"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 233.48 , Clean gas temperature after demister is 14.7 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.29 , cold water supply pressure is 0.0 , cold water supply temperature is 23.88 , Hydraulic oil Temperature is 24.31 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.33"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 233.64 , Clean gas temperature after demister is 14.61 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.95 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.27 , cold water supply pressure is 0.0 , cold water supply temperature is 23.87 , Hydraulic oil Temperature is 24.31 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.24"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.87 , Clean gas pressure after demister is 233.51 , Clean gas temperature after demister is 14.64 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.35 , cold water supply pressure is 0.0 , cold water supply temperature is 23.84 , Hydraulic oil Temperature is 24.28 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.31"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 233.67 , Clean gas temperature after demister is 14.64 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.32 , cold water supply pressure is 0.0 , cold water supply temperature is 23.82 , Hydraulic oil Temperature is 24.27 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.41"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 232.99 , Clean gas temperature after demister is 14.62 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.28 , cold water supply pressure is 0.0 , cold water supply temperature is 23.79 , Hydraulic oil Temperature is 24.28 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.15"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 233.32 , Clean gas temperature after demister is 14.5 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.22 , cold water supply pressure is 0.0 , cold water supply temperature is 23.78 , Hydraulic oil Temperature is 24.28 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.14"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 233.57 , Clean gas temperature after demister is 14.51 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.3 , cold water supply pressure is 0.0 , cold water supply temperature is 23.76 , Hydraulic oil Temperature is 24.25 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.22"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.2 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.52, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.87 , Clean gas pressure after demister is 233.47 , Clean gas temperature after demister is 14.55 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.27 , cold water supply pressure is 0.0 , cold water supply temperature is 23.74 , Hydraulic oil Temperature is 24.25 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.4"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.87 , Clean gas pressure after demister is 233.52 , Clean gas temperature after demister is 14.52 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.3 , cold water supply pressure is 0.0 , cold water supply temperature is 23.73 , Hydraulic oil Temperature is 24.26 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.79 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.41"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 233.13 , Clean gas temperature after demister is 14.44 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.3 , cold water supply pressure is 0.0 , cold water supply temperature is 23.72 , Hydraulic oil Temperature is 24.25 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.23"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 233.07 , Clean gas temperature after demister is 14.43 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.25 , cold water supply pressure is 0.0 , cold water supply temperature is 23.69 , Hydraulic oil Temperature is 24.23 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.79 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.21"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.2 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 233.22 , Clean gas temperature after demister is 14.42 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.31 , cold water supply pressure is 0.0 , cold water supply temperature is 23.67 , Hydraulic oil Temperature is 24.23 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.19 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.13"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.07 , Blast Furnace Top gas hydrogen percentage is 3.2 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.52, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 233.26 , Clean gas temperature after demister is 14.41 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.26 , cold water supply pressure is 0.0 , cold water supply temperature is 23.65 , Hydraulic oil Temperature is 24.21 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.13"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.07 , Blast Furnace Top gas hydrogen percentage is 3.2 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 233.07 , Clean gas temperature after demister is 14.36 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.29 , cold water supply pressure is 0.0 , cold water supply temperature is 23.63 , Hydraulic oil Temperature is 24.2 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.25"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 232.98 , Clean gas temperature after demister is 14.4 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.32 , cold water supply pressure is 0.0 , cold water supply temperature is 23.61 , Hydraulic oil Temperature is 24.2 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.14"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.87 , Clean gas pressure after demister is 233.04 , Clean gas temperature after demister is 14.45 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.33 , cold water supply pressure is 0.0 , cold water supply temperature is 23.6 , Hydraulic oil Temperature is 24.19 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.79 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.19"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 233.61 , Clean gas temperature after demister is 14.43 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.3 , cold water supply pressure is 0.0 , cold water supply temperature is 23.57 , Hydraulic oil Temperature is 24.18 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.26"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 233.66 , Clean gas temperature after demister is 14.36 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.34 , cold water supply pressure is 0.0 , cold water supply temperature is 23.56 , Hydraulic oil Temperature is 24.18 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.26"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.21 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.87 , Clean gas pressure after demister is 233.56 , Clean gas temperature after demister is 14.48 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.38 , cold water supply pressure is 0.0 , cold water supply temperature is 23.54 , Hydraulic oil Temperature is 24.16 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.25"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.22 