docName
stringlengths
19
23
nameWell
stringclasses
23 values
nameWellbore
stringclasses
26 values
name
stringclasses
1 value
dTimStart
stringlengths
25
25
dTimEnd
stringlengths
25
25
versionKind
stringclasses
1 value
createDate
stringclasses
183 values
wellAlias
dict
wellboreAlias
listlengths
2
2
wellboreInfo
listlengths
1
1
statusInfo
listlengths
1
1
fluid
listlengths
0
6
porePressure
listlengths
0
6
surveyStation
listlengths
0
46
activity
listlengths
0
49
lithShowInfo
listlengths
0
7
15_9_F_5_2008_08_12
NO 15/9-F-5
NO 15/9-F-5
name
2008-08-11T00:00:00+02:00
2008-08-12T00:00:00+02:00
normal
2018-05-03T13:53:03+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-08-12T00:00:00+02:00", "dTimDiaHoleStart": "2008-08-11T07:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "RIH with adjustment sub actuation tool. Retract adjustment sub as required. Run casing hanger RT. Pressure test upper tie-back. Set MS-seal. Run bowl protector. Pull VMB plug. Pull bowl protector.", "hpht": "0", "md": "3792", "mdCsgLast": "3790.1", "mdDiaHoleStart": "3792", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3754", "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "43", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Set bowl protector. Made up and racked back Itco spear and adjustment sub. Retrieved annulus insert. RIH with jet sub and washed subsea wellhead with 3000 lpm, displaced to TSW. Retrieved bowl protector. Rigged up for running 10 3/4\" tie-back casing. Ran 10 3/4\" tie-back casing, adjustable sub and 10 3/4\" casing hanger. Engaged Itco spear and RIH with tie-back casing to tag depth of 138,8 m MD. Made up tie-back adapter. POOH with Itco spear.", "tightWell": "0", "tvd": "3247", "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[ { "dTim": "2008-08-11T23:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "3790", "mudClass": "other", "presBopRating": "345", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Inspected 13 3/8\" plug and found worn lip seal. Broke out and laid down plug. Traced and made up back up 13 3/8\" test plug. Closed doors on LPR.", "dTimEnd": "2008-08-11T01:00:00+02:00", "dTimStart": "2008-08-11T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "RIH with 13 3/8\" test plug and landed in surface wellhead at 20 m MD. Lined up cmented unit and filled BOP with seawater through kill line. Closed UPR. Pressure tested BOP against test plug to 20/345 bar 5/10 min. Observed leakage possibly from BSR ram door/bonnet. Bled off pressure.", "dTimEnd": "2008-08-11T02:00:00+02:00", "dTimStart": "2008-08-11T01:00:00+02:00", "md": "20", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Pressured up to 345 bar in order to locate leakage. Located leakage possibly across BSR ram door.", "dTimEnd": "2008-08-11T02:30:00+02:00", "dTimStart": "2008-08-11T02:00:00+02:00", "md": "20", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Drained BOP. Opened BSR doors. Inspected and cleaned seals, found no evident damage. Closed BSR doors.", "dTimEnd": "2008-08-11T05:00:00+02:00", "dTimStart": "2008-08-11T02:30:00+02:00", "md": "20", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Lined up cement unit and filled BOP with seawater. Pressure tested BOP to 345 bar / 10 min -ok. Observed and found leak to be from the BOP hydraulic system.", "dTimEnd": "2008-08-11T05:30:00+02:00", "dTimStart": "2008-08-11T05:00:00+02:00", "md": "20", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "POOH with 13 3/8\" test plug and strapped pipe according to Vetco instructions.", "dTimEnd": "2008-08-11T06:00:00+02:00", "dTimStart": "2008-08-11T05:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Strapped pipe according to Vetco instructions. Calculated 10 3/4\" landing point to be 20,866 m RT.", "dTimEnd": "2008-08-11T06:30:00+02:00", "dTimStart": "2008-08-11T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Picked up bowl protector seetting tool and made up to 13 3/8 bowl protector.", "dTimEnd": "2008-08-11T07:00:00+02:00", "dTimStart": "2008-08-11T06:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 13 3/8\" bowl protector at 20,44 m MD. POOH and laid down running tool.", "dTimEnd": "2008-08-11T07:45:00+02:00", "dTimStart": "2008-08-11T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleared and tidied drillfloor. Held toolbox talk prior to racking back tie-back tools.", "dTimEnd": "2008-08-11T08:45:00+02:00", "dTimStart": "2008-08-11T07:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up and made up 10 3/4\" Itco spear to stand of 5 1/2\" DP. Racked back in derrick. Cleaned windows on drillers cabin for safety due to poor visiblity.", "dTimEnd": "2008-08-11T09:30:00+02:00", "dTimStart": "2008-08-11T08:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up and made up adjustment sub actuation tool to 5 1/2\" DP stand. Racked back in derrick.", "dTimEnd": "2008-08-11T10:00:00+02:00", "dTimStart": "2008-08-11T09:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk for picking up 10 3/4\" casing hanger / adjustment sub.", "dTimEnd": "2008-08-11T10:15:00+02:00", "dTimStart": "2008-08-11T10:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up up 10 3/4\" casing hange / adjustment sub and hung off in rotary.Made up casing hanger handling tool accroding to Vetcc instructions. Laid out assembly.", "dTimEnd": "2008-08-11T11:15:00+02:00", "dTimStart": "2008-08-11T10:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk for running annulus insert retrieval tool.", "dTimEnd": "2008-08-11T11:30:00+02:00", "dTimStart": "2008-08-11T11:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up annulus insert J-slot retrieval tool and RIH 5 1/2\" DP. Strapped pipe and checked serial numbers when running in.", "dTimEnd": "2008-08-11T13:00:00+02:00", "dTimStart": "2008-08-11T11:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Landed off at 139,89 m MD and engaged J-slot tool according to Vetco instructions. Pulled free annulus insert.", "dTimEnd": "2008-08-11T14:00:00+02:00", "dTimStart": "2008-08-11T13:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with annulus insert on 5 1/2\" DP and strapped pipe to check measurements. Calculated tie-back adapter no-go to 139,75 m MD.", "dTimEnd": "2008-08-11T14:30:00+02:00", "dTimStart": "2008-08-11T14:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke out and laid down annulus insert and retrieval tool.", "dTimEnd": "2008-08-11T15:00:00+02:00", "dTimStart": "2008-08-11T14:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up and made up jet sub to stand of 5 1/2\" DP.", "dTimEnd": "2008-08-11T15:30:00+02:00", "dTimStart": "2008-08-11T15:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with jet sub on 5 1/2\" Dp from surface to subsea wellhead 140 m MD. Made 6 passes +/- 2m across subseawellhead while circualtion at 3000 lpm / SPP 22 bar. Displaced production riser to TSW by circualting 3000 lpm / 22 bar. Pumped a total of 50 m3 TSW.", "dTimEnd": "2008-08-11T16:30:00+02:00", "dTimStart": "2008-08-11T15:30:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with jetting sub from 140 m MD to surface. Broke and laid out jet-sub.", "dTimEnd": "2008-08-11T17:00:00+02:00", "dTimStart": "2008-08-11T16:30:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with bowl protector pulling tool. Engaged bowl protector. Strapped pipe in and out to 20,44 m (20,86 m to 10 3/4\" casing hanger lading point).", "dTimEnd": "2008-08-11T17:45:00+02:00", "dTimStart": "2008-08-11T17:00:00+02:00", "md": "20", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with bowl protector. Broke and laid out bowl protector and running tool.", "dTimEnd": "2008-08-11T18:15:00+02:00", "dTimStart": "2008-08-11T17:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted 10 3/4\" casing tong to IR rails. Rigged up BX elevator. Removed master bushing and installed FMS in rotary and hooked up same. Hooked up and function testred casing tong. Re-arranged and tested HTS rollers.", "dTimEnd": "2008-08-11T22:30:00+02:00", "dTimStart": "2008-08-11T18:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up 10 3/4\" tie-back adapter using tugger and single joint elevator. Removed protector and inspected thread and O-rings. Hung off in FMS and secured with dog collar.", "dTimEnd": "2008-08-11T23:00:00+02:00", "dTimStart": "2008-08-11T22:30:00+02:00", "md": "3", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior to running tie-back casing.", "dTimEnd": "2008-08-11T23:30:00+02:00", "dTimStart": "2008-08-11T23:00:00+02:00", "md": "3", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran 10 3/4\" - C95 60,7# VamTop tie-back casing to 15 m MD.", "dTimEnd": "2008-08-12T00:00:00+02:00", "dTimStart": "2008-08-11T23:30:00+02:00", "md": "15", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2008_08_13
NO 15/9-F-5
NO 15/9-F-5
name
2008-08-12T00:00:00+02:00
2008-08-13T00:00:00+02:00
normal
2018-05-03T13:53:03+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-08-13T00:00:00+02:00", "dTimDiaHoleStart": "2008-08-11T07:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "POOH with 10 3/4\" tie-back casing. Install bowl protector. Perform cleaning run across BOP and subsea wellhead. Pull bowl protector. Rig up for running casing. Run 10 3/4\" tie-back casing. ", "hpht": "0", "md": "3792", "mdCsgLast": "3790.1", "mdDiaHoleStart": "3792", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3754", "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "44", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "RIH with adjustment sub actuation tool. Retracted adjustment sub according to Drillquip procedure. Not able to come free with tool with 5 MT overpull. Discussed situation. Not able to come free with 10 MT overpull. Discussed sitaution. Reverted to contingency plan. Released and POOH with 10 3/4\" tie-back casing with stuck tool. Broke casing connection and found tool packed with cuttings/dirt. Discussed situation. POOH with 10 3/4\" tie-back caing.", "tightWell": "0", "tvd": "3247", "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[ { "dTim": "2008-08-12T23:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "3790", "mudClass": "other", "presBopRating": "345", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Ran 10 3/4\" - C95 60,7# VamTop tie-back casing from 15 m to 99 m MD.", "dTimEnd": "2008-08-12T01:45:00+02:00", "dTimStart": "2008-08-12T00:00:00+02:00", "md": "99", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up and made up 10 3/4\" 8,89 m space out pup.", "dTimEnd": "2008-08-12T02:00:00+02:00", "dTimStart": "2008-08-12T01:45:00+02:00", "md": "108", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed BX elevator and changed to DP elevator. Picked up 10 3/4\" casing hanger / adjustment sub assembly and made up same. Removed rubber protection and checked casing hanger according to Vetco proecdure.", "dTimEnd": "2008-08-12T03:30:00+02:00", "dTimStart": "2008-08-12T02:00:00+02:00", "md": "119", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up stand with 10 3/4\" Itco spear with PRS. Made up TDS while holding stand with PRS.", "dTimEnd": "2008-08-12T04:15:00+02:00", "dTimStart": "2008-08-12T03:30:00+02:00", "md": "119", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH and engaged spear in 3 m pup joint below 10 3/4\" hanger by rotating string counterclockwise while picking up, obtained weight of tie-back string of 80 MT. Noted block height when casing hanger flush with RT.", "dTimEnd": "2008-08-12T04:30:00+02:00", "dTimStart": "2008-08-12T04:15:00+02:00", "md": "119", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with tie-back casing on Itco spear and tagged tie-back threads at 139,8 m with 2-3 MT (i.e. approx 15 cm deeper than expected). Checked colour band through B-annulus on Tensioner deck, observed centre of 2nd orange band.", "dTimEnd": "2008-08-12T04:45:00+02:00", "dTimStart": "2008-08-12T04:30:00+02:00", "md": "139.8", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Put horizontal and vertical mark on pipe to count turns and measure elevation. Started rotation at 3 rpm clockwise and counted turns. Lost grip on Itco spear due to too much weight being slacked off when the block weight increased. Re-engaged spear by conterclockwise rotation. Resumed rotation and let block weight incrase approx 8 MT. Stopped rotation after an estimated 4-5 turns obtained, judging from effective rotation and travel on colour bands. Took overpull to 10 MT and set torque limit to 10,17 kNm. Resumed rotation at 3 rpm. Torque and weight increased and peaked at 7,03 kNm before Itco spear released. Estimated total downwards travel 2,5-3 inches. Re-attempted torquing up tie-back adapter twice, spear released at 3-5 kNm. Re-engaged spear and took overpull on tie.back adapter to 30 MT.", "dTimEnd": "2008-08-12T05:30:00+02:00", "dTimStart": "2008-08-12T04:45:00+02:00", "md": "139.8", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Released 10 3/4\" Itco spear and POOH with same. Racked back stand in derrick. Prepared for rigging down casing tong.", "dTimEnd": "2008-08-12T06:00:00+02:00", "dTimStart": "2008-08-12T05:30:00+02:00", "md": "139.9", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged down casing tong. Removed FMS and installed master bushing and bowl. Picked up adjustment sub actuation tool. Made up TDS.", "dTimEnd": "2008-08-12T07:30:00+02:00", "dTimStart": "2008-08-12T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with adjustment sub actuation tool to 28,72 m MD to locate actuation dogs in polish bore (1st target).", "dTimEnd": "2008-08-12T07:45:00+02:00", "dTimStart": "2008-08-12T07:30:00+02:00", "md": "28.7", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressured up through DP to 140 bar to actuate horizontal latch dogs.", "dTimEnd": "2008-08-12T08:00:00+02:00", "dTimStart": "2008-08-12T07:45:00+02:00", "md": "28.7", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up to 2nd target and confirmed horizontal dogs latching into profile, took 5 MT overpull. Confirmed measurements. Rotated pipe 3 turns clockwise and obtained 2 kNm torque. Bled off pressure on DP to zero. Checked measurement towards rotary - no movement.", "dTimEnd": "2008-08-12T08:15:00+02:00", "dTimStart": "2008-08-12T08:00:00+02:00", "md": "28.3", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rotated pipe clockwise to retract adjustment sub. Obtained 6,5 turns on adjustment sub before stalling out on 10 kNm. Took 30 MT overpull and rotated 1/8 turn clockwise before stalling out at 6 kNm. Continuosly checked colour bands through annulus outlet on Tensioner deck. Checked elevation of casing hanger -ok.", "dTimEnd": "2008-08-12T09:15:00+02:00", "dTimStart": "2008-08-12T08:15:00+02:00", "md": "28.3", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Slacked off overpull and came down to 1st tool target (sealbore). Waited 2 minutes for horizontal dog crest to relax. Picked up again and got unexpected overpull of 4-5 MT 20 cm above 2nd tool target (latch groove). Slacked off pipe and picked up againg in attempt to free tool, got overpull at 2nd tool target. Made several attempts to free pipe by coming up and down with tool, not able to pass 2nd target. Pressured up on pipe to 120 bar. Re-attempted passing 2nd target - negative. Bled off pressure. Worked pipe with +/- 5 MT at 2nd target - not able to pass. Tool was free to move down.", "dTimEnd": "2008-08-12T10:15:00+02:00", "dTimStart": "2008-08-12T09:15:00+02:00", "md": "28.3", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Discussed situation with town. Made plan of action.", "dTimEnd": "2008-08-12T13:00:00+02:00", "dTimStart": "2008-08-12T10:15:00+02:00", "md": "28.3", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Re-attempted comming free with adjustable sub actuation tool. Attempted to pull with 10 MT overpull - negative. Pressured up pipe to 115 bar twice in attempt to manipulate horizontal latch dogs. Worked pipe several times with ~ 10 MT overpull - not able to pass 2nd tool target.", "dTimEnd": "2008-08-12T15:00:00+02:00", "dTimStart": "2008-08-12T13:00:00+02:00", "md": "28.3", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held planning meeting for discussing contingency operations. Made plan of action.", "dTimEnd": "2008-08-12T16:30:00+02:00", "dTimStart": "2008-08-12T15:00:00+02:00", "md": "28.3", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Held toolbox meeting prior to contingency operations.", "dTimEnd": "2008-08-12T17:15:00+02:00", "dTimStart": "2008-08-12T16:30:00+02:00", "md": "28.3", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Pressured up on DP to 130 bar to make sure horizontal latch dogs and vertical torque dogs engaged in adjustable sub profiles, maintained pressure throughout operation. Adjusted block weight to 81 mT (~1 MT overpull). Extended adjsutable sub while rotating 1-2 rpm / torque 2-3 kNm. Observed torque peak of 7,09 kNm when rotation and torque transferred to tie-back adapter. Verified correct 10 3/4\" casing hanger travel by observing colour bands through annulus outlet.", "dTimEnd": "2008-08-12T18:00:00+02:00", "dTimStart": "2008-08-12T17:15:00+02:00", "md": "28.3", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "POOH with 10 3/4\" tie-back casing on 5 1/2\" DP stand from 140 m to 119 m MD. Hung 10 3/4\" casing in manual casing slips and secured with dog collar. Observed top of casing hanger packed with dirt/cuttings. Moved casing tong to access IR.", "dTimEnd": "2008-08-12T18:45:00+02:00", "dTimStart": "2008-08-12T18:00:00+02:00", "md": "119", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Installed C-plate on top of 10 3/4\" casing hanger. Bled off pressure on DP to zero. Adjusted pipe height to access 1st DP single with IR. Broke connection on 1st single (service breaking). Hung off DP in C-plate and screwd out connection with chain tongs. Racked back 5 1/2\" DP double.", "dTimEnd": "2008-08-12T19:45:00+02:00", "dTimStart": "2008-08-12T18:45:00+02:00", "md": "119", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Installed DP elevator between C-plate and DP coupling and secured with cargo straps. Installed 10 3/4\" BX elevator underneath 10 3/4\" casing hanger. Removed drilling bails and DP elevator. Installed 10 3/4\" BX elevator. Installed long bails and connected to 10 3/4\" BX elevator. Moved casing tong to IR rails. Hooked up casing tong.", "dTimEnd": "2008-08-12T23:45:00+02:00", "dTimStart": "2008-08-12T19:45:00+02:00", "md": "119", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "POOH with 10 3/4\" tie-back casing to access coupling underneath 10 3/4\" casing hanger /adjustable sub assembly. Hung off on manual slips and secured with dog collar.", "dTimEnd": "2008-08-13T00:00:00+02:00", "dTimStart": "2008-08-12T23:45:00+02:00", "md": "110", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" } ]
[]
15_9_F_5_2008_08_14
NO 15/9-F-5
NO 15/9-F-5
name
2008-08-13T00:00:00+02:00
2008-08-14T00:00:00+02:00
normal
2018-05-03T13:53:03+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-08-14T00:00:00+02:00", "dTimDiaHoleStart": "2008-08-11T07:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Retract adjustment sub according to Drillquip procedure. Run casing hanger running tool and test upper tie-back to 380 bar. Set MS seal and test same. Run bowl protector. Pull VMB plug. Pull bowl protector.", "hpht": "0", "md": "3792", "mdCsgLast": "3790.1", "mdDiaHoleStart": "3792", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3754", "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "45", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "POOH with tie-back casing. Set bowl protector. Jetted BOP and subsea wellhead. Displaced riser to TSW. Pulled bowl protector. Jetted surface wellhead. Rig up for runnig tie-back casing. Ran 10 3/4\" tie-back casing, adjustment sub and casing hanger. Landed tie-back casing on spear. Made up tie-back adapter in subsea wellhead. RIH with adjustment sub actuation tool, attempted to set retract adjustable sub - negative.", "tightWell": "0", "tvd": "3247", "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[ { "dTim": "2008-08-13T23:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "3790", "mudClass": "other", "presBopRating": "345", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Broke casing connection while rotating pipe/bails counterclockwise with TDS. Pulled out until adjustment sub actuation tool in heigh with casing coupling. Observed horizontal latch dog profile packed with cuttings/dirt. Took pictures for reference. Removed dirt/cuttings as required.", "dTimEnd": "2008-08-13T00:45:00+02:00", "dTimStart": "2008-08-13T00:00:00+02:00", "md": "110", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Discussed situation. Decided to pull 10 3/4\" tie-back casing for cleaning well.", "dTimEnd": "2008-08-13T01:15:00+02:00", "dTimStart": "2008-08-13T00:45:00+02:00", "md": "119", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Ripped off horizontal dog latch crest. Stabbed adjustable sub actuation tool into 10 3/4\" casing. Made up casing coupling. Landed 10 3/4\" casing hanger in slips and secured with dog collar.", "dTimEnd": "2008-08-13T02:00:00+02:00", "dTimStart": "2008-08-13T01:15:00+02:00", "md": "119", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Removed long bails and BX elevator. Rigged up short bails.", "dTimEnd": "2008-08-13T03:15:00+02:00", "dTimStart": "2008-08-13T02:00:00+02:00", "md": "119", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Held toolbox talk prior to laying out DP single (innerstring).", "dTimEnd": "2008-08-13T03:30:00+02:00", "dTimStart": "2008-08-13T03:15:00+02:00", "md": "119", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Connected bails to DP elevator on top of C-plate. Removed cargo straps. Pulled out DP single with adjustable sub actuation tool and laid out same. Removed C-plate.", "dTimEnd": "2008-08-13T03:45:00+02:00", "dTimStart": "2008-08-13T03:30:00+02:00", "md": "119", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Picked up casing hanger handling tool and made up to 10 3/4\" casing hanger. POOH to 110 m MD. Broke connection between assembly and 10 3/4\" space out pup.", "dTimEnd": "2008-08-13T04:45:00+02:00", "dTimStart": "2008-08-13T03:45:00+02:00", "md": "110", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Held toolbox talk prior to POOH with 10 3/4\" tie-back casing. Changed to 10 3/4\" BX elevator.", "dTimEnd": "2008-08-13T05:15:00+02:00", "dTimStart": "2008-08-13T04:45:00+02:00", "md": "110", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "POOH with 10 3/4\" tie-back casing from 110 m to 87 m MD.", "dTimEnd": "2008-08-13T06:00:00+02:00", "dTimStart": "2008-08-13T05:15:00+02:00", "md": "110", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "POOH with 10 3/4\" tie-back casing from 87 m MD to surface.", "dTimEnd": "2008-08-13T07:45:00+02:00", "dTimStart": "2008-08-13T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Held toolbox talk for rigging down casing running equipment.", "dTimEnd": "2008-08-13T08:00:00+02:00", "dTimStart": "2008-08-13T07:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Rigged down casing tong. Removed 10 3/4\" BX elevator and installed DP elevator. Cleaned and tidied drillfloor.", "dTimEnd": "2008-08-13T08:45:00+02:00", "dTimStart": "2008-08-13T08:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Picked up bowl protector RT and made up to stand of 5 1/2\" DP. Made up bowl protector to RT.", "dTimEnd": "2008-08-13T09:00:00+02:00", "dTimStart": "2008-08-13T08:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "RIH with bowl protector on 5 1/2\" DP stand and landed same at 20,44 m MD.", "dTimEnd": "2008-08-13T09:30:00+02:00", "dTimStart": "2008-08-13T09:00:00+02:00", "md": "20", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "POOH with bowl protector RT, broke and laid out same.", "dTimEnd": "2008-08-13T10:00:00+02:00", "dTimStart": "2008-08-13T09:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Made up Vetco jet sub. RIH with jet sub and located across BOP. Made 3 passes across BOP cavities while pumping at 4600 lpm / SPP 62 bar.", "dTimEnd": "2008-08-13T12:15:00+02:00", "dTimStart": "2008-08-13T10:00:00+02:00", "md": "10", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "RIH with jet sub on 5 1/2\" from 10 m to 140 m MD. Made up TDS to each stand. Washed down with 3300-3900 lpm / SPP 26-38 bar.", "dTimEnd": "2008-08-13T13:45:00+02:00", "dTimStart": "2008-08-13T12:15:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Washed across subsea wellhead/tie-back threads at 4000 lpm / SPP ~32bar, made 5 passes. Pumped 4 m3 hi-vis pill. Displaced production riser to TSW.", "dTimEnd": "2008-08-13T16:45:00+02:00", "dTimStart": "2008-08-13T13:45:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "POOH with jet sub on 5 1/2\" DP and laid out same. Cleaned and tidied drillfloor.", "dTimEnd": "2008-08-13T17:45:00+02:00", "dTimStart": "2008-08-13T16:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Made up bowl protector RT to 5 1/2 \" stand. Pulled bowl protector at 20,44 m, broke and laid out RT.", "dTimEnd": "2008-08-13T18:15:00+02:00", "dTimStart": "2008-08-13T17:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Made up jets sub. RIH with jestsub on 5 1/2\" DP stand. Made 2 passes across surface wellhead pumping 3600 lpm / SPP 39 bar. POOH with jetsub.", "dTimEnd": "2008-08-13T19:00:00+02:00", "dTimStart": "2008-08-13T18:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Held toolbox talk for laying out jetsub.", "dTimEnd": "2008-08-13T19:15:00+02:00", "dTimStart": "2008-08-13T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Laid out jetsub. Cleard and tidied drillfloor.", "dTimEnd": "2008-08-13T19:30:00+02:00", "dTimStart": "2008-08-13T19:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Picked up adjustment sub actuation tool on single. Broke single and laid out actuation tool. Made up single to double to get full stand. Made up back-up adjustment sub actuation tool dressed with new horizontal latch ring. Racked back tool and 5 1/2\" DP stand.", "dTimEnd": "2008-08-13T20:15:00+02:00", "dTimStart": "2008-08-13T19:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Held toolbox talk prior to rigging casing running equipment.", "dTimEnd": "2008-08-13T20:30:00+02:00", "dTimStart": "2008-08-13T20:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Changed to 10 3/4\" BX elevator. Installed PS-30 slips dressed for 10 3/4\" casing. Lifted casing tong onto IR rails and hooked up same.", "dTimEnd": "2008-08-13T22:15:00+02:00", "dTimStart": "2008-08-13T20:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Held toolbox talk prior to running 10 3/4\" tie-back casing.", "dTimEnd": "2008-08-13T22:30:00+02:00", "dTimStart": "2008-08-13T22:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Lifted back-up tie-back adapter onto HTS.", "dTimEnd": "2008-08-13T22:45:00+02:00", "dTimStart": "2008-08-13T22:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Ran 10 3/4\" - C95 60,7# VamTop tie-back casing from surface to 39 m MD.", "dTimEnd": "2008-08-14T00:00:00+02:00", "dTimStart": "2008-08-13T22:45:00+02:00", "md": "39", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" } ]
[]
15_9_F_5_2008_08_15
NO 15/9-F-5
NO 15/9-F-5
name
2008-08-14T00:00:00+02:00
2008-08-15T00:00:00+02:00
normal
2018-05-03T13:53:03+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-08-15T00:00:00+02:00", "dTimDiaHoleStart": "2008-08-11T07:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "POOH and LD VBM plug. Pull bowl protector and wash surface wellhead. Prepare to run completion. MU and RIH with lower completion assemblies. RIH with 7\" tubing from surface to 1000 m. ", "hpht": "0", "md": "3792", "mdCsgLast": "3790.1", "mdDiaHoleStart": "3792", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3754", "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "46", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Retracted adjustment sub according to Drillquip procedure. Ran casing hanger running tool and tested upper tie-back to 380 bar/10 min. Sat MS seal and test same. Ran bowl protector in surface wellhead. MU and RIH with DP and VMB retrieving tool. Circulated out Hi-vis pill with 40 m3 packer fluid. Released VMB plug. ", "tightWell": "0", "tvd": "3247", "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Ran 10 3/4\" - C95 60,7# VamTop tie-back casing from 39 m to 108 m MD.", "dTimEnd": "2008-08-14T01:45:00+02:00", "dTimStart": "2008-08-14T00:00:00+02:00", "md": "108", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Picked up 10 3/4\" casing hanger / adjustment sub assembly with handling tool. Made up assembly. RIH to 119 m MD and hung off in RT. Broke off casing hanger handling tool with chaintong and laid out same. Drained riser by opening annulus valves.", "dTimEnd": "2008-08-14T02:45:00+02:00", "dTimStart": "2008-08-14T01:45:00+02:00", "md": "119", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Picked up stand with spear in TDS and made up to TDS. Engaged spear in pup joint below 10 3/4\" casing hanger (i.e. 3 m in from top of hanger).", "dTimEnd": "2008-08-14T03:00:00+02:00", "dTimStart": "2008-08-14T02:45:00+02:00", "md": "119", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "RIH with 10 3/4\" casing hanger on spear. Tagged tie-back threads with 3-4 MT at 139,7 m MD, i.e. approx 10 cm shallower than expected. Attempted to rotated clockwise with 2700 Nm, stalled out after 1/4 turn. Rotated counterclokwise 1/2 turn, worked string and came approx 10 cm further down (corresonding to previous landing datum). Resumed clockwise rotation at 3 rpm and entered threads within 2700 Nm limit. Slacked off weight accordingly for each 2-3 MT gained on block. Observed color bands through annulus outlet to confirm travel and height.", "dTimEnd": "2008-08-14T04:00:00+02:00", "dTimStart": "2008-08-14T03:00:00+02:00", "md": "139.8", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Increased torque limit to 10170 Nm. Pulled 5 MT overpull and resumed rotation. String stalled with 7 kNm+ (6,52 kNm Nm recorded on Geoservice screen). Increased to 2 MT overpull, resumed rotation - stalled out on approx 3 kNm and spear released. Re-enaged spear. Took 13 MT overpull and resumed rotation, stalled out on 8 kNm+ (5,72 kNm recorded on Geoservice screen). Took overpull to 30 MT.", "dTimEnd": "2008-08-14T04:30:00+02:00", "dTimStart": "2008-08-14T04:00:00+02:00", "md": "139", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Released spear and POOH. Broke out TDS connection and set back stand and spear in derrick.", "dTimEnd": "2008-08-14T04:45:00+02:00", "dTimStart": "2008-08-14T04:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Picked up stand with adjustable sub actuation tool in PRS and made up to TDS. Measured in to 1st tool target.", "dTimEnd": "2008-08-14T05:30:00+02:00", "dTimStart": "2008-08-14T04:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Pressured up pipe to 140 bar to activate the adjustment sub actuation tool. Picked up to 2nd tool target to engage horizontal latch dogs and torque dogs. Observed 3-4 MT overpull at 2nd tool target. While maintaining overpull started rotation with 1 rpm. Rotated 2 turns / ~1 kNm. No movement observed on hanger at Tensioner deck. Wrong indications. Reattempted setting sequence with same negative result.", "dTimEnd": "2008-08-14T06:00:00+02:00", "dTimStart": "2008-08-14T05:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Made another attempt on adjustable sub setting sequence. While maintaining overpull rotated 7 turns and retracted adjustment sub as per procedure.", "dTimEnd": "2008-08-14T07:00:00+02:00", "dTimStart": "2008-08-14T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Bled off pressure in DP, slacked off 1 m and waited 3 min to allow lock ring to be fully retracted. PU and POOH with adjustment sub actuation tool. Cleaned and cleared rig floor.", "dTimEnd": "2008-08-14T08:00:00+02:00", "dTimStart": "2008-08-14T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RD csg tong. Changed from PS30 slips to to master bushings. Broke down and LO spear and adjustment sub.", "dTimEnd": "2008-08-14T09:15:00+02:00", "dTimStart": "2008-08-14T08:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "PU and MU HRT. RIH with HRT on 5 1/2\" HWDP from surface to 20,77 m. MU HRT to 10 3/4\" surface hanger by 10 left hand turns.", "dTimEnd": "2008-08-14T10:15:00+02:00", "dTimStart": "2008-08-14T09:15:00+02:00", "md": "20.8", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "MU TDS. Performed tool box meeting before lining up to test 10 3/4\" tie-back csg. Verified line-up and pressured up to leak test 10 3/4\" surface tie-back csg and 10 3/4\" x 9 5/8\" csg against VMB plug to 380 bar/10 min with cmt unit. 900 ltrs pumped. Test failed.", "dTimEnd": "2008-08-14T11:30:00+02:00", "dTimStart": "2008-08-14T10:15:00+02:00", "md": "20.8", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed line test to 380 bar/10 min with cmt unit. Test failed.", "dTimEnd": "2008-08-14T12:15:00+02:00", "dTimStart": "2008-08-14T11:30:00+02:00", "md": "20.8", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Greased surface valves on STP manifold and performed line test. Test failed.", "dTimEnd": "2008-08-14T13:45:00+02:00", "dTimStart": "2008-08-14T12:15:00+02:00", "md": "20.8", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "RU pump-in sub and hose directly from cmt test line. Performed line test to 380 bar/10 min with cmt unit. Ok.", "dTimEnd": "2008-08-14T15:30:00+02:00", "dTimStart": "2008-08-14T13:45:00+02:00", "md": "20.8", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Performed line test to 380 bar/10 min with cmt unit. Ok. Leak tested 10 3/4\" surface tie-back csg and 10 3/4\" x 9 5/8\" csg against VMB plug to 380 bar/10 min with cmt unit. Ok. 605 ltrs pumped and 560 ltrs bled back.", "dTimEnd": "2008-08-14T16:15:00+02:00", "dTimStart": "2008-08-14T15:30:00+02:00", "md": "20.8", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Released HRT by 10 right hand turns. POOH and LD same. RD cmt line.", "dTimEnd": "2008-08-14T17:15:00+02:00", "dTimStart": "2008-08-14T16:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RU to RIH with 10 3/4\" MS-T seal assy RT. Found RT dressed for pulling MS-T seal and had to re-adjust length to fit the latch dogs.", "dTimEnd": "2008-08-14T18:00:00+02:00", "dTimStart": "2008-08-14T17:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Re-adjusted length on RT to fit the latch dogs to be able to run MS-T seal.\n\nMeanwhile held Time-out for safety (TOFS) on rig floor and discussed lifting and tugger handling.", "dTimEnd": "2008-08-14T18:45:00+02:00", "dTimStart": "2008-08-14T18:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Continued RU to RIH with 10 3/4\" MS-T seal assy RT.", "dTimEnd": "2008-08-14T20:00:00+02:00", "dTimStart": "2008-08-14T18:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with seal assy RT and MS-T seal from surface to 20.77 m. Landed out on 10 3/4\" csg hanger and locked RT into riser. Sat MS-T seal by applying 4300 psi. Tested seal through test port in multibowl to 380 bar/10 min. Ok.", "dTimEnd": "2008-08-14T21:45:00+02:00", "dTimStart": "2008-08-14T20:00:00+02:00", "md": "20.8", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Released MS-T seal RT from 10 3/4\" csg hanger and POOH with RT. LO RT and removed hydraulic hoses.", "dTimEnd": "2008-08-14T23:00:00+02:00", "dTimStart": "2008-08-14T21:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box meeting. MU and RIH with secondary bowl protector from surface to 20.53 m. Installed secondary bowl protector in surface wellhead. POOH and racked back RT. Cleared rig floor of excess equipment.", "dTimEnd": "2008-08-15T00:00:00+02:00", "dTimStart": "2008-08-14T23:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2008_08_16
NO 15/9-F-5
NO 15/9-F-5
name
2008-08-15T00:00:00+02:00
2008-08-16T00:00:00+02:00
normal
2018-05-03T13:53:03+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-08-16T00:00:00+02:00", "dTimDiaHoleStart": "2008-08-15T10:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "RIH with 7\" tubing from 1330 to 2303 m. MU TRSCSSV. Connect and leak test control line. RIH with 7\" tubing and TRSCSSV CL until ready to tag PBR. Perform space out of tubing. Pull back and install space out joints/pups.", "hpht": "0", "md": "3792", "mdCsgLast": "3790.1", "mdDiaHoleStart": "3792", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "47", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "POOH and LD VBM plug. Pulled bowl protector. Prepared to run completion. MU and RIH with lower completion assemblies. RIH with 7\" tubing from surface to 1330 m. ", "tightWell": "0", "tvd": "3247", "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[ { "dTim": "2008-08-15T16:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "3793", "mudClass": "other", "presBopRating": "345", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Held tool box meeting prior to retrieving VBM plug. MU VBM plug RT to 5 1/2\" HWDP. Changed out master bushings for PS21 slips.", "dTimEnd": "2008-08-15T01:00:00+02:00", "dTimStart": "2008-08-15T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with VBM plug RT on 5 1/2\" HWDP and 5 1/2\" DP from surface to 632 m. Up weight 98 MR/down weight 93 MT/ 2.6 kNm at 10 rpm.", "dTimEnd": "2008-08-15T03:30:00+02:00", "dTimStart": "2008-08-15T01:00:00+02:00", "md": "632", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Established parameters and circulated 2x btms up (20 m3) at 2000 lpm/10 bar to displace out hi-vis pill on top of plug according to program.", "dTimEnd": "2008-08-15T04:30:00+02:00", "dTimStart": "2008-08-15T03:30:00+02:00", "md": "632", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with VBM plug on 5 1/2\" DP from 632 m to 634.5 m. Attempted to latch on to and release VBM plug by applying 15-25 MT and washing above top of plug 200-2000 lpm /0.7 -9 bar between attempts. PU 2 m without observing any overpull after each attempt. Turned string 3 turns to aligne J-slot in RT. No sucess. A total of 10 attemps was made.", "dTimEnd": "2008-08-15T05:30:00+02:00", "dTimStart": "2008-08-15T04:30:00+02:00", "md": "634.5", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Latched on to and release VBM plug by applying 20 MT and then PU to 10 MT up weight on plug to verify that RT was properly latched on plug. Reduced weight on plug to 2 MT and pressured up DP to 30 bar (66 ltrs pumped) . Rotated DP 3/4\" turn RH to open ball valve. Pressure dropped from 30 bar to 4 bar. \n\nRotated 15 turns RH to release plug. Pulled up to 632,5 m and waited 10 min to allow elements to fully retract. RIH to 636.5 m to ensure that plug was free.", "dTimEnd": "2008-08-15T06:00:00+02:00", "dTimStart": "2008-08-15T05:30:00+02:00", "md": "632.5", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with VBM plug and RT on 5 1/2\" DP from 632 m to OOH. Pulled PS21 slips, cleaned rig floor rotary and installed master bushings. LO VBM plug.\n\nMeanwhile changed inserts in PS30 slips to fit 7\" tubing, inspected PRS and load tested manrider.", "dTimEnd": "2008-08-15T10:30:00+02:00", "dTimStart": "2008-08-15T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "MU and RIH with secondary bowl protector pulling tool from surface to 20.5 m. Pulled secondary bowl protector from surface wellhead. POOH and LO RT.", "dTimEnd": "2008-08-15T11:00:00+02:00", "dTimStart": "2008-08-15T10:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk before RU csg equipment. RU Odfjell csg tong and prepared to run 7\" tubing. Connected torque/turn computer. Prepared manual slips for running completion assemblies. Lifted in place BOT cable drum on port fwd setback area.", "dTimEnd": "2008-08-15T13:30:00+02:00", "dTimStart": "2008-08-15T11:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "MU and RIH with 7 1/2\" seal stem with ratcheting mule shoe assembly. Function tested ratcheting mule shoe. MU and ran two 7\" tubing joints according to tally. MU and RIH 7\" x 9 5/8\" Granite production packer and one 7\" tubing joint.", "dTimEnd": "2008-08-15T16:00:00+02:00", "dTimStart": "2008-08-15T13:30:00+02:00", "md": "46", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 7\" tubing in stds from 46 m to 505 m. Running speed was 5-8 stds/hr.", "dTimEnd": "2008-08-15T18:30:00+02:00", "dTimStart": "2008-08-15T16:00:00+02:00", "md": "505", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 7\" tubing from 505 m to 891 m. Running speed was 6-8 jnts/hr.", "dTimEnd": "2008-08-16T00:00:00+02:00", "dTimStart": "2008-08-15T18:30:00+02:00", "md": "891", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2008_08_17
NO 15/9-F-5
NO 15/9-F-5
name
2008-08-16T00:00:00+02:00
2008-08-17T00:00:00+02:00
normal
2018-05-03T13:53:03+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-08-17T00:00:00+02:00", "dTimDiaHoleStart": "2008-08-15T10:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Perform space out of tubing. Pull back and install space out joints/pups. MU tubing hanger assy. Terminate CL. MU communication collar and TH RT. RIH, land and test TH. Perform low pressure tubing leak test and function test of TRSCSSV. Set production packer and leak test tubing. Inflow test TRSCSSV. Test annulus.", "hpht": "0", "md": "3792", "mdCsgLast": "3790.1", "mdDiaHoleStart": "3792", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "48", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "RIH with 7\" tubing from 1330 to 2306 m. MU TRSCSSV. Connected and leak tested control line to 520 bar/10 min. RIH with 7\" tubing and TRSCSSV CL from 2306 m to 2657 m. ", "tightWell": "0", "tvd": "3247", "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[ { "dTim": "2008-08-16T16:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "3793", "mudClass": "other", "presBopRating": "345", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "RIH with 7\" tubing from 891 m to 1330 m. Running speed was 6-8 jnts/hr.\n\nChanged boxes on 2 jnts and rejecting 2 jnts.", "dTimEnd": "2008-08-16T06:00:00+02:00", "dTimStart": "2008-08-16T00:00:00+02:00", "md": "1330", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 7\" tubing from 1330 m to 2304 m. Running speed was 7-8 jnts/hr. \n\nA total of 4.0 hrs was used changing boxes on 5 jnts and rejecting 5 joints. Inspected joints on deck and found 5 jnts with potential damaged box end.Serviced and greased csg tong and elevator.", "dTimEnd": "2008-08-16T21:15:00+02:00", "dTimStart": "2008-08-16T06:00:00+02:00", "md": "2304", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to lifting in DHSV assembly. PU and MU DHSV assembly. RIH with DHSV assy through rotary and installed one joint above DHSV. PU DHSV to working height. RU sheave wheel in tugger and stabilized using aft PRS. Flushed and connected control line.", "dTimEnd": "2008-08-17T00:00:00+02:00", "dTimStart": "2008-08-16T21:15:00+02:00", "md": "2306", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2008_08_18
NO 15/9-F-5
NO 15/9-F-5
name
2008-08-17T00:00:00+02:00
2008-08-18T00:00:00+02:00
normal
2018-05-03T13:53:03+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-08-18T00:00:00+02:00", "dTimDiaHoleStart": "2008-08-17T13:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Test A-annulus to 380 bar. Run BPV and set in TH. POOH and LD landing string and TH running tool. ND diverter, BOP and surface riser. Install dart in BPV.", "hpht": "0", "md": "3792", "mdCsgLast": "3790.1", "mdDiaHoleStart": "3792", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "49", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Performed space out of tubing. Pulled back and installed space out joints/pups. MU tubing hanger assy. Terminated CL. MU communication collar and TH RT. RIH, land and test TH. Performed low pressure tubing leak test and function tested TRSCSSV. Sat production packer and leak tested tubing to 380 bar/15 min. Inflow tested TRSCSSV to 320 bar/30 min. RU to test annulus.", "tightWell": "0", "tvd": "3247", "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[ { "dTim": "2008-08-17T16:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "3793", "mudClass": "other", "presBopRating": "345", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Tested CL to 520 bar/10 min. Ok. Bled down pressure to zero. 240 ml bled back. Pressured up CL to 345 bar to keep DHSV open. Isolated PS30 slips guide insert and made final adjustments to position slips and sheave in derrick.", "dTimEnd": "2008-08-17T01:00:00+02:00", "dTimStart": "2008-08-17T00:00:00+02:00", "md": "2306", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 7\" tubing, TRSCSSV CL and clamps from 2306 m to 2657 m. Running speed was 6 jnts/hr. Kept 345 bar on CL to maintain DHSV open while RIH.", "dTimEnd": "2008-08-17T06:00:00+02:00", "dTimStart": "2008-08-17T01:00:00+02:00", "md": "2648", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 7\" tubing, TRSCSSV CL and clamps from 2657 m to 2758 m. Running speed was 6 jnts/hr. Kept 345 bar on CL to maintain DHSV open while RIH. Performed final count of tubing jnts. Moved HTS and rollers.", "dTimEnd": "2008-08-17T08:00:00+02:00", "dTimStart": "2008-08-17T06:00:00+02:00", "md": "2758", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed swedge and space-out stand and made up to TDS. Started to circulate 200 lpm using mud pump. RIH with space-out string and stung into top of liner at 2812 m. Sat down 5 MT. Measured distance from top of tubing to mark on space-out string to be 39.25 m.", "dTimEnd": "2008-08-17T11:15:00+02:00", "dTimStart": "2008-08-17T08:00:00+02:00", "md": "2812", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "PU and MU selected jnt and pup-jnts according to calculated space-out.", "dTimEnd": "2008-08-17T13:45:00+02:00", "dTimStart": "2008-08-17T11:15:00+02:00", "md": "2812", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed from PS30 to master bushings. PU tubing hanger with handling tool and MU to last jnt of tubing sitting in the slips. Secured control lines with a clamp on upper tubing coupling. Lowered TH down to working height.", "dTimEnd": "2008-08-17T16:00:00+02:00", "dTimStart": "2008-08-17T13:45:00+02:00", "md": "2812", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cut CL 3 m above TH and fed CL through TH swagelok fittings. All spare penetrations was plugged onshore. MU fittings and leak tested all penetrations/fittings through 1/8\" test port 35/380 bar 5/10 min using BOT pump. Ok. Installed C-plate and landed off TH. BO handling tool and LO same. Wrapped CL 3 times around hanger neck.", "dTimEnd": "2008-08-17T19:00:00+02:00", "dTimStart": "2008-08-17T16:00:00+02:00", "md": "2812", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed communication collar onto TH by rotating 5 turns clockwise. Connected DHSV CL to 1/4\" communication port at btm of communication collar. MU THRT to communication collar using 8 turns counter clockwise.", "dTimEnd": "2008-08-17T19:30:00+02:00", "dTimStart": "2008-08-17T19:00:00+02:00", "md": "2812", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Connected DHSV CL to 1/4\" communication port on top of THRT. Connected hydraulic test pump and pressure tested DHSV CL to 570 bar/10 min. Ok. Bled back 420 ml. Connected THRT lock/unlock lines from Vetco reel to THRT. Left 570 bar in DHSV CL while RIH.", "dTimEnd": "2008-08-17T20:00:00+02:00", "dTimStart": "2008-08-17T19:30:00+02:00", "md": "2812", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "PU C-plate and RIH with TH. Cleared rig floor of excess equipment. PU and MU landing jnts. Up weight 180 MT/down weight 135 MT. RIH with TH. Tagged top of liner with 5 MT. Made 3 shifts with ratcheting muleshoe before stung into liner PBR and landed TH on no-go shoulder in multibowl. Slacked off weight until fully landed out. \n\nVerified correct TH land off and TH seal integrity by leak testing through port #1 and #2 on multibowl to 70 bar/5 min. Bled off pressure in all CLs. Pressured up function line to 3000 psi to engage TH lock down ring. Performed pull test on TH to 15 MT to verify hanger lock down.", "dTimEnd": "2008-08-17T21:45:00+02:00", "dTimStart": "2008-08-17T20:00:00+02:00", "md": "20.4", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressure tested TH seal through test port #2 in multibowl to 35/380 bar for 5/10 min. Ok.\n\nMeanwhile lined up from cmt unit to well and flushed lines.", "dTimEnd": "2008-08-17T23:00:00+02:00", "dTimStart": "2008-08-17T21:45:00+02:00", "md": "20.4", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed line test aginst lo-torque valve on pump-in sub to 380 bar/10 min. Dropped 1.7 bar/10 min. 85 ltrs pumped. Opened lo-torque valve. Pressured up to 50 bar/5 min to check for pressure integrity prior to setting packer. Ok. 550 ltrs pumped due to tubing drained when landing TH.", "dTimEnd": "2008-08-18T00:00:00+02:00", "dTimStart": "2008-08-17T23:00:00+02:00", "md": "20.4", "phase": "fixed", "proprietaryCode": "completion -- test scsssv", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2008_08_19
NO 15/9-F-5
NO 15/9-F-5
name
2008-08-18T00:00:00+02:00
2008-08-19T00:00:00+02:00
normal
2018-05-03T13:53:03+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-08-19T00:00:00+02:00", "dTimDiaHoleStart": "2008-08-17T13:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Continue installing spacer spool. Waiting for production to shut down - coordinated towards Sleipner.", "hpht": "0", "md": "3792", "mdCsgLast": "3790.1", "mdDiaHoleStart": "3792", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "50", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Tested A-annulus to 380 bar. Ran BPV and sat in TH. POOH and LD landing string and TH running tool. ND diverter, BOP and surface riser. Retrieved surface riser and lifted down space spool using double lift. Installed dart in BPV. Removed communication collar, terminated CLs and installed seals for XMT. Installed space spool. ", "tightWell": "0", "tvd": "3247", "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[ { "dTim": "2008-08-18T16:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "3793", "mudClass": "other", "presBopRating": "345", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Closed DHSV and bled off above to 5 bar above. 120 ltrs bled back indicating DHSV not closed. Opened DHSV and pressured up and equalized above to 50 bar. 120 ltrs pumped. Observed drop in pressure on BOT pump indicating DHSV open, but had only 280 ml bled back. Repeated sequenze 2 more times before we got good indication that DHSV was fully open and had 220 ltrs bled back.\n\nRepeated function test of DHSV. Closed DHSV and bled off above to 5 bar. 80 ltrs bled back. Observed for 10 min to confirm that DHSV was fully closed and not leaking. Ok. Opened DHSV and pressured up and equalized above to 50 bar. 80 ltrs pumped. Observed drop in pressure on BOT pump indicating DHSV open. Bled off pressure down to 5 bar. 220 ltrs bled back.", "dTimEnd": "2008-08-18T02:15:00+02:00", "dTimStart": "2008-08-18T00:00:00+02:00", "md": "20.4", "phase": "fixed", "proprietaryCode": "completion -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressured up tubing from 5 bar to 380 bar. 1386 ltrs pumped. Kept 570 bar on DHSV CL. Held pressure for 15 min to set packer and test tubing. Ok. Had 1.3 bar drop. \n\nObserved load vibration noise on rig floor when pressure reached 260 bar. Investigated TH and all well head levels. No findings.\n\nBled off tubing pressure and observed pressure dropped immediately to zero. Concluded that lead target blocked cmt line. This was in accordance with observed noise. Bled off tubing pressure carefully to zero. Had 1360 ltrs bled back.", "dTimEnd": "2008-08-18T03:30:00+02:00", "dTimStart": "2008-08-18T02:15:00+02:00", "md": "20.4", "phase": "fixed", "proprietaryCode": "completion -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up through cmt kill line. Performed line test 30/380 bar for 5/10 min. Had 1.4 bar drop.", "dTimEnd": "2008-08-18T04:00:00+02:00", "dTimStart": "2008-08-18T03:30:00+02:00", "md": "20.4", "phase": "fixed", "proprietaryCode": "completion -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressured up tubing to 330 bar while keeping 570 bar on DHSV CL. 1157 ltrs pumped. Closed DHSV and bled off pressure above DHSV to 260 bar. 20 ltrs bled off. Inflow tested DHSV to 70 bar diff/15 min. Had 1.3 bar drop.\n\nBled off pressure above DHSV to 10 bar. 140 ltrs bled back. Inflow tested DHSV to 320 bar diff / 30 min. Had 0.1 bar increase. Equalized pressure by pressuring up to 330 bar above DHSV and opened DHSV. 220 ltrs pumped. Bled off pressure in tubing to zero and kept DHSV open with 570 bar. 1000 ltrs bled back.", "dTimEnd": "2008-08-18T05:30:00+02:00", "dTimStart": "2008-08-18T04:00:00+02:00", "md": "20.4", "phase": "fixed", "proprietaryCode": "completion -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up cmt unit to A-annulus, with hose connected to multibowl and tested RU to 35/380 bar for 5/10 min against annulus valve. Vented B-annulus.", "dTimEnd": "2008-08-18T06:00:00+02:00", "dTimStart": "2008-08-18T05:30:00+02:00", "md": "20.4", "phase": "fixed", "proprietaryCode": "completion -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed line test to A-annulus to 35/380 bar for 5/10 min against annulus valve using packer fluid. High pressure test dropped 1 bar in 10 min. Opened B-annulus to vent.", "dTimEnd": "2008-08-18T06:30:00+02:00", "dTimStart": "2008-08-18T06:00:00+02:00", "md": "20.4", "phase": "fixed", "proprietaryCode": "completion -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressured up A-annulus to leak test packer from below and TH from below to 35/380 bar for 5/10 min pumping brine at 70 lpm. Kept tubing open on drill floor and 570 bar on TRSCSSV CL. Pumped 117 ltrs and observed 0.01 bar drop on low pressure test. Pumped 1170 ltrs (total) and observed 0.5 bar drop on high pressure test. Had flow on both tubing and B-annulus while pressuring up A-annulus due to ballooning effect. No flow observed when pumps was shut in. Bled pressure down to zero and had 1100 ltrs in return. Bled off and shut in A and B-annulus. Closed TRSCSSV. Had leak in FWD PRS.", "dTimEnd": "2008-08-18T09:15:00+02:00", "dTimStart": "2008-08-18T06:30:00+02:00", "md": "20.4", "phase": "fixed", "proprietaryCode": "completion -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Worked at hight and repaired hydraulic leak in FWD PRS.", "dTimEnd": "2008-08-18T10:00:00+02:00", "dTimStart": "2008-08-18T09:15:00+02:00", "md": "20.4", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held tool box meeting. Released landing string by 9 right hand turns. POOH and LD landing string.", "dTimEnd": "2008-08-18T12:00:00+02:00", "dTimStart": "2008-08-18T10:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RD Odfjell csg tong and control box. RD tubing handling equipment.", "dTimEnd": "2008-08-18T13:15:00+02:00", "dTimStart": "2008-08-18T12:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box meeting. Changed to 5 1/2\" handling equipment. PU and MU XO 5 1/2\" FH box x 3 1/2\" IF box to centralizer / BPV running adaptor / BPV. RIH and landed BPV on 5 1/2\" DP in TH at 20.3 m. Sat down string weight to extend locking keys and energized seals. Rotated string 8 1/2\" turns clockwise to lock mandrel and free running adaptor in J-slot. POOH with running string and LD RT.\n", "dTimEnd": "2008-08-18T15:45:00+02:00", "dTimStart": "2008-08-18T13:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "PU 2 joints of 5 1/2\" HWDP and RIH and drained riser. LO jnts.\n\nMeanwhile cleared rig floor of CL wheel, protectors and x-overs. Prepared slings for diverter and double lift for surface riser.", "dTimEnd": "2008-08-18T18:00:00+02:00", "dTimStart": "2008-08-18T15:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk. Attached slings to slick joint. Prepared barriers, handrails and slings. Pulled diverter and secured in set back area. Installed outer ring and master bushings. Loosened nuts on slick joint. Disconnected tension cylinders in WH module. Pulled slick joint and secured in set back area. ND NT2 connection on BOP and sat on stump.", "dTimEnd": "2008-08-19T00:00:00+02:00", "dTimStart": "2008-08-18T18:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2008_08_20
NO 15/9-F-5
NO 15/9-F-5
name
2008-08-19T00:00:00+02:00
2008-08-20T00:00:00+02:00
normal
2018-05-03T13:53:04+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-08-20T00:00:00+02:00", "dTimDiaHoleStart": "2008-08-19T03:15:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Waiting for production to shut down - coordinated towards Sleipner, operations transferred to F-99. Estimated start up 21th of August at 24:00.", "hpht": "0", "md": "3792", "mdCsgLast": "3790.1", "mdDiaHoleStart": "3792", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "51", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Continued installing spacer spool. Waited for production to shut down - coordinated towards Sleipner, operations transferred to F-99.", "tightWell": "0", "tvd": "3247", "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[ { "dTim": "2008-08-19T16:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "3793", "mudClass": "other", "presBopRating": "345", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Continued setting BOP on stump.", "dTimEnd": "2008-08-19T00:15:00+02:00", "dTimStart": "2008-08-19T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Connected slings to riser joint and removed scaffolding on NT2 connection in moonpool.", "dTimEnd": "2008-08-19T02:00:00+02:00", "dTimStart": "2008-08-19T00:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Disconnected NT2 connector on riser joint and pulled riser jnt to rig floor using double lift. Installed master bushings on rig floor and hatch on weather deck. LD riser joint.", "dTimEnd": "2008-08-19T03:15:00+02:00", "dTimStart": "2008-08-19T02:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Disconnected control lines from communication collar and hoisted same to rig floor through hole in half-moon hatch in moonpool. Installed anti vibration ring on TH. Removed one control line exit block on multi bowl. Unwrapped required length of CL around TH neck and fed control line through dedicated port on multi bowl. Fed high pressure packings and fittings onto CL and MU fittings to threads in multi bowl. Installed dart in BPV in TH by hand. Installed 137 VG seal ring on top of multi bowl and VG 63 seal ring on top of TH.", "dTimEnd": "2008-08-19T05:00:00+02:00", "dTimStart": "2008-08-19T03:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed master bushings on rig floor and one half-moon of hatch in moonpool. Lowered spacer spool down from rig floor with TDS and 6 MT tugger (dual lift) until NT2 box connector landed out on top of WH. MU locking dogs until connection leveled out. MU actuation screws with 800 ft-lbs.", "dTimEnd": "2008-08-19T06:00:00+02:00", "dTimStart": "2008-08-19T05:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued MU actuation screws with 800 ft-lbs. Disconnected slings and removed same. \n\nPressure tested and energized BT seals through ports 7/8. Tested VG 63 connection trough test port 9/10 to 35 bar/5 min.\n\nTested TH void, grafoil seals and BT seals 35/380 bar for 5/10 min via test port 5/6.\n\nMU ferrule swagelock fittings for CL. Installed seal rings and CL exit block. Installed seal ring on top of spacer spool.\n\nMeanwhile cleaned cantiliver before laying out 7 5/8\" tubing.\n\n*** Operations transferred to F-99 ***", "dTimEnd": "2008-08-19T07:30:00+02:00", "dTimStart": "2008-08-19T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- test scsssv", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2008_08_22
NO 15/9-F-5
NO 15/9-F-5
name
2008-08-21T00:00:00+02:00
2008-08-22T00:00:00+02:00
normal
