File size: 12,314 Bytes
c879a51 |
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 |
idx,asset_id,timestamp,sensor_type,value,anomaly_detected,transaction_id,stakeholder_role,transaction_status,transaction_amount,contract_terms
0,UU1001,2023-04-01 08:30:00,pressure,120,False,TXN10001,Contractor,Completed,20,"Price-based payment, Delivery within 30 days"
1,UU1002,2023-04-01 09:00:00,temperature,22,True,TXN10002,Supplier,Pending,0,"Fulfillment-based payment, Quality check within 7 days"
2,UU1003,2023-04-01 09:30:00,flow_rate,350,False,TXN10003,Engineer,Completed,50,"Service level agreement, Performance bonus"
3,UU1004,2023-04-01 10:00:00,vibration,0.5,False,TXN10004,Quality Control,Completed,15,"Defective product, Replacement or refund"
4,UU1005,2023-04-01 10:30:00,water_quality,7.2,False,TXN10005,Environmental,Pending,0,Compliance with environmental standards
5,UU1006,2023-04-02 08:15:00,soil_moisture,30%,False,TXN10006,Geotechnical Engineer,In Review,0,Assessment of soil suitability for foundation work
6,UU1006,2023-04-02 08:45:00,soil_moisture,35,False,TXN10006,Contractor,Completed,15,"Quality assurance, Compliance with safety standards"
7,UU1006,2023-04-01 11:00:00,humidity,65,False,TXN10006,Supplier,Completed,30,"Quality check, Prompt delivery"
8,UU1006,2023-04-02 08:45:00,electrical,230,False,TXN10006,Operator,Initiated,0,"Signed agreement, Project start date"
9,UU1006,2023-04-02 11:00:00,soil_moisture,32%,False,TXN10006,Supplier,Completed,45,"Water efficiency compliance, 24-hour delivery"
10,UU1006,2023-04-02 08:45:00,electrical,230,False,TXN10006,Electrical Engineer,Completed,40,"Compliance with safety standards, Maintenance scheduled"
11,UU1051,2023-04-02 11:45:00,soil_moisture,30%,False,TXN10501,Environmental,Completed,300,"Sustainability certification, Compliance with local regulations"
12,UU2001,2023-04-01 08:35:00,leakage,0.02,True,TXN10006,Contractor,Resolved,35,"Leakage repair within 10 hours, Follow-up inspection"
13,UU2001,2023-04-02 11:00:00,pH_level,7.4,False,TXN20001,Consultant,Awaiting review,0,Contract dependent on pH compliance
15,UU1007,2023-04-02 08:45:00,noise_level,60 dB,False,TXN10007,Local Community,Pending,0,Noise management plan in place
16,UU1007,2023-04-02 09:15:00,temperature,23,False,TXN10007,Supplier,Pending,0,"Timely delivery, Acceptance within 2 days"
17,UU1007,2023-04-01 11:30:00,vibration,0.4,False,TXN10007,Engineer,Completed,45,Maintenance within warranty period
18,UU1007,2023-04-02 09:15:00,humidity,55,True,TXN10007,Engineer,Reviewed,0,"Project milestone achieved, Quality review"
19,UU1007,2023-04-02 11:30:00,electrical_conductivity,5.6,False,TXN10007,Electrical Engineer,Pending,0,"Non-conformance penalty, Repair within 2 weeks"
20,UU1007,2023-04-02 09:15:00,humidity,55,False,TXN10007,Maintenance Crew,Completed,10,"Performance within operational parameters, Report to stakeholders"
21,UU1052,2023-04-02 12:15:00,noise_level,65 dB,True,TXN10502,Resident,In Progress,500,"Community service, Noise reduction measures"
22,UU2002,2023-04-01 09:05:00,gas_level,100,False,TXN10007,Supplier,Completed,45,"Delivery of gas line insulation materials, 1-year warranty"
23,UU2002,2023-04-02 11:30:00,corrosion_rate,0.1,False,TXN20002,Maintenance,Scheduled,40,Inspection and repair within 48 hours
25,UU1008,2023-04-02 09:30:00,water_usage,1500 gallons,False,TXN10008,Utility Manager,Completed,200,Water conservation measures
26,UU1008,2023-04-02 09:45:00,flow_rate,400,True,TXN10008,Engineer,Review,0,"Fix or replace equipment, Meet project deadline"
27,UU1008,2023-04-01 12:00:00,flow_rate,330,True,TXN10008,Contractor,Pending,0,"Adjustment required, Additional fee"
28,UU1008,2023-04-02 09:45:00,light,750,False,TXN10008,Manager,Approved,100,"Budget increase, Extended deadline"
29,UU1008,2023-04-02 12:00:00,pH_level,7.5,False,TXN10008,Contractor,Completed,15,"Safety compliance, Warranty period of 1 year"
30,UU1008,2023-04-02 09:45:00,structural,5,False,TXN10008,Structural Engineer,Completed,200,"Compliance with load specifications, Inspection and approval"
31,UU1053,2023-04-02 12:45:00,gas_concentration,0.04 ppm,False,TXN10503,Safety Officer,Completed,0,"Safety training, Regular audits"
