525aa713-65e1-4368-a6f4-38f628be7fed | in clothes shops, the dimensions and fittings recommended for an individual changing cubicle in a sports building should be provided. | {'ID': '177_UK_DocM_V2_AccessAndUseOfBuildings'} | in clothes shops, the dimensions and <e1>fittings</e1> recommended for an individual changing cubicle in a sports <e2>building</e2> should be provided. | necessity |
d3fc8c9b-c23a-4188-8723-369caa90453c | The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most 50 of the building's facade area. | {'ID': '124_Finnish_EnergyEfficiency'} | The reference value for a building's total combined window area is 15 of the sum total of the floor plate areas of the buildings storeys that are fully or in part above the ground but, however, at most <e1>50</e1> of the building's <e2>facade area</e2>. | part-of |
fb1da22f-8ddb-4399-b441-64dca68da9af | If a lift or other device for moving between levels is installed in the exit of an existing building, the dwellings exit may be no less than 850 millimetres wide. | {'ID': '218_Finnish_FireSafety'} | If a <e1>lift</e1> or other device for moving between levels is installed in the <e2>exit</e2> of an existing building, the dwellings exit may be no less than 850 millimetres wide. | part-of |
37239af2-8f49-499f-ab25-73f92d7c9369 | Each letter should be 25mm high. | {'ID': '117_UK_DocS_InfrastructureForChargingOfElectricalVehicles'} | <e1>Each</e1> <e2>letter</e2> should be 25mm high. | selection |
09b2a395-5293-4b7d-82d4-5312482d59e9 | Door entry controls, where provided, are mounted 900-1000mm above finished ground level, and at least 300mm away from any projecting corner. | {'ID': '46_UK_DocM_V1_AccessAndUseOfBuildings'} | Door entry controls, where provided, are mounted <e1>900-1000mm</e1> above finished ground level, and at least 300mm <e2>away</e2> from any projecting corner. | none |
48133b44-eac2-44e2-b2df-c52243e9f7ea | NOTE: For example, if the total system output is made up of three equally sized boilers, at 15% of system output the lead boiler will be operating at 45% of its rated output with the other two boilers switched off. | {'ID': '244_UK_DocM_V2_AccessAndUseOfBuildings'} | NOTE: For example, if the total <e1>system output</e1> is made up of three equally sized boilers, at 15% of <e2>system output</e2> the lead boiler will be operating at 45% of its rated output with the other two boilers switched off. | none |
8cef7dc5-2d76-4dd8-80c5-6861b11a8f6f | Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks. | {'ID': '3_UK_DocR_V1_InfrastructureForElectircalCommunications'} | Where the work concerns a <e1>building</e1> containing more than one <e2>dwelling</e2>, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks. | part-of |
d48274a1-bd70-4db9-8490-14075029cbb7 | All users including wheelchair users should be able to reach and use the controls that summon and direct the lifting device. | {'ID': '109_UK_DocM_V2_AccessAndUseOfBuildings'} | <e1>All</e1> <e2>users</e2> including wheelchair users should be able to reach and use the controls that summon and direct the lifting device. | selection |
656aa2fa-18cb-41ee-ae28-28deb3dffcc3 | The water temperature of the water in the hot water system shall be at least 55 degrees Celsius and available from the hot water plumbing fixture within 20 seconds. | {'ID': '61_Finnish_Health-WaterAndSewerage'} | The <e1>water temperature</e1> of the water in the hot water system shall be at least <e2>55 degrees Celsius</e2> and available from the hot water plumbing fixture within 20 seconds. | greater-equal |
f27c9fb4-dc28-494c-a277-a51360cdfdb8 | A handrail and its ending must be shaped safely and must continue past the start and end points of the structure. | {'ID': '57_Finnish_SafetyOfUse'} | A <e1>handrail</e1> and its ending must be shaped safely and must <e2>continue past the start and end points of the structure</e2>. | necessity |
01008f69-874b-443e-bcb2-2f5630280049 | If stairs are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the tread must be no less than 220 millimetres. | {'ID': '24_Finnish_SafetyOfUse'} | If <e1>stairs</e1> are used only as an emergency exit and if they lead to spaces in a dwelling or accommodation facility other than those that are necessary for living, the riser may be no more than 220 millimetres and the <e2>tread</e2> must be no less than 220 millimetres. | part-of |