2018-05-03T13:53:04+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-08-22T00:00:00+02:00", "dTimDiaHoleStart": "2008-08-21T19:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Test XMT to 380 bar/10 min and flowline to 345 bar/10 min. Inflow test MMV and HMV. Pull dart and BPV. Install and test tree cap. Commision XMT.", "hpht": "0", "md": "3792", "mdCsgLast": "3790.1", "mdDiaHoleStart": "3792", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "52", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Resumed work after waiting for production to shut down F-12, F-14 and F-4 at 19:30 hrs. Lifted, oriented and landed XMT from moon pool to top of spacer spool. Installed flow line spool onto XMT. Connected up flexible flow line. Filled XMT with drill water and tested to 380 bar/10 min", "tightWell": "0", "tvd": "3247", "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[ { "dTim": "2008-08-21T16:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "3173", "mudClass": "other", "presBopRating": "345", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Removed F-5 hatch on weather deck to allow XMT to pass through. Held tool box meeting. Lifted XMT over moon pool with port overhead crane. Transferred weight (XMT) from overhead crane to top drive (TDS). Lowered XMT down through weather deck hatch. Oriented and landed XMT on top of spacer spool. MU grayloc connection and disconnected slings from XMT. Pressure tested seal ring to 35 bar/10 min through test port #3 and #4 on spacer spool to confirm proper seal.\n\nMeanwhile prepared WL equipment and cleaned inside cantiliver and in pump room.", "dTimEnd": "2008-08-21T21:30:00+02:00", "dTimStart": "2008-08-21T19:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed flow line spool onto XMT using 6 MT tugger from rig floor. Re-installed hatches on F-5. Notified PCR for injection start up of F-4.\n\nMeanwhile MU and RB 1 stds of 7 5/8\" csg (A total of 9 stds made up), prepared WL equipment and cleaned inside cantiliver and in pump room.", "dTimEnd": "2008-08-21T22:30:00+02:00", "dTimStart": "2008-08-21T21:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Connected flexible flow line to flow line spool.\n\nMeanwhile MU and RB 4 stds of 7 5/8\" csg (A total of 12 stds made up), prepared WL equipment and cleaned inside cantiliver and in pump room.", "dTimEnd": "2008-08-22T00:00:00+02:00", "dTimStart": "2008-08-21T22:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2008_08_23
NO 15/9-F-5
NO 15/9-F-5
name
2008-08-22T00:00:00+02:00
2008-08-23T00:00:00+02:00
normal
2018-05-03T13:53:04+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-08-23T00:00:00+02:00", "dTimDiaHoleStart": "2008-08-21T19:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Continue commision XMT, LD 3 1/2\" DP and RU WL equpment.", "hpht": "0", "md": "3792", "mdCsgLast": "3790.1", "mdDiaHoleStart": "3792", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "53", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Tested XMT to 380 bar/10 min and flowline to 345 bar/10 min. Inflow tested MMV and HMV. Pulled dart and BPV. RU WL while commisioning XMT.", "tightWell": "0", "tvd": "3247", "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[ { "dTim": "2008-08-22T16:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "3173", "mudClass": "other", "presBopRating": "345", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Connected flexible flow line to flow line spool.\n\nMeanwhile MU and RB 7 stds of 7 5/8\" csg (A total of 19 stds made up), lifted WL BOP's into moonpool and cleaned inside cantiliver and in pump room.", "dTimEnd": "2008-08-22T04:15:00+02:00", "dTimStart": "2008-08-22T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened HMV with Seawell test pump. Held tool box talk. Lined up from cmt unit and connected hose on KWV. Performed line test to 30/380 bar for 5/10 min against KWV. 3.0 bar drop (0.8%) on high pressure test .\n", "dTimEnd": "2008-08-22T06:00:00+02:00", "dTimStart": "2008-08-22T04:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressure tested XMT body and VG 63 ring to 30/380 bar for 5/10 min against dart in BPV. 2.0 bar (0.5%) drop on high pressure test. 50 ltrs pumped and approx 40 ltrs bled back.", "dTimEnd": "2008-08-22T06:45:00+02:00", "dTimStart": "2008-08-22T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attempted to flush flowline through XMT by pumping pot water from production, but had installed check valve in front of hose from cmt unit to KWV. Removed CV and lined up from cmt unit to KWV. Performed line test to 30/380 bar for 5/10 min against KWV. 3.0 bar drop (0.8%) on high pressure test.", "dTimEnd": "2008-08-22T08:00:00+02:00", "dTimStart": "2008-08-22T06:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Open PWV. Flushed through flowline, PWV, XMT, KWV to cmt unit from production with pot water.", "dTimEnd": "2008-08-22T10:30:00+02:00", "dTimStart": "2008-08-22T08:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressure tested flowline/XMT to 30/345 bar for 5/10 min. 3.6 bar (1.0%) drop on high pressure test. 95 ltrs pumped and 90 ltrs bled back.", "dTimEnd": "2008-08-22T11:00:00+02:00", "dTimStart": "2008-08-22T10:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressured up to 130 bar against BPV & dart. Close MMV and bled off pressure above MMV to 10 bar. Inflow tested MMV to 120 bar differential pressure for 15 min. Test ok.\n\nEqualized pressure above MMV. Opened MMV and closed HMV. Bled of any pressure above HMV to 10 bar. Inflow test HMV to 120 bar differential pressure for 15 min. Test ok.\n\nEqualized pressure across HMV. Opened HMV. Bled off pressure. Closed valves. \n\nPressure tested BOT control line exit block for DHSV to 570 bar/15 min using BOT pump. Test ok. Closed DHSV. Bled off 335 ml on line.", "dTimEnd": "2008-08-22T13:30:00+02:00", "dTimStart": "2008-08-22T11:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Built scaffolding around XMT. Opened HMV. RIH with retrieving tool for dart on stinger and retrieved dart. POOH with dart. Pulled BPV from TH. Closed HMV and SV. Closed PWV, KWV and MMV.", "dTimEnd": "2008-08-22T15:45:00+02:00", "dTimStart": "2008-08-22T13:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Commisioned F-5 XMT.\n\nMeanwhile installed WL BOP's (tripple BOP below dual BOP). Built scaffolding around WL BOP's and installed riser sections to rig floor.", "dTimEnd": "2008-08-22T20:00:00+02:00", "dTimStart": "2008-08-22T15:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Commisioned F-5 XMT.\n\nMeanwhile LD 3 1/2\" DP, installed BOP rams and cleaned lower shakers and moon pool area. Torture-tested 7/16\" cable and cut off 1000 m.", "dTimEnd": "2008-08-23T00:00:00+02:00", "dTimStart": "2008-08-22T20:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2008_08_24
NO 15/9-F-5
NO 15/9-F-5
name
2008-08-23T00:00:00+02:00
2008-08-24T00:00:00+02:00
normal
2018-05-03T13:53:04+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-08-24T00:00:00+02:00", "dTimDiaHoleStart": "2008-08-23T22:15:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "RIH and perforate run #1. POOH. LD gun. MU and RIH to perforate #2. ", "hpht": "0", "md": "3792", "mdCsgLast": "3790.1", "mdDiaHoleStart": "3792", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "54", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Continued commision XMT, LD 3 1/2\" DP and RU WL equpment until 22:15. Pressure tested WL rig up. MU and armed perforation guns.", "tightWell": "0", "tvd": "3247", "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[ { "dTim": "2008-08-23T16:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "3792", "mudClass": "other", "presBopRating": "345", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Commisioned F-5 XMT.\n\nMeanwhile LD 3 1/2\" DP (16 of 31 stds layed down), installed BOP rams and cleaned lower shakers and moon pool area. Built rope socket/cable head on 7/16\" cable.", "dTimEnd": "2008-08-23T06:00:00+02:00", "dTimStart": "2008-08-23T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Commisioned F-5 XMT.\n\nMeanwhile LD 3 1/2\" DP (31 stds layed down) and cleaned lower shakers and moon pool area. Held TOFS due to dropped 3 1/2\" DP in fox hole. Tested perforation toolstring and prepared WL equipment. Bundled up and removed 3 1/2\" DP from cantiliver for backload.", "dTimEnd": "2008-08-23T17:00:00+02:00", "dTimStart": "2008-08-23T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Commisioned F-5 XMT.\n\nMeanwhile spotted equipment on rig floor and RU WL lubricator, grease skid, nitrogen rack and local control panel. Hot-checked perforation toolstring. Prepared for pressure testing WL rig up.", "dTimEnd": "2008-08-23T22:15:00+02:00", "dTimStart": "2008-08-23T17:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to pressure testing WL rig up and prior to making up guns.", "dTimEnd": "2008-08-23T22:45:00+02:00", "dTimStart": "2008-08-23T22:15:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Hooked up local control of DHSV and HMV on XMT. Removed hydraulic tube from HMV and drained hydraulic fluid. Hooked up DHSV control hose on XMT. Hooked up HMV control hose.\n\nMeanwhile lined up to fill riser and lubricator with cmt unit. Lifted toolstring into toolcatcher and MU lubricator to lower riser.", "dTimEnd": "2008-08-24T00:00:00+02:00", "dTimStart": "2008-08-23T22:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2008_08_25
NO 15/9-F-5
NO 15/9-F-5
name
2008-08-24T00:00:00+02:00
2008-08-25T00:00:00+02:00
normal
2018-05-03T13:53:04+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-08-25T00:00:00+02:00", "dTimDiaHoleStart": "2008-08-23T22:15:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "LD guns. RIH and perforate run #3. POOH. RD WL equipment.", "hpht": "0", "md": "3792", "mdCsgLast": "3790.1", "mdDiaHoleStart": "3792", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "55", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "RIH and perforated run #1. POOH. LD gun. RIH and perforated run #2. POOH.", "tightWell": "0", "tvd": "3247", "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[ { "dTim": "2008-08-24T16:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "3792", "mudClass": "other", "presBopRating": "345", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Tested DHSV local control hose to 520 bar - ok. Tested HMV local control hose to 207 bar - ok.", "dTimEnd": "2008-08-24T00:15:00+02:00", "dTimStart": "2008-08-24T00:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened SV and and verified line up by opening KWV with 10 bar on the line. Filled riser and lubricator with packer fluid using cmt pump. Closed KWV. Leak tested line from cement pump to KWV to 30/200 bar for 5/10 min against cloed KWV using packer fluid. 1.9 bar (0.95%) drop on high pressure test. 20 ltrs pumped.", "dTimEnd": "2008-08-24T01:00:00+02:00", "dTimStart": "2008-08-24T00:15:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attempted to leak test WL rig up to 30 bar/5 min, but had visual leak between two lubricator sections. Changed O-ring in leaking connection without laying down lubricator. Leak tested WL rig up to 30/200 bar for 5/10 min using packer fluid and cmt pump. 1.8 bar (0.9%) drop on high pressure test. 30 ltrs pumped and bled back. Bled off pressure to closed drain. Closed SV and KWV.", "dTimEnd": "2008-08-24T03:15:00+02:00", "dTimStart": "2008-08-24T01:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened MMV using 42 turns. Opened HMV by applying 207 bar on CL using local control panel. Equalized above DHSV in steps up to 15 bar (60 ltrs pumped) and opened DHSV by applying 520 bar on CL using local control panel. Closed HMV and broke off lubricator at in-situ sub.", "dTimEnd": "2008-08-24T04:00:00+02:00", "dTimStart": "2008-08-24T03:15:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Perforation run #1: Lowered orientating weight and 30 ft gun section into lower riser section and hung off in C-plate. Connected and armed perforating guns according to Schlumberger procedure.", "dTimEnd": "2008-08-24T06:00:00+02:00", "dTimStart": "2008-08-24T04:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Perforation run #1: Connected lubricator and re-routed tugger on lubricator due to twist with wireline sheave wheel.", "dTimEnd": "2008-08-24T08:00:00+02:00", "dTimStart": "2008-08-24T06:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Leak tested in-situ sub to 30/200 bar for 5/10 min with Seawell test pump. Ok. Observed leak in XMT instrumentation piping. Installed temporary fitting.", "dTimEnd": "2008-08-24T08:45:00+02:00", "dTimStart": "2008-08-24T08:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened HMV and observed 0 bar WHP. Verified TRSCSSV was open. Opened SV and RIH with 4.5\" TCP guns on 7/16\" electric line from surface to 3731 m MD. Up weight 1225 kg / Running weight 1170 kg at 450 m.", "dTimEnd": "2008-08-24T11:30:00+02:00", "dTimStart": "2008-08-24T08:45:00+02:00", "md": "3731", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Bled 52 bar WHP down to zero through closed drain. Correlated guns to shooting depth using GR. Hanging weight 2350 kg. Fired guns and perforated interval #1 from 3704.0 m to 3712.0 m MD. Positiv confirmation that guns had fired, but observed no increase in WHP.", "dTimEnd": "2008-08-24T14:15:00+02:00", "dTimStart": "2008-08-24T11:30:00+02:00", "md": "3731", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH and logged GR/CCL from 3700 m to 2809.5 m to top of liner (TOL). POOH with 4.5\" TCP perforation guns from 2809.5 m to OOH. Powered down logging unit at 70 m below seabed. Made PA announcement and pulled cable head into tool catcher. Closed SV to verify BHA OOH.", "dTimEnd": "2008-08-24T17:30:00+02:00", "dTimStart": "2008-08-24T14:15:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed HMV. Observed no WHP. Opened bleed to closed drain as a precaution. Opened needle valve and confirmed that lubricator was empty and that the well was on vacuum.\n\nBroke lubricator at in-situ sub. BO and LD guns using sertified lifting sub. Observed that all shots had fired.", "dTimEnd": "2008-08-24T19:45:00+02:00", "dTimStart": "2008-08-24T17:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Perforation run #2: Megged and inspected cable. Built and tested new cable head. Checked CCL on rig floor. Shut down power to Schlumberger unit according to procedure before MU perforation gun.", "dTimEnd": "2008-08-24T21:00:00+02:00", "dTimStart": "2008-08-24T19:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "PU gun sections from cantiliver onto HTS. Lifted guns into riser using fwd PRS. MU firing head and CAL-B to gun hung off in riser and armed gun. PU toolstring and lifted into toolcatcher. Connected and hung off orientation weight and second gun sections in C-plate. Connected upper toolstring to guns hanging in toolcatcher. PU tension on toolstring and took off C-plate.\n", "dTimEnd": "2008-08-24T23:15:00+02:00", "dTimStart": "2008-08-24T21:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Connected lubricator and filled with MEG. Tested in-situ sub to 30/200 bar for 5/10 min with Seawell test pump. Ok. Opened HMV and observed 0.1 WHP. Verified TRSCSSV was open. Opened SV. RIH with 4.5\" guns to 70 m below seabed and powered up logging unit.", "dTimEnd": "2008-08-25T00:00:00+02:00", "dTimStart": "2008-08-24T23:15:00+02:00", "md": "250", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2008_08_26
NO 15/9-F-5
NO 15/9-F-5
name
2008-08-25T00:00:00+02:00
2008-08-26T00:00:00+02:00
normal
2018-05-03T13:53:04+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-08-26T00:00:00+02:00", "dTimDiaHoleStart": "2008-08-23T22:15:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Continue RD WL equipment. Test XMT tree cap and KWV to 35/380 bar for 5/10 min. Hand over well to production. Continue operation on F-9.", "hpht": "0", "md": "3792", "mdCsgLast": "3790.1", "mdDiaHoleStart": "3792", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "56", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "LD guns. RIH and perforate run #3. POOH. Spotted 3 m3 100% MEG on top of DHSV. Inflow tested A-annulus gate valve to 380-5 bar for 30 min. RD WL lubricator, risers and BOP's.", "tightWell": "0", "tvd": "3247", "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[ { "dTim": "2008-08-25T16:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "3792", "mudClass": "other", "presBopRating": "345", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "RIH with 4.5\" TCP guns on 7/16\" electric line from 250 to 3731 m MD. Up weight 25000 kg / Running weight 1550 kg.", "dTimEnd": "2008-08-25T02:45:00+02:00", "dTimStart": "2008-08-25T00:00:00+02:00", "md": "3730", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Bled 52 bar WHP down to 2 bar through closed drain. Correlated guns to shooting depth using CCL. Hanging weight 2500 kg. Fired guns and perforated interval #2 from 3682.0 m to 3700.5 m MD. Positiv confirmation that guns had fired, tension dropped 50 kg and WHP dropped to 0.5 bar.", "dTimEnd": "2008-08-25T03:45:00+02:00", "dTimStart": "2008-08-25T02:45:00+02:00", "md": "3730", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with 4.5\" TCP perforation guns from 3680 m to OOH. Powered down logging unit at 70 m below seabed. Made PA announcement and pulled cable head into tool catcher. Closed SV to verify BHA OOH. Closed HMV. Observed no WHP. Opened bleed to closed drain as a precaution. Opened needle valve and confirmed that lubricator was empty and that the well was on vacuum.\n", "dTimEnd": "2008-08-25T06:00:00+02:00", "dTimStart": "2008-08-25T03:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke lubricator at in-situ sub. BO and LD guns using sertified lifting sub. Observed that all shots had fired.", "dTimEnd": "2008-08-25T08:15:00+02:00", "dTimStart": "2008-08-25T06:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Perforation run #3: Megged and inspected cable. Built and tested new cable head. Checked CCL on rig floor. Shut down power to Schlumberger unit according to procedure before MU perforation", "dTimEnd": "2008-08-25T09:45:00+02:00", "dTimStart": "2008-08-25T08:15:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "PU gun sections from cantiliver onto HTS. Lifted guns into riser using fwd PRS. MU firing head and CAL-B to gun hung off in riser and armed gun. PU toolstring and lifted into toolcatcher. Connected and hung off orientation weight and second gun sections in C-plate. Connected upper toolstring to guns hanging in toolcatcher. PU tension on toolstring and took off C-plate.", "dTimEnd": "2008-08-25T11:45:00+02:00", "dTimStart": "2008-08-25T09:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Connected lubricator and filled with MEG. Tested in-situ sub to 30/200 bar for 5/10 min with Seawell test pump. Ok. Opened HMV and observed 0 WHP. Verified TRSCSSV was open. Opened SV. RIH with 4.5\" guns to 70 m below seabed and powered up logging unit.", "dTimEnd": "2008-08-25T13:15:00+02:00", "dTimStart": "2008-08-25T11:45:00+02:00", "md": "250", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 4.5\" TCP guns on 7/16\" electric line from 250 to 3730 m MD. Up weight 2500 kg / Running weight 1550 kg.", "dTimEnd": "2008-08-25T16:15:00+02:00", "dTimStart": "2008-08-25T13:15:00+02:00", "md": "3730", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Confirmed no WHP. Correlated guns to shooting depth using CCL. Hanging weight 2500 kg. Fired guns and perforated interval #3 from 3651.5 m to 3670.0 m MD. Positiv confirmation that guns had fired, tension dropped 50 kg.", "dTimEnd": "2008-08-25T17:15:00+02:00", "dTimStart": "2008-08-25T16:15:00+02:00", "md": "3730", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with 4.5\" TCP perforation guns from 3650 m to OOH. Powered down logging unit at 70 m below seabed. Made PA announcement and pulled cable head into tool catcher. Closed SV to verify BHA OOH. Closed HMV. Observed no WHP. Opened bleed to closed drain as a precaution. Opened needle valve and confirmed that lubricator was empty and that the well was on vacuum.", "dTimEnd": "2008-08-25T20:00:00+02:00", "dTimStart": "2008-08-25T17:15:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened HMV and observed 0 WHP. Verified TRSCSSV was open. Opened KWV. Pumped /bullheaded 3 m3 100% MEG at 100 lpm and 4-5 bar into well with cmt pump to provide cusion above closed TRSCSSV. Displaced MEG to above TRSCSSV by chasing it with 6.6 m3 packer fluid at 160 lpm and 5-6 bar. Pumped 1.2 m3 100% MEG to fill XMT body. \n", "dTimEnd": "2008-08-25T22:15:00+02:00", "dTimStart": "2008-08-25T20:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed TRSCSSV and HMV. Leak tested XMT cross to 130 bar / 10 min against closed HMV. Dropped 2.0 bar / 10 min (1.5 %). Bled off pressure to zero bar. Closed KWV.", "dTimEnd": "2008-08-25T23:00:00+02:00", "dTimStart": "2008-08-25T22:15:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke lubricator at in-situ sub. BO and LD guns using certified lifting sub. Observed that all shots had been fired", "dTimEnd": "2008-08-26T00:00:00+02:00", "dTimStart": "2008-08-25T23:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2008_08_27
NO 15/9-F-5
NO 15/9-F-5
name
2008-08-26T00:00:00+02:00
2008-08-27T00:00:00+02:00
normal
2018-05-03T13:53:04+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-08-27T00:00:00+02:00", "dTimDiaHoleStart": "2008-08-23T22:15:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Operation transferred to F-9.", "hpht": "0", "md": "3792", "mdCsgLast": "3790.1", "mdDiaHoleStart": "3792", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "57", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Continued RD WL equipment. Tested XMT tree cap and KWV to 35/380 bar for 5/10 min. Handed over well to production at 12:00. ", "tightWell": "0", "tvd": "3247", "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[ { "dTim": "2008-08-26T16:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "3792", "mudClass": "other", "presBopRating": "345", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Continued to LD and observe 4.5\" perforation guns. Changed out firing head with btm nose. Re-stabbed lubricator at in-situ sub.", "dTimEnd": "2008-08-26T00:45:00+02:00", "dTimStart": "2008-08-26T00:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up and leak tested line from cement unit to outer A-annulus valve to 30/380 bar for 5/10 min using packer fluid. 3.6 bar (0.95%) drop on high pressure test. 20 ltrs pumped.\n\nOpened inner and outer A-annulus. Ensured B-annulus was open. Monitored pressure on tubing side on lubricator. Pressured up A-annulus to 380 bar. Closed inner A-annulus valve. Bled off pressure to 5 bar to cmt unit. Inflow tested inner A-annulus valve to 380 bar for 30 min using packer fluid. 0.5 bar increase on test. 1190 ltrs pumped and 1100 ltrs bled back. No leak observed on B-annulus. Vacuum on tubing side. Equalized and opened A-annulus valve. Bled off pressure.", "dTimEnd": "2008-08-26T02:30:00+02:00", "dTimStart": "2008-08-26T00:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RD lubricatoor on rig floor. Disconnected and pulled riser sections above BOP to rig floor.\n\nMeanwhile brushed F-9 subsea wellhead before installing VX-ring.", "dTimEnd": "2008-08-26T04:30:00+02:00", "dTimStart": "2008-08-26T02:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RD hydraulic BOP hoses. Disconnected WL BOP's and transfered to overhead crane in moonpool. \n\nMeanwhile brushed F-9 subsea wellhead before installing VX-ring.", "dTimEnd": "2008-08-26T06:00:00+02:00", "dTimStart": "2008-08-26T04:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued disconnecting WL BOP's and transfering them by overhead crane in moonpool.", "dTimEnd": "2008-08-26T08:00:00+02:00", "dTimStart": "2008-08-26T06:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed manifold from XMT. Installed blind cap outside KWV and XMT tree cap with 1/2\" needle valve on top. RU test hose from needle valve to Seawell test pump. Leak tested XMT cross to 35/380 bar for 5/10 min against KWV cap and XMT cap. Bled off pressure to zero. Closed needle valves and disconnected test pump. Closed KWV and SV.\n\nMeanwhile removed hatch and lifted out UWG reel, WL BOP's and half moon hatches from moonpool to main deck.", "dTimEnd": "2008-08-26T08:45:00+02:00", "dTimStart": "2008-08-26T08:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed hatch on F-5 and continued removing WL equipment from moonpool.\n\nMeanwhile disassembled scaffolding bridges from cantiliver.", "dTimEnd": "2008-08-26T10:45:00+02:00", "dTimStart": "2008-08-26T08:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Transfered operation of HMV and TRSCSSV to platform system/production. Filled in and signed \"Well handover document\" and handed over well from Volve D&W to Mærsk Production at 12:00. \n\nMeanwhile removed scaffolding around moonpool hatch. \n ****************END OF OPERATIONS****************", "dTimEnd": "2008-08-26T12:00:00+02:00", "dTimStart": "2008-08-26T10:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2008_10_06
NO 15/9-F-5
NO 15/9-F-5
name
2008-10-05T00:00:00+02:00
2008-10-06T00:00:00+02:00
normal
2018-05-03T13:53:04+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-10-06T00:00:00+02:00", "dTimDiaHoleStart": "2008-10-05T20:15:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "RU external pumps and chicksan for frac job.", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": null, "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "1", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Waited for supply boat to arrive with frac equipment.", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Top section of fwd PRS moved forward (along top-most track) until drive section released/broke off and fell over to the side, resting against the upper part of the derrick at midnight the 1. October on F-15S. \nF-5 frac job will be performed partly in parallell with Mærsk sorting out the situation with the fwd PRS.", "dTimEnd": "2008-10-05T20:16:12+02:00", "dTimStart": "2008-10-05T20:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared ropes and equipment in derrick to be able to put fwd PRS back in position.\n\nMeanwhile waited for supply boat to arrive with frac equipment. Continued to clear drill floor and perform general maintenance.", "dTimEnd": "2008-10-05T22:00:00+02:00", "dTimStart": "2008-10-05T20:16:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waiting for Westcon climbers to install ropes and equipment in derrick to be able to put fwd PRS back in position. \n\nMeanwhile cleared drill floor and performed general maintenance. Waited for supply boat to arrive with frac equipment.", "dTimEnd": "2008-10-06T00:00:00+02:00", "dTimStart": "2008-10-05T22:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2008_10_07
NO 15/9-F-5
NO 15/9-F-5
name
2008-10-06T00:00:00+02:00
2008-10-07T00:00:00+02:00
normal
2018-05-03T13:53:05+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-10-07T00:00:00+02:00", "dTimDiaHoleStart": "2008-10-05T20:15:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Continue RU external pumps and chicksan for frac job. Erect fwd PRS back in vertical position. Inject barite in 3 remaining compartments in fwd leg and starboard leg.", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": null, "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "2", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Waited for equipment to arrive with supply boat. Westcon climbers installed ropes and equipment in derrick to be able to erect fwd PRS back in vertical position. RU external pumps and chicksan for frac job.", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Waiting for Westcon climbers to install ropes and equipment in derrick to be able to put fwd PRS back in position. \n\nMeanwhile serviced TDS, cleared drill floor and performed general maintenance. Waited for supply boat to arrive with frac equipment.", "dTimEnd": "2008-10-06T06:00:00+02:00", "dTimStart": "2008-10-06T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waiting for Westcon equipment to be unloaded from supply boat to be able to work on fwd PRS. \n\nMeanwhile removed pipe handler and link tilt cylinder on TDS and performed general maintenance. Waited for supply boat to unload frac equipment.", "dTimEnd": "2008-10-06T10:30:00+02:00", "dTimStart": "2008-10-06T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waiting on helicopter operation before entering derrick with Westcon climbers.", "dTimEnd": "2008-10-06T11:15:00+02:00", "dTimStart": "2008-10-06T10:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Spotted Halliburton frac equipment in moonpool.", "dTimEnd": "2008-10-06T11:45:00+02:00", "dTimStart": "2008-10-06T11:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to RU for frac job on F-5. Checked frac equipment and made walkthrough with crew on spotting/rig up. Reviewed plans for rig-up.\n\nMeanwhile Westcon climbers installed ropes and equipment in derrick to be able to put fwd PRS back in position.", "dTimEnd": "2008-10-06T20:30:00+02:00", "dTimStart": "2008-10-06T11:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RU 3\" chicksan line in moonpool. \n\nMeanwhile Westcon climbers installed ropes and equipment in derrick to be able to put fwd PRS back in position.", "dTimEnd": "2008-10-07T00:00:00+02:00", "dTimStart": "2008-10-06T20:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2008_10_08
NO 15/9-F-5
NO 15/9-F-5
name
2008-10-07T00:00:00+02:00
2008-10-08T00:00:00+02:00
normal
2018-05-03T13:53:05+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": ".9", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-10-08T00:00:00+02:00", "dTimDiaHoleStart": "2008-10-05T20:15:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Continue installing 9 1/2\" riser on F-5 XMT and build scaffolding around riser. Erect fwd PRS back in vertical position. Inject barite in 3 remaining compartments in fwd leg and starboard leg. Perform test run, start injection and stabilize well F-5.", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": null, "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "3", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Continued RU external pumps and chicksan for frac job. Pressure tested 9 5/8\" csg on well F-15 to 290 bar/15 min. Lowered 9 1/2\" riser and 3\" chicksan into moonpool. Production closed in F-5 and handed over well to drilling. Installed safety valve on XMT kill side.", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "RU 3\" chicksan line in moonpool. \n\nMeanwhile Westcon climbers installed ropes and equipment in derrick to be able to put fwd PRS back in position. \n", "dTimEnd": "2008-10-07T01:00:00+02:00", "dTimStart": "2008-10-07T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RU hose from production to gizzly pumpes on cantiliver. Started to RU 3\" chicksan line from grizzly pumps down through hatch to moonpool.\n\nMeanwhile cleaned and preserved tension system pad eyes, continued to work on TDS and prepared for barite injection.", "dTimEnd": "2008-10-07T06:00:00+02:00", "dTimStart": "2008-10-07T01:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to RU 3\" chicksan line from grizzly pumps down through hatch to moonpool. Hooked up pump units electrically.\n\nMeanwhile cleaned and preserved tension system pad eyes, continued to work on TDS and prepared for barite injection in spud cans.", "dTimEnd": "2008-10-07T14:00:00+02:00", "dTimStart": "2008-10-07T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to testing 9 5/8\" csg on F-15S. Performed line test to 290 bar/5 min. Pressure tested 9 5/8\" csg 290 bar/15 min. Dropped 2.2 bar (0.8%). 1760 ltrs pumped and 1760 ltrs bled back.\n\nMeanwhile connected Halliburton 4\" suction hose to water production (Utsira water).", "dTimEnd": "2008-10-07T15:30:00+02:00", "dTimStart": "2008-10-07T14:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Finalized hooking up pump units. Prepared T with pop-off for kill line.\n\nMeanwhile cleaned and preserved tension system pad eyes, continued to work on TDS and prepared for barite injection in spud cans.", "dTimEnd": "2008-10-07T17:30:00+02:00", "dTimStart": "2008-10-07T15:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Crane could not operate due to high winds and thus could not continue RU in moonpool area. Prepared riser sections and pup-in subs on main deck. RU 3\" chicksan line from grizzly pumps down through hatch to moonpool and test-started grizzly pumps.\n\nMeanwhile cleaned and preserved tension system pad eyes and started mixing barite batch #1 for barite injection in spud cans.", "dTimEnd": "2008-10-08T00:00:00+02:00", "dTimStart": "2008-10-07T17:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2008_10_09
NO 15/9-F-5
NO 15/9-F-5
name
2008-10-08T00:00:00+02:00
2008-10-09T00:00:00+02:00
normal
2018-05-03T13:53:05+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": "1.3", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-10-09T00:00:00+02:00", "dTimDiaHoleStart": "2008-10-05T20:15:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Continue water injection to stabilize well. Investigate options for rig-up.", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": null, "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "4", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Completed rig up and leak tested surface lines to 35/360/380bars 5/10/10mins. Production stopped injection into well. Performed rate test of Grizzly pumps without success. Production started injection of well.", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Crane could not operate due to high winds and thus could not continue RU in moonpool area. Prepared riser sections and 9 1/2\" pup-in subs on main deck. Finished RU 3\" chicksan line from grizzly pumps down through hatch to moonpool and test-started grizzly pumps. Ok.\n\nMeanwhile cleaned and preserved tension system pad eyes and mixed barite batch #2 for barite injection in spud cans.", "dTimEnd": "2008-10-08T01:00:00+02:00", "dTimStart": "2008-10-08T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "PU 9 1/2\" riser sections from main deck and lowered into moonpool. PU 3\" chicksan line from main deck and lowered into moonpool.\n\nMeanwhile cleaned and preserved tension system pad eyes and mixed barite batch #2 for barite injection in spud cans.", "dTimEnd": "2008-10-08T02:00:00+02:00", "dTimStart": "2008-10-08T01:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Production closed in F-5 and handed over well to drilling at 03:00.", "dTimEnd": "2008-10-08T03:00:00+02:00", "dTimStart": "2008-10-08T02:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Verified status on F-5 XMT with production operator. Opened bleed offs. Held tool box talk before rigging up on XMT.", "dTimEnd": "2008-10-08T04:00:00+02:00", "dTimStart": "2008-10-08T03:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed safety valve/pop-off on XMT kill side. Removed hatch cover from weather deck. Started installing 9 1/2\" riser sections on XMT.\n\nMeanwhile cleaned and preserved tension system pad eyes and mixed barite batch #2 for barite injection in spud cans.", "dTimEnd": "2008-10-08T06:00:00+02:00", "dTimStart": "2008-10-08T04:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed tree cap and installed WL riser.\n\nMeanwhile abseilers evaluated derrick work, not able to continue working in derrick due to too high wind.\n", "dTimEnd": "2008-10-08T08:00:00+02:00", "dTimStart": "2008-10-08T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Built scaffolding to get access to WL riser connection. \n", "dTimEnd": "2008-10-08T09:00:00+02:00", "dTimStart": "2008-10-08T08:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed WL riser with two pump-in subs on top.\n", "dTimEnd": "2008-10-08T09:30:00+02:00", "dTimStart": "2008-10-08T09:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Built scaffolding to get access to the two pump-in subs.\n", "dTimEnd": "2008-10-08T11:30:00+02:00", "dTimStart": "2008-10-08T09:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged up 3\" chiksan to the two pump-in subs. Filled Grizzly pump with diesel, using 1m³ ICB tanks. Secured all surface lines with wire.\n\nMeanwhile mixed last barite batch for STB spud can. \n", "dTimEnd": "2008-10-08T16:00:00+02:00", "dTimStart": "2008-10-08T11:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed SJA meeting with all involved personnel prior to leak test surface lines, and rate test Grizzly pumps combined with the Cmt unit.\n\nMeanwhile pumped barite into STB spud can. \n", "dTimEnd": "2008-10-08T17:00:00+02:00", "dTimStart": "2008-10-08T16:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Checked rig up / walked lines\n", "dTimEnd": "2008-10-08T18:00:00+02:00", "dTimStart": "2008-10-08T17:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared for flushing the lines.\n", "dTimEnd": "2008-10-08T19:00:00+02:00", "dTimStart": "2008-10-08T18:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk with night shift prior to commence leak testing of the surface lines, and pump rate measurements of Grizzly pumps and Cmt Unit.\n", "dTimEnd": "2008-10-08T20:00:00+02:00", "dTimStart": "2008-10-08T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flushed the lines to the Grizzly pumps.\n", "dTimEnd": "2008-10-08T20:15:00+02:00", "dTimStart": "2008-10-08T20:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Leak tested Grizzly pumps surface lines 35 bars 5min, increased pressure to 360 bars, observed minor leak at T piece in Moon Pool. Bled down pressure and tightened T piece.\n", "dTimEnd": "2008-10-08T21:00:00+02:00", "dTimStart": "2008-10-08T20:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Leak tested line to 360 bars 10 min. Closed Lo-torq at pop-off, attempted to leak test line to 380 bars. Found minor leak in line at cantilever. Bled off pressure and tightened Weco connection. Leak tested line to 380 bars 10min.\n", "dTimEnd": "2008-10-08T21:45:00+02:00", "dTimStart": "2008-10-08T21:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up and leak tested line from Cmt unit to X-max tree. 35/360bars 5/10mins. Bled off pressure.\n", "dTimEnd": "2008-10-08T22:15:00+02:00", "dTimStart": "2008-10-08T21:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened the Swab valve, HMV and applied pressure to the DHSV control line. \n", "dTimEnd": "2008-10-08T22:30:00+02:00", "dTimStart": "2008-10-08T22:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Commenced pumping with the two Grizzly pumps at 500 lpm each pump. DHSV opened at 100 bars. Increased pump rate to 1000 lpm each pump. WH pressure 110 bars. Started pumping with the Cmt unit, pressure picked up to 135bars within a few minutes. Shut down the Cmt unit, observed that pressure dropped to 110 bars with 2000 lpm from the Grizzly pumps.\n", "dTimEnd": "2008-10-08T23:00:00+02:00", "dTimStart": "2008-10-08T22:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Investigated the pressure drop and found air trapped in suction line. Flushed suctions from Utsira manifold. Started pumping again. Lost suction when picking up the rate from 750 to 1000 lpm each pump. Opened fluid ends on Grizzly pumps and flushed manifolds. Made new attempt to pick up rate to 1000 lpm each pump, with same negative result as above.", "dTimEnd": "2008-10-09T00:00:00+02:00", "dTimStart": "2008-10-08T23:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2008_10_10
NO 15/9-F-5
NO 15/9-F-5
name
2008-10-09T00:00:00+02:00
2008-10-10T00:00:00+02:00
normal
2018-05-03T13:53:05+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": "1.6", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-10-10T00:00:00+02:00", "dTimDiaHoleStart": "2008-10-05T20:15:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Performed frac operation by increase BHP to approx. 380 bars. Open PWV and production to take over injection as B&B will back of and close Swab and KWV. Rig down surface equipment.", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": null, "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "5", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Production injected on F-5 well prior to commence Frac operation. Abseilers in derrick rigging up FWD PRS in preparation of re-alignment in upper section of derrick. Rigged down the suction line from Utsira manifold to Halliburton Grizzly pumps. Re-routed suction line from Halliburton Grizzly pumps to the rig floor. Diluted 1.20 SG brine to 1.09 SG.\n\n", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Had several attempts to get rate reading from Grizzly pumps. Concluded that due to gas in the water coming from the Utsira manifold it was not possible to get proper suction. Flushed lines through PSV valve (#13).\n\nMeanwhile held toolbox talk with abseilers before starting working in derrick.", "dTimEnd": "2008-10-09T03:45:00+02:00", "dTimStart": "2008-10-09T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed in the X-mas tree at the Swab valve. Production started water injection.\n\nMeanwhile rigged up to re-align forward PRS.", "dTimEnd": "2008-10-09T06:00:00+02:00", "dTimStart": "2008-10-09T03:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Production injected in F-5 well. To achieve stable injection rate and pressure prior to start frac operation. \n\nParallel activity: Abseilers in derrick rigging up FWD PRS in preparation of re-alignment in upper section of derrick.\n", "dTimEnd": "2008-10-09T12:45:00+02:00", "dTimStart": "2008-10-09T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk and flow tested mix pump into Trip tank, flushed lines with sea water. Flow rate achieved 4000 l/min. \n\nParallel activity: Abseilers in derrick rigging up FWD PRS in preparation of re-alignment in upper section of derrick.\nCleaned in Moonpool, Shaker area, fluid end inspection on mud pumps, general maintenance.\n", "dTimEnd": "2008-10-09T16:00:00+02:00", "dTimStart": "2008-10-09T12:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk and rigged down the suction line from Utsira manifold to Halliburton Grizzly pumps\n\nParallel activity: Westcon down from derrick due to wind speed @ 34 knots,\n", "dTimEnd": "2008-10-09T18:00:00+02:00", "dTimStart": "2008-10-09T16:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk and re-route suction line from Halliburton Grizzly pumps to the rig floor. Flushed CMT lines to drill floor, in preparation for frac job.\n\nParallel activity: Westcon down from derrick due to too high wind speed.\n", "dTimEnd": "2008-10-09T19:00:00+02:00", "dTimStart": "2008-10-09T18:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued flushing CMT lines to drill floor, in prep for Frac job.\n\nParallel activity: Started to dilute 1.20 SG brine to 1.09 SG. Fluid end inspection on mud pump #1, Cleaned and preserved lifting eyes at wellhead.\n", "dTimEnd": "2008-10-09T22:00:00+02:00", "dTimStart": "2008-10-09T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Topped up Grizzly pumps with diesel. Built scaffolding tent for Halliburton controls on cantilever. Held tool box talk prior to derrick inspection of PRS, derrick beams, cable trays. Preliminary plan covered to move PRS into vertical position.\n\nParallel activity: Prepared tools for removing hatch on Slurry tank.\n", "dTimEnd": "2008-10-10T00:00:00+02:00", "dTimStart": "2008-10-09T22:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2008_10_11
NO 15/9-F-5
NO 15/9-F-5
name
2008-10-10T00:00:00+02:00
2008-10-11T00:00:00+02:00
normal
2018-05-03T13:53:05+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": "2", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-10-11T00:00:00+02:00", "dTimDiaHoleStart": "2008-10-05T20:15:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Perform frac job with 1.10 SG brine by increase BHP to approx. 380 bars. Rig down surface equipment.", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": null, "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "6", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Performed frac job. Final pump rate: Cmt unit 1400 lpm Grizzlies 2400 lpm. WHP up to 349 bars, total pumped 380 m³ 1.09 SG brine. Re-arranged set up to be able to increase rate from Grizzly pumps.", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Preparing pits with Brine and drill water for Frac job. Fixed Samson pump in pump room.\n", "dTimEnd": "2008-10-10T02:00:00+02:00", "dTimStart": "2008-10-10T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Derrick inspection to assess lifting point for cable trays, upper drive tray, bath tub. Listed extra lifting equipment needed in the derrick to come from Westcon.\n", "dTimEnd": "2008-10-10T03:00:00+02:00", "dTimStart": "2008-10-10T02:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued preparing pits with Brine and drill water for Frac job.\n", "dTimEnd": "2008-10-10T04:30:00+02:00", "dTimStart": "2008-10-10T03:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Westcon down from derrick due to too high windspeed. Continued further planning to move PRS into vertical position.", "dTimEnd": "2008-10-10T06:00:00+02:00", "dTimStart": "2008-10-10T04:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared plan/procedure for frac job on F-5. Mixed & diluted brine in pits to 1.09 SG.\n\nParallel activity: Continued with Production injecting in F-5. Due to wind speed @ 37 knots no access to the derrick. \n", "dTimEnd": "2008-10-10T14:00:00+02:00", "dTimStart": "2008-10-10T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to perform frac job.\n", "dTimEnd": "2008-10-10T14:15:00+02:00", "dTimStart": "2008-10-10T14:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up Halliburton lines & pressure test same to 330 bar 5 mins. Commence to perform frac job as per program.\n", "dTimEnd": "2008-10-10T16:00:00+02:00", "dTimStart": "2008-10-10T14:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Aborted frac job due to air in the suction system. Installed air bleed off line on both Halliburton Grizzly pump.\n\nLined up for production to continue to inject F-5.", "dTimEnd": "2008-10-10T17:30:00+02:00", "dTimStart": "2008-10-10T16:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued injecting in F-5 via production. No access to derrick due to high wind speed @ 31 Knots.\n\nParallel activity: Fluid end inspection on mud pumps, general maintenance, prepare pad eyes on tension deck and house keeping.\n", "dTimEnd": "2008-10-10T19:00:00+02:00", "dTimStart": "2008-10-10T17:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to perform frac job. \n", "dTimEnd": "2008-10-10T19:30:00+02:00", "dTimStart": "2008-10-10T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up for frac job, equalized across KWV and Swab, opened same. Commenced pumping 1.09 sg brine with Grizzly pumps at WI pressure 330 bars and took over from production. Production backed down injection and closed PWV, bled of pressure in flow line and opened bled valve on the flow line.\nStarted to pump 700 lpm with Cmt unit 800 lpm with each Grizzly pump. WHP 330 bars.\n", "dTimEnd": "2008-10-10T20:30:00+02:00", "dTimStart": "2008-10-10T19:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Increased rate, Cmt unit 1000 lpm and Grizzlies 2070 lpm. WHP started to pick up slowly to 335 bars.\nPicked up rate at Grizzlies to 2300 lpm, pressure at suction line 0.9 bars. Started second mixing pump to keep up the suction pressure.\nFinal pump rate: Cmt unit 1400 lpm Grizzlies 2400 lpm. WHP 349 bars, total pumped 380 m³ 1.09 SG brine.\n", "dTimEnd": "2008-10-10T22:30:00+02:00", "dTimStart": "2008-10-10T20:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Re-arranged surface suction line with two 4\" lines coming from the rig floor. Commenced cleaning suction/mixing lines # 1 and mixing pump #3. \n", "dTimEnd": "2008-10-11T00:00:00+02:00", "dTimStart": "2008-10-10T22:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2008_10_12
NO 15/9-F-5
NO 15/9-F-5
name
2008-10-11T00:00:00+02:00
2008-10-12T00:00:00+02:00
normal
2018-05-03T13:53:05+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": "2.4", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-10-12T00:00:00+02:00", "dTimDiaHoleStart": "2008-10-05T20:15:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Prepare for rigging up WL on F-5.", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": null, "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "7", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Perform frac job. Final pump rate: Cmt unit 1400 lpm Grizzlies 2400 lpm. WHP 357 bars, total pumped 409 m³ 1.10 SG brine. Rigged down Halliburton surface equipment.\n\n", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Prepared Suction line #2 and mixing pump #1 for transforming brine to the two 4\" supply hoses to the Grizzlies. \nUnable to work in derrick due to high winds.\n", "dTimEnd": "2008-10-11T01:00:00+02:00", "dTimStart": "2008-10-11T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Abseilers worked in the derrick securing lifting equipment to move PRS to vertical position.\n", "dTimEnd": "2008-10-11T03:00:00+02:00", "dTimStart": "2008-10-11T01:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed hatch on Slurry tank, cleaned out skimmer tank. Cleaned lines for frac job in Pit room. Commenced taking on Barite from boat.\nUnable to work in derrick due to high winds.\n", "dTimEnd": "2008-10-11T06:00:00+02:00", "dTimStart": "2008-10-11T03:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Recieved 102 MT Barite, 200m³ 1.20 SG Brine and 600m³ drill water.\nContinued with production, to inject on F-5 well. \n\nParallel activity: Abseilers continued rigging up in preparation for alignment of FWD PRS, upper section of derrick. Fluid end inspection on mud pumps, general maintenance, prepared pad eyes on tensioner deck.", "dTimEnd": "2008-10-11T14:15:00+02:00", "dTimStart": "2008-10-11T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Halliburton preparing equipment on cantilever prior to frac job on F-5.\n\nParallel activity: Abseilers down from derrick due to frac job F-5.\n", "dTimEnd": "2008-10-11T14:45:00+02:00", "dTimStart": "2008-10-11T14:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to start frac job on F-5.\n", "dTimEnd": "2008-10-11T15:00:00+02:00", "dTimStart": "2008-10-11T14:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up for frac job, equalized across KWV and Swab, opened same. Commenced pumping 1.10 sg brine with Grizzly pumps at WI pressure 330 bars and took over from production. Production backed down injection and closed PWV, bled of pressure in flow line and opened bled valve on the flow line.\nStarted to pump 500 lpm with Cmt unit and each Grizzly pump running at 750 lpm. WHP 331 bars.\n", "dTimEnd": "2008-10-11T16:00:00+02:00", "dTimStart": "2008-10-11T15:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Increased rate on Cmt unit in steps to 1400 lpm and Grizzlies 2400 lpm. Final WHP 357 bars, total pumped 409 m³ 1.10 SG brine.\n\nParallel activity: Mount hoses on HP cleaning hose reel in shaker area.\n", "dTimEnd": "2008-10-11T17:45:00+02:00", "dTimStart": "2008-10-11T16:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Shut in well at XMT. Frac job performance according to plan, frac of the formation not achieved. Commenced to rig down Halliburton surface equipment.\n", "dTimEnd": "2008-10-11T19:00:00+02:00", "dTimStart": "2008-10-11T17:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued rigging down Halliburton surface equipment.\n\nParallel activity: No access in derrick due to high winds. Worked on mud pump #2, cleaned and preserved lifting eyes at wellhead. Continued cleaning out skimmer tank. Cleaned Rig floor equipment in sack store.\n", "dTimEnd": "2008-10-12T00:00:00+02:00", "dTimStart": "2008-10-11T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2008_10_13
NO 15/9-F-5
NO 15/9-F-5
name
2008-10-12T00:00:00+02:00
2008-10-13T00:00:00+02:00
normal
2018-05-03T13:53:05+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-10-13T00:00:00+02:00", "dTimDiaHoleStart": "2008-10-12T22:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Rig up 7/32\" surface equipment and leak test rig. MU perforation BHA #1 and RIH with same.", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": null, "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "8", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Rigged down Halliburton surface equipment. Production started injection in F-5. Commenced preparing 7/32\" WL surface equipment.", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Continued rigging down Halliburton surface equipment in the Moon pool.\n", "dTimEnd": "2008-10-12T00:30:00+02:00", "dTimStart": "2008-10-12T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to rig down Halliburton equipment in Moon pool and on wellhead. Rigged down Seadrill riser, removed scaffolding.\n\nParallel activity: Abseilers got access to the derrick for rigging up equipment for alignment of FWD PRS.\n", "dTimEnd": "2008-10-12T04:15:00+02:00", "dTimStart": "2008-10-12T00:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to rig down Halliburton equipment in Moonpool and on wellhead.\n\nSnap Lock dropped from derrick. Took time out for safety with involved personnel.\n", "dTimEnd": "2008-10-12T05:00:00+02:00", "dTimStart": "2008-10-12T04:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to rig down Halliburton equipment in Moonpool and wellheads\n\nParrallel activity: Abseilers resumed work in derrick.", "dTimEnd": "2008-10-12T06:00:00+02:00", "dTimStart": "2008-10-12T05:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged down Halliburton surface equipment in the Moon pool.\n\nParallel activity: Abseilers continued rigging up in preparation for alignment of FWD PRS, upper section of derrick.\n", "dTimEnd": "2008-10-12T13:00:00+02:00", "dTimStart": "2008-10-12T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged down Halliburton surface equipment on the cantilever.\n", "dTimEnd": "2008-10-12T15:15:00+02:00", "dTimStart": "2008-10-12T13:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Abseilers continued rigging up in preparation for alignment of FWD PRS, upper section of derrick.\n", "dTimEnd": "2008-10-12T19:00:00+02:00", "dTimStart": "2008-10-12T15:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and preserved lifting eyes at wellhead, Removed drag chain support and brackets of overhead crane in Moon pool. Continued cleaning out skimmer tank.\n\nAbseilers unable to work in derrick due to high winds.\n", "dTimEnd": "2008-10-12T22:00:00+02:00", "dTimStart": "2008-10-12T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held pre-job meeting with new arrived WL personnel.\n", "dTimEnd": "2008-10-12T22:30:00+02:00", "dTimStart": "2008-10-12T22:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared for rigging up WL equipment below the cantilever.\n", "dTimEnd": "2008-10-13T00:00:00+02:00", "dTimStart": "2008-10-12T22:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2008_10_14
NO 15/9-F-5
NO 15/9-F-5
name
2008-10-13T00:00:00+02:00
2008-10-14T00:00:00+02:00
normal
2018-05-03T13:53:05+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-10-14T00:00:00+02:00", "dTimDiaHoleStart": "2008-10-12T22:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Rig up 7/32\" surface equipment and leak test rig. MU perforation BHA #1 and RIH with same.", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": null, "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "9", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Prepared 7/32\" WL surface equipment. Tested F-15 against blind/shear, RIH donut and landed off on shear rams. Modified hatch cover. Closed in F-5 and started installation of the hatch cover.", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Prepared, Grease injection head for 7/32\" wire, Rig up BCU at main deck prior to function test WL BOP and pressure test 7/32\" rams on stump.\n\nParallel activity: Cleaned pump rum and iron rough neck.\n", "dTimEnd": "2008-10-13T04:00:00+02:00", "dTimStart": "2008-10-13T00:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Function tested WL BOP.\n", "dTimEnd": "2008-10-13T04:30:00+02:00", "dTimStart": "2008-10-13T04:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk and pressure tested WL BOP on stump 20/345bars 5/10 mins.\n", "dTimEnd": "2008-10-13T05:45:00+02:00", "dTimStart": "2008-10-13T04:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued preparing WL equipment prior to be spotted below cantilever and in Moon pool.", "dTimEnd": "2008-10-13T06:00:00+02:00", "dTimStart": "2008-10-13T05:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued preparing WL equipment prior to be spotted below cantilever and in Moon pool\n\nParallel activity: Abseilers unable to work in derrick due to high winds\n", "dTimEnd": "2008-10-13T08:45:00+02:00", "dTimStart": "2008-10-13T06:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued preparing WL equipment prior to be spotted on main deck and in Moon pool.\nChanged out WL drum from 7/32\" braided wire to 7/32\" E-line.\n\nParallel activity: Rigged up work basket with various tools to assist Abseilers. Abseilers continued rigging up in preparation for alignment of FWD PRS, upper section of derrick.\n", "dTimEnd": "2008-10-13T18:00:00+02:00", "dTimStart": "2008-10-13T08:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued preparing WL equipment prior to be spotted on main deck and in Moon pool.\n\nParallel activity: Held tool box talk and performed line test from Cmt unit to drilling BOP F-15.\nClosed shear rams and bled of manifold hydraulic pressure, verified pos-lock keeping the blind/shear ram closed. Leak tested the well to 180 bars 10 mins against closed blind/shear.\nAbseilers continued to securing lifting gear to move PRS to vertical.\n", "dTimEnd": "2008-10-13T20:00:00+02:00", "dTimStart": "2008-10-13T18:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Transferred weather deck hatch cover down to the welders store and cut a 350mm hole for the WL riser. Prepared WL equipment to be lowered into the Moon pool. \nDismantled high pressure pipe on the drilling BOP to get access with the WL Lubricator.\n\nParallel activity: Abseilers continued rigging up in preparation for alignment of FWD PRS, upper section of derrick.\nLined up to read pressure on choke manifold, opened all HCR's on BOP, closed required manual valves, RIH donut and landed off on blind/shear ram, closed Upper rams with low pressure, adjusted donut and increased manifold pressure to activate locks on rams, reduced pressure on manifold.", "dTimEnd": "2008-10-14T00:00:00+02:00", "dTimStart": "2008-10-13T20:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2008_10_15
NO 15/9-F-5
NO 15/9-F-5
name
2008-10-14T00:00:00+02:00
2008-10-15T00:00:00+02:00
normal
2018-05-03T13:53:06+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-10-15T00:00:00+02:00", "dTimDiaHoleStart": "2008-10-12T22:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Complete rig up 7/32\" surface equipment and leak test rig. MU perforation BHA #1 and RIH with same.", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": null, "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "10", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Prepared 7/32\" WL surface equipment. Installed hatch cover and R/U riser and BOP. Rigged up CL to HMV and DHSV. Built cable head. Started to make up lubricator.\n\n\n\n", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Continued preparing WL equipment to be lowered down to the Moon pool. \n\nParallel activity: Abseilers continued rigging up in preparation for alignment of FWD PRS, upper section of derrick.\n", "dTimEnd": "2008-10-14T01:00:00+02:00", "dTimStart": "2008-10-14T00:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lowered WL equipment down into the Moon Pool including the modified hatch cover. \n", "dTimEnd": "2008-10-14T04:30:00+02:00", "dTimStart": "2008-10-14T01:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Shut in F-5. Commenced installation of the modified hatch cover.", "dTimEnd": "2008-10-14T06:00:00+02:00", "dTimStart": "2008-10-14T04:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared to open main hatch to Moon pool. Lowered WL BOP and Grease injection pump into the Moon pool. \n", "dTimEnd": "2008-10-14T08:30:00+02:00", "dTimStart": "2008-10-14T06:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Started to spot WL equipment in the Moon Pool.\n\nParallel activity: Held tool box talk and commenced to re-align FWD PRS as per SJA/ PLAN.\n", "dTimEnd": "2008-10-14T12:00:00+02:00", "dTimStart": "2008-10-14T08:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Electrician supplied power to Seawell wire line winch on main deck.\n", "dTimEnd": "2008-10-14T12:45:00+02:00", "dTimStart": "2008-10-14T12:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared to open main hatch to Moon pool. \n", "dTimEnd": "2008-10-14T13:15:00+02:00", "dTimStart": "2008-10-14T12:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk and started to rig up riser and WL BOP. Tested counter on WL winch and load cell.\n\nParallel activity: Held tool box talk, continued to re-align FWD PRS as per SJA/Plan.\n", "dTimEnd": "2008-10-14T18:00:00+02:00", "dTimStart": "2008-10-14T13:15:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Filled riser/BOP prior to leak test. Lowered Seawell pump skid down into the Moon Pool.\n", "dTimEnd": "2008-10-14T19:00:00+02:00", "dTimStart": "2008-10-14T18:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to spot and arrange Seawell WL equipment in the Moon Pool. Prepared for pressure test of WL riser and BOP.\n\nParallel activity: Spotted additional lifting gear required in derrick, lift same to rig floor.\n", "dTimEnd": "2008-10-14T20:15:00+02:00", "dTimStart": "2008-10-14T19:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressure tested Seawell WL riser and BOP 20/345 bars 5/10mins.\n\nParallel activity: Abseilers continued in derrick re-arranging the lifting equipment on FWD PRS.\n", "dTimEnd": "2008-10-14T21:00:00+02:00", "dTimStart": "2008-10-14T20:15:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed kill line and bled off line on KWV. Connected control line to the WL BOP.\n\nParallel activity: Abseilers continued in derrick re-arranging the lifting equipment on FWD PRS. Cleaned in pump room and shakers.\n", "dTimEnd": "2008-10-15T00:00:00+02:00", "dTimStart": "2008-10-14T21:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2008_10_16
