Dataset Viewer
Auto-converted to Parquet
idx
int64
0
99
asset_id
stringlengths
6
6
timestamp
stringdate
2023-04-01 08:30:00
2023-04-02 15:45:00
sensor_type
stringlengths
5
23
value
stringlengths
1
16
anomaly_detected
bool
2 classes
transaction_id
stringlengths
7
8
stakeholder_role
stringlengths
7
24
transaction_status
stringclasses
17 values
transaction_amount
int64
0
1k
contract_terms
stringlengths
19
78
0
UU1001
2023-04-01 08:30:00
pressure
120
false
TXN10001
Contractor
Completed
20
Price-based payment, Delivery within 30 days
1
UU1002
2023-04-01 09:00:00
temperature
22
true
TXN10002
Supplier
Pending
0
Fulfillment-based payment, Quality check within 7 days
2
UU1003
2023-04-01 09:30:00
flow_rate
350
false
TXN10003
Engineer
Completed
50
Service level agreement, Performance bonus
3
UU1004
2023-04-01 10:00:00
vibration
0.5
false
TXN10004
Quality Control
Completed
15
Defective product, Replacement or refund
4
UU1005
2023-04-01 10:30:00
water_quality
7.2
false
TXN10005
Environmental
Pending
0
Compliance with environmental standards
5
UU1006
2023-04-02 08:15:00
soil_moisture
30%
false
TXN10006
Geotechnical Engineer
In Review
0
Assessment of soil suitability for foundation work
6
UU1006
2023-04-02 08:45:00
soil_moisture
35
false
TXN10006
Contractor
Completed
15
Quality assurance, Compliance with safety standards
7
UU1006
2023-04-01 11:00:00
humidity
65
false
TXN10006
Supplier
Completed
30
Quality check, Prompt delivery
8
UU1006
2023-04-02 08:45:00
electrical
230
false
TXN10006
Operator
Initiated
0
Signed agreement, Project start date
9
UU1006
2023-04-02 11:00:00
soil_moisture
32%
false
TXN10006
Supplier
Completed
45
Water efficiency compliance, 24-hour delivery
10
UU1006
2023-04-02 08:45:00
electrical
230
false
TXN10006
Electrical Engineer
Completed
40
Compliance with safety standards, Maintenance scheduled
11
UU1051
2023-04-02 11:45:00
soil_moisture
30%
false
TXN10501
Environmental
Completed
300
Sustainability certification, Compliance with local regulations
12
UU2001
2023-04-01 08:35:00
leakage
0.02
true
TXN10006
Contractor
Resolved
35
Leakage repair within 10 hours, Follow-up inspection
13
UU2001
2023-04-02 11:00:00
pH_level
7.4
false
TXN20001
Consultant
Awaiting review
0
Contract dependent on pH compliance
15
UU1007
2023-04-02 08:45:00
noise_level
60 dB
false
TXN10007
Local Community
Pending
0
Noise management plan in place
16
UU1007
2023-04-02 09:15:00
temperature
23
false
TXN10007
Supplier
Pending
0
Timely delivery, Acceptance within 2 days
17
UU1007
2023-04-01 11:30:00
vibration
0.4
false
TXN10007
Engineer
Completed
45
Maintenance within warranty period
18
UU1007
2023-04-02 09:15:00
humidity
55
true
TXN10007
Engineer
Reviewed
0
Project milestone achieved, Quality review
19
UU1007
2023-04-02 11:30:00
electrical_conductivity
5.6
false
TXN10007
Electrical Engineer
Pending
0
Non-conformance penalty, Repair within 2 weeks
20
UU1007
2023-04-02 09:15:00
humidity
55
false
TXN10007
Maintenance Crew
Completed
10
Performance within operational parameters, Report to stakeholders
21
UU1052
2023-04-02 12:15:00
noise_level
65 dB
true
TXN10502
Resident
In Progress
500
Community service, Noise reduction measures
22
UU2002
2023-04-01 09:05:00
gas_level
100
false
TXN10007
Supplier
Completed
45
Delivery of gas line insulation materials, 1-year warranty
23
UU2002
2023-04-02 11:30:00
corrosion_rate
0.1
false
TXN20002
Maintenance
Scheduled
40
Inspection and repair within 48 hours
25
UU1008
2023-04-02 09:30:00
water_usage
1500 gallons
false
TXN10008
Utility Manager
Completed
200
Water conservation measures
26
UU1008
2023-04-02 09:45:00
flow_rate
400
true
TXN10008
Engineer
Review
0
Fix or replace equipment, Meet project deadline
27
UU1008
2023-04-01 12:00:00
flow_rate
330
true
TXN10008
Contractor
Pending
0
Adjustment required, Additional fee
28
UU1008
2023-04-02 09:45:00
light
750
false
TXN10008
Manager
Approved
100
Budget increase, Extended deadline
29
UU1008
2023-04-02 12:00:00
pH_level
7.5
false
TXN10008
Contractor
Completed
15
Safety compliance, Warranty period of 1 year
30
UU1008
2023-04-02 09:45:00
structural
5
false
TXN10008
Structural Engineer
Completed
200
Compliance with load specifications, Inspection and approval
