text
stringlengths
1.39k
1.4k
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.52, Upstream blast furnace gas pressure control valve position 2 is 99.08 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 237.54 , Clean gas temperature after demister is 18.61 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.59 , cold water supply pressure is 0.01 , cold water supply temperature is 25.74 , Hydraulic oil Temperature is 24.54 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.96 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.11"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.52, Upstream blast furnace gas pressure control valve position 2 is 99.08 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 237.7 , Clean gas temperature after demister is 18.38 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.6 , cold water supply pressure is 0.01 , cold water supply temperature is 25.74 , Hydraulic oil Temperature is 24.54 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.95 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.11"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.08 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 237.28 , Clean gas temperature after demister is 18.5 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.6 , cold water supply pressure is 0.01 , cold water supply temperature is 25.71 , Hydraulic oil Temperature is 24.55 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.93 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.11"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.08 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 237.23 , Clean gas temperature after demister is 18.43 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.58 , cold water supply pressure is 0.01 , cold water supply temperature is 25.71 , Hydraulic oil Temperature is 24.56 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.93 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.11"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.08 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 237.17 , Clean gas temperature after demister is 18.34 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.63 , cold water supply pressure is 0.01 , cold water supply temperature is 25.69 , Hydraulic oil Temperature is 24.55 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.93 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.14"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.08 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 237.09 , Clean gas temperature after demister is 18.15 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.57 , cold water supply pressure is 0.01 , cold water supply temperature is 25.68 , Hydraulic oil Temperature is 24.56 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.92 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.12"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.08 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 237.12 , Clean gas temperature after demister is 18.11 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.59 , cold water supply pressure is 0.01 , cold water supply temperature is 25.65 , Hydraulic oil Temperature is 24.57 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.93 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.11"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.08 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 237.2 , Clean gas temperature after demister is 18.14 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.58 , cold water supply pressure is 0.01 , cold water supply temperature is 25.64 , Hydraulic oil Temperature is 24.58 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.91 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.12"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.08 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 237.17 , Clean gas temperature after demister is 17.99 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.56 , cold water supply pressure is 0.01 , cold water supply temperature is 25.62 , Hydraulic oil Temperature is 24.58 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.91 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.15"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.08 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 237.05 , Clean gas temperature after demister is 17.91 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.61 , cold water supply pressure is 0.01 , cold water supply temperature is 25.59 , Hydraulic oil Temperature is 24.58 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.91 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.13"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.08 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 237.12 , Clean gas temperature after demister is 17.88 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.53 , cold water supply pressure is 0.01 , cold water supply temperature is 25.58 , Hydraulic oil Temperature is 24.58 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.9 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.15"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.08 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 237.15 , Clean gas temperature after demister is 17.82 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.55 , cold water supply pressure is 0.01 , cold water supply temperature is 25.55 , Hydraulic oil Temperature is 24.58 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.9 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.14"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.08 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 237.08 , Clean gas temperature after demister is 17.83 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.55 , cold water supply pressure is 0.01 , cold water supply temperature is 25.52 , Hydraulic oil Temperature is 24.58 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.9 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.15"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.08 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 237.11 , Clean gas temperature after demister is 17.74 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.48 , cold water supply pressure is 0.01 , cold water supply temperature is 25.51 , Hydraulic oil Temperature is 24.6 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.9 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.14"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.09 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 237.09 , Clean gas temperature after demister is 17.66 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.51 , cold water supply pressure is 0.01 , cold water supply temperature is 25.48 , Hydraulic oil Temperature is 24.6 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.9 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.15"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.08 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 237.06 , Clean gas temperature after demister is 17.53 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.49 , cold water supply pressure is 0.01 , cold water supply temperature is 25.44 , Hydraulic oil Temperature is 24.6 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.9 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.15"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.08 