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 233.58 , Clean gas temperature after demister is 14.55 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.31 , cold water supply pressure is 0.0 , cold water supply temperature is 23.54 , Hydraulic oil Temperature is 24.15 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.35"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.87 , Clean gas pressure after demister is 233.66 , Clean gas temperature after demister is 14.55 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.34 , cold water supply pressure is 0.0 , cold water supply temperature is 23.53 , Hydraulic oil Temperature is 24.15 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.84 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.32"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.11 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.87 , Clean gas pressure after demister is 233.62 , Clean gas temperature after demister is 14.53 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.33 , cold water supply pressure is 0.0 , cold water supply temperature is 23.52 , Hydraulic oil Temperature is 24.14 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.82 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.4"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.12 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.87 , Clean gas pressure after demister is 233.65 , Clean gas temperature after demister is 14.62 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.3 , cold water supply pressure is 0.0 , cold water supply temperature is 23.5 , Hydraulic oil Temperature is 24.12 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.36"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.12 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 233.66 , Clean gas temperature after demister is 14.72 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.95 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.28 , cold water supply pressure is 0.0 , cold water supply temperature is 23.5 , Hydraulic oil Temperature is 24.12 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.35"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.13 , Blast Furnace Top gas hydrogen percentage is 3.25 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 49.87 , Clean gas pressure after demister is 233.68 , Clean gas temperature after demister is 14.7 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.28 , cold water supply pressure is 0.0 , cold water supply temperature is 23.47 , Hydraulic oil Temperature is 24.12 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.26"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.13 , Blast Furnace Top gas hydrogen percentage is 3.25 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.87 , Clean gas pressure after demister is 233.69 , Clean gas temperature after demister is 14.57 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.29 , cold water supply pressure is 0.0 , cold water supply temperature is 23.45 , Hydraulic oil Temperature is 24.09 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.19"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.13 , Blast Furnace Top gas hydrogen percentage is 3.26 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 233.79 , Clean gas temperature after demister is 14.87 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.25 , cold water supply pressure is 0.0 , cold water supply temperature is 23.43 , Hydraulic oil Temperature is 24.09 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.28"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.26 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.87 , Clean gas pressure after demister is 233.66 , Clean gas temperature after demister is 14.96 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.28 , cold water supply pressure is 0.0 , cold water supply temperature is 23.42 , Hydraulic oil Temperature is 24.09 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.16"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.26 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.87 , Clean gas pressure after demister is 233.96 , Clean gas temperature after demister is 14.89 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.29 , cold water supply pressure is 0.0 , cold water supply temperature is 23.39 , Hydraulic oil Temperature is 24.08 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.16"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.26 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.87 , Clean gas pressure after demister is 234.06 , Clean gas temperature after demister is 15.02 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.25 , cold water supply pressure is 0.0 , cold water supply temperature is 23.36 , Hydraulic oil Temperature is 24.07 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.37"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.26 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 234.62 , Clean gas temperature after demister is 15.2 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.95 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.25 , cold water supply pressure is 0.0 , cold water supply temperature is 23.35 , Hydraulic oil Temperature is 24.06 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.36"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.13 , Blast Furnace Top gas hydrogen percentage is 3.26 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.49, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.87 , Clean gas pressure after demister is 234.74 , Clean gas temperature after demister is 15.22 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.95 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.24 , cold water supply pressure is 0.0 , cold water supply temperature is 23.34 , Hydraulic oil Temperature is 24.06 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.29"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.26 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.49, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 234.74 , Clean gas temperature after demister is 15.3 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.19 , cold water supply pressure is 0.0 , cold water supply temperature is 23.3 , Hydraulic oil Temperature is 24.05 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.22"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.26 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.48, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.87 , Clean gas pressure after demister is 234.79 , Clean gas temperature after demister is 15.39 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.14 , cold water supply pressure is 0.0 , cold water supply temperature is 23.3 , Hydraulic oil Temperature is 24.04 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.21"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.15 , Blast Furnace Top gas hydrogen percentage is 3.27 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.49, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 234.9 , Clean gas temperature after demister is 15.62 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.08 , cold water supply pressure is 0.0 , cold water supply temperature is 23.28 , Hydraulic oil Temperature is 24.02 