31
UU1053
2023-04-02 12:45:00
gas_concentration
0.04 ppm
false
TXN10503
Safety Officer
Completed
0
Safety training, Regular audits
32
UU2003
2023-04-01 09:40:00
electrical_load
750
false
TXN10008
Engineer
Completed
120
Electrical load balancing, Energy savings report
33
UU2003
2023-04-02 12:00:00
duct_pressure
1.2
false
TXN20003
Technician
Completed
10
Repair services included
35
UU1009
2023-04-02 10:15:00
electricity_consumption
500 kWh
false
TXN10009
Energy Auditor
Completed
100
Reduction of energy usage by 10%
36
UU1009
2023-04-02 10:15:00
vibration
0.6
false
TXN10009
Quality Control
Completed
10
Quality certification, Free upgrade if necessary
37
UU1009
2023-04-01 12:30:00
pressure
125
false
TXN10009
Quality Control
Completed
10
No further action needed
38
UU1009
2023-04-02 10:15:00
pressure
110
false
TXN10009
Consultant
Signed
500
Expert review, Recommendations for improvement
39
UU1009
2023-04-02 12:30:00
noise_level
65dB
false
TXN10009
Environmental Assessor
Completed
30
Environmental impact assessment, Corrective action plan
40
UU1009
2023-04-02 10:15:00
pressure
115
true
TXN10009
Maintenance Crew
Pending
0
Investigation required, Urgent response needed
41
UU1054
2023-04-02 13:15:00
electric_conductivity
500 µS/cm
false
TXN10504
Electrical Contractor
Pending
400
Wiring compliance, Upgrade if needed
42
UU2004
2023-04-01 10:15:00
sewer_flow
150
true
TXN10009
Quality Control
Pending
55
Correction of sewer flow imbalance, Re-inspection in 30 days
43
UU2004
2023-04-02 12:30:00
valve_status
Operational
false
TXN20004
Operator
Operational
0
Regular maintenance
45
UU1010
2023-04-02 10:45:00
gas_pressure
15 psi
false
TXN1010
Safety Inspector
In Progress
0
Compliance with safety standards
46
UU1010
2023-04-02 10:45:00
water_quality
6.8
false
TXN1010
Environmental
Pending
0
Environmental impact assessment, Mitigation measures
47
UU1010
2023-04-01 13:00:00
temperature
23
false
TXN1010
Environmental
Completed
25
Compliance with new standards
48
UU1010
2023-04-02 10:45:00
temperature
23
false
TXN1010
Supervisor
Oversaw
0
Supervision report, Compliance check
49
UU1010
2023-04-02 13:00:00
humidity
45%
false
TXN1010
Quality Control
Completed
10
Inspection and certification, Agreed terms and conditions
50
UU1010
2023-04-02 10:45:00
water_quality
6.5
false
TXN1010
Environmental Specialist
Completed
30
Adherence to water purity standards, Documentation of test results
51
UU1055
2023-04-02 13:45:00
water_pressure
55 psi
false
TXN10505
Plumber
Completed
150
Installation of water-efficient fixtures
52
UU2005
2023-04-01 10:45:00
maintenance_due
2024-01-15
false
TXN10010
Contractor
Scheduled
150
Preventive maintenance, Service contract extension
53
UU2005
2023-04-02 13:00:00
water_level
10.2
false
TXN20005
Engineer
Completed
30
Design approval and optimization
55
UU1011
2023-04-02 11:15:00
traffic_flow
800 vehicles/day
false
TXN1011
Traffic Engineer
Pending
0
Optimization of traffic management during construction
56
UU1011
2023-04-02 11:15:00
pressure
125
false
TXN1011
Contractor
Completed
25
Delivery as per contract specifications, Penalty for delays
57
UU1011
2023-04-01 13:30:00
flow_rate
360
true
TXN1011
Contractor
Pending
0
System overload, Remediation required
58
UU1011
2023-04-02 11:15:00
flow_rate
400
false
TXN1011
Contractor
Committed
500
Service contract, Penalty for delays
59
UU1011
2023-04-02 13:30:00
oxygen_level
18ppm
true
TXN1011
Medical Consultant
Pending
0
Medical safety compliance, Emergency response plan
60
UU1011
2023-04-02 11:15:00
vibration
0.7
false
TXN1011
Quality Control
Completed
15
Passed performance test, Confirmation of operational stability
61
UU1056
2023-04-02 14:15:00
structure_integrity
95%
false
TXN10506
Inspection Agency
Completed
250
Certification of structural integrity, Periodic re-inspection
62
UU2006
2023-04-01 11:00:00
noise_level
70
false
TXN10011
Environmental
Completed
0
Noise pollution assessment, Mitigation plan
63
UU2006
2023-04-02 13:30:00
soil_composition
Sandy loam
false
TXN20006
Environmental Specialist
Completed
0
Compliance with environmental regulations
65
UU1012
2023-04-02 11:45:00
wind_speed
20 mph
false
TXN1012
