idx
int64
0
99
asset_id
stringlengths
6
6
timestamp
stringdate
2023-04-01 08:30:00
2023-04-02 15:45:00
sensor_type
stringlengths
5
23
value
stringlengths
1
16
anomaly_detected
bool
2 classes
transaction_id
stringlengths
7
8
stakeholder_role
stringlengths
7
24
transaction_status
stringclasses
17 values
transaction_amount
int64
0
1k
contract_terms
stringlengths
19
78
0
UU1001
2023-04-01 08:30:00
pressure
120
false
TXN10001
Contractor
Completed
20
Price-based payment, Delivery within 30 days
1
UU1002
2023-04-01 09:00:00
temperature
22
true
TXN10002
Supplier
Pending
0
Fulfillment-based payment, Quality check within 7 days
2
UU1003
2023-04-01 09:30:00
flow_rate
350
false
TXN10003
Engineer
Completed
50
Service level agreement, Performance bonus
3
UU1004
2023-04-01 10:00:00
vibration
0.5
false
TXN10004
Quality Control
Completed
15
Defective product, Replacement or refund
4
UU1005
2023-04-01 10:30:00
water_quality
7.2
false
TXN10005
Environmental
Pending
0
Compliance with environmental standards
5
UU1006
2023-04-02 08:15:00
soil_moisture
30%
false
TXN10006
Geotechnical Engineer
In Review
0
Assessment of soil suitability for foundation work
6
UU1006
2023-04-02 08:45:00
soil_moisture
35
false
TXN10006
Contractor
Completed
15
Quality assurance, Compliance with safety standards
7
UU1006
2023-04-01 11:00:00
humidity
65
false
TXN10006
Supplier
Completed
30
Quality check, Prompt delivery
8
UU1006
2023-04-02 08:45:00
electrical
230
false
TXN10006
Operator
Initiated
0
Signed agreement, Project start date
9
UU1006
2023-04-02 11:00:00
soil_moisture
32%
false
TXN10006
Supplier
Completed
45
Water efficiency compliance, 24-hour delivery
10
UU1006
2023-04-02 08:45:00
electrical
230
false
TXN10006
Electrical Engineer
Completed
40
Compliance with safety standards, Maintenance scheduled
11
UU1051
2023-04-02 11:45:00
soil_moisture
30%
false
TXN10501
Environmental
Completed
300
Sustainability certification, Compliance with local regulations
12
UU2001
2023-04-01 08:35:00
leakage
0.02
true
TXN10006
Contractor
Resolved
35
Leakage repair within 10 hours, Follow-up inspection
13
UU2001
2023-04-02 11:00:00
pH_level
7.4
false
TXN20001
Consultant
Awaiting review
0
Contract dependent on pH compliance
15
UU1007
2023-04-02 08:45:00
noise_level
60 dB
false
TXN10007
Local Community
Pending
0
Noise management plan in place
16
UU1007
2023-04-02 09:15:00
temperature
23
false
TXN10007
Supplier
Pending
0
Timely delivery, Acceptance within 2 days
17
UU1007
2023-04-01 11:30:00
vibration
0.4
false
TXN10007
Engineer
Completed
45
Maintenance within warranty period
18
UU1007
2023-04-02 09:15:00
humidity
55
true
TXN10007
Engineer
Reviewed
0
Project milestone achieved, Quality review
19
UU1007
2023-04-02 11:30:00
electrical_conductivity
5.6
false
TXN10007
Electrical Engineer
Pending
0
Non-conformance penalty, Repair within 2 weeks
20
UU1007
2023-04-02 09:15:00
humidity
55
false
TXN10007
Maintenance Crew
Completed
10
Performance within operational parameters, Report to stakeholders
21
UU1052
2023-04-02 12:15:00
noise_level
65 dB
true
TXN10502
Resident
In Progress
500
Community service, Noise reduction measures
22
UU2002
2023-04-01 09:05:00
gas_level
100
false
TXN10007
Supplier
Completed
45
Delivery of gas line insulation materials, 1-year warranty
23
UU2002
2023-04-02 11:30:00
corrosion_rate
0.1
false
TXN20002
Maintenance
Scheduled
40
Inspection and repair within 48 hours
25
UU1008
2023-04-02 09:30:00
water_usage
1500 gallons
false
TXN10008
Utility Manager
Completed
200
Water conservation measures
26
UU1008
2023-04-02 09:45:00
flow_rate
400
true
TXN10008
Engineer
Review
0
Fix or replace equipment, Meet project deadline
27
UU1008
2023-04-01 12:00:00
flow_rate
330
true
TXN10008
Contractor
Pending
0
Adjustment required, Additional fee
28
UU1008
2023-04-02 09:45:00
light
750
false
TXN10008
Manager
Approved
100
Budget increase, Extended deadline
29
UU1008
2023-04-02 12:00:00
pH_level
7.5
false
TXN10008
Contractor
Completed
15
Safety compliance, Warranty period of 1 year
30
UU1008
2023-04-02 09:45:00
structural
5
false
TXN10008
Structural Engineer
Completed
200
Compliance with load specifications, Inspection and approval
