File size: 407 Bytes
8097001
 
 
 
 
 
 
 
 
1
2
3
4
5
6
7
8
9
The SP / PU / GO request changes to the MPO or the MPO himself causes a change.

The MPO reviews the change request.

The MPO rejects the change of the measuring point by the SP / PU / GO or the MPO confirmes the request of the SP / PU / GO.

The MPO performs the measuring point change.

The MPO reports the implementation to the SP / PU / GO or notifies the SP / PU / GO about the failure of the changes .