NO 15/9-F-5
NO 15/9-F-5
name
2008-10-15T00:00:00+02:00
2008-10-16T00:00:00+02:00
normal
2018-05-03T13:53:06+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-10-16T00:00:00+02:00", "dTimDiaHoleStart": "2008-10-12T22:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "RIH with perforation BHA #1 and perforate interval 3619m - 3622m. POOH and MU perforation BHA #2 and RIH with same.\n", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": null, "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "11", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Completed rigging up 7/32\" surface equipment and leak test rig up. MU perforation BHA #1 and RIH with same from surface to 3420m.\n\n", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Prepared GIH and checked tool catcher. Pulled cable up to Schlumberger work shop on main deck. Built Schlumberger cable head. \n\nParallel activity: Abseilers continued in derrick re-arranging the lifting equipment on FWD PRS.\n", "dTimEnd": "2008-10-15T02:00:00+02:00", "dTimStart": "2008-10-15T00:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up control lines to HMV and leak tested 210bars 10mins. Made up control line to DHSV and leak tested to 520 bars 10min.\n\nParallel activity: Abseilers continued in derrick re-arranging the lifting equipment on FWD PRS. Held tool box talk/SJA in dog house with all involved personnel prior to re-align FWD PRS.\n", "dTimEnd": "2008-10-15T04:45:00+02:00", "dTimStart": "2008-10-15T02:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Started to make up lubricator in Moon Pool.\n\n Parallel activity: Started to re-align FWD PRS as per SJA/ PLAN.\n", "dTimEnd": "2008-10-15T06:00:00+02:00", "dTimStart": "2008-10-15T04:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued making up lubricator in Moon Pool.\n", "dTimEnd": "2008-10-15T07:00:00+02:00", "dTimStart": "2008-10-15T06:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued rig up equipment in the Moon Pool.\n\nParallel activity: Held tool box talk with new crew & commenced to re-align FWD PRS as per SJA / PLAN.\n", "dTimEnd": "2008-10-15T09:00:00+02:00", "dTimStart": "2008-10-15T07:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued rig up equipment in the Moon Pool. Rigged up lifting arrangement for the Lubricator.\n\nParallel activity: FWD PRS now in vertical position. Secured & investigated upper shaft, & made forward plan.\n", "dTimEnd": "2008-10-15T14:00:00+02:00", "dTimStart": "2008-10-15T09:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lowered gun into the Moon Pool. Continued making up lubricator.\n\nParallel activity: Held tool box talk with Abseilers and Varco prior to inspection of PRS.\n", "dTimEnd": "2008-10-15T14:30:00+02:00", "dTimStart": "2008-10-15T14:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged up air hoist for handling BHA. Made up Lubricator to the BOP.\n\nParallel activity: Abseilers and Varco inspected the FWD PRS.\n", "dTimEnd": "2008-10-15T17:30:00+02:00", "dTimStart": "2008-10-15T14:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled back the tool string into the tool catcher. Held tool box talk prior and leak tested lubricator 20/345 bars for 5/10min.\n\nParallel activity: Abseilers and Varco inspected the FWD PRS.\n", "dTimEnd": "2008-10-15T19:00:00+02:00", "dTimStart": "2008-10-15T17:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to make up 3 3/8\" guns.\n", "dTimEnd": "2008-10-15T19:30:00+02:00", "dTimStart": "2008-10-15T19:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up 3 3/8\" gun and found lifting heights not to be sufficient. Re-arranged Air hoist. \n", "dTimEnd": "2008-10-15T22:00:00+02:00", "dTimStart": "2008-10-15T19:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up and landed of the 3 3/8\" gun in the WL BOP. \n", "dTimEnd": "2008-10-16T00:00:00+02:00", "dTimStart": "2008-10-15T22:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2008_10_17
NO 15/9-F-5
NO 15/9-F-5
name
2008-10-16T00:00:00+02:00
2008-10-17T00:00:00+02:00
normal
2018-05-03T13:53:06+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-10-17T00:00:00+02:00", "dTimDiaHoleStart": "2008-10-12T22:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "POOH BHA #2 lay out guns. Secure well closing the Swab and install XMT cap on WL BOP. Started water injection.", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": null, "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "12", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Perforated interval 3619m - 3622m and 3605m - 3608m in two runs.", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Prepared firing head and made up same to the 3 3/8\" gun.\n", "dTimEnd": "2008-10-16T01:00:00+02:00", "dTimStart": "2008-10-16T00:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up lubricator and leak tested In-SiTu connection to 345 bars. Pulled BHA up into the tool catcher.\n", "dTimEnd": "2008-10-16T01:30:00+02:00", "dTimStart": "2008-10-16T01:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk and opened HMV and applied 520 bars to the DHSV. Equalized across the DHSV with the Cmt unit pumping 100% MEG. DHSV opened at 33 bars SIWHP. Bled off surface lines.\n", "dTimEnd": "2008-10-16T03:00:00+02:00", "dTimStart": "2008-10-16T01:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 3 3/8\" gun from surface to 3420m. \n\nParallel activity: Held tool box/SJA meeting prior to move the FWD PRS out into park position.\n", "dTimEnd": "2008-10-16T06:00:00+02:00", "dTimStart": "2008-10-16T03:00:00+02:00", "md": "3420", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued RIH with perforating guns on WL from 3420m - 3640m. Stopped RIH and bled off WHP to approx. 1 bars.\n\nParallel activity: Unable to work in derrick, due to high wind.\n", "dTimEnd": "2008-10-16T11:15:00+02:00", "dTimStart": "2008-10-16T06:00:00+02:00", "md": "3640", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Correlated and positioned guns. Perforated interval from 3619m to 3622m.\n", "dTimEnd": "2008-10-16T11:45:00+02:00", "dTimStart": "2008-10-16T11:15:00+02:00", "md": "3624", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with perforation gun from 3624m to surface.\n", "dTimEnd": "2008-10-16T14:00:00+02:00", "dTimStart": "2008-10-16T11:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "At surface closed the HMV, bled off pressure in the lub/riser and inflow tested HMV.\n\nParallel activity: Climber up in derrick and evaluated rigging up to be able to move FWD PRS.\n", "dTimEnd": "2008-10-16T14:45:00+02:00", "dTimStart": "2008-10-16T14:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke lubricator and laid out 3 3/8\" guns all shots fired.\n\nParallel activity: Unable to work in derrick, due to high wind.\n", "dTimEnd": "2008-10-16T16:30:00+02:00", "dTimStart": "2008-10-16T14:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made new firing head. Picked up new 3 3/8\" guns and lowered into the BOP/riser and connected up to the firing head. Picked up BHA into the lubricator and found guns floated with water. \n", "dTimEnd": "2008-10-16T18:00:00+02:00", "dTimStart": "2008-10-16T16:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Laid down 3 3/8\" guns and picked up back-up with orientated weight made up. Lowered into the BOP/riser and made up guns to firing head.\n", "dTimEnd": "2008-10-16T19:15:00+02:00", "dTimStart": "2008-10-16T18:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- rig up/down", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Made up the In-SiTu sub and leak tested to 150bars 10 min. Line up to the Cmt unit and filled the riser/BOP/lub with 100 % MEG. Applied 11 bars and equalized across the XMT. \n", "dTimEnd": "2008-10-16T20:00:00+02:00", "dTimStart": "2008-10-16T19:15:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opented XMT and RIH with 3 3/8\" guns from surface to 300m.\n", "dTimEnd": "2008-10-16T20:30:00+02:00", "dTimStart": "2008-10-16T20:00:00+02:00", "md": "300", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleared and cleaned in the Moon Pool and weather deck. Built scaffolding walk way to get better access the WL lubricator platform.\n", "dTimEnd": "2008-10-16T23:30:00+02:00", "dTimStart": "2008-10-16T20:30:00+02:00", "md": "300", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued RIH with 3 3/8\" guns from 300m to 1000m.\n", "dTimEnd": "2008-10-17T00:00:00+02:00", "dTimStart": "2008-10-16T23:30:00+02:00", "md": "1000", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2008_10_18
NO 15/9-F-5
NO 15/9-F-5
name
2008-10-17T00:00:00+02:00
2008-10-18T00:00:00+02:00
normal
2018-05-03T13:53:06+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-10-18T00:00:00+02:00", "dTimDiaHoleStart": "2008-10-12T22:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Continue water injection F-5 to stable rate. RD WL. Hand F-5 back to production.\n \n", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": null, "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "13", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Laid out 3 3/8\" guns. All shots fired. Started water injection.", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Continued RIH with 3 3/8\" guns from 1000m to 3430m. Correlated across pup jnt at 3432m.\n", "dTimEnd": "2008-10-17T01:45:00+02:00", "dTimStart": "2008-10-17T00:00:00+02:00", "md": "3420", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued RIH with 3 3/8\" guns from 3430m to 3660m.\n", "dTimEnd": "2008-10-17T02:00:00+02:00", "dTimStart": "2008-10-17T01:45:00+02:00", "md": "3660", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Correlated across perforation depth and pup jnt at 3432m. Had to make 5 correlation passes due to stretch in the 7/32\" E-line. \nPerforated interval from 3605m to 3608m. SIWHP 6 bars dropped to 5 bars and picked up to 6 bars immediately when guns fired.\n", "dTimEnd": "2008-10-17T04:30:00+02:00", "dTimStart": "2008-10-17T02:00:00+02:00", "md": "3610", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with 3 3/8\" guns from 3610m to 1250m", "dTimEnd": "2008-10-17T06:00:00+02:00", "dTimStart": "2008-10-17T04:30:00+02:00", "md": "1250", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with 3 3/8\" guns from 1250m to surface.\n", "dTimEnd": "2008-10-17T07:00:00+02:00", "dTimStart": "2008-10-17T06:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to disconnect the lubricator and lay out the 3 3/8\" guns.\n", "dTimEnd": "2008-10-17T07:15:00+02:00", "dTimStart": "2008-10-17T07:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Inflow tested HMV and disconnected WL lubricator. Laid out 3 3/8\" guns. All shots fired. Installed XMT cap on top of the WL BOP and leak tested same to 20/345bars 5/10 mins.\n\nParallel activity: Held tool box talk and moved FWD PRS to 1 meter from FWD sea fastening.\n", "dTimEnd": "2008-10-17T10:15:00+02:00", "dTimStart": "2008-10-17T07:15:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to leak test KWV and Swab. Checked line up for leak testing of KWV and Swab valve. \n\nParallel activity: Repaired chain pull in derrick and continued to move FWD PRS to FWD position.\n", "dTimEnd": "2008-10-17T12:15:00+02:00", "dTimStart": "2008-10-17T10:15:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Leak tested KWV and Swab valve 35/345bars 5/10 mins.", "dTimEnd": "2008-10-17T13:15:00+02:00", "dTimStart": "2008-10-17T12:15:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Maersk production established control of HMV and DHSV CL.\n", "dTimEnd": "2008-10-17T14:30:00+02:00", "dTimStart": "2008-10-17T13:15:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Started water injection in F-5.\n\nParallel activity: Continued to move PRS to FWD position.\n", "dTimEnd": "2008-10-17T19:00:00+02:00", "dTimStart": "2008-10-17T14:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued water injection in F-5. 9000m³/day 172 bars.\n\nParallel activity: Inspected derrick. Assessed PRS beam lift points. Prepared scaffolding on deck. Climbers carried out full PRS visual check. Spotted scaffolding on rig floor. Prepared and spotted PRS parts on cantilever. Sea fasted FWD PRS. \n", "dTimEnd": "2008-10-18T00:00:00+02:00", "dTimStart": "2008-10-17T19:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2008_10_19
NO 15/9-F-5
NO 15/9-F-5
name
2008-10-18T00:00:00+02:00
2008-10-19T00:00:00+02:00
normal
2018-05-03T13:53:06+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-10-19T00:00:00+02:00", "dTimDiaHoleStart": "2008-10-12T22:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": " Complete RD and pack WL.", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": null, "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "14", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Continued water injection F-5 to satisfactory result. Started to RD WL. Hand F-5 back to production.\n\n", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Continued water injection in F-5. 8700m³/day 160 bars.\n\nParallel activity: Prepared equipment/scaffolding for hoisting up in derrick. Hoisted and erected scaffolding in derrick around FWD PRS at upper drive.\n", "dTimEnd": "2008-10-18T06:00:00+02:00", "dTimStart": "2008-10-18T00:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued water injection in F-5. \nMeanwhile: Pressure tested CRI hose to 200 bar/10 min.\n", "dTimEnd": "2008-10-18T17:30:00+02:00", "dTimStart": "2008-10-18T06:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Production prepared well prior to RD WL, due to low WHP, function tested DHSV. Meanwhile held tool box talk prior to commence RD WL. \n", "dTimEnd": "2008-10-18T20:30:00+02:00", "dTimStart": "2008-10-18T17:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Started to RD WL. Cut wire and laid down Cable head and Cal-B. Spooled back wire to the WL winch. RD GIH and Lubricator.", "dTimEnd": "2008-10-19T00:00:00+02:00", "dTimStart": "2008-10-18T20:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2008_10_20
NO 15/9-F-5
NO 15/9-F-5
name
2008-10-19T00:00:00+02:00
2008-10-20T00:00:00+02:00
normal
2018-05-03T13:53:06+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-10-20T00:00:00+02:00", "dTimDiaHoleStart": "2008-10-12T22:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "None", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": null, "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "15", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "RD WL surface equipment. Changed drum in WL winch. Cleared and cleaned area. Removed scaffolding from Moon Pool. RD Schlumberger cable on cantilever.", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "RD WL BOP and riser. RD chiksan on KWV and installed blind cap. Leak tested tree body to 35/380 bar 5/10 min. Opened Swab and KWV and leak tested KWV, blind cap, HMV and XMT cap 35/380bars 5/10 mins. RD test line and placed hole cover.\n", "dTimEnd": "2008-10-19T03:00:00+02:00", "dTimStart": "2008-10-19T00:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Handed well over to production.\n", "dTimEnd": "2008-10-19T03:15:00+02:00", "dTimStart": "2008-10-19T03:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued RD WL surface equipment.\n", "dTimEnd": "2008-10-19T06:00:00+02:00", "dTimStart": "2008-10-19T03:15:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RD WL surface equipment. Changed drum in WL winch. Cleared and cleaned area. Removed scaffolding from Moon Pool. RD Schlumberger cable on cantilever.", "dTimEnd": "2008-10-19T15:45:00+02:00", "dTimStart": "2008-10-19T06:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2012_09_16
NO 15/9-F-5
NO 15/9-F-5
name
2012-09-15T00:00:00+02:00
2012-09-16T00:00:00+02:00
normal
2018-05-03T13:53:06+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2012-09-16T00:00:00+02:00", "dTimDiaHoleStart": "2012-09-15T19:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "R/U on well. RIH and log RST.\n\nExpected status tomorrow at 06:00: Logging RST.\n", "hpht": "0", "md": "-999.99", "mdCsgLast": null, "mdDiaHoleStart": "3660", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "1", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Well handed over from production department. Leak tested XMT cross. Skidded rig in position.", "tightWell": "0", "tvd": null, "tvdCsgLast": null, "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Well handed over from production department. Held brief prior to leaktest XMT cross.", "dTimEnd": "2012-09-15T20:00:00+02:00", "dTimStart": "2012-09-15T19:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Found out that DHSV was open. Closed DHSV and bleed down pressure above to closed drain.", "dTimEnd": "2012-09-15T21:00:00+02:00", "dTimStart": "2012-09-15T20:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Leak tested XMT cross to 20/120 bar for 5/10 min.", "dTimEnd": "2012-09-15T22:30:00+02:00", "dTimStart": "2012-09-15T21:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Skidded rig in position.", "dTimEnd": "2012-09-16T00:00:00+02:00", "dTimStart": "2012-09-15T22:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2012_09_17
NO 15/9-F-5
NO 15/9-F-5
name
2012-09-16T00:00:00+02:00
2012-09-17T00:00:00+02:00
normal
2018-05-03T13:53:07+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2012-09-17T00:00:00+02:00", "dTimDiaHoleStart": "2012-09-15T19:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Log RST. R/D.\n\nExpected status tomorrow at 06:00: Rigging down.", "hpht": "0", "md": "-999.99", "mdCsgLast": null, "mdDiaHoleStart": "3660", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "2", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "R/U wireline equipment on well. Installed RST toolstring in lubricator. Tested R/U. Opened well and RIH. Logged RST-D in sigma mode and RST-D in IC mode.", "tightWell": "0", "tvd": null, "tvdCsgLast": null, "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Changed to workover hatch.", "dTimEnd": "2012-09-16T00:45:00+02:00", "dTimStart": "2012-09-16T00:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held DOP meeting on drill floor prior to R/U on well.", "dTimEnd": "2012-09-16T01:30:00+02:00", "dTimStart": "2012-09-16T00:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed XMT top cap and installed lower riser and BOP. Installed chiksan manifold on KWV.", "dTimEnd": "2012-09-16T03:00:00+02:00", "dTimStart": "2012-09-16T01:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Leak tested lower riser/BOP connections to 20/120 bar for 5/10 min and function tested BOP. Leak tested chiksan manifold against closed KWV to 20/120 bar for 5/10 min.", "dTimEnd": "2012-09-16T04:00:00+02:00", "dTimStart": "2012-09-16T03:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lowered down lower lubricator from rig floor and stabbed onto BOP.", "dTimEnd": "2012-09-16T04:45:00+02:00", "dTimStart": "2012-09-16T04:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed debrief.", "dTimEnd": "2012-09-16T05:00:00+02:00", "dTimStart": "2012-09-16T04:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted up lubricator and GIH in elevator. Add appox 40 litres of Ramex RX 72 into riser.", "dTimEnd": "2012-09-16T05:45:00+02:00", "dTimStart": "2012-09-16T05:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed RST toolstring into lubricator.", "dTimEnd": "2012-09-16T06:00:00+02:00", "dTimStart": "2012-09-16T05:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to install RST toolstring.", "dTimEnd": "2012-09-16T07:15:00+02:00", "dTimStart": "2012-09-16T06:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up connections and filled lubricator with MEG. Tested R/U to 20/120 bar for 5/10 min.", "dTimEnd": "2012-09-16T08:50:00+02:00", "dTimStart": "2012-09-16T07:15:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened well and RIH with BHA#1, RST toolstring to 3645 m. WHP: 42 bar", "dTimEnd": "2012-09-16T12:25:00+02:00", "dTimStart": "2012-09-16T08:50:00+02:00", "md": "3645", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran correlation pass between 3645 and 3420 m. Adjusted the depth according to reference log.", "dTimEnd": "2012-09-16T13:05:00+02:00", "dTimStart": "2012-09-16T12:25:00+02:00", "md": "3642", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Logged RST-D in Sigma mode between 3642 - 3456 m @ 4.5m/min.", "dTimEnd": "2012-09-16T14:20:00+02:00", "dTimStart": "2012-09-16T13:05:00+02:00", "md": "3456", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH from 3456 to 3642.", "dTimEnd": "2012-09-16T14:40:00+02:00", "dTimStart": "2012-09-16T14:20:00+02:00", "md": "3635", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Logged RST-D in IC mode pass#1 from 3635 - 3460m @ 0.5m/min.", "dTimEnd": "2012-09-16T21:45:00+02:00", "dTimStart": "2012-09-16T14:40:00+02:00", "md": "3460", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH from 3460 to 3637.", "dTimEnd": "2012-09-16T22:15:00+02:00", "dTimStart": "2012-09-16T21:45:00+02:00", "md": "3637", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Logged RST-D in IC mode pass#2 from 3637 - 3600 m @ 0.5m/min.", "dTimEnd": "2012-09-17T00:00:00+02:00", "dTimStart": "2012-09-16T22:15:00+02:00", "md": "3600", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2012_09_18
NO 15/9-F-5
NO 15/9-F-5
name
2012-09-17T00:00:00+02:00
2012-09-18T00:00:00+02:00
normal
2018-05-03T13:53:07+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2012-09-18T00:00:00+02:00", "dTimDiaHoleStart": "2012-09-15T19:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "R/D. Hand over well. Demobilise.\n\n", "hpht": "0", "md": "-999.99", "mdCsgLast": null, "mdDiaHoleStart": "3660", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "3", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Logged RST-D in IC mode pass 2 and 3. POOH. Inflow tested HMV,SV and DHSV. L/D BHA#1, RST toolstring. R/D upper lubricator and GIH.", "tightWell": "0", "tvd": null, "tvdCsgLast": null, "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Logged RST-D in IC mode pass#2 from 3600 - 3460 m @ 0.5m/min. WHP: 42 bar.", "dTimEnd": "2012-09-17T06:00:00+02:00", "dTimStart": "2012-09-17T00:00:00+02:00", "md": "3460", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH to 3637 m.", "dTimEnd": "2012-09-17T06:25:00+02:00", "dTimStart": "2012-09-17T06:00:00+02:00", "md": "3637", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Logged RST-D in IC mode pass#3 from 3637 - 3460 m @ 0.5m/min. WHP: 42 bar.", "dTimEnd": "2012-09-17T16:00:00+02:00", "dTimStart": "2012-09-17T06:25:00+02:00", "md": "3460", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with BHA#1 from 3460 m to surface.", "dTimEnd": "2012-09-17T18:30:00+02:00", "dTimStart": "2012-09-17T16:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "OOH. WHP 42 bar. Closed well and inflow tested HMV and SV.", "dTimEnd": "2012-09-17T19:50:00+02:00", "dTimStart": "2012-09-17T18:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed DHSV and bled down to 10 bar. Inflow tested DHSV. Bled off pressure above and closed well. Meanwhile held DOP meeting prior to R/D.", "dTimEnd": "2012-09-17T20:30:00+02:00", "dTimStart": "2012-09-17T19:50:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Had problem to flush lubricator with N2 through manifold on KWV to blow down. Found rubber particles in LTV. Removed rubber and continued to flush lubricator with N2.", "dTimEnd": "2012-09-17T21:45:00+02:00", "dTimStart": "2012-09-17T20:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke lubricator and L/D BHA#1 on drill floor. Inspected same.", "dTimEnd": "2012-09-17T22:25:00+02:00", "dTimStart": "2012-09-17T21:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held brief prior to R/D upper lubricator and GIH.", "dTimEnd": "2012-09-17T22:40:00+02:00", "dTimStart": "2012-09-17T22:25:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D upper lubricator, GIH and hoses. Disassambled lubricator and lifted out lubricator from rig floor.", "dTimEnd": "2012-09-18T00:00:00+02:00", "dTimStart": "2012-09-17T22:40:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2012_09_19
NO 15/9-F-5
NO 15/9-F-5
name
2012-09-18T00:00:00+02:00
2012-09-19T00:00:00+02:00
normal
2018-05-03T13:53:07+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2012-09-19T00:00:00+02:00", "dTimDiaHoleStart": "2012-09-15T19:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "End of operation. ", "hpht": "0", "md": "-999.99", "mdCsgLast": null, "mdDiaHoleStart": "3660", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "4", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "R/D wireline equipment and back loaded equipment. ", "tightWell": "0", "tvd": null, "tvdCsgLast": null, "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Held brief prior to R/D lower lubricator and BOP.", "dTimEnd": "2012-09-18T00:45:00+02:00", "dTimStart": "2012-09-18T00:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted lower lubricator to rig floor with top drive. Lifted BOP away in moon pool. RD lower riser. Installed tree cap. R/D manifold on KWV. Installed KWV cap. Lifted out grease pump and N2 bottles from rig floor. Lifted out BOP from moon pool.", "dTimEnd": "2012-09-18T04:50:00+02:00", "dTimStart": "2012-09-18T00:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up and leak tested XMT cross to 20/280 bar for 5/10 min. Leak tested tree cap and KWV cap to 20/345 bar for 5/10 min.", "dTimEnd": "2012-09-18T06:00:00+02:00", "dTimStart": "2012-09-18T04:50:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to rig down WL equipment. Handed well back to production.", "dTimEnd": "2012-09-18T11:00:00+02:00", "dTimStart": "2012-09-18T06:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Packed and prepared for back load.\n**********End of operation.***************", "dTimEnd": "2012-09-18T12:00:00+02:00", "dTimStart": "2012-09-18T11:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2015_11_03
NO 15/9-F-5
NO 15/9-F-5
name
2015-11-02T00:00:00+01:00
2015-11-03T00:00:00+01:00
normal
2018-05-03T13:53:07+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2015-11-03T00:00:00+01:00", "dTimDiaHoleStart": "2015-11-02T18:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Complete rigging up equipment. Install toolstring and RIH.", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "1", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Skidded rig from F-11B to F-5. Received well from production.", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Skid rig from F-11 B to F-5.", "dTimEnd": "2015-11-02T20:00:00+01:00", "dTimStart": "2015-11-02T18:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed 7/16\" add-on drum, due to cable strands outside criteria for building new cable head. \nMeanwhile received well from production.", "dTimEnd": "2015-11-02T22:00:00+01:00", "dTimStart": "2015-11-02T20:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Had to wait for rigging on XMT due to leak in header valve on water injection line.\nMeanwhile rigged up new add-on drum and changed to wireline hatch.", "dTimEnd": "2015-11-03T00:00:00+01:00", "dTimStart": "2015-11-02T22:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2015_11_04
NO 15/9-F-5
NO 15/9-F-5
name
2015-11-03T00:00:00+01:00
2015-11-04T00:00:00+01:00
normal
2018-05-03T13:53:07+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2015-11-04T00:00:00+01:00", "dTimDiaHoleStart": "2015-11-02T18:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "None", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "2", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Rigged up WL equipment in F-5. Installed BHA #1 and RIH. Logged RST- D Sigma pass across 3625 - 3450 m. Started to log RST-D IC pass across 3525 - 3470 m.", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Waited on production department to isolate injection line.\nMeanwhile rigged up new add on drum.", "dTimEnd": "2015-11-03T01:30:00+01:00", "dTimStart": "2015-11-03T00:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged up KWV manifold. Inflow tested swab valve to 140 bar for 10 min. Leak tested KWV manifold to 20/140 bar for 5/10 min.\nMeanwhile built new GIH and threaded cable. Schlumberger built cable head and tested toolstring.", "dTimEnd": "2015-11-03T04:40:00+01:00", "dTimStart": "2015-11-03T01:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed toolbox talk prior to disconnect XMT cap and land riser, BOP and lubricator.", "dTimEnd": "2015-11-03T04:50:00+01:00", "dTimStart": "2015-11-03T04:40:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Disconnected XMT top cap and Landed riser, BOP and Lubricator. Hooked up hoses for the BOP.\nMeanwhile Schlumberger tested BHA on deck.", "dTimEnd": "2015-11-03T06:00:00+01:00", "dTimStart": "2015-11-03T04:50:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Function tested BOP and leak tested bleed off hoses on wellhead to 20/140 bar for 5/10 min.", "dTimEnd": "2015-11-03T07:00:00+01:00", "dTimStart": "2015-11-03T06:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared for lifting lubricator.", "dTimEnd": "2015-11-03T09:30:00+01:00", "dTimStart": "2015-11-03T07:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting on rig floor prior to lift up lubricator and perform RST logging.", "dTimEnd": "2015-11-03T10:00:00+01:00", "dTimStart": "2015-11-03T09:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted lubricator into vertical position. MU QTS to riser.", "dTimEnd": "2015-11-03T11:00:00+01:00", "dTimStart": "2015-11-03T10:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U BHA # 1 2,51\" RST-D. M/U lubricator to QTS.", "dTimEnd": "2015-11-03T11:15:00+01:00", "dTimStart": "2015-11-03T11:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Fill RU with 100% MEG. Leak tested lubricator/QTS/riser against SV to 20/200 bar 5/10 min.", "dTimEnd": "2015-11-03T12:40:00+01:00", "dTimStart": "2015-11-03T11:15:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on Production for pumping and equalizing pressure over DHSV.", "dTimEnd": "2015-11-03T13:00:00+01:00", "dTimStart": "2015-11-03T12:40:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened HMV and equalized pressure above DHSV, applied 430 bar on CL to DHSV. WHP 57 bar when DHSV equalized. Opened SV.", "dTimEnd": "2015-11-03T13:45:00+01:00", "dTimStart": "2015-11-03T13:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ BHA # 1 2,51\" OD RST-D from surface m to 383m, WHP 57 bar.", "dTimEnd": "2015-11-03T14:00:00+01:00", "dTimStart": "2015-11-03T13:45:00+01:00", "md": "383", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Schlumberger checked communication with logging tool.", "dTimEnd": "2015-11-03T14:15:00+01:00", "dTimStart": "2015-11-03T14:00:00+01:00", "md": "383", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to RIH from 383 m to 3630 m.\nDepth P/U\n2000 m 2600 lbs\n2400 m 3150 lbs\n3000 m 3900 lbs\n3200 m 4300 lbs\n3600 m 4500 lbs\nFriction factor 0,22.", "dTimEnd": "2015-11-03T16:15:00+01:00", "dTimStart": "2015-11-03T14:15:00+01:00", "md": "3630", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Logged RST-D Sigma pass at 4,5 m/min across interval 3625 - 3450 m. WHP 56 bar.", "dTimEnd": "2015-11-03T17:05:00+01:00", "dTimStart": "2015-11-03T16:15:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH to perform RST-D IC pass at 0,5 m/min across interval 3525 - 3470 m . Performed three passes. \nMeanwhile interpreted logging data. Decided to run a fourth pass while interpretating. WHP 54 bar.", "dTimEnd": "2015-11-04T00:00:00+01:00", "dTimStart": "2015-11-03T17:05:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2015_11_05
NO 15/9-F-5
NO 15/9-F-5
name
2015-11-04T00:00:00+01:00
2015-11-05T00:00:00+01:00
normal
2018-05-03T13:53:07+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2015-11-05T00:00:00+01:00", "dTimDiaHoleStart": "2015-11-02T18:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Pack equipment, clean and tidy area.", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "3", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Logged RST-D IC pass across interval 3525 - 3470 m. Rigged down WL equipment. Tested XMT valves and DHSV. Handed well back to production. Started to rig down for demobilization.", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Logged fourth RST-D IC pass across interval 3525 - 3470 m. Completed logging.", "dTimEnd": "2015-11-04T02:10:00+01:00", "dTimStart": "2015-11-04T00:00:00+01:00", "md": "3470", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH from 3470 m to surface . WHP bar. 54 bar.", "dTimEnd": "2015-11-04T03:45:00+01:00", "dTimStart": "2015-11-04T02:10:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed SV & HMV and inflow tested same. Purged lubricator with N2. Observed grease in bleed off hose.", "dTimEnd": "2015-11-04T05:10:00+01:00", "dTimStart": "2015-11-04T03:45:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Found empty container to drain grease, to avoid getting same into bleed-off lines.", "dTimEnd": "2015-11-04T05:45:00+01:00", "dTimStart": "2015-11-04T05:10:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to purge lubricator.", "dTimEnd": "2015-11-04T06:00:00+01:00", "dTimStart": "2015-11-04T05:45:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed toolbox talk prior to L/D BHA#1.", "dTimEnd": "2015-11-04T06:10:00+01:00", "dTimStart": "2015-11-04T06:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke lubricator and L/D BHA on deck.", "dTimEnd": "2015-11-04T07:00:00+01:00", "dTimStart": "2015-11-04T06:10:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged down top lubricator and prepared for rigging down lubricator.", "dTimEnd": "2015-11-04T08:00:00+01:00", "dTimStart": "2015-11-04T07:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed BOP and opened HMV. Bled off pressure above DHSV and inflow tested same, 0,03 bar/30 min.", "dTimEnd": "2015-11-04T09:15:00+01:00", "dTimStart": "2015-11-04T08:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened BOP. Rigged down lubricator and L/D on drill floor. Disconnected hoses to BOP. Lifted BOP and placed same in moonpool. \nMeanwhile Schlumberger rigged down logging unit.", "dTimEnd": "2015-11-04T13:00:00+01:00", "dTimStart": "2015-11-04T09:15:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Disconnected lower riser section and L/D same on drill floor. Installed top cap. Disconnected KWV manifold and installed KWV cap.", "dTimEnd": "2015-11-04T14:40:00+01:00", "dTimStart": "2015-11-04T13:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Leak tested top cap and KWV cap to 20/345 bar for 5/10 min.", "dTimEnd": "2015-11-04T16:15:00+01:00", "dTimStart": "2015-11-04T14:40:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Disconnected hoses to XMT HMV and DHSV. Cleaned and tidy area. Handed well over to production department.", "dTimEnd": "2015-11-04T17:30:00+01:00", "dTimStart": "2015-11-04T16:15:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted lubricators into containers and rigged down equipment on pipedeck. Lifted BOP from moonpool into container on pipedeck.", "dTimEnd": "2015-11-04T19:00:00+01:00", "dTimStart": "2015-11-04T17:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Reeled back HMV & DHSV and packed skid. Packed BOP pressure control skid.", "dTimEnd": "2015-11-04T22:00:00+01:00", "dTimStart": "2015-11-04T19:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Packed chicksan container and removed scaffolding around wireline winch.", "dTimEnd": "2015-11-05T00:00:00+01:00", "dTimStart": "2015-11-04T22:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2015_11_06
NO 15/9-F-5
NO 15/9-F-5
name
2015-11-05T00:00:00+01:00
2015-11-06T00:00:00+01:00
normal
2018-05-03T13:53:07+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2015-11-06T00:00:00+01:00", "dTimDiaHoleStart": "2015-11-02T18:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Operation complete. Demobilize personnel and equipment.", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "4", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Packed wireline equipment ready for backload. Cleaned and tidy area.", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Packed wireline winch and 7/16\" add-on.", "dTimEnd": "2015-11-05T03:00:00+01:00", "dTimStart": "2015-11-05T00:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Packed Altus work container. Cleaned and tidy area. \n\n----------------------- END OF OPERATION ----------------------", "dTimEnd": "2015-11-05T07:00:00+01:00", "dTimStart": "2015-11-05T03:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2016_04_19
NO 15/9-F-5
NO 15/9-F-5
name
2016-04-18T00:00:00+02:00
2016-04-19T00:00:00+02:00
normal
2018-05-03T13:53:07+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-04-19T00:00:00+02:00", "dTimDiaHoleStart": "2016-04-18T06:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Perforate well intervals (2 runs), R/D WL equipment", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "1", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "R/U WL equipment. Installed plug @ 3592 mMD.", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Skidded rig from F-11 to F-5", "dTimEnd": "2016-04-18T09:00:00+02:00", "dTimStart": "2016-04-18T06:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Handover meeting of well from production department to Intervention.", "dTimEnd": "2016-04-18T09:15:00+02:00", "dTimStart": "2016-04-18T09:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed permanent hatch with WL hatch.", "dTimEnd": "2016-04-18T09:45:00+02:00", "dTimStart": "2016-04-18T09:15:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged up chiksan manifold to KWV. Leak tested same to 20/345 bar for 5/10 min. Removed Top cap on XMT.\n", "dTimEnd": "2016-04-18T10:00:00+02:00", "dTimStart": "2016-04-18T09:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk before lifting Riser section and BOP to XMT.\n", "dTimEnd": "2016-04-18T10:10:00+02:00", "dTimStart": "2016-04-18T10:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted and installed riser section and BOP from moonpool area to XMT.", "dTimEnd": "2016-04-18T11:00:00+02:00", "dTimStart": "2016-04-18T10:10:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Connected Altus pump and hoses for local control of DHSV and HMV.", "dTimEnd": "2016-04-18T11:35:00+02:00", "dTimStart": "2016-04-18T11:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted lubricator and GIH from catwalk and hung off above riser section on drill floor.", "dTimEnd": "2016-04-18T12:20:00+02:00", "dTimStart": "2016-04-18T11:35:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox meeting prior to installing BHA #1 (572-700 ME plug) in lubricator.", "dTimEnd": "2016-04-18T12:30:00+02:00", "dTimStart": "2016-04-18T12:20:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U BHA for run #1 (572-700 ME plug). Leak tested lubricator to 20/345 bar 5/10 min.", "dTimEnd": "2016-04-18T15:20:00+02:00", "dTimStart": "2016-04-18T12:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Equalized and opened HMV and DHSV. WHP = 45 bar", "dTimEnd": "2016-04-18T15:45:00+02:00", "dTimStart": "2016-04-18T15:20:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened SV and RIH with BHA #1 (572-700 ME plug) to 278 mMD. Schlumberger checked tools.", "dTimEnd": "2016-04-18T16:20:00+02:00", "dTimStart": "2016-04-18T15:45:00+02:00", "md": "278", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH and observed BHA starting to float. Reduced speed to 20 m/min and continue to RIH to 3630 mMD. \nTook PUW every 500 m.\n\nDepth (m) PUW (Lbs) \n500 1310\n1000 1830\n1500 2490\n2000 3020\n2500 3780\n3000 4600\n3500 5450\n\nActual Friction factor: 0,3.", "dTimEnd": "2016-04-18T19:10:00+02:00", "dTimStart": "2016-04-18T16:20:00+02:00", "md": "3630", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed correlation passes prior to installing plug. Observed some problems while correlating due to stick slip on BHA.", "dTimEnd": "2016-04-18T20:00:00+02:00", "dTimStart": "2016-04-18T19:10:00+02:00", "md": "3630", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Positioned and installed plug with mid packer element at 3592 mMD. Lost 300 lbs on tension during installation. WHP before/after setting 45 / 45 bar.", "dTimEnd": "2016-04-18T20:25:00+02:00", "dTimStart": "2016-04-18T20:00:00+02:00", "md": "3592", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH from 3592 m to surface . WHP decreased from 45 bar to 2,4 bar while POOH.", "dTimEnd": "2016-04-18T22:25:00+02:00", "dTimStart": "2016-04-18T20:25:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attempted to leak test XMT. Unable due to leakage. Most likely in PWV.", "dTimEnd": "2016-04-18T22:45:00+02:00", "dTimStart": "2016-04-18T22:25:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressured up tubing to 50 bar to inflow test SV and HMV.", "dTimEnd": "2016-04-18T23:00:00+02:00", "dTimStart": "2016-04-18T22:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed and inflow tested HMV and SV.", "dTimEnd": "2016-04-18T23:25:00+02:00", "dTimStart": "2016-04-18T23:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Bled down tubing pressure to 5 bar. Inflow tested ME plug to 45 bar dP for 30 min. Pressure increased 0,15 bar / 30 min", "dTimEnd": "2016-04-19T00:00:00+02:00", "dTimStart": "2016-04-18T23:25:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2016_04_20
NO 15/9-F-5
NO 15/9-F-5
name
2016-04-19T00:00:00+02:00
2016-04-20T00:00:00+02:00
normal
2018-05-03T13:53:07+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-04-20T00:00:00+02:00", "dTimDiaHoleStart": "2016-04-18T06:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "R/D WL equipment. Handover well to production.", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "2", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Perforated two new intervals in well.", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Purged Lubricator with N2.", "dTimEnd": "2016-04-19T00:45:00+02:00", "dTimStart": "2016-04-19T00:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior to L/D BHA #1.", "dTimEnd": "2016-04-19T00:50:00+02:00", "dTimStart": "2016-04-19T00:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke lubricator and L/D BHA #1 on deck. Checked and verified setting tool OK.", "dTimEnd": "2016-04-19T01:30:00+02:00", "dTimStart": "2016-04-19T00:50:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Schlumberger tested cable head.", "dTimEnd": "2016-04-19T02:00:00+02:00", "dTimStart": "2016-04-19T01:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior to M/U BHA #2 (Perforation guns)", "dTimEnd": "2016-04-19T02:10:00+02:00", "dTimStart": "2016-04-19T02:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted BHA up to drill deck using rig crane.", "dTimEnd": "2016-04-19T02:50:00+02:00", "dTimStart": "2016-04-19T02:10:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U BHA for run #2 (Perforation guns). Leak tested QTS to 20/160 bar 5/10 min.", "dTimEnd": "2016-04-19T04:25:00+02:00", "dTimStart": "2016-04-19T02:50:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened SV and HMV. WHP = 0 bar.", "dTimEnd": "2016-04-19T04:30:00+02:00", "dTimStart": "2016-04-19T04:25:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ run #2 (Perforation guns), 4 1/2\" OD guns to 600 m.", "dTimEnd": "2016-04-19T04:55:00+02:00", "dTimStart": "2016-04-19T04:30:00+02:00", "md": "600", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Schlumberger powered up and checked tools at 600 m", "dTimEnd": "2016-04-19T05:05:00+02:00", "dTimStart": "2016-04-19T04:55:00+02:00", "md": "600", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to RIH with BHA #2 from 600 m to 3550 m. \nTook PUW every 500 m\n\nDepth (m) PUW(lbs)\n500 2250\n1000 2850\n1500 3540\n2000 4050\n2500 4800\n3000 5400\n3500 6100\n\n\nActual friction factor: 0,18", "dTimEnd": "2016-04-19T06:15:00+02:00", "dTimStart": "2016-04-19T05:05:00+02:00", "md": "3550", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed 4 correlation passes interval 3460 m to 3550 m.", "dTimEnd": "2016-04-19T06:50:00+02:00", "dTimStart": "2016-04-19T06:15:00+02:00", "md": "3550", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and placed bottom shot at 3510 m and top shot at 3501 m. Bled off WHP to 3 bar, took some time to bleed off.", "dTimEnd": "2016-04-19T07:30:00+02:00", "dTimStart": "2016-04-19T06:50:00+02:00", "md": "3510", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Perforated well interval 3501-3510 m. Lost 170 lbs on tension. \nWHP before/after 3/12,2 bar , A-Annulus before/after 12,8/12,8 bar, B-annulus before after 7,2/7,2 bar", "dTimEnd": "2016-04-19T07:35:00+02:00", "dTimStart": "2016-04-19T07:30:00+02:00", "md": "3510", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Logged CCL up from shooting depth to 3460m.", "dTimEnd": "2016-04-19T07:45:00+02:00", "dTimStart": "2016-04-19T07:35:00+02:00", "md": "3460", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued POOH to surface. WHP = 11,9 bar.", "dTimEnd": "2016-04-19T09:55:00+02:00", "dTimStart": "2016-04-19T07:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed HMV and SV. Inflow tested SV by pressuring up XMT to 200 bar.", "dTimEnd": "2016-04-19T10:25:00+02:00", "dTimStart": "2016-04-19T09:55:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Purged lubricator with N2.", "dTimEnd": "2016-04-19T11:05:00+02:00", "dTimStart": "2016-04-19T10:25:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior to L/D perforation BHA.", "dTimEnd": "2016-04-19T11:20:00+02:00", "dTimStart": "2016-04-19T11:05:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke lubricator. L/D BHA on deck. Confirmed all shots fired.", "dTimEnd": "2016-04-19T12:30:00+02:00", "dTimStart": "2016-04-19T11:20:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Schlumberger tested tools for next run with BHA #3 (Perforation guns).", "dTimEnd": "2016-04-19T14:40:00+02:00", "dTimStart": "2016-04-19T12:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior to R/U BHA #3 (Perforation guns)", "dTimEnd": "2016-04-19T14:50:00+02:00", "dTimStart": "2016-04-19T14:40:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U BHA for run #3 (Perforation guns). Stabbed lubricator and leak tested QTS to 20/160 bar 5/10 min.", "dTimEnd": "2016-04-19T16:20:00+02:00", "dTimStart": "2016-04-19T14:50:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Equalized and opened SV and HMV. WHP = 13,5 bar.", "dTimEnd": "2016-04-19T16:50:00+02:00", "dTimStart": "2016-04-19T16:20:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ run #3 (Perforation guns), 4 1/2\" OD guns from surface to 600 m.", "dTimEnd": "2016-04-19T17:15:00+02:00", "dTimStart": "2016-04-19T16:50:00+02:00", "md": "600", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Schlumberger powered up and checked tools at 600 m", "dTimEnd": "2016-04-19T17:25:00+02:00", "dTimStart": "2016-04-19T17:15:00+02:00", "md": "600", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to RIH with BHA #3 from 600 m to 3550 m.\nTook PUW every 500m.\n\nDepth (m) PUW (lbs)\n500 2400\n1000 3100\n1500 3850\n2000 4400\n2500 5100\n3000 5800\n3500 6250\n\nActual friction factor: 0,18", "dTimEnd": "2016-04-19T18:45:00+02:00", "dTimStart": "2016-04-19T17:25:00+02:00", "md": "3550", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed 5 correlation passes across interval 3430 m - 3507 m.", "dTimEnd": "2016-04-19T19:20:00+02:00", "dTimStart": "2016-04-19T18:45:00+02:00", "md": "3507", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and placed bottom shot at 3492 m and top shot at 3474 m.", "dTimEnd": "2016-04-19T19:25:00+02:00", "dTimStart": "2016-04-19T19:20:00+02:00", "md": "3492", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Perforated well interval 3474-3492 m. Lost 380 lbs on tension. \nWHP before/after 12,8/8,6 bar , A-Annulus before/after 12,7/12,7 bar, B-annulus before after 7,2/7,2 bar.", "dTimEnd": "2016-04-19T19:35:00+02:00", "dTimStart": "2016-04-19T19:25:00+02:00", "md": "3492", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Logged CCL up from shooting depth to 3430m.", "dTimEnd": "2016-04-19T19:45:00+02:00", "dTimStart": "2016-04-19T19:35:00+02:00", "md": "3430", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH from 3430 m to surface. WHP: 9 bar", "dTimEnd": "2016-04-19T21:25:00+02:00", "dTimStart": "2016-04-19T19:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed HMV and SV.", "dTimEnd": "2016-04-19T21:35:00+02:00", "dTimStart": "2016-04-19T21:25:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Purged lubricator with N2. Had to open SV and take return through XMT due to \"grey grease\" liquid in lubricator.", "dTimEnd": "2016-04-19T22:50:00+02:00", "dTimStart": "2016-04-19T21:35:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed and inflow tested SV and HMV.", "dTimEnd": "2016-04-19T23:30:00+02:00", "dTimStart": "2016-04-19T22:50:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior to L/D perforation BHA.", "dTimEnd": "2016-04-19T23:45:00+02:00", "dTimStart": "2016-04-19T23:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke lubricator to L/D BHA #3.", "dTimEnd": "2016-04-20T00:00:00+02:00", "dTimStart": "2016-04-19T23:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2016_04_21
NO 15/9-F-5
NO 15/9-F-5
name
2016-04-20T00:00:00+02:00
2016-04-21T00:00:00+02:00
normal
2018-05-03T13:53:07+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-04-21T00:00:00+02:00", "dTimDiaHoleStart": "2016-04-18T06:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Skid to F-11", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "3", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "Rigged down WL equipment", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "L/D BHA #3 on deck. Confirmed all shots fired.", "dTimEnd": "2016-04-20T00:30:00+02:00", "dTimStart": "2016-04-20T00:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U dummy BHA for testing lubricator. Installed and stabbed lubricator. Leak tested QTS in lubricator to 20/160 bar for 5/10 min", "dTimEnd": "2016-04-20T01:10:00+02:00", "dTimStart": "2016-04-20T00:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed DHSV and opened HMV. Bled down pressure in tubing from 9 bar to 1 bar.", "dTimEnd": "2016-04-20T01:45:00+02:00", "dTimStart": "2016-04-20T01:10:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Inflow tested DHSV to 8 bar dP for 30 min. Pressure increased 0,27 bar / 30 min.", "dTimEnd": "2016-04-20T02:30:00+02:00", "dTimStart": "2016-04-20T01:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior to L/D Lubricator and GIH to catwalk.", "dTimEnd": "2016-04-20T02:40:00+02:00", "dTimStart": "2016-04-20T02:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed HMV. Broke lubricator and L/D Dummy BHA.", "dTimEnd": "2016-04-20T02:55:00+02:00", "dTimStart": "2016-04-20T02:40:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D Lubricator and GIH on catwalk using rig-crane and top drive.", "dTimEnd": "2016-04-20T03:35:00+02:00", "dTimStart": "2016-04-20T02:55:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Stabbed on lifting sub to riser section. Unable to latch with drilling elevator due to hydraulic leakage.", "dTimEnd": "2016-04-20T03:40:00+02:00", "dTimStart": "2016-04-20T03:35:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited for mechanic to fix hydraulic leakage in drilling elevator.\n\nMeanwhile, leak tested KWV to 20/345 bar for 5/10 min.", "dTimEnd": "2016-04-20T04:30:00+02:00", "dTimStart": "2016-04-20T03:40:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Disconnected lower riser from XMT. Liftet entire riser section and BOP from XMT up to moonpool area.", "dTimEnd": "2016-04-20T04:50:00+02:00", "dTimStart": "2016-04-20T04:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed top cap on XMT. Tested same to 20/345 bar for 5/10 min.", "dTimEnd": "2016-04-20T05:30:00+02:00", "dTimStart": "2016-04-20T04:50:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Handed well over from Intervention to Production department.\n\n------------------------ End of Operation ----------------------", "dTimEnd": "2016-04-20T06:45:00+02:00", "dTimStart": "2016-04-20T05:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2016_08_29
NO 15/9-F-5
NO 15/9-F-5
name
2016-08-28T00:00:00+02:00
2016-08-29T00:00:00+02:00
normal
2018-05-03T13:53:07+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-08-29T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-28T17:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Pressure test cement spool and KW manifold.\n- Bullhead 3 x well volumes of SW\n- Bullhead cement in 7\" liner\n- WOC\n- Pressure test and inflow test cement\n- Inflow test DHSV", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "1", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "- Skidded cantilever to F-5\n- Removed hatch\n- Installed cement spool\n- Rigged up chiksan hoses on cmt spool and XT.", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Performed TBT for skidding cantilever to F-5.", "dTimEnd": "2016-08-28T18:00:00+02:00", "dTimStart": "2016-08-28T17:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared and skidded rig 3m port and 2m aft.", "dTimEnd": "2016-08-28T19:00:00+02:00", "dTimStart": "2016-08-28T18:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT with ongoing crew", "dTimEnd": "2016-08-28T19:15:00+02:00", "dTimStart": "2016-08-28T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared to continue skidding rig.\nNoticed cantilever in correct position to swap hatches on F-7 and F-9 (for upcoming future operations on F-9).", "dTimEnd": "2016-08-28T19:30:00+02:00", "dTimStart": "2016-08-28T19:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for swapping hatches on F-7 and F-9.\nMeanwhile: Worked on flow line cover.", "dTimEnd": "2016-08-28T19:45:00+02:00", "dTimStart": "2016-08-28T19:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Swapped hatches on well F-7 and F-9.\nMeanwhile: Worked on flow line cover.", "dTimEnd": "2016-08-28T22:00:00+02:00", "dTimStart": "2016-08-28T19:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Skidded cantilever to well F-5", "dTimEnd": "2016-08-28T22:45:00+02:00", "dTimStart": "2016-08-28T22:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed stairs to access cantilever.", "dTimEnd": "2016-08-28T23:00:00+02:00", "dTimStart": "2016-08-28T22:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed hatch on F-5 and installed half moon hatches.\nMeanwhile: Opened doors on BOP. Worked on flow line cover/goose neck.", "dTimEnd": "2016-08-29T00:00:00+02:00", "dTimStart": "2016-08-28T23:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2016_08_30
NO 15/9-F-5
NO 15/9-F-5
name
2016-08-29T00:00:00+02:00
2016-08-30T00:00:00+02:00
normal
2018-05-03T13:53:08+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-08-30T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-28T17:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- WOC. Meanwhile: Continue BOP test\n- Pressure test and inflow test cement plug\n- Inflow test DHSV\n- R/D cement spool\n- N/D XT and spacer spool", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "2", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "- R/U cement spool\n- Built scaffolding around cement spool and BOP stump\n- Pressure tested cement spool and kill wing\n- Bullheaded hydrocarbons back into well\n- Bullheaded cement in 7\" liner\n- WOC. Meanwhile: Prepare and perform BOP test", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Continued to remove hatch on F-5", "dTimEnd": "2016-08-29T00:30:00+02:00", "dTimStart": "2016-08-29T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for R/U cement spool", "dTimEnd": "2016-08-29T00:45:00+02:00", "dTimStart": "2016-08-29T00:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U cement spool to XT", "dTimEnd": "2016-08-29T02:30:00+02:00", "dTimStart": "2016-08-29T00:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U chiksan and hoses to cement spool.\nInstalled half moon hatches\n\nMeanwhile: Pressure tested cement unit.", "dTimEnd": "2016-08-29T04:00:00+02:00", "dTimStart": "2016-08-29T02:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Built scaffolding around cement spool and BOP stump.\nContinued working on BOP, opened up rams for inspection/cleaning. Found minor traces of cement and swarf.\nMeanwhile: Performed post-skid checks and housekeeping in drilling areas. Short change of drilling crew at 0400.", "dTimEnd": "2016-08-29T06:00:00+02:00", "dTimStart": "2016-08-29T04:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued building scaffolding around cement spool and BOP stump.\nContinued working on BOP, cleaning.\nMeanwhile: Continued post-skid checks and housekeeping.", "dTimEnd": "2016-08-29T07:30:00+02:00", "dTimStart": "2016-08-29T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Connected cement spool bleed-off hose.\nContinued working on BOP.\nMeanwhile: Performed post-skid checks, housekeeping and dailys.", "dTimEnd": "2016-08-29T08:15:00+02:00", "dTimStart": "2016-08-29T07:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Build scaffolding hand rails and stairs for safe access to hatch deck.\nMeanwhile: Continued working on BOP, performed post-skid checks and housekeeping.", "dTimEnd": "2016-08-29T08:45:00+02:00", "dTimStart": "2016-08-29T08:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for pressure testing cement spool", "dTimEnd": "2016-08-29T09:00:00+02:00", "dTimStart": "2016-08-29T08:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continue building scaffolding hand rails and stairs for safe access to hatch deck.\nMeanwhile: Continued working on BOP, performed post-skid checks and housekeeping.", "dTimEnd": "2016-08-29T10:00:00+02:00", "dTimStart": "2016-08-29T09:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up and flushed lines to cement spool.\nPressure tested cement spool to 20/335 bar for 5/10 min. Bled off pressure to closed drain.", "dTimEnd": "2016-08-29T11:00:00+02:00", "dTimStart": "2016-08-29T10:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up and attempted pressure tested kill wing manifold 20/335 bar.\nLeaking hose between kill manifold and cement spool.", "dTimEnd": "2016-08-29T12:00:00+02:00", "dTimStart": "2016-08-29T11:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Replaced leaking hose.", "dTimEnd": "2016-08-29T13:00:00+02:00", "dTimStart": "2016-08-29T12:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressure tested kill wing manifold to 20/335 for 5/10 min.", "dTimEnd": "2016-08-29T13:45:00+02:00", "dTimStart": "2016-08-29T13:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for bullheading SW", "dTimEnd": "2016-08-29T14:00:00+02:00", "dTimStart": "2016-08-29T13:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened HMV, 7 bar trapped below.\nBled off pressure in well to 1,3 bar through closed drain.", "dTimEnd": "2016-08-29T16:15:00+02:00", "dTimStart": "2016-08-29T14:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened SV and trapped 10 bar behind LTV 7 on cmt spool. Opened LTV 7 and observed pressure drop, correct line up.\nPressured up control line for DHSV to 520 bar.\n\nBullheaded 3 m3 50/50 MEG/SW followed by 10 m3 wash pill at 200-400 lpm. DHSV equalized at 54 bar after 8 m3 pumped.\nLined over to SW, and bullheaded SW at 1300 lpm. Observed pressure increasing to 305 bar after 76 m3 of SW pumped.\nDecreased flow to 1000 lpm, pressure decreased and stabilized at +/- 245 bar. Increased flow in steps to 1300 lpm / 273 bar. Continued bullheading 182 m3 SW at 1300 lpm, pressure decreased and stabilized at 1300 lpm / 250 bar.\n\nTotally pumped 258 m2 of SW.\n\nMeanwhile: Performed TBT for cement job.", "dTimEnd": "2016-08-29T20:30:00+02:00", "dTimStart": "2016-08-29T16:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Shut down pumps and lined up to cement unit.", "dTimEnd": "2016-08-29T20:45:00+02:00", "dTimStart": "2016-08-29T20:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed LTV 7 and opened LTV 9.\nReleased bottom dart.\nMixed and pumped 12,3m3 1,90sg cement slurry at 600 lpm / 175 bar.\nDisplaced surface lines with 0,9m3 hi-vis pill from cement unit.\n\nReleased top dart. Closed LTV 9 and opened LTV 11.\nContinued pumping 13,7m3 hi-vis pill from cement unit at 600 lpm / 150 bar.\n\nOpened LTV 7 and LTV 9.\nPumped 38,3 m3 SW at 1300 lpm / 194 bar from cement unit. Cycled DHSV 3x times after 30 m3 SW pumped.\n\nPumped 4,3m3 contamination pill from cement unit at 700 lpm / 160 bar.\nFinal squeeze pressure 208 bar. Final static pressure 96 bar.\n\nStopped pumping. Estimated TOC at 2949 mMD.", "dTimEnd": "2016-08-29T22:30:00+02:00", "dTimStart": "2016-08-29T20:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOC\nClosed SV and bled off pressure in cement spool to closed drain.\nMeanwhile: Monitored pressure in XT cross from control room.", "dTimEnd": "2016-08-30T00:00:00+02:00", "dTimStart": "2016-08-29T22:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2016_08_31