31
UU1053
2023-04-02 12:45:00
gas_concentration
0.04 ppm
false
TXN10503
Safety Officer
Completed
0
Safety training, Regular audits
32
UU2003
2023-04-01 09:40:00
electrical_load
750
false
TXN10008
Engineer
Completed
120
Electrical load balancing, Energy savings report
33
UU2003
2023-04-02 12:00:00
duct_pressure
1.2
false
TXN20003
Technician
Completed
10
Repair services included
35
UU1009
2023-04-02 10:15:00
electricity_consumption
500 kWh
false
TXN10009
Energy Auditor
Completed
100
Reduction of energy usage by 10%
36
UU1009
2023-04-02 10:15:00
vibration
0.6
false
TXN10009
Quality Control
Completed
10
Quality certification, Free upgrade if necessary
37
UU1009
2023-04-01 12:30:00
pressure
125
false
TXN10009
Quality Control
Completed
10
No further action needed
38
UU1009
2023-04-02 10:15:00
pressure
110
false
TXN10009
Consultant
Signed
500
Expert review, Recommendations for improvement
39
UU1009
2023-04-02 12:30:00
noise_level
65dB
false
TXN10009
Environmental Assessor
Completed
30
Environmental impact assessment, Corrective action plan
40
UU1009
2023-04-02 10:15:00
pressure
115
true
TXN10009
Maintenance Crew
Pending
0
Investigation required, Urgent response needed
41
UU1054
2023-04-02 13:15:00
electric_conductivity
500 µS/cm
false
TXN10504
Electrical Contractor
Pending
400
Wiring compliance, Upgrade if needed
42
UU2004
2023-04-01 10:15:00
sewer_flow
150
true
TXN10009
Quality Control
Pending
55
Correction of sewer flow imbalance, Re-inspection in 30 days
43
UU2004
2023-04-02 12:30:00
valve_status
Operational
false
TXN20004
Operator
Operational
0
Regular maintenance
45
UU1010
2023-04-02 10:45:00
gas_pressure
15 psi
false
TXN1010
Safety Inspector
In Progress
0
Compliance with safety standards
46
UU1010
2023-04-02 10:45:00
water_quality
6.8
false
TXN1010
Environmental
Pending
0
Environmental impact assessment, Mitigation measures
47
UU1010
2023-04-01 13:00:00
temperature
23
false
TXN1010
Environmental
Completed
25
Compliance with new standards
48
UU1010
2023-04-02 10:45:00
temperature
23
false
TXN1010
Supervisor
Oversaw
0
Supervision report, Compliance check
49
UU1010
2023-04-02 13:00:00
humidity
45%
false
TXN1010
Quality Control
Completed
10
Inspection and certification, Agreed terms and conditions
50
UU1010
2023-04-02 10:45:00
water_quality
6.5
false
TXN1010
Environmental Specialist
Completed
30
Adherence to water purity standards, Documentation of test results
51
UU1055
2023-04-02 13:45:00
water_pressure
55 psi
false
TXN10505
Plumber
Completed
150
Installation of water-efficient fixtures
52
UU2005
2023-04-01 10:45:00
maintenance_due
2024-01-15
false
TXN10010
Contractor
Scheduled
150
Preventive maintenance, Service contract extension
53
UU2005
2023-04-02 13:00:00
water_level
10.2
false
TXN20005
Engineer
Completed
30
Design approval and optimization
55
UU1011
2023-04-02 11:15:00
traffic_flow
800 vehicles/day
false
TXN1011
Traffic Engineer
Pending
0
Optimization of traffic management during construction
56
UU1011
2023-04-02 11:15:00
pressure
125
false
TXN1011
Contractor
Completed
25
Delivery as per contract specifications, Penalty for delays
57
UU1011
2023-04-01 13:30:00
flow_rate
360
true
TXN1011
Contractor
Pending
0
System overload, Remediation required
58
UU1011
2023-04-02 11:15:00
flow_rate
400
false
TXN1011
Contractor
Committed
500
Service contract, Penalty for delays
59
UU1011
2023-04-02 13:30:00
oxygen_level
18ppm
true
TXN1011
Medical Consultant
Pending
0
Medical safety compliance, Emergency response plan
60
UU1011
2023-04-02 11:15:00
vibration
0.7
false
TXN1011
Quality Control
Completed
15
Passed performance test, Confirmation of operational stability
61
UU1056
2023-04-02 14:15:00
structure_integrity
95%
false
TXN10506
Inspection Agency
Completed
250
Certification of structural integrity, Periodic re-inspection
62
UU2006
2023-04-01 11:00:00
noise_level
70
false
TXN10011
Environmental
Completed
0
Noise pollution assessment, Mitigation plan
63
UU2006
2023-04-02 13:30:00
soil_composition
Sandy loam
false
TXN20006
Environmental Specialist
Completed
0
Compliance with environmental regulations
65
UU1012
2023-04-02 11:45:00
wind_speed
20 mph
false
TXN1012
Structural Engineer