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 237.03 , Clean gas temperature after demister is 17.67 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.54 , cold water supply pressure is 0.01 , cold water supply temperature is 25.42 , Hydraulic oil Temperature is 24.59 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.9 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.16"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.49, Upstream blast furnace gas pressure control valve position 2 is 99.09 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 236.93 , Clean gas temperature after demister is 17.59 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.49 , cold water supply pressure is 0.01 , cold water supply temperature is 25.4 , Hydraulic oil Temperature is 24.61 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.9 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.15"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.08 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 236.83 , Clean gas temperature after demister is 17.5 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.52 , cold water supply pressure is 0.01 , cold water supply temperature is 25.37 , Hydraulic oil Temperature is 24.61 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.9 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.15"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.09 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 236.92 , Clean gas temperature after demister is 17.34 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.47 , cold water supply pressure is 0.01 , cold water supply temperature is 25.36 , Hydraulic oil Temperature is 24.61 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.89 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.16"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.49, Upstream blast furnace gas pressure control valve position 2 is 99.09 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 236.14 , Clean gas temperature after demister is 17.33 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.5 , cold water supply pressure is 0.01 , cold water supply temperature is 25.33 , Hydraulic oil Temperature is 24.62 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.9 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.16"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.49, Upstream blast furnace gas pressure control valve position 2 is 99.07 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 236.18 , Clean gas temperature after demister is 17.36 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.49 , cold water supply pressure is 0.01 , cold water supply temperature is 25.32 , Hydraulic oil Temperature is 24.62 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.89 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.16"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.49, Upstream blast furnace gas pressure control valve position 2 is 99.08 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 236.09 , Clean gas temperature after demister is 17.3 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.51 , cold water supply pressure is 0.01 , cold water supply temperature is 25.31 , Hydraulic oil Temperature is 24.62 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.9 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.17"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.49, Upstream blast furnace gas pressure control valve position 2 is 99.09 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 235.98 , Clean gas temperature after demister is 17.09 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.5 , cold water supply pressure is 0.01 , cold water supply temperature is 25.28 , Hydraulic oil Temperature is 24.62 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.89 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.16"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.49, Upstream blast furnace gas pressure control valve position 2 is 99.08 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 235.98 , Clean gas temperature after demister is 17.19 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.48 , cold water supply pressure is 0.01 , cold water supply temperature is 25.26 , Hydraulic oil Temperature is 24.61 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.89 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.15"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.48, Upstream blast furnace gas pressure control valve position 2 is 99.08 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 235.98 , Clean gas temperature after demister is 17.11 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.52 , cold water supply pressure is 0.01 , cold water supply temperature is 25.24 , Hydraulic oil Temperature is 24.62 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.9 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.16"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.49, Upstream blast furnace gas pressure control valve position 2 is 99.09 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 235.98 , Clean gas temperature after demister is 17.08 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.47 , cold water supply pressure is 0.01 , cold water supply temperature is 25.23 , Hydraulic oil Temperature is 24.62 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.9 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.18"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.48, Upstream blast furnace gas pressure control valve position 2 is 99.08 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 236.04 , Clean gas temperature after demister is 17.0 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.51 , cold water supply pressure is 0.01 , cold water supply temperature is 25.2 , Hydraulic oil Temperature is 24.62 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.89 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.15"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.49, Upstream blast furnace gas pressure control valve position 2 is 99.08 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 235.94 , Clean gas temperature after demister is 16.87 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.45 , cold water supply pressure is 0.01 , cold water supply temperature is 25.18 , Hydraulic oil Temperature is 24.62 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.9 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.15"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.48, Upstream blast furnace gas pressure control valve position 2 is 99.09 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 236.01 , Clean gas temperature after demister is 16.92 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.49 , cold water supply pressure is 0.01 , cold water supply temperature is 25.15 , Hydraulic oil Temperature is 24.61 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.89 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.18"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.48, Upstream blast furnace gas pressure control valve position 2 is 99.12 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 235.95 , Clean gas temperature after demister is 16.89 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.49 , cold water