docName
stringlengths
19
23
nameWell
stringclasses
23 values
nameWellbore
stringclasses
26 values
name
stringclasses
1 value
dTimStart
stringlengths
25
25
dTimEnd
stringlengths
25
25
versionKind
stringclasses
1 value
createDate
stringclasses
183 values
wellAlias
dict
wellboreAlias
listlengths
2
2
wellboreInfo
listlengths
1
1
statusInfo
listlengths
1
1
fluid
listlengths
0
6
porePressure
listlengths
0
6
surveyStation
listlengths
0
46
activity
listlengths
0
49
lithShowInfo
listlengths
0
7
15_9_F_9_2007_11_30
NO 15/9-F-9
NO 15/9-F-9
name
2007-11-29T00:00:00+01:00
2007-11-30T00:00:00+01:00
normal
2018-05-03T13:53:13+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-11-30T00:00:00+01:00", "dTimDiaHoleStart": "2007-11-28T13:45:00+01:00", "diaHole": "36", "diaPilot": null, "distDrill": "16", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Cement 30\" conductor. WOC. Release CART and POOH with landing string. Skid rig to slot F-1.", "hpht": "0", "md": "226", "mdCsgLast": "220.8", "mdDiaHoleStart": "150", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "2", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Racked back BHA and laid out holeopener. Rigged up conductor running equipment. Ran 30\" conductor with cementing innerstring. Landed conductor and checked elavation. Installed cement stand and adjusted elevation. Tested cement line.", "tightWell": "0", "tvd": "226", "tvdCsgLast": "220.8", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-11-29T23:00:00+01:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "117", "yp": "-999.99" } ]
[ { "dTim": "2007-11-30T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "226", "readingKind": "estimated" } ]
[]
[ { "comments": "Drilled 36\" hole section from 210 m to 17 1/2\" TD at 226 m MD. 36\" hole section TD 223 m MD. Drilling parameters : Flow 4400 lpm / SPP 72 bar / Rotation 90 rpm / WOB 0-3 MT / Torque 2-9 kNm. Performed survey every 10 m drilled. Final survey at 226 m MD 0,44 deg.", "dTimEnd": "2007-11-29T01:45:00+01:00", "dTimStart": "2007-11-29T00:00:00+01:00", "md": "226", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Circulated 1,5 times bottoms up while reaming hole with 10 rpm. Swept hole with 25 m3 hi-vis at 4400 lpm. Displaced hole from seawater to 80 m3 1,40 sg WBM pumping at 4400 lpm.", "dTimEnd": "2007-11-29T02:30:00+01:00", "dTimStart": "2007-11-29T01:45:00+01:00", "md": "226", "phase": "fixed", "proprietaryCode": "drilling -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH wirh 36\" hole opener BHA from 226 m to 151 m MD. Meanwhile got ROV in position to observe BHA. Topped up hole with 10 m3 1,40 WBM.", "dTimEnd": "2007-11-29T03:30:00+01:00", "dTimStart": "2007-11-29T02:30:00+01:00", "md": "151", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled 36\" hole opener BHA through funnel while observing with ROV. Observed 8 MT overpull when 36\" bit section was pulled through the guide funnel.", "dTimEnd": "2007-11-29T03:45:00+01:00", "dTimStart": "2007-11-29T03:30:00+01:00", "md": "123", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed FG check of derrick and TDS. Meanwhile troubleshot standjump function on TDS.", "dTimEnd": "2007-11-29T04:45:00+01:00", "dTimStart": "2007-11-29T03:45:00+01:00", "md": "123", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Checked dies on PRS for handling BHA. Continued to POOH with 36\" hole opener BHA from 123 m to 50 m MD. Racked back drillcollars in derrick.", "dTimEnd": "2007-11-29T06:00:00+01:00", "dTimStart": "2007-11-29T04:45:00+01:00", "md": "50", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Racked back drillcollars in derrick.", "dTimEnd": "2007-11-29T07:00:00+01:00", "dTimStart": "2007-11-29T06:00:00+01:00", "md": "37", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior to racking MWD