Completed
50
Stress analysis report for high wind areas
66
UU1012
2023-04-02 11:45:00
temperature
21
false
TXN1012
Supplier
Completed
0
Adjustments made to meet temperature requirements, Quality check within 5 days
67
UU1012
2023-04-01 14:00:00
vibration
0.6
false
TXN1012
Engineer
Completed
60
Retrofit required, Extended warranty
68
UU1012
2023-04-02 11:45:00
vibration
0.6
false
TXN1012
Technician
Repaired
150
Maintenance fee, Service guarantee
69
UU1012
2023-04-02 14:00:00
airflow
3.2m3/s
false
TXN1012
Architect
Completed
25
Design specification compliance, Aesthetic requirements
70
UU1012
2023-04-02 11:45:00
flow_rate
400
false
TXN1012
Supplier
Completed
60
Accurate delivery quantity, Timely delivery
71
UU1057
2023-04-02 14:45:00
acoustic_insulation
null
true
TXN10507
Architect
In Progress
750
Upgrade to soundproofing materials
72
UU2007
2023-04-01 11:15:00
water_pressure
45
true
TXN10012
Engineer
Resolved
60
Pressure adjustment, Performance evaluation within 15 days
73
UU2007
2023-04-02 14:00:00
structural_integrity
95%
false
TXN20007
Contractor
Completed
150
Delivery within specified timeline and quality standards
75
UU1013
2023-04-02 12:15:00
air_quality
25 AQI
false
TXN1013
Health Inspector
Pending
0
Air quality monitoring in construction zones
76
UU1013
2023-04-02 12:15:00
flow_rate
375
false
TXN1013
Engineer
Completed
40
Installation within given timeframe, Defective parts replaced
77
UU1013
2023-04-01 14:30:00
humidity
70
true
TXN1013
Supplier
Completed
20
Excess moisture detected, Remediation
78
UU1013
2023-04-02 12:15:00
electrical
220
false
TXN1013
Operator
Signed
250
Electrical certification, Safety standards
79
UU1013
2023-04-02 14:30:00
pest_detection
positive
true
TXN1013
Pest Control
Pending
0
Pest infestation control, Re-inspection after treatment
80
UU1013
2023-04-02 12:15:00
electrical
220
false
TXN1013
Electrical Engineer
Completed
35
Routine maintenance completion, Updated electrical system documentation
81
UU1058
2023-04-02 15:15:00
smart_lighting_usage
50%
false
TXN10508
Electrical Engineer
Completed
300
Energy efficiency upgrades, Intelligent lighting controls
82
UU2008
2023-04-01 11:30:00
structural_integrity
95
false
TXN10013
Quality Control
Completed
200
Structural reinforcement, Safety audit
83
UU2008
2023-04-02 14:30:00
sewer_flow_rate
0.8 L/s
false
TXN20008
Maintenance
Scheduled
60
Inspection and flow optimization
85
UU1014
2023-04-02 12:45:00
water_quality
6.8 ppm
false
TXN1014
Environmental Specialist
Completed
75
Water treatment and disposal plan
86
UU1014
2023-04-02 12:45:00
vibration
0.4
false
TXN1014
Quality Control
Completed
20
Compliance with vibration limits, Contractual dispute resolution
87
UU1014
2023-04-01 15:00:00
temperature
21
false
TXN1014
Quality Control
Completed
15
Operational, No issues
88
UU1014
2023-04-02 12:45:00
humidity
60
false
TXN1014
Engineer
Confirmed
0
Design approval, Construction start
89
UU1014
2023-04-02 15:00:00
visibility
0.5m
false
TXN1014
Contractor
Completed
20
Construction safety, Fall protection measures
90
UU1014
2023-04-02 12:45:00
humidity
52
false
TXN1014
Maintenance Crew
Pending
0
Calibration check of humidity sensors, Scheduled for next maintenance cycle
91
UU1059
2023-04-02 15:45:00
seismic_activity
0.02
false
TXN10509
Geologist
Completed
0
Regular monitoring and structural adjustments
92
UU2009
2023-04-01 11:45:00
fire_alarm_test
PASS
false
TXN10014
Contractor
Completed
30
Fire safety system test, Certificate of compliance
93
UU2009
2023-04-02 15:00:00
pipe_material
PE
false
TXN20009
Supplier
Confirmed
25
Material quality check and delivery
95
UU1015
2023-04-02 13:15:00
noise_level
55 dB
false
TXN1015
Project Manager
Completed
1,000
Project completion and audit
96
UU1015
2023-04-02 13:15:00
water_quality
7
false
TXN1015
Environmental
Pending
0
Environmental clearance, Sustainable materials use
97
UU1015
2023-04-01 15:30:00
flow_rate
340
false
TXN1015
Contractor
Completed
40
Optimization recommended, Energy savings
99
UU1015
2023-04-02 15:30:00
light_exposure
800lux
false
TXN1015
Electrical Engineer
Pending
0
Lighting safety standards, Installation within the project timeline