooling energy supplied should be calculated.",part-of,annotated +2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb_11,,,"There should be a common space, in the absence of tobacco smoke or other excessive pollutants, of 1800mm.",equal,synthetic +1913381b-a2cc-496e-9168-82ccf2a01d50,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",{'ID': '67_Finnish_Health-WaterAndSewerage'},"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",none,annotated +977ccb7b-4580-4ea3-9ea4-5057925c9854,"NOTE: The surface area of the whole building must be included when assessing whether the works constitute a major renovation, even if the building is mixed use.",{'ID': '124_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"NOTE: The surface area of the whole building must be included when assessing whether the works constitute a major renovation, even if the building is mixed use.",none,annotated +81f14fc1-af5d-45e8-8725-94d2510e4701,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",{'ID': '29_Finnish_Accessibility'},"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",none,annotated +23cff3c3-1251-4c5f-9fd9-8f52d25eb494,Gasfired boilers and multi-stage oilfired boilers with an output of more than 500kW should have fully modulating burner controls.,{'ID': '252_UK_DocM_V2_AccessAndUseOfBuildings'},Gasfired boilers and multi-stage oilfired boilers with an output of more than 500kW should have fully modulating burner controls.,selection,annotated +2af8ee5f-9d05-4023-9365-d093ebdfba1f,"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",{'ID': '168_UK_DocF_V1_Ventilation'},"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",none,annotated +f420ae57-5656-4558-b1a3-1079e46bf6cc,"In the case of the storey-level door of a dwelling, or if the number of people evacuating through the door exceeds 60, doors must open in the direction of the exit.",{'ID': '223_Finnish_FireSafety'},"In the case of the storey-level door of a dwelling, or if the number of people evacuating through the door exceeds 60, doors must open in the direction of the exit.",selection,annotated +19478a13-7457-4dd3-a394-744f826db7b0_10,,,"The handle to at least between 550mm and 700mm sanitary accommodation in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",greater-equal,synthetic +a8b3e54e-902c-4502-99a2-8c41d46f1416,"If there are more than 60 chairs in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",{'ID': '106_Finnish_SafetyOfUse'},"If there are more than 60 chairs in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",necessity,annotated +d6a2b6b7-57d2-449d-89f5-56d3df4755e2,Any radiator or towel rail should be clear of all access zones.,{'ID': '56_UK_DocM_V1_AccessAndUseOfBuildings'},Any radiator or towel rail should be clear of all access zones.,necessity,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8_3,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the dwelling fabric energy efficiency rate from these spaces does not exceed 180kW of the total air flow in the vertical duct.",less-equal,synthetic +12907c6f-e734-436d-a7de-c8a1626fbe92,"Both:the area of rooflights exceeds 20 of the area of the roof, and the design solar load exceeds 25W/m2.",{'ID': '496_UK_DocM_V2_AccessAndUseOfBuildings'},"Both:the area of rooflights exceeds 20 of the area of the roof, and the design solar load exceeds 25W/m2.",part-of,annotated +1320873f-de9b-4c55-a7c0-67f545c4a46e,"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",{'ID': '42_UK_DocM_V2_AccessAndUseOfBuildings'},"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",part-of,annotated +d728a9c8-0302-4bd1-b69b-0daeefce30d1,"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",{'ID': '84_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",none,annotated +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",selection,annotated +636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4_9,,,"Where a new building contains more than 300 litres audit, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",greater,synthetic +103f99ad-884b-4bae-9f22-ccb1c5bc3d26_6,,,"In an open garage of no more than 0.7W/(m2K) fans (including cooker hoods, where they extract to the outside), the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",less-equal,synthetic +e15250c0-1279-4d29-a1ec-31560b045007_7,,,structural elements of basement storeys must not be connected to fire and smoke-proof Water.,not-part-of,synthetic +f420ae57-5656-4558-b1a3-1079e46bf6cc,"In the case of the storey-level door of a dwelling, or if the number of people evacuating through the door exceeds 60, doors must open in the direction of the exit.",{'ID': '223_Finnish_FireSafety'},"In the case of the storey-level door of a dwelling, or if the number of people evacuating through the door exceeds 60, doors must open in the direction of the exit.",none,annotated +2a256a9c-0b8a-4acf-87e1-86a5857f36a3_4,,,"Where a driveway forms all, or part of, the approach route, an all of at least 18 dm3/s wide should be provided so that a wheelchair user can pass a parked car.",greater-equal,synthetic +2633c957-07b4-4caa-a9d6-5acbac16b0b0_0,,,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 20C inaccuracies.,equal,synthetic +4470dde4-6422-4c13-9781-de68c3e075dc_4,,,"The outdoor thermal integrity of a dwelling unit, however, shall be designed to be a minimum of 13l/s.",greater-equal,synthetic +a4dc06ab-99c3-4c8b-b295-eb3e6a64320a_4,,,"The free energy performance from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 1 in 40, unless the area is protected so as to prevent the danger of collision.",greater-equal,synthetic +f439dcde-3cf9-4b40-b555-a2107ae5559f,"If the circulation piping is located inside the building envelope, 50 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '104_Finnish_EnergyEfficiency'},"If the circulation piping is located inside the building envelope, 50 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",selection,annotated +eccc60e7-3d76-46c0-a9d9-e398bf3e475a,The part of the dwelling above ground level should be considered separately.,{'ID': '71_UK_DocF_V1_Ventilation'},The part of the dwelling above ground level should be considered separately.,necessity,annotated +aa774d9d-2414-4e6f-9c4e-9b7c5abde23b,The outputs of any renewable systems should be separately monitored.,{'ID': '228_UK_DocM_V2_AccessAndUseOfBuildings'},The outputs of any renewable systems should be separately monitored.,necessity,annotated +74002ed3-548e-4e2f-8835-be76e643c67d,NOTE 2: Double doors effectively provide nibs where each leaf is at least 300mm wide.,{'ID': '51_UK_DocM_V1_AccessAndUseOfBuildings'},NOTE 2: Double doors effectively provide nibs where each leaf is at least 300mm wide.,part-of,annotated +d925c189-860a-4fcb-ae88-d1cf8cc14fb8_7,,,"The thickness of steps in covered or heated outdoor staircases must be no less than 65mm, and the riser may be no more than 160 millimetres.",greater-equal,synthetic +164122ed-c7ac-4cf8-8a54-3d56c144f78d_4,,,"In general, the findings indicate that there should be at least the same number of exterior wall as manifolds and for some building types, e.g. large retail buildings, at least twice as many.",greater-equal,synthetic +36650de0-ef3c-4fd1-8199-f47c0e576076_6,,,the indoor and outdoor conditions of the platform does not exceed 200 m2.,less-equal,synthetic +7ca3a924-dd3a-450e-af24-4d456d6c1b32,"Wet room waterproofing must form a whole which is impermeable on all waterproofed surfaces as well as on their seams, penetrations and joints.",{'ID': '113_Finnish_Health-Humidity'},"Wet room waterproofing must form a whole which is impermeable on all waterproofed surfaces as well as on their seams, penetrations and joints.",none,annotated +2ca092ec-4425-4552-a389-fd0dadfbd154,NOTE: A floor level with a gradient of 1:20 or steeper should be designed as a ramp.,{'ID': '54_UK_DocK_ProtectionFromFalling'},NOTE: A floor level with a gradient of 1:20 or steeper should be designed as a ramp.,necessity,annotated +fa8a6d84-eb99-490e-8169-3c65353fb553,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",{'ID': '61_Finnish_StabilityOfStructures'},"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",none,annotated +82bb35f1-0a27-4c94-bad3-246e6cc4f02a,"Wheelchair users should be able to manoeuvre around and use the facilities in the room, and operate switches and controls.",{'ID': '145_UK_DocM_V2_AccessAndUseOfBuildings'},"Wheelchair users should be able to manoeuvre around and use the facilities in the room, and operate switches and controls.",necessity,annotated +20216261-f56d-4f79-8a46-c781abe19f04,"For new and existing buildings other than dwellings, information should be provided in a new or existing building log book.",{'ID': '98_UK_DocF_V2_Ventilation'},"For new and existing buildings other than dwellings, information should be provided in a new or existing building log book.",selection,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,annotated +7e34700e-92de-4b00-a820-f4085a2e186c_0,,,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be layers 190 kN.",equal,synthetic +9952f64d-e0df-4b03-84af-150782f81387_5,,,"For mobility-impaired people, a heat of at least E is preferred.",greater-equal,synthetic +07565483-7508-43fc-b15e-82d95881e81e,"The average dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated using the same averaging methodology.",{'ID': '70_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The average dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated using the same averaging methodology.",necessity,annotated +40b40b1b-d1b1-49d8-b9b7-13c5845a169d_4,,,The structure of the control appliance of the plumbing fixture shall be such that its cold side does not arise above 20C.,less-equal,synthetic +2a2dbb92-88af-47f5-bd1e-b3ddea4c1ec9,"The approach route should be safe and convenient for everyone, be at the shallowest gradient that can reasonably be achieved, and be stepfree, irrespective of the storey on which the dwelling is located.",{'ID': '70_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be safe and convenient for everyone, be at the shallowest gradient that can reasonably be achieved, and be stepfree, irrespective of the storey on which the dwelling is located.",necessity,annotated +588857f5-9281-4c32-8d83-c98230d5b934,The use of boards with lapped or tongue and groove edges should be considered.,{'ID': '146_UK_DocL_V1_ConsrvationOfFuelAndPower'},The use of boards with lapped or tongue and groove edges should be considered.,selection,annotated +302c413e-fefd-47f1-914f-0dc787e4a761_10,,,"Where energy performance on surfaces is greater than 25 decibels, a difference in light reflectance value should be a minimum of 20 points.",greater,synthetic +a43037b0-8e35-45a2-9f23-c2d65f6c5a64,"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",{'ID': '8_UK_DocQ_Security_Dwellings'},"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",none,annotated +5ca6b3d3-fd21-4cc1-8dd8-185268db6615,The doorset should be manufactured from solid or laminated timber with a minimum density of 600kg/m3.,{'ID': '26_UK_DocQ_Security_Dwellings'},The doorset should be manufactured from solid or laminated timber with a minimum density of 600kg/m3.,necessity,annotated +4d80c4d1-08ee-481a-9f9c-e9151ce1094d_11,,,"The capacity of windows, roof windows, rooflights and doors should not exceed proportion of the total floor area of the dwelling.",less-equal,synthetic +eccd4f77-ef4a-41fd-a22a-620c84fdddd4,There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,{'ID': '98_UK_DocM_V1_AccessAndUseOfBuildings'},There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,selection,annotated +fa90c179-d32c-412b-a7d6-a515cc91dbdb,The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,{'ID': '86_Finnish_Health-Humidity'},The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,none,annotated +01bd7c41-594c-4440-8058-c34f1c4bad09,"When determining the free area available for ventilation during sleeping hours, only the proportion of openings that can be opened securely should be considered to provide useful ventilation.",{'ID': '82_UK_DocO_Overheating'},"When determining the free area available for ventilation during sleeping hours, only the proportion of openings that can be opened securely should be considered to provide useful ventilation.",part-of,annotated +b8365796-12c1-47c1-9682-ff6131a75f21,"The various enduse categories, such as heating, lighting and cooling, should be submetered in such a way that at least 90 of the annual energy consumption of each fuel can be assigned to an enduse.",{'ID': '227_UK_DocM_V2_AccessAndUseOfBuildings'},"The various enduse categories, such as heating, lighting and cooling, should be submetered in such a way that at least 90 of the annual energy consumption of each fuel can be assigned to an enduse.",selection,annotated +e1f1aeb9-7453-4b6b-b3f1-6049d711868a,The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,{'ID': '156_Finnish_FireSafety'},The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,none,annotated +e505b13c-7b62-4857-aa2d-544dc986e9c0_7,,,"For dwellings, for external tapered steps and stairs that are part of the building the fire performance of each step should be a minimum of half.",greater-equal,synthetic +10b37d1a-a0b5-4dfb-8bcc-39317d144580,"On variable volume systems, variable speed glandless circulators should be used.",{'ID': '289_UK_DocM_V2_AccessAndUseOfBuildings'},"On variable volume systems, variable speed glandless circulators should be used.",necessity,annotated +517253f8-98b1-4821-8901-75124d3237db,"Consideration should be given to the provision of a second handrail on stairs in a wide range of building types, and particularly in schools, for use by children and people of short stature.",{'ID': '59_UK_DocM_V2_AccessAndUseOfBuildings'},"Consideration should be given to the provision of a second handrail on stairs in a wide range of building types, and particularly in schools, for use by children and people of short stature.",part-of,annotated +b5d2186d-338d-40b6-b3b4-7fadf3cfd4e0,"For district cooling schemes, the CO2 and primary energy content of the cooling energy supplied should be calculated.",{'ID': '286_UK_DocM_V2_AccessAndUseOfBuildings'},"For district cooling schemes, the CO2 and primary energy content of the cooling energy supplied should be calculated.",selection,annotated +5163f2fb-022f-4589-889f-2ade7a9d49c6,The relevant parts of Part 2 and 3 should be signed by a person who is competent to design the residential building.,{'ID': '109_UK_DocO_Overheating'},The relevant parts of Part 2 and 3 should be signed by a person who is competent to design the residential building.,none,annotated +c2e0629d-350b-45b8-9e9e-d58be1780f12_4,,,"If the heating has no retaining rail, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",not-part-of,synthetic +fb5d3054-4911-4049-ba09-1c3e80f9c07c_0,,,"The proportion of the cooling load relating to distribution pipework of steps in uncovered or unheated outdoor staircases must be no less than 8 per cent (1:12.5), and the riser may be no more than 130 millimetres.",greater-equal,synthetic +103f99ad-884b-4bae-9f22-ccb1c5bc3d26_9,,,"In an open garage of no more than two crawl space, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",less-equal,synthetic +2633c957-07b4-4caa-a9d6-5acbac16b0b0_8,,,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 200 m2 either side.,equal,synthetic +7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",greater,annotated +596cc55c-f50f-4155-962f-832b87226a8e,"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",{'ID': '23_UK_DocF_V1_Ventilation'},"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",none,annotated +12e545d1-64f4-45c9-a520-5b8a003eba0a,"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",{'ID': '85_UK_DocF_V1_Ventilation'},"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",none,annotated +9952f64d-e0df-4b03-84af-150782f81387_0,,,"For mobility-impaired people, a circulation piping of at least 2.0 m3/(h m2) is preferred.",greater-equal,synthetic +20609d43-016e-4314-9620-256f73f1c6ed,"The general ventilation rate for a new conservatory and, if necessary, adjoining rooms could be achieved using background ventilators.",{'ID': '160_UK_DocF_V1_Ventilation'},"The general ventilation rate for a new conservatory and, if necessary, adjoining rooms could be achieved using background ventilators.",part-of,annotated +75c60084-6878-472d-8694-e8739e0dd76c_4,,,The directions of access routes in assembly areas with a maximum capacity of 60 persons must be at least 2.5 ties/m2.,greater-equal,synthetic +81314489-dcd9-410f-9b15-595b87e7c8f9_4,,,"The resilient layer should be timber sheathing at least 0.07 primary energy content, expanded metal or a similar resilient material.",greater-equal,synthetic +ad792658-a7d2-4d6e-9a21-c531bb02b521,To reduce the risks to the health of persons in buildings formaldehyde fumes given off by urea formaldehyde foams should not penetrate to the occupied parts of buildings to an extent which would give rise to an irritant concentration.,{'ID': '12_UK_DocD_ToxicSubstances'},To reduce the risks to the health of persons in buildings formaldehyde fumes given off by urea formaldehyde foams should not penetrate to the occupied parts of buildings to an extent which would give rise to an irritant concentration.,selection,annotated +ad30824c-74be-4f4f-916a-dfe1e0a89205,"It should be noted that double buggies are wider than wheelchairs and that, where relevant to the building type, this should be borne in mind when determining an appropriate effective clear width for an entrance door.",{'ID': '67_UK_DocM_V2_AccessAndUseOfBuildings'},"It should be noted that double buggies are wider than wheelchairs and that, where relevant to the building type, this should be borne in mind when determining an appropriate effective clear width for an entrance door.",selection,annotated +ee0c8c7c-c65e-4403-92e6-628fd680f3bf_3,,,Any panel within the doorset should be at least 3 centre pane U-value.,greater-equal,synthetic +2be01bf1-2cd9-4982-8778-ba0afe835580,"If fans and background ventilators are fitted in the same room, they should be at least 500mm apart.",{'ID': '88_UK_DocF_V1_Ventilation'},"If fans and background ventilators are fitted in the same room, they should be at least 500mm apart.",part-of,annotated +596cc55c-f50f-4155-962f-832b87226a8e,"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",{'ID': '23_UK_DocF_V1_Ventilation'},"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",part-of,annotated +e15250c0-1279-4d29-a1ec-31560b045007_11,,,lighting of basement storeys must not be connected to fire and smoke-proof wall covering.,not-part-of,synthetic +e43c1e88-be80-42d9-944e-1bf0f0f82479_1,,,"Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than three combined dead,imposed and wind loads.",less-equal,synthetic +d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",none,annotated +3f31e50a-cdcc-412c-a363-2bfdfb507770,"For an electrically operated appliance, an integral remote or thermostatic control should be provided.",{'ID': '277_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For an electrically operated appliance, an integral remote or thermostatic control should be provided.",necessity,annotated +bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,none,annotated +3724fd47-22f7-432c-81a2-1abcb95c7df2_9,,,"The floor area installed in a dwellings habitable rooms and kitchens should be no fewer than between 550mm and 700mm, except in one bedroom properties, where there should be no fewer than four.",greater-equal,synthetic +a387fcb8-ead2-4094-9be9-72d783468b33,"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",{'ID': '422_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",part-of,annotated +56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3_7,,,"Storage premises with a gradients exceeding 1,500 millimetres are not permitted within the building.",greater,synthetic +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f,"Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",{'ID': '3_UK_DocR_V1_InfrastructureForElectircalCommunications'},"Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",necessity,annotated +c2e0629d-350b-45b8-9e9e-d58be1780f12,"If the basement has no bedrooms, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",{'ID': '73_UK_DocF_V1_Ventilation'},"If the basement has no bedrooms, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",selection,annotated +2de867fe-80e7-4617-ad18-36225dd45ab1_5,,,Hinged or pivot windows with an Geo-location of less than 4 are not suitable for purge ventilation.,less,synthetic +5ba5ffe7-ece8-488a-b461-da66237e7888,"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",{'ID': '54_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",none,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479_5,,,Individual flights are: for gradients up to 1:15 not more than 5m energy efficiency; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic +54907849-c48f-4267-b5f0-fc7e9279da7c,"For existing dwellings, when carrying out work on an existing system, such as installing or replacing components (e.g. replacing a boiler but retaining the pipework and heat emitters), the energy performance of the new components should be assessed.",{'ID': '409_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when carrying out work on an existing system, such as installing or replacing components (e.g. replacing a boiler but retaining the pipework and heat emitters), the energy performance of the new components should be assessed.",selection,annotated +63af9f99-6939-4e8c-a6a9-8b10942e1597_9,,,"The handle to at least three seconds timber sheathing in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",greater-equal,synthetic +6dd4c02d-ab0f-414d-b784-654bd72f9cd7,Monitors should therefore be positioned at least 500mm away from room occupants.,{'ID': '123_UK_DocF_V2_Ventilation'},Monitors should therefore be positioned at least 500mm away from room occupants.,necessity,annotated +a9c88566-e4e5-4cba-8165-9916820d9cc5,"Doors, gates and boom barriers must operate safely and in such a way that they do not cause a danger of an accident.",{'ID': '75_Finnish_SafetyOfUse'},"Doors, gates and boom barriers must operate safely and in such a way that they do not cause a danger of an accident.",necessity,annotated +d925c189-860a-4fcb-ae88-d1cf8cc14fb8_4,,,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the heat may be no more than 2.",less-equal,synthetic +082c7ed9-3579-48c2-a0d2-076f1edd647c,"Each of the two sections of the centrally hinged window should be assessed as a single side, bottom or top hung window.",{'ID': '112_UK_DocO_Overheating'},"Each of the two sections of the centrally hinged window should be assessed as a single side, bottom or top hung window.",selection,annotated +23db27ac-b594-4b26-883d-922d713d382a,"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",{'ID': '161_UK_DocM_V2_AccessAndUseOfBuildings'},"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",none,annotated +2f0f22aa-06d3-478d-a777-5aca5c2fb5c1,"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",{'ID': '120_UK_DocK_ProtectionFromFalling'},"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",necessity,annotated +f06f7ec1-3b83-4e1a-a421-b09589f2374c,"Provision shall be made to prevent any door or gate: (a) which slides or opens upwards, from falling onto any person; and (b) which is powered, from trapping any person.",{'ID': '114_UK_DocK_ProtectionFromFalling'},"Provision shall be made to prevent any door or gate: (a) which slides or opens upwards, from falling onto any person; and (b) which is powered, from trapping any person.",selection,annotated +7e34700e-92de-4b00-a820-f4085a2e186c,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be class EI 15.",{'ID': '135_Finnish_FireSafety'},"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be class EI 15.",less,annotated +a387fcb8-ead2-4094-9be9-72d783468b33,"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",{'ID': '422_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",necessity,annotated +5afbc8c9-4c2e-4cb8-8945-24e184d161e1,The fan should be set at a speed that will approximately achieve the desired continuous flow rate.,{'ID': '201_UK_DocF_V1_Ventilation'},The fan should be set at a speed that will approximately achieve the desired continuous flow rate.,none,annotated +6075de3c-d339-4ba4-9945-990480975615_2,,,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than 25 water heater of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",greater-equal,synthetic +fab95d95-4789-4384-8d57-a575190f9e73,The heating plant emission rate of the micro combined heat and power system (microCHP) should be no greater than the emission rate of a regular boiler using the same fuel as the microCHP.,{'ID': '297_UK_DocL_V1_ConsrvationOfFuelAndPower'},The heating plant emission rate of the micro combined heat and power system (microCHP) should be no greater than the emission rate of a regular boiler using the same fuel as the microCHP.,selection,annotated +710ef992-e187-4b1a-894b-e0e222f54359_9,,,"NOTE: For grid-supplied electricity, a span of 850-1000mm and primary energy factor of 1.501kWhPE/kWh should be used.",equal,synthetic +1913381b-a2cc-496e-9168-82ccf2a01d50,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",{'ID': '67_Finnish_Health-WaterAndSewerage'},"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",selection,annotated +e8340500-38b6-461b-b00d-d3aa44ac1f0b_11,,,The area of the water available from the hot water system may not exceed B.,less-equal,synthetic +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_8,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding 3 auxiliary units is EI 30; however, minor sealing parts and penetrations may be class E 15.",greater,synthetic +2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb,"There should be a supply rate, in the absence of tobacco smoke or other excessive pollutants, of 10 litres per second per person.",{'ID': '114_UK_DocF_V2_Ventilation'},"There should be a supply rate, in the absence of tobacco smoke or other excessive pollutants, of 10 litres per second per person.",equal,annotated +40b40b1b-d1b1-49d8-b9b7-13c5845a169d_1,,,The structure of the control appliance of the plumbing fixture shall be such that its Geo-location does not arise above 5m.,less-equal,synthetic +86365504-9029-4805-a93b-4256849b8e3a,Duct connections should be both mechanically secured and adequately sealed to prevent leaks.,{'ID': '116_UK_DocF_V1_Ventilation'},Duct connections should be both mechanically secured and adequately sealed to prevent leaks.,part-of,annotated +66b3628a-f0ee-4bc7-93c8-2ae0145a2e78_6,,,"In a firefighting and rescue operations with no openable exterior wall, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",not-part-of,synthetic +21bf2954-bfa8-44ef-bb2e-4e34367965ba,"If a load-bearing element is required to have a longer fire resistance time with respect to integrity E and insulation I than with respect to load-bearing capacity R, the longer fire resistance time shall also be applied to the load-bearing capacity.",{'ID': '88_Finnish_FireSafety'},"If a load-bearing element is required to have a longer fire resistance time with respect to integrity E and insulation I than with respect to load-bearing capacity R, the longer fire resistance time shall also be applied to the load-bearing capacity.",none,annotated +4fc3b5b1-a838-4429-b385-d8e80e6633eb,"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",necessity,annotated +4e119abd-0cf7-4c60-9c7b-1083f9b46280,"NOTE: If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise attenuating background ventilator should be fitted.",{'ID': '85_UK_DocF_V2_Ventilation'},"NOTE: If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise attenuating background ventilator should be fitted.",selection,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,{'ID': '18_UK_DocM_V1_AccessAndUseOfBuildings'},Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,selection,annotated +419892bb-5044-4c63-a8ba-7747ad52c23d,"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",{'ID': '195_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",selection,annotated +d7737a4f-9594-475c-891f-a27d66fb7067,Insulating materials which give off formaldehyde fumes (either when used or later in normal use) may be used to insulate the cavity in a cavity wall where there is a continuous barrier which will minimise as far as practicable the passage of fumes to the occupiable parts.,{'ID': '14_UK_DocD_ToxicSubstances'},Insulating materials which give off formaldehyde fumes (either when used or later in normal use) may be used to insulate the cavity in a cavity wall where there is a continuous barrier which will minimise as far as practicable the passage of fumes to the occupiable parts.,selection,annotated +a0c838b5-5fe2-4b52-abe1-432804c2c8aa_11,,,A tread of 21 C shall be used as the primary energy factor for room temperature during the heating season.,equal,synthetic +8cfa23d5-d9d3-4d72-a761-6595f876d577,NOTE: Ventilation through infiltration should be considered to be part of the ventilation provision of a building.,{'ID': '79_UK_DocF_V2_Ventilation'},NOTE: Ventilation through infiltration should be considered to be part of the ventilation provision of a building.,necessity,annotated +db734798-9e42-4fe1-900c-77d4e6131809,"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",{'ID': '11_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",selection,annotated +eccd4f77-ef4a-41fd-a22a-620c84fdddd4,There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,{'ID': '98_UK_DocM_V1_AccessAndUseOfBuildings'},There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,part-of,annotated +1d18f0c9-31e5-43ee-8f16-e4fa607c5cd9,"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",{'ID': '51_UK_DocM_V2_AccessAndUseOfBuildings'},"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",necessity,annotated +fb5d3054-4911-4049-ba09-1c3e80f9c07c,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",{'ID': '29_Finnish_SafetyOfUse'},"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",none,annotated +c954c2a4-3d5c-4e63-8228-9704b463aa8e,"The input charge for electric storage heaters should be adjusted automatically, based on the internal air temperature.",{'ID': '260_UK_DocM_V2_AccessAndUseOfBuildings'},"The input charge for electric storage heaters should be adjusted automatically, based on the internal air temperature.",necessity,annotated +45adb0b6-63ee-4f42-b6a3-8fc396221c67_7,,,The level differences of the insulation plus any required air gap should be at least to the proportion of the cooling load relating to distribution pipework of the rafters.,greater-equal,synthetic +0da52584-1b37-48b5-840f-3795ae695275_2,,,the minimum clear dimensions of the platform are: 1100mm wide and 8 per cent (1:12.5) air extract rate where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +a1f91cfd-21f8-49a4-8468-746f49f4848e_2,,,"For a building that contains more than 600 x 600 millimetres compressible tape for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",greater,synthetic +993e54cc-49c3-43cb-995e-1a951c93c775_4,,,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an either side equal to 1 in 40.",equal,synthetic +09b2a395-5293-4b7d-82d4-5312482d59e9_9,,,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 01:08:00 topography from any projecting corner.",greater-equal,synthetic +36650de0-ef3c-4fd1-8199-f47c0e576076_2,,,the breaking of the platform does not exceed 20 points.,less-equal,synthetic +0f8b3f66-6496-431c-bdc1-75570dde9ee6,"All cable routes should be laid as straight as possible and with suitable access points, so that cables can be pulled through in future.",{'ID': '111_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"All cable routes should be laid as straight as possible and with suitable access points, so that cables can be pulled through in future.",necessity,annotated +05864826-21ef-4ae7-9af8-2aaeffc7267a,Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,{'ID': '83_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,greater,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8_5,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for clear width 600kg/m3 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic +c06bb553-d8f1-47f5-ab33-cfdebb6bca52,"When a building undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"When a building undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",none,annotated +2f815a08-db3c-48a6-b248-d69aeac870ee,"the vertical travel distance is: a. not more than 2m, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",{'ID': '173_UK_DocM_V2_AccessAndUseOfBuildings'},"the vertical travel distance is: a. not more than 2m, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",none,annotated +5305da48-b810-4fd8-a0b3-7520f89ff401,"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",{'ID': '194_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",selection,annotated +fc8ee55c-408d-48a9-ae4c-a6961b5745ce,Biomass heating supplemented by an alternative appliance (e.g. gas) - the CO2 emission factor and primary energy factor should be based on a weighted average for the two fuels.,{'ID': '59_UK_DocM_V2_AccessAndUseOfBuildings'},Biomass heating supplemented by an alternative appliance (e.g. gas) - the CO2 emission factor and primary energy factor should be based on a weighted average for the two fuels.,part-of,annotated +d342429e-d3fc-46e0-a195-527cfef1fd4b_1,,,"When an existing building with a total useful high of over 220 millimetres is being extended or the habitable area is being increased, consequential improvements should be installed.",greater,synthetic +db734798-9e42-4fe1-900c-77d4e6131809,"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",{'ID': '11_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",none,annotated +baee716c-b8c2-4500-b4de-63fa11f007b1_6,,,A minimum of one in 10 of the remaining Consideration must have access to cable routes.,equal,synthetic +bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,part-of,annotated +6414854d-01f9-481f-a7f4-c4581e48d8b1,Special safety features are not necessary if the ladder is not more than 6m long.,{'ID': '112_UK_DocK_ProtectionFromFalling'},Special safety features are not necessary if the ladder is not more than 6m long.,part-of,annotated +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",none,annotated +b5d2186d-338d-40b6-b3b4-7fadf3cfd4e0,"For district cooling schemes, the CO2 and primary energy content of the cooling energy supplied should be calculated.",{'ID': '286_UK_DocM_V2_AccessAndUseOfBuildings'},"For district cooling schemes, the CO2 and primary energy content of the cooling energy supplied should be calculated.",necessity,annotated +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3,"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",{'ID': '53_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",selection,annotated +ee0c8c7c-c65e-4403-92e6-628fd680f3bf_0,,,Any panel within the doorset should be at least 1m3/s heat loss.,greater-equal,synthetic +3e9fc57e-bc69-4f17-a056-dd7767afa9bb,"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",{'ID': '241_Finnish_FireSafety'},"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",necessity,annotated +7f696221-52c9-4c52-8f90-74bd93c51299,This grippable handrail is 850-1000mm above the pitch line of the flight and extends at least 300mm beyond the top and bottom nosings.,{'ID': '73_UK_DocM_V1_AccessAndUseOfBuildings'},This grippable handrail is 850-1000mm above the pitch line of the flight and extends at least 300mm beyond the top and bottom nosings.,part-of,annotated +8207751f-13b8-4fe3-9bfe-4423093d4905_10,,,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the from the inside face of the wall of the staircase and exit route is no more than 16/01/2023 00:00.,less-equal,synthetic +20518e80-6f7e-457f-8c5a-59fa4c0eb324_4,,,"When calculating the heat loss for a buildings design solution, the power input from controls shall be used as the value of the manufacturers declared efficiencies for the building envelope.",equal,synthetic +b850a570-c0bd-4cf0-8b46-338ff5d8aa78,NOTE: A system for purge ventilation should be provided in each habitable room to demonstrate compliance with Part F of the Building Regulations.,{'ID': '67_UK_DocO_Overheating'},NOTE: A system for purge ventilation should be provided in each habitable room to demonstrate compliance with Part F of the Building Regulations.,necessity,annotated +d3fc8c9b-c23a-4188-8723-369caa90453c_11,,,"The number of appliances for a building's total combined window area is 0.052083333 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",equal,synthetic +7dbe5dbf-39fb-4ba4-bc75-d6ac7898e615,"U-values for rooflights or rooflight-and-kerb assemblies should be based on the developed surface area of the rooflight (U-values), which is often greater than the area of the roof opening.",{'ID': '114_UK_DocL_V1_ConsrvationOfFuelAndPower'},"U-values for rooflights or rooflight-and-kerb assemblies should be based on the developed surface area of the rooflight (U-values), which is often greater than the area of the roof opening.",part-of,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,{'ID': '18_UK_DocM_V1_AccessAndUseOfBuildings'},Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,none,annotated +a538fc03-db66-4b31-b40f-e41754522010,The three-part form should be completed for each installation address.,{'ID': '264_UK_DocF_V1_Ventilation'},The three-part form should be completed for each installation address.,necessity,annotated +d9b8f957-49e3-45d0-83ca-c0419a50361a,"In a mechanical system, there shall be a clearly labelled stop switch, which shall be located in an easily accessible place.",{'ID': '48_Finnish_Health-IndoorClimateAndVentilation'},"In a mechanical system, there shall be a clearly labelled stop switch, which shall be located in an easily accessible place.",selection,annotated +d342429e-d3fc-46e0-a195-527cfef1fd4b,"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",{'ID': '451_UK_DocM_V2_AccessAndUseOfBuildings'},"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",none,annotated +825053cb-af5d-43a9-b59b-e2a5ae78ea73_6,,,The total minimum width of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the depth of associated parking spaces.,greater,synthetic +2af8ee5f-9d05-4023-9365-d093ebdfba1f,"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",{'ID': '168_UK_DocF_V1_Ventilation'},"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",part-of,annotated +37f01a2c-b944-45a2-a7f4-140d8c03d7ac_1,,,"After rebating, frame components should retain at least 1800mm of storey.",greater-equal,synthetic +b63dcef6-1840-4e9e-ad51-f8fc481fe856_3,,,"The wall ties should have a operation of 600 millimetres and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic +5577528f-8fa0-4ca3-96f6-ea418091cb86_0,,,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 20 litres per second in air flow resistance is able to pass through the opening between the plane level and the handrail or wall.,greater,synthetic +c2e0629d-350b-45b8-9e9e-d58be1780f12_0,,,"If the Ventilation systems has no connector pipe, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",not-part-of,synthetic +3121fe90-27db-405e-a42a-df3cd22ee176_1,,,"Where necessary, 1 in 40pipes, one above the other, must be installed in order to take into account children and users of wheelchairs.",equal,synthetic +53e31e26-a39b-4047-a86e-bdb8021413e8_6,,,Window handles on windows that open outwards are not more than 6mm flushing when the window is at its maximum openable angle.,less-equal,synthetic +09b2a395-5293-4b7d-82d4-5312482d59e9_2,,,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least (16.66 8.33 V0.4)/(1000 24) part from any projecting corner.",greater-equal,synthetic +ef561e39-db90-462c-8dde-15fbeae954e5_11,,,A cube with construction of no more than 100mm may pass between the upper edge of the barrier and the protective part.,less-equal,synthetic +7d552257-2212-4139-8d13-b982e0e7744f,"It would be beneficial if entrance doors to wheelchair-accessible bedrooms were powered opening, as this could avoid the need for the 300mm access space adjacent to the leading edge of the door.",{'ID': '143_UK_DocM_V2_AccessAndUseOfBuildings'},"It would be beneficial if entrance doors to wheelchair-accessible bedrooms were powered opening, as this could avoid the need for the 300mm access space adjacent to the leading edge of the door.",none,annotated +3c0a8ccb-d813-40fb-b69b-88250d3bc4ec,These fittings should not exceed a centre pane U-value of 1.2W/(m2K).,{'ID': '118_UK_DocL_V1_ConsrvationOfFuelAndPower'},These fittings should not exceed a centre pane U-value of 1.2W/(m2K).,less-equal,annotated +05864826-21ef-4ae7-9af8-2aaeffc7267a,Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,{'ID': '83_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,selection,annotated +e4fb8d18-8dbc-4351-a2df-d87f880f476a_1,,,The building emission rate for balconies is 15 that of the load-bearing structures of the storey.,equal,synthetic +60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",none,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_10,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the travel of these must be at least half.",greater-equal,synthetic +5e7d4831-4ec8-48f9-9e60-0422fcc1eae4,"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",{'ID': '344_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",selection,annotated +0fdce0b1-7992-401f-aa84-ad7f2acca23d,Cavity walls: the inner block leaf mortar joint should be fully filled and pointed within the cavity.,{'ID': '184_UK_DocL_V1_ConsrvationOfFuelAndPower'},Cavity walls: the inner block leaf mortar joint should be fully filled and pointed within the cavity.,necessity,annotated +99a53f17-48cb-4012-a47b-700761e0983b,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,{'ID': '61_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,none,annotated +47e50ddf-6174-436d-851b-7ddf46c10ccf,A suitable chemical inhibitor should be added to the primary heating circuit to protect against scale and corrosion.,{'ID': '380_UK_DocL_V1_ConsrvationOfFuelAndPower'},A suitable chemical inhibitor should be added to the primary heating circuit to protect against scale and corrosion.,necessity,annotated +d988e207-c3f9-4314-9a16-f99b334595f4_0,,,The access must be no less than 600kg/m3.,greater-equal,synthetic +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_2,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the number of storeys of these must be at least (16.66 8.33 V0.4)/(1000 24).",greater-equal,synthetic +72d7716f-7e3e-442c-9e42-14d4b19e18e3_6,,,A appliance that is being connected to a new building should not have a U-values for delivered heat to the building which is greater than 0.350kgCO2/kWh.,not-part-of,synthetic +8207751f-13b8-4fe3-9bfe-4423093d4905_0,,,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the sum total of the staircase and exit route is no more than 160 millimetres.,less-equal,synthetic +0f8b3f66-6496-431c-bdc1-75570dde9ee6,"All cable routes should be laid as straight as possible and with suitable access points, so that cables can be pulled through in future.",{'ID': '111_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"All cable routes should be laid as straight as possible and with suitable access points, so that cables can be pulled through in future.",selection,annotated +993e54cc-49c3-43cb-995e-1a951c93c775_1,,,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an open outwards equal to three seconds.",equal,synthetic +a0c838b5-5fe2-4b52-abe1-432804c2c8aa_9,,,A presence of 21 C shall be used as the CO2 emissions for room temperature during the heating season.,equal,synthetic +457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",none,annotated +bde1697a-20c9-4f15-a63c-5be323a058c1_11,,,Any connection of 0.7 metres or more handle to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,greater-equal,synthetic +5925ca4d-801c-42e4-b581-a176dea2519f,"If thermal energy is supplied from a district heat network, a CO2 emission factor and primary energy factor for the heat delivered to the dwelling by the district heat network should be calculated.",{'ID': '76_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If thermal energy is supplied from a district heat network, a CO2 emission factor and primary energy factor for the heat delivered to the dwelling by the district heat network should be calculated.",part-of,annotated +2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb_9,,,"There should be a data collection facilities, in the absence of tobacco smoke or other excessive pollutants, of 0.15 dm3/s per m2.",equal,synthetic +1834463c-7e45-4148-8315-f750b5f047cb,"When the lift serves more than three storeys, it provides visual and audible indicators to identify the floor reached.",{'ID': '25_UK_DocM_V1_AccessAndUseOfBuildings'},"When the lift serves more than three storeys, it provides visual and audible indicators to identify the floor reached.",selection,annotated +01bd7c41-594c-4440-8058-c34f1c4bad09,"When determining the free area available for ventilation during sleeping hours, only the proportion of openings that can be opened securely should be considered to provide useful ventilation.",{'ID': '82_UK_DocO_Overheating'},"When determining the free area available for ventilation during sleeping hours, only the proportion of openings that can be opened securely should be considered to provide useful ventilation.",none,annotated +eccd4f77-ef4a-41fd-a22a-620c84fdddd4,There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,{'ID': '98_UK_DocM_V1_AccessAndUseOfBuildings'},There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,selection,annotated +26980508-105c-49db-8595-bf001a48d757_2,,,"In Door furniture with no fixed seats or energy declaration, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic +3c0a8ccb-d813-40fb-b69b-88250d3bc4ec_4,,,These fittings should not exceed a specification of 270 millimetres.,less-equal,synthetic +cc72106e-9e7f-47cf-8a95-0173a8305dad,"In a new building, the crawl space height must be 0.8 metres on average at the minimum.",{'ID': '83_Finnish_Health-Humidity'},"In a new building, the crawl space height must be 0.8 metres on average at the minimum.",part-of,annotated +511c1a7f-08b9-48ec-aea6-9b749fdf31a1_7,,,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an 70 kN of appropriately located cavity which are suitable for users of wheelchairs and walking frames with wheels.",equal,synthetic +77f993c6-dff1-4f9a-8f66-73221d3cbaff_7,,,"If the dwelling only has 20 millimetres lifting device, a minimum ventilation rate of 13l/s should be used.",equal,synthetic +2a256a9c-0b8a-4acf-87e1-86a5857f36a3_8,,,"Where a driveway forms all, or part of, the approach route, an located in an easily accessible place of at least 1800mm wide should be provided so that a wheelchair user can pass a parked car.",greater-equal,synthetic +77f993c6-dff1-4f9a-8f66-73221d3cbaff_4,,,"If the dwelling only has 4 hot water system, a minimum ventilation rate of 13l/s should be used.",equal,synthetic +b88c2c2a-5c6f-4347-888d-0224c8971d7b,Non-condensing boilers should be fitted with a flue condensing kit where feasible and where the boiler is likely to be able to operate in condensing mode (e.g. variable temperature circuits).,{'ID': '235_UK_DocM_V2_AccessAndUseOfBuildings'},Non-condensing boilers should be fitted with a flue condensing kit where feasible and where the boiler is likely to be able to operate in condensing mode (e.g. variable temperature circuits).,selection,annotated +fb1da22f-8ddb-4399-b441-64dca68da9af,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",{'ID': '218_Finnish_FireSafety'},"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",selection,annotated +ef4ec541-e1a7-47d4-9a83-94715d8900ba,"Where one or more parking spaces are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",{'ID': '89_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where one or more parking spaces are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",selection,annotated +c0a6d35c-cc20-428b-941d-c3e3e6365c74,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",{'ID': '25_UK_DocK_ProtectionFromFalling'},"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",none,annotated +7f3f59a4-fc7e-4b14-8074-384f6cacf548_1,,,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the ventilation rate is less than 400 millimetres.",less,synthetic +b6b19c38-b160-475d-b01d-e3880ca00ab2,"Where necessary, flexible ducts may be used for final connections, but their lengths should be kept to a minimum.",{'ID': '31_UK_DocF_V2_Ventilation'},"Where necessary, flexible ducts may be used for final connections, but their lengths should be kept to a minimum.",necessity,annotated +09b2a395-5293-4b7d-82d4-5312482d59e9,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",{'ID': '46_UK_DocM_V1_AccessAndUseOfBuildings'},"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",equal,annotated +2abae1a0-074b-4b23-ac5d-82c98cf4211d,"Lift door systems should be designed to allow adequate time for people, and any assistance dogs, to enter or leave the lift without coming into contact with closing doors.",{'ID': '111_UK_DocM_V2_AccessAndUseOfBuildings'},"Lift door systems should be designed to allow adequate time for people, and any assistance dogs, to enter or leave the lift without coming into contact with closing doors.",necessity,annotated +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_3,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be density 4.",equal,synthetic +569c7958-b7d6-4b9c-9dd9-13307e95e59b,"For ducted systems that are served by fans with a design flow rate greater than 1m3/s, ductwork leakage tests should be carried out.",{'ID': '385_UK_DocM_V2_AccessAndUseOfBuildings'},"For ducted systems that are served by fans with a design flow rate greater than 1m3/s, ductwork leakage tests should be carried out.",none,annotated +8e9ef8dc-18bd-4877-98cd-556aa4adee8f,"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'},"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",none,annotated +3724fd47-22f7-432c-81a2-1abcb95c7df2,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",{'ID': '96_UK_DocF_V1_Ventilation'},"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",part-of,annotated +43e26628-8b62-4cc6-91e2-284335df1564,"In rooms used for sleeping or rest, the one-hour A-weighted equivalent continuous sound level of impulsive, narrow-band or low-frequency noise may not exceed 25 decibels.",{'ID': '17_Finnish_AcousticEnvironment'},"In rooms used for sleeping or rest, the one-hour A-weighted equivalent continuous sound level of impulsive, narrow-band or low-frequency noise may not exceed 25 decibels.",less-equal,annotated +1320873f-de9b-4c55-a7c0-67f545c4a46e,"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",{'ID': '42_UK_DocM_V2_AccessAndUseOfBuildings'},"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",necessity,annotated +dcc583b1-8c4c-42cf-a1ed-e8907de56254,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",{'ID': '23_Finnish_SafetyOfUse'},"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",none,annotated +da4d5959-6e64-4e04-a1f3-8b42b6addab0_11,,,The outdoor patterns used in the calculations for buildings other than those in intended use categories 1 and 2 outside the occupancy period shall be at least three metres.,greater-equal,synthetic +590ab551-79e8-42f5-bc52-749f8899c088,Extinguishing routes to basement storeys shall be arranged so that basement storeys can be reached from the ground level without a need to pass through the exits of the storeys.,{'ID': '242_Finnish_FireSafety'},Extinguishing routes to basement storeys shall be arranged so that basement storeys can be reached from the ground level without a need to pass through the exits of the storeys.,selection,annotated +e15250c0-1279-4d29-a1ec-31560b045007,Extinguishing routes of basement storeys must not be connected to fire and smoke-proof exits.,{'ID': '244_Finnish_FireSafety'},Extinguishing routes of basement storeys must not be connected to fire and smoke-proof exits.,part-of,annotated +f3bd99b4-7ea5-4968-af10-3c133c0b5aa0,No individual flight has a rise between landings of more than 1800mm.,{'ID': '42_UK_DocM_V1_AccessAndUseOfBuildings'},No individual flight has a rise between landings of more than 1800mm.,less-equal,annotated +2ca092ec-4425-4552-a389-fd0dadfbd154,NOTE: A floor level with a gradient of 1:20 or steeper should be designed as a ramp.,{'ID': '54_UK_DocK_ProtectionFromFalling'},NOTE: A floor level with a gradient of 1:20 or steeper should be designed as a ramp.,greater-equal,annotated +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",selection,annotated +7db23e3b-7063-47a3-b65e-5d02ad78c922,"In a natural ventilation system, the ventilation valves shall be easy to close.",{'ID': '49_Finnish_Health-IndoorClimateAndVentilation'},"In a natural ventilation system, the ventilation valves shall be easy to close.",necessity,annotated +5b4380ba-0066-4735-a362-316d4c8e70b2_1,,,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 9mm emergency exits after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",greater,synthetic +9027959e-efc1-4d32-acbe-e0775d40f001_7,,,"The morticed bolts should have a minimum Unit length of 900mm, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",greater-equal,synthetic +9b594ead-759a-420d-8d1c-52f007daaca4,"Each office should have the means to provide purge ventilation, to reduce pollutants before the office space is occupied or after activities such as painting.",{'ID': '56_UK_DocF_V2_Ventilation'},"Each office should have the means to provide purge ventilation, to reduce pollutants before the office space is occupied or after activities such as painting.",selection,annotated +bfdf95da-d422-47cd-83d7-a30a4969f2e6_4,,,"If the internal ties must be centred on the supporting line, the minimum value of the visual contrast, 0.35W/(m2K), will also be applied to internal ties.",greater-equal,synthetic +76bf63bd-30f4-440d-81a0-61ca16170f70_6,,,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the extract air categories is less than One of the total load.,less,synthetic +38cd3221-7fc9-4462-be20-78b16a4309d3,The area of openings in the newly created dwelling should not be more than 25 of the total floor area.,{'ID': '490_UK_DocL_V1_ConsrvationOfFuelAndPower'},The area of openings in the newly created dwelling should not be more than 25 of the total floor area.,less-equal,annotated +41d06a37-5039-4dc0-aae1-0fe3abbd84fc,The building fabric should be constructed so that the insulation is reasonably continuous across newly built elements.,{'ID': '132_UK_DocL_V1_ConsrvationOfFuelAndPower'},The building fabric should be constructed so that the insulation is reasonably continuous across newly built elements.,selection,annotated +3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,part-of,annotated +561480d1-56e5-41be-a56d-f2f2222bcb17,"Any damage, such as tears, should be repaired before boarding.",{'ID': '185_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Any damage, such as tears, should be repaired before boarding.",necessity,annotated +c236bc17-ef9a-4694-a34e-68a9f38ae405,"For a heat exchanger between a solar primary and secondary system, a minimum of 0.1m2 or equivalent of heat exchanger area should be provided for every 1m2 of the net absorber area of the solar collector.",{'ID': '323_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a heat exchanger between a solar primary and secondary system, a minimum of 0.1m2 or equivalent of heat exchanger area should be provided for every 1m2 of the net absorber area of the solar collector.",selection,annotated +e728e1af-4952-4010-a0bf-3723d54bc450,"Ventilation shall provide healthy, safe and comfortable indoor air quality in occupiable spaces.",{'ID': '45_Finnish_Health-IndoorClimateAndVentilation'},"Ventilation shall provide healthy, safe and comfortable indoor air quality in occupiable spaces.",necessity,annotated +6a41a473-bd3c-4e38-a093-094b3fdae388_9,,,"At least one in every 1,200 MJ/m2 remaining thermal element must be provided with cable routes.",equal,synthetic +b63dcef6-1840-4e9e-ad51-f8fc481fe856_8,,,"The wall ties should have a relationship of 900-1000mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic +2afa8bba-b5ad-4e12-bc27-4beea3fd09b2,The normal relationship between the dimensions of the rise and going is: twice the rise plus the going (2R G) equals between 550mm and 700mm.,{'ID': '19_UK_DocK_ProtectionFromFalling'},The normal relationship between the dimensions of the rise and going is: twice the rise plus the going (2R G) equals between 550mm and 700mm.,equal,annotated +b63dcef6-1840-4e9e-ad51-f8fc481fe856_8,,,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the travel distance is not less than 100mm.",greater-equal,synthetic +8e8f4fb5-00b5-404f-89df-a07287984748_5,,,"In buildings with a going greater than 18 dm3/s, automatic meter reading and data collection facilities should be installed.",greater,synthetic +45adb0b6-63ee-4f42-b6a3-8fc396221c67_6,,,The dimension of the insulation plus any required air gap should be at least to the specification of the rafters.,greater-equal,synthetic +5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",none,annotated +992e8f11-81ac-4d2f-b7d1-60e46b4b7261,Wheelchair accessible dwellings must also provide both a level access shower and a bath.,{'ID': '108_UK_DocM_V1_AccessAndUseOfBuildings'},Wheelchair accessible dwellings must also provide both a level access shower and a bath.,selection,annotated +cc72106e-9e7f-47cf-8a95-0173a8305dad_10,,,"In a new building, the crawl space luminous efficacy must be 25 on average at the minimum.",greater-equal,synthetic +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",part-of,annotated +0ea1e862-2434-4fc8-97a2-b076c992ef20_5,,,"The number of wall ties per square metre of an exit must be at least twice the rise plus the going (2R G) and its free height must be at least 2,100 millimetres.",greater-equal,synthetic +11f2902d-29c2-474e-97d0-628a2a97a666_4,,,"topography of over 150m2 must be equipped with an appropriate safety barrier, railing or handrail.",greater,synthetic +d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,annotated +0aaf71f0-a482-4a72-a407-0d6db79c7f6f_2,,,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than ten millimetres of non-fire-compartmented Skirtings that essentially relate to the business of the building may be located on the level of second storey.",less-equal,synthetic +203faa23-7b71-47c9-a6e5-2333ac45389e_5,,,"The minimum value of the indoor steps of dwelling units and living quarters may be no more than EI 15, and the tread must be no less than 250 millimetres.",less-equal,synthetic +7d1ada0b-8dcc-4c01-84d7-78b80cb404c9,"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",{'ID': '58_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",none,annotated +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_1,,,"Where the work concerns a building containing more than 400mm public areas, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater-equal,synthetic +60024014-cb6a-4a53-9b12-9497e0a1e5e8_9,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the difference in light reflectance value from these spaces does not exceed three of the total air flow in the vertical duct.",less-equal,synthetic +1ebce0c9-705c-47ee-8429-e83cfbed72db,"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",{'ID': '103_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",none,annotated +2695c899-0ada-478c-9b2d-796f79ea4c52,"Glazing, with which people are likely to come into contact whilst moving in or about the building shall: (a) if broken on impact, break in a way which is unlikely to cause injury; or (b) resist impact without breaking; or (c) be shielded or protected from impact.",{'ID': '92_UK_DocK_ProtectionFromFalling'},"Glazing, with which people are likely to come into contact whilst moving in or about the building shall: (a) if broken on impact, break in a way which is unlikely to cause injury; or (b) resist impact without breaking; or (c) be shielded or protected from impact.",none,annotated +fb5d3054-4911-4049-ba09-1c3e80f9c07c_4,,,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the supports may be no more than 01:20:00.",less-equal,synthetic +5ebe90af-93ee-4d92-96fd-44b674d5e1a5,Systems should be designed so that they can be commissioned to suitable ventilation rates so that spaces are not significantly over-ventilated.,{'ID': '335_UK_DocL_V1_ConsrvationOfFuelAndPower'},Systems should be designed so that they can be commissioned to suitable ventilation rates so that spaces are not significantly over-ventilated.,necessity,annotated +5e7d4831-4ec8-48f9-9e60-0422fcc1eae4,"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",{'ID': '344_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",selection,annotated +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_3,,,"In buildings more than 1100mm and at most 28 metres in opening, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",greater,synthetic +00cded8a-5208-4c1b-bda4-9677d45b9375,The layers of attic floor structures and the ventilation must prevent the accumulation of damaging moisture into the roof structure resulting from water vapour diffusion or airflow.,{'ID': '105_Finnish_Health-Humidity'},The layers of attic floor structures and the ventilation must prevent the accumulation of damaging moisture into the roof structure resulting from water vapour diffusion or airflow.,part-of,annotated +d504fd87-d13d-4936-9d7a-71d17954760d_4,,,The performance of the steps in an exit may be no more than six metres.,less-equal,synthetic +77be05f2-cd8c-4d35-85e4-6637b999d8e7_7,,,The automatic flow adjustment of the consequential improvement works should not be less than 9 metres of the value of the principal works.,greater-equal,synthetic +9691451a-57d5-484f-a346-0f83b59f7ae0,"Refreshment facilities, such as restaurants and bars, should be designed so that they can be reached and used by all people independently or with companions.",{'ID': '137_UK_DocM_V2_AccessAndUseOfBuildings'},"Refreshment facilities, such as restaurants and bars, should be designed so that they can be reached and used by all people independently or with companions.",necessity,annotated +596cc55c-f50f-4155-962f-832b87226a8e,"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",{'ID': '23_UK_DocF_V1_Ventilation'},"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",none,annotated +bf798097-bb99-42d0-a73f-8cebab8fbeb8,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.",{'ID': '21_Finnish_SafetyOfUse'},"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.",greater-equal,annotated +ddc0bba6-2df8-43e1-9398-37514366fb06,"For fixed terminals with automatic flow adjustment at the fan unit, the fan speed should be set to achieve the desired continuous flow rate.",{'ID': '208_UK_DocF_V1_Ventilation'},"For fixed terminals with automatic flow adjustment at the fan unit, the fan speed should be set to achieve the desired continuous flow rate.",none,annotated +b0e99ac5-9cbc-4beb-b8ff-85383ae70ea8,"The approach route should be safe and convenient, adopt the shallowest gradient that can reasonably be achieved and be step-free, irrespective of the storey on which the dwelling is located.",{'ID': '40_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be safe and convenient, adopt the shallowest gradient that can reasonably be achieved and be step-free, irrespective of the storey on which the dwelling is located.",necessity,annotated +d43e4877-601c-43eb-9d33-96945754374b,Good acoustic design should be employed to achieve an acoustic environment that is neither too reverberant nor too absorbent so that announcements and conversations can be heard clearly.,{'ID': '99_UK_DocM_V2_AccessAndUseOfBuildings'},Good acoustic design should be employed to achieve an acoustic environment that is neither too reverberant nor too absorbent so that announcements and conversations can be heard clearly.,necessity,annotated +7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",none,annotated +37f01a2c-b944-45a2-a7f4-140d8c03d7ac_6,,,"After rebating, frame components should retain at least 130 millimetres of Floors.",greater-equal,synthetic +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",equal,annotated +569c7958-b7d6-4b9c-9dd9-13307e95e59b_5,,,"For ducted systems that are served by fans with a Capacities greater than 01:08:00, ductwork leakage tests should be carried out.",greater,synthetic +0d8c2f7d-5234-4bec-bbbe-961e499ebbbc,"A proportion of the sleeping accommodation in hotels, motels and student accommodation should be designed for independent use by wheelchair users.",{'ID': '129_UK_DocM_V2_AccessAndUseOfBuildings'},"A proportion of the sleeping accommodation in hotels, motels and student accommodation should be designed for independent use by wheelchair users.",part-of,annotated +df122091-ca53-4134-98a3-47779c06f9df,The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flows at each terminal.,{'ID': '198_UK_DocF_V1_Ventilation'},The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flows at each terminal.,necessity,annotated +f505cec8-d1a6-41ae-b2ba-68ac19f64be2,"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",{'ID': '137_UK_DocM_V2_AccessAndUseOfBuildings'},"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",none,annotated +81314489-dcd9-410f-9b15-595b87e7c8f9_8,,,"The resilient layer should be timber sheathing at least 1m3/s water temperature, expanded metal or a similar resilient material.",greater-equal,synthetic +77f993c6-dff1-4f9a-8f66-73221d3cbaff,"If the dwelling only has one habitable room, a minimum ventilation rate of 13l/s should be used.",{'ID': '43_UK_DocF_V1_Ventilation'},"If the dwelling only has one habitable room, a minimum ventilation rate of 13l/s should be used.",part-of,annotated +0a7ff0c7-c5f9-4069-9d7e-2bfd6c4871d3_9,,,The continuity of the extension does not exceed 10.,less-equal,synthetic +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_0,,,"Where the work concerns a building containing more than 9mm method, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater-equal,synthetic +50e89a86-e2be-439d-b230-79274cd7199b,Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,{'ID': '81_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,none,annotated +8e5e9560-4b22-4fe0-ad86-e52b82ffe4d2,"When calculating the energy consumption of a buildings cooling system, the energy consumption of cooling energy production and the electrical energy consumption of auxiliary units shall be taken into account where the use of the systems is required for indoor temperature control.",{'ID': '111_Finnish_EnergyEfficiency'},"When calculating the energy consumption of a buildings cooling system, the energy consumption of cooling energy production and the electrical energy consumption of auxiliary units shall be taken into account where the use of the systems is required for indoor temperature control.",necessity,annotated +"8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent. {'ID': '9_Finnish_Accessibility'}_0",,,"However, if the habitable area is no more than 1.2W/(m2K), the ramp may not have a gradient of more than eight per cent.",less-equal,synthetic +103f99ad-884b-4bae-9f22-ccb1c5bc3d26_5,,,"In an open garage of no more than two walls, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",less-equal,synthetic +0667134c-1290-4fe0-99eb-41c0b9e63a27,CO2 emissions and primary energy associated with the thermal energy streams of a trigeneration scheme should be attributed in proportion to the output energy streams.,{'ID': '67_UK_DocM_V2_AccessAndUseOfBuildings'},CO2 emissions and primary energy associated with the thermal energy streams of a trigeneration scheme should be attributed in proportion to the output energy streams.,necessity,annotated +64695439-3458-4d43-8e7b-a2ba75075cea,"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",{'ID': '124_Finnish_SafetyOfUse'},"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",selection,annotated +e32bbb47-c826-40c1-8ea4-8c32353d3fd2_8,,,There shall be 75 light source lumens per circuit-watt of Ground floors provided for people in the building.,equal,synthetic +46f5be2a-1514-420b-bc39-331fc6e0d2df_4,,,"The floor area, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the energy efficiency measures, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,synthetic +baee716c-b8c2-4500-b4de-63fa11f007b1_8,,,A minimum of eight per cent in five of the remaining air pressure test must have access to cable routes.,greater-equal,synthetic +9415ae4b-7a74-4c70-a245-e4381c6d71bf,"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",{'ID': '170_UK_DocL_V1_ConsrvationOfFuelAndPower'},"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",none,annotated +922bf8df-3a70-4f45-8c04-200b638d3b3c,The cold water pipe shall be designed and installed so that the temperature in the cold water system may not exceed 20 degrees Celsius.,{'ID': '59_Finnish_Health-WaterAndSewerage'},The cold water pipe shall be designed and installed so that the temperature in the cold water system may not exceed 20 degrees Celsius.,less-equal,annotated +a43037b0-8e35-45a2-9f23-c2d65f6c5a64,"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",{'ID': '8_UK_DocQ_Security_Dwellings'},"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",selection,annotated +88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",none,annotated +01d924bf-4a69-4eb8-b05e-ce993aee3d45_1,,,Perimeter insulation should be continuous and have a minimum measures of 300 litres.,greater-equal,synthetic +77f993c6-dff1-4f9a-8f66-73221d3cbaff_8,,,"If the dwelling only has one habitable room, a minimum control function of 1,200 millimetres should be used.",greater-equal,synthetic +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated +29c431ee-ea93-491d-ab13-06418d93c488,"If luminous efficacy is greater than 75 light source lumens per circuit-watt, manual control is acceptable.",{'ID': '338_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If luminous efficacy is greater than 75 light source lumens per circuit-watt, manual control is acceptable.",selection,annotated +23db27ac-b594-4b26-883d-922d713d382a,"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",{'ID': '161_UK_DocM_V2_AccessAndUseOfBuildings'},"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",none,annotated +a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",none,annotated +aa41a5d4-c0b1-4da7-84a0-5c2e2738654f,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,{'ID': '89_UK_DocF_V1_Ventilation'},The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,part-of,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479_11,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for air extract rate up to ten millimetres not more than 5m long.,less-equal,synthetic +239bd568-c5f2-4ab5-955c-f2d8d86b7b7f,"Where closing devices are needed for fire control, electrically powered hold-open devices or swing-free closing devices should be used as appropriate.",{'ID': '90_UK_DocM_V2_AccessAndUseOfBuildings'},"Where closing devices are needed for fire control, electrically powered hold-open devices or swing-free closing devices should be used as appropriate.",selection,annotated +656aa2fa-18cb-41ee-ae28-28deb3dffcc3_8,,,The termination points of the water in the hot water system shall be at least 90mm and available from the hot water plumbing fixture within 20 seconds.,greater-equal,synthetic +73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",part-of,annotated +8cfa23d5-d9d3-4d72-a761-6595f876d577,NOTE: Ventilation through infiltration should be considered to be part of the ventilation provision of a building.,{'ID': '79_UK_DocF_V2_Ventilation'},NOTE: Ventilation through infiltration should be considered to be part of the ventilation provision of a building.,selection,annotated +29c431ee-ea93-491d-ab13-06418d93c488_3,,,"If domestic hot water circulation heat loss is greater than 0.055555556, manual control is acceptable.",greater,synthetic +9952f64d-e0df-4b03-84af-150782f81387_8,,,"For mobility-impaired people, a conference facility of at least 180 millimetres is preferred.",greater-equal,synthetic +f06f7ec1-3b83-4e1a-a421-b09589f2374c,"Provision shall be made to prevent any door or gate: (a) which slides or opens upwards, from falling onto any person; and (b) which is powered, from trapping any person.",{'ID': '114_UK_DocK_ProtectionFromFalling'},"Provision shall be made to prevent any door or gate: (a) which slides or opens upwards, from falling onto any person; and (b) which is powered, from trapping any person.",selection,annotated +bfdf95da-d422-47cd-83d7-a30a4969f2e6_9,,,"If the internal ties must be centred on the supporting line, the minimum value of the proportion, 0.8 metres, will also be applied to internal ties.",greater-equal,synthetic +2f75848b-a39a-41d3-a6bf-25ef1154bcff,"Where appropriate, these should be automated (with manual override) so that energy savings are maximised.",{'ID': '322_UK_DocM_V2_AccessAndUseOfBuildings'},"Where appropriate, these should be automated (with manual override) so that energy savings are maximised.",necessity,annotated +4b510cad-fefb-44be-a9cb-a26e0c42994c,"If the building is connected to a heating system where heat is conveyed via heat pipes external to the building from a shared heat exchanger or heat generation unit to several buildings, the heat loss from those pipes shall be divided between the buildings in proportion to their areas.",{'ID': '101_Finnish_EnergyEfficiency'},"If the building is connected to a heating system where heat is conveyed via heat pipes external to the building from a shared heat exchanger or heat generation unit to several buildings, the heat loss from those pipes shall be divided between the buildings in proportion to their areas.",part-of,annotated +38020928-c137-486e-88d7-c8feec038c99,A building must be provided with a fire wall if it is situated adjacent to a neighbouring building or so close to a neighbouring building that the spread of fire is evident.,{'ID': '189_Finnish_FireSafety'},A building must be provided with a fire wall if it is situated adjacent to a neighbouring building or so close to a neighbouring building that the spread of fire is evident.,none,annotated +0096a3bf-ac16-4a75-adf9-8c3f4a9b8610_0,,,The smaller differences of each panel which can be either the width or height of the panel should be 15 degrees or less.,less-equal,synthetic +3e9fc57e-bc69-4f17-a056-dd7767afa9bb,"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",{'ID': '241_Finnish_FireSafety'},"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",none,annotated +8151be81-09ad-4dac-b2d2-f0d757915b6c_3,,,"However, when the snow load can occur, the fastening points of the load s should be at least 50mm.",greater-equal,synthetic +bb3ac5b0-14d0-4d75-95d9-713adc6f2f58,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",{'ID': '433_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",necessity,annotated +01008f69-874b-443e-bcb2-2f5630280049_5,,,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the open outwards may be no more than 250 millimetres and the tread must be no less than 220 millimetres.",less-equal,synthetic +825053cb-af5d-43a9-b59b-e2a5ae78ea73,The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,{'ID': '59_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,selection,annotated +4fc3b5b1-a838-4429-b385-d8e80e6633eb,"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",greater,annotated +46f5be2a-1514-420b-bc39-331fc6e0d2df_0,,,"The dwelling primary energy rate, dwelling emission rate and Signs, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and that, respectively.",less-equal,synthetic +7e34700e-92de-4b00-a820-f4085a2e186c_6,,,"If the load capacity between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 18 dm3/s, the wall in question must be class EI 15.",less,synthetic +f5a71c7b-e852-40f2-8f88-91cda7902a7e_8,,,"If a new building has a space heating or airconditioning system with an energy efficiency measures greater than 250 millimetres, a building automation and control system should be installed.",greater,synthetic +f3c5d35c-ad38-46d6-8a75-1a331555b89e,The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flow rates at each terminal.,{'ID': '206_UK_DocF_V1_Ventilation'},The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flow rates at each terminal.,part-of,annotated +"8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent. {'ID': '9_Finnish_Accessibility'}","However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent.",{'ID': '9_Finnish_Accessibility'},"However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent.",less-equal,annotated +c0a6d35c-cc20-428b-941d-c3e3e6365c74,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",{'ID': '25_UK_DocK_ProtectionFromFalling'},"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",part-of,annotated +bf798097-bb99-42d0-a73f-8cebab8fbeb8_6,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the rated output must be no less than 25mm.",greater-equal,synthetic +2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d_6,,,An upstand built on site should not exceed a building primary energy rate of 400-600mm.,less-equal,synthetic +9abdce80-0a4a-400a-8725-205bb3b887e4,"In hard water areas, suitable measures should be taken to treat the feed water to water heaters and the hot water circuit of combination boilers to reduce limescale accumulation.",{'ID': '218_UK_DocM_V2_AccessAndUseOfBuildings'},"In hard water areas, suitable measures should be taken to treat the feed water to water heaters and the hot water circuit of combination boilers to reduce limescale accumulation.",selection,annotated +2ca092ec-4425-4552-a389-fd0dadfbd154_4,,,NOTE: A floor level with a number of storeys of certain proportion or steeper should be designed as a ramp.,greater-equal,synthetic +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_1,,,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 25W/m2 in atmosphere, these must be accessible via the interior.",greater,synthetic +caa5332f-5180-4d07-a41f-e6e0e044a8c1,An existing district heat network that is being connected to a new dwelling should not have a CO2 emission factor for delivered heat to the dwelling which is greater than 0.350kgCO2/kWh.,{'ID': '287_UK_DocL_V1_ConsrvationOfFuelAndPower'},An existing district heat network that is being connected to a new dwelling should not have a CO2 emission factor for delivered heat to the dwelling which is greater than 0.350kgCO2/kWh.,necessity,annotated +66249fda-33bf-4d93-8bf9-53fb82ad0e95,"The driveway and parking area at a plot or building site must be separated from pedestrian, play and recreation areas.",{'ID': '87_Finnish_SafetyOfUse'},"The driveway and parking area at a plot or building site must be separated from pedestrian, play and recreation areas.",necessity,annotated +8bb9aee2-a950-4a65-a715-287035906789,"Spaces of a non-residential building and common spaces of a residential building as well as the fixtures, fittings and fixed equipment in them shall be suitable for persons with mobility and functional impairment.",{'ID': '27_Finnish_Accessibility'},"Spaces of a non-residential building and common spaces of a residential building as well as the fixtures, fittings and fixed equipment in them shall be suitable for persons with mobility and functional impairment.",necessity,annotated +b63dcef6-1840-4e9e-ad51-f8fc481fe856_4,,,"The wall ties should have a configuration of 20mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic +73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",part-of,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_8,,,"If the air flows of energy consumption 1 and 2,100 millimetres are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +baee716c-b8c2-4500-b4de-63fa11f007b1_2,,,A minimum of one in 30% load of the remaining Fixings must have access to cable routes.,equal,synthetic +a4dc06ab-99c3-4c8b-b295-eb3e6a64320a_5,,,"The free total cost from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 0.8 metres, unless the area is protected so as to prevent the danger of collision.",greater-equal,synthetic +d8a06af7-3a6b-4d68-8bba-342aac6d3ac0,Water pipes and sewers installed in the ground shall be identifiable and they shall be located separate from one another.,{'ID': '146_Finnish_Health-WaterAndSewerage'},Water pipes and sewers installed in the ground shall be identifiable and they shall be located separate from one another.,selection,annotated +17fba530-c42b-4eeb-85dd-16da0bacc49c,"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",{'ID': '470_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",selection,annotated +9dd2a0f1-0ff9-4416-8abd-1e6589980ff4_2,,,"If the primary energy factor of a mechanical ventilation systems air duct is designed to be greater than 40, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",greater,synthetic +60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",part-of,annotated +23db27ac-b594-4b26-883d-922d713d382a,"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",{'ID': '161_UK_DocM_V2_AccessAndUseOfBuildings'},"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",necessity,annotated +99a53f17-48cb-4012-a47b-700761e0983b_7,,,Where a new building which is not a residential building or a mixed-use building has more than 20 litres per second driveway (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,greater,synthetic +0df5892a-e396-424e-90f1-74f6ccfb9e1a,"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",{'ID': '61_Finnish_Accessibility'},"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",part-of,annotated +0fdce0b1-7992-401f-aa84-ad7f2acca23d,Cavity walls: the inner block leaf mortar joint should be fully filled and pointed within the cavity.,{'ID': '184_UK_DocL_V1_ConsrvationOfFuelAndPower'},Cavity walls: the inner block leaf mortar joint should be fully filled and pointed within the cavity.,none,annotated +992e8f11-81ac-4d2f-b7d1-60e46b4b7261,Wheelchair accessible dwellings must also provide both a level access shower and a bath.,{'ID': '108_UK_DocM_V1_AccessAndUseOfBuildings'},Wheelchair accessible dwellings must also provide both a level access shower and a bath.,necessity,annotated +a9cea98b-d439-4930-a991-fc17eee6657c,the location of the electric vehicle charge point or future connection location should be suitable for use by electric vehicles with charging inlets in different places.,{'ID': '102_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},the location of the electric vehicle charge point or future connection location should be suitable for use by electric vehicles with charging inlets in different places.,part-of,annotated +d56a51f7-6ec0-457b-a9ed-263fffe3a3e2,"Once open, all doors to accessible entrances should be wide enough to allow unrestricted passage for a variety of users, including wheelchair users, people carrying luggage, people with assistance dogs, and parents with pushchairs and small children.",{'ID': '66_UK_DocM_V2_AccessAndUseOfBuildings'},"Once open, all doors to accessible entrances should be wide enough to allow unrestricted passage for a variety of users, including wheelchair users, people carrying luggage, people with assistance dogs, and parents with pushchairs and small children.",selection,annotated +75c60084-6878-472d-8694-e8739e0dd76c_9,,,The number of storeys of access routes in assembly areas with a maximum capacity of 60 persons must be at least 50 millimetres.,greater-equal,synthetic +54907849-c48f-4267-b5f0-fc7e9279da7c,"For existing dwellings, when carrying out work on an existing system, such as installing or replacing components (e.g. replacing a boiler but retaining the pipework and heat emitters), the energy performance of the new components should be assessed.",{'ID': '409_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when carrying out work on an existing system, such as installing or replacing components (e.g. replacing a boiler but retaining the pipework and heat emitters), the energy performance of the new components should be assessed.",none,annotated +99a53f17-48cb-4012-a47b-700761e0983b_6,,,Where a new building which is not a residential building or a mixed-use building has more than half insulating material (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,greater,synthetic +6c789809-b1b8-429a-8fe2-8ce16f8a4b54,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,{'ID': '62_Finnish_Health-IndoorClimateAndVentilation'},Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,none,annotated +c72a5952-2e0b-4d4a-9185-09e4149b6239,The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,{'ID': '114_Finnish_Health-Humidity'},The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,none,annotated +8a692fe7-08ed-4b90-8b13-7ce2e29d37a2,"During this process, the heat pump (along with its accompanying pipework) should be isolated from the ground heat exchanger such that damage to the internal heat exchanger inside the heat pump is avoided.",{'ID': '386_UK_DocL_V1_ConsrvationOfFuelAndPower'},"During this process, the heat pump (along with its accompanying pipework) should be isolated from the ground heat exchanger such that damage to the internal heat exchanger inside the heat pump is avoided.",necessity,annotated +ef561e39-db90-462c-8dde-15fbeae954e5_8,,,A cube with vertical spacing of no more than 56 metres may pass between the upper edge of the barrier and the protective part.,less-equal,synthetic +a894077e-cebf-4559-9254-ce964bc11b0f,Air flow rates for mechanical ventilation in new dwellings must be measured.,{'ID': '182_UK_DocF_V1_Ventilation'},Air flow rates for mechanical ventilation in new dwellings must be measured.,selection,annotated +81314489-dcd9-410f-9b15-595b87e7c8f9,"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",{'ID': '14_UK_DocQ_Security_Dwellings'},"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",none,annotated +89811586-c819-4eb5-99f5-c4fcefdb9520,Fixed or linked seats must be arranged as rows of seating with an access route on the side of the rows.,{'ID': '107_Finnish_SafetyOfUse'},Fixed or linked seats must be arranged as rows of seating with an access route on the side of the rows.,necessity,annotated +fb5d3054-4911-4049-ba09-1c3e80f9c07c_3,,,"The installation of steps in uncovered or unheated outdoor staircases must be no less than two years, and the riser may be no more than 130 millimetres.",greater-equal,synthetic +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated +d0b6759e-deec-451d-bd7a-ec65b96048be_5,,,"extract air of habitable area 40 degrees Celsius shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",equal,synthetic +0a53e4af-84a7-46aa-b28a-cb1d873c8cae,"The type and quality of public address, hearing enhancement and telephone systems should be chosen carefully to ensure intelligibility.",{'ID': '151_UK_DocM_V2_AccessAndUseOfBuildings'},"The type and quality of public address, hearing enhancement and telephone systems should be chosen carefully to ensure intelligibility.",selection,annotated +9ff8b8fd-5361-4c3d-9a7e-7459276c8df7,The dwelling fabric energy efficiency rate must not exceed the individual dwellings target fabric energy efficiency rate.,{'ID': '66_UK_DocL_V1_ConsrvationOfFuelAndPower'},The dwelling fabric energy efficiency rate must not exceed the individual dwellings target fabric energy efficiency rate.,part-of,annotated +56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3,"Storage premises with a fire load exceeding 1,200 MJ/m2 are not permitted within the building.",{'ID': '73_Finnish_FireSafety'},"Storage premises with a fire load exceeding 1,200 MJ/m2 are not permitted within the building.",none,annotated +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_11,,,"In buildings more than 9 metres and at most 20 millimetres in safety features, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",less-equal,synthetic +0ea1e862-2434-4fc8-97a2-b076c992ef20_6,,,"The heat loss of an exit must be at least four and its free height must be at least 2,100 millimetres.",greater-equal,synthetic +11f2902d-29c2-474e-97d0-628a2a97a666_5,,,"standards of over 0.052083333 must be equipped with an appropriate safety barrier, railing or handrail.",greater,synthetic +fb5d3054-4911-4049-ba09-1c3e80f9c07c,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",{'ID': '29_Finnish_SafetyOfUse'},"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",part-of,annotated +f6add908-4d45-4b3e-83a6-369f6c36c037_0,,,"Door rails, stiles and muntins should be at least 800 millimetres fire resistance time.",greater-equal,synthetic +74b9ee2c-0192-442d-b5a1-a2974d456429,"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",{'ID': '67_UK_DocM_V1_AccessAndUseOfBuildings'},"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",selection,annotated +c47598f9-df79-4d77-aba9-8f380342372f_5,,,extract air of fire resistance time requirement 01:08:00 shall be conducted to the outdoors through individual extract air ducts.,equal,synthetic +389c960b-525d-4f2e-9a2c-1805eb2dc20d,The full area under a stair that forms part of the storage provision should be counted as 1m2.,{'ID': '79_UK_DocM_V1_AccessAndUseOfBuildings'},The full area under a stair that forms part of the storage provision should be counted as 1m2.,equal,annotated +a387fcb8-ead2-4094-9be9-72d783468b33,"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",{'ID': '422_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",part-of,annotated +09b2a395-5293-4b7d-82d4-5312482d59e9,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",{'ID': '46_UK_DocM_V1_AccessAndUseOfBuildings'},"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",none,annotated +2238d6ef-421b-4f84-b24d-d46c6ba2afc5,"For example, when a door is open, people with impaired sight should be able to identify the door opening within the wall, as well as the leading edge of the door.",{'ID': '92_UK_DocM_V2_AccessAndUseOfBuildings'},"For example, when a door is open, people with impaired sight should be able to identify the door opening within the wall, as well as the leading edge of the door.",necessity,annotated +783c19fa-0ef2-466f-b3e9-d4690e34ac5f,Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '214_UK_DocL_V1_ConsrvationOfFuelAndPower'},Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,necessity,annotated +9d172d30-e92f-4151-865c-d204f217705d,The slope of the wet room floor must allow water to flow into the floor drain.,{'ID': '118_Finnish_Health-Humidity'},The slope of the wet room floor must allow water to flow into the floor drain.,part-of,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8_11,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for free gap 1 and half a metre if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic +a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",necessity,annotated +bfdf95da-d422-47cd-83d7-a30a4969f2e6,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",{'ID': '180_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",necessity,annotated +f3bd99b4-7ea5-4968-af10-3c133c0b5aa0_0,,,No individual flight has a away of more than 900mm.,less-equal,synthetic +46f5be2a-1514-420b-bc39-331fc6e0d2df_4,,,"The dwelling primary energy rate, reference value and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, domestic hot water circulation heat loss and target fabric energy efficiency rate, respectively.",less-equal,synthetic +7db23e3b-7063-47a3-b65e-5d02ad78c922,"In a natural ventilation system, the ventilation valves shall be easy to close.",{'ID': '49_Finnish_Health-IndoorClimateAndVentilation'},"In a natural ventilation system, the ventilation valves shall be easy to close.",part-of,annotated +b0e99ac5-9cbc-4beb-b8ff-85383ae70ea8,"The approach route should be safe and convenient, adopt the shallowest gradient that can reasonably be achieved and be step-free, irrespective of the storey on which the dwelling is located.",{'ID': '40_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be safe and convenient, adopt the shallowest gradient that can reasonably be achieved and be step-free, irrespective of the storey on which the dwelling is located.",none,annotated +34a524ec-6994-426f-86af-78788fd34a80_3,,,"Between the locking points for the mortice lock and surface-mounted rim lock, the frequency should be 2.0 m3/(h m2).",equal,synthetic +81f14fc1-af5d-45e8-8725-94d2510e4701_6,,,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a breaking of at least 23C in the hallway and kitchen.",greater-equal,synthetic +fa90c179-d32c-412b-a7d6-a515cc91dbdb,The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,{'ID': '86_Finnish_Health-Humidity'},The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,necessity,annotated +7c74b365-6fdd-494d-9675-3ae036c55348,Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,{'ID': '82_Finnish_SafetyOfUse'},Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,part-of,annotated +76bf63bd-30f4-440d-81a0-61ca16170f70,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,less,annotated +09b2a395-5293-4b7d-82d4-5312482d59e9_11,,,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 180kW headroom from any projecting corner.",greater-equal,synthetic +6ec243f2-9294-4b7c-89a4-1c46e4a69cc9_2,,,"If site constraints necessitate an lifting device of 100 litres or steeper, an approach incorporating ramped access should be provided.",greater-equal,synthetic +8e5e9560-4b22-4fe0-ad86-e52b82ffe4d2,"When calculating the energy consumption of a buildings cooling system, the energy consumption of cooling energy production and the electrical energy consumption of auxiliary units shall be taken into account where the use of the systems is required for indoor temperature control.",{'ID': '111_Finnish_EnergyEfficiency'},"When calculating the energy consumption of a buildings cooling system, the energy consumption of cooling energy production and the electrical energy consumption of auxiliary units shall be taken into account where the use of the systems is required for indoor temperature control.",necessity,annotated +23ff7307-c4ae-4bef-97bf-feb9682d91eb,"If a water pump is used on a closed loop circuit and the motor is rated at more than 750W, then it should be fitted with or controlled by an appropriate variable speed controller on any variable volume system.",{'ID': '290_UK_DocM_V2_AccessAndUseOfBuildings'},"If a water pump is used on a closed loop circuit and the motor is rated at more than 750W, then it should be fitted with or controlled by an appropriate variable speed controller on any variable volume system.",part-of,annotated +f162906e-1097-420e-b2a0-dd746d5794c7,"Where controls are external to the heater, the system should be provided with a time switch/programmer and room thermostat, or programmable room thermostat.",{'ID': '265_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where controls are external to the heater, the system should be provided with a time switch/programmer and room thermostat, or programmable room thermostat.",none,annotated +bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,selection,annotated +05fdde92-d8af-42ad-963b-9019c69a8ab3_0,,,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same condition as the gap used in the external wall should be included within the depth of the intermediate floor structure.",equal,synthetic +0edb92b7-a2e1-480f-b708-e7e6c9951a79,The foundation drainage water shall flow away from the property in such a way that it does not cause problems to the waste water and storm water systems.,{'ID': '173_Finnish_Health-WaterAndSewerage'},The foundation drainage water shall flow away from the property in such a way that it does not cause problems to the waste water and storm water systems.,necessity,annotated +493ec553-7761-4d1e-aa98-05d925ddf955_4,,,The floor plate areas of a horizontal hatch must be at least 2 metres.,greater-equal,synthetic +b63dcef6-1840-4e9e-ad51-f8fc481fe856_9,,,"The wall ties should have a total load of 0.3 and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic +8151be81-09ad-4dac-b2d2-f0d757915b6c_0,,,"However, when the snow load can occur, the reverberation time of the load s should be at least 180kW.",greater-equal,synthetic +cd904a0f-c120-4c67-bcff-6fcc77abca62,Any future connection locations should be clearly identified and labelled.,{'ID': '116_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Any future connection locations should be clearly identified and labelled.,necessity,annotated +0a7ff0c7-c5f9-4069-9d7e-2bfd6c4871d3_8,,,The spread of fire of the extension does not exceed 25 decibels.,less-equal,synthetic +103f99ad-884b-4bae-9f22-ccb1c5bc3d26,"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",{'ID': '110_Finnish_FireSafety'},"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",selection,annotated +108b5709-f035-4697-ba25-56edd2ce60fc,"Where permanent or removable seating is provided as part of the design, allowance should be made for disabled people to have a choice of seating location at spectator events.",{'ID': '126_UK_DocM_V2_AccessAndUseOfBuildings'},"Where permanent or removable seating is provided as part of the design, allowance should be made for disabled people to have a choice of seating location at spectator events.",selection,annotated +3835aa39-14bc-4c7a-a029-a5ce391bad76,The efficiency of the secondary heating appliance with its appropriate fuel should be used in the calculation of the dwelling primary energy rate and dwelling emission rate.,{'ID': '73_UK_DocL_V1_ConsrvationOfFuelAndPower'},The efficiency of the secondary heating appliance with its appropriate fuel should be used in the calculation of the dwelling primary energy rate and dwelling emission rate.,selection,annotated +5afbc8c9-4c2e-4cb8-8945-24e184d161e1,The fan should be set at a speed that will approximately achieve the desired continuous flow rate.,{'ID': '201_UK_DocF_V1_Ventilation'},The fan should be set at a speed that will approximately achieve the desired continuous flow rate.,necessity,annotated +b63dcef6-1840-4e9e-ad51-f8fc481fe856,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",{'ID': '36_UK_DocA_Structure'},"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",greater-equal,annotated +2319724e-2fd4-463b-bb59-0972073dc55a,"Both before and after a newly constructed dwelling is built, a notice must be given to the building control body of the calculations.",{'ID': '44_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Both before and after a newly constructed dwelling is built, a notice must be given to the building control body of the calculations.",selection,annotated +536b172d-ccd1-479a-8136-6ee05db0f264,"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",{'ID': '205_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",part-of,annotated +1fc9255c-929e-4052-aaec-e3ffede5a62e,"For large or complex projects, a commissioning manager should be appointed.",{'ID': '374_UK_DocM_V2_AccessAndUseOfBuildings'},"For large or complex projects, a commissioning manager should be appointed.",selection,annotated +55d84237-8fad-4bd7-b67d-0745b9cc1e31,"The doors of exits, and of areas leading to them, must be easy to open in an emergency.",{'ID': '222_Finnish_FireSafety'},"The doors of exits, and of areas leading to them, must be easy to open in an emergency.",none,annotated +f505cec8-d1a6-41ae-b2ba-68ac19f64be2,"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",{'ID': '137_UK_DocM_V2_AccessAndUseOfBuildings'},"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",none,annotated +302c413e-fefd-47f1-914f-0dc787e4a761_11,,,"Where air distribution on surfaces is greater than 25W/m2, a difference in light reflectance value should be a minimum of 20 points.",greater,synthetic +c7035b48-7244-40a9-a70e-1d244caf72ac,"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",{'ID': '56_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",selection,annotated +536b172d-ccd1-479a-8136-6ee05db0f264_1,,,"Where pipework is above ground, the performance of the pipe lifting device should be at least as high as the high of pipework in the buried part of the system.",greater-equal,synthetic +082c7ed9-3579-48c2-a0d2-076f1edd647c,"Each of the two sections of the centrally hinged window should be assessed as a single side, bottom or top hung window.",{'ID': '112_UK_DocO_Overheating'},"Each of the two sections of the centrally hinged window should be assessed as a single side, bottom or top hung window.",equal,annotated +40b40b1b-d1b1-49d8-b9b7-13c5845a169d_5,,,The structure of the control appliance of the plumbing fixture shall be such that its insulating performance does not arise above adequate means.,less-equal,synthetic +6187cad8-0d6d-4154-b98b-7285b36fea8d,Continuously running fans should be set up to operate without occupant intervention but may have manual or automatic controls for selecting the high rate of operation.,{'ID': '65_UK_DocF_V1_Ventilation'},Continuously running fans should be set up to operate without occupant intervention but may have manual or automatic controls for selecting the high rate of operation.,selection,annotated +76bf63bd-30f4-440d-81a0-61ca16170f70_11,,,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the ventilation provision is less than two years of the total load.,less,synthetic +4a82f789-a98a-4379-9b81-2a20cfba6c87_6,,,"If the internal ties must be centred on the supporting line, the minimum value of the axle group load, 10m, will also be applied to internal ties.",greater-equal,synthetic +e4fb8d18-8dbc-4351-a2df-d87f880f476a_8,,,The step for balconies is 0.7 metres that of the load-bearing structures of the storey.,equal,synthetic +ef4f54b6-1099-4404-9fa2-d0c0d5e55543_4,,,The indoor units must not exceed the individual dwellings differences.,less-equal,synthetic +9027959e-efc1-4d32-acbe-e0775d40f001_10,,,"The morticed bolts should have a minimum water temperature of 0.15, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",greater-equal,synthetic +d504fd87-d13d-4936-9d7a-71d17954760d_5,,,The average carbon monoxide concentration of the steps in an exit may be no more than 600 millimetres.,less-equal,synthetic +d925c189-860a-4fcb-ae88-d1cf8cc14fb8_2,,,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the supports may be no more than certain proportion.",less-equal,synthetic +78d904cd-b605-43a6-b3a4-34c22f557123,"Instead, the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",{'ID': '84_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Instead, the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",selection,annotated +e3b85ad6-6132-40d7-86f8-3cc5d44eb12c_4,,,ten millimetres Grommets should be close to an accessible bathroom suitable for a wheelchair user.,equal,synthetic +86365504-9029-4805-a93b-4256849b8e3a,Duct connections should be both mechanically secured and adequately sealed to prevent leaks.,{'ID': '116_UK_DocF_V1_Ventilation'},Duct connections should be both mechanically secured and adequately sealed to prevent leaks.,necessity,annotated +86350df0-a40e-412b-a301-004524d56736_2,,,"For wet heating systems in new dwellings with a part of half a metre or greater, a minimum of two independently controlled heating circuits should be provided.",greater-equal,synthetic +8efb6108-e49e-4d64-a1e4-22e3f9128b17_4,,,"When calculating the reference heat loss of a building, the value of 10m shall be used as the number for the air leakage rate figure for the building envelope.",equal,synthetic +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_5,,,"Where the work concerns a building containing more than 900 millimetres controls, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater-equal,synthetic +9415ae4b-7a74-4c70-a245-e4381c6d71bf,"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",{'ID': '170_UK_DocL_V1_ConsrvationOfFuelAndPower'},"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",necessity,annotated +bfdf95da-d422-47cd-83d7-a30a4969f2e6,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",{'ID': '180_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",part-of,annotated +a86b58e8-046f-44b7-8e1b-00c876c8c647_3,,,"Parapets in energy efficiency measures A to 300mm and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",less-equal,synthetic +dcc583b1-8c4c-42cf-a1ed-e8907de56254_2,,,"The travel distance of the indoor steps of other spaces intended for everyday use may be no more than 4, and the tread must be no less than 270 millimetres.",less-equal,synthetic +31e6f85a-97ea-4224-9144-bc3d1daad96d,Consideration should be given to providing a low level urinal for children in male washrooms.,{'ID': '174_UK_DocM_V2_AccessAndUseOfBuildings'},Consideration should be given to providing a low level urinal for children in male washrooms.,selection,annotated +0a7ff0c7-c5f9-4069-9d7e-2bfd6c4871d3_5,,,The room temperature of the extension does not exceed off.,less-equal,synthetic +203faa23-7b71-47c9-a6e5-2333ac45389e_3,,,"The U-value of the indoor steps of dwelling units and living quarters may be no more than 220 millimetres, and the tread must be no less than 250 millimetres.",less-equal,synthetic +81314489-dcd9-410f-9b15-595b87e7c8f9,"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",{'ID': '14_UK_DocQ_Security_Dwellings'},"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",none,annotated +8e8f4fb5-00b5-404f-89df-a07287984748,"In buildings with a total useful floor area greater than 1000m2, automatic meter reading and data collection facilities should be installed.",{'ID': '229_UK_DocM_V2_AccessAndUseOfBuildings'},"In buildings with a total useful floor area greater than 1000m2, automatic meter reading and data collection facilities should be installed.",greater,annotated +6c789809-b1b8-429a-8fe2-8ce16f8a4b54_7,,,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the minimum value does not exceed 4.,less-equal,synthetic +2de867fe-80e7-4617-ad18-36225dd45ab1,Hinged or pivot windows with an opening angle of less than 15 degrees are not suitable for purge ventilation.,{'ID': '53_UK_DocF_V1_Ventilation'},Hinged or pivot windows with an opening angle of less than 15 degrees are not suitable for purge ventilation.,part-of,annotated +baee716c-b8c2-4500-b4de-63fa11f007b1_2,,,A minimum of 30% load in five of the remaining Sewers must have access to cable routes.,greater-equal,synthetic +aa41a5d4-c0b1-4da7-84a0-5c2e2738654f_5,,,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than 55 Door.,greater,synthetic +20518e80-6f7e-457f-8c5a-59fa4c0eb324_9,,,"When calculating the heat loss for a buildings design solution, the slope shall be used as the value of the feasibility of installing high-efficiency alternative systems for the building envelope.",equal,synthetic +6c789809-b1b8-429a-8fe2-8ce16f8a4b54,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,{'ID': '62_Finnish_Health-IndoorClimateAndVentilation'},Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,selection,annotated +f7f1a609-ae35-4544-9b38-e471d7a00666,"In order to enhance the efficiency of firefighting and rescue operations, means of smoke extraction shall be designed and constructed in the building so that smoke can be extracted from the different premises in the building.",{'ID': '249_Finnish_FireSafety'},"In order to enhance the efficiency of firefighting and rescue operations, means of smoke extraction shall be designed and constructed in the building so that smoke can be extracted from the different premises in the building.",part-of,annotated +a235c68f-ae44-4770-b005-4e9d7b659eb7_1,,,All cavity walls should have leaves at least 4 steps and cavities at least 50mm wide.,greater-equal,synthetic +8fcdc238-3c30-4659-9303-1b126a39b2cd_2,,,The design solar load should be danger of collision by at least three metres.,greater-equal,synthetic +2b60007d-59a3-4a18-a184-89e76ee17454,Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,{'ID': '161_UK_DocL_V1_ConsrvationOfFuelAndPower'},Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,none,annotated +415aa97a-1b29-4d68-b1f1-e7d29a5ed7d6,Rigid connectors and jubilee clips should be used for flexible ducting to ensure a good seal.,{'ID': '117_UK_DocF_V1_Ventilation'},Rigid connectors and jubilee clips should be used for flexible ducting to ensure a good seal.,necessity,annotated +636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4_7,,,"Where a new building contains more than 10m vapour barriers, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",greater,synthetic +2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_6,,,The normal relationship between the dimensions of the rise and going is: 100 equals three.,equal,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_5,,,Skirtings totalling up to 50mm total thickness and shallow projecting toilets or casings above EI 15 may be discounted when measuring clear width.,greater,synthetic +77be05f2-cd8c-4d35-85e4-6637b999d8e7_2,,,The number of storeys of the consequential improvement works should not be less than 3m of the value of the principal works.,greater-equal,synthetic +eefe1191-2903-4fb8-9138-6471e09fb67d_5,,,The CO2 exceeds 850 millimetres at 11pm.,greater,synthetic +cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",part-of,annotated +83344b26-7cf0-452a-9dac-c0288c46393d,"The non-primary doors for entering a dwelling (for example, back door or garage inter-connecting doors) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",{'ID': '37_UK_DocQ_Security_Dwellings'},"The non-primary doors for entering a dwelling (for example, back door or garage inter-connecting doors) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",selection,annotated +ddd6ec57-ed54-4a8a-abaf-4b1efc287dde,The flushing shall be carried out with household water to remove any dirt and debris from the pipe network.,{'ID': '111_Finnish_Health-WaterAndSewerage'},The flushing shall be carried out with household water to remove any dirt and debris from the pipe network.,none,annotated +0da52584-1b37-48b5-840f-3795ae695275_0,,,the minimum clear dimensions of the platform are: 1100mm wide and 0.052083333 thick where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +6d5428cc-90c2-477e-b20e-978a6d1cd403,Edge columns and walls shall be tied to every floor and roof.,{'ID': '186_Finnish_StabilityOfStructures'},Edge columns and walls shall be tied to every floor and roof.,necessity,annotated +203faa23-7b71-47c9-a6e5-2333ac45389e_8,,,"The heat of the indoor steps of dwelling units and living quarters may be no more than 10 kN, and the tread must be no less than 250 millimetres.",less-equal,synthetic +c2e0629d-350b-45b8-9e9e-d58be1780f12_8,,,"If the heating and cooling systems has no Water pipes, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",not-part-of,synthetic +0ea1e862-2434-4fc8-97a2-b076c992ef20_11,,,"The reference value of an exit must be at least 0.9 metres and its free height must be at least 2,100 millimetres.",greater-equal,synthetic +05864826-21ef-4ae7-9af8-2aaeffc7267a_1,,,Modular and portable buildings with a planned equivalent area of more than 90mm but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,greater,synthetic +e32bbb47-c826-40c1-8ea4-8c32353d3fd2_7,,,There shall be 150m2 of separator or treatment device provided for people in the building.,equal,synthetic +4fc3b5b1-a838-4429-b385-d8e80e6633eb,"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",necessity,annotated +7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",selection,annotated +4a82f789-a98a-4379-9b81-2a20cfba6c87,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 70 kN, will also be applied to internal ties.",{'ID': '179_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 70 kN, will also be applied to internal ties.",none,annotated +c0a6d35c-cc20-428b-941d-c3e3e6365c74,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",{'ID': '25_UK_DocK_ProtectionFromFalling'},"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",selection,annotated +8e8f4fb5-00b5-404f-89df-a07287984748_1,,,"In buildings with a habitable area greater than 20 degrees Celsius, automatic meter reading and data collection facilities should be installed.",greater,synthetic +81f14fc1-af5d-45e8-8725-94d2510e4701,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",{'ID': '29_Finnish_Accessibility'},"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",part-of,annotated +c0a6d35c-cc20-428b-941d-c3e3e6365c74_9,,,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a remains fully open number of steps of 390 millimetres.",equal,synthetic +cc72106e-9e7f-47cf-8a95-0173a8305dad,"In a new building, the crawl space height must be 0.8 metres on average at the minimum.",{'ID': '83_Finnish_Health-Humidity'},"In a new building, the crawl space height must be 0.8 metres on average at the minimum.",selection,annotated +835d8fad-7a27-4299-aa38-a5b1771a6779,"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",{'ID': '178_UK_DocM_V2_AccessAndUseOfBuildings'},"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",none,annotated +34a524ec-6994-426f-86af-78788fd34a80,"Between the locking points for the mortice lock and surface-mounted rim lock, the distance should be 400-600mm.",{'ID': '36_UK_DocQ_Security_Dwellings'},"Between the locking points for the mortice lock and surface-mounted rim lock, the distance should be 400-600mm.",equal,annotated +43e26628-8b62-4cc6-91e2-284335df1564,"In rooms used for sleeping or rest, the one-hour A-weighted equivalent continuous sound level of impulsive, narrow-band or low-frequency noise may not exceed 25 decibels.",{'ID': '17_Finnish_AcousticEnvironment'},"In rooms used for sleeping or rest, the one-hour A-weighted equivalent continuous sound level of impulsive, narrow-band or low-frequency noise may not exceed 25 decibels.",part-of,annotated +39a37d5e-3361-43b9-a209-e5cd45918abc,"For mixed-use buildings which have parking spaces within a covered car park, any requirements to install electric vehicle charge points or cable routes must first be applied to those parking spaces outside the covered car park.",{'ID': '95_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"For mixed-use buildings which have parking spaces within a covered car park, any requirements to install electric vehicle charge points or cable routes must first be applied to those parking spaces outside the covered car park.",part-of,annotated +fb1da22f-8ddb-4399-b441-64dca68da9af,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",{'ID': '218_Finnish_FireSafety'},"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",none,annotated +389c960b-525d-4f2e-9a2c-1805eb2dc20d_5,,,The full indoor units under a stair that forms part of the storage provision should be counted as 25W/m2.,equal,synthetic +6ec243f2-9294-4b7c-89a4-1c46e4a69cc9_9,,,"If site constraints necessitate an casings of 0.2 or steeper, an approach incorporating ramped access should be provided.",greater-equal,synthetic +d0927095-9e43-4ce4-a740-d5df69dc1dc3_1,,,"If the air flows of primary energy content 1 and 0.3 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +9fd15b82-fc32-4364-8724-f1ef14f0c047,The cooker hood should span at least the full width of the cooker.,{'ID': '36_UK_DocF_V1_Ventilation'},The cooker hood should span at least the full width of the cooker.,part-of,annotated +e874f337-2067-4e77-ad32-c3b857f40e7a_7,,,"If the service exceeds eight per cent, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",greater,synthetic +fb1da22f-8ddb-4399-b441-64dca68da9af,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",{'ID': '218_Finnish_FireSafety'},"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",none,annotated +11f2902d-29c2-474e-97d0-628a2a97a666_2,,,"total extract air flow of over eight per cent must be equipped with an appropriate safety barrier, railing or handrail.",greater,synthetic +d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",none,annotated +5f675f4f-74de-4d0f-ae92-c3500d2d952e,The actual equivalent area and location of installed background ventilators should be recorded.,{'ID': '189_UK_DocF_V1_Ventilation'},The actual equivalent area and location of installed background ventilators should be recorded.,necessity,annotated +302c413e-fefd-47f1-914f-0dc787e4a761_3,,,"Where load on surfaces is greater than 230mm, a difference in light reflectance value should be a minimum of 20 points.",greater,synthetic +986f7853-4975-4ecd-8f10-a75d818eb44a,"Fully insulated and continuous cavity closers should be used, installed tight to the insulation and cavity apertures.",{'ID': '140_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Fully insulated and continuous cavity closers should be used, installed tight to the insulation and cavity apertures.",none,annotated +aa41a5d4-c0b1-4da7-84a0-5c2e2738654f_1,,,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than 1400mm circulation piping.,greater,synthetic +8efb6108-e49e-4d64-a1e4-22e3f9128b17_10,,,"When calculating the reference heat loss of a building, the value of (16.66 8.33 V0.4)/(1000 24) shall be used as the performance standards for the air leakage rate figure for the building envelope.",equal,synthetic +6a41a473-bd3c-4e38-a093-094b3fdae388_1,,,At least one in every 30m2 remaining hotels must be provided with cable routes.,equal,synthetic +a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",none,annotated +2de867fe-80e7-4617-ad18-36225dd45ab1_1,,,Hinged or pivot windows with an height of less than 8 per cent (1:12.5) are not suitable for purge ventilation.,less,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_11,,,Skirtings totalling up to 15 degrees shallow projecting and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,less-equal,synthetic +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_7,,,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than EI 15 in intended time of use, these must be accessible via the interior.",greater,synthetic +d796dece-45f6-4527-a151-c59b007e9028,"A safe and marked access route must be reserved for pedestrians in connection with vehicle traffic and goods transport routes, doors and gates in the yards of buildings other than single-family houses, if pedestrian traffic through them is necessary.",{'ID': '132_Finnish_SafetyOfUse'},"A safe and marked access route must be reserved for pedestrians in connection with vehicle traffic and goods transport routes, doors and gates in the yards of buildings other than single-family houses, if pedestrian traffic through them is necessary.",selection,annotated +e320322e-3aee-4167-ad19-a6c6cc41f597,The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,{'ID': '97_Finnish_Health-WaterAndSewerage'},The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,selection,annotated +2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d,An upstand built on site should not exceed a U-value of 0.35W/(m2K).,{'ID': '115_UK_DocL_V1_ConsrvationOfFuelAndPower'},An upstand built on site should not exceed a U-value of 0.35W/(m2K).,part-of,annotated +3153d771-404e-4a54-ac05-ed1b75e37506_8,,,"Gangways should not be less than 1100mm total capital cost unless used by not more than 50 persons, in which case gangways should be a minimum of 1000m2.",greater-equal,synthetic +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_11,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 220 millimetres in sum total and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic +2a256a9c-0b8a-4acf-87e1-86a5857f36a3,"Where a driveway forms all, or part of, the approach route, an additional allowance of at least 900mm wide should be provided so that a wheelchair user can pass a parked car.",{'ID': '17_UK_DocM_V1_AccessAndUseOfBuildings'},"Where a driveway forms all, or part of, the approach route, an additional allowance of at least 900mm wide should be provided so that a wheelchair user can pass a parked car.",greater-equal,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",part-of,annotated +825053cb-af5d-43a9-b59b-e2a5ae78ea73_6,,,The cross fall of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the air leakage rate figure of dwellings in the residential building; b. the number of associated parking spaces.,greater,synthetic +2de867fe-80e7-4617-ad18-36225dd45ab1,Hinged or pivot windows with an opening angle of less than 15 degrees are not suitable for purge ventilation.,{'ID': '53_UK_DocF_V1_Ventilation'},Hinged or pivot windows with an opening angle of less than 15 degrees are not suitable for purge ventilation.,necessity,annotated +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_7,,,Skirtings totalling up to 50mm total thickness and shallow projecting Ramps or casings above (16.66 8.33 V0.4)/(1000 24) may be discounted when measuring clear width.,greater,synthetic +239bd568-c5f2-4ab5-955c-f2d8d86b7b7f,"Where closing devices are needed for fire control, electrically powered hold-open devices or swing-free closing devices should be used as appropriate.",{'ID': '90_UK_DocM_V2_AccessAndUseOfBuildings'},"Where closing devices are needed for fire control, electrically powered hold-open devices or swing-free closing devices should be used as appropriate.",none,annotated +d3e7a947-536e-4a49-9823-e27fc0f68b27_6,,,surfaces of landings to be at least equal to the total useful floor area of the ramp.,greater-equal,synthetic +f420ae57-5656-4558-b1a3-1079e46bf6cc_4,,,"In the case of the storey-level door of a dwelling, or if the performance standards through the door exceeds 7 mg/m3 (6 ppm), doors must open in the direction of the exit.",greater,synthetic +83ff563b-077a-4849-b526-382fbb012647,The breaking of a glass structure or other light-permeable structure of a building must not cause a danger of falling or a danger of injury from fragments falling onto persons below.,{'ID': '67_Finnish_SafetyOfUse'},The breaking of a glass structure or other light-permeable structure of a building must not cause a danger of falling or a danger of injury from fragments falling onto persons below.,part-of,annotated +f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c_11,,,A building with a fittings exceeding 32mm must be equipped with anchoring structures for safety lines.,greater,synthetic +891e9eee-4a4b-4d7c-8051-3aee8302cd6b,"Walls: insulation should be fitted without any air gaps and tight to the structure, cavity closers, lintels and cavity trays.",{'ID': '141_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Walls: insulation should be fitted without any air gaps and tight to the structure, cavity closers, lintels and cavity trays.",part-of,annotated +3835aa39-14bc-4c7a-a029-a5ce391bad76,The efficiency of the secondary heating appliance with its appropriate fuel should be used in the calculation of the dwelling primary energy rate and dwelling emission rate.,{'ID': '73_UK_DocL_V1_ConsrvationOfFuelAndPower'},The efficiency of the secondary heating appliance with its appropriate fuel should be used in the calculation of the dwelling primary energy rate and dwelling emission rate.,necessity,annotated +0f67dad7-6df9-444b-8e72-f447668e3fde_4,,,"Where sanitary facilities are wheelchair accessible, WC pans should be a minimum of 100 millimetres total supply air flow.",greater-equal,synthetic +079db365-cfed-474e-9329-25349ac0db4a,"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",{'ID': '21_Finnish_Accessibility'},"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",part-of,annotated +3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60_3,,,The approach route is a minimum of 900mm wide with a maximum stairs of two.,less-equal,synthetic +2a256a9c-0b8a-4acf-87e1-86a5857f36a3,"Where a driveway forms all, or part of, the approach route, an additional allowance of at least 900mm wide should be provided so that a wheelchair user can pass a parked car.",{'ID': '17_UK_DocM_V1_AccessAndUseOfBuildings'},"Where a driveway forms all, or part of, the approach route, an additional allowance of at least 900mm wide should be provided so that a wheelchair user can pass a parked car.",part-of,annotated +d925c189-860a-4fcb-ae88-d1cf8cc14fb8_4,,,"The class of steps in covered or heated outdoor staircases must be no less than 15 degrees, and the riser may be no more than 160 millimetres.",greater-equal,synthetic +8151be81-09ad-4dac-b2d2-f0d757915b6c_1,,,"However, when the snow load can occur, the elevation difference of the load s should be at least One.",greater-equal,synthetic +bd670961-83e8-410a-85a4-578f2d00c626,"In all cases, roof insulation should be continuous with wall insulation.",{'ID': '168_UK_DocL_V1_ConsrvationOfFuelAndPower'},"In all cases, roof insulation should be continuous with wall insulation.",part-of,annotated +cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",necessity,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8_4,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for output 1,000 millimetres and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic +4a82f789-a98a-4379-9b81-2a20cfba6c87_4,,,"If the internal ties must be centred on the supporting line, the minimum value of the going, adequate means, will also be applied to internal ties.",greater-equal,synthetic +31d635b2-1d32-49dd-a848-5b5acaf50128,"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",{'ID': '407_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",selection,annotated +5fa7daca-cb50-4397-a736-617e52d30187_9,,,"If total combined window area at below 30% are required and unavailable, the target emission rate may be taken as equal to that at 30% load.",equal,synthetic +2a2dbb92-88af-47f5-bd1e-b3ddea4c1ec9,"The approach route should be safe and convenient for everyone, be at the shallowest gradient that can reasonably be achieved, and be stepfree, irrespective of the storey on which the dwelling is located.",{'ID': '70_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be safe and convenient for everyone, be at the shallowest gradient that can reasonably be achieved, and be stepfree, irrespective of the storey on which the dwelling is located.",necessity,annotated +b6e6ebce-e75f-4fae-b9a2-e35c164b3fb4,"Where onsite electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and onsite energy demand.",{'ID': '342_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where onsite electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and onsite energy demand.",selection,annotated +46f5be2a-1514-420b-bc39-331fc6e0d2df_9,,,"The dwelling primary energy rate, reverberation time and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, opening angle and target fabric energy efficiency rate, respectively.",less-equal,synthetic +793cb939-b3d9-46eb-ae65-71a4d5c8031b,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,{'ID': '43_UK_DocM_V1_AccessAndUseOfBuildings'},Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,part-of,annotated +b5aa20f2-571e-48d8-9943-4102c9f9bd1a,"In exit passageways and fire-compartmented elevator shafts, means must be arranged for both smoke extraction and flow of replacement air.",{'ID': '250_Finnish_FireSafety'},"In exit passageways and fire-compartmented elevator shafts, means must be arranged for both smoke extraction and flow of replacement air.",selection,annotated +259c1614-77ef-4ae4-a401-83caa603e374,"The main doors for entering a dwelling (usually the front doorset) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",{'ID': '35_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front doorset) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",necessity,annotated +a0c838b5-5fe2-4b52-abe1-432804c2c8aa_6,,,A rise of 21 C shall be used as the reception for room temperature during the heating season.,equal,synthetic +ee0c8c7c-c65e-4403-92e6-628fd680f3bf_4,,,"Any panel within the doorset should be at least 2,100 millimetres CO2.",greater-equal,synthetic +eccd4f77-ef4a-41fd-a22a-620c84fdddd4,There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,{'ID': '98_UK_DocM_V1_AccessAndUseOfBuildings'},There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,part-of,annotated +984c252b-74f4-4d85-9080-1c8ae1851eca_2,,,"If performance requires thicker glass to be used, an equivalent window unit with exit (0.136kgCO2/kWh) glazing should be shown to meet the required standard.",equal,synthetic +103f99ad-884b-4bae-9f22-ccb1c5bc3d26_11,,,"In an open garage of no more than 20C controls, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",less-equal,synthetic +b51c7a9f-2080-4e60-940f-e59af0cc97ce,"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",{'ID': '34_Finnish_Health-Humidity'},"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",necessity,annotated +956efc87-87de-4d3c-99fb-dc58eab9353b,"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",{'ID': '42_Finnish_Accessibility'},"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",part-of,annotated +4e8c5c50-44af-48f6-b959-e6f9b31afa1e_3,,,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical requirements may be outdoor air and exhaust air ducts.",equal,synthetic +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_9,,,"In buildings more than 0.3W/m2 and at most 28 metres in U-value, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",greater,synthetic +a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",none,annotated +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_6,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding 1,000 millimetres district heat networks is EI 30; however, minor sealing parts and penetrations may be class E 15.",greater,synthetic +8b054fa5-fa6b-40f8-996a-a6dfea855fc3_8,,,"The dimensions between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 150mm on the side wall and no less than 1,500 millimetres on the end wall.",greater-equal,synthetic +511c1a7f-08b9-48ec-aea6-9b749fdf31a1_1,,,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an 01:20:00 of appropriately located construction layers which are suitable for users of wheelchairs and walking frames with wheels.",equal,synthetic +0d8c2f7d-5234-4bec-bbbe-961e499ebbbc,"A proportion of the sleeping accommodation in hotels, motels and student accommodation should be designed for independent use by wheelchair users.",{'ID': '129_UK_DocM_V2_AccessAndUseOfBuildings'},"A proportion of the sleeping accommodation in hotels, motels and student accommodation should be designed for independent use by wheelchair users.",part-of,annotated +56166e36-b14b-4632-9767-70b71d335d9c,"When a dwelling undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",{'ID': '98_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When a dwelling undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",selection,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479_3,,,Individual flights are: for width up to 400mm not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic +dcc583b1-8c4c-42cf-a1ed-e8907de56254_5,,,"The water temperature of the indoor steps of other spaces intended for everyday use may be no more than 6m, and the tread must be no less than 270 millimetres.",less-equal,synthetic +b63dcef6-1840-4e9e-ad51-f8fc481fe856_0,,,"The wall ties should have a seasonal energy efficiency ratio of 0.35W/(m2K) and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic +26980508-105c-49db-8595-bf001a48d757,"In rooms with no fixed seats or furnishings, the number of persons shall be calculated to be two persons per square metre.",{'ID': '103_Finnish_SafetyOfUse'},"In rooms with no fixed seats or furnishings, the number of persons shall be calculated to be two persons per square metre.",selection,annotated +bf798097-bb99-42d0-a73f-8cebab8fbeb8_2,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the alongside the leading edge must be no less than three metres.",greater-equal,synthetic +0f8b3f66-6496-431c-bdc1-75570dde9ee6,"All cable routes should be laid as straight as possible and with suitable access points, so that cables can be pulled through in future.",{'ID': '111_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"All cable routes should be laid as straight as possible and with suitable access points, so that cables can be pulled through in future.",selection,annotated +fb5d3054-4911-4049-ba09-1c3e80f9c07c_1,,,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the design solar load may be no more than between 550mm and 700mm.",less-equal,synthetic +0da52584-1b37-48b5-840f-3795ae695275_7,,,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where 0.35W/(m2K) residential unit are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +0d8c2f7d-5234-4bec-bbbe-961e499ebbbc,"A proportion of the sleeping accommodation in hotels, motels and student accommodation should be designed for independent use by wheelchair users.",{'ID': '129_UK_DocM_V2_AccessAndUseOfBuildings'},"A proportion of the sleeping accommodation in hotels, motels and student accommodation should be designed for independent use by wheelchair users.",none,annotated +fa90c179-d32c-412b-a7d6-a515cc91dbdb,The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,{'ID': '86_Finnish_Health-Humidity'},The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,none,annotated +7a1bc727-1daa-4668-83f6-b44327b96898,"In glazed balconies, the spread of fire from one balcony to another and to an adjacent fire compartment must be restricted.",{'ID': '133_Finnish_FireSafety'},"In glazed balconies, the spread of fire from one balcony to another and to an adjacent fire compartment must be restricted.",selection,annotated +2ff58135-b89d-40d1-a145-51aad9e5a942,"The landing in front of the outside door shall be at least 1,500 millimetres wide and at least 1,500 millimetres long.",{'ID': '16_Finnish_Accessibility'},"The landing in front of the outside door shall be at least 1,500 millimetres wide and at least 1,500 millimetres long.",part-of,annotated +48133b44-eac2-44e2-b2df-c52243e9f7ea,"NOTE: For example, if the total system output is made up of three equally sized boilers, at 15% of system output the lead boiler will be operating at 45% of its rated output with the other two boilers switched off.",{'ID': '244_UK_DocM_V2_AccessAndUseOfBuildings'},"NOTE: For example, if the total system output is made up of three equally sized boilers, at 15% of system output the lead boiler will be operating at 45% of its rated output with the other two boilers switched off.",none,annotated +8207751f-13b8-4fe3-9bfe-4423093d4905,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,{'ID': '26_Finnish_AcousticEnvironment'},A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,part-of,annotated +2f8d4247-e53b-49ae-bd26-c4f1765eaee8_11,,,"Extract air of opening 2, 3 and 70 kN shall not be used as recirculation air.",equal,synthetic +8c7cf3d7-3ab9-4cb4-99bf-016cbbd4914d,Mechanical ventilation systems must be commissioned to provide adequate ventilation.,{'ID': '180_UK_DocF_V1_Ventilation'},Mechanical ventilation systems must be commissioned to provide adequate ventilation.,none,annotated +a94b6b4f-a05e-403e-bbca-ebe1b94e38a1,"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",{'ID': '470_UK_DocM_V2_AccessAndUseOfBuildings'},"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",selection,annotated +8c7cf3d7-3ab9-4cb4-99bf-016cbbd4914d,Mechanical ventilation systems must be commissioned to provide adequate ventilation.,{'ID': '180_UK_DocF_V1_Ventilation'},Mechanical ventilation systems must be commissioned to provide adequate ventilation.,necessity,annotated +7f3f59a4-fc7e-4b14-8074-384f6cacf548_8,,,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the total extract air flow is less than 23C.",less,synthetic +beeec1b2-c382-40cc-aec2-6eda86f5782e,"Each residential unit, shared communal room and common space should be categorised separately.",{'ID': '25_UK_DocO_Overheating'},"Each residential unit, shared communal room and common space should be categorised separately.",selection,annotated +e505b13c-7b62-4857-aa2d-544dc986e9c0_6,,,"For dwellings, for external tapered steps and stairs that are part of the building the number of people evacuating of each step should be a minimum of proportion.",greater-equal,synthetic +eefe1191-2903-4fb8-9138-6471e09fb67d_11,,,The going exceeds five at 11pm.,greater,synthetic +dcc583b1-8c4c-42cf-a1ed-e8907de56254,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",{'ID': '23_Finnish_SafetyOfUse'},"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",part-of,annotated +8421f806-70f2-46a9-a308-90a40da3541d_0,,,"Where the continuity of the approach, whether over its whole length or in part, is 20C or steeper, that part of the approach should be designed as ramped access.",greater-equal,synthetic +7e34700e-92de-4b00-a820-f4085a2e186c_4,,,"If the Air flow rates between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 0.136kgCO2/kWh, the wall in question must be class EI 15.",less,synthetic +7f3f59a4-fc7e-4b14-8074-384f6cacf548,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",{'ID': '45_Finnish_SafetyOfUse'},"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",greater-equal,annotated +7e34700e-92de-4b00-a820-f4085a2e186c_3,,,"If the absence between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 50mm, the wall in question must be class EI 15.",less,synthetic +d8066a73-49c2-4e99-825a-b49b9b2ba67d_5,,,A landing measuring at least one in height must be reserved in front of and behind a door located in an exit route.,greater-equal,synthetic +cf35d4a4-3170-421b-9be1-b68d928eed1d_8,,,"A roof with a construction greater than 65mm must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",greater,synthetic +4e1bda84-398f-4bae-a335-2c7f24501b09,The water heater is situated centrally with a distribution system to supply water to the drawoff points and has a capacity greater than 300 litres.,{'ID': '456_UK_DocM_V2_AccessAndUseOfBuildings'},The water heater is situated centrally with a distribution system to supply water to the drawoff points and has a capacity greater than 300 litres.,necessity,annotated +09b2a395-5293-4b7d-82d4-5312482d59e9_7,,,"Door entry controls, where provided, are mounted 850-1000mm entrance level finished ground level, and at least 300mm away from any projecting corner.",equal,synthetic +8421f806-70f2-46a9-a308-90a40da3541d_10,,,"Where the building primary energy rate of the approach, whether over its whole length or in part, is 28 metres or steeper, that part of the approach should be designed as ramped access.",greater-equal,synthetic +3724fd47-22f7-432c-81a2-1abcb95c7df2,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",{'ID': '96_UK_DocF_V1_Ventilation'},"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",greater-equal,annotated +0096a3bf-ac16-4a75-adf9-8c3f4a9b8610,The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,{'ID': '33_UK_DocQ_Security_Dwellings'},The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,selection,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_11,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under sum 100.",equal,synthetic +117864c0-5065-4c55-b390-c17b60c8d9dd,"If the protective part of the barrier contains only vertical structures, a cube with edges of no more than 100 millimetres may pass through its openings.",{'ID': '48_Finnish_SafetyOfUse'},"If the protective part of the barrier contains only vertical structures, a cube with edges of no more than 100 millimetres may pass through its openings.",none,annotated +7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",necessity,annotated +2de867fe-80e7-4617-ad18-36225dd45ab1_7,,,Hinged or pivot windows with an pitch of less than 16/01/2023 00:00 are not suitable for purge ventilation.,less,synthetic +ffc11c58-ff7e-45f4-a5c7-da59404e5659,"Reasonable provision shall be made in the design and installation of electrical installations in order to protect persons operating, maintaining or altering the installations from fire or injury.",{'ID': '1_UK_DocP_ElectricalSafety'},"Reasonable provision shall be made in the design and installation of electrical installations in order to protect persons operating, maintaining or altering the installations from fire or injury.",part-of,annotated +86350df0-a40e-412b-a301-004524d56736,"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",none,annotated +e874f337-2067-4e77-ad32-c3b857f40e7a_4,,,"If the atmosphere exceeds 190 kN, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",greater,synthetic +d988e207-c3f9-4314-9a16-f99b334595f4_5,,,The travel distance must be no less than 20mm.,greater-equal,synthetic +6b2f3ca5-8cea-4616-8679-438446bc6233,"Since doors are potential barriers, their use should be avoided whenever appropriate.",{'ID': '88_UK_DocM_V2_AccessAndUseOfBuildings'},"Since doors are potential barriers, their use should be avoided whenever appropriate.",necessity,annotated +a4dc06ab-99c3-4c8b-b295-eb3e6a64320a,"The free height from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 2.2 metres, unless the area is protected so as to prevent the danger of collision.",{'ID': '99_Finnish_SafetyOfUse'},"The free height from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 2.2 metres, unless the area is protected so as to prevent the danger of collision.",selection,annotated +88e23b46-22d9-4be6-87b7-40541f7995a9_11,,,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the Extract exceeds between 550mm and 700mm; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",greater,synthetic +525aa713-65e1-4368-a6f4-38f628be7fed,"in clothes shops, the dimensions and fittings recommended for an individual changing cubicle in a sports building should be provided.",{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},"in clothes shops, the dimensions and fittings recommended for an individual changing cubicle in a sports building should be provided.",necessity,annotated +783c19fa-0ef2-466f-b3e9-d4690e34ac5f,Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '214_UK_DocL_V1_ConsrvationOfFuelAndPower'},Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,selection,annotated +1e3d8e3a-93fd-47e2-833e-d7f36c901c77,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,{'ID': '131_UK_DocM_V1_AccessAndUseOfBuildings'},Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,selection,annotated +eff9dd2f-007f-4caf-bb2e-3ff65db910b0,A passenger lift is the most suitable means of vertical access and should be provided wherever possible.,{'ID': '103_UK_DocM_V2_AccessAndUseOfBuildings'},A passenger lift is the most suitable means of vertical access and should be provided wherever possible.,necessity,annotated +9027959e-efc1-4d32-acbe-e0775d40f001,"The morticed bolts should have a minimum projection of 20mm, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",{'ID': '38_UK_DocQ_Security_Dwellings'},"The morticed bolts should have a minimum projection of 20mm, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",greater-equal,annotated +7f3f59a4-fc7e-4b14-8074-384f6cacf548_6,,,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the indoor units is less than 35 mg/m3 (30 ppm).",less,synthetic +750a4f32-2581-4040-ac8b-8e4ad59abd56,Extract ventilators in sanitary accommodation should be capable of continuous operation if required.,{'ID': '48_UK_DocF_V2_Ventilation'},Extract ventilators in sanitary accommodation should be capable of continuous operation if required.,necessity,annotated +678e5476-66e6-40c2-a409-a8248dc6cef7,The sign should be sited where a person installing an electric vehicle charge point in future will see it.,{'ID': '120_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The sign should be sited where a person installing an electric vehicle charge point in future will see it.,necessity,annotated +d941229d-4de4-4873-9704-c207a9b673c8,An exit enclosure has doors that open separately into each adjoining fire compartment without a need to open the doors at the same time.,{'ID': '26_Finnish_FireSafety'},An exit enclosure has doors that open separately into each adjoining fire compartment without a need to open the doors at the same time.,selection,annotated +a090f6bb-f89b-44c1-b6ee-8e72e2be30a0,Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '370_UK_DocM_V2_AccessAndUseOfBuildings'},Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,selection,annotated +0aaf71f0-a482-4a72-a407-0d6db79c7f6f_11,,,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 65mm of non-fire-compartmented rooms that essentially relate to the business of the building may be located on the level of second storey.",less-equal,synthetic +aa41a5d4-c0b1-4da7-84a0-5c2e2738654f,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,{'ID': '89_UK_DocF_V1_Ventilation'},The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,none,annotated +23cff3c3-1251-4c5f-9fd9-8f52d25eb494,Gasfired boilers and multi-stage oilfired boilers with an output of more than 500kW should have fully modulating burner controls.,{'ID': '252_UK_DocM_V2_AccessAndUseOfBuildings'},Gasfired boilers and multi-stage oilfired boilers with an output of more than 500kW should have fully modulating burner controls.,greater,annotated +ef9dc94d-b79c-4fba-897a-eed2b90084b2,"Thermal bridging, including at the party wall, should be reasonably limited.",{'ID': '150_UK_DocM_V2_AccessAndUseOfBuildings'},"Thermal bridging, including at the party wall, should be reasonably limited.",selection,annotated +993e54cc-49c3-43cb-995e-1a951c93c775,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an axle group load equal to 190 kN.",{'ID': '25_Finnish_StabilityOfStructures'},"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an axle group load equal to 190 kN.",part-of,annotated +117864c0-5065-4c55-b390-c17b60c8d9dd,"If the protective part of the barrier contains only vertical structures, a cube with edges of no more than 100 millimetres may pass through its openings.",{'ID': '48_Finnish_SafetyOfUse'},"If the protective part of the barrier contains only vertical structures, a cube with edges of no more than 100 millimetres may pass through its openings.",part-of,annotated +793cb939-b3d9-46eb-ae65-71a4d5c8031b_4,,,Where the ladder is within the private curtilage of the dwelling (but not within a carport or fire compartment) at least one space is a standard parking bay that can be widened to 3.3m.,not-part-of,synthetic +2de867fe-80e7-4617-ad18-36225dd45ab1_0,,,Hinged or pivot windows with an ending of less than two years are not suitable for purge ventilation.,less,synthetic +bb9ec292-062b-43c3-8590-856dd5f6b890_2,,,"The building primary energy rate and sizes calculated using the measured air permeability must not be higher than the target primary energy rate and fittings, respectively.",less-equal,synthetic +8aa4b706-1659-4e30-a4fe-e7f33efe3241_3,,,All 40 degrees Celsius building envelope of the compliance checklist should be completed.,equal,synthetic +716fa732-f3c7-43ad-a4e3-fff43a841018,The vehicle traffic area of a building and its courtyard must be safe and appropriate.,{'ID': '131_Finnish_SafetyOfUse'},The vehicle traffic area of a building and its courtyard must be safe and appropriate.,necessity,annotated +d342429e-d3fc-46e0-a195-527cfef1fd4b,"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",{'ID': '451_UK_DocM_V2_AccessAndUseOfBuildings'},"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",selection,annotated +76bf63bd-30f4-440d-81a0-61ca16170f70,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,necessity,annotated +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",none,annotated +86831830-e7f0-4b90-aa27-dc0542b7ba4d,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least one intermediate landing.",{'ID': '18_Finnish_SafetyOfUse'},"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least one intermediate landing.",none,annotated +e505b13c-7b62-4857-aa2d-544dc986e9c0,"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",{'ID': '18_UK_DocK_ProtectionFromFalling'},"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",none,annotated +c384013b-c40f-4925-acbe-465e1ca5bc13_7,,,600 millimetres building control body per detail should be recorded.,equal,synthetic +81314489-dcd9-410f-9b15-595b87e7c8f9_6,,,"The resilient layer should be timber sheathing at least 1,200 millimetres travel distance, expanded metal or a similar resilient material.",greater-equal,synthetic +06c2e0f7-69c8-47ec-bf31-9902ae9df7cf,"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",{'ID': '109_UK_DocK_ProtectionFromFalling'},"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",necessity,annotated +c384013b-c40f-4925-acbe-465e1ca5bc13_11,,,20 heat per detail should be recorded.,equal,synthetic +5f7b8ff7-50d0-46a2-a48b-fa19786c98fd,"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '105_Finnish_EnergyEfficiency'},"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",selection,annotated +46f5be2a-1514-420b-bc39-331fc6e0d2df_8,,,"The water temperature, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the Manual control, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,synthetic +6c789809-b1b8-429a-8fe2-8ce16f8a4b54_6,,,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the cross fall does not exceed 0.8 metres.,less-equal,synthetic +4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",none,annotated +2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb_6,,,"There should be a swimming pools, in the absence of tobacco smoke or other excessive pollutants, of 0.136kgCO2/kWh.",equal,synthetic +457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",none,annotated +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",none,annotated +511c1a7f-08b9-48ec-aea6-9b749fdf31a1_6,,,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an 20 millimetres of appropriately located standing auditorium which are suitable for users of wheelchairs and walking frames with wheels.",equal,synthetic +825053cb-af5d-43a9-b59b-e2a5ae78ea73_10,,,The dwelling emission rate of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the quality of the installation of dwellings in the residential building; b. the number of associated parking spaces.,greater,synthetic +203faa23-7b71-47c9-a6e5-2333ac45389e_6,,,"The internal temperature of the indoor steps of dwelling units and living quarters may be no more than 600 x 600 millimetres, and the tread must be no less than 250 millimetres.",less-equal,synthetic +f41fb8da-16bd-4404-accb-e32727f3736a,"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",{'ID': '69_Finnish_SafetyOfUse'},"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",selection,annotated +20518e80-6f7e-457f-8c5a-59fa4c0eb324,"When calculating the heat loss for a buildings design solution, the design value shall be used as the value of the air leakage rate figure for the building envelope.",{'ID': '137_Finnish_EnergyEfficiency'},"When calculating the heat loss for a buildings design solution, the design value shall be used as the value of the air leakage rate figure for the building envelope.",none,annotated +a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",necessity,annotated +8e8f4fb5-00b5-404f-89df-a07287984748,"In buildings with a total useful floor area greater than 1000m2, automatic meter reading and data collection facilities should be installed.",{'ID': '229_UK_DocM_V2_AccessAndUseOfBuildings'},"In buildings with a total useful floor area greater than 1000m2, automatic meter reading and data collection facilities should be installed.",part-of,annotated +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_2,,,"Where the cost of installing only cable routes is more than 7% of the total cost of the major open-plan space, there is no elevator shafts to install either electric vehicle charge points or cable routes.",not-part-of,synthetic +c145afb4-469c-49a7-a14f-167094cf055e,People should be able to appreciate easily where to place their feet by highlighting nosings and avoiding open rises.,{'ID': '54_UK_DocM_V2_AccessAndUseOfBuildings'},People should be able to appreciate easily where to place their feet by highlighting nosings and avoiding open rises.,necessity,annotated +6414854d-01f9-481f-a7f4-c4581e48d8b1,Special safety features are not necessary if the ladder is not more than 6m long.,{'ID': '112_UK_DocK_ProtectionFromFalling'},Special safety features are not necessary if the ladder is not more than 6m long.,less-equal,annotated +a4dc06ab-99c3-4c8b-b295-eb3e6a64320a_11,,,"The free type and quality from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 90, unless the area is protected so as to prevent the danger of collision.",greater-equal,synthetic +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_4,,,"Where the work concerns a building containing more than E 15 centralised system, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater-equal,synthetic +0a53e4af-84a7-46aa-b28a-cb1d873c8cae,"The type and quality of public address, hearing enhancement and telephone systems should be chosen carefully to ensure intelligibility.",{'ID': '151_UK_DocM_V2_AccessAndUseOfBuildings'},"The type and quality of public address, hearing enhancement and telephone systems should be chosen carefully to ensure intelligibility.",selection,annotated +09b2a395-5293-4b7d-82d4-5312482d59e9,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",{'ID': '46_UK_DocM_V1_AccessAndUseOfBuildings'},"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",selection,annotated +cea6e7bd-c494-4146-9f81-3fd2ed64a2a6_0,,,The water temperature of the floor surface in the seating area and access route may not exceed 25mm.,less-equal,synthetic +316c89ee-aa42-4e7a-9372-960cf25b3265,Extract ventilation may be by natural means or by mechanical means (e.g. by an extract fan or acentral system).,{'ID': '105_UK_DocF_V2_Ventilation'},Extract ventilation may be by natural means or by mechanical means (e.g. by an extract fan or acentral system).,selection,annotated +bb309bf3-9e86-43d9-8b6e-ebff176d1c88,The sink is not more than 150mm deep with insulation to the underside to prevent scalding of a wheelchair users legs.,{'ID': '96_UK_DocM_V1_AccessAndUseOfBuildings'},The sink is not more than 150mm deep with insulation to the underside to prevent scalding of a wheelchair users legs.,necessity,annotated +72d7716f-7e3e-442c-9e42-14d4b19e18e3_3,,,A electric vehicle charge points that is being connected to a new building should not have a length for delivered heat to the building which is greater than 0.350kgCO2/kWh.,not-part-of,synthetic +0aaf71f0-a482-4a72-a407-0d6db79c7f6f_7,,,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 2.0 m3/(h m2) of non-fire-compartmented basement storeys that essentially relate to the business of the building may be located on the level of second storey.",less-equal,synthetic +569c7958-b7d6-4b9c-9dd9-13307e95e59b,"For ducted systems that are served by fans with a design flow rate greater than 1m3/s, ductwork leakage tests should be carried out.",{'ID': '385_UK_DocM_V2_AccessAndUseOfBuildings'},"For ducted systems that are served by fans with a design flow rate greater than 1m3/s, ductwork leakage tests should be carried out.",greater,annotated +f19c6d4a-f6e8-4f2e-b676-537852f3c38f,"The heat loss from the floor should be calculated using the sum of the thermal resistance of the floor finish and the underlying heated layer, multiplied by 10.",{'ID': '303_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The heat loss from the floor should be calculated using the sum of the thermal resistance of the floor finish and the underlying heated layer, multiplied by 10.",necessity,annotated +d3e7a947-536e-4a49-9823-e27fc0f68b27_10,,,design value of landings to be at least equal to the type and quality of the ramp.,greater-equal,synthetic +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_2,,,"In buildings more than B and at most 28 metres in equivalent area, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",greater,synthetic +b63dcef6-1840-4e9e-ad51-f8fc481fe856_11,,,"The wall ties should have a horizontal spacing of 900mm and a Capacities of 0.055555556, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic +4abb3268-3ba6-47e8-a8b7-4676dbaa9a16_7,,,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear total floor area of 500kW, except in doorways.",equal,synthetic +5ca184fa-e100-4f97-957d-e37ae944786f_3,,,The Geo-location of installing electric vehicle charge points and cable routes is not more than twice the rise plus the going (2R G) of the total capital cost of the major renovation.,less-equal,synthetic +0da52584-1b37-48b5-840f-3795ae695275_11,,,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where 100 non-domestic building are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated +fc129e2c-abfa-48be-9fd6-e85f077ae67b,"A space alongside the leading edge of a door should be provided to enable a wheelchair user to reach and grip the door handle, then open the door without releasing hold on the handle and without the footrest colliding with the return wall.",{'ID': '70_UK_DocM_V2_AccessAndUseOfBuildings'},"A space alongside the leading edge of a door should be provided to enable a wheelchair user to reach and grip the door handle, then open the door without releasing hold on the handle and without the footrest colliding with the return wall.",part-of,annotated +37f01a2c-b944-45a2-a7f4-140d8c03d7ac_4,,,"After rebating, frame components should retain at least 230mm of Ladders.",greater-equal,synthetic +f9de28ac-45bb-4400-9d9f-8afee73bd2e3_11,,,The type and quality should not exceed 50mm of dwelling floor area.,less-equal,synthetic +75c60084-6878-472d-8694-e8739e0dd76c_4,,,The width of access routes in assembly areas with a air extract rate of 20 millimetres must be at least 900 millimetres.,equal,synthetic +8207751f-13b8-4fe3-9bfe-4423093d4905_3,,,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the sales counter of the staircase and exit route is no more than 100 litres.,less-equal,synthetic +cf35d4a4-3170-421b-9be1-b68d928eed1d_5,,,"A roof with a integrity greater than 2 must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",greater,synthetic +8b054fa5-fa6b-40f8-996a-a6dfea855fc3,"The distance between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 400 millimetres on the side wall and no less than 1,500 millimetres on the end wall.",{'ID': '33_Finnish_SafetyOfUse'},"The distance between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 400 millimetres on the side wall and no less than 1,500 millimetres on the end wall.",none,annotated +61bc1c7a-62f8-43c1-9c71-6e3073695cbe,"Roofs: insulation should be installed tight to the structure, without air gaps, and should extend to the wall insulation.",{'ID': '143_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Roofs: insulation should be installed tight to the structure, without air gaps, and should extend to the wall insulation.",part-of,annotated +fa8a6d84-eb99-490e-8169-3c65353fb553,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",{'ID': '61_Finnish_StabilityOfStructures'},"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",part-of,annotated +4d80c4d1-08ee-481a-9f9c-e9151ce1094d_5,,,"The elevation difference of windows, roof windows, rooflights and doors should not exceed 21 C of the total floor area of the dwelling.",less-equal,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_11,,,Skirtings totalling up to 50mm total thickness and shallow projecting exhaust air terminal or casings above 0.05 may be discounted when measuring clear width.,greater,synthetic +60024014-cb6a-4a53-9b12-9497e0a1e5e8_6,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the headroom from these spaces does not exceed 8.5m2 of the total air flow in the vertical duct.",less-equal,synthetic +835d8fad-7a27-4299-aa38-a5b1771a6779_8,,,"In large building complexes, such as retail parks and large sports centres, there should be 25W/m2 wheelchair-accessible unisex cooker capable of including an adult changing table.",equal,synthetic +c0a6d35c-cc20-428b-941d-c3e3e6365c74_2,,,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a to enhance number of steps of 1,000 millimetres.",equal,synthetic +87c9c5f5-18dc-4107-b4af-b44dfb2b9627,The effective rated output should be assessed based on the final installed capacity of the heating or air-conditioning system.,{'ID': '326_UK_DocM_V2_AccessAndUseOfBuildings'},The effective rated output should be assessed based on the final installed capacity of the heating or air-conditioning system.,selection,annotated +2b60007d-59a3-4a18-a184-89e76ee17454,Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,{'ID': '161_UK_DocL_V1_ConsrvationOfFuelAndPower'},Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,none,annotated +8b1482fe-5e9d-4b44-9157-a8de35c65ba9,"If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise-attenuating background ventilator should be fitted.",{'ID': '86_UK_DocF_V1_Ventilation'},"If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise-attenuating background ventilator should be fitted.",necessity,annotated +7f3f59a4-fc7e-4b14-8074-384f6cacf548,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",{'ID': '45_Finnish_SafetyOfUse'},"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",none,annotated +26980508-105c-49db-8595-bf001a48d757_10,,,"In sign with no fixed adjoining rooms or furnishings, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic +b63dcef6-1840-4e9e-ad51-f8fc481fe856_6,,,"The wall ties should have a Leakage of 400kg and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic +8c79efc1-f3e8-4394-ae6a-0bf5432ebcc5,NOTE: Ventilation through infiltration should be considered to be part of the ventilation provision of a dwelling.,{'ID': '131_UK_DocF_V1_Ventilation'},NOTE: Ventilation through infiltration should be considered to be part of the ventilation provision of a dwelling.,part-of,annotated +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_10,,,"Where the net absorber area of installing only cable routes is more than 25mm of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",greater,synthetic +05fdde92-d8af-42ad-963b-9019c69a8ab3,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",{'ID': '163_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",none,annotated +26980508-105c-49db-8595-bf001a48d757_3,,,"In ventilation space or gap with no fixed Drawings or furnishings, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic +3121fe90-27db-405e-a42a-df3cd22ee176_2,,,"Where necessary, 400mmHandrails, one above the other, must be installed in order to take into account children and users of wheelchairs.",equal,synthetic +e4fb8d18-8dbc-4351-a2df-d87f880f476a_5,,,The locations for balconies is 100 that of the load-bearing structures of the storey.,equal,synthetic +fc129e2c-abfa-48be-9fd6-e85f077ae67b,"A space alongside the leading edge of a door should be provided to enable a wheelchair user to reach and grip the door handle, then open the door without releasing hold on the handle and without the footrest colliding with the return wall.",{'ID': '70_UK_DocM_V2_AccessAndUseOfBuildings'},"A space alongside the leading edge of a door should be provided to enable a wheelchair user to reach and grip the door handle, then open the door without releasing hold on the handle and without the footrest colliding with the return wall.",selection,annotated +29232335-402c-4ed9-af74-fd093ac22e28_4,,,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least dwelling fabric energy efficiency rate 01:20:00.,greater-equal,synthetic +ded852b5-c826-4649-8ce5-dece0eba6061,"During the design period of occupancy, a building's room temperature shall be comfortable and not adversely affected by air velocity, thermal radiation, temperature fluctuation, temperature differences or surface temperatures.",{'ID': '32_Finnish_Health-IndoorClimateAndVentilation'},"During the design period of occupancy, a building's room temperature shall be comfortable and not adversely affected by air velocity, thermal radiation, temperature fluctuation, temperature differences or surface temperatures.",part-of,annotated +4ee66fa0-9dcc-4332-b001-f1aec49d9af9,It should be recognised that there is the danger where adjacent spaces each have an induction loop system that the signals may overlap.,{'ID': '154_UK_DocM_V2_AccessAndUseOfBuildings'},It should be recognised that there is the danger where adjacent spaces each have an induction loop system that the signals may overlap.,part-of,annotated +3c0a8ccb-d813-40fb-b69b-88250d3bc4ec_11,,,These fittings should not exceed a agreed level of provision of adequate means.,less-equal,synthetic +533762d6-e592-494d-a08b-a0817b5b4f9f,"If there are associated parking spaces where there is not a requirement to install electric vehicle charge points, cable routes must be installed in all remaining associated parking spaces.",{'ID': '50_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If there are associated parking spaces where there is not a requirement to install electric vehicle charge points, cable routes must be installed in all remaining associated parking spaces.",selection,annotated +f72a98f3-b7d2-4633-b244-0d7242dfb0c9,Every single bedroom has a minimum floor area of 8.5m2 and is at least 2.4m wide.,{'ID': '102_UK_DocM_V1_AccessAndUseOfBuildings'},Every single bedroom has a minimum floor area of 8.5m2 and is at least 2.4m wide.,none,annotated +56b3f993-37b5-4cb1-9540-432972f8056e,"In a mechanical ventilation system, the air handling units and chambers shall be able to withstand the loads caused by fan pressure while the shutoff dampers are closed.",{'ID': '99_Finnish_Health-IndoorClimateAndVentilation'},"In a mechanical ventilation system, the air handling units and chambers shall be able to withstand the loads caused by fan pressure while the shutoff dampers are closed.",none,annotated +dd056285-1aa4-4c6d-94ac-b911458cb7ea,"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",{'ID': '70_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",selection,annotated +835d8fad-7a27-4299-aa38-a5b1771a6779,"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",{'ID': '178_UK_DocM_V2_AccessAndUseOfBuildings'},"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",equal,annotated +09b2a395-5293-4b7d-82d4-5312482d59e9_8,,,"Door entry controls, where provided, are mounted 600kg/m3 deep finished ground level, and at least 300mm away from any projecting corner.",equal,synthetic +05fdde92-d8af-42ad-963b-9019c69a8ab3_4,,,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same U-values as the emergency repairs used in the external wall should be included within the depth of the intermediate floor structure.",equal,synthetic +8beb3f9d-f806-4385-b876-2b3d29d7852a,Independent temperature control of the hot water circuit should be implemented with a cylinder thermostat and a timing device.,{'ID': '269_UK_DocL_V1_ConsrvationOfFuelAndPower'},Independent temperature control of the hot water circuit should be implemented with a cylinder thermostat and a timing device.,necessity,annotated +77f993c6-dff1-4f9a-8f66-73221d3cbaff_6,,,"If the dwelling only has off service building, a minimum ventilation rate of 13l/s should be used.",equal,synthetic +536b172d-ccd1-479a-8136-6ee05db0f264_11,,,"Where pipework is above ground, the performance of the pipe measurements should be at least as high as the intended purpose of pipework in the buried part of the system.",greater-equal,synthetic +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_5,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be load EER 0.5 kN/m2.",equal,synthetic +f5a71c7b-e852-40f2-8f88-91cda7902a7e,"If a new building has a space heating or airconditioning system with an effective rated output greater than 180kW, a building automation and control system should be installed.",{'ID': '319_UK_DocM_V2_AccessAndUseOfBuildings'},"If a new building has a space heating or airconditioning system with an effective rated output greater than 180kW, a building automation and control system should be installed.",part-of,annotated +77f993c6-dff1-4f9a-8f66-73221d3cbaff_4,,,"If the dwelling only has one habitable room, a minimum lengths of 0.15m/s should be used.",greater-equal,synthetic +1913381b-a2cc-496e-9168-82ccf2a01d50_5,,,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the extract air categories of the heat emitters to be installed does not exceed 15 degrees.",less-equal,synthetic +e505b13c-7b62-4857-aa2d-544dc986e9c0,"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",{'ID': '18_UK_DocK_ProtectionFromFalling'},"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",part-of,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_8,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under ventilation provision 270 millimetres.",equal,synthetic +fb5d3054-4911-4049-ba09-1c3e80f9c07c_4,,,"The lengths of steps in uncovered or unheated outdoor staircases must be no less than 0.7 metres, and the riser may be no more than 130 millimetres.",greater-equal,synthetic +703e5c71-bd54-4267-acf4-fa7db1e70d49,"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",{'ID': '67_Finnish_Accessibility'},"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",none,annotated +3e9fc57e-bc69-4f17-a056-dd7767afa9bb_3,,,"If the locations of the building does not exceed 270 millimetres, access to the attic fire compartments from the outside shall be required.",less-equal,synthetic +7e34700e-92de-4b00-a820-f4085a2e186c_3,,,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be planned time of use eight per cent.",equal,synthetic +d3e7a947-536e-4a49-9823-e27fc0f68b27_1,,,headroom of landings to be at least equal to the results of the ramp.,greater-equal,synthetic +37f01a2c-b944-45a2-a7f4-140d8c03d7ac_11,,,"After rebating, frame components should retain at least 6mm of rooflight-and-kerb assemblies.",greater-equal,synthetic +7a6635fc-c464-4d61-8ef1-2fdbf13bb9e7,"U-values for rooflights or rooflight-and-kerb assemblies should be based on the developed surface area of the rooflight (U_d values), which is often greater than the area of the roof opening.",{'ID': '140_UK_DocM_V2_AccessAndUseOfBuildings'},"U-values for rooflights or rooflight-and-kerb assemblies should be based on the developed surface area of the rooflight (U_d values), which is often greater than the area of the roof opening.",part-of,annotated +710ef992-e187-4b1a-894b-e0e222f54359_3,,,"NOTE: For grid-supplied electricity, a parasitic energy use of 44mm and primary energy factor of 1.501kWhPE/kWh should be used.",equal,synthetic +986f7853-4975-4ecd-8f10-a75d818eb44a,"Fully insulated and continuous cavity closers should be used, installed tight to the insulation and cavity apertures.",{'ID': '140_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Fully insulated and continuous cavity closers should be used, installed tight to the insulation and cavity apertures.",necessity,annotated +fb3922fb-8844-40e2-98f5-86e8cccabc72,Cable routes should be provided from a metered electricity supply point to the future connection location.,{'ID': '107_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Cable routes should be provided from a metered electricity supply point to the future connection location.,necessity,annotated +636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4_10,,,"Where a new building contains more than 44mm sand, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",greater,synthetic +8d11b1a7-732a-4153-9564-3f35cc111cb6,A dwelling that is only a basement should be treated as a single-storey dwelling above ground level.,{'ID': '74_UK_DocF_V1_Ventilation'},A dwelling that is only a basement should be treated as a single-storey dwelling above ground level.,necessity,annotated +cccbc1ea-27be-4d7b-b53c-3cb467a51020,"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",{'ID': '220_UK_DocM_V2_AccessAndUseOfBuildings'},"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",selection,annotated +5b1fe636-d2aa-4382-885e-a4f8a2cae4d4,"Generally, a thermal element once upgraded should not have a U-value greater than 0.7W/(m2K).",{'ID': '125_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Generally, a thermal element once upgraded should not have a U-value greater than 0.7W/(m2K).",selection,annotated +b4cef2a7-038c-4f72-8ea6-20e43d766165,"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",{'ID': '70_UK_DocM_V2_AccessAndUseOfBuildings'},"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",selection,annotated +23cff3c3-1251-4c5f-9fd9-8f52d25eb494_5,,,Gasfired boilers and multi-stage oilfired boilers with an steps of more than 300 litres should have fully modulating burner controls.,greater,synthetic +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",none,annotated +511c1a7f-08b9-48ec-aea6-9b749fdf31a1,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an adequate number of appropriately located toilet facilities which are suitable for users of wheelchairs and walking frames with wheels.",{'ID': '51_Finnish_Accessibility'},"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an adequate number of appropriately located toilet facilities which are suitable for users of wheelchairs and walking frames with wheels.",part-of,annotated +d342429e-d3fc-46e0-a195-527cfef1fd4b_2,,,"When an existing building with a total useful air distribution of over 190 kN is being extended or the habitable area is being increased, consequential improvements should be installed.",greater,synthetic +4ee66fa0-9dcc-4332-b001-f1aec49d9af9,It should be recognised that there is the danger where adjacent spaces each have an induction loop system that the signals may overlap.,{'ID': '154_UK_DocM_V2_AccessAndUseOfBuildings'},It should be recognised that there is the danger where adjacent spaces each have an induction loop system that the signals may overlap.,selection,annotated +d8066a73-49c2-4e99-825a-b49b9b2ba67d_6,,,A landing measuring at least 2.0 m3/(h m2) in from the inside face of the wall must be reserved in front of and behind a door located in an exit route.,greater-equal,synthetic +8207751f-13b8-4fe3-9bfe-4423093d4905,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,{'ID': '26_Finnish_AcousticEnvironment'},A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,part-of,annotated +2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb_1,,,"There should be a Their, in the absence of tobacco smoke or other excessive pollutants, of 2.4 metres.",equal,synthetic +9618a274-45da-4e3e-87f0-21c2bfae4a8e,"A guardrail must be used at points with a level difference of over 0.7 metres, if these can be accessed by children.",{'ID': '39_Finnish_SafetyOfUse'},"A guardrail must be used at points with a level difference of over 0.7 metres, if these can be accessed by children.",greater,annotated +825053cb-af5d-43a9-b59b-e2a5ae78ea73_3,,,The total combined window area of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the speed of associated parking spaces.,greater,synthetic +3724fd47-22f7-432c-81a2-1abcb95c7df2_5,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one metre places properties, where there should be no fewer than four.",equal,synthetic +38745b5e-4dea-43fe-9378-5befa5a2399d,A copy of the completed commissioning sheet should be given to the owner of the building.,{'ID': '99_UK_DocF_V2_Ventilation'},A copy of the completed commissioning sheet should be given to the owner of the building.,none,annotated +9abdce80-0a4a-400a-8725-205bb3b887e4,"In hard water areas, suitable measures should be taken to treat the feed water to water heaters and the hot water circuit of combination boilers to reduce limescale accumulation.",{'ID': '218_UK_DocM_V2_AccessAndUseOfBuildings'},"In hard water areas, suitable measures should be taken to treat the feed water to water heaters and the hot water circuit of combination boilers to reduce limescale accumulation.",none,annotated +3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,selection,annotated +61bc1c7a-62f8-43c1-9c71-6e3073695cbe,"Roofs: insulation should be installed tight to the structure, without air gaps, and should extend to the wall insulation.",{'ID': '143_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Roofs: insulation should be installed tight to the structure, without air gaps, and should extend to the wall insulation.",necessity,annotated +419892bb-5044-4c63-a8ba-7747ad52c23d,"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",{'ID': '195_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",none,annotated +c47598f9-df79-4d77-aba9-8f380342372f_11,,,extract air of dimension 15 shall be conducted to the outdoors through individual extract air ducts.,equal,synthetic +cea6e7bd-c494-4146-9f81-3fd2ed64a2a6_7,,,The entrance level of the floor surface in the seating area and access route may not exceed 10.,less-equal,synthetic +7e34700e-92de-4b00-a820-f4085a2e186c_7,,,"If the installation between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 4, the wall in question must be class EI 15.",less,synthetic +7e34700e-92de-4b00-a820-f4085a2e186c_4,,,"If the free gap between facing walls of adjacent glazed balconies or the high of the wall to the window of an adjacent fire compartment is less than 2.4m, the wall in question must be class EI 15.",less,synthetic +e43c1e88-be80-42d9-944e-1bf0f0f82479_2,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 25mm exit.,less-equal,synthetic +835d8fad-7a27-4299-aa38-a5b1771a6779,"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",{'ID': '178_UK_DocM_V2_AccessAndUseOfBuildings'},"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",none,annotated +73b4b305-8971-489a-a290-f996e1f63e19,"The clear width of the door and opening leading to room spaces of a non-residential building as well as to residential rooms of a residential building, necessary spaces serving residence and spaces serving the use of the building shall be at least 800 millimetres.",{'ID': '19_Finnish_Accessibility'},"The clear width of the door and opening leading to room spaces of a non-residential building as well as to residential rooms of a residential building, necessary spaces serving residence and spaces serving the use of the building shall be at least 800 millimetres.",selection,annotated +17fba530-c42b-4eeb-85dd-16da0bacc49c,"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",{'ID': '470_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",selection,annotated +079db365-cfed-474e-9329-25349ac0db4a_6,,,"In connection with the door of an outside space of an individual dwelling the air extract rate outside the door may be more than 5m if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",greater,synthetic +99a53f17-48cb-4012-a47b-700761e0983b_10,,,Where a new building which is not a residential building or a mixed-use building has more than 0.052083333 window and door units (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,greater,synthetic +"8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent. {'ID': '9_Finnish_Accessibility'}_7",,,"However, if the protective part is no more than 0.15 dm3/s per m2, the ramp may not have a gradient of more than eight per cent.",less-equal,synthetic +51517a5d-dd11-41b9-b44b-36d87b959127,The presence of the door should be apparent not only when it is shut but also when it is open.,{'ID': '77_UK_DocM_V2_AccessAndUseOfBuildings'},The presence of the door should be apparent not only when it is shut but also when it is open.,none,annotated +0df5892a-e396-424e-90f1-74f6ccfb9e1a,"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",{'ID': '61_Finnish_Accessibility'},"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",none,annotated +3e9fc57e-bc69-4f17-a056-dd7767afa9bb_6,,,"If the dwelling fabric energy efficiency rate of the building does not exceed 150m2, access to the attic fire compartments from the outside shall be required.",less-equal,synthetic +60024014-cb6a-4a53-9b12-9497e0a1e5e8_0,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the both sides from these spaces does not exceed twice the rise plus the going (2R G) of the total air flow in the vertical duct.",less-equal,synthetic +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_9,,,"Where the performance of installing only cable routes is more than three of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",greater,synthetic +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_4,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 150m2 in visual contrast and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic +aac9b625-4f6b-42e6-b657-2accd6054607,Heating systems for screed floors that are greater than 65mm thick should automatically reduce the room temperature at night or when the room is unoccupied.,{'ID': '299_UK_DocL_V1_ConsrvationOfFuelAndPower'},Heating systems for screed floors that are greater than 65mm thick should automatically reduce the room temperature at night or when the room is unoccupied.,part-of,annotated +46ee0eda-086a-40ab-8e8f-bfa4c85abd49,"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",{'ID': '16_Finnish_SafetyOfUse'},"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",selection,annotated +a090f6bb-f89b-44c1-b6ee-8e72e2be30a0,Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '370_UK_DocM_V2_AccessAndUseOfBuildings'},Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,selection,annotated +64695439-3458-4d43-8e7b-a2ba75075cea,"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",{'ID': '124_Finnish_SafetyOfUse'},"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",necessity,annotated +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3,"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",{'ID': '53_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",none,annotated +7d1ada0b-8dcc-4c01-84d7-78b80cb404c9,"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",{'ID': '58_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",necessity,annotated +1ebce0c9-705c-47ee-8429-e83cfbed72db,"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",{'ID': '103_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",part-of,annotated +caf32693-fa0e-43ba-aa9f-526bcba734fa,Single glazing should be supplemented with low-emissivity secondary glazing.,{'ID': '119_UK_DocL_V1_ConsrvationOfFuelAndPower'},Single glazing should be supplemented with low-emissivity secondary glazing.,selection,annotated +2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb_8,,,"There should be a lift, in the absence of tobacco smoke or other excessive pollutants, of 1,500 millimetres.",equal,synthetic +3ec0e36a-0227-4b76-9fd5-7a2f77877d99,A building that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,{'ID': '23_UK_DocM_V2_AccessAndUseOfBuildings'},A building that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,selection,annotated +c47598f9-df79-4d77-aba9-8f380342372f_6,,,extract air of net absorber area three seconds shall be conducted to the outdoors through individual extract air ducts.,equal,synthetic +35cacecf-06dc-4b0f-aadb-db2ee05518c7_0,,,The area of windows and roof windows (but excluding display windows) located on the roof of the building exceeds between 550mm and 700mm of the facade area.,greater,synthetic +99a53f17-48cb-4012-a47b-700761e0983b_9,,,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) 400-600mm of those bedroom must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,equal,synthetic +75c60084-6878-472d-8694-e8739e0dd76c_0,,,The part of access routes in assembly areas with a maximum capacity of 60 persons must be at least 1400mm.,greater-equal,synthetic +b6b19c38-b160-475d-b01d-e3880ca00ab2,"Where necessary, flexible ducts may be used for final connections, but their lengths should be kept to a minimum.",{'ID': '31_UK_DocF_V2_Ventilation'},"Where necessary, flexible ducts may be used for final connections, but their lengths should be kept to a minimum.",selection,annotated +7e34700e-92de-4b00-a820-f4085a2e186c_10,,,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be number of wall ties per square metre 120.",equal,synthetic +2b60007d-59a3-4a18-a184-89e76ee17454,Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,{'ID': '161_UK_DocL_V1_ConsrvationOfFuelAndPower'},Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,selection,annotated +c384013b-c40f-4925-acbe-465e1ca5bc13_2,,,four Account per detail should be recorded.,equal,synthetic +8efb6108-e49e-4d64-a1e4-22e3f9128b17_6,,,"When calculating the reference heat loss of a building, the value of 0.3W/m2 shall be used as the total load for the air leakage rate figure for the building envelope.",equal,synthetic +ed2cca4a-50f7-470d-9752-dd8722385a24,"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",{'ID': '80_Finnish_SafetyOfUse'},"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",none,annotated +793cb939-b3d9-46eb-ae65-71a4d5c8031b,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,{'ID': '43_UK_DocM_V1_AccessAndUseOfBuildings'},Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,not-part-of,annotated +569c7958-b7d6-4b9c-9dd9-13307e95e59b_6,,,"For ducted systems that are served by fans with a entry greater than 2, ductwork leakage tests should be carried out.",greater,synthetic +72e7ed0c-9e73-46b2-a919-20f3fea337fd_1,,,"An Grommets with a potentially flammable or explosive atmosphere must not be located in a Lifting devices where there are dwellings, accommodation premises, institutions or assembly and business premises.",not-part-of,synthetic +8e5e9560-4b22-4fe0-ad86-e52b82ffe4d2,"When calculating the energy consumption of a buildings cooling system, the energy consumption of cooling energy production and the electrical energy consumption of auxiliary units shall be taken into account where the use of the systems is required for indoor temperature control.",{'ID': '111_Finnish_EnergyEfficiency'},"When calculating the energy consumption of a buildings cooling system, the energy consumption of cooling energy production and the electrical energy consumption of auxiliary units shall be taken into account where the use of the systems is required for indoor temperature control.",selection,annotated +9f8c2fbb-a04e-42f9-8fa0-b7a905dbafa0,"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",{'ID': '40_Finnish_Health-Humidity'},"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",selection,annotated +f505cec8-d1a6-41ae-b2ba-68ac19f64be2,"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",{'ID': '137_UK_DocM_V2_AccessAndUseOfBuildings'},"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",selection,annotated +4e8c5c50-44af-48f6-b959-e6f9b31afa1e_5,,,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical these may be roofs.",equal,synthetic +977ccb7b-4580-4ea3-9ea4-5057925c9854,"NOTE: The surface area of the whole building must be included when assessing whether the works constitute a major renovation, even if the building is mixed use.",{'ID': '124_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"NOTE: The surface area of the whole building must be included when assessing whether the works constitute a major renovation, even if the building is mixed use.",none,annotated +05864826-21ef-4ae7-9af8-2aaeffc7267a_1,,,Modular and portable buildings with a planned service life of more than two years but with an difference in light reflectance value in a single location of less than 400kg should be shown to comply with the energy efficiency requirements.,less,synthetic +85cf77b8-70aa-4453-8d95-00f55a63c4ca,The provision made must be sufficient to (a) allow simple adaptation of the dwelling to meet the needs of occupants who use wheelchairs; or (b) meet the needs of occupants who use wheelchairs.,{'ID': '65_UK_DocM_V1_AccessAndUseOfBuildings'},The provision made must be sufficient to (a) allow simple adaptation of the dwelling to meet the needs of occupants who use wheelchairs; or (b) meet the needs of occupants who use wheelchairs.,necessity,annotated +ae21bd5a-7374-43ad-900e-e2e1a6459cb0,"The target primary energy rate and target emission rate must be calculated using one of the calculation tools in the approved methodology, used in line with the version policy as stated in the methodology.",{'ID': '49_UK_DocM_V2_AccessAndUseOfBuildings'},"The target primary energy rate and target emission rate must be calculated using one of the calculation tools in the approved methodology, used in line with the version policy as stated in the methodology.",necessity,annotated +2b60007d-59a3-4a18-a184-89e76ee17454,Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,{'ID': '161_UK_DocL_V1_ConsrvationOfFuelAndPower'},Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,necessity,annotated +9f8c2fbb-a04e-42f9-8fa0-b7a905dbafa0,"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",{'ID': '40_Finnish_Health-Humidity'},"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",selection,annotated +bb9ec292-062b-43c3-8590-856dd5f6b890_8,,,"The air flow rate and building emission rate calculated using the measured air permeability must not be higher than the equivalent area and target emission rate, respectively.",less-equal,synthetic +46f5be2a-1514-420b-bc39-331fc6e0d2df_6,,,"The dwelling primary energy rate, sales counter and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, seasonal energy efficiency ratio and target fabric energy efficiency rate, respectively.",less-equal,synthetic +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_10,,,"Where the work concerns a building containing more than 2,100 millimetres Duct, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater,synthetic +48133b44-eac2-44e2-b2df-c52243e9f7ea,"NOTE: For example, if the total system output is made up of three equally sized boilers, at 15% of system output the lead boiler will be operating at 45% of its rated output with the other two boilers switched off.",{'ID': '244_UK_DocM_V2_AccessAndUseOfBuildings'},"NOTE: For example, if the total system output is made up of three equally sized boilers, at 15% of system output the lead boiler will be operating at 45% of its rated output with the other two boilers switched off.",selection,annotated +b63dcef6-1840-4e9e-ad51-f8fc481fe856,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",{'ID': '36_UK_DocA_Structure'},"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",necessity,annotated +f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c_9,,,A building with a energy consumption exceeding three must be equipped with anchoring structures for safety lines.,greater,synthetic +5577528f-8fa0-4ca3-96f6-ea418091cb86_2,,,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 m2 in means is able to pass through the opening between the plane level and the handrail or wall.,greater,synthetic +19478a13-7457-4dd3-a394-744f826db7b0_4,,,"The handle to at least 1,500 millimetres airleakage gaps in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",greater-equal,synthetic +23cff3c3-1251-4c5f-9fd9-8f52d25eb494_1,,,Gasfired boilers and multi-stage oilfired boilers with an parasitic energy use of more than 13l/s should have fully modulating burner controls.,greater,synthetic +f009a781-0ced-408d-b3d1-6ae7a848012e,"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",{'ID': '31_Finnish_SafetyOfUse'},"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",selection,annotated +2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_4,,,The normal relationship between the edges of the rise and going is: 8 per cent (1:12.5) equals between 550mm and 700mm.,equal,synthetic +4fc3b5b1-a838-4429-b385-d8e80e6633eb_4,,,"In the absence of relevant harmonised European Standards, products with a distance of the basement storey floor from the entry level exceeding 190 kN must have a product certificate issued by a Notified Body.",greater,synthetic +baee716c-b8c2-4500-b4de-63fa11f007b1_7,,,A minimum of one in 14 metres of the remaining watertight connection must have access to cable routes.,equal,synthetic +536b172d-ccd1-479a-8136-6ee05db0f264_3,,,"Where pipework is above ground, the performance of the pipe device should be at least as high as the number of persons of pipework in the buried part of the system.",greater-equal,synthetic +984c252b-74f4-4d85-9080-1c8ae1851eca_0,,,"If performance requires thicker glass to be used, an equivalent window unit with exposure coefficient (450mm) glazing should be shown to meet the required standard.",equal,synthetic +f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c_5,,,A building with a CO2 emissions exceeding 50mm must be equipped with anchoring structures for safety lines.,greater,synthetic +20518e80-6f7e-457f-8c5a-59fa4c0eb324_0,,,"When calculating the heat loss for a buildings design solution, the Level differences shall be used as the value of the target primary energy rate for the building envelope.",equal,synthetic +28433761-e537-456b-9ff8-00e786b43143,Consumer units should be mounted so that the switches are between 1350mm and 1450mm above floor level.,{'ID': '126_UK_DocM_V1_AccessAndUseOfBuildings'},Consumer units should be mounted so that the switches are between 1350mm and 1450mm above floor level.,necessity,annotated +c3cfbf29-a95f-4453-a7de-a8f6e4ca2ea8,"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",{'ID': '152_Finnish_Health-WaterAndSewerage'},"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",none,annotated +d0b6759e-deec-451d-bd7a-ec65b96048be_1,,,"extract air of construction 2.5 ties/m2 shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",equal,synthetic +e505b13c-7b62-4857-aa2d-544dc986e9c0_11,,,"For dwellings, for external tapered steps and stairs that are part of the building the primary energy of each step should be a minimum of 230mm.",greater-equal,synthetic +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",selection,annotated +208b093d-361f-4aec-819d-4abca4e72c68_4,,,"in an evacuation area where the step is 400mm, the second exit may be no less than 900 millimetres in width.",equal,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_3,,,Skirtings totalling up to 50mm total thickness and shallow projecting Controls or casings above 0.052083333 may be discounted when measuring clear width.,greater,synthetic +835d8fad-7a27-4299-aa38-a5b1771a6779_10,,,"In large building complexes, such as retail parks and large sports centres, there should be 15 wheelchair-accessible unisex ventilation equipment capable of including an adult changing table.",equal,synthetic +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_4,,,"In buildings more than 9 metres and at most four in maximum capacity, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",less-equal,synthetic +710ef992-e187-4b1a-894b-e0e222f54359_7,,,"NOTE: For grid-supplied electricity, a annual percentage of heat of 25mm and primary energy factor of 1.501kWhPE/kWh should be used.",equal,synthetic +61630012-3ff7-44cb-af91-7845be0b6f79,"How the measurements can help you take action CO2 measurements should be used as a broad guide to ventilation within a space, rather than treated as safe thresholds.",{'ID': '126_UK_DocF_V2_Ventilation'},"How the measurements can help you take action CO2 measurements should be used as a broad guide to ventilation within a space, rather than treated as safe thresholds.",necessity,annotated +8e8f4fb5-00b5-404f-89df-a07287984748_3,,,"In buildings with a categories greater than E, automatic meter reading and data collection facilities should be installed.",greater,synthetic +0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,part-of,annotated +3931f0fa-433e-4fb8-96bf-a747f3622ee0,"In order to help people with visual impairment to appreciate the size of a space they have entered, or to find their way around, there should be a visual contrast between the wall and the ceiling, and between the wall and the floor.",{'ID': '97_UK_DocM_V2_AccessAndUseOfBuildings'},"In order to help people with visual impairment to appreciate the size of a space they have entered, or to find their way around, there should be a visual contrast between the wall and the ceiling, and between the wall and the floor.",necessity,annotated +34a524ec-6994-426f-86af-78788fd34a80_0,,,"Between the locking points for the mortice lock and surface-mounted rim lock, the drop should be 100 litres.",equal,synthetic +17fba530-c42b-4eeb-85dd-16da0bacc49c,"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",{'ID': '470_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",none,annotated +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",selection,annotated +3ca5cb38-b90b-4449-ba14-4268866df8e1,The water heater is close to the draw-off points and has a storage capacity no greater than 100 litres.,{'ID': '463_UK_DocM_V2_AccessAndUseOfBuildings'},The water heater is close to the draw-off points and has a storage capacity no greater than 100 litres.,none,annotated +956efc87-87de-4d3c-99fb-dc58eab9353b,"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",{'ID': '42_Finnish_Accessibility'},"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",none,annotated +5b4380ba-0066-4735-a362-316d4c8e70b2_2,,,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 800 millimetres Waterproofing after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",greater,synthetic +a8b3e54e-902c-4502-99a2-8c41d46f1416_1,,,"If there are more than 200 m2 foundations in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",greater,synthetic +922bf8df-3a70-4f45-8c04-200b638d3b3c,The cold water pipe shall be designed and installed so that the temperature in the cold water system may not exceed 20 degrees Celsius.,{'ID': '59_Finnish_Health-WaterAndSewerage'},The cold water pipe shall be designed and installed so that the temperature in the cold water system may not exceed 20 degrees Celsius.,selection,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_10,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under water vapour resistance 200 Watts per room.",equal,synthetic +66b3628a-f0ee-4bc7-93c8-2ae0145a2e78,"In a room with no openable window, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",{'ID': '83_UK_DocF_V1_Ventilation'},"In a room with no openable window, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",necessity,annotated +4f2b56cb-9852-4406-bbea-31f426fb4910,"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",{'ID': '397_UK_DocM_V2_AccessAndUseOfBuildings'},"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",none,annotated +f9de28ac-45bb-4400-9d9f-8afee73bd2e3_6,,,"The emission rate should not exceed 1,000 millimetres of dwelling floor area.",less-equal,synthetic +c0a6d35c-cc20-428b-941d-c3e3e6365c74_6,,,"In a tier that is uninterrupted by cross-gangways, and where the heat emission capacity exceeds 0.9 metres, use a maximum number of steps of 40.",greater,synthetic +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",selection,annotated +5e226793-2805-41b0-bcb6-49319afaefc7,"If the building has a floor area greater than 150m2, heating should be split into different heating zones and each zone should have separate controls for timing and temperature demand.",{'ID': '258_UK_DocM_V2_AccessAndUseOfBuildings'},"If the building has a floor area greater than 150m2, heating should be split into different heating zones and each zone should have separate controls for timing and temperature demand.",necessity,annotated +99a53f17-48cb-4012-a47b-700761e0983b_6,,,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) 0.05 of those vapour barriers must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,equal,synthetic +2702a3b3-b2a8-4457-86e8-3e7de2498dc3,landing call buttons are located between 900mm and 1100mm from the floor of the landing and at least 500mm from any return wall.,{'ID': '185_UK_DocM_V2_AccessAndUseOfBuildings'},landing call buttons are located between 900mm and 1100mm from the floor of the landing and at least 500mm from any return wall.,necessity,annotated +2f8d4247-e53b-49ae-bd26-c4f1765eaee8_10,,,"Extract air of fire compartmenting requirement 1,200 MJ/m2, 3 and 4 shall not be used as recirculation air.",equal,synthetic +193be0e3-dfbb-4e04-ba58-1ae1ed44729b,Consideration should be given to providing an area next to certain seats for an assistance dog to rest.,{'ID': '131_UK_DocM_V2_AccessAndUseOfBuildings'},Consideration should be given to providing an area next to certain seats for an assistance dog to rest.,necessity,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479_0,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 0.8 metres anthracite figure.,less-equal,synthetic +4d80c4d1-08ee-481a-9f9c-e9151ce1094d,"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",{'ID': '421_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",less-equal,annotated +c7035b48-7244-40a9-a70e-1d244caf72ac,"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",{'ID': '56_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",none,annotated +8bb9aee2-a950-4a65-a715-287035906789,"Spaces of a non-residential building and common spaces of a residential building as well as the fixtures, fittings and fixed equipment in them shall be suitable for persons with mobility and functional impairment.",{'ID': '27_Finnish_Accessibility'},"Spaces of a non-residential building and common spaces of a residential building as well as the fixtures, fittings and fixed equipment in them shall be suitable for persons with mobility and functional impairment.",part-of,annotated +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated +c0a6d35c-cc20-428b-941d-c3e3e6365c74_4,,,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a glued in position number of steps of E.",equal,synthetic +7e34700e-92de-4b00-a820-f4085a2e186c_2,,,"If the free gap between facing walls of adjacent glazed balconies or the internal temperature of the wall to the window of an adjacent fire compartment is less than 1.501kWhPE/kWh, the wall in question must be class EI 15.",less,synthetic +3ec0e36a-0227-4b76-9fd5-7a2f77877d99,A building that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,{'ID': '23_UK_DocM_V2_AccessAndUseOfBuildings'},A building that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,part-of,annotated +793cb939-b3d9-46eb-ae65-71a4d5c8031b,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,{'ID': '43_UK_DocM_V1_AccessAndUseOfBuildings'},Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,part-of,annotated +53e31e26-a39b-4047-a86e-bdb8021413e8_8,,,Window handles on windows that open outwards are not more than 800 millimetres both sides when the window is at its maximum openable angle.,less-equal,synthetic +01008f69-874b-443e-bcb2-2f5630280049_1,,,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the U-value may be no more than 90 and the tread must be no less than 220 millimetres.",less-equal,synthetic +dcc583b1-8c4c-42cf-a1ed-e8907de56254_7,,,"The seasonal energy efficiency ratio of the indoor steps of other spaces intended for everyday use may be no more than 2,100 millimetres, and the tread must be no less than 270 millimetres.",less-equal,synthetic +ae098b28-f01d-44df-b601-b7ac7631101d,"On stairs and ramps, a handrail must be installed for the entire length and on both sides of the structure.",{'ID': '54_Finnish_SafetyOfUse'},"On stairs and ramps, a handrail must be installed for the entire length and on both sides of the structure.",part-of,annotated +ae098b28-f01d-44df-b601-b7ac7631101d,"On stairs and ramps, a handrail must be installed for the entire length and on both sides of the structure.",{'ID': '54_Finnish_SafetyOfUse'},"On stairs and ramps, a handrail must be installed for the entire length and on both sides of the structure.",part-of,annotated +48133b44-eac2-44e2-b2df-c52243e9f7ea,"NOTE: For example, if the total system output is made up of three equally sized boilers, at 15% of system output the lead boiler will be operating at 45% of its rated output with the other two boilers switched off.",{'ID': '244_UK_DocM_V2_AccessAndUseOfBuildings'},"NOTE: For example, if the total system output is made up of three equally sized boilers, at 15% of system output the lead boiler will be operating at 45% of its rated output with the other two boilers switched off.",part-of,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_2,,,"If the air flows of height 3 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +f0c72b35-5a0a-4554-8713-96f6f73a67f1_9,,,A cube with Extract of no more than 0.06 m2 may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,less-equal,synthetic +87c9cfa3-8093-497d-be10-dc054abe7062,"For common leaf lintels, the base plate should not be continuous and the lintel core should be insulated.",{'ID': '164_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For common leaf lintels, the base plate should not be continuous and the lintel core should be insulated.",selection,annotated +164122ed-c7ac-4cf8-8a54-3d56c144f78d,"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",{'ID': '172_UK_DocM_V2_AccessAndUseOfBuildings'},"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",none,annotated +76acc6bd-50c0-4f3f-b015-42e171ec6ce7_6,,,"1,500 millimetres ventilation unit room must be installed.",equal,synthetic +203faa23-7b71-47c9-a6e5-2333ac45389e,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the tread must be no less than 250 millimetres.",{'ID': '22_Finnish_SafetyOfUse'},"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the tread must be no less than 250 millimetres.",part-of,annotated +ffbc85cb-4301-4bcb-9a56-7487c95cf16d,Only the proportion of openings which can be opened with a very low risk of occupants falling from height should be considered to form part of the overheating mitigation strategy.,{'ID': '83_UK_DocO_Overheating'},Only the proportion of openings which can be opened with a very low risk of occupants falling from height should be considered to form part of the overheating mitigation strategy.,part-of,annotated +103f99ad-884b-4bae-9f22-ccb1c5bc3d26_1,,,"In an open garage of no more than 0.136kgCO2/kWh door or gate, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",less-equal,synthetic +81314489-dcd9-410f-9b15-595b87e7c8f9_5,,,"The resilient layer should be timber sheathing at least 600kg/m3 design value, expanded metal or a similar resilient material.",greater-equal,synthetic +6d9a1e8e-6fe7-4234-951a-96fdc4598bd7,"If parking spaces are provided for a building, an adequate number of them, but at least one, shall be intended for the use of a person with mobility and functional impairment.",{'ID': '12_Finnish_Accessibility'},"If parking spaces are provided for a building, an adequate number of them, but at least one, shall be intended for the use of a person with mobility and functional impairment.",greater-equal,annotated +29c431ee-ea93-491d-ab13-06418d93c488_0,,,"If distance of the uppermost floor level from the entry level is greater than 23C, manual control is acceptable.",greater,synthetic +2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d_10,,,An upstand built on site should not exceed a Level differences of 0.055555556.,less-equal,synthetic +13a437c0-918c-47f2-85bd-b80dd69eb027_1,,,"There are no building primary energy rate on the drop of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",not-part-of,synthetic +8421f806-70f2-46a9-a308-90a40da3541d_2,,,"Where the total supply air flow of the approach, whether over its whole length or in part, is 2 metres or steeper, that part of the approach should be designed as ramped access.",greater-equal,synthetic +b0e99ac5-9cbc-4beb-b8ff-85383ae70ea8,"The approach route should be safe and convenient, adopt the shallowest gradient that can reasonably be achieved and be step-free, irrespective of the storey on which the dwelling is located.",{'ID': '40_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be safe and convenient, adopt the shallowest gradient that can reasonably be achieved and be step-free, irrespective of the storey on which the dwelling is located.",selection,annotated +0da52584-1b37-48b5-840f-3795ae695275_1,,,the minimum clear dimensions of the platform are: 50mm fire load and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +46ee0eda-086a-40ab-8e8f-bfa4c85abd49,"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",{'ID': '16_Finnish_SafetyOfUse'},"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",selection,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,annotated +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated +922bf8df-3a70-4f45-8c04-200b638d3b3c_5,,,The cold water pipe shall be designed and installed so that the total air flow in the cold water system may not exceed 9mm.,less-equal,synthetic +74002ed3-548e-4e2f-8835-be76e643c67d_6,,,"NOTE 2: Double doors effectively provide nibs where each leaf is at least 1,500 millimetres side.",greater-equal,synthetic +5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",selection,annotated +ff3e8f86-1542-4f54-a776-cfdc8482bad7,The seasonal energy efficiency ratio of an air conditioner working in cooling mode should be a minimum of 4.0.,{'ID': '332_UK_DocL_V1_ConsrvationOfFuelAndPower'},The seasonal energy efficiency ratio of an air conditioner working in cooling mode should be a minimum of 4.0.,selection,annotated +3121fe90-27db-405e-a42a-df3cd22ee176_0,,,"Where necessary, 1,500 millimetresliving accommodation, one above the other, must be installed in order to take into account children and users of wheelchairs.",equal,synthetic +5fe7997a-7e99-485c-89b3-7912d7c8d44d,"If the total flow rate cannot be achieved through all the terminals, then the fan speed should be increased.",{'ID': '199_UK_DocF_V1_Ventilation'},"If the total flow rate cannot be achieved through all the terminals, then the fan speed should be increased.",none,annotated +baee716c-b8c2-4500-b4de-63fa11f007b1_9,,,A minimum of 01:08:00 in five of the remaining text must have access to cable routes.,greater-equal,synthetic +9691451a-57d5-484f-a346-0f83b59f7ae0,"Refreshment facilities, such as restaurants and bars, should be designed so that they can be reached and used by all people independently or with companions.",{'ID': '137_UK_DocM_V2_AccessAndUseOfBuildings'},"Refreshment facilities, such as restaurants and bars, should be designed so that they can be reached and used by all people independently or with companions.",selection,annotated +825053cb-af5d-43a9-b59b-e2a5ae78ea73_9,,,The topography of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the building emission rate of dwellings in the residential building; b. the number of associated parking spaces.,greater,synthetic +c2c49207-78b3-42b0-8b61-ad506f5a80e2,"In hard water areas, suitable measures should be taken to treat the feed water to water heaters and the hot water circuit of combination boilers to reduce lime-scale accumulation.",{'ID': '381_UK_DocL_V1_ConsrvationOfFuelAndPower'},"In hard water areas, suitable measures should be taken to treat the feed water to water heaters and the hot water circuit of combination boilers to reduce lime-scale accumulation.",selection,annotated +99a53f17-48cb-4012-a47b-700761e0983b_11,,,Where a new building which is not a residential building or a mixed-use building has more than 180 millimetres cooker (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,greater,synthetic +9fd15b82-fc32-4364-8724-f1ef14f0c047_2,,,The cooker hood should surface at least the distance of the basement storey floor from the entry level of the cooker.,greater-equal,synthetic +a235c68f-ae44-4770-b005-4e9d7b659eb7_5,,,All cavity walls should have leaves at least 5m wide and cavities at least 50mm wide.,greater-equal,synthetic +31e6f85a-97ea-4224-9144-bc3d1daad96d,Consideration should be given to providing a low level urinal for children in male washrooms.,{'ID': '174_UK_DocM_V2_AccessAndUseOfBuildings'},Consideration should be given to providing a low level urinal for children in male washrooms.,none,annotated +f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c,A building with a height exceeding 9 metres must be equipped with anchoring structures for safety lines.,{'ID': '127_Finnish_SafetyOfUse'},A building with a height exceeding 9 metres must be equipped with anchoring structures for safety lines.,part-of,annotated +6ec243f2-9294-4b7c-89a4-1c46e4a69cc9,"If site constraints necessitate an approach of 1:20 or steeper, an approach incorporating ramped access should be provided.",{'ID': '49_UK_DocM_V2_AccessAndUseOfBuildings'},"If site constraints necessitate an approach of 1:20 or steeper, an approach incorporating ramped access should be provided.",none,annotated +2ff58135-b89d-40d1-a145-51aad9e5a942_2,,,"The landing in front of the outside door shall be at least 180 millimetres that and at least 1,500 millimetres long.",greater-equal,synthetic +b63dcef6-1840-4e9e-ad51-f8fc481fe856_2,,,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the maximum capacity is not less than 25mm.",greater-equal,synthetic +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_1,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding 01:08:00 access routes is EI 30; however, minor sealing parts and penetrations may be class E 15.",greater,synthetic +371e1755-8bb5-456e-bf66-5a50f4c19d59,"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",{'ID': '50_UK_DocK_ProtectionFromFalling'},"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",selection,annotated +76acc6bd-50c0-4f3f-b015-42e171ec6ce7_5,,,50 m2 temperature control must be installed.,equal,synthetic +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_10,,,"If the efficiency of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 300mm of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater,synthetic +d04d6702-5170-4b50-9bda-7367a24e9322,"NOTE: The network distribution point could be in a cabinet, a box mounted on a wall or on a telegraph pole.",{'ID': '5_UK_DocR_V1_InfrastructureForElectircalCommunications'},"NOTE: The network distribution point could be in a cabinet, a box mounted on a wall or on a telegraph pole.",necessity,annotated +f420ae57-5656-4558-b1a3-1079e46bf6cc_6,,,"In the case of the storey-level door of a dwelling, or if the layers through the door exceeds 25mm, doors must open in the direction of the exit.",greater,synthetic +84cd76d7-e5d0-4f39-94bc-0236c65d533a_1,,,"in residential buildings of not more than two storeys, one exit of no less than two years in total cost is permitted.",greater-equal,synthetic +1d18f0c9-31e5-43ee-8f16-e4fa607c5cd9,"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",{'ID': '51_UK_DocM_V2_AccessAndUseOfBuildings'},"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",selection,annotated +517253f8-98b1-4821-8901-75124d3237db,"Consideration should be given to the provision of a second handrail on stairs in a wide range of building types, and particularly in schools, for use by children and people of short stature.",{'ID': '59_UK_DocM_V2_AccessAndUseOfBuildings'},"Consideration should be given to the provision of a second handrail on stairs in a wide range of building types, and particularly in schools, for use by children and people of short stature.",necessity,annotated +baee716c-b8c2-4500-b4de-63fa11f007b1_5,,,A minimum of 400 millimetres in five of the remaining Solid walls must have access to cable routes.,greater-equal,synthetic +0ea1e862-2434-4fc8-97a2-b076c992ef20,"The width of an exit must be at least 1,200 millimetres and its free height must be at least 2,100 millimetres.",{'ID': '214_Finnish_FireSafety'},"The width of an exit must be at least 1,200 millimetres and its free height must be at least 2,100 millimetres.",part-of,annotated +457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",part-of,annotated +2f8d4247-e53b-49ae-bd26-c4f1765eaee8,"Extract air of categories 2, 3 and 4 shall not be used as recirculation air.",{'ID': '73_Finnish_Health-IndoorClimateAndVentilation'},"Extract air of categories 2, 3 and 4 shall not be used as recirculation air.",equal,annotated +8e9ef8dc-18bd-4877-98cd-556aa4adee8f,"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'},"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",none,annotated +72d7716f-7e3e-442c-9e42-14d4b19e18e3_8,,,A Consideration that is being connected to a new building should not have a energy consumption for delivered heat to the building which is greater than 0.350kgCO2/kWh.,not-part-of,synthetic +f6add908-4d45-4b3e-83a6-369f6c36c037_10,,,"Door rails, stiles and muntins should be at least 55 calculations.",greater-equal,synthetic +a86b58e8-046f-44b7-8e1b-00c876c8c647_9,,,"Parapets in integrity A to 230mm and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",less-equal,synthetic +a2bf4b81-52eb-48c0-b753-ed5e939612bf,Waterproofing or water pressure barrier must be located on the outer surface of the exterior wall structure against the ground or inside the exterior thermal insulation facing the ground.,{'ID': '87_Finnish_Health-Humidity'},Waterproofing or water pressure barrier must be located on the outer surface of the exterior wall structure against the ground or inside the exterior thermal insulation facing the ground.,necessity,annotated +84cd76d7-e5d0-4f39-94bc-0236c65d533a,"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",{'ID': '217_Finnish_FireSafety'},"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",none,annotated +5577528f-8fa0-4ca3-96f6-ea418091cb86,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,{'ID': '32_Finnish_SafetyOfUse'},The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,none,annotated +38cd3221-7fc9-4462-be20-78b16a4309d3_6,,,The reference value of openings in the newly created dwelling should not be more than 1400mm of the total floor area.,less-equal,synthetic +26f33f06-e967-4d55-9e73-30990f52ac82,"Loft hatches: where the roof is insulated at ceiling level, hatches should be suitably designed and installed to ensure optimum airtightness.",{'ID': '189_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Loft hatches: where the roof is insulated at ceiling level, hatches should be suitably designed and installed to ensure optimum airtightness.",selection,annotated +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_11,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding 50 m renewable technology is EI 30; however, minor sealing parts and penetrations may be class E 15.",greater,synthetic +3cbfb816-4071-496e-aec2-87d424df047f,Wheelchair users and ambulant disabled people should be able to wash or bathe either independently or with assistance from others.,{'ID': '181_UK_DocM_V2_AccessAndUseOfBuildings'},Wheelchair users and ambulant disabled people should be able to wash or bathe either independently or with assistance from others.,selection,annotated +8207751f-13b8-4fe3-9bfe-4423093d4905,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,{'ID': '26_Finnish_AcousticEnvironment'},A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,part-of,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_11,,,"If the air flows of performance 28 metres and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +835d8fad-7a27-4299-aa38-a5b1771a6779,"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",{'ID': '178_UK_DocM_V2_AccessAndUseOfBuildings'},"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",selection,annotated +7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",selection,annotated +7ca3a924-dd3a-450e-af24-4d456d6c1b32,"Wet room waterproofing must form a whole which is impermeable on all waterproofed surfaces as well as on their seams, penetrations and joints.",{'ID': '113_Finnish_Health-Humidity'},"Wet room waterproofing must form a whole which is impermeable on all waterproofed surfaces as well as on their seams, penetrations and joints.",necessity,annotated +56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3_10,,,Storage premises with a net heating energy demand exceeding 10 litres per second per person are not permitted within the building.,greater,synthetic +1913381b-a2cc-496e-9168-82ccf2a01d50_1,,,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the cold side of the heat emitters to be installed does not exceed 24 metres.",less-equal,synthetic +cc72106e-9e7f-47cf-8a95-0173a8305dad_4,,,"In a new building, the crawl space exposure coefficient must be 100 on average at the minimum.",greater-equal,synthetic +992e8f11-81ac-4d2f-b7d1-60e46b4b7261,Wheelchair accessible dwellings must also provide both a level access shower and a bath.,{'ID': '108_UK_DocM_V1_AccessAndUseOfBuildings'},Wheelchair accessible dwellings must also provide both a level access shower and a bath.,none,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8_7,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for Unit length two and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic +7d877df3-9aa7-4dff-a64d-5356a66c944d_5,,,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a indoor and outdoor conditions exceeding 5m and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",greater,synthetic +2319724e-2fd4-463b-bb59-0972073dc55a,"Both before and after a newly constructed dwelling is built, a notice must be given to the building control body of the calculations.",{'ID': '44_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Both before and after a newly constructed dwelling is built, a notice must be given to the building control body of the calculations.",none,annotated +d925c189-860a-4fcb-ae88-d1cf8cc14fb8_6,,,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the differences may be no more than 8.5m2.",less-equal,synthetic +6c789809-b1b8-429a-8fe2-8ce16f8a4b54,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,{'ID': '62_Finnish_Health-IndoorClimateAndVentilation'},Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,less-equal,annotated +01008f69-874b-443e-bcb2-2f5630280049,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",{'ID': '24_Finnish_SafetyOfUse'},"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres.",less-equal,annotated +3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,none,annotated +2f8d4247-e53b-49ae-bd26-c4f1765eaee8_0,,,"Extract air of design solar load 1.501kWhPE/kWh, 3 and 4 shall not be used as recirculation air.",equal,synthetic +38cd3221-7fc9-4462-be20-78b16a4309d3_8,,,The total minimum width of openings in the newly created dwelling should not be more than 0.2 of the total floor area.,less-equal,synthetic +15c28729-22a9-4992-b43a-bdcf457c0526,"Both before and after a newly constructed building is built, a notice must be given to the building control body of the calculations.",{'ID': '45_UK_DocM_V2_AccessAndUseOfBuildings'},"Both before and after a newly constructed building is built, a notice must be given to the building control body of the calculations.",selection,annotated +0085ecdd-f2f0-45f5-948d-ded697c69866,"In addition, on one side of the toilet seat there shall be a free space of at least 800 millimetres.",{'ID': '44_Finnish_Accessibility'},"In addition, on one side of the toilet seat there shall be a free space of at least 800 millimetres.",none,annotated +2af8ee5f-9d05-4023-9365-d093ebdfba1f,"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",{'ID': '168_UK_DocF_V1_Ventilation'},"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",selection,annotated +3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60_9,,,The approach route is a minimum of 900mm wide with a maximum projection of 60.,less-equal,synthetic +35cacecf-06dc-4b0f-aadb-db2ee05518c7_2,,,The area of windows and roof windows (but excluding display windows) lockable in both horizontal and vertical sewers exceeds five of the facade area.,greater,synthetic +38745b5e-4dea-43fe-9378-5befa5a2399d,A copy of the completed commissioning sheet should be given to the owner of the building.,{'ID': '99_UK_DocF_V2_Ventilation'},A copy of the completed commissioning sheet should be given to the owner of the building.,necessity,annotated +043258d7-d35e-42d9-87c5-b83565c39ad6,"Before elements are concealed by subsequent work, an onsite audit should be undertaken to confirm that the designed details have been constructed.",{'ID': '133_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Before elements are concealed by subsequent work, an onsite audit should be undertaken to confirm that the designed details have been constructed.",none,annotated +9618a274-45da-4e3e-87f0-21c2bfae4a8e_7,,,"A guardrail must be used at points with a shape of over 0.3, if these can be accessed by children.",greater,synthetic +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_7,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be insulating performance 100.",equal,synthetic +9618a274-45da-4e3e-87f0-21c2bfae4a8e_3,,,"A guardrail must be used at points with a cross fall of over 50, if these can be accessed by children.",greater,synthetic +e8e5b04a-e794-4933-b846-aefb5457f60b,The toilet seat shall be placed between 200 and 300 millimetres from the rear wall.,{'ID': '57_Finnish_Accessibility'},The toilet seat shall be placed between 200 and 300 millimetres from the rear wall.,necessity,annotated +922bf8df-3a70-4f45-8c04-200b638d3b3c,The cold water pipe shall be designed and installed so that the temperature in the cold water system may not exceed 20 degrees Celsius.,{'ID': '59_Finnish_Health-WaterAndSewerage'},The cold water pipe shall be designed and installed so that the temperature in the cold water system may not exceed 20 degrees Celsius.,none,annotated +825053cb-af5d-43a9-b59b-e2a5ae78ea73,The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,{'ID': '59_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,part-of,annotated +536b172d-ccd1-479a-8136-6ee05db0f264,"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",{'ID': '205_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",part-of,annotated +33ed3038-99a6-4b2d-906a-a1db21f2d898,"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",{'ID': '250_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",part-of,annotated +82330d3d-6139-4050-9ca0-946bc982fbb0,The sign should be suitably weatherproof for its location.,{'ID': '119_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The sign should be suitably weatherproof for its location.,necessity,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8_9,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for number of wall ties per square metre 500kW and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic +a2bf4b81-52eb-48c0-b753-ed5e939612bf,Waterproofing or water pressure barrier must be located on the outer surface of the exterior wall structure against the ground or inside the exterior thermal insulation facing the ground.,{'ID': '87_Finnish_Health-Humidity'},Waterproofing or water pressure barrier must be located on the outer surface of the exterior wall structure against the ground or inside the exterior thermal insulation facing the ground.,necessity,annotated +b63dcef6-1840-4e9e-ad51-f8fc481fe856_10,,,"The wall ties should have a distance of the basement storey floor from the entry level of 7 mg/m3 (6 ppm) and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic +197b9463-397e-4729-a08d-12739f9db069,"For variable refrigerant flow (VRF) systems, any calculations must include indoor and outdoor conditions, the power input from controls, and indoor units.",{'ID': '283_UK_DocM_V2_AccessAndUseOfBuildings'},"For variable refrigerant flow (VRF) systems, any calculations must include indoor and outdoor conditions, the power input from controls, and indoor units.",necessity,annotated +0da52584-1b37-48b5-840f-3795ae695275_8,,,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where 56 metres basement area are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +f9de28ac-45bb-4400-9d9f-8afee73bd2e3_4,,,The gradients should not exceed 220 millimetres of dwelling floor area.,less-equal,synthetic +0096a3bf-ac16-4a75-adf9-8c3f4a9b8610_4,,,The smaller number of each panel which can be either the width or height of the panel should be 4 or less.,less-equal,synthetic +e505b13c-7b62-4857-aa2d-544dc986e9c0_10,,,"For dwellings, for external tapered steps and stairs that are part of the building the continuity of each step should be a minimum of three metres.",greater-equal,synthetic +e4fb8d18-8dbc-4351-a2df-d87f880f476a,The fire resistance time requirement for balconies is half that of the load-bearing structures of the storey.,{'ID': '90_Finnish_FireSafety'},The fire resistance time requirement for balconies is half that of the load-bearing structures of the storey.,part-of,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479_11,,,Individual flights are: for service up to 0.8 metres not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic +d178dd92-6cf3-4f68-a9ba-44b97d74204a,"Staircases must be safe, sufficiently spacious and suitable for their purpose.",{'ID': '13_Finnish_SafetyOfUse'},"Staircases must be safe, sufficiently spacious and suitable for their purpose.",necessity,annotated +9952f64d-e0df-4b03-84af-150782f81387_1,,,"For mobility-impaired people, a heating and cooling systems of at least off is preferred.",greater-equal,synthetic +528e7551-acfd-4fa6-be24-9c91bd6d7679,The materials and fittings shall be compatible.,{'ID': '149_Finnish_Health-WaterAndSewerage'},The materials and fittings shall be compatible.,necessity,annotated +419892bb-5044-4c63-a8ba-7747ad52c23d,"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",{'ID': '195_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",none,annotated +fb1da22f-8ddb-4399-b441-64dca68da9af_9,,,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 20C from the top and bottom corners of the door.",greater-equal,synthetic +5ba5ffe7-ece8-488a-b461-da66237e7888,"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",{'ID': '54_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",part-of,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479_7,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for elevation difference up to 500kW not more than 5m long.,less-equal,synthetic +7d35f4c4-fa65-4d68-a974-f54386ca8aee_6,,,"However, a horizontal Snow in a protective part must be no higher than 13l/s.",less-equal,synthetic +3153d771-404e-4a54-ac05-ed1b75e37506_10,,,"Gangways should not be less than 1100mm heating plant emission rate unless used by not more than 50 persons, in which case gangways should be a minimum of 600kg/m3.",greater-equal,synthetic +d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",part-of,annotated +8102cb27-2e2a-4008-99d6-a53f5045f6e2,Structures with surfaces exposed to moisture must be resistant to the effects of water.,{'ID': '36_Finnish_Health-Humidity'},Structures with surfaces exposed to moisture must be resistant to the effects of water.,selection,annotated +26980508-105c-49db-8595-bf001a48d757_5,,,"In g-value with no fixed seats or showers, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic +56166e36-b14b-4632-9767-70b71d335d9c,"When a dwelling undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",{'ID': '98_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When a dwelling undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",none,annotated +a235c68f-ae44-4770-b005-4e9d7b659eb7_6,,,All cavity walls should have leaves at least 90mm thick and cavities at least 230mm energy consumption.,greater-equal,synthetic +20216261-f56d-4f79-8a46-c781abe19f04,"For new and existing buildings other than dwellings, information should be provided in a new or existing building log book.",{'ID': '98_UK_DocF_V2_Ventilation'},"For new and existing buildings other than dwellings, information should be provided in a new or existing building log book.",selection,annotated +2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_0,,,The normal relationship between the net heating energy demand of the rise and going is: 0.3 equals between 550mm and 700mm.,equal,synthetic +c0a6d35c-cc20-428b-941d-c3e3e6365c74,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",{'ID': '25_UK_DocK_ProtectionFromFalling'},"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",part-of,annotated +4d80c4d1-08ee-481a-9f9c-e9151ce1094d_10,,,"The Air flow rates of windows, roof windows, rooflights and doors should not exceed 50 of the total floor area of the dwelling.",less-equal,synthetic +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_1,,,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the sections of that installation exceeds 18 dm3/s of the total cost of the major renovation.",greater,synthetic +4094b859-b3b4-4035-94cd-8cf47ccbd801_9,,,The intended purpose is at least 190 millimetres.,greater-equal,synthetic +1913381b-a2cc-496e-9168-82ccf2a01d50,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",{'ID': '67_Finnish_Health-WaterAndSewerage'},"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",less-equal,annotated +8fcdc238-3c30-4659-9303-1b126a39b2cd_5,,,The design solar load should be final by at least 600 x 600 millimetres.,greater-equal,synthetic +316c89ee-aa42-4e7a-9372-960cf25b3265,Extract ventilation may be by natural means or by mechanical means (e.g. by an extract fan or acentral system).,{'ID': '105_UK_DocF_V2_Ventilation'},Extract ventilation may be by natural means or by mechanical means (e.g. by an extract fan or acentral system).,selection,annotated +29232335-402c-4ed9-af74-fd093ac22e28,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,{'ID': '95_Finnish_Health-IndoorClimateAndVentilation'},The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,selection,annotated +2f815a08-db3c-48a6-b248-d69aeac870ee_10,,,"the vertical integrity is: a. not more than 60, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",less-equal,synthetic +2c224c59-366d-447f-9ecc-87c119c2db07,"For new dwellings, the commissioning plan should be given to the building control body with the design stage dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate calculations.",{'ID': '374_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For new dwellings, the commissioning plan should be given to the building control body with the design stage dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate calculations.",selection,annotated +7e369e4c-7768-4a7a-bd9c-41e2aa037b43,The air flows shall be designed so that the average carbon monoxide concentration in a parking garage for motor vehicles during the hour of use assessed as the most critical does not exceed 35 mg/m3 (30 ppm).,{'ID': '61_Finnish_Health-IndoorClimateAndVentilation'},The air flows shall be designed so that the average carbon monoxide concentration in a parking garage for motor vehicles during the hour of use assessed as the most critical does not exceed 35 mg/m3 (30 ppm).,selection,annotated +7d1ada0b-8dcc-4c01-84d7-78b80cb404c9,"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",{'ID': '58_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",selection,annotated +7f3f59a4-fc7e-4b14-8074-384f6cacf548_4,,,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the side edges is less than 1.2W/(m2K).",less,synthetic +d43e4877-601c-43eb-9d33-96945754374b,Good acoustic design should be employed to achieve an acoustic environment that is neither too reverberant nor too absorbent so that announcements and conversations can be heard clearly.,{'ID': '99_UK_DocM_V2_AccessAndUseOfBuildings'},Good acoustic design should be employed to achieve an acoustic environment that is neither too reverberant nor too absorbent so that announcements and conversations can be heard clearly.,selection,annotated +164122ed-c7ac-4cf8-8a54-3d56c144f78d_8,,,"In general, the findings indicate that there should be at least the same number of Calibration as space and for some building types, e.g. large retail buildings, at least twice as many.",greater-equal,synthetic +0da52584-1b37-48b5-840f-3795ae695275_5,,,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where 0.05 fire door are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +dcc583b1-8c4c-42cf-a1ed-e8907de56254_9,,,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the service life must be no less than three.",greater-equal,synthetic +493ec553-7761-4d1e-aa98-05d925ddf955_11,,,The room temperature of a horizontal hatch must be at least 1100mm.,greater-equal,synthetic +60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",none,annotated +984c252b-74f4-4d85-9080-1c8ae1851eca,"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",{'ID': '113_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",necessity,annotated +f7cfdf57-28f3-4d23-90bf-ec2268e14bac,"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",{'ID': '65_Finnish_SafetyOfUse'},"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",necessity,annotated +8e9ef8dc-18bd-4877-98cd-556aa4adee8f,"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'},"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",none,annotated +6d9a1e8e-6fe7-4234-951a-96fdc4598bd7_6,,,"If parking spaces are provided for a building, an adequate number of System controls, but at least 55 degrees Celsius, shall be intended for the use of a person with mobility and functional impairment.",greater-equal,synthetic +569c7958-b7d6-4b9c-9dd9-13307e95e59b_11,,,"For ducted systems that are served by fans with a Unit length greater than 600 millimetres, ductwork leakage tests should be carried out.",greater,synthetic +d0927095-9e43-4ce4-a740-d5df69dc1dc3_5,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under that 50 millimetres.",equal,synthetic +500fc416-e652-4a2c-8dd3-8d9754ea1829,There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,{'ID': '115_UK_DocF_V2_Ventilation'},There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,part-of,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_11,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the feasibility of installing high-efficiency alternative systems of these must be at least 20C.",greater-equal,synthetic +103f99ad-884b-4bae-9f22-ccb1c5bc3d26,"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",{'ID': '110_Finnish_FireSafety'},"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",necessity,annotated +37f01a2c-b944-45a2-a7f4-140d8c03d7ac_3,,,"After rebating, frame components should retain at least 1.3 seconds of rain-water.",greater-equal,synthetic +ec419055-6ed3-4dac-9879-748e2d365a26,"Internal building services: where services penetrate the air barrier, holes should be as small as possible and should be core drilled to limit damage.",{'ID': '180_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Internal building services: where services penetrate the air barrier, holes should be as small as possible and should be core drilled to limit damage.",necessity,annotated +5ca184fa-e100-4f97-957d-e37ae944786f,The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,{'ID': '51_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,selection,annotated +5ba5ffe7-ece8-488a-b461-da66237e7888,"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",{'ID': '54_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",part-of,annotated +e21fa967-934e-4a29-a66d-252fdbbf928f_5,,,"If the parasitic energy use is unknown, an extract air categories of 1 should be made for any control system.",equal,synthetic +bfe386ee-8c0b-41d4-9967-6e873edf7229,"Floors and foundations: insulation should be installed tight to the structure, without air gaps between insulation panels and at edges.",{'ID': '148_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Floors and foundations: insulation should be installed tight to the structure, without air gaps between insulation panels and at edges.",necessity,annotated +ef561e39-db90-462c-8dde-15fbeae954e5_10,,,A cube with total minimum width of no more than 900-1000mm may pass between the upper edge of the barrier and the protective part.,less-equal,synthetic +bf798097-bb99-42d0-a73f-8cebab8fbeb8_4,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the extract air categories of the steps must be no more than E 15 and the tread must be no less than 300 millimetres.",less-equal,synthetic +baee716c-b8c2-4500-b4de-63fa11f007b1,A minimum of one in five of the remaining parking spaces must have access to cable routes.,{'ID': '83_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},A minimum of one in five of the remaining parking spaces must have access to cable routes.,necessity,annotated +46f5be2a-1514-420b-bc39-331fc6e0d2df_5,,,"The dwelling primary energy rate, flushing and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, total floor area and target fabric energy efficiency rate, respectively.",less-equal,synthetic +53e31e26-a39b-4047-a86e-bdb8021413e8_9,,,Window handles on windows that open outwards are not more than 900 millimetres indoor units when the window is at its maximum openable angle.,less-equal,synthetic +3724fd47-22f7-432c-81a2-1abcb95c7df2_1,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in 10 kN Lifting devices properties, where there should be no fewer than four.",equal,synthetic +588857f5-9281-4c32-8d83-c98230d5b934,The use of boards with lapped or tongue and groove edges should be considered.,{'ID': '146_UK_DocL_V1_ConsrvationOfFuelAndPower'},The use of boards with lapped or tongue and groove edges should be considered.,selection,annotated +4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9_6,,,"In spaces intended for more than 60 persons, the allowance of the access route must be at least adequate means.",greater-equal,synthetic +d925c189-860a-4fcb-ae88-d1cf8cc14fb8_10,,,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the heat recovery may be no more than 30% load.",less-equal,synthetic +2b60007d-59a3-4a18-a184-89e76ee17454,Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,{'ID': '161_UK_DocL_V1_ConsrvationOfFuelAndPower'},Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,none,annotated +0a53e4af-84a7-46aa-b28a-cb1d873c8cae,"The type and quality of public address, hearing enhancement and telephone systems should be chosen carefully to ensure intelligibility.",{'ID': '151_UK_DocM_V2_AccessAndUseOfBuildings'},"The type and quality of public address, hearing enhancement and telephone systems should be chosen carefully to ensure intelligibility.",necessity,annotated +fa8a6d84-eb99-490e-8169-3c65353fb553_5,,,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the inaccuracies shall be at least 15.",greater-equal,synthetic +76bf63bd-30f4-440d-81a0-61ca16170f70_2,,,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the gradient is less than 190 kN of the total load.,less,synthetic +a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",none,annotated +8b054fa5-fa6b-40f8-996a-a6dfea855fc3,"The distance between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 400 millimetres on the side wall and no less than 1,500 millimetres on the end wall.",{'ID': '33_Finnish_SafetyOfUse'},"The distance between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 400 millimetres on the side wall and no less than 1,500 millimetres on the end wall.",greater-equal,annotated +7f3f59a4-fc7e-4b14-8074-384f6cacf548_9,,,"The total number of a barrier in a dwellings indoor areas may, however, be at least 2.2 metres if the drop is less than three metres.",greater-equal,synthetic +ec419055-6ed3-4dac-9879-748e2d365a26,"Internal building services: where services penetrate the air barrier, holes should be as small as possible and should be core drilled to limit damage.",{'ID': '180_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Internal building services: where services penetrate the air barrier, holes should be as small as possible and should be core drilled to limit damage.",part-of,annotated +56b3f993-37b5-4cb1-9540-432972f8056e,"In a mechanical ventilation system, the air handling units and chambers shall be able to withstand the loads caused by fan pressure while the shutoff dampers are closed.",{'ID': '99_Finnish_Health-IndoorClimateAndVentilation'},"In a mechanical ventilation system, the air handling units and chambers shall be able to withstand the loads caused by fan pressure while the shutoff dampers are closed.",part-of,annotated +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_2,,,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than twice the rise plus the going (2R G) in total flow rate, these must be accessible via the interior.",greater,synthetic +a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",part-of,annotated +c2e0629d-350b-45b8-9e9e-d58be1780f12_9,,,"If the Rigid ducts has no multipoint locking system, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",not-part-of,synthetic +e505b13c-7b62-4857-aa2d-544dc986e9c0,"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",{'ID': '18_UK_DocK_ProtectionFromFalling'},"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",part-of,annotated +2f815a08-db3c-48a6-b248-d69aeac870ee,"the vertical travel distance is: a. not more than 2m, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",{'ID': '173_UK_DocM_V2_AccessAndUseOfBuildings'},"the vertical travel distance is: a. not more than 2m, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",selection,annotated +e32bbb47-c826-40c1-8ea4-8c32353d3fd2_11,,,There shall be three seconds of stack vent provided for people in the building.,equal,synthetic +302c413e-fefd-47f1-914f-0dc787e4a761,"Where illuminance on surfaces is greater than 200 lux, a difference in light reflectance value should be a minimum of 20 points.",{'ID': '29_UK_DocM_V2_AccessAndUseOfBuildings'},"Where illuminance on surfaces is greater than 200 lux, a difference in light reflectance value should be a minimum of 20 points.",greater,annotated +9d522aad-d404-4a57-83f9-474c95932b9e,Handrails should be spaced away from the wall and rigidly supported in a way that avoids impeding finger grip.,{'ID': '57_UK_DocM_V2_AccessAndUseOfBuildings'},Handrails should be spaced away from the wall and rigidly supported in a way that avoids impeding finger grip.,necessity,annotated +2f8d4247-e53b-49ae-bd26-c4f1765eaee8_4,,,"Extract air of total floor area 0.9 metres, 3 and 4 shall not be used as recirculation air.",equal,synthetic +c7035b48-7244-40a9-a70e-1d244caf72ac,"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",{'ID': '56_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",selection,annotated +8364a5f1-f80e-484c-9f38-bffc6f4c1876,"Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",{'ID': '44_UK_DocM_V1_AccessAndUseOfBuildings'},"Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",none,annotated +339fc78c-a2f2-481c-a410-3aeb41e24b8a_11,,,Solid walls constructed of coursed brickwork or blockwork should be at least as locations as 8 per cent (1:12.5) of the storey height.,greater-equal,synthetic +10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,none,annotated +457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",none,annotated +5925ca4d-801c-42e4-b581-a176dea2519f,"If thermal energy is supplied from a district heat network, a CO2 emission factor and primary energy factor for the heat delivered to the dwelling by the district heat network should be calculated.",{'ID': '76_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If thermal energy is supplied from a district heat network, a CO2 emission factor and primary energy factor for the heat delivered to the dwelling by the district heat network should be calculated.",necessity,annotated +203faa23-7b71-47c9-a6e5-2333ac45389e_3,,,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the ventilation rate must be no less than A.",greater-equal,synthetic +517253f8-98b1-4821-8901-75124d3237db,"Consideration should be given to the provision of a second handrail on stairs in a wide range of building types, and particularly in schools, for use by children and people of short stature.",{'ID': '59_UK_DocM_V2_AccessAndUseOfBuildings'},"Consideration should be given to the provision of a second handrail on stairs in a wide range of building types, and particularly in schools, for use by children and people of short stature.",selection,annotated +f06f7ec1-3b83-4e1a-a421-b09589f2374c,"Provision shall be made to prevent any door or gate: (a) which slides or opens upwards, from falling onto any person; and (b) which is powered, from trapping any person.",{'ID': '114_UK_DocK_ProtectionFromFalling'},"Provision shall be made to prevent any door or gate: (a) which slides or opens upwards, from falling onto any person; and (b) which is powered, from trapping any person.",necessity,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_1,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 25mm in load EER and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic +716fa732-f3c7-43ad-a4e3-fff43a841018,The vehicle traffic area of a building and its courtyard must be safe and appropriate.,{'ID': '131_Finnish_SafetyOfUse'},The vehicle traffic area of a building and its courtyard must be safe and appropriate.,necessity,annotated +783c19fa-0ef2-466f-b3e9-d4690e34ac5f,Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '214_UK_DocL_V1_ConsrvationOfFuelAndPower'},Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,none,annotated +0da52584-1b37-48b5-840f-3795ae695275_8,,,the minimum clear dimensions of the platform are: 1100mm wide and 0.7 exceptional circumstances where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +1913381b-a2cc-496e-9168-82ccf2a01d50_0,,,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the vicinity of the heat emitters to be installed does not exceed 850 millimetres.",less-equal,synthetic +3c0a8ccb-d813-40fb-b69b-88250d3bc4ec_9,,,These fittings should not exceed a distance of 8 per cent (1:12.5).,less-equal,synthetic +73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",selection,annotated +d12808b8-b64d-4742-8026-ba93fe86246d,The pumping station shall be located in a place where it can be easily inspected and serviced.,{'ID': '132_Finnish_Health-WaterAndSewerage'},The pumping station shall be located in a place where it can be easily inspected and serviced.,necessity,annotated +24729e93-fd1e-4e91-bbd6-ef8e73c582fb,"A unit that contains both living accommodation and space for commercial purposes (e.g. as aworkshop or office) should be treated as a residential building, as long as the commercial part canrevert to residential use.",{'ID': '3_UK_DocO_Overheating'},"A unit that contains both living accommodation and space for commercial purposes (e.g. as aworkshop or office) should be treated as a residential building, as long as the commercial part canrevert to residential use.",necessity,annotated +922bf8df-3a70-4f45-8c04-200b638d3b3c_2,,,The cold water pipe shall be designed and installed so that the thermal integrity in the cold water system may not exceed one metre.,less-equal,synthetic +dd056285-1aa4-4c6d-94ac-b911458cb7ea,"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",{'ID': '70_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",selection,annotated +9f8c2fbb-a04e-42f9-8fa0-b7a905dbafa0,"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",{'ID': '40_Finnish_Health-Humidity'},"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",none,annotated +302c413e-fefd-47f1-914f-0dc787e4a761_0,,,"Where fire compartmenting requirement on surfaces is greater than 300 litres, a difference in light reflectance value should be a minimum of 20 points.",greater,synthetic +2c8d2bc3-cf23-48f8-b9c0-b90f150f9f93,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing building.",{'ID': '426_UK_DocM_V2_AccessAndUseOfBuildings'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing building.",selection,annotated +38cd3221-7fc9-4462-be20-78b16a4309d3,The area of openings in the newly created dwelling should not be more than 25 of the total floor area.,{'ID': '490_UK_DocL_V1_ConsrvationOfFuelAndPower'},The area of openings in the newly created dwelling should not be more than 25 of the total floor area.,none,annotated +d3e7a947-536e-4a49-9823-e27fc0f68b27_0,,,heat of landings to be at least equal to the product certificate of the ramp.,greater-equal,synthetic +fc8ee55c-408d-48a9-ae4c-a6961b5745ce,Biomass heating supplemented by an alternative appliance (e.g. gas) - the CO2 emission factor and primary energy factor should be based on a weighted average for the two fuels.,{'ID': '59_UK_DocM_V2_AccessAndUseOfBuildings'},Biomass heating supplemented by an alternative appliance (e.g. gas) - the CO2 emission factor and primary energy factor should be based on a weighted average for the two fuels.,part-of,annotated +7577d9f7-9f3c-4d3b-b8d9-da31d3e1b201,"For example, glare and reflections from shiny surfaces, and large repeating patterns, should be avoided in spaces where visual acuity is critical as they will hamper communication for people with impaired vision, and those who lip read or use sign language.",{'ID': '150_UK_DocM_V2_AccessAndUseOfBuildings'},"For example, glare and reflections from shiny surfaces, and large repeating patterns, should be avoided in spaces where visual acuity is critical as they will hamper communication for people with impaired vision, and those who lip read or use sign language.",selection,annotated +569c7958-b7d6-4b9c-9dd9-13307e95e59b_9,,,"For ducted systems that are served by fans with a annual percentage of heat greater than 0.136kgCO2/kWh, ductwork leakage tests should be carried out.",greater,synthetic +a1f91cfd-21f8-49a4-8468-746f49f4848e_0,,,"For a building that contains more than 24 metres exterior wall for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",greater,synthetic +a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",none,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,annotated +20518e80-6f7e-457f-8c5a-59fa4c0eb324_1,,,"When calculating the heat loss for a buildings design solution, the either side shall be used as the value of the cross-sectional area for the building envelope.",equal,synthetic +0262f6e5-21bc-4312-9388-8ac93b79416d_4,,,The minimum full sunken area of the absorption chillers should be no worse than 0.35W/(m2K).,greater-equal,synthetic +e32bbb47-c826-40c1-8ea4-8c32353d3fd2_9,,,There shall be 1m2 of structure provided for people in the building.,equal,synthetic +7e34700e-92de-4b00-a820-f4085a2e186c_11,,,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be going 0.3.",equal,synthetic +45adb0b6-63ee-4f42-b6a3-8fc396221c67,The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,{'ID': '128_UK_DocL_V1_ConsrvationOfFuelAndPower'},The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,selection,annotated +73b4b305-8971-489a-a290-f996e1f63e19,"The clear width of the door and opening leading to room spaces of a non-residential building as well as to residential rooms of a residential building, necessary spaces serving residence and spaces serving the use of the building shall be at least 800 millimetres.",{'ID': '19_Finnish_Accessibility'},"The clear width of the door and opening leading to room spaces of a non-residential building as well as to residential rooms of a residential building, necessary spaces serving residence and spaces serving the use of the building shall be at least 800 millimetres.",selection,annotated +13a437c0-918c-47f2-85bd-b80dd69eb027,"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",none,annotated +87c9cfa3-8093-497d-be10-dc054abe7062,"For common leaf lintels, the base plate should not be continuous and the lintel core should be insulated.",{'ID': '164_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For common leaf lintels, the base plate should not be continuous and the lintel core should be insulated.",part-of,annotated +4fc3b5b1-a838-4429-b385-d8e80e6633eb_7,,,"In the absence of relevant harmonised European Standards, products with a structure exceeding 190 millimetres must have a product certificate issued by a Notified Body.",greater,synthetic +bfdf95da-d422-47cd-83d7-a30a4969f2e6,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",{'ID': '180_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",greater-equal,annotated +86350df0-a40e-412b-a301-004524d56736_8,,,"For wet heating systems in new dwellings with a water vapour resistance of 450mm or greater, a minimum of two independently controlled heating circuits should be provided.",greater-equal,synthetic +b63dcef6-1840-4e9e-ad51-f8fc481fe856,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",{'ID': '36_UK_DocA_Structure'},"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",necessity,annotated +72e7ed0c-9e73-46b2-a919-20f3fea337fd_8,,,"An Roofs with a potentially flammable or explosive atmosphere must not be located in a water meter where there are dwellings, accommodation premises, institutions or assembly and business premises.",not-part-of,synthetic +825053cb-af5d-43a9-b59b-e2a5ae78ea73_8,,,The energy performance of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the effective rated output of dwellings in the residential building; b. the number of associated parking spaces.,greater,synthetic +f0c72b35-5a0a-4554-8713-96f6f73a67f1_2,,,A cube with widened of no more than three may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,less-equal,synthetic +f6a682fb-f427-41d0-9219-3a45d2134be6,"To correctly assess whether an element meets the limiting U-value, the U-value must be calculated for the element in the appropriate plane - either horizontal or vertical.",{'ID': '109_UK_DocL_V1_ConsrvationOfFuelAndPower'},"To correctly assess whether an element meets the limiting U-value, the U-value must be calculated for the element in the appropriate plane - either horizontal or vertical.",necessity,annotated +16f6f10e-f32f-48b2-85f9-123cdb5448ee,Any unavoidable gaps between boards should be infilled using compressible tape (e.g. for boards within roof rafters) or low expansion foam (e.g. for boards within wall cavities).,{'ID': '147_UK_DocL_V1_ConsrvationOfFuelAndPower'},Any unavoidable gaps between boards should be infilled using compressible tape (e.g. for boards within roof rafters) or low expansion foam (e.g. for boards within wall cavities).,selection,annotated +ddc0bba6-2df8-43e1-9398-37514366fb06,"For fixed terminals with automatic flow adjustment at the fan unit, the fan speed should be set to achieve the desired continuous flow rate.",{'ID': '208_UK_DocF_V1_Ventilation'},"For fixed terminals with automatic flow adjustment at the fan unit, the fan speed should be set to achieve the desired continuous flow rate.",part-of,annotated +8c4a09c5-1eb2-4a41-86d9-b69c031b4592,Ground arrays including header pipes and manifolds should be flushed as one system to remove all debris and purged to remove all air.,{'ID': '384_UK_DocL_V1_ConsrvationOfFuelAndPower'},Ground arrays including header pipes and manifolds should be flushed as one system to remove all debris and purged to remove all air.,part-of,annotated +2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d_11,,,"An upstand built on site should not exceed a instantaneous carbon monoxide concentration of 1,200 MJ/m2.",less-equal,synthetic +c8a048c6-8e7e-4b5a-ada5-02990b983401,"A natural ventilation system, a mechanical extract ventilation system or a mechanical supply and extract ventilation system shall not be designed to be combined in such a way that the directions of air flow between the rooms and in the ductworks may change when the air flows are being controlled.",{'ID': '91_Finnish_Health-IndoorClimateAndVentilation'},"A natural ventilation system, a mechanical extract ventilation system or a mechanical supply and extract ventilation system shall not be designed to be combined in such a way that the directions of air flow between the rooms and in the ductworks may change when the air flows are being controlled.",selection,annotated +aef92227-4c01-4c59-b96d-ce414540606b,"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",{'ID': '63_UK_DocM_V2_AccessAndUseOfBuildings'},"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",necessity,annotated +86a39a0b-093f-4920-9879-fe7b3ae6675a,"In principle, suitable sanitary accommodation should be available to everybody, including sanitary accommodation designed for wheelchair users, ambulant disabled people, people of either sex with babies and small children or people encumbered by luggage.",{'ID': '155_UK_DocM_V2_AccessAndUseOfBuildings'},"In principle, suitable sanitary accommodation should be available to everybody, including sanitary accommodation designed for wheelchair users, ambulant disabled people, people of either sex with babies and small children or people encumbered by luggage.",necessity,annotated +e3b85ad6-6132-40d7-86f8-3cc5d44eb12c_9,,,2m Double doors should be close to an accessible bathroom suitable for a wheelchair user.,equal,synthetic +fb5d3054-4911-4049-ba09-1c3e80f9c07c,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",{'ID': '29_Finnish_SafetyOfUse'},"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",none,annotated +a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",part-of,annotated +113b8bf8-1856-45f5-a54b-d65ef100b437_6,,,"If a gas-fired combination boiler is installed in an existing dwelling, at least 1,500 millimetres of the following both sides, appropriate to the system, should be installed.",greater-equal,synthetic +20216261-f56d-4f79-8a46-c781abe19f04,"For new and existing buildings other than dwellings, information should be provided in a new or existing building log book.",{'ID': '98_UK_DocF_V2_Ventilation'},"For new and existing buildings other than dwellings, information should be provided in a new or existing building log book.",none,annotated +596cc55c-f50f-4155-962f-832b87226a8e,"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",{'ID': '23_UK_DocF_V1_Ventilation'},"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",selection,annotated +cc72106e-9e7f-47cf-8a95-0173a8305dad_5,,,"In a new building, the crawl space indoor units must be 10m on average at the minimum.",greater-equal,synthetic +76bf63bd-30f4-440d-81a0-61ca16170f70,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,necessity,annotated +eccd4f77-ef4a-41fd-a22a-620c84fdddd4_7,,,There is a minimum of 100 millimetres of worktop to at least value of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,greater-equal,synthetic +01008f69-874b-443e-bcb2-2f5630280049_3,,,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the indoor and outdoor conditions may be no more than 35 mg/m3 (30 ppm) and the tread must be no less than 220 millimetres.",less-equal,synthetic +e874f337-2067-4e77-ad32-c3b857f40e7a,"If the number of occupants exceeds 120, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",{'ID': '219_Finnish_FireSafety'},"If the number of occupants exceeds 120, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",greater,annotated +4c83069b-8c22-43ad-92a0-354ecd0e40a1,"Sufficient information should be provided to ensure that people can operate, maintain or alter an electrical installation with reasonable safety.",{'ID': '7_UK_DocP_ElectricalSafety'},"Sufficient information should be provided to ensure that people can operate, maintain or alter an electrical installation with reasonable safety.",necessity,annotated +302c413e-fefd-47f1-914f-0dc787e4a761_6,,,"Where wide on surfaces is greater than 0.055555556, a difference in light reflectance value should be a minimum of 20 points.",greater,synthetic +50e89a86-e2be-439d-b230-79274cd7199b_3,,,Modular and portable buildings with a planned standard thickness of more than E 15 at a single location should be shown to comply with the energy efficiency requirements.,greater,synthetic +b63dcef6-1840-4e9e-ad51-f8fc481fe856_10,,,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the visual contrast is not less than 500kW.",greater-equal,synthetic +99a53f17-48cb-4012-a47b-700761e0983b,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,{'ID': '61_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,equal,annotated +eefe1191-2903-4fb8-9138-6471e09fb67d_7,,,The design value exceeds 2m at 11pm.,greater,synthetic +c0a6d35c-cc20-428b-941d-c3e3e6365c74,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",{'ID': '25_UK_DocK_ProtectionFromFalling'},"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",equal,annotated +f3bd99b4-7ea5-4968-af10-3c133c0b5aa0_7,,,No individual flight has a either side of more than 2.,less-equal,synthetic +3ca5cb38-b90b-4449-ba14-4268866df8e1_0,,,The water heater is close to the draw-off points and has a integrity no greater than 3.3m.,less-equal,synthetic +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f,"Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",{'ID': '3_UK_DocR_V1_InfrastructureForElectircalCommunications'},"Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater-equal,annotated +45adb0b6-63ee-4f42-b6a3-8fc396221c67,The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,{'ID': '128_UK_DocL_V1_ConsrvationOfFuelAndPower'},The depth of the insulation plus any required air gap should be at least to the depth of the rafters.,none,annotated +99a53f17-48cb-4012-a47b-700761e0983b,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,{'ID': '61_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,none,annotated +fb5d3054-4911-4049-ba09-1c3e80f9c07c_3,,,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the energy efficiency may be no more than two years.",less-equal,synthetic +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_5,,,"Where the energy efficiency measures of installing only cable routes is more than five of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",greater,synthetic +82aa0792-8ea3-414a-9952-933b4959b782,"NOTE: All boilers should be used in the calculation, including any that are identical.",{'ID': '249_UK_DocM_V2_AccessAndUseOfBuildings'},"NOTE: All boilers should be used in the calculation, including any that are identical.",none,annotated +f5a71c7b-e852-40f2-8f88-91cda7902a7e,"If a new building has a space heating or airconditioning system with an effective rated output greater than 180kW, a building automation and control system should be installed.",{'ID': '319_UK_DocM_V2_AccessAndUseOfBuildings'},"If a new building has a space heating or airconditioning system with an effective rated output greater than 180kW, a building automation and control system should be installed.",necessity,annotated +3e9fc57e-bc69-4f17-a056-dd7767afa9bb,"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",{'ID': '241_Finnish_FireSafety'},"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",none,annotated +bf798097-bb99-42d0-a73f-8cebab8fbeb8,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.",{'ID': '21_Finnish_SafetyOfUse'},"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.",part-of,annotated +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_2,,,"If the configuration of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 0.2 of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater,synthetic +5f675f4f-74de-4d0f-ae92-c3500d2d952e,The actual equivalent area and location of installed background ventilators should be recorded.,{'ID': '189_UK_DocF_V1_Ventilation'},The actual equivalent area and location of installed background ventilators should be recorded.,part-of,annotated +1e0aa8d6-4291-4a33-883c-b88453c83287,"To correctly assess whether an element meets the limiting U-value, the U-value must be calculated for the element in the appropriate plane either horizontal or vertical.",{'ID': '128_UK_DocM_V2_AccessAndUseOfBuildings'},"To correctly assess whether an element meets the limiting U-value, the U-value must be calculated for the element in the appropriate plane either horizontal or vertical.",necessity,annotated +aa921550-3c5f-470b-b578-1788f83b49a7,Uplighters mounted at low or floor level can disorientate some visually impaired people and should be avoided.,{'ID': '153_UK_DocM_V2_AccessAndUseOfBuildings'},Uplighters mounted at low or floor level can disorientate some visually impaired people and should be avoided.,selection,annotated +ebc429f0-cb90-41ab-9a11-401a2ddc7bad,"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",{'ID': '268_UK_DocF_V1_Ventilation'},"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",selection,annotated +6ec243f2-9294-4b7c-89a4-1c46e4a69cc9_11,,,"If site constraints necessitate an their of 0.3 or steeper, an approach incorporating ramped access should be provided.",greater-equal,synthetic +e8340500-38b6-461b-b00d-d3aa44ac1f0b_1,,,The maximum number of occupants of the water available from the hot water system may not exceed 6mm.,less-equal,synthetic +511c1a7f-08b9-48ec-aea6-9b749fdf31a1,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an adequate number of appropriately located toilet facilities which are suitable for users of wheelchairs and walking frames with wheels.",{'ID': '51_Finnish_Accessibility'},"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an adequate number of appropriately located toilet facilities which are suitable for users of wheelchairs and walking frames with wheels.",none,annotated +10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,part-of,annotated +5fe7997a-7e99-485c-89b3-7912d7c8d44d,"If the total flow rate cannot be achieved through all the terminals, then the fan speed should be increased.",{'ID': '199_UK_DocF_V1_Ventilation'},"If the total flow rate cannot be achieved through all the terminals, then the fan speed should be increased.",part-of,annotated +079db365-cfed-474e-9329-25349ac0db4a,"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",{'ID': '21_Finnish_Accessibility'},"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",greater,annotated +78d904cd-b605-43a6-b3a4-34c22f557123,"Instead, the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",{'ID': '84_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Instead, the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",none,annotated +aaca648c-5f60-4300-a30f-887da252ebd0,The use of visually and acoustically reflective wall surfaces should be minimised within the lifting platform to prevent discomfort for people with visual and hearing impairment.,{'ID': '116_UK_DocM_V2_AccessAndUseOfBuildings'},The use of visually and acoustically reflective wall surfaces should be minimised within the lifting platform to prevent discomfort for people with visual and hearing impairment.,necessity,annotated +dcc583b1-8c4c-42cf-a1ed-e8907de56254_1,,,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the surfaces must be no less than 25W/m2.",greater-equal,synthetic +993e54cc-49c3-43cb-995e-1a951c93c775_11,,,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an exposure coefficient equal to adequate means.",equal,synthetic +164122ed-c7ac-4cf8-8a54-3d56c144f78d,"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",{'ID': '172_UK_DocM_V2_AccessAndUseOfBuildings'},"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",none,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_7,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the operation of these must be at least 90mm.",greater-equal,synthetic +76bf63bd-30f4-440d-81a0-61ca16170f70,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,part-of,annotated +c952db0f-b605-4335-8d56-97fc339ad5ba_8,,,All 0.07 requirement of the installation and commissioning checklist should be completed.,equal,synthetic +a8b3e54e-902c-4502-99a2-8c41d46f1416_4,,,"If there are more than 1.2W/(m2K) facade in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",greater,synthetic +a8b3e54e-902c-4502-99a2-8c41d46f1416_0,,,"If there are more than four structures in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",greater,synthetic +60024014-cb6a-4a53-9b12-9497e0a1e5e8_6,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for performance standards 1 and E 15 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic +2f89cb06-3ee9-49b5-ac36-46f31ae3928f,Hot water pipework should be insulated in all areas inside and outside the building unless it can be demonstrated that the heat is always useful.,{'ID': '170_UK_DocM_V2_AccessAndUseOfBuildings'},Hot water pipework should be insulated in all areas inside and outside the building unless it can be demonstrated that the heat is always useful.,selection,annotated +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",none,annotated +bb9ec292-062b-43c3-8590-856dd5f6b890_1,,,"The categories and building emission rate calculated using the measured air permeability must not be higher than the category and target emission rate, respectively.",less-equal,synthetic +259c1614-77ef-4ae4-a401-83caa603e374,"The main doors for entering a dwelling (usually the front doorset) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",{'ID': '35_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front doorset) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",selection,annotated +aa41a5d4-c0b1-4da7-84a0-5c2e2738654f,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,{'ID': '89_UK_DocF_V1_Ventilation'},The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,part-of,annotated +b850a570-c0bd-4cf0-8b46-338ff5d8aa78,NOTE: A system for purge ventilation should be provided in each habitable room to demonstrate compliance with Part F of the Building Regulations.,{'ID': '67_UK_DocO_Overheating'},NOTE: A system for purge ventilation should be provided in each habitable room to demonstrate compliance with Part F of the Building Regulations.,selection,annotated +bde1697a-20c9-4f15-a63c-5be323a058c1_8,,,Any connection of 900-1000mm or more heating systems to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,greater-equal,synthetic +60024014-cb6a-4a53-9b12-9497e0a1e5e8_4,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the Ventilation from these spaces does not exceed 0.07 of the total air flow in the vertical duct.",less-equal,synthetic +2c12675d-93c9-496a-acf9-b30465dae93d,Any flexible ducts should be installed so that the full internal diameter is maintained and flow resistance is minimised.,{'ID': '113_UK_DocF_V1_Ventilation'},Any flexible ducts should be installed so that the full internal diameter is maintained and flow resistance is minimised.,selection,annotated +1ebce0c9-705c-47ee-8429-e83cfbed72db,"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",{'ID': '103_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",part-of,annotated +cc72106e-9e7f-47cf-8a95-0173a8305dad,"In a new building, the crawl space height must be 0.8 metres on average at the minimum.",{'ID': '83_Finnish_Health-Humidity'},"In a new building, the crawl space height must be 0.8 metres on average at the minimum.",greater-equal,annotated +a235c68f-ae44-4770-b005-4e9d7b659eb7_0,,,All cavity walls should have leaves at least 90mm thick and cavities at least 100 litres number of appliances.,greater-equal,synthetic +56517433-cf40-4b88-a9d4-18e61e0e9993_2,,,"In addition, on both sides of the toilet seat there shall be a load-bearing element of at least One.",greater-equal,synthetic +76bf63bd-30f4-440d-81a0-61ca16170f70,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,none,annotated +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_11,,,"Where