and laying out 36\" holeopener.", "dTimEnd": "2007-11-29T07:15:00+01:00", "dTimStart": "2007-11-29T07:00:00+01:00", "md": "37", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke out and racked back stand of DC/powerpulse MWD. Laid out 36\" x26\" x 17 1/2\" holeopener on deck. Cleared and tidied drillfloor.", "dTimEnd": "2007-11-29T08:15:00+01:00", "dTimStart": "2007-11-29T07:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior to rigging conductor running equipment.", "dTimEnd": "2007-11-29T08:30:00+01:00", "dTimStart": "2007-11-29T08:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed elevator and drilling bails. Installed conductor bails and elevator. Transferred slips, bowl and dogcollars to drillfloor.", "dTimEnd": "2007-11-29T10:00:00+01:00", "dTimStart": "2007-11-29T08:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Took timeout with crews to go through lessons learnt from recent conductor running incident onboard and West Epsilon incident.", "dTimEnd": "2007-11-29T10:30:00+01:00", "dTimStart": "2007-11-29T10:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior to running 30\" conductor.", "dTimEnd": "2007-11-29T10:45:00+01:00", "dTimStart": "2007-11-29T10:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up shoe joint. Had problems latching elevator due to weldings on joint. Installed casing inserts in RT.", "dTimEnd": "2007-11-29T12:15:00+01:00", "dTimStart": "2007-11-29T10:45:00+01:00", "md": "6", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran 30\" conductor from surface to 68 m MD. Tested float for flowthrough- ok.", "dTimEnd": "2007-11-29T16:00:00+01:00", "dTimStart": "2007-11-29T12:15:00+01:00", "md": "68", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk before changing handling equipment.", "dTimEnd": "2007-11-29T16:15:00+01:00", "dTimStart": "2007-11-29T16:00:00+01:00", "md": "68", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed conductor bails and elevator. Installed DP bails and elevator. Prepared casing tongs.", "dTimEnd": "2007-11-29T16:30:00+01:00", "dTimStart": "2007-11-29T16:15:00+01:00", "md": "68", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up 30\" conductor housing. Made up conductor housing to conductor, applied 33000 ft lbs m/u torque. Ran in with conductor to 90 m MD. Installed C-plate in rotary and landed conductor housing in same. Removed handling CART. Filled conductor with 12 m3 seawater.", "dTimEnd": "2007-11-29T20:30:00+01:00", "dTimStart": "2007-11-29T16:30:00+01:00", "md": "90", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed C-plate on top of conductor housing. Ran 7 ea 4 3/4\" aluminium innerstring joints inside conductor. Installed centralizer on joint #2. Cleared riggfloor. Picked up running CART and made up innerstring x-over. Made up CART to innerstring. Made up CART to conductor housing with 5 lefthand turns according to Vetco instruction. Installed iInclinometer and valve handle on CART. Readings on inclinometer : pitch 0,2-0,3 / roll 0,10-0,25", "dTimEnd": "2007-11-29T23:00:00+01:00", "dTimStart": "2007-11-29T20:30:00+01:00", "md": "90", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed masterbushing. RIH with 30\" conductor on dedicated landing string to 108 m MD. Attached sling to DP before lowering housing through Centralizer deck. Pulled condutor to oposite side of fillup valve/inclinometer and lowered conductor through deck in one continuous stroke.", "dTimEnd": "2007-11-30T00:00:00+01:00", "dTimStart": "2007-11-29T23:00:00+01:00", "md": "108", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_2007_12_01
NO 15/9-F-9
NO 15/9-F-9
name
2007-11-30T00:00:00+01:00
2007-12-01T00:00:00+01:00
normal