NO 15/9-F-5
NO 15/9-F-5
name
2016-08-30T00:00:00+02:00
2016-08-31T00:00:00+02:00
normal
2018-05-03T13:53:08+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-08-31T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-28T17:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Install communication collar and prepare wellhead for BOP riser.\n- N/U HP riser and BOP\n- Perform connector test\n- Retrieve BPV plug\n- RIH with THRT\n- R/U WL and cut tubing", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "2949", "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "3", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "- WOC. Meanwhile: Performed BOP test\n- Pressure tested and inflow tested cement plug\n- Performed low and high pressure inflow test of DHSV\n- R/D cement spool\n- Installed BPV plug\n- N/D X-mas tree", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "WOC\nInspected and prepared BOP for pressure testing.\nMeanwhile: Monitored pressure in XT cross from control room. Bled off pressure in XT cross from 133 bar to 96 bar.", "dTimEnd": "2016-08-30T01:00:00+02:00", "dTimStart": "2016-08-30T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOC\nContinued inspection of BOP. Prepared for pressure testing BOP and manifold. Unable to achieve pressure test of cement unit.\nMeanwhile: Monitored pressure in XT cross from control room. Bled off pressure in XT cross from 133 bar to 96 bar. Started to change out PRS wires.", "dTimEnd": "2016-08-30T02:00:00+02:00", "dTimStart": "2016-08-30T01:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOC\nN/U NT2 connector on BOP. Troubleshot leak on cement unit.\nMeanwhile: Monitored pressure in XT cross from control room. Bled off pressure in XT cross from 137 bar to 96 bar. Continued changing PRS wires.", "dTimEnd": "2016-08-30T04:00:00+02:00", "dTimStart": "2016-08-30T02:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOC\nPrepared BOP test mandrel. Performed TBT for BOP test.\nStarted BOP test. Pressure tested kill manifold to 20/345 bar for 5/10 min.\nLined up and flushed BOP.\nMeanwhile: Monitored pressure in XT cross from control room. Bled off pressure in XT cross from 136 bar to 96 bar", "dTimEnd": "2016-08-30T06:00:00+02:00", "dTimStart": "2016-08-30T04:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOC\nPressure tested LPR to 20/345 bar for 5/10 min with SW.", "dTimEnd": "2016-08-30T07:00:00+02:00", "dTimStart": "2016-08-30T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOC\nPerformed TBT for pressure testing BOP with onging crew.\nContinued BOP test.", "dTimEnd": "2016-08-30T09:00:00+02:00", "dTimStart": "2016-08-30T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for pressure testing and inflow testing cement plug", "dTimEnd": "2016-08-30T09:15:00+02:00", "dTimStart": "2016-08-30T09:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed HMV and bled off pressure between SV and HMV to closed drain.\nOpened SV and equalized pressure above HMV\nOpened HMV and increase pressure to 315 bar\nClosed SV and bled off pressure above SV", "dTimEnd": "2016-08-30T10:00:00+02:00", "dTimStart": "2016-08-30T09:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attempted to pressure test cement plug to 315 bar for 10 min. Monitored pressure in XT cross from control room. Increasing pressure trend.\nMeanwhile: Continued pressure testing BOP.", "dTimEnd": "2016-08-30T10:45:00+02:00", "dTimStart": "2016-08-30T10:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Bled down pressure to 80 bar to closed drain. Observed pressure for 5 min.\nContinued bleeding down pressure in 10 bar increments to 10 bar.\nMeanwhile: Continued BOP test.", "dTimEnd": "2016-08-30T12:30:00+02:00", "dTimStart": "2016-08-30T10:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Inflow tested cement plug to 15 bar differential pressure for 30 min.\nMeanwhile: Continued BOP test.", "dTimEnd": "2016-08-30T13:15:00+02:00", "dTimStart": "2016-08-30T12:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up and equalized above SV. Opened SV and pressure tested cement plug to 315 bar for 10 min.\nMeanwhile: Opened BOP and removed test mandrel.", "dTimEnd": "2016-08-30T13:45:00+02:00", "dTimStart": "2016-08-30T13:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed DHSV and bled down pressure to 240 bar above.\nPerformed low pressure inflow test of DHSV to 70 bar / 30 min\nBled down pressure above DHSV to 10 bar.\nPerformed hi-pressure inflow test of DHSV to 305 bar / 30 min.", "dTimEnd": "2016-08-30T15:15:00+02:00", "dTimStart": "2016-08-30T13:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressured up to 315 bar to equalize pressure above DHSV.\nOpened DHSV and bled down pressure in well to 20 bar. Closed DHSV.\nBled off all pressure above DHSV.\nClosed SV.\nOpedned SV and confirmed no pressure build-up. Drained cement spool and closed SV.\nMeanwhile: Performed TBT for R/D cement spool", "dTimEnd": "2016-08-30T16:30:00+02:00", "dTimStart": "2016-08-30T15:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Disconnected hoses and removed gauges from cement spool", "dTimEnd": "2016-08-30T17:00:00+02:00", "dTimStart": "2016-08-30T16:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed XT instrumentation.\nMeanwhile: BOP POD. Disconnected BOP NT2 connector from stump. Pressure tested manifolds.", "dTimEnd": "2016-08-30T18:00:00+02:00", "dTimStart": "2016-08-30T17:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued R/D cement spool. Removed scaffolding.\nMeanwhile: Pressure tested manifolds.", "dTimEnd": "2016-08-30T19:00:00+02:00", "dTimStart": "2016-08-30T18:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for R/D cement spool with ongoing crew.", "dTimEnd": "2016-08-30T19:15:00+02:00", "dTimStart": "2016-08-30T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Checked all lifting equipment for lifting cement spool.", "dTimEnd": "2016-08-30T19:30:00+02:00", "dTimStart": "2016-08-30T19:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted cement spool and L/D in moonpool.", "dTimEnd": "2016-08-30T21:00:00+02:00", "dTimStart": "2016-08-30T19:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and attempted to install BPV plug\nPlug not catching onto threads, possibly due to dirt in TH area.", "dTimEnd": "2016-08-30T22:00:00+02:00", "dTimStart": "2016-08-30T21:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out with BPV plug and inspected same. Threads in good condition, and no damages on the plug.\nRe-attempted several times to install plug.", "dTimEnd": "2016-08-30T23:30:00+02:00", "dTimStart": "2016-08-30T22:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Left BPV plug loose in the TH to act as junk catcher for the DHSV.", "dTimEnd": "2016-08-31T00:00:00+02:00", "dTimStart": "2016-08-30T23:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2016_09_01
NO 15/9-F-5
NO 15/9-F-5
name
2016-08-31T00:00:00+02:00
2016-09-01T00:00:00+02:00
normal
2018-05-03T13:53:08+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-09-01T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-28T17:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- R/U WL\n- Cut tubing at 2774 mMD\n- Displace A-annulus to SW\n- R/D WL\n- Retrieve TH and L/D same\n- Pull 570 m of tubing\n- RIH with tubing on 5 1/2\" drill pipe", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "2949", "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "4", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "- N/D XT\n- N/D XT spacer spool\n- N/U BOP and diverter\n- Performed connector test\n- Retrieved BPV\n- RIH with THRT\n- Opened DHSV", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Removed chiksan hoses and control lines from WH/XT.", "dTimEnd": "2016-08-31T00:45:00+02:00", "dTimStart": "2016-08-31T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed hatches on F-5 and F-10. Removed beam between wells.", "dTimEnd": "2016-08-31T02:15:00+02:00", "dTimStart": "2016-08-31T00:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed elevator from bails. Installed lifting chains to TDS.", "dTimEnd": "2016-08-31T02:45:00+02:00", "dTimStart": "2016-08-31T02:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled master bushing and rotary ring. Installed handrail around rotary.\nMeanwhile: Performed TBT for lifting XT.", "dTimEnd": "2016-08-31T03:00:00+02:00", "dTimStart": "2016-08-31T02:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lowered lifting equipment from rotary down to moonpool. Attached lifting equipment to XT.", "dTimEnd": "2016-08-31T03:15:00+02:00", "dTimStart": "2016-08-31T03:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed XT clamp", "dTimEnd": "2016-08-31T03:30:00+02:00", "dTimStart": "2016-08-31T03:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted XT into moonpool and landed on skid.", "dTimEnd": "2016-08-31T04:45:00+02:00", "dTimStart": "2016-08-31T03:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Secured XT on skid.", "dTimEnd": "2016-08-31T05:00:00+02:00", "dTimStart": "2016-08-31T04:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lowered tuggers down to WH deck. Attached spacer spool to lifting arrangement.\nLifted spacer spool from WH deck to drill floor. L/D spacer spool.\n\nM/U BPV plug in TH. Observed dirt in the TH area.", "dTimEnd": "2016-08-31T06:00:00+02:00", "dTimStart": "2016-08-31T05:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed master bushing.\nConfirmed no pressure in WH voids. Disconnected control lines on WH and blinded off ports.\nMeanwhile: Installed mouse hole and L/O RT. P/U HP riser joint.", "dTimEnd": "2016-08-31T07:00:00+02:00", "dTimStart": "2016-08-31T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for installing communication collar.\nMeanwhile: Measured distance RKB - WH 20,0 m.", "dTimEnd": "2016-08-31T07:15:00+02:00", "dTimStart": "2016-08-31T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed communication collar.\nMeanwhile: Lifted XT from moonpool to main deck. Performed TBT for installing hatches.", "dTimEnd": "2016-08-31T08:15:00+02:00", "dTimStart": "2016-08-31T07:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed beam and hatch on F-10.", "dTimEnd": "2016-08-31T09:45:00+02:00", "dTimStart": "2016-08-31T08:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for running HP riser joint.", "dTimEnd": "2016-08-31T10:00:00+02:00", "dTimStart": "2016-08-31T09:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran HP riser joint and set down 2 ton.\nM/U connector on WH.", "dTimEnd": "2016-08-31T11:15:00+02:00", "dTimStart": "2016-08-31T10:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed split hatch around riser joint.", "dTimEnd": "2016-08-31T11:30:00+02:00", "dTimStart": "2016-08-31T11:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Built scaffolding around riser joint.\nMeanwhile: Prepared for running slick joint and diverter. Performed TBT for N/U BOP/Diverter.", "dTimEnd": "2016-08-31T13:15:00+02:00", "dTimStart": "2016-08-31T11:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Skidded BOP from test stump to well center. Landed BOP on NT-2 connector.", "dTimEnd": "2016-08-31T14:15:00+02:00", "dTimStart": "2016-08-31T13:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Built remaining scaffolding around riser joint.", "dTimEnd": "2016-08-31T14:30:00+02:00", "dTimStart": "2016-08-31T14:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed slick joint.", "dTimEnd": "2016-08-31T15:00:00+02:00", "dTimStart": "2016-08-31T14:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed tension cylinders. Starboard aft and fwd tension cylinders misaligned to the BOP.\nMeanwhile: M/U BOP NT-2 connector to riser.", "dTimEnd": "2016-08-31T18:00:00+02:00", "dTimStart": "2016-08-31T15:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Load shifted weight from BOP carrier to tension system.", "dTimEnd": "2016-08-31T18:15:00+02:00", "dTimStart": "2016-08-31T18:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran diverter 0,1 m above slick joint.\nAligned slick joint/BOP to diverter using tension system and BOP carrier.\nLanded diverter and disconnected lifting equipment.\nM/U slick joint.", "dTimEnd": "2016-08-31T19:00:00+02:00", "dTimStart": "2016-08-31T18:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for working on the slick joint.", "dTimEnd": "2016-08-31T19:15:00+02:00", "dTimStart": "2016-08-31T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed master bushing. R/D diverter RT.", "dTimEnd": "2016-08-31T19:45:00+02:00", "dTimStart": "2016-08-31T19:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "N/U slick joint nuts.\nN/U overshot.\nMeanwhile: Prepared tubing handling equipment on drill floor. Liftet casing tong to drill floor. Prepared BPV RT BHA.", "dTimEnd": "2016-08-31T21:00:00+02:00", "dTimStart": "2016-08-31T19:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "De-isolated and pressured up BOP control system.\nMeanwhile: R/U chiksan hoses on WH. Performed TBT for connector test.", "dTimEnd": "2016-08-31T21:30:00+02:00", "dTimStart": "2016-08-31T21:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up and filled BOP.\nPerformed BOP connector test to 20/345 bar for 5/10 min.\nMeanwhile: Continued R/U of chiksan hoses on WH.", "dTimEnd": "2016-08-31T22:30:00+02:00", "dTimStart": "2016-08-31T21:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with BPV RT on 3 1/2\" DP. Latched onto dart and POOH and L/D.\nMeanwhile: Continued R/U of chiksan hoses on WH.", "dTimEnd": "2016-08-31T23:00:00+02:00", "dTimStart": "2016-08-31T22:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with stinger BHA. Pulled BPV plug. POOH and L/D tools.\nMeanwhile: Continued R/U of chiksan hoses on WH.", "dTimEnd": "2016-08-31T23:45:00+02:00", "dTimStart": "2016-08-31T23:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared and R/U casing tong.", "dTimEnd": "2016-09-01T00:00:00+02:00", "dTimStart": "2016-08-31T23:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2016_09_02
NO 15/9-F-5
NO 15/9-F-5
name
2016-09-01T00:00:00+02:00
2016-09-02T00:00:00+02:00
normal
2018-05-03T13:53:08+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-09-02T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-28T17:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Free stuck TH\n- Pull approximately 570 m of tubing\n- RIH and place cement plug in 9 5/8\" casing\n- WOC", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "2949", "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "5", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "- RIH and latched THRT onto TH\n- Pressured up DHSV\n- R/U WL equipment\n- Cut tubing at 2774 mMD\n- Displaced A-annulus to SW\n- Attempted to pull TH\n- POOH with THRT\n- Attempted to pull TH w/ spear", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Continued R/U casing tong.\nChanged inserts in elevator.\nMeanwhile: Continued R/U chiksan hoses on WH. Performed TBT for M/U THRT", "dTimEnd": "2016-09-01T01:30:00+02:00", "dTimStart": "2016-09-01T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared control line spool for THRT.", "dTimEnd": "2016-09-01T01:45:00+02:00", "dTimStart": "2016-09-01T01:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U THRT. Spaced out for BOP.\nMeanwhile: Contiued R/U hoses on WH.", "dTimEnd": "2016-09-01T03:15:00+02:00", "dTimStart": "2016-09-01T01:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U control lines to THRT.", "dTimEnd": "2016-09-01T03:30:00+02:00", "dTimStart": "2016-09-01T03:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with THRT on 7\" landing string to 19.9m. Latched onto TH.\nPulled 10 ton overpull to confirm latch.", "dTimEnd": "2016-09-01T04:00:00+02:00", "dTimStart": "2016-09-01T03:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and attempted to M/U 7\" swedge. Too small OD on swedge for casing tong to M/U.\nMeanwhile: Performed line test of hoses on WH.", "dTimEnd": "2016-09-01T04:15:00+02:00", "dTimStart": "2016-09-01T04:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U circulation swedge.\nMeanwhile: Continued line test on WH.", "dTimEnd": "2016-09-01T04:30:00+02:00", "dTimStart": "2016-09-01T04:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U cement hose and lo-torque valve.", "dTimEnd": "2016-09-01T04:45:00+02:00", "dTimStart": "2016-09-01T04:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed line-up test to circulatoin swedge.\nPressure tested cement hose to 100 bar for 10 min.", "dTimEnd": "2016-09-01T05:15:00+02:00", "dTimStart": "2016-09-01T04:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up to rig pumps. Pressured up DHSV control line to 520 bar.\nPressured up tubing to 90 bar, indication of DHSV opened on control line pump.\nBled off and monitored for pressure build-up in tubing for 5 min. No pressure build-up observed.", "dTimEnd": "2016-09-01T06:00:00+02:00", "dTimStart": "2016-09-01T05:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D cement hose and B/O circulation swedge.", "dTimEnd": "2016-09-01T06:15:00+02:00", "dTimStart": "2016-09-01T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for R/U WL", "dTimEnd": "2016-09-01T06:30:00+02:00", "dTimStart": "2016-09-01T06:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U wireline equipment.", "dTimEnd": "2016-09-01T07:00:00+02:00", "dTimStart": "2016-09-01T06:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U WL equipment.\nObserved crude oil dripping out of tubing while R/U WL, 0,5 ltrs/min.\nInstalled swedge. Flowchecked well and monitored annulus gauge for 30 min, static.\nMeanwhile: Performed TBT for M/U cutter toolstring.", "dTimEnd": "2016-09-01T08:00:00+02:00", "dTimStart": "2016-09-01T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U cutter toolstring", "dTimEnd": "2016-09-01T08:45:00+02:00", "dTimStart": "2016-09-01T08:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ cutter toolstring from surface to 2800 m.", "dTimEnd": "2016-09-01T10:15:00+02:00", "dTimStart": "2016-09-01T08:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Correlated depth and positioned cutter at 2774 mMD.", "dTimEnd": "2016-09-01T10:45:00+02:00", "dTimStart": "2016-09-01T10:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressure tested surface lines to 20/345 bar for 5/10 min.", "dTimEnd": "2016-09-01T11:15:00+02:00", "dTimStart": "2016-09-01T10:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up to monitor pressure on annulus while performing cut.\nCut tubing at 2774 mMD, good indications of cut, lost 280 lbs weight. No change in pressure observed on annulus.", "dTimEnd": "2016-09-01T11:30:00+02:00", "dTimStart": "2016-09-01T11:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH from 2774 m to surface.", "dTimEnd": "2016-09-01T13:00:00+02:00", "dTimStart": "2016-09-01T11:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D toolstring.", "dTimEnd": "2016-09-01T13:15:00+02:00", "dTimStart": "2016-09-01T13:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D wireline equipment.", "dTimEnd": "2016-09-01T13:30:00+02:00", "dTimStart": "2016-09-01T13:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U swedge and installed cement hose.\nLined up to circulate over poor boy degasser.", "dTimEnd": "2016-09-01T14:00:00+02:00", "dTimStart": "2016-09-01T13:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for handling H2S and gas on surface and pump room.", "dTimEnd": "2016-09-01T14:15:00+02:00", "dTimStart": "2016-09-01T14:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Circulated 2 x B/U down tubing and returns through choke via poor boy degasser, 1300 lpm / 130 bar.\nMax gas 6,2%, 1 ppm H2S in gas trap.", "dTimEnd": "2016-09-01T17:00:00+02:00", "dTimStart": "2016-09-01T14:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flowchecked well, observed backflow out tubing 1 lpm. Backflow decreased and stopped.\nR/D swedge.\nMeanwhile: Performed TBT for releasing, pulling and L/D tubing hanger.", "dTimEnd": "2016-09-01T17:45:00+02:00", "dTimStart": "2016-09-01T17:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Released TH.\nAttempted to pull TH, 130 ton overpull. Worked string up/down several times.", "dTimEnd": "2016-09-01T19:00:00+02:00", "dTimStart": "2016-09-01T17:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Worked string up/down. Max hookload 287 ton. Monitored well on TT, static.\nNautral weight (tubing weight + block weight) 158 ton. Strech measured from 158 ton to 287 ton, 6 cm.\nEstimated stuck point 55m. Most likely TH stuck at 20m.", "dTimEnd": "2016-09-01T20:45:00+02:00", "dTimStart": "2016-09-01T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for investigating stuck tubing", "dTimEnd": "2016-09-01T21:00:00+02:00", "dTimStart": "2016-09-01T20:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed A-annulus valves and removed hose on annulus outlet. Opened valves, no backflow observed.\nP/U to 280 ton and slacked off to 67 ton, repeated 3 times. Noticed multibowl moving when picking up weight.", "dTimEnd": "2016-09-01T21:15:00+02:00", "dTimStart": "2016-09-01T21:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Evaluated situation. Discussed situation w/ onshore organisation.\nMeanwhile: Filled riser, monitored well on TT, static. Closed DHSV.", "dTimEnd": "2016-09-01T22:00:00+02:00", "dTimStart": "2016-09-01T21:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rotated 8 turns right hand to release communication collar.\nWorked string up/down 157/67 ton hookload (92 ton OP). THRT came free at 157 ton hookload.", "dTimEnd": "2016-09-01T22:45:00+02:00", "dTimStart": "2016-09-01T22:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with THRT and L/D same.", "dTimEnd": "2016-09-01T23:30:00+02:00", "dTimStart": "2016-09-01T22:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed hoses on WH. Installed new pressure gauge on annulus outlet on WH.\nMeanwhile: Inspected diverter and drilling equipment after movement.", "dTimEnd": "2016-09-02T00:00:00+02:00", "dTimStart": "2016-09-01T23:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2016_09_03
NO 15/9-F-5
NO 15/9-F-5
name
2016-09-02T00:00:00+02:00
2016-09-03T00:00:00+02:00
normal
2018-05-03T13:53:08+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-09-03T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-28T17:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Wait on equipment to free TH\n- Work to free TH", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "2949", "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "6", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "- Discussed situation with onshore organization\n- Waited for equipment to free TH", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Evaluating situation.\nMeanwhile: Performed maintenance and housekeeping", "dTimEnd": "2016-09-02T01:15:00+02:00", "dTimStart": "2016-09-02T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for running spear and pack-off.", "dTimEnd": "2016-09-02T01:30:00+02:00", "dTimStart": "2016-09-02T01:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U spear assy with pack-off.", "dTimEnd": "2016-09-02T01:45:00+02:00", "dTimStart": "2016-09-02T01:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Inspected and serviced spear and grapple.", "dTimEnd": "2016-09-02T02:00:00+02:00", "dTimStart": "2016-09-02T01:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with spear to 25,1m. Enganged spear.\nAttempted to pull free TH with 30 ton overpull. Observed WH moving.\nDisengaged spear.", "dTimEnd": "2016-09-02T03:15:00+02:00", "dTimStart": "2016-09-02T02:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with spear assembly and racked back.", "dTimEnd": "2016-09-02T03:30:00+02:00", "dTimStart": "2016-09-02T03:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Evaluated situation.\nLined up to monitor well on TT and annulus gauge.\nMeanwhile: Serviced drilling equipment. Performed housekeeping in moonpool.", "dTimEnd": "2016-09-02T07:00:00+02:00", "dTimStart": "2016-09-02T03:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Evaluated situation. Discussed situation w/ onshore organisation\nMeanwhile: Moved casing tong to fox hole. Pressure tested stand pipe and choke manifolds to 20/345 bar for 5/10min. Prepared for slip&cut.", "dTimEnd": "2016-09-02T09:45:00+02:00", "dTimStart": "2016-09-02T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Evaluated situation. Discussed situation w/ onshore organisation\nMeanwhile: Performed slip&cut.\n", "dTimEnd": "2016-09-02T11:45:00+02:00", "dTimStart": "2016-09-02T09:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Evaluated situation. Discussed situation w/ onshore organisation\nMeanwhile: Calibrated drawworks", "dTimEnd": "2016-09-02T12:15:00+02:00", "dTimStart": "2016-09-02T11:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on brine prior displacing well to heavy fluid\nMeanwhile: \n- Discussed with onshore organization.\n- Greased valves on choke manifold.\n- Serviced FWD PRS upper head rollers.\n- Performed housekeeping\n- Calibrated block weight sensor (mudlogger sensor)", "dTimEnd": "2016-09-02T19:00:00+02:00", "dTimStart": "2016-09-02T12:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on brine prior displacing well to heavy fluid\nMeanwhile:\n- Prepared temporary trip tank\n- Serviced FWD PRS\n- Performed housekeeping\n- Cleaned pits\n- Prepared tools and equipment for N/D BOP", "dTimEnd": "2016-09-03T00:00:00+02:00", "dTimStart": "2016-09-02T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2016_09_04
NO 15/9-F-5
NO 15/9-F-5
name
2016-09-03T00:00:00+02:00
2016-09-04T00:00:00+02:00
normal
2018-05-03T13:53:08+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-09-04T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-28T17:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- N/D BOP\n- Inspect TH locking mechanism\n- Work to free TH (Based on inspection)\n- N/U BOP", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "2949", "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "7", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "- Waited for equipment to free TH\n- Pumped killpill and displaced well to heavy brine\n- Installed trip tank setup on WH\n- Performed extended flow check\n", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Waited on brine prior displacing well to heavy fluid\nMeanwhile:\n- Continued servicing FWR PRS\n- Cleaned pits\n- Performed PMs", "dTimEnd": "2016-09-03T04:00:00+02:00", "dTimStart": "2016-09-03T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on brine prior displacing well to heavy fluid\nMeanwhile:\n- Performed housekeeping\n- Worked on modification on encoder on drawworks.\n- Cleaned pits\n- Performed PMs", "dTimEnd": "2016-09-03T07:00:00+02:00", "dTimStart": "2016-09-03T04:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared for displacing well to brine. Cleaned pits (entering tanks)\nMeanwhile:\n- Performed PMs.\n- Performed housekeeping\n- Worked on drawworks\n- Prepared permits\n- Inspected TDS and TDS hoses\n- Tested BX3 elevator and rotator\n- Finished recieving brine from boat 13:30.", "dTimEnd": "2016-09-03T13:30:00+02:00", "dTimStart": "2016-09-03T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared for displacing well to brine.\nMixed 1.19sg CaCl2 brine and kill pill. Experienced foaming and lost suction from pit.", "dTimEnd": "2016-09-03T14:30:00+02:00", "dTimStart": "2016-09-03T13:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flushed lines several times.", "dTimEnd": "2016-09-03T16:00:00+02:00", "dTimStart": "2016-09-03T14:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared to displace well to brine.\nMixed new kill pill.\nMeanwhile:\n- Removed slick joint nut (left 4 in)", "dTimEnd": "2016-09-03T18:30:00+02:00", "dTimStart": "2016-09-03T16:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with spear/grapple/pack-off assy to 26m and engage spear.", "dTimEnd": "2016-09-03T19:00:00+02:00", "dTimStart": "2016-09-03T18:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for displacing well", "dTimEnd": "2016-09-03T19:30:00+02:00", "dTimStart": "2016-09-03T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Checked and confirmed line up. Walked the lines.", "dTimEnd": "2016-09-03T20:00:00+02:00", "dTimStart": "2016-09-03T19:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed new TBT due to uncerntainty in operation. Confirmed line-up.", "dTimEnd": "2016-09-03T20:15:00+02:00", "dTimStart": "2016-09-03T20:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Staged up rig pumps and pumped 37,2m3 1,19sg CaCl2 brine at 1200 lpm / 156 bar.\nLined up and pumped 10m3 1,19sg CaCl2 kill pill.\nPumped 48,2m3 1,19sg CaCl2 brine at 1200 lpm. Pressure started to increase, then dropped again before increasing to ~160 bar.", "dTimEnd": "2016-09-03T22:15:00+02:00", "dTimStart": "2016-09-03T20:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flow checked well through open choke. Some backflow observed, then static.\nContinued monitoring well on trip tank.", "dTimEnd": "2016-09-03T22:30:00+02:00", "dTimStart": "2016-09-03T22:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Disenganged spear and pulled pack-off out of tubing.\nDisplaced BOP to 1,19sg CaCl2 brine.", "dTimEnd": "2016-09-03T23:15:00+02:00", "dTimStart": "2016-09-03T22:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Disconnected TDS. POOH with BHA. Checked tools and R/B BHA.", "dTimEnd": "2016-09-03T23:45:00+02:00", "dTimStart": "2016-09-03T23:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged up to drain riser through A-annulus outlet on WH (u-tubing down tubing and returns through A-annulus).", "dTimEnd": "2016-09-04T00:00:00+02:00", "dTimStart": "2016-09-03T23:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2016_09_05
NO 15/9-F-5
NO 15/9-F-5
name
2016-09-04T00:00:00+02:00
2016-09-05T00:00:00+02:00
normal
2018-05-03T13:53:08+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": "1.6", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-09-05T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-28T17:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Perform extended flow check\n- N/D BOP and riser\n- Perform tubing hanger remedial work\n- N/U BOP", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "2949", "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "8", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "- Drained riser\n- Performed exteded flow check on modified TT on WH\n- Installed BPV plug\n- N/D BOP and diverter\n- Inspected TH\n- Observed u-tube out of well\n- N/U BOP\n- Observed well on TT and modified TT on WH. Gained slightly more in TT than on WH.\n- Performed BOP connector test to 20/345 bar", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Drained riser.\nMeanwhile: Prepared BPV plug and running tool. Changed to 3 1/2\" handling equipment.", "dTimEnd": "2016-09-04T01:00:00+02:00", "dTimStart": "2016-09-04T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged up modified trip tank on WH deck. Attempted to flowcheck well on modified trip tank from A-annulus. Unable to pump or getting returns.\nRigged up new pump. Re-attempted to flowcheck well on modified trip tank. Found VR plug blinded off service wing on WH.", "dTimEnd": "2016-09-04T02:00:00+02:00", "dTimStart": "2016-09-04T01:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Discussed situation.", "dTimEnd": "2016-09-04T02:45:00+02:00", "dTimStart": "2016-09-04T02:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for removing flange on WH.", "dTimEnd": "2016-09-04T03:00:00+02:00", "dTimStart": "2016-09-04T02:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed flange on WH. Removed VR plug.\nRe-installed flange on WH. Installed circulation valves for modified trip tank.", "dTimEnd": "2016-09-04T03:15:00+02:00", "dTimStart": "2016-09-04T03:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed extended flow check of well over modified trip tank on WH.\nWell static for 45 min, then losses.\nLost 130 ltr/hr for 15 min. Observed small gain (20 ltrs), then static.", "dTimEnd": "2016-09-04T04:45:00+02:00", "dTimStart": "2016-09-04T03:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued flow checking well for 1 hr over modified trip tank on WH deck, static.", "dTimEnd": "2016-09-04T05:45:00+02:00", "dTimStart": "2016-09-04T04:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH and installed BPV plug", "dTimEnd": "2016-09-04T06:30:00+02:00", "dTimStart": "2016-09-04T05:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with BPV RT. L/D same.", "dTimEnd": "2016-09-04T07:00:00+02:00", "dTimStart": "2016-09-04T06:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for pulling diverter", "dTimEnd": "2016-09-04T07:15:00+02:00", "dTimStart": "2016-09-04T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared chains and lifting bridle for diverter.\nPulled diverter", "dTimEnd": "2016-09-04T08:15:00+02:00", "dTimStart": "2016-09-04T07:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled slip joint", "dTimEnd": "2016-09-04T08:45:00+02:00", "dTimStart": "2016-09-04T08:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Load shifted to BOP carrier. Removed tension cylinders", "dTimEnd": "2016-09-04T09:45:00+02:00", "dTimStart": "2016-09-04T08:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "N/D BOP", "dTimEnd": "2016-09-04T10:15:00+02:00", "dTimStart": "2016-09-04T09:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed parts of scaffolding around riser to be able to skid over to test stump.", "dTimEnd": "2016-09-04T10:30:00+02:00", "dTimStart": "2016-09-04T10:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Moved BOP from well center to BOP test stump.", "dTimEnd": "2016-09-04T11:00:00+02:00", "dTimStart": "2016-09-04T10:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed remaining scaffolding around riser.", "dTimEnd": "2016-09-04T11:15:00+02:00", "dTimStart": "2016-09-04T11:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for pulling riser.", "dTimEnd": "2016-09-04T11:30:00+02:00", "dTimStart": "2016-09-04T11:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed master bushing and outer ring. Attached chains and lifting bridle to riser joint.\nDisconnected riser from WH.\nRemoved hole cover and pulled riser joint to drill floor.\nInstalled outer ring and master bushing.\nInstalled hole cover.", "dTimEnd": "2016-09-04T12:15:00+02:00", "dTimStart": "2016-09-04T11:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Inspected tubing hanger.\nObserved increased u-tube from well while removing communication collar.", "dTimEnd": "2016-09-04T13:30:00+02:00", "dTimStart": "2016-09-04T12:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for installing riser", "dTimEnd": "2016-09-04T13:45:00+02:00", "dTimStart": "2016-09-04T13:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled master bushing and outer ring.\nInstalled Riser.", "dTimEnd": "2016-09-04T15:00:00+02:00", "dTimStart": "2016-09-04T13:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Built scaffolding around riser joint", "dTimEnd": "2016-09-04T15:30:00+02:00", "dTimStart": "2016-09-04T15:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Moved BOP from stump to well center.\nLanded BOP on riser joint.", "dTimEnd": "2016-09-04T16:15:00+02:00", "dTimStart": "2016-09-04T15:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Finished scaffolding around riser.", "dTimEnd": "2016-09-04T16:30:00+02:00", "dTimStart": "2016-09-04T16:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U NT-2 connector.", "dTimEnd": "2016-09-04T17:00:00+02:00", "dTimStart": "2016-09-04T16:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed tension cylinders.\nLoad shifted weight from BOP carrier to tension system.", "dTimEnd": "2016-09-04T18:00:00+02:00", "dTimStart": "2016-09-04T17:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed slip joint", "dTimEnd": "2016-09-04T18:15:00+02:00", "dTimStart": "2016-09-04T18:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed diverter.\nM/U slip joint", "dTimEnd": "2016-09-04T19:00:00+02:00", "dTimStart": "2016-09-04T18:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for BOP connector test", "dTimEnd": "2016-09-04T19:15:00+02:00", "dTimStart": "2016-09-04T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D chains from TDS.\nInstalled BX elevator. Change to 3 1/2\" inserts.", "dTimEnd": "2016-09-04T19:45:00+02:00", "dTimStart": "2016-09-04T19:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U BPV RT. RIH to 6m.", "dTimEnd": "2016-09-04T20:00:00+02:00", "dTimStart": "2016-09-04T19:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U bolts on slip joint", "dTimEnd": "2016-09-04T20:30:00+02:00", "dTimStart": "2016-09-04T20:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressureized diverter system and overshot packer.", "dTimEnd": "2016-09-04T21:00:00+02:00", "dTimStart": "2016-09-04T20:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Consulted onshore organization.\nObserved well on TT and modified TT on WH. Gained 240 ltr/20min at TT, lost 200 ltrs/20min on WH TT.", "dTimEnd": "2016-09-04T23:00:00+02:00", "dTimStart": "2016-09-04T21:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Consulted onshore organization.\nWell control duty and onshore organization concluded to perform BOP connector test and circulate well to even brine weight, no kill pill.\nObserved well on TT and modified TT on WH. Gained 140 ltr/20min at TT, lost 130 ltrs/20min on WH TT.", "dTimEnd": "2016-09-04T23:30:00+02:00", "dTimStart": "2016-09-04T23:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with BPV dart RT to 20m. Installed dart. POOH", "dTimEnd": "2016-09-04T23:45:00+02:00", "dTimStart": "2016-09-04T23:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up for connector test\nMeanwhile: Flushed TT with clean brine", "dTimEnd": "2016-09-05T00:00:00+02:00", "dTimStart": "2016-09-04T23:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2016_09_06
NO 15/9-F-5
NO 15/9-F-5
name
2016-09-05T00:00:00+02:00
2016-09-06T00:00:00+02:00
normal
2018-05-03T13:53:08+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": "2.6", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-09-06T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-28T17:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Continue remedial work on TH\n- N/U BOP\n- Pull tubing\n- Place balanced cement plug in 9 5/8\" casing", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "2949", "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "9", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "- Performed BOP connector test to 20/345 bar for 5/10min\n- Retrieved BPV plug\n- Circulated well to even brine weight 1,19sg in/out.\n- Monitored well on TT\n- N/D Diverter and BOP\n- Performed remedial work on TH", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Continued line-up for connector test.\nMeanwhile: Flushed TT with clean brine.", "dTimEnd": "2016-09-05T00:15:00+02:00", "dTimStart": "2016-09-05T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed low pressure test of BOP connector, 20bar/5min.\nContinued pressuring up to 250 bar. Stopped pumping and checked that volume pumped corresponded with expected theoretical volume. Continued pressuring up to 345 bar.\nPerformed high pressure test of BOP connector, 345bar/10min.", "dTimEnd": "2016-09-05T01:00:00+02:00", "dTimStart": "2016-09-05T00:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Retrieved BPV dart and BPV plug. Found chunks of cement on top of RT.", "dTimEnd": "2016-09-05T01:30:00+02:00", "dTimStart": "2016-09-05T01:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Canged to 5 1/2\" handling equipment.\nMeanwhile: Performed TBT for RIH with spear and pack-off", "dTimEnd": "2016-09-05T01:45:00+02:00", "dTimStart": "2016-09-05T01:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U spear/pack-off assy. Inspected tools.", "dTimEnd": "2016-09-05T02:00:00+02:00", "dTimStart": "2016-09-05T01:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with spear BHA to 26m.", "dTimEnd": "2016-09-05T02:15:00+02:00", "dTimStart": "2016-09-05T02:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Engaged spear and pulled 10 ton OP.", "dTimEnd": "2016-09-05T02:30:00+02:00", "dTimStart": "2016-09-05T02:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up to pump down drill string, taking returns through A-annulus via choke and poor boy.", "dTimEnd": "2016-09-05T02:45:00+02:00", "dTimStart": "2016-09-05T02:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Initiated circulation. SPP increased rappidly to 30 bar, no pressure on annulus gauge.\nPumped slowly until pressure dropped from 63 bar to 7 bar. Observed returns on shaker.", "dTimEnd": "2016-09-05T03:15:00+02:00", "dTimStart": "2016-09-05T02:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Staged up pumps in steps to 1200 lpm / 144 bar.\nReturn brine weight 1.18sg until 68 m3 pumped.\nAt 68 m3 pumped the return brine weight decreased to 1.14sg and slightly changed color (kill pill with graphite).\nReturn brine weight gradually increased to 1.17sg at 73 m3 pumped.\nAt 77 m3 the return brine weight was back at 1.18sg.\nCirculated totally 118m3, until even brine weight in/out.", "dTimEnd": "2016-09-05T05:30:00+02:00", "dTimStart": "2016-09-05T03:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Stopped pumps. Disengaged spear.\nPOOH with spear/pack-off BHA.", "dTimEnd": "2016-09-05T06:00:00+02:00", "dTimStart": "2016-09-05T05:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flow checked well, static", "dTimEnd": "2016-09-05T06:30:00+02:00", "dTimStart": "2016-09-05T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up to modified TT\nMonitored well on rig TT and modified TT. Observed expected u-tube down string and out of A-annulus (due to height difference of approximately 25m).", "dTimEnd": "2016-09-05T07:00:00+02:00", "dTimStart": "2016-09-05T06:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Monitored well on rig TT only.\nTook sample from A-annulus, 15 ppm oil content.\nMeanwhile: Changed handling equipment. Prepared to N/D BOP and diverter.", "dTimEnd": "2016-09-05T07:15:00+02:00", "dTimStart": "2016-09-05T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drained BOP and riser out A-annulus.", "dTimEnd": "2016-09-05T08:45:00+02:00", "dTimStart": "2016-09-05T07:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Monitored well on WH TT. Gained 50 ltrs first 30min, decreasing trend.", "dTimEnd": "2016-09-05T10:30:00+02:00", "dTimStart": "2016-09-05T08:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Monitored well on WH TT, static.\nMeanwhile: Installed BPV plug.", "dTimEnd": "2016-09-05T11:15:00+02:00", "dTimStart": "2016-09-05T10:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed handling equipment for pulling diverter.", "dTimEnd": "2016-09-05T11:45:00+02:00", "dTimStart": "2016-09-05T11:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed bolts on slipjoint", "dTimEnd": "2016-09-05T12:00:00+02:00", "dTimStart": "2016-09-05T11:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for N/D BOP", "dTimEnd": "2016-09-05T12:15:00+02:00", "dTimStart": "2016-09-05T12:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled master bushing and installed handrail around rotary.\nPulled diverter and L/D same.", "dTimEnd": "2016-09-05T12:45:00+02:00", "dTimStart": "2016-09-05T12:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled slipjoint.\nInstalled master bushing.", "dTimEnd": "2016-09-05T13:30:00+02:00", "dTimStart": "2016-09-05T12:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Load shifted weight from tension system to BOP carrier.\nN/D tension system\nDisconnected BOP NT-2 connector", "dTimEnd": "2016-09-05T15:00:00+02:00", "dTimStart": "2016-09-05T13:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Skidded BOP off well center.", "dTimEnd": "2016-09-05T15:30:00+02:00", "dTimStart": "2016-09-05T15:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed scaffolding", "dTimEnd": "2016-09-05T15:45:00+02:00", "dTimStart": "2016-09-05T15:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed master bushing. Installed handrails around rotary.", "dTimEnd": "2016-09-05T16:00:00+02:00", "dTimStart": "2016-09-05T15:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted riser joint off WH, L/D same on drill floor.\nInstalled hatch in moonpool.\nInstalled master bushing", "dTimEnd": "2016-09-05T16:45:00+02:00", "dTimStart": "2016-09-05T16:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and inspected TH area. Took pictures of locking ring.", "dTimEnd": "2016-09-05T18:00:00+02:00", "dTimStart": "2016-09-05T16:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Discussed plan forward with onshore organization.\nPerformed SJA for remedial work on TH.", "dTimEnd": "2016-09-05T19:00:00+02:00", "dTimStart": "2016-09-05T18:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U equipment to drill holes in activation ring and stop ring in TH.\nMounted anchor ring and drilling machine onto WH.", "dTimEnd": "2016-09-05T22:30:00+02:00", "dTimStart": "2016-09-05T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled hole in TH activation ring and stop ring. Slow progression to begin with, increased after first 4-5mm drilled.", "dTimEnd": "2016-09-06T00:00:00+02:00", "dTimStart": "2016-09-05T22:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2016_09_07
NO 15/9-F-5
NO 15/9-F-5
name
2016-09-06T00:00:00+02:00
2016-09-07T00:00:00+02:00
normal
2018-05-03T13:53:08+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": "3.4", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-09-07T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-28T17:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- RIH with tubing on 5 1/2\" DP\n- Circulate well to SW\n- Place balanced cement plug in 9 5/8\" csg\n- WOC Meanwhile: RIH w/tubing on spear. Perform BOP function test\n- Tag TOC, leave tubing in well. POOH\n- Clean surface CH seal area.", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "2949", "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "10", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "- Performed remedial work on TH\n- N/U BOP\n- Retrieved TH with spear\n- Pulled tubing", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Continued drilling 4 ea holes. Worn out one bit each hole.\nSpent approximately 1,5 hour each hole. Experienced slow progress at the end of fourth hole due to wear on bit.", "dTimEnd": "2016-09-06T07:30:00+02:00", "dTimStart": "2016-09-06T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and cleared TH profile.", "dTimEnd": "2016-09-06T07:45:00+02:00", "dTimStart": "2016-09-06T07:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D TH drilling equipment from WH.", "dTimEnd": "2016-09-06T08:00:00+02:00", "dTimStart": "2016-09-06T07:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Worked free stop ring and activation ring from TH.\nObserved dirt below stop ring, which possibly prevented activation ring to stroke up to fully released position.\nRemoved stop ring and activation ring. TH lock ring collapsed out of locking grooves. Removed lock ring.\nMeanwhile: Performed TBT for N/U BOP", "dTimEnd": "2016-09-06T09:30:00+02:00", "dTimStart": "2016-09-06T08:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed hatch.\nPulled master bushing.", "dTimEnd": "2016-09-06T09:45:00+02:00", "dTimStart": "2016-09-06T09:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lowered HP riser joint from drill floor to WH.\nM/U connector on WH\nInstalled hatch around riser.", "dTimEnd": "2016-09-06T10:30:00+02:00", "dTimStart": "2016-09-06T09:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed scaffolding around riser in moonpool.", "dTimEnd": "2016-09-06T10:45:00+02:00", "dTimStart": "2016-09-06T10:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Skidded BOP over well center. Landed onto riser joint.\nM/U BOP connector on riser joint.", "dTimEnd": "2016-09-06T12:15:00+02:00", "dTimStart": "2016-09-06T10:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed slipjoint.\nInstalled masterbushing.", "dTimEnd": "2016-09-06T12:30:00+02:00", "dTimStart": "2016-09-06T12:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed tension cylinders to BOP.\nMeanwhile: Prepared diverter.", "dTimEnd": "2016-09-06T14:30:00+02:00", "dTimStart": "2016-09-06T12:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U bolts on slipjoint.", "dTimEnd": "2016-09-06T15:00:00+02:00", "dTimStart": "2016-09-06T14:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Insalled diverter.", "dTimEnd": "2016-09-06T16:00:00+02:00", "dTimStart": "2016-09-06T15:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Load shifted weight from BOP carrier to tension system.\nPressurized diverter system, koomey unit and overshot.", "dTimEnd": "2016-09-06T16:30:00+02:00", "dTimStart": "2016-09-06T16:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Filled BOP with SW", "dTimEnd": "2016-09-06T16:45:00+02:00", "dTimStart": "2016-09-06T16:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed BOP connector test to 20/235 bar for 5/10min.\nMeanwhile: R/U spooling unit for control lines.", "dTimEnd": "2016-09-06T17:15:00+02:00", "dTimStart": "2016-09-06T16:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U BPV RT", "dTimEnd": "2016-09-06T17:30:00+02:00", "dTimStart": "2016-09-06T17:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ BPV RT on 3 1/2\" DP", "dTimEnd": "2016-09-06T17:45:00+02:00", "dTimStart": "2016-09-06T17:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Retrieved BPV dart.", "dTimEnd": "2016-09-06T18:00:00+02:00", "dTimStart": "2016-09-06T17:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with BPV RT on 3 1/2\" DP\nRetrieved BPV plug", "dTimEnd": "2016-09-06T18:15:00+02:00", "dTimStart": "2016-09-06T18:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U handling equipment for 5 1/2\"\nMeanwhile: Performed TBT for running spear BHA.", "dTimEnd": "2016-09-06T18:30:00+02:00", "dTimStart": "2016-09-06T18:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Reconfigured spear BHA in order to handle TH at surface.\nB/O and L/O double 5 1/2\" DP.", "dTimEnd": "2016-09-06T19:45:00+02:00", "dTimStart": "2016-09-06T18:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/spear BHA to 25m.\nEngaged spear", "dTimEnd": "2016-09-06T20:00:00+02:00", "dTimStart": "2016-09-06T19:45:00+02:00", "md": "2774", "phase": "fixed", "proprietaryCode": "plug abandon -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled tubing free, 10 ton OP.", "dTimEnd": "2016-09-06T20:15:00+02:00", "dTimStart": "2016-09-06T20:00:00+02:00", "md": "2774", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ tubng on spear. L/D 1 single 5 1/2\" DP (due to space out on surface).", "dTimEnd": "2016-09-06T20:30:00+02:00", "dTimStart": "2016-09-06T20:15:00+02:00", "md": "2761", "phase": "fixed", "proprietaryCode": "plug abandon -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for R/U casing equipment", "dTimEnd": "2016-09-06T20:45:00+02:00", "dTimStart": "2016-09-06T20:30:00+02:00", "md": "2761", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U casing tong", "dTimEnd": "2016-09-06T21:15:00+02:00", "dTimStart": "2016-09-06T20:45:00+02:00", "md": "2761", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ tubing and tubing hanger on spear.", "dTimEnd": "2016-09-06T21:30:00+02:00", "dTimStart": "2016-09-06T21:15:00+02:00", "md": "2748", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "B/O and L/D down spear.", "dTimEnd": "2016-09-06T21:45:00+02:00", "dTimStart": "2016-09-06T21:30:00+02:00", "md": "2748", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "B/O and L/D down tubing hanger", "dTimEnd": "2016-09-06T22:00:00+02:00", "dTimStart": "2016-09-06T21:45:00+02:00", "md": "2748", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for installing slips", "dTimEnd": "2016-09-06T22:15:00+02:00", "dTimStart": "2016-09-06T22:00:00+02:00", "md": "2748", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed BX-4 inserts to 7\".\nP/U tubing. Removed master bushing.\nInstalled FMS slips.", "dTimEnd": "2016-09-06T22:45:00+02:00", "dTimStart": "2016-09-06T22:15:00+02:00", "md": "2744", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH and removed clamp.\nL/O 2 ea 7\" pup joints to cantilever.", "dTimEnd": "2016-09-06T23:00:00+02:00", "dTimStart": "2016-09-06T22:45:00+02:00", "md": "2744", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ 7\" tubing from 2744 mMD to 2711 mMD. Avg pulling speed 4 jnt/hr.", "dTimEnd": "2016-09-07T00:00:00+02:00", "dTimStart": "2016-09-06T23:00:00+02:00", "md": "2711", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2016_09_08
NO 15/9-F-5
NO 15/9-F-5
name
2016-09-07T00:00:00+02:00
2016-09-08T00:00:00+02:00
normal
2018-05-03T13:53:08+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": "2.4", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-09-08T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-28T17:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Tag TOC w/ 10 ton\n- Release spear and POOH with spear BHA\n- Wash surface seal assy area\n- Retrieve MS-T surface seal\n- Cut 10 3/4\" tie-back casing\n- Pull 10 3/4\" tie-back casing\n- Release tie-back adapter", "hpht": "0", "md": "-999.99", "mdCsgLast": "3790.1", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "2949", "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "11", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "- POOH w/ 7\" tubing from 2774 m to 2186 m\n- Displaced well to SW\n- Placed balanced cement plug in 9 5/8\" casing\n- WOC", "tightWell": "0", "tvd": null, "tvdCsgLast": "3245.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "POOH w/ 7\" tubing from 2744 mMD to 2557 mMD. Avg pulling speed 6,5 jnts/hr.", "dTimEnd": "2016-09-07T02:00:00+02:00", "dTimStart": "2016-09-07T00:00:00+02:00", "md": "2557", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ 7\" tubing from 2557 mMD to 2463 mMD. Avg pulling speed 8 jnts/hr.", "dTimEnd": "2016-09-07T03:00:00+02:00", "dTimStart": "2016-09-07T02:00:00+02:00", "md": "2463", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ 7\" tubing from 2463 mMD to 2351 mMD. Avg pulling speed 10 jnts/hr.", "dTimEnd": "2016-09-07T04:00:00+02:00", "dTimStart": "2016-09-07T03:00:00+02:00", "md": "2351", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ 7\" tubing from 2351 mMD to 2265 mMD. Avg pulling speed 6 jnts/hr.", "dTimEnd": "2016-09-07T05:00:00+02:00", "dTimStart": "2016-09-07T04:00:00+02:00", "md": "2276", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ 7\" tubing from 2265 mMD to 2257 mMD.\nL/D DHSV assy", "dTimEnd": "2016-09-07T05:15:00+02:00", "dTimStart": "2016-09-07T05:00:00+02:00", "md": "2257", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ 7\" tubing from 2257 mMD to 2186 mMD. Avg pulling speed 11 jnts/hr.", "dTimEnd": "2016-09-07T05:45:00+02:00", "dTimStart": "2016-09-07T05:15:00+02:00", "md": "2186", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Counted joints on deck.\nPrepared to RIH with tubing on 5 1/2\" DP", "dTimEnd": "2016-09-07T06:00:00+02:00", "dTimStart": "2016-09-07T05:45:00+02:00", "md": "2186", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U swedge with pre-installed combination wiper.", "dTimEnd": "2016-09-07T07:00:00+02:00", "dTimStart": "2016-09-07T06:00:00+02:00", "md": "2186", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for R/D casing equipment", "dTimEnd": "2016-09-07T07:15:00+02:00", "dTimStart": "2016-09-07T07:00:00+02:00", "md": "2186", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D casing handling equipment.\nRemoved control line spool.", "dTimEnd": "2016-09-07T08:00:00+02:00", "dTimStart": "2016-09-07T07:15:00+02:00", "md": "2186", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed BX elevator inserts to 5 1/2\" DP.\nMeanwhile: Cleaned and cleared drill floor.", "dTimEnd": "2016-09-07T08:15:00+02:00", "dTimStart": "2016-09-07T08:00:00+02:00", "md": "2186", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U 5 1/2\" stand, M/U to swedge.\nChanged to PS-21 slips and function tested same.", "dTimEnd": "2016-09-07T08:30:00+02:00", "dTimStart": "2016-09-07T08:15:00+02:00", "md": "2188", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH closed ended w/ tubing on 5 1/2\" DP from 2188 m to 2460 m. Avg. tripping speed 530 m/hr.", "dTimEnd": "2016-09-07T09:00:00+02:00", "dTimStart": "2016-09-07T08:30:00+02:00", "md": "2460", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Filled pipe", "dTimEnd": "2016-09-07T09:15:00+02:00", "dTimStart": "2016-09-07T09:00:00+02:00", "md": "2460", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH closed ended w/ tubing on 5 1/2\" DP from 2460 m to 2770 m. Avg. tripping speed 530 m/hr.", "dTimEnd": "2016-09-07T10:00:00+02:00", "dTimStart": "2016-09-07T09:15:00+02:00", "md": "2770", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for displacement\nObserved losses on TT due to heavy fluid in annulus seeping past pre-installed wiper in tubing.", "dTimEnd": "2016-09-07T10:15:00+02:00", "dTimStart": "2016-09-07T10:00:00+02:00", "md": "2770", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U pump-in sub.\nInstalled lo-torque valve.", "dTimEnd": "2016-09-07T10:45:00+02:00", "dTimStart": "2016-09-07T10:15:00+02:00", "md": "2770", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up to rig pumps.\nInitiated circulation, staged up pumps to 3000 lpm / 153 bar.\nDisplaced well to SW.", "dTimEnd": "2016-09-07T11:30:00+02:00", "dTimStart": "2016-09-07T10:45:00+02:00", "md": "2770", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U 1 m above combination wiper after 51 m3 of SW pumped.\nContinued displacing well to SW at 2200 lpm / 58 bar, until OIW content below 30ppm.\nPumped totally 151 m3 of SW.", "dTimEnd": "2016-09-07T12:45:00+02:00", "dTimStart": "2016-09-07T11:30:00+02:00", "md": "2769", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed cement hose\nMeanwhile: Performed TBT for cement job", "dTimEnd": "2016-09-07T13:00:00+02:00", "dTimStart": "2016-09-07T12:45:00+02:00", "md": "2769", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Balanced cement plug in 9 5/8\" csg (2769 m - 2569 m ): Pumped 20 m3 wash pill, 2300 lpm/ 60 bar. Mixed and pumped 9,4 m3 of 1,90 SG cement slurry, 600 l/min. Displaced the cement to the rig floor with 2890 l of FW. Zeroed stroke counters. R/D cement hose.\nDisplaced the cement with 39,6 m3 (1788 strokes) of SW, 3200 lpm/ 90 bar, using rig pumps.", "dTimEnd": "2016-09-07T14:45:00+02:00", "dTimStart": "2016-09-07T13:00:00+02:00", "md": "2769", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "B/O and L/D pump-in sub.", "dTimEnd": "2016-09-07T15:00:00+02:00", "dTimStart": "2016-09-07T14:45:00+02:00", "md": "2769", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ tubing restricted on 5 1/2\" DP from 2769 m to 2570 m. 4 min/std.", "dTimEnd": "2016-09-07T15:45:00+02:00", "dTimStart": "2016-09-07T15:00:00+02:00", "md": "2570", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U pup with pre-installed sponge ball.\nLined up to discharge returns.\nPumped 10m3 hi-vis pill.\nCirculated 4,3 x B/U, 2300 lpm/ 55 bar.", "dTimEnd": "2016-09-07T17:45:00+02:00", "dTimStart": "2016-09-07T15:45:00+02:00", "md": "2570", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U BOP cleaning tool", "dTimEnd": "2016-09-07T18:00:00+02:00", "dTimStart": "2016-09-07T17:45:00+02:00", "md": "2570", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned BOP 10 x passes, 1500 lpm.", "dTimEnd": "2016-09-07T18:30:00+02:00", "dTimStart": "2016-09-07T18:00:00+02:00", "md": "2570", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH 1 stand, L/D BOP cleaning tool", "dTimEnd": "2016-09-07T19:00:00+02:00", "dTimStart": "2016-09-07T18:30:00+02:00", "md": "2540", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ tubing on 5 1/2\" DP from 2540 m to 2177 m. Avg. tripping speed 300 m/hr.", "dTimEnd": "2016-09-07T20:00:00+02:00", "dTimStart": "2016-09-07T19:00:00+02:00", "md": "2177", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed elevator inserts to 7\".\nMeanwhile: Performed TBT for R/U casing tong", "dTimEnd": "2016-09-07T20:15:00+02:00", "dTimStart": "2016-09-07T20:00:00+02:00", "md": "2177", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U casing tong.", "dTimEnd": "2016-09-07T20:30:00+02:00", "dTimStart": "2016-09-07T20:15:00+02:00", "md": "2177", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "B/O pup and swedge, L/D same.", "dTimEnd": "2016-09-07T20:45:00+02:00", "dTimStart": "2016-09-07T20:30:00+02:00", "md": "2177", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed elevator inserts to 5 1/2\"\nR/D casing tong.", "dTimEnd": "2016-09-07T21:00:00+02:00", "dTimStart": "2016-09-07T20:45:00+02:00", "md": "2177", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U 7\" spear BHA from HTS.", "dTimEnd": "2016-09-07T21:15:00+02:00", "dTimStart": "2016-09-07T21:00:00+02:00", "md": "2177", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Engaged spear in 7\" tubing at surface.\nRIH w/ tubing on 5 1/2\" DP from 2177 m to 2508 m. Avg. tripping speed 440 m/hr.", "dTimEnd": "2016-09-07T22:00:00+02:00", "dTimStart": "2016-09-07T21:15:00+02:00", "md": "2508", "phase": "fixed", "proprietaryCode": "plug abandon -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOC\nMeanwhile: Serviced TDS. Removed casing tong for pulling 7\" tubing. Installed casing tong for pulling 10 3/4\" casing in fox hole.", "dTimEnd": "2016-09-08T00:00:00+02:00", "dTimStart": "2016-09-07T22:00:00+02:00", "md": "2508", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2016_09_09