the cost of installing only cable routes is more than 7% of the total cost of the major extension, there is no load-bearing element to install either electric vehicle charge points or cable routes.",not-part-of,synthetic +9415ae4b-7a74-4c70-a245-e4381c6d71bf,"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",{'ID': '170_UK_DocL_V1_ConsrvationOfFuelAndPower'},"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",less,annotated +99a53f17-48cb-4012-a47b-700761e0983b_4,,,Where a new building which is not a residential building or a mixed-use building has more than 90mm toilet and washing facility (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,greater,synthetic +1085a40e-a3d6-48e2-85ac-8247a26f04f2,Mechanical ventilation systems must be commissioned in accordance with an approved procedure.,{'ID': '35_UK_DocF_V2_Ventilation'},Mechanical ventilation systems must be commissioned in accordance with an approved procedure.,necessity,annotated +74b9ee2c-0192-442d-b5a1-a2974d456429,"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",{'ID': '67_UK_DocM_V1_AccessAndUseOfBuildings'},"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",selection,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",none,annotated +88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",necessity,annotated +a8b3e54e-902c-4502-99a2-8c41d46f1416_6,,,"If there are more than 1m2 Insulating materials in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",greater,synthetic +17d9350b-ba07-405f-bbe3-3b728eab4dee,The facilities suitable for persons with mobility and functional impairment shall be marked with the International Symbol of Access.,{'ID': '62_Finnish_Accessibility'},The facilities suitable for persons with mobility and functional impairment shall be marked with the International Symbol of Access.,selection,annotated +a922fe4e-30c9-4fef-a442-27459b959914,Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,{'ID': '82_Finnish_Health-WaterAndSewerage'},Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,selection,annotated +a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",none,annotated +259c1614-77ef-4ae4-a401-83caa603e374,"The main doors for entering a dwelling (usually the front doorset) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",{'ID': '35_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front doorset) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",selection,annotated +88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",part-of,annotated +3724fd47-22f7-432c-81a2-1abcb95c7df2_7,,,"The parasitic energy use installed in a dwellings habitable rooms and kitchens should be no fewer than 2.4m, except in one bedroom properties, where there should be no fewer than four.",greater-equal,synthetic +86a39a0b-093f-4920-9879-fe7b3ae6675a,"In principle, suitable sanitary accommodation should be available to everybody, including sanitary accommodation designed for wheelchair users, ambulant disabled people, people of either sex with babies and small children or people encumbered by luggage.",{'ID': '155_UK_DocM_V2_AccessAndUseOfBuildings'},"In principle, suitable sanitary accommodation should be available to everybody, including sanitary accommodation designed for wheelchair users, ambulant disabled people, people of either sex with babies and small children or people encumbered by luggage.",necessity,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_1,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under energy efficiency 500 millimetres.",equal,synthetic +c2e0629d-350b-45b8-9e9e-d58be1780f12_11,,,"If the community heating primary circuit has no structures, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",not-part-of,synthetic +7d1ada0b-8dcc-4c01-84d7-78b80cb404c9,"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",{'ID': '58_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",selection,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8_0,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for load capacity 1 and E if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic +1de9d3e5-dee3-42c9-b929-80b7936f1642,The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,{'ID': '33_Finnish_Accessibility'},The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,necessity,annotated +09b2a395-5293-4b7d-82d4-5312482d59e9_6,,,"Door entry controls, where provided, are mounted 300 litres automatic flow adjustment finished ground level, and at least 300mm away from any projecting corner.",equal,synthetic +6075de3c-d339-4ba4-9945-990480975615_4,,,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than two years photovoltaic array of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",greater-equal,synthetic +113b8bf8-1856-45f5-a54b-d65ef100b437_10,,,"If a gas-fired combination boiler is installed in an existing dwelling, at least 2m of the following supports, appropriate to the system, should be installed.",greater-equal,synthetic +0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,none,annotated +56517433-cf40-4b88-a9d4-18e61e0e9993_9,,,"In addition, on both sides of the toilet seat there shall be a water pressure barrier of at least 65mm.",greater-equal,synthetic +f733b7c9-a406-4f5a-b383-9d3f8b70a559,The selection of relevant critical situations for design should be made reflecting the conditions that can reasonably be foreseen during future use.,{'ID': '5_UK_DocA_Structure'},The selection of relevant critical situations for design should be made reflecting the conditions that can reasonably be foreseen during future use.,part-of,annotated +f0c72b35-5a0a-4554-8713-96f6f73a67f1_5,,,A cube with number of wall ties per square metre of no more than 1 may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,less-equal,synthetic +113b8bf8-1856-45f5-a54b-d65ef100b437_4,,,"If a gas-fired combination boiler is installed in an existing dwelling, at least certain proportion of the following Unit length, appropriate to the system, should be installed.",greater-equal,synthetic +2f89cb06-3ee9-49b5-ac36-46f31ae3928f,Hot water pipework should be insulated in all areas inside and outside the building unless it can be demonstrated that the heat is always useful.,{'ID': '170_UK_DocM_V2_AccessAndUseOfBuildings'},Hot water pipework should be insulated in all areas inside and outside the building unless it can be demonstrated that the heat is always useful.,part-of,annotated +ec0cd536-6082-48ba-b9e7-8678c02d65a4,Waste water shall be conveyed to the sewer of the water supply plant or for purification property-specifically or to a cesspit.,{'ID': '122_Finnish_Health-WaterAndSewerage'},Waste water shall be conveyed to the sewer of the water supply plant or for purification property-specifically or to a cesspit.,necessity,annotated +7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8,"For sizes of cylinder not listed, the heat loss from the cylinder should not exceed (16.66 8.33 V0.4)/(1000 24), where V is the volume in litres.",{'ID': '208_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For sizes of cylinder not listed, the heat loss from the cylinder should not exceed (16.66 8.33 V0.4)/(1000 24), where V is the volume in litres.",part-of,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8_3,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for air flow rate 50 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic +8595e26e-db5c-4d09-9fcf-02b530b61e23,There must be access to each fire compartment of an attic for firefighting operations.,{'ID': '240_Finnish_FireSafety'},There must be access to each fire compartment of an attic for firefighting operations.,selection,annotated +fa90c179-d32c-412b-a7d6-a515cc91dbdb,The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,{'ID': '86_Finnish_Health-Humidity'},The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,selection,annotated +e21fa967-934e-4a29-a66d-252fdbbf928f,"If the parasitic energy use is unknown, an allowance of 0.3W/m2 should be made for any control system.",{'ID': '473_UK_DocM_V2_AccessAndUseOfBuildings'},"If the parasitic energy use is unknown, an allowance of 0.3W/m2 should be made for any control system.",equal,annotated +3ca5cb38-b90b-4449-ba14-4268866df8e1_2,,,The water heater is close to the draw-off points and has a results no greater than 24 degrees Celsius.,less-equal,synthetic +46f5be2a-1514-420b-bc39-331fc6e0d2df_5,,,"The dwelling primary energy rate, dwelling emission rate and step, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and vicinity, respectively.",less-equal,synthetic +a4dc06ab-99c3-4c8b-b295-eb3e6a64320a_9,,,"The free energy efficiency measures from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 01:20:00, unless the area is protected so as to prevent the danger of collision.",greater-equal,synthetic +16f6f10e-f32f-48b2-85f9-123cdb5448ee,Any unavoidable gaps between boards should be infilled using compressible tape (e.g. for boards within roof rafters) or low expansion foam (e.g. for boards within wall cavities).,{'ID': '147_UK_DocL_V1_ConsrvationOfFuelAndPower'},Any unavoidable gaps between boards should be infilled using compressible tape (e.g. for boards within roof rafters) or low expansion foam (e.g. for boards within wall cavities).,selection,annotated +0da52584-1b37-48b5-840f-3795ae695275_9,,,the minimum clear dimensions of the platform are: 1100mm wide and 0.05 reception where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +9eb5bf01-3810-44e3-802b-7c7eadad1831,"Mechanical ventilation systems, including both continuous and intermittent mechanical ventilation, should be designed and installed to minimise noise.",{'ID': '21_UK_DocF_V1_Ventilation'},"Mechanical ventilation systems, including both continuous and intermittent mechanical ventilation, should be designed and installed to minimise noise.",necessity,annotated +636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4_3,,,"Where a new building contains more than EI 15 free area, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",greater,synthetic +26980508-105c-49db-8595-bf001a48d757_4,,,"In baby changing facilities with no fixed seats or justification, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic +54f4e30f-d171-4156-ae87-7aed3541dd18,Insulated cavity closers should be used for all construction types.,{'ID': '165_UK_DocL_V1_ConsrvationOfFuelAndPower'},Insulated cavity closers should be used for all construction types.,selection,annotated +4094b859-b3b4-4035-94cd-8cf47ccbd801_4,,,The primary energy is at least 25mm.,greater-equal,synthetic +bde1697a-20c9-4f15-a63c-5be323a058c1_1,,,Any connection of 0.15 or more Extract air to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,greater-equal,synthetic +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_8,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 14 metres in dwelling emission rate and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic +56166e36-b14b-4632-9767-70b71d335d9c,"When a dwelling undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",{'ID': '98_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When a dwelling undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",necessity,annotated +a0c838b5-5fe2-4b52-abe1-432804c2c8aa_0,,,A measures of 21 C shall be used as the Air flow rates for room temperature during the heating season.,equal,synthetic +72e7ed0c-9e73-46b2-a919-20f3fea337fd_6,,,"An attic with a potentially flammable or explosive atmosphere must not be located in a loading docks where there are dwellings, accommodation premises, institutions or assembly and business premises.",not-part-of,synthetic +8aa4b706-1659-4e30-a4fe-e7f33efe3241_9,,,All 600kg/m3 Ventilation systems of the compliance checklist should be completed.,equal,synthetic +77be05f2-cd8c-4d35-85e4-6637b999d8e7_10,,,The Air permeability of the consequential improvement works should not be less than 40 of the value of the principal works.,greater-equal,synthetic +4e8c5c50-44af-48f6-b959-e6f9b31afa1e_4,,,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical handrail may be speed glandless circulators.",equal,synthetic +56166e36-b14b-4632-9767-70b71d335d9c,"When a dwelling undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",{'ID': '98_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When a dwelling undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",selection,annotated +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_4,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be presence 9 metres.",equal,synthetic +3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60,The approach route is a minimum of 900mm wide with a maximum cross fall of 1 in 40.,{'ID': '16_UK_DocM_V1_AccessAndUseOfBuildings'},The approach route is a minimum of 900mm wide with a maximum cross fall of 1 in 40.,less-equal,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479_7,,,Individual flights are: for energy efficiency up to 90 not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic +079db365-cfed-474e-9329-25349ac0db4a_0,,,"In connection with the door of an outside space of an individual dwelling the manufacturers declared efficiencies outside the door may be more than 50 if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",greater,synthetic +e32bbb47-c826-40c1-8ea4-8c32353d3fd2_5,,,There shall be 500 millimetres of rain-water provided for people in the building.,equal,synthetic +08efb7a8-1f9e-491b-8a6f-7043ec96ea3b,The methodology for determining costs should be consistent between all elements of the calculation to allow a fair comparison between the cost of the major renovation and the cost of electric vehicle charge point infrastructure.,{'ID': '54_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The methodology for determining costs should be consistent between all elements of the calculation to allow a fair comparison between the cost of the major renovation and the cost of electric vehicle charge point infrastructure.,selection,annotated +75c60084-6878-472d-8694-e8739e0dd76c_1,,,The annual percentage of heat of access routes in assembly areas with a maximum capacity of 60 persons must be at least two years.,greater-equal,synthetic +dd056285-1aa4-4c6d-94ac-b911458cb7ea,"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",{'ID': '70_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",none,annotated +4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",selection,annotated +0fdce0b1-7992-401f-aa84-ad7f2acca23d,Cavity walls: the inner block leaf mortar joint should be fully filled and pointed within the cavity.,{'ID': '184_UK_DocL_V1_ConsrvationOfFuelAndPower'},Cavity walls: the inner block leaf mortar joint should be fully filled and pointed within the cavity.,none,annotated +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated +43a7a088-718f-4a11-a392-88e71559466e,"In exceptional circumstances in an existing building, a wheelchair platform stairlift may be considered, provided its installation does not conflict with requirements for means of escape.",{'ID': '107_UK_DocM_V2_AccessAndUseOfBuildings'},"In exceptional circumstances in an existing building, a wheelchair platform stairlift may be considered, provided its installation does not conflict with requirements for means of escape.",none,annotated +28c47652-47a0-4fa4-8343-beee0af2691c,"Large roof surfaces must be divided into parts of no more than 2,400 square metres.",{'ID': '181_Finnish_FireSafety'},"Large roof surfaces must be divided into parts of no more than 2,400 square metres.",necessity,annotated +1c511111-ab71-4b68-9421-f588bc4b9180,"People with visual impairment should be in no doubt as to the location of glass doors, especially when they are within a glazed screen.",{'ID': '76_UK_DocM_V2_AccessAndUseOfBuildings'},"People with visual impairment should be in no doubt as to the location of glass doors, especially when they are within a glazed screen.",necessity,annotated +61bc1c7a-62f8-43c1-9c71-6e3073695cbe,"Roofs: insulation should be installed tight to the structure, without air gaps, and should extend to the wall insulation.",{'ID': '143_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Roofs: insulation should be installed tight to the structure, without air gaps, and should extend to the wall insulation.",necessity,annotated +5e7d4831-4ec8-48f9-9e60-0422fcc1eae4,"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",{'ID': '344_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",part-of,annotated +7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",part-of,annotated +aa41a5d4-c0b1-4da7-84a0-5c2e2738654f_6,,,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than 4 battery storage.,greater,synthetic +43e26628-8b62-4cc6-91e2-284335df1564_2,,,"In rooms used for sleeping or rest, the shallow projecting may not exceed half a metre.",less-equal,synthetic +239bd568-c5f2-4ab5-955c-f2d8d86b7b7f,"Where closing devices are needed for fire control, electrically powered hold-open devices or swing-free closing devices should be used as appropriate.",{'ID': '90_UK_DocM_V2_AccessAndUseOfBuildings'},"Where closing devices are needed for fire control, electrically powered hold-open devices or swing-free closing devices should be used as appropriate.",selection,annotated +13a437c0-918c-47f2-85bd-b80dd69eb027_2,,,"There are no air tightness on the diameter of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",not-part-of,synthetic +c766f874-d4aa-45b8-89f7-20b08db787c6,The total height of the barrier must be one metre if the drop is no more than six metres.,{'ID': '43_Finnish_SafetyOfUse'},The total height of the barrier must be one metre if the drop is no more than six metres.,part-of,annotated +f5a71c7b-e852-40f2-8f88-91cda7902a7e_9,,,"If a new building has a space heating or airconditioning system with an proportion greater than 15, a building automation and control system should be installed.",greater,synthetic +fb1da22f-8ddb-4399-b441-64dca68da9af,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",{'ID': '218_Finnish_FireSafety'},"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",part-of,annotated +d3fc8c9b-c23a-4188-8723-369caa90453c_7,,,"The steps for a building's total combined window area is 30% load of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",equal,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_10,,,Skirtings totalling up to 50mm total thickness and shallow projecting floor level or casings above 900 millimetres may be discounted when measuring clear width.,greater,synthetic +0262f6e5-21bc-4312-9388-8ac93b79416d_7,,,The minimum full energy efficiency of the absorption chillers should be no worse than 0.055555556.,greater-equal,synthetic +339fc78c-a2f2-481c-a410-3aeb41e24b8a,Solid walls constructed of coursed brickwork or blockwork should be at least as thick as 1/16 of the storey height.,{'ID': '32_UK_DocA_Structure'},Solid walls constructed of coursed brickwork or blockwork should be at least as thick as 1/16 of the storey height.,part-of,annotated +17d9350b-ba07-405f-bbe3-3b728eab4dee,The facilities suitable for persons with mobility and functional impairment shall be marked with the International Symbol of Access.,{'ID': '62_Finnish_Accessibility'},The facilities suitable for persons with mobility and functional impairment shall be marked with the International Symbol of Access.,necessity,annotated +4fc3b5b1-a838-4429-b385-d8e80e6633eb_11,,,"In the absence of relevant harmonised European Standards, products with a facade area exceeding 20 must have a product certificate issued by a Notified Body.",greater,synthetic +ec2e84a5-89bc-4c16-9a55-1965efd13981,"Wall insulation should be installed to the top of the wall plate; in some places, such as the eaves, this may be above the cavity closure or barrier.",{'ID': '167_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Wall insulation should be installed to the top of the wall plate; in some places, such as the eaves, this may be above the cavity closure or barrier.",selection,annotated +536b172d-ccd1-479a-8136-6ee05db0f264,"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",{'ID': '205_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",greater-equal,annotated +d0b6759e-deec-451d-bd7a-ec65b96048be_11,,,"extract air of speed 20 degrees Celsius shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",equal,synthetic +86350df0-a40e-412b-a301-004524d56736_0,,,"For wet heating systems in new dwellings with a design value of E 15 or greater, a minimum of two independently controlled heating circuits should be provided.",greater-equal,synthetic +d04d6702-5170-4b50-9bda-7367a24e9322,"NOTE: The network distribution point could be in a cabinet, a box mounted on a wall or on a telegraph pole.",{'ID': '5_UK_DocR_V1_InfrastructureForElectircalCommunications'},"NOTE: The network distribution point could be in a cabinet, a box mounted on a wall or on a telegraph pole.",necessity,annotated +4abb3268-3ba6-47e8-a8b7-4676dbaa9a16_5,,,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear total cost of 90mm, except in doorways.",equal,synthetic +33d3a432-5793-4102-ba93-da485c334abd,The termination points of cable duct should be sited where access to maintain in future is unrestricted.,{'ID': '113_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The termination points of cable duct should be sited where access to maintain in future is unrestricted.,necessity,annotated +d342429e-d3fc-46e0-a195-527cfef1fd4b_11,,,"When an existing building with a total useful access of over 1.2W/(m2K) is being extended or the habitable area is being increased, consequential improvements should be installed.",greater,synthetic +8aa4b706-1659-4e30-a4fe-e7f33efe3241_2,,,All five commercial part of the compliance checklist should be completed.,equal,synthetic +ed2cca4a-50f7-470d-9752-dd8722385a24,"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",{'ID': '80_Finnish_SafetyOfUse'},"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",selection,annotated +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_7,,,"Where the work concerns a building containing more than eight per cent Controls, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater,synthetic +eefe1191-2903-4fb8-9138-6471e09fb67d_4,,,The Level differences exceeds 10 at 11pm.,greater,synthetic +1320873f-de9b-4c55-a7c0-67f545c4a46e,"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",{'ID': '42_UK_DocM_V2_AccessAndUseOfBuildings'},"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",selection,annotated +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",part-of,annotated +835d8fad-7a27-4299-aa38-a5b1771a6779,"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",{'ID': '178_UK_DocM_V2_AccessAndUseOfBuildings'},"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",selection,annotated +2f815a08-db3c-48a6-b248-d69aeac870ee_1,,,"the vertical steps is: a. not more than EI 30, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",less-equal,synthetic +b5d2186d-338d-40b6-b3b4-7fadf3cfd4e0,"For district cooling schemes, the CO2 and primary energy content of the cooling energy supplied should be calculated.",{'ID': '286_UK_DocM_V2_AccessAndUseOfBuildings'},"For district cooling schemes, the CO2 and primary energy content of the cooling energy supplied should be calculated.",part-of,annotated +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_0,,,"If the side edges of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds EI 15 of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater,synthetic +3724fd47-22f7-432c-81a2-1abcb95c7df2_4,,,"The that installed in a dwellings habitable rooms and kitchens should be no fewer than 44mm, except in one bedroom properties, where there should be no fewer than four.",greater-equal,synthetic +ec381965-2539-4bd6-9260-e667b4746a3a,To reduce the risks to the health of persons in buildings formaldehyde fumes given off by urea formaldehyde foams should not penetrate to occupied parts of buildings to an extent which would give rise to an irritant concentration.,{'ID': '4_UK_DocD_ToxicSubstances'},To reduce the risks to the health of persons in buildings formaldehyde fumes given off by urea formaldehyde foams should not penetrate to occupied parts of buildings to an extent which would give rise to an irritant concentration.,selection,annotated +5fa7daca-cb50-4397-a736-617e52d30187_6,,,"If breaking at below 30% are required and unavailable, the heat exchanger area may be taken as equal to that at 30% load.",equal,synthetic +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",part-of,annotated +06c2e0f7-69c8-47ec-bf31-9902ae9df7cf,"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",{'ID': '109_UK_DocK_ProtectionFromFalling'},"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",necessity,annotated +20518e80-6f7e-457f-8c5a-59fa4c0eb324,"When calculating the heat loss for a buildings design solution, the design value shall be used as the value of the air leakage rate figure for the building envelope.",{'ID': '137_Finnish_EnergyEfficiency'},"When calculating the heat loss for a buildings design solution, the design value shall be used as the value of the air leakage rate figure for the building envelope.",equal,annotated +868ad193-b0d2-47b9-9fe0-ded5b761d3b0,The integrity of the water system shall be ensured with pressure testing using water.,{'ID': '106_Finnish_Health-WaterAndSewerage'},The integrity of the water system shall be ensured with pressure testing using water.,necessity,annotated +793cb939-b3d9-46eb-ae65-71a4d5c8031b_3,,,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be side to 200 millimetres.,less-equal,synthetic +4ee66fa0-9dcc-4332-b001-f1aec49d9af9,It should be recognised that there is the danger where adjacent spaces each have an induction loop system that the signals may overlap.,{'ID': '154_UK_DocM_V2_AccessAndUseOfBuildings'},It should be recognised that there is the danger where adjacent spaces each have an induction loop system that the signals may overlap.,none,annotated +bfdf95da-d422-47cd-83d7-a30a4969f2e6_1,,,"If the internal ties must be centred on the supporting line, the minimum value of the service, 10m, will also be applied to internal ties.",greater-equal,synthetic +70292367-f940-4ca6-b35f-b47bd4e66cd3,Cable routes must still be provided for a minimum of one in five parking spaces.,{'ID': '71_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Cable routes must still be provided for a minimum of one in five parking spaces.,selection,annotated +8805ec9f-3f5f-44fc-9078-3ae62439c973,"NOTE: When a single U-value is calculated for a product range of doors, the configuration of the door chosen for the calculation should be the worst performing in the product range.",{'ID': '108_UK_DocL_V1_ConsrvationOfFuelAndPower'},"NOTE: When a single U-value is calculated for a product range of doors, the configuration of the door chosen for the calculation should be the worst performing in the product range.",none,annotated +21d5baaf-1c54-43ac-ac3e-992c5fa20f10,Units should be draught-proofed.,{'ID': '418_UK_DocL_V1_ConsrvationOfFuelAndPower'},Units should be draught-proofed.,necessity,annotated +d925c189-860a-4fcb-ae88-d1cf8cc14fb8_1,,,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the primary energy content may be no more than 0.15m/s.",less-equal,synthetic +525aa713-65e1-4368-a6f4-38f628be7fed,"in clothes shops, the dimensions and fittings recommended for an individual changing cubicle in a sports building should be provided.",{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},"in clothes shops, the dimensions and fittings recommended for an individual changing cubicle in a sports building should be provided.",part-of,annotated +cf35d4a4-3170-421b-9be1-b68d928eed1d_6,,,"A roof with a directions greater than 0.5 kN/m2 must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",greater,synthetic +339fc78c-a2f2-481c-a410-3aeb41e24b8a_2,,,Solid walls constructed of coursed brickwork or blockwork should be at least as steps as 300mm of the storey height.,greater-equal,synthetic +d0927095-9e43-4ce4-a740-d5df69dc1dc3_6,,,"If the air flows of both sides three and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +0da52584-1b37-48b5-840f-3795ae695275_5,,,the minimum clear dimensions of the platform are: 50 m shape and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +0cfe8c0e-45e4-4c4c-bf9b-906e26e28c75,"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",{'ID': '43_UK_DocM_V2_AccessAndUseOfBuildings'},"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",selection,annotated +cc72106e-9e7f-47cf-8a95-0173a8305dad_2,,,"In a new building, the crawl space differences must be 2.4m on average at the minimum.",greater-equal,synthetic +569c7958-b7d6-4b9c-9dd9-13307e95e59b_4,,,"For ducted systems that are served by fans with a continuity greater than 21 C, ductwork leakage tests should be carried out.",greater,synthetic +563cd5fb-adc9-4bde-8b34-4accc93ac84b,"Systems should not be significantly oversized in most circumstances, the cooling appliance should not be sized for more than 120 of the design cooling load.",{'ID': '331_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Systems should not be significantly oversized in most circumstances, the cooling appliance should not be sized for more than 120 of the design cooling load.",part-of,annotated +4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9,"In spaces intended for more than 60 persons, the width of the access route must be at least 1,200 millimetres.",{'ID': '116_Finnish_SafetyOfUse'},"In spaces intended for more than 60 persons, the width of the access route must be at least 1,200 millimetres.",none,annotated +316c89ee-aa42-4e7a-9372-960cf25b3265,Extract ventilation may be by natural means or by mechanical means (e.g. by an extract fan or acentral system).,{'ID': '105_UK_DocF_V2_Ventilation'},Extract ventilation may be by natural means or by mechanical means (e.g. by an extract fan or acentral system).,necessity,annotated +88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",none,annotated +8efb6108-e49e-4d64-a1e4-22e3f9128b17_3,,,"When calculating the reference heat loss of a building, the value of 0.7W/(m2K) shall be used as the tie force for the air leakage rate figure for the building envelope.",equal,synthetic +cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",necessity,annotated +fac44f87-4eb9-4f56-998c-74efa9512309,"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",{'ID': '106_Finnish_Health-Humidity'},"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",necessity,annotated +39a37d5e-3361-43b9-a209-e5cd45918abc,"For mixed-use buildings which have parking spaces within a covered car park, any requirements to install electric vehicle charge points or cable routes must first be applied to those parking spaces outside the covered car park.",{'ID': '95_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"For mixed-use buildings which have parking spaces within a covered car park, any requirements to install electric vehicle charge points or cable routes must first be applied to those parking spaces outside the covered car park.",necessity,annotated +53e31e26-a39b-4047-a86e-bdb8021413e8,Window handles on windows that open outwards are not more than 650mm from the inside face of the wall when the window is at its maximum openable angle.,{'ID': '84_UK_DocO_Overheating'},Window handles on windows that open outwards are not more than 650mm from the inside face of the wall when the window is at its maximum openable angle.,selection,annotated +8fec1c4a-527e-49b6-9267-89ff700a9291,"Where membranes are penetrated, careful detailing should be used to achieve a robust and durable seal at these penetrations.",{'ID': '182_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where membranes are penetrated, careful detailing should be used to achieve a robust and durable seal at these penetrations.",selection,annotated +d504fd87-d13d-4936-9d7a-71d17954760d_8,,,The rated speed of the steps in an exit may be no more than 1.2W/(m2K).,less-equal,synthetic +aa7c5790-2189-451d-bd0e-956a257a7b6d,"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",{'ID': '201_UK_DocL_V1_ConsrvationOfFuelAndPower'},"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",selection,annotated +2c725d50-13d5-4e77-bacf-9f174530e27c,The energy efficiency of historic and traditional buildings should be improved only if doing so will not cause long-term deterioration of the buildings fabric or fittings.,{'ID': '17_UK_DocM_V2_AccessAndUseOfBuildings'},The energy efficiency of historic and traditional buildings should be improved only if doing so will not cause long-term deterioration of the buildings fabric or fittings.,selection,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",part-of,annotated +2f815a08-db3c-48a6-b248-d69aeac870ee_2,,,"the vertical gradients is: a. not more than four, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",less-equal,synthetic +c7035b48-7244-40a9-a70e-1d244caf72ac,"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",{'ID': '56_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",selection,annotated +8b7e8e7e-81dd-4a76-bdd3-8269ac00f74b,The system can be overridden by a door reactivating device that relies on appropriate electronic methods (but not a door edge pressure system); provided that the lift door remains fully open for at least three seconds.,{'ID': '24_UK_DocM_V1_AccessAndUseOfBuildings'},The system can be overridden by a door reactivating device that relies on appropriate electronic methods (but not a door edge pressure system); provided that the lift door remains fully open for at least three seconds.,necessity,annotated +fb5d3054-4911-4049-ba09-1c3e80f9c07c_5,,,"The maintained of steps in uncovered or unheated outdoor staircases must be no less than adequate means, and the riser may be no more than 130 millimetres.",greater-equal,synthetic +993e54cc-49c3-43cb-995e-1a951c93c775_8,,,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an service equal to 1.",equal,synthetic +fac44f87-4eb9-4f56-998c-74efa9512309,"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",{'ID': '106_Finnish_Health-Humidity'},"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",none,annotated +10b37d1a-a0b5-4dfb-8bcc-39317d144580,"On variable volume systems, variable speed glandless circulators should be used.",{'ID': '289_UK_DocM_V2_AccessAndUseOfBuildings'},"On variable volume systems, variable speed glandless circulators should be used.",selection,annotated +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_10,,,"Skirtings totalling up to 2,100 millimetres vertical spacing and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.",less-equal,synthetic +c0a6d35c-cc20-428b-941d-c3e3e6365c74_0,,,"In a tier that is uninterrupted by cross-gangways, and where the structure exceeds 1,200 MJ/m2, use a maximum number of steps of 40.",greater,synthetic +5925ca4d-801c-42e4-b581-a176dea2519f,"If thermal energy is supplied from a district heat network, a CO2 emission factor and primary energy factor for the heat delivered to the dwelling by the district heat network should be calculated.",{'ID': '76_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If thermal energy is supplied from a district heat network, a CO2 emission factor and primary energy factor for the heat delivered to the dwelling by the district heat network should be calculated.",selection,annotated +339fc78c-a2f2-481c-a410-3aeb41e24b8a,Solid walls constructed of coursed brickwork or blockwork should be at least as thick as 1/16 of the storey height.,{'ID': '32_UK_DocA_Structure'},Solid walls constructed of coursed brickwork or blockwork should be at least as thick as 1/16 of the storey height.,greater-equal,annotated +09b2a395-5293-4b7d-82d4-5312482d59e9_5,,,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 0.15m/s flushing from any projecting corner.",greater-equal,synthetic +8e5e9560-4b22-4fe0-ad86-e52b82ffe4d2,"When calculating the energy consumption of a buildings cooling system, the energy consumption of cooling energy production and the electrical energy consumption of auxiliary units shall be taken into account where the use of the systems is required for indoor temperature control.",{'ID': '111_Finnish_EnergyEfficiency'},"When calculating the energy consumption of a buildings cooling system, the energy consumption of cooling energy production and the electrical energy consumption of auxiliary units shall be taken into account where the use of the systems is required for indoor temperature control.",none,annotated +eeb4239f-3819-475c-ad20-756bed80c4ff_6,,,"In reference heat loss calculations, the value used as the number of wall ties per square metre of the buildings ventilation system shall be E.",equal,synthetic +d796dece-45f6-4527-a151-c59b007e9028,"A safe and marked access route must be reserved for pedestrians in connection with vehicle traffic and goods transport routes, doors and gates in the yards of buildings other than single-family houses, if pedestrian traffic through them is necessary.",{'ID': '132_Finnish_SafetyOfUse'},"A safe and marked access route must be reserved for pedestrians in connection with vehicle traffic and goods transport routes, doors and gates in the yards of buildings other than single-family houses, if pedestrian traffic through them is necessary.",selection,annotated +e8340500-38b6-461b-b00d-d3aa44ac1f0b_9,,,The flow rate of the water available from the hot water system may not exceed 20 millimetres.,less-equal,synthetic +a43037b0-8e35-45a2-9f23-c2d65f6c5a64,"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",{'ID': '8_UK_DocQ_Security_Dwellings'},"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",part-of,annotated +a0c838b5-5fe2-4b52-abe1-432804c2c8aa_5,,,A water temperature of 21 C shall be used as the extends for room temperature during the heating season.,equal,synthetic +536b172d-ccd1-479a-8136-6ee05db0f264_9,,,"Where pipework is above ground, the performance of the pipe flight should be at least as high as the air extract rate of pipework in the buried part of the system.",greater-equal,synthetic +5577528f-8fa0-4ca3-96f6-ea418091cb86,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,{'ID': '32_Finnish_SafetyOfUse'},The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,necessity,annotated +34a524ec-6994-426f-86af-78788fd34a80_1,,,"Between the locking points for the mortice lock and surface-mounted rim lock, the Leakage should be 120.",equal,synthetic +bb3ac5b0-14d0-4d75-95d9-713adc6f2f58,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",{'ID': '433_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",none,annotated +85745724-aa09-4cdd-ad17-3c50ea2b99a1,"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",{'ID': '105_UK_DocM_V1_AccessAndUseOfBuildings'},"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",necessity,annotated +4a82f789-a98a-4379-9b81-2a20cfba6c87_9,,,"If the internal ties must be centred on the supporting line, the minimum value of the standard thickness, 0.136kgCO2/kWh, will also be applied to internal ties.",greater-equal,synthetic +a9cea98b-d439-4930-a991-fc17eee6657c,the location of the electric vehicle charge point or future connection location should be suitable for use by electric vehicles with charging inlets in different places.,{'ID': '102_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},the location of the electric vehicle charge point or future connection location should be suitable for use by electric vehicles with charging inlets in different places.,necessity,annotated +1ebce0c9-705c-47ee-8429-e83cfbed72db,"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",{'ID': '103_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",part-of,annotated +6414854d-01f9-481f-a7f4-c4581e48d8b1_11,,,Special safety features are not necessary if the induction loop is not more than one long.,less-equal,synthetic +7f696221-52c9-4c52-8f90-74bd93c51299_5,,,This grippable handrail is 850-1000mm above the pitch line of the flight and emission rate at least 900mm beyond the top and bottom nosings.,greater-equal,synthetic +23cff3c3-1251-4c5f-9fd9-8f52d25eb494_11,,,Gasfired boilers and multi-stage oilfired boilers with an locations of more than 5m should have fully modulating burner controls.,greater,synthetic +922bf8df-3a70-4f45-8c04-200b638d3b3c_8,,,The cold water pipe shall be designed and installed so that the safety features in the cold water system may not exceed 40.,less-equal,synthetic +6c789809-b1b8-429a-8fe2-8ce16f8a4b54_1,,,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the standards does not exceed 3.,less-equal,synthetic +302c413e-fefd-47f1-914f-0dc787e4a761_9,,,"Where heat emission capacity on surfaces is greater than 24 metres, a difference in light reflectance value should be a minimum of 20 points.",greater,synthetic +8364a5f1-f80e-484c-9f38-bffc6f4c1876,"Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",{'ID': '44_UK_DocM_V1_AccessAndUseOfBuildings'},"Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",selection,annotated +d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",selection,annotated +500fc416-e652-4a2c-8dd3-8d9754ea1829,There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,{'ID': '115_UK_DocF_V2_Ventilation'},There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,none,annotated +fb5d3054-4911-4049-ba09-1c3e80f9c07c,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",{'ID': '29_Finnish_SafetyOfUse'},"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",greater-equal,annotated +05fdde92-d8af-42ad-963b-9019c69a8ab3_11,,,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same number of occupants as the structural elements used in the external wall should be included within the depth of the intermediate floor structure.",equal,synthetic +7e369e4c-7768-4a7a-bd9c-41e2aa037b43,The air flows shall be designed so that the average carbon monoxide concentration in a parking garage for motor vehicles during the hour of use assessed as the most critical does not exceed 35 mg/m3 (30 ppm).,{'ID': '61_Finnish_Health-IndoorClimateAndVentilation'},The air flows shall be designed so that the average carbon monoxide concentration in a parking garage for motor vehicles during the hour of use assessed as the most critical does not exceed 35 mg/m3 (30 ppm).,part-of,annotated +5fa7daca-cb50-4397-a736-617e52d30187_2,,,"If efficiencies at below 30% are required and unavailable, the total minimum width may be taken as equal to that at 400-600mm.",equal,synthetic +6d9a1e8e-6fe7-4234-951a-96fdc4598bd7_2,,,"If parking spaces are provided for a building, an adequate number of building, but at least 90, shall be intended for the use of a person with mobility and functional impairment.",greater-equal,synthetic +15c28729-22a9-4992-b43a-bdcf457c0526,"Both before and after a newly constructed building is built, a notice must be given to the building control body of the calculations.",{'ID': '45_UK_DocM_V2_AccessAndUseOfBuildings'},"Both before and after a newly constructed building is built, a notice must be given to the building control body of the calculations.",selection,annotated +19478a13-7457-4dd3-a394-744f826db7b0_8,,,"The handle to at least A Areas in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",greater-equal,synthetic +37239af2-8f49-499f-ab25-73f92d7c9369,Each letter should be 25mm high.,{'ID': '117_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Each letter should be 25mm high.,selection,annotated +28c47652-47a0-4fa4-8343-beee0af2691c,"Large roof surfaces must be divided into parts of no more than 2,400 square metres.",{'ID': '181_Finnish_FireSafety'},"Large roof surfaces must be divided into parts of no more than 2,400 square metres.",part-of,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_4,,,"If the air flows of measures 30% load and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",selection,annotated +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_11,,,"Where the air flow resistance of installing only cable routes is more than 0.3W/m2 of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",greater,synthetic +a235c68f-ae44-4770-b005-4e9d7b659eb7_2,,,All cavity walls should have leaves at least 180kW constraints and cavities at least 50mm wide.,greater-equal,synthetic +0096a3bf-ac16-4a75-adf9-8c3f4a9b8610_9,,,The smaller U-values of each panel which can be either the width or height of the panel should be 650mm or less.,less-equal,synthetic +c384013b-c40f-4925-acbe-465e1ca5bc13,One photograph per detail should be recorded.,{'ID': '480_UK_DocL_V1_ConsrvationOfFuelAndPower'},One photograph per detail should be recorded.,equal,annotated +72e7ed0c-9e73-46b2-a919-20f3fea337fd,"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",{'ID': '56_Finnish_FireSafety'},"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",none,annotated +76bf63bd-30f4-440d-81a0-61ca16170f70_3,,,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the results is less than 20 millimetres of the total load.,less,synthetic +3153d771-404e-4a54-ac05-ed1b75e37506_0,,,"Gangways should not be less than 1100mm floor area unless used by not more than 50 persons, in which case gangways should be a minimum of 50mm.",greater-equal,synthetic +bb9ec292-062b-43c3-8590-856dd5f6b890_3,,,"The building primary energy rate and termination points calculated using the measured air permeability must not be higher than the target primary energy rate and level with entry, respectively.",less-equal,synthetic +df09194e-2fe6-4007-b6c1-1a7383f1baba,"Generally, gradients within the approach should be as gentle as possible.",{'ID': '40_UK_DocM_V2_AccessAndUseOfBuildings'},"Generally, gradients within the approach should be as gentle as possible.",selection,annotated +f505cec8-d1a6-41ae-b2ba-68ac19f64be2,"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",{'ID': '137_UK_DocM_V2_AccessAndUseOfBuildings'},"If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness glazing should be shown to meet the required standard.",selection,annotated +e505b13c-7b62-4857-aa2d-544dc986e9c0_4,,,"For dwellings, for external tapered steps and stairs that are part of the building the thermal integrity of each step should be a minimum of 14 metres.",greater-equal,synthetic +b5aa20f2-571e-48d8-9943-4102c9f9bd1a,"In exit passageways and fire-compartmented elevator shafts, means must be arranged for both smoke extraction and flow of replacement air.",{'ID': '250_Finnish_FireSafety'},"In exit passageways and fire-compartmented elevator shafts, means must be arranged for both smoke extraction and flow of replacement air.",necessity,annotated +984c252b-74f4-4d85-9080-1c8ae1851eca,"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",{'ID': '113_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",none,annotated +d0f0d416-a728-4d23-965e-10ff6559f2d8,All users including wheelchair users should be able to reach and use the controls that summon and direct the lifting platform.,{'ID': '113_UK_DocM_V2_AccessAndUseOfBuildings'},All users including wheelchair users should be able to reach and use the controls that summon and direct the lifting platform.,part-of,annotated +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_0,,,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 90mm in patterns, these must be accessible via the interior.",greater,synthetic +9b594ead-759a-420d-8d1c-52f007daaca4,"Each office should have the means to provide purge ventilation, to reduce pollutants before the office space is occupied or after activities such as painting.",{'ID': '56_UK_DocF_V2_Ventilation'},"Each office should have the means to provide purge ventilation, to reduce pollutants before the office space is occupied or after activities such as painting.",necessity,annotated +0aaf71f0-a482-4a72-a407-0d6db79c7f6f,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",{'ID': '69_Finnish_FireSafety'},"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",selection,annotated +ed2cca4a-50f7-470d-9752-dd8722385a24,"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",{'ID': '80_Finnish_SafetyOfUse'},"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",part-of,annotated +ff3e8f86-1542-4f54-a776-cfdc8482bad7_3,,,The level differences of an air conditioner working in cooling mode should be a minimum of 55.,greater-equal,synthetic +f9de28ac-45bb-4400-9d9f-8afee73bd2e3_8,,,The design solar load should not exceed two of dwelling floor area.,less-equal,synthetic +d178dd92-6cf3-4f68-a9ba-44b97d74204a,"Staircases must be safe, sufficiently spacious and suitable for their purpose.",{'ID': '13_Finnish_SafetyOfUse'},"Staircases must be safe, sufficiently spacious and suitable for their purpose.",necessity,annotated +8aa4b706-1659-4e30-a4fe-e7f33efe3241_6,,,All A restrictors of the compliance checklist should be completed.,equal,synthetic +34a524ec-6994-426f-86af-78788fd34a80_4,,,"Between the locking points for the mortice lock and surface-mounted rim lock, the size should be 230mm.",equal,synthetic +13a437c0-918c-47f2-85bd-b80dd69eb027_6,,,"There are no air extract rate on the Extract of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",not-part-of,synthetic +0638f810-16d0-4670-8870-4e7c78c5371f,Insulated cavity closers should be installed where appropriate.,{'ID': '419_UK_DocL_V1_ConsrvationOfFuelAndPower'},Insulated cavity closers should be installed where appropriate.,selection,annotated +e874f337-2067-4e77-ad32-c3b857f40e7a,"If the number of occupants exceeds 120, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",{'ID': '219_Finnish_FireSafety'},"If the number of occupants exceeds 120, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",necessity,annotated +d713514a-9398-45a2-9584-efecff6ebcc5,Reasonable provision must be made to resist unauthorised access to (a) any dwelling; and (b) any part of a building from which access can be gained to a flat within the building.,{'ID': '4_UK_DocQ_Security_Dwellings'},Reasonable provision must be made to resist unauthorised access to (a) any dwelling; and (b) any part of a building from which access can be gained to a flat within the building.,necessity,annotated +079db365-cfed-474e-9329-25349ac0db4a,"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",{'ID': '21_Finnish_Accessibility'},"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",selection,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479_9,,,Individual flights are: for gradients up to 1:15 not more than 6mm standard thickness; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic +20518e80-6f7e-457f-8c5a-59fa4c0eb324_3,,,"When calculating the heat loss for a buildings design solution, the deep shall be used as the value of the clear width for the building envelope.",equal,synthetic +f5a71c7b-e852-40f2-8f88-91cda7902a7e,"If a new building has a space heating or airconditioning system with an effective rated output greater than 180kW, a building automation and control system should be installed.",{'ID': '319_UK_DocM_V2_AccessAndUseOfBuildings'},"If a new building has a space heating or airconditioning system with an effective rated output greater than 180kW, a building automation and control system should be installed.",greater,annotated +a387fcb8-ead2-4094-9be9-72d783468b33_10,,,"If the open outwards of windows, roof windows, rooflights and doors exceeds 200 m2 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",greater,synthetic +74002ed3-548e-4e2f-8835-be76e643c67d_11,,,NOTE 2: Double doors effectively provide nibs where each leaf is at least 20 millimetres locations.,greater-equal,synthetic +50e89a86-e2be-439d-b230-79274cd7199b,Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,{'ID': '81_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,none,annotated +656aa2fa-18cb-41ee-ae28-28deb3dffcc3,The water temperature of the water in the hot water system shall be at least 55 degrees Celsius and available from the hot water plumbing fixture within 20 seconds.,{'ID': '61_Finnish_Health-WaterAndSewerage'},The water temperature of the water in the hot water system shall be at least 55 degrees Celsius and available from the hot water plumbing fixture within 20 seconds.,greater-equal,annotated +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_4,,,Skirtings totalling up to 65mm inner surfaces and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,less-equal,synthetic +a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",part-of,annotated +113b8bf8-1856-45f5-a54b-d65ef100b437_2,,,"If a gas-fired combination boiler is installed in an existing dwelling, at least 7 mg/m3 (6 ppm) of the following manufacturers declared efficiencies, appropriate to the system, should be installed.",greater-equal,synthetic +aec8a3e1-5ba0-4288-ab0a-e47b0310ff6a,Capacities should be derived from the combined total of a buildings publicly accessible facilities.,{'ID': '162_UK_DocM_V2_AccessAndUseOfBuildings'},Capacities should be derived from the combined total of a buildings publicly accessible facilities.,necessity,annotated +0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90��° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,annotated +ec2e84a5-89bc-4c16-9a55-1965efd13981,"Wall insulation should be installed to the top of the wall plate; in some places, such as the eaves, this may be above the cavity closure or barrier.",{'ID': '167_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Wall insulation should be installed to the top of the wall plate; in some places, such as the eaves, this may be above the cavity closure or barrier.",necessity,annotated +5fa7daca-cb50-4397-a736-617e52d30187_5,,,"If feasibility of installing high-efficiency alternative systems at below 30% are required and unavailable, the air leakage rate figure may be taken as equal to that at 30% load.",equal,synthetic +5fa7daca-cb50-4397-a736-617e52d30187_1,,,"If outputs at below 30% are required and unavailable, the that may be taken as equal to that at 30% load.",equal,synthetic +b810df40-4dd8-44c4-80c4-b33bb873a5e9,"If the circulation piping is located inside the building envelopes insulation, 25 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '103_Finnish_EnergyEfficiency'},"If the circulation piping is located inside the building envelopes insulation, 25 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",selection,annotated +19478a13-7457-4dd3-a394-744f826db7b0_2,,,"The handle to at least 1.501kWhPE/kWh building owner in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",greater-equal,synthetic +7f3f59a4-fc7e-4b14-8074-384f6cacf548_0,,,"The storage capacity of a barrier in a dwellings indoor areas may, however, be at least 20C if the drop is less than three metres.",greater-equal,synthetic +3724fd47-22f7-432c-81a2-1abcb95c7df2,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",{'ID': '96_UK_DocF_V1_Ventilation'},"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",part-of,annotated +3121fe90-27db-405e-a42a-df3cd22ee176_11,,,"Where necessary, 60cube, one above the other, must be installed in order to take into account children and users of wheelchairs.",equal,synthetic +aaca648c-5f60-4300-a30f-887da252ebd0,The use of visually and acoustically reflective wall surfaces should be minimised within the lifting platform to prevent discomfort for people with visual and hearing impairment.,{'ID': '116_UK_DocM_V2_AccessAndUseOfBuildings'},The use of visually and acoustically reflective wall surfaces should be minimised within the lifting platform to prevent discomfort for people with visual and hearing impairment.,selection,annotated +984c252b-74f4-4d85-9080-1c8ae1851eca_8,,,"If performance requires thicker glass to be used, an equivalent window unit with domestic hot water cylinder heat loss (half a metre) glazing should be shown to meet the required standard.",equal,synthetic +5fa7daca-cb50-4397-a736-617e52d30187_0,,,"If efficiencies at below 30% are required and unavailable, the heat loss may be taken as equal to that at 15.",equal,synthetic +f72a98f3-b7d2-4633-b244-0d7242dfb0c9_7,,,Every single bedroom has a minimum axle group load of 220 millimetres and is at least 2.4m wide.,greater-equal,synthetic +4470dde4-6422-4c13-9781-de68c3e075dc_7,,,"The outdoor rate of heat release of a dwelling unit, however, shall be designed to be a minimum of 55 degrees Celsius.",greater-equal,synthetic +f0c72b35-5a0a-4554-8713-96f6f73a67f1_7,,,A cube with relationship of no more than 01:08:00 may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,less-equal,synthetic +05fdde92-d8af-42ad-963b-9019c69a8ab3_6,,,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same exit as the Refreshment facilities used in the external wall should be included within the depth of the intermediate floor structure.",equal,synthetic +26980508-105c-49db-8595-bf001a48d757_1,,,"In fan with no fixed seats or sign, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic +a4dc06ab-99c3-4c8b-b295-eb3e6a64320a,"The free height from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 2.2 metres, unless the area is protected so as to prevent the danger of collision.",{'ID': '99_Finnish_SafetyOfUse'},"The free height from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 2.2 metres, unless the area is protected so as to prevent the danger of collision.",greater-equal,annotated +fb5d3054-4911-4049-ba09-1c3e80f9c07c_6,,,"The number of appliances of steps in uncovered or unheated outdoor staircases must be no less than 500 millimetres, and the riser may be no more than 130 millimetres.",greater-equal,synthetic +dcc583b1-8c4c-42cf-a1ed-e8907de56254_0,,,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the size must be no less than 65 degrees Celsius.",greater-equal,synthetic +7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88_7,,,The resilient layer should be to the full height of the door and 200 m2 Activation of the doorset.,equal,synthetic +755b768a-b9d0-4175-8b69-398c399aeac7,It should be possible for information about the building to be easily obtained from a reception point or gathered from notice boards and signs.,{'ID': '86_UK_DocM_V2_AccessAndUseOfBuildings'},It should be possible for information about the building to be easily obtained from a reception point or gathered from notice boards and signs.,selection,annotated +7c44934c-61e1-4904-a493-1aa360ccc7d1,"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",{'ID': '1_UK_DocA_Structure'},"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",selection,annotated +2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_2,,,The normal relationship between the number of storeys of the rise and going is: 9mm equals between 550mm and 700mm.,equal,synthetic +d728a9c8-0302-4bd1-b69b-0daeefce30d1,"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",{'ID': '84_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",selection,annotated +710ef992-e187-4b1a-894b-e0e222f54359_4,,,"NOTE: For grid-supplied electricity, a surface temperature of 20 and primary energy factor of 1.501kWhPE/kWh should be used.",equal,synthetic +43e26628-8b62-4cc6-91e2-284335df1564_10,,,"In rooms used for sleeping or rest, the fire igniting may not exceed 20.",less-equal,synthetic +75c60084-6878-472d-8694-e8739e0dd76c_2,,,The width of access routes in assembly areas with a travel of 3 must be at least 900 millimetres.,equal,synthetic +4fc3b5b1-a838-4429-b385-d8e80e6633eb,"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",selection,annotated +33eb3a5a-584f-4d1e-84a0-35fe66954d80,Consideration should be given to the power requirements of essential (e.g. life safety) systems.,{'ID': '323_UK_DocM_V2_AccessAndUseOfBuildings'},Consideration should be given to the power requirements of essential (e.g. life safety) systems.,necessity,annotated +d3e7a947-536e-4a49-9823-e27fc0f68b27,Length of landings to be at least equal to the width of the ramp.,{'ID': '66_UK_DocK_ProtectionFromFalling'},Length of landings to be at least equal to the width of the ramp.,part-of,annotated +db734798-9e42-4fe1-900c-77d4e6131809,"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",{'ID': '11_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",selection,annotated +5b1fe636-d2aa-4382-885e-a4f8a2cae4d4_2,,,"Generally, a thermal element once upgraded should not have a locations greater than 0.15m/s.",less-equal,synthetic +642e2c46-45a8-440f-af0b-1b53f41d8d8f,Taps and WC cubicle doors should be operable by people with limited strength or manual dexterity and doors to cubicles should be capable of being opened if a person has collapsed against them while inside the cubicle.,{'ID': '156_UK_DocM_V2_AccessAndUseOfBuildings'},Taps and WC cubicle doors should be operable by people with limited strength or manual dexterity and doors to cubicles should be capable of being opened if a person has collapsed against them while inside the cubicle.,necessity,annotated +113b8bf8-1856-45f5-a54b-d65ef100b437_0,,,"If a gas-fired combination boiler is installed in an existing dwelling, at least two years of the following prevailing wind direction, appropriate to the system, should be installed.",greater-equal,synthetic +10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,necessity,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_3,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the automatic flow adjustment of these must be at least 3.3m.",greater-equal,synthetic +76acc6bd-50c0-4f3f-b015-42e171ec6ce7_1,,,390 millimetres baby changing facilities must be installed.,equal,synthetic +a1f91cfd-21f8-49a4-8468-746f49f4848e_8,,,"For a building that contains more than 60 playgrounds for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",greater,synthetic +33206aa7-1092-4ab9-9534-8e8e16e72d1b,The storm water system shall be cleansable via manholes and fittings.,{'ID': '165_Finnish_Health-WaterAndSewerage'},The storm water system shall be cleansable via manholes and fittings.,necessity,annotated +9027959e-efc1-4d32-acbe-e0775d40f001,"The morticed bolts should have a minimum projection of 20mm, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",{'ID': '38_UK_DocQ_Security_Dwellings'},"The morticed bolts should have a minimum projection of 20mm, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",necessity,annotated +10b2bf58-18df-46ee-a766-ed11eec6f42b,"Humus soil, organic substances decomposing or rotting from moisture or building waste must not be left under new buildings, in their crawl spaces and in their gravel backfills functioning as a drainage layer.",{'ID': '45_Finnish_Health-Humidity'},"Humus soil, organic substances decomposing or rotting from moisture or building waste must not be left under new buildings, in their crawl spaces and in their gravel backfills functioning as a drainage layer.",selection,annotated +a68b404d-d10a-4e48-b25b-907261271e75,Voids between insulation at the top of the external wall and the cavity wall/timber frame insulation should be fully filled with insulation.,{'ID': '171_UK_DocL_V1_ConsrvationOfFuelAndPower'},Voids between insulation at the top of the external wall and the cavity wall/timber frame insulation should be fully filled with insulation.,selection,annotated +33ed3038-99a6-4b2d-906a-a1db21f2d898,"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",{'ID': '250_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",part-of,annotated +8364a5f1-f80e-484c-9f38-bffc6f4c1876_3,,,"Where communal parking is provided to blocks of flats, at least 0.3 standard sign is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",greater-equal,synthetic +aca1acce-65c1-4677-a979-ce2920457a55,The surface of stairs the must not be slippery.,{'ID': '14_Finnish_SafetyOfUse'},The surface of stairs the must not be slippery.,part-of,annotated +c2e0629d-350b-45b8-9e9e-d58be1780f12_3,,,"If the bath has no they, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",not-part-of,synthetic +99a53f17-48cb-4012-a47b-700761e0983b_7,,,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) 1.2W/(m2K) of those Glazing must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,equal,synthetic +46f5be2a-1514-420b-bc39-331fc6e0d2df,"The dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and target fabric energy efficiency rate, respectively.",{'ID': '356_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,annotated +df24d65a-425f-4ddd-b3aa-0ae34be4b0c1,Beading should be mechanically fixed and glued in position.,{'ID': '32_UK_DocQ_Security_Dwellings'},Beading should be mechanically fixed and glued in position.,necessity,annotated +bdfc74e0-24b2-41e2-be4e-6cab13de421f,The test data should be certified by a notified body.,{'ID': '222_UK_DocL_V1_ConsrvationOfFuelAndPower'},The test data should be certified by a notified body.,necessity,annotated +d342429e-d3fc-46e0-a195-527cfef1fd4b_7,,,"When an existing building with a total useful target fabric energy efficiency rate of over 400 millimetres is being extended or the habitable area is being increased, consequential improvements should be installed.",greater,synthetic +fc54cd23-e216-4f59-b1b6-35ec47a83a4a,Test data must be from a minimum of five in-situ measurements of the same module types and link details as used in the actual building.,{'ID': '351_UK_DocM_V2_AccessAndUseOfBuildings'},Test data must be from a minimum of five in-situ measurements of the same module types and link details as used in the actual building.,necessity,annotated +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated +ef561e39-db90-462c-8dde-15fbeae954e5_6,,,A cube with U-values of no more than 2.4m may pass between the upper edge of the barrier and the protective part.,less-equal,synthetic +1d18f0c9-31e5-43ee-8f16-e4fa607c5cd9,"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",{'ID': '51_UK_DocM_V2_AccessAndUseOfBuildings'},"The same approved calculation tool must be used to calculate the target primary energy rate, the target emission rate, the building primary energy rate and the building emission rate.",none,annotated +d0b6759e-deec-451d-bd7a-ec65b96048be,"extract air of category 3 shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",{'ID': '130_Finnish_Health-IndoorClimateAndVentilation'},"extract air of category 3 shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",necessity,annotated +5ba5ffe7-ece8-488a-b461-da66237e7888,"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",{'ID': '54_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",none,annotated +9f8c2fbb-a04e-42f9-8fa0-b7a905dbafa0,"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",{'ID': '40_Finnish_Health-Humidity'},"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",necessity,annotated +b63dcef6-1840-4e9e-ad51-f8fc481fe856_2,,,"The wall ties should have a horizontal spacing of 900mm and a level differences of 5m, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",necessity,annotated +26980508-105c-49db-8595-bf001a48d757_3,,,"In cable duct with no fixed seats or schools, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic +d0927095-9e43-4ce4-a740-d5df69dc1dc3_10,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and impact 0.055555556 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +d7b27bbb-ac51-4036-8073-d094cbe994db,"In cases where the Energy Related Products Regulations and the Building Regulations both apply, both standards should be met.",{'ID': '232_UK_DocM_V2_AccessAndUseOfBuildings'},"In cases where the Energy Related Products Regulations and the Building Regulations both apply, both standards should be met.",selection,annotated +6c789809-b1b8-429a-8fe2-8ce16f8a4b54,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,{'ID': '62_Finnish_Health-IndoorClimateAndVentilation'},Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,none,annotated +dcc583b1-8c4c-42cf-a1ed-e8907de56254,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",{'ID': '23_Finnish_SafetyOfUse'},"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",greater-equal,annotated +c0abe869-e87e-4e66-a8ca-8578a338b07a,"Where a building automation and control system is installed, its control capabilities should be appropriate for the building, its expected usage and the building services specification.",{'ID': '329_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a building automation and control system is installed, its control capabilities should be appropriate for the building, its expected usage and the building services specification.",selection,annotated +c06bb553-d8f1-47f5-ab33-cfdebb6bca52,"When a building undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"When a building undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",selection,annotated +536b172d-ccd1-479a-8136-6ee05db0f264_10,,,"Where pipework is above ground, the performance of the pipe fasteners should be at least as high as the allowance of pipework in the buried part of the system.",greater-equal,synthetic +d925c189-860a-4fcb-ae88-d1cf8cc14fb8_7,,,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the intended purpose may be no more than 15 degrees.",less-equal,synthetic +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_9,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 50 m2 in sum and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic +2f75848b-a39a-41d3-a6bf-25ef1154bcff,"Where appropriate, these should be automated (with manual override) so that energy savings are maximised.",{'ID': '322_UK_DocM_V2_AccessAndUseOfBuildings'},"Where appropriate, these should be automated (with manual override) so that energy savings are maximised.",selection,annotated +cea6e7bd-c494-4146-9f81-3fd2ed64a2a6_9,,,The total combined window area of the floor surface in the seating area and access route may not exceed 15mm.,less-equal,synthetic +d34c0f60-8df0-4310-b5af-428c63225a6f,"After a period of non-use of at least eight hours, the water temperature may not exceed 24 degrees Celsius.",{'ID': '60_Finnish_Health-WaterAndSewerage'},"After a period of non-use of at least eight hours, the water temperature may not exceed 24 degrees Celsius.",part-of,annotated +9f5fe460-cae1-4653-a951-38e31f3ed15d,"Any restrictors placed on windows used as emergency exits must, however, be easily releasable by an adult.",{'ID': '81_Finnish_SafetyOfUse'},"Any restrictors placed on windows used as emergency exits must, however, be easily releasable by an adult.",selection,annotated +fc29901a-8b5e-48a5-a569-bed57699cf72,Moisture from the foundation wall and the base floors concrete slab must not transfer harmfully to the wooden sole plates or upper wall and floor structures.,{'ID': '89_Finnish_Health-Humidity'},Moisture from the foundation wall and the base floors concrete slab must not transfer harmfully to the wooden sole plates or upper wall and floor structures.,necessity,annotated +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_0,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be heat loss ten millimetres.",equal,synthetic +cccbc1ea-27be-4d7b-b53c-3cb467a51020,"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",{'ID': '220_UK_DocM_V2_AccessAndUseOfBuildings'},"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",part-of,annotated +5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",selection,annotated +5ed671ca-0cd0-47e2-ad68-1d910e5ddbdf,The access route in the seating area or standing auditorium must be directly accessible from the end of each row.,{'ID': '114_Finnish_SafetyOfUse'},The access route in the seating area or standing auditorium must be directly accessible from the end of each row.,part-of,annotated +563cd5fb-adc9-4bde-8b34-4accc93ac84b,"Systems should not be significantly oversized in most circumstances, the cooling appliance should not be sized for more than 120 of the design cooling load.",{'ID': '331_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Systems should not be significantly oversized in most circumstances, the cooling appliance should not be sized for more than 120 of the design cooling load.",necessity,annotated +63af9f99-6939-4e8c-a6a9-8b10942e1597_10,,,"The handle to at least 2 metres commissioning plan in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",greater-equal,synthetic +ef561e39-db90-462c-8dde-15fbeae954e5_5,,,A cube with steps of no more than 180kW may pass between the upper edge of the barrier and the protective part.,less-equal,synthetic +2af8ee5f-9d05-4023-9365-d093ebdfba1f,"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",{'ID': '168_UK_DocF_V1_Ventilation'},"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",none,annotated +6b2f3ca5-8cea-4616-8679-438446bc6233,"Since doors are potential barriers, their use should be avoided whenever appropriate.",{'ID': '88_UK_DocM_V2_AccessAndUseOfBuildings'},"Since doors are potential barriers, their use should be avoided whenever appropriate.",part-of,annotated +bf798097-bb99-42d0-a73f-8cebab8fbeb8_4,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the Extract must be no less than two persons per square metre.",greater-equal,synthetic +ee0c8c7c-c65e-4403-92e6-628fd680f3bf_8,,,Any panel within the doorset should be at least 1 size.,greater-equal,synthetic +b5aa20f2-571e-48d8-9943-4102c9f9bd1a,"In exit passageways and fire-compartmented elevator shafts, means must be arranged for both smoke extraction and flow of replacement air.",{'ID': '250_Finnish_FireSafety'},"In exit passageways and fire-compartmented elevator shafts, means must be arranged for both smoke extraction and flow of replacement air.",necessity,annotated +2032e456-bf80-4342-90dc-0da164e00a9a,A unit that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,{'ID': '7_UK_DocF_V1_Ventilation'},A unit that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,selection,annotated +b02f9b87-d934-4c2f-8a59-b3b8c0a7be17,"Instantaneous or snapshot CO2 readings can be misleading, so several measurements should be taken throughout the day.",{'ID': '124_UK_DocF_V2_Ventilation'},"Instantaneous or snapshot CO2 readings can be misleading, so several measurements should be taken throughout the day.",necessity,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_3,,,"If the air flows of SEER 220 millimetres and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +88e23b46-22d9-4be6-87b7-40541f7995a9_9,,,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the surface exceeds 0.35W/(m2K); 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",greater,synthetic +05864826-21ef-4ae7-9af8-2aaeffc7267a,Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,{'ID': '83_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,part-of,annotated +d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",equal,annotated +a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",greater,annotated +793cb939-b3d9-46eb-ae65-71a4d5c8031b_11,,,Where the design solar load is within the private curtilage of the dwelling (but not within a carport or insulated plane) at least one space is a standard parking bay that can be widened to 3.3m.,not-part-of,synthetic +10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,none,annotated +5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",part-of,annotated +a86b58e8-046f-44b7-8e1b-00c876c8c647,"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",{'ID': '30_Finnish_StabilityOfStructures'},"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",none,annotated +642e2c46-45a8-440f-af0b-1b53f41d8d8f,Taps and WC cubicle doors should be operable by people with limited strength or manual dexterity and doors to cubicles should be capable of being opened if a person has collapsed against them while inside the cubicle.,{'ID': '156_UK_DocM_V2_AccessAndUseOfBuildings'},Taps and WC cubicle doors should be operable by people with limited strength or manual dexterity and doors to cubicles should be capable of being opened if a person has collapsed against them while inside the cubicle.,part-of,annotated +81314489-dcd9-410f-9b15-595b87e7c8f9,"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",{'ID': '14_UK_DocQ_Security_Dwellings'},"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",necessity,annotated +993e54cc-49c3-43cb-995e-1a951c93c775,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an axle group load equal to 190 kN.",{'ID': '25_Finnish_StabilityOfStructures'},"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an axle group load equal to 190 kN.",equal,annotated +511c1a7f-08b9-48ec-aea6-9b749fdf31a1,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an adequate number of appropriately located toilet facilities which are suitable for users of wheelchairs and walking frames with wheels.",{'ID': '51_Finnish_Accessibility'},"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an adequate number of appropriately located toilet facilities which are suitable for users of wheelchairs and walking frames with wheels.",selection,annotated +103f99ad-884b-4bae-9f22-ccb1c5bc3d26,"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",{'ID': '110_Finnish_FireSafety'},"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",none,annotated +0f2dbc3b-0f3e-444e-a688-ed8faebd1226,Seats must be fixed to a base if the floor of the seating area is sloped or if there are level differences between the floors of the respective rows of seats.,{'ID': '105_Finnish_SafetyOfUse'},Seats must be fixed to a base if the floor of the seating area is sloped or if there are level differences between the floors of the respective rows of seats.,selection,annotated +0a7ff0c7-c5f9-4069-9d7e-2bfd6c4871d3_7,,,"The one-hour A-weighted equivalent continuous sound level of impulsive, narrow-band or low-frequency noise of the extension does not exceed 0.3.",less-equal,synthetic +6414854d-01f9-481f-a7f4-c4581e48d8b1,Special safety features are not necessary if the ladder is not more than 6m long.,{'ID': '112_UK_DocK_ProtectionFromFalling'},Special safety features are not necessary if the ladder is not more than 6m long.,selection,annotated +2f89cb06-3ee9-49b5-ac36-46f31ae3928f,Hot water pipework should be insulated in all areas inside and outside the building unless it can be demonstrated that the heat is always useful.,{'ID': '170_UK_DocM_V2_AccessAndUseOfBuildings'},Hot water pipework should be insulated in all areas inside and outside the building unless it can be demonstrated that the heat is always useful.,selection,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479_9,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 55 load.,less-equal,synthetic +457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",none,annotated +b63dcef6-1840-4e9e-ad51-f8fc481fe856_7,,,"The wall ties should have a horizontal spacing of 900mm and a heat recovery of 15mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic +cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",part-of,annotated +01bd7c41-594c-4440-8058-c34f1c4bad09,"When determining the free area available for ventilation during sleeping hours, only the proportion of openings that can be opened securely should be considered to provide useful ventilation.",{'ID': '82_UK_DocO_Overheating'},"When determining the free area available for ventilation during sleeping hours, only the proportion of openings that can be opened securely should be considered to provide useful ventilation.",necessity,annotated +74b9ee2c-0192-442d-b5a1-a2974d456429,"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",{'ID': '67_UK_DocM_V1_AccessAndUseOfBuildings'},"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",necessity,annotated +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_3,,,"Where the cost of installing only cable routes is more than 7% of the total cost of the major thermal bridging, there is no control appliance to install either electric vehicle charge points or cable routes.",not-part-of,synthetic +c7035b48-7244-40a9-a70e-1d244caf72ac,"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",{'ID': '56_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",none,annotated +596cc55c-f50f-4155-962f-832b87226a8e,"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",{'ID': '23_UK_DocF_V1_Ventilation'},"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",necessity,annotated +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",necessity,annotated +56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3,"Storage premises with a fire load exceeding 1,200 MJ/m2 are not permitted within the building.",{'ID': '73_Finnish_FireSafety'},"Storage premises with a fire load exceeding 1,200 MJ/m2 are not permitted within the building.",necessity,annotated +7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",necessity,annotated +a15ee053-da1e-44cd-bdd9-76cdcb68eaee,"Whenever the building is moved to a new location, in which its intended time of use is less than two years, these calculations can be provided as evidence that the energy efficiency requirements are met.",{'ID': '87_UK_DocM_V2_AccessAndUseOfBuildings'},"Whenever the building is moved to a new location, in which its intended time of use is less than two years, these calculations can be provided as evidence that the energy efficiency requirements are met.",necessity,annotated +c384013b-c40f-4925-acbe-465e1ca5bc13,One photograph per detail should be recorded.,{'ID': '480_UK_DocL_V1_ConsrvationOfFuelAndPower'},One photograph per detail should be recorded.,necessity,annotated +3e9fc57e-bc69-4f17-a056-dd7767afa9bb_10,,,"If the CO2 emission factor of the building does not exceed 1,500 millimetres, access to the attic fire compartments from the outside shall be required.",less-equal,synthetic +05864826-21ef-4ae7-9af8-2aaeffc7267a_2,,,Modular and portable buildings with a planned service life of more than two years but with an ventilation provision in a single location of less than 400 millimetres should be shown to comply with the energy efficiency requirements.,less,synthetic +63af9f99-6939-4e8c-a6a9-8b10942e1597_2,,,"The handle to at least 0.15 dm3/s per m2 energy savings in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",greater-equal,synthetic +3ec9d4e7-3526-411c-8b30-0c7671660ed1,"The relationship between the kitchen, dining and living areas should be convenient and step-free.",{'ID': '91_UK_DocM_V1_AccessAndUseOfBuildings'},"The relationship between the kitchen, dining and living areas should be convenient and step-free.",selection,annotated +bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,part-of,annotated +8e8f4fb5-00b5-404f-89df-a07287984748_7,,,"In buildings with a maintained greater than 2,100 millimetres, automatic meter reading and data collection facilities should be installed.",greater,synthetic +a8b3e54e-902c-4502-99a2-8c41d46f1416_2,,,"If there are more than 15mm ventilation system in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",greater,synthetic +e4fb8d18-8dbc-4351-a2df-d87f880f476a_0,,,The air flow rates for balconies is 200 lux that of the load-bearing structures of the storey.,equal,synthetic +35cacecf-06dc-4b0f-aadb-db2ee05518c7_7,,,The area of windows and roof windows (but excluding display windows) same exceeds 75 light source lumens per circuit-watt of the facade area.,greater,synthetic +8e8f4fb5-00b5-404f-89df-a07287984748_11,,,"In buildings with a total extract air flow greater than 600kg/m3, automatic meter reading and data collection facilities should be installed.",greater,synthetic +66b3628a-f0ee-4bc7-93c8-2ae0145a2e78_1,,,"In a compliance checklist with no openable surfaces, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",not-part-of,synthetic +ff3e8f86-1542-4f54-a776-cfdc8482bad7_5,,,"The one-hour A-weighted equivalent continuous sound level of impulsive, narrow-band or low-frequency noise of an air conditioner working in cooling mode should be a minimum of 30.",greater-equal,synthetic +50e89a86-e2be-439d-b230-79274cd7199b,Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,{'ID': '81_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,greater,annotated +9eb5bf01-3810-44e3-802b-7c7eadad1831,"Mechanical ventilation systems, including both continuous and intermittent mechanical ventilation, should be designed and installed to minimise noise.",{'ID': '21_UK_DocF_V1_Ventilation'},"Mechanical ventilation systems, including both continuous and intermittent mechanical ventilation, should be designed and installed to minimise noise.",selection,annotated +01d924bf-4a69-4eb8-b05e-ce993aee3d45_2,,,Perimeter insulation should be continuous and have a minimum heat gain of 1.3 seconds.,greater-equal,synthetic +34a524ec-6994-426f-86af-78788fd34a80,"Between the locking points for the mortice lock and surface-mounted rim lock, the distance should be 400-600mm.",{'ID': '36_UK_DocQ_Security_Dwellings'},"Between the locking points for the mortice lock and surface-mounted rim lock, the distance should be 400-600mm.",part-of,annotated +164122ed-c7ac-4cf8-8a54-3d56c144f78d_3,,,"In general, the findings indicate that there should be at least the same number of day-care institutions as boiler interlock and for some building types, e.g. large retail buildings, at least twice as many.",greater-equal,synthetic +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",necessity,annotated +6075de3c-d339-4ba4-9945-990480975615_6,,,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than 6mm Part 2 and 3 of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",greater-equal,synthetic +8207751f-13b8-4fe3-9bfe-4423093d4905,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,{'ID': '26_Finnish_AcousticEnvironment'},A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,none,annotated +74b9ee2c-0192-442d-b5a1-a2974d456429,"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",{'ID': '67_UK_DocM_V1_AccessAndUseOfBuildings'},"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",none,annotated +4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9,"In spaces intended for more than 60 persons, the width of the access route must be at least 1,200 millimetres.",{'ID': '116_Finnish_SafetyOfUse'},"In spaces intended for more than 60 persons, the width of the access route must be at least 1,200 millimetres.",greater-equal,annotated +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",none,annotated +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_3,,,"In buildings more than 9 metres and at most two persons per square metre in intermediate landing, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",less-equal,synthetic +2f8d4247-e53b-49ae-bd26-c4f1765eaee8_5,,,"Extract air of design solar load 2, 3 and 24 degrees Celsius shall not be used as recirculation air.",equal,synthetic +ef4ec541-e1a7-47d4-9a83-94715d8900ba_5,,,"Where 60 persons or more extension are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",greater-equal,synthetic +c0a6d35c-cc20-428b-941d-c3e3e6365c74_9,,,"In a tier that is uninterrupted by cross-gangways, and where the installation exceeds 0.1m2, use a maximum number of steps of 40.",greater,synthetic +0096a3bf-ac16-4a75-adf9-8c3f4a9b8610_3,,,The smaller manufacturers declared efficiencies of each panel which can be either the width or height of the panel should be 900 millimetres or less.,less-equal,synthetic +389c960b-525d-4f2e-9a2c-1805eb2dc20d_6,,,The full installation under a stair that forms part of the storage provision should be counted as 5m.,equal,synthetic +56517433-cf40-4b88-a9d4-18e61e0e9993_1,,,"In addition, on both sides of the toilet seat there shall be a roof windows of at least twice the rise plus the going (2R G).",greater-equal,synthetic +7f065688-203b-42d0-acb9-8fde5ff37821,Main distribution routes should be through vertical risers to minimise heat gains into common spaces.,{'ID': '44_UK_DocO_Overheating'},Main distribution routes should be through vertical risers to minimise heat gains into common spaces.,selection,annotated +a4fccc69-c508-4405-92aa-2cfe36bfca39,Exits of parts of the building separated by a fire wall must be constructed separately so that in the event of a fire there is no need to use any door that may be in the fire wall.,{'ID': '209_Finnish_FireSafety'},Exits of parts of the building separated by a fire wall must be constructed separately so that in the event of a fire there is no need to use any door that may be in the fire wall.,part-of,annotated +973c9430-2b4a-4ab4-82df-7060c3002f77_2,,,The slope for the community heating primary circuit should be a minimum of 2.4 metres.,greater-equal,synthetic +7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8_0,,,"For sizes of cylinder not listed, the commissioning notice from the cylinder should not exceed 13l/s, where V is the volume in litres.",less-equal,synthetic +113b8bf8-1856-45f5-a54b-d65ef100b437_7,,,"If a gas-fired combination boiler is installed in an existing dwelling, at least 1,200 millimetres of the following axle group load, appropriate to the system, should be installed.",greater-equal,synthetic +c47598f9-df79-4d77-aba9-8f380342372f_7,,,extract air of Capacities four shall be conducted to the outdoors through individual extract air ducts.,equal,synthetic +40b40b1b-d1b1-49d8-b9b7-13c5845a169d,The structure of the control appliance of the plumbing fixture shall be such that its surface temperature does not arise above 40 degrees Celsius.,{'ID': '71_Finnish_Health-WaterAndSewerage'},The structure of the control appliance of the plumbing fixture shall be such that its surface temperature does not arise above 40 degrees Celsius.,none,annotated +9fee4426-8d7f-40f9-bc6f-562a5d3fd9b4,"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",{'ID': '144_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",part-of,annotated +8207751f-13b8-4fe3-9bfe-4423093d4905,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,{'ID': '26_Finnish_AcousticEnvironment'},A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,part-of,annotated +4d80c4d1-08ee-481a-9f9c-e9151ce1094d_8,,,"The surface of windows, roof windows, rooflights and doors should not exceed 01:08:00 of the total floor area of the dwelling.",less-equal,synthetic +01d924bf-4a69-4eb8-b05e-ce993aee3d45_4,,,Perimeter insulation should be continuous and have a minimum gradient of 20.,greater-equal,synthetic +56166e36-b14b-4632-9767-70b71d335d9c,"When a dwelling undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",{'ID': '98_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When a dwelling undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",selection,annotated +53bb982d-5260-4a69-a6dd-71e4f074e676,The depth of standing rows must be at least half a metre.,{'ID': '111_Finnish_SafetyOfUse'},The depth of standing rows must be at least half a metre.,greater-equal,annotated +d728a9c8-0302-4bd1-b69b-0daeefce30d1,"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",{'ID': '84_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",none,annotated +9027959e-efc1-4d32-acbe-e0775d40f001_6,,,"The morticed bolts should have a minimum length of 200 Watts per room, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",greater-equal,synthetic +c9983da5-23f1-4211-88ce-68e4753e4ab9,"A target primary energy rate, target emission rate, building primary energy rate and the building emission rate should be calculated for non-exempt buildings with low energy demand.",{'ID': '102_UK_DocM_V2_AccessAndUseOfBuildings'},"A target primary energy rate, target emission rate, building primary energy rate and the building emission rate should be calculated for non-exempt buildings with low energy demand.",necessity,annotated +99a53f17-48cb-4012-a47b-700761e0983b_0,,,Where a new building which is not a residential building or a mixed-use building has more than 01:20:00 residential block of flats (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,greater,synthetic +cf35d4a4-3170-421b-9be1-b68d928eed1d_7,,,"A roof with a luminous efficacy greater than 60 must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",greater,synthetic +009e12eb-db83-485c-9ffc-e1f462251109,Each air terminal should have a free area of at least 90 of the free area of its associated duct.,{'ID': '115_UK_DocF_V1_Ventilation'},Each air terminal should have a free area of at least 90 of the free area of its associated duct.,greater-equal,annotated +09b2a395-5293-4b7d-82d4-5312482d59e9,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",{'ID': '46_UK_DocM_V1_AccessAndUseOfBuildings'},"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",greater-equal,annotated +9fee4426-8d7f-40f9-bc6f-562a5d3fd9b4,"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",{'ID': '144_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",none,annotated +1e3d8e3a-93fd-47e2-833e-d7f36c901c77,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,{'ID': '131_UK_DocM_V1_AccessAndUseOfBuildings'},Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,part-of,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479_3,,,Individual flights are: for gradients up to 1:15 not more than 200 m2 frequency; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic +c8a048c6-8e7e-4b5a-ada5-02990b983401,"A natural ventilation system, a mechanical extract ventilation system or a mechanical supply and extract ventilation system shall not be designed to be combined in such a way that the directions of air flow between the rooms and in the ductworks may change when the air flows are being controlled.",{'ID': '91_Finnish_Health-IndoorClimateAndVentilation'},"A natural ventilation system, a mechanical extract ventilation system or a mechanical supply and extract ventilation system shall not be designed to be combined in such a way that the directions of air flow between the rooms and in the ductworks may change when the air flows are being controlled.",necessity,annotated +aa41a5d4-c0b1-4da7-84a0-5c2e2738654f_9,,,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than 20 millimetres System controls.,greater,synthetic +f162906e-1097-420e-b2a0-dd746d5794c7,"Where controls are external to the heater, the system should be provided with a time switch/programmer and room thermostat, or programmable room thermostat.",{'ID': '265_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where controls are external to the heater, the system should be provided with a time switch/programmer and room thermostat, or programmable room thermostat.",none,annotated +55d84237-8fad-4bd7-b67d-0745b9cc1e31,"The doors of exits, and of areas leading to them, must be easy to open in an emergency.",{'ID': '222_Finnish_FireSafety'},"The doors of exits, and of areas leading to them, must be easy to open in an emergency.",necessity,annotated +7e34700e-92de-4b00-a820-f4085a2e186c_8,,,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be dimension 100 litres.",equal,synthetic +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_5,,,"In buildings more than eight per cent and at most 28 metres in structure, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",greater,synthetic +39a37d5e-3361-43b9-a209-e5cd45918abc,"For mixed-use buildings which have parking spaces within a covered car park, any requirements to install electric vehicle charge points or cable routes must first be applied to those parking spaces outside the covered car park.",{'ID': '95_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"For mixed-use buildings which have parking spaces within a covered car park, any requirements to install electric vehicle charge points or cable routes must first be applied to those parking spaces outside the covered car park.",selection,annotated +8364a5f1-f80e-484c-9f38-bffc6f4c1876_6,,,"Where communal parking is provided to blocks of flats, at least 120 standard Extract air is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",greater-equal,synthetic +590ab551-79e8-42f5-bc52-749f8899c088,Extinguishing routes to basement storeys shall be arranged so that basement storeys can be reached from the ground level without a need to pass through the exits of the storeys.,{'ID': '242_Finnish_FireSafety'},Extinguishing routes to basement storeys shall be arranged so that basement storeys can be reached from the ground level without a need to pass through the exits of the storeys.,necessity,annotated +a922fe4e-30c9-4fef-a442-27459b959914,Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,{'ID': '82_Finnish_Health-WaterAndSewerage'},Vertical service pipes shall be equipped with mechanical or structural leak detectors at each floor if the service pipes are not visible.,selection,annotated +d504fd87-d13d-4936-9d7a-71d17954760d_10,,,The free gap of the steps in an exit may be no more than 1 in 40.,less-equal,synthetic +60205cf2-fa87-4195-9415-a6fb144a9b72,"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",{'ID': '96_Finnish_SafetyOfUse'},"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",part-of,annotated +9dd2a0f1-0ff9-4416-8abd-1e6589980ff4_1,,,"If the internal temperature of a mechanical ventilation systems air duct is designed to be greater than 500kW, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",greater,synthetic +13a437c0-918c-47f2-85bd-b80dd69eb027_10,,,"There are no cold side on the visual contrast of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",not-part-of,synthetic +8efb6108-e49e-4d64-a1e4-22e3f9128b17,"When calculating the reference heat loss of a building, the value of 2.0 m3/(h m2) shall be used as the reference value for the air leakage rate figure for the building envelope.",{'ID': '136_Finnish_EnergyEfficiency'},"When calculating the reference heat loss of a building, the value of 2.0 m3/(h m2) shall be used as the reference value for the air leakage rate figure for the building envelope.",part-of,annotated +05864826-21ef-4ae7-9af8-2aaeffc7267a_10,,,Modular and portable buildings with a planned service life of more than two years but with an luminous efficacy in a single location of less than 1m2 should be shown to comply with the energy efficiency requirements.,less,synthetic +2c8d2bc3-cf23-48f8-b9c0-b90f150f9f93,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing building.",{'ID': '426_UK_DocM_V2_AccessAndUseOfBuildings'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing building.",necessity,annotated +81f14fc1-af5d-45e8-8725-94d2510e4701,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",{'ID': '29_Finnish_Accessibility'},"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",selection,annotated +20216261-f56d-4f79-8a46-c781abe19f04,"For new and existing buildings other than dwellings, information should be provided in a new or existing building log book.",{'ID': '98_UK_DocF_V2_Ventilation'},"For new and existing buildings other than dwellings, information should be provided in a new or existing building log book.",none,annotated +81314489-dcd9-410f-9b15-595b87e7c8f9_0,,,"The resilient layer should be timber sheathing at least 21 C boiler type, expanded metal or a similar resilient material.",greater-equal,synthetic +7c74b365-6fdd-494d-9675-3ae036c55348,Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,{'ID': '82_Finnish_SafetyOfUse'},Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,part-of,annotated +f1b9829d-7ac3-4bc5-918a-5bbb8d663a35,"For space heating systems, temperature control should be installed for the heating appliance.",{'ID': '248_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For space heating systems, temperature control should be installed for the heating appliance.",part-of,annotated +d713514a-9398-45a2-9584-efecff6ebcc5,Reasonable provision must be made to resist unauthorised access to (a) any dwelling; and (b) any part of a building from which access can be gained to a flat within the building.,{'ID': '4_UK_DocQ_Security_Dwellings'},Reasonable provision must be made to resist unauthorised access to (a) any dwelling; and (b) any part of a building from which access can be gained to a flat within the building.,none,annotated +eefe1191-2903-4fb8-9138-6471e09fb67d_0,,,The domestic hot water circulation heat loss exceeds 390 millimetres at 11pm.,greater,synthetic +d342429e-d3fc-46e0-a195-527cfef1fd4b_6,,,"When an existing building with a total useful number of storeys of over 0.5 kN/m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",greater,synthetic +d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",none,annotated +f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c_3,,,A building with a location exceeding 01:20:00 must be equipped with anchoring structures for safety lines.,greater,synthetic +5ba5ffe7-ece8-488a-b461-da66237e7888,"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",{'ID': '54_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",necessity,annotated +977ccb7b-4580-4ea3-9ea4-5057925c9854,"NOTE: The surface area of the whole building must be included when assessing whether the works constitute a major renovation, even if the building is mixed use.",{'ID': '124_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"NOTE: The surface area of the whole building must be included when assessing whether the works constitute a major renovation, even if the building is mixed use.",none,annotated +c47598f9-df79-4d77-aba9-8f380342372f_9,,,extract air of mechanical ventilation 25 decibels shall be conducted to the outdoors through individual extract air ducts.,equal,synthetic +8e9ef8dc-18bd-4877-98cd-556aa4adee8f,"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'},"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",none,annotated +77be05f2-cd8c-4d35-85e4-6637b999d8e7_6,,,The selection of the consequential improvement works should not be less than 1100mm of the value of the principal works.,greater-equal,synthetic +efd2d371-97de-4d5e-af06-e404ff71f316,The impact of the ground and crawl space on heat loss shall be taken into account in heat loss calculations.,{'ID': '91_Finnish_EnergyEfficiency'},The impact of the ground and crawl space on heat loss shall be taken into account in heat loss calculations.,none,annotated +6594919a-cde6-4dd8-be04-eb61e30f99bb,"Snow or rain-water shall not be allowed to ingress the ventilation system via externally mounted air transfer devices in quantities causing damage to the system, lowering air quality or impairing the functioning of the system.",{'ID': '67_Finnish_Health-IndoorClimateAndVentilation'},"Snow or rain-water shall not be allowed to ingress the ventilation system via externally mounted air transfer devices in quantities causing damage to the system, lowering air quality or impairing the functioning of the system.",necessity,annotated +113b8bf8-1856-45f5-a54b-d65ef100b437_8,,,"If a gas-fired combination boiler is installed in an existing dwelling, at least 0.9 metres of the following target primary energy rate, appropriate to the system, should be installed.",greater-equal,synthetic +f6add908-4d45-4b3e-83a6-369f6c36c037_4,,,"Door rails, stiles and muntins should be at least 35 mg/m3 (30 ppm) height.",greater-equal,synthetic +20518e80-6f7e-457f-8c5a-59fa4c0eb324,"When calculating the heat loss for a buildings design solution, the design value shall be used as the value of the air leakage rate figure for the building envelope.",{'ID': '137_Finnish_EnergyEfficiency'},"When calculating the heat loss for a buildings design solution, the design value shall be used as the value of the air leakage rate figure for the building envelope.",part-of,annotated +0365837b-a04d-4aaf-a2f5-2e89403a9c2b,"If all the terminals have to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",{'ID': '200_UK_DocF_V1_Ventilation'},"If all the terminals have to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",necessity,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_8,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and constraints 9mm air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +c5a6cac6-a314-47b1-aabd-13f2d1b7ad56,A step-free approach route should be provided to all private entrances.,{'ID': '71_UK_DocM_V1_AccessAndUseOfBuildings'},A step-free approach route should be provided to all private entrances.,none,annotated +5e7d4831-4ec8-48f9-9e60-0422fcc1eae4_1,,,"When replacing an existing system, the time-lapse of the new system should be no less than total floor area of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",greater-equal,synthetic +e43c1e88-be80-42d9-944e-1bf0f0f82479,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,{'ID': '18_UK_DocM_V1_AccessAndUseOfBuildings'},Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,annotated +ebc429f0-cb90-41ab-9a11-401a2ddc7bad,"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",{'ID': '268_UK_DocF_V1_Ventilation'},"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",selection,annotated +6d9a1e8e-6fe7-4234-951a-96fdc4598bd7,"If parking spaces are provided for a building, an adequate number of them, but at least one, shall be intended for the use of a person with mobility and functional impairment.",{'ID': '12_Finnish_Accessibility'},"If parking spaces are provided for a building, an adequate number of them, but at least one, shall be intended for the use of a person with mobility and functional impairment.",none,annotated +793cb939-b3d9-46eb-ae65-71a4d5c8031b_4,,,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be patterns to 40.,less-equal,synthetic +082c7ed9-3579-48c2-a0d2-076f1edd647c,"Each of the two sections of the centrally hinged window should be assessed as a single side, bottom or top hung window.",{'ID': '112_UK_DocO_Overheating'},"Each of the two sections of the centrally hinged window should be assessed as a single side, bottom or top hung window.",part-of,annotated +5305da48-b810-4fd8-a0b3-7520f89ff401,"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",{'ID': '194_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",necessity,annotated +5f7b8ff7-50d0-46a2-a48b-fa19786c98fd,"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '105_Finnish_EnergyEfficiency'},"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",none,annotated +0aaf71f0-a482-4a72-a407-0d6db79c7f6f,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",{'ID': '69_Finnish_FireSafety'},"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",none,annotated +fb5d3054-4911-4049-ba09-1c3e80f9c07c,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",{'ID': '29_Finnish_SafetyOfUse'},"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",none,annotated +29232335-402c-4ed9-af74-fd093ac22e28_2,,,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least total load 300 litres.,greater-equal,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,{'ID': '131_UK_DocM_V1_AccessAndUseOfBuildings'},Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,necessity,annotated +f51da5c6-7614-4719-8150-e22851e4aa12,"The building fabric should be constructed so that thermal bridging, including at the party wall, is reasonably limited.",{'ID': '152_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The building fabric should be constructed so that thermal bridging, including at the party wall, is reasonably limited.",selection,annotated +46f5be2a-1514-420b-bc39-331fc6e0d2df_5,,,"The combined dead,imposed and wind loads, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the load EER, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,synthetic +493ec553-7761-4d1e-aa98-05d925ddf955_10,,,The primary energy content of a horizontal hatch must be at least 200 millimetres.,greater-equal,synthetic +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_3,,,"Where the work concerns a building containing more than 60 persons damage, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater-equal,synthetic +b4ae0bf1-8dec-4e43-b10b-4a593780d742,Partitioning doors in accommodation premises shall be equipped with closing devices.,{'ID': '121_Finnish_FireSafety'},Partitioning doors in accommodation premises shall be equipped with closing devices.,necessity,annotated +371e1755-8bb5-456e-bf66-5a50f4c19d59,"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",{'ID': '50_UK_DocK_ProtectionFromFalling'},"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",none,annotated +9b329413-b6d6-4953-9b34-c82d3a2e9c44,"Before a new heating appliance is installed, all central heating and primary hot water circuits should be thoroughly cleaned and flushed out.",{'ID': '216_UK_DocM_V2_AccessAndUseOfBuildings'},"Before a new heating appliance is installed, all central heating and primary hot water circuits should be thoroughly cleaned and flushed out.",necessity,annotated +f6add908-4d45-4b3e-83a6-369f6c36c037,"Door rails, stiles and muntins should be at least 44mm thick.",{'ID': '28_UK_DocQ_Security_Dwellings'},"Door rails, stiles and muntins should be at least 44mm thick.",part-of,annotated +4e119abd-0cf7-4c60-9c7b-1083f9b46280,"NOTE: If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise attenuating background ventilator should be fitted.",{'ID': '85_UK_DocF_V2_Ventilation'},"NOTE: If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise attenuating background ventilator should be fitted.",selection,annotated +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_4,,,"Where the cost of installing only cable routes is more than 7% of the total cost of the major going, there is no sunken to install either electric vehicle charge points or cable routes.",not-part-of,synthetic +45adb0b6-63ee-4f42-b6a3-8fc396221c67_10,,,The standards of the insulation plus any required air gap should be at least to the relationship of the rafters.,greater-equal,synthetic +e8340500-38b6-461b-b00d-d3aa44ac1f0b_2,,,The tie force of the water available from the hot water system may not exceed 8 per cent (1:12.5).,less-equal,synthetic +bb3ac5b0-14d0-4d75-95d9-713adc6f2f58,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",{'ID': '433_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",necessity,annotated +f3c5d35c-ad38-46d6-8a75-1a331555b89e,The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flow rates at each terminal.,{'ID': '206_UK_DocF_V1_Ventilation'},The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flow rates at each terminal.,selection,annotated +0da52584-1b37-48b5-840f-3795ae695275_0,,,the minimum clear dimensions of the platform are: 50 m2 size and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +3639910c-8ebf-499a-aeec-6f1951b28134,"Additionally, insulated plaster-board should be used in reveals to abut jambs and should be considered within reveal soffits.",{'ID': '166_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Additionally, insulated plaster-board should be used in reveals to abut jambs and should be considered within reveal soffits.",selection,annotated +825053cb-af5d-43a9-b59b-e2a5ae78ea73_8,,,The fire igniting of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the extends of associated parking spaces.,greater,synthetic +2f8d4247-e53b-49ae-bd26-c4f1765eaee8_4,,,"Extract air of above 2, 3 and 40 degrees Celsius shall not be used as recirculation air.",equal,synthetic +4d80c4d1-08ee-481a-9f9c-e9151ce1094d,"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",{'ID': '421_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",part-of,annotated +cea6e7bd-c494-4146-9f81-3fd2ed64a2a6_5,,,The minimum value of the floor surface in the seating area and access route may not exceed 0.8 metres.,less-equal,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_6,,,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or shower room above 400-600mm may be discounted when measuring clear width.,greater,synthetic +6ec243f2-9294-4b7c-89a4-1c46e4a69cc9_10,,,"If site constraints necessitate an foundations of 2.4 metres or steeper, an approach incorporating ramped access should be provided.",greater-equal,synthetic +c7137e3d-e3f2-4a19-87bc-ccb194d42c74,"Incoming services: ducts, and cables wherever possible, should be grouped to minimise how often the air barrier is penetrated, while ensuring sufficient space to allow adequate screed flow between ducts.",{'ID': '178_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Incoming services: ducts, and cables wherever possible, should be grouped to minimise how often the air barrier is penetrated, while ensuring sufficient space to allow adequate screed flow between ducts.",necessity,annotated +d54852df-8e3c-4e99-8484-31c403b78558,"If work is carried out on a system that includes a boiler, a boiler interlock should be installed.",{'ID': '256_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If work is carried out on a system that includes a boiler, a boiler interlock should be installed.",necessity,annotated +3121fe90-27db-405e-a42a-df3cd22ee176,"Where necessary, two handrails, one above the other, must be installed in order to take into account children and users of wheelchairs.",{'ID': '55_Finnish_SafetyOfUse'},"Where necessary, two handrails, one above the other, must be installed in order to take into account children and users of wheelchairs.",none,annotated +"8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent. {'ID': '9_Finnish_Accessibility'}_11",,,"However, if the air flow rates is no more than 600kg/m3, the ramp may not have a gradient of more than eight per cent.",less-equal,synthetic +43e26628-8b62-4cc6-91e2-284335df1564_3,,,"In rooms used for sleeping or rest, the domestic hot water circulation heat loss may not exceed 200 Watts per room.",less-equal,synthetic +7f3f59a4-fc7e-4b14-8074-384f6cacf548_7,,,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the horizontal spacing is less than 2m.",less,synthetic +7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88_3,,,The resilient layer should be to the full height of the door and ten millimetres drop of the doorset.,equal,synthetic +bf798097-bb99-42d0-a73f-8cebab8fbeb8,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.",{'ID': '21_Finnish_SafetyOfUse'},"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.",less-equal,annotated +46f5be2a-1514-420b-bc39-331fc6e0d2df,"The dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and target fabric energy efficiency rate, respectively.",{'ID': '356_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and target fabric energy efficiency rate, respectively.",selection,annotated +6ec243f2-9294-4b7c-89a4-1c46e4a69cc9_1,,,"If site constraints necessitate an Voids of adequate number or steeper, an approach incorporating ramped access should be provided.",greater-equal,synthetic +e43c1e88-be80-42d9-944e-1bf0f0f82479_7,,,Individual flights are: for gradients up to 1:15 not more than 35 mg/m3 (30 ppm) exceptional circumstances; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic +082c7ed9-3579-48c2-a0d2-076f1edd647c_6,,,"Each of the 50 m minimum value of the centrally hinged window should be assessed as a single side, bottom or top hung window.",equal,synthetic +05864826-21ef-4ae7-9af8-2aaeffc7267a_3,,,Modular and portable buildings with a planned minimum value of more than 800 millimetres but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,greater,synthetic +33ed3038-99a6-4b2d-906a-a1db21f2d898,"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",{'ID': '250_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",none,annotated +19478a13-7457-4dd3-a394-744f826db7b0,"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",{'ID': '127_UK_DocM_V1_AccessAndUseOfBuildings'},"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",part-of,annotated +cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",none,annotated +bb3ac5b0-14d0-4d75-95d9-713adc6f2f58,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",{'ID': '433_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",necessity,annotated +389c960b-525d-4f2e-9a2c-1805eb2dc20d_8,,,"The full annual percentage of heat under a stair that forms part of the storage provision should be counted as 1,200 millimetres.",equal,synthetic +29c431ee-ea93-491d-ab13-06418d93c488_6,,,"If total capital cost is greater than 0.9 metres, manual control is acceptable.",greater,synthetic +d0b6759e-deec-451d-bd7a-ec65b96048be_10,,,"extract air of sizes B shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",equal,synthetic +4470dde4-6422-4c13-9781-de68c3e075dc_9,,,"The outdoor sunken area of a dwelling unit, however, shall be designed to be a minimum of 24 metres.",greater-equal,synthetic +6075de3c-d339-4ba4-9945-990480975615_7,,,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than 20mm Standing areas of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",greater-equal,synthetic +1c511111-ab71-4b68-9421-f588bc4b9180,"People with visual impairment should be in no doubt as to the location of glass doors, especially when they are within a glazed screen.",{'ID': '76_UK_DocM_V2_AccessAndUseOfBuildings'},"People with visual impairment should be in no doubt as to the location of glass doors, especially when they are within a glazed screen.",none,annotated +13a437c0-918c-47f2-85bd-b80dd69eb027,"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",part-of,annotated +aa7c5790-2189-451d-bd0e-956a257a7b6d,"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",{'ID': '201_UK_DocL_V1_ConsrvationOfFuelAndPower'},"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",none,annotated +23db27ac-b594-4b26-883d-922d713d382a,"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",{'ID': '161_UK_DocM_V2_AccessAndUseOfBuildings'},"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",selection,annotated +9618a274-45da-4e3e-87f0-21c2bfae4a8e_10,,,"A guardrail must be used at points with a number of appliances of over 100 litres, if these can be accessed by children.",greater,synthetic +5fa7daca-cb50-4397-a736-617e52d30187_10,,,"If efficiencies at below 30% are required and unavailable, the surface temperature may be taken as equal to that at 20.",equal,synthetic +0df5892a-e396-424e-90f1-74f6ccfb9e1a,"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",{'ID': '61_Finnish_Accessibility'},"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",part-of,annotated +0096a3bf-ac16-4a75-adf9-8c3f4a9b8610_2,,,The smaller fire load of each panel which can be either the width or height of the panel should be 2 metres or less.,less-equal,synthetic +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_9,,,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the sales counter of that installation exceeds 2.5 ties/m2 of the total cost of the major renovation.",greater,synthetic +009e12eb-db83-485c-9ffc-e1f462251109_4,,,Each air terminal should have a environment of at least 0.35W/(m2K) of the free area of its associated duct.,greater-equal,synthetic +db734798-9e42-4fe1-900c-77d4e6131809,"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",{'ID': '11_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",selection,annotated +86350df0-a40e-412b-a301-004524d56736_6,,,"For wet heating systems in new dwellings with a centre pane U-value of 130 millimetres or greater, a minimum of two independently controlled heating circuits should be provided.",greater-equal,synthetic +10b2bf58-18df-46ee-a766-ed11eec6f42b,"Humus soil, organic substances decomposing or rotting from moisture or building waste must not be left under new buildings, in their crawl spaces and in their gravel backfills functioning as a drainage layer.",{'ID': '45_Finnish_Health-Humidity'},"Humus soil, organic substances decomposing or rotting from moisture or building waste must not be left under new buildings, in their crawl spaces and in their gravel backfills functioning as a drainage layer.",none,annotated +457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",part-of,annotated +4b510cad-fefb-44be-a9cb-a26e0c42994c,"If the building is connected to a heating system where heat is conveyed via heat pipes external to the building from a shared heat exchanger or heat generation unit to several buildings, the heat loss from those pipes shall be divided between the buildings in proportion to their areas.",{'ID': '101_Finnish_EnergyEfficiency'},"If the building is connected to a heating system where heat is conveyed via heat pipes external to the building from a shared heat exchanger or heat generation unit to several buildings, the heat loss from those pipes shall be divided between the buildings in proportion to their areas.",part-of,annotated +46f5be2a-1514-420b-bc39-331fc6e0d2df_3,,,"The dwelling primary energy rate, dwelling emission rate and span, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and target emission rate, respectively.",less-equal,synthetic +2b60007d-59a3-4a18-a184-89e76ee17454,Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,{'ID': '161_UK_DocL_V1_ConsrvationOfFuelAndPower'},Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation.,selection,annotated +f6a682fb-f427-41d0-9219-3a45d2134be6,"To correctly assess whether an element meets the limiting U-value, the U-value must be calculated for the element in the appropriate plane - either horizontal or vertical.",{'ID': '109_UK_DocL_V1_ConsrvationOfFuelAndPower'},"To correctly assess whether an element meets the limiting U-value, the U-value must be calculated for the element in the appropriate plane - either horizontal or vertical.",selection,annotated +7f3f59a4-fc7e-4b14-8074-384f6cacf548_0,,,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the entry is less than 2.2 metres.",less,synthetic +99a53f17-48cb-4012-a47b-700761e0983b,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,{'ID': '61_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,necessity,annotated +f7f1a609-ae35-4544-9b38-e471d7a00666,"In order to enhance the efficiency of firefighting and rescue operations, means of smoke extraction shall be designed and constructed in the building so that smoke can be extracted from the different premises in the building.",{'ID': '249_Finnish_FireSafety'},"In order to enhance the efficiency of firefighting and rescue operations, means of smoke extraction shall be designed and constructed in the building so that smoke can be extracted from the different premises in the building.",selection,annotated +3d0bbf85-327f-4f92-a468-201f81080779,The roof insulation should be installed when the eaves are still accessible.,{'ID': '169_UK_DocL_V1_ConsrvationOfFuelAndPower'},The roof insulation should be installed when the eaves are still accessible.,part-of,annotated +46f5be2a-1514-420b-bc39-331fc6e0d2df_3,,,"The dwelling primary energy rate, Manual control and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, standards and target fabric energy efficiency rate, respectively.",less-equal,synthetic +73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",necessity,annotated +636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4_0,,,"Where a new building contains more than One internal stairs, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",greater,synthetic +77be05f2-cd8c-4d35-85e4-6637b999d8e7,The value of the consequential improvement works should not be less than 10 of the value of the principal works.,{'ID': '452_UK_DocM_V2_AccessAndUseOfBuildings'},The value of the consequential improvement works should not be less than 10 of the value of the principal works.,greater-equal,annotated +ff3e8f86-1542-4f54-a776-cfdc8482bad7,The seasonal energy efficiency ratio of an air conditioner working in cooling mode should be a minimum of 4.0.,{'ID': '332_UK_DocL_V1_ConsrvationOfFuelAndPower'},The seasonal energy efficiency ratio of an air conditioner working in cooling mode should be a minimum of 4.0.,part-of,annotated +ddc0bba6-2df8-43e1-9398-37514366fb06,"For fixed terminals with automatic flow adjustment at the fan unit, the fan speed should be set to achieve the desired continuous flow rate.",{'ID': '208_UK_DocF_V1_Ventilation'},"For fixed terminals with automatic flow adjustment at the fan unit, the fan speed should be set to achieve the desired continuous flow rate.",necessity,annotated +29c431ee-ea93-491d-ab13-06418d93c488_4,,,"If service is greater than 55, manual control is acceptable.",greater,synthetic +0da52584-1b37-48b5-840f-3795ae695275_11,,,the minimum clear dimensions of the platform are: 1100mm wide and twice the rise plus the going (2R G) condition where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +835d8fad-7a27-4299-aa38-a5b1771a6779,"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",{'ID': '178_UK_DocM_V2_AccessAndUseOfBuildings'},"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",selection,annotated +a4fccc69-c508-4405-92aa-2cfe36bfca39,Exits of parts of the building separated by a fire wall must be constructed separately so that in the event of a fire there is no need to use any door that may be in the fire wall.,{'ID': '209_Finnish_FireSafety'},Exits of parts of the building separated by a fire wall must be constructed separately so that in the event of a fire there is no need to use any door that may be in the fire wall.,none,annotated +973c9430-2b4a-4ab4-82df-7060c3002f77_3,,,The riser for the community heating primary circuit should be a minimum of 400kg.,greater-equal,synthetic +f6add908-4d45-4b3e-83a6-369f6c36c037_9,,,"Door rails, stiles and muntins should be at least 8 per cent (1:12.5) total cost.",greater-equal,synthetic +4e119abd-0cf7-4c60-9c7b-1083f9b46280,"NOTE: If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise attenuating background ventilator should be fitted.",{'ID': '85_UK_DocF_V2_Ventilation'},"NOTE: If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise attenuating background ventilator should be fitted.",necessity,annotated +835d8fad-7a27-4299-aa38-a5b1771a6779_7,,,"In large building complexes, such as retail parks and large sports centres, there should be twice the rise plus the going (2R G) wheelchair-accessible unisex cooling appliance capable of including an adult changing table.",equal,synthetic +3153d771-404e-4a54-ac05-ed1b75e37506_11,,,"Gangways should not be less than 1100mm shallow projecting unless used by not more than 50 persons, in which case gangways should be a minimum of three.",greater-equal,synthetic +2be01bf1-2cd9-4982-8778-ba0afe835580,"If fans and background ventilators are fitted in the same room, they should be at least 500mm apart.",{'ID': '88_UK_DocF_V1_Ventilation'},"If fans and background ventilators are fitted in the same room, they should be at least 500mm apart.",none,annotated +f2bf62e6-9577-48b5-b15d-9fe4904acf52,"Where controls are integrated in the heater, the system should be provided with a time switch/programmer and room temperature sensor linked to heater firing and fan speed control.",{'ID': '268_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where controls are integrated in the heater, the system should be provided with a time switch/programmer and room temperature sensor linked to heater firing and fan speed control.",selection,annotated +7d877df3-9aa7-4dff-a64d-5356a66c944d_0,,,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a design value exceeding 650mm and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",greater,synthetic +7c44934c-61e1-4904-a493-1aa360ccc7d1,"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",{'ID': '1_UK_DocA_Structure'},"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",selection,annotated +536b172d-ccd1-479a-8136-6ee05db0f264,"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",{'ID': '205_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",none,annotated +75c60084-6878-472d-8694-e8739e0dd76c_8,,,The width of access routes in assembly areas with a product certificate of 100 litres must be at least 900 millimetres.,equal,synthetic +bb9ec292-062b-43c3-8590-856dd5f6b890_7,,,"The natural light and building emission rate calculated using the measured air permeability must not be higher than the efficiencies and target emission rate, respectively.",less-equal,synthetic +d728a9c8-0302-4bd1-b69b-0daeefce30d1,"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",{'ID': '84_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",part-of,annotated +2f815a08-db3c-48a6-b248-d69aeac870ee_0,,,"the vertical constraints is: a. not more than 1800mm, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",less-equal,synthetic +7d35f4c4-fa65-4d68-a974-f54386ca8aee_8,,,"However, a horizontal strategy in a protective part must be no higher than 50mm.",less-equal,synthetic +4470dde4-6422-4c13-9781-de68c3e075dc,"The outdoor air flow of a dwelling unit, however, shall be designed to be a minimum of 18 dm3/s.",{'ID': '54_Finnish_Health-IndoorClimateAndVentilation'},"The outdoor air flow of a dwelling unit, however, shall be designed to be a minimum of 18 dm3/s.",greater-equal,annotated +3ec9d4e7-3526-411c-8b30-0c7671660ed1,"The relationship between the kitchen, dining and living areas should be convenient and step-free.",{'ID': '91_UK_DocM_V1_AccessAndUseOfBuildings'},"The relationship between the kitchen, dining and living areas should be convenient and step-free.",necessity,annotated +19478a13-7457-4dd3-a394-744f826db7b0_7,,,"The handle to at least 30 driveways in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",greater-equal,synthetic +eeb4239f-3819-475c-ad20-756bed80c4ff_1,,,"In reference heat loss calculations, the value used as the dimension of the buildings ventilation system shall be 190 kN.",equal,synthetic +0f67dad7-6df9-444b-8e72-f447668e3fde_0,,,"Where sanitary facilities are wheelchair accessible, WC pans should be a minimum of two reception.",greater-equal,synthetic +511c1a7f-08b9-48ec-aea6-9b749fdf31a1_4,,,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an 300mm of appropriately located living quarters which are suitable for users of wheelchairs and walking frames with wheels.",equal,synthetic +bfc84a1d-db59-4f4a-bd93-3d5f1043d11e,A notice of the measured air flow rates must be given to the building control body.,{'ID': '183_UK_DocF_V1_Ventilation'},A notice of the measured air flow rates must be given to the building control body.,necessity,annotated +0aaf71f0-a482-4a72-a407-0d6db79c7f6f,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",{'ID': '69_Finnish_FireSafety'},"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",none,annotated +eeb4239f-3819-475c-ad20-756bed80c4ff_10,,,"In reference heat loss calculations, the value used as the presence of the buildings ventilation system shall be 300 litres.",equal,synthetic +c0a6d35c-cc20-428b-941d-c3e3e6365c74,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",{'ID': '25_UK_DocK_ProtectionFromFalling'},"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",none,annotated +bfdf95da-d422-47cd-83d7-a30a4969f2e6,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",{'ID': '180_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",none,annotated +5e7d4831-4ec8-48f9-9e60-0422fcc1eae4,"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",{'ID': '344_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",selection,annotated +56517433-cf40-4b88-a9d4-18e61e0e9993_7,,,"In addition, on both sides of the toilet seat there shall be a terminals of at least 0.7.",greater-equal,synthetic +c0a6d35c-cc20-428b-941d-c3e3e6365c74_11,,,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a commissioned in accordance with an approved procedure number of steps of 900 millimetres.",equal,synthetic +05fdde92-d8af-42ad-963b-9019c69a8ab3_3,,,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same fire resistance time requirement as the Frames used in the external wall should be included within the depth of the intermediate floor structure.",equal,synthetic +a235c68f-ae44-4770-b005-4e9d7b659eb7_7,,,All cavity walls should have leaves at least 90mm thick and cavities at least 0.3W/m2 power input from controls.,greater-equal,synthetic +72b3e031-a732-4749-af3e-ffd5c635e830,Boards should be fitted to the structure to avoid any gaps between board edges and between the board facings.,{'ID': '145_UK_DocL_V1_ConsrvationOfFuelAndPower'},Boards should be fitted to the structure to avoid any gaps between board edges and between the board facings.,necessity,annotated +259c1614-77ef-4ae4-a401-83caa603e374,"The main doors for entering a dwelling (usually the front doorset) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",{'ID': '35_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front doorset) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",selection,annotated +5fe7997a-7e99-485c-89b3-7912d7c8d44d,"If the total flow rate cannot be achieved through all the terminals, then the fan speed should be increased.",{'ID': '199_UK_DocF_V1_Ventilation'},"If the total flow rate cannot be achieved through all the terminals, then the fan speed should be increased.",necessity,annotated +07336e23-ffc0-4625-9dca-73c1eb5808c7,Purge ventilation should be capable of extracting at least four air changes per hour per room directly to the outside.,{'ID': '47_UK_DocF_V1_Ventilation'},Purge ventilation should be capable of extracting at least four air changes per hour per room directly to the outside.,necessity,annotated +fb5d3054-4911-4049-ba09-1c3e80f9c07c_7,,,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the opening may be no more than 270 millimetres.",less-equal,synthetic +36650de0-ef3c-4fd1-8199-f47c0e576076_10,,,the results of the platform does not exceed E.,less-equal,synthetic +ee0c8c7c-c65e-4403-92e6-628fd680f3bf_9,,,Any panel within the doorset should be at least 15 protection.,greater-equal,synthetic +4470dde4-6422-4c13-9781-de68c3e075dc_6,,,"The outdoor agreed level of provision of a dwelling unit, however, shall be designed to be a minimum of 6m.",greater-equal,synthetic +0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,none,annotated +5fa7daca-cb50-4397-a736-617e52d30187_8,,,"If operation at below 30% are required and unavailable, the away may be taken as equal to that at 30% load.",equal,synthetic +f5a71c7b-e852-40f2-8f88-91cda7902a7e,"If a new building has a space heating or airconditioning system with an effective rated output greater than 180kW, a building automation and control system should be installed.",{'ID': '319_UK_DocM_V2_AccessAndUseOfBuildings'},"If a new building has a space heating or airconditioning system with an effective rated output greater than 180kW, a building automation and control system should be installed.",none,annotated +ef561e39-db90-462c-8dde-15fbeae954e5_3,,,A cube with entry of no more than 1000m2 may pass between the upper edge of the barrier and the protective part.,less-equal,synthetic +5b1fe636-d2aa-4382-885e-a4f8a2cae4d4_3,,,"Generally, a thermal element once upgraded should not have a Control greater than 25 decibels.",less-equal,synthetic +60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",part-of,annotated +9415ae4b-7a74-4c70-a245-e4381c6d71bf,"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",{'ID': '170_UK_DocL_V1_ConsrvationOfFuelAndPower'},"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",none,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",none,annotated +45b99da0-5bce-49b7-9ce2-04810c7e5a19,"For recessed meter boxes on the cold side of the construction, insulation should be installed behind the enclosure.",{'ID': '151_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For recessed meter boxes on the cold side of the construction, insulation should be installed behind the enclosure.",selection,annotated +ef4ec541-e1a7-47d4-9a83-94715d8900ba,"Where one or more parking spaces are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",{'ID': '89_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where one or more parking spaces are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",part-of,annotated +74002ed3-548e-4e2f-8835-be76e643c67d,NOTE 2: Double doors effectively provide nibs where each leaf is at least 300mm wide.,{'ID': '51_UK_DocM_V1_AccessAndUseOfBuildings'},NOTE 2: Double doors effectively provide nibs where each leaf is at least 300mm wide.,part-of,annotated +2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_10,,,The normal relationship between the spread of fire of the rise and going is: 0.136kgCO2/kWh equals between 550mm and 700mm.,equal,synthetic +0365837b-a04d-4aaf-a2f5-2e89403a9c2b,"If all the terminals have to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",{'ID': '200_UK_DocF_V1_Ventilation'},"If all the terminals have to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",none,annotated +203faa23-7b71-47c9-a6e5-2333ac45389e_2,,,"The control capabilities of the indoor steps of dwelling units and living quarters may be no more than 0.7W/(m2K), and the tread must be no less than 250 millimetres.",less-equal,synthetic +a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",greater,annotated +8e8f4fb5-00b5-404f-89df-a07287984748_8,,,"In buildings with a reference value greater than 1800mm, automatic meter reading and data collection facilities should be installed.",greater,synthetic +84cd76d7-e5d0-4f39-94bc-0236c65d533a,"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",{'ID': '217_Finnish_FireSafety'},"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",none,annotated +7f72632a-dc0a-4318-afd7-7090b42350fc,Mechanical supply terminals should be located and directed to avoid draughts.,{'ID': '106_UK_DocF_V1_Ventilation'},Mechanical supply terminals should be located and directed to avoid draughts.,selection,annotated +405a2082-beb9-4c5f-bc9f-d688b72e723b,Intermediate floors: floor-to-wall junctions should be detailed to ensure that insulation in the external wall is continuous.,{'ID': '162_UK_DocL_V1_ConsrvationOfFuelAndPower'},Intermediate floors: floor-to-wall junctions should be detailed to ensure that insulation in the external wall is continuous.,none,annotated +208b093d-361f-4aec-819d-4abca4e72c68_10,,,"in an evacuation area where the fire resistance time requirement is 01:08:00, the second exit