2018-05-03T13:53:13+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-12-01T00:00:00+01:00", "dTimDiaHoleStart": "2007-11-28T13:45:00+01:00", "diaHole": "36", "diaPilot": null, "distDrill": "0", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "n/a", "hpht": "0", "md": "226", "mdCsgLast": "220.8", "mdDiaHoleStart": "150", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "217", "mdStrengthForm": "0", "presTestType": null, "reportNo": "3", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Operated conductor centralizer pistons. Circulated well to seawater. Mixed and pumped 54 m3 cement and displaced with 6,5 m3 seawater. WOC. Made measurements on conductor. Released CART. Retrieved CART and innerstring. Installed hatches and prepared for skidding to F-1.", "tightWell": "0", "tvd": "226", "tvdCsgLast": "220.8", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-11-30T23:00:00+01:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": null, "md": "-999.99", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "115", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Ran in with 30\" conductor on dedicated landing string to 132 m MD. Filled conductor with 20 m2 seawater until returns thorugh shoe observed. Hookload after filling 109 MT.", "dTimEnd": "2007-11-30T01:30:00+01:00", "dTimStart": "2007-11-30T00:00:00+01:00", "md": "132", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Stung 30\" conductor into funnel on F-9 while observing with ROV.", "dTimEnd": "2007-11-30T02:00:00+01:00", "dTimStart": "2007-11-30T01:30:00+01:00", "md": "148", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in with 30\" conductor from 148 m to 221 m MD, only minor drag in hole. Observed 112,88 m mark on landing string flush with machined ring on Centralizer deck. Meanwhile deployed hotstab line on tugger wire.", "dTimEnd": "2007-11-30T03:00:00+01:00", "dTimStart": "2007-11-30T02:00:00+01:00", "md": "221", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up and made up cement stand. Accidentally applied torque on TDS and put 2,5 turns righthand rotations on string. Inspected CART with ROV and backed CART in again using lefthand turns in rotary table. Performed digiquartz measurement on F-7 and F-9 indicating F-9 12 cm too high.", "dTimEnd": "2007-11-30T04:00:00+01:00", "dTimStart": "2007-11-30T03:00:00+01:00", "md": "221", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up cement hose to side entry sub. Adjusted height on F-9 conductor 10 cm down. Repeated elevation check on conductor housing by doing consecutive measurement on F-9 and F-7. Measured F-9 elevation 3 mm higher that F-7 - ok. Bad visiblity for establishing hotstab on template.", "dTimEnd": "2007-11-30T05:00:00+01:00", "dTimStart": "2007-11-30T04:00:00+01:00", "md": "221", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Poor visiblity on template base for establishing hotstab. Meanwhile tested cement line against lo-torque on side entry sub to 200 bar 10 min - ok. Made readings on inclinometer : pitch 1,3 deg / roll 0,3 deg.", "dTimEnd": "2007-11-30T06:00:00+01:00", "dTimStart": "2007-11-30T05:00:00+01:00", "md": "221", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited for visiblity to improve for engaging hotstab.", "dTimEnd": "2007-11-30T07:00:00+01:00", "dTimStart": "2007-11-30T06:00:00+01:00", "md": "221", "phase": "fixed", "proprietaryCode": "drilling -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed dummy stab and installed hotstab in bank #4 on template base. Shifted lever to \"on\". Energized centralizing pistons with 2000 psi and observed travel on pistons with ROV. Made readings on inclinometer : pitch 1,27 deg / roll 0,3 deg.", "dTimEnd": "2007-11-30T08:15:00+01:00", "dTimStart": "2007-11-30T07:00:00+01:00", "md": "221", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke circulation and verified conductor full of water by observing return through fillup