32,UU2003,2023-04-01 09:40:00,electrical_load,750,False,TXN10008,Engineer,Completed,120,"Electrical load balancing, Energy savings report"
33,UU2003,2023-04-02 12:00:00,duct_pressure,1.2,False,TXN20003,Technician,Completed,10,Repair services included
35,UU1009,2023-04-02 10:15:00,electricity_consumption,500 kWh,False,TXN10009,Energy Auditor,Completed,100,Reduction of energy usage by 10%
36,UU1009,2023-04-02 10:15:00,vibration,0.6,False,TXN10009,Quality Control,Completed,10,"Quality certification, Free upgrade if necessary"
37,UU1009,2023-04-01 12:30:00,pressure,125,False,TXN10009,Quality Control,Completed,10,No further action needed
38,UU1009,2023-04-02 10:15:00,pressure,110,False,TXN10009,Consultant,Signed,500,"Expert review, Recommendations for improvement"
39,UU1009,2023-04-02 12:30:00,noise_level,65dB,False,TXN10009,Environmental Assessor,Completed,30,"Environmental impact assessment, Corrective action plan"
40,UU1009,2023-04-02 10:15:00,pressure,115,True,TXN10009,Maintenance Crew,Pending,0,"Investigation required, Urgent response needed"
41,UU1054,2023-04-02 13:15:00,electric_conductivity,500 µS/cm,False,TXN10504,Electrical Contractor,Pending,400,"Wiring compliance, Upgrade if needed"
42,UU2004,2023-04-01 10:15:00,sewer_flow,150,True,TXN10009,Quality Control,Pending,55,"Correction of sewer flow imbalance, Re-inspection in 30 days"
43,UU2004,2023-04-02 12:30:00,valve_status,Operational,False,TXN20004,Operator,Operational,0,Regular maintenance
45,UU1010,2023-04-02 10:45:00,gas_pressure,15 psi,False,TXN1010,Safety Inspector,In Progress,0,Compliance with safety standards
46,UU1010,2023-04-02 10:45:00,water_quality,6.8,False,TXN1010,Environmental,Pending,0,"Environmental impact assessment, Mitigation measures"
47,UU1010,2023-04-01 13:00:00,temperature,23,False,TXN1010,Environmental,Completed,25,Compliance with new standards
48,UU1010,2023-04-02 10:45:00,temperature,23,False,TXN1010,Supervisor,Oversaw,0,"Supervision report, Compliance check"
49,UU1010,2023-04-02 13:00:00,humidity,45%,False,TXN1010,Quality Control,Completed,10,"Inspection and certification, Agreed terms and conditions"
50,UU1010,2023-04-02 10:45:00,water_quality,6.5,False,TXN1010,Environmental Specialist,Completed,30,"Adherence to water purity standards, Documentation of test results"
51,UU1055,2023-04-02 13:45:00,water_pressure,55 psi,False,TXN10505,Plumber,Completed,150,Installation of water-efficient fixtures
52,UU2005,2023-04-01 10:45:00,maintenance_due,2024-01-15,False,TXN10010,Contractor,Scheduled,150,"Preventive maintenance, Service contract extension"
53,UU2005,2023-04-02 13:00:00,water_level,10.2,False,TXN20005,Engineer,Completed,30,Design approval and optimization
55,UU1011,2023-04-02 11:15:00,traffic_flow,800 vehicles/day,False,TXN1011,Traffic Engineer,Pending,0,Optimization of traffic management during construction
56,UU1011,2023-04-02 11:15:00,pressure,125,False,TXN1011,Contractor,Completed,25,"Delivery as per contract specifications, Penalty for delays"
57,UU1011,2023-04-01 13:30:00,flow_rate,360,True,TXN1011,Contractor,Pending,0,"System overload, Remediation required"
58,UU1011,2023-04-02 11:15:00,flow_rate,400,False,TXN1011,Contractor,Committed,500,"Service contract, Penalty for delays"
59,UU1011,2023-04-02 13:30:00,oxygen_level,18ppm,True,TXN1011,Medical Consultant,Pending,0,"Medical safety compliance, Emergency response plan"
60,UU1011,2023-04-02 11:15:00,vibration,0.7,False,TXN1011,Quality Control,Completed,15,"Passed performance test, Confirmation of operational stability"
61,UU1056,2023-04-02 14:15:00,structure_integrity,95%,False,TXN10506,Inspection Agency,Completed,250,"Certification of structural integrity, Periodic re-inspection"
62,UU2006,2023-04-01 11:00:00,noise_level,70,False,TXN10011,Environmental,Completed,0,"Noise pollution assessment, Mitigation plan"
63,UU2006,2023-04-02 13:30:00,soil_composition,Sandy loam,False,TXN20006,Environmental Specialist,Completed,0,Compliance with environmental regulations
65,UU1012,2023-04-02 11:45:00,wind_speed,20 mph,False,TXN1012,Structural Engineer,Completed,50,Stress analysis report for high wind areas