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.22"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.15 , Blast Furnace Top gas hydrogen percentage is 3.27 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.48, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 234.89 , Clean gas temperature after demister is 15.78 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.04 , cold water supply pressure is 0.0 , cold water supply temperature is 23.26 , Hydraulic oil Temperature is 24.02 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.28"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.15 , Blast Furnace Top gas hydrogen percentage is 3.27 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.49, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 234.98 , Clean gas temperature after demister is 15.83 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.03 , cold water supply pressure is 0.0 , cold water supply temperature is 23.23 , Hydraulic oil Temperature is 24.02 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.26"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.15 , Blast Furnace Top gas hydrogen percentage is 3.27 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.48, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 235.52 , Clean gas temperature after demister is 15.99 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.02 , cold water supply pressure is 0.0 , cold water supply temperature is 23.24 , Hydraulic oil Temperature is 24.02 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.35"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.15 , Blast Furnace Top gas hydrogen percentage is 3.26 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.48, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 235.81 , Clean gas temperature after demister is 16.34 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 20.01 , cold water supply pressure is 0.0 , cold water supply temperature is 23.22 , Hydraulic oil Temperature is 23.98 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.3"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.15 , Blast Furnace Top gas hydrogen percentage is 3.26 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.48, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 235.88 , Clean gas temperature after demister is 16.48 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.95 , AG element 3 is open with a value of 98.65 , High pressure network Blast Furnace gas flow rate is 20.0 , cold water supply pressure is 0.0 , cold water supply temperature is 23.2 , Hydraulic oil Temperature is 23.98 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.82 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.25"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.26 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.49, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 235.92 , Clean gas temperature after demister is 16.7 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 19.98 , cold water supply pressure is 0.0 , cold water supply temperature is 23.19 , Hydraulic oil Temperature is 23.98 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.82 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.26"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.26 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.48, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 236.08 , Clean gas temperature after demister is 16.75 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 19.99 , cold water supply pressure is 0.0 , cold water supply temperature is 23.18 , Hydraulic oil Temperature is 23.98 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.84 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.25"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.26 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 236.31 , Clean gas temperature after demister is 17.09 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 19.94 , cold water supply pressure is 0.0 , cold water supply temperature is 23.17 , Hydraulic oil Temperature is 23.96 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.84 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.25"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.26 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 236.96 , Clean gas temperature after demister is 17.34 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 19.93 , cold water supply pressure is 0.0 , cold water supply temperature is 23.16 , Hydraulic oil Temperature is 23.95 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.84 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.23"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.26 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.52, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 237.03 , Clean gas temperature after demister is 17.51 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 19.89 , cold water supply pressure is 0.0 , cold water supply temperature is 23.15 , Hydraulic oil Temperature is 23.94 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.84 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.26"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.26 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.52, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 237.02 , Clean gas temperature after demister is 17.9 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 19.85 , cold water supply pressure is 0.0 , cold water supply temperature is 23.14 , Hydraulic oil Temperature is 23.94 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.88 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.27"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.25 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.53, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 237.11 , Clean gas temperature after demister is 18.21 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 19.88 , cold water supply pressure is 0.0 , cold water supply temperature is 23.12 , Hydraulic oil Temperature is 23.93 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.86 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.24"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.25 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.54, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 237.3 , Clean gas temperature after demister is 18.44 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.95 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 19.9 , cold water supply pressure is 0.0 , cold water supply temperature is 23.11 , Hydraulic oil Temperature is 23.94 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.87 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.23"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.25 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.54, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 237.63 , Clean gas temperature after demister is 18.5 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 19.85 , cold water supply pressure is 0.0 , cold water supply temperature is 23.1 , Hydraulic oil Temperature is 23.94 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.88 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.23"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.25 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.56, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 