valve. Closed fillup valve with ROV. Hookload before circulating 87 MT.", "dTimEnd": "2007-11-30T08:30:00+01:00", "dTimStart": "2007-11-30T08:15:00+01:00", "md": "221", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Stepped pumps up to 1500 lpm and circulated 50 m3 seawater. Poor visiblity, assumed to be caused by returns from hole. Meanwhile performed prejob meeting prior to cementing. Hookload after circulating 97 MT.", "dTimEnd": "2007-11-30T09:30:00+01:00", "dTimStart": "2007-11-30T08:30:00+01:00", "md": "221", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed cement job. Mixed and pumped 54 m3 1,52 sg tuned light cement slurry from cement unit. Pump rate 650-750 lpm. Pump pressure 22 bar. Displaced cement with 6,5 m3 seawater to put theoretical TOC at 217 m MD inside conductor. Bad visiblity due to no current, hard to judge amount of returns from hole. Hookload after cementing 97 MT.", "dTimEnd": "2007-11-30T10:45:00+01:00", "dTimStart": "2007-11-30T09:30:00+01:00", "md": "221", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged down cement line and flushed through manifold.", "dTimEnd": "2007-11-30T11:15:00+01:00", "dTimStart": "2007-11-30T10:45:00+01:00", "md": "221", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited for cement to set up. \n\nMeanwhile :\n-Serviced TDS\n-Serviced fwd and aft PRS\n-Changed annular element\n-Housekeeping, cleaning and maintenance on drillfloor\n", "dTimEnd": "2007-11-30T21:00:00+01:00", "dTimStart": "2007-11-30T11:15:00+01:00", "md": "221", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on cement to set up.\n\nMeanwhile :\n-Made x-y measurements on conductor relative to funnel 36 cm/36 cm\n-Shifted bank #4 handle to \"off\" and disengaged centralizer cylinders with 2000 psi through minireel\n-Retrieved hotstab and guidewire\n-Removed lo-torque on cement stand\n-Performed toolbox talk prior to releasing CART", "dTimEnd": "2007-11-30T23:30:00+01:00", "dTimStart": "2007-11-30T21:00:00+01:00", "md": "221", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Slacked off 11 MT to obtain neutral at CART. Released CART by 5 righthand rotations. Lifted out CART from conductor housing and set slips on landing string.", "dTimEnd": "2007-12-01T00:00:00+01:00", "dTimStart": "2007-11-30T23:30:00+01:00", "md": "221", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_2007_12_02
NO 15/9-F-9
NO 15/9-F-9
name
2007-12-01T00:00:00+01:00
2007-12-02T00:00:00+01:00
normal
2018-05-03T13:53:14+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-12-02T00:00:00+01:00", "dTimDiaHoleStart": "2007-11-28T13:45:00+01:00", "diaHole": "36", "diaPilot": null, "distDrill": "0", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "None", "hpht": "0", "md": "226", "mdCsgLast": "220.8", "mdDiaHoleStart": "150", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "217", "mdStrengthForm": "0", "presTestType": null, "reportNo": "4", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "None", "tightWell": "0", "tvd": "226", "tvdCsgLast": "220.8", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[]
[]
[]
[ { "comments": "Broke out and racked back cement stand. Pumped 2 ea sponge balls at 2200 lpm to clean string.", "dTimEnd": "2007-12-01T00:45:00+01:00", "dTimStart": "2007-12-01T00:00:00+01:00", "md": "219", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke out an set back running CART. Pulled 4 3/4\" aluminium inner string using tugger, C-plate and clamps. Meanwhile made digiquartz measurement of conductor housing elevation with ROV. F-9 24 mm lower than F-7.\n", "dTimEnd": "2007-12-01T03:30:00+01:00", "dTimStart": "2007-12-01T00:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed hatches in wellhead module and removed barriers. Installed hatch in moonpool. Prepared for skidding to F-1. Meanwhile installed dummy stab in bank#4 with ROV.\n\n****Operations transferred to 15/9-F-1****", "dTimEnd": "2007-12-01T04:30:00+01:00", "dTimStart": "2007-12-01T03:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_2007_12_13