supply pressure is 0.01 , cold water supply temperature is 25.15 , Hydraulic oil Temperature is 24.63 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.89 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.17"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.49, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 235.96 , Clean gas temperature after demister is 16.83 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.44 , cold water supply pressure is 0.01 , cold water supply temperature is 25.12 , Hydraulic oil Temperature is 24.61 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.89 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.18"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.49, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 235.92 , Clean gas temperature after demister is 16.69 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.48 , cold water supply pressure is 0.01 , cold water supply temperature is 25.11 , Hydraulic oil Temperature is 24.62 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.88 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.19"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.48, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 235.78 , Clean gas temperature after demister is 16.64 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.4 , cold water supply pressure is 0.01 , cold water supply temperature is 25.09 , Hydraulic oil Temperature is 24.61 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.88 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.16"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.48, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 235.78 , Clean gas temperature after demister is 16.65 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.44 , cold water supply pressure is 0.01 , cold water supply temperature is 25.06 , Hydraulic oil Temperature is 24.61 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.89 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.2"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.48, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 235.72 , Clean gas temperature after demister is 16.67 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.42 , cold water supply pressure is 0.01 , cold water supply temperature is 25.06 , Hydraulic oil Temperature is 24.61 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.9 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.21"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.48, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 235.65 , Clean gas temperature after demister is 16.46 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.43 , cold water supply pressure is 0.01 , cold water supply temperature is 25.03 , Hydraulic oil Temperature is 24.61 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.89 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.22"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.49, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 235.48 , Clean gas temperature after demister is 16.38 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.45 , cold water supply pressure is 0.01 , cold water supply temperature is 25.04 , Hydraulic oil Temperature is 24.6 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.89 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.19"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.22 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.49, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 235.22 , Clean gas temperature after demister is 16.51 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.44 , cold water supply pressure is 0.01 , cold water supply temperature is 25.01 , Hydraulic oil Temperature is 24.6 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.88 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.25"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.22 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.48, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 235.01 , Clean gas temperature after demister is 16.38 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.62 , High pressure network Blast Furnace gas flow rate is 20.46 , cold water supply pressure is 0.01 , cold water supply temperature is 25.0 , Hydraulic oil Temperature is 24.6 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.89 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.26"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.22 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.49, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 234.95 , Clean gas temperature after demister is 16.36 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.63 , High pressure network Blast Furnace gas flow rate is 20.39 , cold water supply pressure is 0.01 , cold water supply temperature is 24.98 , Hydraulic oil Temperature is 24.6 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.89 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.25"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.22 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.49, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 234.86 , Clean gas temperature after demister is 16.19 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.63 , High pressure network Blast Furnace gas flow rate is 20.46 , cold water supply pressure is 0.01 , cold water supply temperature is 24.98 , Hydraulic oil Temperature is 24.6 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.88 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.29"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.22 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.49, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 234.83 , Clean gas temperature after demister is 16.2 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.64 , High pressure network Blast Furnace gas flow rate is 20.4 , cold water supply pressure is 0.01 , cold water supply temperature is 24.95 , Hydraulic oil Temperature is 24.59 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.88 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.23"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.22 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.49, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 234.81 , Clean gas temperature after demister is 16.14 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.65 , High pressure network Blast Furnace gas flow rate is 20.44 , cold water supply pressure is 0.01 , cold water supply temperature is 24.94 , Hydraulic oil Temperature is 24.59 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.88 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.17"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.22 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.49, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 234.73 , Clean gas temperature after demister is 16.11 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.4 , cold water supply pressure is 0.01 , cold water supply temperature is 24.93 , Hydraulic oil Temperature is 24.59 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.86 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.22"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.22 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.49, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 