Structural Engineer
Completed
50
Stress analysis report for high wind areas
66
UU1012
2023-04-02 11:45:00
temperature
21
false
TXN1012
Supplier
Completed
0
Adjustments made to meet temperature requirements, Quality check within 5 days
67
UU1012
2023-04-01 14:00:00
vibration
0.6
false
TXN1012
Engineer
Completed
60
Retrofit required, Extended warranty
68
UU1012
2023-04-02 11:45:00
vibration
0.6
false
TXN1012
Technician
Repaired
150
Maintenance fee, Service guarantee
69
UU1012
2023-04-02 14:00:00
airflow
3.2m3/s
false
TXN1012
Architect
Completed
25
Design specification compliance, Aesthetic requirements
70
UU1012
2023-04-02 11:45:00
flow_rate
400
false
TXN1012
Supplier
Completed
60
Accurate delivery quantity, Timely delivery
71
UU1057
2023-04-02 14:45:00
acoustic_insulation
null
true
TXN10507
Architect
In Progress
750
Upgrade to soundproofing materials
72
UU2007
2023-04-01 11:15:00
water_pressure
45
true
TXN10012
Engineer
Resolved
60
Pressure adjustment, Performance evaluation within 15 days
73
UU2007
2023-04-02 14:00:00
structural_integrity
95%
false
TXN20007
Contractor
Completed
150
Delivery within specified timeline and quality standards
75
UU1013
2023-04-02 12:15:00
air_quality
25 AQI
false
TXN1013
Health Inspector
Pending
0
Air quality monitoring in construction zones
76
UU1013
2023-04-02 12:15:00
flow_rate
375
false
TXN1013
Engineer
Completed
40
Installation within given timeframe, Defective parts replaced
77
UU1013
2023-04-01 14:30:00
humidity
70
true
TXN1013
Supplier
Completed
20
Excess moisture detected, Remediation
78
UU1013
2023-04-02 12:15:00
electrical
220
false
TXN1013
Operator
Signed
250
Electrical certification, Safety standards
79
UU1013
2023-04-02 14:30:00
pest_detection
positive
true
TXN1013
Pest Control
Pending
0
Pest infestation control, Re-inspection after treatment
80
UU1013
2023-04-02 12:15:00
electrical
220
false
TXN1013
Electrical Engineer
Completed
35
Routine maintenance completion, Updated electrical system documentation
81
UU1058
2023-04-02 15:15:00
smart_lighting_usage
50%
false
TXN10508
Electrical Engineer
Completed
300
Energy efficiency upgrades, Intelligent lighting controls
82
UU2008
2023-04-01 11:30:00
structural_integrity
95
false
TXN10013
Quality Control
Completed
200
Structural reinforcement, Safety audit
83
UU2008
2023-04-02 14:30:00
sewer_flow_rate
0.8 L/s
false
TXN20008
Maintenance
Scheduled
60
Inspection and flow optimization
85
UU1014
2023-04-02 12:45:00
water_quality
6.8 ppm
false
TXN1014
Environmental Specialist
Completed
75
Water treatment and disposal plan
86
UU1014
2023-04-02 12:45:00
vibration
0.4
false
TXN1014
Quality Control
Completed
20
Compliance with vibration limits, Contractual dispute resolution
87
UU1014
2023-04-01 15:00:00
temperature
21
false
TXN1014
Quality Control
Completed
15
Operational, No issues
88
UU1014
2023-04-02 12:45:00
humidity
60
false
TXN1014
Engineer
Confirmed
0
Design approval, Construction start
89
UU1014
2023-04-02 15:00:00
visibility
0.5m
false
TXN1014
Contractor
Completed
20
Construction safety, Fall protection measures
90
UU1014
2023-04-02 12:45:00
humidity
52
false
TXN1014
Maintenance Crew
Pending
0
Calibration check of humidity sensors, Scheduled for next maintenance cycle
91
UU1059
2023-04-02 15:45:00
seismic_activity
0.02
false
TXN10509
Geologist
Completed
0
Regular monitoring and structural adjustments
92
UU2009
2023-04-01 11:45:00
fire_alarm_test
PASS
false
TXN10014
Contractor
Completed
30
Fire safety system test, Certificate of compliance
93
UU2009
2023-04-02 15:00:00
pipe_material
PE
false
TXN20009
Supplier
Confirmed
25
Material quality check and delivery
95
UU1015
2023-04-02 13:15:00
noise_level
55 dB
false
TXN1015
Project Manager
Completed
1,000
Project completion and audit
96
UU1015
2023-04-02 13:15:00
water_quality
7
false
TXN1015
Environmental
Pending
0
Environmental clearance, Sustainable materials use
97
UU1015
2023-04-01 15:30:00
flow_rate
340
false
TXN1015
Contractor
Completed
40
Optimization recommended, Energy savings
99
UU1015
2023-04-02 15:30:00
light_exposure
800lux
false
TXN1015
Electrical Engineer
Pending
0
Lighting safety standards, Installation within the project timeline