NO 15/9-F-9
NO 15/9-F-9
name
2007-12-12T00:00:00+01:00
2007-12-13T00:00:00+01:00
normal
2018-05-03T13:53:14+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-12-13T00:00:00+01:00", "dTimDiaHoleStart": "2007-12-12T21:00:00+01:00", "diaHole": "17.5", "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Drill 17 1/2\" hole from 229 m to 600 m MD.", "hpht": "0", "md": "226", "mdCsgLast": "220.8", "mdDiaHoleStart": "226", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "5", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Removed scaffolding below centralizer deck. MU and RIH with 17 1/2\" BHA. Drilled out 30\" shoe and cleaned out rathole. Repaired hydraulic leak in TDS.", "tightWell": "0", "tvd": "226", "tvdCsgLast": "220.8", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-12-12T21:00:00+01:00", "density": "1.4", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "215", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "103", "yp": "-999.99" }, { "dTim": "2007-12-12T21:01:00+01:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "215", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "120", "yp": "-999.99" } ]
[ { "dTim": "2007-12-13T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "226", "readingKind": "estimated" } ]
[]
[ { "comments": "Removed hatch on F-9 and installed hatch on F-14 in wellhead module. Meanwhile carried out pre-skidding checklist. Held toolbox talk prior to skidding rig from F-14 to F-9. Skidded rig 1.5 m port.", "dTimEnd": "2007-12-12T03:00:00+01:00", "dTimStart": "2007-12-12T00:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleared drilling areas and checked FWD PRS. Checked that all decks were in alignment. Rearranged hatches on F-14 and F-9.", "dTimEnd": "2007-12-12T04:15:00+01:00", "dTimStart": "2007-12-12T03:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Sent down and installed cover on funnel and moved funnel to F-9. Meanwhile picked up bit assembly and inspected same. Serviced TDS. Discovered that part of scaffolding below centralizer deck on WH module have to be removed for 17 1/2\" BHA to pass on F-9.", "dTimEnd": "2007-12-12T06:00:00+01:00", "dTimStart": "2007-12-12T04:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on daylight for close standby to be able to remove scaffolding below centralizer deck in WH module.\n\nMeanwhile performed torque test on TDS and serviced equipment on drillfloor.", "dTimEnd": "2007-12-12T10:00:00+01:00", "dTimStart": "2007-12-12T06:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed scaffolding from below centralizer deck in WH module.", "dTimEnd": "2007-12-12T12:30:00+01:00", "dTimStart": "2007-12-12T10:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "PU and MU 17 1/2\" bit, motor, 17 1/4\" stab and GWD. RIH with 17 1/2\" BHA to 23 m.", "dTimEnd": "2007-12-12T14:00:00+01:00", "dTimStart": "2007-12-12T12:30:00+01:00", "md": "23", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to remove scaffolding below centralizer deck in WH module.", "dTimEnd": "2007-12-12T15:00:00+01:00", "dTimStart": "2007-12-12T14:00:00+01:00", "md": "23", "phase": "fixed", "proprietaryCode": "drilling -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "MU and RIH with 17 1/2\" BHA from 23 m to 156 m. Sat UHBO sleeve to high side scribe line. Stabbed into CTS on top of conductor housing while observing with ROV.", "dTimEnd": "2007-12-12T19:00:00+01:00", "dTimStart": "2007-12-12T15:00:00+01:00", "md": "156", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk with new crew. Inspected PRS dies and tested mud pump #1 using