may be no less than 900 millimetres in width.",equal,synthetic +54da8684-242a-4a73-8ce5-ee908a038299,"Corridors and passageways should be wide enough to allow people with buggies, people carrying cases or people on crutches to pass others on the access route.",{'ID': '96_UK_DocM_V2_AccessAndUseOfBuildings'},"Corridors and passageways should be wide enough to allow people with buggies, people carrying cases or people on crutches to pass others on the access route.",necessity,annotated +6d9a1e8e-6fe7-4234-951a-96fdc4598bd7_4,,,"If parking spaces are provided for a building, an adequate number of cabinet, but at least 18 dm3/s, shall be intended for the use of a person with mobility and functional impairment.",greater-equal,synthetic +eefe1191-2903-4fb8-9138-6471e09fb67d_6,,,The automatic flow adjustment exceeds half at 11pm.,greater,synthetic +825053cb-af5d-43a9-b59b-e2a5ae78ea73_7,,,The air-tightness of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the widened of associated parking spaces.,greater,synthetic +9415ae4b-7a74-4c70-a245-e4381c6d71bf_11,,,"At gables and party walls, insulation should extend to the wall; if the bars between the wall and joist is less than 2m, perimeter insulation may be required.",less,synthetic +ebc429f0-cb90-41ab-9a11-401a2ddc7bad,"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",{'ID': '268_UK_DocF_V1_Ventilation'},"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",none,annotated +99a53f17-48cb-4012-a47b-700761e0983b_3,,,Where a new building which is not a residential building or a mixed-use building has more than 600 millimetres fittings (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,greater,synthetic +baee716c-b8c2-4500-b4de-63fa11f007b1_5,,,A minimum of one in 0.2 of the remaining floor must have access to cable routes.,equal,synthetic +5ba5ffe7-ece8-488a-b461-da66237e7888,"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",{'ID': '54_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",necessity,annotated +e40e66a5-25da-494b-b09c-e3241289a1b7,All other bedrooms should be accessible to a wheelchair user.,{'ID': '101_UK_DocM_V1_AccessAndUseOfBuildings'},All other bedrooms should be accessible to a wheelchair user.,selection,annotated +fa90c179-d32c-412b-a7d6-a515cc91dbdb,The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,{'ID': '86_Finnish_Health-Humidity'},The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,necessity,annotated +783c19fa-0ef2-466f-b3e9-d4690e34ac5f,Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '214_UK_DocL_V1_ConsrvationOfFuelAndPower'},Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,selection,annotated +53e31e26-a39b-4047-a86e-bdb8021413e8_2,,,Window handles on windows that open outwards are not more than 100 litres target fabric energy efficiency rate when the window is at its maximum openable angle.,less-equal,synthetic +10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,none,annotated +5163f2fb-022f-4589-889f-2ade7a9d49c6,The relevant parts of Part 2 and 3 should be signed by a person who is competent to design the residential building.,{'ID': '109_UK_DocO_Overheating'},The relevant parts of Part 2 and 3 should be signed by a person who is competent to design the residential building.,selection,annotated +d925c189-860a-4fcb-ae88-d1cf8cc14fb8_11,,,"The cross fall of steps in covered or heated outdoor staircases must be no less than 5m, and the riser may be no more than 160 millimetres.",greater-equal,synthetic +8151be81-09ad-4dac-b2d2-f0d757915b6c_7,,,"However, when the snow load can occur, the maximum number of occupants of the load s should be at least 8.5m2.",greater-equal,synthetic +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f,"Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",{'ID': '3_UK_DocR_V1_InfrastructureForElectircalCommunications'},"Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",none,annotated +2f8d4247-e53b-49ae-bd26-c4f1765eaee8_1,,,"Extract air of flow rate 2, 3 and half a metre shall not be used as recirculation air.",equal,synthetic +d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",part-of,annotated +7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",selection,annotated +d3fc8c9b-c23a-4188-8723-369caa90453c_0,,,"The going for a building's total combined window area is 1m2 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",equal,synthetic +4e8c5c50-44af-48f6-b959-e6f9b31afa1e_6,,,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical Supply temperature control may be casings.",equal,synthetic +f420ae57-5656-4558-b1a3-1079e46bf6cc_8,,,"In the case of the storey-level door of a dwelling, or if the floor area through the door exceeds 120, doors must open in the direction of the exit.",greater,synthetic +45adb0b6-63ee-4f42-b6a3-8fc396221c67_5,,,The air leakage rate figure of the insulation plus any required air gap should be at least to the ventilation of the rafters.,greater-equal,synthetic +a0c838b5-5fe2-4b52-abe1-432804c2c8aa_4,,,A service life of 21 C shall be used as the air flow rate for room temperature during the heating season.,equal,synthetic +2ff58135-b89d-40d1-a145-51aad9e5a942_4,,,"The landing in front of the outside door shall be at least One air extract rate and at least 1,500 millimetres long.",greater-equal,synthetic +01008f69-874b-443e-bcb2-2f5630280049_7,,,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the standards may be no more than between 550mm and 700mm and the tread must be no less than 220 millimetres.",less-equal,synthetic +8479a43c-e64a-4180-af62-7f4124c460b8,"An entrance door should be included, which should be shut all the time.",{'ID': '56_UK_DocO_Overheating'},"An entrance door should be included, which should be shut all the time.",necessity,annotated +5b1fe636-d2aa-4382-885e-a4f8a2cae4d4_11,,,"Generally, a thermal element once upgraded should not have a vertical spacing greater than 0.5 kN/m2.",less-equal,synthetic +5577528f-8fa0-4ca3-96f6-ea418091cb86_6,,,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than B in illuminance is able to pass through the opening between the plane level and the handrail or wall.,greater,synthetic +8101fa0e-645c-4a83-a6ab-66c45e94bf67,"If the dwelling already has mechanical ventilation, the centralised system could be extended into the additional room.",{'ID': '155_UK_DocF_V1_Ventilation'},"If the dwelling already has mechanical ventilation, the centralised system could be extended into the additional room.",part-of,annotated +a9c88566-e4e5-4cba-8165-9916820d9cc5,"Doors, gates and boom barriers must operate safely and in such a way that they do not cause a danger of an accident.",{'ID': '75_Finnish_SafetyOfUse'},"Doors, gates and boom barriers must operate safely and in such a way that they do not cause a danger of an accident.",necessity,annotated +50e89a86-e2be-439d-b230-79274cd7199b,Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,{'ID': '81_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,selection,annotated +a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",selection,annotated +4ec7b2ef-59e8-4ab1-9243-16587296b466,Fire must not spread in a roof or in its underlay in a way that causes a hazard.,{'ID': '179_Finnish_FireSafety'},Fire must not spread in a roof or in its underlay in a way that causes a hazard.,selection,annotated +7f3f59a4-fc7e-4b14-8074-384f6cacf548_5,,,"The outputs of a barrier in a dwellings indoor areas may, however, be at least 2.4 metres if the drop is less than three metres.",greater-equal,synthetic +977ccb7b-4580-4ea3-9ea4-5057925c9854,"NOTE: The surface area of the whole building must be included when assessing whether the works constitute a major renovation, even if the building is mixed use.",{'ID': '124_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"NOTE: The surface area of the whole building must be included when assessing whether the works constitute a major renovation, even if the building is mixed use.",part-of,annotated +c25a4595-d20d-40ed-bada-495abcfef307,"Background ventilators should be at least 1700mm above floor level, to reduce cold draughts, but still be easy for the occupant to reach.",{'ID': '64_UK_DocF_V1_Ventilation'},"Background ventilators should be at least 1700mm above floor level, to reduce cold draughts, but still be easy for the occupant to reach.",necessity,annotated +88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",none,annotated +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_5,,,"Where the work concerns a building containing more than 0.05 fire and service rescue equipment, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater,synthetic +5ca6b3d3-fd21-4cc1-8dd8-185268db6615,The doorset should be manufactured from solid or laminated timber with a minimum density of 600kg/m3.,{'ID': '26_UK_DocQ_Security_Dwellings'},The doorset should be manufactured from solid or laminated timber with a minimum density of 600kg/m3.,part-of,annotated +39a37d5e-3361-43b9-a209-e5cd45918abc,"For mixed-use buildings which have parking spaces within a covered car park, any requirements to install electric vehicle charge points or cable routes must first be applied to those parking spaces outside the covered car park.",{'ID': '95_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"For mixed-use buildings which have parking spaces within a covered car park, any requirements to install electric vehicle charge points or cable routes must first be applied to those parking spaces outside the covered car park.",selection,annotated +015b966c-962b-4505-b742-21eaabe0240a,"Where there is a prevailing wind direction, exhaust outlets should be downwind of intakes.",{'ID': '130_UK_DocF_V1_Ventilation'},"Where there is a prevailing wind direction, exhaust outlets should be downwind of intakes.",necessity,annotated +f7f1a609-ae35-4544-9b38-e471d7a00666,"In order to enhance the efficiency of firefighting and rescue operations, means of smoke extraction shall be designed and constructed in the building so that smoke can be extracted from the different premises in the building.",{'ID': '249_Finnish_FireSafety'},"In order to enhance the efficiency of firefighting and rescue operations, means of smoke extraction shall be designed and constructed in the building so that smoke can be extracted from the different premises in the building.",none,annotated +3121fe90-27db-405e-a42a-df3cd22ee176_10,,,"Where necessary, 0.35W/(m2K)flights, one above the other, must be installed in order to take into account children and users of wheelchairs.",equal,synthetic +fb1da22f-8ddb-4399-b441-64dca68da9af_0,,,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than three seconds room temperature.",greater-equal,synthetic +7e34700e-92de-4b00-a820-f4085a2e186c_11,,,"If the free gap between facing walls of adjacent glazed balconies or the depth of the wall to the window of an adjacent fire compartment is less than 0.136kgCO2/kWh, the wall in question must be class EI 15.",less,synthetic +c952db0f-b605-4335-8d56-97fc339ad5ba,All three parts of the installation and commissioning checklist should be completed.,{'ID': '262_UK_DocF_V1_Ventilation'},All three parts of the installation and commissioning checklist should be completed.,equal,annotated +c06bb553-d8f1-47f5-ab33-cfdebb6bca52,"When a building undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"When a building undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",selection,annotated +6e5e61dd-039d-4079-9c3f-f52fc12efefb,For continuing horizontal structures the loaded area shall be calculated span by span.,{'ID': '12_Finnish_StabilityOfStructures'},For continuing horizontal structures the loaded area shall be calculated span by span.,none,annotated +6ec243f2-9294-4b7c-89a4-1c46e4a69cc9,"If site constraints necessitate an approach of 1:20 or steeper, an approach incorporating ramped access should be provided.",{'ID': '49_UK_DocM_V2_AccessAndUseOfBuildings'},"If site constraints necessitate an approach of 1:20 or steeper, an approach incorporating ramped access should be provided.",greater-equal,annotated +511c1a7f-08b9-48ec-aea6-9b749fdf31a1_0,,,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an m3/(hm2) at 50Pa of appropriately located Structures which are suitable for users of wheelchairs and walking frames with wheels.",equal,synthetic +8364a5f1-f80e-484c-9f38-bffc6f4c1876,"Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",{'ID': '44_UK_DocM_V1_AccessAndUseOfBuildings'},"Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",part-of,annotated +0aaf71f0-a482-4a72-a407-0d6db79c7f6f_10,,,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 15mm of non-fire-compartmented data collection facilities that essentially relate to the business of the building may be located on the level of second storey.",less-equal,synthetic +8c4a09c5-1eb2-4a41-86d9-b69c031b4592,Ground arrays including header pipes and manifolds should be flushed as one system to remove all debris and purged to remove all air.,{'ID': '384_UK_DocL_V1_ConsrvationOfFuelAndPower'},Ground arrays including header pipes and manifolds should be flushed as one system to remove all debris and purged to remove all air.,necessity,annotated +2ca092ec-4425-4552-a389-fd0dadfbd154_5,,,NOTE: A floor level with a Signs of 0.9 metres or steeper should be designed as a ramp.,greater-equal,synthetic +b63dcef6-1840-4e9e-ad51-f8fc481fe856_4,,,"The wall ties should have a horizontal spacing of 900mm and a span of 800 millimetres, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic +c47598f9-df79-4d77-aba9-8f380342372f_1,,,"extract air of combined dead,imposed and wind loads 40 degrees Celsius shall be conducted to the outdoors through individual extract air ducts.",equal,synthetic +d9b8f957-49e3-45d0-83ca-c0419a50361a,"In a mechanical system, there shall be a clearly labelled stop switch, which shall be located in an easily accessible place.",{'ID': '48_Finnish_Health-IndoorClimateAndVentilation'},"In a mechanical system, there shall be a clearly labelled stop switch, which shall be located in an easily accessible place.",selection,annotated +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",selection,annotated +cb522b91-f26f-460e-adee-1a7f59ba10c9,"For heat pump installations in which there are other heat sources available to the same building, each of these heat sources should be appropriately incorporated into a singular control system.",{'ID': '315_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heat pump installations in which there are other heat sources available to the same building, each of these heat sources should be appropriately incorporated into a singular control system.",none,annotated +01d924bf-4a69-4eb8-b05e-ce993aee3d45_0,,,Perimeter insulation should be continuous and have a minimum entry of 500 millimetres.,greater-equal,synthetic +b6e6ebce-e75f-4fae-b9a2-e35c164b3fb4,"Where onsite electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and onsite energy demand.",{'ID': '342_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where onsite electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and onsite energy demand.",selection,annotated +f0c72b35-5a0a-4554-8713-96f6f73a67f1,A cube with edges of no more than 50 millimetres may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,{'ID': '51_Finnish_SafetyOfUse'},A cube with edges of no more than 50 millimetres may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,necessity,annotated +53bb982d-5260-4a69-a6dd-71e4f074e676_7,,,The horizontal spacing of standing rows must be at least 20 degrees Celsius.,greater-equal,synthetic +ee0c8c7c-c65e-4403-92e6-628fd680f3bf,Any panel within the doorset should be at least 15mm thick.,{'ID': '30_UK_DocQ_Security_Dwellings'},Any panel within the doorset should be at least 15mm thick.,part-of,annotated +b51c7a9f-2080-4e60-940f-e59af0cc97ce,"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",{'ID': '34_Finnish_Health-Humidity'},"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",none,annotated +c0a6d35c-cc20-428b-941d-c3e3e6365c74_1,,,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a acoustically reflective number of steps of 0.2.",equal,synthetic +4a82f789-a98a-4379-9b81-2a20cfba6c87_8,,,"If the internal ties must be centred on the supporting line, the minimum value of the width, 200 m2, will also be applied to internal ties.",greater-equal,synthetic +4470dde4-6422-4c13-9781-de68c3e075dc_2,,,"The outdoor inaccuracies of a dwelling unit, however, shall be designed to be a minimum of two years.",greater-equal,synthetic +a86b58e8-046f-44b7-8e1b-00c876c8c647_7,,,"Parapets in primary energy content A to 400kg and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",less-equal,synthetic +13a437c0-918c-47f2-85bd-b80dd69eb027_3,,,"There are no planned time of use on the load EER of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",not-part-of,synthetic +c5c5365f-273f-4c29-8491-4f50aabc3b78,"Manual controls for powered entrance doors should be clearly distinguishable against the background and not located so that a person, having used the control, needs to move to avoid contact with the door as it opens.",{'ID': '74_UK_DocM_V2_AccessAndUseOfBuildings'},"Manual controls for powered entrance doors should be clearly distinguishable against the background and not located so that a person, having used the control, needs to move to avoid contact with the door as it opens.",selection,annotated +fa8a6d84-eb99-490e-8169-3c65353fb553_10,,,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the structure shall be at least adequate number.",greater-equal,synthetic +8e9ef8dc-18bd-4877-98cd-556aa4adee8f,"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'},"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",selection,annotated +e1460729-0b58-4a44-99ac-dc150f918428,The cleanouts shall be located so that the entire pipeline may be cleansed.,{'ID': '158_Finnish_Health-WaterAndSewerage'},The cleanouts shall be located so that the entire pipeline may be cleansed.,selection,annotated +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_9,,,"If the limits of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds A of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater,synthetic +aaca648c-5f60-4300-a30f-887da252ebd0,The use of visually and acoustically reflective wall surfaces should be minimised within the lifting platform to prevent discomfort for people with visual and hearing impairment.,{'ID': '116_UK_DocM_V2_AccessAndUseOfBuildings'},The use of visually and acoustically reflective wall surfaces should be minimised within the lifting platform to prevent discomfort for people with visual and hearing impairment.,selection,annotated +5b4380ba-0066-4735-a362-316d4c8e70b2,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",{'ID': '73_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",part-of,annotated +9fd15b82-fc32-4364-8724-f1ef14f0c047_6,,,The cooker hood should side at least the use of the cooker.,greater-equal,synthetic +aaca648c-5f60-4300-a30f-887da252ebd0,The use of visually and acoustically reflective wall surfaces should be minimised within the lifting platform to prevent discomfort for people with visual and hearing impairment.,{'ID': '116_UK_DocM_V2_AccessAndUseOfBuildings'},The use of visually and acoustically reflective wall surfaces should be minimised within the lifting platform to prevent discomfort for people with visual and hearing impairment.,selection,annotated +12f51746-1632-4628-9d8a-98dcf58ed9fc,Doors must be capable of opening outwards - in wheelchair adaptable bathrooms the door may open inwards providing that the door can be easily rehung to open outwards (e.g. door stops are planted and easily moved).,{'ID': '116_UK_DocM_V1_AccessAndUseOfBuildings'},Doors must be capable of opening outwards - in wheelchair adaptable bathrooms the door may open inwards providing that the door can be easily rehung to open outwards (e.g. door stops are planted and easily moved).,selection,annotated +88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",part-of,annotated +316c89ee-aa42-4e7a-9372-960cf25b3265,Extract ventilation may be by natural means or by mechanical means (e.g. by an extract fan or acentral system).,{'ID': '105_UK_DocF_V2_Ventilation'},Extract ventilation may be by natural means or by mechanical means (e.g. by an extract fan or acentral system).,selection,annotated +02f5e3fb-7a8b-4a88-a6e5-337cc0835284,"When a new residential building is erected, information about the building must be given to the owner of the building to allow them to use the overheating mitigation strategy effectively.",{'ID': '90_UK_DocO_Overheating'},"When a new residential building is erected, information about the building must be given to the owner of the building to allow them to use the overheating mitigation strategy effectively.",none,annotated +ced8e4bc-84ed-467a-b41f-d933cff5bb0d,All evacuation areas must be designed in such a way that it is possible to transport an immobile individual on a stretcher via the exit route.,{'ID': '15_Finnish_SafetyOfUse'},All evacuation areas must be designed in such a way that it is possible to transport an immobile individual on a stretcher via the exit route.,selection,annotated +57f7bbad-51b7-4627-8fe9-2d7a50289448,"Doors to the principal, or alternative accessible, entrance should be accessible to all, particularly wheelchair users and people with limited physical dexterity.",{'ID': '64_UK_DocM_V2_AccessAndUseOfBuildings'},"Doors to the principal, or alternative accessible, entrance should be accessible to all, particularly wheelchair users and people with limited physical dexterity.",necessity,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",none,annotated +3153d771-404e-4a54-ac05-ed1b75e37506,"Gangways should not be less than 1100mm wide unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",{'ID': '8_UK_DocK_ProtectionFromFalling'},"Gangways should not be less than 1100mm wide unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",necessity,annotated +05864826-21ef-4ae7-9af8-2aaeffc7267a_9,,,Modular and portable buildings with a planned target fabric energy efficiency rate of more than 8 per cent (1:12.5) but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,greater,synthetic +50e89a86-e2be-439d-b230-79274cd7199b_1,,,Modular and portable buildings with a planned CO2 emission factor of more than 1.3 seconds at a single location should be shown to comply with the energy efficiency requirements.,greater,synthetic +6075de3c-d339-4ba4-9945-990480975615_8,,,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than 28 metres network distribution point of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",greater-equal,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,{'ID': '131_UK_DocM_V1_AccessAndUseOfBuildings'},Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,necessity,annotated +ef4ec541-e1a7-47d4-9a83-94715d8900ba,"Where one or more parking spaces are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",{'ID': '89_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where one or more parking spaces are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",greater-equal,annotated +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated +8e7e4d9a-05b8-4512-91c5-e8dbb9488685,"At night, windows, patio doors and balcony doors should be modelled as closed.",{'ID': '55_UK_DocO_Overheating'},"At night, windows, patio doors and balcony doors should be modelled as closed.",selection,annotated +29232335-402c-4ed9-af74-fd093ac22e28,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,{'ID': '95_Finnish_Health-IndoorClimateAndVentilation'},The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,selection,annotated +2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_7,,,The normal relationship between the total capital cost of the rise and going is: 270 millimetres equals between 550mm and 700mm.,equal,synthetic +3724fd47-22f7-432c-81a2-1abcb95c7df2,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",{'ID': '96_UK_DocF_V1_Ventilation'},"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",equal,annotated +5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",none,annotated +c384013b-c40f-4925-acbe-465e1ca5bc13_10,,,14 metres warning sign per detail should be recorded.,equal,synthetic +8b054fa5-fa6b-40f8-996a-a6dfea855fc3_10,,,"The free gap between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than B on the side wall and no less than 1,500 millimetres on the end wall.",greater-equal,synthetic +984c252b-74f4-4d85-9080-1c8ae1851eca,"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",{'ID': '113_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",none,annotated +5ca184fa-e100-4f97-957d-e37ae944786f_11,,,The side edges of installing electric vehicle charge points and cable routes is not more than 18 dm3/s of the total capital cost of the major renovation.,less-equal,synthetic +3724fd47-22f7-432c-81a2-1abcb95c7df2_10,,,"The natural light installed in a dwellings habitable rooms and kitchens should be no fewer than 10m, except in one bedroom properties, where there should be no fewer than four.",greater-equal,synthetic +c1b2e39e-0bab-438c-8b35-c2b37e5cf93a,"Equipment should be designed, specified and installed with the aim of maximising its efficiency as installed.",{'ID': '233_UK_DocM_V2_AccessAndUseOfBuildings'},"Equipment should be designed, specified and installed with the aim of maximising its efficiency as installed.",none,annotated +3c801d84-c59d-48ef-95b9-f711d22061d4,"The compartment should be fitted with support rails, and include a minimum activity space to accommodate people who use crutches, or otherwise have impaired leg movements.",{'ID': '167_UK_DocM_V2_AccessAndUseOfBuildings'},"The compartment should be fitted with support rails, and include a minimum activity space to accommodate people who use crutches, or otherwise have impaired leg movements.",necessity,annotated +09b2a395-5293-4b7d-82d4-5312482d59e9_9,,,"Door entry controls, where provided, are mounted 28 metres ventilation provision finished ground level, and at least 300mm away from any projecting corner.",equal,synthetic +793cb939-b3d9-46eb-ae65-71a4d5c8031b_0,,,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be clear width to 4.,less-equal,synthetic +e21fa967-934e-4a29-a66d-252fdbbf928f_6,,,"If the parasitic energy use is unknown, an absence of 0.052083333 should be made for any control system.",equal,synthetic +10b2bf58-18df-46ee-a766-ed11eec6f42b,"Humus soil, organic substances decomposing or rotting from moisture or building waste must not be left under new buildings, in their crawl spaces and in their gravel backfills functioning as a drainage layer.",{'ID': '45_Finnish_Health-Humidity'},"Humus soil, organic substances decomposing or rotting from moisture or building waste must not be left under new buildings, in their crawl spaces and in their gravel backfills functioning as a drainage layer.",necessity,annotated +05864826-21ef-4ae7-9af8-2aaeffc7267a_6,,,Modular and portable buildings with a planned thickness of more than 190 millimetres but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,greater,synthetic +c952db0f-b605-4335-8d56-97fc339ad5ba_2,,,All 1800mm dwelling of the installation and commissioning checklist should be completed.,equal,synthetic +7f3f59a4-fc7e-4b14-8074-384f6cacf548_6,,,"The dimensions of a barrier in a dwellings indoor areas may, however, be at least 1 if the drop is less than three metres.",greater-equal,synthetic +fac44f87-4eb9-4f56-998c-74efa9512309,"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",{'ID': '106_Finnish_Health-Humidity'},"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",none,annotated +d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",part-of,annotated +ccc405a0-c6d6-4ace-ad70-e0cfe07cd1e3,"Stairs, ladders and ramps shall be so designed, constructed and installed as to be safe for people moving between different levels in or about the building.",{'ID': '14_UK_DocK_ProtectionFromFalling'},"Stairs, ladders and ramps shall be so designed, constructed and installed as to be safe for people moving between different levels in or about the building.",necessity,annotated +50e89a86-e2be-439d-b230-79274cd7199b,Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,{'ID': '81_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,selection,annotated +84cd76d7-e5d0-4f39-94bc-0236c65d533a,"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",{'ID': '217_Finnish_FireSafety'},"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",none,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_6,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under glare and reflections 1,200 millimetres.",equal,synthetic +a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",selection,annotated +81f14fc1-af5d-45e8-8725-94d2510e4701_1,,,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a either side of at least 390 millimetres in the hallway and kitchen.",greater-equal,synthetic +5ba5ffe7-ece8-488a-b461-da66237e7888,"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",{'ID': '54_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",part-of,annotated +c06bb553-d8f1-47f5-ab33-cfdebb6bca52,"When a building undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"When a building undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",selection,annotated +a1f91cfd-21f8-49a4-8468-746f49f4848e_1,,,"For a building that contains more than 0.8 metres water system for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",greater,synthetic +74002ed3-548e-4e2f-8835-be76e643c67d_7,,,NOTE 2: Double doors effectively provide nibs where each leaf is at least one per 100m2 distance of the basement storey floor from the entry level.,greater-equal,synthetic +1d10aa43-7650-46b1-83c3-867f212ab9c3,Background ventilators should meet the performance standards for both of the following: a. air flow from outside to inside the dwelling; b. air flow from inside the dwelling to outside.,{'ID': '58_UK_DocF_V1_Ventilation'},Background ventilators should meet the performance standards for both of the following: a. air flow from outside to inside the dwelling; b. air flow from inside the dwelling to outside.,part-of,annotated +4fc3b5b1-a838-4429-b385-d8e80e6633eb_1,,,"In the absence of relevant harmonised European Standards, products with a dwelling emission rate exceeding two years must have a product certificate issued by a Notified Body.",greater,synthetic +fb5d3054-4911-4049-ba09-1c3e80f9c07c_10,,,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the number of occupants may be no more than 21 C.",less-equal,synthetic +d34c0f60-8df0-4310-b5af-428c63225a6f,"After a period of non-use of at least eight hours, the water temperature may not exceed 24 degrees Celsius.",{'ID': '60_Finnish_Health-WaterAndSewerage'},"After a period of non-use of at least eight hours, the water temperature may not exceed 24 degrees Celsius.",selection,annotated +bfe386ee-8c0b-41d4-9967-6e873edf7229,"Floors and foundations: insulation should be installed tight to the structure, without air gaps between insulation panels and at edges.",{'ID': '148_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Floors and foundations: insulation should be installed tight to the structure, without air gaps between insulation panels and at edges.",none,annotated +01d924bf-4a69-4eb8-b05e-ce993aee3d45_8,,,Perimeter insulation should be continuous and have a minimum anthracite figure of 0.9 metres.,greater-equal,synthetic +c3cfbf29-a95f-4453-a7de-a8f6e4ca2ea8,"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",{'ID': '152_Finnish_Health-WaterAndSewerage'},"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",selection,annotated +8e9ef8dc-18bd-4877-98cd-556aa4adee8f,"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'},"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",selection,annotated +6c789809-b1b8-429a-8fe2-8ce16f8a4b54,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,{'ID': '62_Finnish_Health-IndoorClimateAndVentilation'},Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,selection,annotated +6e5e61dd-039d-4079-9c3f-f52fc12efefb,For continuing horizontal structures the loaded area shall be calculated span by span.,{'ID': '12_Finnish_StabilityOfStructures'},For continuing horizontal structures the loaded area shall be calculated span by span.,selection,annotated +e320322e-3aee-4167-ad19-a6c6cc41f597,The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,{'ID': '97_Finnish_Health-WaterAndSewerage'},The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,none,annotated +328fb8e7-cae4-4465-b7a7-24f0d066d65a,"The results of all pressure tests on buildings, including any test failures, should be reported to the building control body.",{'ID': '360_UK_DocM_V2_AccessAndUseOfBuildings'},"The results of all pressure tests on buildings, including any test failures, should be reported to the building control body.",part-of,annotated +31d635b2-1d32-49dd-a848-5b5acaf50128,"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",{'ID': '407_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",none,annotated +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_8,,,"In buildings more than 30 and at most 28 metres in heating plant emission rate, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",greater,synthetic +850d22c2-6ff0-4ab6-89e1-75368bad5aa6,Barriers on loading docks must not impede loading and unloading.,{'ID': '136_Finnish_SafetyOfUse'},Barriers on loading docks must not impede loading and unloading.,necessity,annotated +bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,part-of,annotated +e505b13c-7b62-4857-aa2d-544dc986e9c0,"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",{'ID': '18_UK_DocK_ProtectionFromFalling'},"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",selection,annotated +ef561e39-db90-462c-8dde-15fbeae954e5_9,,,A cube with standards of no more than 0.055555556 may pass between the upper edge of the barrier and the protective part.,less-equal,synthetic +b4754f3a-0a30-40fd-9f90-2e3d9e30d2a6,Fixed building services must be commissioned to ensure that they use no more fuel and power than is reasonable in the circumstances.,{'ID': '371_UK_DocL_V1_ConsrvationOfFuelAndPower'},Fixed building services must be commissioned to ensure that they use no more fuel and power than is reasonable in the circumstances.,none,annotated +710ef992-e187-4b1a-894b-e0e222f54359_0,,,"NOTE: For grid-supplied electricity, a number of people evacuating of 90mm and primary energy factor of 1.501kWhPE/kWh should be used.",equal,synthetic +eeb4239f-3819-475c-ad20-756bed80c4ff,"In reference heat loss calculations, the value used as the annual efficiency of heat recovery from ventilation extract air of the buildings ventilation system shall be 55.",{'ID': '151_Finnish_EnergyEfficiency'},"In reference heat loss calculations, the value used as the annual efficiency of heat recovery from ventilation extract air of the buildings ventilation system shall be 55.",part-of,annotated +8364a5f1-f80e-484c-9f38-bffc6f4c1876_2,,,"Where communal parking is provided to blocks of flats, at least 50 standard pipework is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",greater-equal,synthetic +64695439-3458-4d43-8e7b-a2ba75075cea,"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",{'ID': '124_Finnish_SafetyOfUse'},"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",none,annotated +7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",necessity,annotated +636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4_8,,,"Where a new building contains more than adequate means ceilings, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",greater,synthetic +a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",none,annotated +3724fd47-22f7-432c-81a2-1abcb95c7df2_8,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in adequate means foundations properties, where there should be no fewer than four.",equal,synthetic +ad792658-a7d2-4d6e-9a21-c531bb02b521,To reduce the risks to the health of persons in buildings formaldehyde fumes given off by urea formaldehyde foams should not penetrate to the occupied parts of buildings to an extent which would give rise to an irritant concentration.,{'ID': '12_UK_DocD_ToxicSubstances'},To reduce the risks to the health of persons in buildings formaldehyde fumes given off by urea formaldehyde foams should not penetrate to the occupied parts of buildings to an extent which would give rise to an irritant concentration.,selection,annotated +2ff58135-b89d-40d1-a145-51aad9e5a942_6,,,"The landing in front of the outside door shall be at least one number of storeys and at least 1,500 millimetres long.",greater-equal,synthetic +f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c_2,,,A building with a fire load exceeding 280mm must be equipped with anchoring structures for safety lines.,greater,synthetic +86831830-e7f0-4b90-aa27-dc0542b7ba4d_6,,,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least 1800mm step.",greater-equal,synthetic +5577528f-8fa0-4ca3-96f6-ea418091cb86,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,{'ID': '32_Finnish_SafetyOfUse'},The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,part-of,annotated +825053cb-af5d-43a9-b59b-e2a5ae78ea73_3,,,The CO2 of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the cold side of dwellings in the residential building; b. the number of associated parking spaces.,greater,synthetic +2319724e-2fd4-463b-bb59-0972073dc55a,"Both before and after a newly constructed dwelling is built, a notice must be given to the building control body of the calculations.",{'ID': '44_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Both before and after a newly constructed dwelling is built, a notice must be given to the building control body of the calculations.",selection,annotated +db734798-9e42-4fe1-900c-77d4e6131809,"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",{'ID': '11_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",selection,annotated +ba93ede4-473f-4c07-b439-3699580cbcbe,No individual flight has a rise of more than 1800mm between landings.,{'ID': '21_UK_DocM_V1_AccessAndUseOfBuildings'},No individual flight has a rise of more than 1800mm between landings.,selection,annotated +0da52584-1b37-48b5-840f-3795ae695275_4,,,the minimum clear dimensions of the platform are: 1100mm wide and 70 kN constraints where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +c5c5365f-273f-4c29-8491-4f50aabc3b78,"Manual controls for powered entrance doors should be clearly distinguishable against the background and not located so that a person, having used the control, needs to move to avoid contact with the door as it opens.",{'ID': '74_UK_DocM_V2_AccessAndUseOfBuildings'},"Manual controls for powered entrance doors should be clearly distinguishable against the background and not located so that a person, having used the control, needs to move to avoid contact with the door as it opens.",none,annotated +164122ed-c7ac-4cf8-8a54-3d56c144f78d_1,,,"In general, the findings indicate that there should be at least the same number of wall-to-floor junctions as perimeter insulation and for some building types, e.g. large retail buildings, at least twice as many.",greater-equal,synthetic +e8340500-38b6-461b-b00d-d3aa44ac1f0b_7,,,The sections of the water available from the hot water system may not exceed 65mm.,less-equal,synthetic +8fcdc238-3c30-4659-9303-1b126a39b2cd_11,,,The design solar load should be for dua-lfuel appliances by at least 0.055555556.,greater-equal,synthetic +cea6e7bd-c494-4146-9f81-3fd2ed64a2a6,The slope of the floor surface in the seating area and access route may not exceed 8 per cent (1:12.5).,{'ID': '119_Finnish_SafetyOfUse'},The slope of the floor surface in the seating area and access route may not exceed 8 per cent (1:12.5).,part-of,annotated +0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,annotated +8b054fa5-fa6b-40f8-996a-a6dfea855fc3_3,,,"The drop between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 100mm on the side wall and no less than 1,500 millimetres on the end wall.",greater-equal,synthetic +f41fb8da-16bd-4404-accb-e32727f3736a,"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",{'ID': '69_Finnish_SafetyOfUse'},"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",selection,annotated +c7035b48-7244-40a9-a70e-1d244caf72ac,"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",{'ID': '56_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",selection,annotated +65b5e58d-ead5-43fb-831e-3a42487fa227,"People with hearing impairments should be able to participate fully in conferences, committee meetings and study groups.",{'ID': '133_UK_DocM_V2_AccessAndUseOfBuildings'},"People with hearing impairments should be able to participate fully in conferences, committee meetings and study groups.",necessity,annotated +b63dcef6-1840-4e9e-ad51-f8fc481fe856_3,,,"The wall ties should have a horizontal spacing of 900mm and a domestic hot water circulation heat loss of 24 degrees Celsius, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic +ebc429f0-cb90-41ab-9a11-401a2ddc7bad,"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",{'ID': '268_UK_DocF_V1_Ventilation'},"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",selection,annotated +12e545d1-64f4-45c9-a520-5b8a003eba0a_8,,,"If the dwelling has more than 15 exposed building's, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",greater,synthetic +a387fcb8-ead2-4094-9be9-72d783468b33,"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",{'ID': '422_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",none,annotated +66b3628a-f0ee-4bc7-93c8-2ae0145a2e78_4,,,"In a CO2 readings with no openable submission, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",not-part-of,synthetic +00cded8a-5208-4c1b-bda4-9677d45b9375,The layers of attic floor structures and the ventilation must prevent the accumulation of damaging moisture into the roof structure resulting from water vapour diffusion or airflow.,{'ID': '105_Finnish_Health-Humidity'},The layers of attic floor structures and the ventilation must prevent the accumulation of damaging moisture into the roof structure resulting from water vapour diffusion or airflow.,necessity,annotated +05864826-21ef-4ae7-9af8-2aaeffc7267a_2,,,Modular and portable buildings with a planned Capacities of more than 0.3 but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,greater,synthetic +7e34700e-92de-4b00-a820-f4085a2e186c_6,,,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be heat gain 0.07.",equal,synthetic +2032e456-bf80-4342-90dc-0da164e00a9a,A unit that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,{'ID': '7_UK_DocF_V1_Ventilation'},A unit that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,none,annotated +8421f806-70f2-46a9-a308-90a40da3541d,"Where the gradient of the approach, whether over its whole length or in part, is 1:20 or steeper, that part of the approach should be designed as ramped access.",{'ID': '41_UK_DocM_V2_AccessAndUseOfBuildings'},"Where the gradient of the approach, whether over its whole length or in part, is 1:20 or steeper, that part of the approach should be designed as ramped access.",necessity,annotated +2a256a9c-0b8a-4acf-87e1-86a5857f36a3_5,,,"Where a driveway forms all, or part of, the approach route, an linked to one another in at least four groups of at least 2,100 millimetres wide should be provided so that a wheelchair user can pass a parked car.",greater-equal,synthetic +3ac96918-764f-403d-a588-37b5f4a16f46,"For absorption chillers used in conjunction with onsite CHP or a district heat network or community heating system, the CO2 emissions and primary energy should be calculated in the same way as when using CHP for heating.",{'ID': '284_UK_DocM_V2_AccessAndUseOfBuildings'},"For absorption chillers used in conjunction with onsite CHP or a district heat network or community heating system, the CO2 emissions and primary energy should be calculated in the same way as when using CHP for heating.",part-of,annotated +fb5d3054-4911-4049-ba09-1c3e80f9c07c,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",{'ID': '29_Finnish_SafetyOfUse'},"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",part-of,annotated +c7035b48-7244-40a9-a70e-1d244caf72ac,"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",{'ID': '56_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",selection,annotated +8b1482fe-5e9d-4b44-9157-a8de35c65ba9,"If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise-attenuating background ventilator should be fitted.",{'ID': '86_UK_DocF_V1_Ventilation'},"If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise-attenuating background ventilator should be fitted.",selection,annotated +7f696221-52c9-4c52-8f90-74bd93c51299,This grippable handrail is 850-1000mm above the pitch line of the flight and extends at least 300mm beyond the top and bottom nosings.,{'ID': '73_UK_DocM_V1_AccessAndUseOfBuildings'},This grippable handrail is 850-1000mm above the pitch line of the flight and extends at least 300mm beyond the top and bottom nosings.,selection,annotated +b8365796-12c1-47c1-9682-ff6131a75f21,"The various enduse categories, such as heating, lighting and cooling, should be submetered in such a way that at least 90 of the annual energy consumption of each fuel can be assigned to an enduse.",{'ID': '227_UK_DocM_V2_AccessAndUseOfBuildings'},"The various enduse categories, such as heating, lighting and cooling, should be submetered in such a way that at least 90 of the annual energy consumption of each fuel can be assigned to an enduse.",selection,annotated +3e9fc57e-bc69-4f17-a056-dd7767afa9bb_1,,,"If the standard thickness of the building does not exceed 180 millimetres, access to the attic fire compartments from the outside shall be required.",less-equal,synthetic +83344b26-7cf0-452a-9dac-c0288c46393d,"The non-primary doors for entering a dwelling (for example, back door or garage inter-connecting doors) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",{'ID': '37_UK_DocQ_Security_Dwellings'},"The non-primary doors for entering a dwelling (for example, back door or garage inter-connecting doors) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",selection,annotated +f19c920a-bd5a-49ac-a111-69fb944271b4,The net heating energy demand for ventilation shall be calculated on the basis of the heating of air after heat recovery to supply air temperature and any heating before heat recovery.,{'ID': '86_Finnish_EnergyEfficiency'},The net heating energy demand for ventilation shall be calculated on the basis of the heating of air after heat recovery to supply air temperature and any heating before heat recovery.,necessity,annotated +c2e0629d-350b-45b8-9e9e-d58be1780f12_1,,,"If the street areas has no Ventilation ductwork, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",not-part-of,synthetic +51550284-0701-41b2-9a76-a0061d16938a,"Windows and doors: to ensure continuity of the air barrier, window and door units should connect to the primary air barrier and window and door frames should be taped to surrounding structural openings, using air sealing tape.",{'ID': '188_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Windows and doors: to ensure continuity of the air barrier, window and door units should connect to the primary air barrier and window and door frames should be taped to surrounding structural openings, using air sealing tape.",none,annotated +239bd568-c5f2-4ab5-955c-f2d8d86b7b7f,"Where closing devices are needed for fire control, electrically powered hold-open devices or swing-free closing devices should be used as appropriate.",{'ID': '90_UK_DocM_V2_AccessAndUseOfBuildings'},"Where closing devices are needed for fire control, electrically powered hold-open devices or swing-free closing devices should be used as appropriate.",necessity,annotated +8f2f0722-46e5-4c3a-937d-51edde58141a,Routes intended for vehicle traffic must be located in a way that does not restrict pedestrian routes or the space required for opening doors and gates.,{'ID': '90_Finnish_SafetyOfUse'},Routes intended for vehicle traffic must be located in a way that does not restrict pedestrian routes or the space required for opening doors and gates.,selection,annotated +5fe7997a-7e99-485c-89b3-7912d7c8d44d,"If the total flow rate cannot be achieved through all the terminals, then the fan speed should be increased.",{'ID': '199_UK_DocF_V1_Ventilation'},"If the total flow rate cannot be achieved through all the terminals, then the fan speed should be increased.",selection,annotated +636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4,"Where a new building contains more than one dwelling, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",{'ID': '6_UK_DocR_V1_InfrastructureForElectircalCommunications'},"Where a new building contains more than one dwelling, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",part-of,annotated +419892bb-5044-4c63-a8ba-7747ad52c23d,"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",{'ID': '195_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",none,annotated +12e1a42b-38ed-42c8-ac32-86091fcb85b1,The frequency of measurements should be sufficient to ensure that changes in the use of the room or space throughout the day are represented in the readings.,{'ID': '125_UK_DocF_V2_Ventilation'},The frequency of measurements should be sufficient to ensure that changes in the use of the room or space throughout the day are represented in the readings.,part-of,annotated +b4cef2a7-038c-4f72-8ea6-20e43d766165,"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",{'ID': '70_UK_DocM_V2_AccessAndUseOfBuildings'},"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",none,annotated +bfdf95da-d422-47cd-83d7-a30a4969f2e6,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",{'ID': '180_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",selection,annotated +c236bc17-ef9a-4694-a34e-68a9f38ae405,"For a heat exchanger between a solar primary and secondary system, a minimum of 0.1m2 or equivalent of heat exchanger area should be provided for every 1m2 of the net absorber area of the solar collector.",{'ID': '323_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a heat exchanger between a solar primary and secondary system, a minimum of 0.1m2 or equivalent of heat exchanger area should be provided for every 1m2 of the net absorber area of the solar collector.",necessity,annotated +da4d5959-6e64-4e04-a1f3-8b42b6addab0_10,,,The outdoor tread used in the calculations for buildings other than those in intended use categories 1 and 2 outside the occupancy period shall be at least 5m.,greater-equal,synthetic +4d80c4d1-08ee-481a-9f9c-e9151ce1094d_7,,,"The open outwards of windows, roof windows, rooflights and doors should not exceed 400 millimetres of the total floor area of the dwelling.",less-equal,synthetic +aa921550-3c5f-470b-b578-1788f83b49a7,Uplighters mounted at low or floor level can disorientate some visually impaired people and should be avoided.,{'ID': '153_UK_DocM_V2_AccessAndUseOfBuildings'},Uplighters mounted at low or floor level can disorientate some visually impaired people and should be avoided.,none,annotated +a387fcb8-ead2-4094-9be9-72d783468b33_3,,,"If the effective rated output of windows, roof windows, rooflights and doors exceeds 3m of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",greater,synthetic +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",none,annotated +973c9430-2b4a-4ab4-82df-7060c3002f77,The design temperature difference for the community heating primary circuit should be a minimum of 20C.,{'ID': '292_UK_DocL_V1_ConsrvationOfFuelAndPower'},The design temperature difference for the community heating primary circuit should be a minimum of 20C.,greater-equal,annotated +0a7ff0c7-c5f9-4069-9d7e-2bfd6c4871d3,The floor area of the extension does not exceed 30m2.,{'ID': '13_UK_DocL_V1_ConsrvationOfFuelAndPower'},The floor area of the extension does not exceed 30m2.,less-equal,annotated +1181f374-2034-44c4-8823-26f80bd0ec02,The barrier must not feature horizontal structures or patterns that make it possible to climb.,{'ID': '41_Finnish_SafetyOfUse'},The barrier must not feature horizontal structures or patterns that make it possible to climb.,necessity,annotated +05864826-21ef-4ae7-9af8-2aaeffc7267a_4,,,Modular and portable buildings with a planned Ventilation of more than 3.3m but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,greater,synthetic +13a437c0-918c-47f2-85bd-b80dd69eb027_8,,,"There are no deep on the boiler type of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",not-part-of,synthetic +0262f6e5-21bc-4312-9388-8ac93b79416d,The minimum full load EER of the absorption chillers should be no worse than 0.7.,{'ID': '285_UK_DocM_V2_AccessAndUseOfBuildings'},The minimum full load EER of the absorption chillers should be no worse than 0.7.,selection,annotated +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",selection,annotated +7e34700e-92de-4b00-a820-f4085a2e186c_5,,,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be slope 2.4m.",equal,synthetic +d0927095-9e43-4ce4-a740-d5df69dc1dc3_2,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under feasibility of installing high-efficiency alternative systems 0.1m2.",equal,synthetic +6c789809-b1b8-429a-8fe2-8ce16f8a4b54,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,{'ID': '62_Finnish_Health-IndoorClimateAndVentilation'},Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,none,annotated +37f01a2c-b944-45a2-a7f4-140d8c03d7ac_8,,,"After rebating, frame components should retain at least 450mm of light well.",greater-equal,synthetic +0096a3bf-ac16-4a75-adf9-8c3f4a9b8610_6,,,The smaller rate of heat release of each panel which can be either the width or height of the panel should be 300 millimetres or less.,less-equal,synthetic +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_0,,,"Where the work concerns a building containing more than 0.15 dm3/s per m2 system and its electrical output, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater,synthetic +89811586-c819-4eb5-99f5-c4fcefdb9520,Fixed or linked seats must be arranged as rows of seating with an access route on the side of the rows.,{'ID': '107_Finnish_SafetyOfUse'},Fixed or linked seats must be arranged as rows of seating with an access route on the side of the rows.,selection,annotated +4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",selection,annotated +53e31e26-a39b-4047-a86e-bdb8021413e8_11,,,Window handles on windows that open outwards are not more than 300 litres primary energy content when the window is at its maximum openable angle.,less-equal,synthetic +70cd7164-bc50-4b16-95b0-432188db4ea5,Buildings located near to significant local pollution sources should be designed to minimise the intake of external air pollutants.,{'ID': '80_UK_DocO_Overheating'},Buildings located near to significant local pollution sources should be designed to minimise the intake of external air pollutants.,necessity,annotated +a86b58e8-046f-44b7-8e1b-00c876c8c647_8,,,"Parapets in heat gain A to 650mm and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",less-equal,synthetic +8207751f-13b8-4fe3-9bfe-4423093d4905_8,,,"A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the control capabilities of the staircase and exit route is no more than 2,100 millimetres.",less-equal,synthetic +9dd2a0f1-0ff9-4416-8abd-1e6589980ff4_7,,,"If the Manual control of a mechanical ventilation systems air duct is designed to be greater than 3m, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",greater,synthetic +5e51b653-449e-4d00-be19-0e20ecff5c49,The default condition should be off.,{'ID': '213_UK_DocM_V2_AccessAndUseOfBuildings'},The default condition should be off.,equal,annotated +3ca5cb38-b90b-4449-ba14-4268866df8e1_6,,,"The water heater is close to the draw-off points and has a power requirements no greater than 1,500 millimetres.",less-equal,synthetic +956efc87-87de-4d3c-99fb-dc58eab9353b,"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",{'ID': '42_Finnish_Accessibility'},"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",part-of,annotated +5ca184fa-e100-4f97-957d-e37ae944786f_2,,,The energy consumption of installing electric vehicle charge points and cable routes is not more than off of the total capital cost of the major renovation.,less-equal,synthetic +c47598f9-df79-4d77-aba9-8f380342372f_4,,,extract air of flushing 0.7 shall be conducted to the outdoors through individual extract air ducts.,equal,synthetic +208b093d-361f-4aec-819d-4abca4e72c68_9,,,"in an evacuation area where the tie force is 6mm, the second exit may be no less than 900 millimetres in width.",equal,synthetic +2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_6,,,The normal relationship between the ending of the rise and going is: 0.35W/(m2K) equals between 550mm and 700mm.,equal,synthetic +f4b90866-b477-4fe0-a96f-3d6e0d1bd2f6,The annual percentage of heat supplied from each heat source should be the same for each newly connected dwelling.,{'ID': '79_UK_DocL_V1_ConsrvationOfFuelAndPower'},The annual percentage of heat supplied from each heat source should be the same for each newly connected dwelling.,necessity,annotated +922bf8df-3a70-4f45-8c04-200b638d3b3c,The cold water pipe shall be designed and installed so that the temperature in the cold water system may not exceed 20 degrees Celsius.,{'ID': '59_Finnish_Health-WaterAndSewerage'},The cold water pipe shall be designed and installed so that the temperature in the cold water system may not exceed 20 degrees Celsius.,necessity,annotated +10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,necessity,annotated +2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb_10,,,"There should be a space heating or airconditioning system, in the absence of tobacco smoke or other excessive pollutants, of 35 mg/m3 (30 ppm).",equal,synthetic +339fc78c-a2f2-481c-a410-3aeb41e24b8a_9,,,Solid walls constructed of coursed brickwork or blockwork should be at least as reception as 100 litres of the storey height.,greater-equal,synthetic +d0b6759e-deec-451d-bd7a-ec65b96048be,"extract air of category 3 shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",{'ID': '130_Finnish_Health-IndoorClimateAndVentilation'},"extract air of category 3 shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",part-of,annotated +da4d5959-6e64-4e04-a1f3-8b42b6addab0_7,,,The outdoor side edges used in the calculations for buildings other than those in intended use categories 1 and 2 outside the occupancy period shall be at least 20 degrees Celsius.,greater-equal,synthetic +60024014-cb6a-4a53-9b12-9497e0a1e5e8_11,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for air flow rates 15 degrees and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic +b4ae0bf1-8dec-4e43-b10b-4a593780d742,Partitioning doors in accommodation premises shall be equipped with closing devices.,{'ID': '121_Finnish_FireSafety'},Partitioning doors in accommodation premises shall be equipped with closing devices.,part-of,annotated +b63dcef6-1840-4e9e-ad51-f8fc481fe856,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",{'ID': '36_UK_DocA_Structure'},"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",none,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479_0,,,Individual flights are: for intended time of use up to half not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic +d0927095-9e43-4ce4-a740-d5df69dc1dc3_3,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and thermal integrity eight per cent air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +0096a3bf-ac16-4a75-adf9-8c3f4a9b8610,The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,{'ID': '33_UK_DocQ_Security_Dwellings'},The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,none,annotated +e4fb8d18-8dbc-4351-a2df-d87f880f476a_9,,,The allowance for balconies is 100 litres that of the load-bearing structures of the storey.,equal,synthetic +3322ab9c-4c2b-49af-9bf5-74e0efec08d1,The water system shall withstand internal excess pressure of at least 1 000 kilopascals.,{'ID': '65_Finnish_Health-WaterAndSewerage'},The water system shall withstand internal excess pressure of at least 1 000 kilopascals.,necessity,annotated +973c9430-2b4a-4ab4-82df-7060c3002f77_4,,,The number of occupants for the community heating primary circuit should be a minimum of 30m2.,greater-equal,synthetic +26980508-105c-49db-8595-bf001a48d757_9,,,"In cooker hood with no fixed Door furniture or furnishings, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic +eefe1191-2903-4fb8-9138-6471e09fb67d,The internal temperature exceeds 23C at 11pm.,{'ID': '53_UK_DocO_Overheating'},The internal temperature exceeds 23C at 11pm.,greater,annotated +43a7a088-718f-4a11-a392-88e71559466e,"In exceptional circumstances in an existing building, a wheelchair platform stairlift may be considered, provided its installation does not conflict with requirements for means of escape.",{'ID': '107_UK_DocM_V2_AccessAndUseOfBuildings'},"In exceptional circumstances in an existing building, a wheelchair platform stairlift may be considered, provided its installation does not conflict with requirements for means of escape.",selection,annotated +082c7ed9-3579-48c2-a0d2-076f1edd647c_2,,,"Each of the 2.4m entry of the centrally hinged window should be assessed as a single side, bottom or top hung window.",equal,synthetic +c0a6d35c-cc20-428b-941d-c3e3e6365c74_1,,,"In a tier that is uninterrupted by cross-gangways, and where the cross fall exceeds 1 in 40, use a maximum number of steps of 40.",greater,synthetic +35cacecf-06dc-4b0f-aadb-db2ee05518c7_9,,,The area of windows and roof windows (but excluding display windows) Insulated exceeds two of the facade area.,greater,synthetic +d925c189-860a-4fcb-ae88-d1cf8cc14fb8,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",{'ID': '28_Finnish_SafetyOfUse'},"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",less-equal,annotated +40b40b1b-d1b1-49d8-b9b7-13c5845a169d,The structure of the control appliance of the plumbing fixture shall be such that its surface temperature does not arise above 40 degrees Celsius.,{'ID': '71_Finnish_Health-WaterAndSewerage'},The structure of the control appliance of the plumbing fixture shall be such that its surface temperature does not arise above 40 degrees Celsius.,part-of,annotated +2f815a08-db3c-48a6-b248-d69aeac870ee_11,,,"the vertical anthracite figure is: a. not more than 0.3, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",less-equal,synthetic +d342429e-d3fc-46e0-a195-527cfef1fd4b_4,,,"When an existing building with a total useful load capacity of over 90 is being extended or the habitable area is being increased, consequential improvements should be installed.",greater,synthetic +bfc6b7af-2aa8-4c6c-8d4d-1b86f8a67eb5,The total supply air flow should be distributed proportionately to the volume of each habitable room.,{'ID': '105_UK_DocF_V1_Ventilation'},The total supply air flow should be distributed proportionately to the volume of each habitable room.,necessity,annotated +8bb9aee2-a950-4a65-a715-287035906789,"Spaces of a non-residential building and common spaces of a residential building as well as the fixtures, fittings and fixed equipment in them shall be suitable for persons with mobility and functional impairment.",{'ID': '27_Finnish_Accessibility'},"Spaces of a non-residential building and common spaces of a residential building as well as the fixtures, fittings and fixed equipment in them shall be suitable for persons with mobility and functional impairment.",part-of,annotated +cccbc1ea-27be-4d7b-b53c-3cb467a51020,"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",{'ID': '220_UK_DocM_V2_AccessAndUseOfBuildings'},"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",selection,annotated +43e26628-8b62-4cc6-91e2-284335df1564_8,,,"In rooms used for sleeping or rest, the input charge may not exceed 130 millimetres.",less-equal,synthetic +6594919a-cde6-4dd8-be04-eb61e30f99bb,"Snow or rain-water shall not be allowed to ingress the ventilation system via externally mounted air transfer devices in quantities causing damage to the system, lowering air quality or impairing the functioning of the system.",{'ID': '67_Finnish_Health-IndoorClimateAndVentilation'},"Snow or rain-water shall not be allowed to ingress the ventilation system via externally mounted air transfer devices in quantities causing damage to the system, lowering air quality or impairing the functioning of the system.",none,annotated +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated +a4dc06ab-99c3-4c8b-b295-eb3e6a64320a,"The free height from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 2.2 metres, unless the area is protected so as to prevent the danger of collision.",{'ID': '99_Finnish_SafetyOfUse'},"The free height from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 2.2 metres, unless the area is protected so as to prevent the danger of collision.",selection,annotated +9027959e-efc1-4d32-acbe-e0775d40f001_2,,,"The morticed bolts should have a minimum results of 2m, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",greater-equal,synthetic +64695439-3458-4d43-8e7b-a2ba75075cea,"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",{'ID': '124_Finnish_SafetyOfUse'},"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",selection,annotated +5b4380ba-0066-4735-a362-316d4c8e70b2_5,,,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 1800mm heat pump after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",greater,synthetic +8e8f4fb5-00b5-404f-89df-a07287984748,"In buildings with a total useful floor area greater than 1000m2, automatic meter reading and data collection facilities should be installed.",{'ID': '229_UK_DocM_V2_AccessAndUseOfBuildings'},"In buildings with a total useful floor area greater than 1000m2, automatic meter reading and data collection facilities should be installed.",necessity,annotated +b51c7a9f-2080-4e60-940f-e59af0cc97ce,"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",{'ID': '34_Finnish_Health-Humidity'},"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",part-of,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",none,annotated +11f2902d-29c2-474e-97d0-628a2a97a666,"Level differences of over 500 millimetres must be equipped with an appropriate safety barrier, railing or handrail.",{'ID': '109_Finnish_SafetyOfUse'},"Level differences of over 500 millimetres must be equipped with an appropriate safety barrier, railing or handrail.",necessity,annotated +bb9ec292-062b-43c3-8590-856dd5f6b890_10,,,"The total flow rate and building emission rate calculated using the measured air permeability must not be higher than the seasonal energy efficiency ratio and target emission rate, respectively.",less-equal,synthetic +64aead92-11dc-49ab-9086-c86f6d1f9c3e,A dynamic calculation tool shall be used for the calculation of the room temperature for the summer season.,{'ID': '162_Finnish_EnergyEfficiency'},A dynamic calculation tool shall be used for the calculation of the room temperature for the summer season.,selection,annotated +7d1ada0b-8dcc-4c01-84d7-78b80cb404c9,"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",{'ID': '58_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",selection,annotated +75c60084-6878-472d-8694-e8739e0dd76c_3,,,The width of access routes in assembly areas with a Leakage of one must be at least 900 millimetres.,equal,synthetic +75c60084-6878-472d-8694-e8739e0dd76c_5,,,The density of access routes in assembly areas with a maximum capacity of 60 persons must be at least 600kg/m3.,greater-equal,synthetic +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_3,,,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the Air permeability of that installation exceeds 0.055555556 of the total cost of the major renovation.",greater,synthetic +73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",necessity,annotated +203faa23-7b71-47c9-a6e5-2333ac45389e_0,,,"The dimensions of the indoor steps of dwelling units and living quarters may be no more than 0.5 kN/m2, and the tread must be no less than 250 millimetres.",less-equal,synthetic +2ca092ec-4425-4552-a389-fd0dadfbd154,NOTE: A floor level with a gradient of 1:20 or steeper should be designed as a ramp.,{'ID': '54_UK_DocK_ProtectionFromFalling'},NOTE: A floor level with a gradient of 1:20 or steeper should be designed as a ramp.,selection,annotated +d504fd87-d13d-4936-9d7a-71d17954760d_1,,,The design of the steps in an exit may be no more than eight per cent.,less-equal,synthetic +46f5be2a-1514-420b-bc39-331fc6e0d2df_0,,,"The capacity, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the opening, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,synthetic +f41fb8da-16bd-4404-accb-e32727f3736a,"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",{'ID': '69_Finnish_SafetyOfUse'},"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",selection,annotated +1913381b-a2cc-496e-9168-82ccf2a01d50_3,,,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the maximum number of occupants of the heat emitters to be installed does not exceed EI 30.",less-equal,synthetic +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated +d5e04f9c-3e74-4ade-8a8c-07b77efd3fd1,"For windows and roof windows, U-values should be calculated based on a vertical position.",{'ID': '110_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For windows and roof windows, U-values should be calculated based on a vertical position.",necessity,annotated +922bf8df-3a70-4f45-8c04-200b638d3b3c_10,,,The cold water pipe shall be designed and installed so that the CO2 emissions in the cold water system may not exceed one per 100m2.,less-equal,synthetic +23cff3c3-1251-4c5f-9fd9-8f52d25eb494_3,,,Gasfired boilers and multi-stage oilfired boilers with an use of more than six metres should have fully modulating burner controls.,greater,synthetic +d504fd87-d13d-4936-9d7a-71d17954760d_9,,,The air distribution of the steps in an exit may be no more than certain proportion.,less-equal,synthetic +9618a274-45da-4e3e-87f0-21c2bfae4a8e_5,,,"A guardrail must be used at points with a minimum value of over 100 millimetres, if these can be accessed by children.",greater,synthetic +41d06a37-5039-4dc0-aae1-0fe3abbd84fc,The building fabric should be constructed so that the insulation is reasonably continuous across newly built elements.,{'ID': '132_UK_DocL_V1_ConsrvationOfFuelAndPower'},The building fabric should be constructed so that the insulation is reasonably continuous across newly built elements.,necessity,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,annotated +9618a274-45da-4e3e-87f0-21c2bfae4a8e_11,,,"A guardrail must be used at points with a rate of heat release of over 3, if these can be accessed by children.",greater,synthetic +2ff58135-b89d-40d1-a145-51aad9e5a942_3,,,"The landing in front of the outside door shall be at least 15mm heat emission capacity and at least 1,500 millimetres long.",greater-equal,synthetic +eccd4f77-ef4a-41fd-a22a-620c84fdddd4,There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,{'ID': '98_UK_DocM_V1_AccessAndUseOfBuildings'},There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,none,annotated +d988e207-c3f9-4314-9a16-f99b334595f4_8,,,The Manual control must be no less than twice the rise plus the going (2R G).,greater-equal,synthetic +23cff3c3-1251-4c5f-9fd9-8f52d25eb494_4,,,Gasfired boilers and multi-stage oilfired boilers with an sum of more than 0.3 should have fully modulating burner controls.,greater,synthetic +b63dcef6-1840-4e9e-ad51-f8fc481fe856_1,,,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the riser is not less than 3.3m.",greater-equal,synthetic +4f2b56cb-9852-4406-bbea-31f426fb4910,"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",{'ID': '397_UK_DocM_V2_AccessAndUseOfBuildings'},"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",selection,annotated +83344b26-7cf0-452a-9dac-c0288c46393d,"The non-primary doors for entering a dwelling (for example, back door or garage inter-connecting doors) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",{'ID': '37_UK_DocQ_Security_Dwellings'},"The non-primary doors for entering a dwelling (for example, back door or garage inter-connecting doors) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",selection,annotated +86831830-e7f0-4b90-aa27-dc0542b7ba4d_10,,,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least 1,200 millimetres span.",greater-equal,synthetic +a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",none,annotated +f2516477-0c54-4192-9a7a-7bf8755f57e9,"The water meter of a property shall be located in a place where it is easy to install, read and service and where it cannot freeze.",{'ID': '73_Finnish_Health-WaterAndSewerage'},"The water meter of a property shall be located in a place where it is easy to install, read and service and where it cannot freeze.",necessity,annotated +f5a71c7b-e852-40f2-8f88-91cda7902a7e_0,,,"If a new building has a space heating or airconditioning system with an shallow projecting greater than 1m2, a building automation and control system should be installed.",greater,synthetic +75c60084-6878-472d-8694-e8739e0dd76c_1,,,The width of access routes in assembly areas with a quality of the installation of 8 per cent (1:12.5) must be at least 900 millimetres.,equal,synthetic +8e8f4fb5-00b5-404f-89df-a07287984748_4,,,"In buildings with a level differences greater than 100, automatic meter reading and data collection facilities should be installed.",greater,synthetic +203faa23-7b71-47c9-a6e5-2333ac45389e_10,,,"The stairs of the indoor steps of dwelling units and living quarters may be no more than 32mm, and the tread must be no less than 250 millimetres.",less-equal,synthetic +51517a5d-dd11-41b9-b44b-36d87b959127,The presence of the door should be apparent not only when it is shut but also when it is open.,{'ID': '77_UK_DocM_V2_AccessAndUseOfBuildings'},The presence of the door should be apparent not only when it is shut but also when it is open.,none,annotated +86831830-e7f0-4b90-aa27-dc0542b7ba4d_11,,,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least 900 millimetres operation.",greater-equal,synthetic +3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,part-of,annotated +77f993c6-dff1-4f9a-8f66-73221d3cbaff_11,,,"If the dwelling only has 20mm sanitary accommodation, a minimum ventilation rate of 13l/s should be used.",equal,synthetic +76bf63bd-30f4-440d-81a0-61ca16170f70_5,,,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the thick is less than 8.5m2 of the total load.,less,synthetic +f72a98f3-b7d2-4633-b244-0d7242dfb0c9_11,,,Every single bedroom has a minimum room temperature of 100 millimetres and is at least 2.4m wide.,greater-equal,synthetic +e8340500-38b6-461b-b00d-d3aa44ac1f0b_4,,,The alongside the leading edge of the water available from the hot water system may not exceed adequate means.,less-equal,synthetic +77f993c6-dff1-4f9a-8f66-73221d3cbaff_1,,,"If the dwelling only has 120 lead boiler, a minimum ventilation rate of 13l/s should be used.",equal,synthetic +19478a13-7457-4dd3-a394-744f826db7b0_3,,,"The handle to at least 650mm gaps in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",greater-equal,synthetic +710ef992-e187-4b1a-894b-e0e222f54359_6,,,"NOTE: For grid-supplied electricity, a total number of 8.5m2 and primary energy factor of 1.501kWhPE/kWh should be used.",equal,synthetic +fac44f87-4eb9-4f56-998c-74efa9512309,"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",{'ID': '106_Finnish_Health-Humidity'},"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",necessity,annotated +45b99da0-5bce-49b7-9ce2-04810c7e5a19,"For recessed meter boxes on the cold side of the construction, insulation should be installed behind the enclosure.",{'ID': '151_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For recessed meter boxes on the cold side of the construction, insulation should be installed behind the enclosure.",necessity,annotated +94c0e823-a61d-49d6-82b3-4ca96f65dfa4,The buildings surfaces and lighting must be such that they achieve the contrasts in brightness needed for observation.,{'ID': '64_Finnish_SafetyOfUse'},The buildings surfaces and lighting must be such that they achieve the contrasts in brightness needed for observation.,necessity,annotated +7d877df3-9aa7-4dff-a64d-5356a66c944d_10,,,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a design temperature difference exceeding 0.15 and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",greater,synthetic +88e23b46-22d9-4be6-87b7-40541f7995a9_5,,,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the calculation of primary energy and CO2 emissions exceeds 100 litres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",greater,synthetic +2ff58135-b89d-40d1-a145-51aad9e5a942_1,,,"The landing in front of the outside door shall be at least 7 mg/m3 (6 ppm) protection and at least 1,500 millimetres long.",greater-equal,synthetic +20518e80-6f7e-457f-8c5a-59fa4c0eb324,"When calculating the heat loss for a buildings design solution, the design value shall be used as the value of the air leakage rate figure for the building envelope.",{'ID': '137_Finnish_EnergyEfficiency'},"When calculating the heat loss for a buildings design solution, the design value shall be used as the value of the air leakage rate figure for the building envelope.",none,annotated +d342429e-d3fc-46e0-a195-527cfef1fd4b,"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",{'ID': '451_UK_DocM_V2_AccessAndUseOfBuildings'},"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",part-of,annotated +b63dcef6-1840-4e9e-ad51-f8fc481fe856_5,,,"The wall ties should have a frequency of 55 degrees Celsius and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic +f0c72b35-5a0a-4554-8713-96f6f73a67f1_6,,,A cube with primary energy factor of no more than 18 dm3/s may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,less-equal,synthetic +77be05f2-cd8c-4d35-85e4-6637b999d8e7,The value of the consequential improvement works should not be less than 10 of the value of the principal works.,{'ID': '452_UK_DocM_V2_AccessAndUseOfBuildings'},The value of the consequential improvement works should not be less than 10 of the value of the principal works.,selection,annotated +ef4f54b6-1099-4404-9fa2-d0c0d5e55543_9,,,The location must not exceed the individual dwellings selection.,less-equal,synthetic +11f2902d-29c2-474e-97d0-628a2a97a666,"Level differences of over 500 millimetres must be equipped with an appropriate safety barrier, railing or handrail.",{'ID': '109_Finnish_SafetyOfUse'},"Level differences of over 500 millimetres must be equipped with an appropriate safety barrier, railing or handrail.",greater,annotated +079db365-cfed-474e-9329-25349ac0db4a_2,,,"In connection with the door of an outside space of an individual dwelling the boiler type outside the door may be more than 100 litres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",greater,synthetic +3724fd47-22f7-432c-81a2-1abcb95c7df2,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",{'ID': '96_UK_DocF_V1_Ventilation'},"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",greater-equal,annotated +5ca184fa-e100-4f97-957d-e37ae944786f_5,,,The domestic hot water cylinder heat loss of installing electric vehicle charge points and cable routes is not more than 0.7W/(m2K) of the total capital cost of the major renovation.,less-equal,synthetic +74002ed3-548e-4e2f-8835-be76e643c67d_2,,,NOTE 2: Double doors effectively provide nibs where each leaf is at least 400 millimetres configuration.,greater-equal,synthetic +bde1697a-20c9-4f15-a63c-5be323a058c1_7,,,"Any connection of 1,000 millimetres or more sinks to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.",greater-equal,synthetic +339fc78c-a2f2-481c-a410-3aeb41e24b8a_1,,,Solid walls constructed of coursed brickwork or blockwork should be at least as feasibility of installing high-efficiency alternative systems as 1.501kWhPE/kWh of the storey height.,greater-equal,synthetic +2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_5,,,The normal relationship between the dimensions of the rise and going is: proportion equals three metres.,equal,synthetic +5e51b653-449e-4d00-be19-0e20ecff5c49_1,,,The default that should be 50 millimetres.,equal,synthetic +74002ed3-548e-4e2f-8835-be76e643c67d_0,,,NOTE 2: Double doors effectively provide nibs where each leaf is at least half a metre energy efficiency.,greater-equal,synthetic +2032e456-bf80-4342-90dc-0da164e00a9a,A unit that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,{'ID': '7_UK_DocF_V1_Ventilation'},A unit that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,none,annotated +46f5be2a-1514-420b-bc39-331fc6e0d2df_7,,,"The dwelling primary energy rate, rated speed and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, total number of ventilators and target fabric energy efficiency rate, respectively.",less-equal,synthetic +3e9fc57e-bc69-4f17-a056-dd7767afa9bb_11,,,"If the limits of the building does not exceed 0.3, access to the attic fire compartments from the outside shall be required.",less-equal,synthetic +0da52584-1b37-48b5-840f-3795ae695275_10,,,the minimum clear dimensions of the platform are: 1100mm wide and 90 control function where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c_0,,,A building with a lengths exceeding 18 dm3/s must be equipped with anchoring structures for safety lines.,greater,synthetic +f7cfdf57-28f3-4d23-90bf-ec2268e14bac,"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",{'ID': '65_Finnish_SafetyOfUse'},"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",selection,annotated +8719164e-370a-42f2-9240-0a1b8db1a2c7,Extensive voids must be partitioned in order to restrict the spread of fire.,{'ID': '129_Finnish_FireSafety'},Extensive voids must be partitioned in order to restrict the spread of fire.,necessity,annotated +bfdf95da-d422-47cd-83d7-a30a4969f2e6_10,,,"If the internal ties must be centred on the supporting line, the minimum value of the patterns, 1,000 millimetres, will also be applied to internal ties.",greater-equal,synthetic +5b4380ba-0066-4735-a362-316d4c8e70b2_3,,,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 180kW shower rooms after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",greater,synthetic +baee716c-b8c2-4500-b4de-63fa11f007b1_0,,,A minimum of certain proportion in five of the remaining residential block of flats must have access to cable routes.,greater-equal,synthetic +20216261-f56d-4f79-8a46-c781abe19f04,"For new and existing buildings other than dwellings, information should be provided in a new or existing building log book.",{'ID': '98_UK_DocF_V2_Ventilation'},"For new and existing buildings other than dwellings, information should be provided in a new or existing building log book.",selection,annotated +984c252b-74f4-4d85-9080-1c8ae1851eca,"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",{'ID': '113_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",none,annotated +f733b7c9-a406-4f5a-b383-9d3f8b70a559,The selection of relevant critical situations for design should be made reflecting the conditions that can reasonably be foreseen during future use.,{'ID': '5_UK_DocA_Structure'},The selection of relevant critical situations for design should be made reflecting the conditions that can reasonably be foreseen during future use.,none,annotated +72e7ed0c-9e73-46b2-a919-20f3fea337fd_4,,,"An WC accommodation with a potentially flammable or explosive atmosphere must not be located in a doors where there are dwellings, accommodation premises, institutions or assembly and business premises.",not-part-of,synthetic +6a41a473-bd3c-4e38-a093-094b3fdae388_6,,,At least one in every 230mm remaining heating appliance must be provided with cable routes.,equal,synthetic +596cc55c-f50f-4155-962f-832b87226a8e,"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",{'ID': '23_UK_DocF_V1_Ventilation'},"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy.",selection,annotated +73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",part-of,annotated +8b054fa5-fa6b-40f8-996a-a6dfea855fc3_4,,,"The axle group load between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 220 millimetres on the side wall and no less than 1,500 millimetres on the end wall.",greater-equal,synthetic +42f29765-356f-4d9c-9a73-bc99e7044e07,"People with mobility impairments who arrive as passengers should be able to alight from a vehicle close to the principal entrance, or alternative accessible entrance, of the building in a way that is convenient for entry into the building.",{'ID': '47_UK_DocM_V2_AccessAndUseOfBuildings'},"People with mobility impairments who arrive as passengers should be able to alight from a vehicle close to the principal entrance, or alternative accessible entrance, of the building in a way that is convenient for entry into the building.",necessity,annotated +c0abe869-e87e-4e66-a8ca-8578a338b07a,"Where a building automation and control system is installed, its control capabilities should be appropriate for the building, its expected usage and the building services specification.",{'ID': '329_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a building automation and control system is installed, its control capabilities should be appropriate for the building, its expected usage and the building services specification.",selection,annotated +3724fd47-22f7-432c-81a2-1abcb95c7df2_4,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in B extract fan properties, where there should be no fewer than four.",equal,synthetic +d925c189-860a-4fcb-ae88-d1cf8cc14fb8_8,,,"The edges of steps in covered or heated outdoor staircases must be no less than 20 degrees Celsius, and the riser may be no more than 160 millimetres.",greater-equal,synthetic +d30364dd-539e-4351-9d53-89ad358a4b44,"U-values for rooflights or rooflight-and-kerb assemblies should be based on the outer developed surface area, which is often greater than the area of the roof opening.",{'ID': '122_UK_DocL_V1_ConsrvationOfFuelAndPower'},"U-values for rooflights or rooflight-and-kerb assemblies should be based on the outer developed surface area, which is often greater than the area of the roof opening.",part-of,annotated +710ef992-e187-4b1a-894b-e0e222f54359_8,,,"NOTE: For grid-supplied electricity, a total useful floor area of 300 litres and primary energy factor of 1.501kWhPE/kWh should be used.",equal,synthetic +37f30855-f103-43f1-aef2-b37c05b4c174,Facilitating future connection to any local district heat networks should be considered (e.g. providing capped off connections in pipework to allow later connection to a local district heat network).,{'ID': '232_UK_DocL_V1_ConsrvationOfFuelAndPower'},Facilitating future connection to any local district heat networks should be considered (e.g. providing capped off connections in pipework to allow later connection to a local district heat network).,selection,annotated +703e5c71-bd54-4267-acf4-fa7db1e70d49,"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",{'ID': '67_Finnish_Accessibility'},"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",none,annotated +fac44f87-4eb9-4f56-998c-74efa9512309,"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",{'ID': '106_Finnish_Health-Humidity'},"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",none,annotated +05fdde92-d8af-42ad-963b-9019c69a8ab3,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",{'ID': '163_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",part-of,annotated +17fba530-c42b-4eeb-85dd-16da0bacc49c,"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",{'ID': '470_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",selection,annotated +cea6e7bd-c494-4146-9f81-3fd2ed64a2a6_3,,,The efficiency of the floor surface in the seating area and access route may not exceed 32mm.,less-equal,synthetic +3153d771-404e-4a54-ac05-ed1b75e37506_9,,,"Gangways should not be less than 1100mm travel distance unless used by not more than 50 persons, in which case gangways should be a minimum of 2,100 millimetres.",greater-equal,synthetic +f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c_6,,,A building with a impact exceeding 0.8 metres must be equipped with anchoring structures for safety lines.,greater,synthetic +bb9ec292-062b-43c3-8590-856dd5f6b890_6,,,"The anthracite figure and building emission rate calculated using the measured air permeability must not be higher than the Air permeability and target emission rate, respectively.",less-equal,synthetic +8364a5f1-f80e-484c-9f38-bffc6f4c1876,"Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",{'ID': '44_UK_DocM_V1_AccessAndUseOfBuildings'},"Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",greater-equal,annotated +aa41a5d4-c0b1-4da7-84a0-5c2e2738654f_11,,,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than 20 litres per second Linear interpolation.,greater,synthetic +e320322e-3aee-4167-ad19-a6c6cc41f597,The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,{'ID': '97_Finnish_Health-WaterAndSewerage'},The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,selection,annotated +360bc9ab-1ae1-44f0-a6a3-c1110edac6a9,The annual energy savings should be estimated using the National Calculation Methodology Modelling Guide.,{'ID': '465_UK_DocM_V2_AccessAndUseOfBuildings'},The annual energy savings should be estimated using the National Calculation Methodology Modelling Guide.,necessity,annotated +4470dde4-6422-4c13-9781-de68c3e075dc,"The outdoor air flow of a dwelling unit, however, shall be designed to be a minimum of 18 dm3/s.",{'ID': '54_Finnish_Health-IndoorClimateAndVentilation'},"The outdoor air flow of a dwelling unit, however, shall be designed to be a minimum of 18 dm3/s.",none,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",part-of,annotated +ef4f54b6-1099-4404-9fa2-d0c0d5e55543_10,,,The thresholds must not exceed the individual dwellings gradient.,less-equal,synthetic +01008f69-874b-443e-bcb2-2f5630280049_6,,,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the air tightness may be no more than 1,200 MJ/m2 and the tread must be no less than 220 millimetres.",less-equal,synthetic +5b4380ba-0066-4735-a362-316d4c8e70b2,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",{'ID': '73_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",none,annotated +526d7a82-6362-4fce-8d58-1ab0b0005235,The structures of the wet rooms must be rigid enough that the thermal and moisture movements do no damage the wet room waterproofing or surface structures.,{'ID': '115_Finnish_Health-Humidity'},The structures of the wet rooms must be rigid enough that the thermal and moisture movements do no damage the wet room waterproofing or surface structures.,part-of,annotated +3121fe90-27db-405e-a42a-df3cd22ee176_5,,,"Where necessary, 0.15Window handles, one above the other, must be installed in order to take into account children and users of wheelchairs.",equal,synthetic +c0a6d35c-cc20-428b-941d-c3e3e6365c74_3,,,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a installed over unheated rooms number of steps of 01:08:00.",equal,synthetic +7c44934c-61e1-4904-a493-1aa360ccc7d1,"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",{'ID': '1_UK_DocA_Structure'},"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",none,annotated +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_0,,,"Where the U-values of installing only cable routes is more than two of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",greater,synthetic +1e0aa8d6-4291-4a33-883c-b88453c83287,"To correctly assess whether an element meets the limiting U-value, the U-value must be calculated for the element in the appropriate plane either horizontal or vertical.",{'ID': '128_UK_DocM_V2_AccessAndUseOfBuildings'},"To correctly assess whether an element meets the limiting U-value, the U-value must be calculated for the element in the appropriate plane either horizontal or vertical.",selection,annotated +5577528f-8fa0-4ca3-96f6-ea418091cb86,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,{'ID': '32_Finnish_SafetyOfUse'},The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,greater,annotated +aa41a5d4-c0b1-4da7-84a0-5c2e2738654f,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,{'ID': '89_UK_DocF_V1_Ventilation'},The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,part-of,annotated +f36650d9-cd31-4795-9728-7a4dcf3cadde,"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",{'ID': '229_Finnish_FireSafety'},"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",necessity,annotated +4094b859-b3b4-4035-94cd-8cf47ccbd801,The load capacity is at least 400kg.,{'ID': '23_UK_DocM_V1_AccessAndUseOfBuildings'},The load capacity is at least 400kg.,greater-equal,annotated +ee0c8c7c-c65e-4403-92e6-628fd680f3bf_2,,,Any panel within the doorset should be at least 390 millimetres condition.,greater-equal,synthetic +c33e482e-252a-4e99-a905-7861a480d024,"Geo-location should be enabled to confirm the location, date and time of each image.",{'ID': '484_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Geo-location should be enabled to confirm the location, date and time of each image.",necessity,annotated +bf798097-bb99-42d0-a73f-8cebab8fbeb8_5,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the opening must be no less than three seconds.",greater-equal,synthetic +ca1e0369-2dfe-4cf2-8194-87f72ee5a633,"Vertical, horizontal and slinky ground arrays in particular should be flushed in both directions.",{'ID': '385_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Vertical, horizontal and slinky ground arrays in particular should be flushed in both directions.",necessity,annotated +2de867fe-80e7-4617-ad18-36225dd45ab1_2,,,Hinged or pivot windows with an energy performance of less than 2.4m are not suitable for purge ventilation.,less,synthetic +12e545d1-64f4-45c9-a520-5b8a003eba0a_0,,,"If the dwelling has more than E 15 exposed bathroom, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",greater,synthetic +a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",selection,annotated +4fc3b5b1-a838-4429-b385-d8e80e6633eb,"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",selection,annotated +aac9b625-4f6b-42e6-b657-2accd6054607,Heating systems for screed floors that are greater than 65mm thick should automatically reduce the room temperature at night or when the room is unoccupied.,{'ID': '299_UK_DocL_V1_ConsrvationOfFuelAndPower'},Heating systems for screed floors that are greater than 65mm thick should automatically reduce the room temperature at night or when the room is unoccupied.,necessity,annotated +ef4f54b6-1099-4404-9fa2-d0c0d5e55543_11,,,The U-values must not exceed the individual dwellings prevailing wind direction.,less-equal,synthetic +86831830-e7f0-4b90-aa27-dc0542b7ba4d,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least one intermediate landing.",{'ID': '18_Finnish_SafetyOfUse'},"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least one intermediate landing.",greater-equal,annotated +16f6f10e-f32f-48b2-85f9-123cdb5448ee,Any unavoidable gaps between boards should be infilled using compressible tape (e.g. for boards within roof rafters) or low expansion foam (e.g. for boards within wall cavities).,{'ID': '147_UK_DocL_V1_ConsrvationOfFuelAndPower'},Any unavoidable gaps between boards should be infilled using compressible tape (e.g. for boards within roof rafters) or low expansion foam (e.g. for boards within wall cavities).,none,annotated +dae0db09-fd4b-4f2c-99c0-cd742b19d17a,"A glass structure or other light-permeable structure, along with its mountings, must withstand the load to which it is normally subject, unless the structure is protected by a fixed collision barrier.",{'ID': '68_Finnish_SafetyOfUse'},"A glass structure or other light-permeable structure, along with its mountings, must withstand the load to which it is normally subject, unless the structure is protected by a fixed collision barrier.",necessity,annotated +7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",none,annotated +26980508-105c-49db-8595-bf001a48d757,"In rooms with no fixed seats or furnishings, the number of persons shall be calculated to be two persons per square metre.",{'ID': '103_Finnish_SafetyOfUse'},"In rooms with no fixed seats or furnishings, the number of persons shall be calculated to be two persons per square metre.",selection,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,{'ID': '18_UK_DocM_V1_AccessAndUseOfBuildings'},Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,none,annotated +6e61f4b0-ddc1-44cb-9966-0e146933d032,"Where a separate-sex toilet washroom can be accessed by wheelchair users, it should be possible for them to use both a urinal, where appropriate, and a washbasin at a lower height than is provided for other users.",{'ID': '171_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a separate-sex toilet washroom can be accessed by wheelchair users, it should be possible for them to use both a urinal, where appropriate, and a washbasin at a lower height than is provided for other users.",selection,annotated +09e6b265-5610-4917-ac32-6b2c8f144fd6,"Windows, skylights and ventilators which can be opened by people in or about the building shall be so constructed or equipped that they may be opened, closed or adjusted safely.",{'ID': '107_UK_DocK_ProtectionFromFalling'},"Windows, skylights and ventilators which can be opened by people in or about the building shall be so constructed or equipped that they may be opened, closed or adjusted safely.",necessity,annotated +c72a5952-2e0b-4d4a-9185-09e4149b6239,The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,{'ID': '114_Finnish_Health-Humidity'},The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,necessity,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479_10,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for ending up to 0.07 not more than 5m long.,less-equal,synthetic +c47598f9-df79-4d77-aba9-8f380342372f,extract air of category 4 shall be conducted to the outdoors through individual extract air ducts.,{'ID': '88_Finnish_Health-IndoorClimateAndVentilation'},extract air of category 4 shall be conducted to the outdoors through individual extract air ducts.,part-of,annotated +ef561e39-db90-462c-8dde-15fbeae954e5_1,,,A cube with rise of no more than two may pass between the upper edge of the barrier and the protective part.,less-equal,synthetic +079db365-cfed-474e-9329-25349ac0db4a_11,,,"In connection with the door of an outside space of an individual dwelling the maximum number of occupants outside the door may be more than 0.2 if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",greater,synthetic +bb9ec292-062b-43c3-8590-856dd5f6b890_11,,,"The size and building emission rate calculated using the measured air permeability must not be higher than the efficiency and target emission rate, respectively.",less-equal,synthetic +76bf63bd-30f4-440d-81a0-61ca16170f70,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,part-of,annotated +5e7d4831-4ec8-48f9-9e60-0422fcc1eae4,"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",{'ID': '344_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",none,annotated +32dec356-9315-4ea6-9213-86ad0a72802b,Drawings should be reviewed by the designer and installer and should include specifications for key materials.,{'ID': '177_UK_DocL_V1_ConsrvationOfFuelAndPower'},Drawings should be reviewed by the designer and installer and should include specifications for key materials.,necessity,annotated +8e9ef8dc-18bd-4877-98cd-556aa4adee8f,"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'},"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",selection,annotated +5211dbd1-d12a-4371-ad62-1dc5616cd2f5,The heat pump along with its accompanying pipework should be flushed and purged as a separate system while isolated from the ground array system.,{'ID': '387_UK_DocL_V1_ConsrvationOfFuelAndPower'},The heat pump along with its accompanying pipework should be flushed and purged as a separate system while isolated from the ground array system.,necessity,annotated +7d35f4c4-fa65-4d68-a974-f54386ca8aee_9,,,"However, a horizontal fasteners in a protective part must be no higher than 300 millimetres.",less-equal,synthetic +9415ae4b-7a74-4c70-a245-e4381c6d71bf,"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",{'ID': '170_UK_DocL_V1_ConsrvationOfFuelAndPower'},"At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required.",none,annotated +99a53f17-48cb-4012-a47b-700761e0983b_3,,,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) 8.5m2 of those precipices must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,equal,synthetic +389c960b-525d-4f2e-9a2c-1805eb2dc20d_7,,,The full illuminance under a stair that forms part of the storage provision should be counted as 10 litres per second per person.,equal,synthetic +bde1697a-20c9-4f15-a63c-5be323a058c1_6,,,Any connection of 20mm or more parking to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,greater-equal,synthetic +a9944ed0-7168-4ec7-b761-0641e3e3228b,The sewerage system shall be equipped with cleanouts that are easy to handle and lockable in both horizontal and vertical sewers.,{'ID': '157_Finnish_Health-WaterAndSewerage'},The sewerage system shall be equipped with cleanouts that are easy to handle and lockable in both horizontal and vertical sewers.,none,annotated +47e50ddf-6174-436d-851b-7ddf46c10ccf,A suitable chemical inhibitor should be added to the primary heating circuit to protect against scale and corrosion.,{'ID': '380_UK_DocL_V1_ConsrvationOfFuelAndPower'},A suitable chemical inhibitor should be added to the primary heating circuit to protect against scale and corrosion.,selection,annotated +500fc416-e652-4a2c-8dd3-8d9754ea1829,There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,{'ID': '115_UK_DocF_V2_Ventilation'},There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,selection,annotated +2a256a9c-0b8a-4acf-87e1-86a5857f36a3_6,,,"Where a driveway forms all, or part of, the approach route, an uppermost of at least 5m wide should be provided so that a wheelchair user can pass a parked car.",greater-equal,synthetic +4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",none,annotated +8151be81-09ad-4dac-b2d2-f0d757915b6c,"However, when the snow load can occur, the minimum value of the load s should be at least 0.5 kN/m2.",{'ID': '110_Finnish_StabilityOfStructures'},"However, when the snow load can occur, the minimum value of the load s should be at least 0.5 kN/m2.",none,annotated +40b40b1b-d1b1-49d8-b9b7-13c5845a169d_6,,,The structure of the control appliance of the plumbing fixture shall be such that its headroom does not arise above 150mm.,less-equal,synthetic +a86b58e8-046f-44b7-8e1b-00c876c8c647,"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",{'ID': '30_Finnish_StabilityOfStructures'},"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",necessity,annotated +01d924bf-4a69-4eb8-b05e-ce993aee3d45_11,,,Perimeter insulation should be continuous and have a minimum parasitic energy use of half a metre.,greater-equal,synthetic +e505b13c-7b62-4857-aa2d-544dc986e9c0,"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",{'ID': '18_UK_DocK_ProtectionFromFalling'},"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",selection,annotated +76acc6bd-50c0-4f3f-b015-42e171ec6ce7,One electric vehicle charge point must be installed.,{'ID': '82_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},One electric vehicle charge point must be installed.,equal,annotated +1d10aa43-7650-46b1-83c3-867f212ab9c3,Background ventilators should meet the performance standards for both of the following: a. air flow from outside to inside the dwelling; b. air flow from inside the dwelling to outside.,{'ID': '58_UK_DocF_V1_Ventilation'},Background ventilators should meet the performance standards for both of the following: a. air flow from outside to inside the dwelling; b. air flow from inside the dwelling to outside.,selection,annotated +7f696221-52c9-4c52-8f90-74bd93c51299,This grippable handrail is 850-1000mm above the pitch line of the flight and extends at least 300mm beyond the top and bottom nosings.,{'ID': '73_UK_DocM_V1_AccessAndUseOfBuildings'},This grippable handrail is 850-1000mm above the pitch line of the flight and extends at least 300mm beyond the top and bottom nosings.,part-of,annotated +13a437c0-918c-47f2-85bd-b80dd69eb027,"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",necessity,annotated +6075de3c-d339-4ba4-9945-990480975615_0,,,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than 70 kN design solar load of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",greater-equal,synthetic +7f696221-52c9-4c52-8f90-74bd93c51299_1,,,This grippable handrail is 850-1000mm above the pitch line of the flight and tie force at least 270 millimetres beyond the top and bottom nosings.,greater-equal,synthetic +bb9ec292-062b-43c3-8590-856dd5f6b890_3,,,"The use and building emission rate calculated using the measured air permeability must not be higher than the away and target emission rate, respectively.",less-equal,synthetic +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_11,,,"Where the work concerns a building containing more than 400-600mm systems, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater-equal,synthetic +aef92227-4c01-4c59-b96d-ce414540606b,"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",{'ID': '63_UK_DocM_V2_AccessAndUseOfBuildings'},"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",none,annotated +8e9ef8dc-18bd-4877-98cd-556aa4adee8f,"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'},"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",selection,annotated +d8066a73-49c2-4e99-825a-b49b9b2ba67d_8,,,A landing measuring at least 0.15 in full width must be reserved in front of and behind a door located in an exit route.,greater-equal,synthetic +5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",selection,annotated +c0a6d35c-cc20-428b-941d-c3e3e6365c74_8,,,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a average number of steps of 75 light source lumens per circuit-watt.",equal,synthetic +ff3e8f86-1542-4f54-a776-cfdc8482bad7_9,,,The horizontal spacing of an air conditioner working in cooling mode should be a minimum of 390 millimetres.,greater-equal,synthetic +4e8c5c50-44af-48f6-b959-e6f9b31afa1e_8,,,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical Standing areas may be thermal element.",equal,synthetic +bc5a76fa-f0ec-47d5-b8e3-0e9458f3f140,"Foundations: wherever possible, blocks below the damp-proof course should be the same as those specified in the design for the above-ground main wall element (in masonry construction).",{'ID': '159_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Foundations: wherever possible, blocks below the damp-proof course should be the same as those specified in the design for the above-ground main wall element (in masonry construction).",necessity,annotated +2032e456-bf80-4342-90dc-0da164e00a9a,A unit that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,{'ID': '7_UK_DocF_V1_Ventilation'},A unit that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,part-of,annotated +05864826-21ef-4ae7-9af8-2aaeffc7267a,Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,{'ID': '83_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,none,annotated +b51c7a9f-2080-4e60-940f-e59af0cc97ce,"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",{'ID': '34_Finnish_Health-Humidity'},"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",necessity,annotated +0096a3bf-ac16-4a75-adf9-8c3f4a9b8610,The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,{'ID': '33_UK_DocQ_Security_Dwellings'},The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,part-of,annotated +38cd3221-7fc9-4462-be20-78b16a4309d3_5,,,The open outwards of openings in the newly created dwelling should not be more than 2m of the total floor area.,less-equal,synthetic +8f2f0722-46e5-4c3a-937d-51edde58141a,Routes intended for vehicle traffic must be located in a way that does not restrict pedestrian routes or the space required for opening doors and gates.,{'ID': '90_Finnish_SafetyOfUse'},Routes intended for vehicle traffic must be located in a way that does not restrict pedestrian routes or the space required for opening doors and gates.,necessity,annotated +6c789809-b1b8-429a-8fe2-8ce16f8a4b54,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,{'ID': '62_Finnish_Health-IndoorClimateAndVentilation'},Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,selection,annotated +9b908e68-0f92-4883-9fd2-7fe013848b15,"Where a gas combination boiler is used, the boiler type should be selected to modulate down to the typical heating load of the dwelling.",{'ID': '237_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a gas combination boiler is used, the boiler type should be selected to modulate down to the typical heating load of the dwelling.",selection,annotated +517253f8-98b1-4821-8901-75124d3237db,"Consideration should be given to the provision of a second handrail on stairs in a wide range of building types, and particularly in schools, for use by children and people of short stature.",{'ID': '59_UK_DocM_V2_AccessAndUseOfBuildings'},"Consideration should be given to the provision of a second handrail on stairs in a wide range of building types, and particularly in schools, for use by children and people of short stature.",selection,annotated +a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",part-of,annotated +8beb3f9d-f806-4385-b876-2b3d29d7852a,Independent temperature control of the hot water circuit should be implemented with a cylinder thermostat and a timing device.,{'ID': '269_UK_DocL_V1_ConsrvationOfFuelAndPower'},Independent temperature control of the hot water circuit should be implemented with a cylinder thermostat and a timing device.,part-of,annotated +d713514a-9398-45a2-9584-efecff6ebcc5,Reasonable provision must be made to resist unauthorised access to (a) any dwelling; and (b) any part of a building from which access can be gained to a flat within the building.,{'ID': '4_UK_DocQ_Security_Dwellings'},Reasonable provision must be made to resist unauthorised access to (a) any dwelling; and (b) any part of a building from which access can be gained to a flat within the building.,necessity,annotated +8fec1c4a-527e-49b6-9267-89ff700a9291,"Where membranes are penetrated, careful detailing should be used to achieve a robust and durable seal at these penetrations.",{'ID': '182_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where membranes are penetrated, careful detailing should be used to achieve a robust and durable seal at these penetrations.",selection,annotated +12e545d1-64f4-45c9-a520-5b8a003eba0a_3,,,"If the dwelling has more than 220 millimetres exposed ramp, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",greater,synthetic +759d26ff-821f-4949-9096-a7e15c5580f6,Windows and doors: should be installed in such a way that the thermal integrity of the insulated plane is maintained.,{'ID': '137_UK_DocL_V1_ConsrvationOfFuelAndPower'},Windows and doors: should be installed in such a way that the thermal integrity of the insulated plane is maintained.,selection,annotated +d941229d-4de4-4873-9704-c207a9b673c8,An exit enclosure has doors that open separately into each adjoining fire compartment without a need to open the doors at the same time.,{'ID': '26_Finnish_FireSafety'},An exit enclosure has doors that open separately into each adjoining fire compartment without a need to open the doors at the same time.,part-of,annotated +6187cad8-0d6d-4154-b98b-7285b36fea8d,Continuously running fans should be set up to operate without occupant intervention but may have manual or automatic controls for selecting the high rate of operation.,{'ID': '65_UK_DocF_V1_Ventilation'},Continuously running fans should be set up to operate without occupant intervention but may have manual or automatic controls for selecting the high rate of operation.,selection,annotated +c952db0f-b605-4335-8d56-97fc339ad5ba_9,,,All 15mm bathrooms of the installation and commissioning checklist should be completed.,equal,synthetic +3e9fc57e-bc69-4f17-a056-dd7767afa9bb_4,,,"If the energy consumption of the building does not exceed two, access to the attic fire compartments from the outside shall be required.",less-equal,synthetic +10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,necessity,annotated +339fc78c-a2f2-481c-a410-3aeb41e24b8a_4,,,Solid walls constructed of coursed brickwork or blockwork should be at least as total load as 6m of the storey height.,greater-equal,synthetic +2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_7,,,"The normal relationship between the dimensions of the rise and going is: 1,200 MJ/m2 equals 40 degrees Celsius.",equal,synthetic +78d904cd-b605-43a6-b3a4-34c22f557123,"Instead, the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",{'ID': '84_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Instead, the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",none,annotated +3c0a8ccb-d813-40fb-b69b-88250d3bc4ec_3,,,These fittings should not exceed a from the top and bottom corners of the door of 0.2.,less-equal,synthetic +82330d3d-6139-4050-9ca0-946bc982fbb0,The sign should be suitably weatherproof for its location.,{'ID': '119_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The sign should be suitably weatherproof for its location.,selection,annotated +72e7ed0c-9e73-46b2-a919-20f3fea337fd_3,,,"An electric resistance heating with a potentially flammable or explosive atmosphere must not be located in a installation and commissioning checklist where there are dwellings, accommodation premises, institutions or assembly and business premises.",not-part-of,synthetic +4c83069b-8c22-43ad-92a0-354ecd0e40a1,"Sufficient information should be provided to ensure that people can operate, maintain or alter an electrical installation with reasonable safety.",{'ID': '7_UK_DocP_ElectricalSafety'},"Sufficient information should be provided to ensure that people can operate, maintain or alter an electrical installation with reasonable safety.",selection,annotated +1913381b-a2cc-496e-9168-82ccf2a01d50_11,,,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the going of the heat emitters to be installed does not exceed 24 degrees Celsius.",less-equal,synthetic +f6add908-4d45-4b3e-83a6-369f6c36c037_6,,,"Door rails, stiles and muntins should be at least 1800mm measures.",greater-equal,synthetic +e505b13c-7b62-4857-aa2d-544dc986e9c0,"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",{'ID': '18_UK_DocK_ProtectionFromFalling'},"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",greater-equal,annotated +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_0,,,"In buildings more than 1 and at most 28 metres in clear width, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",greater,synthetic +a235c68f-ae44-4770-b005-4e9d7b659eb7,All cavity walls should have leaves at least 90mm thick and cavities at least 50mm wide.,{'ID': '35_UK_DocA_Structure'},All cavity walls should have leaves at least 90mm thick and cavities at least 50mm wide.,greater-equal,annotated +7f3f59a4-fc7e-4b14-8074-384f6cacf548,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",{'ID': '45_Finnish_SafetyOfUse'},"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",none,annotated +8207751f-13b8-4fe3-9bfe-4423093d4905_11,,,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the rated speed of the staircase and exit route is no more than 900mm.,less-equal,synthetic +aef92227-4c01-4c59-b96d-ce414540606b,"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",{'ID': '63_UK_DocM_V2_AccessAndUseOfBuildings'},"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",none,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8_1,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the Activation from these spaces does not exceed adequate number of the total air flow in the vertical duct.",less-equal,synthetic +302c413e-fefd-47f1-914f-0dc787e4a761_1,,,"Where cross-sectional area on surfaces is greater than 01:08:00, a difference in light reflectance value should be a minimum of 20 points.",greater,synthetic +4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9_1,,,"In spaces intended for more than 60 persons, the power requirements of the access route must be at least Five ventilators.",greater-equal,synthetic +05864826-21ef-4ae7-9af8-2aaeffc7267a_3,,,"Modular and portable buildings with a planned service life of more than two years but with an clear width in a single location of less than 1,500 millimetres should be shown to comply with the energy efficiency requirements.",less,synthetic +7c44934c-61e1-4904-a493-1aa360ccc7d1,"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",{'ID': '1_UK_DocA_Structure'},"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",selection,annotated +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_0,,,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the topography of that installation exceeds 35 mg/m3 (30 ppm) of the total cost of the major renovation.",greater,synthetic +642e2c46-45a8-440f-af0b-1b53f41d8d8f,Taps and WC cubicle doors should be operable by people with limited strength or manual dexterity and doors to cubicles should be capable of being opened if a person has collapsed against them while inside the cubicle.,{'ID': '156_UK_DocM_V2_AccessAndUseOfBuildings'},Taps and WC cubicle doors should be operable by people with limited strength or manual dexterity and doors to cubicles should be capable of being opened if a person has collapsed against them while inside the cubicle.,necessity,annotated +2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb,"There should be a supply rate, in the absence of tobacco smoke or other excessive pollutants, of 10 litres per second per person.",{'ID': '114_UK_DocF_V2_Ventilation'},"There should be a supply rate, in the absence of tobacco smoke or other excessive pollutants, of 10 litres per second per person.",necessity,annotated +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_6,,,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the sum of that installation exceeds 120 of the total cost of the major renovation.",greater,synthetic +77f993c6-dff1-4f9a-8f66-73221d3cbaff_10,,,"If the dwelling only has one habitable room, a minimum protective part of 100 should be used.",greater-equal,synthetic +7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8_8,,,"For sizes of cylinder not listed, the Linear interpolation from the cylinder should not exceed 2, where V is the volume in litres.",less-equal,synthetic +dcc583b1-8c4c-42cf-a1ed-e8907de56254_3,,,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the number of occupants must be no less than 5m.",greater-equal,synthetic +35af73f1-53c7-4377-9da0-acf99eef4d8e,"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",{'ID': '159_UK_DocM_V2_AccessAndUseOfBuildings'},"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",part-of,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",necessity,annotated +793cb939-b3d9-46eb-ae65-71a4d5c8031b_11,,,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be total number to 0.7W/(m2K).,less-equal,synthetic +082c7ed9-3579-48c2-a0d2-076f1edd647c_9,,,"Each of the 30 air tightness of the centrally hinged window should be assessed as a single side, bottom or top hung window.",equal,synthetic +e15250c0-1279-4d29-a1ec-31560b045007_4,,,cords of basement storeys must not be connected to fire and smoke-proof Door entry controls.,not-part-of,synthetic +36650de0-ef3c-4fd1-8199-f47c0e576076_11,,,"the patterns of the platform does not exceed 1,500 millimetres.",less-equal,synthetic +bb9ec292-062b-43c3-8590-856dd5f6b890,"The building primary energy rate and building emission rate calculated using the measured air permeability must not be higher than the target primary energy rate and target emission rate, respectively.",{'ID': '357_UK_DocM_V2_AccessAndUseOfBuildings'},"The building primary energy rate and building emission rate calculated using the measured air permeability must not be higher than the target primary energy rate and target emission rate, respectively.",less-equal,annotated +7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",part-of,annotated +a7d2ac72-8a5b-4432-8449-001439d3ab93,Guarding should be sized to prevent the passage of a 100mm sphere.,{'ID': '85_UK_DocO_Overheating'},Guarding should be sized to prevent the passage of a 100mm sphere.,necessity,annotated +0f67dad7-6df9-444b-8e72-f447668e3fde_11,,,"Where sanitary facilities are wheelchair accessible, WC pans should be a minimum of 0.9 metres instantaneous carbon monoxide concentration.",greater-equal,synthetic +d5a90fc3-6477-476f-91f0-083444f3b68b,Ventilation should be controllable.,{'ID': '63_UK_DocF_V1_Ventilation'},Ventilation should be controllable.,necessity,annotated +c0a6d35c-cc20-428b-941d-c3e3e6365c74_10,,,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a replaced number of steps of 1.501kWhPE/kWh.",equal,synthetic +78a7dc3d-5e1e-4858-8913-b319e30f2ff1,The air extract rate should be 20 litres per second per machine during use.,{'ID': '46_UK_DocF_V2_Ventilation'},The air extract rate should be 20 litres per second per machine during use.,part-of,annotated +81314489-dcd9-410f-9b15-595b87e7c8f9,"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",{'ID': '14_UK_DocQ_Security_Dwellings'},"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",part-of,annotated +cea6e7bd-c494-4146-9f81-3fd2ed64a2a6_11,,,The location of the floor surface in the seating area and access route may not exceed (16.66 8.33 V0.4)/(1000 24).,less-equal,synthetic +73b4b305-8971-489a-a290-f996e1f63e19,"The clear width of the door and opening leading to room spaces of a non-residential building as well as to residential rooms of a residential building, necessary spaces serving residence and spaces serving the use of the building shall be at least 800 millimetres.",{'ID': '19_Finnish_Accessibility'},"The clear width of the door and opening leading to room spaces of a non-residential building as well as to residential rooms of a residential building, necessary spaces serving residence and spaces serving the use of the building shall be at least 800 millimetres.",none,annotated +2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_1,,,The normal relationship between the load capacity of the rise and going is: 21 C equals between 550mm and 700mm.,equal,synthetic +dd056285-1aa4-4c6d-94ac-b911458cb7ea,"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",{'ID': '70_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",selection,annotated +54907849-c48f-4267-b5f0-fc7e9279da7c,"For existing dwellings, when carrying out work on an existing system, such as installing or replacing components (e.g. replacing a boiler but retaining the pipework and heat emitters), the energy performance of the new components should be assessed.",{'ID': '409_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when carrying out work on an existing system, such as installing or replacing components (e.g. replacing a boiler but retaining the pipework and heat emitters), the energy performance of the new components should be assessed.",none,annotated +f7cfdf57-28f3-4d23-90bf-ec2268e14bac,"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",{'ID': '65_Finnish_SafetyOfUse'},"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",part-of,annotated +dcc583b1-8c4c-42cf-a1ed-e8907de56254_6,,,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the atmosphere must be no less than 180kW.",greater-equal,synthetic +6075de3c-d339-4ba4-9945-990480975615_3,,,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than 2m speed glandless circulators of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",greater-equal,synthetic +7a1bc727-1daa-4668-83f6-b44327b96898,"In glazed balconies, the spread of fire from one balcony to another and to an adjacent fire compartment must be restricted.",{'ID': '133_Finnish_FireSafety'},"In glazed balconies, the spread of fire from one balcony to another and to an adjacent fire compartment must be restricted.",none,annotated +3e9fc57e-bc69-4f17-a056-dd7767afa9bb,"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",{'ID': '241_Finnish_FireSafety'},"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",part-of,annotated +01bd7c41-594c-4440-8058-c34f1c4bad09,"When determining the free area available for ventilation during sleeping hours, only the proportion of openings that can be opened securely should be considered to provide useful ventilation.",{'ID': '82_UK_DocO_Overheating'},"When determining the free area available for ventilation during sleeping hours, only the proportion of openings that can be opened securely should be considered to provide useful ventilation.",selection,annotated +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_2,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be maximum number of occupants 0.15.",equal,synthetic +d0927095-9e43-4ce4-a740-d5df69dc1dc3_9,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under visual contrast 25W/m2.",equal,synthetic +05864826-21ef-4ae7-9af8-2aaeffc7267a_9,,,Modular and portable buildings with a planned service life of more than two years but with an product certificate in a single location of less than 6mm should be shown to comply with the energy efficiency requirements.,less,synthetic +2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb_2,,,"There should be a Test data, in the absence of tobacco smoke or other excessive pollutants, of 30m2.",equal,synthetic +103f99ad-884b-4bae-9f22-ccb1c5bc3d26_7,,,"In an open garage of no more than 600 x 600 millimetres free area, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",less-equal,synthetic +a235c68f-ae44-4770-b005-4e9d7b659eb7_8,,,All cavity walls should have leaves at least 90mm thick and cavities at least 7 mg/m3 (6 ppm) both sides.,greater-equal,synthetic +29232335-402c-4ed9-af74-fd093ac22e28_10,,,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least target fabric energy efficiency rate 30% load.,greater-equal,synthetic +bf798097-bb99-42d0-a73f-8cebab8fbeb8_9,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the service of the steps must be no more than 500 millimetres and the tread must be no less than 300 millimetres.",less-equal,synthetic +389c960b-525d-4f2e-9a2c-1805eb2dc20d_4,,,The full continuity under a stair that forms part of the storage provision should be counted as 600kg/m3.,equal,synthetic +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_3,,,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 30m2 in design temperature difference, these must be accessible via the interior.",greater,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,{'ID': '131_UK_DocM_V1_AccessAndUseOfBuildings'},Skirtings totalling up to 50mm total thickness and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,greater,annotated +6e5e61dd-039d-4079-9c3f-f52fc12efefb,For continuing horizontal structures the loaded area shall be calculated span by span.,{'ID': '12_Finnish_StabilityOfStructures'},For continuing horizontal structures the loaded area shall be calculated span by span.,part-of,annotated +7f72632a-dc0a-4318-afd7-7090b42350fc,Mechanical supply terminals should be located and directed to avoid draughts.,{'ID': '106_UK_DocF_V1_Ventilation'},Mechanical supply terminals should be located and directed to avoid draughts.,selection,annotated +835d8fad-7a27-4299-aa38-a5b1771a6779_4,,,"In large building complexes, such as retail parks and large sports centres, there should be 28 metres wheelchair-accessible unisex accommodation capable of including an adult changing table.",equal,synthetic +6ec243f2-9294-4b7c-89a4-1c46e4a69cc9_7,,,"If site constraints necessitate an non-domestic building of one or steeper, an approach incorporating ramped access should be provided.",greater-equal,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_2,,,Skirtings totalling up to 180kW target primary energy rate and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,less-equal,synthetic +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_6,,,"If the Control of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 5m of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater,synthetic +d3e7a947-536e-4a49-9823-e27fc0f68b27_11,,,air flow rate of landings to be at least equal to the rise of the ramp.,greater-equal,synthetic +4a0355cd-8b2f-4be1-b0d1-3fc90981b3d3,"In addition, the entrance must be protected against snow loads with a covering.",{'ID': '97_Finnish_SafetyOfUse'},"In addition, the entrance must be protected against snow loads with a covering.",necessity,annotated +15f74476-8f8e-48a3-8906-752c29fdebac,The results should be recorded and given to the building owner.,{'ID': '399_UK_DocM_V2_AccessAndUseOfBuildings'},The results should be recorded and given to the building owner.,necessity,annotated +4fc3b5b1-a838-4429-b385-d8e80e6633eb_2,,,"In the absence of relevant harmonised European Standards, products with a dimensions exceeding 2.2 metres must have a product certificate issued by a Notified Body.",greater,synthetic +aa7c5790-2189-451d-bd0e-956a257a7b6d,"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",{'ID': '201_UK_DocL_V1_ConsrvationOfFuelAndPower'},"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",none,annotated +8fcdc238-3c30-4659-9303-1b126a39b2cd_3,,,The design solar load should be long-term by at least 100 litres.,greater-equal,synthetic +bde1697a-20c9-4f15-a63c-5be323a058c1_3,,,Any connection of 8.5m2 or more copy to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,greater-equal,synthetic +e68377dd-acec-4915-a0b4-a5eb8c840bf1,"Where vehicle barriers are necessary, sufficient space (for example 500mm) should be allowed around the future connection location.",{'ID': '121_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where vehicle barriers are necessary, sufficient space (for example 500mm) should be allowed around the future connection location.",selection,annotated +d54852df-8e3c-4e99-8484-31c403b78558,"If work is carried out on a system that includes a boiler, a boiler interlock should be installed.",{'ID': '256_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If work is carried out on a system that includes a boiler, a boiler interlock should be installed.",part-of,annotated +3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60_11,,,The approach route is a minimum of 900mm wide with a maximum thick of proportion.,less-equal,synthetic +9fee4426-8d7f-40f9-bc6f-562a5d3fd9b4,"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",{'ID': '144_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",selection,annotated +3cbfb816-4071-496e-aec2-87d424df047f,Wheelchair users and ambulant disabled people should be able to wash or bathe either independently or with assistance from others.,{'ID': '181_UK_DocM_V2_AccessAndUseOfBuildings'},Wheelchair users and ambulant disabled people should be able to wash or bathe either independently or with assistance from others.,selection,annotated +8e7e4d9a-05b8-4512-91c5-e8dbb9488685,"At night, windows, patio doors and balcony doors should be modelled as closed.",{'ID': '55_UK_DocO_Overheating'},"At night, windows, patio doors and balcony doors should be modelled as closed.",selection,annotated +5afbc8c9-4c2e-4cb8-8945-24e184d161e1,The fan should be set at a speed that will approximately achieve the desired continuous flow rate.,{'ID': '201_UK_DocF_V1_Ventilation'},The fan should be set at a speed that will approximately achieve the desired continuous flow rate.,selection,annotated +f009a781-0ced-408d-b3d1-6ae7a848012e,"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",{'ID': '31_Finnish_SafetyOfUse'},"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",necessity,annotated +8aa4b706-1659-4e30-a4fe-e7f33efe3241_7,,,All 2m lighting of the compliance checklist should be completed.,equal,synthetic +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_3,,,"If the Air permeability of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 2 metres of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater,synthetic +d7b27bbb-ac51-4036-8073-d094cbe994db,"In cases where the Energy Related Products Regulations and the Building Regulations both apply, both standards should be met.",{'ID': '232_UK_DocM_V2_AccessAndUseOfBuildings'},"In cases where the Energy Related Products Regulations and the Building Regulations both apply, both standards should be met.",selection,annotated +45338082-ca66-418b-8fe1-8f2be926f330_11,,,A plaster-board of no more than 800 millimetres may pass between the stair steps.,less-equal,synthetic +e4fb8d18-8dbc-4351-a2df-d87f880f476a_4,,,The distance of the basement storey floor from the entry level for balconies is 7 mg/m3 (6 ppm) that of the load-bearing structures of the storey.,equal,synthetic +e1f1aeb9-7453-4b6b-b3f1-6049d711868a,The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,{'ID': '156_Finnish_FireSafety'},The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,none,annotated +c7035b48-7244-40a9-a70e-1d244caf72ac,"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",{'ID': '56_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",selection,annotated +7d877df3-9aa7-4dff-a64d-5356a66c944d_4,,,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a total capital cost exceeding 6mm and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",greater,synthetic +082a011b-2d6a-4569-b58d-f8cab00f5d81,The quality of the installation of the ventilator product should be checked to ensure it is correctly mounted within the wall or window aperture.,{'ID': '191_UK_DocF_V1_Ventilation'},The quality of the installation of the ventilator product should be checked to ensure it is correctly mounted within the wall or window aperture.,part-of,annotated +203faa23-7b71-47c9-a6e5-2333ac45389e_2,,,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the heat must be no less than 400kg.",greater-equal,synthetic +3e9fc57e-bc69-4f17-a056-dd7767afa9bb_9,,,"If the layers of the building does not exceed (16.66 8.33 V0.4)/(1000 24), access to the attic fire compartments from the outside shall be required.",less-equal,synthetic +7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88_5,,,The resilient layer should be to the full height of the door and 15 degrees elevation difference of the doorset.,equal,synthetic +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_2,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding 1.501kWhPE/kWh extract air is EI 30; however, minor sealing parts and penetrations may be class E 15.",greater,synthetic +9eb5bf01-3810-44e3-802b-7c7eadad1831,"Mechanical ventilation systems, including both continuous and intermittent mechanical ventilation, should be designed and installed to minimise noise.",{'ID': '21_UK_DocF_V1_Ventilation'},"Mechanical ventilation systems, including both continuous and intermittent mechanical ventilation, should be designed and installed to minimise noise.",selection,annotated +55d84237-8fad-4bd7-b67d-0745b9cc1e31,"The doors of exits, and of areas leading to them, must be easy to open in an emergency.",{'ID': '222_Finnish_FireSafety'},"The doors of exits, and of areas leading to them, must be easy to open in an emergency.",part-of,annotated +c5c5365f-273f-4c29-8491-4f50aabc3b78,"Manual controls for powered entrance doors should be clearly distinguishable against the background and not located so that a person, having used the control, needs to move to avoid contact with the door as it opens.",{'ID': '74_UK_DocM_V2_AccessAndUseOfBuildings'},"Manual controls for powered entrance doors should be clearly distinguishable against the background and not located so that a person, having used the control, needs to move to avoid contact with the door as it opens.",necessity,annotated +7dbe5dbf-39fb-4ba4-bc75-d6ac7898e615,"U-values for rooflights or rooflight-and-kerb assemblies should be based on the developed surface area of the rooflight (U-values), which is often greater than the area of the roof opening.",{'ID': '114_UK_DocL_V1_ConsrvationOfFuelAndPower'},"U-values for rooflights or rooflight-and-kerb assemblies should be based on the developed surface area of the rooflight (U-values), which is often greater than the area of the roof opening.",necessity,annotated +4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9_10,,,"In spaces intended for more than 60 persons, the rise of the access route must be at least 280mm.",greater-equal,synthetic +efe70fd9-5cdd-4586-9ebc-73c2960b1e00,"If a fire door is kept open in normal use, it shall be equipped with devices that will close the door in the event of fire.",{'ID': '120_Finnish_FireSafety'},"If a fire door is kept open in normal use, it shall be equipped with devices that will close the door in the event of fire.",selection,annotated +50e89a86-e2be-439d-b230-79274cd7199b,Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,{'ID': '81_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,necessity,annotated +113b8bf8-1856-45f5-a54b-d65ef100b437,"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",{'ID': '262_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",none,annotated +ebc429f0-cb90-41ab-9a11-401a2ddc7bad,"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",{'ID': '268_UK_DocF_V1_Ventilation'},"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",none,annotated +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater,annotated +35af73f1-53c7-4377-9da0-acf99eef4d8e,"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",{'ID': '159_UK_DocM_V2_AccessAndUseOfBuildings'},"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",selection,annotated +f162906e-1097-420e-b2a0-dd746d5794c7,"Where controls are external to the heater, the system should be provided with a time switch/programmer and room thermostat, or programmable room thermostat.",{'ID': '265_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where controls are external to the heater, the system should be provided with a time switch/programmer and room thermostat, or programmable room thermostat.",necessity,annotated +38322c6e-7509-4638-9a8d-74d5cfb777b2,A new district heat network should be taken as meaning any other district heat network.,{'ID': '83_UK_DocL_V1_ConsrvationOfFuelAndPower'},A new district heat network should be taken as meaning any other district heat network.,selection,annotated +29c431ee-ea93-491d-ab13-06418d93c488,"If luminous efficacy is greater than 75 light source lumens per circuit-watt, manual control is acceptable.",{'ID': '338_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If luminous efficacy is greater than 75 light source lumens per circuit-watt, manual control is acceptable.",greater,annotated +835d8fad-7a27-4299-aa38-a5b1771a6779_3,,,"In large building complexes, such as retail parks and large sports centres, there should be 0.7 wheelchair-accessible unisex substantial proportion capable of including an adult changing table.",equal,synthetic +37f01a2c-b944-45a2-a7f4-140d8c03d7ac_5,,,"After rebating, frame components should retain at least half a metre of Waterproofing.",greater-equal,synthetic +2f8d4247-e53b-49ae-bd26-c4f1765eaee8_7,,,"Extract air of size 30m2, 3 and 4 shall not be used as recirculation air.",equal,synthetic +5163f2fb-022f-4589-889f-2ade7a9d49c6,The relevant parts of Part 2 and 3 should be signed by a person who is competent to design the residential building.,{'ID': '109_UK_DocO_Overheating'},The relevant parts of Part 2 and 3 should be signed by a person who is competent to design the residential building.,necessity,annotated +f9de28ac-45bb-4400-9d9f-8afee73bd2e3_10,,,The step should not exceed half of dwelling floor area.,less-equal,synthetic +50e89a86-e2be-439d-b230-79274cd7199b_11,,,Modular and portable buildings with a planned domestic hot water cylinder heat loss of more than 8 per cent (1:12.5) at a single location should be shown to comply with the energy efficiency requirements.,greater,synthetic +0da52584-1b37-48b5-840f-3795ae695275_3,,,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where 70 kN ventilation fans are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +f6add908-4d45-4b3e-83a6-369f6c36c037,"Door rails, stiles and muntins should be at least 44mm thick.",{'ID': '28_UK_DocQ_Security_Dwellings'},"Door rails, stiles and muntins should be at least 44mm thick.",part-of,annotated +df122091-ca53-4134-98a3-47779c06f9df,The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flows at each terminal.,{'ID': '198_UK_DocF_V1_Ventilation'},The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flows at each terminal.,none,annotated +825053cb-af5d-43a9-b59b-e2a5ae78ea73_2,,,The Capacities of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the energy consumption of dwellings in the residential building; b. the number of associated parking spaces.,greater,synthetic +783c19fa-0ef2-466f-b3e9-d4690e34ac5f,Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '214_UK_DocL_V1_ConsrvationOfFuelAndPower'},Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,part-of,annotated +40b40b1b-d1b1-49d8-b9b7-13c5845a169d_3,,,"The structure of the control appliance of the plumbing fixture shall be such that its target emission rate does not arise above 1,200 millimetres.",less-equal,synthetic +dcc583b1-8c4c-42cf-a1ed-e8907de56254,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",{'ID': '23_Finnish_SafetyOfUse'},"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",none,annotated +3ca5cb38-b90b-4449-ba14-4268866df8e1,The water heater is close to the draw-off points and has a storage capacity no greater than 100 litres.,{'ID': '463_UK_DocM_V2_AccessAndUseOfBuildings'},The water heater is close to the draw-off points and has a storage capacity no greater than 100 litres.,part-of,annotated +8364a5f1-f80e-484c-9f38-bffc6f4c1876,"Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",{'ID': '44_UK_DocM_V1_AccessAndUseOfBuildings'},"Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",selection,annotated +986f7853-4975-4ecd-8f10-a75d818eb44a,"Fully insulated and continuous cavity closers should be used, installed tight to the insulation and cavity apertures.",{'ID': '140_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Fully insulated and continuous cavity closers should be used, installed tight to the insulation and cavity apertures.",none,annotated +451e7c91-d39f-4401-a0e3-5ab455ab0442,"The approach route should be level, gently sloping, or, where necessary, ramped.",{'ID': '15_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be level, gently sloping, or, where necessary, ramped.",necessity,annotated +f7cfdf57-28f3-4d23-90bf-ec2268e14bac,"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",{'ID': '65_Finnish_SafetyOfUse'},"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",none,annotated +20518e80-6f7e-457f-8c5a-59fa4c0eb324_8,,,"When calculating the heat loss for a buildings design solution, the results shall be used as the value of the location for the building envelope.",equal,synthetic +009e12eb-db83-485c-9ffc-e1f462251109_11,,,Each air terminal should have a filling alarm of at least 850-1000mm of the free area of its associated duct.,greater-equal,synthetic +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",none,annotated +2633c957-07b4-4caa-a9d6-5acbac16b0b0_10,,,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 500 millimetres diameter.,equal,synthetic +569c7958-b7d6-4b9c-9dd9-13307e95e59b_8,,,"For ducted systems that are served by fans with a heating plant emission rate greater than 850 millimetres, ductwork leakage tests should be carried out.",greater,synthetic +76bf63bd-30f4-440d-81a0-61ca16170f70,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,selection,annotated +a4dc06ab-99c3-4c8b-b295-eb3e6a64320a_2,,,"The free both sides from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 850-1000mm, unless the area is protected so as to prevent the danger of collision.",greater-equal,synthetic +72b3e031-a732-4749-af3e-ffd5c635e830,Boards should be fitted to the structure to avoid any gaps between board edges and between the board facings.,{'ID': '145_UK_DocL_V1_ConsrvationOfFuelAndPower'},Boards should be fitted to the structure to avoid any gaps between board edges and between the board facings.,selection,annotated +6ec243f2-9294-4b7c-89a4-1c46e4a69cc9_8,,,"If site constraints necessitate an fridge of 600 millimetres or steeper, an approach incorporating ramped access should be provided.",greater-equal,synthetic +01008f69-874b-443e-bcb2-2f5630280049_0,,,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the from the top and bottom corners of the door may be no more than 1,500 millimetres and the tread must be no less than 220 millimetres.",less-equal,synthetic +aa41a5d4-c0b1-4da7-84a0-5c2e2738654f_7,,,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than certain proportion areas.,greater,synthetic +6465e5b9-4c10-41ec-9839-3e7cb7114911,Programmable room thermostats with an override feature should be provided for all direct electric zones of the electric underfloor heating system.,{'ID': '314_UK_DocL_V1_ConsrvationOfFuelAndPower'},Programmable room thermostats with an override feature should be provided for all direct electric zones of the electric underfloor heating system.,selection,annotated +78094ea9-f870-40e9-8174-8dfce8f30a90,The penetrating services should be sealed to the air barrier using proprietary grommets or collars with air-sealing tape or sealant.,{'ID': '181_UK_DocL_V1_ConsrvationOfFuelAndPower'},The penetrating services should be sealed to the air barrier using proprietary grommets or collars with air-sealing tape or sealant.,necessity,annotated +77be05f2-cd8c-4d35-85e4-6637b999d8e7,The value of the consequential improvement works should not be less than 10 of the value of the principal works.,{'ID': '452_UK_DocM_V2_AccessAndUseOfBuildings'},The value of the consequential improvement works should not be less than 10 of the value of the principal works.,part-of,annotated +7d877df3-9aa7-4dff-a64d-5356a66c944d_1,,,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a differences exceeding 9 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",greater,synthetic +891e9eee-4a4b-4d7c-8051-3aee8302cd6b,"Walls: insulation should be fitted without any air gaps and tight to the structure, cavity closers, lintels and cavity trays.",{'ID': '141_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Walls: insulation should be fitted without any air gaps and tight to the structure, cavity closers, lintels and cavity trays.",necessity,annotated +642e2c46-45a8-440f-af0b-1b53f41d8d8f,Taps and WC cubicle doors should be operable by people with limited strength or manual dexterity and doors to cubicles should be capable of being opened if a person has collapsed against them while inside the cubicle.,{'ID': '156_UK_DocM_V2_AccessAndUseOfBuildings'},Taps and WC cubicle doors should be operable by people with limited strength or manual dexterity and doors to cubicles should be capable of being opened if a person has collapsed against them while inside the cubicle.,necessity,annotated +bf798097-bb99-42d0-a73f-8cebab8fbeb8_3,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the storage capacity must be no less than 100 litres.",greater-equal,synthetic +4abb3268-3ba6-47e8-a8b7-4676dbaa9a16_1,,,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear efficiency of 850-1000mm, except in doorways.",equal,synthetic +17fba530-c42b-4eeb-85dd-16da0bacc49c,"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",{'ID': '470_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",selection,annotated +7e34700e-92de-4b00-a820-f4085a2e186c_4,,,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be number of people evacuating 1,200 MJ/m2.",equal,synthetic +f7f1a609-ae35-4544-9b38-e471d7a00666,"In order to enhance the efficiency of firefighting and rescue operations, means of smoke extraction shall be designed and constructed in the building so that smoke can be extracted from the different premises in the building.",{'ID': '249_Finnish_FireSafety'},"In order to enhance the efficiency of firefighting and rescue operations, means of smoke extraction shall be designed and constructed in the building so that smoke can be extracted from the different premises in the building.",part-of,annotated +7577d9f7-9f3c-4d3b-b8d9-da31d3e1b201,"For example, glare and reflections from shiny surfaces, and large repeating patterns, should be avoided in spaces where visual acuity is critical as they will hamper communication for people with impaired vision, and those who lip read or use sign language.",{'ID': '150_UK_DocM_V2_AccessAndUseOfBuildings'},"For example, glare and reflections from shiny surfaces, and large repeating patterns, should be avoided in spaces where visual acuity is critical as they will hamper communication for people with impaired vision, and those who lip read or use sign language.",part-of,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",less-equal,annotated +f72a98f3-b7d2-4633-b244-0d7242dfb0c9,Every single bedroom has a minimum floor area of 8.5m2 and is at least 2.4m wide.,{'ID': '102_UK_DocM_V1_AccessAndUseOfBuildings'},Every single bedroom has a minimum floor area of 8.5m2 and is at least 2.4m wide.,greater-equal,annotated +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_1,,,"In buildings more than 0.3 and at most 28 metres in sum total, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",greater,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_0,,,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or Sewers above E may be discounted when measuring clear width.,greater,synthetic +f6add908-4d45-4b3e-83a6-369f6c36c037,"Door rails, stiles and muntins should be at least 44mm thick.",{'ID': '28_UK_DocQ_Security_Dwellings'},"Door rails, stiles and muntins should be at least 44mm thick.",greater-equal,annotated +0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,none,annotated +23867bb3-e845-48ca-9ee8-72010a55aa42,WC doors must be capable of opening outwards.,{'ID': '124_UK_DocM_V1_AccessAndUseOfBuildings'},WC doors must be capable of opening outwards.,necessity,annotated +ccc405a0-c6d6-4ace-ad70-e0cfe07cd1e3,"Stairs, ladders and ramps shall be so designed, constructed and installed as to be safe for people moving between different levels in or about the building.",{'ID': '14_UK_DocK_ProtectionFromFalling'},"Stairs, ladders and ramps shall be so designed, constructed and installed as to be safe for people moving between different levels in or about the building.",necessity,annotated +ef4f54b6-1099-4404-9fa2-d0c0d5e55543_5,,,The distance of the basement storey floor from the entry level must not exceed the individual dwellings value.,less-equal,synthetic +a86b58e8-046f-44b7-8e1b-00c876c8c647,"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",{'ID': '30_Finnish_StabilityOfStructures'},"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",less-equal,annotated +389c960b-525d-4f2e-9a2c-1805eb2dc20d_0,,,The full span under a stair that forms part of the storage provision should be counted as 220 millimetres.,equal,synthetic +d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",none,annotated +7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8,"For sizes of cylinder not listed, the heat loss from the cylinder should not exceed (16.66 8.33 V0.4)/(1000 24), where V is the volume in litres.",{'ID': '208_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For sizes of cylinder not listed, the heat loss from the cylinder should not exceed (16.66 8.33 V0.4)/(1000 24), where V is the volume in litres.",selection,annotated +38745b5e-4dea-43fe-9378-5befa5a2399d,A copy of the completed commissioning sheet should be given to the owner of the building.,{'ID': '99_UK_DocF_V2_Ventilation'},A copy of the completed commissioning sheet should be given to the owner of the building.,part-of,annotated +fa90c179-d32c-412b-a7d6-a515cc91dbdb,The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,{'ID': '86_Finnish_Health-Humidity'},The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,none,annotated +19478a13-7457-4dd3-a394-744f826db7b0,"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",{'ID': '127_UK_DocM_V1_AccessAndUseOfBuildings'},"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",selection,annotated +333110c1-ba9e-4c1d-9249-6604f49ba09a,"The presence of doors, whether open or closed, should be apparent to visually impaired people through the careful choice of colour and material for the door and its surroundings.",{'ID': '91_UK_DocM_V2_AccessAndUseOfBuildings'},"The presence of doors, whether open or closed, should be apparent to visually impaired people through the careful choice of colour and material for the door and its surroundings.",none,annotated +2be01bf1-2cd9-4982-8778-ba0afe835580,"If fans and background ventilators are fitted in the same room, they should be at least 500mm apart.",{'ID': '88_UK_DocF_V1_Ventilation'},"If fans and background ventilators are fitted in the same room, they should be at least 500mm apart.",selection,annotated +35cacecf-06dc-4b0f-aadb-db2ee05518c7_8,,,"The area of windows and roof windows (but excluding display windows) protect persons operating, maintaining or altering the installations from fire or injury exceeds 100 litres of the facade area.",greater,synthetic +75c60084-6878-472d-8694-e8739e0dd76c_11,,,The surface area of access routes in assembly areas with a maximum capacity of 60 persons must be at least 600 millimetres.,greater-equal,synthetic +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_5,,,"In buildings more than 9 metres and at most 60 in continuity, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",less-equal,synthetic +793cb939-b3d9-46eb-ae65-71a4d5c8031b,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,{'ID': '43_UK_DocM_V1_AccessAndUseOfBuildings'},Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,less-equal,annotated +9ff8b8fd-5361-4c3d-9a7e-7459276c8df7,The dwelling fabric energy efficiency rate must not exceed the individual dwellings target fabric energy efficiency rate.,{'ID': '66_UK_DocL_V1_ConsrvationOfFuelAndPower'},The dwelling fabric energy efficiency rate must not exceed the individual dwellings target fabric energy efficiency rate.,less-equal,annotated +50e89a86-e2be-439d-b230-79274cd7199b_4,,,Modular and portable buildings with a planned going of more than 90 at a single location should be shown to comply with the energy efficiency requirements.,greater,synthetic +e3b85ad6-6132-40d7-86f8-3cc5d44eb12c_2,,,certain proportion acoustic design should be close to an accessible bathroom suitable for a wheelchair user.,equal,synthetic +d9b8f957-49e3-45d0-83ca-c0419a50361a,"In a mechanical system, there shall be a clearly labelled stop switch, which shall be located in an easily accessible place.",{'ID': '48_Finnish_Health-IndoorClimateAndVentilation'},"In a mechanical system, there shall be a clearly labelled stop switch, which shall be located in an easily accessible place.",necessity,annotated +46f5be2a-1514-420b-bc39-331fc6e0d2df_4,,,"The dwelling primary energy rate, dwelling emission rate and facade area, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and SEER, respectively.",less-equal,synthetic +6c789809-b1b8-429a-8fe2-8ce16f8a4b54_0,,,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the maximum number of occupants does not exceed 18 dm3/s.,less-equal,synthetic +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",none,annotated +c72a5952-2e0b-4d4a-9185-09e4149b6239,The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,{'ID': '114_Finnish_Health-Humidity'},The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,selection,annotated +4c83069b-8c22-43ad-92a0-354ecd0e40a1,"Sufficient information should be provided to ensure that people can operate, maintain or alter an electrical installation with reasonable safety.",{'ID': '7_UK_DocP_ElectricalSafety'},"Sufficient information should be provided to ensure that people can operate, maintain or alter an electrical installation with reasonable safety.",none,annotated +2f0f22aa-06d3-478d-a777-5aca5c2fb5c1,"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",{'ID': '120_UK_DocK_ProtectionFromFalling'},"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",selection,annotated +75c60084-6878-472d-8694-e8739e0dd76c,The width of access routes in assembly areas with a maximum capacity of 60 persons must be at least 900 millimetres.,{'ID': '115_Finnish_SafetyOfUse'},The width of access routes in assembly areas with a maximum capacity of 60 persons must be at least 900 millimetres.,greater-equal,annotated +a86b58e8-046f-44b7-8e1b-00c876c8c647_1,,,"Parapets in either side A to 65 degrees Celsius and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",less-equal,synthetic +d504fd87-d13d-4936-9d7a-71d17954760d_0,,,The away of the steps in an exit may be no more than 35 mg/m3 (30 ppm).,less-equal,synthetic +4f2b56cb-9852-4406-bbea-31f426fb4910,"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",{'ID': '397_UK_DocM_V2_AccessAndUseOfBuildings'},"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",selection,annotated +12907c6f-e734-436d-a7de-c8a1626fbe92,"Both:the area of rooflights exceeds 20 of the area of the roof, and the design solar load exceeds 25W/m2.",{'ID': '496_UK_DocM_V2_AccessAndUseOfBuildings'},"Both:the area of rooflights exceeds 20 of the area of the roof, and the design solar load exceeds 25W/m2.",part-of,annotated +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated +e26e2280-635f-44b5-967c-6cf0b56e15de,Water pipes that are located in cold premises shall be thermally insulated.,{'ID': '86_Finnish_Health-WaterAndSewerage'},Water pipes that are located in cold premises shall be thermally insulated.,selection,annotated +2f815a08-db3c-48a6-b248-d69aeac870ee,"the vertical travel distance is: a. not more than 2m, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",{'ID': '173_UK_DocM_V2_AccessAndUseOfBuildings'},"the vertical travel distance is: a. not more than 2m, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",none,annotated +5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",none,annotated +328fb8e7-cae4-4465-b7a7-24f0d066d65a,"The results of all pressure tests on buildings, including any test failures, should be reported to the building control body.",{'ID': '360_UK_DocM_V2_AccessAndUseOfBuildings'},"The results of all pressure tests on buildings, including any test failures, should be reported to the building control body.",none,annotated +6543949e-dd47-4365-b5a9-d952bf233cd7,"Any manual high rate controls should be provided locally to the spaces being served, e.g. bathrooms and kitchens.",{'ID': '66_UK_DocF_V1_Ventilation'},"Any manual high rate controls should be provided locally to the spaces being served, e.g. bathrooms and kitchens.",necessity,annotated +c8a048c6-8e7e-4b5a-ada5-02990b983401,"A natural ventilation system, a mechanical extract ventilation system or a mechanical supply and extract ventilation system shall not be designed to be combined in such a way that the directions of air flow between the rooms and in the ductworks may change when the air flows are being controlled.",{'ID': '91_Finnish_Health-IndoorClimateAndVentilation'},"A natural ventilation system, a mechanical extract ventilation system or a mechanical supply and extract ventilation system shall not be designed to be combined in such a way that the directions of air flow between the rooms and in the ductworks may change when the air flows are being controlled.",none,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",part-of,annotated +33ed3038-99a6-4b2d-906a-a1db21f2d898,"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",{'ID': '250_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",selection,annotated +e4fb8d18-8dbc-4351-a2df-d87f880f476a_10,,,The facade area for balconies is 50 that of the load-bearing structures of the storey.,equal,synthetic +aa41a5d4-c0b1-4da7-84a0-5c2e2738654f,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,{'ID': '89_UK_DocF_V1_Ventilation'},The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,none,annotated +ffc11c58-ff7e-45f4-a5c7-da59404e5659,"Reasonable provision shall be made in the design and installation of electrical installations in order to protect persons operating, maintaining or altering the installations from fire or injury.",{'ID': '1_UK_DocP_ElectricalSafety'},"Reasonable provision shall be made in the design and installation of electrical installations in order to protect persons operating, maintaining or altering the installations from fire or injury.",part-of,annotated +c3cfbf29-a95f-4453-a7de-a8f6e4ca2ea8,"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",{'ID': '152_Finnish_Health-WaterAndSewerage'},"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",selection,annotated +793cb939-b3d9-46eb-ae65-71a4d5c8031b_5,,,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be frequency to 10.,less-equal,synthetic +eeb4239f-3819-475c-ad20-756bed80c4ff_8,,,"In reference heat loss calculations, the value used as the travel of the buildings ventilation system shall be 5m.",equal,synthetic +a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",necessity,annotated +e874f337-2067-4e77-ad32-c3b857f40e7a_3,,,"If the opening exceeds 2m, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",greater,synthetic +203faa23-7b71-47c9-a6e5-2333ac45389e_11,,,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the annual efficiency of heat recovery from ventilation extract air must be no less than 10 kN.",greater-equal,synthetic +a8b3e54e-902c-4502-99a2-8c41d46f1416_8,,,"If there are more than six metres properties in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",greater,synthetic +108b5709-f035-4697-ba25-56edd2ce60fc,"Where permanent or removable seating is provided as part of the design, allowance should be made for disabled people to have a choice of seating location at spectator events.",{'ID': '126_UK_DocM_V2_AccessAndUseOfBuildings'},"Where permanent or removable seating is provided as part of the design, allowance should be made for disabled people to have a choice of seating location at spectator events.",none,annotated +a94b6b4f-a05e-403e-bbca-ebe1b94e38a1,"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",{'ID': '470_UK_DocM_V2_AccessAndUseOfBuildings'},"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",none,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",none,annotated +50e89a86-e2be-439d-b230-79274cd7199b,Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,{'ID': '81_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,part-of,annotated +2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_8,,,The normal relationship between the air flow of the rise and going is: 15mm equals between 550mm and 700mm.,equal,synthetic +8efb6108-e49e-4d64-a1e4-22e3f9128b17_0,,,"When calculating the reference heat loss of a building, the value of 3.3m shall be used as the habitable area for the air leakage rate figure for the building envelope.",equal,synthetic +35cacecf-06dc-4b0f-aadb-db2ee05518c7,The area of windows and roof windows (but excluding display windows) within the area served exceeds 40 of the facade area.,{'ID': '495_UK_DocM_V2_AccessAndUseOfBuildings'},The area of windows and roof windows (but excluding display windows) within the area served exceeds 40 of the facade area.,necessity,annotated +d0b6759e-deec-451d-bd7a-ec65b96048be_7,,,"extract air of fire resistance time 8.5m2 shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",equal,synthetic +d178dd92-6cf3-4f68-a9ba-44b97d74204a,"Staircases must be safe, sufficiently spacious and suitable for their purpose.",{'ID': '13_Finnish_SafetyOfUse'},"Staircases must be safe, sufficiently spacious and suitable for their purpose.",necessity,annotated +d3e7a947-536e-4a49-9823-e27fc0f68b27,Length of landings to be at least equal to the width of the ramp.,{'ID': '66_UK_DocK_ProtectionFromFalling'},Length of landings to be at least equal to the width of the ramp.,greater-equal,annotated +6c789809-b1b8-429a-8fe2-8ce16f8a4b54,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,{'ID': '62_Finnish_Health-IndoorClimateAndVentilation'},Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the instantaneous carbon monoxide concentration does not exceed 7 mg/m3 (6 ppm).,part-of,annotated +793cb939-b3d9-46eb-ae65-71a4d5c8031b_7,,,Where the garage doorset is within the private curtilage of the dwelling (but not within a carport or compliance checklist) at least one space is a standard parking bay that can be widened to 3.3m.,not-part-of,synthetic +bfdf95da-d422-47cd-83d7-a30a4969f2e6_5,,,"If the internal ties must be centred on the supporting line, the minimum value of the fire performance, 50mm, will also be applied to internal ties.",greater-equal,synthetic +5ca184fa-e100-4f97-957d-e37ae944786f_1,,,The insulating performance of installing electric vehicle charge points and cable routes is not more than 60 persons of the total capital cost of the major renovation.,less-equal,synthetic +aa7c5790-2189-451d-bd0e-956a257a7b6d,"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",{'ID': '201_UK_DocL_V1_ConsrvationOfFuelAndPower'},"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",selection,annotated +868ad193-b0d2-47b9-9fe0-ded5b761d3b0,The integrity of the water system shall be ensured with pressure testing using water.,{'ID': '106_Finnish_Health-WaterAndSewerage'},The integrity of the water system shall be ensured with pressure testing using water.,none,annotated +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated +cc72106e-9e7f-47cf-8a95-0173a8305dad_11,,,"In a new building, the crawl space dwelling emission rate must be 55 on average at the minimum.",greater-equal,synthetic +77f993c6-dff1-4f9a-8f66-73221d3cbaff,"If the dwelling only has one habitable room, a minimum ventilation rate of 13l/s should be used.",{'ID': '43_UK_DocF_V1_Ventilation'},"If the dwelling only has one habitable room, a minimum ventilation rate of 13l/s should be used.",equal,annotated +bfb006bb-c7f5-4586-adc3-89c758d4d99d,The system should be specified and installed according to the manufacturers instructions to ensure the overall performance of the system meets a reasonable standard.,{'ID': '332_UK_DocM_V2_AccessAndUseOfBuildings'},The system should be specified and installed according to the manufacturers instructions to ensure the overall performance of the system meets a reasonable standard.,necessity,annotated +1913381b-a2cc-496e-9168-82ccf2a01d50,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",{'ID': '67_Finnish_Health-WaterAndSewerage'},"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",part-of,annotated +4d80c4d1-08ee-481a-9f9c-e9151ce1094d_1,,,"The height of windows, roof windows, rooflights and doors should not exceed 1 of the total floor area of the dwelling.",less-equal,synthetic +47b51cfa-bda8-4971-83c1-5aa198c59297,The loading area must be safe and appropriate.,{'ID': '135_Finnish_SafetyOfUse'},The loading area must be safe and appropriate.,necessity,annotated +371e1755-8bb5-456e-bf66-5a50f4c19d59,"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",{'ID': '50_UK_DocK_ProtectionFromFalling'},"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",selection,annotated +b63dcef6-1840-4e9e-ad51-f8fc481fe856_2,,,"The wall ties should have a height of 400-600mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic +2f815a08-db3c-48a6-b248-d69aeac870ee_9,,,"the vertical internal temperature is: a. not more than 60 persons, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",less-equal,synthetic +4e8c5c50-44af-48f6-b959-e6f9b31afa1e,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical heating technology may be electric resistance heating.",{'ID': '89_UK_DocM_V2_AccessAndUseOfBuildings'},"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical heating technology may be electric resistance heating.",selection,annotated +f420ae57-5656-4558-b1a3-1079e46bf6cc,"In the case of the storey-level door of a dwelling, or if the number of people evacuating through the door exceeds 60, doors must open in the direction of the exit.",{'ID': '223_Finnish_FireSafety'},"In the case of the storey-level door of a dwelling, or if the number of people evacuating through the door exceeds 60, doors must open in the direction of the exit.",part-of,annotated +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_8,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be horizontal spacing 65mm.",equal,synthetic +1c511111-ab71-4b68-9421-f588bc4b9180,"People with visual impairment should be in no doubt as to the location of glass doors, especially when they are within a glazed screen.",{'ID': '76_UK_DocM_V2_AccessAndUseOfBuildings'},"People with visual impairment should be in no doubt as to the location of glass doors, especially when they are within a glazed screen.",necessity,annotated +56517433-cf40-4b88-a9d4-18e61e0e9993_10,,,"In addition, on both sides of the toilet seat there shall be a flights of at least 180 millimetres.",greater-equal,synthetic +c5a6cac6-a314-47b1-aabd-13f2d1b7ad56,A step-free approach route should be provided to all private entrances.,{'ID': '71_UK_DocM_V1_AccessAndUseOfBuildings'},A step-free approach route should be provided to all private entrances.,necessity,annotated +e15250c0-1279-4d29-a1ec-31560b045007_6,,,chambers of basement storeys must not be connected to fire and smoke-proof water meters.,not-part-of,synthetic +009e12eb-db83-485c-9ffc-e1f462251109,Each air terminal should have a free area of at least 90 of the free area of its associated duct.,{'ID': '115_UK_DocF_V1_Ventilation'},Each air terminal should have a free area of at least 90 of the free area of its associated duct.,necessity,annotated +536b172d-ccd1-479a-8136-6ee05db0f264,"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",{'ID': '205_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",part-of,annotated +984c252b-74f4-4d85-9080-1c8ae1851eca_7,,,"If performance requires thicker glass to be used, an equivalent window unit with reception (400kg) glazing should be shown to meet the required standard.",equal,synthetic +2cb4937d-9ec4-4013-8e9b-318a8adae27a,Account should be taken of outside noise when considering whether openable windows are appropriate for purge ventilation.,{'ID': '24_UK_DocF_V1_Ventilation'},Account should be taken of outside noise when considering whether openable windows are appropriate for purge ventilation.,necessity,annotated +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_0,,,"Where the cost of installing only cable routes is more than 7% of the total cost of the major boxings, there is no mortice lock to install either electric vehicle charge points or cable routes.",not-part-of,synthetic +e7cc3da8-211a-4244-b711-210a912ca2ac,Ground floors and those in contact with the outside of the dwelling should be insulated to limit heat losses to not more than 10W/m2.,{'ID': '302_UK_DocL_V1_ConsrvationOfFuelAndPower'},Ground floors and those in contact with the outside of the dwelling should be insulated to limit heat losses to not more than 10W/m2.,necessity,annotated +bb3ac5b0-14d0-4d75-95d9-713adc6f2f58,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",{'ID': '433_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",necessity,annotated +e874f337-2067-4e77-ad32-c3b857f40e7a_9,,,"If the annual percentage of heat exceeds 50mm, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",greater,synthetic +0096a3bf-ac16-4a75-adf9-8c3f4a9b8610,The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,{'ID': '33_UK_DocQ_Security_Dwellings'},The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,selection,annotated +8b9e1d32-efa8-409b-873b-22e2eae5b537,External walls and their various layers must form a whole that prevents water from harmfully penetrating into the structures.,{'ID': '95_Finnish_Health-Humidity'},External walls and their various layers must form a whole that prevents water from harmfully penetrating into the structures.,selection,annotated +203faa23-7b71-47c9-a6e5-2333ac45389e_5,,,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the sizes must be no less than 0.3.",greater-equal,synthetic +9f8c2fbb-a04e-42f9-8fa0-b7a905dbafa0,"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",{'ID': '40_Finnish_Health-Humidity'},"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",selection,annotated +96ad745d-47e4-44d5-91ee-a0482881dd8f,"Consideration should be given to installing a fold-down table, e.g. for baby changing.",{'ID': '168_UK_DocM_V2_AccessAndUseOfBuildings'},"Consideration should be given to installing a fold-down table, e.g. for baby changing.",necessity,annotated +64695439-3458-4d43-8e7b-a2ba75075cea,"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",{'ID': '124_Finnish_SafetyOfUse'},"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",part-of,annotated +2f89cb06-3ee9-49b5-ac36-46f31ae3928f,Hot water pipework should be insulated in all areas inside and outside the building unless it can be demonstrated that the heat is always useful.,{'ID': '170_UK_DocM_V2_AccessAndUseOfBuildings'},Hot water pipework should be insulated in all areas inside and outside the building unless it can be demonstrated that the heat is always useful.,necessity,annotated +4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",part-of,annotated +4e441774-859a-4a85-94ec-5fda3b2a6531,"A copy should be submitted to the building control body as evidence that the system has been correctly installed, inspected and commissioned.",{'ID': '265_UK_DocF_V1_Ventilation'},"A copy should be submitted to the building control body as evidence that the system has been correctly installed, inspected and commissioned.",necessity,annotated +db734798-9e42-4fe1-900c-77d4e6131809,"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",{'ID': '11_UK_DocQ_Security_Dwellings'},"The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset.",selection,annotated +1913381b-a2cc-496e-9168-82ccf2a01d50,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",{'ID': '67_Finnish_Health-WaterAndSewerage'},"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",selection,annotated +0df5892a-e396-424e-90f1-74f6ccfb9e1a,"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",{'ID': '61_Finnish_Accessibility'},"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",part-of,annotated +5577528f-8fa0-4ca3-96f6-ea418091cb86,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,{'ID': '32_Finnish_SafetyOfUse'},The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,part-of,annotated +33eb3a5a-584f-4d1e-84a0-35fe66954d80,Consideration should be given to the power requirements of essential (e.g. life safety) systems.,{'ID': '323_UK_DocM_V2_AccessAndUseOfBuildings'},Consideration should be given to the power requirements of essential (e.g. life safety) systems.,selection,annotated +64695439-3458-4d43-8e7b-a2ba75075cea,"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",{'ID': '124_Finnish_SafetyOfUse'},"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",none,annotated +7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8_9,,,"For sizes of cylinder not listed, the dwellings from the cylinder should not exceed 600kg/m3, where V is the volume in litres.",less-equal,synthetic +ed2cca4a-50f7-470d-9752-dd8722385a24,"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",{'ID': '80_Finnish_SafetyOfUse'},"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",none,annotated +7af206e3-3c30-4fd8-8d95-bf9b95861206,Systems should be commissioned to optimise the use of energy for pumping.,{'ID': '393_UK_DocL_V1_ConsrvationOfFuelAndPower'},Systems should be commissioned to optimise the use of energy for pumping.,necessity,annotated +569c7958-b7d6-4b9c-9dd9-13307e95e59b_7,,,"For ducted systems that are served by fans with a service greater than One, ductwork leakage tests should be carried out.",greater,synthetic +2633c957-07b4-4caa-a9d6-5acbac16b0b0_5,,,"NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 2,100 millimetres design flow rate.",equal,synthetic +009e12eb-db83-485c-9ffc-e1f462251109_3,,,Each air terminal should have a building services of at least 1400mm of the free area of its associated duct.,greater-equal,synthetic +72d7716f-7e3e-442c-9e42-14d4b19e18e3,A district heat network that is being connected to a new building should not have a CO2 emission factor for delivered heat to the building which is greater than 0.350kgCO2/kWh.,{'ID': '336_UK_DocM_V2_AccessAndUseOfBuildings'},A district heat network that is being connected to a new building should not have a CO2 emission factor for delivered heat to the building which is greater than 0.350kgCO2/kWh.,selection,annotated +d988e207-c3f9-4314-9a16-f99b334595f4,The tread must be no less than 270 millimetres.,{'ID': '26_Finnish_SafetyOfUse'},The tread must be no less than 270 millimetres.,greater-equal,annotated +8364a5f1-f80e-484c-9f38-bffc6f4c1876,"Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",{'ID': '44_UK_DocM_V1_AccessAndUseOfBuildings'},"Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",none,annotated +2c224c59-366d-447f-9ecc-87c119c2db07,"For new dwellings, the commissioning plan should be given to the building control body with the design stage dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate calculations.",{'ID': '374_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For new dwellings, the commissioning plan should be given to the building control body with the design stage dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate calculations.",part-of,annotated +72e7ed0c-9e73-46b2-a919-20f3fea337fd,"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",{'ID': '56_Finnish_FireSafety'},"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",part-of,annotated +7f3f59a4-fc7e-4b14-8074-384f6cacf548_8,,,"The level with entry of a barrier in a dwellings indoor areas may, however, be at least 25mm if the drop is less than three metres.",greater-equal,synthetic +b5d2186d-338d-40b6-b3b4-7fadf3cfd4e0,"For district cooling schemes, the CO2 and primary energy content of the cooling energy supplied should be calculated.",{'ID': '286_UK_DocM_V2_AccessAndUseOfBuildings'},"For district cooling schemes, the CO2 and primary energy content of the cooling energy supplied should be calculated.",none,annotated +f3c5d35c-ad38-46d6-8a75-1a331555b89e,The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flow rates at each terminal.,{'ID': '206_UK_DocF_V1_Ventilation'},The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flow rates at each terminal.,necessity,annotated +493ec553-7761-4d1e-aa98-05d925ddf955_0,,,The tie force of a horizontal hatch must be at least 400kg.,greater-equal,synthetic +9494f4b9-aae0-4668-aebb-1d8851dd0824,"In refreshment facilities, bars and counters (or sections of them) should be at a level suitable for wheelchair users.",{'ID': '127_UK_DocM_V2_AccessAndUseOfBuildings'},"In refreshment facilities, bars and counters (or sections of them) should be at a level suitable for wheelchair users.",part-of,annotated +cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",none,annotated +5e7d4831-4ec8-48f9-9e60-0422fcc1eae4,"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",{'ID': '344_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",selection,annotated +11f2902d-29c2-474e-97d0-628a2a97a666_7,,,"glare and reflections of over 01:08:00 must be equipped with an appropriate safety barrier, railing or handrail.",greater,synthetic +d504fd87-d13d-4936-9d7a-71d17954760d_7,,,"The sizes of the steps in an exit may be no more than 1,500 millimetres.",less-equal,synthetic +0fdce0b1-7992-401f-aa84-ad7f2acca23d,Cavity walls: the inner block leaf mortar joint should be fully filled and pointed within the cavity.,{'ID': '184_UK_DocL_V1_ConsrvationOfFuelAndPower'},Cavity walls: the inner block leaf mortar joint should be fully filled and pointed within the cavity.,selection,annotated +6075de3c-d339-4ba4-9945-990480975615,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than three ventilators of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",{'ID': '94_UK_DocF_V1_Ventilation'},"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than three ventilators of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",selection,annotated +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_1,,,Skirtings totalling up to 50mm total thickness and shallow projecting assembly areas or casings above 20 millimetres may be discounted when measuring clear width.,greater,synthetic +45338082-ca66-418b-8fe1-8f2be926f330_3,,,A roof-lights of no more than A may pass between the stair steps.,less-equal,synthetic +656aa2fa-18cb-41ee-ae28-28deb3dffcc3,The water temperature of the water in the hot water system shall be at least 55 degrees Celsius and available from the hot water plumbing fixture within 20 seconds.,{'ID': '61_Finnish_Health-WaterAndSewerage'},The water temperature of the water in the hot water system shall be at least 55 degrees Celsius and available from the hot water plumbing fixture within 20 seconds.,part-of,annotated +103f99ad-884b-4bae-9f22-ccb1c5bc3d26,"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",{'ID': '110_Finnish_FireSafety'},"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",part-of,annotated +aa7c5790-2189-451d-bd0e-956a257a7b6d,"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",{'ID': '201_UK_DocL_V1_ConsrvationOfFuelAndPower'},"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",necessity,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,{'ID': '18_UK_DocM_V1_AccessAndUseOfBuildings'},Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,annotated +a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",part-of,annotated +203faa23-7b71-47c9-a6e5-2333ac45389e_1,,,"The primary energy factor of the indoor steps of dwelling units and living quarters may be no more than 0.3, and the tread must be no less than 250 millimetres.",less-equal,synthetic +19c404de-7fd5-4e44-8a8f-b4219883f0ce,That background ventilators allow fresh air into the building and should be left open.,{'ID': '102_UK_DocF_V2_Ventilation'},That background ventilators allow fresh air into the building and should be left open.,necessity,annotated +d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",none,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_4,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and energy consumption 8.5m2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +4094b859-b3b4-4035-94cd-8cf47ccbd801_3,,,"The air flow resistance is at least 1,500 millimetres.",greater-equal,synthetic +1de9d3e5-dee3-42c9-b929-80b7936f1642,The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,{'ID': '33_Finnish_Accessibility'},The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,none,annotated +a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",selection,annotated +793cb939-b3d9-46eb-ae65-71a4d5c8031b_5,,,Where the sewers is within the private curtilage of the dwelling (but not within a carport or evacuation areas) at least one space is a standard parking bay that can be widened to 3.3m.,not-part-of,synthetic +85745724-aa09-4cdd-ad17-3c50ea2b99a1,"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",{'ID': '105_UK_DocM_V1_AccessAndUseOfBuildings'},"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",necessity,annotated +88e23b46-22d9-4be6-87b7-40541f7995a9_1,,,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the total capital cost exceeds 25 decibels; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",greater,synthetic +60024014-cb6a-4a53-9b12-9497e0a1e5e8_1,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for thermal integrity 1 and 0.5 kN/m2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic +5b4380ba-0066-4735-a362-316d4c8e70b2_9,,,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 0.2 timber frame after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",greater,synthetic +2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d_3,,,An upstand built on site should not exceed a total extract air flow of 25 decibels.,less-equal,synthetic +a0c838b5-5fe2-4b52-abe1-432804c2c8aa_10,,,A illuminance of 21 C shall be used as the Signs for room temperature during the heating season.,equal,synthetic +7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88_6,,,The resilient layer should be to the full height of the door and 0.15m/s input charge of the doorset.,equal,synthetic +bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,greater-equal,annotated +b63dcef6-1840-4e9e-ad51-f8fc481fe856_7,,,"The wall ties should have a temperature of 4 and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic +d3fc8c9b-c23a-4188-8723-369caa90453c_5,,,"The total extract air flow for a building's total combined window area is 50 millimetres of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",equal,synthetic +4abb3268-3ba6-47e8-a8b7-4676dbaa9a16_6,,,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear vicinity of 2, except in doorways.",equal,synthetic +8151be81-09ad-4dac-b2d2-f0d757915b6c_5,,,"However, when the snow load can occur, the breaking of the load s should be at least 0.15m/s.",greater-equal,synthetic +46f5be2a-1514-420b-bc39-331fc6e0d2df_2,,,"The dwelling primary energy rate, dwelling emission rate and travel, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and size, respectively.",less-equal,synthetic +76acc6bd-50c0-4f3f-b015-42e171ec6ce7_2,,,400mm thermometers must be installed.,equal,synthetic +b4582e8e-9bf5-4d2e-8eb3-975e45511aa2,"The building should be designed, within the overall constraints of space, so that the difference in level between the entrance storey and the site entry point is minimised.",{'ID': '37_UK_DocM_V2_AccessAndUseOfBuildings'},"The building should be designed, within the overall constraints of space, so that the difference in level between the entrance storey and the site entry point is minimised.",selection,annotated +87c9cfa3-8093-497d-be10-dc054abe7062,"For common leaf lintels, the base plate should not be continuous and the lintel core should be insulated.",{'ID': '164_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For common leaf lintels, the base plate should not be continuous and the lintel core should be insulated.",necessity,annotated +f0c72b35-5a0a-4554-8713-96f6f73a67f1,A cube with edges of no more than 50 millimetres may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,{'ID': '51_Finnish_SafetyOfUse'},A cube with edges of no more than 50 millimetres may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,part-of,annotated +8207751f-13b8-4fe3-9bfe-4423093d4905,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,{'ID': '26_Finnish_AcousticEnvironment'},A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,none,annotated +2de867fe-80e7-4617-ad18-36225dd45ab1,Hinged or pivot windows with an opening angle of less than 15 degrees are not suitable for purge ventilation.,{'ID': '53_UK_DocF_V1_Ventilation'},Hinged or pivot windows with an opening angle of less than 15 degrees are not suitable for purge ventilation.,less,annotated +46ee0eda-086a-40ab-8e8f-bfa4c85abd49,"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",{'ID': '16_Finnish_SafetyOfUse'},"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",none,annotated +b4cef2a7-038c-4f72-8ea6-20e43d766165,"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",{'ID': '70_UK_DocM_V2_AccessAndUseOfBuildings'},"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",selection,annotated +302c413e-fefd-47f1-914f-0dc787e4a761,"Where illuminance on surfaces is greater than 200 lux, a difference in light reflectance value should be a minimum of 20 points.",{'ID': '29_UK_DocM_V2_AccessAndUseOfBuildings'},"Where illuminance on surfaces is greater than 200 lux, a difference in light reflectance value should be a minimum of 20 points.",none,annotated +a8b3e54e-902c-4502-99a2-8c41d46f1416_3,,,"If there are more than EI 30 dwellings in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",greater,synthetic +3d0bbf85-327f-4f92-a468-201f81080779,The roof insulation should be installed when the eaves are still accessible.,{'ID': '169_UK_DocL_V1_ConsrvationOfFuelAndPower'},The roof insulation should be installed when the eaves are still accessible.,necessity,annotated +0262f6e5-21bc-4312-9388-8ac93b79416d_2,,,The minimum full output of the absorption chillers should be no worse than 100 millimetres.,greater-equal,synthetic +5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",none,annotated +40b40b1b-d1b1-49d8-b9b7-13c5845a169d_11,,,The structure of the control appliance of the plumbing fixture shall be such that its load capacity does not arise above 200 Watts per room.,less-equal,synthetic +5b1fe636-d2aa-4382-885e-a4f8a2cae4d4_9,,,"Generally, a thermal element once upgraded should not have a calculations greater than 0.8 metres.",less-equal,synthetic +7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8_4,,,"For sizes of cylinder not listed, the water heater from the cylinder should not exceed 28 metres, where V is the volume in litres.",less-equal,synthetic +079db365-cfed-474e-9329-25349ac0db4a,"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",{'ID': '21_Finnish_Accessibility'},"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",none,annotated +457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",selection,annotated +5b4380ba-0066-4735-a362-316d4c8e70b2_7,,,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 20C facility after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",greater,synthetic +835d8fad-7a27-4299-aa38-a5b1771a6779,"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",{'ID': '178_UK_DocM_V2_AccessAndUseOfBuildings'},"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",none,annotated +76acc6bd-50c0-4f3f-b015-42e171ec6ce7_0,,,15 balcony must be installed.,equal,synthetic +88e23b46-22d9-4be6-87b7-40541f7995a9_4,,,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the air leakage rate figure exceeds 60; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",greater,synthetic +bd033057-ac6c-45bb-92c7-ca58bf22dab1,The lobby should be large enough and of a shape to allow a wheelchair user or a person pushing a pram to move clear of one door before opening the second door.,{'ID': '80_UK_DocM_V2_AccessAndUseOfBuildings'},The lobby should be large enough and of a shape to allow a wheelchair user or a person pushing a pram to move clear of one door before opening the second door.,necessity,annotated +3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,none,annotated +9fd15b82-fc32-4364-8724-f1ef14f0c047_5,,,The cooker hood should surface area at least the intended time of use of the cooker.,greater-equal,synthetic +72d7716f-7e3e-442c-9e42-14d4b19e18e3_2,,,A pipes that is being connected to a new building should not have a air distribution for delivered heat to the building which is greater than 0.350kgCO2/kWh.,not-part-of,synthetic +8b054fa5-fa6b-40f8-996a-a6dfea855fc3,"The distance between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 400 millimetres on the side wall and no less than 1,500 millimetres on the end wall.",{'ID': '33_Finnish_SafetyOfUse'},"The distance between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 400 millimetres on the side wall and no less than 1,500 millimetres on the end wall.",selection,annotated +38cd3221-7fc9-4462-be20-78b16a4309d3,The area of openings in the newly created dwelling should not be more than 25 of the total floor area.,{'ID': '490_UK_DocL_V1_ConsrvationOfFuelAndPower'},The area of openings in the newly created dwelling should not be more than 25 of the total floor area.,part-of,annotated +05fdde92-d8af-42ad-963b-9019c69a8ab3_9,,,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same fittings as the gigabit-ready physical infrastructure used in the external wall should be included within the depth of the intermediate floor structure.",equal,synthetic +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",none,annotated +9fd15b82-fc32-4364-8724-f1ef14f0c047_7,,,The cooker hood should location at least the surfaces of the cooker.,greater-equal,synthetic +5ba5ffe7-ece8-488a-b461-da66237e7888,"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",{'ID': '54_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",part-of,annotated +82aa0792-8ea3-414a-9952-933b4959b782,"NOTE: All boilers should be used in the calculation, including any that are identical.",{'ID': '249_UK_DocM_V2_AccessAndUseOfBuildings'},"NOTE: All boilers should be used in the calculation, including any that are identical.",none,annotated +c72a5952-2e0b-4d4a-9185-09e4149b6239,The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,{'ID': '114_Finnish_Health-Humidity'},The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,part-of,annotated +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated +9dd2a0f1-0ff9-4416-8abd-1e6589980ff4,"If the cross-sectional area of a mechanical ventilation systems air duct is designed to be greater than 0.06 m2, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",{'ID': '100_Finnish_Health-IndoorClimateAndVentilation'},"If the cross-sectional area of a mechanical ventilation systems air duct is designed to be greater than 0.06 m2, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",part-of,annotated +2ca092ec-4425-4552-a389-fd0dadfbd154_10,,,NOTE: A floor level with a differences of 180 millimetres or steeper should be designed as a ramp.,greater-equal,synthetic +9dd2a0f1-0ff9-4416-8abd-1e6589980ff4,"If the cross-sectional area of a mechanical ventilation systems air duct is designed to be greater than 0.06 m2, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",{'ID': '100_Finnish_Health-IndoorClimateAndVentilation'},"If the cross-sectional area of a mechanical ventilation systems air duct is designed to be greater than 0.06 m2, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",greater,annotated +46f5be2a-1514-420b-bc39-331fc6e0d2df_9,,,"The flushing, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the distance of the basement storey floor from the entry level, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,synthetic +c9983da5-23f1-4211-88ce-68e4753e4ab9,"A target primary energy rate, target emission rate, building primary energy rate and the building emission rate should be calculated for non-exempt buildings with low energy demand.",{'ID': '102_UK_DocM_V2_AccessAndUseOfBuildings'},"A target primary energy rate, target emission rate, building primary energy rate and the building emission rate should be calculated for non-exempt buildings with low energy demand.",necessity,annotated +8b9e1d32-efa8-409b-873b-22e2eae5b537,External walls and their various layers must form a whole that prevents water from harmfully penetrating into the structures.,{'ID': '95_Finnish_Health-Humidity'},External walls and their various layers must form a whole that prevents water from harmfully penetrating into the structures.,necessity,annotated +2238d6ef-421b-4f84-b24d-d46c6ba2afc5,"For example, when a door is open, people with impaired sight should be able to identify the door opening within the wall, as well as the leading edge of the door.",{'ID': '92_UK_DocM_V2_AccessAndUseOfBuildings'},"For example, when a door is open, people with impaired sight should be able to identify the door opening within the wall, as well as the leading edge of the door.",none,annotated +1afa330a-2d10-44bd-bdce-b9f2667a1b21,"Where it can be held open, steps should be taken to avoid people being harmed by walking into the door.",{'ID': '78_UK_DocM_V2_AccessAndUseOfBuildings'},"Where it can be held open, steps should be taken to avoid people being harmed by walking into the door.",selection,annotated +46f5be2a-1514-420b-bc39-331fc6e0d2df,"The dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and target fabric energy efficiency rate, respectively.",{'ID': '356_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and target fabric energy efficiency rate, respectively.",selection,annotated +ebc429f0-cb90-41ab-9a11-401a2ddc7bad,"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",{'ID': '268_UK_DocF_V1_Ventilation'},"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",selection,annotated +c5a6cac6-a314-47b1-aabd-13f2d1b7ad56,A step-free approach route should be provided to all private entrances.,{'ID': '71_UK_DocM_V1_AccessAndUseOfBuildings'},A step-free approach route should be provided to all private entrances.,selection,annotated +86350df0-a40e-412b-a301-004524d56736,"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",part-of,annotated +ef561e39-db90-462c-8dde-15fbeae954e5,A cube with edges of no more than 200 millimetres may pass between the upper edge of the barrier and the protective part.,{'ID': '50_Finnish_SafetyOfUse'},A cube with edges of no more than 200 millimetres may pass between the upper edge of the barrier and the protective part.,less-equal,annotated +f6add908-4d45-4b3e-83a6-369f6c36c037_11,,,"Door rails, stiles and muntins should be at least 14 metres sections.",greater-equal,synthetic +26980508-105c-49db-8595-bf001a48d757_6,,,"In strategy with no fixed terrace of houses or furnishings, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic +3724fd47-22f7-432c-81a2-1abcb95c7df2_10,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in 20 panel parts properties, where there should be no fewer than four.",equal,synthetic +a372d2c4-f734-479d-bc8d-d3a8aa15362d,"A wide range of people, including accompanied wheelchair users, should be able to access and use the lift.",{'ID': '49_UK_DocM_V1_AccessAndUseOfBuildings'},"A wide range of people, including accompanied wheelchair users, should be able to access and use the lift.",selection,annotated +108b5709-f035-4697-ba25-56edd2ce60fc,"Where permanent or removable seating is provided as part of the design, allowance should be made for disabled people to have a choice of seating location at spectator events.",{'ID': '126_UK_DocM_V2_AccessAndUseOfBuildings'},"Where permanent or removable seating is provided as part of the design, allowance should be made for disabled people to have a choice of seating location at spectator events.",selection,annotated +d0f0d416-a728-4d23-965e-10ff6559f2d8,All users including wheelchair users should be able to reach and use the controls that summon and direct the lifting platform.,{'ID': '113_UK_DocM_V2_AccessAndUseOfBuildings'},All users including wheelchair users should be able to reach and use the controls that summon and direct the lifting platform.,necessity,annotated +26980508-105c-49db-8595-bf001a48d757_1,,,"In connector pipe with no fixed space heating system or furnishings, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic +9ff8b8fd-5361-4c3d-9a7e-7459276c8df7_2,,,The total number of ventilators must not exceed the individual dwellings alongside the leading edge.,less-equal,synthetic +cea6e7bd-c494-4146-9f81-3fd2ed64a2a6_4,,,"The Length of the floor surface in the seating area and access route may not exceed 1,200 millimetres.",less-equal,synthetic +e320322e-3aee-4167-ad19-a6c6cc41f597,The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,{'ID': '97_Finnish_Health-WaterAndSewerage'},The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,none,annotated +cccbc1ea-27be-4d7b-b53c-3cb467a51020,"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",{'ID': '220_UK_DocM_V2_AccessAndUseOfBuildings'},"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",none,annotated +f0c72b35-5a0a-4554-8713-96f6f73a67f1_10,,,A cube with wide of no more than 23C may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,less-equal,synthetic +56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3_2,,,Storage premises with a performance standards exceeding 01:20:00 are not permitted within the building.,greater,synthetic +aef92227-4c01-4c59-b96d-ce414540606b,"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",{'ID': '63_UK_DocM_V2_AccessAndUseOfBuildings'},"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",selection,annotated +7d35f4c4-fa65-4d68-a974-f54386ca8aee_4,,,"However, a horizontal hot water ring duct in a protective part must be no higher than (16.66 8.33 V0.4)/(1000 24).",less-equal,synthetic +9952f64d-e0df-4b03-84af-150782f81387,"For mobility-impaired people, a going of at least 300mm is preferred.",{'ID': '124_UK_DocM_V2_AccessAndUseOfBuildings'},"For mobility-impaired people, a going of at least 300mm is preferred.",necessity,annotated +7d552257-2212-4139-8d13-b982e0e7744f,"It would be beneficial if entrance doors to wheelchair-accessible bedrooms were powered opening, as this could avoid the need for the 300mm access space adjacent to the leading edge of the door.",{'ID': '143_UK_DocM_V2_AccessAndUseOfBuildings'},"It would be beneficial if entrance doors to wheelchair-accessible bedrooms were powered opening, as this could avoid the need for the 300mm access space adjacent to the leading edge of the door.",part-of,annotated +3121fe90-27db-405e-a42a-df3cd22ee176_3,,,"Where necessary, 1,200 MJ/m2requirement, one above the other, must be installed in order to take into account children and users of wheelchairs.",equal,synthetic +9497b383-7217-4366-80c5-6f5677b30893,"If the building is heated through a district heat network or community heating system, the effective rated output should be based on the capacity of the equipment installed in the building, making reasonable assumptions for the operation of the district heat network or community heating system, including flow temperatures.",{'ID': '325_UK_DocM_V2_AccessAndUseOfBuildings'},"If the building is heated through a district heat network or community heating system, the effective rated output should be based on the capacity of the equipment installed in the building, making reasonable assumptions for the operation of the district heat network or community heating system, including flow temperatures.",selection,annotated +20518e80-6f7e-457f-8c5a-59fa4c0eb324_11,,,"When calculating the heat loss for a buildings design solution, the entrance level shall be used as the value of the allowance for the building envelope.",equal,synthetic +e4fb8d18-8dbc-4351-a2df-d87f880f476a,The fire resistance time requirement for balconies is half that of the load-bearing structures of the storey.,{'ID': '90_Finnish_FireSafety'},The fire resistance time requirement for balconies is half that of the load-bearing structures of the storey.,none,annotated +e21fa967-934e-4a29-a66d-252fdbbf928f_10,,,"If the parasitic energy use is unknown, an design flow rate of 250 millimetres should be made for any control system.",equal,synthetic +f420ae57-5656-4558-b1a3-1079e46bf6cc,"In the case of the storey-level door of a dwelling, or if the number of people evacuating through the door exceeds 60, doors must open in the direction of the exit.",{'ID': '223_Finnish_FireSafety'},"In the case of the storey-level door of a dwelling, or if the number of people evacuating through the door exceeds 60, doors must open in the direction of the exit.",greater,annotated +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_5,,,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the air flow resistance of that installation exceeds EI 15 of the total cost of the major renovation.",greater,synthetic +3724fd47-22f7-432c-81a2-1abcb95c7df2_2,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in 400-600mm Ramps properties, where there should be no fewer than four.",equal,synthetic +d728a9c8-0302-4bd1-b69b-0daeefce30d1,"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",{'ID': '84_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",part-of,annotated +c25a4595-d20d-40ed-bada-495abcfef307,"Background ventilators should be at least 1700mm above floor level, to reduce cold draughts, but still be easy for the occupant to reach.",{'ID': '64_UK_DocF_V1_Ventilation'},"Background ventilators should be at least 1700mm above floor level, to reduce cold draughts, but still be easy for the occupant to reach.",necessity,annotated +cf35d4a4-3170-421b-9be1-b68d928eed1d_3,,,"A roof with a alongside the leading edge greater than eight per cent must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",greater,synthetic +3153d771-404e-4a54-ac05-ed1b75e37506,"Gangways should not be less than 1100mm wide unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",{'ID': '8_UK_DocK_ProtectionFromFalling'},"Gangways should not be less than 1100mm wide unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",greater-equal,annotated +9497b383-7217-4366-80c5-6f5677b30893,"If the building is heated through a district heat network or community heating system, the effective rated output should be based on the capacity of the equipment installed in the building, making reasonable assumptions for the operation of the district heat network or community heating system, including flow temperatures.",{'ID': '325_UK_DocM_V2_AccessAndUseOfBuildings'},"If the building is heated through a district heat network or community heating system, the effective rated output should be based on the capacity of the equipment installed in the building, making reasonable assumptions for the operation of the district heat network or community heating system, including flow temperatures.",none,annotated +cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",necessity,annotated +78d904cd-b605-43a6-b3a4-34c22f557123,"Instead, the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",{'ID': '84_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Instead, the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",necessity,annotated +1de9d3e5-dee3-42c9-b929-80b7936f1642,The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,{'ID': '33_Finnish_Accessibility'},The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,none,annotated +5fa7daca-cb50-4397-a736-617e52d30187_9,,,"If efficiencies at below 30% are required and unavailable, the dimensions may be taken as equal to that at 1m3/s.",equal,synthetic +a86b58e8-046f-44b7-8e1b-00c876c8c647_11,,,"Parapets in headroom A to 90 and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",less-equal,synthetic +7e34700e-92de-4b00-a820-f4085a2e186c,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be class EI 15.",{'ID': '135_Finnish_FireSafety'},"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be class EI 15.",less,annotated +6187cad8-0d6d-4154-b98b-7285b36fea8d,Continuously running fans should be set up to operate without occupant intervention but may have manual or automatic controls for selecting the high rate of operation.,{'ID': '65_UK_DocF_V1_Ventilation'},Continuously running fans should be set up to operate without occupant intervention but may have manual or automatic controls for selecting the high rate of operation.,none,annotated +a387fcb8-ead2-4094-9be9-72d783468b33,"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",{'ID': '422_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",none,annotated +74b9ee2c-0192-442d-b5a1-a2974d456429,"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",{'ID': '67_UK_DocM_V1_AccessAndUseOfBuildings'},"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",selection,annotated +4d80c4d1-08ee-481a-9f9c-e9151ce1094d_4,,,"The building primary energy rate of windows, roof windows, rooflights and doors should not exceed 2 of the total floor area of the dwelling.",less-equal,synthetic +636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4,"Where a new building contains more than one dwelling, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",{'ID': '6_UK_DocR_V1_InfrastructureForElectircalCommunications'},"Where a new building contains more than one dwelling, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",part-of,annotated +0365837b-a04d-4aaf-a2f5-2e89403a9c2b,"If all the terminals have to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",{'ID': '200_UK_DocF_V1_Ventilation'},"If all the terminals have to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",necessity,annotated +d8a06af7-3a6b-4d68-8bba-342aac6d3ac0,Water pipes and sewers installed in the ground shall be identifiable and they shall be located separate from one another.,{'ID': '146_Finnish_Health-WaterAndSewerage'},Water pipes and sewers installed in the ground shall be identifiable and they shall be located separate from one another.,selection,annotated +3724fd47-22f7-432c-81a2-1abcb95c7df2,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",{'ID': '96_UK_DocF_V1_Ventilation'},"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",none,annotated +d504fd87-d13d-4936-9d7a-71d17954760d,The riser of the steps in an exit may be no more than 180 millimetres.,{'ID': '25_Finnish_SafetyOfUse'},The riser of the steps in an exit may be no more than 180 millimetres.,less-equal,annotated +09b2a395-5293-4b7d-82d4-5312482d59e9_1,,,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 1,200 millimetres structure from any projecting corner.",greater-equal,synthetic +29232335-402c-4ed9-af74-fd093ac22e28_9,,,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least presence 50mm.,greater-equal,synthetic +13a437c0-918c-47f2-85bd-b80dd69eb027,"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",none,annotated +d3fc8c9b-c23a-4188-8723-369caa90453c_3,,,"The air-tightness for a building's total combined window area is 75 light source lumens per circuit-watt of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",equal,synthetic +cb522b91-f26f-460e-adee-1a7f59ba10c9,"For heat pump installations in which there are other heat sources available to the same building, each of these heat sources should be appropriately incorporated into a singular control system.",{'ID': '315_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heat pump installations in which there are other heat sources available to the same building, each of these heat sources should be appropriately incorporated into a singular control system.",necessity,annotated +7d35f4c4-fa65-4d68-a974-f54386ca8aee_1,,,"However, a horizontal seating in a protective part must be no higher than E.",less-equal,synthetic +f0c72b35-5a0a-4554-8713-96f6f73a67f1_1,,,A cube with specification of no more than 2.0 m3/(h m2) may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,less-equal,synthetic +2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_8,,,The normal relationship between the dimensions of the rise and going is: 200 lux equals 400 millimetres.,equal,synthetic +c8a048c6-8e7e-4b5a-ada5-02990b983401,"A natural ventilation system, a mechanical extract ventilation system or a mechanical supply and extract ventilation system shall not be designed to be combined in such a way that the directions of air flow between the rooms and in the ductworks may change when the air flows are being controlled.",{'ID': '91_Finnish_Health-IndoorClimateAndVentilation'},"A natural ventilation system, a mechanical extract ventilation system or a mechanical supply and extract ventilation system shall not be designed to be combined in such a way that the directions of air flow between the rooms and in the ductworks may change when the air flows are being controlled.",selection,annotated +c384013b-c40f-4925-acbe-465e1ca5bc13_0,,,50 m2 buildings per detail should be recorded.,equal,synthetic +0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,annotated +2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_9,,,The normal relationship between the dimensions of the rise and going is: 3 equals 20 points.,equal,synthetic +6075de3c-d339-4ba4-9945-990480975615,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than three ventilators of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",{'ID': '94_UK_DocF_V1_Ventilation'},"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than three ventilators of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",necessity,annotated +36650de0-ef3c-4fd1-8199-f47c0e576076_1,,,"the depth of the platform does not exceed 1,200 millimetres.",less-equal,synthetic +e21fa967-934e-4a29-a66d-252fdbbf928f_9,,,"If the parasitic energy use is unknown, an heat recovery of two should be made for any control system.",equal,synthetic +b63dcef6-1840-4e9e-ad51-f8fc481fe856,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",{'ID': '36_UK_DocA_Structure'},"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",necessity,annotated +2633c957-07b4-4caa-a9d6-5acbac16b0b0_7,,,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and four fire igniting.,equal,synthetic +4b510cad-fefb-44be-a9cb-a26e0c42994c,"If the building is connected to a heating system where heat is conveyed via heat pipes external to the building from a shared heat exchanger or heat generation unit to several buildings, the heat loss from those pipes shall be divided between the buildings in proportion to their areas.",{'ID': '101_Finnish_EnergyEfficiency'},"If the building is connected to a heating system where heat is conveyed via heat pipes external to the building from a shared heat exchanger or heat generation unit to several buildings, the heat loss from those pipes shall be divided between the buildings in proportion to their areas.",selection,annotated +60205cf2-fa87-4195-9415-a6fb144a9b72,"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",{'ID': '96_Finnish_SafetyOfUse'},"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",necessity,annotated +8b054fa5-fa6b-40f8-996a-a6dfea855fc3_0,,,"The total floor area between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 900mm on the side wall and no less than 1,500 millimetres on the end wall.",greater-equal,synthetic +84cd76d7-e5d0-4f39-94bc-0236c65d533a_2,,,"in residential buildings of not more than two storeys, one exit of no less than 55 in drop is permitted.",greater-equal,synthetic +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_8,,,"In buildings more than 9 metres and at most 8 per cent (1:12.5) in breaking, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",less-equal,synthetic +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_10,,,"Where the work concerns a building containing more than 35 mg/m3 (30 ppm) skylights, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater-equal,synthetic +bf798097-bb99-42d0-a73f-8cebab8fbeb8_1,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the installed generation capacity of the steps must be no more than 75 light source lumens per circuit-watt and the tread must be no less than 300 millimetres.",less-equal,synthetic +a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",none,annotated +d342429e-d3fc-46e0-a195-527cfef1fd4b,"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",{'ID': '451_UK_DocM_V2_AccessAndUseOfBuildings'},"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",selection,annotated +2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_1,,,The normal relationship between the dimensions of the rise and going is: 800 millimetres equals 16/01/2023 00:00.,equal,synthetic +1afa330a-2d10-44bd-bdce-b9f2667a1b21,"Where it can be held open, steps should be taken to avoid people being harmed by walking into the door.",{'ID': '78_UK_DocM_V2_AccessAndUseOfBuildings'},"Where it can be held open, steps should be taken to avoid people being harmed by walking into the door.",necessity,annotated +511c1a7f-08b9-48ec-aea6-9b749fdf31a1_8,,,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an 0.136kgCO2/kWh of appropriately located heating circuits which are suitable for users of wheelchairs and walking frames with wheels.",equal,synthetic +84cd76d7-e5d0-4f39-94bc-0236c65d533a,"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",{'ID': '217_Finnish_FireSafety'},"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",part-of,annotated +746e7940-e063-42d5-a5c7-af12bb243924,"All floor areas, even when located at different levels, should be accessible.",{'ID': '128_UK_DocM_V2_AccessAndUseOfBuildings'},"All floor areas, even when located at different levels, should be accessible.",selection,annotated +835d8fad-7a27-4299-aa38-a5b1771a6779,"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",{'ID': '178_UK_DocM_V2_AccessAndUseOfBuildings'},"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",selection,annotated +9953a539-8775-467a-9028-f51fe6d0f9f6,Grommets or flexible collars should be used around incoming services and sealed to the air barrier with air-sealing tape or sealant.,{'ID': '179_UK_DocL_V1_ConsrvationOfFuelAndPower'},Grommets or flexible collars should be used around incoming services and sealed to the air barrier with air-sealing tape or sealant.,necessity,annotated +8e9ef8dc-18bd-4877-98cd-556aa4adee8f,"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'},"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",selection,annotated +73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",none,annotated +b63dcef6-1840-4e9e-ad51-f8fc481fe856_6,,,"The wall ties should have a horizontal spacing of 900mm and a travel of 90mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic +35cacecf-06dc-4b0f-aadb-db2ee05518c7,The area of windows and roof windows (but excluding display windows) within the area served exceeds 40 of the facade area.,{'ID': '495_UK_DocM_V2_AccessAndUseOfBuildings'},The area of windows and roof windows (but excluding display windows) within the area served exceeds 40 of the facade area.,none,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8_4,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for frequency 1 and 56 metres if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic +fb1da22f-8ddb-4399-b441-64dca68da9af,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",{'ID': '218_Finnish_FireSafety'},"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",greater-equal,annotated +05fdde92-d8af-42ad-963b-9019c69a8ab3_5,,,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same cost as the garage doorset used in the external wall should be included within the depth of the intermediate floor structure.",equal,synthetic +4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",none,annotated +56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3_5,,,Storage premises with a primary energy content exceeding B are not permitted within the building.,greater,synthetic +7e34700e-92de-4b00-a820-f4085a2e186c_1,,,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be water vapour resistance 1,500 millimetres.",equal,synthetic +83344b26-7cf0-452a-9dac-c0288c46393d,"The non-primary doors for entering a dwelling (for example, back door or garage inter-connecting doors) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",{'ID': '37_UK_DocQ_Security_Dwellings'},"The non-primary doors for entering a dwelling (for example, back door or garage inter-connecting doors) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",selection,annotated +aa7c5790-2189-451d-bd0e-956a257a7b6d,"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",{'ID': '201_UK_DocL_V1_ConsrvationOfFuelAndPower'},"In an existing system, when a boiler or hot water storage vessel is replaced, any accessible pipes in the dwelling should be insulated.",part-of,annotated +0f2dbc3b-0f3e-444e-a688-ed8faebd1226,Seats must be fixed to a base if the floor of the seating area is sloped or if there are level differences between the floors of the respective rows of seats.,{'ID': '105_Finnish_SafetyOfUse'},Seats must be fixed to a base if the floor of the seating area is sloped or if there are level differences between the floors of the respective rows of seats.,selection,annotated +83ff563b-077a-4849-b526-382fbb012647,The breaking of a glass structure or other light-permeable structure of a building must not cause a danger of falling or a danger of injury from fragments falling onto persons below.,{'ID': '67_Finnish_SafetyOfUse'},The breaking of a glass structure or other light-permeable structure of a building must not cause a danger of falling or a danger of injury from fragments falling onto persons below.,part-of,annotated +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_1,,,"Where the work concerns a building containing more than 400-600mm roof structures, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater,synthetic +5305da48-b810-4fd8-a0b3-7520f89ff401,"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",{'ID': '194_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",none,annotated +d342429e-d3fc-46e0-a195-527cfef1fd4b_8,,,"When an existing building with a total useful Extract of over 1m3/s is being extended or the habitable area is being increased, consequential improvements should be installed.",greater,synthetic +d0927095-9e43-4ce4-a740-d5df69dc1dc3_2,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and shape EI 30 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +4e119abd-0cf7-4c60-9c7b-1083f9b46280,"NOTE: If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise attenuating background ventilator should be fitted.",{'ID': '85_UK_DocF_V2_Ventilation'},"NOTE: If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise attenuating background ventilator should be fitted.",selection,annotated +7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",none,annotated +aa921550-3c5f-470b-b578-1788f83b49a7,Uplighters mounted at low or floor level can disorientate some visually impaired people and should be avoided.,{'ID': '153_UK_DocM_V2_AccessAndUseOfBuildings'},Uplighters mounted at low or floor level can disorientate some visually impaired people and should be avoided.,necessity,annotated +2cf150af-bede-4bb6-aa2e-b9f42a109761,The warning should be placed sufficiently in advance of the hazard to allow time to stop and not be so narrow that it might be missed in a single stride.,{'ID': '53_UK_DocM_V2_AccessAndUseOfBuildings'},The warning should be placed sufficiently in advance of the hazard to allow time to stop and not be so narrow that it might be missed in a single stride.,necessity,annotated +8207751f-13b8-4fe3-9bfe-4423093d4905_5,,,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the thick of the staircase and exit route is no more than 1000m2.,less-equal,synthetic +d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",none,annotated +9ff8b8fd-5361-4c3d-9a7e-7459276c8df7_9,,,The Unit length must not exceed the individual dwellings primary energy content.,less-equal,synthetic +4abb3268-3ba6-47e8-a8b7-4676dbaa9a16_0,,,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear installation of 200 m2, except in doorways.",equal,synthetic +4f2b56cb-9852-4406-bbea-31f426fb4910,"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",{'ID': '397_UK_DocM_V2_AccessAndUseOfBuildings'},"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",none,annotated +72d7716f-7e3e-442c-9e42-14d4b19e18e3_5,,,A Provision that is being connected to a new building should not have a anthracite figure for delivered heat to the building which is greater than 0.350kgCO2/kWh.,not-part-of,synthetic +cea6e7bd-c494-4146-9f81-3fd2ed64a2a6,The slope of the floor surface in the seating area and access route may not exceed 8 per cent (1:12.5).,{'ID': '119_Finnish_SafetyOfUse'},The slope of the floor surface in the seating area and access route may not exceed 8 per cent (1:12.5).,part-of,annotated +a894077e-cebf-4559-9254-ce964bc11b0f,Air flow rates for mechanical ventilation in new dwellings must be measured.,{'ID': '182_UK_DocF_V1_Ventilation'},Air flow rates for mechanical ventilation in new dwellings must be measured.,necessity,annotated +5e51b653-449e-4d00-be19-0e20ecff5c49_2,,,The default flushing should be eight per cent.,equal,synthetic +9952f64d-e0df-4b03-84af-150782f81387,"For mobility-impaired people, a going of at least 300mm is preferred.",{'ID': '124_UK_DocM_V2_AccessAndUseOfBuildings'},"For mobility-impaired people, a going of at least 300mm is preferred.",none,annotated +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_4,,,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 500kW in maintained, these must be accessible via the interior.",greater,synthetic +bfdf95da-d422-47cd-83d7-a30a4969f2e6,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",{'ID': '180_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 10 kN, will also be applied to internal ties.",none,annotated +3c0a8ccb-d813-40fb-b69b-88250d3bc4ec_2,,,These fittings should not exceed a heat loss of 60 persons.,less-equal,synthetic +b6e6ebce-e75f-4fae-b9a2-e35c164b3fb4,"Where onsite electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and onsite energy demand.",{'ID': '342_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where onsite electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and onsite energy demand.",none,annotated +75c60084-6878-472d-8694-e8739e0dd76c_0,,,The width of access routes in assembly areas with a service life of 50 m2 must be at least 900 millimetres.,equal,synthetic +802f724b-cd37-4e78-9cbc-42ccec62237f,"System controls should be wired so that when there is no demand for space heating or hot water, the heating appliance, if appropriate, and pump are switched off.",{'ID': '306_UK_DocM_V2_AccessAndUseOfBuildings'},"System controls should be wired so that when there is no demand for space heating or hot water, the heating appliance, if appropriate, and pump are switched off.",necessity,annotated +333110c1-ba9e-4c1d-9249-6604f49ba09a,"The presence of doors, whether open or closed, should be apparent to visually impaired people through the careful choice of colour and material for the door and its surroundings.",{'ID': '91_UK_DocM_V2_AccessAndUseOfBuildings'},"The presence of doors, whether open or closed, should be apparent to visually impaired people through the careful choice of colour and material for the door and its surroundings.",none,annotated +c47598f9-df79-4d77-aba9-8f380342372f,extract air of category 4 shall be conducted to the outdoors through individual extract air ducts.,{'ID': '88_Finnish_Health-IndoorClimateAndVentilation'},extract air of category 4 shall be conducted to the outdoors through individual extract air ducts.,equal,annotated +7e34700e-92de-4b00-a820-f4085a2e186c_9,,,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be constraints 50mm.",equal,synthetic +b63dcef6-1840-4e9e-ad51-f8fc481fe856_5,,,"The wall ties should have a horizontal spacing of 900mm and a relationship of 0.3, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic +d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",part-of,annotated +76bf63bd-30f4-440d-81a0-61ca16170f70_1,,,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the performance is less than 900mm of the total load.,less,synthetic +3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60_4,,,The approach route is a minimum of 900mm wide with a maximum instantaneous carbon monoxide concentration of 6m.,less-equal,synthetic +8207751f-13b8-4fe3-9bfe-4423093d4905_6,,,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the product certificate of the staircase and exit route is no more than 56 metres.,less-equal,synthetic +9ff8b8fd-5361-4c3d-9a7e-7459276c8df7_11,,,The topography must not exceed the individual dwellings dwelling emission rate.,less-equal,synthetic +3639910c-8ebf-499a-aeec-6f1951b28134,"Additionally, insulated plaster-board should be used in reveals to abut jambs and should be considered within reveal soffits.",{'ID': '166_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Additionally, insulated plaster-board should be used in reveals to abut jambs and should be considered within reveal soffits.",necessity,annotated +50e89a86-e2be-439d-b230-79274cd7199b_10,,,Modular and portable buildings with a planned total flow rate of more than 44mm at a single location should be shown to comply with the energy efficiency requirements.,greater,synthetic +e1f1aeb9-7453-4b6b-b3f1-6049d711868a,The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,{'ID': '156_Finnish_FireSafety'},The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,none,annotated +5ca184fa-e100-4f97-957d-e37ae944786f_8,,,The target primary energy rate of installing electric vehicle charge points and cable routes is not more than 0.2 of the total capital cost of the major renovation.,less-equal,synthetic +0da52584-1b37-48b5-840f-3795ae695275_6,,,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where 0.1m2 window unit are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +60205cf2-fa87-4195-9415-a6fb144a9b72,"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",{'ID': '96_Finnish_SafetyOfUse'},"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",selection,annotated +36650de0-ef3c-4fd1-8199-f47c0e576076_8,,,the total extract air flow of the platform does not exceed 2m.,less-equal,synthetic +7e34700e-92de-4b00-a820-f4085a2e186c_1,,,"If the free gap between facing walls of adjacent glazed balconies or the absence of the wall to the window of an adjacent fire compartment is less than 50 millimetres, the wall in question must be class EI 15.",less,synthetic +66b3628a-f0ee-4bc7-93c8-2ae0145a2e78_8,,,"In a Dwellings with no openable door systems, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",not-part-of,synthetic +fb5d3054-4911-4049-ba09-1c3e80f9c07c_10,,,"The breaking of steps in uncovered or unheated outdoor staircases must be no less than 25mm, and the riser may be no more than 130 millimetres.",greater-equal,synthetic +cd904a0f-c120-4c67-bcff-6fcc77abca62,Any future connection locations should be clearly identified and labelled.,{'ID': '116_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Any future connection locations should be clearly identified and labelled.,necessity,annotated +bf798097-bb99-42d0-a73f-8cebab8fbeb8_5,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the performance standards of the steps must be no more than 100 litres and the tread must be no less than 300 millimetres.",less-equal,synthetic +05864826-21ef-4ae7-9af8-2aaeffc7267a_5,,,Modular and portable buildings with a planned type and quality of more than 500 millimetres but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,greater,synthetic +164122ed-c7ac-4cf8-8a54-3d56c144f78d_9,,,"In general, the findings indicate that there should be at least the same number of heating technology as fire-extinguishing system and for some building types, e.g. large retail buildings, at least twice as many.",greater-equal,synthetic +371e1755-8bb5-456e-bf66-5a50f4c19d59,"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",{'ID': '50_UK_DocK_ProtectionFromFalling'},"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",none,annotated +83ff563b-077a-4849-b526-382fbb012647,The breaking of a glass structure or other light-permeable structure of a building must not cause a danger of falling or a danger of injury from fragments falling onto persons below.,{'ID': '67_Finnish_SafetyOfUse'},The breaking of a glass structure or other light-permeable structure of a building must not cause a danger of falling or a danger of injury from fragments falling onto persons below.,part-of,annotated +a1f91cfd-21f8-49a4-8468-746f49f4848e_4,,,"For a building that contains more than 7 mg/m3 (6 ppm) circulation piping for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",greater,synthetic +76acc6bd-50c0-4f3f-b015-42e171ec6ce7_9,,,20 degrees Celsius toilet washroom must be installed.,equal,synthetic +45338082-ca66-418b-8fe1-8f2be926f330_6,,,A ventilators of no more than 65mm may pass between the stair steps.,less-equal,synthetic +75c60084-6878-472d-8694-e8739e0dd76c,The width of access routes in assembly areas with a maximum capacity of 60 persons must be at least 900 millimetres.,{'ID': '115_Finnish_SafetyOfUse'},The width of access routes in assembly areas with a maximum capacity of 60 persons must be at least 900 millimetres.,part-of,annotated +45adb0b6-63ee-4f42-b6a3-8fc396221c67_11,,,The air flow resistance of the insulation plus any required air gap should be at least to the power requirements of the rafters.,greater-equal,synthetic +51550284-0701-41b2-9a76-a0061d16938a,"Windows and doors: to ensure continuity of the air barrier, window and door units should connect to the primary air barrier and window and door frames should be taped to surrounding structural openings, using air sealing tape.",{'ID': '188_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Windows and doors: to ensure continuity of the air barrier, window and door units should connect to the primary air barrier and window and door frames should be taped to surrounding structural openings, using air sealing tape.",necessity,annotated +7e369e4c-7768-4a7a-bd9c-41e2aa037b43,The air flows shall be designed so that the average carbon monoxide concentration in a parking garage for motor vehicles during the hour of use assessed as the most critical does not exceed 35 mg/m3 (30 ppm).,{'ID': '61_Finnish_Health-IndoorClimateAndVentilation'},The air flows shall be designed so that the average carbon monoxide concentration in a parking garage for motor vehicles during the hour of use assessed as the most critical does not exceed 35 mg/m3 (30 ppm).,selection,annotated +8595e26e-db5c-4d09-9fcf-02b530b61e23,There must be access to each fire compartment of an attic for firefighting operations.,{'ID': '240_Finnish_FireSafety'},There must be access to each fire compartment of an attic for firefighting operations.,necessity,annotated +569c7958-b7d6-4b9c-9dd9-13307e95e59b_0,,,"For ducted systems that are served by fans with a prevailing wind direction greater than 40, ductwork leakage tests should be carried out.",greater,synthetic +84cd76d7-e5d0-4f39-94bc-0236c65d533a,"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",{'ID': '217_Finnish_FireSafety'},"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",none,annotated +12907c6f-e734-436d-a7de-c8a1626fbe92,"Both:the area of rooflights exceeds 20 of the area of the roof, and the design solar load exceeds 25W/m2.",{'ID': '496_UK_DocM_V2_AccessAndUseOfBuildings'},"Both:the area of rooflights exceeds 20 of the area of the roof, and the design solar load exceeds 25W/m2.",none,annotated +1d10aa43-7650-46b1-83c3-867f212ab9c3,Background ventilators should meet the performance standards for both of the following: a. air flow from outside to inside the dwelling; b. air flow from inside the dwelling to outside.,{'ID': '58_UK_DocF_V1_Ventilation'},Background ventilators should meet the performance standards for both of the following: a. air flow from outside to inside the dwelling; b. air flow from inside the dwelling to outside.,selection,annotated +d56a51f7-6ec0-457b-a9ed-263fffe3a3e2,"Once open, all doors to accessible entrances should be wide enough to allow unrestricted passage for a variety of users, including wheelchair users, people carrying luggage, people with assistance dogs, and parents with pushchairs and small children.",{'ID': '66_UK_DocM_V2_AccessAndUseOfBuildings'},"Once open, all doors to accessible entrances should be wide enough to allow unrestricted passage for a variety of users, including wheelchair users, people carrying luggage, people with assistance dogs, and parents with pushchairs and small children.",necessity,annotated +389c960b-525d-4f2e-9a2c-1805eb2dc20d_9,,,The full air extract rate under a stair that forms part of the storage provision should be counted as ten millimetres.,equal,synthetic +4a82f789-a98a-4379-9b81-2a20cfba6c87,"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 70 kN, will also be applied to internal ties.",{'ID': '179_Finnish_StabilityOfStructures'},"If the internal ties must be centred on the supporting line, the minimum value of the tie force, 70 kN, will also be applied to internal ties.",none,annotated +23cff3c3-1251-4c5f-9fd9-8f52d25eb494,Gasfired boilers and multi-stage oilfired boilers with an output of more than 500kW should have fully modulating burner controls.,{'ID': '252_UK_DocM_V2_AccessAndUseOfBuildings'},Gasfired boilers and multi-stage oilfired boilers with an output of more than 500kW should have fully modulating burner controls.,none,annotated +b6b19c38-b160-475d-b01d-e3880ca00ab2,"Where necessary, flexible ducts may be used for final connections, but their lengths should be kept to a minimum.",{'ID': '31_UK_DocF_V2_Ventilation'},"Where necessary, flexible ducts may be used for final connections, but their lengths should be kept to a minimum.",part-of,annotated +84033aa1-c68d-457c-b7d8-893e879cd196,The pumping station shall be equipped with a malfunction detector.,{'ID': '131_Finnish_Health-WaterAndSewerage'},The pumping station shall be equipped with a malfunction detector.,necessity,annotated +44b436fd-26ab-4b00-82e9-9565e73bb87e,NOTE: Any method to reduce overheating risk in residential buildings must comply with all other parts of the Building Regulations.,{'ID': '65_UK_DocO_Overheating'},NOTE: Any method to reduce overheating risk in residential buildings must comply with all other parts of the Building Regulations.,necessity,annotated +5ca184fa-e100-4f97-957d-e37ae944786f_9,,,The wide of installing electric vehicle charge points and cable routes is not more than 1 of the total capital cost of the major renovation.,less-equal,synthetic +07565483-7508-43fc-b15e-82d95881e81e,"The average dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated using the same averaging methodology.",{'ID': '70_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The average dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated using the same averaging methodology.",necessity,annotated +3121fe90-27db-405e-a42a-df3cd22ee176,"Where necessary, two handrails, one above the other, must be installed in order to take into account children and users of wheelchairs.",{'ID': '55_Finnish_SafetyOfUse'},"Where necessary, two handrails, one above the other, must be installed in order to take into account children and users of wheelchairs.",necessity,annotated +a43037b0-8e35-45a2-9f23-c2d65f6c5a64,"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",{'ID': '8_UK_DocQ_Security_Dwellings'},"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",selection,annotated +451e7c91-d39f-4401-a0e3-5ab455ab0442,"The approach route should be level, gently sloping, or, where necessary, ramped.",{'ID': '15_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be level, gently sloping, or, where necessary, ramped.",necessity,annotated +99a53f17-48cb-4012-a47b-700761e0983b,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,{'ID': '61_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,part-of,annotated +8e7e4d9a-05b8-4512-91c5-e8dbb9488685,"At night, windows, patio doors and balcony doors should be modelled as closed.",{'ID': '55_UK_DocO_Overheating'},"At night, windows, patio doors and balcony doors should be modelled as closed.",necessity,annotated +f7cfdf57-28f3-4d23-90bf-ec2268e14bac,"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",{'ID': '65_Finnish_SafetyOfUse'},"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",selection,annotated +3724fd47-22f7-432c-81a2-1abcb95c7df2,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",{'ID': '96_UK_DocF_V1_Ventilation'},"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom properties, where there should be no fewer than four.",none,annotated +7134933d-17df-4a8c-b72e-1c09177bad1c,The spread of fire in voids of wall-type building elements must be restricted at least by storey.,{'ID': '130_Finnish_FireSafety'},The spread of fire in voids of wall-type building elements must be restricted at least by storey.,none,annotated +457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",necessity,annotated +3724fd47-22f7-432c-81a2-1abcb95c7df2_6,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom basins, where there should be no fewer than 25mm.",greater-equal,synthetic +7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88_11,,,The resilient layer should be to the full height of the door and 15mm category of the doorset.,equal,synthetic +9027959e-efc1-4d32-acbe-e0775d40f001_8,,,"The morticed bolts should have a minimum vicinity of 50mm, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",greater-equal,synthetic +60024014-cb6a-4a53-9b12-9497e0a1e5e8_11,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the design from these spaces does not exceed 65 degrees Celsius of the total air flow in the vertical duct.",less-equal,synthetic +d3e7a947-536e-4a49-9823-e27fc0f68b27_8,,,measures of landings to be at least equal to the domestic hot water circulation heat loss of the ramp.,greater-equal,synthetic +d04d6702-5170-4b50-9bda-7367a24e9322,"NOTE: The network distribution point could be in a cabinet, a box mounted on a wall or on a telegraph pole.",{'ID': '5_UK_DocR_V1_InfrastructureForElectircalCommunications'},"NOTE: The network distribution point could be in a cabinet, a box mounted on a wall or on a telegraph pole.",selection,annotated +0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,none,annotated +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_9,,,Skirtings totalling up to 8 per cent (1:12.5) differences and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,less-equal,synthetic +75c60084-6878-472d-8694-e8739e0dd76c_7,,,The width of access routes in assembly areas with a step of 65 degrees Celsius must be at least 900 millimetres.,equal,synthetic +d0927095-9e43-4ce4-a740-d5df69dc1dc3_7,,,"If the air flows of elevation difference 50 m2 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +716fa732-f3c7-43ad-a4e3-fff43a841018,The vehicle traffic area of a building and its courtyard must be safe and appropriate.,{'ID': '131_Finnish_SafetyOfUse'},The vehicle traffic area of a building and its courtyard must be safe and appropriate.,necessity,annotated +a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",none,annotated +0365837b-a04d-4aaf-a2f5-2e89403a9c2b,"If all the terminals have to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",{'ID': '200_UK_DocF_V1_Ventilation'},"If all the terminals have to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",part-of,annotated +5f675f4f-74de-4d0f-ae92-c3500d2d952e,The actual equivalent area and location of installed background ventilators should be recorded.,{'ID': '189_UK_DocF_V1_Ventilation'},The actual equivalent area and location of installed background ventilators should be recorded.,selection,annotated +536b172d-ccd1-479a-8136-6ee05db0f264,"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",{'ID': '205_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",part-of,annotated +922bf8df-3a70-4f45-8c04-200b638d3b3c_1,,,The cold water pipe shall be designed and installed so that the tie force in the cold water system may not exceed 500 millimetres.,less-equal,synthetic +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated +08075a86-82be-487e-915b-2c8423f95cb8,The equivalent area of the opening should meet or exceed the free area of the opening.,{'ID': '39_UK_DocO_Overheating'},The equivalent area of the opening should meet or exceed the free area of the opening.,part-of,annotated +34a524ec-6994-426f-86af-78788fd34a80,"Between the locking points for the mortice lock and surface-mounted rim lock, the distance should be 400-600mm.",{'ID': '36_UK_DocQ_Security_Dwellings'},"Between the locking points for the mortice lock and surface-mounted rim lock, the distance should be 400-600mm.",part-of,annotated +2238d6ef-421b-4f84-b24d-d46c6ba2afc5,"For example, when a door is open, people with impaired sight should be able to identify the door opening within the wall, as well as the leading edge of the door.",{'ID': '92_UK_DocM_V2_AccessAndUseOfBuildings'},"For example, when a door is open, people with impaired sight should be able to identify the door opening within the wall, as well as the leading edge of the door.",selection,annotated +e505b13c-7b62-4857-aa2d-544dc986e9c0,"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",{'ID': '18_UK_DocK_ProtectionFromFalling'},"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",none,annotated +f7f1a609-ae35-4544-9b38-e471d7a00666,"In order to enhance the efficiency of firefighting and rescue operations, means of smoke extraction shall be designed and constructed in the building so that smoke can be extracted from the different premises in the building.",{'ID': '249_Finnish_FireSafety'},"In order to enhance the efficiency of firefighting and rescue operations, means of smoke extraction shall be designed and constructed in the building so that smoke can be extracted from the different premises in the building.",selection,annotated +88e23b46-22d9-4be6-87b7-40541f7995a9_2,,,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the category exceeds 2.5 ties/m2; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",greater,synthetic +0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,selection,annotated +3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,necessity,annotated +5fa7daca-cb50-4397-a736-617e52d30187_11,,,"If efficiencies at below 30% are required and unavailable, the above may be taken as equal to that at 0.15.",equal,synthetic +7d877df3-9aa7-4dff-a64d-5356a66c944d_3,,,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a atmosphere exceeding 0.9 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",greater,synthetic +656aa2fa-18cb-41ee-ae28-28deb3dffcc3_1,,,The insulating performance of the water in the hot water system shall be at least 4 and available from the hot water plumbing fixture within 20 seconds.,greater-equal,synthetic +956efc87-87de-4d3c-99fb-dc58eab9353b_4,,,A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a that of at least 23C.,greater-equal,synthetic +6a41a473-bd3c-4e38-a093-094b3fdae388_5,,,At least one in every 0.15 dm3/s per m2 remaining low expansion foam must be provided with cable routes.,equal,synthetic +6414854d-01f9-481f-a7f4-c4581e48d8b1_7,,,Special safety features are not necessary if the sleeping accommodation is not more than 25 decibels long.,less-equal,synthetic +ae098b28-f01d-44df-b601-b7ac7631101d,"On stairs and ramps, a handrail must be installed for the entire length and on both sides of the structure.",{'ID': '54_Finnish_SafetyOfUse'},"On stairs and ramps, a handrail must be installed for the entire length and on both sides of the structure.",necessity,annotated +c5a6cac6-a314-47b1-aabd-13f2d1b7ad56,A step-free approach route should be provided to all private entrances.,{'ID': '71_UK_DocM_V1_AccessAndUseOfBuildings'},A step-free approach route should be provided to all private entrances.,selection,annotated +103f99ad-884b-4bae-9f22-ccb1c5bc3d26,"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",{'ID': '110_Finnish_FireSafety'},"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",less-equal,annotated +a538fc03-db66-4b31-b40f-e41754522010,The three-part form should be completed for each installation address.,{'ID': '264_UK_DocF_V1_Ventilation'},The three-part form should be completed for each installation address.,selection,annotated +835d8fad-7a27-4299-aa38-a5b1771a6779,"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",{'ID': '178_UK_DocM_V2_AccessAndUseOfBuildings'},"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",none,annotated +53e31e26-a39b-4047-a86e-bdb8021413e8,Window handles on windows that open outwards are not more than 650mm from the inside face of the wall when the window is at its maximum openable angle.,{'ID': '84_UK_DocO_Overheating'},Window handles on windows that open outwards are not more than 650mm from the inside face of the wall when the window is at its maximum openable angle.,part-of,annotated +8207751f-13b8-4fe3-9bfe-4423093d4905_1,,,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the level with entry of the staircase and exit route is no more than adequate means.,less-equal,synthetic +e32bbb47-c826-40c1-8ea4-8c32353d3fd2_6,,,There shall be 0.7 of electric storage heaters provided for people in the building.,equal,synthetic +7f3f59a4-fc7e-4b14-8074-384f6cacf548_9,,,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the value is less than three.",less,synthetic +a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",none,annotated +7d877df3-9aa7-4dff-a64d-5356a66c944d_7,,,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a capacity exceeding 90mm and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",greater,synthetic +8b054fa5-fa6b-40f8-996a-a6dfea855fc3_7,,,"The thresholds between a door that opens onto a landing and the upper edge of the ramp or flight of stairs must be no less than 65mm on the side wall and no less than 1,500 millimetres on the end wall.",greater-equal,synthetic +fa8a6d84-eb99-490e-8169-3c65353fb553,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",{'ID': '61_Finnish_StabilityOfStructures'},"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",selection,annotated +92f99822-6896-4ade-abbe-7598f8225b9e,"The information should be provided in a clear manner, for a non-technical audience.",{'ID': '93_UK_DocO_Overheating'},"The information should be provided in a clear manner, for a non-technical audience.",necessity,annotated +536b172d-ccd1-479a-8136-6ee05db0f264,"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",{'ID': '205_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",selection,annotated +4fc3b5b1-a838-4429-b385-d8e80e6633eb,"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",none,annotated +793cb939-b3d9-46eb-ae65-71a4d5c8031b_9,,,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be design to 56 metres.,less-equal,synthetic +85cf77b8-70aa-4453-8d95-00f55a63c4ca,The provision made must be sufficient to (a) allow simple adaptation of the dwelling to meet the needs of occupants who use wheelchairs; or (b) meet the needs of occupants who use wheelchairs.,{'ID': '65_UK_DocM_V1_AccessAndUseOfBuildings'},The provision made must be sufficient to (a) allow simple adaptation of the dwelling to meet the needs of occupants who use wheelchairs; or (b) meet the needs of occupants who use wheelchairs.,necessity,annotated +45338082-ca66-418b-8fe1-8f2be926f330_10,,,A Heat pumps of no more than 0.9 metres may pass between the stair steps.,less-equal,synthetic +f64c5a32-2f88-4be6-abf4-8870a4e51fdf,"The use of recirculation, transfer or secondary air shall not cause any harmful spread of impurities, in particular odours.",{'ID': '72_Finnish_Health-IndoorClimateAndVentilation'},"The use of recirculation, transfer or secondary air shall not cause any harmful spread of impurities, in particular odours.",selection,annotated +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_7,,,"In buildings more than 20 millimetres and at most 28 metres in water vapour resistance, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",greater,synthetic +2c725d50-13d5-4e77-bacf-9f174530e27c,The energy efficiency of historic and traditional buildings should be improved only if doing so will not cause long-term deterioration of the buildings fabric or fittings.,{'ID': '17_UK_DocM_V2_AccessAndUseOfBuildings'},The energy efficiency of historic and traditional buildings should be improved only if doing so will not cause long-term deterioration of the buildings fabric or fittings.,selection,annotated +f72a98f3-b7d2-4633-b244-0d7242dfb0c9_3,,,Every single bedroom has a minimum free gap of 1.501kWhPE/kWh and is at least 2.4m wide.,greater-equal,synthetic +e8340500-38b6-461b-b00d-d3aa44ac1f0b_10,,,The Length of the water available from the hot water system may not exceed 9 metres.,less-equal,synthetic +28433761-e537-456b-9ff8-00e786b43143,Consumer units should be mounted so that the switches are between 1350mm and 1450mm above floor level.,{'ID': '126_UK_DocM_V1_AccessAndUseOfBuildings'},Consumer units should be mounted so that the switches are between 1350mm and 1450mm above floor level.,selection,annotated +0a7ff0c7-c5f9-4069-9d7e-2bfd6c4871d3_10,,,The exceptional circumstances of the extension does not exceed 01:08:00.,less-equal,synthetic +"8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent. {'ID': '9_Finnish_Accessibility'}_2",,,"However, if the boiler efficiency is no more than 50 millimetres, the ramp may not have a gradient of more than eight per cent.",less-equal,synthetic +4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9_4,,,"In spaces intended for more than 60 persons, the total flow rate of the access route must be at least 0.7 metres.",greater-equal,synthetic +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_7,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding 0.136kgCO2/kWh facility for festive occasions is EI 30; however, minor sealing parts and penetrations may be class E 15.",greater,synthetic +a1f91cfd-21f8-49a4-8468-746f49f4848e_5,,,"For a building that contains more than 30m2 organic substances for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",greater,synthetic +35af73f1-53c7-4377-9da0-acf99eef4d8e,"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",{'ID': '159_UK_DocM_V2_AccessAndUseOfBuildings'},"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",selection,annotated +35af73f1-53c7-4377-9da0-acf99eef4d8e,"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",{'ID': '159_UK_DocM_V2_AccessAndUseOfBuildings'},"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",none,annotated +2a256a9c-0b8a-4acf-87e1-86a5857f36a3_2,,,"Where a driveway forms all, or part of, the approach route, an demonstrate compliance with Part F of the Building Regulations of at least 20 litres per second wide should be provided so that a wheelchair user can pass a parked car.",greater-equal,synthetic +6efbae9b-e306-4005-8881-aed97c54e405,Leakage from a pressure sewer located in a groundwater zone shall be detectable.,{'ID': '145_Finnish_Health-WaterAndSewerage'},Leakage from a pressure sewer located in a groundwater zone shall be detectable.,part-of,annotated +1de9d3e5-dee3-42c9-b929-80b7936f1642,The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,{'ID': '33_Finnish_Accessibility'},The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,part-of,annotated +8c7cf3d7-3ab9-4cb4-99bf-016cbbd4914d,Mechanical ventilation systems must be commissioned to provide adequate ventilation.,{'ID': '180_UK_DocF_V1_Ventilation'},Mechanical ventilation systems must be commissioned to provide adequate ventilation.,selection,annotated +e505b13c-7b62-4857-aa2d-544dc986e9c0_0,,,"For dwellings, for external tapered steps and stairs that are part of the building the protective part of each step should be a minimum of 0.8 metres.",greater-equal,synthetic +5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",part-of,annotated +244aeb26-ba33-498c-8a28-989b5aa879a8,The pumping station shall be water tight and resistant to earth pressure and it may not cause odour problem.,{'ID': '129_Finnish_Health-WaterAndSewerage'},The pumping station shall be water tight and resistant to earth pressure and it may not cause odour problem.,necessity,annotated +c72a5952-2e0b-4d4a-9185-09e4149b6239,The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,{'ID': '114_Finnish_Health-Humidity'},The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,necessity,annotated +9618a274-45da-4e3e-87f0-21c2bfae4a8e_6,,,"A guardrail must be used at points with a Unit length of over certain proportion, if these can be accessed by children.",greater,synthetic +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_10,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding half air conditioner is EI 30; however, minor sealing parts and penetrations may be class E 15.",greater,synthetic +fa8a6d84-eb99-490e-8169-3c65353fb553_9,,,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the energy savings shall be at least 14 metres.",greater-equal,synthetic +e8340500-38b6-461b-b00d-d3aa44ac1f0b_0,,,The Ventilation of the water available from the hot water system may not exceed 250 millimetres.,less-equal,synthetic +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",part-of,annotated +e505b13c-7b62-4857-aa2d-544dc986e9c0_3,,,"For dwellings, for external tapered steps and stairs that are part of the building the category of each step should be a minimum of 2 metres.",greater-equal,synthetic +05864826-21ef-4ae7-9af8-2aaeffc7267a_11,,,Modular and portable buildings with a planned spread of fire of more than 300 litres but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,greater,synthetic +50e89a86-e2be-439d-b230-79274cd7199b_9,,,Modular and portable buildings with a planned fittings of more than 24 degrees Celsius at a single location should be shown to comply with the energy efficiency requirements.,greater,synthetic +9fd15b82-fc32-4364-8724-f1ef14f0c047,The cooker hood should span at least the full width of the cooker.,{'ID': '36_UK_DocF_V1_Ventilation'},The cooker hood should span at least the full width of the cooker.,part-of,annotated +d728a9c8-0302-4bd1-b69b-0daeefce30d1,"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",{'ID': '84_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",part-of,annotated +f3bd99b4-7ea5-4968-af10-3c133c0b5aa0_8,,,"No individual flight has a access of more than 1,200 MJ/m2.",less-equal,synthetic +9c9a27b6-b4be-4946-854a-c46ee812140c,"In general, accessible bedrooms should be no less advantageously situated than other bedrooms.",{'ID': '142_UK_DocM_V2_AccessAndUseOfBuildings'},"In general, accessible bedrooms should be no less advantageously situated than other bedrooms.",necessity,annotated +8efb6108-e49e-4d64-a1e4-22e3f9128b17_8,,,"When calculating the reference heat loss of a building, the value of 1 shall be used as the dwelling primary energy rate for the air leakage rate figure for the building envelope.",equal,synthetic +aa41a5d4-c0b1-4da7-84a0-5c2e2738654f_4,,,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than 180kW duct.,greater,synthetic +4fc3b5b1-a838-4429-b385-d8e80e6633eb_0,,,"In the absence of relevant harmonised European Standards, products with a cross fall exceeding 650mm must have a product certificate issued by a Notified Body.",greater,synthetic +cea6e7bd-c494-4146-9f81-3fd2ed64a2a6_2,,,The clear width of the floor surface in the seating area and access route may not exceed 190 kN.,less-equal,synthetic +26980508-105c-49db-8595-bf001a48d757_9,,,"In copy with no fixed seats or waste, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_7,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 150m2 in flow rate; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic +0365837b-a04d-4aaf-a2f5-2e89403a9c2b,"If all the terminals have to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",{'ID': '200_UK_DocF_V1_Ventilation'},"If all the terminals have to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",none,annotated +e32bbb47-c826-40c1-8ea4-8c32353d3fd2_0,,,There shall be 0.1m2 of technical utility room provided for people in the building.,equal,synthetic +5e51b653-449e-4d00-be19-0e20ecff5c49_11,,,The default design solar load should be 800 millimetres.,equal,synthetic +5ca6b3d3-fd21-4cc1-8dd8-185268db6615,The doorset should be manufactured from solid or laminated timber with a minimum density of 600kg/m3.,{'ID': '26_UK_DocQ_Security_Dwellings'},The doorset should be manufactured from solid or laminated timber with a minimum density of 600kg/m3.,none,annotated +72d7716f-7e3e-442c-9e42-14d4b19e18e3_1,,,A detailing that is being connected to a new building should not have a difference in light reflectance value for delivered heat to the building which is greater than 0.350kgCO2/kWh.,not-part-of,synthetic +ddc0bba6-2df8-43e1-9398-37514366fb06,"For fixed terminals with automatic flow adjustment at the fan unit, the fan speed should be set to achieve the desired continuous flow rate.",{'ID': '208_UK_DocF_V1_Ventilation'},"For fixed terminals with automatic flow adjustment at the fan unit, the fan speed should be set to achieve the desired continuous flow rate.",part-of,annotated +74b9ee2c-0192-442d-b5a1-a2974d456429,"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",{'ID': '67_UK_DocM_V1_AccessAndUseOfBuildings'},"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",none,annotated +7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88,The resilient layer should be to the full height of the door and 600mm either side of the doorset.,{'ID': '15_UK_DocQ_Security_Dwellings'},The resilient layer should be to the full height of the door and 600mm either side of the doorset.,equal,annotated +ad30824c-74be-4f4f-916a-dfe1e0a89205,"It should be noted that double buggies are wider than wheelchairs and that, where relevant to the building type, this should be borne in mind when determining an appropriate effective clear width for an entrance door.",{'ID': '67_UK_DocM_V2_AccessAndUseOfBuildings'},"It should be noted that double buggies are wider than wheelchairs and that, where relevant to the building type, this should be borne in mind when determining an appropriate effective clear width for an entrance door.",selection,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",part-of,annotated +9415ae4b-7a74-4c70-a245-e4381c6d71bf_2,,,"At gables and party walls, insulation should extend to the wall; if the air flow between the wall and joist is less than four, perimeter insulation may be required.",less,synthetic +bf798097-bb99-42d0-a73f-8cebab8fbeb8_10,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the horizontal spacing of the steps must be no more than 300mm and the tread must be no less than 300 millimetres.",less-equal,synthetic +5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",none,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_11,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and water temperature one air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +75c60084-6878-472d-8694-e8739e0dd76c,The width of access routes in assembly areas with a maximum capacity of 60 persons must be at least 900 millimetres.,{'ID': '115_Finnish_SafetyOfUse'},The width of access routes in assembly areas with a maximum capacity of 60 persons must be at least 900 millimetres.,part-of,annotated +a4dc06ab-99c3-4c8b-b295-eb3e6a64320a,"The free height from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 2.2 metres, unless the area is protected so as to prevent the danger of collision.",{'ID': '99_Finnish_SafetyOfUse'},"The free height from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 2.2 metres, unless the area is protected so as to prevent the danger of collision.",selection,annotated +0cfe8c0e-45e4-4c4c-bf9b-906e26e28c75,"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",{'ID': '43_UK_DocM_V2_AccessAndUseOfBuildings'},"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",none,annotated +d925c189-860a-4fcb-ae88-d1cf8cc14fb8_8,,,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the efficiency may be no more than 0.3W/m2.",less-equal,synthetic +90b450dc-e913-48b3-bd17-dbac5b6fb057,The separator devices shall be located so that they can be serviced and emptied easily and without causing problems.,{'ID': '153_Finnish_Health-WaterAndSewerage'},The separator devices shall be located so that they can be serviced and emptied easily and without causing problems.,necessity,annotated +009e12eb-db83-485c-9ffc-e1f462251109_9,,,Each air terminal should have a premises of at least twice the rise plus the going (2R G) of the free area of its associated duct.,greater-equal,synthetic +536b172d-ccd1-479a-8136-6ee05db0f264,"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",{'ID': '205_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",none,annotated +5ba5ffe7-ece8-488a-b461-da66237e7888,"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",{'ID': '54_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",part-of,annotated +e1f1aeb9-7453-4b6b-b3f1-6049d711868a,The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,{'ID': '156_Finnish_FireSafety'},The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,none,annotated +a4fccc69-c508-4405-92aa-2cfe36bfca39,Exits of parts of the building separated by a fire wall must be constructed separately so that in the event of a fire there is no need to use any door that may be in the fire wall.,{'ID': '209_Finnish_FireSafety'},Exits of parts of the building separated by a fire wall must be constructed separately so that in the event of a fire there is no need to use any door that may be in the fire wall.,selection,annotated +5b4380ba-0066-4735-a362-316d4c8e70b2_6,,,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 2m plot after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",greater,synthetic +9415ae4b-7a74-4c70-a245-e4381c6d71bf_7,,,"At gables and party walls, insulation should extend to the wall; if the Wall between the wall and joist is less than 2.0 m3/(h m2), perimeter insulation may be required.",less,synthetic +66b3628a-f0ee-4bc7-93c8-2ae0145a2e78_3,,,"In a requirement with no openable Intermittent extract fans, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",not-part-of,synthetic +a0c838b5-5fe2-4b52-abe1-432804c2c8aa_7,,,A energy savings of 21 C shall be used as the total useful floor area for room temperature during the heating season.,equal,synthetic +f1898d1c-5d14-4f9b-8c31-e0ac7623a61c,The building control body should be provided with a report that demonstrates that the residential building passes CIBSEs TM59 assessment of overheating.,{'ID': '47_UK_DocO_Overheating'},The building control body should be provided with a report that demonstrates that the residential building passes CIBSEs TM59 assessment of overheating.,necessity,annotated +197b9463-397e-4729-a08d-12739f9db069,"For variable refrigerant flow (VRF) systems, any calculations must include indoor and outdoor conditions, the power input from controls, and indoor units.",{'ID': '283_UK_DocM_V2_AccessAndUseOfBuildings'},"For variable refrigerant flow (VRF) systems, any calculations must include indoor and outdoor conditions, the power input from controls, and indoor units.",necessity,annotated +354c849e-8e02-47ec-992c-e5431a62cb3f,Ventilation systems that provide supply and extract ventilation should be fitted with a heat recovery system where technically feasible.,{'ID': '309_UK_DocM_V2_AccessAndUseOfBuildings'},Ventilation systems that provide supply and extract ventilation should be fitted with a heat recovery system where technically feasible.,none,annotated +3ca5cb38-b90b-4449-ba14-4268866df8e1_4,,,The water heater is close to the draw-off points and has a Manual control no greater than 2.2 metres.,less-equal,synthetic +4ee66fa0-9dcc-4332-b001-f1aec49d9af9,It should be recognised that there is the danger where adjacent spaces each have an induction loop system that the signals may overlap.,{'ID': '154_UK_DocM_V2_AccessAndUseOfBuildings'},It should be recognised that there is the danger where adjacent spaces each have an induction loop system that the signals may overlap.,selection,annotated +9691451a-57d5-484f-a346-0f83b59f7ae0,"Refreshment facilities, such as restaurants and bars, should be designed so that they can be reached and used by all people independently or with companions.",{'ID': '137_UK_DocM_V2_AccessAndUseOfBuildings'},"Refreshment facilities, such as restaurants and bars, should be designed so that they can be reached and used by all people independently or with companions.",selection,annotated +ef561e39-db90-462c-8dde-15fbeae954e5,A cube with edges of no more than 200 millimetres may pass between the upper edge of the barrier and the protective part.,{'ID': '50_Finnish_SafetyOfUse'},A cube with edges of no more than 200 millimetres may pass between the upper edge of the barrier and the protective part.,none,annotated +9618a274-45da-4e3e-87f0-21c2bfae4a8e_0,,,"A guardrail must be used at points with a dwelling primary energy rate of over 280mm, if these can be accessed by children.",greater,synthetic +113b8bf8-1856-45f5-a54b-d65ef100b437,"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",{'ID': '262_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",selection,annotated +35af73f1-53c7-4377-9da0-acf99eef4d8e,"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",{'ID': '159_UK_DocM_V2_AccessAndUseOfBuildings'},"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",necessity,annotated +d0b6759e-deec-451d-bd7a-ec65b96048be_2,,,"extract air of above 850 millimetres shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",equal,synthetic +09b2a395-5293-4b7d-82d4-5312482d59e9,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",{'ID': '46_UK_DocM_V1_AccessAndUseOfBuildings'},"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",none,annotated +f72a98f3-b7d2-4633-b244-0d7242dfb0c9_0,,,Every single bedroom has a minimum emission rate of 0.052083333 and is at least 2.4m wide.,greater-equal,synthetic +76acc6bd-50c0-4f3f-b015-42e171ec6ce7_3,,,(16.66 8.33 V0.4)/(1000 24) living area must be installed.,equal,synthetic +f050b9bc-ce9e-4e51-8291-bbabda986732,all dimensions are minimum except where noted.,{'ID': '88_UK_DocM_V1_AccessAndUseOfBuildings'},all dimensions are minimum except where noted.,necessity,annotated +7d552257-2212-4139-8d13-b982e0e7744f,"It would be beneficial if entrance doors to wheelchair-accessible bedrooms were powered opening, as this could avoid the need for the 300mm access space adjacent to the leading edge of the door.",{'ID': '143_UK_DocM_V2_AccessAndUseOfBuildings'},"It would be beneficial if entrance doors to wheelchair-accessible bedrooms were powered opening, as this could avoid the need for the 300mm access space adjacent to the leading edge of the door.",selection,annotated +f1b9829d-7ac3-4bc5-918a-5bbb8d663a35,"For space heating systems, temperature control should be installed for the heating appliance.",{'ID': '248_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For space heating systems, temperature control should be installed for the heating appliance.",necessity,annotated +825053cb-af5d-43a9-b59b-e2a5ae78ea73,The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,{'ID': '59_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,selection,annotated +9dd51871-3235-4bbe-abdc-ab8d6dd3b1e6,"For example, the shutters should be used in the day and the windows opened only when it is cooler outside.",{'ID': '96_UK_DocO_Overheating'},"For example, the shutters should be used in the day and the windows opened only when it is cooler outside.",necessity,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479_8,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 400kg intended purpose.,less-equal,synthetic +53e31e26-a39b-4047-a86e-bdb8021413e8_0,,,Window handles on windows that open outwards are not more than twice the rise plus the going (2R G) standard thickness when the window is at its maximum openable angle.,less-equal,synthetic +113b8bf8-1856-45f5-a54b-d65ef100b437,"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",{'ID': '262_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",selection,annotated +cea6e7bd-c494-4146-9f81-3fd2ed64a2a6_10,,,The flow rate of the floor surface in the seating area and access route may not exceed EI 30.,less-equal,synthetic +63af9f99-6939-4e8c-a6a9-8b10942e1597_3,,,"The handle to at least 4 gangways in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",greater-equal,synthetic +6ec243f2-9294-4b7c-89a4-1c46e4a69cc9,"If site constraints necessitate an approach of 1:20 or steeper, an approach incorporating ramped access should be provided.",{'ID': '49_UK_DocM_V2_AccessAndUseOfBuildings'},"If site constraints necessitate an approach of 1:20 or steeper, an approach incorporating ramped access should be provided.",part-of,annotated +3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,part-of,annotated +26980508-105c-49db-8595-bf001a48d757,"In rooms with no fixed seats or furnishings, the number of persons shall be calculated to be two persons per square metre.",{'ID': '103_Finnish_SafetyOfUse'},"In rooms with no fixed seats or furnishings, the number of persons shall be calculated to be two persons per square metre.",not-part-of,annotated +7f3f59a4-fc7e-4b14-8074-384f6cacf548_5,,,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the proportion of the cooling load relating to distribution pipework is less than 10m.",less,synthetic +87c9cfa3-8093-497d-be10-dc054abe7062,"For common leaf lintels, the base plate should not be continuous and the lintel core should be insulated.",{'ID': '164_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For common leaf lintels, the base plate should not be continuous and the lintel core should be insulated.",necessity,annotated +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_9,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be area 220 millimetres.",equal,synthetic +53e31e26-a39b-4047-a86e-bdb8021413e8,Window handles on windows that open outwards are not more than 650mm from the inside face of the wall when the window is at its maximum openable angle.,{'ID': '84_UK_DocO_Overheating'},Window handles on windows that open outwards are not more than 650mm from the inside face of the wall when the window is at its maximum openable angle.,none,annotated +4d80c4d1-08ee-481a-9f9c-e9151ce1094d,"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",{'ID': '421_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",none,annotated +0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,selection,annotated +956efc87-87de-4d3c-99fb-dc58eab9353b,"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",{'ID': '42_Finnish_Accessibility'},"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",necessity,annotated +cea6e7bd-c494-4146-9f81-3fd2ed64a2a6_6,,,"The gradients of the floor surface in the seating area and access route may not exceed 1,500 millimetres.",less-equal,synthetic +53bb982d-5260-4a69-a6dd-71e4f074e676_5,,,The intended purpose of standing rows must be at least 450mm.,greater-equal,synthetic +51550284-0701-41b2-9a76-a0061d16938a,"Windows and doors: to ensure continuity of the air barrier, window and door units should connect to the primary air barrier and window and door frames should be taped to surrounding structural openings, using air sealing tape.",{'ID': '188_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Windows and doors: to ensure continuity of the air barrier, window and door units should connect to the primary air barrier and window and door frames should be taped to surrounding structural openings, using air sealing tape.",none,annotated +adc0ce58-8e7e-42fa-a823-ab45f266f77f,Sewers shall be connected to a stack vent that extends above the roofing of a building.,{'ID': '135_Finnish_Health-WaterAndSewerage'},Sewers shall be connected to a stack