NO 15/9-F-5
NO 15/9-F-5
name
2016-09-08T00:00:00+02:00
2016-09-09T00:00:00+02:00
normal
2018-05-03T13:53:08+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": "1.2", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-09-09T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-28T17:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Release tie-back adatper\n- Retrieve tie-back adapter\n- Punch below 10 3/4\" CH\n- Cut 10 3/4\" casing\n- Mill 10 3/4\" CH ID to 12 1/4\"", "hpht": "0", "md": "-999.99", "mdCsgLast": "1404.7", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "2621", "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "12", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "- WOC\n- Attempted to tag TOC\n- WOC additional 2 hours\n- Tagged TOC w/10 ton. Released spear and POOH w/ 5 1/2\" DP.\n- Washed 10 3/4\" MS-T seal area\n- Retrieved MS-T seal assy\n- Cut 10 3/4\" surface tie-back\n- Retrieved 10 3/4\" surface tie-back\n", "tightWell": "0", "tvd": null, "tvdCsgLast": "1340.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "WOC\nMeanwhile:\n- Continued working on TDS, aligned saver sub.\n- Changed hydraulic hose on TDS retract system\n- Inspected saver sub\n- Prepared and measured upcoming BHAs\n- Bled off B-annulus. 2 bar trapped, bled off all pressure\n- Performed PMs\n- Performed housekeeping at WH deck", "dTimEnd": "2016-09-08T06:30:00+02:00", "dTimStart": "2016-09-08T00:00:00+02:00", "md": "2508", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U 1 5 1/2\" DP stand and RIH w/ tubing from 2508 m to 2549 m.\nM/U TDS to DP.", "dTimEnd": "2016-09-08T07:00:00+02:00", "dTimStart": "2016-09-08T06:30:00+02:00", "md": "2549", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for tagging TOC and leave tubing in well.", "dTimEnd": "2016-09-08T07:15:00+02:00", "dTimStart": "2016-09-08T07:00:00+02:00", "md": "2549", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Initiated flow 550 lpm / 10 bar.\nWashed down slowly to 2620 mMD and attempted to tag TOC. Took weight gradually, 8 ton, indicating green cement.", "dTimEnd": "2016-09-08T08:15:00+02:00", "dTimStart": "2016-09-08T07:15:00+02:00", "md": "2620", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH to 2600 mMD. Circulated 500 lpm / 10 bar.", "dTimEnd": "2016-09-08T09:00:00+02:00", "dTimStart": "2016-09-08T08:15:00+02:00", "md": "2600", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH to 2587 mMD while circulating 500 lpm / 10 bar.\nIncreased flow to 1500 lpm / 63 bar, circulated B/U while discharging cement contaminated returns.", "dTimEnd": "2016-09-08T09:45:00+02:00", "dTimStart": "2016-09-08T09:00:00+02:00", "md": "2587", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOC while circulating at 500 lpm / 10 bar.", "dTimEnd": "2016-09-08T11:30:00+02:00", "dTimStart": "2016-09-08T09:45:00+02:00", "md": "2587", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Washed down slowly with 550 lpm / 10 bar. Observed pressure slighly increasing to 15 bar. Reduced flow rate to 200 lpm / 2 bar.\nTagged TOC with 10 ton at 2621 mMD.\nSet down all tubing weight and disengaged spear.", "dTimEnd": "2016-09-08T12:00:00+02:00", "dTimStart": "2016-09-08T11:30:00+02:00", "md": "2621", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "B/O TDS\nDropped 3\" drift.", "dTimEnd": "2016-09-08T12:15:00+02:00", "dTimStart": "2016-09-08T12:00:00+02:00", "md": "362", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ spear BHA on 5 1/2\" DP from 362 m to 15 m. Avg. tripping speed 600 m/hr.", "dTimEnd": "2016-09-08T13:00:00+02:00", "dTimStart": "2016-09-08T12:15:00+02:00", "md": "15", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D single 5 1/2\" DP.\nR/B spear BHA.", "dTimEnd": "2016-09-08T13:30:00+02:00", "dTimStart": "2016-09-08T13:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U jet sub.", "dTimEnd": "2016-09-08T13:45:00+02:00", "dTimStart": "2016-09-08T13:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ jet sub on 5 1/2\" DP to 23 m.", "dTimEnd": "2016-09-08T14:00:00+02:00", "dTimStart": "2016-09-08T13:45:00+02:00", "md": "23", "phase": "fixed", "proprietaryCode": "plug abandon -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned MS-T seal assy surface with 1500 lpm / 22 bar. Made 3 x passes.", "dTimEnd": "2016-09-08T14:10:00+02:00", "dTimStart": "2016-09-08T14:00:00+02:00", "md": "23", "phase": "fixed", "proprietaryCode": "plug abandon -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ jet sub on 5 1/2\" DP from 23 m to surface.", "dTimEnd": "2016-09-08T14:20:00+02:00", "dTimStart": "2016-09-08T14:10:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D Jet sub.", "dTimEnd": "2016-09-08T14:30:00+02:00", "dTimStart": "2016-09-08T14:20:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U MS-T seal retrieval tool.", "dTimEnd": "2016-09-08T14:45:00+02:00", "dTimStart": "2016-09-08T14:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U control lines to MS-T retrieval tool. Function tested retrieval tool.", "dTimEnd": "2016-09-08T15:30:00+02:00", "dTimStart": "2016-09-08T14:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with MS-T retrieval tool to 20 m. Set down 2 ton.\nM/U TDS\nEngaged tool, managed to achieve 2,5 turns left.\nRan hydraulic sequence to release MS-T seal.", "dTimEnd": "2016-09-08T16:45:00+02:00", "dTimStart": "2016-09-08T15:30:00+02:00", "md": "20", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled MS-T seal free with 70 ton OP.", "dTimEnd": "2016-09-08T17:00:00+02:00", "dTimStart": "2016-09-08T16:45:00+02:00", "md": "20", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with MS-T retrieval tool and seal assy to surface.", "dTimEnd": "2016-09-08T17:15:00+02:00", "dTimStart": "2016-09-08T17:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D control lines from MS-T retrieval tool. L/D retrieval tool.", "dTimEnd": "2016-09-08T17:45:00+02:00", "dTimStart": "2016-09-08T17:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and cleared drill floor", "dTimEnd": "2016-09-08T18:00:00+02:00", "dTimStart": "2016-09-08T17:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U cutter BHA for cutting 10 3/4\" surface tie-back.", "dTimEnd": "2016-09-08T18:30:00+02:00", "dTimStart": "2016-09-08T18:00:00+02:00", "md": "9", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ cutter BHA on 5 1/2\" DP from 9 m to 117 m.", "dTimEnd": "2016-09-08T19:00:00+02:00", "dTimStart": "2016-09-08T18:30:00+02:00", "md": "117", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Established parameters:\n200 lpm / 7 bar, 400 lpm / 48 bar, 500 lpm / 81 bar, 600 lpm / 116 bar. 40 rpm / 2 to 4 kNm, 80 rpm / 2 to 5 kNm, 100 rpm / 2 to 6 kNm. Up/down weight 72/68 ton.\nPositioned cutter at 123 m and cut 10 3/4\" tie-back casing, 100 rpm / 3 to 8 kNm, 400 lpm / 49 bar. Observed pressure drop, indicating casing cut.", "dTimEnd": "2016-09-08T19:30:00+02:00", "dTimStart": "2016-09-08T19:00:00+02:00", "md": "123", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled up while circulating at 500 lpm, observed pressure increasing to 111 bar. Ran in slowly with rotation, observed pressure dropped to 3 bar when knifes entered cut.", "dTimEnd": "2016-09-08T19:45:00+02:00", "dTimStart": "2016-09-08T19:30:00+02:00", "md": "123", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ 10 3/4\" cutter BHA on 5 1/2\" DP from 123 m to surface.", "dTimEnd": "2016-09-08T20:00:00+02:00", "dTimStart": "2016-09-08T19:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D cutter BHA to HTS.", "dTimEnd": "2016-09-08T20:15:00+02:00", "dTimStart": "2016-09-08T20:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U spear BHA from set-back. Inspected grapple.", "dTimEnd": "2016-09-08T20:45:00+02:00", "dTimStart": "2016-09-08T20:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ 10 3/4\" spear BHA on 5 1/2\" DP from surface to 25 m.\nEngaged spear and attempted to pull 10 3/4\" surface tie-back casing, 30 ton OP.", "dTimEnd": "2016-09-08T20:55:00+02:00", "dTimStart": "2016-09-08T20:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Disengaged spear and POOH to surface. R/B spear BHA.", "dTimEnd": "2016-09-08T21:00:00+02:00", "dTimStart": "2016-09-08T20:55:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- fish", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U 10 3/4\" cutter BHA from HTS. Adjusted sweep and physical stop on cutters.", "dTimEnd": "2016-09-08T21:45:00+02:00", "dTimStart": "2016-09-08T21:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ 10 3/4\" BHA on 5 1/2\" DP from surface to 123 m. M/U TDS", "dTimEnd": "2016-09-08T22:15:00+02:00", "dTimStart": "2016-09-08T21:45:00+02:00", "md": "123", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Initiated rotation and flow, 100 rpm / 2 to 6 kNm, 500 lpm / 81 bar. Cut 10 3/4\" surface tie-back casing.\nObserved slight knock in riser and pressure dropped, indicating successful cut.\nObserved mud like substance on shaker, switched on gas trap. No gas observed.", "dTimEnd": "2016-09-08T22:45:00+02:00", "dTimStart": "2016-09-08T22:15:00+02:00", "md": "123", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flowchecked well for 10 min prior to POOH, static.", "dTimEnd": "2016-09-08T23:00:00+02:00", "dTimStart": "2016-09-08T22:45:00+02:00", "md": "123", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "B/O TDS.\nPOOH w/ 10 3/4\" cutter BHA on 5 1/2\" DP from 123 m to surface.", "dTimEnd": "2016-09-08T23:15:00+02:00", "dTimStart": "2016-09-08T23:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D cutter BHA", "dTimEnd": "2016-09-08T23:30:00+02:00", "dTimStart": "2016-09-08T23:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Reset and calibrated spinner wrench on IRN.", "dTimEnd": "2016-09-09T00:00:00+02:00", "dTimStart": "2016-09-08T23:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2016_09_10
NO 15/9-F-5
NO 15/9-F-5
name
2016-09-09T00:00:00+02:00
2016-09-10T00:00:00+02:00
normal
2018-05-03T13:53:09+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": ".9", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-09-10T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-28T17:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Mill 10cm off top of casing\n- Pull 10 3/4\" casing\n- Install 13 3/8\" EZSV plug at 303m\n- Place balanced cement plug in 13 3/8\" casing", "hpht": "0", "md": "-999.99", "mdCsgLast": "1404.7", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "2621", "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "13", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "- Pulled tie-back casing\n- Released tie-back adapter\n- Retrieved tie-back adatper\n- Perforated below 10 3/4\" CH\n- Cut 10 3/4\" casing at 317m\n- Milled 10 3/4\" casing hanger ID to 12 1/4\"", "tightWell": "0", "tvd": null, "tvdCsgLast": "1340.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "P/U 10 3/4\" spear BHA from set-back.", "dTimEnd": "2016-09-09T00:05:00+02:00", "dTimStart": "2016-09-09T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- fish", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ 10 3/4\" spear BHA on 5 1/2\" DP from surface to 25 m.\nEngaged spear in tie-back casing.", "dTimEnd": "2016-09-09T00:15:00+02:00", "dTimStart": "2016-09-09T00:05:00+02:00", "md": "25", "phase": "fixed", "proprietaryCode": "interruption -- fish", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ spear and tie-back casing on 5 1/2\" DP from 25 m surface.", "dTimEnd": "2016-09-09T00:30:00+02:00", "dTimStart": "2016-09-09T00:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed bushings in rotary.\nReleased spear at surface and R/B same.", "dTimEnd": "2016-09-09T01:00:00+02:00", "dTimStart": "2016-09-09T00:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for pulling 10 3/4\" surface tie-back.", "dTimEnd": "2016-09-09T01:15:00+02:00", "dTimStart": "2016-09-09T01:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U casing tong. Changed to BX-3 elevator.\nChanged PDM head to handle 10 3/4\".", "dTimEnd": "2016-09-09T02:30:00+02:00", "dTimStart": "2016-09-09T01:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with 10 3/4\" tie-back casing. Avg pulling speed 6,5 jnt/hr. Used manual slips and dog collar.", "dTimEnd": "2016-09-09T04:00:00+02:00", "dTimStart": "2016-09-09T02:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D cut casing joint to HTS.", "dTimEnd": "2016-09-09T04:15:00+02:00", "dTimStart": "2016-09-09T04:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D handling equipment.", "dTimEnd": "2016-09-09T05:15:00+02:00", "dTimStart": "2016-09-09T04:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for releasing tie-back adapter.", "dTimEnd": "2016-09-09T05:30:00+02:00", "dTimStart": "2016-09-09T05:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U torque tool BHA", "dTimEnd": "2016-09-09T05:45:00+02:00", "dTimStart": "2016-09-09T05:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 3 singles LH thread 5 1/2\" DP", "dTimEnd": "2016-09-09T06:15:00+02:00", "dTimStart": "2016-09-09T05:45:00+02:00", "md": "45", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed to LH thread saver sub", "dTimEnd": "2016-09-09T07:00:00+02:00", "dTimStart": "2016-09-09T06:15:00+02:00", "md": "45", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT with ongoing crew", "dTimEnd": "2016-09-09T07:15:00+02:00", "dTimStart": "2016-09-09T07:00:00+02:00", "md": "45", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued changing to LH thread saver sub, M/U to 95 kNm.", "dTimEnd": "2016-09-09T07:45:00+02:00", "dTimStart": "2016-09-09T07:15:00+02:00", "md": "45", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and inspected torque tool.\nRIH w/ torque tool BHA on 5 1/2\" LH thread DP to 139,8 m.", "dTimEnd": "2016-09-09T08:30:00+02:00", "dTimStart": "2016-09-09T07:45:00+02:00", "md": "139.8", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Latched dogs in tie-back adapter.\nReleased tie-back connector by rotating left, 10 kNm.", "dTimEnd": "2016-09-09T09:00:00+02:00", "dTimStart": "2016-09-09T08:30:00+02:00", "md": "139.8", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ torque tool BHA on 5 1/2\" LH thread DP from 139,8 m surface. Set BHA in slips.", "dTimEnd": "2016-09-09T09:45:00+02:00", "dTimStart": "2016-09-09T09:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed from left threaded saver sub to normal saver sub.", "dTimEnd": "2016-09-09T10:30:00+02:00", "dTimStart": "2016-09-09T09:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D torque tool BHA", "dTimEnd": "2016-09-09T10:45:00+02:00", "dTimStart": "2016-09-09T10:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U 10 3/4\" spear BHA. Inspected tools.", "dTimEnd": "2016-09-09T11:00:00+02:00", "dTimStart": "2016-09-09T10:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 10 3/4\" spear BHA on 5 1/2\" DP to 127m. Engaged spear.", "dTimEnd": "2016-09-09T11:30:00+02:00", "dTimStart": "2016-09-09T11:00:00+02:00", "md": "127", "phase": "fixed", "proprietaryCode": "plug abandon -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ spear BHA and tie-back adatper on 5 1/2\" DP from 127 m to surface.", "dTimEnd": "2016-09-09T12:00:00+02:00", "dTimStart": "2016-09-09T11:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for handling fish at surface", "dTimEnd": "2016-09-09T12:15:00+02:00", "dTimStart": "2016-09-09T12:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/O tie-back adapter and remaining casing. R/B spear BHA.", "dTimEnd": "2016-09-09T12:30:00+02:00", "dTimStart": "2016-09-09T12:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for handling guns", "dTimEnd": "2016-09-09T12:45:00+02:00", "dTimStart": "2016-09-09T12:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed BX elevator inserts and IRN dies.\nInstalled barriers for handling explosives.", "dTimEnd": "2016-09-09T13:00:00+02:00", "dTimStart": "2016-09-09T12:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U 10 3/4\" perforation guns", "dTimEnd": "2016-09-09T14:30:00+02:00", "dTimStart": "2016-09-09T13:00:00+02:00", "md": "17", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ 10 3/4\" guns on 5 1/2\" DP to 148 m.", "dTimEnd": "2016-09-09T15:00:00+02:00", "dTimStart": "2016-09-09T14:30:00+02:00", "md": "148", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U TDS, confirmed line up and filled string.\nB/O TDS and dropped ball. M/U TDS.\nSpaced out to 147,5 m. Closed MPR and opened choke.\nPressured up string to 140 bar with rig pumps, 150 lpm. Fired guns, pressure dropped to 5 bar, good indications.", "dTimEnd": "2016-09-09T16:00:00+02:00", "dTimStart": "2016-09-09T15:00:00+02:00", "md": "147.5", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Circulated 1000lpm / 11 bar, took returns through choke and poor boy. Observed max 1 ppm H2S in gas trap, no gas.", "dTimEnd": "2016-09-09T16:45:00+02:00", "dTimStart": "2016-09-09T16:00:00+02:00", "md": "147.5", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flowchecked well for 5 min over choke, static.\nFlowchecked well for 10 min on TT, static.", "dTimEnd": "2016-09-09T17:00:00+02:00", "dTimStart": "2016-09-09T16:45:00+02:00", "md": "147.5", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ 10 3/4\" guns on 5 1/2\" DP from 147,5 m to 17 m.", "dTimEnd": "2016-09-09T17:15:00+02:00", "dTimStart": "2016-09-09T17:00:00+02:00", "md": "17", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and inspected guns, all shots fired.\nMeanwhile: Performed TBT for handling guns.", "dTimEnd": "2016-09-09T17:30:00+02:00", "dTimStart": "2016-09-09T17:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D perforation guns.", "dTimEnd": "2016-09-09T18:30:00+02:00", "dTimStart": "2016-09-09T17:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and cleared drill floor", "dTimEnd": "2016-09-09T18:45:00+02:00", "dTimStart": "2016-09-09T18:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U 10 3/4\" cutter BHA. Inspected tools.", "dTimEnd": "2016-09-09T19:00:00+02:00", "dTimStart": "2016-09-09T18:45:00+02:00", "md": "7", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ 10 3/4\" cutter BHA on 5 1/2\" DP from 7 m to 319 m (bit depth) / 317 m (cutter depth).", "dTimEnd": "2016-09-09T19:30:00+02:00", "dTimStart": "2016-09-09T19:00:00+02:00", "md": "319", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U TDS and filled pipe.\nRecorded parameters: 200 lpm / 8 bar, 300 lpm / 21 bar, 400 lpm / 38 bar, 500 lpm / 72 bar, 600 lpm / 102 bar. Up/down weight 79/75 ton. 80 rpm / 2 to 6 kNm.", "dTimEnd": "2016-09-09T20:15:00+02:00", "dTimStart": "2016-09-09T19:30:00+02:00", "md": "319", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attempted to cut 10 3/4\" casing at 317 m, 500 lpm / 64 bar, 80 rpm / 4 to 11 kNm. Knock in string observed and torque decreased.\nNo pressure drop observed.\nPulled up 1 m above cut, no change in SPP observed. Ran in 0,5m below cut, no change in SPP observed and no tag of cut.", "dTimEnd": "2016-09-09T21:00:00+02:00", "dTimStart": "2016-09-09T20:15:00+02:00", "md": "319", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Re-cut 10 3/4\" casing at 316 m, 500 lpm / 64 bar, 80 rpm / 4 to 11 kNm. Observed decreasing torque trend, no pressure drop observed. Cut until torque fell back to free rotational torque.", "dTimEnd": "2016-09-09T22:30:00+02:00", "dTimStart": "2016-09-09T21:00:00+02:00", "md": "318", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed 10 min flowcheck, static.", "dTimEnd": "2016-09-09T22:45:00+02:00", "dTimStart": "2016-09-09T22:30:00+02:00", "md": "318", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ 10 3/4\" cutter BHA on 5 1/2\" DP from 318 m to surface.", "dTimEnd": "2016-09-09T23:30:00+02:00", "dTimStart": "2016-09-09T22:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D cutter BHA on drill floor due to too much wind for crane operations.", "dTimEnd": "2016-09-09T23:45:00+02:00", "dTimStart": "2016-09-09T23:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and cleared drill floor", "dTimEnd": "2016-09-10T00:00:00+02:00", "dTimStart": "2016-09-09T23:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2016_09_11
NO 15/9-F-5
NO 15/9-F-5
name
2016-09-10T00:00:00+02:00
2016-09-11T00:00:00+02:00
normal
2018-05-03T13:53:09+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-09-11T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-28T17:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- N/D BOP\n- Skid to well F-14", "hpht": "0", "md": "-999.99", "mdCsgLast": "1404.7", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "200", "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "14", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "- Milled 10 3/4\" casing hanger ID to 12 1/4\"\n- Pulled 10 3/4\" casing\n- Installed 13 3/8\" EZSV plug at 303m\n- Displaced well to clean SW\n- Placed balanced cement plug in 13 3/8\" casing\n- Cleaned BOP\n- Started to N/D diverter and BOP", "tightWell": "0", "tvd": null, "tvdCsgLast": "1340.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Continued cleaning and clearing drill floor", "dTimEnd": "2016-09-10T00:15:00+02:00", "dTimStart": "2016-09-10T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for milling 10 3/4\" casing hanger\nMeanwhile: Performed drops inspection on TDS", "dTimEnd": "2016-09-10T00:30:00+02:00", "dTimStart": "2016-09-10T00:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U 12 1/4\" CH milling BHA.", "dTimEnd": "2016-09-10T02:15:00+02:00", "dTimStart": "2016-09-10T00:30:00+02:00", "md": "76", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ 12 1/4\" CH milling BHA on 5 1/2\" DP from 71 m to 138 m.", "dTimEnd": "2016-09-10T02:30:00+02:00", "dTimStart": "2016-09-10T02:15:00+02:00", "md": "138", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U TDS and filled pipe. Recorded parameters; up/down weight 82/78 ton, 80 rpm / 2-6 KNM, 2000 lpm / 11 bar.", "dTimEnd": "2016-09-10T03:00:00+02:00", "dTimStart": "2016-09-10T02:30:00+02:00", "md": "138", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Tagged 10 3/4\" CH with CH mill at 141,26 m w/ 4 ton. Marked pipe.", "dTimEnd": "2016-09-10T03:15:00+02:00", "dTimStart": "2016-09-10T03:00:00+02:00", "md": "143.1", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Milled 10 3/4\" casing hanger from 141,26m to 141,55m, 1500-2000 lpm / 12-15 bar, 80-100 rpm / 9-12 kNm, WOB 1-6 ton.\nGot good indications that casing parted from CH. Torque decreased to 2 to 6 kNm after milling 29cm, observed small gas peak of 1% and 1 ppm H2S in gas trap.\nPulled up 1 m with flow and rotation, no restrictions.\nStopped rotation and slided down through CH area, no restriction.", "dTimEnd": "2016-09-10T05:45:00+02:00", "dTimStart": "2016-09-10T03:15:00+02:00", "md": "143.4", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued sliding down and tagged top of 10 3/4\" casing at 142,66 m.\nDressed off 10 cm of top of casing, 2000 lpm / 15 bar, 80-100 rpm / 7-9 kNm, WOB 3-8 ton.", "dTimEnd": "2016-09-10T06:45:00+02:00", "dTimStart": "2016-09-10T05:45:00+02:00", "md": "144.4", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled up and placed taper mill above CH.\nCirculated 2 x B/U, 3000 lpm / 20 bar.", "dTimEnd": "2016-09-10T07:00:00+02:00", "dTimStart": "2016-09-10T06:45:00+02:00", "md": "142", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flowchecked well for 10 min, static.\nMeanwhile: Performed TBT for drops inspection.", "dTimEnd": "2016-09-10T07:15:00+02:00", "dTimStart": "2016-09-10T07:00:00+02:00", "md": "142", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed drops inspection on TDS, moonpool, derrick and drill floor. No findings.", "dTimEnd": "2016-09-10T08:00:00+02:00", "dTimStart": "2016-09-10T07:15:00+02:00", "md": "142", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for manual handling", "dTimEnd": "2016-09-10T08:15:00+02:00", "dTimStart": "2016-09-10T08:00:00+02:00", "md": "142", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ 10 3/4\" CH milling BHA on 5 1/2\" DP from 142 m to 108 m.", "dTimEnd": "2016-09-10T08:30:00+02:00", "dTimStart": "2016-09-10T08:15:00+02:00", "md": "108", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and cleared drill floor. L/O cutter BHA, which was previously left on drill floor due to wind restriction on crane.", "dTimEnd": "2016-09-10T08:45:00+02:00", "dTimStart": "2016-09-10T08:30:00+02:00", "md": "108", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued POOH w/ 10 3/4\" milling BHA on 5 1/2\" DP from 108 m to 70 m. Over-torqued connections due to vibrations during milling.", "dTimEnd": "2016-09-10T09:00:00+02:00", "dTimStart": "2016-09-10T08:45:00+02:00", "md": "70", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued POOH w/ 10 3/4\" milling BHA on 5 1/2\" DP from 70 m to surface.", "dTimEnd": "2016-09-10T10:00:00+02:00", "dTimStart": "2016-09-10T09:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned string magnet, 22kg swarf.\nL/D 10 3/4\" milling BHA.", "dTimEnd": "2016-09-10T10:30:00+02:00", "dTimStart": "2016-09-10T10:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TOFS. Cleaned and cleared walkways and escape routes on drill floor.\nMeanwhile: Function tested BSR.", "dTimEnd": "2016-09-10T10:45:00+02:00", "dTimStart": "2016-09-10T10:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U 10 3/4\" spear BHA. Inspected and serviced grapple. Set spear in catch mode.", "dTimEnd": "2016-09-10T11:15:00+02:00", "dTimStart": "2016-09-10T10:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ 10 3/4\" spear on 5 1/2\" DP from surface to 148 m. Pulled up and verified spear engaged in 10 3/4\" casing, 88 ton on weight indicator.", "dTimEnd": "2016-09-10T12:00:00+02:00", "dTimStart": "2016-09-10T11:15:00+02:00", "md": "148", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with 10 3/4\" casing on 5 1/2\" DP from 316 m to 205 m.", "dTimEnd": "2016-09-10T12:30:00+02:00", "dTimStart": "2016-09-10T12:00:00+02:00", "md": "205", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flowchecked well for 10 min, static.\nMeanwhile: Performed TBT for releasing spear at surface.", "dTimEnd": "2016-09-10T12:45:00+02:00", "dTimStart": "2016-09-10T12:30:00+02:00", "md": "205", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH to 191 m and L/D 1 single 5 1/2\" DP.", "dTimEnd": "2016-09-10T13:00:00+02:00", "dTimStart": "2016-09-10T12:45:00+02:00", "md": "191", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U handling equipment for 10 3/4\" casing", "dTimEnd": "2016-09-10T13:45:00+02:00", "dTimStart": "2016-09-10T13:00:00+02:00", "md": "191", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH to 175m. Set slips on casing.\nDisengaged spear. R/B spear BHA.", "dTimEnd": "2016-09-10T14:15:00+02:00", "dTimStart": "2016-09-10T13:45:00+02:00", "md": "175", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "B/O 10 3/4\" casing pup and L/O same.", "dTimEnd": "2016-09-10T14:30:00+02:00", "dTimStart": "2016-09-10T14:15:00+02:00", "md": "175", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed to casing elevator dressed for 10 3/4\".", "dTimEnd": "2016-09-10T15:15:00+02:00", "dTimStart": "2016-09-10T14:30:00+02:00", "md": "175", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with 10 3/4\" casing from 175 m surface. Average pulling speed 6,2 joints/hr. Used manual slips and dog collar.\nL/O cut casing joint.", "dTimEnd": "2016-09-10T17:45:00+02:00", "dTimStart": "2016-09-10T15:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and cleared drill floor", "dTimEnd": "2016-09-10T18:00:00+02:00", "dTimStart": "2016-09-10T17:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D handling equipment for 10 3/4\" casing.\nChanged to elevator for 5 1/2\" DP handling.", "dTimEnd": "2016-09-10T19:00:00+02:00", "dTimStart": "2016-09-10T18:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for running 13 3/8\" EZSV plug", "dTimEnd": "2016-09-10T19:15:00+02:00", "dTimStart": "2016-09-10T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U 13 3/8\" EZSV RT and plug. Installed springs on tool.", "dTimEnd": "2016-09-10T20:00:00+02:00", "dTimStart": "2016-09-10T19:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ 13 3/8\" EZSV plug on 5 1/2\" DP from surface to 303 m. Avg. tripping speed 450 m/hr.", "dTimEnd": "2016-09-10T20:45:00+02:00", "dTimStart": "2016-09-10T20:00:00+02:00", "md": "303", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Recorded up/down weight, 77/73 ton.\nEstablished circulation and washed the setting area, 800lpm/ 4 bar.\nInstalled the 13 3/8\" EZSV plug at 303 m. Load tested the plug with 10 ton.", "dTimEnd": "2016-09-10T21:15:00+02:00", "dTimStart": "2016-09-10T20:45:00+02:00", "md": "303", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pumped 10m3 wash pill and 10 m3 push pill followed by SW while rotating string 50 rpm.\nCirculated until clean SW in returns, 2500 lpm / 16 bar.", "dTimEnd": "2016-09-10T22:15:00+02:00", "dTimStart": "2016-09-10T21:15:00+02:00", "md": "300", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for cement job", "dTimEnd": "2016-09-10T22:30:00+02:00", "dTimStart": "2016-09-10T22:15:00+02:00", "md": "300", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "B/O double 5 1/2\" DP.\nM/U pump-in sub to string. M/U TDS.\nSpaced out 3m above EZSV plug.", "dTimEnd": "2016-09-10T23:00:00+02:00", "dTimStart": "2016-09-10T22:30:00+02:00", "md": "300", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed cement hose.\nLeak tested cement line to 100 bar for 2 min.", "dTimEnd": "2016-09-10T23:15:00+02:00", "dTimStart": "2016-09-10T23:00:00+02:00", "md": "300", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pumped 10m3 drill water with rig pumps, 2500 lpm / 14 bar.\n\nMixed and pumped 7,8 m3 1,93 sg cement slurry, 600 lpm / 16 bar. Displaced cement with 2 m3 drill water, 600lpm / 14 bar, using cement unit.", "dTimEnd": "2016-09-11T00:00:00+02:00", "dTimStart": "2016-09-10T23:15:00+02:00", "md": "300", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2016_09_12
NO 15/9-F-5
NO 15/9-F-5
name
2016-09-11T00:00:00+02:00
2016-09-12T00:00:00+02:00
normal
2018-05-03T13:53:09+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-09-12T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-28T17:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "None", "hpht": "0", "md": "-999.99", "mdCsgLast": "1404.7", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "200", "mdStrengthForm": "2921", "presTestType": "formation integrity test", "reportNo": "15", "ropCurrent": "-999.99", "strengthForm": "1.65", "sum24Hr": "- Washed BOP and function tested rams after cementing\n- Drained riser\n- N/D BOP\n- Skidded to F-14", "tightWell": "0", "tvd": null, "tvdCsgLast": "1340.3", "tvdStrengthForm": "2610", "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "B/O and L/O pump-in sub.\nM/U double 5 1/2\" DP to drill string.", "dTimEnd": "2016-09-11T00:15:00+02:00", "dTimStart": "2016-09-11T00:00:00+02:00", "md": "300", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH restricted w/ EZSV RT on 5 1/2\" DP from 300 m to 180 m. 2min/std.", "dTimEnd": "2016-09-11T00:30:00+02:00", "dTimStart": "2016-09-11T00:15:00+02:00", "md": "180", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed pup with pre-loaded sponge ball.\nM/U TDS.\nCirculated 2 x B/U, 2500 lpm/ 13 bar at 50 rpm.\nDischarged cement contaminated returns.", "dTimEnd": "2016-09-11T01:00:00+02:00", "dTimStart": "2016-09-11T00:30:00+02:00", "md": "180", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ EZSV RT on 5 1/2\" DP from 180 m to 115 m.", "dTimEnd": "2016-09-11T01:15:00+02:00", "dTimStart": "2016-09-11T01:00:00+02:00", "md": "120", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U BOP wash tool and FOSV.", "dTimEnd": "2016-09-11T01:45:00+02:00", "dTimStart": "2016-09-11T01:15:00+02:00", "md": "120", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Washed BOP by pumping SW at 1600 lpm, 80 rpm, 3 x passes.", "dTimEnd": "2016-09-11T02:45:00+02:00", "dTimStart": "2016-09-11T01:45:00+02:00", "md": "120", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Functioned BOP rams and washed additional 3 passes", "dTimEnd": "2016-09-11T03:00:00+02:00", "dTimStart": "2016-09-11T02:45:00+02:00", "md": "120", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flowchecked well for 10min, static.\nMeanwhile: B/O and L/D BOP washing tool.", "dTimEnd": "2016-09-11T03:15:00+02:00", "dTimStart": "2016-09-11T03:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ EZSV RT on 5 1/2\" DP from 120 m to surface.", "dTimEnd": "2016-09-11T03:30:00+02:00", "dTimStart": "2016-09-11T03:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D EZSV RT.", "dTimEnd": "2016-09-11T03:45:00+02:00", "dTimStart": "2016-09-11T03:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drained riser through B-annulus outlet on WH.\nMeanwhile: Installed chains on TDS for pulling diverter. R/U fence around rotary.", "dTimEnd": "2016-09-11T04:45:00+02:00", "dTimStart": "2016-09-11T03:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for pulling diverter", "dTimEnd": "2016-09-11T05:00:00+02:00", "dTimStart": "2016-09-11T04:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attempted to pull diverter.\nAdjusted tension cylinders while holding 3-4 ton overpull.", "dTimEnd": "2016-09-11T07:00:00+02:00", "dTimStart": "2016-09-11T05:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT with ongoing crew for pulling diverter.", "dTimEnd": "2016-09-11T07:15:00+02:00", "dTimStart": "2016-09-11T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled diverter and R/B same.", "dTimEnd": "2016-09-11T08:15:00+02:00", "dTimStart": "2016-09-11T07:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "N/D slipjoint and R/B same.\nMeanwhile: Performed pre-skidding checks.", "dTimEnd": "2016-09-11T09:00:00+02:00", "dTimStart": "2016-09-11T08:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Load shifted weight from tension cylinders to BOP carrier.\nN/D tension cylinders\nMeanwhile: Continued with pre-skidding checks.", "dTimEnd": "2016-09-11T10:00:00+02:00", "dTimStart": "2016-09-11T09:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Diconnected BOP connector.\nLifted and skidded BOP off well center.", "dTimEnd": "2016-09-11T10:45:00+02:00", "dTimStart": "2016-09-11T10:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed scaffolding around HP riser.", "dTimEnd": "2016-09-11T11:00:00+02:00", "dTimStart": "2016-09-11T10:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U equipment to lift HP riser.", "dTimEnd": "2016-09-11T11:15:00+02:00", "dTimStart": "2016-09-11T11:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Disconnected NT2 connector on WH.\nRemoved WH hole covers.\nPulled HP riser from WH to drill floor. L/D riser.", "dTimEnd": "2016-09-11T12:00:00+02:00", "dTimStart": "2016-09-11T11:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed scaffolding in moonpool.\nMeanwhile: Performed TBT for moving hatches in moonpool.\n\n\n******** END OF REPORT ********", "dTimEnd": "2016-09-11T12:45:00+02:00", "dTimStart": "2016-09-11T12:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2016_10_14
NO 15/9-F-5
NO 15/9-F-5
name
2016-10-13T00:00:00+02:00
2016-10-14T00:00:00+02:00
normal
2018-05-03T13:53:09+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-10-14T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-28T17:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Continue cut and pull remaining riser joints\n- R/D riser pulling equipment\n- Bring tension cylinders to moonpool \n- Install hatches and hole covers.\n- Skid rig to F-15", "hpht": "0", "md": "-999.99", "mdCsgLast": "1404.7", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": null, "presTestType": "formation integrity test", "reportNo": "16", "ropCurrent": "-999.99", "strengthForm": null, "sum24Hr": "- Skidded cantilever to F-5. Removed hatches and hole covers\n- RIH with innerstring / BHA.\n- Removed tension cylinders, boat collision stool and deck centralizers\n- Cut riser at 134,9m\n- Pulled, cut and L/D tensioner joint\n- Cut and pulled riser joints (3 out of 7)", "tightWell": "0", "tvd": null, "tvdCsgLast": "1340.3", "tvdStrengthForm": null, "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Performed TBT for skidding rig", "dTimEnd": "2016-10-13T02:45:00+02:00", "dTimStart": "2016-10-13T02:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Skidded rig AFT to well F-5", "dTimEnd": "2016-10-13T03:30:00+02:00", "dTimStart": "2016-10-13T02:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Built handrail scaffold in moonpool.\nMeanwhile: Performed post-skid checks.", "dTimEnd": "2016-10-13T03:45:00+02:00", "dTimStart": "2016-10-13T03:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed hatch in moonpool", "dTimEnd": "2016-10-13T04:15:00+02:00", "dTimStart": "2016-10-13T03:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Built ring/fence around deck openings.\nMeanwhile: Performed TBT to run NT2 connector.", "dTimEnd": "2016-10-13T04:45:00+02:00", "dTimStart": "2016-10-13T04:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled master bushing and removed fence around rotary.\nRan NT2 connector and installed same on multibowl.", "dTimEnd": "2016-10-13T05:30:00+02:00", "dTimStart": "2016-10-13T04:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U cutter BHA", "dTimEnd": "2016-10-13T07:00:00+02:00", "dTimStart": "2016-10-13T05:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U Multibowl RT to inner string. Recorder up/down weight 75/72 ton.\nRIH and engaged Multibowl RT to multibowl by rotating elevator.\nM/U TDS.", "dTimEnd": "2016-10-13T07:30:00+02:00", "dTimStart": "2016-10-13T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for removal of tension cylinders", "dTimEnd": "2016-10-13T07:45:00+02:00", "dTimStart": "2016-10-13T07:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Bled off pressure on tension cylinders and transfered load to TDS. R/D tension cylinders, hubs and tensioner ring.\nRemoved boat collision stool and centralizers at all decks.\nInstalled hoses to multibowl outlets.\nMeanwhile: L/O 21 joints 5 1/2\" DP from set-back. Performed TBT for cutting riser.", "dTimEnd": "2016-10-13T12:00:00+02:00", "dTimStart": "2016-10-13T07:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Took tension, 20 ton overpull.\nStaged up flow rate to 2400 lpm / 90 bar.\nCut riser, lost overpull, good indication of cut.", "dTimEnd": "2016-10-13T12:30:00+02:00", "dTimStart": "2016-10-13T12:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed hoses and outlets from Multibowl.", "dTimEnd": "2016-10-13T13:00:00+02:00", "dTimStart": "2016-10-13T12:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled riser until Multibowl at drill floor.\nInstalled big C-plate and landed off riser.", "dTimEnd": "2016-10-13T13:45:00+02:00", "dTimStart": "2016-10-13T13:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "B/O Multibowl RT.\nInstalled false rotary.", "dTimEnd": "2016-10-13T14:00:00+02:00", "dTimStart": "2016-10-13T13:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Parked AFT PRS w/ Multibowl RT in safe position.", "dTimEnd": "2016-10-13T14:15:00+02:00", "dTimStart": "2016-10-13T14:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled and R/B innser string.", "dTimEnd": "2016-10-13T14:45:00+02:00", "dTimStart": "2016-10-13T14:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/B cutting BHA", "dTimEnd": "2016-10-13T15:00:00+02:00", "dTimStart": "2016-10-13T14:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U Multibowl RT", "dTimEnd": "2016-10-13T15:30:00+02:00", "dTimStart": "2016-10-13T15:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled tensioner joint (Lift #1), cleaned riser for marine growth at centralizer deck.\nInstalled master bushing and elevator. Landed riser onto elevator.", "dTimEnd": "2016-10-13T16:30:00+02:00", "dTimStart": "2016-10-13T15:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U cutting machine", "dTimEnd": "2016-10-13T16:45:00+02:00", "dTimStart": "2016-10-13T16:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cut tensioner joint\nSignificant wave height 2,7 m.", "dTimEnd": "2016-10-13T17:45:00+02:00", "dTimStart": "2016-10-13T16:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D cutting machine", "dTimEnd": "2016-10-13T18:00:00+02:00", "dTimStart": "2016-10-13T17:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/O tensioner joint", "dTimEnd": "2016-10-13T18:30:00+02:00", "dTimStart": "2016-10-13T18:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed running tool.\nInstalled cradle on HTS frame.\nRemoved elevator.\nCleared drill floor.", "dTimEnd": "2016-10-13T19:00:00+02:00", "dTimStart": "2016-10-13T18:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for cut and pull riser joints", "dTimEnd": "2016-10-13T19:15:00+02:00", "dTimStart": "2016-10-13T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted riser and removed master bushing.", "dTimEnd": "2016-10-13T19:30:00+02:00", "dTimStart": "2016-10-13T19:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled riser (lift #2).\nCleaned off marine growth on centralizer deck (relatively big amounts of growth on spash zone joint).", "dTimEnd": "2016-10-13T20:15:00+02:00", "dTimStart": "2016-10-13T19:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled riser flange to drill floor. Installed master bushing and elevator.\nRemoved fairing and landed riser onto elevator.", "dTimEnd": "2016-10-13T20:30:00+02:00", "dTimStart": "2016-10-13T20:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U cutting machine", "dTimEnd": "2016-10-13T20:45:00+02:00", "dTimStart": "2016-10-13T20:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cut riser joint. Knifes jammed several times possibly due to movement.\nChanged 1 knife due to wear.\nSignificant wave height between 2,8 and 3,3 m.", "dTimEnd": "2016-10-13T22:00:00+02:00", "dTimStart": "2016-10-13T20:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D cutting machine.", "dTimEnd": "2016-10-13T22:15:00+02:00", "dTimStart": "2016-10-13T22:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/O riser joint (lift #2).", "dTimEnd": "2016-10-13T22:30:00+02:00", "dTimStart": "2016-10-13T22:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled riser (lift #3)\nInstalled elevator and master bushing. Landed riser onto elevator.", "dTimEnd": "2016-10-13T23:00:00+02:00", "dTimStart": "2016-10-13T22:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U cutting machine.\nCut riser.\nR/D cutting machine.\nSignificant wave height 3,5 m.", "dTimEnd": "2016-10-13T23:30:00+02:00", "dTimStart": "2016-10-13T23:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/O riser joint (lift #3).", "dTimEnd": "2016-10-13T23:45:00+02:00", "dTimStart": "2016-10-13T23:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled riser out of splash zone (lift #4).", "dTimEnd": "2016-10-14T00:00:00+02:00", "dTimStart": "2016-10-13T23:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2016_10_15
NO 15/9-F-5
NO 15/9-F-5
name
2016-10-14T00:00:00+02:00
2016-10-15T00:00:00+02:00
normal
2018-05-03T13:53:09+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-10-15T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-28T17:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Continue WOW\n- Meanwhile: Skid rig to F-9 and tag TOC; Skid to F-15 and circulate to get clean SW in riser.", "hpht": "0", "md": "-999.99", "mdCsgLast": "1404.7", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": null, "presTestType": "formation integrity test", "reportNo": "17", "ropCurrent": "-999.99", "strengthForm": null, "sum24Hr": "- Pulled production riser\n- WOW; Meanwhile: L/O DP and HWDP; R/D tension cylinders; Cleaned pits and shakers; Moved equipment from WH deck", "tightWell": "0", "tvd": null, "tvdCsgLast": "1340.3", "tvdStrengthForm": null, "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Pulled riser flange above rotary (lift #4).\nInstalled master bushing and elevator. Landed riser onto elevator.", "dTimEnd": "2016-10-14T00:15:00+02:00", "dTimStart": "2016-10-14T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U cutting machine.\nCut riser.", "dTimEnd": "2016-10-14T00:45:00+02:00", "dTimStart": "2016-10-14T00:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D cutting machine.", "dTimEnd": "2016-10-14T01:00:00+02:00", "dTimStart": "2016-10-14T00:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/O riser joint.", "dTimEnd": "2016-10-14T01:15:00+02:00", "dTimStart": "2016-10-14T01:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled riser (lift #5).\nInstalled master bushing and elevator. Landed riser onto elevator.", "dTimEnd": "2016-10-14T01:45:00+02:00", "dTimStart": "2016-10-14T01:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U cutting machine.\nCut riser.\nR/D cutting machine.", "dTimEnd": "2016-10-14T02:45:00+02:00", "dTimStart": "2016-10-14T01:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/O riser joint", "dTimEnd": "2016-10-14T03:00:00+02:00", "dTimStart": "2016-10-14T02:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled riser (lift #6).\nPulled flange through rotary, installed master and elevator.\nLanded riser onto elevator.", "dTimEnd": "2016-10-14T03:15:00+02:00", "dTimStart": "2016-10-14T03:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U cutting machine\nCut riser.\nR/D cutting machine.", "dTimEnd": "2016-10-14T03:45:00+02:00", "dTimStart": "2016-10-14T03:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/O riser joint.\nUnable to move riser joint from HTS to cantilever due to wind above 40knts.", "dTimEnd": "2016-10-14T04:00:00+02:00", "dTimStart": "2016-10-14T03:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled master bushing.\nPulled riser through rotary (lift #7).\nInstaller master bushing and hole cover.", "dTimEnd": "2016-10-14T04:30:00+02:00", "dTimStart": "2016-10-14T04:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/O riser joint #6 and #7 to cantilever.", "dTimEnd": "2016-10-14T04:45:00+02:00", "dTimStart": "2016-10-14T04:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed elevator.", "dTimEnd": "2016-10-14T05:00:00+02:00", "dTimStart": "2016-10-14T04:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for R/D tension cylinders left hanging in the top mounting point.", "dTimEnd": "2016-10-14T05:15:00+02:00", "dTimStart": "2016-10-14T05:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on weather for pulling production risers\n\nMeanwhile:\nR/D tension cylinders.\nReconfigured cutter BHA and R/B in different finger (blocked 5 1/2\" DP to be L/O).", "dTimEnd": "2016-10-14T07:00:00+02:00", "dTimStart": "2016-10-14T05:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on weather for pulling production risers\n\nMeanwhile:\nContinued R/D tension cylinders. Stuck pin, needed to work loose.\nL/O 6 joints #24,7 and 35 joints #21,9 5 1/2\" DP\nL/O 4 singles 5 1/2\" HWDP\nCleaned pits", "dTimEnd": "2016-10-14T16:30:00+02:00", "dTimStart": "2016-10-14T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on weather for pulling production risers\n\nMeanwhile:\nPerformed skidding checks.\nPerformed DROPS inspection in derrick, STB crane pedestal, production main deck and cantilever walkways.\nContinued R/D tension cylinders.\nLifted 3 x tension cylinders and boat collision stool from WH to drill floor.\nCleaned pits\nCleaned shakers", "dTimEnd": "2016-10-14T19:00:00+02:00", "dTimStart": "2016-10-14T16:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on weather for pulling production risers\n\nMeanwhile:\nContinued R/D cylinders on well F-4 and F-5.\nCleaned pits and shakers", "dTimEnd": "2016-10-15T00:00:00+02:00", "dTimStart": "2016-10-14T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2016_10_16
NO 15/9-F-5
NO 15/9-F-5
name
2016-10-15T00:00:00+02:00
2016-10-16T00:00:00+02:00
normal
2018-05-03T13:53:09+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-10-16T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-28T17:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- WOW until wind is within limit for skidding\n- Skid cantilever to F-9 A, tag TOC\n- Skid to F-15 D and displace out fluid in riser\n- Pull production riser on F-15 D", "hpht": "0", "md": "-999.99", "mdCsgLast": "1404.7", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": null, "presTestType": "formation integrity test", "reportNo": "18", "ropCurrent": "-999.99", "strengthForm": null, "sum24Hr": "WOW for skidding cantilever (too stong wind) and pulling production risers\n\nMeanwhile:\nLifted equipment from WH deck to drill floor\nCleaned pits and shakers\nAssisted removal of pit sensors\nInspected BOP\nInspected dry silos", "tightWell": "0", "tvd": null, "tvdCsgLast": "1340.3", "tvdStrengthForm": null, "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Waited on weather for pulling production risers\n\nMeanwhile:\nLifted equipment from well F-4 and F-5 from WH deck to drill floor (cylinders, centralizers, boat collision stool etc.)\nCleaned pits and shakers", "dTimEnd": "2016-10-15T04:30:00+02:00", "dTimStart": "2016-10-15T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on weather for skidding cantilever and pulling production risers\nToo strong wind to skid.\n\nMeanwhile:\nInstalled moonpool hatch.\nRemoved scaffolding and handrail on WH deck.\nCleaned pits and shakers", "dTimEnd": "2016-10-15T07:00:00+02:00", "dTimStart": "2016-10-15T04:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on weather for skidding cantilever and pulling production risers.\nToo strong wind to skid\n\nMeanwhile:\nCleaned trip tanks\nAssisted removal of pit sensors\nCleaned shakers\nOpened BOP and inspected cavities\nOpened annular preventer and inspected same", "dTimEnd": "2016-10-15T19:00:00+02:00", "dTimStart": "2016-10-15T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on weather for skidding cantilever and pulling production risers.\nToo strong wind to skid\n\nMeanwihle:\nContinued cleaning shakers\nContinued inspecting BOP and ram cavities\nOpen and inspected dry bulk silos", "dTimEnd": "2016-10-16T00:00:00+02:00", "dTimStart": "2016-10-15T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_5_2016_10_17
NO 15/9-F-5
NO 15/9-F-5
name
2016-10-16T00:00:00+02:00
2016-10-17T00:00:00+02:00
normal
2018-05-03T13:53:09+02:00
{ "name": "15/9-F-5", "namingSystem": "NPD code" }
[ { "name": "15/9-F-5", "namingSystem": "NPD code" }, { "name": "5769", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-11T00:00:00+01:00", "dateDrillComplete": "2008-07-30", "daysBehind": ".8", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-10-17T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-28T17:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Skid to F-9 and tag TOC while WOW for pulling production riser on F-15 D\n- Skid to F-15 D\n- Pull production riser at F-15 D", "hpht": "0", "md": "-999.99", "mdCsgLast": "1404.7", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": null, "presTestType": "formation integrity test", "reportNo": "19", "ropCurrent": "-999.99", "strengthForm": null, "sum24Hr": "Waited on weather for skidding to F-9\nMeanwhile:\nCleaned shakers and pits\nInspected BOP\nInspected dry bulk silos\nAssembled annular preventer", "tightWell": "0", "tvd": null, "tvdCsgLast": "1340.3", "tvdStrengthForm": null, "waterDepth": "91", "wellheadElevation": "138.9" } ]
[]
[]
[]
[ { "comments": "Waited on weather for skidding cantilever and pulling production risers.\nToo strong wind to skid.\n\nMeanwhile:\nContinued cleaning shakers\nContinued inspecting BOP\nContinued inspecting dry bulk silos", "dTimEnd": "2016-10-16T03:00:00+02:00", "dTimStart": "2016-10-16T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on weather for skidding cantilever and pulling production risers.\nToo strong wind to skid\n\nMeanwhile:\nPerformed TBT for skidding", "dTimEnd": "2016-10-16T03:15:00+02:00", "dTimStart": "2016-10-16T03:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on weather for skidding cantilever and pulling production risers.\nToo strong wind to skid\n\nMeanwhile:\nContinued cleaning shakers\nContinued inspecting BOP\nContinued inspecting dry bulk silos", "dTimEnd": "2016-10-16T07:00:00+02:00", "dTimStart": "2016-10-16T03:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on weather for skidding cantilever and pulling production risers.\nToo strong wind to skid\n\nMeanwhile:\nCleaned shaker pits and upper shakers.\nContinued inspection of dry bulk silos.\nAssembled annular preventer\nInspected BOP ram cavities\n\n**** END OF REPORT ****", "dTimEnd": "2016-10-16T15:45:00+02:00", "dTimStart": "2016-10-16T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2007_09_15
NO 15/9-F-7
NO 15/9-F-7
name
2007-09-14T00:00:00+02:00
2007-09-15T00:00:00+02:00
normal
2018-05-03T13:53:09+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-15T00:00:00+02:00", "dTimDiaHoleStart": "2007-09-14T21:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Skid rig to slot number 7 (including skidding for removing riser tie-in winch). MU and run in with 36\" BHA and \"drill centralizing bushing\".", "hpht": "0", "md": "0", "mdCsgLast": null, "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "1", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "WOW to skid rig to F-7. Skidded to F-7. Started to skid out to remove riser tie-in winch.", "tightWell": "0", "tvd": "0", "tvdCsgLast": null, "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-09-14T14:00:00+02:00", "density": "1.01", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "0", "mudClass": "other", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Seawater", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "WOW to skid rig to F-7. Wind 41-53 kt.", "dTimEnd": "2007-09-15T00:00:00+02:00", "dTimStart": "2007-09-14T21:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2007_09_16
NO 15/9-F-7
NO 15/9-F-7
name
2007-09-15T00:00:00+02:00
2007-09-16T00:00:00+02:00
normal
2018-05-03T13:53:09+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": ".7", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-16T00:00:00+02:00", "dTimDiaHoleStart": "2007-09-14T21:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "0", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Drill 36\" hole to TD using sea water and hi-vis pills. Circulate hole clean and displace to 1.40 sg bentonite mud. POOH and LO 36\" HO assy.", "hpht": "0", "md": "17", "mdCsgLast": null, "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "2", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Skidded rig to F-7 and removed riser equipment from drill floor. LO 12 singles of 5 1/2\" HWDP and 6 singles of 8 1/4\" DC. PU and MU 12 singles of 5 1/2\" HWDP and RB in derrick as dedicated landing string. MU and RIH with 36\" BHA and \"drill centralizing bushing\" to 145 m MD. Started washing down with sea water and no rotation.", "tightWell": "0", "tvd": "17", "tvdCsgLast": null, "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-09-15T14:00:00+02:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "0", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "115", "yp": "-999.99" } ]
[]
[]
[ { "comments": "WOW to skid rig to F-7. Wind 41-53 kt.", "dTimEnd": "2007-09-15T03:30:00+02:00", "dTimStart": "2007-09-15T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box meeting prior to skidding. Removed main staircase and baskets to be able to skid. Skidded rig to F-7. Had decreasing trend on weather (wind 25-38 kt, morning forcast 17-22 kt) and decided to to skid all the way out to remove riser tie-in winch.", "dTimEnd": "2007-09-15T06:00:00+02:00", "dTimStart": "2007-09-15T03:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- transit", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Starboard aft skidding cylinder failed and thus stopped skidding operation. Decided to cancel skidding operation to remove riser tie-in winch and to stay on location (F-7) and start drilling.", "dTimEnd": "2007-09-15T07:00:00+02:00", "dTimStart": "2007-09-15T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Installed stairways to cantilever. Removed diverter and riser equipment from drill floor.", "dTimEnd": "2007-09-15T10:15:00+02:00", "dTimStart": "2007-09-15T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box meeting before pipe handling. LO 12 singles of 5 1/2\" HWDP. LO 3 singles of 8 1/4\" DC.", "dTimEnd": "2007-09-15T13:45:00+02:00", "dTimStart": "2007-09-15T10:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed dies on aft PRS.", "dTimEnd": "2007-09-15T15:15:00+02:00", "dTimStart": "2007-09-15T13:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to LO 3 singles of 8 1/4\" DC. PU and MU 3 stds of 5 1/2\" HWDP and RB in derrick as dedicated landing string.", "dTimEnd": "2007-09-15T20:30:00+02:00", "dTimStart": "2007-09-15T15:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Serviced TDS and blocks.", "dTimEnd": "2007-09-15T21:00:00+02:00", "dTimStart": "2007-09-15T20:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "PU 36\" HO assembly. Removed master bushing and outer ring. RIH with 36\" HO assembly to 9 m and re-instated outer ring and bushing.", "dTimEnd": "2007-09-15T22:45:00+02:00", "dTimStart": "2007-09-15T21:00:00+02:00", "md": "9", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "MU 36\" BHA from 9 m to 17 m.", "dTimEnd": "2007-09-16T00:00:00+02:00", "dTimStart": "2007-09-15T22:45:00+02:00", "md": "17", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2007_09_17
NO 15/9-F-7
NO 15/9-F-7
name
2007-09-16T00:00:00+02:00
2007-09-17T00:00:00+02:00
normal
2018-05-03T13:53:09+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": "1.1", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-17T00:00:00+02:00", "dTimDiaHoleStart": "2007-09-16T05:00:00+02:00", "diaHole": "36", "diaPilot": null, "distDrill": "4", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Drill 36\" hole to TD using sea water and hi-vis pills. Circulate hole clean and displace to 1.40 sg bentonite mud. POOH and LO 36\" HO assy.", "hpht": "0", "md": "149", "mdCsgLast": "166", "mdDiaHoleStart": "146", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "3", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "No progress on washing down to start drilling 36\" hole at 145 m. POOH . Changed to 26\" BHA and RIH. Drilled down to 149 m. POOH and re-run 36\" HO assembly. Entered 26\" hole with 17 1/2\" bit and 26\"/36\" HO assembly.", "tightWell": "0", "tvd": "149", "tvdCsgLast": "166", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-09-16T14:00:00+02:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "0", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "115", "yp": "-999.99" } ]
[]
[]