a2f3a871-91d5-4777-95c9-4744792b3a69 | in an existing building, for the principal or main staff entrance or entrances to be accessible, an alternative accessible entrance should be provided. | {'ID': '61_UK_DocM_V2_AccessAndUseOfBuildings'} | in an existing building, for the principal or main staff <e1>entrance</e1> or entrances to be <e2>accessible</e2>, an alternative accessible entrance should be provided. | selection |
3d0bbf85-327f-4f92-a468-201f81080779 | The roof insulation should be installed when the eaves are still accessible. | {'ID': '169_UK_DocL_V1_ConsrvationOfFuelAndPower'} | The <e1>roof</e1> <e2>insulation</e2> should be installed when the eaves are still accessible. | part-of |
1913381b-a2cc-496e-9168-82ccf2a01d50 | In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the heat emission capacity of the heat emitters to be installed does not exceed 200 Watts per room. | {'ID': '67_Finnish_Health-WaterAndSewerage'} | In connection with repair and alteration work, the heat emitters connected to the domestic hot water ring duct may be replaced so that the <e1>heat emission capacity</e1> of the <e2>heat emitters</e2> to be installed does not exceed 200 Watts per room. | part-of |
a538fc03-db66-4b31-b40f-e41754522010 | The three-part form should be completed for each installation address. | {'ID': '264_UK_DocF_V1_Ventilation'} | The <e1>three-part</e1> <e2>form</e2> should be completed for each installation address. | selection |
b63dcef6-1840-4e9e-ad51-f8fc481fe856 | The wall ties should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the number of wall ties per square metre is not less than 2.5 ties/m2. | {'ID': '36_UK_DocA_Structure'} | The <e1>wall ties</e1> should have a horizontal spacing of 900mm and a vertical spacing of 450mm, or alternatively should be spaced such that the <e2>number of wall ties per square metre</e2> is not less than 2.5 ties/m2. | none |
8e9ef8dc-18bd-4877-98cd-556aa4adee8f | Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) limiting heat gains and losses (i) through thermal elements and other parts of the building fabric; and (ii) from pipes, ducts and vessels used for space heating, space cooling and hot water services; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances. | {'ID': '431_UK_DocM_V2_AccessAndUseOfBuildings'} | Reasonable provision shall be made for the conservation of fuel and power in buildings by: (a) <e1>limiting heat gains and losses</e1> (i) through thermal elements and other parts of the building fabric; and (ii) <e2>from pipes, ducts and vessels used for space heating, space cooling and hot water services</e2>; (b) providing fixed building services which (i) are energy efficient to a reasonable standard; (ii) have effective controls; and (iii) are commissioned by testing and adjusting as necessary to ensure they use no more fuel and power than is reasonable in the circumstances. | selection |
41d06a37-5039-4dc0-aae1-0fe3abbd84fc | The building fabric should be constructed so that the insulation is reasonably continuous across newly built elements. | {'ID': '132_UK_DocL_V1_ConsrvationOfFuelAndPower'} | The <e1>building fabric</e1> should be <e2>constructed</e2> so that the insulation is reasonably continuous across newly built elements. | necessity |
9f5fe460-cae1-4653-a951-38e31f3ed15d | Any restrictors placed on windows used as emergency exits must, however, be easily releasable by an adult. | {'ID': '81_Finnish_SafetyOfUse'} | Any <e1>restrictors</e1> placed on <e2>windows</e2> used as emergency exits must, however, be easily releasable by an adult. | part-of |
fab95d95-4789-4384-8d57-a575190f9e73 | The heating plant emission rate of the micro combined heat and power system (microCHP) should be no greater than the emission rate of a regular boiler using the same fuel as the microCHP. | {'ID': '297_UK_DocL_V1_ConsrvationOfFuelAndPower'} | The heating plant emission rate of the micro combined heat and power system (microCHP) should be no greater than the emission rate of a <e1>regular</e1> <e2>boiler</e2> using the same fuel as the microCHP. | selection |
7323113d-fcd0-4e19-a24a-c6171ec8c2b7 | District heat networks and community heating systems should be designed to accommodate heat meter(s) for each dwelling. | {'ID': '295_UK_DocL_V1_ConsrvationOfFuelAndPower'} | <e1>District heat networks</e1> and <e2>community heating systems</e2> should be designed to accommodate heat meter(s) for each dwelling. | none |
85745724-aa09-4cdd-ad17-3c50ea2b99a1 | Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the clear zone beneath basins, services and pedestals is maximised to enable wheelchair users to approach. | {'ID': '105_UK_DocM_V1_AccessAndUseOfBuildings'} | Where sanitary facilities are wheelchair accessible, basins and sinks should be wall hung (typically with their rim 770-850mm above finished floor level) and the <e1>clear zone</e1> beneath basins, services and pedestals is <e2>maximised to enable wheelchair users to approach</e2>. | necessity |