238.09 , Clean gas temperature after demister is 18.91 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.95 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 19.89 , cold water supply pressure is 0.0 , cold water supply temperature is 23.08 , Hydraulic oil Temperature is 23.91 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.89 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.23"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.25 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.58, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.85 , Clean gas pressure after demister is 238.25 , Clean gas temperature after demister is 19.28 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.95 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 19.85 , cold water supply pressure is 0.0 , cold water supply temperature is 23.07 , Hydraulic oil Temperature is 23.9 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.88 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.26"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.25 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.58, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 238.32 , Clean gas temperature after demister is 19.55 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 19.83 , cold water supply pressure is 0.0 , cold water supply temperature is 23.05 , Hydraulic oil Temperature is 23.91 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.2 , Pump is discharging water at pressure of 0.89 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 6.81"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.25 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.59, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 238.33 , Clean gas temperature after demister is 19.81 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.66 , High pressure network Blast Furnace gas flow rate is 19.76 , cold water supply pressure is 0.0 , cold water supply temperature is 23.04 , Hydraulic oil Temperature is 23.9 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 47.88 , Pump is discharging water at pressure of 0.89 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 7.81"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.25 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.6, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 238.54 , Clean gas temperature after demister is 20.16 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.67 , High pressure network Blast Furnace gas flow rate is 19.77 , cold water supply pressure is 0.0 , cold water supply temperature is 23.05 , Hydraulic oil Temperature is 23.9 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 65.69 , Pump is discharging water at pressure of 0.89 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 4.18"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.25 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.62, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 239.12 , Clean gas temperature after demister is 20.51 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 19.88 , cold water supply pressure is 0.0 , cold water supply temperature is 23.03 , Hydraulic oil Temperature is 23.91 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 65.8 , Pump is discharging water at pressure of 0.89 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 4.19"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.25 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.63, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 239.27 , Clean gas temperature after demister is 20.75 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 19.87 , cold water supply pressure is 0.0 , cold water supply temperature is 23.02 , Hydraulic oil Temperature is 23.89 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 65.8 , Pump is discharging water at pressure of 0.89 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 4.23"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.25 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.64, Upstream blast furnace gas pressure control valve position 2 is 99.18 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 239.26 , Clean gas temperature after demister is 20.94 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 19.98 , cold water supply pressure is 0.0 , cold water supply temperature is 23.01 , Hydraulic oil Temperature is 23.88 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 65.8 , Pump is discharging water at pressure of 0.9 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 4.22"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.25 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.66, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.86 , Clean gas pressure after demister is 239.4 , Clean gas temperature after demister is 21.3 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 19.97 , cold water supply pressure is 0.0 , cold water supply temperature is 23.0 , Hydraulic oil Temperature is 23.87 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 65.8 , Pump is discharging water at pressure of 0.89 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 4.26"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.67, Upstream blast furnace gas pressure control valve position 2 is 99.18 , Downstream Blast furnace gas PCV 8104 is 49.87 , Clean gas pressure after demister is 239.4 , Clean gas temperature after demister is 21.6 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 19.96 , cold water supply pressure is 0.0 , cold water supply temperature is 23.01 , Hydraulic oil Temperature is 23.89 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 65.8 , Pump is discharging water at pressure of 0.89 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 4.27"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.68, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 239.63 , Clean gas temperature after demister is 21.86 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.95 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 19.93 , cold water supply pressure is 0.0 , cold water supply temperature is 23.01 , Hydraulic oil Temperature is 23.87 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 65.8 , Pump is discharging water at pressure of 0.9 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 4.26"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.68, Upstream blast furnace gas pressure control valve position 2 is 99.18 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 239.99 , Clean gas temperature after demister is 22.0 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 19.97 , cold water supply pressure is 0.0 , cold water supply temperature is 23.0 , Hydraulic oil Temperature is 23.87 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 65.8 , Pump is discharging water at pressure of 0.9 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 4.23"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.68, Upstream blast furnace gas pressure control valve position 2 is 99.19 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 240.38 , Clean gas temperature after demister is 22.14 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.95 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 20.01 , cold water supply pressure is 0.0 , cold water supply temperature is 22.99 , Hydraulic oil Temperature is 