[ { "comments": "MU 36\" BHA from 17 m to 26 m.", "dTimEnd": "2007-09-16T00:30:00+02:00", "dTimStart": "2007-09-16T00:00:00+02:00", "md": "26", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Skidded cantilever 11 cm forward to adjust rig floor on F-7.", "dTimEnd": "2007-09-16T01:00:00+02:00", "dTimStart": "2007-09-16T00:30:00+02:00", "md": "26", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "MU 36\" BHA from 26 m to 122 m.", "dTimEnd": "2007-09-16T03:00:00+02:00", "dTimStart": "2007-09-16T01:00:00+02:00", "md": "122", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed derrick inspection prior to spudding the hole. Meanwhile ROV checked template and got in position for stab-in.", "dTimEnd": "2007-09-16T04:00:00+02:00", "dTimStart": "2007-09-16T03:00:00+02:00", "md": "122", "phase": "fixed", "proprietaryCode": "drilling -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "MU 36\" BHA from 122 m to 144 m. Observed fill below template. Continued RIH slowly without pumps and with no rotation until positive tag at 145.0 m.", "dTimEnd": "2007-09-16T05:00:00+02:00", "dTimStart": "2007-09-16T04:00:00+02:00", "md": "145", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Started pumping seawater at 1000 lpm and washed down with no rotation.", "dTimEnd": "2007-09-16T06:00:00+02:00", "dTimStart": "2007-09-16T05:00:00+02:00", "md": "145.2", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "No progress washing down at 1000 lpm with no rotation due to cement below template. Evalutated situation of having centralizer drill bushing at F-12 DCI level. Decided to change BHA to be able to drill out cement.", "dTimEnd": "2007-09-16T08:00:00+02:00", "dTimStart": "2007-09-16T06:00:00+02:00", "md": "145.2", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH to change BHA.", "dTimEnd": "2007-09-16T12:30:00+02:00", "dTimStart": "2007-09-16T08:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "PU and MU 26\" BHA", "dTimEnd": "2007-09-16T14:00:00+02:00", "dTimStart": "2007-09-16T12:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 26\" BHA to 142 m. ROV assisted stabbing into template guide funnel. Washed down with seawater to 145 m with 550 lpm.", "dTimEnd": "2007-09-16T16:00:00+02:00", "dTimStart": "2007-09-16T14:00:00+02:00", "md": "145", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled cement with seawater at 550 lpm/4-5 bar, 5 rpm/1-2 kNm and 1 MT WOB to 149 m. 4 m drilled hole will allow centralizer drill bushing to land in template guide funnel when starrting to drill with 36\" HO assembly.", "dTimEnd": "2007-09-16T19:00:00+02:00", "dTimStart": "2007-09-16T16:00:00+02:00", "md": "149.2", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with 26\" BHA from 149 m to surface.", "dTimEnd": "2007-09-16T21:00:00+02:00", "dTimStart": "2007-09-16T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed software upgrade on VI-CIS. Meanwhile serviced PRS and rig floor equipment.", "dTimEnd": "2007-09-16T23:30:00+02:00", "dTimStart": "2007-09-16T21:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "success" }, { "comments": "PU 36\" HO assembly.", "dTimEnd": "2007-09-17T00:00:00+02:00", "dTimStart": "2007-09-16T23:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2007_09_18
NO 15/9-F-7
NO 15/9-F-7
name
2007-09-17T00:00:00+02:00
2007-09-18T00:00:00+02:00
normal
2018-05-03T13:53:09+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": "1.3", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-18T00:00:00+02:00", "dTimDiaHoleStart": "2007-09-16T05:00:00+02:00", "diaHole": "36", "diaPilot": null, "distDrill": "59", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "MU 30\" conductor and conductor housing. Install UWG top-up system on upper 25 m of conductor. RU C-plate and MU cement stinger and CART. RIH with 30\" conductor on dedicated landing string. ROV to assist stabbing. ROV to actuate conductor centralizer. Cement 30\" conductor.", "hpht": "0", "md": "208", "mdCsgLast": "166", "mdDiaHoleStart": "146", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "4", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Drilled 36\" hole from 149 m to 208 m MD. Circulated hole clean and displaced hole to 1.40 sg bentonite mud. POOH and LD 36\" HO assy. RU for running 30\" conductor. MU 30\" conductor shoe.", "tightWell": "0", "tvd": "208", "tvdCsgLast": "166", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-09-17T14:00:00+02:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "208", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "117", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Removed master bushing and outer ring. RIH with 36\" HO assembly to 9 m and re-instated outer ring and bushing. MU 36\" BHA from 9 m to 142 m. Stabbed into funnel on template guided by ROV and washed down 600 lpm/1 bar to 145 m.", "dTimEnd": "2007-09-17T04:00:00+02:00", "dTimStart": "2007-09-17T00:00:00+02:00", "md": "145", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attempted to enter 26\" hole washing down 600 lpm/1 bar. Inspected string with ROV and found that 36\" HO and centralizer bushing was clear of F-12 DCI. Applied 1-5 rpm and entered pre-drilled 26\" hole. Washed down 1000 lpm/1 bar to 149 m. Observed with ROV that centralizer bushing had not landed out in funnel.", "dTimEnd": "2007-09-17T06:00:00+02:00", "dTimStart": "2007-09-17T04:00:00+02:00", "md": "149", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Reamed 26\" pre-drilled hole to be able to land out centralizer bushing in funnel, 1000-1500 lpm, 5-15 rpm.", "dTimEnd": "2007-09-17T07:00:00+02:00", "dTimStart": "2007-09-17T06:00:00+02:00", "md": "149", "phase": "fixed", "proprietaryCode": "drilling -- ream", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled 36\" hole from 149 m to 187 m MD, 2000-4550 lpm, 15-83 bar, 50-80 rpm, 4-7 kNm, 1-2.5 MT WOB, ROP 5-9 m/hr. Pumped 20 m3 hi-vis pills as required. Down linked and performed survey at 168 m and 183 m. Up weight 102 MT / Down weight 97 MT.\n\nSurvey at 155 m 0.93 inc\n at 171 m 0.49 inc. \n at 184 m 0.57 inc", "dTimEnd": "2007-09-17T15:00:00+02:00", "dTimStart": "2007-09-17T07:00:00+02:00", "md": "187", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Repaired liner spray on mud pump #3.", "dTimEnd": "2007-09-17T15:30:00+02:00", "dTimStart": "2007-09-17T15:00:00+02:00", "md": "187", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Drilled 36\" hole from 187 m to 209 m MD, 4550 lpm, 83 bar, 80 rpm, 4 kNm, 1-2.5 MT WOB, ROP 5-9 m/hr. Pumped 20 m3 hi-vis pills as required. Down linked and performed survey at 197 m.\n\nSurvey at 195.6 m 0.49 inc", "dTimEnd": "2007-09-17T19:00:00+02:00", "dTimStart": "2007-09-17T15:30:00+02:00", "md": "209", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Circulated btms up with seawater and sweept with 25 m3 hi-vis pill. ROV confirmed TD by measuring paint mark 0.5 m below template funnel. Displaced hole to 1.40 sg bentonite mud at 4800 lpm and 106 bar.", "dTimEnd": "2007-09-17T20:00:00+02:00", "dTimStart": "2007-09-17T19:00:00+02:00", "md": "207", "phase": "fixed", "proprietaryCode": "drilling -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with 36\" BHA from 206 m to 5 m below seabed. No drag observed. Topped up hole with 1.40 sg mud at 1770 lpm and 5 bar. POOH with 36\" BHA and LO same.", "dTimEnd": "2007-09-17T23:30:00+02:00", "dTimStart": "2007-09-17T20:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleared and tidied rig floor off excess equipment. Held tool box meeting prior to picking up CART assembly.", "dTimEnd": "2007-09-18T00:00:00+02:00", "dTimStart": "2007-09-17T23:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2007_09_19
NO 15/9-F-7
NO 15/9-F-7
name
2007-09-18T00:00:00+02:00
2007-09-19T00:00:00+02:00
normal
2018-05-03T13:53:09+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": "1.7", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-19T00:00:00+02:00", "dTimDiaHoleStart": "2007-09-16T05:00:00+02:00", "diaHole": "36", "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Continue RIH with 30\" conductor on 5 1/2\" HWDP landing string to TD. ROV to actuate conductor centralizer. Cement 30\" conductor. Waiting on cement to set. Release CART and POOH. LD cement stinger and running tool. Clear rig floor.", "hpht": "0", "md": "208", "mdCsgLast": "166", "mdDiaHoleStart": "146", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "5", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "MU 30\" conductor and conductor housing. Installed UWG top-up system on upper 25 m of conductor. RU C-plate and MU cement stinger and CART. RIH with 30\" conductor on dedicated landing string. ROV manipulated conductor to be able to pass F-12 DCI valve and assisted stabbing into F-7 template funnel. ", "tightWell": "0", "tvd": "208", "tvdCsgLast": "166", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-09-18T14:00:00+02:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "208", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "117", "yp": "-999.99" } ]
[]
[]
[ { "comments": "PU CART assembly and RB in derrick. MU cmt assembly and LO same. Removed 5 1/2\" elevators and bails. RU for running 30\" conductor.", "dTimEnd": "2007-09-18T04:30:00+02:00", "dTimStart": "2007-09-18T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box meeting with all personnel involved prior to running conductors. PU 30\" shoe joint and checked float for flow through by flushing with water.", "dTimEnd": "2007-09-18T06:00:00+02:00", "dTimStart": "2007-09-18T04:30:00+02:00", "md": "12", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "MU 30\" conductor. Installed cement top-up system with cement oulet 25 m below mud line and burst disk assembly 15 m below mud line. Aligned UWG top-up system to avoid conflict with the 3 hydraulic rams in the template well slot.", "dTimEnd": "2007-09-18T11:00:00+02:00", "dTimStart": "2007-09-18T06:00:00+02:00", "md": "49", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed 5 1/2\" DP elevator and bails. Re-installed link tilt system.", "dTimEnd": "2007-09-18T14:00:00+02:00", "dTimStart": "2007-09-18T11:00:00+02:00", "md": "49", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "MU conductor housing joint. Landed out on bushing in rotary. Disconnected and LD handling CART.", "dTimEnd": "2007-09-18T17:30:00+02:00", "dTimStart": "2007-09-18T14:00:00+02:00", "md": "62", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RU innerstring C-plate on top of 30\" housing joint. MU up aluminium cement stinger (innerstring). PU CART and stabbed lower end into innerstring x-over. Removed C-plate. Locked CART to housing joint with 5 left-hand turns. Performed PU test. Installed 2\" fill up valve and inclinometer on CART.", "dTimEnd": "2007-09-18T19:30:00+02:00", "dTimStart": "2007-09-18T17:30:00+02:00", "md": "62", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran conductor through rotary and installed master bushings. Installed cement top-up system as conductor was RIH.", "dTimEnd": "2007-09-18T22:00:00+02:00", "dTimStart": "2007-09-18T19:30:00+02:00", "md": "62", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed hose for UWG top-up system.", "dTimEnd": "2007-09-18T23:00:00+02:00", "dTimStart": "2007-09-18T22:00:00+02:00", "md": "62", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Filled conductor with SW and continued RIH with 30\" conductor on 5 1/2\" HWDP landing string to 118 m.", "dTimEnd": "2007-09-18T23:30:00+02:00", "dTimStart": "2007-09-18T23:00:00+02:00", "md": "118", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed dies on pipe handler.", "dTimEnd": "2007-09-19T00:00:00+02:00", "dTimStart": "2007-09-18T23:30:00+02:00", "md": "118", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" } ]
[]
15_9_F_7_2007_09_20
NO 15/9-F-7
NO 15/9-F-7
name
2007-09-19T00:00:00+02:00
2007-09-20T00:00:00+02:00
normal
2018-05-03T13:53:10+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": "2.2", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-20T00:00:00+02:00", "dTimDiaHoleStart": "2007-09-16T05:00:00+02:00", "diaHole": "36", "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Release CART and POOH. LD cement stinger and running tool. Clear rig floor. MU and RIH with 17 1/2\" BHA. Drill out 30\" shoe using SW and hi-vis pills.", "hpht": "0", "md": "208", "mdCsgLast": "166", "mdDiaHoleStart": "146", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "6", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Continued RIH with 30\" conductor on 5 1/2\" HWDP landing string to TD. ROV actuated conductor centralizer. Cemented 30\" conductor. Waited 10 hours on cement to set. Performed remedial cement job. ", "tightWell": "0", "tvd": "208", "tvdCsgLast": "166", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-09-19T14:00:00+02:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "208", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "117", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Changed dies on pipe handler.", "dTimEnd": "2007-09-19T00:30:00+02:00", "dTimStart": "2007-09-19T00:00:00+02:00", "md": "118", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "RIH with 30\" conductor on 5 1/2\" HWDP landing string from 118 m to 138 m.", "dTimEnd": "2007-09-19T01:00:00+02:00", "dTimStart": "2007-09-19T00:30:00+02:00", "md": "138", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Stopped RIH with 30\" conductor at 138 m due to possible collision with F-12 DCI valve. Monitored and evalutated situation.", "dTimEnd": "2007-09-19T03:00:00+02:00", "dTimStart": "2007-09-19T01:00:00+02:00", "md": "138", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RU tugger from moonpool and installed wire sling on lower part of conductor with ROV to manipulate 30\" conductor away from F-12. String weight 105 MT.", "dTimEnd": "2007-09-19T05:15:00+02:00", "dTimStart": "2007-09-19T03:00:00+02:00", "md": "138", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 30\" conductor on 5 1/2\" HWDP landing string past F-12 DCI valve and stabbed into template slot assisted by ROV.", "dTimEnd": "2007-09-19T05:45:00+02:00", "dTimStart": "2007-09-19T05:15:00+02:00", "md": "143", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 30\" conductor on 5 1/2\" HWDP landing string from 143 m to 157 m.", "dTimEnd": "2007-09-19T06:00:00+02:00", "dTimStart": "2007-09-19T05:45:00+02:00", "md": "157", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 30\" conductor on 5 1/2\" HWDP landing string from 157 m to 203 m.", "dTimEnd": "2007-09-19T09:00:00+02:00", "dTimStart": "2007-09-19T06:00:00+02:00", "md": "202", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Spaced out cement stand and ensured that 30\" conductor housing was 112.88 m from machined ring on centralizer deck. ROV checked level using DigiQuartz. Found F-7 to be 27 cm to high.\nAdjusted string hight and checked level with DigiQuarz. Made two measurements and confirmed F-7 to be positioned 12,2 cm higher than F12, as per program.\n", "dTimEnd": "2007-09-19T10:00:00+02:00", "dTimStart": "2007-09-19T09:00:00+02:00", "md": "202", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in with forward 6 MT tugger as guide from moonpool. ROV hooked it up to the template and attached shackle and rope to the hot stab. Launched the minireel hose from moonpool on the guide tugger. Hooked up ROV with hydraulic reservoir to hydraulic receptacle on template. Engaged centralization rams in template funnel.\n\nPitch and roll readings :\nBefore engaging rams ; roll 0.6 / pitch 0.2\nAfter engaging rams ; roll 0.5 / pitch 0.2", "dTimEnd": "2007-09-19T13:45:00+02:00", "dTimStart": "2007-09-19T10:00:00+02:00", "md": "202", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Circulated 30 m3 SW at 2500 lpm. Meanwhile held tool box talk prior to cement job.", "dTimEnd": "2007-09-19T14:15:00+02:00", "dTimStart": "2007-09-19T13:45:00+02:00", "md": "202", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Trouble shoot purge system prior to cement job.", "dTimEnd": "2007-09-19T16:00:00+02:00", "dTimStart": "2007-09-19T14:15:00+02:00", "md": "202", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Mixed and pumped 46.2 m3 1.52 sg Tuned Light XL cement slurry at 800 lpm. Displaced cement slurry with 6.0 m3 of SW at max rate using cement unit. Bleed off pressure and checked for back-flow. Removed cmt hose and flushed through manifolds and hoses.", "dTimEnd": "2007-09-19T17:15:00+02:00", "dTimStart": "2007-09-19T16:00:00+02:00", "md": "202", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOC while holding landing string in tension at correct depth.\n\nMeanwhile:\n-Flushed and cleaned cmt unit.\n-Inspected seabed for sement returns - inconclusive due to poor visability\n-Performed maintenance on aft PRS\n-Prepared for Top-up job", "dTimEnd": "2007-09-20T00:00:00+02:00", "dTimStart": "2007-09-19T17:15:00+02:00", "md": "202", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2007_09_21
NO 15/9-F-7
NO 15/9-F-7
name
2007-09-20T00:00:00+02:00
2007-09-21T00:00:00+02:00
normal
2018-05-03T13:53:10+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": "2.2", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-21T00:00:00+02:00", "dTimDiaHoleStart": "2007-09-16T05:00:00+02:00", "diaHole": "36", "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "RIH with 17 1/2\" BHA from 144 m to 200 m. Drill out 30\" shoe using SW and hi-vis pills. Clean out rathole. Drill to 570 m MD using SW and hi-vis pills.", "hpht": "0", "md": "208", "mdCsgLast": "202", "mdDiaHoleStart": "146", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "7", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Released CART and POOH. LD cement stinger and running tool. Cleared rig floor. Installed CTS funnel and DCI hose on F-7 using ROV. MU and RIH with 17 1/2\" BHA to 144 m.", "tightWell": "0", "tvd": "208", "tvdCsgLast": "202", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-09-20T22:00:00+02:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "111", "yp": "-999.99" } ]
[]
[]
[ { "comments": "WOC while holding landing string in tension at correct depth.", "dTimEnd": "2007-09-20T02:30:00+02:00", "dTimStart": "2007-09-20T00:00:00+02:00", "md": "202", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box meeting in cement control room prior to pumping down the top-up pipe. Lined up to to pump down top-up pipe. Tested line and manifold 100bar/5 min. Stepped up pressure pumping at 50 l/min. At 52 bar (770 psi) differential, pressure bled of rapidly indicating burst disk rupture. Indications are that it is the shallowmost disk that ruptured.\n", "dTimEnd": "2007-09-20T03:15:00+02:00", "dTimStart": "2007-09-20T02:30:00+02:00", "md": "202", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed circulation test at 500 lpm/32 bar with SW for 10 min. Prepared for remedial cement job. Pumped 6 m3 of 1,56 G-cement slurry at 500lpm/74 bar. Displaced cement down cement hose and top up pipe with 1,1 m3 SW.", "dTimEnd": "2007-09-20T05:30:00+02:00", "dTimStart": "2007-09-20T03:15:00+02:00", "md": "202", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Disconnected hose and dropped release ball. Let ball drop and sheard out release sub on UWG with 139 bar. Checked release by ROV.", "dTimEnd": "2007-09-20T06:00:00+02:00", "dTimStart": "2007-09-20T05:30:00+02:00", "md": "202", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attempted to retrieve UWG top-up hose. Flushed hose with 5 m3 SW. Took weight with tugger, but were unable to pull the released hose out of the top-off system.", "dTimEnd": "2007-09-20T08:00:00+02:00", "dTimStart": "2007-09-20T06:00:00+02:00", "md": "202", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed cutter on ROV. Cut UWG top-up hose and retrieved it to surface.", "dTimEnd": "2007-09-20T13:45:00+02:00", "dTimStart": "2007-09-20T08:00:00+02:00", "md": "202", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Slacked off to neutral weigt. Observed no movement on conductor. ROV confirmed inclinometer readings. Released CART by rotating 5 times to the right. Pulled CART above 30\" housing. RB 1 std and dropped sponge ball and flushed DP with 2500 lpm for 5 min. POOH.\n\nMeanwhile attempted to retract centralization rams in template funnel. ROV did not manage to pull dummy hot-stab and broke handle on operation panel.\n\nPitch and roll readings :\nAfter cement job; roll 0.43 / pitch 0.54\n", "dTimEnd": "2007-09-20T16:30:00+02:00", "dTimStart": "2007-09-20T13:45:00+02:00", "md": "31", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box meeting befor handling BHA. LO cement stinger and CART.", "dTimEnd": "2007-09-20T18:00:00+02:00", "dTimStart": "2007-09-20T16:30:00+02:00", "md": "31", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled vacuum hose for DCI through rotary for ROV to pick up.", "dTimEnd": "2007-09-20T18:30:00+02:00", "dTimStart": "2007-09-20T18:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "BO and LO cement stand. RD 6 MT tugger in moonpool. Cleaned and cleared rig floor.", "dTimEnd": "2007-09-20T21:30:00+02:00", "dTimStart": "2007-09-20T18:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk with all personnel involved. PU 17 1/2\" bit and motor assy.", "dTimEnd": "2007-09-20T22:30:00+02:00", "dTimStart": "2007-09-20T21:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "BO pre-made bit and mudmotor assembly and adjusted bend to 1.22 deg. MU bit and motor assembly.", "dTimEnd": "2007-09-20T23:30:00+02:00", "dTimStart": "2007-09-20T22:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- rig up/down", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "MU and RIH with 17 1/2\" BHA.", "dTimEnd": "2007-09-21T00:00:00+02:00", "dTimStart": "2007-09-20T23:30:00+02:00", "md": "9", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2007_09_22
NO 15/9-F-7
NO 15/9-F-7
name
2007-09-21T00:00:00+02:00
2007-09-22T00:00:00+02:00
normal
2018-05-03T13:53:10+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": "2.5", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-22T00:00:00+02:00", "dTimDiaHoleStart": "2007-09-21T13:45:00+02:00", "diaHole": "17.5", "diaPilot": null, "distDrill": "7", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Drill 17 1/2\" hole from 215 m to 375 m taking gyro singel-shot survey every 10 m.", "hpht": "0", "md": "215", "mdCsgLast": "202", "mdDiaHoleStart": "210", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "8", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "RIH with 17 1/2\" BHA from 144 m and tagged cmt at 196 m. Drill out 30\" shoe using SW and hi-vis pills. Clean out rathole. Drill to 215 m MD while attempting to take surveys. Spotted 10 m3 1.40 sg pill on bottom and POOH. Changed 17 1/2\" BHA and RIH to 200 m. RU gyro unit to run single shot survey through DP.", "tightWell": "0", "tvd": "215", "tvdCsgLast": "202", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-09-21T22:00:00+02:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "115", "yp": "-999.99" } ]
[]
[]
[ { "comments": "MU and RIH with 17 1/2\" BHA from 9 m to 129 m. Stabbed into 30\" conductor housing at 139.7 m assisted by ROV. RIH with 17 1/2\" BHA to 144 m.", "dTimEnd": "2007-09-21T06:00:00+02:00", "dTimStart": "2007-09-21T00:00:00+02:00", "md": "144", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "MU and RIH with 17 1/2\" BHA from 144 m to 188 m. Started circulating and attempted to take survey without sucess.", "dTimEnd": "2007-09-21T07:45:00+02:00", "dTimStart": "2007-09-21T06:00:00+02:00", "md": "188", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RB 1 std and topped up oil in TDS.", "dTimEnd": "2007-09-21T09:45:00+02:00", "dTimStart": "2007-09-21T07:45:00+02:00", "md": "188", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Attempted to re-take survey without sucess.", "dTimEnd": "2007-09-21T10:15:00+02:00", "dTimStart": "2007-09-21T09:45:00+02:00", "md": "188", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Washed down and tagged cmt at 196 m. Drilled out shoe from 196 m to 210 m; 3500 lpm, 93 bar, 60 rpm, 3 kNm, 2 MT WOB. Up weight 100 MT/down weight 97 MT. Pulled through shoe and observed no drag.", "dTimEnd": "2007-09-21T13:45:00+02:00", "dTimStart": "2007-09-21T10:15:00+02:00", "md": "210", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attempted to re-take survey without sucess. Drilled 17 1/2\" hole from 210 m to 215 m; 3000 lpm, 71 bar, 60 rpm, 1-6 kNm, 1 MT WOB. Attempted to re-take survey without sucess.", "dTimEnd": "2007-09-21T15:15:00+02:00", "dTimStart": "2007-09-21T13:45:00+02:00", "md": "215", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Circulated while evaluating problem with survey. Spotted 10 m3 1.40 sg pill on bottom prior to POOH to change BHA.", "dTimEnd": "2007-09-21T16:00:00+02:00", "dTimStart": "2007-09-21T15:15:00+02:00", "md": "215", "phase": "fixed", "proprietaryCode": "drilling -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH from 215 m to 192 m. Inspected TDS for loose items. Continued POOH from 192 m to surface.", "dTimEnd": "2007-09-21T20:30:00+02:00", "dTimStart": "2007-09-21T16:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed 5 1/2\" elevator due to missing pin.", "dTimEnd": "2007-09-21T22:00:00+02:00", "dTimStart": "2007-09-21T20:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "MU and RIH with new 17 1/2\" BHA to 36 m.", "dTimEnd": "2007-09-22T00:00:00+02:00", "dTimStart": "2007-09-21T22:00:00+02:00", "md": "36", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2007_09_23
NO 15/9-F-7
NO 15/9-F-7
name
2007-09-22T00:00:00+02:00
2007-09-23T00:00:00+02:00
normal
2018-05-03T13:53:10+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": "2.8", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-23T00:00:00+02:00", "dTimDiaHoleStart": "2007-09-21T13:45:00+02:00", "diaHole": "17.5", "diaPilot": null, "distDrill": "65", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Drill 17 1/2\" hole from 280 m to 440 m taking gyro singel-shot survey every single drilled.", "hpht": "0", "md": "280", "mdCsgLast": "202", "mdDiaHoleStart": "210", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "9", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Continued RU WL gyro. Drill 17 1/2\" hole from 215 m to 280 m taking gyro singel-shot survey every single drilled. Had possible small screw/T-bar dropped down hole (inside drill string) at 276 m.", "tightWell": "0", "tvd": "280", "tvdCsgLast": "202", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-09-22T22:00:00+02:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "115", "yp": "-999.99" } ]
[ { "dTim": "2007-09-23T00:00:00+02:00", "equivalentMudWeight": "1.03", "md": "280", "readingKind": "estimated" } ]
[ { "azi": "274.41", "dTim": "2007-09-23T00:00:00+02:00", "incl": ".22", "md": "160", "tvd": "160" }, { "azi": "272.78", "dTim": "2007-09-23T00:00:00+02:00", "incl": ".3", "md": "170", "tvd": "170" }, { "azi": "262.14", "dTim": "2007-09-23T00:00:00+02:00", "incl": ".26", "md": "180", "tvd": "180" }, { "azi": "267.67", "dTim": "2007-09-23T00:00:00+02:00", "incl": ".23", "md": "190", "tvd": "190" }, { "azi": "260.35", "dTim": "2007-09-23T00:00:00+02:00", "incl": ".32", "md": "199", "tvd": "199" }, { "azi": "226.35", "dTim": "2007-09-23T00:00:00+02:00", "incl": ".31", "md": "208", "tvd": "208" }, { "azi": "244.76", "dTim": "2007-09-23T00:00:00+02:00", "incl": ".48", "md": "218", "tvd": "218" }, { "azi": "249.93", "dTim": "2007-09-23T00:00:00+02:00", "incl": ".25", "md": "229.7", "tvd": "229.7" }, { "azi": "229.35", "dTim": "2007-09-23T00:00:00+02:00", "incl": ".46", "md": "240.2", "tvd": "240.2" }, { "azi": "304.09", "dTim": "2007-09-23T00:00:00+02:00", "incl": ".24", "md": "249.6", "tvd": "249.6" } ]
[ { "comments": "MU and RIH with new 17 1/2\" BHA from 36 m to 129 m. Stabbed into 30\" conductor housing at 139.7 m assisted by ROV. RIH with new 17 1/2\" BHA from 140 m to 200 m. Weight under jar is 13 MT.", "dTimEnd": "2007-09-22T03:00:00+02:00", "dTimStart": "2007-09-22T00:00:00+02:00", "md": "200", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RU gyro unit in V-door to be able to run single shot survey through DP.", "dTimEnd": "2007-09-22T06:00:00+02:00", "dTimStart": "2007-09-22T03:00:00+02:00", "md": "200", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed electrical box in gyro unit.", "dTimEnd": "2007-09-22T07:00:00+02:00", "dTimStart": "2007-09-22T06:00:00+02:00", "md": "200", "phase": "wire line", "proprietaryCode": "interruption -- rig up/down", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Continued RU gyro unit in V-door to be able to run single shot survey through DP.", "dTimEnd": "2007-09-22T09:15:00+02:00", "dTimStart": "2007-09-22T07:00:00+02:00", "md": "200", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Washed down from 200 to 215 m. Pulled back through shoe to verify no obstruction.", "dTimEnd": "2007-09-22T09:45:00+02:00", "dTimStart": "2007-09-22T09:15:00+02:00", "md": "215", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled 17 1/2\" hole from 215 m to 266 m using 5 1/2\" HWDP as drilling stand; 3100-3400 lpm, 75-87 bar, 60 rpm, 1-6 kNm, 1 MT WOB. Up weight 97 MT/down weight 93 MT. Pumped 10 m3 hi-vis sweep and spotted 10m3 hi-vis on bottom prior to each gyro run. Performed gyro survey every single drilled. Strapped pipe to one side at centralizer deck using 6 MT moonpool tugger to enhance quality on survey. Gyro kept hanging up while RIH at 110 m from bit (inside 5 1/2\" HWDP) and needed several attempts to be able to pass.\n", "dTimEnd": "2007-09-23T00:00:00+02:00", "dTimStart": "2007-09-22T09:45:00+02:00", "md": "266", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2007_09_24
NO 15/9-F-7
NO 15/9-F-7
name
2007-09-23T00:00:00+02:00
2007-09-24T00:00:00+02:00
normal
2018-05-03T13:53:10+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": "3.1", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-24T00:00:00+02:00", "dTimDiaHoleStart": "2007-09-21T13:45:00+02:00", "diaHole": "17.5", "diaPilot": null, "distDrill": "28", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Drill 17 1/2\" hole from 305 m to 665 m.", "hpht": "0", "md": "308", "mdCsgLast": "202", "mdDiaHoleStart": "210", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "10", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Drill 17 1/2\" hole from 280 m to 308 m taking gyro singel-shot survey every single drilled. POOH to change to BHA with MWD gyro. RIH with new 17 1/2\" BHA. Attempted to take survey before starting to drill 17 1/2\" hole.", "tightWell": "0", "tvd": "308", "tvdCsgLast": "202", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-09-23T22:00:00+02:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "115", "yp": "-999.99" } ]
[ { "dTim": "2007-09-24T00:00:00+02:00", "equivalentMudWeight": "1.03", "md": "308", "readingKind": "estimated" } ]
[ { "azi": "334", "dTim": "2007-09-24T00:00:00+02:00", "incl": ".22", "md": "259", "tvd": "259" }, { "azi": "63.36", "dTim": "2007-09-24T00:00:00+02:00", "incl": ".06", "md": "270", "tvd": "270" }, { "azi": "14.41", "dTim": "2007-09-24T00:00:00+02:00", "incl": ".31", "md": "280", "tvd": "280" }, { "azi": "42.81", "dTim": "2007-09-24T00:00:00+02:00", "incl": ".33", "md": "289", "tvd": "289" } ]
[ { "comments": "Drilled 17 1/2\" hole from 266 m to 276 m; 3000-3500 lpm, 60-92 bar, 70 rpm, 2-5 kNm, 3-5 MT WOB. Pumped 10 m3 hi-vis sweep and spotted 10m3 hi-vis on bottom. Performed gyro survey at 262 m. \n", "dTimEnd": "2007-09-23T03:00:00+02:00", "dTimStart": "2007-09-23T00:00:00+02:00", "md": "276", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Dropped T-bar (2.5 cm x 2.5 cm extended screw) from gyro goose-neck. It was probably lost down hole (inside drill string). Evaluated situation and discussed further action with town, decided to continue drilling operation.", "dTimEnd": "2007-09-23T05:00:00+02:00", "dTimStart": "2007-09-23T03:00:00+02:00", "md": "276", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Performed gyro survey at 273.4 m. Drilled 17 1/2\" hole from 276 m to 280 m; 3500 lpm, 98 bar, 70 rpm, 3-4 kNm, 3-4 MT WOB.", "dTimEnd": "2007-09-23T06:00:00+02:00", "dTimStart": "2007-09-23T05:00:00+02:00", "md": "280", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled 17 1/2\" hole from 280 m to 307 m using 5 1/2\" HWDP as drilling stand; 3000-4000 lpm, 76-126 bar, 70 rpm, 1-6 kNm, 2-4 MT WOB. Up weight 100 MT/down weight 97 MT. Pumped 10 m3 hi-vis sweep and spotted 10m3 hi-vis on bottom prior to each gyro run. Performed gyro survey every single drilled.", "dTimEnd": "2007-09-23T13:00:00+02:00", "dTimStart": "2007-09-23T06:00:00+02:00", "md": "307", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pumped 10 m3 hi-vis pill and swept out of hole. Spotted 12 m3 1.40 sg mud at 3100 lpm/72 bar.", "dTimEnd": "2007-09-23T13:30:00+02:00", "dTimStart": "2007-09-23T13:00:00+02:00", "md": "307", "phase": "fixed", "proprietaryCode": "drilling -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH from 307 m to 122 m. No drag observed. Inspected TDS for loose items. Continued POOH from 122 m to surface. Found T-bar, that was lost yesterday from gyro goose-neck, in bit.", "dTimEnd": "2007-09-23T19:00:00+02:00", "dTimStart": "2007-09-23T13:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "MU and RIH with new 17 1/2\" BHA from surface to 83 m.", "dTimEnd": "2007-09-24T00:00:00+02:00", "dTimStart": "2007-09-23T19:00:00+02:00", "md": "83", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2007_09_25
NO 15/9-F-7
NO 15/9-F-7
name
2007-09-24T00:00:00+02:00
2007-09-25T00:00:00+02:00
normal
2018-05-03T13:53:10+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": "3.4", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-25T00:00:00+02:00", "dTimDiaHoleStart": "2007-09-21T13:45:00+02:00", "diaHole": "17.5", "diaPilot": null, "distDrill": "20", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Drill 17 1/2\" hole from 353 m to 520 m taking gyro singel-shot survey every 10 m.", "hpht": "0", "md": "328", "mdCsgLast": "202", "mdDiaHoleStart": "210", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "11", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "POOH to change MWD gyro. RIH with 17 1/2\" BHA from surface to 308 m. Drilled 17 1/2\" hole from 308 m to 328 m while attempting to take survey with gMWD. Drilled 17 1/2\" hole from 328 m to 353 m taking gyro singel-shot survey every single drilled. ", "tightWell": "0", "tvd": "328", "tvdCsgLast": "202", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-09-24T22:00:00+02:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "328", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "115", "yp": "-999.99" } ]
[ { "dTim": "2007-09-25T00:00:00+02:00", "equivalentMudWeight": "1.03", "md": "353", "readingKind": "estimated" } ]
[ { "azi": "272.12", "dTim": "2007-09-25T00:00:00+02:00", "incl": ".22", "md": "296", "tvd": "296" }, { "azi": "296.43", "dTim": "2007-09-25T00:00:00+02:00", "incl": ".26", "md": "305", "tvd": "305" }, { "azi": "247.57", "dTim": "2007-09-25T00:00:00+02:00", "incl": ".24", "md": "317", "tvd": "317" } ]
[ { "comments": "RIH with new 17 1/2\" BHA from 83 to 122 m.", "dTimEnd": "2007-09-24T00:30:00+02:00", "dTimStart": "2007-09-24T00:00:00+02:00", "md": "122", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Surfaced ROV to repair hydraulic leak.", "dTimEnd": "2007-09-24T01:00:00+02:00", "dTimStart": "2007-09-24T00:30:00+02:00", "md": "122", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "RIH with new 17 1/2\" BHA from 122 to 129 m. Stabbed into 30\" conductor housing at 139.7 m assisted by ROV. RIH with new 17 1/2\" BHA from 140 m to 227 m.", "dTimEnd": "2007-09-24T02:00:00+02:00", "dTimStart": "2007-09-24T01:00:00+02:00", "md": "227", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Surfaced ROV to repair hydraulic leak in operation-arm. Meanwhile pulled 171/2\" BHA into shoe at 195 m. Dived ROV and re-connected on to DCI hose.", "dTimEnd": "2007-09-24T03:00:00+02:00", "dTimStart": "2007-09-24T02:00:00+02:00", "md": "195", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "RIH with new 17 1/2\" BHA from 195 to 305 m. Attempted to take survey at 305 m with gMWD before drilling ahead.", "dTimEnd": "2007-09-24T04:15:00+02:00", "dTimStart": "2007-09-24T03:00:00+02:00", "md": "305", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued attempting to take survey with gMWD at 307 m without sucess. Drilled 1 m to 308 and made several attempts to take survey. No sucess. MWD transmission is working fine, but gMWD signals are corrupt.", "dTimEnd": "2007-09-24T06:00:00+02:00", "dTimStart": "2007-09-24T04:15:00+02:00", "md": "308", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Continued attempting to take survey with gMWD at 308 m without sucess. MWD transmission is working fine, but gMWD signals are \"froozen\" (will not create new signals).", "dTimEnd": "2007-09-24T07:15:00+02:00", "dTimStart": "2007-09-24T06:00:00+02:00", "md": "308", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Pumped 10 m3 hi-vis pill and swept out of hole. Spotted 12 m3 1.40 sg mud prior to POOH.", "dTimEnd": "2007-09-24T07:45:00+02:00", "dTimStart": "2007-09-24T07:15:00+02:00", "md": "308", "phase": "fixed", "proprietaryCode": "drilling -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH from 308 m to surface. No drag observed.", "dTimEnd": "2007-09-24T11:45:00+02:00", "dTimStart": "2007-09-24T07:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Changed out gMWD tool.", "dTimEnd": "2007-09-24T12:45:00+02:00", "dTimStart": "2007-09-24T11:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- rig up/down", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "MU and RIH with new 17 1/2\" BHA from surface to 136 m. Stabbed into 30\" conductor housing at 139.7 m assisted by ROV. RIH with new 17 1/2\" BHA from 140 m to 261 m. Sat scribe-line and aligned UHBO. Surface tested gMWD at 49 m, 3100 lpm/65 bar.", "dTimEnd": "2007-09-24T18:30:00+02:00", "dTimStart": "2007-09-24T12:45:00+02:00", "md": "261", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Washed down with new 17 1/2\" BHA from 261 to 308 m, 3100 lpm, 80 bar, 60 rpm, 1-5 kNm. Attempted to take survey at 298 m and at 308 m with gMWD before drilling ahead.", "dTimEnd": "2007-09-24T20:30:00+02:00", "dTimStart": "2007-09-24T18:30:00+02:00", "md": "308", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Drilled 17 1/2\" hole from 308 m to 318 m; 4000 lpm, 131 bar, 70 rpm, 1-5 kNm, 0-1 MT WOB. Attempted to take survey with gMWD without sucess. Drilled 17 1/2\" hole from 318 m to 328 m and attempted to take survey with gMWD without sucess.", "dTimEnd": "2007-09-24T23:00:00+02:00", "dTimStart": "2007-09-24T20:30:00+02:00", "md": "328", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "RB 1std. Picked up 1 std of 5 1/2\" HWDP to use as drilling stand.", "dTimEnd": "2007-09-25T00:00:00+02:00", "dTimStart": "2007-09-24T23:00:00+02:00", "md": "328", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" } ]
[ { "dTim": "2007-09-25T00:00:00+02:00", "lithology": "Est at current TD", "mdBottom": "1", "mdTop": "353", "show": null, "tvdBottom": null, "tvdTop": "353" } ]
15_9_F_7_2007_09_26
NO 15/9-F-7
NO 15/9-F-7
name
2007-09-25T00:00:00+02:00
2007-09-26T00:00:00+02:00
normal
2018-05-03T13:53:10+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": "3.7", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-26T00:00:00+02:00", "dTimDiaHoleStart": "2007-09-21T13:45:00+02:00", "diaHole": "17.5", "diaPilot": null, "distDrill": "322", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Drill 17 1/2\" hole from 759 m to TD m taking gyroMWD survey every std. Circulate well clean. Displace open hole and conductor to 1.40 sg bentonite mud. POOH and RB 17 1/2\" BHA. RU for running 20 x 13 3/8\" csg. MU and start RIH 20 x 13 3/8\" csg.", "hpht": "0", "md": "650", "mdCsgLast": "202", "mdDiaHoleStart": "210", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "12", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Drilled/surveyed 17 1/2\" hole from 353 m to 759 m.", "tightWell": "0", "tvd": "649.5", "tvdCsgLast": "202", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-09-25T22:00:00+02:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "635", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "115", "yp": "-999.99" } ]
[ { "dTim": "2007-09-26T00:00:00+02:00", "equivalentMudWeight": "1.03", "md": "700", "readingKind": "estimated" } ]
[ { "azi": "260.24", "dTim": "2007-09-26T00:00:00+02:00", "incl": "8.46", "md": "730.2", "tvd": "728.8" }, { "azi": "306.96", "dTim": "2007-09-26T00:00:00+02:00", "incl": ".45", "md": "339.4", "tvd": "339.4" }, { "azi": "280.87", "dTim": "2007-09-26T00:00:00+02:00", "incl": ".44", "md": "349.6", "tvd": "349.6" }, { "azi": "300.44", "dTim": "2007-09-26T00:00:00+02:00", "incl": ".42", "md": "359.2", "tvd": "359.2" }, { "azi": "302.91", "dTim": "2007-09-26T00:00:00+02:00", "incl": ".39", "md": "368.3", "tvd": "368.3" }, { "azi": "271.39", "dTim": "2007-09-26T00:00:00+02:00", "incl": ".6", "md": "387.9", "tvd": "387.9" }, { "azi": "289.9", "dTim": "2007-09-26T00:00:00+02:00", "incl": ".4", "md": "408.6", "tvd": "408.6" }, { "azi": "262.49", "dTim": "2007-09-26T00:00:00+02:00", "incl": ".63", "md": "437.4", "tvd": "437.4" }, { "azi": "263.8", "dTim": "2007-09-26T00:00:00+02:00", "incl": ".58", "md": "465.1", "tvd": "465.1" }, { "azi": "273.05", "dTim": "2007-09-26T00:00:00+02:00", "incl": "2.21", "md": "489.1", "tvd": "489.1" }, { "azi": "280.07", "dTim": "2007-09-26T00:00:00+02:00", "incl": "2.54", "md": "516", "tvd": "516" }, { "azi": "264.68", "dTim": "2007-09-26T00:00:00+02:00", "incl": "2.89", "md": "545.9", "tvd": "545.9" }, { "azi": "268.37", "dTim": "2007-09-26T00:00:00+02:00", "incl": "3.78", "md": "569.3", "tvd": "569.2" }, { "azi": "263.11", "dTim": "2007-09-26T00:00:00+02:00", "incl": "5.24", "md": "609.6", "tvd": "609.4" }, { "azi": "259.43", "dTim": "2007-09-26T00:00:00+02:00", "incl": "7.38", "md": "650.6", "tvd": "650.1" }, { "azi": "261.55", "dTim": "2007-09-26T00:00:00+02:00", "incl": "9.04", "md": "690.3", "tvd": "689.4" }, { "azi": "247.57", "dTim": "2007-09-26T00:00:00+02:00", "incl": ".24", "md": "317", "tvd": "317" } ]
[ { "comments": "Drilled 17 1/2\" hole from 328 m to 353 m using 5 1/2\" HWDP as drilling stand; 4000 lpm, 139 bar, 70 rpm, 2-5 kNm, 1-2 MT WOB. Up weight 102 MT/down weight 100 MT. Pumped 10 m3 hi-vis sweep and spotted 10m3 hi-vis on bottom prior to each WL gyro run. Performed WL gyro surveys at 331m, 339m, and 353 m. Each run taking approx. 1 hr incl. RU and RD.", "dTimEnd": "2007-09-25T06:00:00+02:00", "dTimStart": "2007-09-25T00:00:00+02:00", "md": "353", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled 17 1/2\" hole from 353 m to 650 m; 4000-4500 lpm, 141-177 bar, 80 rpm, 4-8 kNm, 4-6 MT WOB, ROP 35-70 m/hr. Pumped 3 x 10 m3 hi-vis sweeps and reamed one single pr std. Performed gyro survey every 30 m until more than 15 m away from F-12. Performed gyroMWD survey every std (approx every 40 m) from there on. Slided in following intervals: 480-495m, 530-538m, 560-570m, 595-610m, 632-650m.\n\nMeanwhile inspected TDS and derrick for loose items. Checked die-carriers. Carried out repairs on forward PRS. Pressure tested BOP (6 months tests).", "dTimEnd": "2007-09-26T00:00:00+02:00", "dTimStart": "2007-09-25T06:00:00+02:00", "md": "458", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2007_09_27
NO 15/9-F-7
NO 15/9-F-7
name
2007-09-26T00:00:00+02:00
2007-09-27T00:00:00+02:00
normal
2018-05-03T13:53:10+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": "3.8", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-27T00:00:00+02:00", "dTimDiaHoleStart": "2007-09-21T13:45:00+02:00", "diaHole": "17.5", "diaPilot": null, "distDrill": "265", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "MU and start RIH 20 x 13 3/8\" csg. MU X-over and 18 3/4\" wellhead housing assembly. RIH and land 20 x 13 3/8\" csg. Circulate, pump and displace cement.", "hpht": "0", "md": "915", "mdCsgLast": "202", "mdDiaHoleStart": "210", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "13", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Drilled 17 1/2\" hole from 759 m to TD at 915 m taking gyroMWD survey every std. Circulated well clean. Displaced open hole and conductor to 1.40 sg bentonite mud. POOH and RB 17 1/2\" BHA. RU for running 20 x 13 3/8\" csg. ", "tightWell": "0", "tvd": "911", "tvdCsgLast": "202", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-09-26T22:00:00+02:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "911", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "115", "yp": "-999.99" } ]
[ { "dTim": "2007-09-27T00:00:00+02:00", "equivalentMudWeight": "1.03", "md": "915", "readingKind": "estimated" } ]
[ { "azi": "256.89", "dTim": "2007-09-27T00:00:00+02:00", "incl": "9.53", "md": "770.8", "tvd": "768.9" }, { "azi": "258.24", "dTim": "2007-09-27T00:00:00+02:00", "incl": "9.32", "md": "809.8", "tvd": "807.4" }, { "azi": "259.74", "dTim": "2007-09-27T00:00:00+02:00", "incl": "9.22", "md": "851.6", "tvd": "848.6" }, { "azi": "264.09", "dTim": "2007-09-27T00:00:00+02:00", "incl": "8.6", "md": "890.7", "tvd": "887.3" } ]
[ { "comments": "Drilled 17 1/2\" hole from 650 m to 759 m; 4000-4500 lpm, 130-160 bar, 80 rpm, 1-3 kNm, 3-4 MT WOB, ROP 33-55 m/hr. Pumped 3 x 10 m3 hi-vis sweeps and reamed one single pr std. Performed gyroMWD survey every std. Slided in following intervals: 675-690m, 745-760m. Up weight 114 MT/down weight 109 MT.\n\nContinued repairs on forward PRS and pressure tested BOP (6 months tests).", "dTimEnd": "2007-09-26T05:15:00+02:00", "dTimStart": "2007-09-26T00:00:00+02:00", "md": "759", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rotated and reciprocated pipe while repairs are carried out to MP1 and MP3.", "dTimEnd": "2007-09-26T06:00:00+02:00", "dTimStart": "2007-09-26T05:15:00+02:00", "md": "759", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Rotated and reciprocated pipe while repairs was carried out to MP2 and MP3.", "dTimEnd": "2007-09-26T06:45:00+02:00", "dTimStart": "2007-09-26T06:00:00+02:00", "md": "759", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Drilled 17 1/2\" hole from 759 m to 915 m; 4440-4515 lpm, 168-173 bar, 80 rpm, 3-8 kNm, 1-7 MT WOB, ROP 45-90 m/hr. Pumped 3 x 10 m3 hi-vis sweeps and reamed one single pr std. Performed MWD cluster at 800 m and gyroMWD survey every std. Slided in following interval: 907-915m. Up weight 122 MT/down weight 115 MT.\n", "dTimEnd": "2007-09-26T13:15:00+02:00", "dTimStart": "2007-09-26T06:45:00+02:00", "md": "915", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pumped 30 m3 hi-vis followed by 30 m3 SW and then 30 m3 hi-vis to circulate hole clean, 3500 lpm, 107 bar, 30 rpm. Pulled 1 std and pumped 3 x btms up with SW, 4450 lpm, 159 bar, 80 rpm.", "dTimEnd": "2007-09-26T15:45:00+02:00", "dTimStart": "2007-09-26T13:15:00+02:00", "md": "915", "phase": "fixed", "proprietaryCode": "drilling -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Displaced open hole (170 m3) to 1.40 sg mud, 4450-2970 lpm, max 103 bar, 20 rpm.", "dTimEnd": "2007-09-26T17:15:00+02:00", "dTimStart": "2007-09-26T15:45:00+02:00", "md": "905.6", "phase": "fixed", "proprietaryCode": "drilling -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with 17 1/2\" BHA. Took 29 MT overpull at 315 m. Worked the pipe up/down with 1.40 sg mud at 450 lpm and 30 rpm on the string. No drag observed when POOH trough tight spot the second time. Continued POOH to 30\" conductor shoe at 202 m and topped up conductor with 22 m3 1.40 sg mud. Continued POOH and started laying out 17 1/2\" BHA. \n", "dTimEnd": "2007-09-27T00:00:00+02:00", "dTimStart": "2007-09-26T17:15:00+02:00", "md": "12", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2007_09_28
NO 15/9-F-7
NO 15/9-F-7
name
2007-09-27T00:00:00+02:00
2007-09-28T00:00:00+02:00
normal
2018-05-03T13:53:10+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": "4.2", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-28T00:00:00+02:00", "dTimDiaHoleStart": "2007-09-21T13:45:00+02:00", "diaHole": "17.5", "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Change out casing handling equipment to DP handling equipment. RIH and install 18 3/4\" well head. Cement 13 3/8\" casing. Start to run production riser.", "hpht": "0", "md": "915", "mdCsgLast": "202", "mdDiaHoleStart": "210", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "14", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "RIH with 13 3/8\" casing from surface to 773m.", "tightWell": "0", "tvd": "911", "tvdCsgLast": "202", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-09-27T22:00:00+02:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "115", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Continued laying out 17 1/2\" BHA. Cleaned and cleared drill floor. Meanwhile prepared tugger for removing funnel.", "dTimEnd": "2007-09-27T02:30:00+02:00", "dTimStart": "2007-09-27T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RU for running 20 x 13 3/8\" casing. Changed elevators and bails. Installed x-overs to Peak circ tool and installed flex hose.", "dTimEnd": "2007-09-27T06:00:00+02:00", "dTimStart": "2007-09-27T02:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued rigging up surface equipment prior to run 13 3/8\" casing. Cleared and cleaned rig floor for casing running. Odfjell rigged up casing tong.", "dTimEnd": "2007-09-27T08:15:00+02:00", "dTimStart": "2007-09-27T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to running 13 3/8\" casing", "dTimEnd": "2007-09-27T08:30:00+02:00", "dTimStart": "2007-09-27T08:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up and made up shoe joint, intermediate and landing collar joint and Baker locked same.", "dTimEnd": "2007-09-27T10:00:00+02:00", "dTimStart": "2007-09-27T08:30:00+02:00", "md": "37", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Put on guide line on casing shoe, to assist the ROV for guiding the 13 3/8\" casing into the 30\" conductor.\n", "dTimEnd": "2007-09-27T10:15:00+02:00", "dTimStart": "2007-09-27T10:00:00+02:00", "md": "37", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 13 3/8\" casing from 37 m to 137 m, filling the pipe every 5th joint. Laid out 2 joints of pipe.", "dTimEnd": "2007-09-27T15:00:00+02:00", "dTimStart": "2007-09-27T10:15:00+02:00", "md": "137", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "High pressure hose to port side pump of the ROV busted. ROV came out of the water, fixed busted hose and dived again.", "dTimEnd": "2007-09-27T16:00:00+02:00", "dTimStart": "2007-09-27T15:00:00+02:00", "md": "137", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Had several attempts to enter the 30\" conductor with the 13 3/8\" casing shoe before entering. Tuggers on centralizer deck and the ROV were used for guiding the 13 3/8\" casing into the 30\" conductor.", "dTimEnd": "2007-09-27T18:00:00+02:00", "dTimStart": "2007-09-27T16:00:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued RIH with 13 3/8\" casing from 140 m to 536 m, filling the pipe every 5th joint.", "dTimEnd": "2007-09-28T00:00:00+02:00", "dTimStart": "2007-09-27T18:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2007_09_29
NO 15/9-F-7
NO 15/9-F-7
name
2007-09-28T00:00:00+02:00
2007-09-29T00:00:00+02:00
normal
2018-05-03T13:53:10+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": "3.9", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-29T00:00:00+02:00", "dTimDiaHoleStart": "2007-09-21T13:45:00+02:00", "diaHole": "17.5", "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Run with production riser and install same, install Tension ring with cylinders. Cut the riser. ", "hpht": "0", "md": "915", "mdCsgLast": "907.7", "mdDiaHoleStart": "210", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "15", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Ran with 18 3/4\" Well head, installed same and cemented the 13 3/4\" casing. POOH w/ CART and L/O same. Prepared and started to run production riser.", "tightWell": "0", "tvd": "911", "tvdCsgLast": "904.1", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[]
[]
[]
[ { "comments": "Continued RIH with 13 3/8\" casing from 536 m to 582 m. Laid out 3 joints of pipe.", "dTimEnd": "2007-09-28T03:00:00+02:00", "dTimStart": "2007-09-28T00:00:00+02:00", "md": "582", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "The casing tong were unable to make up high torque. Trouble shooted the casing tong, the tong were repaired and operation was resumed.", "dTimEnd": "2007-09-28T03:30:00+02:00", "dTimStart": "2007-09-28T03:00:00+02:00", "md": "582", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Continued RIH, with 13 3/8\" casing from 582 m to 773 m, filling the pipe every 5th joint", "dTimEnd": "2007-09-28T05:30:00+02:00", "dTimStart": "2007-09-28T03:30:00+02:00", "md": "773", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to changing out surface handling equipment and picking up 18 3/4\" well head.", "dTimEnd": "2007-09-28T05:45:00+02:00", "dTimStart": "2007-09-28T05:30:00+02:00", "md": "773", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Started rigging down the casing handling equipment.", "dTimEnd": "2007-09-28T06:00:00+02:00", "dTimStart": "2007-09-28T05:45:00+02:00", "md": "773", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued rigging down Odfjell surface equipment, elevator and bails. Rigged up bails and 5½\" elevator.", "dTimEnd": "2007-09-28T08:00:00+02:00", "dTimStart": "2007-09-28T06:00:00+02:00", "md": "773", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to picking up the 18 3/4\" Well Head housing and CART assembly, and made up same.", "dTimEnd": "2007-09-28T09:00:00+02:00", "dTimStart": "2007-09-28T08:00:00+02:00", "md": "773", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged down the casing tong and the automatic slips and installed 5½\" slips.", "dTimEnd": "2007-09-28T10:15:00+02:00", "dTimStart": "2007-09-28T09:00:00+02:00", "md": "773", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in with 18 3/4\" Well Head housing and landed same, took 25 MT over pull.\n", "dTimEnd": "2007-09-28T12:45:00+02:00", "dTimStart": "2007-09-28T10:15:00+02:00", "md": "907.7", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Circulation was established with sea water at 2300 lpm, prior to performing the cement job. Simultaneously tool box talk was held, and cement line tested to 200 bars 10 min.", "dTimEnd": "2007-09-28T14:00:00+02:00", "dTimStart": "2007-09-28T12:45:00+02:00", "md": "907.7", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "20 bars were applied to the IBOP before commencing the cement job.\n", "dTimEnd": "2007-09-28T14:30:00+02:00", "dTimStart": "2007-09-28T14:00:00+02:00", "md": "907.7", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Mixed and performed cmt job. \nPumped : 74,5 m³ 1.56 SG lead slurry at 900 - 1100 lpm, 14 - 18 bars pump pressure.\n 20 m³ 1.92 SG tail slurry at 800 - 1000 lpm, 13 - 18 bars pump pressure.", "dTimEnd": "2007-09-28T16:30:00+02:00", "dTimStart": "2007-09-28T14:30:00+02:00", "md": "907.7", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Released dart, chased dart with 3000 ltr SW with cement unit. Top plug shear pressure/volume: 58 bars/1127 ltr. Continued displacing with rig pumps at 3000 lpm, slowed down to 1400 lpm after 52 m3 pumped. FCP 44 bars. At 2469 stks bumped plug, 97.7 % pump efficiency. Increased pressure to 114 bars and held for 10 min to pressure test casing..\nBled off pressure and checked for backflow to Halliburton cement unit, 640 l bled back.", "dTimEnd": "2007-09-28T17:15:00+02:00", "dTimStart": "2007-09-28T16:30:00+02:00", "md": "907.7", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Released CART assembly, pulled up 1 single and laid out cement head.", "dTimEnd": "2007-09-28T19:00:00+02:00", "dTimStart": "2007-09-28T17:15:00+02:00", "md": "907.7", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Dropped the two Halliburton sponge balls and flushed string using sea water at max rate. POOH. Pup joint and HWDP single were laid out, racked back remaining of the landing string in derrick. CART running tool was laid out.", "dTimEnd": "2007-09-28T20:15:00+02:00", "dTimStart": "2007-09-28T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Master bushing and adapter ring were removed. Installed rotary table frame barrier and lowered Tension ring assembly to Tension deck. Meanwhile flushed cement manifold lines. Installed master bushing and removed rotary table framed barrier.", "dTimEnd": "2007-09-28T21:15:00+02:00", "dTimStart": "2007-09-28T20:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up Cement head and broke of HWDP single and laid out same. Cleared and cleaned rig floor prior for next operation.", "dTimEnd": "2007-09-28T22:15:00+02:00", "dTimStart": "2007-09-28T21:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed riser saddle to HTS, rigged up for installing the rider spider.", "dTimEnd": "2007-09-28T22:45:00+02:00", "dTimStart": "2007-09-28T22:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to run production riser.", "dTimEnd": "2007-09-28T23:30:00+02:00", "dTimStart": "2007-09-28T22:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up and made up handling sub for Tension joint and laid out same on cantilever.", "dTimEnd": "2007-09-29T00:00:00+02:00", "dTimStart": "2007-09-28T23:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2007_09_30
NO 15/9-F-7
NO 15/9-F-7
name
2007-09-29T00:00:00+02:00
2007-09-30T00:00:00+02:00
normal
2018-05-03T13:53:11+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": "4.1", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-30T00:00:00+02:00", "dTimDiaHoleStart": "2007-09-21T13:45:00+02:00", "diaHole": "17.5", "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Complete testing of the production riser. Install the tension system. Cut the riser. Land the surface riser.", "hpht": "0", "md": "915", "mdCsgLast": "907.7", "mdDiaHoleStart": "210", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "16", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Function tested the TBC. Ran in with the production riser, landed and installed same.", "tightWell": "0", "tvd": "911", "tvdCsgLast": "904.1", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[]
[]
[]
[ { "comments": "The riser spider were brought in to the rig floor.", "dTimEnd": "2007-09-29T00:45:00+02:00", "dTimStart": "2007-09-29T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Transported the riser spider to near the rotary, removed the master bushing and adapter ring. Installed the spider and hooked up hydraulic hoses and function tested same.\n", "dTimEnd": "2007-09-29T01:45:00+02:00", "dTimStart": "2007-09-29T00:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up TBC and stress joint and landed of in the spider.", "dTimEnd": "2007-09-29T02:30:00+02:00", "dTimStart": "2007-09-29T01:45:00+02:00", "md": "12", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up double riser number 1 and made up same. Riser was ran to a convenient height, for function testing of TBC in Moonpool area.", "dTimEnd": "2007-09-29T04:00:00+02:00", "dTimStart": "2007-09-29T02:30:00+02:00", "md": "15", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Vetco performed function test of the TBC according to the program.", "dTimEnd": "2007-09-29T06:00:00+02:00", "dTimStart": "2007-09-29T04:00:00+02:00", "md": "15", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Functioning test were continued of the TBC according to the program.", "dTimEnd": "2007-09-29T06:30:00+02:00", "dTimStart": "2007-09-29T06:00:00+02:00", "md": "15", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued too make up and ran in with production risers to 26.5m", "dTimEnd": "2007-09-29T07:00:00+02:00", "dTimStart": "2007-09-29T06:30:00+02:00", "md": "26.5", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk with day shift prior making up and running production riser.", "dTimEnd": "2007-09-29T07:45:00+02:00", "dTimStart": "2007-09-29T07:00:00+02:00", "md": "26.5", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued too make up and ran in with production risers to 54.5 m", "dTimEnd": "2007-09-29T10:30:00+02:00", "dTimStart": "2007-09-29T07:45:00+02:00", "md": "54.5", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Tension/guide wires were hooked up on the template using the ROV.", "dTimEnd": "2007-09-29T11:45:00+02:00", "dTimStart": "2007-09-29T10:30:00+02:00", "md": "54.5", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to make up and ran in with production risers to 103 m.", "dTimEnd": "2007-09-29T17:30:00+02:00", "dTimStart": "2007-09-29T11:45:00+02:00", "md": "103", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flanges bolt on tension joint had to be cut from 415mm to 365mm.", "dTimEnd": "2007-09-29T19:00:00+02:00", "dTimStart": "2007-09-29T17:30:00+02:00", "md": "103", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to make up the tension joint. Removed the riser spider and installed the master bushing. Started to run in with tension joint.", "dTimEnd": "2007-09-29T21:30:00+02:00", "dTimStart": "2007-09-29T19:00:00+02:00", "md": "120", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Tension joint got stuck in master bushing, 20 MT down weight. Picked up riser with master bushing attached to tension joint 10cm and were able to free bushing by hammering down the master bushing. No damage to the tension joint.", "dTimEnd": "2007-09-29T23:00:00+02:00", "dTimStart": "2007-09-29T21:30:00+02:00", "md": "120", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Tool box talk was held prior to stabbing/landing the TBC. Ran tension joint below rotary table and installed master bushing. Made up landing string to TDS. ROV removed the dust cover.", "dTimEnd": "2007-09-30T00:00:00+02:00", "dTimStart": "2007-09-29T23:00:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2007_10_01