234.78 , Clean gas temperature after demister is 15.98 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.98 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.41 , cold water supply pressure is 0.01 , cold water supply temperature is 24.89 , Hydraulic oil Temperature is 24.59 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.86 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.26"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.22 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.49, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 234.83 , Clean gas temperature after demister is 16.06 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.39 , cold water supply pressure is 0.01 , cold water supply temperature is 24.87 , Hydraulic oil Temperature is 24.59 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.85 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.3"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.22 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.49, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 234.75 , Clean gas temperature after demister is 16.0 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.39 , cold water supply pressure is 0.01 , cold water supply temperature is 24.86 , Hydraulic oil Temperature is 24.58 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.85 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.27"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.22 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 234.8 , Clean gas temperature after demister is 15.84 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.4 , cold water supply pressure is 0.01 , cold water supply temperature is 24.85 , Hydraulic oil Temperature is 24.58 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.88 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.28"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.22 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 234.63 , Clean gas temperature after demister is 15.82 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.37 , cold water supply pressure is 0.01 , cold water supply temperature is 24.82 , Hydraulic oil Temperature is 24.58 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.86 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.26"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.22 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 234.77 , Clean gas temperature after demister is 15.73 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.38 , cold water supply pressure is 0.01 , cold water supply temperature is 24.81 , Hydraulic oil Temperature is 24.57 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.87 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.3"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.22 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 234.78 , Clean gas temperature after demister is 15.79 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.41 , cold water supply pressure is 0.01 , cold water supply temperature is 24.78 , Hydraulic oil Temperature is 24.56 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.87 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.22"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.22 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 234.68 , Clean gas temperature after demister is 15.71 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.35 , cold water supply pressure is 0.01 , cold water supply temperature is 24.77 , Hydraulic oil Temperature is 24.56 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.82 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.3"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.22 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 234.62 , Clean gas temperature after demister is 15.58 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.43 , cold water supply pressure is 0.01 , cold water supply temperature is 24.74 , Hydraulic oil Temperature is 24.56 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.87 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.35"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.22 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 234.53 , Clean gas temperature after demister is 15.69 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.35 , cold water supply pressure is 0.01 , cold water supply temperature is 24.72 , Hydraulic oil Temperature is 24.54 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.87 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.32"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.22 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 234.48 , Clean gas temperature after demister is 15.64 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.41 , cold water supply pressure is 0.01 , cold water supply temperature is 24.72 , Hydraulic oil Temperature is 24.54 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.85 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.24"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.22 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 234.62 , Clean gas temperature after demister is 15.57 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.41 , cold water supply pressure is 0.01 , cold water supply temperature is 24.7 , Hydraulic oil Temperature is 24.54 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.85 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.23"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.22 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 234.42 , Clean gas temperature after demister is 15.45 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.38 , cold water supply pressure is 0.01 , cold water supply temperature is 24.69 , Hydraulic oil Temperature is 24.55 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.82 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.31"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.22 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 234.51 , Clean gas temperature after demister is 15.37 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.41 , cold water supply pressure is 0.01 , cold water supply temperature is 24.67 , Hydraulic oil Temperature is 24.54 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.82 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.21"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 234.3 , Clean gas temperature after demister is 15.47 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.4 , cold water supply pressure is 0.01 , cold water supply temperature is 24.66 , Hydraulic oil Temperature is 24.54 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.82 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.26"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.22 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 234.48 , Clean gas temperature after demister is 15.42 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.4 , cold water supply pressure is 0.01 , cold water supply temperature is 24.64 , Hydraulic oil Temperature is 24.52 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.82 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.24"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.22 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 234.11 , Clean gas temperature after demister