23.86 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 65.8 , Pump is discharging water at pressure of 0.91 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 4.24"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.68, Upstream blast furnace gas pressure control valve position 2 is 99.18 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 240.34 , Clean gas temperature after demister is 22.48 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 20.03 , cold water supply pressure is 0.0 , cold water supply temperature is 23.0 , Hydraulic oil Temperature is 23.87 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 65.8 , Pump is discharging water at pressure of 0.9 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 4.24"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.67, Upstream blast furnace gas pressure control valve position 2 is 99.18 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 240.9 , Clean gas temperature after demister is 22.94 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.94 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 20.04 , cold water supply pressure is 0.0 , cold water supply temperature is 23.0 , Hydraulic oil Temperature is 23.86 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 65.8 , Pump is discharging water at pressure of 0.91 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 4.25"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.67, Upstream blast furnace gas pressure control valve position 2 is 99.18 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 241.55 , Clean gas temperature after demister is 23.33 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.95 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 19.97 , cold water supply pressure is 0.0 , cold water supply temperature is 23.0 , Hydraulic oil Temperature is 23.87 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 65.8 , Pump is discharging water at pressure of 0.91 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 4.25"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 100.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.66, Upstream blast furnace gas pressure control valve position 2 is 99.18 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 241.64 , Clean gas temperature after demister is 23.77 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.95 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 20.08 , cold water supply pressure is 0.0 , cold water supply temperature is 23.01 , Hydraulic oil Temperature is 23.86 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 65.8 , Pump is discharging water at pressure of 0.92 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 4.24"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.66, Upstream blast furnace gas pressure control valve position 2 is 99.18 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 242.13 , Clean gas temperature after demister is 24.34 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.95 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 20.06 , cold water supply pressure is 0.0 , cold water supply temperature is 23.0 , Hydraulic oil Temperature is 23.87 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 65.8 , Pump is discharging water at pressure of 0.91 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 4.27"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.24 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.66, Upstream blast furnace gas pressure control valve position 2 is 99.18 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 242.67 , Clean gas temperature after demister is 24.87 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.95 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 20.09 , cold water supply pressure is 0.0 , cold water supply temperature is 23.0 , Hydraulic oil Temperature is 23.87 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 26.98 , Pump is discharging water at pressure of 0.96 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 0.82 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 4.26"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.14 , Blast Furnace Top gas hydrogen percentage is 3.23 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.66, Upstream blast furnace gas pressure control valve position 2 is 99.18 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 242.9 , Clean gas temperature after demister is 25.28 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.95 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 20.19 , cold water supply pressure is 0.0 , cold water supply temperature is 23.02 , Hydraulic oil Temperature is 23.86 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 26.98 , Pump is discharging water at pressure of 0.96 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 1.44 , Water Flow through Pre scrubber nozzle is 1.1\n\n### Assistant:\nPre Scrubber water level 3 is 4.26"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.12 , Blast Furnace Top gas hydrogen percentage is 3.22 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.66, Upstream blast furnace gas pressure control valve position 2 is 99.19 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 242.98 , Clean gas temperature after demister is 25.51 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.95 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 20.23 , cold water supply pressure is 0.0 , cold water supply temperature is 23.01 , Hydraulic oil Temperature is 23.88 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 0.98 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 8.31 , Water Flow through Pre scrubber nozzle is 11.2\n\n### Assistant:\nPre Scrubber water level 3 is 4.26"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.11 , Blast Furnace Top gas hydrogen percentage is 3.2 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.65, Upstream blast furnace gas pressure control valve position 2 is 99.18 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 243.32 , Clean gas temperature after demister is 25.94 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.95 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 20.18 , cold water supply pressure is 0.0 , cold water supply temperature is 23.01 , Hydraulic oil Temperature is 23.86 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 0.95 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 25.72 , Water Flow through Pre scrubber nozzle is 32.4\n\n### Assistant:\nPre Scrubber water level 3 is 4.26"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.2 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.65, Upstream blast furnace gas pressure control valve position 2 is 99.19 , Downstream Blast furnace gas PCV 8104 is 49.88 , Clean gas pressure after demister is 243.84 , Clean gas temperature after demister is 26.67 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.95 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 20.21 , cold water supply pressure is 0.0 , cold water supply temperature is 23.04 , Hydraulic oil Temperature is 23.87 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 0.98 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 31.11 , Water Flow through Pre scrubber nozzle is 37.7\n\n### Assistant:\nPre Scrubber water level 3 is 4.26"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.2 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.65, Upstream