8364a5f1-f80e-484c-9f38-bffc6f4c1876 | Where communal parking is provided to blocks of flats, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal). | {'ID': '44_UK_DocM_V1_AccessAndUseOfBuildings'} | Where communal <e1>parking</e1> is provided to <e2>blocks of flats</e2>, at least one standard parking bay is provided close to the communal entrance of each core of the block (or to the lift core where the parking bay is internal). | part-of |
d5b6ff18-626d-4e6f-b788-0c67f7a4ebab | If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation. | {'ID': '75_UK_DocS_InfrastructureForChargingOfElectricalVehicles'} | If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major <e1>renovation</e1> (a) such a building is exempt from the requirement to install the electric vehicle charge point; and (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds <e2>7%</e2> of the total cost of the major renovation. | none |
a477ee34-044e-443b-a95f-fbb1da913c38 | Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible accommodation in separate-sex toilet washrooms, wheelchair-accessible unisex toileting facilities and baby changing facilities. | {'ID': '160_UK_DocM_V2_AccessAndUseOfBuildings'} | Changing places toilets, facilities designed for individuals with complex and multiple impairments who may require the assistance of up to two assistants, should be provided in addition to any wheelchair-accessible <e1>accommodation</e1> in separate-sex toilet <e2>washrooms</e2>, wheelchair-accessible unisex toileting facilities and baby changing facilities. | part-of |
32f91d86-2cbf-4d57-ab93-5a28fd804df8 | Signs indicating the location of a lifting device accessible by mobility-impaired people should be clearly visible from the building entrance. | {'ID': '104_UK_DocM_V2_AccessAndUseOfBuildings'} | <e1>Signs</e1> indicating the location of a lifting device accessible by mobility-impaired people should be <e2>clearly visible from the building entrance</e2>. | necessity |
2b60007d-59a3-4a18-a184-89e76ee17454 | Masonry construction: external or cavity wall insulation should extend below the damp-proof course (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation. | {'ID': '161_UK_DocL_V1_ConsrvationOfFuelAndPower'} | Masonry construction: external or cavity wall <e1>insulation</e1> should <e2>extend below the damp-proof course</e2> (where applicable) and be at least the equivalent of one full block height (215mm) below the underside of the floor structure/slab and beyond the depth of the floor insulation. | necessity |
984c252b-74f4-4d85-9080-1c8ae1851eca | If performance requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard. | {'ID': '113_UK_DocL_V1_ConsrvationOfFuelAndPower'} | If performance requires thicker glass to be used, an equivalent window unit with <e1>standard thickness</e1> (6mm) <e2>glazing</e2> should be shown to meet the required standard. | part-of |
419892bb-5044-4c63-a8ba-7747ad52c23d | When installing windows, roof windows, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof. | {'ID': '195_UK_DocL_V1_ConsrvationOfFuelAndPower'} | When installing <e1>windows</e1>, <e2>roof windows</e2>, rooflights or doors (all of which are controlled fittings), the controlled fitting should be well fitted and reasonably draught-proof. | none |
31d635b2-1d32-49dd-a848-5b5acaf50128 | For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed. | {'ID': '407_UK_DocL_V1_ConsrvationOfFuelAndPower'} | For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the <e1>energy performance</e1> of the whole <e2>system</e2> should be assessed. | part-of |
ad30824c-74be-4f4f-916a-dfe1e0a89205 | It should be noted that double buggies are wider than wheelchairs and that, where relevant to the building type, this should be borne in mind when determining an appropriate effective clear width for an entrance door. | {'ID': '67_UK_DocM_V2_AccessAndUseOfBuildings'} | It should be noted that double buggies are wider than wheelchairs and that, where relevant to the building type, this should be borne in mind when determining an <e1>appropriate</e1> effective <e2>clear width</e2> for an entrance door. | selection |
