Spaces:
Sleeping
Sleeping
The fault detector reports a failure to the MPO or MPO has a suspicion of their own fault. | |
The MPO shall examine the failure. | |
The MPO rejects the failure of the fault detector or the MPO confirms the failure of the fault detector. | |
If the MPO confirms the failure of the fault detector , he informes the GO and the MSP. | |
The MPO fixes the fault at the measuring device. | |
The MPO shares the results of the repairs carried out with the fault detector. | |
The MPO will inform the GO about the resolution of the interference. | |
The MPO will inform the MSP about the resolution of the interference . |