vent that extends above the roofing of a building.,selection,annotated +7e34700e-92de-4b00-a820-f4085a2e186c_11,,,"If the axle group load between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 30% load, the wall in question must be class EI 15.",less,synthetic +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_4,,,"Where the sum of installing only cable routes is more than 0.35W/(m2K) of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",greater,synthetic +536b172d-ccd1-479a-8136-6ee05db0f264_0,,,"Where pipework is above ground, the performance of the pipe properties should be at least as high as the effective rated output of pipework in the buried part of the system.",greater-equal,synthetic +4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9,"In spaces intended for more than 60 persons, the width of the access route must be at least 1,200 millimetres.",{'ID': '116_Finnish_SafetyOfUse'},"In spaces intended for more than 60 persons, the width of the access route must be at least 1,200 millimetres.",part-of,annotated +01008f69-874b-443e-bcb2-2f5630280049_4,,,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the thick may be no more than 15 degrees and the tread must be no less than 220 millimetres.",less-equal,synthetic +793cb939-b3d9-46eb-ae65-71a4d5c8031b,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,{'ID': '43_UK_DocM_V1_AccessAndUseOfBuildings'},Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,none,annotated +f3bd99b4-7ea5-4968-af10-3c133c0b5aa0_3,,,No individual flight has a Leakage of more than 200 lux.,less-equal,synthetic +bb9ec292-062b-43c3-8590-856dd5f6b890_11,,,"The building primary energy rate and illuminance calculated using the measured air permeability must not be higher than the target primary energy rate and total flow rate, respectively.",less-equal,synthetic +636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4,"Where a new building contains more than one dwelling, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",{'ID': '6_UK_DocR_V1_InfrastructureForElectircalCommunications'},"Where a new building contains more than one dwelling, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",greater,annotated +a090f6bb-f89b-44c1-b6ee-8e72e2be30a0,Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '370_UK_DocM_V2_AccessAndUseOfBuildings'},Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,none,annotated +8207751f-13b8-4fe3-9bfe-4423093d4905_2,,,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the service life of the staircase and exit route is no more than 2 metres.,less-equal,synthetic +8efb6108-e49e-4d64-a1e4-22e3f9128b17_11,,,"When calculating the reference heat loss of a building, the value of 13l/s shall be used as the load for the air leakage rate figure for the building envelope.",equal,synthetic +35cacecf-06dc-4b0f-aadb-db2ee05518c7_3,,,The area of windows and roof windows (but excluding display windows) suitable for their purpose exceeds 10m of the facade area.,greater,synthetic +d0b6759e-deec-451d-bd7a-ec65b96048be_0,,,"extract air of proportion 0.06 m2 shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",equal,synthetic +3724fd47-22f7-432c-81a2-1abcb95c7df2_7,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in 10m Staircases properties, where there should be no fewer than four.",equal,synthetic +3153d771-404e-4a54-ac05-ed1b75e37506_3,,,"Gangways should not be less than 1100mm net absorber area unless used by not more than 50 persons, in which case gangways should be a minimum of 200 m2.",greater-equal,synthetic +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",necessity,annotated +103f99ad-884b-4bae-9f22-ccb1c5bc3d26,"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",{'ID': '110_Finnish_FireSafety'},"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",part-of,annotated +0cfe8c0e-45e4-4c4c-bf9b-906e26e28c75,"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",{'ID': '43_UK_DocM_V2_AccessAndUseOfBuildings'},"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",selection,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479_8,,,Individual flights are: for Capacities up to 23C not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic +dae0db09-fd4b-4f2c-99c0-cd742b19d17a,"A glass structure or other light-permeable structure, along with its mountings, must withstand the load to which it is normally subject, unless the structure is protected by a fixed collision barrier.",{'ID': '68_Finnish_SafetyOfUse'},"A glass structure or other light-permeable structure, along with its mountings, must withstand the load to which it is normally subject, unless the structure is protected by a fixed collision barrier.",part-of,annotated +2ff58135-b89d-40d1-a145-51aad9e5a942,"The landing in front of the outside door shall be at least 1,500 millimetres wide and at least 1,500 millimetres long.",{'ID': '16_Finnish_Accessibility'},"The landing in front of the outside door shall be at least 1,500 millimetres wide and at least 1,500 millimetres long.",part-of,annotated +8e9ef8dc-18bd-4877-98cd-556aa4adee8f,"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'},"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",selection,annotated +1085a40e-a3d6-48e2-85ac-8247a26f04f2,Mechanical ventilation systems must be commissioned in accordance with an approved procedure.,{'ID': '35_UK_DocF_V2_Ventilation'},Mechanical ventilation systems must be commissioned in accordance with an approved procedure.,selection,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479_0,,,Individual flights are: for gradients up to 1:15 not more than half widened; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic +d0927095-9e43-4ce4-a740-d5df69dc1dc3_9,,,"If the air flows of maintained 1 and 10 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +bde1697a-20c9-4f15-a63c-5be323a058c1_5,,,Any connection of 10 litres per second per person or more entrance door to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,greater-equal,synthetic +0df5892a-e396-424e-90f1-74f6ccfb9e1a,"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",{'ID': '61_Finnish_Accessibility'},"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",part-of,annotated +2f0f22aa-06d3-478d-a777-5aca5c2fb5c1,"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",{'ID': '120_UK_DocK_ProtectionFromFalling'},"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",none,annotated +371e1755-8bb5-456e-bf66-5a50f4c19d59,"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",{'ID': '50_UK_DocK_ProtectionFromFalling'},"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",selection,annotated +fa8a6d84-eb99-490e-8169-3c65353fb553,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",{'ID': '61_Finnish_StabilityOfStructures'},"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",none,annotated +63af9f99-6939-4e8c-a6a9-8b10942e1597,"The handle to at least one window in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",{'ID': '57_UK_DocM_V1_AccessAndUseOfBuildings'},"The handle to at least one window in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",part-of,annotated +1913381b-a2cc-496e-9168-82ccf2a01d50_9,,,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the manufacturers declared efficiencies of the heat emitters to be installed does not exceed 1.501kWhPE/kWh.",less-equal,synthetic +2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d_8,,,An upstand built on site should not exceed a energy efficiency of 0.3.,less-equal,synthetic +3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60_0,,,The approach route is a minimum of 900mm wide with a maximum outputs of 2 metres.,less-equal,synthetic +3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60_1,,,The approach route is a minimum of 900mm wide with a maximum maximum number of occupants of 180 millimetres.,less-equal,synthetic +7e34700e-92de-4b00-a820-f4085a2e186c,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be class EI 15.",{'ID': '135_Finnish_FireSafety'},"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be class EI 15.",selection,annotated +9fd15b82-fc32-4364-8724-f1ef14f0c047_4,,,The cooker hood should total useful floor area at least the absence of the cooker.,greater-equal,synthetic +bc5a76fa-f0ec-47d5-b8e3-0e9458f3f140,"Foundations: wherever possible, blocks below the damp-proof course should be the same as those specified in the design for the above-ground main wall element (in masonry construction).",{'ID': '159_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Foundations: wherever possible, blocks below the damp-proof course should be the same as those specified in the design for the above-ground main wall element (in masonry construction).",selection,annotated +c90714e3-d8f9-47dc-ac9c-2e7ee516a89c,The joint between waterproofing and the floor drain must be tight.,{'ID': '119_Finnish_Health-Humidity'},The joint between waterproofing and the floor drain must be tight.,selection,annotated +29c431ee-ea93-491d-ab13-06418d93c488_7,,,"If dimension is greater than 0.2, manual control is acceptable.",greater,synthetic +d713514a-9398-45a2-9584-efecff6ebcc5,Reasonable provision must be made to resist unauthorised access to (a) any dwelling; and (b) any part of a building from which access can be gained to a flat within the building.,{'ID': '4_UK_DocQ_Security_Dwellings'},Reasonable provision must be made to resist unauthorised access to (a) any dwelling; and (b) any part of a building from which access can be gained to a flat within the building.,part-of,annotated +37f01a2c-b944-45a2-a7f4-140d8c03d7ac,"After rebating, frame components should retain at least 32mm of timber.",{'ID': '29_UK_DocQ_Security_Dwellings'},"After rebating, frame components should retain at least 32mm of timber.",greater-equal,annotated +bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,none,annotated +9494f4b9-aae0-4668-aebb-1d8851dd0824,"In refreshment facilities, bars and counters (or sections of them) should be at a level suitable for wheelchair users.",{'ID': '127_UK_DocM_V2_AccessAndUseOfBuildings'},"In refreshment facilities, bars and counters (or sections of them) should be at a level suitable for wheelchair users.",necessity,annotated +fab95d95-4789-4384-8d57-a575190f9e73,The heating plant emission rate of the micro combined heat and power system (microCHP) should be no greater than the emission rate of a regular boiler using the same fuel as the microCHP.,{'ID': '297_UK_DocL_V1_ConsrvationOfFuelAndPower'},The heating plant emission rate of the micro combined heat and power system (microCHP) should be no greater than the emission rate of a regular boiler using the same fuel as the microCHP.,part-of,annotated +e505b13c-7b62-4857-aa2d-544dc986e9c0,"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",{'ID': '18_UK_DocK_ProtectionFromFalling'},"For dwellings, for external tapered steps and stairs that are part of the building the going of each step should be a minimum of 280mm.",part-of,annotated +da4d5959-6e64-4e04-a1f3-8b42b6addab0_1,,,The outdoor number of wall ties per square metre used in the calculations for buildings other than those in intended use categories 1 and 2 outside the occupancy period shall be at least 14 metres.,greater-equal,synthetic +3153d771-404e-4a54-ac05-ed1b75e37506_6,,,"Gangways should not be less than 20 points exceptional circumstances unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",greater-equal,synthetic +36650de0-ef3c-4fd1-8199-f47c0e576076,the rated speed of the platform does not exceed 0.15m/s.,{'ID': '183_UK_DocM_V2_AccessAndUseOfBuildings'},the rated speed of the platform does not exceed 0.15m/s.,less-equal,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8_6,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for U-value 25 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic +8421f806-70f2-46a9-a308-90a40da3541d,"Where the gradient of the approach, whether over its whole length or in part, is 1:20 or steeper, that part of the approach should be designed as ramped access.",{'ID': '41_UK_DocM_V2_AccessAndUseOfBuildings'},"Where the gradient of the approach, whether over its whole length or in part, is 1:20 or steeper, that part of the approach should be designed as ramped access.",selection,annotated +cf35d4a4-3170-421b-9be1-b68d928eed1d_9,,,"A roof with a thermal integrity greater than 21 C must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",greater,synthetic +9415ae4b-7a74-4c70-a245-e4381c6d71bf_9,,,"At gables and party walls, insulation should extend to the wall; if the Floors between the wall and joist is less than 0.136kgCO2/kWh, perimeter insulation may be required.",less,synthetic +ee0c8c7c-c65e-4403-92e6-628fd680f3bf,Any panel within the doorset should be at least 15mm thick.,{'ID': '30_UK_DocQ_Security_Dwellings'},Any panel within the doorset should be at least 15mm thick.,greater-equal,annotated +fb1da22f-8ddb-4399-b441-64dca68da9af_10,,,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 25mm patterns.",greater-equal,synthetic +13a437c0-918c-47f2-85bd-b80dd69eb027,"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",selection,annotated +34a524ec-6994-426f-86af-78788fd34a80,"Between the locking points for the mortice lock and surface-mounted rim lock, the distance should be 400-600mm.",{'ID': '36_UK_DocQ_Security_Dwellings'},"Between the locking points for the mortice lock and surface-mounted rim lock, the distance should be 400-600mm.",selection,annotated +2ff58135-b89d-40d1-a145-51aad9e5a942_10,,,"The landing in front of the outside door shall be at least between 550mm and 700mm floor plate areas and at least 1,500 millimetres long.",greater-equal,synthetic +2f8d4247-e53b-49ae-bd26-c4f1765eaee8_6,,,"Extract air of installed generation capacity 500kW, 3 and 4 shall not be used as recirculation air.",equal,synthetic +4fc3b5b1-a838-4429-b385-d8e80e6633eb_10,,,"In the absence of relevant harmonised European Standards, products with a domestic hot water cylinder heat loss exceeding 0.1m2 must have a product certificate issued by a Notified Body.",greater,synthetic +3ec0e36a-0227-4b76-9fd5-7a2f77877d99,A building that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,{'ID': '23_UK_DocM_V2_AccessAndUseOfBuildings'},A building that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,part-of,annotated +51f35d58-c411-4d6d-b36e-9ddf10199908,"Whatever lifting device is chosen, internal stairs should always be provided as an alternative means of vertical access, and designed to suit ambulant disabled people and those with impaired sight.",{'ID': '106_UK_DocM_V2_AccessAndUseOfBuildings'},"Whatever lifting device is chosen, internal stairs should always be provided as an alternative means of vertical access, and designed to suit ambulant disabled people and those with impaired sight.",necessity,annotated +51517a5d-dd11-41b9-b44b-36d87b959127,The presence of the door should be apparent not only when it is shut but also when it is open.,{'ID': '77_UK_DocM_V2_AccessAndUseOfBuildings'},The presence of the door should be apparent not only when it is shut but also when it is open.,necessity,annotated +fa8a6d84-eb99-490e-8169-3c65353fb553,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",{'ID': '61_Finnish_StabilityOfStructures'},"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",greater-equal,annotated +079db365-cfed-474e-9329-25349ac0db4a_7,,,"In connection with the door of an outside space of an individual dwelling the air distribution outside the door may be more than 230mm if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",greater,synthetic +5e7d4831-4ec8-48f9-9e60-0422fcc1eae4,"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",{'ID': '344_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",greater-equal,annotated +5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",none,annotated +33ed3038-99a6-4b2d-906a-a1db21f2d898,"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",{'ID': '250_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",selection,annotated +2d31da64-b8e0-40aa-a8f6-6ae601e5c0da,lifting platform controls are located between 800mm and 1100mm from the floor of the lifting platform and at least 400mm from any return wall.,{'ID': '184_UK_DocM_V2_AccessAndUseOfBuildings'},lifting platform controls are located between 800mm and 1100mm from the floor of the lifting platform and at least 400mm from any return wall.,necessity,annotated +208b093d-361f-4aec-819d-4abca4e72c68_6,,,"in an evacuation area where the number of occupants is two, the second exit may be no less than 900 millimetres in width.",equal,synthetic +c06bb553-d8f1-47f5-ab33-cfdebb6bca52,"When a building undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"When a building undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",necessity,annotated +7a1bc727-1daa-4668-83f6-b44327b96898,"In glazed balconies, the spread of fire from one balcony to another and to an adjacent fire compartment must be restricted.",{'ID': '133_Finnish_FireSafety'},"In glazed balconies, the spread of fire from one balcony to another and to an adjacent fire compartment must be restricted.",necessity,annotated +3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60_8,,,The approach route is a minimum of 900mm wide with a maximum load EER of 16/01/2023 00:00.,less-equal,synthetic +302c413e-fefd-47f1-914f-0dc787e4a761_2,,,"Where height on surfaces is greater than EI 15, a difference in light reflectance value should be a minimum of 20 points.",greater,synthetic +079db365-cfed-474e-9329-25349ac0db4a,"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",{'ID': '21_Finnish_Accessibility'},"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",selection,annotated +85745724-aa09-4cdd-ad17-3c50ea2b99a1,"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",{'ID': '105_UK_DocM_V1_AccessAndUseOfBuildings'},"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",part-of,annotated +3e9fc57e-bc69-4f17-a056-dd7767afa9bb,"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",{'ID': '241_Finnish_FireSafety'},"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",none,annotated +993e54cc-49c3-43cb-995e-1a951c93c775_7,,,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an total air flow equal to 100.",equal,synthetic +99a53f17-48cb-4012-a47b-700761e0983b_0,,,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) half a metre of those rooms must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,equal,synthetic +3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,part-of,annotated +9618a274-45da-4e3e-87f0-21c2bfae4a8e_2,,,"A guardrail must be used at points with a air flow rates of over m3/(hm2) at 50Pa, if these can be accessed by children.",greater,synthetic +f9de28ac-45bb-4400-9d9f-8afee73bd2e3,The number of appliances should not exceed one per 100m2 of dwelling floor area.,{'ID': '273_UK_DocL_V1_ConsrvationOfFuelAndPower'},The number of appliances should not exceed one per 100m2 of dwelling floor area.,part-of,annotated +746e7940-e063-42d5-a5c7-af12bb243924,"All floor areas, even when located at different levels, should be accessible.",{'ID': '128_UK_DocM_V2_AccessAndUseOfBuildings'},"All floor areas, even when located at different levels, should be accessible.",necessity,annotated +208b093d-361f-4aec-819d-4abca4e72c68_0,,,"in an evacuation area where the constraints is four, the second exit may be no less than 900 millimetres in width.",equal,synthetic +99a53f17-48cb-4012-a47b-700761e0983b,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,{'ID': '61_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,selection,annotated +aa774d9d-2414-4e6f-9c4e-9b7c5abde23b,The outputs of any renewable systems should be separately monitored.,{'ID': '228_UK_DocM_V2_AccessAndUseOfBuildings'},The outputs of any renewable systems should be separately monitored.,selection,annotated +f36650d9-cd31-4795-9728-7a4dcf3cadde,"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",{'ID': '229_Finnish_FireSafety'},"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",necessity,annotated +793cb939-b3d9-46eb-ae65-71a4d5c8031b_10,,,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be dwelling fabric energy efficiency rate to 32mm.,less-equal,synthetic +31e6f85a-97ea-4224-9144-bc3d1daad96d,Consideration should be given to providing a low level urinal for children in male washrooms.,{'ID': '174_UK_DocM_V2_AccessAndUseOfBuildings'},Consideration should be given to providing a low level urinal for children in male washrooms.,selection,annotated +a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",none,annotated +55d84237-8fad-4bd7-b67d-0745b9cc1e31,"The doors of exits, and of areas leading to them, must be easy to open in an emergency.",{'ID': '222_Finnish_FireSafety'},"The doors of exits, and of areas leading to them, must be easy to open in an emergency.",selection,annotated +a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",selection,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_5,,,"If the air flows of equivalent area 1 and between 550mm and 700mm are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +981a0996-c526-4ee7-b679-0f17bd5ecd29,"Where it is not feasible to install a space heating system that can operate at this temperature (e.g. where there is insufficient space for larger radiators, or the existing distribution system is provided with higher temperature heat from a low carbon district heat network), the space heating system should be designed to the lowest design temperature possible that will still meet the heating needs of the building.",{'ID': '209_UK_DocM_V2_AccessAndUseOfBuildings'},"Where it is not feasible to install a space heating system that can operate at this temperature (e.g. where there is insufficient space for larger radiators, or the existing distribution system is provided with higher temperature heat from a low carbon district heat network), the space heating system should be designed to the lowest design temperature possible that will still meet the heating needs of the building.",necessity,annotated +81f14fc1-af5d-45e8-8725-94d2510e4701_4,,,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a high of at least (16.66 8.33 V0.4)/(1000 24) in the hallway and kitchen.",greater-equal,synthetic +4abb3268-3ba6-47e8-a8b7-4676dbaa9a16_10,,,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear location of 20 millimetres, except in doorways.",equal,synthetic +3e9fc57e-bc69-4f17-a056-dd7767afa9bb_5,,,"If the maintained of the building does not exceed 30m2, access to the attic fire compartments from the outside shall be required.",less-equal,synthetic +10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,none,annotated +ff3e8f86-1542-4f54-a776-cfdc8482bad7_8,,,The net absorber area of an air conditioner working in cooling mode should be a minimum of 4.,greater-equal,synthetic +0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,part-of,annotated +009e12eb-db83-485c-9ffc-e1f462251109,Each air terminal should have a free area of at least 90 of the free area of its associated duct.,{'ID': '115_UK_DocF_V1_Ventilation'},Each air terminal should have a free area of at least 90 of the free area of its associated duct.,none,annotated +77f993c6-dff1-4f9a-8f66-73221d3cbaff_2,,,"If the dwelling only has 0.7 metres control system, a minimum ventilation rate of 13l/s should be used.",equal,synthetic +164122ed-c7ac-4cf8-8a54-3d56c144f78d,"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",{'ID': '172_UK_DocM_V2_AccessAndUseOfBuildings'},"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",greater-equal,annotated +0da52584-1b37-48b5-840f-3795ae695275_1,,,the minimum clear dimensions of the platform are: 1100mm wide and 120 ventilation provision where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +6efbae9b-e306-4005-8881-aed97c54e405,Leakage from a pressure sewer located in a groundwater zone shall be detectable.,{'ID': '145_Finnish_Health-WaterAndSewerage'},Leakage from a pressure sewer located in a groundwater zone shall be detectable.,part-of,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_0,,,"If the air flows of distance of the uppermost floor level from the entry level 1 and ten millimetres are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +8207751f-13b8-4fe3-9bfe-4423093d4905,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,{'ID': '26_Finnish_AcousticEnvironment'},A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,none,annotated +eefe1191-2903-4fb8-9138-6471e09fb67d_3,,,The presence exceeds certain proportion at 11pm.,greater,synthetic +9415ae4b-7a74-4c70-a245-e4381c6d71bf_3,,,"At gables and party walls, insulation should extend to the wall; if the access route between the wall and joist is less than 50 m2, perimeter insulation may be required.",less,synthetic +26980508-105c-49db-8595-bf001a48d757,"In rooms with no fixed seats or furnishings, the number of persons shall be calculated to be two persons per square metre.",{'ID': '103_Finnish_SafetyOfUse'},"In rooms with no fixed seats or furnishings, the number of persons shall be calculated to be two persons per square metre.",none,annotated +4fc3b5b1-a838-4429-b385-d8e80e6633eb_9,,,"In the absence of relevant harmonised European Standards, products with a side edges exceeding 10 litres per second per person must have a product certificate issued by a Notified Body.",greater,synthetic +5b1fe636-d2aa-4382-885e-a4f8a2cae4d4_6,,,"Generally, a thermal element once upgraded should not have a sum greater than 50 m2.",less-equal,synthetic +9027959e-efc1-4d32-acbe-e0775d40f001_4,,,"The morticed bolts should have a minimum location of 10, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",greater-equal,synthetic +636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4_5,,,"Where a new building contains more than 120 seats, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",greater,synthetic +8364a5f1-f80e-484c-9f38-bffc6f4c1876_1,,,"Where communal parking is provided to blocks of flats, at least four standard ventilation valves is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",greater-equal,synthetic +e320322e-3aee-4167-ad19-a6c6cc41f597,The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,{'ID': '97_Finnish_Health-WaterAndSewerage'},The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,none,annotated +353ebb10-20b6-4100-acfa-1afed0784b33,Designs should clearly indicate means to limit disruption to the insulation.,{'ID': '150_UK_DocL_V1_ConsrvationOfFuelAndPower'},Designs should clearly indicate means to limit disruption to the insulation.,necessity,annotated +a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",selection,annotated +825053cb-af5d-43a9-b59b-e2a5ae78ea73_9,,,The habitable area of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the Signs of associated parking spaces.,greater,synthetic +26980508-105c-49db-8595-bf001a48d757_0,,,"In Rigid ducts with no fixed Mortar snots or furnishings, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic +8805ec9f-3f5f-44fc-9078-3ae62439c973,"NOTE: When a single U-value is calculated for a product range of doors, the configuration of the door chosen for the calculation should be the worst performing in the product range.",{'ID': '108_UK_DocL_V1_ConsrvationOfFuelAndPower'},"NOTE: When a single U-value is calculated for a product range of doors, the configuration of the door chosen for the calculation should be the worst performing in the product range.",none,annotated +6a41a473-bd3c-4e38-a093-094b3fdae388,At least one in every five remaining parking spaces must be provided with cable routes.,{'ID': '68_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},At least one in every five remaining parking spaces must be provided with cable routes.,none,annotated +bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,selection,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479_6,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 0.7 metres water vapour resistance.,less-equal,synthetic +2f0f22aa-06d3-478d-a777-5aca5c2fb5c1,"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",{'ID': '120_UK_DocK_ProtectionFromFalling'},"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",selection,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",selection,annotated +bb9ec292-062b-43c3-8590-856dd5f6b890_0,,,"The thickness and building emission rate calculated using the measured air permeability must not be higher than the full width and target emission rate, respectively.",less-equal,synthetic +fac44f87-4eb9-4f56-998c-74efa9512309,"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",{'ID': '106_Finnish_Health-Humidity'},"If air barriers or vapour barriers have been used in the structure, the seams, edges and penetrations must be tight.",part-of,annotated +bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,part-of,annotated +a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",selection,annotated +5e7d4831-4ec8-48f9-9e60-0422fcc1eae4,"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",{'ID': '344_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",selection,annotated +e15250c0-1279-4d29-a1ec-31560b045007_3,,,oil and grease separators of basement storeys must not be connected to fire and smoke-proof building envelope.,not-part-of,synthetic +082c7ed9-3579-48c2-a0d2-076f1edd647c_8,,,"Each of the E 15 steps of the centrally hinged window should be assessed as a single side, bottom or top hung window.",equal,synthetic +6ab07828-b6aa-4a60-8860-333f061a0fde,"Door furniture on manually operated non-powered doors should be easy to operate by people with limited manual dexterity, and be readily apparent against the background of the door.",{'ID': '71_UK_DocM_V2_AccessAndUseOfBuildings'},"Door furniture on manually operated non-powered doors should be easy to operate by people with limited manual dexterity, and be readily apparent against the background of the door.",necessity,annotated +5fa7daca-cb50-4397-a736-617e52d30187_0,,,"If indoor and outdoor conditions at below 30% are required and unavailable, the fire resistance time may be taken as equal to that at 30% load.",equal,synthetic +2f8d4247-e53b-49ae-bd26-c4f1765eaee8_11,,,"Extract air of SEER 1m2, 3 and 4 shall not be used as recirculation air.",equal,synthetic +825053cb-af5d-43a9-b59b-e2a5ae78ea73,The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,{'ID': '59_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The total number of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the number of associated parking spaces.,part-of,annotated +7c44934c-61e1-4904-a493-1aa360ccc7d1,"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",{'ID': '1_UK_DocA_Structure'},"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",selection,annotated +339fc78c-a2f2-481c-a410-3aeb41e24b8a_10,,,Solid walls constructed of coursed brickwork or blockwork should be at least as planned time of use as 30 of the storey height.,greater-equal,synthetic +aac9b625-4f6b-42e6-b657-2accd6054607,Heating systems for screed floors that are greater than 65mm thick should automatically reduce the room temperature at night or when the room is unoccupied.,{'ID': '299_UK_DocL_V1_ConsrvationOfFuelAndPower'},Heating systems for screed floors that are greater than 65mm thick should automatically reduce the room temperature at night or when the room is unoccupied.,part-of,annotated +d1512435-3f66-4a07-90fd-fd3e3d2bea1a,The stairs between floor levels must be covered.,{'ID': '17_Finnish_SafetyOfUse'},The stairs between floor levels must be covered.,selection,annotated +8e8f4fb5-00b5-404f-89df-a07287984748_6,,,"In buildings with a insulating performance greater than 44mm, automatic meter reading and data collection facilities should be installed.",greater,synthetic +0667134c-1290-4fe0-99eb-41c0b9e63a27,CO2 emissions and primary energy associated with the thermal energy streams of a trigeneration scheme should be attributed in proportion to the output energy streams.,{'ID': '67_UK_DocM_V2_AccessAndUseOfBuildings'},CO2 emissions and primary energy associated with the thermal energy streams of a trigeneration scheme should be attributed in proportion to the output energy streams.,none,annotated +d925c189-860a-4fcb-ae88-d1cf8cc14fb8,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",{'ID': '28_Finnish_SafetyOfUse'},"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",none,annotated +60205cf2-fa87-4195-9415-a6fb144a9b72,"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",{'ID': '96_Finnish_SafetyOfUse'},"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",part-of,annotated +9c2051ae-9878-4772-9471-bc5b8a28c3ae,"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy, taking into consideration the use and likely background level of noise from other sources.",{'ID': '23_UK_DocF_V2_Ventilation'},"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy, taking into consideration the use and likely background level of noise from other sources.",selection,annotated +05864826-21ef-4ae7-9af8-2aaeffc7267a,Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,{'ID': '83_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,none,annotated +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_6,,,"Where the work concerns a building containing more than 100 water system, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater,synthetic +49c6fd15-70a9-4733-8de8-8dd2fe49fe0a,"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",{'ID': '231_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",none,annotated +77f993c6-dff1-4f9a-8f66-73221d3cbaff_5,,,"If the dwelling only has 900-1000mm duct, a minimum ventilation rate of 13l/s should be used.",equal,synthetic +35cacecf-06dc-4b0f-aadb-db2ee05518c7_5,,,The area of windows and roof windows (but excluding display windows) at its maximum openable angle exceeds 4 of the facade area.,greater,synthetic +84cd76d7-e5d0-4f39-94bc-0236c65d533a_0,,,"in residential buildings of not more than two storeys, one exit of no less than 500kW in going is permitted.",greater-equal,synthetic +7a1bc727-1daa-4668-83f6-b44327b96898,"In glazed balconies, the spread of fire from one balcony to another and to an adjacent fire compartment must be restricted.",{'ID': '133_Finnish_FireSafety'},"In glazed balconies, the spread of fire from one balcony to another and to an adjacent fire compartment must be restricted.",part-of,annotated +656aa2fa-18cb-41ee-ae28-28deb3dffcc3_7,,,The ventilation rate of the water in the hot water system shall be at least 0.7W/(m2K) and available from the hot water plumbing fixture within 20 seconds.,greater-equal,synthetic +e7cc3da8-211a-4244-b711-210a912ca2ac,Ground floors and those in contact with the outside of the dwelling should be insulated to limit heat losses to not more than 10W/m2.,{'ID': '302_UK_DocL_V1_ConsrvationOfFuelAndPower'},Ground floors and those in contact with the outside of the dwelling should be insulated to limit heat losses to not more than 10W/m2.,none,annotated +05698d4d-c140-4bce-94b3-386ce02baa6b,The storm water sewers within the building shall be equipped with condensation insulation.,{'ID': '169_Finnish_Health-WaterAndSewerage'},The storm water sewers within the building shall be equipped with condensation insulation.,part-of,annotated +3ac96918-764f-403d-a588-37b5f4a16f46,"For absorption chillers used in conjunction with onsite CHP or a district heat network or community heating system, the CO2 emissions and primary energy should be calculated in the same way as when using CHP for heating.",{'ID': '284_UK_DocM_V2_AccessAndUseOfBuildings'},"For absorption chillers used in conjunction with onsite CHP or a district heat network or community heating system, the CO2 emissions and primary energy should be calculated in the same way as when using CHP for heating.",necessity,annotated +793cb939-b3d9-46eb-ae65-71a4d5c8031b_7,,,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be cross-sectional area to 24 degrees Celsius.,less-equal,synthetic +56b3f993-37b5-4cb1-9540-432972f8056e,"In a mechanical ventilation system, the air handling units and chambers shall be able to withstand the loads caused by fan pressure while the shutoff dampers are closed.",{'ID': '99_Finnish_Health-IndoorClimateAndVentilation'},"In a mechanical ventilation system, the air handling units and chambers shall be able to withstand the loads caused by fan pressure while the shutoff dampers are closed.",selection,annotated +43e26628-8b62-4cc6-91e2-284335df1564_7,,,"In rooms used for sleeping or rest, the visual contrast may not exceed one.",less-equal,synthetic +78d904cd-b605-43a6-b3a4-34c22f557123,"Instead, the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",{'ID': '84_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Instead, the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",necessity,annotated +3e9fc57e-bc69-4f17-a056-dd7767afa9bb_8,,,"If the travel distance of the building does not exceed E, access to the attic fire compartments from the outside shall be required.",less-equal,synthetic +993e54cc-49c3-43cb-995e-1a951c93c775_2,,,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an value equal to 2m.",equal,synthetic +5ddf9b8d-87fb-4fc4-9b38-4ff91008cfdf,The annual energy savings should be estimated using the Standard Assessment Procedure.,{'ID': '464_UK_DocL_V1_ConsrvationOfFuelAndPower'},The annual energy savings should be estimated using the Standard Assessment Procedure.,necessity,annotated +7f696221-52c9-4c52-8f90-74bd93c51299_7,,,This grippable handrail is 850-1000mm above the pitch line of the flight and heat gain at least 2.0 m3/(h m2) beyond the top and bottom nosings.,greater-equal,synthetic +54907849-c48f-4267-b5f0-fc7e9279da7c,"For existing dwellings, when carrying out work on an existing system, such as installing or replacing components (e.g. replacing a boiler but retaining the pipework and heat emitters), the energy performance of the new components should be assessed.",{'ID': '409_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when carrying out work on an existing system, such as installing or replacing components (e.g. replacing a boiler but retaining the pipework and heat emitters), the energy performance of the new components should be assessed.",part-of,annotated +50e89a86-e2be-439d-b230-79274cd7199b_7,,,Modular and portable buildings with a planned shape of more than 280mm at a single location should be shown to comply with the energy efficiency requirements.,greater,synthetic +d3e7a947-536e-4a49-9823-e27fc0f68b27_5,,,illuminance of landings to be at least equal to the opening angle of the ramp.,greater-equal,synthetic +b4cef2a7-038c-4f72-8ea6-20e43d766165,"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",{'ID': '70_UK_DocM_V2_AccessAndUseOfBuildings'},"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",none,annotated +b4582e8e-9bf5-4d2e-8eb3-975e45511aa2,"The building should be designed, within the overall constraints of space, so that the difference in level between the entrance storey and the site entry point is minimised.",{'ID': '37_UK_DocM_V2_AccessAndUseOfBuildings'},"The building should be designed, within the overall constraints of space, so that the difference in level between the entrance storey and the site entry point is minimised.",necessity,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_8,,,"If the air flows of storage capacity 600 x 600 millimetres and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +e15250c0-1279-4d29-a1ec-31560b045007_0,,,joint of basement storeys must not be connected to fire and smoke-proof toilet seat.,not-part-of,synthetic +d728a9c8-0302-4bd1-b69b-0daeefce30d1,"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",{'ID': '84_UK_DocM_V2_AccessAndUseOfBuildings'},"Where a service building has a reception or sales counter, there should be convenient access to it and part of it should be at a level suitable for a wheelchair user or a seated person.",none,annotated +56517433-cf40-4b88-a9d4-18e61e0e9993,"In addition, on both sides of the toilet seat there shall be a free space of at least 800 millimetres.",{'ID': '55_Finnish_Accessibility'},"In addition, on both sides of the toilet seat there shall be a free space of at least 800 millimetres.",necessity,annotated +ffc11c58-ff7e-45f4-a5c7-da59404e5659,"Reasonable provision shall be made in the design and installation of electrical installations in order to protect persons operating, maintaining or altering the installations from fire or injury.",{'ID': '1_UK_DocP_ElectricalSafety'},"Reasonable provision shall be made in the design and installation of electrical installations in order to protect persons operating, maintaining or altering the installations from fire or injury.",necessity,annotated +a387fcb8-ead2-4094-9be9-72d783468b33_9,,,"If the energy performance of windows, roof windows, rooflights and doors exceeds 270 millimetres of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",greater,synthetic +dd056285-1aa4-4c6d-94ac-b911458cb7ea,"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",{'ID': '70_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",none,annotated +29c431ee-ea93-491d-ab13-06418d93c488_5,,,"If equivalent area is greater than 90, manual control is acceptable.",greater,synthetic +3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,none,annotated +4a82f789-a98a-4379-9b81-2a20cfba6c87_0,,,"If the internal ties must be centred on the supporting line, the minimum value of the either side, 9mm, will also be applied to internal ties.",greater-equal,synthetic +fb5d3054-4911-4049-ba09-1c3e80f9c07c_2,,,"The prevailing wind direction of steps in uncovered or unheated outdoor staircases must be no less than 0.055555556, and the riser may be no more than 130 millimetres.",greater-equal,synthetic +d925c189-860a-4fcb-ae88-d1cf8cc14fb8,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",{'ID': '28_Finnish_SafetyOfUse'},"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",none,annotated +72d7716f-7e3e-442c-9e42-14d4b19e18e3_10,,,A Frames that is being connected to a new building should not have a entrance level for delivered heat to the building which is greater than 0.350kgCO2/kWh.,not-part-of,synthetic +fc54cd23-e216-4f59-b1b6-35ec47a83a4a,Test data must be from a minimum of five in-situ measurements of the same module types and link details as used in the actual building.,{'ID': '351_UK_DocM_V2_AccessAndUseOfBuildings'},Test data must be from a minimum of five in-situ measurements of the same module types and link details as used in the actual building.,necessity,annotated +a8b3e54e-902c-4502-99a2-8c41d46f1416,"If there are more than 60 chairs in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",{'ID': '106_Finnish_SafetyOfUse'},"If there are more than 60 chairs in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",none,annotated +ddc0bba6-2df8-43e1-9398-37514366fb06,"For fixed terminals with automatic flow adjustment at the fan unit, the fan speed should be set to achieve the desired continuous flow rate.",{'ID': '208_UK_DocF_V1_Ventilation'},"For fixed terminals with automatic flow adjustment at the fan unit, the fan speed should be set to achieve the desired continuous flow rate.",selection,annotated +1cf2f287-457b-4f89-8c43-135ffda5029a,"The provision made must be sufficient to (a) meet the needs of occupants with differing needs, including some older or disabled people; and (b) to allow adaptation of the dwelling to meet the changing needs of occupants over time.",{'ID': '36_UK_DocM_V1_AccessAndUseOfBuildings'},"The provision made must be sufficient to (a) meet the needs of occupants with differing needs, including some older or disabled people; and (b) to allow adaptation of the dwelling to meet the changing needs of occupants over time.",necessity,annotated +2695c899-0ada-478c-9b2d-796f79ea4c52,"Glazing, with which people are likely to come into contact whilst moving in or about the building shall: (a) if broken on impact, break in a way which is unlikely to cause injury; or (b) resist impact without breaking; or (c) be shielded or protected from impact.",{'ID': '92_UK_DocK_ProtectionFromFalling'},"Glazing, with which people are likely to come into contact whilst moving in or about the building shall: (a) if broken on impact, break in a way which is unlikely to cause injury; or (b) resist impact without breaking; or (c) be shielded or protected from impact.",selection,annotated +f420ae57-5656-4558-b1a3-1079e46bf6cc_3,,,"In the case of the storey-level door of a dwelling, or if the distance of the uppermost floor level from the entry level through the door exceeds 900mm, doors must open in the direction of the exit.",greater,synthetic +72785bd7-d935-4c81-ab5f-ba2095ba62a9,"Manual controls, where provided, should be within reasonable reach of the occupants.",{'ID': '20_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Manual controls, where provided, should be within reasonable reach of the occupants.",selection,annotated +d3e7a947-536e-4a49-9823-e27fc0f68b27_7,,,water temperature of landings to be at least equal to the load EER of the ramp.,greater-equal,synthetic +2f8d4247-e53b-49ae-bd26-c4f1765eaee8_0,,,"Extract air of compensating measures 2, 3 and 35 mg/m3 (30 ppm) shall not be used as recirculation air.",equal,synthetic +88e23b46-22d9-4be6-87b7-40541f7995a9_3,,,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the visual contrast exceeds 2.0 m3/(h m2); 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",greater,synthetic +9415ae4b-7a74-4c70-a245-e4381c6d71bf_6,,,"At gables and party walls, insulation should extend to the wall; if the load-bearing structures between the wall and joist is less than 0.35W/(m2K), perimeter insulation may be required.",less,synthetic +eccd4f77-ef4a-41fd-a22a-620c84fdddd4,There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,{'ID': '98_UK_DocM_V1_AccessAndUseOfBuildings'},There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,selection,annotated +d342429e-d3fc-46e0-a195-527cfef1fd4b,"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",{'ID': '451_UK_DocM_V2_AccessAndUseOfBuildings'},"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",part-of,annotated +d8a06af7-3a6b-4d68-8bba-342aac6d3ac0,Water pipes and sewers installed in the ground shall be identifiable and they shall be located separate from one another.,{'ID': '146_Finnish_Health-WaterAndSewerage'},Water pipes and sewers installed in the ground shall be identifiable and they shall be located separate from one another.,necessity,annotated +cc72106e-9e7f-47cf-8a95-0173a8305dad_6,,,"In a new building, the crawl space access must be 1100mm on average at the minimum.",greater-equal,synthetic +2c8d2bc3-cf23-48f8-b9c0-b90f150f9f93,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing building.",{'ID': '426_UK_DocM_V2_AccessAndUseOfBuildings'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing building.",necessity,annotated +23db27ac-b594-4b26-883d-922d713d382a,"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",{'ID': '161_UK_DocM_V2_AccessAndUseOfBuildings'},"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",none,annotated +f733b7c9-a406-4f5a-b383-9d3f8b70a559,The selection of relevant critical situations for design should be made reflecting the conditions that can reasonably be foreseen during future use.,{'ID': '5_UK_DocA_Structure'},The selection of relevant critical situations for design should be made reflecting the conditions that can reasonably be foreseen during future use.,necessity,annotated +aef92227-4c01-4c59-b96d-ce414540606b,"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",{'ID': '63_UK_DocM_V2_AccessAndUseOfBuildings'},"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",selection,annotated +6ec243f2-9294-4b7c-89a4-1c46e4a69cc9_6,,,"If site constraints necessitate an free space of 18 dm3/s or steeper, an approach incorporating ramped access should be provided.",greater-equal,synthetic +e43c1e88-be80-42d9-944e-1bf0f0f82479,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,{'ID': '18_UK_DocM_V1_AccessAndUseOfBuildings'},Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,part-of,annotated +e505b13c-7b62-4857-aa2d-544dc986e9c0_9,,,"For dwellings, for external tapered steps and stairs that are part of the building the calculations of each step should be a minimum of 28 metres.",greater-equal,synthetic +d342429e-d3fc-46e0-a195-527cfef1fd4b,"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",{'ID': '451_UK_DocM_V2_AccessAndUseOfBuildings'},"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",none,annotated +40b40b1b-d1b1-49d8-b9b7-13c5845a169d_0,,,The structure of the control appliance of the plumbing fixture shall be such that its feasibility of installing high-efficiency alternative systems does not arise above m3/(hm2) at 50Pa.,less-equal,synthetic +ba93ede4-473f-4c07-b439-3699580cbcbe,No individual flight has a rise of more than 1800mm between landings.,{'ID': '21_UK_DocM_V1_AccessAndUseOfBuildings'},No individual flight has a rise of more than 1800mm between landings.,part-of,annotated +793cb939-b3d9-46eb-ae65-71a4d5c8031b,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,{'ID': '43_UK_DocM_V1_AccessAndUseOfBuildings'},Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,none,annotated +53e31e26-a39b-4047-a86e-bdb8021413e8_3,,,Window handles on windows that open outwards are not more than 90mm temperature when the window is at its maximum openable angle.,less-equal,synthetic +9dd2a0f1-0ff9-4416-8abd-1e6589980ff4_3,,,"If the from the inside face of the wall of a mechanical ventilation systems air duct is designed to be greater than EI 15, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",greater,synthetic +5ca184fa-e100-4f97-957d-e37ae944786f_10,,,"The combined dead,imposed and wind loads of installing electric vehicle charge points and cable routes is not more than 5m of the total capital cost of the major renovation.",less-equal,synthetic +b8365796-12c1-47c1-9682-ff6131a75f21,"The various enduse categories, such as heating, lighting and cooling, should be submetered in such a way that at least 90 of the annual energy consumption of each fuel can be assigned to an enduse.",{'ID': '227_UK_DocM_V2_AccessAndUseOfBuildings'},"The various enduse categories, such as heating, lighting and cooling, should be submetered in such a way that at least 90 of the annual energy consumption of each fuel can be assigned to an enduse.",necessity,annotated +710ef992-e187-4b1a-894b-e0e222f54359_2,,,"NOTE: For grid-supplied electricity, a proportion of three seconds and primary energy factor of 1.501kWhPE/kWh should be used.",equal,synthetic +88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",none,annotated +a43037b0-8e35-45a2-9f23-c2d65f6c5a64,"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",{'ID': '8_UK_DocQ_Security_Dwellings'},"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",none,annotated +117864c0-5065-4c55-b390-c17b60c8d9dd,"If the protective part of the barrier contains only vertical structures, a cube with edges of no more than 100 millimetres may pass through its openings.",{'ID': '48_Finnish_SafetyOfUse'},"If the protective part of the barrier contains only vertical structures, a cube with edges of no more than 100 millimetres may pass through its openings.",part-of,annotated +9dd2a0f1-0ff9-4416-8abd-1e6589980ff4_5,,,"If the equivalent area of a mechanical ventilation systems air duct is designed to be greater than ten millimetres, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",greater,synthetic +710ef992-e187-4b1a-894b-e0e222f54359,"NOTE: For grid-supplied electricity, a CO2 emission factor of 0.136kgCO2/kWh and primary energy factor of 1.501kWhPE/kWh should be used.",{'ID': '199_UK_DocM_V2_AccessAndUseOfBuildings'},"NOTE: For grid-supplied electricity, a CO2 emission factor of 0.136kgCO2/kWh and primary energy factor of 1.501kWhPE/kWh should be used.",none,annotated +86350df0-a40e-412b-a301-004524d56736,"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",none,annotated +64695439-3458-4d43-8e7b-a2ba75075cea,"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",{'ID': '124_Finnish_SafetyOfUse'},"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",selection,annotated +5e51b653-449e-4d00-be19-0e20ecff5c49_10,,,The default number of appliances should be proportion.,equal,synthetic +0cfe8c0e-45e4-4c4c-bf9b-906e26e28c75,"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",{'ID': '43_UK_DocM_V2_AccessAndUseOfBuildings'},"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",selection,annotated +385a4365-40c0-4c07-8854-b07bde292fd2,"The electrical energy consumption of a mechanical ventilation system shall be calculated on the basis of air flows, specific fan powers and operating times for all air handling units and powered roof ventilators in the building.",{'ID': '109_Finnish_EnergyEfficiency'},"The electrical energy consumption of a mechanical ventilation system shall be calculated on the basis of air flows, specific fan powers and operating times for all air handling units and powered roof ventilators in the building.",necessity,annotated +5b4380ba-0066-4735-a362-316d4c8e70b2,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",{'ID': '73_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",selection,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_0,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and above 2.5 ties/m2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +4470dde4-6422-4c13-9781-de68c3e075dc_0,,,"The outdoor operation of a dwelling unit, however, shall be designed to be a minimum of 65 degrees Celsius.",greater-equal,synthetic +636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4,"Where a new building contains more than one dwelling, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",{'ID': '6_UK_DocR_V1_InfrastructureForElectircalCommunications'},"Where a new building contains more than one dwelling, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",part-of,annotated +2633c957-07b4-4caa-a9d6-5acbac16b0b0_11,,,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 150m2 open outwards.,equal,synthetic +5b1fe636-d2aa-4382-885e-a4f8a2cae4d4_4,,,"Generally, a thermal element once upgraded should not have a parasitic energy use greater than 01:08:00.",less-equal,synthetic +103f99ad-884b-4bae-9f22-ccb1c5bc3d26,"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",{'ID': '110_Finnish_FireSafety'},"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",none,annotated +525aa713-65e1-4368-a6f4-38f628be7fed,"in clothes shops, the dimensions and fittings recommended for an individual changing cubicle in a sports building should be provided.",{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},"in clothes shops, the dimensions and fittings recommended for an individual changing cubicle in a sports building should be provided.",selection,annotated +ca1bbebb-fe4e-48d8-8cdf-eef13cd79ee9,The dwelling emission rate must not exceed the individual dwellings target emission rate.,{'ID': '65_UK_DocL_V1_ConsrvationOfFuelAndPower'},The dwelling emission rate must not exceed the individual dwellings target emission rate.,part-of,annotated +d0b6759e-deec-451d-bd7a-ec65b96048be_4,,,"extract air of U-values 900mm shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",equal,synthetic +5b1fe636-d2aa-4382-885e-a4f8a2cae4d4_7,,,"Generally, a thermal element once upgraded should not have a entrance level greater than 15 degrees.",less-equal,synthetic +4094b859-b3b4-4035-94cd-8cf47ccbd801_6,,,The fire performance is at least B.,greater-equal,synthetic +ef4ec541-e1a7-47d4-9a83-94715d8900ba_10,,,"Where 35 mg/m3 (30 ppm) or more bathroom are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",greater-equal,synthetic +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated +e3128ebd-be79-48f2-93b5-7806c9a9026a,"Constructions behind surfaces exposed to running water, repetitious splash water or water condensation must be waterproofed.",{'ID': '110_Finnish_Health-Humidity'},"Constructions behind surfaces exposed to running water, repetitious splash water or water condensation must be waterproofed.",necessity,annotated +ca1e0369-2dfe-4cf2-8194-87f72ee5a633,"Vertical, horizontal and slinky ground arrays in particular should be flushed in both directions.",{'ID': '385_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Vertical, horizontal and slinky ground arrays in particular should be flushed in both directions.",selection,annotated +4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9_11,,,"In spaces intended for more than 60 persons, the above of the access route must be at least 400mm.",greater-equal,synthetic +"8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent. {'ID': '9_Finnish_Accessibility'}_5",,,"However, if the cold side is no more than 10 kN, the ramp may not have a gradient of more than eight per cent.",less-equal,synthetic +73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",none,annotated +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",part-of,annotated +9dd2a0f1-0ff9-4416-8abd-1e6589980ff4_4,,,"If the air leakage rate figure of a mechanical ventilation systems air duct is designed to be greater than 6m, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",greater,synthetic +0f67dad7-6df9-444b-8e72-f447668e3fde_5,,,"Where sanitary facilities are wheelchair accessible, WC pans should be a minimum of 0.7 metres pitch.",greater-equal,synthetic +bf798097-bb99-42d0-a73f-8cebab8fbeb8_6,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the alongside the leading edge of the steps must be no more than 1,500 millimetres and the tread must be no less than 300 millimetres.",less-equal,synthetic +7d35f4c4-fa65-4d68-a974-f54386ca8aee,"However, a horizontal gap in a protective part must be no higher than ten millimetres.",{'ID': '49_Finnish_SafetyOfUse'},"However, a horizontal gap in a protective part must be no higher than ten millimetres.",part-of,annotated +1913381b-a2cc-496e-9168-82ccf2a01d50_2,,,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the installed generation capacity of the heat emitters to be installed does not exceed 1,200 MJ/m2.",less-equal,synthetic +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_10,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 55 in relationship; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic +11f2902d-29c2-474e-97d0-628a2a97a666_0,,,"CO2 of over 250 millimetres must be equipped with an appropriate safety barrier, railing or handrail.",greater,synthetic +2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d_4,,,An upstand built on site should not exceed a pressures of 100.,less-equal,synthetic +9d172d30-e92f-4151-865c-d204f217705d,The slope of the wet room floor must allow water to flow into the floor drain.,{'ID': '118_Finnish_Health-Humidity'},The slope of the wet room floor must allow water to flow into the floor drain.,necessity,annotated +33ed3038-99a6-4b2d-906a-a1db21f2d898,"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",{'ID': '250_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",none,annotated +0638f810-16d0-4670-8870-4e7c78c5371f,Insulated cavity closers should be installed where appropriate.,{'ID': '419_UK_DocL_V1_ConsrvationOfFuelAndPower'},Insulated cavity closers should be installed where appropriate.,necessity,annotated +164122ed-c7ac-4cf8-8a54-3d56c144f78d_0,,,"In general, the findings indicate that there should be at least the same number of ventilation systems as Spaces and for some building types, e.g. large retail buildings, at least twice as many.",greater-equal,synthetic +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",necessity,annotated +09b2a395-5293-4b7d-82d4-5312482d59e9_11,,,"Door entry controls, where provided, are mounted 4 Air permeability finished ground level, and at least 300mm away from any projecting corner.",equal,synthetic +dcc583b1-8c4c-42cf-a1ed-e8907de56254,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",{'ID': '23_Finnish_SafetyOfUse'},"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",part-of,annotated +66b3628a-f0ee-4bc7-93c8-2ae0145a2e78,"In a room with no openable window, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",{'ID': '83_UK_DocF_V1_Ventilation'},"In a room with no openable window, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",not-part-of,annotated +6414854d-01f9-481f-a7f4-c4581e48d8b1_10,,,Special safety features are not necessary if the Photographs is not more than 16/01/2023 00:00 long.,less-equal,synthetic +0262f6e5-21bc-4312-9388-8ac93b79416d,The minimum full load EER of the absorption chillers should be no worse than 0.7.,{'ID': '285_UK_DocM_V2_AccessAndUseOfBuildings'},The minimum full load EER of the absorption chillers should be no worse than 0.7.,selection,annotated +d5e2fb3e-df0c-48bd-8a09-734822ff086d,"For emergency repairs, if it is not possible to notify the building control body in advance, the building control body should be notified as soon as possible.",{'ID': '4_UK_DocF_V1_Ventilation'},"For emergency repairs, if it is not possible to notify the building control body in advance, the building control body should be notified as soon as possible.",selection,annotated +a235c68f-ae44-4770-b005-4e9d7b659eb7_4,,,All cavity walls should have leaves at least one number of persons and cavities at least 50mm wide.,greater-equal,synthetic +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",part-of,annotated +b5aa20f2-571e-48d8-9943-4102c9f9bd1a,"In exit passageways and fire-compartmented elevator shafts, means must be arranged for both smoke extraction and flow of replacement air.",{'ID': '250_Finnish_FireSafety'},"In exit passageways and fire-compartmented elevator shafts, means must be arranged for both smoke extraction and flow of replacement air.",selection,annotated +984c252b-74f4-4d85-9080-1c8ae1851eca_10,,,"If performance requires thicker glass to be used, an equivalent window unit with pitch (850 millimetres) glazing should be shown to meet the required standard.",equal,synthetic +8805ec9f-3f5f-44fc-9078-3ae62439c973,"NOTE: When a single U-value is calculated for a product range of doors, the configuration of the door chosen for the calculation should be the worst performing in the product range.",{'ID': '108_UK_DocL_V1_ConsrvationOfFuelAndPower'},"NOTE: When a single U-value is calculated for a product range of doors, the configuration of the door chosen for the calculation should be the worst performing in the product range.",selection,annotated +e874f337-2067-4e77-ad32-c3b857f40e7a_1,,,"If the location exceeds 15mm, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",greater,synthetic +dae0db09-fd4b-4f2c-99c0-cd742b19d17a,"A glass structure or other light-permeable structure, along with its mountings, must withstand the load to which it is normally subject, unless the structure is protected by a fixed collision barrier.",{'ID': '68_Finnish_SafetyOfUse'},"A glass structure or other light-permeable structure, along with its mountings, must withstand the load to which it is normally subject, unless the structure is protected by a fixed collision barrier.",selection,annotated +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",none,annotated +0365837b-a04d-4aaf-a2f5-2e89403a9c2b,"If all the terminals have to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",{'ID': '200_UK_DocF_V1_Ventilation'},"If all the terminals have to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",none,annotated +81f14fc1-af5d-45e8-8725-94d2510e4701_7,,,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a floor plate areas of at least 0.136kgCO2/kWh in the hallway and kitchen.",greater-equal,synthetic +5b4380ba-0066-4735-a362-316d4c8e70b2_8,,,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 400-600mm Air pressure tests after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",greater,synthetic +922bf8df-3a70-4f45-8c04-200b638d3b3c_0,,,The cold water pipe shall be designed and installed so that the axle group load in the cold water system may not exceed 3.,less-equal,synthetic +36650de0-ef3c-4fd1-8199-f47c0e576076_5,,,the number of occupants of the platform does not exceed 35 mg/m3 (30 ppm).,less-equal,synthetic +86350df0-a40e-412b-a301-004524d56736,"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",selection,annotated +26980508-105c-49db-8595-bf001a48d757_11,,,"In connections with no fixed seats or air handling units, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic +9618a274-45da-4e3e-87f0-21c2bfae4a8e_4,,,"A guardrail must be used at points with a primary energy factor of over 50 millimetres, if these can be accessed by children.",greater,synthetic +3153d771-404e-4a54-ac05-ed1b75e37506,"Gangways should not be less than 1100mm wide unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",{'ID': '8_UK_DocK_ProtectionFromFalling'},"Gangways should not be less than 1100mm wide unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",selection,annotated +636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4_6,,,"Where a new building contains more than 65mm WC compartment doors, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",greater,synthetic +6d9a1e8e-6fe7-4234-951a-96fdc4598bd7_3,,,"If parking spaces are provided for a building, an adequate number of public address, but at least 0.9 metres, shall be intended for the use of a person with mobility and functional impairment.",greater-equal,synthetic +2c224c59-366d-447f-9ecc-87c119c2db07,"For new dwellings, the commissioning plan should be given to the building control body with the design stage dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate calculations.",{'ID': '374_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For new dwellings, the commissioning plan should be given to the building control body with the design stage dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate calculations.",necessity,annotated +2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_11,,,The normal relationship between the cost of the rise and going is: 90 equals between 550mm and 700mm.,equal,synthetic +993e54cc-49c3-43cb-995e-1a951c93c775_6,,,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an above equal to 1100mm.",equal,synthetic +fa90c179-d32c-412b-a7d6-a515cc91dbdb,The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,{'ID': '86_Finnish_Health-Humidity'},The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure.,none,annotated +a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",necessity,annotated +d342429e-d3fc-46e0-a195-527cfef1fd4b,"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",{'ID': '451_UK_DocM_V2_AccessAndUseOfBuildings'},"When an existing building with a total useful floor area of over 1000m2 is being extended or the habitable area is being increased, consequential improvements should be installed.",none,annotated +b63dcef6-1840-4e9e-ad51-f8fc481fe856,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",{'ID': '36_UK_DocA_Structure'},"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",selection,annotated +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",selection,annotated +5e51b653-449e-4d00-be19-0e20ecff5c49_7,,,The default annual percentage of heat should be 21 C.,equal,synthetic +7e34700e-92de-4b00-a820-f4085a2e186c_0,,,"If the free gap between facing walls of adjacent glazed balconies or the Air permeability of the wall to the window of an adjacent fire compartment is less than 1m2, the wall in question must be class EI 15.",less,synthetic +a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",selection,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479_4,,,Individual flights are: for gradients up to 1:15 not more than Five ventilators primary energy; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic +72e7ed0c-9e73-46b2-a919-20f3fea337fd,"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",{'ID': '56_Finnish_FireSafety'},"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",none,annotated +a387fcb8-ead2-4094-9be9-72d783468b33_11,,,"If the distance of the basement storey floor from the entry level of windows, roof windows, rooflights and doors exceeds 50 m2 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",greater,synthetic +e43c1e88-be80-42d9-944e-1bf0f0f82479_3,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for category up to 2 metres not more than 5m long.,less-equal,synthetic +5ed671ca-0cd0-47e2-ad68-1d910e5ddbdf,The access route in the seating area or standing auditorium must be directly accessible from the end of each row.,{'ID': '114_Finnish_SafetyOfUse'},The access route in the seating area or standing auditorium must be directly accessible from the end of each row.,part-of,annotated +86831830-e7f0-4b90-aa27-dc0542b7ba4d_7,,,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least 15 degrees from the inside face of the wall.",greater-equal,synthetic +e43c1e88-be80-42d9-944e-1bf0f0f82479_6,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for rated output up to 150mm not more than 5m long.,less-equal,synthetic +60205cf2-fa87-4195-9415-a6fb144a9b72,"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",{'ID': '96_Finnish_SafetyOfUse'},"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",part-of,annotated +8151be81-09ad-4dac-b2d2-f0d757915b6c_10,,,"However, when the snow load can occur, the manufacturers declared efficiencies of the load s should be at least 20 litres per second.",greater-equal,synthetic +77f993c6-dff1-4f9a-8f66-73221d3cbaff_9,,,"If the dwelling only has one habitable room, a minimum capacity of One should be used.",greater-equal,synthetic +0da52584-1b37-48b5-840f-3795ae695275_10,,,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where off water removal system are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +6ec243f2-9294-4b7c-89a4-1c46e4a69cc9,"If site constraints necessitate an approach of 1:20 or steeper, an approach incorporating ramped access should be provided.",{'ID': '49_UK_DocM_V2_AccessAndUseOfBuildings'},"If site constraints necessitate an approach of 1:20 or steeper, an approach incorporating ramped access should be provided.",necessity,annotated +7f696221-52c9-4c52-8f90-74bd93c51299,This grippable handrail is 850-1000mm above the pitch line of the flight and extends at least 300mm beyond the top and bottom nosings.,{'ID': '73_UK_DocM_V1_AccessAndUseOfBuildings'},This grippable handrail is 850-1000mm above the pitch line of the flight and extends at least 300mm beyond the top and bottom nosings.,greater-equal,annotated +2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d_0,,,An upstand built on site should not exceed a power requirements of 130 millimetres.,less-equal,synthetic +4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",equal,annotated +d925c189-860a-4fcb-ae88-d1cf8cc14fb8_0,,,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the away may be no more than 65mm.",less-equal,synthetic +2af8ee5f-9d05-4023-9365-d093ebdfba1f,"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",{'ID': '168_UK_DocF_V1_Ventilation'},"Where building work is carried out in a kitchen or bathroom, any existing fans (including cooker hoods, where they extract to the outside) should be retained or replaced.",none,annotated +5ddf9b8d-87fb-4fc4-9b38-4ff91008cfdf,The annual energy savings should be estimated using the Standard Assessment Procedure.,{'ID': '464_UK_DocL_V1_ConsrvationOfFuelAndPower'},The annual energy savings should be estimated using the Standard Assessment Procedure.,selection,annotated +74002ed3-548e-4e2f-8835-be76e643c67d,NOTE 2: Double doors effectively provide nibs where each leaf is at least 300mm wide.,{'ID': '51_UK_DocM_V1_AccessAndUseOfBuildings'},NOTE 2: Double doors effectively provide nibs where each leaf is at least 300mm wide.,part-of,annotated +2f8d4247-e53b-49ae-bd26-c4f1765eaee8_2,,,"Extract air of impact three, 3 and 4 shall not be used as recirculation air.",equal,synthetic +8151be81-09ad-4dac-b2d2-f0d757915b6c_2,,,"However, when the snow load can occur, the tread of the load s should be at least 15mm.",greater-equal,synthetic +a090f6bb-f89b-44c1-b6ee-8e72e2be30a0,Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '370_UK_DocM_V2_AccessAndUseOfBuildings'},Where a system for on-site electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,selection,annotated +fb1da22f-8ddb-4399-b441-64dca68da9af,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",{'ID': '218_Finnish_FireSafety'},"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",selection,annotated +0aaf71f0-a482-4a72-a407-0d6db79c7f6f,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",{'ID': '69_Finnish_FireSafety'},"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",part-of,annotated +46f5be2a-1514-420b-bc39-331fc6e0d2df_10,,,"The boiler type, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the maintained, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,synthetic +13a437c0-918c-47f2-85bd-b80dd69eb027_5,,,"There are no mechanical ventilation on the reverberation time of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",not-part-of,synthetic +e874f337-2067-4e77-ad32-c3b857f40e7a_2,,,"If the horizontal spacing exceeds 600kg/m3, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",greater,synthetic +113b8bf8-1856-45f5-a54b-d65ef100b437,"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",{'ID': '262_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",selection,annotated +eccc60e7-3d76-46c0-a9d9-e398bf3e475a,The part of the dwelling above ground level should be considered separately.,{'ID': '71_UK_DocF_V1_Ventilation'},The part of the dwelling above ground level should be considered separately.,part-of,annotated +6a41a473-bd3c-4e38-a093-094b3fdae388_7,,,At least one in every 10 kN remaining surfaces must be provided with cable routes.,equal,synthetic +eefe1191-2903-4fb8-9138-6471e09fb67d,The internal temperature exceeds 23C at 11pm.,{'ID': '53_UK_DocO_Overheating'},The internal temperature exceeds 23C at 11pm.,selection,annotated +f420ae57-5656-4558-b1a3-1079e46bf6cc_10,,,"In the case of the storey-level door of a dwelling, or if the room temperature through the door exceeds 18 dm3/s, doors must open in the direction of the exit.",greater,synthetic +e32bbb47-c826-40c1-8ea4-8c32353d3fd2_1,,,There shall be 8 per cent (1:12.5) of Waste water provided for people in the building.,equal,synthetic +f420ae57-5656-4558-b1a3-1079e46bf6cc,"In the case of the storey-level door of a dwelling, or if the number of people evacuating through the door exceeds 60, doors must open in the direction of the exit.",{'ID': '223_Finnish_FireSafety'},"In the case of the storey-level door of a dwelling, or if the number of people evacuating through the door exceeds 60, doors must open in the direction of the exit.",none,annotated +4f2b56cb-9852-4406-bbea-31f426fb4910,"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",{'ID': '397_UK_DocM_V2_AccessAndUseOfBuildings'},"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",selection,annotated +079db365-cfed-474e-9329-25349ac0db4a_5,,,"In connection with the door of an outside space of an individual dwelling the building emission rate outside the door may be more than 1.501kWhPE/kWh if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",greater,synthetic +d9b8f957-49e3-45d0-83ca-c0419a50361a,"In a mechanical system, there shall be a clearly labelled stop switch, which shall be located in an easily accessible place.",{'ID': '48_Finnish_Health-IndoorClimateAndVentilation'},"In a mechanical system, there shall be a clearly labelled stop switch, which shall be located in an easily accessible place.",selection,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",selection,annotated +3e9fc57e-bc69-4f17-a056-dd7767afa9bb_7,,,"If the insulating performance of the building does not exceed 2.5 ties/m2, access to the attic fire compartments from the outside shall be required.",less-equal,synthetic +2c725d50-13d5-4e77-bacf-9f174530e27c,The energy efficiency of historic and traditional buildings should be improved only if doing so will not cause long-term deterioration of the buildings fabric or fittings.,{'ID': '17_UK_DocM_V2_AccessAndUseOfBuildings'},The energy efficiency of historic and traditional buildings should be improved only if doing so will not cause long-term deterioration of the buildings fabric or fittings.,none,annotated +35cacecf-06dc-4b0f-aadb-db2ee05518c7_6,,,The area of windows and roof windows (but excluding display windows) cleansed by water rinsing exceeds 230mm of the facade area.,greater,synthetic +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",selection,annotated +2f815a08-db3c-48a6-b248-d69aeac870ee_4,,,"the vertical rise is: a. not more than one per 100m2, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",less-equal,synthetic +6187cad8-0d6d-4154-b98b-7285b36fea8d,Continuously running fans should be set up to operate without occupant intervention but may have manual or automatic controls for selecting the high rate of operation.,{'ID': '65_UK_DocF_V1_Ventilation'},Continuously running fans should be set up to operate without occupant intervention but may have manual or automatic controls for selecting the high rate of operation.,selection,annotated +4a82f789-a98a-4379-9b81-2a20cfba6c87_1,,,"If the internal ties must be centred on the supporting line, the minimum value of the proportion of the cooling load relating to distribution pipework, 600mm, will also be applied to internal ties.",greater-equal,synthetic +38cd3221-7fc9-4462-be20-78b16a4309d3_3,,,The emission rate of openings in the newly created dwelling should not be more than 150m2 of the total floor area.,less-equal,synthetic +793cb939-b3d9-46eb-ae65-71a4d5c8031b,Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,{'ID': '43_UK_DocM_V1_AccessAndUseOfBuildings'},Where the parking is within the private curtilage of the dwelling (but not within a carport or garage) at least one space is a standard parking bay that can be widened to 3.3m.,necessity,annotated +bf798097-bb99-42d0-a73f-8cebab8fbeb8_11,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the load of the steps must be no more than 20 millimetres and the tread must be no less than 300 millimetres.",less-equal,synthetic +6414854d-01f9-481f-a7f4-c4581e48d8b1,Special safety features are not necessary if the ladder is not more than 6m long.,{'ID': '112_UK_DocK_ProtectionFromFalling'},Special safety features are not necessary if the ladder is not more than 6m long.,none,annotated +493ec553-7761-4d1e-aa98-05d925ddf955_9,,,The layers of a horizontal hatch must be at least 100mm.,greater-equal,synthetic +7d1ada0b-8dcc-4c01-84d7-78b80cb404c9,"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",{'ID': '58_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If there are not enough associated parking spaces outside of the covered car park to meet the requirement to install electric vehicle charge points, then cable routes should be installed for associated parking spaces within the covered car park.",selection,annotated +bfdf95da-d422-47cd-83d7-a30a4969f2e6_7,,,"If the internal ties must be centred on the supporting line, the minimum value of the output, 400mm, will also be applied to internal ties.",greater-equal,synthetic +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_6,,,"In buildings more than 5m and at most 28 metres in heat emission capacity, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",greater,synthetic +5e7d4831-4ec8-48f9-9e60-0422fcc1eae4,"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",{'ID': '344_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When replacing an existing system, the installed generation capacity of the new system should be no less than that of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",part-of,annotated +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_3,,,"Where the surface temperature of installing only cable routes is more than EI 30 of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",greater,synthetic +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_9,,,"Where the cost of installing only cable routes is more than 7% of the total cost of the major platform, there is no towel rail to install either electric vehicle charge points or cable routes.",not-part-of,synthetic +7f72632a-dc0a-4318-afd7-7090b42350fc,Mechanical supply terminals should be located and directed to avoid draughts.,{'ID': '106_UK_DocF_V1_Ventilation'},Mechanical supply terminals should be located and directed to avoid draughts.,selection,annotated +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated +73b4b305-8971-489a-a290-f996e1f63e19,"The clear width of the door and opening leading to room spaces of a non-residential building as well as to residential rooms of a residential building, necessary spaces serving residence and spaces serving the use of the building shall be at least 800 millimetres.",{'ID': '19_Finnish_Accessibility'},"The clear width of the door and opening leading to room spaces of a non-residential building as well as to residential rooms of a residential building, necessary spaces serving residence and spaces serving the use of the building shall be at least 800 millimetres.",part-of,annotated +46f5be2a-1514-420b-bc39-331fc6e0d2df_7,,,"The dwelling primary energy rate, dwelling emission rate and building emission rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and reverberation time, respectively.",less-equal,synthetic +7c74b365-6fdd-494d-9675-3ae036c55348,Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,{'ID': '82_Finnish_SafetyOfUse'},Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,necessity,annotated +ef4ec541-e1a7-47d4-9a83-94715d8900ba_6,,,"Where E or more balcony are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",greater-equal,synthetic +43a7a088-718f-4a11-a392-88e71559466e,"In exceptional circumstances in an existing building, a wheelchair platform stairlift may be considered, provided its installation does not conflict with requirements for means of escape.",{'ID': '107_UK_DocM_V2_AccessAndUseOfBuildings'},"In exceptional circumstances in an existing building, a wheelchair platform stairlift may be considered, provided its installation does not conflict with requirements for means of escape.",selection,annotated +a86b58e8-046f-44b7-8e1b-00c876c8c647_2,,,"Parapets in going A to 1000m2 and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",less-equal,synthetic +46f5be2a-1514-420b-bc39-331fc6e0d2df_7,,,"The sunken area, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the product certificate, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,synthetic +05864826-21ef-4ae7-9af8-2aaeffc7267a,Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,{'ID': '83_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,selection,annotated +d791b3d9-ff45-46d6-90d4-39fdaf9d0879,Lighting should be designed based on CIBSEs SLL Lighting Handbook or an equivalent design guide.,{'ID': '310_UK_DocM_V2_AccessAndUseOfBuildings'},Lighting should be designed based on CIBSEs SLL Lighting Handbook or an equivalent design guide.,necessity,annotated +d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",none,annotated +72e7ed0c-9e73-46b2-a919-20f3fea337fd_7,,,"An residential unit with a potentially flammable or explosive atmosphere must not be located in a detrimental physical or chemical substances where there are dwellings, accommodation premises, institutions or assembly and business premises.",not-part-of,synthetic +6d9a1e8e-6fe7-4234-951a-96fdc4598bd7_9,,,"If parking spaces are provided for a building, an adequate number of Humus soil, but at least 1.2W/(m2K), shall be intended for the use of a person with mobility and functional impairment.",greater-equal,synthetic +ec419055-6ed3-4dac-9879-748e2d365a26,"Internal building services: where services penetrate the air barrier, holes should be as small as possible and should be core drilled to limit damage.",{'ID': '180_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Internal building services: where services penetrate the air barrier, holes should be as small as possible and should be core drilled to limit damage.",none,annotated +99a53f17-48cb-4012-a47b-700761e0983b_8,,,Where a new building which is not a residential building or a mixed-use building has more than 100 enduse categories (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,greater,synthetic +86831830-e7f0-4b90-aa27-dc0542b7ba4d,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least one intermediate landing.",{'ID': '18_Finnish_SafetyOfUse'},"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least one intermediate landing.",selection,annotated +29232335-402c-4ed9-af74-fd093ac22e28_8,,,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least fittings 20.,greater-equal,synthetic +aca1acce-65c1-4677-a979-ce2920457a55,The surface of stairs the must not be slippery.,{'ID': '14_Finnish_SafetyOfUse'},The surface of stairs the must not be slippery.,necessity,annotated +9ebe07e9-8381-451a-9ab8-701912478b30,The air flow rate of all mechanical ventilation fans should be tested.,{'ID': '210_UK_DocF_V1_Ventilation'},The air flow rate of all mechanical ventilation fans should be tested.,part-of,annotated +6414854d-01f9-481f-a7f4-c4581e48d8b1,Special safety features are not necessary if the ladder is not more than 6m long.,{'ID': '112_UK_DocK_ProtectionFromFalling'},Special safety features are not necessary if the ladder is not more than 6m long.,none,annotated +371e1755-8bb5-456e-bf66-5a50f4c19d59,"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",{'ID': '50_UK_DocK_ProtectionFromFalling'},"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",none,annotated +f41fb8da-16bd-4404-accb-e32727f3736a,"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",{'ID': '69_Finnish_SafetyOfUse'},"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",none,annotated +cf152151-90f9-47d0-9e4e-5a1cd813d4e5,System controls should be wired so that when there is no demand for space heating or hot water the heating appliance and pump are switched off.,{'ID': '247_UK_DocL_V1_ConsrvationOfFuelAndPower'},System controls should be wired so that when there is no demand for space heating or hot water the heating appliance and pump are switched off.,necessity,annotated +a235c68f-ae44-4770-b005-4e9d7b659eb7_0,,,All cavity walls should have leaves at least 2.2 metres gradients and cavities at least 50mm wide.,greater-equal,synthetic +ddf21ce1-bd2a-49f5-8ba6-d2bcb5edf575,Taps should be lever operated and capable of easy operation.,{'ID': '97_UK_DocM_V1_AccessAndUseOfBuildings'},Taps should be lever operated and capable of easy operation.,necessity,annotated +9b908e68-0f92-4883-9fd2-7fe013848b15,"Where a gas combination boiler is used, the boiler type should be selected to modulate down to the typical heating load of the dwelling.",{'ID': '237_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a gas combination boiler is used, the boiler type should be selected to modulate down to the typical heating load of the dwelling.",necessity,annotated +9952f64d-e0df-4b03-84af-150782f81387,"For mobility-impaired people, a going of at least 300mm is preferred.",{'ID': '124_UK_DocM_V2_AccessAndUseOfBuildings'},"For mobility-impaired people, a going of at least 300mm is preferred.",none,annotated +9415ae4b-7a74-4c70-a245-e4381c6d71bf_8,,,"At gables and party walls, insulation should extend to the wall; if the private curtilage between the wall and joist is less than 600 millimetres, perimeter insulation may be required.",less,synthetic +f0c72b35-5a0a-4554-8713-96f6f73a67f1_8,,,A cube with maximum capacity of no more than 16/01/2023 00:00 may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,less-equal,synthetic +81314489-dcd9-410f-9b15-595b87e7c8f9,"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",{'ID': '14_UK_DocQ_Security_Dwellings'},"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",necessity,annotated +85745724-aa09-4cdd-ad17-3c50ea2b99a1,"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",{'ID': '105_UK_DocM_V1_AccessAndUseOfBuildings'},"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",part-of,annotated +6ec243f2-9294-4b7c-89a4-1c46e4a69cc9_3,,,"If site constraints necessitate an Wheelchair users of 9mm or steeper, an approach incorporating ramped access should be provided.",greater-equal,synthetic +32dec356-9315-4ea6-9213-86ad0a72802b,Drawings should be reviewed by the designer and installer and should include specifications for key materials.,{'ID': '177_UK_DocL_V1_ConsrvationOfFuelAndPower'},Drawings should be reviewed by the designer and installer and should include specifications for key materials.,necessity,annotated +1fc9255c-929e-4052-aaec-e3ffede5a62e,"For large or complex projects, a commissioning manager should be appointed.",{'ID': '374_UK_DocM_V2_AccessAndUseOfBuildings'},"For large or complex projects, a commissioning manager should be appointed.",selection,annotated +72e7ed0c-9e73-46b2-a919-20f3fea337fd_10,,,"An Fixings with a potentially flammable or explosive atmosphere must not be located in a terraces where there are dwellings, accommodation premises, institutions or assembly and business premises.",not-part-of,synthetic +6d9a1e8e-6fe7-4234-951a-96fdc4598bd7_10,,,"If parking spaces are provided for a building, an adequate number of hearing enhancement, but at least 30m2, shall be intended for the use of a person with mobility and functional impairment.",greater-equal,synthetic +84cd76d7-e5d0-4f39-94bc-0236c65d533a,"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",{'ID': '217_Finnish_FireSafety'},"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",part-of,annotated +29232335-402c-4ed9-af74-fd093ac22e28,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,{'ID': '95_Finnish_Health-IndoorClimateAndVentilation'},The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,none,annotated +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_2,,,"Where the work concerns a building containing more than 900-1000mm property, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater-equal,synthetic +5ba5ffe7-ece8-488a-b461-da66237e7888,"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",{'ID': '54_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",necessity,annotated +7f696221-52c9-4c52-8f90-74bd93c51299_0,,,This grippable handrail is 850-1000mm above the pitch line of the flight and design value at least 7 mg/m3 (6 ppm) beyond the top and bottom nosings.,greater-equal,synthetic +3ac96918-764f-403d-a588-37b5f4a16f46,"For absorption chillers used in conjunction with onsite CHP or a district heat network or community heating system, the CO2 emissions and primary energy should be calculated in the same way as when using CHP for heating.",{'ID': '284_UK_DocM_V2_AccessAndUseOfBuildings'},"For absorption chillers used in conjunction with onsite CHP or a district heat network or community heating system, the CO2 emissions and primary energy should be calculated in the same way as when using CHP for heating.",part-of,annotated +f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c_7,,,A building with a visual contrast exceeding 90 must be equipped with anchoring structures for safety lines.,greater,synthetic +4e8c5c50-44af-48f6-b959-e6f9b31afa1e,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical heating technology may be electric resistance heating.",{'ID': '89_UK_DocM_V2_AccessAndUseOfBuildings'},"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical heating technology may be electric resistance heating.",selection,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_4,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under total extract air flow two.",equal,synthetic +66b3628a-f0ee-4bc7-93c8-2ae0145a2e78_2,,,"In a cooling energy with no openable wet room, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",not-part-of,synthetic +2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb_7,,,"There should be a Provision, in the absence of tobacco smoke or other excessive pollutants, of 400kg.",equal,synthetic +8207751f-13b8-4fe3-9bfe-4423093d4905_7,,,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the maximum number of occupants of the staircase and exit route is no more than two .,less-equal,synthetic +8c4a09c5-1eb2-4a41-86d9-b69c031b4592,Ground arrays including header pipes and manifolds should be flushed as one system to remove all debris and purged to remove all air.,{'ID': '384_UK_DocL_V1_ConsrvationOfFuelAndPower'},Ground arrays including header pipes and manifolds should be flushed as one system to remove all debris and purged to remove all air.,necessity,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_5,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 15 degrees in rise; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic +a8b3e54e-902c-4502-99a2-8c41d46f1416_10,,,"If there are more than 3m dwelling in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",greater,synthetic +e43c1e88-be80-42d9-944e-1bf0f0f82479_9,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for total useful floor area up to adequate number not more than 5m long.,less-equal,synthetic +8fcdc238-3c30-4659-9303-1b126a39b2cd_1,,,The design solar load should be link details as used in the actual building by at least 20 points.,greater-equal,synthetic +082c7ed9-3579-48c2-a0d2-076f1edd647c_4,,,"Each of the 50 fire resistance time of the centrally hinged window should be assessed as a single side, bottom or top hung window.",equal,synthetic +d8a06af7-3a6b-4d68-8bba-342aac6d3ac0,Water pipes and sewers installed in the ground shall be identifiable and they shall be located separate from one another.,{'ID': '146_Finnish_Health-WaterAndSewerage'},Water pipes and sewers installed in the ground shall be identifiable and they shall be located separate from one another.,necessity,annotated +aa41a5d4-c0b1-4da7-84a0-5c2e2738654f,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,{'ID': '89_UK_DocF_V1_Ventilation'},The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,part-of,annotated +f009a781-0ced-408d-b3d1-6ae7a848012e,"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",{'ID': '31_Finnish_SafetyOfUse'},"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",necessity,annotated +7575211d-616b-42bb-b112-73a949e7ca6a,Any combined facility should be divided into distinct wet and dry areas.,{'ID': '176_UK_DocM_V2_AccessAndUseOfBuildings'},Any combined facility should be divided into distinct wet and dry areas.,selection,annotated +a43037b0-8e35-45a2-9f23-c2d65f6c5a64,"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",{'ID': '8_UK_DocQ_Security_Dwellings'},"Where access to the dwelling can be gained via an interconnecting doorset from the garage, then either the garage doorset (pedestrian and vehicular) or the interconnecting doorset should be a secure doorset.",none,annotated +eccd4f77-ef4a-41fd-a22a-620c84fdddd4,There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,{'ID': '98_UK_DocM_V1_AccessAndUseOfBuildings'},There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,greater-equal,annotated +20518e80-6f7e-457f-8c5a-59fa4c0eb324_10,,,"When calculating the heat loss for a buildings design solution, the inaccuracies shall be used as the value of the number of wall ties per square metre for the building envelope.",equal,synthetic +e4fb8d18-8dbc-4351-a2df-d87f880f476a_6,,,The Air flow rates for balconies is 280mm that of the load-bearing structures of the storey.,equal,synthetic +bb9ec292-062b-43c3-8590-856dd5f6b890_4,,,"The quality of the installation and building emission rate calculated using the measured air permeability must not be higher than the glare and reflections and target emission rate, respectively.",less-equal,synthetic +009e12eb-db83-485c-9ffc-e1f462251109_1,,,Each air terminal should have a gap of at least 400kg of the free area of its associated duct.,greater-equal,synthetic +d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",part-of,annotated +2ca092ec-4425-4552-a389-fd0dadfbd154_1,,,NOTE: A floor level with a Control of 50 millimetres or steeper should be designed as a ramp.,greater-equal,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_5,,,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or ventilation system above EI 15 may be discounted when measuring clear width.,greater,synthetic +2f89cb06-3ee9-49b5-ac36-46f31ae3928f,Hot water pipework should be insulated in all areas inside and outside the building unless it can be demonstrated that the heat is always useful.,{'ID': '170_UK_DocM_V2_AccessAndUseOfBuildings'},Hot water pipework should be insulated in all areas inside and outside the building unless it can be demonstrated that the heat is always useful.,selection,annotated +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_3,,,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or Air flows above 900-1000mm may be discounted when measuring clear width.,greater,synthetic +0cfe8c0e-45e4-4c4c-bf9b-906e26e28c75,"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",{'ID': '43_UK_DocM_V2_AccessAndUseOfBuildings'},"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",none,annotated +7f3f59a4-fc7e-4b14-8074-384f6cacf548_11,,,"The alongside the leading edge of a barrier in a dwellings indoor areas may, however, be at least 270 millimetres if the drop is less than three metres.",greater-equal,synthetic +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_1,,,"Where the minimum value of installing only cable routes is more than 50 m2 of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",greater,synthetic +f6add908-4d45-4b3e-83a6-369f6c36c037_3,,,"Door rails, stiles and muntins should be at least 100mm Control.",greater-equal,synthetic +2f0f22aa-06d3-478d-a777-5aca5c2fb5c1,"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",{'ID': '120_UK_DocK_ProtectionFromFalling'},"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",necessity,annotated +23db27ac-b594-4b26-883d-922d713d382a,"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",{'ID': '161_UK_DocM_V2_AccessAndUseOfBuildings'},"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",selection,annotated +13a437c0-918c-47f2-85bd-b80dd69eb027_4,,,"There are no energy efficiency on the fire resistance time requirement of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",not-part-of,synthetic +f3bd99b4-7ea5-4968-af10-3c133c0b5aa0_4,,,No individual flight has a service life of more than 75 light source lumens per circuit-watt.,less-equal,synthetic +7a42150c-1f5d-449c-ac83-addfe816e46a,Accessible entrances should be clearly sign-posted and easily recognisable.,{'ID': '62_UK_DocM_V2_AccessAndUseOfBuildings'},Accessible entrances should be clearly sign-posted and easily recognisable.,necessity,annotated +e3b85ad6-6132-40d7-86f8-3cc5d44eb12c_8,,,2.0 m3/(h m2) stairs should be close to an accessible bathroom suitable for a wheelchair user.,equal,synthetic +7577d9f7-9f3c-4d3b-b8d9-da31d3e1b201,"For example, glare and reflections from shiny surfaces, and large repeating patterns, should be avoided in spaces where visual acuity is critical as they will hamper communication for people with impaired vision, and those who lip read or use sign language.",{'ID': '150_UK_DocM_V2_AccessAndUseOfBuildings'},"For example, glare and reflections from shiny surfaces, and large repeating patterns, should be avoided in spaces where visual acuity is critical as they will hamper communication for people with impaired vision, and those who lip read or use sign language.",selection,annotated +53b7d989-c81f-4e01-a5ec-4b2cb30b4bfa,The size of a fire compartment must be limited so that a fire igniting in the compartment does not cause unreasonably vast damages (compartmentation by area).,{'ID': '104_Finnish_FireSafety'},The size of a fire compartment must be limited so that a fire igniting in the compartment does not cause unreasonably vast damages (compartmentation by area).,selection,annotated +5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",part-of,annotated +dcc583b1-8c4c-42cf-a1ed-e8907de56254_1,,,"The air extract rate of the indoor steps of other spaces intended for everyday use may be no more than 25W/m2, and the tread must be no less than 270 millimetres.",less-equal,synthetic +35af73f1-53c7-4377-9da0-acf99eef4d8e,"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",{'ID': '159_UK_DocM_V2_AccessAndUseOfBuildings'},"WC compartment doors, and doors to wheelchair-accessible unisex toilets, changing rooms or shower rooms have an emergency release mechanism so that they are capable of being opened outwards, from the outside , in case of emergency.",necessity,annotated +ca1e0369-2dfe-4cf2-8194-87f72ee5a633,"Vertical, horizontal and slinky ground arrays in particular should be flushed in both directions.",{'ID': '385_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Vertical, horizontal and slinky ground arrays in particular should be flushed in both directions.",selection,annotated +56166e36-b14b-4632-9767-70b71d335d9c,"When a dwelling undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",{'ID': '98_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When a dwelling undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",none,annotated +2f8d4247-e53b-49ae-bd26-c4f1765eaee8,"Extract air of categories 2, 3 and 4 shall not be used as recirculation air.",{'ID': '73_Finnish_Health-IndoorClimateAndVentilation'},"Extract air of categories 2, 3 and 4 shall not be used as recirculation air.",equal,annotated +df122091-ca53-4134-98a3-47779c06f9df,The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flows at each terminal.,{'ID': '198_UK_DocF_V1_Ventilation'},The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flows at each terminal.,none,annotated +103f99ad-884b-4bae-9f22-ccb1c5bc3d26_10,,,"In an open garage of no more than 100 litres bath, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",less-equal,synthetic +8efb6108-e49e-4d64-a1e4-22e3f9128b17_1,,,"When calculating the reference heat loss of a building, the value of 120 shall be used as the thresholds for the air leakage rate figure for the building envelope.",equal,synthetic +19478a13-7457-4dd3-a394-744f826db7b0,"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",{'ID': '127_UK_DocM_V1_AccessAndUseOfBuildings'},"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",selection,annotated +f3bd99b4-7ea5-4968-af10-3c133c0b5aa0_5,,,No individual flight has a sum total of more than 0.8 metres.,less-equal,synthetic +99a53f17-48cb-4012-a47b-700761e0983b,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,{'ID': '61_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,selection,annotated +4470dde4-6422-4c13-9781-de68c3e075dc_11,,,"The outdoor internal temperature of a dwelling unit, however, shall be designed to be a minimum of 1.",greater-equal,synthetic +bf798097-bb99-42d0-a73f-8cebab8fbeb8,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.",{'ID': '21_Finnish_SafetyOfUse'},"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.",part-of,annotated +38cd3221-7fc9-4462-be20-78b16a4309d3_4,,,"The energy efficiency of openings in the newly created dwelling should not be more than 1,200 millimetres of the total floor area.",less-equal,synthetic +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_10,,,"Where the cost of installing only cable routes is more than 7% of the total cost of the major Structures, there is no floor voids to install either electric vehicle charge points or cable routes.",not-part-of,synthetic +7f72632a-dc0a-4318-afd7-7090b42350fc,Mechanical supply terminals should be located and directed to avoid draughts.,{'ID': '106_UK_DocF_V1_Ventilation'},Mechanical supply terminals should be located and directed to avoid draughts.,necessity,annotated +6e5e61dd-039d-4079-9c3f-f52fc12efefb,For continuing horizontal structures the loaded area shall be calculated span by span.,{'ID': '12_Finnish_StabilityOfStructures'},For continuing horizontal structures the loaded area shall be calculated span by span.,none,annotated +7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8_1,,,"For sizes of cylinder not listed, the installation and commissioning checklist from the cylinder should not exceed B, where V is the volume in litres.",less-equal,synthetic +973c9430-2b4a-4ab4-82df-7060c3002f77_1,,,The air leakage rate figure for the community heating primary circuit should be a minimum of half a metre.,greater-equal,synthetic +6a41a473-bd3c-4e38-a093-094b3fdae388_8,,,At least one in every (16.66 8.33 V0.4)/(1000 24) remaining approach must be provided with cable routes.,equal,synthetic +e43c1e88-be80-42d9-944e-1bf0f0f82479_1,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for pitch up to 450mm not more than 5m long.,less-equal,synthetic +53e31e26-a39b-4047-a86e-bdb8021413e8,Window handles on windows that open outwards are not more than 650mm from the inside face of the wall when the window is at its maximum openable angle.,{'ID': '84_UK_DocO_Overheating'},Window handles on windows that open outwards are not more than 650mm from the inside face of the wall when the window is at its maximum openable angle.,none,annotated +01d924bf-4a69-4eb8-b05e-ce993aee3d45,Perimeter insulation should be continuous and have a minimum thickness of 25mm.,{'ID': '135_UK_DocL_V1_ConsrvationOfFuelAndPower'},Perimeter insulation should be continuous and have a minimum thickness of 25mm.,greater-equal,annotated +ddd6ec57-ed54-4a8a-abaf-4b1efc287dde,The flushing shall be carried out with household water to remove any dirt and debris from the pipe network.,{'ID': '111_Finnish_Health-WaterAndSewerage'},The flushing shall be carried out with household water to remove any dirt and debris from the pipe network.,necessity,annotated +2633c957-07b4-4caa-a9d6-5acbac16b0b0,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 100 load.,{'ID': '245_UK_DocM_V2_AccessAndUseOfBuildings'},NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 100 load.,none,annotated +c2e0629d-350b-45b8-9e9e-d58be1780f12_6,,,"If the door has no window, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",not-part-of,synthetic +6c789809-b1b8-429a-8fe2-8ce16f8a4b54_10,,,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the access does not exceed 60 persons.,less-equal,synthetic +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3,"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",{'ID': '53_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",greater,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479_3,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than half a metre layers.,less-equal,synthetic +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",none,annotated +aef92227-4c01-4c59-b96d-ce414540606b,"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",{'ID': '63_UK_DocM_V2_AccessAndUseOfBuildings'},"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",part-of,annotated +825053cb-af5d-43a9-b59b-e2a5ae78ea73_2,,,The from the top and bottom corners of the door of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the service life of associated parking spaces.,greater,synthetic +993e54cc-49c3-43cb-995e-1a951c93c775_3,,,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an design value equal to 900-1000mm.",equal,synthetic +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated +1320873f-de9b-4c55-a7c0-67f545c4a46e,"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",{'ID': '42_UK_DocM_V2_AccessAndUseOfBuildings'},"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",none,annotated +2f8d4247-e53b-49ae-bd26-c4f1765eaee8_1,,,"Extract air of service life 0.3W/m2, 3 and 4 shall not be used as recirculation air.",equal,synthetic +c7035b48-7244-40a9-a70e-1d244caf72ac,"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",{'ID': '56_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",selection,annotated +dd898f7c-ee89-4c12-adaf-0ba78a6b001f,"Provision shall be made to prevent people moving in or about the building from colliding with open windows, skylights or ventilators.",{'ID': '98_UK_DocK_ProtectionFromFalling'},"Provision shall be made to prevent people moving in or about the building from colliding with open windows, skylights or ventilators.",necessity,annotated +0da52584-1b37-48b5-840f-3795ae695275_7,,,the minimum clear dimensions of the platform are: m3/(hm2) at 50Pa continuity and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +e43c1e88-be80-42d9-944e-1bf0f0f82479_10,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 4 Air permeability.,less-equal,synthetic +ef4f54b6-1099-4404-9fa2-d0c0d5e55543_8,,,The feasibility of installing high-efficiency alternative systems must not exceed the individual dwellings side edges.,less-equal,synthetic +bc49524e-4bac-4d16-bc83-5a977019cfaa,Other ventilation systems may be acceptable if they can be shown to meet an equal level of performance.,{'ID': '30_UK_DocF_V1_Ventilation'},Other ventilation systems may be acceptable if they can be shown to meet an equal level of performance.,selection,annotated +a1f91cfd-21f8-49a4-8468-746f49f4848e_10,,,"For a building that contains more than 900mm patient rooms for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",greater,synthetic +35cacecf-06dc-4b0f-aadb-db2ee05518c7,The area of windows and roof windows (but excluding display windows) within the area served exceeds 40 of the facade area.,{'ID': '495_UK_DocM_V2_AccessAndUseOfBuildings'},The area of windows and roof windows (but excluding display windows) within the area served exceeds 40 of the facade area.,greater,annotated +5ca184fa-e100-4f97-957d-e37ae944786f_0,,,The specification of installing electric vehicle charge points and cable routes is not more than 0.7 of the total capital cost of the major renovation.,less-equal,synthetic +c952db0f-b605-4335-8d56-97fc339ad5ba_7,,,All 32mm plaster-board of the installation and commissioning checklist should be completed.,equal,synthetic +5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",none,annotated +e4fb8d18-8dbc-4351-a2df-d87f880f476a,The fire resistance time requirement for balconies is half that of the load-bearing structures of the storey.,{'ID': '90_Finnish_FireSafety'},The fire resistance time requirement for balconies is half that of the load-bearing structures of the storey.,equal,annotated +5163f2fb-022f-4589-889f-2ade7a9d49c6,The relevant parts of Part 2 and 3 should be signed by a person who is competent to design the residential building.,{'ID': '109_UK_DocO_Overheating'},The relevant parts of Part 2 and 3 should be signed by a person who is competent to design the residential building.,part-of,annotated +9c2051ae-9878-4772-9471-bc5b8a28c3ae,"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy, taking into consideration the use and likely background level of noise from other sources.",{'ID': '23_UK_DocF_V2_Ventilation'},"For mechanical ventilation systems, fan units should be appropriately sized so that fans operating in normal background ventilation mode are not overly noisy, taking into consideration the use and likely background level of noise from other sources.",necessity,annotated +2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_11,,,The normal relationship between the dimensions of the rise and going is: 150m2 equals 25.,equal,synthetic +05864826-21ef-4ae7-9af8-2aaeffc7267a_6,,,Modular and portable buildings with a planned service life of more than two years but with an patterns in a single location of less than 40 degrees Celsius should be shown to comply with the energy efficiency requirements.,less,synthetic +103f99ad-884b-4bae-9f22-ccb1c5bc3d26,"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",{'ID': '110_Finnish_FireSafety'},"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",none,annotated +8fcdc238-3c30-4659-9303-1b126a39b2cd_4,,,The design solar load should be located away from the direct impact of the sources of local pollution by at least 0.2.,greater-equal,synthetic +8151be81-09ad-4dac-b2d2-f0d757915b6c_9,,,"However, when the snow load can occur, the habitable area of the load s should be at least 0.06 m2.",greater-equal,synthetic +4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",selection,annotated +c416d5e5-cb27-414c-b22e-7ed38be54ed1,There must be an automatic fire-extinguishing system that is suitable for its purpose and connected to the emergency centre.,{'ID': '232_Finnish_FireSafety'},There must be an automatic fire-extinguishing system that is suitable for its purpose and connected to the emergency centre.,selection,annotated +9abdce80-0a4a-400a-8725-205bb3b887e4,"In hard water areas, suitable measures should be taken to treat the feed water to water heaters and the hot water circuit of combination boilers to reduce limescale accumulation.",{'ID': '218_UK_DocM_V2_AccessAndUseOfBuildings'},"In hard water areas, suitable measures should be taken to treat the feed water to water heaters and the hot water circuit of combination boilers to reduce limescale accumulation.",selection,annotated +10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,part-of,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,annotated +8e8f4fb5-00b5-404f-89df-a07287984748_9,,,"In buildings with a CO2 greater than 6m, automatic meter reading and data collection facilities should be installed.",greater,synthetic +103f99ad-884b-4bae-9f22-ccb1c5bc3d26_2,,,"In an open garage of no more than 6m Gasfired boilers, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",less-equal,synthetic +dcc583b1-8c4c-42cf-a1ed-e8907de56254_10,,,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the net absorber area must be no less than 50 m2.",greater-equal,synthetic +26980508-105c-49db-8595-bf001a48d757_7,,,"In places with no fixed seats or Timing and temperature demand control, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic +ef9dc94d-b79c-4fba-897a-eed2b90084b2,"Thermal bridging, including at the party wall, should be reasonably limited.",{'ID': '150_UK_DocM_V2_AccessAndUseOfBuildings'},"Thermal bridging, including at the party wall, should be reasonably limited.",necessity,annotated +83ff563b-077a-4849-b526-382fbb012647,The breaking of a glass structure or other light-permeable structure of a building must not cause a danger of falling or a danger of injury from fragments falling onto persons below.,{'ID': '67_Finnish_SafetyOfUse'},The breaking of a glass structure or other light-permeable structure of a building must not cause a danger of falling or a danger of injury from fragments falling onto persons below.,necessity,annotated +a4dc06ab-99c3-4c8b-b295-eb3e6a64320a_7,,,"The free air flow rate from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 1,500 millimetres, unless the area is protected so as to prevent the danger of collision.",greater-equal,synthetic +6075de3c-d339-4ba4-9945-990480975615,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than three ventilators of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",{'ID': '94_UK_DocF_V1_Ventilation'},"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than three ventilators of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",greater-equal,annotated +7d35f4c4-fa65-4d68-a974-f54386ca8aee,"However, a horizontal gap in a protective part must be no higher than ten millimetres.",{'ID': '49_Finnish_SafetyOfUse'},"However, a horizontal gap in a protective part must be no higher than ten millimetres.",less-equal,annotated +bfe386ee-8c0b-41d4-9967-6e873edf7229,"Floors and foundations: insulation should be installed tight to the structure, without air gaps between insulation panels and at edges.",{'ID': '148_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Floors and foundations: insulation should be installed tight to the structure, without air gaps between insulation panels and at edges.",selection,annotated +d504fd87-d13d-4936-9d7a-71d17954760d_3,,,The glare and reflections of the steps in an exit may be no more than 230mm.,less-equal,synthetic +11f2902d-29c2-474e-97d0-628a2a97a666_6,,,"air extract rate of over 0.15 must be equipped with an appropriate safety barrier, railing or handrail.",greater,synthetic +f9de28ac-45bb-4400-9d9f-8afee73bd2e3_3,,,The wide should not exceed five of dwelling floor area.,less-equal,synthetic +2de867fe-80e7-4617-ad18-36225dd45ab1_4,,,Hinged or pivot windows with an either side of less than 9 metres are not suitable for purge ventilation.,less,synthetic +84cd76d7-e5d0-4f39-94bc-0236c65d533a_5,,,"in residential buildings of not more than two storeys, one exit of no less than 90mm in widened is permitted.",greater-equal,synthetic +9a574829-3211-4b4f-8c0c-c7a7ab9cfd54,The whole building ventilation rate should be met.,{'ID': '47_UK_DocF_V2_Ventilation'},The whole building ventilation rate should be met.,necessity,annotated +38cd3221-7fc9-4462-be20-78b16a4309d3_0,,,The elevation difference of openings in the newly created dwelling should not be more than 10m of the total floor area.,less-equal,synthetic +e32bbb47-c826-40c1-8ea4-8c32353d3fd2_10,,,There shall be 65mm of room provided for people in the building.,equal,synthetic +cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",part-of,annotated +f36650d9-cd31-4795-9728-7a4dcf3cadde,"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",{'ID': '229_Finnish_FireSafety'},"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",necessity,annotated +2f8d4247-e53b-49ae-bd26-c4f1765eaee8,"Extract air of categories 2, 3 and 4 shall not be used as recirculation air.",{'ID': '73_Finnish_Health-IndoorClimateAndVentilation'},"Extract air of categories 2, 3 and 4 shall not be used as recirculation air.",necessity,annotated +956efc87-87de-4d3c-99fb-dc58eab9353b_8,,,A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a Signs of at least proportion.,greater-equal,synthetic +66b3628a-f0ee-4bc7-93c8-2ae0145a2e78,"In a room with no openable window, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",{'ID': '83_UK_DocF_V1_Ventilation'},"In a room with no openable window, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",part-of,annotated +793cb939-b3d9-46eb-ae65-71a4d5c8031b_2,,,Where the kitchens is within the private curtilage of the dwelling (but not within a carport or chambers) at least one space is a standard parking bay that can be widened to 3.3m.,not-part-of,synthetic +0ea1e862-2434-4fc8-97a2-b076c992ef20_1,,,"The total supply air flow of an exit must be at least 9mm and its free height must be at least 2,100 millimetres.",greater-equal,synthetic +4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9_5,,,"In spaces intended for more than 60 persons, the away of the access route must be at least 900mm.",greater-equal,synthetic +72d7716f-7e3e-442c-9e42-14d4b19e18e3_0,,,A habitable rooms that is being connected to a new building should not have a absence for delivered heat to the building which is greater than 0.350kgCO2/kWh.,not-part-of,synthetic +103f99ad-884b-4bae-9f22-ccb1c5bc3d26,"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",{'ID': '110_Finnish_FireSafety'},"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",selection,annotated +9415ae4b-7a74-4c70-a245-e4381c6d71bf_1,,,"At gables and party walls, insulation should extend to the wall; if the electrically operated appliance between the wall and joist is less than 3, perimeter insulation may be required.",less,synthetic +a86b58e8-046f-44b7-8e1b-00c876c8c647,"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",{'ID': '30_Finnish_StabilityOfStructures'},"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",none,annotated +77f993c6-dff1-4f9a-8f66-73221d3cbaff,"If the dwelling only has one habitable room, a minimum ventilation rate of 13l/s should be used.",{'ID': '43_UK_DocF_V1_Ventilation'},"If the dwelling only has one habitable room, a minimum ventilation rate of 13l/s should be used.",part-of,annotated +3121fe90-27db-405e-a42a-df3cd22ee176_9,,,"Where necessary, 1.3 secondsholes, one above the other, must be installed in order to take into account children and users of wheelchairs.",equal,synthetic +cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",none,annotated +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated +d0b6759e-deec-451d-bd7a-ec65b96048be_3,,,"extract air of heat 190 millimetres shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",equal,synthetic +e93da678-4b62-493b-8c4d-31a95da3885d,An energy declaration shall be drawn up when designing a building.,{'ID': '172_Finnish_EnergyEfficiency'},An energy declaration shall be drawn up when designing a building.,necessity,annotated +aa41a5d4-c0b1-4da7-84a0-5c2e2738654f_0,,,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than 1100mm windows.,greater,synthetic +239bd568-c5f2-4ab5-955c-f2d8d86b7b7f,"Where closing devices are needed for fire control, electrically powered hold-open devices or swing-free closing devices should be used as appropriate.",{'ID': '90_UK_DocM_V2_AccessAndUseOfBuildings'},"Where closing devices are needed for fire control, electrically powered hold-open devices or swing-free closing devices should be used as appropriate.",necessity,annotated +9ff8b8fd-5361-4c3d-9a7e-7459276c8df7_0,,,The size must not exceed the individual dwellings service life.,less-equal,synthetic +05864826-21ef-4ae7-9af8-2aaeffc7267a,Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,{'ID': '83_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,selection,annotated +6c789809-b1b8-429a-8fe2-8ce16f8a4b54_2,,,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the Control does not exceed 300 millimetres.,less-equal,synthetic +34a524ec-6994-426f-86af-78788fd34a80_2,,,"Between the locking points for the mortice lock and surface-mounted rim lock, the proportion should be 390 millimetres.",equal,synthetic +7323113d-fcd0-4e19-a24a-c6171ec8c2b7,District heat networks and community heating systems should be designed to accommodate heat meter(s) for each dwelling.,{'ID': '295_UK_DocL_V1_ConsrvationOfFuelAndPower'},District heat networks and community heating systems should be designed to accommodate heat meter(s) for each dwelling.,none,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,{'ID': '18_UK_DocM_V1_AccessAndUseOfBuildings'},Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,annotated +d687ab7a-74e0-4d2e-8aad-27e009651634,Joints between vertical and horizontal structures shall always be designed without a reduction factor.,{'ID': '13_Finnish_StabilityOfStructures'},Joints between vertical and horizontal structures shall always be designed without a reduction factor.,necessity,annotated +f009a781-0ced-408d-b3d1-6ae7a848012e,"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",{'ID': '31_Finnish_SafetyOfUse'},"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",none,annotated +fa8a6d84-eb99-490e-8169-3c65353fb553,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",{'ID': '61_Finnish_StabilityOfStructures'},"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the exposure coefficient shall be at least 1.",part-of,annotated +203faa23-7b71-47c9-a6e5-2333ac45389e,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the tread must be no less than 250 millimetres.",{'ID': '22_Finnish_SafetyOfUse'},"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the tread must be no less than 250 millimetres.",part-of,annotated +f36650d9-cd31-4795-9728-7a4dcf3cadde,"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",{'ID': '229_Finnish_FireSafety'},"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",necessity,annotated +c7035b48-7244-40a9-a70e-1d244caf72ac,"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",{'ID': '56_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",selection,annotated +bf798097-bb99-42d0-a73f-8cebab8fbeb8_0,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the power input from controls must be no less than 900mm.",greater-equal,synthetic +8b9e1d32-efa8-409b-873b-22e2eae5b537,External walls and their various layers must form a whole that prevents water from harmfully penetrating into the structures.,{'ID': '95_Finnish_Health-Humidity'},External walls and their various layers must form a whole that prevents water from harmfully penetrating into the structures.,part-of,annotated +5305da48-b810-4fd8-a0b3-7520f89ff401,"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",{'ID': '194_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",necessity,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,annotated +a94b6b4f-a05e-403e-bbca-ebe1b94e38a1,"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",{'ID': '470_UK_DocM_V2_AccessAndUseOfBuildings'},"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",selection,annotated +86350df0-a40e-412b-a301-004524d56736,"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",greater-equal,annotated +63af9f99-6939-4e8c-a6a9-8b10942e1597_8,,,"The handle to at least 1m2 heat release in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",greater-equal,synthetic +e43c1e88-be80-42d9-944e-1bf0f0f82479_10,,,Individual flights are: for input charge up to 850 millimetres not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic +703e5c71-bd54-4267-acf4-fa7db1e70d49,"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",{'ID': '67_Finnish_Accessibility'},"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",none,annotated +a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",necessity,annotated +64695439-3458-4d43-8e7b-a2ba75075cea,"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",{'ID': '124_Finnish_SafetyOfUse'},"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",selection,annotated +74002ed3-548e-4e2f-8835-be76e643c67d_4,,,NOTE 2: Double doors effectively provide nibs where each leaf is at least 160 millimetres number of appliances.,greater-equal,synthetic +c6d0c791-e7f9-4a3f-abc1-631a2e6be0d1,Manual reset should be possible if there is an over-temperature trip.,{'ID': '269_UK_DocM_V2_AccessAndUseOfBuildings'},Manual reset should be possible if there is an over-temperature trip.,necessity,annotated +baee716c-b8c2-4500-b4de-63fa11f007b1_9,,,A minimum of one in 1800mm of the remaining Standing areas must have access to cable routes.,equal,synthetic +01bd7c41-594c-4440-8058-c34f1c4bad09,"When determining the free area available for ventilation during sleeping hours, only the proportion of openings that can be opened securely should be considered to provide useful ventilation.",{'ID': '82_UK_DocO_Overheating'},"When determining the free area available for ventilation during sleeping hours, only the proportion of openings that can be opened securely should be considered to provide useful ventilation.",selection,annotated +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_10,,,"In buildings more than 25mm and at most 28 metres in long, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",greater,synthetic +8aa4b706-1659-4e30-a4fe-e7f33efe3241_10,,,All E staircase of the compliance checklist should be completed.,equal,synthetic +8e8f4fb5-00b5-404f-89df-a07287984748_10,,,"In buildings with a power requirements greater than 450mm, automatic meter reading and data collection facilities should be installed.",greater,synthetic +23db27ac-b594-4b26-883d-922d713d382a,"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",{'ID': '161_UK_DocM_V2_AccessAndUseOfBuildings'},"When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled.",none,annotated +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_7,,,"Where the cost of installing only cable routes is more than 7% of the total cost of the major Handrails, there is no Ventilation ductwork to install either electric vehicle charge points or cable routes.",not-part-of,synthetic +12e545d1-64f4-45c9-a520-5b8a003eba0a,"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",{'ID': '85_UK_DocF_V1_Ventilation'},"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",none,annotated +3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60_10,,,The approach route is a minimum of 900mm wide with a maximum intermediate landing of One.,less-equal,synthetic +85745724-aa09-4cdd-ad17-3c50ea2b99a1,"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",{'ID': '105_UK_DocM_V1_AccessAndUseOfBuildings'},"Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach.",none,annotated +76bf63bd-30f4-440d-81a0-61ca16170f70,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,none,annotated +1913381b-a2cc-496e-9168-82ccf2a01d50_8,,,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the design flow rate of the heat emitters to be installed does not exceed 500 millimetres.",less-equal,synthetic +83344b26-7cf0-452a-9dac-c0288c46393d,"The non-primary doors for entering a dwelling (for example, back door or garage inter-connecting doors) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",{'ID': '37_UK_DocQ_Security_Dwellings'},"The non-primary doors for entering a dwelling (for example, back door or garage inter-connecting doors) should be fitted with a multipoint locking system that meets the requirements of: PAS 3621 (key locking on both sides), or PAS 8621 (non-key locking on the internal face), or PAS 10621 (non-key locking on the internal face, but with an external locking override facility).",selection,annotated +825053cb-af5d-43a9-b59b-e2a5ae78ea73_4,,,The level with entry of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the results of dwellings in the residential building; b. the number of associated parking spaces.,greater,synthetic +b810df40-4dd8-44c4-80c4-b33bb873a5e9,"If the circulation piping is located inside the building envelopes insulation, 25 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '103_Finnish_EnergyEfficiency'},"If the circulation piping is located inside the building envelopes insulation, 25 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",selection,annotated +cc72106e-9e7f-47cf-8a95-0173a8305dad_3,,,"In a new building, the crawl space cross-sectional area must be two on average at the minimum.",greater-equal,synthetic +500fc416-e652-4a2c-8dd3-8d9754ea1829,There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,{'ID': '115_UK_DocF_V2_Ventilation'},There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,selection,annotated +710ef992-e187-4b1a-894b-e0e222f54359_11,,,"NOTE: For grid-supplied electricity, a presence of 300mm and primary energy factor of 1.501kWhPE/kWh should be used.",equal,synthetic +02f5e3fb-7a8b-4a88-a6e5-337cc0835284,"When a new residential building is erected, information about the building must be given to the owner of the building to allow them to use the overheating mitigation strategy effectively.",{'ID': '90_UK_DocO_Overheating'},"When a new residential building is erected, information about the building must be given to the owner of the building to allow them to use the overheating mitigation strategy effectively.",selection,annotated +419892bb-5044-4c63-a8ba-7747ad52c23d,"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",{'ID': '195_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",necessity,annotated +3ec0e36a-0227-4b76-9fd5-7a2f77877d99,A building that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,{'ID': '23_UK_DocM_V2_AccessAndUseOfBuildings'},A building that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,necessity,annotated +eccd4f77-ef4a-41fd-a22a-620c84fdddd4_11,,,There is a minimum of 30 of worktop to at least distance of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,greater-equal,synthetic +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_3,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding 25 decibels devices that will close the door in the event of fire is EI 30; however, minor sealing parts and penetrations may be class E 15.",greater,synthetic +77be05f2-cd8c-4d35-85e4-6637b999d8e7,The value of the consequential improvement works should not be less than 10 of the value of the principal works.,{'ID': '452_UK_DocM_V2_AccessAndUseOfBuildings'},The value of the consequential improvement works should not be less than 10 of the value of the principal works.,selection,annotated +fb5d3054-4911-4049-ba09-1c3e80f9c07c_0,,,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the Geo-location may be no more than 20 degrees Celsius.",less-equal,synthetic +c416d5e5-cb27-414c-b22e-7ed38be54ed1,There must be an automatic fire-extinguishing system that is suitable for its purpose and connected to the emergency centre.,{'ID': '232_Finnish_FireSafety'},There must be an automatic fire-extinguishing system that is suitable for its purpose and connected to the emergency centre.,necessity,annotated +f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c_8,,,A building with a maximum number of occupants exceeding certain proportion must be equipped with anchoring structures for safety lines.,greater,synthetic +7d35f4c4-fa65-4d68-a974-f54386ca8aee_11,,,"However, a horizontal Waste water in a protective part must be no higher than four.",less-equal,synthetic +bf798097-bb99-42d0-a73f-8cebab8fbeb8_10,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the fire resistance time must be no less than 1,500 millimetres.",greater-equal,synthetic +e320322e-3aee-4167-ad19-a6c6cc41f597,The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,{'ID': '97_Finnish_Health-WaterAndSewerage'},The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,necessity,annotated +9a574829-3211-4b4f-8c0c-c7a7ab9cfd54,The whole building ventilation rate should be met.,{'ID': '47_UK_DocF_V2_Ventilation'},The whole building ventilation rate should be met.,selection,annotated +beeec1b2-c382-40cc-aec2-6eda86f5782e,"Each residential unit, shared communal room and common space should be categorised separately.",{'ID': '25_UK_DocO_Overheating'},"Each residential unit, shared communal room and common space should be categorised separately.",necessity,annotated +ef561e39-db90-462c-8dde-15fbeae954e5,A cube with edges of no more than 200 millimetres may pass between the upper edge of the barrier and the protective part.,{'ID': '50_Finnish_SafetyOfUse'},A cube with edges of no more than 200 millimetres may pass between the upper edge of the barrier and the protective part.,necessity,annotated +7134933d-17df-4a8c-b72e-1c09177bad1c,The spread of fire in voids of wall-type building elements must be restricted at least by storey.,{'ID': '130_Finnish_FireSafety'},The spread of fire in voids of wall-type building elements must be restricted at least by storey.,necessity,annotated +73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",part-of,annotated +2f815a08-db3c-48a6-b248-d69aeac870ee,"the vertical travel distance is: a. not more than 2m, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",{'ID': '173_UK_DocM_V2_AccessAndUseOfBuildings'},"the vertical travel distance is: a. not more than 2m, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",less-equal,annotated +10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,necessity,annotated +533762d6-e592-494d-a08b-a0817b5b4f9f,"If there are associated parking spaces where there is not a requirement to install electric vehicle charge points, cable routes must be installed in all remaining associated parking spaces.",{'ID': '50_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If there are associated parking spaces where there is not a requirement to install electric vehicle charge points, cable routes must be installed in all remaining associated parking spaces.",selection,annotated +66249fda-33bf-4d93-8bf9-53fb82ad0e95,"The driveway and parking area at a plot or building site must be separated from pedestrian, play and recreation areas.",{'ID': '87_Finnish_SafetyOfUse'},"The driveway and parking area at a plot or building site must be separated from pedestrian, play and recreation areas.",part-of,annotated +ff3e8f86-1542-4f54-a776-cfdc8482bad7_10,,,The prevailing wind direction of an air conditioner working in cooling mode should be a minimum of 56 metres.,greater-equal,synthetic +86350df0-a40e-412b-a301-004524d56736,"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",necessity,annotated +01d924bf-4a69-4eb8-b05e-ce993aee3d45_5,,,Perimeter insulation should be continuous and have a minimum surface area of 1800mm.,greater-equal,synthetic +"8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent. {'ID': '9_Finnish_Accessibility'}_10",,,"However, if the diameter is no more than 0.9 metres, the ramp may not have a gradient of more than eight per cent.",less-equal,synthetic +e3b85ad6-6132-40d7-86f8-3cc5d44eb12c_6,,,twice the rise plus the going (2R G) submission should be close to an accessible bathroom suitable for a wheelchair user.,equal,synthetic +88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",selection,annotated +66249fda-33bf-4d93-8bf9-53fb82ad0e95,"The driveway and parking area at a plot or building site must be separated from pedestrian, play and recreation areas.",{'ID': '87_Finnish_SafetyOfUse'},"The driveway and parking area at a plot or building site must be separated from pedestrian, play and recreation areas.",part-of,annotated +e3b85ad6-6132-40d7-86f8-3cc5d44eb12c_7,,,20mm systems should be close to an accessible bathroom suitable for a wheelchair user.,equal,synthetic +835d8fad-7a27-4299-aa38-a5b1771a6779_5,,,"In large building complexes, such as retail parks and large sports centres, there should be 600 x 600 millimetres wheelchair-accessible unisex block of flats capable of including an adult changing table.",equal,synthetic +7f3f59a4-fc7e-4b14-8074-384f6cacf548,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",{'ID': '45_Finnish_SafetyOfUse'},"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the drop is less than three metres.",part-of,annotated +9952f64d-e0df-4b03-84af-150782f81387_9,,,"For mobility-impaired people, a courtyard of at least 900-1000mm is preferred.",greater-equal,synthetic +cf35d4a4-3170-421b-9be1-b68d928eed1d_10,,,"A roof with a energy savings greater than 24 degrees Celsius must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",greater,synthetic +c3cfbf29-a95f-4453-a7de-a8f6e4ca2ea8,"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",{'ID': '152_Finnish_Health-WaterAndSewerage'},"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",selection,annotated +8aad11d6-bd81-4a57-bd73-7c1319a76494,"Where on-site electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and on-site energy demand.",{'ID': '331_UK_DocM_V2_AccessAndUseOfBuildings'},"Where on-site electricity generation and storage is installed, such as photovoltaic panels or battery storage, systems should be an appropriate size for the site, available infrastructure and on-site energy demand.",selection,annotated +21bf2954-bfa8-44ef-bb2e-4e34367965ba,"If a load-bearing element is required to have a longer fire resistance time with respect to integrity E and insulation I than with respect to load-bearing capacity R, the longer fire resistance time shall also be applied to the load-bearing capacity.",{'ID': '88_Finnish_FireSafety'},"If a load-bearing element is required to have a longer fire resistance time with respect to integrity E and insulation I than with respect to load-bearing capacity R, the longer fire resistance time shall also be applied to the load-bearing capacity.",necessity,annotated +5aebe4f8-6ca6-4448-94db-5272b5541efb,"The results of all pressure tests on dwellings, including any test failures, should be reported to the building control body.",{'ID': '359_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The results of all pressure tests on dwellings, including any test failures, should be reported to the building control body.",part-of,annotated +1913381b-a2cc-496e-9168-82ccf2a01d50,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",{'ID': '67_Finnish_Health-WaterAndSewerage'},"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",part-of,annotated +aa41a5d4-c0b1-4da7-84a0-5c2e2738654f_2,,,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than 55 degrees Celsius cooker.,greater,synthetic +0ea1e862-2434-4fc8-97a2-b076c992ef20,"The width of an exit must be at least 1,200 millimetres and its free height must be at least 2,100 millimetres.",{'ID': '214_Finnish_FireSafety'},"The width of an exit must be at least 1,200 millimetres and its free height must be at least 2,100 millimetres.",greater-equal,annotated +2cadb28f-a6c8-4fe2-b1c9-a918eb5437f9,On-site electricity generation systems must be commissioned to ensure that they produce as much electricity as is reasonable in the circumstances.,{'ID': '372_UK_DocL_V1_ConsrvationOfFuelAndPower'},On-site electricity generation systems must be commissioned to ensure that they produce as much electricity as is reasonable in the circumstances.,necessity,annotated +76bf63bd-30f4-440d-81a0-61ca16170f70,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},Control should be maximised and heat gain to uninsulated pipes should only be permitted where the proportion of the cooling load relating to distribution pipework is less than 1 of the total load.,none,annotated +9dd2a0f1-0ff9-4416-8abd-1e6589980ff4_8,,,"If the drop of a mechanical ventilation systems air duct is designed to be greater than 20 millimetres, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",greater,synthetic +aa41a5d4-c0b1-4da7-84a0-5c2e2738654f_8,,,"The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than 1,000 millimetres expanded metal.",greater,synthetic +656aa2fa-18cb-41ee-ae28-28deb3dffcc3_4,,,The total floor area of the water in the hot water system shall be at least 300mm and available from the hot water plumbing fixture within 20 seconds.,greater-equal,synthetic +8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c,"However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent.",{'ID': '9_Finnish_Accessibility'},"However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent.",part-of,annotated +4e8c5c50-44af-48f6-b959-e6f9b31afa1e_10,,,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical water removal system may be exit enclosure.",equal,synthetic +c47598f9-df79-4d77-aba9-8f380342372f_10,,,extract air of total combined window area 3.3m shall be conducted to the outdoors through individual extract air ducts.,equal,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_4,,,Skirtings totalling up to 50mm total thickness and shallow projecting indoor steps or casings above 100mm may be discounted when measuring clear width.,greater,synthetic +4abb3268-3ba6-47e8-a8b7-4676dbaa9a16_8,,,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear maximum number of occupants of 900mm, except in doorways.",equal,synthetic +1320873f-de9b-4c55-a7c0-67f545c4a46e,"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",{'ID': '42_UK_DocM_V2_AccessAndUseOfBuildings'},"All access routes to principal, or alternative accessible, entrances should be surfaced so that people are able to travel along them easily, without excessive effort and without the risk of tripping or falling.",selection,annotated +992e8f11-81ac-4d2f-b7d1-60e46b4b7261,Wheelchair accessible dwellings must also provide both a level access shower and a bath.,{'ID': '108_UK_DocM_V1_AccessAndUseOfBuildings'},Wheelchair accessible dwellings must also provide both a level access shower and a bath.,selection,annotated +825053cb-af5d-43a9-b59b-e2a5ae78ea73_10,,,The number of occupants of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the intended purpose of associated parking spaces.,greater,synthetic +13a437c0-918c-47f2-85bd-b80dd69eb027,"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",part-of,annotated +164122ed-c7ac-4cf8-8a54-3d56c144f78d,"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",{'ID': '172_UK_DocM_V2_AccessAndUseOfBuildings'},"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",selection,annotated +0aaf71f0-a482-4a72-a407-0d6db79c7f6f_6,,,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 3.3m of non-fire-compartmented light well that essentially relate to the business of the building may be located on the level of second storey.",less-equal,synthetic +50e89a86-e2be-439d-b230-79274cd7199b_0,,,Modular and portable buildings with a planned widened of more than 0.3 at a single location should be shown to comply with the energy efficiency requirements.,greater,synthetic +77f993c6-dff1-4f9a-8f66-73221d3cbaff_3,,,"If the dwelling only has one habitable room, a minimum room temperature of 0.06 m2 should be used.",greater-equal,synthetic +f420ae57-5656-4558-b1a3-1079e46bf6cc_5,,,"In the case of the storey-level door of a dwelling, or if the target emission rate through the door exceeds 850 millimetres, doors must open in the direction of the exit.",greater,synthetic +31d635b2-1d32-49dd-a848-5b5acaf50128,"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",{'ID': '407_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",necessity,annotated +079db365-cfed-474e-9329-25349ac0db4a_9,,,"In connection with the door of an outside space of an individual dwelling the standards outside the door may be more than 2.4m if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",greater,synthetic +56517433-cf40-4b88-a9d4-18e61e0e9993,"In addition, on both sides of the toilet seat there shall be a free space of at least 800 millimetres.",{'ID': '55_Finnish_Accessibility'},"In addition, on both sides of the toilet seat there shall be a free space of at least 800 millimetres.",greater-equal,annotated +5f675f4f-74de-4d0f-ae92-c3500d2d952e,The actual equivalent area and location of installed background ventilators should be recorded.,{'ID': '189_UK_DocF_V1_Ventilation'},The actual equivalent area and location of installed background ventilators should be recorded.,part-of,annotated +5b4380ba-0066-4735-a362-316d4c8e70b2,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",{'ID': '73_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",none,annotated +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_10,,,"In buildings more than 9 metres and at most One in service life, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",less-equal,synthetic +5e7d4831-4ec8-48f9-9e60-0422fcc1eae4_10,,,"When replacing an existing system, the fire compartmenting requirement of the new system should be no less than storage capacity of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",greater-equal,synthetic +0cfe8c0e-45e4-4c4c-bf9b-906e26e28c75,"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",{'ID': '43_UK_DocM_V2_AccessAndUseOfBuildings'},"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",selection,annotated +3ec0e36a-0227-4b76-9fd5-7a2f77877d99,A building that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,{'ID': '23_UK_DocM_V2_AccessAndUseOfBuildings'},A building that contains both living accommodation and space for commercial purposes (e.g. for a workshop or office) should be treated as a dwelling if the commercial part can be reverted to domestic use.,selection,annotated +4d80c4d1-08ee-481a-9f9c-e9151ce1094d_3,,,"The cold side of windows, roof windows, rooflights and doors should not exceed 20 litres per second of the total floor area of the dwelling.",less-equal,synthetic +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_10,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be length 9mm.",equal,synthetic +05fdde92-d8af-42ad-963b-9019c69a8ab3,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",{'ID': '163_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",none,annotated +64695439-3458-4d43-8e7b-a2ba75075cea,"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",{'ID': '124_Finnish_SafetyOfUse'},"There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly.",selection,annotated +f0c72b35-5a0a-4554-8713-96f6f73a67f1_11,,,A cube with target emission rate of no more than 300mm may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,less-equal,synthetic +6075de3c-d339-4ba4-9945-990480975615_9,,,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than One building of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",greater-equal,synthetic +5fa7daca-cb50-4397-a736-617e52d30187_7,,,"If efficiencies at below 30% are required and unavailable, the flow rate may be taken as equal to that at 850 millimetres.",equal,synthetic +29c431ee-ea93-491d-ab13-06418d93c488_10,,,"If deep is greater than eight per cent, manual control is acceptable.",greater,synthetic +0d8c2f7d-5234-4bec-bbbe-961e499ebbbc,"A proportion of the sleeping accommodation in hotels, motels and student accommodation should be designed for independent use by wheelchair users.",{'ID': '129_UK_DocM_V2_AccessAndUseOfBuildings'},"A proportion of the sleeping accommodation in hotels, motels and student accommodation should be designed for independent use by wheelchair users.",part-of,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,{'ID': '18_UK_DocM_V1_AccessAndUseOfBuildings'},Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,annotated +8e5e9560-4b22-4fe0-ad86-e52b82ffe4d2,"When calculating the energy consumption of a buildings cooling system, the energy consumption of cooling energy production and the electrical energy consumption of auxiliary units shall be taken into account where the use of the systems is required for indoor temperature control.",{'ID': '111_Finnish_EnergyEfficiency'},"When calculating the energy consumption of a buildings cooling system, the energy consumption of cooling energy production and the electrical energy consumption of auxiliary units shall be taken into account where the use of the systems is required for indoor temperature control.",part-of,annotated +38cd3221-7fc9-4462-be20-78b16a4309d3_2,,,The ending of openings in the newly created dwelling should not be more than 120 of the total floor area.,less-equal,synthetic +37f01a2c-b944-45a2-a7f4-140d8c03d7ac,"After rebating, frame components should retain at least 32mm of timber.",{'ID': '29_UK_DocQ_Security_Dwellings'},"After rebating, frame components should retain at least 32mm of timber.",selection,annotated +d925c189-860a-4fcb-ae88-d1cf8cc14fb8_9,,,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the class may be no more than four.",less-equal,synthetic +38cd3221-7fc9-4462-be20-78b16a4309d3_11,,,The fire igniting of openings in the newly created dwelling should not be more than 300 millimetres of the total floor area.,less-equal,synthetic +8421f806-70f2-46a9-a308-90a40da3541d,"Where the gradient of the approach, whether over its whole length or in part, is 1:20 or steeper, that part of the approach should be designed as ramped access.",{'ID': '41_UK_DocM_V2_AccessAndUseOfBuildings'},"Where the gradient of the approach, whether over its whole length or in part, is 1:20 or steeper, that part of the approach should be designed as ramped access.",part-of,annotated +8aa4b706-1659-4e30-a4fe-e7f33efe3241_0,,,All three seconds Window handles of the compliance checklist should be completed.,equal,synthetic +5305da48-b810-4fd8-a0b3-7520f89ff401,"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",{'ID': '194_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",none,annotated +13a437c0-918c-47f2-85bd-b80dd69eb027_7,,,"There are no air flow resistance on the Ventilation of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",not-part-of,synthetic +0da52584-1b37-48b5-840f-3795ae695275_1,,,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where one metre Heating systems are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_6,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 8 per cent (1:12.5) in condition and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic +eefe1191-2903-4fb8-9138-6471e09fb67d_9,,,The flow rate exceeds 190 millimetres at 11pm.,greater,synthetic +4d54279f-8590-4a58-86d5-afb7f3069870,"The apartment-specific water meters shall be located in a place where they are easy to install, read and service.",{'ID': '75_Finnish_Health-WaterAndSewerage'},"The apartment-specific water meters shall be located in a place where they are easy to install, read and service.",necessity,annotated +569c7958-b7d6-4b9c-9dd9-13307e95e59b,"For ducted systems that are served by fans with a design flow rate greater than 1m3/s, ductwork leakage tests should be carried out.",{'ID': '385_UK_DocM_V2_AccessAndUseOfBuildings'},"For ducted systems that are served by fans with a design flow rate greater than 1m3/s, ductwork leakage tests should be carried out.",selection,annotated +5577528f-8fa0-4ca3-96f6-ea418091cb86,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,{'ID': '32_Finnish_SafetyOfUse'},The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,none,annotated +956efc87-87de-4d3c-99fb-dc58eab9353b_10,,,A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a quality of the installation of at least 1.501kWhPE/kWh.,greater-equal,synthetic +7f696221-52c9-4c52-8f90-74bd93c51299,This grippable handrail is 850-1000mm above the pitch line of the flight and extends at least 300mm beyond the top and bottom nosings.,{'ID': '73_UK_DocM_V1_AccessAndUseOfBuildings'},This grippable handrail is 850-1000mm above the pitch line of the flight and extends at least 300mm beyond the top and bottom nosings.,none,annotated +2afa8bba-b5ad-4e12-bc27-4beea3fd09b2,The normal relationship between the dimensions of the rise and going is: twice the rise plus the going (2R G) equals between 550mm and 700mm.,{'ID': '19_UK_DocK_ProtectionFromFalling'},The normal relationship between the dimensions of the rise and going is: twice the rise plus the going (2R G) equals between 550mm and 700mm.,part-of,annotated +3153d771-404e-4a54-ac05-ed1b75e37506_4,,,"Gangways should not be less than A category unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",greater-equal,synthetic +50e89a86-e2be-439d-b230-79274cd7199b,Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,{'ID': '81_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,selection,annotated +29232335-402c-4ed9-af74-fd093ac22e28_6,,,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least rise between landings 100.,greater-equal,synthetic +984c252b-74f4-4d85-9080-1c8ae1851eca_6,,,"If performance requires thicker glass to be used, an equivalent window unit with cross-sectional area (30m2) glazing should be shown to meet the required standard.",equal,synthetic +53e31e26-a39b-4047-a86e-bdb8021413e8_10,,,Window handles on windows that open outwards are not more than 600 millimetres maximum capacity when the window is at its maximum openable angle.,less-equal,synthetic +533762d6-e592-494d-a08b-a0817b5b4f9f,"If there are associated parking spaces where there is not a requirement to install electric vehicle charge points, cable routes must be installed in all remaining associated parking spaces.",{'ID': '50_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If there are associated parking spaces where there is not a requirement to install electric vehicle charge points, cable routes must be installed in all remaining associated parking spaces.",necessity,annotated +405a2082-beb9-4c5f-bc9f-d688b72e723b,Intermediate floors: floor-to-wall junctions should be detailed to ensure that insulation in the external wall is continuous.,{'ID': '162_UK_DocL_V1_ConsrvationOfFuelAndPower'},Intermediate floors: floor-to-wall junctions should be detailed to ensure that insulation in the external wall is continuous.,selection,annotated +a387fcb8-ead2-4094-9be9-72d783468b33,"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",{'ID': '422_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",part-of,annotated +a387fcb8-ead2-4094-9be9-72d783468b33_4,,,"If the air leakage rate figure of windows, roof windows, rooflights and doors exceeds 30% load of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",greater,synthetic +baee716c-b8c2-4500-b4de-63fa11f007b1_1,,,A minimum of one in 32mm of the remaining energy declaration must have access to cable routes.,equal,synthetic +793cb939-b3d9-46eb-ae65-71a4d5c8031b_1,,,Where the site is within the private curtilage of the dwelling (but not within a carport or blocks of flats) at least one space is a standard parking bay that can be widened to 3.3m.,not-part-of,synthetic +f5a71c7b-e852-40f2-8f88-91cda7902a7e,"If a new building has a space heating or airconditioning system with an effective rated output greater than 180kW, a building automation and control system should be installed.",{'ID': '319_UK_DocM_V2_AccessAndUseOfBuildings'},"If a new building has a space heating or airconditioning system with an effective rated output greater than 180kW, a building automation and control system should be installed.",none,annotated +77f993c6-dff1-4f9a-8f66-73221d3cbaff,"If the dwelling only has one habitable room, a minimum ventilation rate of 13l/s should be used.",{'ID': '43_UK_DocF_V1_Ventilation'},"If the dwelling only has one habitable room, a minimum ventilation rate of 13l/s should be used.",greater-equal,annotated +9ebe07e9-8381-451a-9ab8-701912478b30,The air flow rate of all mechanical ventilation fans should be tested.,{'ID': '210_UK_DocF_V1_Ventilation'},The air flow rate of all mechanical ventilation fans should be tested.,selection,annotated +079db365-cfed-474e-9329-25349ac0db4a,"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",{'ID': '21_Finnish_Accessibility'},"In connection with the door of an outside space of an individual dwelling the level difference outside the door may be more than 20 millimetres if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",selection,annotated +f06f7ec1-3b83-4e1a-a421-b09589f2374c,"Provision shall be made to prevent any door or gate: (a) which slides or opens upwards, from falling onto any person; and (b) which is powered, from trapping any person.",{'ID': '114_UK_DocK_ProtectionFromFalling'},"Provision shall be made to prevent any door or gate: (a) which slides or opens upwards, from falling onto any person; and (b) which is powered, from trapping any person.",necessity,annotated +05698d4d-c140-4bce-94b3-386ce02baa6b,The storm water sewers within the building shall be equipped with condensation insulation.,{'ID': '169_Finnish_Health-WaterAndSewerage'},The storm water sewers within the building shall be equipped with condensation insulation.,necessity,annotated +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_7,,,"In buildings more than 9 metres and at most 15 in absence, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",less-equal,synthetic +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_9,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 0.9 metres in extract air categories; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic +b5edf19f-56df-436a-89f0-9ab5bf6963ea,"If necessary, fire compartments shall be partitioned in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '106_Finnish_FireSafety'},"If necessary, fire compartments shall be partitioned in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",none,annotated +a387fcb8-ead2-4094-9be9-72d783468b33,"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",{'ID': '422_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",none,annotated +dcc583b1-8c4c-42cf-a1ed-e8907de56254,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",{'ID': '23_Finnish_SafetyOfUse'},"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",less-equal,annotated +45338082-ca66-418b-8fe1-8f2be926f330_8,,,A early childhood education premises of no more than twice the rise plus the going (2R G) may pass between the stair steps.,less-equal,synthetic +eefe1191-2903-4fb8-9138-6471e09fb67d_8,,,The surface area exceeds 600 millimetres at 11pm.,greater,synthetic +b4cef2a7-038c-4f72-8ea6-20e43d766165,"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",{'ID': '70_UK_DocM_V2_AccessAndUseOfBuildings'},"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",part-of,annotated +956efc87-87de-4d3c-99fb-dc58eab9353b,"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",{'ID': '42_Finnish_Accessibility'},"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",greater-equal,annotated +208b093d-361f-4aec-819d-4abca4e72c68_11,,,"in an evacuation area where the exit is 2m, the second exit may be no less than 900 millimetres in width.",equal,synthetic +3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,part-of,annotated +ae098b28-f01d-44df-b601-b7ac7631101d,"On stairs and ramps, a handrail must be installed for the entire length and on both sides of the structure.",{'ID': '54_Finnish_SafetyOfUse'},"On stairs and ramps, a handrail must be installed for the entire length and on both sides of the structure.",none,annotated +72d7716f-7e3e-442c-9e42-14d4b19e18e3,A district heat network that is being connected to a new building should not have a CO2 emission factor for delivered heat to the building which is greater than 0.350kgCO2/kWh.,{'ID': '336_UK_DocM_V2_AccessAndUseOfBuildings'},A district heat network that is being connected to a new building should not have a CO2 emission factor for delivered heat to the building which is greater than 0.350kgCO2/kWh.,none,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",selection,annotated +500fc416-e652-4a2c-8dd3-8d9754ea1829,There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,{'ID': '115_UK_DocF_V2_Ventilation'},There should be no visible mould on the inner surfaces of external walls of a properly heated building with typical moisture generation.,none,annotated +c0a6d35c-cc20-428b-941d-c3e3e6365c74_6,,,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a potentially flammable number of steps of 9mm.",equal,synthetic +3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,selection,annotated +7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",selection,annotated +8805ec9f-3f5f-44fc-9078-3ae62439c973,"NOTE: When a single U-value is calculated for a product range of doors, the configuration of the door chosen for the calculation should be the worst performing in the product range.",{'ID': '108_UK_DocL_V1_ConsrvationOfFuelAndPower'},"NOTE: When a single U-value is calculated for a product range of doors, the configuration of the door chosen for the calculation should be the worst performing in the product range.",none,annotated +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_6,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be exposure coefficient 50.",equal,synthetic +a0d4a888-a5f8-449e-b28c-43fd1003dca3, The fire compartment shall be partitioned by accommodation room.,{'ID': '258_Finnish_FireSafety'},The fire compartment shall be partitioned by accommodation room.,necessity,annotated +7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",none,annotated +38745b5e-4dea-43fe-9378-5befa5a2399d,A copy of the completed commissioning sheet should be given to the owner of the building.,{'ID': '99_UK_DocF_V2_Ventilation'},A copy of the completed commissioning sheet should be given to the owner of the building.,none,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",none,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479_8,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for maintained up to four not more than 5m long.,less-equal,synthetic +76acc6bd-50c0-4f3f-b015-42e171ec6ce7_8,,,40 degrees Celsius chamber must be installed.,equal,synthetic +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_9,,,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 50 m in boiler efficiency, these must be accessible via the interior.",greater,synthetic +3c0a8ccb-d813-40fb-b69b-88250d3bc4ec_5,,,"These fittings should not exceed a combined dead,imposed and wind loads of 2.5 ties/m2.",less-equal,synthetic +43a7a088-718f-4a11-a392-88e71559466e,"In exceptional circumstances in an existing building, a wheelchair platform stairlift may be considered, provided its installation does not conflict with requirements for means of escape.",{'ID': '107_UK_DocM_V2_AccessAndUseOfBuildings'},"In exceptional circumstances in an existing building, a wheelchair platform stairlift may be considered, provided its installation does not conflict with requirements for means of escape.",necessity,annotated +6a553c19-481f-4947-9047-fd2c4d0daa44,"Any floors, walls and doors that have been installed to allow the potential liftway to be used as storage or for other purposes could be easily removed without structural alteration.",{'ID': '83_UK_DocM_V1_AccessAndUseOfBuildings'},"Any floors, walls and doors that have been installed to allow the potential liftway to be used as storage or for other purposes could be easily removed without structural alteration.",necessity,annotated +fb5d3054-4911-4049-ba09-1c3e80f9c07c_2,,,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the one side may be no more than 600kg/m3.",less-equal,synthetic +34a524ec-6994-426f-86af-78788fd34a80_8,,,"Between the locking points for the mortice lock and surface-mounted rim lock, the Air permeability should be 2.4m.",equal,synthetic +203faa23-7b71-47c9-a6e5-2333ac45389e,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the tread must be no less than 250 millimetres.",{'ID': '22_Finnish_SafetyOfUse'},"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the tread must be no less than 250 millimetres.",part-of,annotated +a8b3e54e-902c-4502-99a2-8c41d46f1416,"If there are more than 60 chairs in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",{'ID': '106_Finnish_SafetyOfUse'},"If there are more than 60 chairs in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",part-of,annotated +4abb3268-3ba6-47e8-a8b7-4676dbaa9a16_2,,,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear maximum capacity of 190 millimetres, except in doorways.",equal,synthetic +06c2e0f7-69c8-47ec-bf31-9902ae9df7cf,"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",{'ID': '109_UK_DocK_ProtectionFromFalling'},"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",necessity,annotated +4abb3268-3ba6-47e8-a8b7-4676dbaa9a16_11,,,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear combined dead,imposed and wind loads of 56 metres, except in doorways.",equal,synthetic +e43c1e88-be80-42d9-944e-1bf0f0f82479,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,{'ID': '18_UK_DocM_V1_AccessAndUseOfBuildings'},Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 5m long.,selection,annotated +5e51b653-449e-4d00-be19-0e20ecff5c49_3,,,The default wide should be 300mm.,equal,synthetic +c952db0f-b605-4335-8d56-97fc339ad5ba_11,,,All 1m2 construction layers of the installation and commissioning checklist should be completed.,equal,synthetic +fb1da22f-8ddb-4399-b441-64dca68da9af_11,,,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 1 agreed level of provision.",greater-equal,synthetic +e320322e-3aee-4167-ad19-a6c6cc41f597,The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,{'ID': '97_Finnish_Health-WaterAndSewerage'},The water system shall incorporate: 1) a pressure gauge; 2) thermometers in the water pipe of mixed domestic hot water from the water heater and in the domestic hot water ring duct to measure the temperature of return water; 3) throttling valves.,selection,annotated +2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d_9,,,An upstand built on site should not exceed a annual efficiency of heat recovery from ventilation extract air of 1m3/s.,less-equal,synthetic +009e12eb-db83-485c-9ffc-e1f462251109_8,,,Each air terminal should have a sheathing board of at least 190 millimetres of the free area of its associated duct.,greater-equal,synthetic +c33e482e-252a-4e99-a905-7861a480d024,"Geo-location should be enabled to confirm the location, date and time of each image.",{'ID': '484_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Geo-location should be enabled to confirm the location, date and time of each image.",selection,annotated +922bf8df-3a70-4f45-8c04-200b638d3b3c_9,,,The cold water pipe shall be designed and installed so that the reverberation time in the cold water system may not exceed 1m3/s.,less-equal,synthetic +12f51746-1632-4628-9d8a-98dcf58ed9fc,Doors must be capable of opening outwards - in wheelchair adaptable bathrooms the door may open inwards providing that the door can be easily rehung to open outwards (e.g. door stops are planted and easily moved).,{'ID': '116_UK_DocM_V1_AccessAndUseOfBuildings'},Doors must be capable of opening outwards - in wheelchair adaptable bathrooms the door may open inwards providing that the door can be easily rehung to open outwards (e.g. door stops are planted and easily moved).,necessity,annotated +457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",none,annotated +302c413e-fefd-47f1-914f-0dc787e4a761_7,,,"Where drop on surfaces is greater than 850 millimetres, a difference in light reflectance value should be a minimum of 20 points.",greater,synthetic +493ec553-7761-4d1e-aa98-05d925ddf955,The opening of a horizontal hatch must be at least 600 x 600 millimetres.,{'ID': '84_Finnish_SafetyOfUse'},The opening of a horizontal hatch must be at least 600 x 600 millimetres.,greater-equal,annotated +5b4380ba-0066-4735-a362-316d4c8e70b2,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",{'ID': '73_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",necessity,annotated +d82c4149-8daa-48b2-8f46-c959a5f9ebe3,"Artificial lighting should be designed to give good colour rendering of all surfaces, without creating glare or pools of bright light and strong shadows.",{'ID': '152_UK_DocM_V2_AccessAndUseOfBuildings'},"Artificial lighting should be designed to give good colour rendering of all surfaces, without creating glare or pools of bright light and strong shadows.",necessity,annotated +ebb26e9f-622f-4faa-a2c8-997158e30499,Mortar snots should be removed to ensure a tight fit with the structure and cavities cleared of all debris.,{'ID': '142_UK_DocL_V1_ConsrvationOfFuelAndPower'},Mortar snots should be removed to ensure a tight fit with the structure and cavities cleared of all debris.,necessity,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8_5,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the number of people evacuating from these spaces does not exceed 6mm of the total air flow in the vertical duct.",less-equal,synthetic +793cb939-b3d9-46eb-ae65-71a4d5c8031b_8,,,Where the pipes is within the private curtilage of the dwelling (but not within a carport or thermal energy streams) at least one space is a standard parking bay that can be widened to 3.3m.,not-part-of,synthetic +eccc60e7-3d76-46c0-a9d9-e398bf3e475a,The part of the dwelling above ground level should be considered separately.,{'ID': '71_UK_DocF_V1_Ventilation'},The part of the dwelling above ground level should be considered separately.,none,annotated +d504fd87-d13d-4936-9d7a-71d17954760d_6,,,The heat recovery of the steps in an exit may be no more than 0.055555556.,less-equal,synthetic +bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,necessity,annotated +d2b6e6e7-1545-4d84-ae81-e136edd3be74,A handrail must be designed and shaped so that it allows a firm grip.,{'ID': '56_Finnish_SafetyOfUse'},A handrail must be designed and shaped so that it allows a firm grip.,necessity,annotated +cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",greater,annotated +339fc78c-a2f2-481c-a410-3aeb41e24b8a_5,,,Solid walls constructed of coursed brickwork or blockwork should be at least as total combined window area as 6mm of the storey height.,greater-equal,synthetic +7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88_0,,,The resilient layer should be to the full height of the door and adequate means shape of the doorset.,equal,synthetic +b5addb77-be99-45a2-8dc0-fdf5d1969a57,Each column and wall shall be supplied with continuous vertical ties from the foundations to the roof level.,{'ID': '194_Finnish_StabilityOfStructures'},Each column and wall shall be supplied with continuous vertical ties from the foundations to the roof level.,selection,annotated +09b2a395-5293-4b7d-82d4-5312482d59e9,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",{'ID': '46_UK_DocM_V1_AccessAndUseOfBuildings'},"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner.",selection,annotated +45b99da0-5bce-49b7-9ce2-04810c7e5a19,"For recessed meter boxes on the cold side of the construction, insulation should be installed behind the enclosure.",{'ID': '151_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For recessed meter boxes on the cold side of the construction, insulation should be installed behind the enclosure.",part-of,annotated +e505b13c-7b62-4857-aa2d-544dc986e9c0_5,,,"For dwellings, for external tapered steps and stairs that are part of the building the riser of each step should be a minimum of 0.7 metres.",greater-equal,synthetic +fb5d3054-4911-4049-ba09-1c3e80f9c07c,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",{'ID': '29_Finnish_SafetyOfUse'},"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",selection,annotated +fb1da22f-8ddb-4399-b441-64dca68da9af,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",{'ID': '218_Finnish_FireSafety'},"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",none,annotated +ec1783bd-3e59-42d6-9709-cd0cc7d2c365,The air flow resistance of all components should be considered when specifying ventilation systems.,{'ID': '55_UK_DocF_V1_Ventilation'},The air flow resistance of all components should be considered when specifying ventilation systems.,necessity,annotated +36650de0-ef3c-4fd1-8199-f47c0e576076_9,,,the total capital cost of the platform does not exceed 300mm.,less-equal,synthetic +f2bf62e6-9577-48b5-b15d-9fe4904acf52,"Where controls are integrated in the heater, the system should be provided with a time switch/programmer and room temperature sensor linked to heater firing and fan speed control.",{'ID': '268_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where controls are integrated in the heater, the system should be provided with a time switch/programmer and room temperature sensor linked to heater firing and fan speed control.",none,annotated +cf152151-90f9-47d0-9e4e-5a1cd813d4e5,System controls should be wired so that when there is no demand for space heating or hot water the heating appliance and pump are switched off.,{'ID': '247_UK_DocL_V1_ConsrvationOfFuelAndPower'},System controls should be wired so that when there is no demand for space heating or hot water the heating appliance and pump are switched off.,selection,annotated +7f3f59a4-fc7e-4b14-8074-384f6cacf548_7,,,"The heat gain of a barrier in a dwellings indoor areas may, however, be at least 0.055555556 if the drop is less than three metres.",greater-equal,synthetic +9fee4426-8d7f-40f9-bc6f-562a5d3fd9b4,"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",{'ID': '144_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",none,annotated +81f14fc1-af5d-45e8-8725-94d2510e4701,"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",{'ID': '29_Finnish_Accessibility'},"A dwelling that is intended for service housing or supported housing of a person with mobility and functional impairment shall, irrespective of the number of storeys in the building, have a turning space with a diameter of at least 1,500 millimetres in the hallway and kitchen.",none,annotated +81314489-dcd9-410f-9b15-595b87e7c8f9,"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",{'ID': '14_UK_DocQ_Security_Dwellings'},"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",necessity,annotated +a8b3e54e-902c-4502-99a2-8c41d46f1416_9,,,"If there are more than 500kW pressure tests in a space, they must be linked to one another in at least four groups, unless the chairs are placed around tables.",greater,synthetic +1913381b-a2cc-496e-9168-82ccf2a01d50,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",{'ID': '67_Finnish_Health-WaterAndSewerage'},"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room.",selection,annotated +75c60084-6878-472d-8694-e8739e0dd76c_10,,,The width of access routes in assembly areas with a heat gain of 300mm must be at least 900 millimetres.,equal,synthetic +3ca5cb38-b90b-4449-ba14-4268866df8e1_3,,,The water heater is close to the draw-off points and has a equivalent area no greater than One.,less-equal,synthetic +19478a13-7457-4dd3-a394-744f826db7b0_0,,,"The handle to at least two years Rigid connectors in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",greater-equal,synthetic +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f,"Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",{'ID': '3_UK_DocR_V1_InfrastructureForElectircalCommunications'},"Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",part-of,annotated +9b329413-b6d6-4953-9b34-c82d3a2e9c44,"Before a new heating appliance is installed, all central heating and primary hot water circuits should be thoroughly cleaned and flushed out.",{'ID': '216_UK_DocM_V2_AccessAndUseOfBuildings'},"Before a new heating appliance is installed, all central heating and primary hot water circuits should be thoroughly cleaned and flushed out.",necessity,annotated +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated +339fc78c-a2f2-481c-a410-3aeb41e24b8a,Solid walls constructed of coursed brickwork or blockwork should be at least as thick as 1/16 of the storey height.,{'ID': '32_UK_DocA_Structure'},Solid walls constructed of coursed brickwork or blockwork should be at least as thick as 1/16 of the storey height.,none,annotated +0ea1e862-2434-4fc8-97a2-b076c992ef20_0,,,"The thresholds of an exit must be at least 16/01/2023 00:00 and its free height must be at least 2,100 millimetres.",greater-equal,synthetic +b5addb77-be99-45a2-8dc0-fdf5d1969a57,Each column and wall shall be supplied with continuous vertical ties from the foundations to the roof level.,{'ID': '194_Finnish_StabilityOfStructures'},Each column and wall shall be supplied with continuous vertical ties from the foundations to the roof level.,none,annotated +bb309bf3-9e86-43d9-8b6e-ebff176d1c88,The sink is not more than 150mm deep with insulation to the underside to prevent scalding of a wheelchair users legs.,{'ID': '96_UK_DocM_V1_AccessAndUseOfBuildings'},The sink is not more than 150mm deep with insulation to the underside to prevent scalding of a wheelchair users legs.,selection,annotated +33ed3038-99a6-4b2d-906a-a1db21f2d898,"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",{'ID': '250_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",selection,annotated +0096a3bf-ac16-4a75-adf9-8c3f4a9b8610,The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,{'ID': '33_UK_DocQ_Security_Dwellings'},The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,part-of,annotated +f5a71c7b-e852-40f2-8f88-91cda7902a7e_1,,,"If a new building has a space heating or airconditioning system with an primary energy factor greater than two years, a building automation and control system should be installed.",greater,synthetic +10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,none,annotated +0ea1e862-2434-4fc8-97a2-b076c992ef20_1,,,"The width of an exit must be at least 1,200 millimetres and its free shallow projecting must be at least five.",greater-equal,synthetic +793cb939-b3d9-46eb-ae65-71a4d5c8031b_9,,,Where the community heating primary circuit is within the private curtilage of the dwelling (but not within a carport or retaining rail) at least one space is a standard parking bay that can be widened to 3.3m.,not-part-of,synthetic +77be05f2-cd8c-4d35-85e4-6637b999d8e7,The value of the consequential improvement works should not be less than 10 of the value of the principal works.,{'ID': '452_UK_DocM_V2_AccessAndUseOfBuildings'},The value of the consequential improvement works should not be less than 10 of the value of the principal works.,part-of,annotated +103f99ad-884b-4bae-9f22-ccb1c5bc3d26_3,,,"In an open garage of no more than 3 appliance, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",less-equal,synthetic +2cfc6994-0cbe-4bdf-9ed5-af8d40c79d8c,The load shall be stated on this sign in kg/m2.,{'ID': '22_Finnish_StabilityOfStructures'},The load shall be stated on this sign in kg/m2.,necessity,annotated +33ed3038-99a6-4b2d-906a-a1db21f2d898,"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",{'ID': '250_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",none,annotated +17fba530-c42b-4eeb-85dd-16da0bacc49c,"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",{'ID': '470_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded.",necessity,annotated +f2e57c55-e340-4fa2-87c5-03f4bf8e5942,"Where the dwelling is defined as wheelchair adaptable, it should be easy to install a lift.",{'ID': '82_UK_DocM_V1_AccessAndUseOfBuildings'},"Where the dwelling is defined as wheelchair adaptable, it should be easy to install a lift.",selection,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_6,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 8.5m2 in difference in light reflectance value; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic +5ca184fa-e100-4f97-957d-e37ae944786f_4,,,The ventilation of installing electric vehicle charge points and cable routes is not more than 25 decibels of the total capital cost of the major renovation.,less-equal,synthetic +56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3_4,,,Storage premises with a quality of the installation exceeding 2.4 metres are not permitted within the building.,greater,synthetic +0262f6e5-21bc-4312-9388-8ac93b79416d_10,,,The minimum full vicinity of the absorption chillers should be no worse than 1100mm.,greater-equal,synthetic +d3fc8c9b-c23a-4188-8723-369caa90453c,"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",{'ID': '124_Finnish_EnergyEfficiency'},"The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",part-of,annotated +c3cfbf29-a95f-4453-a7de-a8f6e4ca2ea8,"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",{'ID': '152_Finnish_Health-WaterAndSewerage'},"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",selection,annotated +b02f9b87-d934-4c2f-8a59-b3b8c0a7be17,"Instantaneous or snapshot CO2 readings can be misleading, so several measurements should be taken throughout the day.",{'ID': '124_UK_DocF_V2_Ventilation'},"Instantaneous or snapshot CO2 readings can be misleading, so several measurements should be taken throughout the day.",selection,annotated +7d877df3-9aa7-4dff-a64d-5356a66c944d_6,,,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a side exceeding 100 and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",greater,synthetic +07565483-7508-43fc-b15e-82d95881e81e,"The average dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated using the same averaging methodology.",{'ID': '70_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The average dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated using the same averaging methodology.",necessity,annotated +11710051-ee66-4fe2-83f9-85ea53aa5b03,"The ventilation system shall produce an adequate outdoor air flow to the building and extract from indoor air substances that are harmful to health, excessive humidity, odours with adverse effects on comfort and indoor air impurities arising from humans, construction products and activities.",{'ID': '46_Finnish_Health-IndoorClimateAndVentilation'},"The ventilation system shall produce an adequate outdoor air flow to the building and extract from indoor air substances that are harmful to health, excessive humidity, odours with adverse effects on comfort and indoor air impurities arising from humans, construction products and activities.",necessity,annotated +f0c72b35-5a0a-4554-8713-96f6f73a67f1,A cube with edges of no more than 50 millimetres may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,{'ID': '51_Finnish_SafetyOfUse'},A cube with edges of no more than 50 millimetres may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,less-equal,annotated +12907c6f-e734-436d-a7de-c8a1626fbe92,"Both:the area of rooflights exceeds 20 of the area of the roof, and the design solar load exceeds 25W/m2.",{'ID': '496_UK_DocM_V2_AccessAndUseOfBuildings'},"Both:the area of rooflights exceeds 20 of the area of the roof, and the design solar load exceeds 25W/m2.",selection,annotated +9fee4426-8d7f-40f9-bc6f-562a5d3fd9b4,"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",{'ID': '144_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",none,annotated +fb1da22f-8ddb-4399-b441-64dca68da9af,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",{'ID': '218_Finnish_FireSafety'},"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",part-of,annotated +710ef992-e187-4b1a-894b-e0e222f54359,"NOTE: For grid-supplied electricity, a CO2 emission factor of 0.136kgCO2/kWh and primary energy factor of 1.501kWhPE/kWh should be used.",{'ID': '199_UK_DocM_V2_AccessAndUseOfBuildings'},"NOTE: For grid-supplied electricity, a CO2 emission factor of 0.136kgCO2/kWh and primary energy factor of 1.501kWhPE/kWh should be used.",selection,annotated +c952db0f-b605-4335-8d56-97fc339ad5ba_1,,,All 20 litres per second organic substances of the installation and commissioning checklist should be completed.,equal,synthetic +3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60_6,,,The approach route is a minimum of 900mm wide with a maximum long of 1.501kWhPE/kWh.,less-equal,synthetic +bf798097-bb99-42d0-a73f-8cebab8fbeb8_8,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the frequency of the steps must be no more than 0.7W/(m2K) and the tread must be no less than 300 millimetres.",less-equal,synthetic +46f5be2a-1514-420b-bc39-331fc6e0d2df_3,,,"The heat exchanger area, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the output, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,synthetic +72e7ed0c-9e73-46b2-a919-20f3fea337fd,"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",{'ID': '56_Finnish_FireSafety'},"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",part-of,annotated +a94b6b4f-a05e-403e-bbca-ebe1b94e38a1,"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",{'ID': '470_UK_DocM_V2_AccessAndUseOfBuildings'},"The area of sloping surfaces such as staircases, galleries, raked auditoria and tiered terraces should be taken as their area on plan.",selection,annotated +7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88_1,,,The resilient layer should be to the full height of the door and One design temperature difference of the doorset.,equal,synthetic +7c74b365-6fdd-494d-9675-3ae036c55348,Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,{'ID': '82_Finnish_SafetyOfUse'},Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,necessity,annotated +20518e80-6f7e-457f-8c5a-59fa4c0eb324,"When calculating the heat loss for a buildings design solution, the design value shall be used as the value of the air leakage rate figure for the building envelope.",{'ID': '137_Finnish_EnergyEfficiency'},"When calculating the heat loss for a buildings design solution, the design value shall be used as the value of the air leakage rate figure for the building envelope.",part-of,annotated +45338082-ca66-418b-8fe1-8f2be926f330_5,,,A network distribution point of no more than 1 in 40 may pass between the stair steps.,less-equal,synthetic +10b2bf58-18df-46ee-a766-ed11eec6f42b,"Humus soil, organic substances decomposing or rotting from moisture or building waste must not be left under new buildings, in their crawl spaces and in their gravel backfills functioning as a drainage layer.",{'ID': '45_Finnish_Health-Humidity'},"Humus soil, organic substances decomposing or rotting from moisture or building waste must not be left under new buildings, in their crawl spaces and in their gravel backfills functioning as a drainage layer.",necessity,annotated +c2c49207-78b3-42b0-8b61-ad506f5a80e2,"In hard water areas, suitable measures should be taken to treat the feed water to water heaters and the hot water circuit of combination boilers to reduce lime-scale accumulation.",{'ID': '381_UK_DocL_V1_ConsrvationOfFuelAndPower'},"In hard water areas, suitable measures should be taken to treat the feed water to water heaters and the hot water circuit of combination boilers to reduce lime-scale accumulation.",necessity,annotated +0085ecdd-f2f0-45f5-948d-ded697c69866,"In addition, on one side of the toilet seat there shall be a free space of at least 800 millimetres.",{'ID': '44_Finnish_Accessibility'},"In addition, on one side of the toilet seat there shall be a free space of at least 800 millimetres.",part-of,annotated +72d7716f-7e3e-442c-9e42-14d4b19e18e3_4,,,"A Fixings that is being connected to a new building should not have a combined dead,imposed and wind loads for delivered heat to the building which is greater than 0.350kgCO2/kWh.",not-part-of,synthetic +31e6f85a-97ea-4224-9144-bc3d1daad96d,Consideration should be given to providing a low level urinal for children in male washrooms.,{'ID': '174_UK_DocM_V2_AccessAndUseOfBuildings'},Consideration should be given to providing a low level urinal for children in male washrooms.,none,annotated +0aaf71f0-a482-4a72-a407-0d6db79c7f6f_8,,,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than one metre of non-fire-compartmented water meters that essentially relate to the business of the building may be located on the level of second storey.",less-equal,synthetic +baee716c-b8c2-4500-b4de-63fa11f007b1_0,,,A minimum of one in 1.3 seconds of the remaining WC pans must have access to cable routes.,equal,synthetic +c3cfbf29-a95f-4453-a7de-a8f6e4ca2ea8,"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",{'ID': '152_Finnish_Health-WaterAndSewerage'},"If sand, sludge, grease, petrol, oil or other detrimental physical or chemical substances may end up in the sewerage system or network or in the environment, the sewerage system shall be equipped with a separator or treatment device.",selection,annotated +eeb4239f-3819-475c-ad20-756bed80c4ff_2,,,"In reference heat loss calculations, the value used as the service of the buildings ventilation system shall be 150mm.",equal,synthetic +113b8bf8-1856-45f5-a54b-d65ef100b437,"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",{'ID': '262_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",necessity,annotated +208b093d-361f-4aec-819d-4abca4e72c68,"in an evacuation area where the maximum number of occupants is 60, the second exit may be no less than 900 millimetres in width.",{'ID': '216_Finnish_FireSafety'},"in an evacuation area where the maximum number of occupants is 60, the second exit may be no less than 900 millimetres in width.",equal,annotated +ee0c8c7c-c65e-4403-92e6-628fd680f3bf,Any panel within the doorset should be at least 15mm thick.,{'ID': '30_UK_DocQ_Security_Dwellings'},Any panel within the doorset should be at least 15mm thick.,none,annotated +1913381b-a2cc-496e-9168-82ccf2a01d50_4,,,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the internal temperature of the heat emitters to be installed does not exceed 0.15m/s.",less-equal,synthetic +009e12eb-db83-485c-9ffc-e1f462251109_0,,,Each air terminal should have a living quarters of at least 70 kN of the free area of its associated duct.,greater-equal,synthetic +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c_1,,,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be target fabric energy efficiency rate adequate means.",equal,synthetic +e874f337-2067-4e77-ad32-c3b857f40e7a_6,,,"If the domestic hot water cylinder heat loss exceeds 8.5m2, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",greater,synthetic +d0b6759e-deec-451d-bd7a-ec65b96048be_9,,,"extract air of indoor units 60 persons shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",equal,synthetic +3ca5cb38-b90b-4449-ba14-4268866df8e1_8,,,The water heater is close to the draw-off points and has a opening no greater than 850 millimetres.,less-equal,synthetic +63af9f99-6939-4e8c-a6a9-8b10942e1597,"The handle to at least one window in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",{'ID': '57_UK_DocM_V1_AccessAndUseOfBuildings'},"The handle to at least one window in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",none,annotated +47e50ddf-6174-436d-851b-7ddf46c10ccf,A suitable chemical inhibitor should be added to the primary heating circuit to protect against scale and corrosion.,{'ID': '380_UK_DocL_V1_ConsrvationOfFuelAndPower'},A suitable chemical inhibitor should be added to the primary heating circuit to protect against scale and corrosion.,selection,annotated +f06f7ec1-3b83-4e1a-a421-b09589f2374c,"Provision shall be made to prevent any door or gate: (a) which slides or opens upwards, from falling onto any person; and (b) which is powered, from trapping any person.",{'ID': '114_UK_DocK_ProtectionFromFalling'},"Provision shall be made to prevent any door or gate: (a) which slides or opens upwards, from falling onto any person; and (b) which is powered, from trapping any person.",selection,annotated +fb5d3054-4911-4049-ba09-1c3e80f9c07c,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",{'ID': '29_Finnish_SafetyOfUse'},"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the riser may be no more than 130 millimetres.",none,annotated +9ff8b8fd-5361-4c3d-9a7e-7459276c8df7_8,,,The total supply air flow must not exceed the individual dwellings cost.,less-equal,synthetic +7e34700e-92de-4b00-a820-f4085a2e186c_1,,,"If the domestic hot water circulation heat loss between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 20 degrees Celsius, the wall in question must be class EI 15.",less,synthetic +77be05f2-cd8c-4d35-85e4-6637b999d8e7_9,,,The slope of the consequential improvement works should not be less than 01:20:00 of the value of the principal works.,greater-equal,synthetic +02f5e3fb-7a8b-4a88-a6e5-337cc0835284,"When a new residential building is erected, information about the building must be given to the owner of the building to allow them to use the overheating mitigation strategy effectively.",{'ID': '90_UK_DocO_Overheating'},"When a new residential building is erected, information about the building must be given to the owner of the building to allow them to use the overheating mitigation strategy effectively.",necessity,annotated +981a0996-c526-4ee7-b679-0f17bd5ecd29,"Where it is not feasible to install a space heating system that can operate at this temperature (e.g. where there is insufficient space for larger radiators, or the existing distribution system is provided with higher temperature heat from a low carbon district heat network), the space heating system should be designed to the lowest design temperature possible that will still meet the heating needs of the building.",{'ID': '209_UK_DocM_V2_AccessAndUseOfBuildings'},"Where it is not feasible to install a space heating system that can operate at this temperature (e.g. where there is insufficient space for larger radiators, or the existing distribution system is provided with higher temperature heat from a low carbon district heat network), the space heating system should be designed to the lowest design temperature possible that will still meet the heating needs of the building.",none,annotated +4fc3b5b1-a838-4429-b385-d8e80e6633eb,"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"In the absence of relevant harmonised European Standards, products with a travel exceeding 3m must have a product certificate issued by a Notified Body.",part-of,annotated +33ed3038-99a6-4b2d-906a-a1db21f2d898,"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",{'ID': '250_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",none,annotated +319372c4-2f9b-4594-8150-b9fd2c7670c4,A stack vent located in cold premises shall be thermally insulated.,{'ID': '136_Finnish_Health-WaterAndSewerage'},A stack vent located in cold premises shall be thermally insulated.,necessity,annotated +2f8d4247-e53b-49ae-bd26-c4f1765eaee8_8,,,"Extract air of termination points 2, 3 and 160 millimetres shall not be used as recirculation air.",equal,synthetic +4d80c4d1-08ee-481a-9f9c-e9151ce1094d,"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",{'ID': '421_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",none,annotated +e21fa967-934e-4a29-a66d-252fdbbf928f_7,,,"If the parasitic energy use is unknown, an rate of heat release of twice the rise plus the going (2R G) should be made for any control system.",equal,synthetic +b4cef2a7-038c-4f72-8ea6-20e43d766165,"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",{'ID': '70_UK_DocM_V2_AccessAndUseOfBuildings'},"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",necessity,annotated +3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60_2,,,The approach route is a minimum of 900mm wide with a maximum Extract of five.,less-equal,synthetic +a1f91cfd-21f8-49a4-8468-746f49f4848e,"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",{'ID': '50_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a building that contains more than one dwelling for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",part-of,annotated +5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",selection,annotated +12f51746-1632-4628-9d8a-98dcf58ed9fc,Doors must be capable of opening outwards - in wheelchair adaptable bathrooms the door may open inwards providing that the door can be easily rehung to open outwards (e.g. door stops are planted and easily moved).,{'ID': '116_UK_DocM_V1_AccessAndUseOfBuildings'},Doors must be capable of opening outwards - in wheelchair adaptable bathrooms the door may open inwards providing that the door can be easily rehung to open outwards (e.g. door stops are planted and easily moved).,necessity,annotated +aa41a5d4-c0b1-4da7-84a0-5c2e2738654f,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,{'ID': '89_UK_DocF_V1_Ventilation'},The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than one bedroom.,greater,annotated +aa921550-3c5f-470b-b578-1788f83b49a7,Uplighters mounted at low or floor level can disorientate some visually impaired people and should be avoided.,{'ID': '153_UK_DocM_V2_AccessAndUseOfBuildings'},Uplighters mounted at low or floor level can disorientate some visually impaired people and should be avoided.,selection,annotated +23cff3c3-1251-4c5f-9fd9-8f52d25eb494_6,,,Gasfired boilers and multi-stage oilfired boilers with an level with entry of more than 450mm should have fully modulating burner controls.,greater,synthetic +5b1fe636-d2aa-4382-885e-a4f8a2cae4d4_0,,,"Generally, a thermal element once upgraded should not have a axle group load greater than 20 litres per second.",less-equal,synthetic +825053cb-af5d-43a9-b59b-e2a5ae78ea73_0,,,The efficiency of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the class of associated parking spaces.,greater,synthetic +8fcdc238-3c30-4659-9303-1b126a39b2cd,The design solar load should be reduced by at least 20%.,{'ID': '499_UK_DocM_V2_AccessAndUseOfBuildings'},The design solar load should be reduced by at least 20%.,necessity,annotated +2de867fe-80e7-4617-ad18-36225dd45ab1_10,,,Hinged or pivot windows with an number of appliances of less than 0.15 dm3/s per m2 are not suitable for purge ventilation.,less,synthetic +c0a6d35c-cc20-428b-941d-c3e3e6365c74_7,,,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a include specifications for key materials number of steps of 190 kN.",equal,synthetic +2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb_3,,,"There should be a steps, in the absence of tobacco smoke or other excessive pollutants, of 25 decibels.",equal,synthetic +a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",selection,annotated +208b093d-361f-4aec-819d-4abca4e72c68,"in an evacuation area where the maximum number of occupants is 60, the second exit may be no less than 900 millimetres in width.",{'ID': '216_Finnish_FireSafety'},"in an evacuation area where the maximum number of occupants is 60, the second exit may be no less than 900 millimetres in width.",none,annotated +f41fb8da-16bd-4404-accb-e32727f3736a,"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",{'ID': '69_Finnish_SafetyOfUse'},"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",selection,annotated +2de867fe-80e7-4617-ad18-36225dd45ab1_3,,,Hinged or pivot windows with an Moisture of less than 8.5m2 are not suitable for purge ventilation.,less,synthetic +e43c1e88-be80-42d9-944e-1bf0f0f82479_6,,,Individual flights are: for locations up to 9 metres not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic +4abb3268-3ba6-47e8-a8b7-4676dbaa9a16,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",{'ID': '28_UK_DocK_ProtectionFromFalling'},"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear headroom of 2m, except in doorways.",selection,annotated +ddf21ce1-bd2a-49f5-8ba6-d2bcb5edf575,Taps should be lever operated and capable of easy operation.,{'ID': '97_UK_DocM_V1_AccessAndUseOfBuildings'},Taps should be lever operated and capable of easy operation.,necessity,annotated +36650de0-ef3c-4fd1-8199-f47c0e576076_7,,,the installation of the platform does not exceed 190 kN.,less-equal,synthetic +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_3,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 400 millimetres in air distribution and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic +fdd9e41e-20a5-4f5b-9dae-91653467c3ec,Multiple cooling units should be provided with controls that ensure that the combined plant operates in its most efficient modes.,{'ID': '275_UK_DocM_V2_AccessAndUseOfBuildings'},Multiple cooling units should be provided with controls that ensure that the combined plant operates in its most efficient modes.,necessity,annotated +1de9d3e5-dee3-42c9-b929-80b7936f1642,The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,{'ID': '33_Finnish_Accessibility'},The lift shall provide access to the entrance level and each level with entry to a dwelling or a space serving the use of the building.,selection,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",part-of,annotated +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_4,,,"Where the work concerns a building containing more than three cords, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater,synthetic +05fdde92-d8af-42ad-963b-9019c69a8ab3_7,,,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same air extract rate as the extension used in the external wall should be included within the depth of the intermediate floor structure.",equal,synthetic +54907849-c48f-4267-b5f0-fc7e9279da7c,"For existing dwellings, when carrying out work on an existing system, such as installing or replacing components (e.g. replacing a boiler but retaining the pipework and heat emitters), the energy performance of the new components should be assessed.",{'ID': '409_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when carrying out work on an existing system, such as installing or replacing components (e.g. replacing a boiler but retaining the pipework and heat emitters), the energy performance of the new components should be assessed.",necessity,annotated +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",necessity,annotated +ec419055-6ed3-4dac-9879-748e2d365a26,"Internal building services: where services penetrate the air barrier, holes should be as small as possible and should be core drilled to limit damage.",{'ID': '180_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Internal building services: where services penetrate the air barrier, holes should be as small as possible and should be core drilled to limit damage.",selection,annotated +99a53f17-48cb-4012-a47b-700761e0983b_1,,,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) 0.06 m2 of those fan units must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,equal,synthetic +18797f16-0b56-41e9-a4e6-d4150db4165d,A new building must be built to a minimum standard of total energy performance.,{'ID': '47_UK_DocM_V2_AccessAndUseOfBuildings'},A new building must be built to a minimum standard of total energy performance.,selection,annotated +66b3628a-f0ee-4bc7-93c8-2ae0145a2e78,"In a room with no openable window, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",{'ID': '83_UK_DocF_V1_Ventilation'},"In a room with no openable window, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",selection,annotated +38020928-c137-486e-88d7-c8feec038c99,A building must be provided with a fire wall if it is situated adjacent to a neighbouring building or so close to a neighbouring building that the spread of fire is evident.,{'ID': '189_Finnish_FireSafety'},A building must be provided with a fire wall if it is situated adjacent to a neighbouring building or so close to a neighbouring building that the spread of fire is evident.,none,annotated +b5addb77-be99-45a2-8dc0-fdf5d1969a57,Each column and wall shall be supplied with continuous vertical ties from the foundations to the roof level.,{'ID': '194_Finnish_StabilityOfStructures'},Each column and wall shall be supplied with continuous vertical ties from the foundations to the roof level.,selection,annotated +7134933d-17df-4a8c-b72e-1c09177bad1c,The spread of fire in voids of wall-type building elements must be restricted at least by storey.,{'ID': '130_Finnish_FireSafety'},The spread of fire in voids of wall-type building elements must be restricted at least by storey.,part-of,annotated +12e545d1-64f4-45c9-a520-5b8a003eba0a,"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",{'ID': '85_UK_DocF_V1_Ventilation'},"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",part-of,annotated +ef4ec541-e1a7-47d4-9a83-94715d8900ba,"Where one or more parking spaces are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",{'ID': '89_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where one or more parking spaces are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",selection,annotated +588857f5-9281-4c32-8d83-c98230d5b934,The use of boards with lapped or tongue and groove edges should be considered.,{'ID': '146_UK_DocL_V1_ConsrvationOfFuelAndPower'},The use of boards with lapped or tongue and groove edges should be considered.,necessity,annotated +a235c68f-ae44-4770-b005-4e9d7b659eb7,All cavity walls should have leaves at least 90mm thick and cavities at least 50mm wide.,{'ID': '35_UK_DocA_Structure'},All cavity walls should have leaves at least 90mm thick and cavities at least 50mm wide.,greater-equal,annotated +02648917-f651-4c45-9449-1623cafd6cdc,Public Health Englands Indoor Air Quality Guidelines for Selected Volatile Organic Compounds (VOCs) in the UK should be used.,{'ID': '118_UK_DocF_V2_Ventilation'},Public Health Englands Indoor Air Quality Guidelines for Selected Volatile Organic Compounds (VOCs) in the UK should be used.,necessity,annotated +a1f91cfd-21f8-49a4-8468-746f49f4848e_11,,,"For a building that contains more than 2.4 metres acoustic environment for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",greater,synthetic +29c431ee-ea93-491d-ab13-06418d93c488_1,,,"If air extract rate is greater than 30, manual control is acceptable.",greater,synthetic +2633c957-07b4-4caa-a9d6-5acbac16b0b0_3,,,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and two design value.,equal,synthetic +bf798097-bb99-42d0-a73f-8cebab8fbeb8,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.",{'ID': '21_Finnish_SafetyOfUse'},"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres.",part-of,annotated +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_10,,,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the rise of that installation exceeds 25 decibels of the total cost of the major renovation.",greater,synthetic +2f815a08-db3c-48a6-b248-d69aeac870ee_5,,,"the vertical efficiencies is: a. not more than 180kW, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",less-equal,synthetic +956efc87-87de-4d3c-99fb-dc58eab9353b_5,,,A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a fire resistance time requirement of at least 10 litres per second per person.,greater-equal,synthetic +f4557f58-1986-4de0-b0b8-539906b7fbcb,"For rooflights, U-values should be calculated based on a horizontal position.",{'ID': '130_UK_DocM_V2_AccessAndUseOfBuildings'},"For rooflights, U-values should be calculated based on a horizontal position.",part-of,annotated +a1f91cfd-21f8-49a4-8468-746f49f4848e_3,,,"For a building that contains more than 0.15m/s Manual controls for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",greater,synthetic +f2bf62e6-9577-48b5-b15d-9fe4904acf52,"Where controls are integrated in the heater, the system should be provided with a time switch/programmer and room temperature sensor linked to heater firing and fan speed control.",{'ID': '268_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where controls are integrated in the heater, the system should be provided with a time switch/programmer and room temperature sensor linked to heater firing and fan speed control.",selection,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8_10,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the supports from these spaces does not exceed 1m3/s of the total air flow in the vertical duct.",less-equal,synthetic +42f29765-356f-4d9c-9a73-bc99e7044e07,"People with mobility impairments who arrive as passengers should be able to alight from a vehicle close to the principal entrance, or alternative accessible entrance, of the building in a way that is convenient for entry into the building.",{'ID': '47_UK_DocM_V2_AccessAndUseOfBuildings'},"People with mobility impairments who arrive as passengers should be able to alight from a vehicle close to the principal entrance, or alternative accessible entrance, of the building in a way that is convenient for entry into the building.",selection,annotated +d3654276-d6c6-4f32-af90-2d1040cb536c,Mechanical ventilation with heat recovery systems should be designed to avoid the moist air from the wet rooms recirculating to the habitable rooms.,{'ID': '107_UK_DocF_V1_Ventilation'},Mechanical ventilation with heat recovery systems should be designed to avoid the moist air from the wet rooms recirculating to the habitable rooms.,part-of,annotated +f72a98f3-b7d2-4633-b244-0d7242dfb0c9_4,,,Every single bedroom has a minimum air flow resistance of 20mm and is at least 2.4m wide.,greater-equal,synthetic +7323113d-fcd0-4e19-a24a-c6171ec8c2b7,District heat networks and community heating systems should be designed to accommodate heat meter(s) for each dwelling.,{'ID': '295_UK_DocL_V1_ConsrvationOfFuelAndPower'},District heat networks and community heating systems should be designed to accommodate heat meter(s) for each dwelling.,necessity,annotated +bfdf95da-d422-47cd-83d7-a30a4969f2e6_6,,,"If the internal ties must be centred on the supporting line, the minimum value of the CO2 emission factor, one, will also be applied to internal ties.",greater-equal,synthetic +b4cef2a7-038c-4f72-8ea6-20e43d766165,"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",{'ID': '70_UK_DocM_V2_AccessAndUseOfBuildings'},"The building primary energy rate and building emission rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the CO2 emission factors and primary energy factors have been derived.",none,annotated +5b1fe636-d2aa-4382-885e-a4f8a2cae4d4_5,,,"Generally, a thermal element once upgraded should not have a design greater than 55 degrees Celsius.",less-equal,synthetic +8805ec9f-3f5f-44fc-9078-3ae62439c973,"NOTE: When a single U-value is calculated for a product range of doors, the configuration of the door chosen for the calculation should be the worst performing in the product range.",{'ID': '108_UK_DocL_V1_ConsrvationOfFuelAndPower'},"NOTE: When a single U-value is calculated for a product range of doors, the configuration of the door chosen for the calculation should be the worst performing in the product range.",part-of,annotated +eccc60e7-3d76-46c0-a9d9-e398bf3e475a,The part of the dwelling above ground level should be considered separately.,{'ID': '71_UK_DocF_V1_Ventilation'},The part of the dwelling above ground level should be considered separately.,selection,annotated +7e78bb20-5337-45b1-ad14-de356d35a020,Ventilation ductwork should be made and assembled so as to be reasonably airtight.,{'ID': '299_UK_DocM_V2_AccessAndUseOfBuildings'},Ventilation ductwork should be made and assembled so as to be reasonably airtight.,necessity,annotated +4470dde4-6422-4c13-9781-de68c3e075dc_10,,,"The outdoor total cost of a dwelling unit, however, shall be designed to be a minimum of E.",greater-equal,synthetic +43e26628-8b62-4cc6-91e2-284335df1564_9,,,"In rooms used for sleeping or rest, the fire performance may not exceed 2.5 ties/m2.",less-equal,synthetic +5e226793-2805-41b0-bcb6-49319afaefc7,"If the building has a floor area greater than 150m2, heating should be split into different heating zones and each zone should have separate controls for timing and temperature demand.",{'ID': '258_UK_DocM_V2_AccessAndUseOfBuildings'},"If the building has a floor area greater than 150m2, heating should be split into different heating zones and each zone should have separate controls for timing and temperature demand.",none,annotated +c952db0f-b605-4335-8d56-97fc339ad5ba_5,,,All 1100mm construction of the installation and commissioning checklist should be completed.,equal,synthetic +7f696221-52c9-4c52-8f90-74bd93c51299_2,,,This grippable handrail is 850-1000mm above the pitch line of the flight and standards at least 230mm beyond the top and bottom nosings.,greater-equal,synthetic +e3b85ad6-6132-40d7-86f8-3cc5d44eb12c,One bedroom should be close to an accessible bathroom suitable for a wheelchair user.,{'ID': '100_UK_DocM_V1_AccessAndUseOfBuildings'},One bedroom should be close to an accessible bathroom suitable for a wheelchair user.,equal,annotated +bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,part-of,annotated +29c431ee-ea93-491d-ab13-06418d93c488,"If luminous efficacy is greater than 75 light source lumens per circuit-watt, manual control is acceptable.",{'ID': '338_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If luminous efficacy is greater than 75 light source lumens per circuit-watt, manual control is acceptable.",none,annotated +56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3_11,,,Storage premises with a headroom exceeding 6m are not permitted within the building.,greater,synthetic +5ca184fa-e100-4f97-957d-e37ae944786f,The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,{'ID': '51_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,selection,annotated +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",selection,annotated +06c2e0f7-69c8-47ec-bf31-9902ae9df7cf,"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",{'ID': '109_UK_DocK_ProtectionFromFalling'},"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",selection,annotated +e32bbb47-c826-40c1-8ea4-8c32353d3fd2_2,,,There shall be 16/01/2023 00:00 of waste water pumping station provided for people in the building.,equal,synthetic +3ca5cb38-b90b-4449-ba14-4268866df8e1_10,,,The water heater is close to the draw-off points and has a water vapour resistance no greater than 8.5m2.,less-equal,synthetic +40b40b1b-d1b1-49d8-b9b7-13c5845a169d_2,,,The structure of the control appliance of the plumbing fixture shall be such that its air distribution does not arise above five.,less-equal,synthetic +f19c920a-bd5a-49ac-a111-69fb944271b4,The net heating energy demand for ventilation shall be calculated on the basis of the heating of air after heat recovery to supply air temperature and any heating before heat recovery.,{'ID': '86_Finnish_EnergyEfficiency'},The net heating energy demand for ventilation shall be calculated on the basis of the heating of air after heat recovery to supply air temperature and any heating before heat recovery.,part-of,annotated +cf35d4a4-3170-421b-9be1-b68d928eed1d,"A roof with a pitch greater than 1:8 must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",{'ID': '125_Finnish_SafetyOfUse'},"A roof with a pitch greater than 1:8 must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",part-of,annotated +a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",selection,annotated +5ca184fa-e100-4f97-957d-e37ae944786f_7,,,The dwelling primary energy rate of installing electric vehicle charge points and cable routes is not more than 850 millimetres of the total capital cost of the major renovation.,less-equal,synthetic +13a437c0-918c-47f2-85bd-b80dd69eb027,"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"There are no limits on the design of display windows and similar glazing, but for new buildings their impact must be taken into account in the calculation of primary energy and CO2 emissions.",part-of,annotated +72e7ed0c-9e73-46b2-a919-20f3fea337fd_0,,,"An rails with a potentially flammable or explosive atmosphere must not be located in a motor where there are dwellings, accommodation premises, institutions or assembly and business premises.",not-part-of,synthetic +c7035b48-7244-40a9-a70e-1d244caf72ac,"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",{'ID': '56_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",none,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",part-of,annotated +3724fd47-22f7-432c-81a2-1abcb95c7df2_9,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in eight per cent hot water circuit properties, where there should be no fewer than four.",equal,synthetic +511c1a7f-08b9-48ec-aea6-9b749fdf31a1_5,,,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an EI 30 of appropriately located hot water storage vessel which are suitable for users of wheelchairs and walking frames with wheels.",equal,synthetic +208b093d-361f-4aec-819d-4abca4e72c68_1,,,"in an evacuation area where the total thickness is 24 metres, the second exit may be no less than 900 millimetres in width.",equal,synthetic +66b3628a-f0ee-4bc7-93c8-2ae0145a2e78_5,,,"In a that part with no openable drawings, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",not-part-of,synthetic +51284e52-f2f4-41b5-85e2-3fa96ab8602a,"All users of facilities should be able to locate suitable seating and move safely and easily to and from the seating area and ancillary accommodation, such as lavatories, dining rooms and bedroom suites.",{'ID': '132_UK_DocM_V2_AccessAndUseOfBuildings'},"All users of facilities should be able to locate suitable seating and move safely and easily to and from the seating area and ancillary accommodation, such as lavatories, dining rooms and bedroom suites.",part-of,annotated +a86b58e8-046f-44b7-8e1b-00c876c8c647_6,,,"Parapets in air flow resistance A to proportion and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",less-equal,synthetic +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated +86350df0-a40e-412b-a301-004524d56736,"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",selection,annotated +e43c1e88-be80-42d9-944e-1bf0f0f82479_0,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for load EER up to 390 millimetres not more than 5m long.,less-equal,synthetic +5e51b653-449e-4d00-be19-0e20ecff5c49_8,,,The default habitable area should be 0.3W/m2.,equal,synthetic +8719164e-370a-42f2-9240-0a1b8db1a2c7,Extensive voids must be partitioned in order to restrict the spread of fire.,{'ID': '129_Finnish_FireSafety'},Extensive voids must be partitioned in order to restrict the spread of fire.,selection,annotated +4abb3268-3ba6-47e8-a8b7-4676dbaa9a16_9,,,"For buildings other than dwellings and for common access areas in buildings that contain flats, Provide all means of escape routes with a minimum clear rise between landings of 100 millimetres, except in doorways.",equal,synthetic +6c789809-b1b8-429a-8fe2-8ce16f8a4b54_5,,,Air flows in the continuous working area of a parking garage for motor vehicles shall be designed so that the going does not exceed 230mm.,less-equal,synthetic +c0a6d35c-cc20-428b-941d-c3e3e6365c74,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",{'ID': '25_UK_DocK_ProtectionFromFalling'},"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",greater,annotated +a1f91cfd-21f8-49a4-8468-746f49f4848e_7,,,"For a building that contains more than two years kitchens for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",greater,synthetic +cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",part-of,annotated +7e34700e-92de-4b00-a820-f4085a2e186c_10,,,"If the free gap between facing walls of adjacent glazed balconies or the energy efficiency of the wall to the window of an adjacent fire compartment is less than 55, the wall in question must be class EI 15.",less,synthetic +755b768a-b9d0-4175-8b69-398c399aeac7,It should be possible for information about the building to be easily obtained from a reception point or gathered from notice boards and signs.,{'ID': '86_UK_DocM_V2_AccessAndUseOfBuildings'},It should be possible for information about the building to be easily obtained from a reception point or gathered from notice boards and signs.,necessity,annotated +d342429e-d3fc-46e0-a195-527cfef1fd4b_10,,,"When an existing building with a total useful shallow projecting of over 1,000 millimetres is being extended or the habitable area is being increased, consequential improvements should be installed.",greater,synthetic +50e89a86-e2be-439d-b230-79274cd7199b,Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,{'ID': '81_UK_DocM_V2_AccessAndUseOfBuildings'},Modular and portable buildings with a planned service life of more than two years at a single location should be shown to comply with the energy efficiency requirements.,selection,annotated +c72a5952-2e0b-4d4a-9185-09e4149b6239,The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,{'ID': '114_Finnish_Health-Humidity'},The flooring functioning as waterproofing or waterproofing located underneath the flooring in wet rooms must have a watertight connection with the waterproofing of the wall.,none,annotated +d925c189-860a-4fcb-ae88-d1cf8cc14fb8_6,,,"The thresholds of steps in covered or heated outdoor staircases must be no less than E, and the riser may be no more than 160 millimetres.",greater-equal,synthetic +9ff8b8fd-5361-4c3d-9a7e-7459276c8df7_7,,,The energy savings must not exceed the individual dwellings energy performance.,less-equal,synthetic +cc72106e-9e7f-47cf-8a95-0173a8305dad,"In a new building, the crawl space height must be 0.8 metres on average at the minimum.",{'ID': '83_Finnish_Health-Humidity'},"In a new building, the crawl space height must be 0.8 metres on average at the minimum.",none,annotated +37f01a2c-b944-45a2-a7f4-140d8c03d7ac_7,,,"After rebating, frame components should retain at least 50 of heat sources.",greater-equal,synthetic +19478a13-7457-4dd3-a394-744f826db7b0,"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",{'ID': '127_UK_DocM_V1_AccessAndUseOfBuildings'},"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",greater-equal,annotated +c2e0629d-350b-45b8-9e9e-d58be1780f12_2,,,"If the playgrounds has no Beading, it should be treated as having one bedroom when calculating the ventilation required for the purposes of meeting the ventilation standards.",not-part-of,synthetic +3153d771-404e-4a54-ac05-ed1b75e37506_6,,,"Gangways should not be less than 1100mm total supply air flow unless used by not more than 50 persons, in which case gangways should be a minimum of 90.",greater-equal,synthetic +419892bb-5044-4c63-a8ba-7747ad52c23d,"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",{'ID': '195_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",necessity,annotated +082c7ed9-3579-48c2-a0d2-076f1edd647c_0,,,"Each of the 0.7 metres service of the centrally hinged window should be assessed as a single side, bottom or top hung window.",equal,synthetic +33d3a432-5793-4102-ba93-da485c334abd,The termination points of cable duct should be sited where access to maintain in future is unrestricted.,{'ID': '113_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The termination points of cable duct should be sited where access to maintain in future is unrestricted.,part-of,annotated +103f99ad-884b-4bae-9f22-ccb1c5bc3d26_0,,,"In an open garage of no more than 20 degrees Celsius lighting, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",less-equal,synthetic +0085ecdd-f2f0-45f5-948d-ded697c69866,"In addition, on one side of the toilet seat there shall be a free space of at least 800 millimetres.",{'ID': '55_Finnish_Accessibility'},"In addition, on one side of the toilet seat there shall be a free space of at least 800 millimetres.",necessity,annotated +079db365-cfed-474e-9329-25349ac0db4a_8,,,"In connection with the door of an outside space of an individual dwelling the edges outside the door may be more than 6m if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",greater,synthetic +451e7c91-d39f-4401-a0e3-5ab455ab0442,"The approach route should be level, gently sloping, or, where necessary, ramped.",{'ID': '15_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be level, gently sloping, or, where necessary, ramped.",necessity,annotated +f0c72b35-5a0a-4554-8713-96f6f73a67f1_3,,,A cube with indoor and outdoor conditions of no more than 0.1m2 may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,less-equal,synthetic +bde1697a-20c9-4f15-a63c-5be323a058c1,Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,{'ID': '90_Finnish_Health-IndoorClimateAndVentilation'},Any connection of two or more air handling units to the same duct or chamber shall be designed so that the pressures of the rooms or the directions of air flow between the rooms and in the ductworks do not change when the air flows of the units are being controlled.,none,annotated +ef4f54b6-1099-4404-9fa2-d0c0d5e55543_6,,,The Extract must not exceed the individual dwellings anthracite figure.,less-equal,synthetic +e4fb8d18-8dbc-4351-a2df-d87f880f476a_11,,,The limits for balconies is 13l/s that of the load-bearing structures of the storey.,equal,synthetic +2ff58135-b89d-40d1-a145-51aad9e5a942_9,,,"The landing in front of the outside door shall be at least 21 C proportion and at least 1,500 millimetres long.",greater-equal,synthetic +f9de28ac-45bb-4400-9d9f-8afee73bd2e3_2,,,The rise should not exceed 0.7W/(m2K) of dwelling floor area.,less-equal,synthetic +043258d7-d35e-42d9-87c5-b83565c39ad6,"Before elements are concealed by subsequent work, an onsite audit should be undertaken to confirm that the designed details have been constructed.",{'ID': '133_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Before elements are concealed by subsequent work, an onsite audit should be undertaken to confirm that the designed details have been constructed.",selection,annotated +88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",selection,annotated +793cb939-b3d9-46eb-ae65-71a4d5c8031b_0,,,Where the window unit is within the private curtilage of the dwelling (but not within a carport or joints) at least one space is a standard parking bay that can be widened to 3.3m.,not-part-of,synthetic +baee716c-b8c2-4500-b4de-63fa11f007b1_10,,,A minimum of one in two of the remaining Door furniture must have access to cable routes.,equal,synthetic +b2b81097-97a3-41c2-922c-ffec3e2dd8c0,Turning circle should be clear of top step of any adjacent flight of steps.,{'ID': '87_UK_DocM_V1_AccessAndUseOfBuildings'},Turning circle should be clear of top step of any adjacent flight of steps.,necessity,annotated +45338082-ca66-418b-8fe1-8f2be926f330_0,,,A parking garage of no more than 25mm may pass between the stair steps.,less-equal,synthetic +8edf6848-bdc2-4970-8328-5a24d69a2f0d,"Unit length should be measured through midline of the worktop, not the front or rear edge.",{'ID': '94_UK_DocM_V1_AccessAndUseOfBuildings'},"Unit length should be measured through midline of the worktop, not the front or rear edge.",necessity,annotated +73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",part-of,annotated +6a41a473-bd3c-4e38-a093-094b3fdae388_10,,,At least one in every 01:08:00 remaining malfunction detector must be provided with cable routes.,equal,synthetic +d0927095-9e43-4ce4-a740-d5df69dc1dc3_1,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and travel distance 500 millimetres air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +38cd3221-7fc9-4462-be20-78b16a4309d3_10,,,The class of openings in the newly created dwelling should not be more than 25W/m2 of the total floor area.,less-equal,synthetic +d43e4877-601c-43eb-9d33-96945754374b,Good acoustic design should be employed to achieve an acoustic environment that is neither too reverberant nor too absorbent so that announcements and conversations can be heard clearly.,{'ID': '99_UK_DocM_V2_AccessAndUseOfBuildings'},Good acoustic design should be employed to achieve an acoustic environment that is neither too reverberant nor too absorbent so that announcements and conversations can be heard clearly.,selection,annotated +c0a6d35c-cc20-428b-941d-c3e3e6365c74,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",{'ID': '25_UK_DocK_ProtectionFromFalling'},"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",part-of,annotated +e9d02df9-2fcb-4acc-bd08-18a4348cd823,"If people need to obtain tickets for pay and display parking, the ticket dispensing machines should be located in a way that allows a person in a wheelchair, or a person of short stature, to gain access close to the machine and reach the payment and ticket dispensing functions.",{'ID': '46_UK_DocM_V2_AccessAndUseOfBuildings'},"If people need to obtain tickets for pay and display parking, the ticket dispensing machines should be located in a way that allows a person in a wheelchair, or a person of short stature, to gain access close to the machine and reach the payment and ticket dispensing functions.",necessity,annotated +079db365-cfed-474e-9329-25349ac0db4a_10,,,"In connection with the door of an outside space of an individual dwelling the from the inside face of the wall outside the door may be more than three seconds if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",greater,synthetic +aa41a5d4-c0b1-4da7-84a0-5c2e2738654f_10,,,The total number of ventilators installed in the dwellings habitable rooms and kitchens should be at least the following: Five ventilators if the dwelling has more than 2m barrier.,greater,synthetic +afd03eb1-8356-4755-a764-6869d0ac4171,"Reasonable provision should be made for people to (a) gain access to; and (b) use, the dwelling and its facilities.",{'ID': '9_UK_DocM_V1_AccessAndUseOfBuildings'},"Reasonable provision should be made for people to (a) gain access to; and (b) use, the dwelling and its facilities.",none,annotated +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated +c06bb553-d8f1-47f5-ab33-cfdebb6bca52,"When a building undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",{'ID': '117_UK_DocM_V2_AccessAndUseOfBuildings'},"When a building undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered.",selection,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab,"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",{'ID': '83_Finnish_SafetyOfUse'},"The free opening of the vertical hatch or window of an emergency exit must be at least 600 millimetres in height and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",part-of,annotated +793cb939-b3d9-46eb-ae65-71a4d5c8031b_3,,,Where the free space is within the private curtilage of the dwelling (but not within a carport or hard water areas) at least one space is a standard parking bay that can be widened to 3.3m.,not-part-of,synthetic +cea6e7bd-c494-4146-9f81-3fd2ed64a2a6,The slope of the floor surface in the seating area and access route may not exceed 8 per cent (1:12.5).,{'ID': '119_Finnish_SafetyOfUse'},The slope of the floor surface in the seating area and access route may not exceed 8 per cent (1:12.5).,less-equal,annotated +e32bbb47-c826-40c1-8ea4-8c32353d3fd2,There shall be adequate means of ventilation provided for people in the building.,{'ID': '15_UK_DocF_V1_Ventilation'},There shall be adequate means of ventilation provided for people in the building.,equal,annotated +72e7ed0c-9e73-46b2-a919-20f3fea337fd,"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",{'ID': '56_Finnish_FireSafety'},"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",part-of,annotated +e21fa967-934e-4a29-a66d-252fdbbf928f_4,,,"If the parasitic energy use is unknown, an constraints of 70 kN should be made for any control system.",equal,synthetic +46f5be2a-1514-420b-bc39-331fc6e0d2df,"The dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and target fabric energy efficiency rate, respectively.",{'ID': '356_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and target fabric energy efficiency rate, respectively.",less-equal,annotated +dcc583b1-8c4c-42cf-a1ed-e8907de56254_7,,,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the relationship must be no less than 190 kN.",greater-equal,synthetic +09b2a395-5293-4b7d-82d4-5312482d59e9_8,,,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 900mm building emission rate from any projecting corner.",greater-equal,synthetic +082c7ed9-3579-48c2-a0d2-076f1edd647c_11,,,"Each of the 0.7 SEER of the centrally hinged window should be assessed as a single side, bottom or top hung window.",equal,synthetic +3724fd47-22f7-432c-81a2-1abcb95c7df2_0,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in 500kW insulating material properties, where there should be no fewer than four.",equal,synthetic +561480d1-56e5-41be-a56d-f2f2222bcb17,"Any damage, such as tears, should be repaired before boarding.",{'ID': '185_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Any damage, such as tears, should be repaired before boarding.",selection,annotated +c5c5365f-273f-4c29-8491-4f50aabc3b78,"Manual controls for powered entrance doors should be clearly distinguishable against the background and not located so that a person, having used the control, needs to move to avoid contact with the door as it opens.",{'ID': '74_UK_DocM_V2_AccessAndUseOfBuildings'},"Manual controls for powered entrance doors should be clearly distinguishable against the background and not located so that a person, having used the control, needs to move to avoid contact with the door as it opens.",part-of,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_7,,,"The free opening of the vertical hatch or window of an emergency exit must be at least three metres in mechanical ventilation and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic +36650de0-ef3c-4fd1-8199-f47c0e576076_4,,,the fire performance of the platform does not exceed A.,less-equal,synthetic +72e7ed0c-9e73-46b2-a919-20f3fea337fd,"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",{'ID': '56_Finnish_FireSafety'},"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",none,annotated +e8340500-38b6-461b-b00d-d3aa44ac1f0b_6,,,The condition of the water available from the hot water system may not exceed 50 m.,less-equal,synthetic +d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",none,annotated +78b82c71-b2a9-41ea-a5f9-45bdba64fa7a,The correct operation of each control function should be tested where it is practical.,{'ID': '218_UK_DocF_V1_Ventilation'},The correct operation of each control function should be tested where it is practical.,part-of,annotated +956efc87-87de-4d3c-99fb-dc58eab9353b,"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",{'ID': '42_Finnish_Accessibility'},"A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a diameter of at least 1,500 millimetres.",none,annotated +6d190990-05e3-4496-8945-320d5937c7b8,Controls should be provided for ventilators so that the ventilation in each room can be adjusted.,{'ID': '58_UK_DocF_V2_Ventilation'},Controls should be provided for ventilators so that the ventilation in each room can be adjusted.,necessity,annotated +5305da48-b810-4fd8-a0b3-7520f89ff401,"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",{'ID': '194_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",selection,annotated +fdd9f39e-e397-4172-b4da-3d213a30f987,On-site electricity generation should be provided with automated controls that support the design of the system and the intended use.,{'ID': '335_UK_DocM_V2_AccessAndUseOfBuildings'},On-site electricity generation should be provided with automated controls that support the design of the system and the intended use.,selection,annotated +7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8_11,,,"For sizes of cylinder not listed, the street areas from the cylinder should not exceed 4, where V is the volume in litres.",less-equal,synthetic +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_10,,,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 300mm in operation, these must be accessible via the interior.",greater,synthetic +e15250c0-1279-4d29-a1ec-31560b045007_5,,,Turning circle of basement storeys must not be connected to fire and smoke-proof seats.,not-part-of,synthetic +51284e52-f2f4-41b5-85e2-3fa96ab8602a,"All users of facilities should be able to locate suitable seating and move safely and easily to and from the seating area and ancillary accommodation, such as lavatories, dining rooms and bedroom suites.",{'ID': '132_UK_DocM_V2_AccessAndUseOfBuildings'},"All users of facilities should be able to locate suitable seating and move safely and easily to and from the seating area and ancillary accommodation, such as lavatories, dining rooms and bedroom suites.",none,annotated +6414854d-01f9-481f-a7f4-c4581e48d8b1_2,,,Special safety features are not necessary if the lead boiler is not more than (16.66 8.33 V0.4)/(1000 24) long.,less-equal,synthetic +7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8_7,,,"For sizes of cylinder not listed, the roof windows from the cylinder should not exceed 300mm, where V is the volume in litres.",less-equal,synthetic +a387fcb8-ead2-4094-9be9-72d783468b33_6,,,"If the protective part of windows, roof windows, rooflights and doors exceeds 20 points of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",greater,synthetic +703e5c71-bd54-4267-acf4-fa7db1e70d49,"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",{'ID': '67_Finnish_Accessibility'},"Any sound system in an auditorium, a restaurant, a conference facility, a facility for festive occasions, a teaching facility or other similar assembly facility or a public service facility shall have an induction loop or a similar sound transmission system.",part-of,annotated +ed2cca4a-50f7-470d-9752-dd8722385a24,"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",{'ID': '80_Finnish_SafetyOfUse'},"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",necessity,annotated +4e119abd-0cf7-4c60-9c7b-1083f9b46280,"NOTE: If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise attenuating background ventilator should be fitted.",{'ID': '85_UK_DocF_V2_Ventilation'},"NOTE: If an exposed facade is close to an area of sustained and loud noise (e.g. a main road), then a noise attenuating background ventilator should be fitted.",none,annotated +eccd4f77-ef4a-41fd-a22a-620c84fdddd4_6,,,There is a minimum of 55 of worktop to at least inner surfaces of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,greater-equal,synthetic +ec1783bd-3e59-42d6-9709-cd0cc7d2c365,The air flow resistance of all components should be considered when specifying ventilation systems.,{'ID': '55_UK_DocF_V1_Ventilation'},The air flow resistance of all components should be considered when specifying ventilation systems.,part-of,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8_8,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for presence 0.052083333 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic +783c19fa-0ef2-466f-b3e9-d4690e34ac5f,Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,{'ID': '214_UK_DocL_V1_ConsrvationOfFuelAndPower'},Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances.,selection,annotated +8e9ef8dc-18bd-4877-98cd-556aa4adee8f,"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",{'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'},"Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances.",none,annotated +8e83d841-dcab-479c-a131-a5ce80cd416d,The fan speed should be set to achieve the desired continuous flow rate.,{'ID': '197_UK_DocF_V1_Ventilation'},The fan speed should be set to achieve the desired continuous flow rate.,necessity,annotated +cccbc1ea-27be-4d7b-b53c-3cb467a51020,"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",{'ID': '220_UK_DocM_V2_AccessAndUseOfBuildings'},"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",selection,annotated +c952db0f-b605-4335-8d56-97fc339ad5ba,All three parts of the installation and commissioning checklist should be completed.,{'ID': '262_UK_DocF_V1_Ventilation'},All three parts of the installation and commissioning checklist should be completed.,part-of,annotated +511c1a7f-08b9-48ec-aea6-9b749fdf31a1,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an adequate number of appropriately located toilet facilities which are suitable for users of wheelchairs and walking frames with wheels.",{'ID': '51_Finnish_Accessibility'},"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an adequate number of appropriately located toilet facilities which are suitable for users of wheelchairs and walking frames with wheels.",selection,annotated +3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,necessity,annotated +9c9a27b6-b4be-4946-854a-c46ee812140c,"In general, accessible bedrooms should be no less advantageously situated than other bedrooms.",{'ID': '142_UK_DocM_V2_AccessAndUseOfBuildings'},"In general, accessible bedrooms should be no less advantageously situated than other bedrooms.",selection,annotated +ad30824c-74be-4f4f-916a-dfe1e0a89205,"It should be noted that double buggies are wider than wheelchairs and that, where relevant to the building type, this should be borne in mind when determining an appropriate effective clear width for an entrance door.",{'ID': '67_UK_DocM_V2_AccessAndUseOfBuildings'},"It should be noted that double buggies are wider than wheelchairs and that, where relevant to the building type, this should be borne in mind when determining an appropriate effective clear width for an entrance door.",selection,annotated +339fc78c-a2f2-481c-a410-3aeb41e24b8a_3,,,Solid walls constructed of coursed brickwork or blockwork should be at least as projection as 50 of the storey height.,greater-equal,synthetic +9b908e68-0f92-4883-9fd2-7fe013848b15,"Where a gas combination boiler is used, the boiler type should be selected to modulate down to the typical heating load of the dwelling.",{'ID': '237_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a gas combination boiler is used, the boiler type should be selected to modulate down to the typical heating load of the dwelling.",part-of,annotated +0da52584-1b37-48b5-840f-3795ae695275_5,,,the minimum clear dimensions of the platform are: 1100mm wide and 65 degrees Celsius open outwards where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +b63dcef6-1840-4e9e-ad51-f8fc481fe856,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",{'ID': '36_UK_DocA_Structure'},"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",none,annotated +8aa4b706-1659-4e30-a4fe-e7f33efe3241_4,,,All certain proportion exhaust outlets of the compliance checklist should be completed.,equal,synthetic +6b2f3ca5-8cea-4616-8679-438446bc6233,"Since doors are potential barriers, their use should be avoided whenever appropriate.",{'ID': '88_UK_DocM_V2_AccessAndUseOfBuildings'},"Since doors are potential barriers, their use should be avoided whenever appropriate.",selection,annotated +e1f1aeb9-7453-4b6b-b3f1-6049d711868a,The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,{'ID': '156_Finnish_FireSafety'},The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,necessity,annotated +6075de3c-d339-4ba4-9945-990480975615_11,,,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than 2 leaf of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",greater-equal,synthetic +cc72106e-9e7f-47cf-8a95-0173a8305dad_1,,,"In a new building, the crawl space effective rated output must be 0.2 on average at the minimum.",greater-equal,synthetic +d6a2b6b7-57d2-449d-89f5-56d3df4755e2,Any radiator or towel rail should be clear of all access zones.,{'ID': '56_UK_DocM_V1_AccessAndUseOfBuildings'},Any radiator or towel rail should be clear of all access zones.,none,annotated +ef4f54b6-1099-4404-9fa2-d0c0d5e55543_1,,,The long must not exceed the individual dwellings rated output.,less-equal,synthetic +7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88,The resilient layer should be to the full height of the door and 600mm either side of the doorset.,{'ID': '15_UK_DocQ_Security_Dwellings'},The resilient layer should be to the full height of the door and 600mm either side of the doorset.,necessity,annotated +5ca184fa-e100-4f97-957d-e37ae944786f,The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,{'ID': '51_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},The cost of installing electric vehicle charge points and cable routes is not more than 7% of the total capital cost of the major renovation.,part-of,annotated +2f0f22aa-06d3-478d-a777-5aca5c2fb5c1,"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",{'ID': '120_UK_DocK_ProtectionFromFalling'},"For sliding doors and gates, provide both of the following: (i) a stop or other effective means to prevent them coming off the end of the track; (ii) a retaining rail to prevent doors and gates falling if the suspension system fails or the rollers leave the track.",selection,annotated +75c60084-6878-472d-8694-e8739e0dd76c_9,,,The width of access routes in assembly areas with a sizes of 15 must be at least 900 millimetres.,equal,synthetic +81314489-dcd9-410f-9b15-595b87e7c8f9,"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",{'ID': '14_UK_DocQ_Security_Dwellings'},"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",selection,annotated +113b8bf8-1856-45f5-a54b-d65ef100b437,"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",{'ID': '262_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If a gas-fired combination boiler is installed in an existing dwelling, at least one of the following energy efficiency measures, appropriate to the system, should be installed.",part-of,annotated +8c4a09c5-1eb2-4a41-86d9-b69c031b4592,Ground arrays including header pipes and manifolds should be flushed as one system to remove all debris and purged to remove all air.,{'ID': '384_UK_DocL_V1_ConsrvationOfFuelAndPower'},Ground arrays including header pipes and manifolds should be flushed as one system to remove all debris and purged to remove all air.,part-of,annotated +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",none,annotated +a86b58e8-046f-44b7-8e1b-00c876c8c647,"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",{'ID': '30_Finnish_StabilityOfStructures'},"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",necessity,annotated +8207751f-13b8-4fe3-9bfe-4423093d4905,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,{'ID': '26_Finnish_AcousticEnvironment'},A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,necessity,annotated +baee716c-b8c2-4500-b4de-63fa11f007b1_3,,,A minimum of one in 16/01/2023 00:00 of the remaining Water pipes must have access to cable routes.,equal,synthetic +f4b0b5b8-ab26-46a2-8028-c279958fa927,"Any justification and strategy should be in line with the approved airtightness testing methodology, CIBSEs TM23.",{'ID': '355_UK_DocM_V2_AccessAndUseOfBuildings'},"Any justification and strategy should be in line with the approved airtightness testing methodology, CIBSEs TM23.",necessity,annotated +45338082-ca66-418b-8fe1-8f2be926f330_4,,,A fire compartments of no more than 160 millimetres may pass between the stair steps.,less-equal,synthetic +1ebce0c9-705c-47ee-8429-e83cfbed72db,"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",{'ID': '103_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",part-of,annotated +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",none,annotated +45adb0b6-63ee-4f42-b6a3-8fc396221c67_3,,,The length of the insulation plus any required air gap should be at least to the internal temperature of the rafters.,greater-equal,synthetic +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_11,,,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the value of that installation exceeds 8 per cent (1:12.5) of the total cost of the major renovation.",greater,synthetic +984c252b-74f4-4d85-9080-1c8ae1851eca,"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",{'ID': '113_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",none,annotated +8364a5f1-f80e-484c-9f38-bffc6f4c1876_9,,,"Where communal parking is provided to blocks of flats, at least 0.15 dm3/s per m2 standard access points is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",greater-equal,synthetic +e43c1e88-be80-42d9-944e-1bf0f0f82479_8,,,Individual flights are: for gradients up to 1:15 not more than 1.2W/(m2K) surface area; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic +29232335-402c-4ed9-af74-fd093ac22e28_1,,,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least either side 3m.,greater-equal,synthetic +3c28dbd6-8a3d-4ede-ae08-89e4b5d69d60_5,,,The approach route is a minimum of 900mm wide with a maximum directions of 30m2.,less-equal,synthetic +eccd4f77-ef4a-41fd-a22a-620c84fdddd4_0,,,There is a minimum of one of worktop to at least calculation of primary energy and CO2 emissions of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,greater-equal,synthetic +8d11b1a7-732a-4153-9564-3f35cc111cb6,A dwelling that is only a basement should be treated as a single-storey dwelling above ground level.,{'ID': '74_UK_DocF_V1_Ventilation'},A dwelling that is only a basement should be treated as a single-storey dwelling above ground level.,selection,annotated +38cd3221-7fc9-4462-be20-78b16a4309d3_9,,,The entrance level of openings in the newly created dwelling should not be more than 15mm of the total floor area.,less-equal,synthetic +6b2f3ca5-8cea-4616-8679-438446bc6233,"Since doors are potential barriers, their use should be avoided whenever appropriate.",{'ID': '88_UK_DocM_V2_AccessAndUseOfBuildings'},"Since doors are potential barriers, their use should be avoided whenever appropriate.",none,annotated +5fa7daca-cb50-4397-a736-617e52d30187_1,,,"If efficiencies at below 30% are required and unavailable, the constraints may be taken as equal to that at 600kg/m3.",equal,synthetic +203faa23-7b71-47c9-a6e5-2333ac45389e_7,,,"The facade area of the indoor steps of dwelling units and living quarters may be no more than 100, and the tread must be no less than 250 millimetres.",less-equal,synthetic +6bf41e87-d7c1-42a5-bf0d-67c711a21753,"Additionally, a sign identifying the floor reached should be provided on each landing in a location that can be easily seen from the lifting device and is designed so that it contrasts visually with its surrounding.",{'ID': '105_UK_DocM_V2_AccessAndUseOfBuildings'},"Additionally, a sign identifying the floor reached should be provided on each landing in a location that can be easily seen from the lifting device and is designed so that it contrasts visually with its surrounding.",necessity,annotated +31d635b2-1d32-49dd-a848-5b5acaf50128,"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",{'ID': '407_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",part-of,annotated +2c725d50-13d5-4e77-bacf-9f174530e27c,The energy efficiency of historic and traditional buildings should be improved only if doing so will not cause long-term deterioration of the buildings fabric or fittings.,{'ID': '17_UK_DocM_V2_AccessAndUseOfBuildings'},The energy efficiency of historic and traditional buildings should be improved only if doing so will not cause long-term deterioration of the buildings fabric or fittings.,none,annotated +2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb_5,,,"There should be a motor, in the absence of tobacco smoke or other excessive pollutants, of 600 x 600 millimetres.",equal,synthetic +ff3e8f86-1542-4f54-a776-cfdc8482bad7_0,,,The air flow resistance of an air conditioner working in cooling mode should be a minimum of 0.15 dm3/s per m2.,greater-equal,synthetic +759d26ff-821f-4949-9096-a7e15c5580f6,Windows and doors: should be installed in such a way that the thermal integrity of the insulated plane is maintained.,{'ID': '137_UK_DocL_V1_ConsrvationOfFuelAndPower'},Windows and doors: should be installed in such a way that the thermal integrity of the insulated plane is maintained.,necessity,annotated +8fcdc238-3c30-4659-9303-1b126a39b2cd_8,,,The design solar load should be from outside to inside the dwelling by at least 800 millimetres.,greater-equal,synthetic +e32bbb47-c826-40c1-8ea4-8c32353d3fd2_3,,,There shall be 6m of ties provided for people in the building.,equal,synthetic +f7935bb4-9e5f-4e91-bbf1-54e45c1ef24c,A building with a height exceeding 9 metres must be equipped with anchoring structures for safety lines.,{'ID': '127_Finnish_SafetyOfUse'},A building with a height exceeding 9 metres must be equipped with anchoring structures for safety lines.,greater,annotated +8421f806-70f2-46a9-a308-90a40da3541d_6,,,"Where the internal temperature of the approach, whether over its whole length or in part, is 1 in 40 or steeper, that part of the approach should be designed as ramped access.",greater-equal,synthetic +ebc429f0-cb90-41ab-9a11-401a2ddc7bad,"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",{'ID': '268_UK_DocF_V1_Ventilation'},"For continuous mechanical ventilation systems, such as continuous mechanical extract ventilation or mechanical ventilation with heat recovery, the system should be balanced to achieve design air flow rates at each room terminal.",selection,annotated +993e54cc-49c3-43cb-995e-1a951c93c775_5,,,"When a warning sign is not posted, the areas shall be designed to an axle load Qk and also to an Manual control equal to 20 points.",equal,synthetic +5925ca4d-801c-42e4-b581-a176dea2519f,"If thermal energy is supplied from a district heat network, a CO2 emission factor and primary energy factor for the heat delivered to the dwelling by the district heat network should be calculated.",{'ID': '76_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If thermal energy is supplied from a district heat network, a CO2 emission factor and primary energy factor for the heat delivered to the dwelling by the district heat network should be calculated.",part-of,annotated +81314489-dcd9-410f-9b15-595b87e7c8f9_3,,,"The resilient layer should be timber sheathing at least 25 decibels heat, expanded metal or a similar resilient material.",greater-equal,synthetic +c9983da5-23f1-4211-88ce-68e4753e4ab9,"A target primary energy rate, target emission rate, building primary energy rate and the building emission rate should be calculated for non-exempt buildings with low energy demand.",{'ID': '102_UK_DocM_V2_AccessAndUseOfBuildings'},"A target primary energy rate, target emission rate, building primary energy rate and the building emission rate should be calculated for non-exempt buildings with low energy demand.",none,annotated +f0c72b35-5a0a-4554-8713-96f6f73a67f1_4,,,A cube with size of no more than 30% load may pass between the lower edge of a barriers protective part and the landing or the upper surface or edge of a step.,less-equal,synthetic +2695c899-0ada-478c-9b2d-796f79ea4c52,"Glazing, with which people are likely to come into contact whilst moving in or about the building shall: (a) if broken on impact, break in a way which is unlikely to cause injury; or (b) resist impact without breaking; or (c) be shielded or protected from impact.",{'ID': '92_UK_DocK_ProtectionFromFalling'},"Glazing, with which people are likely to come into contact whilst moving in or about the building shall: (a) if broken on impact, break in a way which is unlikely to cause injury; or (b) resist impact without breaking; or (c) be shielded or protected from impact.",necessity,annotated +a235c68f-ae44-4770-b005-4e9d7b659eb7_1,,,All cavity walls should have leaves at least 90mm thick and cavities at least three metres Signs.,greater-equal,synthetic +759d26ff-821f-4949-9096-a7e15c5580f6,Windows and doors: should be installed in such a way that the thermal integrity of the insulated plane is maintained.,{'ID': '137_UK_DocL_V1_ConsrvationOfFuelAndPower'},Windows and doors: should be installed in such a way that the thermal integrity of the insulated plane is maintained.,necessity,annotated +7602a501-a5b5-429c-99e1-8bc801243494,"The flooring and wall covering must provide waterproofing, or separate waterproofing must be installed under the flooring and behind the wall covering.",{'ID': '111_Finnish_Health-Humidity'},"The flooring and wall covering must provide waterproofing, or separate waterproofing must be installed under the flooring and behind the wall covering.",necessity,annotated +d988e207-c3f9-4314-9a16-f99b334595f4_4,,,The Activation must be no less than 0.15 dm3/s per m2.,greater-equal,synthetic +5fa7daca-cb50-4397-a736-617e52d30187_7,,,"If span at below 30% are required and unavailable, the planned time of use may be taken as equal to that at 30% load.",equal,synthetic +46ee0eda-086a-40ab-8e8f-bfa4c85abd49,"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",{'ID': '16_Finnish_SafetyOfUse'},"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",none,annotated +c47598f9-df79-4d77-aba9-8f380342372f_8,,,extract air of floor area 18 dm3/s shall be conducted to the outdoors through individual extract air ducts.,equal,synthetic +3121fe90-27db-405e-a42a-df3cd22ee176_6,,,"Where necessary, 0.7design solution, one above the other, must be installed in order to take into account children and users of wheelchairs.",equal,synthetic +f7cfdf57-28f3-4d23-90bf-ec2268e14bac,"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",{'ID': '65_Finnish_SafetyOfUse'},"Ramps, steps, thresholds and differences in levels in passageways must be clearly indicated using lighting and surface brightness contrasts or warning signs.",selection,annotated +b5addb77-be99-45a2-8dc0-fdf5d1969a57,Each column and wall shall be supplied with continuous vertical ties from the foundations to the roof level.,{'ID': '194_Finnish_StabilityOfStructures'},Each column and wall shall be supplied with continuous vertical ties from the foundations to the roof level.,selection,annotated +113b8bf8-1856-45f5-a54b-d65ef100b437_11,,,"If a gas-fired combination boiler is installed in an existing dwelling, at least 44mm of the following sections, appropriate to the system, should be installed.",greater-equal,synthetic +51517a5d-dd11-41b9-b44b-36d87b959127,The presence of the door should be apparent not only when it is shut but also when it is open.,{'ID': '77_UK_DocM_V2_AccessAndUseOfBuildings'},The presence of the door should be apparent not only when it is shut but also when it is open.,selection,annotated +77b0edab-012f-4047-a2db-fe6303993780,"Ventilation systems that, under normal operation, recirculate air between more than one space, room or zone should also be able to operate in a mode that reduces the risk of the transmission of airborne infection.",{'ID': '60_UK_DocF_V2_Ventilation'},"Ventilation systems that, under normal operation, recirculate air between more than one space, room or zone should also be able to operate in a mode that reduces the risk of the transmission of airborne infection.",necessity,annotated +9415ae4b-7a74-4c70-a245-e4381c6d71bf_10,,,"At gables and party walls, insulation should extend to the wall; if the Windows, skylights and ventilators between the wall and joist is less than 0.7 metres, perimeter insulation may be required.",less,synthetic +19478a13-7457-4dd3-a394-744f826db7b0,"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",{'ID': '127_UK_DocM_V1_AccessAndUseOfBuildings'},"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",necessity,annotated +45338082-ca66-418b-8fe1-8f2be926f330,A cube of no more than 100 millimetres may pass between the stair steps.,{'ID': '52_Finnish_SafetyOfUse'},A cube of no more than 100 millimetres may pass between the stair steps.,less-equal,annotated +a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",necessity,annotated +835d8fad-7a27-4299-aa38-a5b1771a6779,"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",{'ID': '178_UK_DocM_V2_AccessAndUseOfBuildings'},"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",necessity,annotated +a387fcb8-ead2-4094-9be9-72d783468b33_5,,,"If the exit of windows, roof windows, rooflights and doors exceeds 8.5m2 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",greater,synthetic +12e545d1-64f4-45c9-a520-5b8a003eba0a_5,,,"If the dwelling has more than 20mm exposed gas combination boiler, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",greater,synthetic +39a37d5e-3361-43b9-a209-e5cd45918abc,"For mixed-use buildings which have parking spaces within a covered car park, any requirements to install electric vehicle charge points or cable routes must first be applied to those parking spaces outside the covered car park.",{'ID': '95_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"For mixed-use buildings which have parking spaces within a covered car park, any requirements to install electric vehicle charge points or cable routes must first be applied to those parking spaces outside the covered car park.",part-of,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_10,,,"If the air flows of location 150m2 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +0aaf71f0-a482-4a72-a407-0d6db79c7f6f_3,,,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 900mm of non-fire-compartmented Linear interpolation that essentially relate to the business of the building may be located on the level of second storey.",less-equal,synthetic +4d80c4d1-08ee-481a-9f9c-e9151ce1094d_2,,,"The vertical spacing of windows, roof windows, rooflights and doors should not exceed 400kg of the total floor area of the dwelling.",less-equal,synthetic +08075a86-82be-487e-915b-2c8423f95cb8,The equivalent area of the opening should meet or exceed the free area of the opening.,{'ID': '39_UK_DocO_Overheating'},The equivalent area of the opening should meet or exceed the free area of the opening.,necessity,annotated +0ea1e862-2434-4fc8-97a2-b076c992ef20_6,,,"The width of an exit must be at least 1,200 millimetres and its free energy consumption must be at least 1.",greater-equal,synthetic +baee716c-b8c2-4500-b4de-63fa11f007b1_10,,,"A minimum of 1,000 millimetres in five of the remaining air-leakage gaps must have access to cable routes.",greater-equal,synthetic +26980508-105c-49db-8595-bf001a48d757_0,,,"In Roofs with no fixed seats or Insulating materials, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic +e21fa967-934e-4a29-a66d-252fdbbf928f_8,,,"If the parasitic energy use is unknown, an performance standards of 4 should be made for any control system.",equal,synthetic +a235c68f-ae44-4770-b005-4e9d7b659eb7_3,,,All cavity walls should have leaves at least 10m Unit length and cavities at least 50mm wide.,greater-equal,synthetic +e15250c0-1279-4d29-a1ec-31560b045007,Extinguishing routes of basement storeys must not be connected to fire and smoke-proof exits.,{'ID': '244_Finnish_FireSafety'},Extinguishing routes of basement storeys must not be connected to fire and smoke-proof exits.,not-part-of,annotated +29c431ee-ea93-491d-ab13-06418d93c488,"If luminous efficacy is greater than 75 light source lumens per circuit-watt, manual control is acceptable.",{'ID': '338_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If luminous efficacy is greater than 75 light source lumens per circuit-watt, manual control is acceptable.",selection,annotated +f2e57c55-e340-4fa2-87c5-03f4bf8e5942,"Where the dwelling is defined as wheelchair adaptable, it should be easy to install a lift.",{'ID': '82_UK_DocM_V1_AccessAndUseOfBuildings'},"Where the dwelling is defined as wheelchair adaptable, it should be easy to install a lift.",necessity,annotated +3724fd47-22f7-432c-81a2-1abcb95c7df2_10,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in one bedroom justification, where there should be no fewer than 50 millimetres.",greater-equal,synthetic +51517a5d-dd11-41b9-b44b-36d87b959127,The presence of the door should be apparent not only when it is shut but also when it is open.,{'ID': '77_UK_DocM_V2_AccessAndUseOfBuildings'},The presence of the door should be apparent not only when it is shut but also when it is open.,selection,annotated +5b1fe636-d2aa-4382-885e-a4f8a2cae4d4_8,,,"Generally, a thermal element once upgraded should not have a ending greater than 20 degrees Celsius.",less-equal,synthetic +8421f806-70f2-46a9-a308-90a40da3541d,"Where the gradient of the approach, whether over its whole length or in part, is 1:20 or steeper, that part of the approach should be designed as ramped access.",{'ID': '41_UK_DocM_V2_AccessAndUseOfBuildings'},"Where the gradient of the approach, whether over its whole length or in part, is 1:20 or steeper, that part of the approach should be designed as ramped access.",greater-equal,annotated +01008f69-874b-443e-bcb2-2f5630280049_9,,,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the dimension may be no more than ten millimetres and the tread must be no less than 220 millimetres.",less-equal,synthetic +082c7ed9-3579-48c2-a0d2-076f1edd647c,"Each of the two sections of the centrally hinged window should be assessed as a single side, bottom or top hung window.",{'ID': '112_UK_DocO_Overheating'},"Each of the two sections of the centrally hinged window should be assessed as a single side, bottom or top hung window.",necessity,annotated +d925c189-860a-4fcb-ae88-d1cf8cc14fb8_3,,,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the Geo-location may be no more than 120.",less-equal,synthetic +bb9ec292-062b-43c3-8590-856dd5f6b890_5,,,"The building primary energy rate and type and quality calculated using the measured air permeability must not be higher than the target primary energy rate and quality of the installation, respectively.",less-equal,synthetic +7e34700e-92de-4b00-a820-f4085a2e186c_0,,,"If the design between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 15, the wall in question must be class EI 15.",less,synthetic +45338082-ca66-418b-8fe1-8f2be926f330_2,,,A they of no more than 24 degrees Celsius may pass between the stair steps.,less-equal,synthetic +3f7b1106-06a0-4c3f-a01d-e275421775ac,That background ventilators allow fresh air into the home and should be left open.,{'ID': '228_UK_DocF_V1_Ventilation'},That background ventilators allow fresh air into the home and should be left open.,selection,annotated +3724fd47-22f7-432c-81a2-1abcb95c7df2_11,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in 180kW exhaust outlets properties, where there should be no fewer than four.",equal,synthetic +66b3628a-f0ee-4bc7-93c8-2ae0145a2e78_10,,,"In a barrier with no openable driveways, an intermittent extract fan should be provided with controls which continue to operate the fan for at least 15 minutes after the room is vacated.",not-part-of,synthetic +3153d771-404e-4a54-ac05-ed1b75e37506_5,,,"Gangways should not be less than 200 lux projection unless used by not more than 50 persons, in which case gangways should be a minimum of 900mm.",greater-equal,synthetic +33ed3038-99a6-4b2d-906a-a1db21f2d898,"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",{'ID': '250_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",necessity,annotated +ef561e39-db90-462c-8dde-15fbeae954e5,A cube with edges of no more than 200 millimetres may pass between the upper edge of the barrier and the protective part.,{'ID': '50_Finnish_SafetyOfUse'},A cube with edges of no more than 200 millimetres may pass between the upper edge of the barrier and the protective part.,part-of,annotated +46ee0eda-086a-40ab-8e8f-bfa4c85abd49,"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",{'ID': '16_Finnish_SafetyOfUse'},"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",part-of,annotated +759d26ff-821f-4949-9096-a7e15c5580f6,Windows and doors: should be installed in such a way that the thermal integrity of the insulated plane is maintained.,{'ID': '137_UK_DocL_V1_ConsrvationOfFuelAndPower'},Windows and doors: should be installed in such a way that the thermal integrity of the insulated plane is maintained.,part-of,annotated +835d8fad-7a27-4299-aa38-a5b1771a6779,"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",{'ID': '178_UK_DocM_V2_AccessAndUseOfBuildings'},"In large building complexes, such as retail parks and large sports centres, there should be one wheelchair-accessible unisex toilet capable of including an adult changing table.",selection,annotated +fc129e2c-abfa-48be-9fd6-e85f077ae67b,"A space alongside the leading edge of a door should be provided to enable a wheelchair user to reach and grip the door handle, then open the door without releasing hold on the handle and without the footrest colliding with the return wall.",{'ID': '70_UK_DocM_V2_AccessAndUseOfBuildings'},"A space alongside the leading edge of a door should be provided to enable a wheelchair user to reach and grip the door handle, then open the door without releasing hold on the handle and without the footrest colliding with the return wall.",none,annotated +563cd5fb-adc9-4bde-8b34-4accc93ac84b,"Systems should not be significantly oversized in most circumstances, the cooling appliance should not be sized for more than 120 of the design cooling load.",{'ID': '331_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Systems should not be significantly oversized in most circumstances, the cooling appliance should not be sized for more than 120 of the design cooling load.",necessity,annotated +e3b85ad6-6132-40d7-86f8-3cc5d44eb12c_5,,,9mm floor should be close to an accessible bathroom suitable for a wheelchair user.,equal,synthetic +46ee0eda-086a-40ab-8e8f-bfa4c85abd49,"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",{'ID': '16_Finnish_SafetyOfUse'},"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",necessity,annotated +19478a13-7457-4dd3-a394-744f826db7b0,"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",{'ID': '127_UK_DocM_V1_AccessAndUseOfBuildings'},"The handle to at least one window in the principal living area is 700-1000mm above floor level, unless fitted with a remote opening device that is within this height range.",none,annotated +536b172d-ccd1-479a-8136-6ee05db0f264_4,,,"Where pipework is above ground, the performance of the pipe Beading should be at least as high as the pressures of pipework in the buried part of the system.",greater-equal,synthetic +75c60084-6878-472d-8694-e8739e0dd76c_6,,,The width of access routes in assembly areas with a horizontal spacing of 180kW must be at least 900 millimetres.,equal,synthetic +dd056285-1aa4-4c6d-94ac-b911458cb7ea,"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",{'ID': '70_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",none,annotated +7f3f59a4-fc7e-4b14-8074-384f6cacf548_10,,,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the number of persons is less than 900mm.",less,synthetic +d43e4877-601c-43eb-9d33-96945754374b,Good acoustic design should be employed to achieve an acoustic environment that is neither too reverberant nor too absorbent so that announcements and conversations can be heard clearly.,{'ID': '99_UK_DocM_V2_AccessAndUseOfBuildings'},Good acoustic design should be employed to achieve an acoustic environment that is neither too reverberant nor too absorbent so that announcements and conversations can be heard clearly.,none,annotated +244aeb26-ba33-498c-8a28-989b5aa879a8,The pumping station shall be water tight and resistant to earth pressure and it may not cause odour problem.,{'ID': '129_Finnish_Health-WaterAndSewerage'},The pumping station shall be water tight and resistant to earth pressure and it may not cause odour problem.,necessity,annotated +082c7ed9-3579-48c2-a0d2-076f1edd647c_10,,,"Each of the 0.05 total capital cost of the centrally hinged window should be assessed as a single side, bottom or top hung window.",equal,synthetic +7d877df3-9aa7-4dff-a64d-5356a66c944d,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",{'ID': '59_Finnish_SafetyOfUse'},"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a width exceeding 2.4 metres and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",necessity,annotated +3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,none,annotated +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",part-of,annotated +d925c189-860a-4fcb-ae88-d1cf8cc14fb8_5,,,"The illuminance of steps in covered or heated outdoor staircases must be no less than 30% load, and the riser may be no more than 160 millimetres.",greater-equal,synthetic +d54852df-8e3c-4e99-8484-31c403b78558,"If work is carried out on a system that includes a boiler, a boiler interlock should be installed.",{'ID': '256_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If work is carried out on a system that includes a boiler, a boiler interlock should be installed.",none,annotated +977ccb7b-4580-4ea3-9ea4-5057925c9854,"NOTE: The surface area of the whole building must be included when assessing whether the works constitute a major renovation, even if the building is mixed use.",{'ID': '124_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"NOTE: The surface area of the whole building must be included when assessing whether the works constitute a major renovation, even if the building is mixed use.",selection,annotated +2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d_7,,,An upstand built on site should not exceed a gradient of 0.15.,less-equal,synthetic +7d552257-2212-4139-8d13-b982e0e7744f,"It would be beneficial if entrance doors to wheelchair-accessible bedrooms were powered opening, as this could avoid the need for the 300mm access space adjacent to the leading edge of the door.",{'ID': '143_UK_DocM_V2_AccessAndUseOfBuildings'},"It would be beneficial if entrance doors to wheelchair-accessible bedrooms were powered opening, as this could avoid the need for the 300mm access space adjacent to the leading edge of the door.",selection,annotated +5b1fe636-d2aa-4382-885e-a4f8a2cae4d4,"Generally, a thermal element once upgraded should not have a U-value greater than 0.7W/(m2K).",{'ID': '125_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Generally, a thermal element once upgraded should not have a U-value greater than 0.7W/(m2K).",less-equal,annotated +922bf8df-3a70-4f45-8c04-200b638d3b3c,The cold water pipe shall be designed and installed so that the temperature in the cold water system may not exceed 20 degrees Celsius.,{'ID': '59_Finnish_Health-WaterAndSewerage'},The cold water pipe shall be designed and installed so that the temperature in the cold water system may not exceed 20 degrees Celsius.,none,annotated +1fc9255c-929e-4052-aaec-e3ffede5a62e,"For large or complex projects, a commissioning manager should be appointed.",{'ID': '374_UK_DocM_V2_AccessAndUseOfBuildings'},"For large or complex projects, a commissioning manager should be appointed.",necessity,annotated +389c960b-525d-4f2e-9a2c-1805eb2dc20d_3,,,The full free gap under a stair that forms part of the storage provision should be counted as 60.,equal,synthetic +0a7ff0c7-c5f9-4069-9d7e-2bfd6c4871d3_11,,,The sizes of the extension does not exceed 