is 15.4 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.38 , cold water supply pressure is 0.01 , cold water supply temperature is 24.62 , Hydraulic oil Temperature is 24.51 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.84 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.23"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 234.68 , Clean gas temperature after demister is 15.22 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.39 , cold water supply pressure is 0.01 , cold water supply temperature is 24.61 , Hydraulic oil Temperature is 24.51 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.82 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.34"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 234.51 , Clean gas temperature after demister is 15.28 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.37 , cold water supply pressure is 0.01 , cold water supply temperature is 24.58 , Hydraulic oil Temperature is 24.52 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.83 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.22"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 234.3 , Clean gas temperature after demister is 15.33 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.34 , cold water supply pressure is 0.01 , cold water supply temperature is 24.57 , Hydraulic oil Temperature is 24.52 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.84 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.3"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.22 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 234.48 , Clean gas temperature after demister is 15.29 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.36 , cold water supply pressure is 0.01 , cold water supply temperature is 24.55 , Hydraulic oil Temperature is 24.5 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.82 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.27"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.22 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 234.31 , Clean gas temperature after demister is 15.17 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.32 , cold water supply pressure is 0.01 , cold water supply temperature is 24.52 , Hydraulic oil Temperature is 24.51 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.83 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.31"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 234.11 , Clean gas temperature after demister is 15.3 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.34 , cold water supply pressure is 0.01 , cold water supply temperature is 24.51 , Hydraulic oil Temperature is 24.49 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.36"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 234.31 , Clean gas temperature after demister is 15.2 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.31 , cold water supply pressure is 0.01 , cold water supply temperature is 24.5 , Hydraulic oil Temperature is 24.48 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.83 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.24"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 234.57 , Clean gas temperature after demister is 15.19 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.35 , cold water supply pressure is 0.01 , cold water supply temperature is 24.48 , Hydraulic oil Temperature is 24.47 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.82 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.33"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 234.6 , Clean gas temperature after demister is 15.08 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.35 , cold water supply pressure is 0.01 , cold water supply temperature is 24.47 , Hydraulic oil Temperature is 24.47 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.83 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.32"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 234.31 , Clean gas temperature after demister is 15.21 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.29 , cold water supply pressure is 0.01 , cold water supply temperature is 24.44 , Hydraulic oil Temperature is 24.47 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.82 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.37"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.49, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 234.65 , Clean gas temperature after demister is 15.24 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.27 , cold water supply pressure is 0.01 , cold water supply temperature is 24.41 , Hydraulic oil Temperature is 24.46 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.82 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.34"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 234.58 , Clean gas temperature after demister is 15.1 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.39 , cold water supply pressure is 0.01 , cold water supply temperature is 24.4 , Hydraulic oil Temperature is 24.47 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.84 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.28"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 234.31 , Clean gas temperature after demister is 15.13 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.29 , cold water supply pressure is 0.01 , cold water supply temperature is 24.38 , Hydraulic oil Temperature is 24.45 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.82 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.2"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.22 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 233.96 , Clean gas temperature after demister is 15.19 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.32 , cold water supply pressure is 0.01 , cold water supply temperature is 24.37 , Hydraulic oil Temperature is 24.45 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.82 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.29"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 234.62 , Clean gas temperature after demister is 15.19 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.32 , cold water supply pressure is 0.01 , cold water supply temperature is 24.35 , Hydraulic oil Temperature is 24.45 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.83 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.26"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.49, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 234.16 , Clean gas temperature after demister is 15.16 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.36 , cold water supply pressure is 0.01 , cold water supply temperature is 24.34 , Hydraulic oil Temperature is 24.44 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.82 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.25"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 234.65 , Clean gas temperature after demister is 15.03 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.39 , cold water supply pressure is 0.01 , cold water supply temperature is 24.32 , Hydraulic oil Temperature is 24.45 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.84 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.32"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 234.57 , Clean gas temperature after demister is 15.18 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.39 , cold water supply pressure is 0.01 , cold water supply temperature is 24.29 , Hydraulic oil Temperature is 24.43 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.82 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.24"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 234.33 , Clean gas temperature after demister is 15.19 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.38 , cold water supply pressure is 0.01 , cold water supply temperature is 24.29 , Hydraulic oil Temperature is 24.41 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.84 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.31"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 234.62 , Clean gas temperature after demister is 15.06 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.33 , cold water supply pressure is 0.01 , cold water supply temperature is 24.26 , Hydraulic oil Temperature is 24.41 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.83 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.34"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 234.02 , Clean gas temperature after demister is 15.05 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.29 , cold water supply pressure is 0.01 , cold water supply temperature is 24.24 , Hydraulic oil Temperature is 24.39 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.82 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.39"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 233.87 , Clean gas temperature after demister is 15.08 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.29 , cold water supply pressure is 0.01 , cold water supply temperature is 24.21 , Hydraulic oil Temperature is 24.39 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.83 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.28"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 234.11 , Clean gas temperature after demister is 15.08 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.3 , cold water supply pressure is 0.01 , cold water supply temperature is 24.2 , Hydraulic oil Temperature is 24.4 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.82 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.3"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 233.95 , Clean gas temperature after demister is 15.01 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.26 , cold water supply pressure is 0.01 , cold water supply temperature is 24.18 , Hydraulic oil Temperature is 24.39 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.82 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.31"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 233.92 , Clean gas temperature after demister is 14.95 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.29 , cold water supply pressure is 0.01 , cold water supply temperature is 24.16 , Hydraulic oil Temperature is 24.39 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.29"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 233.78 , Clean gas temperature after demister is 14.98 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.31 , cold water supply pressure is 0.01 , cold water supply temperature is 24.14 , Hydraulic oil Temperature is 24.37 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.29"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 233.72 , Clean gas temperature after demister is 15.02 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.27 , cold water supply pressure is 0.01 , cold water supply temperature is 24.13 , Hydraulic oil Temperature is 24.37 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.34"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 233.83 , Clean gas temperature after demister is 14.8 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.3 , cold water supply pressure is 0.01 , cold water supply temperature is 24.11 , Hydraulic oil Temperature is 24.36 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.38"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 233.72 , Clean gas temperature after demister is 14.83 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.27 , cold water supply pressure is 0.01 , cold water supply temperature is 24.08 , Hydraulic oil Temperature is 24.36 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.22"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 233.75 , Clean gas temperature after demister is 14.96 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.26 , cold water supply pressure is 0.01 , cold water supply temperature is 24.06 , Hydraulic oil Temperature is 24.36 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.34"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.87 , Clean gas pressure after demister is 233.63 , Clean gas temperature after demister is 14.89 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.28 , cold water supply pressure is 0.0 , cold water supply temperature is 24.05 , Hydraulic oil Temperature is 24.35 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.4"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 233.63 , Clean gas temperature after demister is 14.83 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.39 , cold water supply pressure is 0.0 , cold water supply temperature is 24.02 , Hydraulic oil Temperature is 24.35 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.39"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 233.74 , Clean gas temperature after demister is 14.8 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.19 , cold water supply pressure is 0.0 , cold water supply temperature is 24.02 , Hydraulic oil Temperature is 24.33 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.26"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.87 , Clean gas pressure after demister is 233.69 , Clean gas temperature after demister is 14.88 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.23 , cold water supply pressure is 0.0 , cold water supply temperature is 23.98 , Hydraulic oil Temperature is 24.34 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.3"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 233.74 , Clean gas temperature after demister is 14.83 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.24 , cold water supply pressure is 0.0 , cold water supply temperature is 23.96 , Hydraulic oil Temperature is 24.32 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.25"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 233.72 , Clean gas temperature after demister is 14.72 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.24 , cold water supply pressure is 0.0 , cold water supply temperature is 23.94 , Hydraulic oil Temperature is 24.32 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.37"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 233.72 , Clean gas temperature after demister is 14.62 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.33 , cold water supply pressure is 0.0 , cold water supply temperature is 23.93 , Hydraulic oil Temperature is 24.31 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.38"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 233.59 , Clean gas temperature after demister is 14.78 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.34 , cold water supply pressure is 0.0 , cold water supply temperature is 23.89 , Hydraulic oil Temperature is 24.32 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.4"