NO 15/9-F-7
NO 15/9-F-7
name
2007-09-30T00:00:00+02:00
2007-10-01T00:00:00+02:00
normal
2018-05-03T13:53:11+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": "4.2", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-10-01T00:00:00+02:00", "dTimDiaHoleStart": "2007-09-21T13:45:00+02:00", "diaHole": "17.5", "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Install surface wellhead and riser. Install Diverter. MU and RIH with 12 1/4\" BHA", "hpht": "0", "md": "915", "mdCsgLast": "907.7", "mdDiaHoleStart": "210", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "17", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Pressure tested production riser to 10/70bars 5/10 mins. Installed centralizers and Tension ring assembly and tension cylinders. Cut production riser at 1360 mm above machined ring on Tension deck. Bevelled the top of the production riser.", "tightWell": "0", "tvd": "911", "tvdCsgLast": "904.1", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[]
[]
[]
[ { "comments": "Aligned the TBC over the Well Head and ran down with the TBC over the Well Head.", "dTimEnd": "2007-09-30T00:30:00+02:00", "dTimStart": "2007-09-30T00:00:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Landed and connected the TBC as per Vetco procedure. Weight prior to landing 100 MT. Installed hot stab for locking the TBC set down 15MT. As moving the hot stab the umbilical came off the shackle attached to the guide line and the ROV lost the hot stab. The umbilical were pulled to surface and re-attached to the guide line and ran back in and connected up. Locked TBC as Vetco procedure.", "dTimEnd": "2007-09-30T04:00:00+02:00", "dTimStart": "2007-09-30T00:30:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Over pull 20 MT was held for 3 mins, adjusted tension to 10 MT as per Vetco procedure. Lined up to cement unit for pressure testing of the production riser found blockage in cement line.", "dTimEnd": "2007-09-30T04:15:00+02:00", "dTimStart": "2007-09-30T04:00:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Investigated problem with cement/kill manifold lined up an alternative route.", "dTimEnd": "2007-09-30T05:45:00+02:00", "dTimStart": "2007-09-30T04:15:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- bop activities", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Started to filling the riser prior to pressure testing of same.", "dTimEnd": "2007-09-30T06:00:00+02:00", "dTimStart": "2007-09-30T05:45:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued filling the riser prior to pressure testing of same. Pressure tested production riser 10/70 bars 5/10 mins. Volume pumped 560 litres had returns of 555 litres.", "dTimEnd": "2007-09-30T07:45:00+02:00", "dTimStart": "2007-09-30T06:00:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Vetco flushed TBC, installed dummy stab.", "dTimEnd": "2007-09-30T09:15:00+02:00", "dTimStart": "2007-09-30T07:45:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to installation of centralizers, tension ring assembly and tension cylinders.", "dTimEnd": "2007-09-30T09:30:00+02:00", "dTimStart": "2007-09-30T09:15:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed centralizers.", "dTimEnd": "2007-09-30T12:30:00+02:00", "dTimStart": "2007-09-30T09:30:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed tension ring assembly and tension cylinders.", "dTimEnd": "2007-09-30T19:00:00+02:00", "dTimStart": "2007-09-30T12:30:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk with night shift prior to continue rigging the tension ring assembly and tension cylinders.", "dTimEnd": "2007-09-30T19:15:00+02:00", "dTimStart": "2007-09-30T19:00:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued rigging the tension ring assembly and tension cylinders. Adjusted tension cylinders to 150 MT.", "dTimEnd": "2007-09-30T22:00:00+02:00", "dTimStart": "2007-09-30T19:15:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to rigging up the cutting device for cutting the production riser.Commenced rigging up the cutting device. Simultaneously removed and installed new drill line spool. \n", "dTimEnd": "2007-10-01T00:00:00+02:00", "dTimStart": "2007-09-30T22:00:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2007_10_02
NO 15/9-F-7
NO 15/9-F-7
name
2007-10-01T00:00:00+02:00
2007-10-02T00:00:00+02:00
normal
2018-05-03T13:53:11+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": "4.2", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-10-02T00:00:00+02:00", "dTimDiaHoleStart": "2007-09-21T13:45:00+02:00", "diaHole": "17.5", "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Drill out 13 3/8\" shoe using SW and Hi-vis. Displace to new 1.28 sg WBM and clean out rat hole. Drill 12 1/4\" hole to 1083 mMD/ 1076 mTVD. Circulate well clean. Condition mud over shakers at TD (use 200 mesh screen). Circulate hole clean.", "hpht": "0", "md": "915", "mdCsgLast": "907.7", "mdDiaHoleStart": "210", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "18", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Installed well head and surface riser, had to cut off 25 cm of the surface riser. M/U 12 ¼\" drilling BHA and RIH same. Tagged TOC at 880 m drilled from 880 m to 881 m.", "tightWell": "0", "tvd": "911", "tvdCsgLast": "904.1", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[]
[ { "dTim": "2007-10-02T00:00:00+02:00", "equivalentMudWeight": "1.03", "md": "915", "readingKind": "estimated" } ]
[]
[ { "comments": "Continued rigging up cutting device for cutting the production riser. Simultaneously had the top drive serviced.", "dTimEnd": "2007-10-01T02:00:00+02:00", "dTimStart": "2007-10-01T00:00:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cut the production riser 1360 mm above machined ring on Tension deck. Simultaneously serviced PRS.", "dTimEnd": "2007-10-01T04:45:00+02:00", "dTimStart": "2007-10-01T02:00:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out landing string and broke out pup joints and landing sub.", "dTimEnd": "2007-10-01T05:30:00+02:00", "dTimStart": "2007-10-01T04:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Started bevelling of the production riser top. Rigged up slings for surface riser.", "dTimEnd": "2007-10-01T06:00:00+02:00", "dTimStart": "2007-10-01T05:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Bevelled the production riser top.", "dTimEnd": "2007-10-01T07:00:00+02:00", "dTimStart": "2007-10-01T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to lowering down the surface riser and well head.", "dTimEnd": "2007-10-01T07:30:00+02:00", "dTimStart": "2007-10-01T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in with surface riser and well head according to Vetco procedure.", "dTimEnd": "2007-10-01T08:30:00+02:00", "dTimStart": "2007-10-01T07:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Measured new space out for correction of length for the surface riser.", "dTimEnd": "2007-10-01T10:00:00+02:00", "dTimStart": "2007-10-01T08:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to pulling out with the surface riser.", "dTimEnd": "2007-10-01T10:15:00+02:00", "dTimStart": "2007-10-01T10:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out with the surface riser and laid out same on cantilever.", "dTimEnd": "2007-10-01T11:00:00+02:00", "dTimStart": "2007-10-01T10:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cut off 25 cm of the surface riser.", "dTimEnd": "2007-10-01T12:15:00+02:00", "dTimStart": "2007-10-01T11:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up surface riser and ran in with same, landed in well head. Pressure tested BT seal on the surface well head to 70 bars for 10 mins, took over pull of 2.5 MT.", "dTimEnd": "2007-10-01T15:15:00+02:00", "dTimStart": "2007-10-01T12:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up and installed diverter, outer ring and master bushing.", "dTimEnd": "2007-10-01T17:15:00+02:00", "dTimStart": "2007-10-01T15:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to pick up 12 ¼\" drilling BHA.", "dTimEnd": "2007-10-01T17:30:00+02:00", "dTimStart": "2007-10-01T17:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up 12 ¼\" drilling BHA, ran in from surface to 37 m.", "dTimEnd": "2007-10-01T20:30:00+02:00", "dTimStart": "2007-10-01T17:30:00+02:00", "md": "37", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Problems with PRS trouble shooted, found soft ware problem, Eletronic Technician corrected error.", "dTimEnd": "2007-10-01T21:15:00+02:00", "dTimStart": "2007-10-01T20:30:00+02:00", "md": "37", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Continued RIH with 12 ¼\" drilling BHA from 37 m to 175 m.", "dTimEnd": "2007-10-01T22:15:00+02:00", "dTimStart": "2007-10-01T21:15:00+02:00", "md": "175", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to changing out wash pipe, started to change out wash pipe.", "dTimEnd": "2007-10-02T00:00:00+02:00", "dTimStart": "2007-10-01T22:15:00+02:00", "md": "175", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2007_10_03
NO 15/9-F-7
NO 15/9-F-7
name
2007-10-02T00:00:00+02:00
2007-10-03T00:00:00+02:00
normal
2018-05-03T13:53:11+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": "4.6", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-10-03T00:00:00+02:00", "dTimDiaHoleStart": "2007-10-02T15:30:00+02:00", "diaHole": "12.25", "diaPilot": null, "distDrill": "63", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Drill 12 1/4\" hole to 1083 mMD/ 1076 mTVD. Circulate well clean. Condition mud over shakers at TD (use 200 mesh screen). Circulate hole clean. Verify well is stable. Perform check trip to shoe. POOH and LD 12 1/4\" BHA. MU and RIH with clean out BHA. Scrape screen hanger setting area.", "hpht": "0", "md": "978", "mdCsgLast": "907.7", "mdDiaHoleStart": "915", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "19", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Drilled out shoe track from 881m to 908m. Displaced well to WBM 1.26 SG. Drilled ahead to 978m. MP1, 2 & 3 malfunctioned, pulled out into the shoe, rectified MP failures.", "tightWell": "0", "tvd": "974", "tvdCsgLast": "904.1", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-10-02T16:00:00+02:00", "density": "1.26", "filterCakeLtlp": "2", "filtrateLtlp": "10.3", "locationSample": "Flowline", "md": "915", "mudClass": "water based", "presBopRating": "0", "pv": "34", "tempHthp": null, "type": "Soludril-N", "visFunnel": "-999.99", "yp": "17" }, { "dTim": "2007-10-02T22:00:00+02:00", "density": "1.24", "filterCakeLtlp": "2", "filtrateLtlp": "11", "locationSample": "Reserve pit", "md": "978", "mudClass": "water based", "presBopRating": "0", "pv": "33", "tempHthp": null, "type": "Soludril-N", "visFunnel": "-999.99", "yp": "17.5" } ]
[ { "dTim": "2007-10-03T00:00:00+02:00", "equivalentMudWeight": "1.03", "md": "978", "readingKind": "estimated" } ]
[ { "azi": "261.78", "dTim": "2007-10-03T00:00:00+02:00", "incl": "8.3", "md": "962.4", "tvd": "-999.99" } ]
[ { "comments": "Continued changing out the wash pipe, pressure tested same to 207 bars", "dTimEnd": "2007-10-02T00:15:00+02:00", "dTimStart": "2007-10-02T00:00:00+02:00", "md": "175", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attempted to install 10\" diverter elements, not possible due to damaged elements. Changed master bushing for PS 21 slips.", "dTimEnd": "2007-10-02T02:15:00+02:00", "dTimStart": "2007-10-02T00:15:00+02:00", "md": "197", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued RIH with 12 ¼\" drilling BHA on 5½\" DP to 859 m, made up to TDS, established circulation, washed down from 859 m with 1180 lpm 30 rpm. Tagged TOC at 880 m.", "dTimEnd": "2007-10-02T04:45:00+02:00", "dTimStart": "2007-10-02T02:15:00+02:00", "md": "880", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled cement/float from 880 m to 881 m with sea water 3060 lpm, 70 rpm and 84 bars.", "dTimEnd": "2007-10-02T06:00:00+02:00", "dTimStart": "2007-10-02T04:45:00+02:00", "md": "881", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued drill out shoe track from 881 m to 898 m, 3200 lpm, 99 bars, 70 rpm, 3-6 kNm, 2-3 MT WOB, pumped 20 m³ Hi-vis at 898 m.", "dTimEnd": "2007-10-02T11:00:00+02:00", "dTimStart": "2007-10-02T06:00:00+02:00", "md": "898", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Took out the PS-21 slips and installed the 10\" diverter inserts, re-installed the PS-21 slips.", "dTimEnd": "2007-10-02T11:30:00+02:00", "dTimStart": "2007-10-02T11:00:00+02:00", "md": "898", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued drill out shoe track from 898 m to 908 m 13 3/8\" shoe. Drilled out rat hole from 908.m to 916.5 m, 3200.lpm, 100 bars, 70 rpm, 4 kNm, 1 MT WOB.", "dTimEnd": "2007-10-02T13:15:00+02:00", "dTimStart": "2007-10-02T11:30:00+02:00", "md": "916.5", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned rat hole. Held tool box talk prior to displace hole to WBM.", "dTimEnd": "2007-10-02T14:00:00+02:00", "dTimStart": "2007-10-02T13:15:00+02:00", "md": "916.5", "phase": "fixed", "proprietaryCode": "drilling -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Displaced well to 1.28 SG Soludril-N WBM, 3200 lpm, 90 - 120 bars SSP. Density of mud in returns: 1,26 SG.", "dTimEnd": "2007-10-02T15:30:00+02:00", "dTimStart": "2007-10-02T14:00:00+02:00", "md": "916.5", "phase": "fixed", "proprietaryCode": "drilling -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to drill ahead from 916.5 to 959 m. 3200 lpm, 90 - 120 bars, WOB 1-10 MT, 70-180 rpm, torque 3-20 kNm. ECD 1.29 sg EMW. MP-1 shut down.", "dTimEnd": "2007-10-02T17:30:00+02:00", "dTimStart": "2007-10-02T15:30:00+02:00", "md": "959", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled off bottom circulating with MP-2, 1700 lpm, 42 bars SSP. MP-1 was re-started, the shut down caused by electrical error.", "dTimEnd": "2007-10-02T18:00:00+02:00", "dTimStart": "2007-10-02T17:30:00+02:00", "md": "959", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Continued to drill ahead to 970 m, stand pipe pressure dropped 40 bars.", "dTimEnd": "2007-10-02T18:15:00+02:00", "dTimStart": "2007-10-02T18:00:00+02:00", "md": "970", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Trouble shooted stand pipe pressure drop, tested/ checked MP-1 and MP-2, found no indication of surface error. Stand pipe pressure back to normal.", "dTimEnd": "2007-10-02T19:00:00+02:00", "dTimStart": "2007-10-02T18:15:00+02:00", "md": "970", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Continued to drill ahead to 978 m. Mud pumps shut down.", "dTimEnd": "2007-10-02T19:45:00+02:00", "dTimStart": "2007-10-02T19:00:00+02:00", "md": "978", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Circulated and reciprocated pipe, investigated MP-1 and attempted to repair same.", "dTimEnd": "2007-10-02T23:30:00+02:00", "dTimStart": "2007-10-02T19:45:00+02:00", "md": "978", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Attempted to establish drilling parameters. Mud pumps kept falling out.", "dTimEnd": "2007-10-03T00:00:00+02:00", "dTimStart": "2007-10-02T23:30:00+02:00", "md": "978", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "equipment failure" } ]
[]
15_9_F_7_2007_10_04
NO 15/9-F-7
NO 15/9-F-7
name
2007-10-03T00:00:00+02:00
2007-10-04T00:00:00+02:00
normal
2018-05-03T13:53:11+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": "4.9", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-10-04T00:00:00+02:00", "dTimDiaHoleStart": "2007-10-02T15:30:00+02:00", "diaHole": "12.25", "diaPilot": null, "distDrill": "96", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "MU and RIH with clean out BHA. Scrape screen hanger setting area. Circulate well clean. Displace open hole to 1.20 sg NaCl/NaBr brine. Open circulation sub. Pump wash train round in 13 3/8\" casing and circulate 1.20 sg NaCl until well is clean. POOH and LD cleanout BHA. Wash WH and riser. MU and run sand screen. ", "hpht": "0", "md": "1083", "mdCsgLast": "907.7", "mdDiaHoleStart": "915", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "20", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Drilled from 978 m to 1083 m, Performed wiper trip to the shoe and back to TD, no tight spots. Circulated well clean, POOH with 12 ¼\" BHA.", "tightWell": "0", "tvd": "1077", "tvdCsgLast": "904.1", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-10-03T15:00:00+02:00", "density": "1.26", "filterCakeLtlp": null, "filtrateLtlp": "8.4", "locationSample": "Flowline", "md": "1083", "mudClass": "water based", "presBopRating": "0", "pv": "38", "tempHthp": null, "type": "Soludril-N", "visFunnel": "-999.99", "yp": "19.5" }, { "dTim": "2007-10-03T10:00:00+02:00", "density": "1.27", "filterCakeLtlp": null, "filtrateLtlp": "8.6", "locationSample": "Flowline", "md": "1010", "mudClass": "water based", "presBopRating": "0", "pv": "38", "tempHthp": null, "type": "Soludril-N", "visFunnel": "-999.99", "yp": "17" } ]
[ { "dTim": "2007-10-04T00:00:00+02:00", "equivalentMudWeight": "1.03", "md": "1083", "readingKind": "estimated" } ]
[ { "azi": "261.78", "dTim": "2007-10-04T00:00:00+02:00", "incl": "8.3", "md": "962.4", "tvd": "958.2" }, { "azi": "262.86", "dTim": "2007-10-04T00:00:00+02:00", "incl": "8.53", "md": "1005.4", "tvd": "1000.8" }, { "azi": "263.46", "dTim": "2007-10-04T00:00:00+02:00", "incl": "8.66", "md": "1043.9", "tvd": "1038.9" } ]
[ { "comments": "Continued working on mud pumps.", "dTimEnd": "2007-10-03T01:00:00+02:00", "dTimStart": "2007-10-03T00:00:00+02:00", "md": "978", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Pulled out and into the shoe, monitored well over the trip tank. Meanwhile continued working on mud pumps.", "dTimEnd": "2007-10-03T01:45:00+02:00", "dTimStart": "2007-10-03T01:00:00+02:00", "md": "897", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Investigated failures on mud pumps and carried out repairs.\nFailures located: MP-1: Swab in line, MP-2: Fluid end problems, MP-3: Liner problem, software problem, insufficient fluid supply. \n", "dTimEnd": "2007-10-03T06:00:00+02:00", "dTimStart": "2007-10-03T01:45:00+02:00", "md": "897", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Pepaired the mud pumps.", "dTimEnd": "2007-10-03T07:00:00+02:00", "dTimStart": "2007-10-03T06:00:00+02:00", "md": "897", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "circulated at 897 m to test pumps, Ran back in to 978 m.", "dTimEnd": "2007-10-03T08:00:00+02:00", "dTimStart": "2007-10-03T07:00:00+02:00", "md": "978", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Drilled ahead from 978 m to 1018 m, 3300 lpm, 139 bars, 150 rpm, 10-12 kNm, WOB 9 MT, ECD 1.3 SG.", "dTimEnd": "2007-10-03T09:30:00+02:00", "dTimStart": "2007-10-03T08:00:00+02:00", "md": "1018", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Took survey.", "dTimEnd": "2007-10-03T09:45:00+02:00", "dTimStart": "2007-10-03T09:30:00+02:00", "md": "1018", "phase": "fixed", "proprietaryCode": "drilling -- survey", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled ahead from 1018 m to 1083 m, 2880 lpm, 115 bars, 131 rpm, 12-18 kNm, WOB 6 MT, ECD 1.3 SG.", "dTimEnd": "2007-10-03T13:30:00+02:00", "dTimStart": "2007-10-03T09:45:00+02:00", "md": "1083", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Circulated bottoms up 3 times, reciprocating the pipe inside the shale, 3300 lpm 120 rpm. Flow checked well, well static.", "dTimEnd": "2007-10-03T15:00:00+02:00", "dTimStart": "2007-10-03T13:30:00+02:00", "md": "1083", "phase": "fixed", "proprietaryCode": "drilling -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled up to inside the shoe at 900 m.", "dTimEnd": "2007-10-03T16:15:00+02:00", "dTimStart": "2007-10-03T15:00:00+02:00", "md": "900", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flow checked well. Meanwhile held tool box talk prior to remove 10\" diverter insert and removed same. Well static.", "dTimEnd": "2007-10-03T17:00:00+02:00", "dTimStart": "2007-10-03T16:15:00+02:00", "md": "900", "phase": "fixed", "proprietaryCode": "drilling -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH from shoe and tagged TD at 1083 m, no tight spots.", "dTimEnd": "2007-10-03T17:45:00+02:00", "dTimStart": "2007-10-03T17:00:00+02:00", "md": "1083", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Circulated until well were clean, reciprocating the pipe inside the shale, 2700 lpm 96 bars.", "dTimEnd": "2007-10-03T19:45:00+02:00", "dTimStart": "2007-10-03T17:45:00+02:00", "md": "1083", "phase": "fixed", "proprietaryCode": "drilling -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flow checked well, well static.", "dTimEnd": "2007-10-03T20:15:00+02:00", "dTimStart": "2007-10-03T19:45:00+02:00", "md": "1083", "phase": "fixed", "proprietaryCode": "drilling -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with 5½\" DP and 12 ¼\" drilling BHA from 1083 m to 275 m, pulled out wet.", "dTimEnd": "2007-10-04T00:00:00+02:00", "dTimStart": "2007-10-03T20:15:00+02:00", "md": "275", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2007_10_05
NO 15/9-F-7
NO 15/9-F-7
name
2007-10-04T00:00:00+02:00
2007-10-05T00:00:00+02:00
normal
2018-05-03T13:53:11+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": "3.6", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-10-05T00:00:00+02:00", "dTimDiaHoleStart": "2007-10-04T04:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "RU for running 9 5/8\" sand screens. MU and run 9 5/8\" sand screens on 5 ½\" DP, install same. POOH with 9 5/8\" sand screens running tool. M/U swab cup assembly and RIH.", "hpht": "0", "md": "1083", "mdCsgLast": "907.7", "mdDiaHoleStart": "978", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "21", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Attempted to RIH with 13 3/8\" scarper clean BHA. Unable to pass 87 m. RIH with clean up BHA without scraper and cleaned well. POOH with clean up BHA. Performed drift run with liner hanger to 145 m. Started rigging up for running 9 5/8\" screens. ", "tightWell": "0", "tvd": "1077", "tvdCsgLast": "904.1", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "139.7" } ]
[ { "dTim": "2007-10-04T15:00:00+02:00", "density": "1.26", "filterCakeLtlp": null, "filtrateLtlp": "8.4", "locationSample": "Flowline", "md": "1083", "mudClass": "water based", "presBopRating": "0", "pv": "38", "tempHthp": null, "type": "Soludril-N", "visFunnel": "-999.99", "yp": "19.5" } ]
[]
[]
[ { "comments": "Continued POOH with 5½\" DP and 12 ¼\" drilling BHA from 275 m to surface, pulled out wet and laid out 12 ¼\" drilling BHA.", "dTimEnd": "2007-10-04T04:00:00+02:00", "dTimStart": "2007-10-04T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleared and cleaned rig floor prior to picking up clean out BHA.", "dTimEnd": "2007-10-04T04:30:00+02:00", "dTimStart": "2007-10-04T04:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Started to make up cleanout BHA.", "dTimEnd": "2007-10-04T06:00:00+02:00", "dTimStart": "2007-10-04T04:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued making up scraper BHA.", "dTimEnd": "2007-10-04T07:00:00+02:00", "dTimStart": "2007-10-04T06:00:00+02:00", "md": "210", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk with day shift. Ran scraper slowly through riser. Hung up at 87m. Picked up rotated string twice 90 deg. Attempted to pass obstruction. Discussed the situation with town. Meanwhile prepared for removal of the scaffolding in the derrick.", "dTimEnd": "2007-10-04T08:45:00+02:00", "dTimStart": "2007-10-04T07:00:00+02:00", "md": "300", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with 13 3/8\" scraper. Removed PS-21 slips and installed master bushing. Inspected scraper.", "dTimEnd": "2007-10-04T10:00:00+02:00", "dTimStart": "2007-10-04T08:45:00+02:00", "md": "210", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to break/lay out scraper. Broke/laid out same. Removed master bushing and installed PS-21 slips.", "dTimEnd": "2007-10-04T10:30:00+02:00", "dTimStart": "2007-10-04T10:00:00+02:00", "md": "210", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued RIH with clean up BHA from 218 m to 1077 m, Took up/down weight at 1057 m 105/95 MT.", "dTimEnd": "2007-10-04T13:15:00+02:00", "dTimStart": "2007-10-04T10:30:00+02:00", "md": "1077", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up and made up Kelly cock and ball release sub. RIH to 1080 m.", "dTimEnd": "2007-10-04T14:00:00+02:00", "dTimStart": "2007-10-04T13:15:00+02:00", "md": "1080", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Circulated and increased pump rate in steps to 3000 LPM. String rotaion 40 RPM. Reciprocated the string while circulating.\n", "dTimEnd": "2007-10-04T15:30:00+02:00", "dTimStart": "2007-10-04T14:00:00+02:00", "md": "1080", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Displaced 1,28 SG Soludril-N mud from open hole and +/-150 m into 13 3/8\" casing. Pumped 43 m3 of 1.20 SG saturated NaCl brine at 3000 lpm/137 bar. Reciprocated the string while circulating.", "dTimEnd": "2007-10-04T16:45:00+02:00", "dTimStart": "2007-10-04T15:30:00+02:00", "md": "1080", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attached air control hose to the release ball sub and released 2 1/8\" ball. Continued with displacement program, 400 lpm, 9 bar prior to shear the SABS sub. SABS sheared at 63 bar. 400 lpm/7 bar after.", "dTimEnd": "2007-10-04T17:00:00+02:00", "dTimStart": "2007-10-04T16:45:00+02:00", "md": "1080", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued pumping to displace the 13-3/8\" casing to 1.20 SG NaCl brine while rotating and reciprocation the string. Increased pump rate to 3000 lpm/34 bar after opening SABS.\nPumped the High-vis soap train according to Halliburton procedure while reciprocating and rotating the string. Continued displacing the soap train with 1.20 SG NaCl brine until the well was clean.\n", "dTimEnd": "2007-10-04T19:15:00+02:00", "dTimStart": "2007-10-04T17:00:00+02:00", "md": "1080", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Observed well for 30 mins, well static.", "dTimEnd": "2007-10-04T19:45:00+02:00", "dTimStart": "2007-10-04T19:15:00+02:00", "md": "1080", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pumped 10 m³ 1.44 SG slug prior to POOH with clean up BHA. POOH with clean up BHA from 1080 m to 130 m", "dTimEnd": "2007-10-05T00:00:00+02:00", "dTimStart": "2007-10-04T19:45:00+02:00", "md": "130", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2007_10_06
NO 15/9-F-7
NO 15/9-F-7
name
2007-10-05T00:00:00+02:00
2007-10-06T00:00:00+02:00
normal
2018-05-03T13:53:11+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": "3.8", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-10-06T00:00:00+02:00", "dTimDiaHoleStart": "2007-10-05T04:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "POOH with 9 5/8\" sand screens running tool. M/U swab cup assembly and RIH. Swab well in blank 9 5/8\" pipe until acceptable loss rate is achieved. POOH and LD swab cup assembly. RIH, retrieve bore protector. RIH jetting tool for Riser/Well head - Clean riser/Well head. MU ESP assemblies and connect cable. Run in with ESP on 7 5/8\" tubing.", "hpht": "0", "md": "1085", "mdCsgLast": "1062", "mdDiaHoleStart": "1083", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "22", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "RU for running 9 5/8\" sand screen. RIH with 9 5/8\" sand screen on 5 ½\" DP, installed same. Displaced well to 1.03 SG NaCl brine. POOH with 9 5/8\" sand screen running tool from 825 m to 810 m.", "tightWell": "0", "tvd": "1077", "tvdCsgLast": "1056.7", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "139.7" } ]
[ { "dTim": "2007-10-05T15:00:00+02:00", "density": "1.2", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "1083", "mudClass": "other", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Continued POOH with clean up from 130 m to surface. Laid out bull nose. Metal shavings recovered with magnet.", "dTimEnd": "2007-10-05T00:15:00+02:00", "dTimStart": "2007-10-05T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to perform drift run with liner hanger to 145 m.", "dTimEnd": "2007-10-05T00:30:00+02:00", "dTimStart": "2007-10-05T00:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed drift run with liner hanger to 145 m. No obstruction observed.", "dTimEnd": "2007-10-05T03:00:00+02:00", "dTimStart": "2007-10-05T00:30:00+02:00", "md": "145", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with liner hanger from 145 m to surface and laid out same, No marks or damage to the liner hanger re-runable.", "dTimEnd": "2007-10-05T04:00:00+02:00", "dTimStart": "2007-10-05T03:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to rig up surface handling equipment for running 9 5/8\" screens and casing", "dTimEnd": "2007-10-05T04:15:00+02:00", "dTimStart": "2007-10-05T04:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Started rigging up surface handling equipment for running 9 5/8\" screens and casing. Changed elevator inserts to 9 5/8\" casing. Rigged up casing tong", "dTimEnd": "2007-10-05T06:00:00+02:00", "dTimStart": "2007-10-05T04:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued rigging up for RIH with 9 5/8\" screen.\n", "dTimEnd": "2007-10-05T08:30:00+02:00", "dTimStart": "2007-10-05T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to picking up 9 5/8\" screens. Picked up first joint and installed centralizer. Problems with torque set point on casing tong.\n", "dTimEnd": "2007-10-05T08:45:00+02:00", "dTimStart": "2007-10-05T08:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Investigated problems with torque set point on casing tong.\n", "dTimEnd": "2007-10-05T09:00:00+02:00", "dTimStart": "2007-10-05T08:45:00+02:00", "md": "12", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Changed out the casing tong to the back-up tong. Function tested and calibrated the tong.", "dTimEnd": "2007-10-05T13:00:00+02:00", "dTimStart": "2007-10-05T09:00:00+02:00", "md": "12", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Continued to RIH with 9 5/8\" screens from 12 m to 47 m.", "dTimEnd": "2007-10-05T13:45:00+02:00", "dTimStart": "2007-10-05T13:00:00+02:00", "md": "47", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Stopped RIH due to helicopter. No crane operation permitted.\n", "dTimEnd": "2007-10-05T14:00:00+02:00", "dTimStart": "2007-10-05T13:45:00+02:00", "md": "47", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to RIH with 9 5/8\" screens from 47 m to 143 m. Software problem with casing tong.\n", "dTimEnd": "2007-10-05T16:00:00+02:00", "dTimStart": "2007-10-05T14:00:00+02:00", "md": "143", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Trouble shooted the casing tong. Tong came out of sequence, due to software problem, repaired same.", "dTimEnd": "2007-10-05T16:45:00+02:00", "dTimStart": "2007-10-05T16:00:00+02:00", "md": "143", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Continued to RIH with 9 5/8\" screens from 143 m to 203 m.\n", "dTimEnd": "2007-10-05T18:30:00+02:00", "dTimStart": "2007-10-05T16:45:00+02:00", "md": "203", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box prior to change out 5½\" elevator inserts and pick up the liner hanger. Picked up liner hanger and made up same.\n", "dTimEnd": "2007-10-05T20:00:00+02:00", "dTimStart": "2007-10-05T18:30:00+02:00", "md": "212", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to rigging down 9 5/8\" casing handling equipment. Started to rigging down 9 5/8\" casing handling equipment. Not able to operate PRS.", "dTimEnd": "2007-10-05T20:30:00+02:00", "dTimStart": "2007-10-05T20:00:00+02:00", "md": "212", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Not able to operate the PRS. Electrical technician investigated and resat software.", "dTimEnd": "2007-10-05T21:15:00+02:00", "dTimStart": "2007-10-05T20:30:00+02:00", "md": "212", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Completed rigging down 9 5/8\" casing handling equipment.", "dTimEnd": "2007-10-05T22:15:00+02:00", "dTimStart": "2007-10-05T21:15:00+02:00", "md": "212", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to RIH with screens on HWDP and DP", "dTimEnd": "2007-10-05T22:30:00+02:00", "dTimStart": "2007-10-05T22:15:00+02:00", "md": "212", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 9 5/8\" screens on 5½\" HWDP from 212 m to 336 m", "dTimEnd": "2007-10-05T23:30:00+02:00", "dTimStart": "2007-10-05T22:30:00+02:00", "md": "336", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to RIH with 9 5/8\" screens on 5½\" DP from 336 m to 500 m", "dTimEnd": "2007-10-06T00:00:00+02:00", "dTimStart": "2007-10-05T23:30:00+02:00", "md": "500", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2007_10_07
NO 15/9-F-7
NO 15/9-F-7
name
2007-10-06T00:00:00+02:00
2007-10-07T00:00:00+02:00
normal
2018-05-03T13:53:11+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": "3.8", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-10-07T00:00:00+02:00", "dTimDiaHoleStart": "2007-10-05T04:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "POOH with swab cup assembly. Redress burst disk sub. M/U two Swab cups for stimulation with Citric acid. RIH with Swab assembly and pump Citric acid. POOH with Swab assembly. Perform tubing hanger dummy run. M/U and RIH ESP. ", "hpht": "0", "md": "1085", "mdCsgLast": "1062", "mdDiaHoleStart": "1083", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "23", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "POOH with 9 5/8\" liner hanger BHA from 810 m to surface and laid out same. During PU of Swab assembly, a part of the aft upper PRS support arm came off and dropped on to the rig floor. Operation was stopped until safe operation could continue. RIH with Swab assembly on 5½\" DP to swab in well to achieve good losses rate, Loose rate vent from 1200 lpm to 150 lpm.", "tightWell": "0", "tvd": "1077", "tvdCsgLast": "1056.7", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "139.7" } ]
[ { "dTim": "2007-10-06T15:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "1083", "mudClass": "other", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Continued RIH with 9 5/8\" screens from 500 m to 738 m. Took weight at 738 m sat down weight 9 MT and picked up free. Made up TDS. Broke circulation 500 lpm, 5 bars, RIH passed obstruction at 738m. Continued RIH with 9 5/8\" screens from 738 m to 907 m (shoe)", "dTimEnd": "2007-10-06T02:30:00+02:00", "dTimStart": "2007-10-06T00:00:00+02:00", "md": "907", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to RIH with 9 5/8\" screens in open hole from 907 m to 1060 m. Took up/down weight 124/105 MT", "dTimEnd": "2007-10-06T03:15:00+02:00", "dTimStart": "2007-10-06T02:30:00+02:00", "md": "1060", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Dropped 1 3/4\" aluminium ball. Positioned string at setting depth 1062 m in up weight. Chased ball with 220 lpm. Applied 125 bars to string when ball seated. Held pressure for 2 mins. Sat down weight 20 MT on liner hanger. Increased the pressure to 185 bars, 2 mins to released the running tool. Increased the pressure to shear the ball seat. Ball seat sheared at 200 bars.\nPicked up to the free moving up weight to bring the Packer Actuator dogs above the PBR. Sat down 30 ton. Observed packer shearing. Top Liner hanger PBR at 850 m.\n", "dTimEnd": "2007-10-06T04:00:00+02:00", "dTimStart": "2007-10-06T03:15:00+02:00", "md": "1062", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled running tool out of PBR to 825 m. Displaced 13 3/8\" casing to 1.03 SG NaCl brine with 3000 lpm 45 - 35 bars.", "dTimEnd": "2007-10-06T05:45:00+02:00", "dTimStart": "2007-10-06T04:00:00+02:00", "md": "825", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with liner hanger running tool from 825 m to 810 m", "dTimEnd": "2007-10-06T06:00:00+02:00", "dTimStart": "2007-10-06T05:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to POOH with 9 5/8\" liner hanger BHA from 810 m to surface and laid out same.", "dTimEnd": "2007-10-06T09:30:00+02:00", "dTimStart": "2007-10-06T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to change over from PS-21 to master bushing. Cleared rig floor and changed out PS-21 slips to master bushing. During installation of the master bushing the PRS tagged the pipe finger system. Visual inspection was performed and no visual damaged observed. During PU of Swab assembly, the aft upper PRS support arm came off and dropped on to the rig floor.", "dTimEnd": "2007-10-06T10:00:00+02:00", "dTimStart": "2007-10-06T09:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Work was terminated until safe operation could continue.\nBoth support arms were modified by installing safety wires. Double barrier \n", "dTimEnd": "2007-10-06T19:00:00+02:00", "dTimStart": "2007-10-06T10:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Time out with night shift discussed the incident.\n", "dTimEnd": "2007-10-06T19:30:00+02:00", "dTimStart": "2007-10-06T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "The PRS was function tested and accepted for continued operation.\n", "dTimEnd": "2007-10-06T20:00:00+02:00", "dTimStart": "2007-10-06T19:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held tool box talk prior to pick up Swab assembly. Picked up SWAB assembly and tested check valve.\n", "dTimEnd": "2007-10-06T21:00:00+02:00", "dTimStart": "2007-10-06T20:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed to PS-21 slips. RIH with Swab assembly on 5½\" DP from surface to 848 m. No losses to formation.\n", "dTimEnd": "2007-10-06T23:15:00+02:00", "dTimStart": "2007-10-06T21:00:00+02:00", "md": "848", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up to TDS. Swabbed in the well twice using 3 strokes at the time with stroke length of 35 m. Swabbing speed 30 m/min. Losses 400 and 1000 lpm.\n", "dTimEnd": "2007-10-07T00:00:00+02:00", "dTimStart": "2007-10-06T23:15:00+02:00", "md": "848", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2007_10_08
NO 15/9-F-7
NO 15/9-F-7
name
2007-10-07T00:00:00+02:00
2007-10-08T00:00:00+02:00
normal
2018-05-03T13:53:11+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": "4.2", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-10-08T00:00:00+02:00", "dTimDiaHoleStart": "2007-10-05T04:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "POOH with the swabbing assemblies and LD same. Retrieve bore protector. RIH jetting tool for Riser/Well head. Prepare to run ESP assembly. Spot equipment on deck and on drillfloor. MU ESP assemblies and connect cable. Run in with ESP on 7 5/8\" tubing.", "hpht": "0", "md": "1085", "mdCsgLast": "1062", "mdDiaHoleStart": "1083", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "24", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "POOH with the Swab assembly. RIH with Swab new assemblie. Pumped 14,5 m³ of Citric acid (1,06 SG). Displaced Citric acid with 8,6 m³ 1.03 SG NaCl. Let Citirc acid soak. Lined up to trip tank and established loss rate, loss rate 450 lpm. Pulled the string up to 840 m above the PBR. Lined up to trip tank and established loss rate, loss rate 400 lpm. POOH with the swabbing assemblie from 840 m to 530 m.", "tightWell": "0", "tvd": "1077", "tvdCsgLast": "1056.7", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "139.7" } ]
[ { "dTim": "2007-10-07T15:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "1083", "mudClass": "other", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Continued swabbing the well 3 times using 3 strokes at the time with stroke length of 35 m. Swabbing speed 40 and 50 m/min. Losses 1200, 700 and 600 lpm. Filled up trip tank and observed final loss rate of 300 lpm.\n", "dTimEnd": "2007-10-07T02:45:00+02:00", "dTimStart": "2007-10-07T00:00:00+02:00", "md": "888", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressured up the string and bursted the burst disk sub at 250 bars.\n", "dTimEnd": "2007-10-07T03:00:00+02:00", "dTimStart": "2007-10-07T02:45:00+02:00", "md": "888", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with Swab assembly from 888 m to 1050 m.\n", "dTimEnd": "2007-10-07T03:30:00+02:00", "dTimStart": "2007-10-07T03:00:00+02:00", "md": "1050", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Connected up to TDS POOH pumping 1000 lpm, 10 m/min, 8 bars SSP, 1.03 SG NaCl.\n", "dTimEnd": "2007-10-07T05:00:00+02:00", "dTimStart": "2007-10-07T03:30:00+02:00", "md": "918", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled the swab assembly above the PBR. Established a loss rate of 150 lpm.", "dTimEnd": "2007-10-07T06:00:00+02:00", "dTimStart": "2007-10-07T05:00:00+02:00", "md": "829", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared for POOH with the Swab assembly.", "dTimEnd": "2007-10-07T06:30:00+02:00", "dTimStart": "2007-10-07T06:00:00+02:00", "md": "888", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Started to POOH with the Swab assembly from 888 m to 835 m.\n", "dTimEnd": "2007-10-07T06:45:00+02:00", "dTimStart": "2007-10-07T06:30:00+02:00", "md": "835", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Stopped POOH with the Swab assembly. Evaluated situation.\n", "dTimEnd": "2007-10-07T07:00:00+02:00", "dTimStart": "2007-10-07T06:45:00+02:00", "md": "835", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk with day shift. evaluated situation. Meanwhile greased drilling equipment, installed TIW.\n", "dTimEnd": "2007-10-07T08:15:00+02:00", "dTimStart": "2007-10-07T07:00:00+02:00", "md": "835", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Slip and cut drill line.\n", "dTimEnd": "2007-10-07T12:00:00+02:00", "dTimStart": "2007-10-07T08:15:00+02:00", "md": "835", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Calibrated TDS height for Geoservices.\n", "dTimEnd": "2007-10-07T12:45:00+02:00", "dTimStart": "2007-10-07T12:00:00+02:00", "md": "835", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Started to POOH with 5½\" DP and Swab assembly from 835 m to 112 m.\n", "dTimEnd": "2007-10-07T14:15:00+02:00", "dTimStart": "2007-10-07T12:45:00+02:00", "md": "112", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked and made up second Swab assembly.\n", "dTimEnd": "2007-10-07T15:30:00+02:00", "dTimStart": "2007-10-07T14:15:00+02:00", "md": "112", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with Swab assemblie from 112 m to 849 m.\n", "dTimEnd": "2007-10-07T17:30:00+02:00", "dTimStart": "2007-10-07T15:30:00+02:00", "md": "849", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to RIH with Swab assemblie at 2 min/std to 1050 m.", "dTimEnd": "2007-10-07T18:15:00+02:00", "dTimStart": "2007-10-07T17:30:00+02:00", "md": "1050", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pumped 14,5 m³ of Citric acid (1,06 SG) with 1500 lpm. Displaced Citric acid with 8,6 m³ 1.03 SG NaCl brine at 1500 lpm. Closed DP on stand pipe valve, locked in fluid in DP. Let Citric acid soak.\n", "dTimEnd": "2007-10-07T20:30:00+02:00", "dTimStart": "2007-10-07T18:15:00+02:00", "md": "1050", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled the upper cup into the blank pipe and swabbed the well 2 times with 10 m strokes 30 m/min. Ran back to 1050 m. Opened the stand pipe valve. Pumped 0.5 m³ down DP and displaced clean acid into well bore. Closed stand pipe valve. Let Citric acid soak.\n", "dTimEnd": "2007-10-07T21:30:00+02:00", "dTimStart": "2007-10-07T20:30:00+02:00", "md": "1050", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled the upper cup into the blank pipe and swabbed the well 2 times with 10 m strokes 30 m/min. Ran back to 1050 m. Opened the stand pipe valve. Pumped 0.5 m³ down DP and displaced clean acid into well bore. Closed stand pipe valve. Let Citric acid soak.", "dTimEnd": "2007-10-07T22:15:00+02:00", "dTimStart": "2007-10-07T21:30:00+02:00", "md": "1050", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled the upper cup into the blank pipe and swabbed the well 2 times with 10 m strokes 30 m/min. Ran back to 1050 m. Opened the stand pipe valve. Pumped 0.5 m³ down DP and displaced clean acid into well bore. Closed stand pipe valve. Let Citric acid soak.", "dTimEnd": "2007-10-07T23:00:00+02:00", "dTimStart": "2007-10-07T22:15:00+02:00", "md": "1050", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled the upper cup into the blank pipe and swabbed the well 2 times with 10 m strokes 30 m/min. Ran back to 1050 m. Opened the stand pipe valve. Pumped 0.5 m3 down DP and displaced clean acid into well bore.", "dTimEnd": "2007-10-07T23:15:00+02:00", "dTimStart": "2007-10-07T23:00:00+02:00", "md": "1050", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up to trip tank and established loss rate, loss rate 450 lpm.", "dTimEnd": "2007-10-08T00:00:00+02:00", "dTimStart": "2007-10-07T23:15:00+02:00", "md": "1050", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2007_10_09
NO 15/9-F-7
NO 15/9-F-7
name
2007-10-08T00:00:00+02:00
2007-10-09T00:00:00+02:00
normal
2018-05-03T13:53:12+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": "4.8", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-10-09T00:00:00+02:00", "dTimDiaHoleStart": "2007-10-08T12:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Complete making up the ESP pump equipment. Run in with ESP on 7 5/8\" tubing. MU hanger FAST swivel assembly. Orient hanger and lock quick connector. Space out penetrator cable. Cut cable. Make splice. Install penetrator in hanger. Leak test between seals on penetrator. MU tubing hanger running tool. Prepare to land hanger. Run in and land hanger. Leak test. Nipple down diverter and surface riser. Install tubing bonnet, spacer spool and ball valve assembly. Leak test. Terminate cable. Install XMT", "hpht": "0", "md": "1085", "mdCsgLast": "1062", "mdDiaHoleStart": "1083", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "25", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "POOH with the Swabbing assemblies from 530 m to surface. RIH and retrieved the bowl protector at 20.61 m. Jet washed the surface well head. Perform dummy run with the tubing hanger, landed same and documented orientation. Racked tubing hanger back in the derrick. Rigged up surface equipment for handling the ESP equipment. Made up ESP assemblies and tested same.", "tightWell": "0", "tvd": "1077", "tvdCsgLast": "1056.7", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "139.7" } ]
[ { "dTim": "2007-10-08T15:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "1083", "mudClass": "other", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Pulled the string up to 1026 m, having the upper swab cup inside the 9 5/8\" blank pipe. Opened stand pipe valve. Pumped 30 m³ 1.03 SG brine, to ensure that the remaining Citric acid was bull headed into the formation. Pumping rate 420 lpm 5 bars SPP.", "dTimEnd": "2007-10-08T01:30:00+02:00", "dTimStart": "2007-10-08T00:00:00+02:00", "md": "1026", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled the string to 900 m having the bottom swab cup inside the 9 5/8\" blank pipe. Displaced the remaining citric acid into the formation by pumping 20 m³ 1.03 SG packer fluid.", "dTimEnd": "2007-10-08T03:15:00+02:00", "dTimStart": "2007-10-08T01:30:00+02:00", "md": "900", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled the string up to 840 m above the PBR. Lined up to trip tank and established loss rate, loss rate 400 lpm.", "dTimEnd": "2007-10-08T04:30:00+02:00", "dTimStart": "2007-10-08T03:15:00+02:00", "md": "840", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with the Swabbing assemblies from 840 m to 731 m. As POOH filled the well with 1.03 SG packer fluid.", "dTimEnd": "2007-10-08T05:15:00+02:00", "dTimStart": "2007-10-08T04:30:00+02:00", "md": "731", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Stand threads got caught in box, when picking up with PRS. Freed the stand from box. Inspected the dies and the rollers on PRS head.", "dTimEnd": "2007-10-08T05:45:00+02:00", "dTimStart": "2007-10-08T05:15:00+02:00", "md": "731", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Continued POOH with the Swabbing assemblies from 731 m to 530 m. As POOH filled the well with 1.03 SG packer fluid.", "dTimEnd": "2007-10-08T06:00:00+02:00", "dTimStart": "2007-10-08T05:45:00+02:00", "md": "530", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued POOH with the Swabbing assemblies from 530 m to surface. Laid out the two Swabbing assemblies.", "dTimEnd": "2007-10-08T08:15:00+02:00", "dTimStart": "2007-10-08T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to retrieving the bowl protector. Removed master bushing and pulled 18\" diverter inserts.", "dTimEnd": "2007-10-08T08:45:00+02:00", "dTimStart": "2007-10-08T08:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH and retrieved the bowl protector at 20.61 m. POOH and laid out same. Installed the master bushing.", "dTimEnd": "2007-10-08T09:00:00+02:00", "dTimStart": "2007-10-08T08:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up the jetting tool. Ran in and washed the surface well head area (1500 lpm/5 rpm) total pumped 8 m³ packer fluid. Pulled out and laid out jetting tool.", "dTimEnd": "2007-10-08T10:30:00+02:00", "dTimStart": "2007-10-08T09:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to perform dummy run with the tubing hanger. Cleared rig floor and picked up and made up tubing hanger. Ran in and landed the tubing hanger, documented the orientation. Pulled out with tubing hanger and racked back in the derrick.", "dTimEnd": "2007-10-08T12:45:00+02:00", "dTimStart": "2007-10-08T10:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to rig up. Rigged up surface equipment for handling the ESP equipment, casing tong, goose neck and cable.", "dTimEnd": "2007-10-08T19:00:00+02:00", "dTimStart": "2007-10-08T12:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to picking up the ESP motor. Picked up same.", "dTimEnd": "2007-10-08T20:30:00+02:00", "dTimStart": "2007-10-08T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Serviced the motor and evacuated the air", "dTimEnd": "2007-10-08T21:15:00+02:00", "dTimStart": "2007-10-08T20:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed protector joint, ESP pump, discharge pressure assembly and x-o 9 5/8\" x 7 5/8\".", "dTimEnd": "2007-10-09T00:00:00+02:00", "dTimStart": "2007-10-08T21:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2007_10_10
NO 15/9-F-7
NO 15/9-F-7
name
2007-10-09T00:00:00+02:00
2007-10-10T00:00:00+02:00
normal
2018-05-03T13:53:12+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": "5.4", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-10-10T00:00:00+02:00", "dTimDiaHoleStart": "2007-10-08T12:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "MU hanger FAST swivel assembly. Orient hanger and lock quick connector. Space out penetrator cable. Cut cable. Make splice. Install penetrator in hanger. Leak test between seals on penetrator. MU tubing hanger running tool. Prepare to land hanger. Run in and land hanger. Leak test. Nipple down diverter and surface riser. Install tubing bonnet, spacer spool and ball valve assembly. Leak test. Terminate cable. Install XMT", "hpht": "0", "md": "1085", "mdCsgLast": "1062", "mdDiaHoleStart": "1083", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "26", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Completed testing of the cabling to the ESP motor. RIH with ESP on 7 5/8\" tubing from surface m to 760m. Installed cable clamps every joint. Laid out 4 joints. Checked the Phoenix connection every hours.", "tightWell": "0", "tvd": "1077", "tvdCsgLast": "1056.7", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "139.7" } ]
[ { "dTim": "2007-10-09T15:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "1083", "mudClass": "other", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Installed hydraulic line to Phoenix Multisensor at motor and leak tested connection to 207 bars (3000 psi) 10 min.", "dTimEnd": "2007-10-09T01:15:00+02:00", "dTimStart": "2007-10-09T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Connected up the electrical cable to the motor and tested out same.", "dTimEnd": "2007-10-09T06:00:00+02:00", "dTimStart": "2007-10-09T01:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued testing of the cabling to the ESP motor.", "dTimEnd": "2007-10-09T07:00:00+02:00", "dTimStart": "2007-10-09T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up ¼\" hydraulic line from Multisensor gauge to discharge pressure assembly. Leak tested 207 bar (3000 psi) for 10 minutes.", "dTimEnd": "2007-10-09T07:45:00+02:00", "dTimStart": "2007-10-09T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to run in hole with 7 5/8\" tubing. Changed slips inserts to 7 5/8\" inserts.", "dTimEnd": "2007-10-09T08:30:00+02:00", "dTimStart": "2007-10-09T07:45:00+02:00", "md": "16", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up 7 5/8\" casing and adjusted Odfjell casing tong.", "dTimEnd": "2007-10-09T09:15:00+02:00", "dTimStart": "2007-10-09T08:30:00+02:00", "md": "16", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with ESP on 7 5/8\" tubing from 16 m to 500 m. Installed cable clamps every joint. Laid out 4 joints. Checked the Phoenix connection every hours.", "dTimEnd": "2007-10-10T00:00:00+02:00", "dTimStart": "2007-10-09T09:15:00+02:00", "md": "500", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2007_10_11
NO 15/9-F-7
NO 15/9-F-7
name
2007-10-10T00:00:00+02:00
2007-10-11T00:00:00+02:00
normal
2018-05-03T13:53:12+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": "5.5", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-10-11T00:00:00+02:00", "dTimDiaHoleStart": "2007-10-08T12:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "None", "hpht": "0", "md": "1085", "mdCsgLast": "828.2", "mdDiaHoleStart": "1083", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "27", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Continued RIH with ESP on 7 5/8\" tubing from 760 m to 800 m. Installed the tubing hanger and released from same. N/D the diverter and the riser. Installed the Tubing Bonnet, spacer spool and ball valve assembly. Leak tested cable penetrator seals in tubing bonnet to 69 bar (1000 psi). Leak tested the tubing bonnet cavity to 69 bar (1000 psi). \n", "tightWell": "0", "tvd": "1077", "tvdCsgLast": null, "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "139.7" } ]
[ { "dTim": "2007-10-10T15:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "1083", "mudClass": "other", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Continued RIH with ESP on 7 5/8\" tubing from 500 m to 760 m. Installed cable clamps every joint. Checked the Phoenix connection every hours.", "dTimEnd": "2007-10-10T06:00:00+02:00", "dTimStart": "2007-10-10T00:00:00+02:00", "md": "760", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued RIH with ESP on 7 5/8\" tubing from 760 m to 800 m. Installed cable clamps every joint.", "dTimEnd": "2007-10-10T07:00:00+02:00", "dTimStart": "2007-10-10T06:00:00+02:00", "md": "800", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed to 5½\" DP inserts. Picked up, made up tubing hanger and installed cable clamp.", "dTimEnd": "2007-10-10T07:30:00+02:00", "dTimStart": "2007-10-10T07:00:00+02:00", "md": "800", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged down the casing handling equipment and the casing tong.", "dTimEnd": "2007-10-10T09:00:00+02:00", "dTimStart": "2007-10-10T07:30:00+02:00", "md": "800", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke the fast connection. Orientated the tubing hanger by rotating hanger. Made up the fast connection to 17.7 kNm.", "dTimEnd": "2007-10-10T11:30:00+02:00", "dTimStart": "2007-10-10T09:00:00+02:00", "md": "800", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed the PS-21 slips and installed master bushing.", "dTimEnd": "2007-10-10T12:00:00+02:00", "dTimStart": "2007-10-10T11:30:00+02:00", "md": "800", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lower the tubing hanger down to suitable working height. Installed the penetrator in tubing hanger. Leak tested the penetrator o-rings to 69 bars (1000 psi) for 10 minutes.", "dTimEnd": "2007-10-10T12:45:00+02:00", "dTimStart": "2007-10-10T12:00:00+02:00", "md": "800", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Spliced the cable to pigtail, as per Schlumberger splicing procedure.", "dTimEnd": "2007-10-10T16:15:00+02:00", "dTimStart": "2007-10-10T12:45:00+02:00", "md": "800", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Checked the electrical connection and rigged down the splicing equipment", "dTimEnd": "2007-10-10T16:45:00+02:00", "dTimStart": "2007-10-10T16:15:00+02:00", "md": "800", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged up and leak tested the penetrator o-rings to 69 bars (1000 ps)i for 10 minutes.", "dTimEnd": "2007-10-10T17:15:00+02:00", "dTimStart": "2007-10-10T16:45:00+02:00", "md": "800", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed the master bushing and ran in with the tubing hanger.", "dTimEnd": "2007-10-10T18:00:00+02:00", "dTimStart": "2007-10-10T17:15:00+02:00", "md": "800", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Checked the electrical connection. Installed the master bushing continued running in with the tubing hanger. Landed the tubing hanger at the mark from the dummy run. 20.61 m.", "dTimEnd": "2007-10-10T18:30:00+02:00", "dTimStart": "2007-10-10T18:00:00+02:00", "md": "826", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Disconnected the tubing hanger running tool by rotating the landing string to the right 9 turns. Pulled out the tubing hanger running tool.", "dTimEnd": "2007-10-10T20:00:00+02:00", "dTimStart": "2007-10-10T18:30:00+02:00", "md": "826", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "N/D the diverter and the riser and laid out the riser.\n", "dTimEnd": "2007-10-11T00:00:00+02:00", "dTimStart": "2007-10-10T20:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2007_10_12
NO 15/9-F-7
NO 15/9-F-7
name
2007-10-11T00:00:00+02:00
2007-10-12T00:00:00+02:00
normal
2018-05-03T13:53:12+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": "5.4", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-10-12T00:00:00+02:00", "dTimDiaHoleStart": "2007-10-08T12:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "None", "hpht": "0", "md": "1085", "mdCsgLast": "828.2", "mdDiaHoleStart": "1083", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "28", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "None", "tightWell": "0", "tvd": "1077", "tvdCsgLast": null, "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "139.7" } ]
[]
[]
[]
[ { "comments": "Prepared the surface Well Head for installation of the Tubing Bonnet, spacer spool and ball valve assembly. Installed same.\n", "dTimEnd": "2007-10-11T01:30:00+02:00", "dTimStart": "2007-10-11T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Leak tested cable penetrator seals in tubing bonnet to 69 bar (1000 psi). Meanwhile changed out valve on TDS.", "dTimEnd": "2007-10-11T02:30:00+02:00", "dTimStart": "2007-10-11T01:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Leak tested the tubing bonnet cavity to 69 bar (1000 psi).", "dTimEnd": "2007-10-11T03:15:00+02:00", "dTimStart": "2007-10-11T02:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2015_02_05
NO 15/9-F-7
NO 15/9-F-7
name
2015-02-04T00:00:00+01:00
2015-02-05T00:00:00+01:00
normal
2018-05-03T13:53:12+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2015-02-05T00:00:00+01:00", "dTimDiaHoleStart": "2015-02-04T14:15:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Install surface riser and diverter. Release tubing hanger and pull ESP assemblies on 7 5/8\" tubing. R/U WL for caliper log of casing.", "hpht": "0", "md": "1083", "mdCsgLast": "828.2", "mdDiaHoleStart": "1083", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "1", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Skidded catilever to F-7. Installed hatches. Nippled down flowline. Attempted to disconnect and pull tubing bonnet, spacer spool and ball valve.", "tightWell": "0", "tvd": null, "tvdCsgLast": null, "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[]
[]
[]