DecentralizedConstruct

tags: blockchain, construction, stakeholder collaboration

Note: This is an AI-generated dataset so its content may be inaccurate or false

Dataset Description:

The 'DecentralizedConstruct' dataset captures the attributes and activities within a decentralized framework for underground utility construction projects, utilizing blockchain technology for asset monitoring, stakeholder collaboration, and transaction facilitation.

CSV Content Preview:

"asset_id","timestamp","sensor_type","value","anomaly_detected","transaction_id","stakeholder_role","transaction_status","transaction_amount","contract_terms"
"UU1001","2023-04-01 08:30:00","pressure","120","false","TXN10001","Contractor","Completed","20.00","Price-based payment, Delivery within 30 days"
"UU1002","2023-04-01 09:00:00","temperature","22","true","TXN10002","Supplier","Pending","0.00","Fulfillment-based payment, Quality check within 7 days"
"UU1003","2023-04-01 09:30:00","flow_rate","350","false","TXN10003","Engineer","Completed","50.00","Service level agreement, Performance bonus"
"UU1004","2023-04-01 10:00:00","vibration","0.5","false","TXN10004","Quality Control","Completed","15.00","Defective product, Replacement or refund"
"UU1005","2023-04-01 10:30:00","water_quality","7.2","false","TXN10005","Environmental","Pending","0.00","Compliance with environmental standards"

Source of the data:

The dataset was generated using the Infinite Dataset Hub and microsoft/Phi-3-mini-4k-instruct using the query 'labels text The proposed decentralized framework will enable efficient monitoring of real-world assets through the integration of smart contracts, allowing for real-time updates and enhanced transparency in the Underground Utility Construction sector. This integration will not only optimize the supply chain but also promote secure and reliable collaboration among various stakeholders, fostering a more robust and resilient decentralized system. Additionally, the utilization of cryptocurrency will facilitate cost-effective transactions, thereby reducing the economic burden on the construction process. The use of smart contracts in decentralized blockchain technology has led to the creation of autonomous infrastructure management systems in underground utility construction projects. These systems utilize real-world assets, such as sensors and IoT devices, to monitor and optimize the construction process. By leveraging the transparency and immutability of blockchain, project stakeholders can ensure municipal compliance and reduce the risk of disputes. Moreover, the integration of cryptocurrency and decentralized finance (DeFi) enables the secure and efficient payment of contractors and suppliers. However, the adoption of this technology still faces challenges related to scalability and interoperability with existing infrastructure. The utilization of decentralized blockchain technology in underground utility construction allows for the creation of tamper-proof ledgers that record asset utilization and management of complex networks. This enables the automation of permitting and regulatory compliance through smart contracts, reducing the need for intermediaries and increasing the efficiency of supply chain management.':

Downloads last month
6