ded852b5-c826-4649-8ce5-dece0eba6061 | During the design period of occupancy, a building's room temperature shall be comfortable and not adversely affected by air velocity, thermal radiation, temperature fluctuation, temperature differences or surface temperatures. | {'ID': '32_Finnish_Health-IndoorClimateAndVentilation'} | <e1>During the design period of occupancy</e1>, a building's room temperature shall be <e2>comfortable</e2> and not adversely affected by air velocity, thermal radiation, temperature fluctuation, temperature differences or surface temperatures. | none |
fa90c179-d32c-412b-a7d6-a515cc91dbdb | The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed water removal system allowing the cellar wall to dry in an outward direction must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure. | {'ID': '86_Finnish_Health-Humidity'} | The structure of the exterior wall against the ground must be waterproofed or isolated against water pressure or a structurally managed <e1>water removal system</e1> <e2>allowing the cellar wall to dry in an outward direction</e2> must be used to prevent moisture from the surrounding ground and storm water from penetrating the wall structure. | selection |
86350df0-a40e-412b-a301-004524d56736 | For wet heating systems in new dwellings with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided. | {'ID': '246_UK_DocL_V1_ConsrvationOfFuelAndPower'} | For wet <e1>heating systems</e1> in new <e2>dwellings</e2> with a floor area of 150m2 or greater, a minimum of two independently controlled heating circuits should be provided. | part-of |
bd670961-83e8-410a-85a4-578f2d00c626 | In all cases, roof insulation should be continuous with wall insulation. | {'ID': '168_UK_DocL_V1_ConsrvationOfFuelAndPower'} | In all cases, <e1>roof</e1> <e2>insulation</e2> should be continuous with wall insulation. | part-of |
783c19fa-0ef2-466f-b3e9-d4690e34ac5f | Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the system and its electrical output are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances. | {'ID': '214_UK_DocL_V1_ConsrvationOfFuelAndPower'} | Where a system for onsite electricity generation is installed (a) reasonable provision must be made to ensure that (i) the <e1>system</e1> and its <e2>electrical output</e2> are appropriately sized for the site and available infrastructure; (ii) the system has effective controls; and (b) it must be commissioned by testing and adjusting as necessary to ensure that it produces the maximum electricity that is reasonable in the circumstances. | part-of |
23db27ac-b594-4b26-883d-922d713d382a | When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled. | {'ID': '161_UK_DocM_V2_AccessAndUseOfBuildings'} | When installing or renovating thermal elements, the element being installed should be <e1>draught-proofed</e1> and <e2>airleakage gaps</e2> should be filled. | none |
e1f1aeb9-7453-4b6b-b3f1-6049d711868a | The fire performance of the external wall structure of a building no more than 56 metres in height may also be demonstrated by a fullscale test. | {'ID': '156_Finnish_FireSafety'} | The fire performance of the external <e1>wall structure</e1> of a building no more than 56 metres in height may also be <e2>demonstrated by a fullscale test</e2>. | none |
bf798097-bb99-42d0-a73f-8cebab8fbeb8 | In the entrance halls and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the steps must be no more than 160 millimetres and the tread must be no less than 300 millimetres. | {'ID': '21_Finnish_SafetyOfUse'} | In the <e1>entrance halls</e1> and other indoor areas of administrative, service and business premises and in assembly areas, the riser of the <e2>steps</e2> must be no more than 160 millimetres and the tread must be no less than 300 millimetres. | part-of |
db734798-9e42-4fe1-900c-77d4e6131809 | The main doors for entering a dwelling (usually the front door) should have a door viewer unless other means exist to see callers, such as clear glass within the door or a window next to the doorset. | {'ID': '11_UK_DocQ_Security_Dwellings'} | The main doors for entering a dwelling (usually the front door) should have a door viewer unless other <e1>means</e1> <e2>exist to see callers</e2>, such as clear glass within the door or a window next to the doorset. | selection |
4a82f789-a98a-4379-9b81-2a20cfba6c87 | If the internal ties must be centred on the supporting line, the minimum value of the tie force, 70 kN, will also be applied to internal ties. | {'ID': '179_Finnish_StabilityOfStructures'} | If the internal <e1>ties</e1> must be <e2>centred on the supporting line</e2>, the minimum value of the tie force, 70 kN, will also be applied to internal ties. | necessity |
