iBSiBSmax
|
i 22
|
Constraint 18 is the operation equation in which param
|
eters ηchandηdisare charging and discharging efficiency
|
respectively Constraints 1922 are limits of charging and
|
discharging rates states of charge and sizes respectively
|
In this problem the battery size BS is chosen as our
|
design variable and the remaining operationrelated ones
|
as our control variables including charged and discharged
|
power of batteries PchPdis active and reactive power
|
output of generators PGQG AC and MTDC power flow
|
related variables csvin constraints eq 46 eq 14 and
|
the power through MCC PConvPLossPDC
|
To convert this problem into a graphbased model we
|
define each ACDC bus ACDC branch converter and
|
BESS as graph nodes The linking constraints of the edges
|
and objective terms in each node are derived based the
|
abovedescribed formulation We consider eight hours as our
|
problem time horizon The resulting graph is shown in Figure
|
3 with each color representing an hour The structure of the
|
graph shows the nodes with associated decision variables
|
connected in time sequential hours While selecting one of
|
the hours on the graph circled in black shows the linking
|
constraints among different components including the same
|
components of the system
|
IV R ESULTS
|
DC grid branch data is presented in Tables I The converter
|
droop control and efficiency parameters are k 002d 1
|
β 003 The batteries minimum BSmin and maximum
|
BSmax capacities are 20MWh and 120MWh respectively
|
and their initial and minimum states of charge at the last hour
|
are set to half of BSmin Batteries charge and discharge
|
efficiency are 08and11 respectively Nominal wind farm
|
WF outputs are set as 40MW and 50MW respectively
|
Nominal load and generator cost functions are taken from
|
the 9bus system data In each hour WF output nominal
|
load and fuel cost are multiplied by the factors provided in
|
Table II The problem is formulated in Julia programming
|
with packages JuMP andPlasmo solved by Ipopt and
|
Juniper on a laptop with i712800H CPU and 16GB ram
|
Fig 3 The graphbased codesign optimization problem visualization for
|
IEEE9 busMTDC use case Each color indicates a time snapshot of the
|
complete system described as a graph node for 8 Hours
|
TABLE I
|
DC G RIDBRANCH DATA
|
From To Rpu From To Rpu
|
1 2 00016 2 3 00048
|
1 4 00048 3 4 00042
|
A Single Objective Function
|
We first only consider objective function eq 2 for
|
minimizing total cost The results by setting each of the two
|
batteries with the same fixed sizes ranging from 20MWh to
|
120MWh in 10 MWh increments are shown in Figure 4
|
Fig 4 Minimum total system costs with different battery sizes
|
By setting battery sizes as decision variables total cost is
|
minimized with an optimal solution of 265 MWh and 932
|
MWh The time for solving this problem is about 45 seconds
|
while solving all 11 problems with fixed battery sizes takes
|
almost 15 minutes in total
|
To better understand how the batteries help reduce total
|
cost we investigate in detail their hourly operations In
|
Figure 5 the total charging positivedischarging negative
|
power and state of charge of the batteries are shown by solid
|
lines by the subfigures respectively including results with
|
TABLE II
|
LOAD W INDFARM OUTPUT AND COST LEVELS
|
Hour 1 2 3 4 5 6 7 8
|
Load 09 11 125 14 155 13 115 1
|
WF Output 1 095 105 09 085 1 11 095
|
Fuel Cost 11 09 13 15 18 16 14 1411 fixed battery sizes and that of CCD by setting battery sizes
|
as decision variables The dashed lines are relative load and
|
generation cost levels in Table II The BS in legend stands
|
for Battery Size When load and generation costs are low
|
like in the first and last few hours the batteries are charged
|
These charged power is then used to satisfy demand when
|
load and cost are high By transferring load from peak to off
|
peak hours the total cost is reduced By choosing the best
|
battery sizes based on singleobjective control codesign our
|
model can balance the cost of battery installation operation
|
and power generation
|
Fig 5 Different battery sizes and relative costload levels in each hour
|
a Battery chargingdischarging operation b Battery state of charge
|
Since batteries transfer load from peak to offpeak time to
|
reduce cost it is not difficult to imagine that different load
|
levels may require different battery sizes We calculate the
|
total cost of the system based on these 11 fixed battery sizes
|
considering demand levels between 98 and 104 of the
|
original nominal demand The results are shown in Figure 6
|
As the load increases the best battery sizes to have minimum
|
total cost also increase On one hand higher demand may
|
need larger battery capacities for transferring load from peak
|
to offpeak hours On the other hand higher generation cost
|
resulting from larger load allows more budgets for battery
|
installation and operation
|
Fig 6 Total system cost of different nominal demand and battery sizes
|
B Multiple Objective Functions
|
In this subsection we minimize both objective functions
|
eq 2 and eq 3 together We first simply adopt the
|
linear scalarization approach to find the Pareto front ie
|