66,UU1012,2023-04-02 11:45:00,temperature,21,False,TXN1012,Supplier,Completed,0,"Adjustments made to meet temperature requirements, Quality check within 5 days"
67,UU1012,2023-04-01 14:00:00,vibration,0.6,False,TXN1012,Engineer,Completed,60,"Retrofit required, Extended warranty"
68,UU1012,2023-04-02 11:45:00,vibration,0.6,False,TXN1012,Technician,Repaired,150,"Maintenance fee, Service guarantee"
69,UU1012,2023-04-02 14:00:00,airflow,3.2m3/s,False,TXN1012,Architect,Completed,25,"Design specification compliance, Aesthetic requirements"
70,UU1012,2023-04-02 11:45:00,flow_rate,400,False,TXN1012,Supplier,Completed,60,"Accurate delivery quantity, Timely delivery"
71,UU1057,2023-04-02 14:45:00,acoustic_insulation,,True,TXN10507,Architect,In Progress,750,Upgrade to soundproofing materials
72,UU2007,2023-04-01 11:15:00,water_pressure,45,True,TXN10012,Engineer,Resolved,60,"Pressure adjustment, Performance evaluation within 15 days"
73,UU2007,2023-04-02 14:00:00,structural_integrity,95%,False,TXN20007,Contractor,Completed,150,Delivery within specified timeline and quality standards
75,UU1013,2023-04-02 12:15:00,air_quality,25 AQI,False,TXN1013,Health Inspector,Pending,0,Air quality monitoring in construction zones
76,UU1013,2023-04-02 12:15:00,flow_rate,375,False,TXN1013,Engineer,Completed,40,"Installation within given timeframe, Defective parts replaced"
77,UU1013,2023-04-01 14:30:00,humidity,70,True,TXN1013,Supplier,Completed,20,"Excess moisture detected, Remediation"
78,UU1013,2023-04-02 12:15:00,electrical,220,False,TXN1013,Operator,Signed,250,"Electrical certification, Safety standards"
79,UU1013,2023-04-02 14:30:00,pest_detection,positive,True,TXN1013,Pest Control,Pending,0,"Pest infestation control, Re-inspection after treatment"
80,UU1013,2023-04-02 12:15:00,electrical,220,False,TXN1013,Electrical Engineer,Completed,35,"Routine maintenance completion, Updated electrical system documentation"
81,UU1058,2023-04-02 15:15:00,smart_lighting_usage,50%,False,TXN10508,Electrical Engineer,Completed,300,"Energy efficiency upgrades, Intelligent lighting controls"
82,UU2008,2023-04-01 11:30:00,structural_integrity,95,False,TXN10013,Quality Control,Completed,200,"Structural reinforcement, Safety audit"
83,UU2008,2023-04-02 14:30:00,sewer_flow_rate,0.8 L/s,False,TXN20008,Maintenance,Scheduled,60,Inspection and flow optimization
85,UU1014,2023-04-02 12:45:00,water_quality,6.8 ppm,False,TXN1014,Environmental Specialist,Completed,75,Water treatment and disposal plan
86,UU1014,2023-04-02 12:45:00,vibration,0.4,False,TXN1014,Quality Control,Completed,20,"Compliance with vibration limits, Contractual dispute resolution"
87,UU1014,2023-04-01 15:00:00,temperature,21,False,TXN1014,Quality Control,Completed,15,"Operational, No issues"
88,UU1014,2023-04-02 12:45:00,humidity,60,False,TXN1014,Engineer,Confirmed,0,"Design approval, Construction start"
89,UU1014,2023-04-02 15:00:00,visibility,0.5m,False,TXN1014,Contractor,Completed,20,"Construction safety, Fall protection measures"
90,UU1014,2023-04-02 12:45:00,humidity,52,False,TXN1014,Maintenance Crew,Pending,0,"Calibration check of humidity sensors, Scheduled for next maintenance cycle"
91,UU1059,2023-04-02 15:45:00,seismic_activity,0.02,False,TXN10509,Geologist,Completed,0,Regular monitoring and structural adjustments
92,UU2009,2023-04-01 11:45:00,fire_alarm_test,PASS,False,TXN10014,Contractor,Completed,30,"Fire safety system test, Certificate of compliance"
93,UU2009,2023-04-02 15:00:00,pipe_material,PE,False,TXN20009,Supplier,Confirmed,25,Material quality check and delivery
95,UU1015,2023-04-02 13:15:00,noise_level,55 dB,False,TXN1015,Project Manager,Completed,1000,Project completion and audit
96,UU1015,2023-04-02 13:15:00,water_quality,7,False,TXN1015,Environmental,Pending,0,"Environmental clearance, Sustainable materials use"
97,UU1015,2023-04-01 15:30:00,flow_rate,340,False,TXN1015,Contractor,Completed,40,"Optimization recommended, Energy savings"
99,UU1015,2023-04-02 15:30:00,light_exposure,800lux,False,TXN1015,Electrical Engineer,Pending,0,"Lighting safety standards, Installation within the project timeline"
|