eefe1191-2903-4fb8-9138-6471e09fb67d | The internal temperature exceeds 23C at 11pm. | {'ID': '53_UK_DocO_Overheating'} | The <e1>internal temperature</e1> exceeds 23C at <e2>11pm</e2>. | selection |
0096a3bf-ac16-4a75-adf9-8c3f4a9b8610 | The smaller dimension of each panel which can be either the width or height of the panel should be 230mm or less. | {'ID': '33_UK_DocQ_Security_Dwellings'} | The smaller dimension of each panel which can be either the <e1>width</e1> or height of the <e2>panel</e2> should be 230mm or less. | part-of |
56166e36-b14b-4632-9767-70b71d335d9c | When a dwelling undergoes a major renovation, the technical, environmental and economic feasibility of installing high-efficiency alternative systems should be considered. | {'ID': '98_UK_DocL_V1_ConsrvationOfFuelAndPower'} | When a dwelling undergoes a major renovation, the <e1>technical</e1>, environmental and economic <e2>feasibility of installing high-efficiency alternative systems</e2> should be considered. | selection |
164122ed-c7ac-4cf8-8a54-3d56c144f78d | In general, the findings indicate that there should be at least the same number of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many. | {'ID': '172_UK_DocM_V2_AccessAndUseOfBuildings'} | In general, the findings indicate that there should be at least the <e1>same</e1> <e2>number</e2> of WCs (for women) as urinals (for men) and for some building types, e.g. large retail buildings, at least twice as many. | selection |
043258d7-d35e-42d9-87c5-b83565c39ad6 | Before elements are concealed by subsequent work, an onsite audit should be undertaken to confirm that the designed details have been constructed. | {'ID': '133_UK_DocL_V1_ConsrvationOfFuelAndPower'} | Before elements are concealed by subsequent work, an onsite <e1>audit</e1> should be <e2>undertaken to confirm that the designed details have been constructed</e2>. | necessity |
f9de28ac-45bb-4400-9d9f-8afee73bd2e3 | The number of appliances should not exceed one per 100m2 of dwelling floor area. | {'ID': '273_UK_DocL_V1_ConsrvationOfFuelAndPower'} | The <e1>number of appliances</e1> should not exceed <e2>one per 100m2</e2> of dwelling floor area. | less-equal |
a9c88566-e4e5-4cba-8165-9916820d9cc5 | Doors, gates and boom barriers must operate safely and in such a way that they do not cause a danger of an accident. | {'ID': '75_Finnish_SafetyOfUse'} | Doors, <e1>gates</e1> and boom barriers must operate safely and in such a way that they do <e2>not cause a danger of an accident</e2>. | none |
23db27ac-b594-4b26-883d-922d713d382a | When installing or renovating thermal elements, the element being installed should be draught-proofed and airleakage gaps should be filled. | {'ID': '161_UK_DocM_V2_AccessAndUseOfBuildings'} | When installing or renovating thermal elements, the <e1>element</e1> <e2>being installed</e2> should be draught-proofed and airleakage gaps should be filled. | selection |
8e5e9560-4b22-4fe0-ad86-e52b82ffe4d2 | When calculating the energy consumption of a buildings cooling system, the energy consumption of cooling energy production and the electrical energy consumption of auxiliary units shall be taken into account where the use of the systems is required for indoor temperature control. | {'ID': '111_Finnish_EnergyEfficiency'} | When calculating the energy consumption of a buildings cooling system, the <e1>energy consumption</e1> of cooling energy production and the electrical energy consumption of auxiliary units shall be <e2>taken into account where the use of the systems is required for indoor temperature control</e2>. | necessity |
17fba530-c42b-4eeb-85dd-16da0bacc49c | Areas that are not enclosed, such as open floors, covered ways and balconies, should be excluded. | {'ID': '470_UK_DocL_V1_ConsrvationOfFuelAndPower'} | <e1>Areas</e1> that are not enclosed, such as open floors, <e2>covered ways</e2> and balconies, should be excluded. | selection |
2cc3d5b0-d3b4-45f2-a00d-838fd3f9abbb | There should be a supply rate, in the absence of tobacco smoke or other excessive pollutants, of 10 litres per second per person. | {'ID': '114_UK_DocF_V2_Ventilation'} | There should be a <e1>supply rate</e1>, <e2>in the absence of tobacco smoke or other excessive pollutants</e2>, of 10 litres per second per person. | necessity |
bfe386ee-8c0b-41d4-9967-6e873edf7229 | Floors and foundations: insulation should be installed tight to the structure, without air gaps between insulation panels and at edges. | {'ID': '148_UK_DocL_V1_ConsrvationOfFuelAndPower'} | <e1>Floors</e1> and foundations: insulation should be installed tight to the structure, <e2>without air gaps between insulation panels and at edges</e2>. | none |