blast furnace gas pressure control valve position 2 is 99.18 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 243.85 , Clean gas temperature after demister is 26.94 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.95 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 20.25 , cold water supply pressure is 0.0 , cold water supply temperature is 23.04 , Hydraulic oil Temperature is 23.88 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 0.97 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 36.65 , Water Flow through Pre scrubber nozzle is 53.35\n\n### Assistant:\nPre Scrubber water level 3 is 4.26"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.2 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.64, Upstream blast furnace gas pressure control valve position 2 is 99.19 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 243.94 , Clean gas temperature after demister is 27.24 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.95 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 20.27 , cold water supply pressure is 0.0 , cold water supply temperature is 23.06 , Hydraulic oil Temperature is 23.87 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 0.98 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 41.53 , Water Flow through Pre scrubber nozzle is 58.23\n\n### Assistant:\nPre Scrubber water level 3 is 4.27"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.1 , Blast Furnace Top gas hydrogen percentage is 3.2 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.63, Upstream blast furnace gas pressure control valve position 2 is 99.18 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 243.94 , Clean gas temperature after demister is 27.46 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 20.18 , cold water supply pressure is 0.0 , cold water supply temperature is 23.08 , Hydraulic oil Temperature is 23.88 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 0.98 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 47.15 , Water Flow through Pre scrubber nozzle is 63.85\n\n### Assistant:\nPre Scrubber water level 3 is 4.27"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.09 , Blast Furnace Top gas hydrogen percentage is 3.2 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.64, Upstream blast furnace gas pressure control valve position 2 is 99.19 , Downstream Blast furnace gas PCV 8104 is 49.9 , Clean gas pressure after demister is 244.4 , Clean gas temperature after demister is 27.55 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 20.03 , cold water supply pressure is 0.0 , cold water supply temperature is 23.09 , Hydraulic oil Temperature is 23.89 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 0.98 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 51.79 , Water Flow through Pre scrubber nozzle is 68.49\n\n### Assistant:\nPre Scrubber water level 3 is 4.28"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.08 , Blast Furnace Top gas hydrogen percentage is 3.19 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.65, Upstream blast furnace gas pressure control valve position 2 is 99.19 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 244.54 , Clean gas temperature after demister is 27.71 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.95 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 20.1 , cold water supply pressure is 0.0 , cold water supply temperature is 23.12 , Hydraulic oil Temperature is 23.87 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 0.98 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 55.19 , Water Flow through Pre scrubber nozzle is 71.89\n\n### Assistant:\nPre Scrubber water level 3 is 4.27"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.18 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.64, Upstream blast furnace gas pressure control valve position 2 is 98.99 , Downstream Blast furnace gas PCV 8104 is 49.89 , Clean gas pressure after demister is 244.94 , Clean gas temperature after demister is 27.81 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 20.17 , cold water supply pressure is 0.0 , cold water supply temperature is 23.13 , Hydraulic oil Temperature is 23.89 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 0.99 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 58.98 , Water Flow through Pre scrubber nozzle is 75.68\n\n### Assistant:\nPre Scrubber water level 3 is 4.2"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.01 , Blast Furnace Top gas hydrogen percentage is 3.16 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.65, Upstream blast furnace gas pressure control valve position 2 is 98.94 , Downstream Blast furnace gas PCV 8104 is 49.9 , Clean gas pressure after demister is 245.12 , Clean gas temperature after demister is 27.78 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 20.11 , cold water supply pressure is 0.0 , cold water supply temperature is 23.16 , Hydraulic oil Temperature is 23.9 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 1.0 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 61.74 , Water Flow through Pre scrubber nozzle is 78.44\n\n### Assistant:\nPre Scrubber water level 3 is 4.21"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.01 , Blast Furnace Top gas hydrogen percentage is 3.15 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.59, Upstream blast furnace gas pressure control valve position 2 is 98.98 , Downstream Blast furnace gas PCV 8104 is 49.9 , Clean gas pressure after demister is 244.96 , Clean gas temperature after demister is 28.06 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.95 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 17.82 , cold water supply pressure is 0.0 , cold water supply temperature is 23.17 , Hydraulic oil Temperature is 23.9 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 0.98 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 65.72 , Water Flow through Pre scrubber nozzle is 82.42\n\n### Assistant:\nPre Scrubber water level 3 is 3.91"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.01 , Blast Furnace Top gas hydrogen percentage is 3.14 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.54, Upstream blast furnace gas pressure control valve position 2 is 99.4 , Downstream Blast furnace gas PCV 8104 is 49.9 , Clean gas pressure after demister is 245.01 , Clean gas temperature after demister is 28.18 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.95 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 17.42 , cold water supply pressure is 0.0 , cold water supply temperature is 23.2 , Hydraulic oil Temperature is 23.9 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 0.99 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 69.33 , Water Flow through Pre scrubber nozzle is 86.03\n\n### Assistant:\nPre Scrubber water level 3 is 3.65"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.01 , Blast Furnace Top gas hydrogen percentage is 3.14 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.53, Upstream blast furnace gas pressure control valve position 2 is 99.65 , Downstream Blast furnace gas PCV 8104 is 49.9 , Clean gas pressure after demister is 245.01 , Clean gas temperature after demister is 28.2 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.95 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 17.4 , cold water supply