65mm.,less-equal,synthetic +2ef73ac0-d424-4e28-9782-3dbaf6e0a046,Attics and uppermost floor voids shall be divided into 400 m2 parts.,{'ID': '107_Finnish_FireSafety'},Attics and uppermost floor voids shall be divided into 400 m2 parts.,necessity,annotated +84cd76d7-e5d0-4f39-94bc-0236c65d533a,"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",{'ID': '217_Finnish_FireSafety'},"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",part-of,annotated +bfdf95da-d422-47cd-83d7-a30a4969f2e6_11,,,"If the internal ties must be centred on the supporting line, the minimum value of the axle group load, 1m2, will also be applied to internal ties.",greater-equal,synthetic +6d9a1e8e-6fe7-4234-951a-96fdc4598bd7_0,,,"If parking spaces are provided for a building, an adequate number of door or gate, but at least 70 kN, shall be intended for the use of a person with mobility and functional impairment.",greater-equal,synthetic +536b172d-ccd1-479a-8136-6ee05db0f264,"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",{'ID': '205_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where pipework is above ground, the performance of the pipe insulation should be at least as high as the insulating performance of pipework in the buried part of the system.",part-of,annotated +fb1da22f-8ddb-4399-b441-64dca68da9af_7,,,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 1,200 MJ/m2 one side.",greater-equal,synthetic +203faa23-7b71-47c9-a6e5-2333ac45389e,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the tread must be no less than 250 millimetres.",{'ID': '22_Finnish_SafetyOfUse'},"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the tread must be no less than 250 millimetres.",greater-equal,annotated +3121fe90-27db-405e-a42a-df3cd22ee176_8,,,"Where necessary, 15mmmuntins, one above the other, must be installed in order to take into account children and users of wheelchairs.",equal,synthetic +05864826-21ef-4ae7-9af8-2aaeffc7267a_8,,,Modular and portable buildings with a planned room temperature of more than 0.055555556 but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,greater,synthetic +"8feaf7f2-dfd8-43ae-ab8d-791ee1ffd86c However, if the elevation difference is no more than 1,000 millimetres, the ramp may not have a gradient of more than eight per cent. {'ID': '9_Finnish_Accessibility'}_8",,,"However, if the axle group load is no more than 65 degrees Celsius, the ramp may not have a gradient of more than eight per cent.",less-equal,synthetic +f6add908-4d45-4b3e-83a6-369f6c36c037_5,,,"Door rails, stiles and muntins should be at least 25 decibels edges.",greater-equal,synthetic +20518e80-6f7e-457f-8c5a-59fa4c0eb324_2,,,"When calculating the heat loss for a buildings design solution, the surface area shall be used as the value of the domestic hot water circulation heat loss for the building envelope.",equal,synthetic +b5addb77-be99-45a2-8dc0-fdf5d1969a57,Each column and wall shall be supplied with continuous vertical ties from the foundations to the roof level.,{'ID': '194_Finnish_StabilityOfStructures'},Each column and wall shall be supplied with continuous vertical ties from the foundations to the roof level.,necessity,annotated +eefe1191-2903-4fb8-9138-6471e09fb67d_1,,,The U-value exceeds 50 at 11pm.,greater,synthetic +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_1,,,"Where the cost of installing only cable routes is more than 7% of the total cost of the major secure doorset, there is no cavity to install either electric vehicle charge points or cable routes.",not-part-of,synthetic +9dd2a0f1-0ff9-4416-8abd-1e6589980ff4_6,,,"If the energy efficiency of a mechanical ventilation systems air duct is designed to be greater than 60, the outdoor air and exhaust air ducts shall be fitted with shutoff dampers that close automatically when the system shuts down.",greater,synthetic +9fd15b82-fc32-4364-8724-f1ef14f0c047_11,,,The cooker hood should habitable area at least the exposure coefficient of the cooker.,greater-equal,synthetic +75c60084-6878-472d-8694-e8739e0dd76c_11,,,"The width of access routes in assembly areas with a thresholds of 1,500 millimetres must be at least 900 millimetres.",equal,synthetic +8421f806-70f2-46a9-a308-90a40da3541d_1,,,"Where the air leakage rate figure of the approach, whether over its whole length or in part, is E 15 or steeper, that part of the approach should be designed as ramped access.",greater-equal,synthetic +11f2902d-29c2-474e-97d0-628a2a97a666_11,,,"maximum capacity of over 50 m must be equipped with an appropriate safety barrier, railing or handrail.",greater,synthetic +10e66a84-25db-40a0-87d5-6297d0732fe4,The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,{'ID': '93_Finnish_Health-WaterAndSewerage'},The shutoff valves shall be located: 1) at each house; 2) at each apartment; 3) in vertical service pipes; 4) on both sides of devices installed in the service pipes; 5) before a device or fixture that is connected to the connector pipe; 6) on both sides of the water meters.,part-of,annotated +b63dcef6-1840-4e9e-ad51-f8fc481fe856_0,,,"The wall ties should have a horizontal spacing of 900mm and a glare and reflections of 0.35W/(m2K), or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",none,annotated +8b7e8e7e-81dd-4a76-bdd3-8269ac00f74b,The system can be overridden by a door reactivating device that relies on appropriate electronic methods (but not a door edge pressure system); provided that the lift door remains fully open for at least three seconds.,{'ID': '24_UK_DocM_V1_AccessAndUseOfBuildings'},The system can be overridden by a door reactivating device that relies on appropriate electronic methods (but not a door edge pressure system); provided that the lift door remains fully open for at least three seconds.,part-of,annotated +d925c189-860a-4fcb-ae88-d1cf8cc14fb8,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",{'ID': '28_Finnish_SafetyOfUse'},"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",selection,annotated +079db365-cfed-474e-9329-25349ac0db4a_3,,,"In connection with the door of an outside space of an individual dwelling the total flow rate outside the door may be more than adequate means if the level difference can, with reasonable effort, be eliminated with equipment in the outdoor space.",greater,synthetic +e7be7432-5505-47ad-b586-2a2e3f5a1a37,"If the index terminal has to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",{'ID': '203_UK_DocF_V1_Ventilation'},"If the index terminal has to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",none,annotated +e4fb8d18-8dbc-4351-a2df-d87f880f476a_7,,,The net absorber area for balconies is 8.5m2 that of the load-bearing structures of the storey.,equal,synthetic +e43c1e88-be80-42d9-944e-1bf0f0f82479_4,,,Individual flights are: for Extract up to 8.5m2 not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic +cf35d4a4-3170-421b-9be1-b68d928eed1d,"A roof with a pitch greater than 1:8 must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",{'ID': '125_Finnish_SafetyOfUse'},"A roof with a pitch greater than 1:8 must be constructed making appropriate use of walkways, roof ladders, safety ladders, roof stairs, roof treads and foot rails.",greater,annotated +511c1a7f-08b9-48ec-aea6-9b749fdf31a1,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an adequate number of appropriately located toilet facilities which are suitable for users of wheelchairs and walking frames with wheels.",{'ID': '51_Finnish_Accessibility'},"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an adequate number of appropriately located toilet facilities which are suitable for users of wheelchairs and walking frames with wheels.",none,annotated +7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8_6,,,"For sizes of cylinder not listed, the dwelling unit from the cylinder should not exceed 0.7, where V is the volume in litres.",less-equal,synthetic +fc8ee55c-408d-48a9-ae4c-a6961b5745ce,Biomass heating supplemented by an alternative appliance (e.g. gas) - the CO2 emission factor and primary energy factor should be based on a weighted average for the two fuels.,{'ID': '59_UK_DocM_V2_AccessAndUseOfBuildings'},Biomass heating supplemented by an alternative appliance (e.g. gas) - the CO2 emission factor and primary energy factor should be based on a weighted average for the two fuels.,selection,annotated +113b8bf8-1856-45f5-a54b-d65ef100b437_5,,,"If a gas-fired combination boiler is installed in an existing dwelling, at least twice the rise plus the going (2R G) of the following cold side, appropriate to the system, should be installed.",greater-equal,synthetic +7f3f59a4-fc7e-4b14-8074-384f6cacf548_3,,,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the distance is less than 200 lux.",less,synthetic +77f993c6-dff1-4f9a-8f66-73221d3cbaff_3,,,"If the dwelling only has 2.2 metres electricity generation systems, a minimum ventilation rate of 13l/s should be used.",equal,synthetic +11f2902d-29c2-474e-97d0-628a2a97a666_1,,,"high of over 100 must be equipped with an appropriate safety barrier, railing or handrail.",greater,synthetic +a2f3a871-91d5-4777-95c9-4744792b3a69,"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",{'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'},"in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided.",selection,annotated +c5c5365f-273f-4c29-8491-4f50aabc3b78,"Manual controls for powered entrance doors should be clearly distinguishable against the background and not located so that a person, having used the control, needs to move to avoid contact with the door as it opens.",{'ID': '74_UK_DocM_V2_AccessAndUseOfBuildings'},"Manual controls for powered entrance doors should be clearly distinguishable against the background and not located so that a person, having used the control, needs to move to avoid contact with the door as it opens.",necessity,annotated +973c9430-2b4a-4ab4-82df-7060c3002f77_11,,,The axle group load for the community heating primary circuit should be a minimum of two persons per square metre.,greater-equal,synthetic +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_2,,,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the fittings of that installation exceeds 400 millimetres of the total cost of the major renovation.",greater,synthetic +244aeb26-ba33-498c-8a28-989b5aa879a8,The pumping station shall be water tight and resistant to earth pressure and it may not cause odour problem.,{'ID': '129_Finnish_Health-WaterAndSewerage'},The pumping station shall be water tight and resistant to earth pressure and it may not cause odour problem.,none,annotated +3121fe90-27db-405e-a42a-df3cd22ee176,"Where necessary, two handrails, one above the other, must be installed in order to take into account children and users of wheelchairs.",{'ID': '55_Finnish_SafetyOfUse'},"Where necessary, two handrails, one above the other, must be installed in order to take into account children and users of wheelchairs.",equal,annotated +fc8ee55c-408d-48a9-ae4c-a6961b5745ce,Biomass heating supplemented by an alternative appliance (e.g. gas) - the CO2 emission factor and primary energy factor should be based on a weighted average for the two fuels.,{'ID': '59_UK_DocM_V2_AccessAndUseOfBuildings'},Biomass heating supplemented by an alternative appliance (e.g. gas) - the CO2 emission factor and primary energy factor should be based on a weighted average for the two fuels.,necessity,annotated +959b4ba1-2cf2-4ae9-84d4-055e9c0040f1,The inaccuracies of the crane wheels should be determined together with the crane supplier.,{'ID': '229_Finnish_StabilityOfStructures'},The inaccuracies of the crane wheels should be determined together with the crane supplier.,part-of,annotated +f420ae57-5656-4558-b1a3-1079e46bf6cc_1,,,"In the case of the storey-level door of a dwelling, or if the power input from controls through the door exceeds two , doors must open in the direction of the exit.",greater,synthetic +0da52584-1b37-48b5-840f-3795ae695275_6,,,"the minimum clear dimensions of the platform are: 1100mm wide and 1,200 millimetres speed where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.",equal,synthetic +710ef992-e187-4b1a-894b-e0e222f54359_10,,,"NOTE: For grid-supplied electricity, a feasibility of installing high-efficiency alternative systems of 16/01/2023 00:00 and primary energy factor of 1.501kWhPE/kWh should be used.",equal,synthetic +60024014-cb6a-4a53-9b12-9497e0a1e5e8_5,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for surface 1 and 30m2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic +bfdf95da-d422-47cd-83d7-a30a4969f2e6_3,,,"If the internal ties must be centred on the supporting line, the minimum value of the mechanical ventilation, 1800mm, will also be applied to internal ties.",greater-equal,synthetic +e43c1e88-be80-42d9-944e-1bf0f0f82479_10,,,Individual flights are: for gradients up to 1:15 not more than 2 metres primary energy factor; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic +8fec1c4a-527e-49b6-9267-89ff700a9291,"Where membranes are penetrated, careful detailing should be used to achieve a robust and durable seal at these penetrations.",{'ID': '182_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where membranes are penetrated, careful detailing should be used to achieve a robust and durable seal at these penetrations.",necessity,annotated +244aeb26-ba33-498c-8a28-989b5aa879a8,The pumping station shall be water tight and resistant to earth pressure and it may not cause odour problem.,{'ID': '129_Finnish_Health-WaterAndSewerage'},The pumping station shall be water tight and resistant to earth pressure and it may not cause odour problem.,necessity,annotated +46f5be2a-1514-420b-bc39-331fc6e0d2df_1,,,"The dwelling primary energy rate, dwelling emission rate and fire resistance time, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and internal temperature, respectively.",less-equal,synthetic +20216261-f56d-4f79-8a46-c781abe19f04,"For new and existing buildings other than dwellings, information should be provided in a new or existing building log book.",{'ID': '98_UK_DocF_V2_Ventilation'},"For new and existing buildings other than dwellings, information should be provided in a new or existing building log book.",necessity,annotated +3ca5cb38-b90b-4449-ba14-4268866df8e1,The water heater is close to the draw-off points and has a storage capacity no greater than 100 litres.,{'ID': '463_UK_DocM_V2_AccessAndUseOfBuildings'},The water heater is close to the draw-off points and has a storage capacity no greater than 100 litres.,less-equal,annotated +efe27c3d-80a8-4999-9310-77160105fe37,"Instead, the building primary energy rate and building emission rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",{'ID': '91_UK_DocM_V2_AccessAndUseOfBuildings'},"Instead, the building primary energy rate and building emission rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",necessity,annotated +28c47652-47a0-4fa4-8343-beee0af2691c,"Large roof surfaces must be divided into parts of no more than 2,400 square metres.",{'ID': '181_Finnish_FireSafety'},"Large roof surfaces must be divided into parts of no more than 2,400 square metres.",selection,annotated +6a41a473-bd3c-4e38-a093-094b3fdae388,At least one in every five remaining parking spaces must be provided with cable routes.,{'ID': '68_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},At least one in every five remaining parking spaces must be provided with cable routes.,necessity,annotated +a235c68f-ae44-4770-b005-4e9d7b659eb7_9,,,All cavity walls should have leaves at least 90mm thick and cavities at least 20 millimetres ventilation rate.,greater-equal,synthetic +e8340500-38b6-461b-b00d-d3aa44ac1f0b,The temperature of the water available from the hot water system may not exceed 65 degrees Celsius.,{'ID': '62_Finnish_Health-WaterAndSewerage'},The temperature of the water available from the hot water system may not exceed 65 degrees Celsius.,less-equal,annotated +01d924bf-4a69-4eb8-b05e-ce993aee3d45,Perimeter insulation should be continuous and have a minimum thickness of 25mm.,{'ID': '135_UK_DocL_V1_ConsrvationOfFuelAndPower'},Perimeter insulation should be continuous and have a minimum thickness of 25mm.,part-of,annotated +451e7c91-d39f-4401-a0e3-5ab455ab0442,"The approach route should be level, gently sloping, or, where necessary, ramped.",{'ID': '15_UK_DocM_V1_AccessAndUseOfBuildings'},"The approach route should be level, gently sloping, or, where necessary, ramped.",necessity,annotated +f6ea9be6-644d-4dc6-8954-d115bdd528c8,"The building emission rate and building primary energy rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the combined emission factor has been derived.",{'ID': '62_UK_DocM_V2_AccessAndUseOfBuildings'},"The building emission rate and building primary energy rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the combined emission factor has been derived.",necessity,annotated +4fc3b5b1-a838-4429-b385-d8e80e6633eb_6,,,"In the absence of relevant harmonised European Standards, products with a cold side exceeding 270 millimetres must have a product certificate issued by a Notified Body.",greater,synthetic +588857f5-9281-4c32-8d83-c98230d5b934,The use of boards with lapped or tongue and groove edges should be considered.,{'ID': '146_UK_DocL_V1_ConsrvationOfFuelAndPower'},The use of boards with lapped or tongue and groove edges should be considered.,none,annotated +203faa23-7b71-47c9-a6e5-2333ac45389e_11,,,"The air flow rates of the indoor steps of dwelling units and living quarters may be no more than 0.05, and the tread must be no less than 250 millimetres.",less-equal,synthetic +f3bd99b4-7ea5-4968-af10-3c133c0b5aa0_11,,,No individual flight has a pitch of more than 5m.,less-equal,synthetic +3931f0fa-433e-4fb8-96bf-a747f3622ee0,"In order to help people with visual impairment to appreciate the size of a space they have entered, or to find their way around, there should be a visual contrast between the wall and the ceiling, and between the wall and the floor.",{'ID': '97_UK_DocM_V2_AccessAndUseOfBuildings'},"In order to help people with visual impairment to appreciate the size of a space they have entered, or to find their way around, there should be a visual contrast between the wall and the ceiling, and between the wall and the floor.",none,annotated +7d552257-2212-4139-8d13-b982e0e7744f,"It would be beneficial if entrance doors to wheelchair-accessible bedrooms were powered opening, as this could avoid the need for the 300mm access space adjacent to the leading edge of the door.",{'ID': '143_UK_DocM_V2_AccessAndUseOfBuildings'},"It would be beneficial if entrance doors to wheelchair-accessible bedrooms were powered opening, as this could avoid the need for the 300mm access space adjacent to the leading edge of the door.",none,annotated +043258d7-d35e-42d9-87c5-b83565c39ad6,"Before elements are concealed by subsequent work, an onsite audit should be undertaken to confirm that the designed details have been constructed.",{'ID': '133_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Before elements are concealed by subsequent work, an onsite audit should be undertaken to confirm that the designed details have been constructed.",necessity,annotated +0df5892a-e396-424e-90f1-74f6ccfb9e1a,"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",{'ID': '61_Finnish_Accessibility'},"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",part-of,annotated +5b4380ba-0066-4735-a362-316d4c8e70b2_0,,,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10m exit enclosure after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",greater,synthetic +fb1da22f-8ddb-4399-b441-64dca68da9af,"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",{'ID': '218_Finnish_FireSafety'},"If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide.",part-of,annotated +956efc87-87de-4d3c-99fb-dc58eab9353b_0,,,A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a level differences of at least 30% load.,greater-equal,synthetic +0f67dad7-6df9-444b-8e72-f447668e3fde,"Where sanitary facilities are wheelchair accessible, WC pans should be a minimum of 400mm high.",{'ID': '104_UK_DocM_V1_AccessAndUseOfBuildings'},"Where sanitary facilities are wheelchair accessible, WC pans should be a minimum of 400mm high.",part-of,annotated +9027959e-efc1-4d32-acbe-e0775d40f001_1,,,"The morticed bolts should have a minimum Capacities of 65mm, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",greater-equal,synthetic +09b2a395-5293-4b7d-82d4-5312482d59e9_2,,,"Door entry controls, where provided, are mounted one per 100m2 ending finished ground level, and at least 300mm away from any projecting corner.",equal,synthetic +05864826-21ef-4ae7-9af8-2aaeffc7267a_10,,,Modular and portable buildings with a planned ventilation rate of more than 0.06 m2 but with an intended time of use in a single location of less than two years should be shown to comply with the energy efficiency requirements.,greater,synthetic +eeb4239f-3819-475c-ad20-756bed80c4ff_11,,,"In reference heat loss calculations, the value used as the power requirements of the buildings ventilation system shall be 300 millimetres.",equal,synthetic +12e545d1-64f4-45c9-a520-5b8a003eba0a_1,,,"If the dwelling has more than 160 millimetres exposed floor-to-wall junctions, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",greater,synthetic +3ca5cb38-b90b-4449-ba14-4268866df8e1,The water heater is close to the draw-off points and has a storage capacity no greater than 100 litres.,{'ID': '463_UK_DocM_V2_AccessAndUseOfBuildings'},The water heater is close to the draw-off points and has a storage capacity no greater than 100 litres.,necessity,annotated +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_1,,,"In buildings more than 9 metres and at most 0.9 metres in from the inside face of the wall, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",less-equal,synthetic +6bf41e87-d7c1-42a5-bf0d-67c711a21753,"Additionally, a sign identifying the floor reached should be provided on each landing in a location that can be easily seen from the lifting device and is designed so that it contrasts visually with its surrounding.",{'ID': '105_UK_DocM_V2_AccessAndUseOfBuildings'},"Additionally, a sign identifying the floor reached should be provided on each landing in a location that can be easily seen from the lifting device and is designed so that it contrasts visually with its surrounding.",selection,annotated +8364a5f1-f80e-484c-9f38-bffc6f4c1876_5,,,"Where communal parking is provided to blocks of flats, at least proportion standard water is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal).",greater-equal,synthetic +656aa2fa-18cb-41ee-ae28-28deb3dffcc3,The water temperature of the water in the hot water system shall be at least 55 degrees Celsius and available from the hot water plumbing fixture within 20 seconds.,{'ID': '61_Finnish_Health-WaterAndSewerage'},The water temperature of the water in the hot water system shall be at least 55 degrees Celsius and available from the hot water plumbing fixture within 20 seconds.,necessity,annotated +636bce88-fd3b-4e5a-9f6a-4aa0d3d1bfa4_1,,,"Where a new building contains more than 0.7W/(m2K) ticket dispensing machines, a common access point for a gigabit-capable public electronic communications network is required as a part of the buildings gigabit-ready physical infrastructure.",greater,synthetic +5ba5ffe7-ece8-488a-b461-da66237e7888,"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",{'ID': '54_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",part-of,annotated +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_4,,,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the total minimum width of that installation exceeds EI 30 of the total cost of the major renovation.",greater,synthetic +d0927095-9e43-4ce4-a740-d5df69dc1dc3_9,,,"If the air flows of equivalent area 100 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +0262f6e5-21bc-4312-9388-8ac93b79416d_11,,,"The minimum full dwelling primary energy rate of the absorption chillers should be no worse than 1,000 millimetres.",greater-equal,synthetic +6414854d-01f9-481f-a7f4-c4581e48d8b1_9,,,Special safety features are not necessary if the facility is not more than 800 millimetres long.,less-equal,synthetic +38cd3221-7fc9-4462-be20-78b16a4309d3_7,,,The location of openings in the newly created dwelling should not be more than ten millimetres of the total floor area.,less-equal,synthetic +825053cb-af5d-43a9-b59b-e2a5ae78ea73_5,,,The shallow projecting of associated parking spaces which have access to either: a. cable routes; b. an electric vehicle charge point should be the greater of the following: a. the number of dwellings in the residential building; b. the pressures of associated parking spaces.,greater,synthetic +164122ed-c7ac-4cf8-8a54-3d56c144f78d,"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",{'ID': '172_UK_DocM_V2_AccessAndUseOfBuildings'},"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",necessity,annotated +c952db0f-b605-4335-8d56-97fc339ad5ba_6,,,All 200 millimetres day-care institutions of the installation and commissioning checklist should be completed.,equal,synthetic +05864826-21ef-4ae7-9af8-2aaeffc7267a_11,,,Modular and portable buildings with a planned service life of more than two years but with an total capital cost in a single location of less than 13l/s should be shown to comply with the energy efficiency requirements.,less,synthetic +a86b58e8-046f-44b7-8e1b-00c876c8c647,"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",{'ID': '30_Finnish_StabilityOfStructures'},"Parapets in categories A to E and panel parts of walls acting as parapets, as well as their fasteners, shall be designed to the concentrated load Qk = 0.3 kN acting on a random spot.",selection,annotated +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3,"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",{'ID': '53_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where the cost of installing only cable routes is more than 7% of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",part-of,annotated +eccd4f77-ef4a-41fd-a22a-620c84fdddd4,There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,{'ID': '98_UK_DocM_V1_AccessAndUseOfBuildings'},There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,selection,annotated +3e9fc57e-bc69-4f17-a056-dd7767afa9bb_2,,,"If the surface area of the building does not exceed two years, access to the attic fire compartments from the outside shall be required.",less-equal,synthetic +dd056285-1aa4-4c6d-94ac-b911458cb7ea,"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",{'ID': '70_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where any of the parking spaces for new buildings other than residential or mixed-use buildings are in a covered car park, the requirement to install an electric vehicle charge point should be met by installing a charge point in a parking space that is not within a covered car park.",part-of,annotated +05fdde92-d8af-42ad-963b-9019c69a8ab3,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",{'ID': '163_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",necessity,annotated +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",none,annotated +d8066a73-49c2-4e99-825a-b49b9b2ba67d_7,,,A landing measuring at least 1m2 in atmosphere must be reserved in front of and behind a door located in an exit route.,greater-equal,synthetic +2a256a9c-0b8a-4acf-87e1-86a5857f36a3_9,,,"Where a driveway forms all, or part of, the approach route, an behind surfaces exposed to running water, repetitious splash water or water condensation of at least 100 wide should be provided so that a wheelchair user can pass a parked car.",greater-equal,synthetic +29ad081e-90f4-4eb0-9cea-a4f49beea768,Fans used for general air distribution that are rated at more than 1100W should be fitted with variable speed drives.,{'ID': '298_UK_DocM_V2_AccessAndUseOfBuildings'},Fans used for general air distribution that are rated at more than 1100W should be fitted with variable speed drives.,none,annotated +9027959e-efc1-4d32-acbe-e0775d40f001,"The morticed bolts should have a minimum projection of 20mm, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",{'ID': '38_UK_DocQ_Security_Dwellings'},"The morticed bolts should have a minimum projection of 20mm, should be at least 100mm from the top and bottom corners of the door, and should avoid any door construction joints.",part-of,annotated +d43e4877-601c-43eb-9d33-96945754374b,Good acoustic design should be employed to achieve an acoustic environment that is neither too reverberant nor too absorbent so that announcements and conversations can be heard clearly.,{'ID': '99_UK_DocM_V2_AccessAndUseOfBuildings'},Good acoustic design should be employed to achieve an acoustic environment that is neither too reverberant nor too absorbent so that announcements and conversations can be heard clearly.,selection,annotated +371e1755-8bb5-456e-bf66-5a50f4c19d59,"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",{'ID': '50_UK_DocK_ProtectionFromFalling'},"Where there is full-height structural guarding, if you provide a second (lower) handrail, the vertical height from the pitch line of the steps (or the surface of the ramp) to the top of the second (lower) handrail should be 600mm.",none,annotated +cb2f2c09-8ae6-42a4-ac21-861c912c30f9_0,,,"In buildings more than 9 metres and at most 190 kN in anthracite figure, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",less-equal,synthetic +33ed3038-99a6-4b2d-906a-a1db21f2d898,"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",{'ID': '250_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For heating systems in new dwellings, or when a heat generator such as a boiler is replaced in an existing dwelling, each room should be provided with thermostatic room controls.",none,annotated +4e1bda84-398f-4bae-a335-2c7f24501b09,The water heater is situated centrally with a distribution system to supply water to the drawoff points and has a capacity greater than 300 litres.,{'ID': '456_UK_DocM_V2_AccessAndUseOfBuildings'},The water heater is situated centrally with a distribution system to supply water to the drawoff points and has a capacity greater than 300 litres.,part-of,annotated +67657794-a272-4ab2-9b19-df29e9d24844,Ground floors and external walls: the wall-to-floor junctions should be detailed to achieve continuity of insulation.,{'ID': '160_UK_DocL_V1_ConsrvationOfFuelAndPower'},Ground floors and external walls: the wall-to-floor junctions should be detailed to achieve continuity of insulation.,part-of,annotated +fb5d3054-4911-4049-ba09-1c3e80f9c07c_9,,,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the boiler type may be no more than 1.501kWhPE/kWh.",less-equal,synthetic +c952db0f-b605-4335-8d56-97fc339ad5ba_3,,,All 0.9 metres Humus soil of the installation and commissioning checklist should be completed.,equal,synthetic +a1f91cfd-21f8-49a4-8468-746f49f4848e_9,,,"For a building that contains more than 9 metres emergency repairs for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",greater,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_7,,,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or materials above 2m may be discounted when measuring clear width.,greater,synthetic +984c252b-74f4-4d85-9080-1c8ae1851eca_4,,,"If performance requires thicker glass to be used, an equivalent window unit with product certificate (01:08:00) glazing should be shown to meet the required standard.",equal,synthetic +d988e207-c3f9-4314-9a16-f99b334595f4_6,,,"The one-hour A-weighted equivalent continuous sound level of impulsive, narrow-band or low-frequency noise must be no less than 25mm.",greater-equal,synthetic +f3c5d35c-ad38-46d6-8a75-1a331555b89e,The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flow rates at each terminal.,{'ID': '206_UK_DocF_V1_Ventilation'},The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flow rates at each terminal.,necessity,annotated +0cafda73-ee3a-4a99-a224-2d142de63618,"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",{'ID': '238_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where a wet heating system is either: a. newly installed b. fully replaced in an existing building, including the heating appliance, emitters and associated pipework all parts of the system including pipework and emitters should be sized to allow the space heating system to operate effectively and in a manner that meets the heating needs of the dwelling, at a maximum flow temperature of 55C or lower.",selection,annotated +7f696221-52c9-4c52-8f90-74bd93c51299_8,,,This grippable handrail is 850-1000mm above the pitch line of the flight and Capacities at least 250 millimetres beyond the top and bottom nosings.,greater-equal,synthetic +06c2e0f7-69c8-47ec-bf31-9902ae9df7cf,"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",{'ID': '109_UK_DocK_ProtectionFromFalling'},"Provision shall be made for any windows, skylights, or any transparent or translucent walls, ceilings or roofs to be safely accessible for cleaning.",necessity,annotated +f06f7ec1-3b83-4e1a-a421-b09589f2374c,"Provision shall be made to prevent any door or gate: (a) which slides or opens upwards, from falling onto any person; and (b) which is powered, from trapping any person.",{'ID': '114_UK_DocK_ProtectionFromFalling'},"Provision shall be made to prevent any door or gate: (a) which slides or opens upwards, from falling onto any person; and (b) which is powered, from trapping any person.",selection,annotated +df09194e-2fe6-4007-b6c1-1a7383f1baba,"Generally, gradients within the approach should be as gentle as possible.",{'ID': '40_UK_DocM_V2_AccessAndUseOfBuildings'},"Generally, gradients within the approach should be as gentle as possible.",necessity,annotated +2fad9e0f-fa0d-4a6b-9c63-152ef8828c4d,An upstand built on site should not exceed a U-value of 0.35W/(m2K).,{'ID': '115_UK_DocL_V1_ConsrvationOfFuelAndPower'},An upstand built on site should not exceed a U-value of 0.35W/(m2K).,less-equal,annotated +8151be81-09ad-4dac-b2d2-f0d757915b6c_11,,,"However, when the snow load can occur, the air flow of the load s should be at least E.",greater-equal,synthetic +f7f1a609-ae35-4544-9b38-e471d7a00666,"In order to enhance the efficiency of firefighting and rescue operations, means of smoke extraction shall be designed and constructed in the building so that smoke can be extracted from the different premises in the building.",{'ID': '249_Finnish_FireSafety'},"In order to enhance the efficiency of firefighting and rescue operations, means of smoke extraction shall be designed and constructed in the building so that smoke can be extracted from the different premises in the building.",selection,annotated +aec934d9-6175-4624-9e8d-1ee6f71fb49d,Sufficient information about the overheating mitigation strategy and its maintenance requirements must be given to owners so that it can be used effectively.,{'ID': '92_UK_DocO_Overheating'},Sufficient information about the overheating mitigation strategy and its maintenance requirements must be given to owners so that it can be used effectively.,selection,annotated +0da52584-1b37-48b5-840f-3795ae695275_3,,,the minimum clear dimensions of the platform are: 1100mm wide and 0.3 average carbon monoxide concentration where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +5577528f-8fa0-4ca3-96f6-ea418091cb86_5,,,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 55 in heat exchanger area is able to pass through the opening between the plane level and the handrail or wall.,greater,synthetic +8aa4b706-1659-4e30-a4fe-e7f33efe3241_11,,,All 25 decibels notice of the compliance checklist should be completed.,equal,synthetic +5ed671ca-0cd0-47e2-ad68-1d910e5ddbdf,The access route in the seating area or standing auditorium must be directly accessible from the end of each row.,{'ID': '114_Finnish_SafetyOfUse'},The access route in the seating area or standing auditorium must be directly accessible from the end of each row.,necessity,annotated +86831830-e7f0-4b90-aa27-dc0542b7ba4d_4,,,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least 190 kN construction.",greater-equal,synthetic +ffbc85cb-4301-4bcb-9a56-7487c95cf16d,Only the proportion of openings which can be opened with a very low risk of occupants falling from height should be considered to form part of the overheating mitigation strategy.,{'ID': '83_UK_DocO_Overheating'},Only the proportion of openings which can be opened with a very low risk of occupants falling from height should be considered to form part of the overheating mitigation strategy.,necessity,annotated +4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9_7,,,"In spaces intended for more than 60 persons, the level differences of the access route must be at least one per 100m2.",greater-equal,synthetic +ef561e39-db90-462c-8dde-15fbeae954e5_0,,,A cube with intermediate landing of no more than 1 may pass between the upper edge of the barrier and the protective part.,less-equal,synthetic +3c0a8ccb-d813-40fb-b69b-88250d3bc4ec_8,,,These fittings should not exceed a stairs of 2.0 m3/(h m2).,less-equal,synthetic +3e9fc57e-bc69-4f17-a056-dd7767afa9bb,"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",{'ID': '241_Finnish_FireSafety'},"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",selection,annotated +164122ed-c7ac-4cf8-8a54-3d56c144f78d,"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",{'ID': '172_UK_DocM_V2_AccessAndUseOfBuildings'},"In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many.",selection,annotated +c5c5365f-273f-4c29-8491-4f50aabc3b78,"Manual controls for powered entrance doors should be clearly distinguishable against the background and not located so that a person, having used the control, needs to move to avoid contact with the door as it opens.",{'ID': '74_UK_DocM_V2_AccessAndUseOfBuildings'},"Manual controls for powered entrance doors should be clearly distinguishable against the background and not located so that a person, having used the control, needs to move to avoid contact with the door as it opens.",none,annotated +caa5332f-5180-4d07-a41f-e6e0e044a8c1,An existing district heat network that is being connected to a new dwelling should not have a CO2 emission factor for delivered heat to the dwelling which is greater than 0.350kgCO2/kWh.,{'ID': '287_UK_DocL_V1_ConsrvationOfFuelAndPower'},An existing district heat network that is being connected to a new dwelling should not have a CO2 emission factor for delivered heat to the dwelling which is greater than 0.350kgCO2/kWh.,selection,annotated +c7035b48-7244-40a9-a70e-1d244caf72ac,"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",{'ID': '56_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The same approved calculation tool must be used to calculate the target primary energy rate, target emission rate and target fabric energy efficiency rate and the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate.",none,annotated +78d904cd-b605-43a6-b3a4-34c22f557123,"Instead, the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",{'ID': '84_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Instead, the dwelling primary energy rate, dwelling emission rate and dwelling fabric energy efficiency rate should be calculated as if the area covered by the pool were replaced with the equivalent area of floor with the same U-value as the pool surround.",necessity,annotated +5577528f-8fa0-4ca3-96f6-ea418091cb86_4,,,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than half a metre in heat is able to pass through the opening between the plane level and the handrail or wall.,greater,synthetic +8fec1c4a-527e-49b6-9267-89ff700a9291,"Where membranes are penetrated, careful detailing should be used to achieve a robust and durable seal at these penetrations.",{'ID': '182_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where membranes are penetrated, careful detailing should be used to achieve a robust and durable seal at these penetrations.",none,annotated +0a53e4af-84a7-46aa-b28a-cb1d873c8cae,"The type and quality of public address, hearing enhancement and telephone systems should be chosen carefully to ensure intelligibility.",{'ID': '151_UK_DocM_V2_AccessAndUseOfBuildings'},"The type and quality of public address, hearing enhancement and telephone systems should be chosen carefully to ensure intelligibility.",selection,annotated +4f2b56cb-9852-4406-bbea-31f426fb4910,"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",{'ID': '397_UK_DocM_V2_AccessAndUseOfBuildings'},"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",none,annotated +419892bb-5044-4c63-a8ba-7747ad52c23d,"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",{'ID': '195_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof.",none,annotated +72e7ed0c-9e73-46b2-a919-20f3fea337fd,"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",{'ID': '56_Finnish_FireSafety'},"An area with a potentially flammable or explosive atmosphere must not be located in a building where there are dwellings, accommodation premises, institutions or assembly and business premises.",selection,annotated +74b9ee2c-0192-442d-b5a1-a2974d456429,"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",{'ID': '67_UK_DocM_V1_AccessAndUseOfBuildings'},"The dwelling is wheelchair adaptable such that key parts of the accommodation, including sanitary facilities and kitchens, could be easily altered to meet the needs of a wheelchair user or, where required by a local planning authority, the dwelling is wheelchair accessible.",selection,annotated +f420ae57-5656-4558-b1a3-1079e46bf6cc_2,,,"In the case of the storey-level door of a dwelling, or if the intended purpose through the door exceeds 35 mg/m3 (30 ppm), doors must open in the direction of the exit.",greater,synthetic +a5e9c36f-358f-4375-943c-6d5b89c82647,"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",{'ID': '92_Finnish_SafetyOfUse'},"Any abrupt level differences of over 0.7 metres and any precipices located in the vicinity of common play and recreation areas associated with buildings with more than two dwellings must be indicated by appropriate barriers or suitable planted areas, or outfitted with a base that cushions any fall.",none,annotated +203faa23-7b71-47c9-a6e5-2333ac45389e,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the tread must be no less than 250 millimetres.",{'ID': '22_Finnish_SafetyOfUse'},"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the tread must be no less than 250 millimetres.",none,annotated +0aaf71f0-a482-4a72-a407-0d6db79c7f6f,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",{'ID': '69_Finnish_FireSafety'},"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",selection,annotated +793cb939-b3d9-46eb-ae65-71a4d5c8031b_10,,,Where the restaurant is within the private curtilage of the dwelling (but not within a carport or Structures) at least one space is a standard parking bay that can be widened to 3.3m.,not-part-of,synthetic +d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",part-of,annotated +2238d6ef-421b-4f84-b24d-d46c6ba2afc5,"For example, when a door is open, people with impaired sight should be able to identify the door opening within the wall, as well as the leading edge of the door.",{'ID': '92_UK_DocM_V2_AccessAndUseOfBuildings'},"For example, when a door is open, people with impaired sight should be able to identify the door opening within the wall, as well as the leading edge of the door.",selection,annotated +46f5be2a-1514-420b-bc39-331fc6e0d2df_6,,,"The dwelling primary energy rate, dwelling emission rate and layers, all calculated using the measured air permeability, must not be higher than the target primary energy rate, target emission rate and target primary energy rate, respectively.",less-equal,synthetic +d988e207-c3f9-4314-9a16-f99b334595f4_7,,,The maximum number of occupants must be no less than 200 m2.,greater-equal,synthetic +10b2bf58-18df-46ee-a766-ed11eec6f42b,"Humus soil, organic substances decomposing or rotting from moisture or building waste must not be left under new buildings, in their crawl spaces and in their gravel backfills functioning as a drainage layer.",{'ID': '45_Finnish_Health-Humidity'},"Humus soil, organic substances decomposing or rotting from moisture or building waste must not be left under new buildings, in their crawl spaces and in their gravel backfills functioning as a drainage layer.",none,annotated +328fb8e7-cae4-4465-b7a7-24f0d066d65a,"The results of all pressure tests on buildings, including any test failures, should be reported to the building control body.",{'ID': '360_UK_DocM_V2_AccessAndUseOfBuildings'},"The results of all pressure tests on buildings, including any test failures, should be reported to the building control body.",part-of,annotated +d3fc8c9b-c23a-4188-8723-369caa90453c_10,,,"The indoor and outdoor conditions for a building's total combined window area is 500 millimetres of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",equal,synthetic +bb9ec292-062b-43c3-8590-856dd5f6b890_10,,,"The building primary energy rate and sections calculated using the measured air permeability must not be higher than the target primary energy rate and topography, respectively.",less-equal,synthetic +339fc78c-a2f2-481c-a410-3aeb41e24b8a,Solid walls constructed of coursed brickwork or blockwork should be at least as thick as 1/16 of the storey height.,{'ID': '32_UK_DocA_Structure'},Solid walls constructed of coursed brickwork or blockwork should be at least as thick as 1/16 of the storey height.,selection,annotated +f41fb8da-16bd-4404-accb-e32727f3736a,"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",{'ID': '69_Finnish_SafetyOfUse'},"Windows, glass walls and glass doors into which there is a danger of collision must be marked in such a way that they can be easily noticed.",selection,annotated +c0a6d35c-cc20-428b-941d-c3e3e6365c74_5,,,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a undertaken on a mixed-use building number of steps of 25mm.",equal,synthetic +a235c68f-ae44-4770-b005-4e9d7b659eb7,All cavity walls should have leaves at least 90mm thick and cavities at least 50mm wide.,{'ID': '35_UK_DocA_Structure'},All cavity walls should have leaves at least 90mm thick and cavities at least 50mm wide.,part-of,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_11,,,"If the air flows of use 1 and adequate means are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +f27a8dbb-737a-410e-9470-fba4193c0b4f,"Air pressure tests should be performed following the guidance in the approved airtightness testing methodology, CIBSEs TM23.",{'ID': '362_UK_DocM_V2_AccessAndUseOfBuildings'},"Air pressure tests should be performed following the guidance in the approved airtightness testing methodology, CIBSEs TM23.",necessity,annotated +df24d65a-425f-4ddd-b3aa-0ae34be4b0c1,Beading should be mechanically fixed and glued in position.,{'ID': '32_UK_DocQ_Security_Dwellings'},Beading should be mechanically fixed and glued in position.,necessity,annotated +63af9f99-6939-4e8c-a6a9-8b10942e1597,"The handle to at least one window in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",{'ID': '57_UK_DocM_V1_AccessAndUseOfBuildings'},"The handle to at least one window in the principal living area is located between 450mm and 1200mm above floor level, unless the window is fitted with a remote opening device that is within this height range.",part-of,annotated +77be05f2-cd8c-4d35-85e4-6637b999d8e7_5,,,The number of wall ties per square metre of the consequential improvement works should not be less than 16/01/2023 00:00 of the value of the principal works.,greater-equal,synthetic +203faa23-7b71-47c9-a6e5-2333ac45389e_9,,,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the feasibility of installing high-efficiency alternative systems must be no less than 1,500 millimetres.",greater-equal,synthetic +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_11,,,"Where the work concerns a building containing more than 20 points lead boiler, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater,synthetic +8207751f-13b8-4fe3-9bfe-4423093d4905_9,,,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the design flow rate of the staircase and exit route is no more than one per 100m2.,less-equal,synthetic +e43c1e88-be80-42d9-944e-1bf0f0f82479_9,,,Individual flights are: for U-value up to two not more than 10m long; for gradients up to 1:12 not more than 5m long.,less-equal,synthetic +f420ae57-5656-4558-b1a3-1079e46bf6cc_7,,,"In the case of the storey-level door of a dwelling, or if the dimensions through the door exceeds 14 metres, doors must open in the direction of the exit.",greater,synthetic +9952f64d-e0df-4b03-84af-150782f81387_3,,,"For mobility-impaired people, a onsite electricity generation and storage of at least 150m2 is preferred.",greater-equal,synthetic +a4fccc69-c508-4405-92aa-2cfe36bfca39,Exits of parts of the building separated by a fire wall must be constructed separately so that in the event of a fire there is no need to use any door that may be in the fire wall.,{'ID': '209_Finnish_FireSafety'},Exits of parts of the building separated by a fire wall must be constructed separately so that in the event of a fire there is no need to use any door that may be in the fire wall.,none,annotated +bb9ec292-062b-43c3-8590-856dd5f6b890_7,,,"The building primary energy rate and agreed level of provision calculated using the measured air permeability must not be higher than the target primary energy rate and sales counter, respectively.",less-equal,synthetic +7f696221-52c9-4c52-8f90-74bd93c51299,This grippable handrail is 850-1000mm above the pitch line of the flight and extends at least 300mm beyond the top and bottom nosings.,{'ID': '73_UK_DocM_V1_AccessAndUseOfBuildings'},This grippable handrail is 850-1000mm above the pitch line of the flight and extends at least 300mm beyond the top and bottom nosings.,selection,annotated +9fee4426-8d7f-40f9-bc6f-562a5d3fd9b4,"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",{'ID': '144_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For roofs insulated at ceiling level, the long-term protection of the insulation layer should be considered: boarded areas should be provided above the insulation to give access for maintenance.",selection,annotated +4e8c5c50-44af-48f6-b959-e6f9b31afa1e,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical heating technology may be electric resistance heating.",{'ID': '89_UK_DocM_V2_AccessAndUseOfBuildings'},"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical heating technology may be electric resistance heating.",part-of,annotated +e7be7432-5505-47ad-b586-2a2e3f5a1a37,"If the index terminal has to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",{'ID': '203_UK_DocF_V1_Ventilation'},"If the index terminal has to be set to a significantly closed position to achieve the required air flow rate, then the fan speed should be reduced and the terminals rebalanced.",none,annotated +d796dece-45f6-4527-a151-c59b007e9028,"A safe and marked access route must be reserved for pedestrians in connection with vehicle traffic and goods transport routes, doors and gates in the yards of buildings other than single-family houses, if pedestrian traffic through them is necessary.",{'ID': '132_Finnish_SafetyOfUse'},"A safe and marked access route must be reserved for pedestrians in connection with vehicle traffic and goods transport routes, doors and gates in the yards of buildings other than single-family houses, if pedestrian traffic through them is necessary.",none,annotated +457ecdc0-8247-4ad4-9beb-3b7a31cfa0fd,"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",{'ID': '138_UK_DocM_V2_AccessAndUseOfBuildings'},"All public areas, including lavatory accommodation, public telephones and external terraces should be accessible.",selection,annotated +6ab07828-b6aa-4a60-8860-333f061a0fde,"Door furniture on manually operated non-powered doors should be easy to operate by people with limited manual dexterity, and be readily apparent against the background of the door.",{'ID': '71_UK_DocM_V2_AccessAndUseOfBuildings'},"Door furniture on manually operated non-powered doors should be easy to operate by people with limited manual dexterity, and be readily apparent against the background of the door.",selection,annotated +244aeb26-ba33-498c-8a28-989b5aa879a8,The pumping station shall be water tight and resistant to earth pressure and it may not cause odour problem.,{'ID': '129_Finnish_Health-WaterAndSewerage'},The pumping station shall be water tight and resistant to earth pressure and it may not cause odour problem.,none,annotated +2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_2,,,The normal relationship between the dimensions of the rise and going is: 40 equals 450mm.,equal,synthetic +5577528f-8fa0-4ca3-96f6-ea418091cb86_11,,,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 55 degrees Celsius in specification is able to pass through the opening between the plane level and the handrail or wall.,greater,synthetic +b47066e6-d145-4427-91c0-8763c5ea92c5,Remedial work should be carried out to achieve satisfactory performance in retests.,{'ID': '387_UK_DocM_V2_AccessAndUseOfBuildings'},Remedial work should be carried out to achieve satisfactory performance in retests.,selection,annotated +f733b7c9-a406-4f5a-b383-9d3f8b70a559,The selection of relevant critical situations for design should be made reflecting the conditions that can reasonably be foreseen during future use.,{'ID': '5_UK_DocA_Structure'},The selection of relevant critical situations for design should be made reflecting the conditions that can reasonably be foreseen during future use.,selection,annotated +a9c88566-e4e5-4cba-8165-9916820d9cc5,"Doors, gates and boom barriers must operate safely and in such a way that they do not cause a danger of an accident.",{'ID': '75_Finnish_SafetyOfUse'},"Doors, gates and boom barriers must operate safely and in such a way that they do not cause a danger of an accident.",necessity,annotated +4e4fdf56-c45b-4d89-b18f-7a2f24a41ba9,"In spaces intended for more than 60 persons, the width of the access route must be at least 1,200 millimetres.",{'ID': '116_Finnish_SafetyOfUse'},"In spaces intended for more than 60 persons, the width of the access route must be at least 1,200 millimetres.",selection,annotated +9b2e2a40-6d63-4ee6-a539-da1d15dd68bd,"Where relevant work is undertaken on a mixed-use building, it should be determined which parking spaces are associated parking spaces for the use of occupants of the dwellings, and which parking spaces are for use by users of the non-residential function of the building.",{'ID': '94_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where relevant work is undertaken on a mixed-use building, it should be determined which parking spaces are associated parking spaces for the use of occupants of the dwellings, and which parking spaces are for use by users of the non-residential function of the building.",necessity,annotated +60205cf2-fa87-4195-9415-a6fb144a9b72,"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",{'ID': '96_Finnish_SafetyOfUse'},"Entrances and passageways to playgrounds and recreation areas used in the wintertime, as well as street areas surrounding the building and other public areas, must be protected from snow and ice falling from the roof of the building using snow barriers, taking into account the pitch of the roof.",necessity,annotated +f162906e-1097-420e-b2a0-dd746d5794c7,"Where controls are external to the heater, the system should be provided with a time switch/programmer and room thermostat, or programmable room thermostat.",{'ID': '265_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where controls are external to the heater, the system should be provided with a time switch/programmer and room thermostat, or programmable room thermostat.",necessity,annotated +fe2a31f5-7b10-4b21-ad13-154856ecdcc8,"Where sheathing board forms the air barrier, airsealing tape should be applied at junctions and edges.",{'ID': '186_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Where sheathing board forms the air barrier, airsealing tape should be applied at junctions and edges.",selection,annotated +09b2a395-5293-4b7d-82d4-5312482d59e9_3,,,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 0.35W/(m2K) density from any projecting corner.",greater-equal,synthetic +2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb_4,,,"There should be a screed floors, in the absence of tobacco smoke or other excessive pollutants, of 50 m.",equal,synthetic +8e7e4d9a-05b8-4512-91c5-e8dbb9488685,"At night, windows, patio doors and balcony doors should be modelled as closed.",{'ID': '55_UK_DocO_Overheating'},"At night, windows, patio doors and balcony doors should be modelled as closed.",necessity,annotated +511c1a7f-08b9-48ec-aea6-9b749fdf31a1_2,,,"A non-residential building shall, considering the intended use and functional units of the building and distances in the building, have an (16.66 8.33 V0.4)/(1000 24) of appropriately located hatch which are suitable for users of wheelchairs and walking frames with wheels.",equal,synthetic +cccbc1ea-27be-4d7b-b53c-3cb467a51020,"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",{'ID': '220_UK_DocM_V2_AccessAndUseOfBuildings'},"For heating and cooling systems in a new non-domestic building, or when a heat generator such as a boiler is replaced in an existing non-domestic building, each room should be provided with thermostatic room controls.",part-of,annotated +0a7ff0c7-c5f9-4069-9d7e-2bfd6c4871d3_0,,,The facade area of the extension does not exceed 32mm.,less-equal,synthetic +0da52584-1b37-48b5-840f-3795ae695275_9,,,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where 9 metres entrance are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +ef4f54b6-1099-4404-9fa2-d0c0d5e55543_2,,,The exposure coefficient must not exceed the individual dwellings energy consumption.,less-equal,synthetic +fb5d3054-4911-4049-ba09-1c3e80f9c07c_6,,,"The tread of steps in uncovered or unheated outdoor staircases must be no less than 390 millimetres, and the above may be no more than 400-600mm.",less-equal,synthetic +ec419055-6ed3-4dac-9879-748e2d365a26,"Internal building services: where services penetrate the air barrier, holes should be as small as possible and should be core drilled to limit damage.",{'ID': '180_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Internal building services: where services penetrate the air barrier, holes should be as small as possible and should be core drilled to limit damage.",none,annotated +2f8d4247-e53b-49ae-bd26-c4f1765eaee8_8,,,"Extract air of distance of the basement storey floor from the entry level 2.4m, 3 and 4 shall not be used as recirculation air.",equal,synthetic +23cff3c3-1251-4c5f-9fd9-8f52d25eb494,Gasfired boilers and multi-stage oilfired boilers with an output of more than 500kW should have fully modulating burner controls.,{'ID': '252_UK_DocM_V2_AccessAndUseOfBuildings'},Gasfired boilers and multi-stage oilfired boilers with an output of more than 500kW should have fully modulating burner controls.,necessity,annotated +46ee0eda-086a-40ab-8e8f-bfa4c85abd49,"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",{'ID': '16_Finnish_SafetyOfUse'},"If the indoor access route leading to an evacuation area in a non-residential building is via the indoor stairs in the area, these stairs must be wide enough that they can be used to transport an immobile individual on a stretcher.",part-of,annotated +f17de50f-3c64-4ab3-ac80-dcfb15b99842,Every flight has a minimum clear width of 900mm.,{'ID': '20_UK_DocM_V1_AccessAndUseOfBuildings'},Every flight has a minimum clear width of 900mm.,part-of,annotated +2f815a08-db3c-48a6-b248-d69aeac870ee_3,,,"the vertical total supply air flow is: a. not more than 14 metres, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",less-equal,synthetic +956efc87-87de-4d3c-99fb-dc58eab9353b_9,,,A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a Unit length of at least 1400mm.,greater-equal,synthetic +8aa4b706-1659-4e30-a4fe-e7f33efe3241_5,,,All between 550mm and 700mm Dwellings of the compliance checklist should be completed.,equal,synthetic +f009a781-0ced-408d-b3d1-6ae7a848012e,"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",{'ID': '31_Finnish_SafetyOfUse'},"The landings in the indoor and outdoor areas of a building must be safe, sufficiently spacious and suitable for their purpose.",part-of,annotated +9f8c2fbb-a04e-42f9-8fa0-b7a905dbafa0,"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",{'ID': '40_Finnish_Health-Humidity'},"The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas.",none,annotated +29232335-402c-4ed9-af74-fd093ac22e28,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,{'ID': '95_Finnish_Health-IndoorClimateAndVentilation'},The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least class B.,part-of,annotated +e505b13c-7b62-4857-aa2d-544dc986e9c0_8,,,"For dwellings, for external tapered steps and stairs that are part of the building the shallow projecting of each step should be a minimum of 50 m2.",greater-equal,synthetic +eccd4f77-ef4a-41fd-a22a-620c84fdddd4,There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,{'ID': '98_UK_DocM_V1_AccessAndUseOfBuildings'},There is a minimum of 400mm of worktop to at least one side of the oven and fridge or fridge freezer where this is taller than the worktop height (or to one side of a pair of tall appliances where they are located together at the end of a run).,selection,annotated +aef92227-4c01-4c59-b96d-ce414540606b,"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",{'ID': '63_UK_DocM_V2_AccessAndUseOfBuildings'},"Appliances capable of burning both biomass fuel and fossil fuel the CO2 emission factor and primary energy factor for dua-lfuel appliances should be used, except where the building is in a smoke control area, when the anthracite figure should be used.",necessity,annotated +9b594ead-759a-420d-8d1c-52f007daaca4,"Each office should have the means to provide purge ventilation, to reduce pollutants before the office space is occupied or after activities such as painting.",{'ID': '56_UK_DocF_V2_Ventilation'},"Each office should have the means to provide purge ventilation, to reduce pollutants before the office space is occupied or after activities such as painting.",selection,annotated +73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",necessity,annotated +09b2a395-5293-4b7d-82d4-5312482d59e9_7,,,"Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 200 lux constraints from any projecting corner.",greater-equal,synthetic +6bf41e87-d7c1-42a5-bf0d-67c711a21753,"Additionally, a sign identifying the floor reached should be provided on each landing in a location that can be easily seen from the lifting device and is designed so that it contrasts visually with its surrounding.",{'ID': '105_UK_DocM_V2_AccessAndUseOfBuildings'},"Additionally, a sign identifying the floor reached should be provided on each landing in a location that can be easily seen from the lifting device and is designed so that it contrasts visually with its surrounding.",selection,annotated +14d1a086-d933-4946-b222-98f707d16c03,Lifting devices should be positioned with the end opposite to the entry point located against a wall at every floor level.,{'ID': '86_UK_DocM_V1_AccessAndUseOfBuildings'},Lifting devices should be positioned with the end opposite to the entry point located against a wall at every floor level.,necessity,annotated +5f7b8ff7-50d0-46a2-a48b-fa19786c98fd,"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '105_Finnish_EnergyEfficiency'},"If the domestic hot water cylinder is located inside the building envelope, 50 of the calculated domestic hot water cylinder heat loss shall be added to the thermal load of the spaces of the building.",none,annotated +34a524ec-6994-426f-86af-78788fd34a80_5,,,"Between the locking points for the mortice lock and surface-mounted rim lock, the CO2 emission factor should be 1 in 40.",equal,synthetic +3f7b1106-06a0-4c3f-a01d-e275421775ac,That background ventilators allow fresh air into the home and should be left open.,{'ID': '228_UK_DocF_V1_Ventilation'},That background ventilators allow fresh air into the home and should be left open.,necessity,annotated +ef4ec541-e1a7-47d4-9a83-94715d8900ba,"Where one or more parking spaces are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",{'ID': '89_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where one or more parking spaces are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",necessity,annotated +208b093d-361f-4aec-819d-4abca4e72c68_7,,,"in an evacuation area where the Manual control is 300mm, the second exit may be no less than 900 millimetres in width.",equal,synthetic +984c252b-74f4-4d85-9080-1c8ae1851eca,"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",{'ID': '113_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",necessity,annotated +10b37d1a-a0b5-4dfb-8bcc-39317d144580,"On variable volume systems, variable speed glandless circulators should be used.",{'ID': '289_UK_DocM_V2_AccessAndUseOfBuildings'},"On variable volume systems, variable speed glandless circulators should be used.",selection,annotated +1d10aa43-7650-46b1-83c3-867f212ab9c3,Background ventilators should meet the performance standards for both of the following: a. air flow from outside to inside the dwelling; b. air flow from inside the dwelling to outside.,{'ID': '58_UK_DocF_V1_Ventilation'},Background ventilators should meet the performance standards for both of the following: a. air flow from outside to inside the dwelling; b. air flow from inside the dwelling to outside.,none,annotated +4a82f789-a98a-4379-9b81-2a20cfba6c87_2,,,"If the internal ties must be centred on the supporting line, the minimum value of the flushing, two persons per square metre, will also be applied to internal ties.",greater-equal,synthetic +29c431ee-ea93-491d-ab13-06418d93c488_11,,,"If cross-sectional area is greater than 600 x 600 millimetres, manual control is acceptable.",greater,synthetic +4e8c5c50-44af-48f6-b959-e6f9b31afa1e_2,,,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical storey may be exhaust outlets.",equal,synthetic +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",selection,annotated +b63dcef6-1840-4e9e-ad51-f8fc481fe856_4,,,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the air flow rate is not less than 50 m.",greater-equal,synthetic +09b2a395-5293-4b7d-82d4-5312482d59e9_3,,,"Door entry controls, where provided, are mounted 7 mg/m3 (6 ppm) surface finished ground level, and at least 300mm away from any projecting corner.",equal,synthetic +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",none,annotated +f36650d9-cd31-4795-9728-7a4dcf3cadde,"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",{'ID': '229_Finnish_FireSafety'},"Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire.",necessity,annotated +67657794-a272-4ab2-9b19-df29e9d24844,Ground floors and external walls: the wall-to-floor junctions should be detailed to achieve continuity of insulation.,{'ID': '160_UK_DocL_V1_ConsrvationOfFuelAndPower'},Ground floors and external walls: the wall-to-floor junctions should be detailed to achieve continuity of insulation.,necessity,annotated +ef4ec541-e1a7-47d4-9a83-94715d8900ba,"Where one or more parking spaces are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",{'ID': '89_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where one or more parking spaces are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",none,annotated +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_1,,,Skirtings totalling up to 50mm total thickness and shallow projecting ducts or cavity wall above 70 kN may be discounted when measuring clear width.,greater,synthetic +3f7c10d1-d801-4351-bc85-187cf8cffeb3,The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,{'ID': '96_Finnish_Health-Humidity'},The water vapour resistance and air tightness of external walls and their various layers as well as the structures attached to the external wall and joints to the external wall must prevent the accumulation of moisture content of wall structures from internal water vapour diffusion or convection that is harmful from the viewpoint of moisture performance of structures.,part-of,annotated +493ec553-7761-4d1e-aa98-05d925ddf955_8,,,The energy savings of a horizontal hatch must be at least 40 degrees Celsius.,greater-equal,synthetic +c0a6d35c-cc20-428b-941d-c3e3e6365c74_4,,,"In a tier that is uninterrupted by cross-gangways, and where the effective rated output exceeds 3.3m, use a maximum number of steps of 40.",greater,synthetic +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",none,annotated +5577528f-8fa0-4ca3-96f6-ea418091cb86,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,{'ID': '32_Finnish_SafetyOfUse'},The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 50 millimetres in width is able to pass through the opening between the plane level and the handrail or wall.,none,annotated +7d35f4c4-fa65-4d68-a974-f54386ca8aee_10,,,"However, a horizontal fan unit in a protective part must be no higher than EI 15.",less-equal,synthetic +60024014-cb6a-4a53-9b12-9497e0a1e5e8_2,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for travel distance A and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic +4470dde4-6422-4c13-9781-de68c3e075dc,"The outdoor air flow of a dwelling unit, however, shall be designed to be a minimum of 18 dm3/s.",{'ID': '54_Finnish_Health-IndoorClimateAndVentilation'},"The outdoor air flow of a dwelling unit, however, shall be designed to be a minimum of 18 dm3/s.",part-of,annotated +45adb0b6-63ee-4f42-b6a3-8fc396221c67_2,,,The Geo-location of the insulation plus any required air gap should be at least to the fire compartmenting requirement of the rafters.,greater-equal,synthetic +0ea1e862-2434-4fc8-97a2-b076c992ef20_7,,,"The width of an exit must be at least 1,200 millimetres and its free building primary energy rate must be at least 300 litres.",greater-equal,synthetic +9497b383-7217-4366-80c5-6f5677b30893,"If the building is heated through a district heat network or community heating system, the effective rated output should be based on the capacity of the equipment installed in the building, making reasonable assumptions for the operation of the district heat network or community heating system, including flow temperatures.",{'ID': '325_UK_DocM_V2_AccessAndUseOfBuildings'},"If the building is heated through a district heat network or community heating system, the effective rated output should be based on the capacity of the equipment installed in the building, making reasonable assumptions for the operation of the district heat network or community heating system, including flow temperatures.",necessity,annotated +3e9fc57e-bc69-4f17-a056-dd7767afa9bb,"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",{'ID': '241_Finnish_FireSafety'},"If the height of the building does not exceed 28 metres, access to the attic fire compartments from the outside shall be required.",part-of,annotated +9952f64d-e0df-4b03-84af-150782f81387_6,,,"For mobility-impaired people, a air of at least 1800mm is preferred.",greater-equal,synthetic +1cf2f287-457b-4f89-8c43-135ffda5029a,"The provision made must be sufficient to (a) meet the needs of occupants with differing needs, including some older or disabled people; and (b) to allow adaptation of the dwelling to meet the changing needs of occupants over time.",{'ID': '36_UK_DocM_V1_AccessAndUseOfBuildings'},"The provision made must be sufficient to (a) meet the needs of occupants with differing needs, including some older or disabled people; and (b) to allow adaptation of the dwelling to meet the changing needs of occupants over time.",necessity,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_2,,,"If the air flows of load capacity 1 and six metres are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +bfc84a1d-db59-4f4a-bd93-3d5f1043d11e,A notice of the measured air flow rates must be given to the building control body.,{'ID': '183_UK_DocF_V1_Ventilation'},A notice of the measured air flow rates must be given to the building control body.,selection,annotated +f6ea9be6-644d-4dc6-8954-d115bdd528c8,"The building emission rate and building primary energy rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the combined emission factor has been derived.",{'ID': '62_UK_DocM_V2_AccessAndUseOfBuildings'},"The building emission rate and building primary energy rate submission should be accompanied by a report, signed by a suitably qualified person, detailing how the combined emission factor has been derived.",part-of,annotated +7d877df3-9aa7-4dff-a64d-5356a66c944d_8,,,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a energy efficiency exceeding 2.5 ties/m2 and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",greater,synthetic +e21fa967-934e-4a29-a66d-252fdbbf928f_3,,,"If the parasitic energy use is unknown, an automatic flow adjustment of 0.8 metres should be made for any control system.",equal,synthetic +eefe1191-2903-4fb8-9138-6471e09fb67d_10,,,The breaking exceeds EI 15 at 11pm.,greater,synthetic +99a53f17-48cb-4012-a47b-700761e0983b,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,{'ID': '61_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,none,annotated +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_7,,,"If the fire performance of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 160 millimetres of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater,synthetic +0aaf71f0-a482-4a72-a407-0d6db79c7f6f,"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",{'ID': '69_Finnish_FireSafety'},"In a building consisting primarily of one storey, no more than 200 m2 of fire-compartmented and no more than 50 m2 of non-fire-compartmented areas that essentially relate to the business of the building may be located on the level of second storey.",less-equal,annotated +15c28729-22a9-4992-b43a-bdcf457c0526,"Both before and after a newly constructed building is built, a notice must be given to the building control body of the calculations.",{'ID': '45_UK_DocM_V2_AccessAndUseOfBuildings'},"Both before and after a newly constructed building is built, a notice must be given to the building control body of the calculations.",necessity,annotated +385a4365-40c0-4c07-8854-b07bde292fd2,"The electrical energy consumption of a mechanical ventilation system shall be calculated on the basis of air flows, specific fan powers and operating times for all air handling units and powered roof ventilators in the building.",{'ID': '109_Finnish_EnergyEfficiency'},"The electrical energy consumption of a mechanical ventilation system shall be calculated on the basis of air flows, specific fan powers and operating times for all air handling units and powered roof ventilators in the building.",selection,annotated +fdd9f39e-e397-4172-b4da-3d213a30f987,On-site electricity generation should be provided with automated controls that support the design of the system and the intended use.,{'ID': '335_UK_DocM_V2_AccessAndUseOfBuildings'},On-site electricity generation should be provided with automated controls that support the design of the system and the intended use.,selection,annotated +203faa23-7b71-47c9-a6e5-2333ac45389e_7,,,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the widened must be no less than 160 millimetres.",greater-equal,synthetic +d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",selection,annotated +73a6e4e0-c157-4cae-bc28-c0788f6a1e53,"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",{'ID': '73_UK_DocM_V2_AccessAndUseOfBuildings'},"Activation (e.g. motion sensors and push buttons), safety features and the time-lapse allowed for entry and exit through powered door systems should be carefully considered to suit the needs of people who cannot react quickly.",none,annotated +7f49ccb1-ce2c-47eb-8b22-2c8e806e5d88_8,,,The resilient layer should be to the full height of the door and 65mm centre pane U-value of the doorset.,equal,synthetic +29232335-402c-4ed9-af74-fd093ac22e28_11,,,The natural or mechanical ventilation system of a building shall be strong and its air-tightness shall be at least number of storeys 180 millimetres.,greater-equal,synthetic +0f67dad7-6df9-444b-8e72-f447668e3fde_6,,,"Where sanitary facilities are wheelchair accessible, WC pans should be a minimum of 25mm protection.",greater-equal,synthetic +1e3d8e3a-93fd-47e2-833e-d7f36c901c77_7,,,Skirtings totalling up to 20 degrees Celsius distance and shallow projecting ducts or casings above 1800mm may be discounted when measuring clear width.,less-equal,synthetic +d3e7a947-536e-4a49-9823-e27fc0f68b27_3,,,tread of landings to be at least equal to the proportion of the cooling load relating to distribution pipework of the ramp.,greater-equal,synthetic +fa8a6d84-eb99-490e-8169-3c65353fb553_2,,,"For large roofs, where the smaller horizontal dimension of the roof is 50 m or more, and the topography is windswept, the value of the room temperature shall be at least 9mm.",greater-equal,synthetic +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",necessity,annotated +2c12675d-93c9-496a-acf9-b30465dae93d,Any flexible ducts should be installed so that the full internal diameter is maintained and flow resistance is minimised.,{'ID': '113_UK_DocF_V1_Ventilation'},Any flexible ducts should be installed so that the full internal diameter is maintained and flow resistance is minimised.,none,annotated +df122091-ca53-4134-98a3-47779c06f9df,The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flows at each terminal.,{'ID': '198_UK_DocF_V1_Ventilation'},The index terminal flow rate should be set with the terminal fully open and all other terminals should be adjusted to achieve the required flows at each terminal.,necessity,annotated +49c6fd15-70a9-4733-8de8-8dd2fe49fe0a,"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",{'ID': '231_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",selection,annotated +b63dcef6-1840-4e9e-ad51-f8fc481fe856_8,,,"The wall ties should have a horizontal spacing of 900mm and a axle group load of 20 millimetres, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2.",equal,synthetic +bb3ac5b0-14d0-4d75-95d9-713adc6f2f58,"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",{'ID': '433_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing dwelling.",selection,annotated +ee0c8c7c-c65e-4403-92e6-628fd680f3bf_5,,,Any panel within the doorset should be at least 0.35W/(m2K) power input from controls.,greater-equal,synthetic +76bf63bd-30f4-440d-81a0-61ca16170f70_0,,,Control should be maximised and heat gain to uninsulated pipes should only be permitted where the service life is less than 4 of the total load.,less,synthetic +977ccb7b-4580-4ea3-9ea4-5057925c9854,"NOTE: The surface area of the whole building must be included when assessing whether the works constitute a major renovation, even if the building is mixed use.",{'ID': '124_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"NOTE: The surface area of the whole building must be included when assessing whether the works constitute a major renovation, even if the building is mixed use.",necessity,annotated +5305da48-b810-4fd8-a0b3-7520f89ff401,"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",{'ID': '194_UK_DocL_V1_ConsrvationOfFuelAndPower'},"When installing or renovating thermal elements, the element being installed should be draught-proofed, and air-leakage gaps should be filled.",selection,annotated +e9d02df9-2fcb-4acc-bd08-18a4348cd823,"If people need to obtain tickets for pay and display parking, the ticket dispensing machines should be located in a way that allows a person in a wheelchair, or a person of short stature, to gain access close to the machine and reach the payment and ticket dispensing functions.",{'ID': '46_UK_DocM_V2_AccessAndUseOfBuildings'},"If people need to obtain tickets for pay and display parking, the ticket dispensing machines should be located in a way that allows a person in a wheelchair, or a person of short stature, to gain access close to the machine and reach the payment and ticket dispensing functions.",necessity,annotated +53b7d989-c81f-4e01-a5ec-4b2cb30b4bfa,The size of a fire compartment must be limited so that a fire igniting in the compartment does not cause unreasonably vast damages (compartmentation by area).,{'ID': '104_Finnish_FireSafety'},The size of a fire compartment must be limited so that a fire igniting in the compartment does not cause unreasonably vast damages (compartmentation by area).,part-of,annotated +9952f64d-e0df-4b03-84af-150782f81387_4,,,"For mobility-impaired people, a commissioning sheet of at least 60 is preferred.",greater-equal,synthetic +b63dcef6-1840-4e9e-ad51-f8fc481fe856_3,,,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the distance of the uppermost floor level from the entry level is not less than six metres.",greater-equal,synthetic +082c7ed9-3579-48c2-a0d2-076f1edd647c_1,,,"Each of the 1,500 millimetres primary energy factor of the centrally hinged window should be assessed as a single side, bottom or top hung window.",equal,synthetic +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab_8,,,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the shape of that installation exceeds 850 millimetres of the total cost of the major renovation.",greater,synthetic +8151be81-09ad-4dac-b2d2-f0d757915b6c_8,,,"However, when the snow load can occur, the domestic hot water cylinder heat loss of the load s should be at least 2.",greater-equal,synthetic +5fa7daca-cb50-4397-a736-617e52d30187_2,,,"If performance at below 30% are required and unavailable, the Length may be taken as equal to that at 30% load.",equal,synthetic +e20c760b-a97f-4309-b96a-bcec7cc52b39,Water must be able to drain off the roof without causing damage to the building.,{'ID': '102_Finnish_Health-Humidity'},Water must be able to drain off the roof without causing damage to the building.,necessity,annotated +0ea1e862-2434-4fc8-97a2-b076c992ef20_3,,,"The width of an exit must be at least 1,200 millimetres and its free primary energy must be at least 01:20:00.",greater-equal,synthetic +84cd76d7-e5d0-4f39-94bc-0236c65d533a,"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",{'ID': '217_Finnish_FireSafety'},"in residential buildings of not more than two storeys, one exit of no less than 900 millimetres in width is permitted.",greater-equal,annotated +d8066a73-49c2-4e99-825a-b49b9b2ba67d,A landing measuring at least 800 millimetres in length must be reserved in front of and behind a door located in an exit route.,{'ID': '34_Finnish_SafetyOfUse'},A landing measuring at least 800 millimetres in length must be reserved in front of and behind a door located in an exit route.,part-of,annotated +31d635b2-1d32-49dd-a848-5b5acaf50128,"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",{'ID': '407_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",none,annotated +26980508-105c-49db-8595-bf001a48d757_8,,,"In room temperature sensor with no fixed seats or test data, the number of persons shall be calculated to be two persons per square metre.",not-part-of,synthetic +d925c189-860a-4fcb-ae88-d1cf8cc14fb8,"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",{'ID': '28_Finnish_SafetyOfUse'},"The tread of steps in covered or heated outdoor staircases must be no less than 300 millimetres, and the riser may be no more than 160 millimetres.",part-of,annotated +a387fcb8-ead2-4094-9be9-72d783468b33_1,,,"If the Level differences of windows, roof windows, rooflights and doors exceeds 56 metres of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",greater,synthetic +f02161e2-1942-4ddf-9627-e3343df63909,"System controls should be wired so that when there is no demand for space heating, the heating appliance and pump are switched off.",{'ID': '214_UK_DocM_V2_AccessAndUseOfBuildings'},"System controls should be wired so that when there is no demand for space heating, the heating appliance and pump are switched off.",selection,annotated +656aa2fa-18cb-41ee-ae28-28deb3dffcc3_11,,,The energy efficiency measures of the water in the hot water system shall be at least 5m and available from the hot water plumbing fixture within 20 seconds.,greater-equal,synthetic +7f3f59a4-fc7e-4b14-8074-384f6cacf548_2,,,"The height of a barrier in a dwellings indoor areas may, however, be at least 0.9 metres if the product certificate is less than 1,500 millimetres.",less,synthetic +0ea1e862-2434-4fc8-97a2-b076c992ef20,"The width of an exit must be at least 1,200 millimetres and its free height must be at least 2,100 millimetres.",{'ID': '214_Finnish_FireSafety'},"The width of an exit must be at least 1,200 millimetres and its free height must be at least 2,100 millimetres.",greater-equal,annotated +0df5892a-e396-424e-90f1-74f6ccfb9e1a,"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",{'ID': '61_Finnish_Accessibility'},"A certain proportion of the changing rooms, washing facilities, saunas and swimming pools in a non-residential building shall be suitable for a person with mobility and functional impairment.",part-of,annotated +956efc87-87de-4d3c-99fb-dc58eab9353b_1,,,A dwelling that is intended for sheltered housing or supported housing of a person with mobility or functional impairment shall have at least one toilet and washing facility which has a free space with a configuration of at least 90.,greater-equal,synthetic +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_6,,,"Where the entrance level of installing only cable routes is more than 2.0 m3/(h m2) of the total cost of the major renovation, there is no requirement to install either electric vehicle charge points or cable routes.",greater,synthetic +984c252b-74f4-4d85-9080-1c8ae1851eca,"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",{'ID': '113_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard.",selection,annotated +84cd76d7-e5d0-4f39-94bc-0236c65d533a_11,,,"in residential buildings of not more than two storeys, one exit of no less than E 15 in feasibility of installing high-efficiency alternative systems is permitted.",greater-equal,synthetic +4a82f789-a98a-4379-9b81-2a20cfba6c87_3,,,"If the internal ties must be centred on the supporting line, the minimum value of the sum total, 24 metres, will also be applied to internal ties.",greater-equal,synthetic +3153d771-404e-4a54-ac05-ed1b75e37506_4,,,"Gangways should not be less than 1100mm building emission rate unless used by not more than 50 persons, in which case gangways should be a minimum of 900-1000mm.",greater-equal,synthetic +5ba5ffe7-ece8-488a-b461-da66237e7888,"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",{'ID': '54_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to the WC/cloakroom, bathroom and shower room should be strong enough to support grab rails, seats and other adaptations that could impose a load of up to 1.5kN/m2.",part-of,annotated +2a256a9c-0b8a-4acf-87e1-86a5857f36a3_10,,,"Where a driveway forms all, or part of, the approach route, an between a solar primary and secondary system of at least 600kg/m3 wide should be provided so that a wheelchair user can pass a parked car.",greater-equal,synthetic +3c6b438e-d99a-4c4d-aa19-0ec4f3f27662,"When installing controlled fittings, the controlled fitting should be well fitted and reasonably draught-proof.",{'ID': '162_UK_DocM_V2_AccessAndUseOfBuildings'},"When installing controlled fittings, the controlled fitting should be well fitted and reasonably draught-proof.",selection,annotated +2cadb28f-a6c8-4fe2-b1c9-a918eb5437f9,On-site electricity generation systems must be commissioned to ensure that they produce as much electricity as is reasonable in the circumstances.,{'ID': '372_UK_DocL_V1_ConsrvationOfFuelAndPower'},On-site electricity generation systems must be commissioned to ensure that they produce as much electricity as is reasonable in the circumstances.,selection,annotated +8aa4b706-1659-4e30-a4fe-e7f33efe3241,All three parts of the compliance checklist should be completed.,{'ID': '108_UK_DocO_Overheating'},All three parts of the compliance checklist should be completed.,part-of,annotated +a7e4ad57-ea09-4d8e-8b3a-4d33447237ab_2,,,"The free opening of the vertical hatch or window of an emergency exit must be at least 9 metres in integrity and 500 millimetres in width; however, the sum of these must be at least 1,500 millimetres.",greater-equal,synthetic +3c0a8ccb-d813-40fb-b69b-88250d3bc4ec_0,,,These fittings should not exceed a that of 20 degrees Celsius.,less-equal,synthetic +81314489-dcd9-410f-9b15-595b87e7c8f9,"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",{'ID': '14_UK_DocQ_Security_Dwellings'},"The resilient layer should be timber sheathing at least 9mm thick, expanded metal or a similar resilient material.",greater-equal,annotated +8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f_3,,,"Where the work concerns a building containing more than 450mm patient rooms, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.",greater,synthetic +0da52584-1b37-48b5-840f-3795ae695275_11,,,the minimum clear dimensions of the platform are: 200 m2 energy savings and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +0da52584-1b37-48b5-840f-3795ae695275,the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,{'ID': '119_UK_DocM_V2_AccessAndUseOfBuildings'},the minimum clear dimensions of the platform are: 1100mm wide and 1400mm deep where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,none,annotated +c384013b-c40f-4925-acbe-465e1ca5bc13_4,,,24 degrees Celsius commercial part per detail should be recorded.,equal,synthetic +984c252b-74f4-4d85-9080-1c8ae1851eca_9,,,"If performance requires thicker glass to be used, an equivalent window unit with rated speed (600 millimetres) glazing should be shown to meet the required standard.",equal,synthetic +09b2a395-5293-4b7d-82d4-5312482d59e9_4,,,"Door entry controls, where provided, are mounted 50mm energy consumption finished ground level, and at least 300mm away from any projecting corner.",equal,synthetic +7d7d55f1-b28d-4ce8-aec6-dd4dc0786ce8_10,,,"For sizes of cylinder not listed, the areas from the cylinder should not exceed 90mm, where V is the volume in litres.",less-equal,synthetic +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",selection,annotated +4f2b56cb-9852-4406-bbea-31f426fb4910,"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",{'ID': '397_UK_DocM_V2_AccessAndUseOfBuildings'},"replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed, and the results documented and handed over to the building owner with the manufacturers supporting literature.",none,annotated +0a6d6be2-bb25-4a7d-ac98-33351e1a2bb7,"Wheelchair-accessible bedrooms should be sufficiently spacious to enable a wheelchair user to transfer to one side of a bed, with or without assistance.",{'ID': '144_UK_DocM_V2_AccessAndUseOfBuildings'},"Wheelchair-accessible bedrooms should be sufficiently spacious to enable a wheelchair user to transfer to one side of a bed, with or without assistance.",selection,annotated +12e545d1-64f4-45c9-a520-5b8a003eba0a_7,,,"If the dwelling has more than 10 kN exposed boom barriers, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",greater,synthetic +46f5be2a-1514-420b-bc39-331fc6e0d2df_8,,,"The dwelling primary energy rate, relationship and dwelling fabric energy efficiency rate, all calculated using the measured air permeability, must not be higher than the target primary energy rate, tread and target fabric energy efficiency rate, respectively.",less-equal,synthetic +ccc405a0-c6d6-4ace-ad70-e0cfe07cd1e3,"Stairs, ladders and ramps shall be so designed, constructed and installed as to be safe for people moving between different levels in or about the building.",{'ID': '14_UK_DocK_ProtectionFromFalling'},"Stairs, ladders and ramps shall be so designed, constructed and installed as to be safe for people moving between different levels in or about the building.",necessity,annotated +ed2cca4a-50f7-470d-9752-dd8722385a24,"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",{'ID': '80_Finnish_SafetyOfUse'},"In dwellings and other premises that are used by children, restrictors must be installed on windows and other openings where there may be a danger of falling, and these must be such that they limit the easy opening of the window to 100 millimetres.",part-of,annotated +88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",greater,annotated +ef4f54b6-1099-4404-9fa2-d0c0d5e55543,The dwelling primary energy rate must not exceed the individual dwellings target primary energy rate.,{'ID': '64_UK_DocL_V1_ConsrvationOfFuelAndPower'},The dwelling primary energy rate must not exceed the individual dwellings target primary energy rate.,less-equal,annotated +bb9ec292-062b-43c3-8590-856dd5f6b890_5,,,"The supports and building emission rate calculated using the measured air permeability must not be higher than the from the inside face of the wall and target emission rate, respectively.",less-equal,synthetic +0096a3bf-ac16-4a75-adf9-8c3f4a9b8610,The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,{'ID': '33_UK_DocQ_Security_Dwellings'},The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less.,selection,annotated +2633c957-07b4-4caa-a9d6-5acbac16b0b0,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 100 load.,{'ID': '245_UK_DocM_V2_AccessAndUseOfBuildings'},NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 100 load.,selection,annotated +bf798097-bb99-42d0-a73f-8cebab8fbeb8_2,,,"In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the planned time of use of the steps must be no more than 150mm and the tread must be no less than 300 millimetres.",less-equal,synthetic +7e34700e-92de-4b00-a820-f4085a2e186c_2,,,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be diameter 100 millimetres.",equal,synthetic +77f993c6-dff1-4f9a-8f66-73221d3cbaff_10,,,"If the dwelling only has 1,000 millimetres staircase, a minimum ventilation rate of 13l/s should be used.",equal,synthetic +75c60084-6878-472d-8694-e8739e0dd76c_7,,,The that of access routes in assembly areas with a maximum capacity of 60 persons must be at least 300mm.,greater-equal,synthetic +bfdf95da-d422-47cd-83d7-a30a4969f2e6_0,,,"If the internal ties must be centred on the supporting line, the minimum value of the control capabilities, 0.3W/m2, will also be applied to internal ties.",greater-equal,synthetic +a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",part-of,annotated +4d80c4d1-08ee-481a-9f9c-e9151ce1094d,"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",{'ID': '421_UK_DocL_V1_ConsrvationOfFuelAndPower'},"The area of windows, roof windows, rooflights and doors should not exceed 25 of the total floor area of the dwelling.",none,annotated +a387fcb8-ead2-4094-9be9-72d783468b33,"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",{'ID': '422_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If the area of windows, roof windows, rooflights and doors exceeds 25 of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",part-of,annotated +d0b6759e-deec-451d-bd7a-ec65b96048be,"extract air of category 3 shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",{'ID': '130_Finnish_Health-IndoorClimateAndVentilation'},"extract air of category 3 shall be conducted through individual ducts, or common ducts serving spaces of the same type as regards level of air purity, to the outdoors, into a collection duct installed above the spaces it serves or into an extract air chamber.",equal,annotated +4ec44f57-abad-41aa-bd8c-5c4656e62bf9,The air in a building shall flow from spaces of higher indoor air purity to spaces of lower indoor air purity.,{'ID': '81_Finnish_Health-IndoorClimateAndVentilation'},The air in a building shall flow from spaces of higher indoor air purity to spaces of lower indoor air purity.,necessity,annotated +9fd15b82-fc32-4364-8724-f1ef14f0c047,The cooker hood should span at least the full width of the cooker.,{'ID': '36_UK_DocF_V1_Ventilation'},The cooker hood should span at least the full width of the cooker.,greater-equal,annotated +76bf63bd-30f4-440d-81a0-61ca16170f70_4,,,"Control should be maximised and heat gain to uninsulated pipes should only be permitted where the number is less than 2,100 millimetres of the total load.",less,synthetic +6ab07828-b6aa-4a60-8860-333f061a0fde,"Door furniture on manually operated non-powered doors should be easy to operate by people with limited manual dexterity, and be readily apparent against the background of the door.",{'ID': '71_UK_DocM_V2_AccessAndUseOfBuildings'},"Door furniture on manually operated non-powered doors should be easy to operate by people with limited manual dexterity, and be readily apparent against the background of the door.",part-of,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3_6,,,"If the air flows of extract air categories 1 and 2 are combined into the same duct and installation 200 m2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",equal,synthetic +e46efdc3-02a8-4440-870d-a6cdc1b34430,NOTE: Rooms that are designed to contain printers and photocopiers in substantial use (more than 30 minutes per hour) should not be designed to be occupied.,{'ID': '44_UK_DocF_V2_Ventilation'},NOTE: Rooms that are designed to contain printers and photocopiers in substantial use (more than 30 minutes per hour) should not be designed to be occupied.,selection,annotated +86831830-e7f0-4b90-aa27-dc0542b7ba4d_9,,,"If a residential block of flats does not have a lift, the stairs between floor levels must have natural light and at least 180 millimetres directions.",greater-equal,synthetic +3724fd47-22f7-432c-81a2-1abcb95c7df2_1,,,"The fastening points installed in a dwellings habitable rooms and kitchens should be no fewer than 190 kN, except in one bedroom properties, where there should be no fewer than four.",greater-equal,synthetic +ef4ec541-e1a7-47d4-9a83-94715d8900ba_7,,,"Where 1 or more existing system are within a covered car park, the requirement to install electric vehicle charge points should be met by installing charge points in parking spaces that are not within a covered car park.",greater-equal,synthetic +56b0e4bf-81d7-4ab9-855b-780ef2f0b1d3,"Storage premises with a fire load exceeding 1,200 MJ/m2 are not permitted within the building.",{'ID': '73_Finnish_FireSafety'},"Storage premises with a fire load exceeding 1,200 MJ/m2 are not permitted within the building.",part-of,annotated +493ec553-7761-4d1e-aa98-05d925ddf955_3,,,The step of a horizontal hatch must be at least 20C.,greater-equal,synthetic +e874f337-2067-4e77-ad32-c3b857f40e7a_8,,,"If the one-hour A-weighted equivalent continuous sound level of impulsive, narrow-band or low-frequency noise exceeds one metre, the total minimum width of the exits shall be calculated by increasing the original 1,200 millimetres by 400 millimetres for each additional group of 60 people.",greater,synthetic +da4d5959-6e64-4e04-a1f3-8b42b6addab0_3,,,The outdoor difference in light reflectance value used in the calculations for buildings other than those in intended use categories 1 and 2 outside the occupancy period shall be at least 23C.,greater-equal,synthetic +2a8898d7-8561-4f67-9979-1bbba8ad42e6,"If insulating material is inserted into a cavity in a cavity wall, reasonable precautions shall be taken to prevent the subsequent permeation of any toxic fumes from that material into any part of the building occupied by people.",{'ID': '3_UK_DocD_ToxicSubstances'},"If insulating material is inserted into a cavity in a cavity wall, reasonable precautions shall be taken to prevent the subsequent permeation of any toxic fumes from that material into any part of the building occupied by people.",part-of,annotated +12e545d1-64f4-45c9-a520-5b8a003eba0a,"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",{'ID': '85_UK_DocF_V1_Ventilation'},"If the dwelling has more than one exposed facade, the area of background ventilators on each facade should be similar, to allow cross-ventilation.",greater,annotated +20609d43-016e-4314-9620-256f73f1c6ed,"The general ventilation rate for a new conservatory and, if necessary, adjoining rooms could be achieved using background ventilators.",{'ID': '160_UK_DocF_V1_Ventilation'},"The general ventilation rate for a new conservatory and, if necessary, adjoining rooms could be achieved using background ventilators.",selection,annotated +05fdde92-d8af-42ad-963b-9019c69a8ab3,"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",{'ID': '163_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For a timber frame where the intermediate floor structure breaches the external wall insulation, further insulation of the same thickness as the insulation used in the external wall should be included within the depth of the intermediate floor structure.",none,annotated +354c849e-8e02-47ec-992c-e5431a62cb3f,Ventilation systems that provide supply and extract ventilation should be fitted with a heat recovery system where technically feasible.,{'ID': '309_UK_DocM_V2_AccessAndUseOfBuildings'},Ventilation systems that provide supply and extract ventilation should be fitted with a heat recovery system where technically feasible.,necessity,annotated +8efb6108-e49e-4d64-a1e4-22e3f9128b17_7,,,"When calculating the reference heat loss of a building, the value of 2 shall be used as the height for the air leakage rate figure for the building envelope.",equal,synthetic +316c89ee-aa42-4e7a-9372-960cf25b3265,Extract ventilation may be by natural means or by mechanical means (e.g. by an extract fan or acentral system).,{'ID': '105_UK_DocF_V2_Ventilation'},Extract ventilation may be by natural means or by mechanical means (e.g. by an extract fan or acentral system).,part-of,annotated +8efb6108-e49e-4d64-a1e4-22e3f9128b17,"When calculating the reference heat loss of a building, the value of 2.0 m3/(h m2) shall be used as the reference value for the air leakage rate figure for the building envelope.",{'ID': '136_Finnish_EnergyEfficiency'},"When calculating the reference heat loss of a building, the value of 2.0 m3/(h m2) shall be used as the reference value for the air leakage rate figure for the building envelope.",part-of,annotated +ad30824c-74be-4f4f-916a-dfe1e0a89205,"It should be noted that double buggies are wider than wheelchairs and that, where relevant to the building type, this should be borne in mind when determining an appropriate effective clear width for an entrance door.",{'ID': '67_UK_DocM_V2_AccessAndUseOfBuildings'},"It should be noted that double buggies are wider than wheelchairs and that, where relevant to the building type, this should be borne in mind when determining an appropriate effective clear width for an entrance door.",necessity,annotated +8207751f-13b8-4fe3-9bfe-4423093d4905,A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,{'ID': '26_Finnish_AcousticEnvironment'},A building with dwellings or accommodation or patient rooms shall be designed and implemented so that the reverberation time of the staircase and exit route is no more than 1.3 seconds.,less-equal,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8_0,,,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for habitable area 1.501kWhPE/kWh and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",equal,synthetic +88e23b46-22d9-4be6-87b7-40541f7995a9,"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",{'ID': '254_Finnish_FireSafety'},"A building shall be provided with a permanently installed dry riser that is suitable for its purpose for transporting water for fire extinguishing: 1) in the premises above the entry level of the building, when the distance of the uppermost floor level from the entry level exceeds 24 metres; 2) in the premises below the entry level of the building, when the distance of the basement storey floor from the entry level exceeds 14 metres.",selection,annotated +dcc583b1-8c4c-42cf-a1ed-e8907de56254_10,,,"The intermediate landing of the indoor steps of other spaces intended for everyday use may be no more than 8 per cent (1:12.5), and the tread must be no less than 270 millimetres.",less-equal,synthetic +082c7ed9-3579-48c2-a0d2-076f1edd647c_3,,,"Each of the 90mm above of the centrally hinged window should be assessed as a single side, bottom or top hung window.",equal,synthetic +cb531516-b36e-4155-a8fa-5114e3e71dbc,The insulant should be chosen to achieve the lowest practicable U-value.,{'ID': '129_UK_DocL_V1_ConsrvationOfFuelAndPower'},The insulant should be chosen to achieve the lowest practicable U-value.,necessity,annotated +56517433-cf40-4b88-a9d4-18e61e0e9993_8,,,"In addition, on both sides of the toilet seat there shall be a electric resistance heating of at least 8 per cent (1:12.5).",greater-equal,synthetic +208b093d-361f-4aec-819d-4abca4e72c68,"in an evacuation area where the maximum number of occupants is 60, the second exit may be no less than 900 millimetres in width.",{'ID': '216_Finnish_FireSafety'},"in an evacuation area where the maximum number of occupants is 60, the second exit may be no less than 900 millimetres in width.",part-of,annotated +bb9ec292-062b-43c3-8590-856dd5f6b890_2,,,"The patterns and building emission rate calculated using the measured air permeability must not be higher than the edges and target emission rate, respectively.",less-equal,synthetic +40b40b1b-d1b1-49d8-b9b7-13c5845a169d_7,,,The structure of the control appliance of the plumbing fixture shall be such that its capacity does not arise above 30.,less-equal,synthetic +f439dcde-3cf9-4b40-b555-a2107ae5559f,"If the circulation piping is located inside the building envelope, 50 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",{'ID': '104_Finnish_EnergyEfficiency'},"If the circulation piping is located inside the building envelope, 50 of the calculated domestic hot water circulation heat loss shall be added to the thermal load of the spaces of the building.",none,annotated +5577528f-8fa0-4ca3-96f6-ea418091cb86_9,,,The side edges of stairs and landings must be fitted with a raised camber to prevent slipping over the edge if a cube measuring more than 01:08:00 in lengths is able to pass through the opening between the plane level and the handrail or wall.,greater,synthetic +203faa23-7b71-47c9-a6e5-2333ac45389e_8,,,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the design solar load must be no less than 400 millimetres.",greater-equal,synthetic +569c7958-b7d6-4b9c-9dd9-13307e95e59b,"For ducted systems that are served by fans with a design flow rate greater than 1m3/s, ductwork leakage tests should be carried out.",{'ID': '385_UK_DocM_V2_AccessAndUseOfBuildings'},"For ducted systems that are served by fans with a design flow rate greater than 1m3/s, ductwork leakage tests should be carried out.",necessity,annotated +922bf8df-3a70-4f45-8c04-200b638d3b3c_11,,,The cold water pipe shall be designed and installed so that the breaking in the cold water system may not exceed 8 per cent (1:12.5).,less-equal,synthetic +0da52584-1b37-48b5-840f-3795ae695275_7,,,the minimum clear dimensions of the platform are: 1100mm wide and 25 decibels boiler efficiency where two doors are located at 90° relative to each other and where the lifting platform is enclosed or where provision is being made for an accompanied wheelchair user.,equal,synthetic +4094b859-b3b4-4035-94cd-8cf47ccbd801_7,,,The distance of the uppermost floor level from the entry level is at least eight per cent.,greater-equal,synthetic +7c74b365-6fdd-494d-9675-3ae036c55348,Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,{'ID': '82_Finnish_SafetyOfUse'},Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,part-of,annotated +0aad98a7-74e6-4678-9620-2f80355e7ba8,commissioning notice must be given to the building control body.,{'ID': '94_UK_DocF_V2_Ventilation'},commissioning notice must be given to the building control body.,necessity,annotated +7f696221-52c9-4c52-8f90-74bd93c51299_6,,,This grippable handrail is 850-1000mm above the pitch line of the flight and output at least 70 kN beyond the top and bottom nosings.,greater-equal,synthetic +98ef7ffc-fba9-439f-ab36-5fd6fd1d8e0f,Complex details should be avoided wherever possible.,{'ID': '154_UK_DocL_V1_ConsrvationOfFuelAndPower'},Complex details should be avoided wherever possible.,selection,annotated +6414854d-01f9-481f-a7f4-c4581e48d8b1_3,,,Special safety features are not necessary if the Manual controls is not more than 35 mg/m3 (30 ppm) long.,less-equal,synthetic +35cacecf-06dc-4b0f-aadb-db2ee05518c7_10,,,The area of windows and roof windows (but excluding display windows) commissioned to ensure that they produce as much electricity as is reasonable in the circumstances exceeds 100 of the facade area.,greater,synthetic +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",selection,annotated +2f815a08-db3c-48a6-b248-d69aeac870ee,"the vertical travel distance is: a. not more than 2m, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",{'ID': '173_UK_DocM_V2_AccessAndUseOfBuildings'},"the vertical travel distance is: a. not more than 2m, where there is no liftway enclosure and no floor penetration; b. more than 2m, where there is a liftway enclosure.",selection,annotated +2633c957-07b4-4caa-a9d6-5acbac16b0b0,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 100 load.,{'ID': '245_UK_DocM_V2_AccessAndUseOfBuildings'},NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 100 load.,none,annotated +5b1fe636-d2aa-4382-885e-a4f8a2cae4d4_1,,,"Generally, a thermal element once upgraded should not have a building emission rate greater than 1,500 millimetres.",less-equal,synthetic +7c74b365-6fdd-494d-9675-3ae036c55348,Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,{'ID': '82_Finnish_SafetyOfUse'},Ladders and other structural elements at emergency exits and service routes must be designed and constructed so that they can also be used in an emergency situation.,none,annotated +2de867fe-80e7-4617-ad18-36225dd45ab1,Hinged or pivot windows with an opening angle of less than 15 degrees are not suitable for purge ventilation.,{'ID': '53_UK_DocF_V1_Ventilation'},Hinged or pivot windows with an opening angle of less than 15 degrees are not suitable for purge ventilation.,selection,annotated +726e23c9-02a3-4c56-98d0-8981b7ce877b,"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",{'ID': '126_Finnish_Health-WaterAndSewerage'},"In the construction of a new building as well as in repair and alteration work corresponding to the construction of a new building, the premises to be fitted with a floor drain shall be: 1. showers and bathrooms as well as wash rooms in connection with saunas; 2. laundry room; 3. heat distribution room; 4. ventilation unit room; 5. toilet facility intended for public use; 6. technical utility room with a possibility to water damage; 7. car wash facility; 8. special facilities cleansed by water rinsing.",selection,annotated +60024014-cb6a-4a53-9b12-9497e0a1e5e8,"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",{'ID': '85_Finnish_Health-IndoorClimateAndVentilation'},"Extract air from toilets, washrooms and cleaning spaces may be conducted to vertical ducts for extract air categories 1 and 2 if the total extract air flow from these spaces does not exceed 10 of the total air flow in the vertical duct.",none,annotated +c0a6d35c-cc20-428b-941d-c3e3e6365c74_11,,,"In a tier that is uninterrupted by cross-gangways, and where the luminous efficacy exceeds 200 millimetres, use a maximum number of steps of 40.",greater,synthetic +56b3f993-37b5-4cb1-9540-432972f8056e,"In a mechanical ventilation system, the air handling units and chambers shall be able to withstand the loads caused by fan pressure while the shutoff dampers are closed.",{'ID': '99_Finnish_Health-IndoorClimateAndVentilation'},"In a mechanical ventilation system, the air handling units and chambers shall be able to withstand the loads caused by fan pressure while the shutoff dampers are closed.",part-of,annotated +7e34700e-92de-4b00-a820-f4085a2e186c,"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be class EI 15.",{'ID': '135_Finnish_FireSafety'},"If the free gap between facing walls of adjacent glazed balconies or the distance of the wall to the window of an adjacent fire compartment is less than 2 metres, the wall in question must be class EI 15.",selection,annotated +525aa713-65e1-4368-a6f4-38f628be7fed,"in clothes shops, the dimensions and fittings recommended for an individual changing cubicle in a sports building should be provided.",{'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'},"in clothes shops, the dimensions and fittings recommended for an individual changing cubicle in a sports building should be provided.",none,annotated +d0927095-9e43-4ce4-a740-d5df69dc1dc3,"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",{'ID': '84_Finnish_Health-IndoorClimateAndVentilation'},"If the air flows of extract air categories 1 and 2 are combined into the same duct and category 2 air flow accounts for more than 10 of the combined air flow, the combined air flow is classified under category 2.",none,annotated +52de82bc-2c00-4500-81ec-a46781a8e4e7,Automatic control of input charge should be provided.,{'ID': '279_UK_DocL_V1_ConsrvationOfFuelAndPower'},Automatic control of input charge should be provided.,necessity,annotated +fab95d95-4789-4384-8d57-a575190f9e73,The heating plant emission rate of the micro combined heat and power system (microCHP) should be no greater than the emission rate of a regular boiler using the same fuel as the microCHP.,{'ID': '297_UK_DocL_V1_ConsrvationOfFuelAndPower'},The heating plant emission rate of the micro combined heat and power system (microCHP) should be no greater than the emission rate of a regular boiler using the same fuel as the microCHP.,part-of,annotated +656aa2fa-18cb-41ee-ae28-28deb3dffcc3,The water temperature of the water in the hot water system shall be at least 55 degrees Celsius and available from the hot water plumbing fixture within 20 seconds.,{'ID': '61_Finnish_Health-WaterAndSewerage'},The water temperature of the water in the hot water system shall be at least 55 degrees Celsius and available from the hot water plumbing fixture within 20 seconds.,none,annotated +11f2902d-29c2-474e-97d0-628a2a97a666_9,,,"control capabilities of over 0.3 must be equipped with an appropriate safety barrier, railing or handrail.",greater,synthetic +2c12675d-93c9-496a-acf9-b30465dae93d,Any flexible ducts should be installed so that the full internal diameter is maintained and flow resistance is minimised.,{'ID': '113_UK_DocF_V1_Ventilation'},Any flexible ducts should be installed so that the full internal diameter is maintained and flow resistance is minimised.,selection,annotated +35cacecf-06dc-4b0f-aadb-db2ee05518c7_1,,,The area of windows and roof windows (but excluding display windows) practical exceeds off of the facade area.,greater,synthetic +3121fe90-27db-405e-a42a-df3cd22ee176_4,,,"Where necessary, 390 millimetresrafters, one above the other, must be installed in order to take into account children and users of wheelchairs.",equal,synthetic +7c44934c-61e1-4904-a493-1aa360ccc7d1,"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",{'ID': '1_UK_DocA_Structure'},"The building shall be constructed so that the combined dead,imposed and wind loads are sustained and transmitted by it to the ground: (a) safely; and (b) without causing such deflection or deformation of any part of the building, or such movement of the ground, as will impair the stability of any part of another building.",necessity,annotated +569c7958-b7d6-4b9c-9dd9-13307e95e59b_10,,,"For ducted systems that are served by fans with a ending greater than 1,500 millimetres, ductwork leakage tests should be carried out.",greater,synthetic +31d635b2-1d32-49dd-a848-5b5acaf50128,"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",{'ID': '407_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed.",selection,annotated +5e7d4831-4ec8-48f9-9e60-0422fcc1eae4_2,,,"When replacing an existing system, the control capabilities of the new system should be no less than value of the existing system, except where a smaller system can be demonstrated to be more appropriate or effective (e.g. replacing an existing system with one which is better matched to the dwelling's energy demand).",greater-equal,synthetic +99a53f17-48cb-4012-a47b-700761e0983b_11,,,Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces (a) 2 of those casings must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.,equal,synthetic +1ebce0c9-705c-47ee-8429-e83cfbed72db,"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",{'ID': '103_UK_DocM_V1_AccessAndUseOfBuildings'},"All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2.",part-of,annotated +81314489-dcd9-410f-9b15-595b87e7c8f9_10,,,"The resilient layer should be timber sheathing at least EI 15 size, expanded metal or a similar resilient material.",greater-equal,synthetic +5869233a-4fc0-48bf-9007-2b0c9a169fef,"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",{'ID': '100_Finnish_FireSafety'},"A building shall, if its size, number of storeys or an intended purpose of a premises within the building so requires, be divided into fire compartments in order to restrict the spread of fire and smoke, to provide safe evacuation and to facilitate rescue and extinguishing measures.",selection,annotated +ccc405a0-c6d6-4ace-ad70-e0cfe07cd1e3,"Stairs, ladders and ramps shall be so designed, constructed and installed as to be safe for people moving between different levels in or about the building.",{'ID': '14_UK_DocK_ProtectionFromFalling'},"Stairs, ladders and ramps shall be so designed, constructed and installed as to be safe for people moving between different levels in or about the building.",none,annotated +2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_0,,,The normal relationship between the dimensions of the rise and going is: 30% load equals 15 degrees.,equal,synthetic +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",greater,annotated +b51c7a9f-2080-4e60-940f-e59af0cc97ce,"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",{'ID': '34_Finnish_Health-Humidity'},"The buildings enclosure together with its construction layers and joints must form a whole, preventing the transfer of water across the surface of the enclosure into the construction by wind, slanting rain and wind pressure.",none,annotated +1913381b-a2cc-496e-9168-82ccf2a01d50_10,,,"In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the air-tightness of the heat emitters to be installed does not exceed 18 dm3/s.",less-equal,synthetic +cb2f2c09-8ae6-42a4-ac21-861c912c30f9,"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",{'ID': '126_Finnish_SafetyOfUse'},"In buildings more than 9 metres and at most 28 metres in height, the attic and roof must be accessible via the interior and exterior of the building; in buildings more than 28 metres in height, these must be accessible via the interior.",part-of,annotated +d48274a1-bd70-4db9-8490-14075029cbb7,All users including wheelchair users should be able to reach and use the controls that summon and direct the lifting device.,{'ID': '109_UK_DocM_V2_AccessAndUseOfBuildings'},All users including wheelchair users should be able to reach and use the controls that summon and direct the lifting device.,part-of,annotated +0a7ff0c7-c5f9-4069-9d7e-2bfd6c4871d3_4,,,The total minimum width of the extension does not exceed 600kg/m3.,less-equal,synthetic +0cfe8c0e-45e4-4c4c-bf9b-906e26e28c75,"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",{'ID': '43_UK_DocM_V2_AccessAndUseOfBuildings'},"There should be sufficient space for people to approach the building, pass others who are travelling in the opposite direction and carry out all necessary manoeuvres.",none,annotated +2633c957-07b4-4caa-a9d6-5acbac16b0b0,NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 100 load.,{'ID': '245_UK_DocM_V2_AccessAndUseOfBuildings'},NOTE: Linear interpolation should be used to determine efficiencies between manufacturers declared efficiencies at 30 and 100 load.,equal,annotated +bfe386ee-8c0b-41d4-9967-6e873edf7229,"Floors and foundations: insulation should be installed tight to the structure, without air gaps between insulation panels and at edges.",{'ID': '148_UK_DocL_V1_ConsrvationOfFuelAndPower'},"Floors and foundations: insulation should be installed tight to the structure, without air gaps between insulation panels and at edges.",part-of,annotated +3724fd47-22f7-432c-81a2-1abcb95c7df2_6,,,"The total number of ventilators installed in a dwellings habitable rooms and kitchens should be no fewer than five, except in 200 m2 morticed bolts properties, where there should be no fewer than four.",equal,synthetic +da4d5959-6e64-4e04-a1f3-8b42b6addab0_2,,,The outdoor drop used in the calculations for buildings other than those in intended use categories 1 and 2 outside the occupancy period shall be at least 1.3 seconds.,greater-equal,synthetic +e43c1e88-be80-42d9-944e-1bf0f0f82479_7,,,Individual flights are: for gradients up to 1:15 not more than 10m long; for gradients up to 1:12 not more than 300 millimetres travel distance.,less-equal,synthetic +7c8f6c05-769d-46a8-9dc6-84b509bf8d9c,"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",{'ID': '134_Finnish_FireSafety'},"The fire compartmenting requirement for the balcony slab of a glazed balcony of a building exceeding two storeys is EI 30; however, minor sealing parts and penetrations may be class E 15.",selection,annotated +9ff8b8fd-5361-4c3d-9a7e-7459276c8df7_4,,,The temperature must not exceed the individual dwellings tie force.,less-equal,synthetic +64f259ba-5280-4bf5-bea2-e18cb837a940,A water point shall incorporate a drainage point that is connected to the sewer via a drainage fixture.,{'ID': '124_Finnish_Health-WaterAndSewerage'},A water point shall incorporate a drainage point that is connected to the sewer via a drainage fixture.,selection,annotated +6075de3c-d339-4ba4-9945-990480975615,"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than three ventilators of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",{'ID': '94_UK_DocF_V1_Ventilation'},"Where a kitchen and living room accommodation are not separate rooms (i.e. open plan), no fewer than three ventilators of the same equivalent area as for other habitable rooms should be provided within the open-plan space.",none,annotated +86350df0-a40e-412b-a301-004524d56736,"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",{'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'},"For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided.",none,annotated +5f675f4f-74de-4d0f-ae92-c3500d2d952e,The actual equivalent area and location of installed background ventilators should be recorded.,{'ID': '189_UK_DocF_V1_Ventilation'},The actual equivalent area and location of installed background ventilators should be recorded.,necessity,annotated +01008f69-874b-443e-bcb2-2f5630280049_11,,,"If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the Extract may be no more than 150m2 and the tread must be no less than 220 millimetres.",less-equal,synthetic +1d10aa43-7650-46b1-83c3-867f212ab9c3,Background ventilators should meet the performance standards for both of the following: a. air flow from outside to inside the dwelling; b. air flow from inside the dwelling to outside.,{'ID': '58_UK_DocF_V1_Ventilation'},Background ventilators should meet the performance standards for both of the following: a. air flow from outside to inside the dwelling; b. air flow from inside the dwelling to outside.,necessity,annotated +0096a3bf-ac16-4a75-adf9-8c3f4a9b8610_10,,,The smaller frequency of each panel which can be either the width or height of the panel should be 0.3W/m2 or less.,less-equal,synthetic +ef561e39-db90-462c-8dde-15fbeae954e5_7,,,A cube with extends of no more than 28 metres may pass between the upper edge of the barrier and the protective part.,less-equal,synthetic +5b4380ba-0066-4735-a362-316d4c8e70b2,"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",{'ID': '73_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"Where a building undergoing major renovation, which is not a residential building or a mixeduse building, will have more than 10 parking spaces after the major renovation is completed (a) one of those parking spaces must have access to one electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces.",none,annotated +7d35f4c4-fa65-4d68-a974-f54386ca8aee,"However, a horizontal gap in a protective part must be no higher than ten millimetres.",{'ID': '49_Finnish_SafetyOfUse'},"However, a horizontal gap in a protective part must be no higher than ten millimetres.",selection,annotated +ded852b5-c826-4649-8ce5-dece0eba6061,"During the design period of occupancy, a building's room temperature shall be comfortable and not adversely affected by air velocity, thermal radiation, temperature fluctuation, temperature differences or surface temperatures.",{'ID': '32_Finnish_Health-IndoorClimateAndVentilation'},"During the design period of occupancy, a building's room temperature shall be comfortable and not adversely affected by air velocity, thermal radiation, temperature fluctuation, temperature differences or surface temperatures.",none,annotated +103f99ad-884b-4bae-9f22-ccb1c5bc3d26_8,,,"In an open garage of no more than 900-1000mm test data, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",less-equal,synthetic +84cd76d7-e5d0-4f39-94bc-0236c65d533a_7,,,"in residential buildings of not more than two storeys, one exit of no less than 650mm in selection is permitted.",greater-equal,synthetic +c0a6d35c-cc20-428b-941d-c3e3e6365c74,"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",{'ID': '25_UK_DocK_ProtectionFromFalling'},"In a tier that is uninterrupted by cross-gangways, and where the pitch exceeds 25, use a maximum number of steps of 40.",none,annotated +f034fbd1-7547-425a-8163-513fcac0b66b,The roof structures and joints must be properly inclined and sealed for water drainage.,{'ID': '103_Finnish_Health-Humidity'},The roof structures and joints must be properly inclined and sealed for water drainage.,necessity,annotated +e1f1aeb9-7453-4b6b-b3f1-6049d711868a,The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,{'ID': '156_Finnish_FireSafety'},The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test.,none,annotated +dcc583b1-8c4c-42cf-a1ed-e8907de56254,"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",{'ID': '23_Finnish_SafetyOfUse'},"The rise of the indoor steps of other spaces intended for everyday use may be no more than 180 millimetres, and the tread must be no less than 270 millimetres.",none,annotated +49c6fd15-70a9-4733-8de8-8dd2fe49fe0a,"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",{'ID': '231_UK_DocL_V1_ConsrvationOfFuelAndPower'},"If renewable technology such as a wind turbine or photovoltaic array is replaced, the new system should have an electrical output that is at least the same as that of the original installation.",selection,annotated +3c0a8ccb-d813-40fb-b69b-88250d3bc4ec_6,,,These fittings should not exceed a rise between landings of 8.5m2.,less-equal,synthetic +a372d2c4-f734-479d-bc8d-d3a8aa15362d,"A wide range of people, including accompanied wheelchair users, should be able to access and use the lift.",{'ID': '49_UK_DocM_V1_AccessAndUseOfBuildings'},"A wide range of people, including accompanied wheelchair users, should be able to access and use the lift.",selection,annotated +3cbfb816-4071-496e-aec2-87d424df047f,Wheelchair users and ambulant disabled people should be able to wash or bathe either independently or with assistance from others.,{'ID': '181_UK_DocM_V2_AccessAndUseOfBuildings'},Wheelchair users and ambulant disabled people should be able to wash or bathe either independently or with assistance from others.,necessity,annotated +4e8c5c50-44af-48f6-b959-e6f9b31afa1e,"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical heating technology may be electric resistance heating.",{'ID': '89_UK_DocM_V2_AccessAndUseOfBuildings'},"If the planned time of use of a modular or portable building in a single location is less than two years, the only practical heating technology may be electric resistance heating.",selection,annotated +d3fc8c9b-c23a-4188-8723-369caa90453c_1,,,"The illuminance for a building's total combined window area is 90 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area.",equal,synthetic +bed3cb74-fdd3-4888-80ab-b416d1b060ad,"For systems that have the ability to use free cooling or heat recovery, the SEER should be derived for the specific application, including free cooling or heat recovery elements.",{'ID': '282_UK_DocM_V2_AccessAndUseOfBuildings'},"For systems that have the ability to use free cooling or heat recovery, the SEER should be derived for the specific application, including free cooling or heat recovery elements.",none,annotated +6ec243f2-9294-4b7c-89a4-1c46e4a69cc9,"If site constraints necessitate an approach of 1:20 or steeper, an approach incorporating ramped access should be provided.",{'ID': '49_UK_DocM_V2_AccessAndUseOfBuildings'},"If site constraints necessitate an approach of 1:20 or steeper, an approach incorporating ramped access should be provided.",necessity,annotated +bb9ec292-062b-43c3-8590-856dd5f6b890_0,,,"The building primary energy rate and rise calculated using the measured air permeability must not be higher than the target primary energy rate and efficiencies, respectively.",less-equal,synthetic +7faab614-f3bc-41b4-9dbf-0ff2b3ea56f3_5,,,"Where the cost of installing only cable routes is more than 7% of the total cost of the major timber sheathing, there is no battery storage to install either electric vehicle charge points or cable routes.",not-part-of,synthetic +d3e7a947-536e-4a49-9823-e27fc0f68b27_4,,,performance of landings to be at least equal to the extract air categories of the ramp.,greater-equal,synthetic +2f8d4247-e53b-49ae-bd26-c4f1765eaee8_2,,,"Extract air of habitable area 2, 3 and 13l/s shall not be used as recirculation air.",equal,synthetic +0667134c-1290-4fe0-99eb-41c0b9e63a27,CO2 emissions and primary energy associated with the thermal energy streams of a trigeneration scheme should be attributed in proportion to the output energy streams.,{'ID': '67_UK_DocM_V2_AccessAndUseOfBuildings'},CO2 emissions and primary energy associated with the thermal energy streams of a trigeneration scheme should be attributed in proportion to the output energy streams.,part-of,annotated +a387fcb8-ead2-4094-9be9-72d783468b33_8,,,"If the fire igniting of windows, roof windows, rooflights and doors exceeds 300 millimetres of the total floor area of the dwelling, compensating measures should be taken to improve the energy efficiency of the dwelling.",greater,synthetic +40b40b1b-d1b1-49d8-b9b7-13c5845a169d,The structure of the control appliance of the plumbing fixture shall be such that its surface temperature does not arise above 40 degrees Celsius.,{'ID': '71_Finnish_Health-WaterAndSewerage'},The structure of the control appliance of the plumbing fixture shall be such that its surface temperature does not arise above 40 degrees Celsius.,part-of,annotated +103f99ad-884b-4bae-9f22-ccb1c5bc3d26,"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",{'ID': '110_Finnish_FireSafety'},"In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined.",selection,annotated +3121fe90-27db-405e-a42a-df3cd22ee176_7,,,"Where necessary, 4information, one above the other, must be installed in order to take into account children and users of wheelchairs.",equal,synthetic +6a41a473-bd3c-4e38-a093-094b3fdae388_3,,,At least one in every 600kg/m3 remaining drainage water must be provided with cable routes.,equal,synthetic +2afa8bba-b5ad-4e12-bc27-4beea3fd09b2_3,,,The normal relationship between the side edges of the rise and going is: 50 m2 equals between 550mm and 700mm.,equal,synthetic +7d877df3-9aa7-4dff-a64d-5356a66c944d_9,,,"In public outdoor and indoor spaces, and in business and service premises, a handrail must continue at least 300 millimetres past the start and end points of the structure, and in the case of stairs or ramps that have a rated output exceeding 0.15 dm3/s per m2 and are located in assembly areas, it must also be placed so as to divide the passageway into parts no wider than the abovementioned width.",greater,synthetic +d5b6ff18-626d-4e6f-b788-0c67f7a4ebab,"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",{'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'},"If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.",none,annotated +d3e7a947-536e-4a49-9823-e27fc0f68b27_9,,,standards of landings to be at least equal to the selection of the ramp.,greater-equal,synthetic +a477ee34-044e-443b-a95f-fbb1da913c38,"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",{'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'},"Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities.",part-of,annotated +f64c5a32-2f88-4be6-abf4-8870a4e51fdf,"The use of recirculation, transfer or secondary air shall not cause any harmful spread of impurities, in particular odours.",{'ID': '72_Finnish_Health-IndoorClimateAndVentilation'},"The use of recirculation, transfer or secondary air shall not cause any harmful spread of impurities, in particular odours.",necessity,annotated +981a0996-c526-4ee7-b679-0f17bd5ecd29,"Where it is not feasible to install a space heating system that can operate at this temperature (e.g. where there is insufficient space for larger radiators, or the existing distribution system is provided with higher temperature heat from a low carbon district heat network), the space heating system should be designed to the lowest design temperature possible that will still meet the heating needs of the building.",{'ID': '209_UK_DocM_V2_AccessAndUseOfBuildings'},"Where it is not feasible to install a space heating system that can operate at this temperature (e.g. where there is insufficient space for larger radiators, or the existing distribution system is provided with higher temperature heat from a low carbon district heat network), the space heating system should be designed to the lowest design temperature possible that will still meet the heating needs of the building.",selection,annotated +ff3e8f86-1542-4f54-a776-cfdc8482bad7_1,,,The rise between landings of an air conditioner working in cooling mode should be a minimum of 1.3 seconds.,greater-equal,synthetic +38020928-c137-486e-88d7-c8feec038c99,A building must be provided with a fire wall if it is situated adjacent to a neighbouring building or so close to a neighbouring building that the spread of fire is evident.,{'ID': '189_Finnish_FireSafety'},A building must be provided with a fire wall if it is situated adjacent to a neighbouring building or so close to a neighbouring building that the spread of fire is evident.,necessity,annotated +b63dcef6-1840-4e9e-ad51-f8fc481fe856_7,,,"The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the intended purpose is not less than 75 light source lumens per circuit-watt.",greater-equal,synthetic +f3bd99b4-7ea5-4968-af10-3c133c0b5aa0_1,,,No individual flight has a level differences of more than 30.,less-equal,synthetic +a1f91cfd-21f8-49a4-8468-746f49f4848e_6,,,"For a building that contains more than 2.4m roof windows for example a block of flats or a terrace of houses an average target primary energy rate, target emission rate and target fabric energy efficiency rate may be calculated as an alternative to individual target rates for each dwelling.",greater,synthetic +203faa23-7b71-47c9-a6e5-2333ac45389e,"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the tread must be no less than 250 millimetres.",{'ID': '22_Finnish_SafetyOfUse'},"The riser of the indoor steps of dwelling units and living quarters may be no more than 190 millimetres, and the tread must be no less than 250 millimetres.",less-equal,annotated +01bd7c41-594c-4440-8058-c34f1c4bad09,"When determining the free area available for ventilation during sleeping hours, only the proportion of openings that can be opened securely should be considered to provide useful ventilation.",{'ID': '82_UK_DocO_Overheating'},"When determining the free area available for ventilation during sleeping hours, only the proportion of openings that can be opened securely should be considered to provide useful ventilation.",none,annotated +74002ed3-548e-4e2f-8835-be76e643c67d_5,,,NOTE 2: Double doors effectively provide nibs where each leaf is at least 25 total extract air flow.,greater-equal,synthetic +bb9ec292-062b-43c3-8590-856dd5f6b890_1,,,"The building primary energy rate and calculations calculated using the measured air permeability must not be higher than the target primary energy rate and density, respectively.",less-equal,synthetic +2a256a9c-0b8a-4acf-87e1-86a5857f36a3_7,,,"Where a driveway forms all, or part of, the approach route, an fixed to a base of at least 01:20:00 wide should be provided so that a wheelchair user can pass a parked car.",greater-equal,synthetic +9a574829-3211-4b4f-8c0c-c7a7ab9cfd54,The whole building ventilation rate should be met.,{'ID': '47_UK_DocF_V2_Ventilation'},The whole building ventilation rate should be met.,part-of,annotated