1ebce0c9-705c-47ee-8429-e83cfbed72db | All walls, ducts and boxings to every WC/cloakroom, bath and shower room are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2. | {'ID': '103_UK_DocM_V1_AccessAndUseOfBuildings'} | All walls, ducts and <e1>boxings</e1> to every WC/cloakroom, bath and <e2>shower room</e2> are strong enough to support grab rails, seats and other adaptations that could impose a load of 1.5kN/m2. | part-of |
2c8d2bc3-cf23-48f8-b9c0-b90f150f9f93 | Any walls, doors and windows should be insulated and draught-proofed to at least the same extent as in the existing building. | {'ID': '426_UK_DocM_V2_AccessAndUseOfBuildings'} | Any walls, doors and <e1>windows</e1> should be insulated and <e2>draught-proofed</e2> to at least the same extent as in the existing building. | necessity |
a4dc06ab-99c3-4c8b-b295-eb3e6a64320a | The free height from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 2.2 metres, unless the area is protected so as to prevent the danger of collision. | {'ID': '99_Finnish_SafetyOfUse'} | The free height from the ground or from the surface of a driveway or walkway of the lower edge of a structural element, device or equipment protruding from the building, such as a balcony, bay window, sign, lighting device or awning, must be at least 2.2 metres, unless the <e1>area</e1> is <e2>protected so as to prevent the danger of collision</e2>. | selection |
9f8c2fbb-a04e-42f9-8fa0-b7a905dbafa0 | The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the ventilation space or gap is fully usable as a ventilation air flow path and that the ventilation space or gap is free of enclosed, non-ventilated areas. | {'ID': '40_Finnish_Health-Humidity'} | The ventilation openings or slots leading to the ventilation space or gap of a structure equipped with a ventilation space or gap must be positioned so that the <e1>ventilation space or gap</e1> is <e2>fully usable as a ventilation air flow path</e2> and that the ventilation space or gap is free of enclosed, non-ventilated areas. | selection |
f36650d9-cd31-4795-9728-7a4dcf3cadde | Dwellings, accommodation premises, institutions, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate system that gives a warning at an early stage of a beginning fire. | {'ID': '229_Finnish_FireSafety'} | Dwellings, accommodation premises, <e1>institutions</e1>, day-care institutions, day-care centres and other early childhood education premises and schools must be provided with an appropriate <e2>system that gives a warning at an early stage of a beginning fire</e2>. | necessity |
103f99ad-884b-4bae-9f22-ccb1c5bc3d26 | In an open garage of no more than five storeys, the maximum area may be used as the surface area of the storeys, even though the driveways between the various storeys are combined. | {'ID': '110_Finnish_FireSafety'} | In an open garage of no more than five storeys, the maximum <e1>area</e1> may be used as the surface area of the storeys, even though the driveways between the various storeys are <e2>combined</e2>. | none |
31d635b2-1d32-49dd-a848-5b5acaf50128 | For existing dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the energy performance of the whole system should be assessed. | {'ID': '407_UK_DocL_V1_ConsrvationOfFuelAndPower'} | For <e1>existing</e1> dwellings, when installing a complete new or replacement system (e.g. replacing a heating system including the heating appliance, pipework and heat emitters), the <e2>energy performance</e2> of the whole system should be assessed. | none |
64695439-3458-4d43-8e7b-a2ba75075cea | There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and structural elements that are located on the roof of the building and that must be accessed regularly. | {'ID': '124_Finnish_SafetyOfUse'} | There must be safe and easily accessible, uninterrupted access routes to any chimneys, ventilation equipment and other building equipment and <e1>structural elements</e1> that are <e2>located on the roof of the building</e2> and that must be accessed regularly. | selection |
45338082-ca66-418b-8fe1-8f2be926f330 | A cube of no more than 100 millimetres may pass between the stair steps. | {'ID': '52_Finnish_SafetyOfUse'} | A <e1>cube</e1> of no more than <e2>100 millimetres</e2> may pass between the stair steps. | less-equal |
cc72106e-9e7f-47cf-8a95-0173a8305dad | In a new building, the crawl space height must be 0.8 metres on average at the minimum. | {'ID': '83_Finnish_Health-Humidity'} | In a new <e1>building</e1>, the crawl space <e2>height</e2> must be 0.8 metres on average at the minimum. | none |