pressure is 0.01 , cold water supply temperature is 23.22 , Hydraulic oil Temperature is 23.9 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 1.0 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 73.06 , Water Flow through Pre scrubber nozzle is 89.76\n\n### Assistant:\nPre Scrubber water level 3 is 3.61"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.01 , Blast Furnace Top gas hydrogen percentage is 3.14 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.28 , Downstream Blast furnace gas PCV 8104 is 49.9 , Clean gas pressure after demister is 244.87 , Clean gas temperature after demister is 28.42 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 17.19 , cold water supply pressure is 0.01 , cold water supply temperature is 23.25 , Hydraulic oil Temperature is 23.9 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 0.99 , Recirculated water pressure is 0.33 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 76.04 , Water Flow through Pre scrubber nozzle is 92.74\n\n### Assistant:\nPre Scrubber water level 3 is 3.63"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.0 , Blast Furnace Top gas hydrogen percentage is 3.15 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.51, Upstream blast furnace gas pressure control valve position 2 is 99.09 , Downstream Blast furnace gas PCV 8104 is 49.9 , Clean gas pressure after demister is 244.94 , Clean gas temperature after demister is 28.42 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 17.37 , cold water supply pressure is 0.01 , cold water supply temperature is 23.28 , Hydraulic oil Temperature is 23.91 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 0.99 , Recirculated water pressure is 0.33 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 78.42 , Water Flow through Pre scrubber nozzle is 95.12\n\n### Assistant:\nPre Scrubber water level 3 is 3.62"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.0 , Blast Furnace Top gas hydrogen percentage is 3.15 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.52, Upstream blast furnace gas pressure control valve position 2 is 99.18 , Downstream Blast furnace gas PCV 8104 is 49.9 , Clean gas pressure after demister is 244.95 , Clean gas temperature after demister is 28.53 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 17.42 , cold water supply pressure is 0.01 , cold water supply temperature is 23.31 , Hydraulic oil Temperature is 23.9 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 1.0 , Recirculated water pressure is 0.33 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 80.94 , Water Flow through Pre scrubber nozzle is 97.64\n\n### Assistant:\nPre Scrubber water level 3 is 3.63"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.0 , Blast Furnace Top gas hydrogen percentage is 3.15 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.5, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 244.9 , Clean gas temperature after demister is 29.03 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 17.25 , cold water supply pressure is 0.01 , cold water supply temperature is 23.35 , Hydraulic oil Temperature is 23.9 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 0.99 , Recirculated water pressure is 0.33 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 83.5 , Water Flow through Pre scrubber nozzle is 100.2\n\n### Assistant:\nPre Scrubber water level 3 is 3.63"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.0 , Blast Furnace Top gas hydrogen percentage is 3.15 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.49, Upstream blast furnace gas pressure control valve position 2 is 99.27 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 245.02 , Clean gas temperature after demister is 29.21 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 17.12 , cold water supply pressure is 0.01 , cold water supply temperature is 23.37 , Hydraulic oil Temperature is 23.91 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 1.0 , Recirculated water pressure is 0.33 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 84.83 , Water Flow through Pre scrubber nozzle is 101.53\n\n### Assistant:\nPre Scrubber water level 3 is 3.65"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.0 , Blast Furnace Top gas hydrogen percentage is 3.15 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.48, Upstream blast furnace gas pressure control valve position 2 is 99.31 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 245.1 , Clean gas temperature after demister is 29.19 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 16.64 , cold water supply pressure is 0.01 , cold water supply temperature is 23.39 , Hydraulic oil Temperature is 23.92 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 0.99 , Recirculated water pressure is 0.33 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 87.16 , Water Flow through Pre scrubber nozzle is 103.86\n\n### Assistant:\nPre Scrubber water level 3 is 3.66"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.01 , Blast Furnace Top gas hydrogen percentage is 3.15 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.47, Upstream blast furnace gas pressure control valve position 2 is 99.31 , Downstream Blast furnace gas PCV 8104 is 49.9 , Clean gas pressure after demister is 245.09 , Clean gas temperature after demister is 29.29 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 16.17 , cold water supply pressure is 0.01 , cold water supply temperature is 23.44 , Hydraulic oil Temperature is 23.91 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 1.0 , Recirculated water pressure is 0.33 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 89.07 , Water Flow through Pre scrubber nozzle is 105.77\n\n### Assistant:\nPre Scrubber water level 3 is 3.67"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.0 , Blast Furnace Top gas hydrogen percentage is 3.16 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.18, Upstream blast furnace gas pressure control valve position 2 is 99.27 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 245.07 , Clean gas temperature after demister is 29.67 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 11.02 , cold water supply pressure is 0.01 , cold water supply temperature is 23.46 , Hydraulic oil Temperature is 23.92 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 1.0 , Recirculated water pressure is 0.33 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 91.31 , Water Flow through Pre scrubber nozzle is 108.01\n\n### Assistant:\nPre Scrubber water level 3 is 3.67"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.01 , Blast Furnace Top gas hydrogen percentage is 3.16 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.04, Upstream blast furnace gas pressure control valve position 2 is 100.0 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 245.04 , Clean gas temperature after demister is 30.45 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 8.8 , cold water supply pressure is 0.01 , cold water supply temperature is 23.49 , Hydraulic oil Temperature is 23.9 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 1.0 , Recirculated water pressure is 0.33 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 93.34 , Water Flow through Pre scrubber nozzle is 110.04\n\n### Assistant:\nPre Scrubber water level 3 is 3.68"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.01 , Blast Furnace