[ { "comments": "Well F-7 handed over from Production to D&W.\nPerformed TBT for skidding rig with personnel from drilling, marine and technical departments.", "dTimEnd": "2015-02-04T04:00:00+01:00", "dTimStart": "2015-02-04T03:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Skidded the cantilever from F-9 to F-7", "dTimEnd": "2015-02-04T05:30:00+01:00", "dTimStart": "2015-02-04T04:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Unbolted weather deck hatches on F-7. Moved split hatches in moonpool. Meanwhile prepared for nippling down flowline on F-7. Removed nuts on ball valve and prepared for lifting ball valve, spacer spool and tubing bonnet.", "dTimEnd": "2015-02-04T09:30:00+01:00", "dTimStart": "2015-02-04T05:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Skidded cantilever from F-7 to F-9.", "dTimEnd": "2015-02-04T10:30:00+01:00", "dTimStart": "2015-02-04T09:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Unbolted F-9 drilling hatches. Moved F-7 hatch to F-9. Meanwhile nippled down flowline on F-7 and prepared for lifting ball valve, spacer spool and tubing bonnet.", "dTimEnd": "2015-02-04T12:30:00+01:00", "dTimStart": "2015-02-04T10:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Skidded cantilever from F-9 to F-7.", "dTimEnd": "2015-02-04T13:15:00+01:00", "dTimStart": "2015-02-04T12:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed split hatches on F-7.", "dTimEnd": "2015-02-04T14:15:00+01:00", "dTimStart": "2015-02-04T13:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed pre-job meeting for securing F-7 flowline on XMT deck.", "dTimEnd": "2015-02-04T15:00:00+01:00", "dTimStart": "2015-02-04T14:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Secured flowhose with S-piece attached on XMT deck. R/U to pull tubing bonnet, spacer spool and ball valve. Vetco installed bolts for releasing lockring on tubing bonnet. Held TBT for running surface riser. Meanwhile Production Dept shut down adjacent wells according to SimOps-procedure.", "dTimEnd": "2015-02-04T17:15:00+01:00", "dTimStart": "2015-02-04T15:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attempted to disconnect and pull tubing bonnet. Not able to pull assembly free.", "dTimEnd": "2015-02-04T17:30:00+01:00", "dTimStart": "2015-02-04T17:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attempted to disconnect tubing bonnet. Adjusted lockring releasing bolts. Worked tension 0-4 ton. Not able to move bonnet. Pressured up tubing bonnet cavity to pump tubing bonnet from below. Continued adjusting releasing bolts and working tension up/down. Tubing bonnet moved up, but slightly skewed. 4-5 mm movement close to the penetrator, 5-7 mm 180 degrees off the penetrator. Continued attempting to release tubing bonnet. Attempted to wiggle assembly horizontally with chain hoists connected to spacer spool at XMT deck. Installed hydraulick jacks to prevent tubing bonnet from dropping back down.", "dTimEnd": "2015-02-05T00:00:00+01:00", "dTimStart": "2015-02-04T17:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2015_02_06
NO 15/9-F-7
NO 15/9-F-7
name
2015-02-05T00:00:00+01:00
2015-02-06T00:00:00+01:00
normal
2018-05-03T13:53:12+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2015-02-06T00:00:00+01:00", "dTimDiaHoleStart": "2015-02-04T14:15:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "L/D ESP assemblies. R/U WL. Run multicaliper log. Install ME-plug in screen section. M/U and RIH with ESP assemblies on 7 5/8\" tubing.", "hpht": "0", "md": "1083", "mdCsgLast": "828.2", "mdDiaHoleStart": "1083", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "2", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Released and pulled tubing bonnet, spacer spool and ball valve. Installed surface riser and diverter. Released tubing hanger and pulled ESP assemblies on 7 5/8\" tubing to 141 m.", "tightWell": "0", "tvd": null, "tvdCsgLast": null, "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[]
[]
[]
[ { "comments": "Continued working tension up/down to release tubing bonnet. Managed to level out the travel evenly around bonnet. Slacked off tension and lowered soft slings to XMT-deck to remove braided wire slings and connect soft slings directly to ball valve. Dropped 1ea 2m 2 1/2\" braided wire sling into tubing while disassembling. Evaluated situation and covered tubing.", "dTimEnd": "2015-02-05T02:45:00+01:00", "dTimStart": "2015-02-05T00:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Connected soft slings to pad eyes on ball valve. Continued attempting to release tubing bonnet, working tension up/down while hammering on bonnet. Slowly making progress.", "dTimEnd": "2015-02-05T05:15:00+01:00", "dTimStart": "2015-02-05T02:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Tubing bonnet came loose. Removed latch ring releasing bolts. Pulled tubing bonnet, spacer spool and ball valve to drill floor. Covered tubing hanger with bucket.", "dTimEnd": "2015-02-05T06:00:00+01:00", "dTimStart": "2015-02-05T05:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned wellhead for landing surface riser. Meanwhile prepared surface riser for lifting.", "dTimEnd": "2015-02-05T07:00:00+01:00", "dTimStart": "2015-02-05T06:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for installing riser. P/U surface riser and tailed same into well centre. Lowered surface riser through rotary and latched on to surface wellhead. Production Dept informed re-start production from adjacent wells according to SimOps-procedure.", "dTimEnd": "2015-02-05T07:45:00+01:00", "dTimStart": "2015-02-05T07:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for installing diverter. P/U and nippled up diverter.", "dTimEnd": "2015-02-05T08:45:00+01:00", "dTimStart": "2015-02-05T07:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed master bushings. Changed handling equipment to 5 1/2\".", "dTimEnd": "2015-02-05T09:00:00+01:00", "dTimStart": "2015-02-05T08:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for releasing tubing hanger.", "dTimEnd": "2015-02-05T09:15:00+01:00", "dTimStart": "2015-02-05T09:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U TH RT and M/U DP landing stand to same.", "dTimEnd": "2015-02-05T09:30:00+01:00", "dTimStart": "2015-02-05T09:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Measured in to to latch point 20,7 m and engaged RT by 9,5 left hand turns.", "dTimEnd": "2015-02-05T10:15:00+01:00", "dTimStart": "2015-02-05T09:30:00+01:00", "md": "827", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U Weatherford tong. Meanwhile performed TBT for L/D tubing hanger.", "dTimEnd": "2015-02-05T11:45:00+01:00", "dTimStart": "2015-02-05T10:15:00+01:00", "md": "827", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed master bushings. Pulled tubing hanger free with nop overpull. Pulled tubing hanger above rotary.", "dTimEnd": "2015-02-05T12:00:00+01:00", "dTimStart": "2015-02-05T11:45:00+01:00", "md": "799", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cut and terminated ESP cable, tested same. Meanwhile R/U compact auto slips and B/O tubing hanger.", "dTimEnd": "2015-02-05T13:00:00+01:00", "dTimStart": "2015-02-05T12:00:00+01:00", "md": "799", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D down tubing hanger and running tool, assisted by crane.", "dTimEnd": "2015-02-05T13:15:00+01:00", "dTimStart": "2015-02-05T13:00:00+01:00", "md": "799", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with 7 5/8\" tubing with ESP cable from 799 m to 763m. Observed approx 30 cm of damaged armor cable.", "dTimEnd": "2015-02-05T14:45:00+01:00", "dTimStart": "2015-02-05T13:15:00+01:00", "md": "763", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Inspected cable. Lowered banana sheave from derrick to rig floor to allow damaged piece to pass through. Recovered parts of armor on next clamp on tubing. Approx 15 cm armor missing, presumably left in well.", "dTimEnd": "2015-02-05T15:15:00+01:00", "dTimStart": "2015-02-05T14:45:00+01:00", "md": "763", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "POOH with 7 5/8\" tubing with ESP cable from 763 m to 141 m. Avg pulling speed 5,8 joints/hr", "dTimEnd": "2015-02-06T00:00:00+01:00", "dTimStart": "2015-02-05T15:15:00+01:00", "md": "141", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2015_02_07
NO 15/9-F-7
NO 15/9-F-7
name
2015-02-06T00:00:00+01:00
2015-02-07T00:00:00+01:00
normal
2018-05-03T13:53:12+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2015-02-07T00:00:00+01:00", "dTimDiaHoleStart": "2015-02-06T06:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "M/U ESP assemblies and RIH with same on 7 5/8\" tubing with control cable. P/U and M/U tubing hanger.", "hpht": "0", "md": "1083", "mdCsgLast": "1062", "mdDiaHoleStart": "1083", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "3", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "L/D ESP assemblies. TOFS due to dropped EPS cable. R/U WL. Performed multifinger caliper log. Installed ME-plug in screen section.", "tightWell": "0", "tvd": null, "tvdCsgLast": "1056.7", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[]
[]
[]
[ { "comments": "Continued POOH with ESP assemblies on 7 5/8\" tubing from 141 m to 21 m. Avg pulling speed 5 joints/hrs. Recovered total 67 tubing clamps, no clamps left in hole.", "dTimEnd": "2015-02-06T01:15:00+01:00", "dTimStart": "2015-02-06T00:00:00+01:00", "md": "21", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for changing handling equipment. Removed compact auto slips. Installed master bushings. Set manual slips on pup joint above discharge head.", "dTimEnd": "2015-02-06T02:00:00+01:00", "dTimStart": "2015-02-06T01:15:00+01:00", "md": "21", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out to L/D ESP assemblies. Removed Protectorlisers down to Pothead. Cut ESP power cable. Attached ESP cable to rope with chinese finger and duct tape. Spooled back same over banana sheave up in derrick. With chinese finger in sheave, ESP cable came loose and dropped to rig floor.", "dTimEnd": "2015-02-06T02:45:00+01:00", "dTimStart": "2015-02-06T02:00:00+01:00", "md": "21", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Secured area. Evaluated situation. Performed TOFS.", "dTimEnd": "2015-02-06T04:00:00+01:00", "dTimStart": "2015-02-06T02:45:00+01:00", "md": "21", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Performed TBT prior to continue operation.", "dTimEnd": "2015-02-06T04:15:00+01:00", "dTimStart": "2015-02-06T04:00:00+01:00", "md": "21", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled up to discharge head. Cut control line. Installed lifting clamp and landed on stovepipe. Removed bolt on head. Recovered dropped wire sling from top of discharge head. Continued B/O and L/D Discharge assy, Pump, Protector, Motor and Multisensor. Recovered total 4 ea Protectorlisers and 1 ea special XO clamp, no clamps left in hole.", "dTimEnd": "2015-02-06T06:00:00+01:00", "dTimStart": "2015-02-06T04:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and cleared rig floor. Held TBT for R/U WL.", "dTimEnd": "2015-02-06T06:15:00+01:00", "dTimStart": "2015-02-06T06:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U wireline equipment.", "dTimEnd": "2015-02-06T06:30:00+01:00", "dTimStart": "2015-02-06T06:15:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U WL toolstring for multicaliper.", "dTimEnd": "2015-02-06T07:00:00+01:00", "dTimStart": "2015-02-06T06:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held TBT for running wireline operation. Tested toolstring.", "dTimEnd": "2015-02-06T07:15:00+01:00", "dTimStart": "2015-02-06T07:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with multifinger caliper toolstring to 870 m.", "dTimEnd": "2015-02-06T08:45:00+01:00", "dTimStart": "2015-02-06T07:15:00+01:00", "md": "870", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened caliper and started logging up from 870 m to surface.", "dTimEnd": "2015-02-06T10:15:00+01:00", "dTimStart": "2015-02-06T08:45:00+01:00", "md": "15", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Evaluated logging results. \nMeanwhile performed Time Out For Safety with all personnel involved in operation. Focused on use of established planning routines/TBTs, clear communication and the importance of stopping the operation if something is unclear, unsafe, or if there has been a change in conditions. Emphasised the general risk related to cold rig and campaign crew consisting of personnel gathered from various rigs.", "dTimEnd": "2015-02-06T11:30:00+01:00", "dTimStart": "2015-02-06T10:15:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for L/D WL toolstring. L/D same. Changed out cable head.", "dTimEnd": "2015-02-06T12:15:00+01:00", "dTimStart": "2015-02-06T11:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared ME plug and setting tool. Meanwhile changed collar on Bolt on Head ESP-assembly.", "dTimEnd": "2015-02-06T16:45:00+01:00", "dTimStart": "2015-02-06T12:15:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Performed TBT for M/U ME-plug toolstring.", "dTimEnd": "2015-02-06T17:00:00+01:00", "dTimStart": "2015-02-06T16:45:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "M/U ME-plug toolstring. Charged up nitrigen chamber on setting tool.", "dTimEnd": "2015-02-06T19:00:00+01:00", "dTimStart": "2015-02-06T17:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Performed TBT with night crew", "dTimEnd": "2015-02-06T19:15:00+01:00", "dTimStart": "2015-02-06T19:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Continued M/U ME-plug toolstring.", "dTimEnd": "2015-02-06T19:30:00+01:00", "dTimStart": "2015-02-06T19:15:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Performed operational checks and tested tools", "dTimEnd": "2015-02-06T19:45:00+01:00", "dTimStart": "2015-02-06T19:30:00+01:00", "md": "10", "phase": "wire line", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "RIH with ME-plug on WL. Correlated depth in 9 5/8\" screen hanger.", "dTimEnd": "2015-02-06T20:45:00+01:00", "dTimStart": "2015-02-06T19:45:00+01:00", "md": "860", "phase": "wire line", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "RIH with ME-plug on WL. Lost weight at 1048 m. Pulled up and attempted to RIH at higher speed to pass obstruction. No go.", "dTimEnd": "2015-02-06T21:15:00+01:00", "dTimStart": "2015-02-06T20:45:00+01:00", "md": "1048", "phase": "wire line", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "P/U until tension in string. Activated setting tool and set plug according to Interwell procedure. Observed tension drop from 2230 lbs to 1520 lbs. RIH and tagged plug. Top plug at 1043 m. Mid element at 1044,2 m.", "dTimEnd": "2015-02-06T21:30:00+01:00", "dTimStart": "2015-02-06T21:15:00+01:00", "md": "1045.5", "phase": "wire line", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Performed Time Out For Safety with all personnel involved in operation. Focused on use of established planning routines/TBTs, clear communication and the importance of stopping the operation if something is unclear, unsafe, or if there has been a change in conditions. Emphasised the general risk related to cold rig and campaign crew consisting of personnel gathered from various rigs.", "dTimEnd": "2015-02-06T22:00:00+01:00", "dTimStart": "2015-02-06T21:30:00+01:00", "md": "1030", "phase": "wire line", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "POOH with plug RT on WL to 50 m.", "dTimEnd": "2015-02-06T22:45:00+01:00", "dTimStart": "2015-02-06T22:00:00+01:00", "md": "50", "phase": "wire line", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Performed TBT for L/D WL toolstring and R/D WL equipment.", "dTimEnd": "2015-02-06T23:00:00+01:00", "dTimStart": "2015-02-06T22:45:00+01:00", "md": "50", "phase": "wire line", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "L/D ME-plug RT", "dTimEnd": "2015-02-06T23:15:00+01:00", "dTimStart": "2015-02-06T23:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "R/D wireline equipment. Cleaned and cleared rig floor.", "dTimEnd": "2015-02-06T23:45:00+01:00", "dTimStart": "2015-02-06T23:15:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2015_02_08
NO 15/9-F-7
NO 15/9-F-7
name
2015-02-07T00:00:00+01:00
2015-02-08T00:00:00+01:00
normal
2018-05-03T13:53:12+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2015-02-08T00:00:00+01:00", "dTimDiaHoleStart": "2015-02-07T00:15:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "P/U and M/U tubing hanger. Splice ESP cable to penetrator pigtail. Land and test TH. Nipple down diverter and surface riser. Install tubing bonnet, spacer spool and ball valve. Nipple up flowline. Handover well to production. \nDemobilize after ESP campaign.", "hpht": "0", "md": "1083", "mdCsgLast": "1062", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "4", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Installed RT on TH assembly. M/U ESP assemblies and RIH with same on 7 5/8\" tubing to 323 m.", "tightWell": "0", "tvd": null, "tvdCsgLast": "1056.7", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[]
[]
[]
[ { "comments": "Cleaned and cleared rig floor.", "dTimEnd": "2015-02-07T00:15:00+01:00", "dTimStart": "2015-02-07T00:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed rotator arm on elevator. Installed #2 bowls.", "dTimEnd": "2015-02-07T00:30:00+01:00", "dTimStart": "2015-02-07T00:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for changing RT on primary TH assy.", "dTimEnd": "2015-02-07T00:45:00+01:00", "dTimStart": "2015-02-07T00:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed BX inserts to 9 5/8\".", "dTimEnd": "2015-02-07T01:00:00+01:00", "dTimStart": "2015-02-07T00:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U primary TH/RT assy and landed same in rotary. Released running tool and L/D same. Attempted to P/U back-up TH/RT assy to land same in rathole. Malfunction on forward PRS", "dTimEnd": "2015-02-07T02:30:00+01:00", "dTimStart": "2015-02-07T01:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Troubleshot foreward PRS.", "dTimEnd": "2015-02-07T03:15:00+01:00", "dTimStart": "2015-02-07T02:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "P/U back-up TH/RT and landed same in rathole. Released RT and installed same on primary TH in rotary. Meanwhile changed out ESP cable reel on catilever.", "dTimEnd": "2015-02-07T03:45:00+01:00", "dTimStart": "2015-02-07T03:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for L/D TH assemblies from rathole and rotary. L/D assemblies.", "dTimEnd": "2015-02-07T04:30:00+01:00", "dTimStart": "2015-02-07T03:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for P/U and M/U ESP assemblies. Installed stovepipe above rotary.", "dTimEnd": "2015-02-07T04:45:00+01:00", "dTimStart": "2015-02-07T04:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U ESP assembly 1 - Multisensor and motor. Landed lifting clamp on stovepipe in rotary. Serviced motor according to Schlumberger procedure.", "dTimEnd": "2015-02-07T06:15:00+01:00", "dTimStart": "2015-02-07T04:45:00+01:00", "md": "10", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U ESP assembly 2 - Protector. Landed lifting clamp on stovepipe in rotary.", "dTimEnd": "2015-02-07T06:45:00+01:00", "dTimStart": "2015-02-07T06:15:00+01:00", "md": "14", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U ESP assembly 3 - ESP pump. Landed lifting clamp on stovepipe in rotary.", "dTimEnd": "2015-02-07T07:00:00+01:00", "dTimStart": "2015-02-07T06:45:00+01:00", "md": "17", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT with day crew.", "dTimEnd": "2015-02-07T07:45:00+01:00", "dTimStart": "2015-02-07T07:00:00+01:00", "md": "17", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U ESP assembly 4 - Discharge pressure assembly. Landed lifting clamp on stovepipe in rotary.", "dTimEnd": "2015-02-07T08:30:00+01:00", "dTimStart": "2015-02-07T07:45:00+01:00", "md": "17", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed inserts in elevator to 7 5/8\".", "dTimEnd": "2015-02-07T08:45:00+01:00", "dTimStart": "2015-02-07T08:30:00+01:00", "md": "17", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U assembly 5 - Bolt on discharge head.", "dTimEnd": "2015-02-07T09:15:00+01:00", "dTimStart": "2015-02-07T08:45:00+01:00", "md": "17", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled back to multisensor and connected hydraulic line to same. Pressure tested hydraulic line to 3000 psi.", "dTimEnd": "2015-02-07T10:00:00+01:00", "dTimStart": "2015-02-07T09:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH to top of motor. Tested motor and multisensor electrically. Megger tested cable", "dTimEnd": "2015-02-07T11:15:00+01:00", "dTimStart": "2015-02-07T10:00:00+01:00", "md": "10", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Mounted banana sheave for ESP power cable on PRS. Fed cable through same.", "dTimEnd": "2015-02-07T11:30:00+01:00", "dTimStart": "2015-02-07T11:15:00+01:00", "md": "10", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Spliced cable to connections on pump assembly.", "dTimEnd": "2015-02-07T14:00:00+01:00", "dTimStart": "2015-02-07T11:30:00+01:00", "md": "10", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Megger tested electrical cable to pump.", "dTimEnd": "2015-02-07T14:30:00+01:00", "dTimStart": "2015-02-07T14:00:00+01:00", "md": "10", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Serviced protector seal and filled with oil.", "dTimEnd": "2015-02-07T15:30:00+01:00", "dTimStart": "2015-02-07T14:30:00+01:00", "md": "10", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed protectorliser clamps on ESP assembly. Terminated hydraulic line. Landed and secured string with manual slips in rotary.", "dTimEnd": "2015-02-07T17:30:00+01:00", "dTimStart": "2015-02-07T15:30:00+01:00", "md": "21", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for running 7 5/8\" tubing with ESP power cable.", "dTimEnd": "2015-02-07T17:45:00+01:00", "dTimStart": "2015-02-07T17:30:00+01:00", "md": "21", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U first 7 5/8\" tubing joint. Fitted clamp on tubing collar. Installed compact auto slips.", "dTimEnd": "2015-02-07T18:30:00+01:00", "dTimStart": "2015-02-07T17:45:00+01:00", "md": "21", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with ESP assemblies on 7 5/8\" tubing from 21 m to 43 m. M/U control line clamp on every connection.", "dTimEnd": "2015-02-07T19:00:00+01:00", "dTimStart": "2015-02-07T18:30:00+01:00", "md": "43", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT with night crew for running 7 5/8\" tubing with ESP cable.", "dTimEnd": "2015-02-07T19:15:00+01:00", "dTimStart": "2015-02-07T19:00:00+01:00", "md": "43", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with ESP assemblies on 7 5/8\" tubing from 43 m to 323 m. M/U control line clamp on every connection. Schlumberger megger tested power cable at 66 m and 173 m. Avg running speed 5,2 joints/hr.", "dTimEnd": "2015-02-08T00:00:00+01:00", "dTimStart": "2015-02-07T19:15:00+01:00", "md": "323", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2015_02_09
NO 15/9-F-7
NO 15/9-F-7
name
2015-02-08T00:00:00+01:00
2015-02-09T00:00:00+01:00
normal
2018-05-03T13:53:12+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2015-02-09T00:00:00+01:00", "dTimDiaHoleStart": "2015-02-08T19:45:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "N/A", "hpht": "0", "md": "1083", "mdCsgLast": "1062", "mdDiaHoleStart": "1083", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "5", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "RIH with ESP assemblies on 7 5/8\" tubing. P/U and M/U tubing hanger, spliced ESP cable to same. Landed TH. Nippled down diverter and surface riser. Installed tubing bonnet, spacer spool and ball valve. Commenced final pressure tests at WH. Bolted flowline to ball valve. Installed hatch covers.", "tightWell": "0", "tvd": null, "tvdCsgLast": "1056.7", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[]
[]
[]
[ { "comments": "RIH with ESP assemblies on 7 5/8\" tubing from 323 m to 771 m. M/U control line clamp on every connection. Schlumberger megger tested power cable at 323 m, 455 m and 624 m. Avg running speed 6,9 joints/hr.", "dTimEnd": "2015-02-08T05:45:00+01:00", "dTimStart": "2015-02-08T00:00:00+01:00", "md": "771", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for removing compact auto slips. Removed compact auto slips and installed master bushings. Meanwhile Schlumberger megger tested power cable.", "dTimEnd": "2015-02-08T06:00:00+01:00", "dTimStart": "2015-02-08T05:45:00+01:00", "md": "771", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with ESP assemblies on 7 5/8\" tubing from 771 m to 782 m. Set manual slips. P/U and M/U 7 5/8\" tubing pup joint.", "dTimEnd": "2015-02-08T06:30:00+01:00", "dTimStart": "2015-02-08T06:00:00+01:00", "md": "782", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for P/U tubing hanger. Changed elevator inserts to 5 1/2\".", "dTimEnd": "2015-02-08T06:45:00+01:00", "dTimStart": "2015-02-08T06:30:00+01:00", "md": "782", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U TH/RT assembly from HTS.", "dTimEnd": "2015-02-08T07:00:00+01:00", "dTimStart": "2015-02-08T06:45:00+01:00", "md": "782", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT with day crew.", "dTimEnd": "2015-02-08T07:15:00+01:00", "dTimStart": "2015-02-08T07:00:00+01:00", "md": "782", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "B/O FAST connector. Oriented tubing hanger. M/U FAST connector.", "dTimEnd": "2015-02-08T08:00:00+01:00", "dTimStart": "2015-02-08T07:15:00+01:00", "md": "792", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with tubing hanger to working height. Mounted penetrator in TH, measured cable cutting point. Disassembled penetrator and spaced out for cable splice. Performed final electrical checks on cable. Removed banana sheave from PRS.", "dTimEnd": "2015-02-08T08:45:00+01:00", "dTimStart": "2015-02-08T08:00:00+01:00", "md": "792", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cut cable and spooled back remaining cable to reel. Spliced cable to penetrator pigtails.", "dTimEnd": "2015-02-08T15:15:00+01:00", "dTimStart": "2015-02-08T08:45:00+01:00", "md": "792", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed penetrator in hanger, installed clamps on cable. Pressure tested penetrator seals, 69 bar / 10 min. Tested downhole system after splicing - ok.", "dTimEnd": "2015-02-08T16:00:00+01:00", "dTimStart": "2015-02-08T15:15:00+01:00", "md": "795", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed Vetco O-ring for tubing hanger. Removed master bushings.", "dTimEnd": "2015-02-08T16:30:00+01:00", "dTimStart": "2015-02-08T16:00:00+01:00", "md": "795", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D Weatherford tong.", "dTimEnd": "2015-02-08T17:30:00+01:00", "dTimStart": "2015-02-08T16:30:00+01:00", "md": "795", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U DP landing stand, M/U same to TH RT. RIH and landed TH.", "dTimEnd": "2015-02-08T18:15:00+01:00", "dTimStart": "2015-02-08T17:30:00+01:00", "md": "819.3", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Disconnected RT. POOH with landing string.", "dTimEnd": "2015-02-08T18:30:00+01:00", "dTimStart": "2015-02-08T18:15:00+01:00", "md": "10", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Schlumberger tested ESP system through landing lead. Meanwhile performed TBT for nippling down diverter and surdface riser.", "dTimEnd": "2015-02-08T19:30:00+01:00", "dTimStart": "2015-02-08T18:30:00+01:00", "md": "10", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D tubing hanger running tool.", "dTimEnd": "2015-02-08T19:45:00+01:00", "dTimStart": "2015-02-08T19:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed BX elevator. Installed chains and lifting bridle on TDS. Pulled master bushings.", "dTimEnd": "2015-02-08T20:00:00+01:00", "dTimStart": "2015-02-08T19:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled diverter, parked and secured same in set back. Verified adjacent wells shut-in according to SimOps-procedure.", "dTimEnd": "2015-02-08T20:30:00+01:00", "dTimStart": "2015-02-08T20:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attached chains/slings to surface riser. Disconnected riser and pulled same to surface. L/D surface riser to HTS with crane assist.", "dTimEnd": "2015-02-08T22:00:00+01:00", "dTimStart": "2015-02-08T20:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed surface riser from HTS. Placed tubing bonnet/spacer spool/ball valve-assy on HTS. Meanwhile performed TBT for P/U and run assy.", "dTimEnd": "2015-02-08T22:45:00+01:00", "dTimStart": "2015-02-08T22:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U, run and installed tubing bonnet/spacer spool/ ball valve-assy. Closed ball valve and disassembled pad eyes. Production Dept informed that heavy lift landed, according to SimOps-procedure.", "dTimEnd": "2015-02-08T23:15:00+01:00", "dTimStart": "2015-02-08T22:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted flowhose with S-piece onto ball valve with tugger through rotary. Bolted flowline to ball valve. Bolts to be torqued-up at later stage by Production Dept. Simultaneously commenced pressure testing of penetrator seals in tubing bonnet, tubing bonnet cavity and annulus insert valve.", "dTimEnd": "2015-02-08T23:45:00+01:00", "dTimStart": "2015-02-08T23:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed hatch cover on F-7.\nMeanwhile continued pressure testing penetrator seals in tubing bonnet, tubing bonnet cavity and annulus insert valve.", "dTimEnd": "2015-02-09T00:00:00+01:00", "dTimStart": "2015-02-08T23:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2015_02_10
NO 15/9-F-7
NO 15/9-F-7
name
2015-02-09T00:00:00+01:00
2015-02-10T00:00:00+01:00
normal
2018-05-03T13:53:13+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2015-02-10T00:00:00+01:00", "dTimDiaHoleStart": "2015-02-08T19:45:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "None", "hpht": "0", "md": "1083", "mdCsgLast": "1062", "mdDiaHoleStart": "1083", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "6", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Performed final tests of tubing bonnet after landing TH. ", "tightWell": "0", "tvd": null, "tvdCsgLast": "1056.7", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[]
[]
[]
[ { "comments": "Continued pressure testing cable penetrator seals 69 bar / 10 min, tubing bonnet cavity 69 bar / 10 min and annulus insert valve 69 bar / 10 min.\nMeanwhile performed TBT and installed diverter and master bushings. Set TH RT with pup joint in foxhole, B/O and L/D same. Cleaned and cleared rig floor.\n\n--- END OF OPERATION @ 02:15 ---\nCommisioning to be performed offline", "dTimEnd": "2015-02-09T02:15:00+01:00", "dTimStart": "2015-02-09T00:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2016_07_29
NO 15/9-F-7
NO 15/9-F-7
name
2016-07-28T00:00:00+02:00
2016-07-29T00:00:00+02:00
normal
2018-05-03T13:53:13+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-07-29T00:00:00+02:00", "dTimDiaHoleStart": "2016-07-28T10:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Pull 12 tubing joints\n- Engage spear at surface and RIH to 849m. Leave tubing in well\n- Install EZSV and place balanced cement plug\n- Rig down surface riser and diverter\n- Skid to next well (F-14)", "hpht": "0", "md": "-999.99", "mdCsgLast": "1062", "mdDiaHoleStart": "1", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": "leak off test", "reportNo": "1", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "- Skidded rig to F-7\n- Rigged down surface equipment on wellhead\n- Installed surface riser and diverter\n- Retrieved and L/O TH\n- Pulled tubing", "tightWell": "0", "tvd": null, "tvdCsgLast": "1056.7", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[]
[]
[]
[ { "comments": "Performed TBT for skidding to F-7", "dTimEnd": "2016-07-28T09:15:00+02:00", "dTimStart": "2016-07-28T09:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Finalized skidding checklists. Removed access stairs to cantilever.", "dTimEnd": "2016-07-28T09:30:00+02:00", "dTimStart": "2016-07-28T09:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Skidded rig over well F-7.", "dTimEnd": "2016-07-28T10:30:00+02:00", "dTimStart": "2016-07-28T09:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed access stairs to cantilever.", "dTimEnd": "2016-07-28T10:45:00+02:00", "dTimStart": "2016-07-28T10:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for pulling hatches on F-7.", "dTimEnd": "2016-07-28T11:00:00+02:00", "dTimStart": "2016-07-28T10:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Confirmed no pressure in well. Opened up bleed off valve and ball valve on well head.", "dTimEnd": "2016-07-28T11:30:00+02:00", "dTimStart": "2016-07-28T11:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled hatch.", "dTimEnd": "2016-07-28T11:45:00+02:00", "dTimStart": "2016-07-28T11:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attached lifting arrangement for spool piece to TDS and tuggers using double securing.\nAdjusted lock ring on well head.\n\nPulled spool piece to drill floor and L/O same.", "dTimEnd": "2016-07-28T13:00:00+02:00", "dTimStart": "2016-07-28T11:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed master bushing. Installed hatch cover in moonpool.", "dTimEnd": "2016-07-28T13:15:00+02:00", "dTimStart": "2016-07-28T13:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and prepared seal area on well head.\nMeanwhile: Performed TBT P/U surface riser.", "dTimEnd": "2016-07-28T14:15:00+02:00", "dTimStart": "2016-07-28T13:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U surface riser from cantilever.", "dTimEnd": "2016-07-28T14:45:00+02:00", "dTimStart": "2016-07-28T14:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for running and landing surface riser on WH.", "dTimEnd": "2016-07-28T15:00:00+02:00", "dTimStart": "2016-07-28T14:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed master bushing and hatch cover in moonpool.\nRIH and landed surface riser on NT2 connector.\nPulled 2 ton overpull, confirmed NT2 connector properly latched.", "dTimEnd": "2016-07-28T15:30:00+02:00", "dTimStart": "2016-07-28T15:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed lifting arrangement from TDS.\nInstalled master bushing..\nMeanwhile: Installed \"half moon\" hatch around riser.", "dTimEnd": "2016-07-28T16:00:00+02:00", "dTimStart": "2016-07-28T15:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for diverter handling", "dTimEnd": "2016-07-28T16:15:00+02:00", "dTimStart": "2016-07-28T16:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U diverter from set-back.\nObserved chunks of cement in diverter overshot. Cleaned/washed same.", "dTimEnd": "2016-07-28T17:30:00+02:00", "dTimStart": "2016-07-28T16:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed diverter", "dTimEnd": "2016-07-28T17:45:00+02:00", "dTimStart": "2016-07-28T17:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed lifting arrangement from TDS bails.\nInstalled 5 1/2\" elevator.", "dTimEnd": "2016-07-28T18:15:00+02:00", "dTimStart": "2016-07-28T17:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for BHA handling", "dTimEnd": "2016-07-28T18:30:00+02:00", "dTimStart": "2016-07-28T18:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U Retrieval tool", "dTimEnd": "2016-07-28T18:45:00+02:00", "dTimStart": "2016-07-28T18:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ retrieval tool from surface to 6m.", "dTimEnd": "2016-07-28T19:00:00+02:00", "dTimStart": "2016-07-28T18:45:00+02:00", "md": "6", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT with ongoing crew for continuing RIH with retrieval tool", "dTimEnd": "2016-07-28T19:15:00+02:00", "dTimStart": "2016-07-28T19:00:00+02:00", "md": "6", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ retrieving tool on 5 1/2\" drill pipe to 20m.\nEnganged retrieving tool with 10 turns LH.", "dTimEnd": "2016-07-28T19:30:00+02:00", "dTimStart": "2016-07-28T19:15:00+02:00", "md": "20", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ retrieving tool and completion string on 5 1/2\" DP to 6 m and set slips on 5 1/2\" pup. No overpull observed, up weight 97 ton.", "dTimEnd": "2016-07-28T19:45:00+02:00", "dTimStart": "2016-07-28T19:30:00+02:00", "md": "6", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for rigging up handling equipment and spooling unit for electrical cable to ESP.", "dTimEnd": "2016-07-28T20:00:00+02:00", "dTimStart": "2016-07-28T19:45:00+02:00", "md": "6", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U casing handling equipment and spooling unit.\nNeeded to move pipe from set-back to get enough space for spooling unit.\nBuilt shelter with scaffolding above spool operating panel.", "dTimEnd": "2016-07-28T23:45:00+02:00", "dTimStart": "2016-07-28T20:00:00+02:00", "md": "6", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with tubing hanger and installed FMS slips.", "dTimEnd": "2016-07-29T00:00:00+02:00", "dTimStart": "2016-07-28T23:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2016_07_30
NO 15/9-F-7
NO 15/9-F-7
name
2016-07-29T00:00:00+02:00
2016-07-30T00:00:00+02:00
normal
2018-05-03T13:53:13+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-07-30T00:00:00+02:00", "dTimDiaHoleStart": "2016-07-28T10:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "No upcoming operations on F-7", "hpht": "0", "md": "-999.99", "mdCsgLast": "1062", "mdDiaHoleStart": "1", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "189", "mdStrengthForm": "0", "presTestType": "leak off test", "reportNo": "2", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "- Pulled TH and 290m tubing\n- Set EZSV plug in 13 3/8\" casing\n- Place balanced cement plug\n- Pulled diverter\n- Pulled surface LP riser", "tightWell": "0", "tvd": null, "tvdCsgLast": "1056.7", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[]
[]
[]
[ { "comments": "Continued rigging up FMS slips.", "dTimEnd": "2016-07-29T01:15:00+02:00", "dTimStart": "2016-07-29T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "B/O connection on tubing pup below TH and L/D TH and pup together.", "dTimEnd": "2016-07-29T01:45:00+02:00", "dTimStart": "2016-07-29T01:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for L/O tubing/completion.", "dTimEnd": "2016-07-29T02:00:00+02:00", "dTimStart": "2016-07-29T01:45:00+02:00", "md": "794", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH from 794 mMD to 771 mMD.\nExperienced issues with spooling unit rig-up. Alignment made it problematic to spool in at the same time as pulling out of hole.", "dTimEnd": "2016-07-29T03:00:00+02:00", "dTimStart": "2016-07-29T02:00:00+02:00", "md": "771", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "TOFS: Discussed rig up and red zone compliance. Decided to rig up cable sheave in PRS (2,5m above rotary) in order to minimize amount of work inside red zone.", "dTimEnd": "2016-07-29T03:15:00+02:00", "dTimStart": "2016-07-29T03:00:00+02:00", "md": "771", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Re-arranged rig up by including cable sheave.\nInstalled sheave in PRS and rotated rotary 90 degrees to optimize alignment to spooler unit.", "dTimEnd": "2016-07-29T04:00:00+02:00", "dTimStart": "2016-07-29T03:15:00+02:00", "md": "771", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with tubing from 771 mMD to 579 mMD. Average pulling speed 5,7 jnt/hr.", "dTimEnd": "2016-07-29T07:00:00+02:00", "dTimStart": "2016-07-29T04:00:00+02:00", "md": "579", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT with ongoing crew for L/O tubing", "dTimEnd": "2016-07-29T07:15:00+02:00", "dTimStart": "2016-07-29T07:00:00+02:00", "md": "579", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with tubing from 579 mMD to 528 mMD. Avg. pulling speed 6,6 jnt/hr.", "dTimEnd": "2016-07-29T08:00:00+02:00", "dTimStart": "2016-07-29T07:15:00+02:00", "md": "528", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for rigging down spooling unit and handling equipment.", "dTimEnd": "2016-07-29T08:15:00+02:00", "dTimStart": "2016-07-29T08:00:00+02:00", "md": "528", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D handling equipment, scaffolding and spooing unit.\nChanged inserts in BX elevator, 5 1/2\".", "dTimEnd": "2016-07-29T10:15:00+02:00", "dTimStart": "2016-07-29T08:15:00+02:00", "md": "528", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U spear assy, inspected same and latched spear in tubing at surface.", "dTimEnd": "2016-07-29T10:30:00+02:00", "dTimStart": "2016-07-29T10:15:00+02:00", "md": "528", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed FMS slips and installed master bushing.", "dTimEnd": "2016-07-29T11:00:00+02:00", "dTimStart": "2016-07-29T10:30:00+02:00", "md": "528", "phase": "fixed", "proprietaryCode": "plug abandon -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ tubing on spear and 5 1/2\" DP from 528 m to 864 m . Avg. tripping speed 165 m/hr.", "dTimEnd": "2016-07-29T13:00:00+02:00", "dTimStart": "2016-07-29T11:00:00+02:00", "md": "864", "phase": "fixed", "proprietaryCode": "plug abandon -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Sat down 20 ton and released spear.", "dTimEnd": "2016-07-29T13:15:00+02:00", "dTimStart": "2016-07-29T13:00:00+02:00", "md": "864", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ spear on 5 1/2\" DP from 325 m to surface . Avg. tripping speed 650 m/hr.", "dTimEnd": "2016-07-29T13:45:00+02:00", "dTimStart": "2016-07-29T13:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D spear assy", "dTimEnd": "2016-07-29T14:00:00+02:00", "dTimStart": "2016-07-29T13:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U 13 3/8\" EZSV plug BHA.", "dTimEnd": "2016-07-29T14:45:00+02:00", "dTimStart": "2016-07-29T14:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ EZSV plug on 5 1/2\" DP from surface to 286 mMD. Avg. tripping speed 286 m/hr.", "dTimEnd": "2016-07-29T15:45:00+02:00", "dTimStart": "2016-07-29T14:45:00+02:00", "md": "286", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Washed setting area with 600 lpm between 286 mMD to 292 mMD.\nSet EZSV plug at 289 mMD. Tagged plug with 10 ton.", "dTimEnd": "2016-07-29T16:30:00+02:00", "dTimStart": "2016-07-29T15:45:00+02:00", "md": "292", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Staged up pumps to 2900lpm. Pumped 18m3 SW.\nDisconnected TDS and pulled out 1 std.", "dTimEnd": "2016-07-29T17:00:00+02:00", "dTimStart": "2016-07-29T16:30:00+02:00", "md": "286", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U pump-in sub. Spaced out with stinger at 287 mMD.", "dTimEnd": "2016-07-29T17:15:00+02:00", "dTimStart": "2016-07-29T17:00:00+02:00", "md": "287", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for placing balanced cement plug", "dTimEnd": "2016-07-29T17:30:00+02:00", "dTimStart": "2016-07-29T17:15:00+02:00", "md": "287", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed line test to 100 bar / 2 min. Bled back to 20 bar and confirmed line-up.", "dTimEnd": "2016-07-29T17:45:00+02:00", "dTimStart": "2016-07-29T17:30:00+02:00", "md": "287", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pumped 2 m3 FW from cement unit.\nMixed and pumped 7,8 m3 1,95sg cement slurry at 600lpm / 15 bar.\nDisplaced cement with 2 m3 FW.", "dTimEnd": "2016-07-29T18:30:00+02:00", "dTimStart": "2016-07-29T17:45:00+02:00", "md": "287", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D pump-in sub.", "dTimEnd": "2016-07-29T18:40:00+02:00", "dTimStart": "2016-07-29T18:30:00+02:00", "md": "287", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with EZSV RT from 287 mMD to 170 mMD.\nM/U TDS, installed sponge ball and circulated above TOC. 2500 lpm /12 bar, 50 rpm / 5kNm.", "dTimEnd": "2016-07-29T19:30:00+02:00", "dTimStart": "2016-07-29T18:40:00+02:00", "md": "170", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ EZSV RT on 5 1/2\" DP from 170 mMD to 3 mMD. Avg. tripping speed 640 m/hr.", "dTimEnd": "2016-07-29T19:45:00+02:00", "dTimStart": "2016-07-29T19:30:00+02:00", "md": "170", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D EZSV RT.", "dTimEnd": "2016-07-29T20:00:00+02:00", "dTimStart": "2016-07-29T19:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and cleared drill floor.", "dTimEnd": "2016-07-29T20:15:00+02:00", "dTimStart": "2016-07-29T20:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drained riser, bled off diverter system and prepared to pull diverter.", "dTimEnd": "2016-07-29T21:45:00+02:00", "dTimStart": "2016-07-29T20:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for pulling diverter.", "dTimEnd": "2016-07-29T22:00:00+02:00", "dTimStart": "2016-07-29T21:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled diverter and R/B in set-back.", "dTimEnd": "2016-07-29T22:30:00+02:00", "dTimStart": "2016-07-29T22:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT rigging up to pull LP riser (surface riser).", "dTimEnd": "2016-07-29T22:45:00+02:00", "dTimStart": "2016-07-29T22:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed master bushing and attached lifting arrangement for LP riser.", "dTimEnd": "2016-07-29T23:00:00+02:00", "dTimStart": "2016-07-29T22:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for disconnecting LP riser.", "dTimEnd": "2016-07-29T23:15:00+02:00", "dTimStart": "2016-07-29T23:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attempted to release connector on LP riser. Riser stuck, max overpull 8 ton.", "dTimEnd": "2016-07-29T23:45:00+02:00", "dTimStart": "2016-07-29T23:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Re-attempted to release connector.", "dTimEnd": "2016-07-30T00:00:00+02:00", "dTimStart": "2016-07-29T23:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2016_07_31
NO 15/9-F-7
NO 15/9-F-7
name
2016-07-30T00:00:00+02:00
2016-07-31T00:00:00+02:00
normal
2018-05-03T13:53:13+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-07-31T00:00:00+02:00", "dTimDiaHoleStart": "2016-07-28T10:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "N/A", "hpht": "0", "md": "-999.99", "mdCsgLast": "1062", "mdDiaHoleStart": "1", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "189", "mdStrengthForm": "0", "presTestType": "leak off test", "reportNo": "3", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "- Pulled surface riser\n- Installed hatch", "tightWell": "0", "tvd": null, "tvdCsgLast": "1056.7", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[]
[]
[]
[ { "comments": "Made several attempts to release LP riser connector. Re adjusted release bolts and attempted to move riser by extending/retracting TDS.\n\nConnector came loose after several attempts.", "dTimEnd": "2016-07-30T02:30:00+02:00", "dTimStart": "2016-07-30T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed hatch cover and liftet riser to drill floor and L/D same.", "dTimEnd": "2016-07-30T03:30:00+02:00", "dTimStart": "2016-07-30T02:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged down lifting arrangement.\nInstalled hatch plate on F-7.\n************** End of report ***************", "dTimEnd": "2016-07-30T04:15:00+02:00", "dTimStart": "2016-07-30T03:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2016_10_23
NO 15/9-F-7
NO 15/9-F-7
name
2016-10-22T00:00:00+02:00
2016-10-23T00:00:00+02:00
normal
2018-05-03T13:53:13+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-10-23T00:00:00+02:00", "dTimDiaHoleStart": "2016-07-28T10:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Cut riser on well F-9 A\n- Pull and cut riser on F-9 A\n- Clean and clear WH decks and drill floor\n- Install hatches.", "hpht": "0", "md": "-999.99", "mdCsgLast": "1062", "mdDiaHoleStart": "1", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": null, "presTestType": "leak off test", "reportNo": "4", "ropCurrent": "-999.99", "strengthForm": null, "sum24Hr": "- Skidded to F-7\n- RIH with inner string\n- R/D tension cylinders and cut riser at 134,5m\n- Pulled riser\n- Lifted tension cylinders from WH deck to drill floor\n- Skidded to F-9 A", "tightWell": "0", "tvd": null, "tvdCsgLast": "1056.7", "tvdStrengthForm": null, "waterDepth": "91", "wellheadElevation": "139.8" } ]
[]
[]
[]
[ { "comments": "Prepared for skidding. Completed pre-skid checklists.", "dTimEnd": "2016-10-22T00:15:00+02:00", "dTimStart": "2016-10-22T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for skidding rig to F-7", "dTimEnd": "2016-10-22T00:30:00+02:00", "dTimStart": "2016-10-22T00:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Skidded cantilever to well F-7.", "dTimEnd": "2016-10-22T00:45:00+02:00", "dTimStart": "2016-10-22T00:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed hatch in moonpool and built scaffolding in moonpool and WH decks.\nMeanwhile: Performed post-skid checks.", "dTimEnd": "2016-10-22T01:30:00+02:00", "dTimStart": "2016-10-22T00:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "PRS roller stuck on FWD PRS, troubleshot same.", "dTimEnd": "2016-10-22T02:00:00+02:00", "dTimStart": "2016-10-22T01:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with cutter BHA into wellhead.\nIssue with stuck roller on FWD PRS re-appeared.\nDecided to L/O Multibowl RT to free AFT PRS", "dTimEnd": "2016-10-22T02:30:00+02:00", "dTimStart": "2016-10-22T02:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with Multibowl RT.\nB/O and L/O 3 x pup 5 1/2\" DP pups and singles (entire Multibowl RT BHA).", "dTimEnd": "2016-10-22T03:45:00+02:00", "dTimStart": "2016-10-22T02:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U 2 std 5 1/2\" DP and spear assy.\nRIH and M/U TDS. Engaged spear in riser.\nPulled 20 ton overpull to confirm spear engaged.", "dTimEnd": "2016-10-22T05:00:00+02:00", "dTimStart": "2016-10-22T03:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Load shifted weight from tension system to TDS.\nR/D tension cylinders.", "dTimEnd": "2016-10-22T07:00:00+02:00", "dTimStart": "2016-10-22T05:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT with ongoing crew", "dTimEnd": "2016-10-22T07:15:00+02:00", "dTimStart": "2016-10-22T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed diverter (\"Stikhætta\") on Multibowl. R/U hose for return flow.\nRemoved boat collision stool.", "dTimEnd": "2016-10-22T08:45:00+02:00", "dTimStart": "2016-10-22T07:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled 30 ton over pull. Staged up flow rate to 2400 lpm / 95 bar.\nCut riser at 134,5m.", "dTimEnd": "2016-10-22T09:00:00+02:00", "dTimStart": "2016-10-22T08:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged down \"Stikhætta\" and hose.", "dTimEnd": "2016-10-22T09:30:00+02:00", "dTimStart": "2016-10-22T09:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled riser and inner string to drill floor.\nR/U C-plate and landed off riser.", "dTimEnd": "2016-10-22T10:15:00+02:00", "dTimStart": "2016-10-22T09:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U false rotary and POOH with inner string, R/B same.", "dTimEnd": "2016-10-22T11:15:00+02:00", "dTimStart": "2016-10-22T10:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U spear assy and engaged in riser.\nChanged out C-plate. Installed elevator and landed riser.\nReleased spear and R/B.\nRemoved BX-elevator and link tilt pins.\nPOOH with riser (Lift #1), cleaned off marine growth on centralizer deck.", "dTimEnd": "2016-10-22T13:30:00+02:00", "dTimStart": "2016-10-22T11:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U cutting machine.\nCut riser. Significant wave height 1,4m\nR/D cutting machine.", "dTimEnd": "2016-10-22T15:15:00+02:00", "dTimStart": "2016-10-22T13:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/O tensioner joint and WH.\nInstalled link tilt pins.", "dTimEnd": "2016-10-22T16:30:00+02:00", "dTimStart": "2016-10-22T15:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled riser (Lift #2), cleaned off marine growth on centralizer deck.", "dTimEnd": "2016-10-22T17:00:00+02:00", "dTimStart": "2016-10-22T16:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U cutting machine\nCut riser. Significant wave height 1,3m\nR/D cutting machine", "dTimEnd": "2016-10-22T17:30:00+02:00", "dTimStart": "2016-10-22T17:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/O riser joint (Lift #2).\nPulled riser (Lift #3), cleaned off marine growth at centralizer deck.", "dTimEnd": "2016-10-22T18:00:00+02:00", "dTimStart": "2016-10-22T17:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U cutting machine\nCut riser. Significant wave height 1,6m\nR/D cutting machine", "dTimEnd": "2016-10-22T18:30:00+02:00", "dTimStart": "2016-10-22T18:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/O riser joint (Lift #3).\nPulled riser (Lift #4), cleaned off marine growth at centralizer deck.\nRiser out of splash zone at 19:15", "dTimEnd": "2016-10-22T19:15:00+02:00", "dTimStart": "2016-10-22T18:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U cutting machine\nCut riser.\nR/D cutting machine", "dTimEnd": "2016-10-22T19:45:00+02:00", "dTimStart": "2016-10-22T19:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/O riser joint (Lift #4).\nPulled riser (Lift #5), cleaned off marine growth at centralizer deck.", "dTimEnd": "2016-10-22T20:15:00+02:00", "dTimStart": "2016-10-22T19:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U cutting machine\nCut riser.\nR/D cutting machine", "dTimEnd": "2016-10-22T20:45:00+02:00", "dTimStart": "2016-10-22T20:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/O riser joint (Lift #5).\nPulled riser (Lift #6), cleaned off marine growth at centralizer deck.", "dTimEnd": "2016-10-22T21:15:00+02:00", "dTimStart": "2016-10-22T20:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U cutting machine\nCut riser.\nR/D cutting machine", "dTimEnd": "2016-10-22T21:45:00+02:00", "dTimStart": "2016-10-22T21:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/O riser joint (Lift #6).\nPulled riser (Lift #7).\nL/O stress joint and lower pup joint.", "dTimEnd": "2016-10-22T22:30:00+02:00", "dTimStart": "2016-10-22T21:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and cleared drill floor", "dTimEnd": "2016-10-22T22:45:00+02:00", "dTimStart": "2016-10-22T22:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for lifting tension cylinders from WH deck to drill floor.", "dTimEnd": "2016-10-22T23:00:00+02:00", "dTimStart": "2016-10-22T22:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted 8 ea tension cylinders from WH deck to drill floor.", "dTimEnd": "2016-10-23T00:00:00+02:00", "dTimStart": "2016-10-22T23:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_7_2016_10_24
NO 15/9-F-7
NO 15/9-F-7
name
2016-10-23T00:00:00+02:00
2016-10-24T00:00:00+02:00
normal
2018-05-03T13:53:13+02:00
{ "name": "15/9-F-7", "namingSystem": "NPD code" }
[ { "name": "15/9-F-7", "namingSystem": "NPD code" }, { "name": "5610", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-05-01T00:00:00+02:00", "dateDrillComplete": "2007-10-04", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-10-24T00:00:00+02:00", "dTimDiaHoleStart": "2016-07-28T10:45:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "None", "hpht": "0", "md": "-999.99", "mdCsgLast": "1062", "mdDiaHoleStart": "1", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": null, "presTestType": "leak off test", "reportNo": "5", "ropCurrent": "-999.99", "strengthForm": null, "sum24Hr": "- Installed hatches", "tightWell": "0", "tvd": null, "tvdCsgLast": "1056.7", "tvdStrengthForm": null, "waterDepth": "91", "wellheadElevation": "139.8" } ]
[]
[]
[]
[ { "comments": "Continued lifting remaining 8 ea cylinders from WH to drill floor.\nRemoved scafflding in moonpool and WH decks.", "dTimEnd": "2016-10-23T01:00:00+02:00", "dTimStart": "2016-10-23T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed hatches in moonpool and WH decks\n\n**** END OF REPORT ****", "dTimEnd": "2016-10-23T01:45:00+02:00", "dTimStart": "2016-10-23T01:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_2007_11_29
NO 15/9-F-9
NO 15/9-F-9
name
2007-11-28T00:00:00+01:00
2007-11-29T00:00:00+01:00
normal
2018-05-03T13:53:13+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-11-29T00:00:00+01:00", "dTimDiaHoleStart": "2007-11-28T13:45:00+01:00", "diaHole": "36", "diaPilot": null, "distDrill": "66", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Lay out 36\" hole opener. Rig up for running 30\" conductor. Run conductor. Run cement stinger inside conductor. RIH on landing string and land conductor at 226 m MD. Verify conductor datum. Cement coductor. Wait on cement to set up.", "hpht": "0", "md": "210", "mdCsgLast": null, "mdDiaHoleStart": "150", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "1", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Made up and RIH with 36\" hole opener BHA. Drilled 36\" x 26\" x 17 1/2\" hole from 144 m to 226 m MD. Circulated well clean and displaced to 1,40 sg WBM. POOH with 36\" hole opener BHA to 50 m MD.", "tightWell": "0", "tvd": "210", "tvdCsgLast": null, "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-11-28T15:00:00+01:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "160", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "110", "yp": "-999.99" }, { "dTim": "2007-11-28T21:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "192", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Seawater", "visFunnel": "-999.99", "yp": "-999.99" }, { "dTim": "2007-11-28T21:59:00+01:00", "density": "1.4", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "198", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "125", "yp": "-999.99" } ]
[ { "dTim": "2007-11-29T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "226", "readingKind": "estimated" } ]
[ { "azi": "-999.99", "dTim": "2007-11-29T00:00:00+01:00", "incl": ".56", "md": "149.6", "tvd": "149.6" }, { "azi": "-999.99", "dTim": "2007-11-29T00:00:00+01:00", "incl": ".59", "md": "161.2", "tvd": "161.2" }, { "azi": "-999.99", "dTim": "2007-11-29T00:00:00+01:00", "incl": ".44", "md": "170.1", "tvd": "170.1" }, { "azi": "-999.99", "dTim": "2007-11-29T00:00:00+01:00", "incl": ".47", "md": "179.1", "tvd": "179.1" }, { "azi": "-999.99", "dTim": "2007-11-29T00:00:00+01:00", "incl": ".61", "md": "190.1", "tvd": "190.1" }, { "azi": "-999.99", "dTim": "2007-11-29T00:00:00+01:00", "incl": ".48", "md": "199.5", "tvd": "199.5" }, { "azi": "-999.99", "dTim": "2007-11-29T00:00:00+01:00", "incl": ".44", "md": "210.7", "tvd": "210.7" } ]
[ { "comments": "Performed toolbox. Removed hatches and fenced off all levels in WH module. Picked up and hung off 36\" hole opener.", "dTimEnd": "2007-11-28T07:45:00+01:00", "dTimStart": "2007-11-28T06:30:00+01:00", "md": "8", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up powerpulse and drilcollar. RIH with 36\" hole opener from 8 m to 50 m MD. Observed leakage on elevator.", "dTimEnd": "2007-11-28T09:00:00+01:00", "dTimStart": "2007-11-28T07:45:00+01:00", "md": "50", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed leaking fitting on DP elevator.", "dTimEnd": "2007-11-28T09:15:00+01:00", "dTimStart": "2007-11-28T09:00:00+01:00", "md": "50", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "RIH with 36\" holeopener BHA from 50 m to 140 m MD.", "dTimEnd": "2007-11-28T12:00:00+01:00", "dTimStart": "2007-11-28T09:15:00+01:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Stabbed 36\" hole opener BHA into F-9 funnel assisted by ROV.", "dTimEnd": "2007-11-28T12:15:00+01:00", "dTimStart": "2007-11-28T12:00:00+01:00", "md": "144", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Started washing and rotation with 900 lpm / 40 rpm. Tagged seabed at 144,3 m MD with 5 MT WOB. Washed and rotated down to 150 m MD with reduced parameters : Flow 900 lpm / Rotation 40 rpm / WOB 0,3 MT / Torque 6-14 kNm. ROV observed drill guide bushing landing in guide funnel.", "dTimEnd": "2007-11-28T13:45:00+01:00", "dTimStart": "2007-11-28T12:15:00+01:00", "md": "150", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled 36\" hole section from 150 m to 165 m MD. Drilling parameters : Flow 2700 lpm / Rotation 70 rpm / WOB 2 MT / Torque 12-25 kNm. Performed survey, inclination 1,12 deg.", "dTimEnd": "2007-11-28T16:15:00+01:00", "dTimStart": "2007-11-28T13:45:00+01:00", "md": "165", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Reamed drilled section in order to redcue inclination. Observed excessive rattling in drillstring between 159 m and 161 m MD. Performed survey, inclination 0,56 deg. Observed hydraulic leak on TDS.", "dTimEnd": "2007-11-28T17:15:00+01:00", "dTimStart": "2007-11-28T16:15:00+01:00", "md": "165", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Repaired leaking fitting on TDS. Meanwhile pumped 10 m3 hi-vis.", "dTimEnd": "2007-11-28T17:30:00+01:00", "dTimStart": "2007-11-28T17:15:00+01:00", "md": "165", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Drilled 36\" hole section from 165 m to 210 m MD. Drilling parameters : Flow 2700-4400 lpm / SPP 70 bar / Rotation 90 rpm / WOB 2-3 MT / Torque 5-14 kNm. Performed survey every 10 m drilled. Swept hole with 20 m3 hi-vis before connections.", "dTimEnd": "2007-11-29T00:00:00+01:00", "dTimStart": "2007-11-28T17:30:00+01:00", "md": "210", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" } ]
[]