Top gas hydrogen percentage is 3.16 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.03, Upstream blast furnace gas pressure control valve position 2 is 100.0 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 245.07 , Clean gas temperature after demister is 31.0 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 13.32 , cold water supply pressure is 0.01 , cold water supply temperature is 23.52 , Hydraulic oil Temperature is 23.91 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 0.99 , Recirculated water pressure is 0.33 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 95.02 , Water Flow through Pre scrubber nozzle is 111.72\n\n### Assistant:\nPre Scrubber water level 3 is 3.68"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.01 , Blast Furnace Top gas hydrogen percentage is 3.16 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.03, Upstream blast furnace gas pressure control valve position 2 is 98.31 , Downstream Blast furnace gas PCV 8104 is 49.9 , Clean gas pressure after demister is 245.1 , Clean gas temperature after demister is 31.63 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 17.18 , cold water supply pressure is 0.01 , cold water supply temperature is 23.55 , Hydraulic oil Temperature is 23.92 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 1.0 , Recirculated water pressure is 0.33 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 96.31 , Water Flow through Pre scrubber nozzle is 113.01\n\n### Assistant:\nPre Scrubber water level 3 is 3.66"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.01 , Blast Furnace Top gas hydrogen percentage is 3.17 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.03, Upstream blast furnace gas pressure control valve position 2 is 98.56 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 245.19 , Clean gas temperature after demister is 32.34 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 17.61 , cold water supply pressure is 0.01 , cold water supply temperature is 23.6 , Hydraulic oil Temperature is 23.91 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 0.99 , Recirculated water pressure is 0.33 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 98.86 , Water Flow through Pre scrubber nozzle is 115.56\n\n### Assistant:\nPre Scrubber water level 3 is 3.7"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.02 , Blast Furnace Top gas hydrogen percentage is 3.18 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.03, Upstream blast furnace gas pressure control valve position 2 is 99.3 , Downstream Blast furnace gas PCV 8104 is 49.92 , Clean gas pressure after demister is 245.24 , Clean gas temperature after demister is 32.48 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 17.28 , cold water supply pressure is 0.01 , cold water supply temperature is 23.61 , Hydraulic oil Temperature is 23.94 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 1.0 , Recirculated water pressure is 0.33 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 100.61 , Water Flow through Pre scrubber nozzle is 117.31\n\n### Assistant:\nPre Scrubber water level 3 is 3.69"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.02 , Blast Furnace Top gas hydrogen percentage is 3.18 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.03, Upstream blast furnace gas pressure control valve position 2 is 99.35 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 245.28 , Clean gas temperature after demister is 32.72 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 17.89 , cold water supply pressure is 0.01 , cold water supply temperature is 23.64 , Hydraulic oil Temperature is 23.93 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 1.02 , Recirculated water pressure is 0.33 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 101.17 , Water Flow through Pre scrubber nozzle is 117.87\n\n### Assistant:\nPre Scrubber water level 3 is 3.69"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.02 , Blast Furnace Top gas hydrogen percentage is 3.19 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.03, Upstream blast furnace gas pressure control valve position 2 is 99.34 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 245.87 , Clean gas temperature after demister is 32.99 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 18.19 , cold water supply pressure is 0.01 , cold water supply temperature is 23.7 , Hydraulic oil Temperature is 23.94 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 1.01 , Recirculated water pressure is 0.33 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 102.5 , Water Flow through Pre scrubber nozzle is 119.2\n\n### Assistant:\nPre Scrubber water level 3 is 3.7"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.03 , Blast Furnace Top gas hydrogen percentage is 3.19 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.02, Upstream blast furnace gas pressure control valve position 2 is 99.35 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 245.99 , Clean gas temperature after demister is 33.01 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.97 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 18.27 , cold water supply pressure is 0.01 , cold water supply temperature is 23.73 , Hydraulic oil Temperature is 23.93 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 1.0 , Recirculated water pressure is 0.33 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 103.16 , Water Flow through Pre scrubber nozzle is 119.86\n\n### Assistant:\nPre Scrubber water level 3 is 3.69"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.03 , Blast Furnace Top gas hydrogen percentage is 3.2 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.03, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 49.91 , Clean gas pressure after demister is 246.1 , Clean gas temperature after demister is 32.84 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 18.31 , cold water supply pressure is 0.01 , cold water supply temperature is 23.76 , Hydraulic oil Temperature is 23.94 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 1.01 , Recirculated water pressure is 0.33 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 103.5 , Water Flow through Pre scrubber nozzle is 120.2\n\n### Assistant:\nPre Scrubber water level 3 is 3.68"
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.04 , Blast Furnace Top gas hydrogen percentage is 3.2 , Downstream blast furnace gas pressure control valve position 1 is 99.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.03, Upstream blast furnace gas pressure control valve position 2 is 99.09 , Downstream Blast furnace gas PCV 8104 is 49.92 , Clean gas pressure after demister is 246.17 , Clean gas temperature after demister is 32.46 , AG element 1 is open with a value of 100.0 , AG element 2 is open with a value of 99.96 , AG element 3 is open with a value of 98.7 , High pressure network Blast Furnace gas flow rate is 18.33 , cold water supply pressure is 0.01 , cold water supply temperature is 23.8 , Hydraulic oil Temperature is 23.94 , Gas Scrubber is being operated at pressure of 0.01 , Prescrubber water control valve position is 27.37 , Pump is discharging water at pressure of 1.03 , Recirculated water pressure is 0.33 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 104.88 , Water Flow through Pre scrubber nozzle is 121.58\n\n### Assistant:\nPre Scrubber water level 3 is 3.67"