controls from drillers remote panel.", "dTimEnd": "2007-12-12T20:00:00+01:00", "dTimStart": "2007-12-12T19:00:00+01:00", "md": "156", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued RIH from 156 m to 196 m. Washed down from 196 m with 2000 lpm / 51 bar / 20 RPM. Tagged cement at 217.8 m. Connected CTS hose to ROV and started pumping with dredge pump.", "dTimEnd": "2007-12-12T21:00:00+01:00", "dTimStart": "2007-12-12T20:00:00+01:00", "md": "217", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled out 30\" shoe and rathole from 217 m to 226 m MD. Drilling parameters : Flow 3500 lpm / SPP 122 bar / Rotation 40 rpm / Torque 1-3 kNm / WOB 0-1 MT. Reamed back inside shoe for every 2 m drilled. Pumped 10 m3 his-vis sweep as required to clean the hole.\t\t\t\n", "dTimEnd": "2007-12-13T00:00:00+01:00", "dTimStart": "2007-12-12T21:00:00+01:00", "md": "226", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_2007_12_14
NO 15/9-F-9
NO 15/9-F-9
name
2007-12-13T00:00:00+01:00
2007-12-14T00:00:00+01:00
normal
2018-05-03T13:53:14+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-12-14T00:00:00+01:00", "dTimDiaHoleStart": "2007-12-12T21:00:00+01:00", "diaHole": "17.5", "diaPilot": null, "distDrill": "426", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Drill 17 1/2\" section to TD at 920 m. Circulate well clean. Displace open hole and conductor to 1.40 sg bentonite mud. POOH and RB 17 1/2\" BHA. RU for running 20 x 13 3/8\" csg. Start MU and run 20 x 13 3/8\" csg.", "hpht": "0", "md": "652", "mdCsgLast": "220.8", "mdDiaHoleStart": "226", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "6", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Drilled 17 1/2\" section from 229 m to 784 m MD using SW and hi-vis pills.", "tightWell": "0", "tvd": "651.6", "tvdCsgLast": "220.8", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-12-13T21:01:00+01:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "215", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "130", "yp": "-999.99" }, { "dTim": "2007-12-13T21:00:00+01:00", "density": "1.4", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "215", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "121", "yp": "-999.99" } ]
[ { "dTim": "2007-12-14T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "652", "readingKind": "estimated" } ]
[ { "azi": "197.21", "dTim": "2007-12-14T00:00:00+01:00", "incl": ".26", "md": "218.5", "tvd": "218.5" }, { "azi": "255.31", "dTim": "2007-12-14T00:00:00+01:00", "incl": ".18", "md": "259", "tvd": "259" }, { "azi": "240.89", "dTim": "2007-12-14T00:00:00+01:00", "incl": ".35", "md": "299.5", "tvd": "299.5" }, { "azi": "34.96", "dTim": "2007-12-14T00:00:00+01:00", "incl": ".44", "md": "340", "tvd": "340" }, { "azi": "344.16", "dTim": "2007-12-14T00:00:00+01:00", "incl": ".35", "md": "380.1", "tvd": "380.1" }, { "azi": "352.69", "dTim": "2007-12-14T00:00:00+01:00", "incl": ".35", "md": "420.4", "tvd": "420.4" }, { "azi": "35.05", "dTim": "2007-12-14T00:00:00+01:00", "incl": ".35", "md": "460.6", "tvd": "460.6" }, { "azi": "36.99", "dTim": "2007-12-14T00:00:00+01:00", "incl": ".35", "md": "500.8", "tvd": "500.8" }, { "azi": "101.32", "dTim": "2007-12-14T00:00:00+01:00", "incl": "2.9", "md": "540.9", "tvd": "540.9" }, { "azi": "101.23", "dTim": "2007-12-14T00:00:00+01:00", "incl": "3.87", "md": "580.4", "tvd": "580.3" }, { "azi": "89.02", "dTim": "2007-12-14T00:00:00+01:00", "incl": "7.13", "md": "661.5", "tvd": "661" }, { "azi": "83.48", "dTim": "2007-12-14T00:00:00+01:00", "incl": "8.71", "md": "701.8", "tvd": "700.9" }, { "azi": "82.34", "dTim": "2007-12-14T00:00:00+01:00", "incl": "11.7", "md": "742.2", "tvd": "740.7" }, { "azi": "104.05", "dTim": "2007-12-14T00:00:00+01:00", "incl": "5.63", "md": "620.8", "tvd": "620.6" } ]
[ { "comments": "Drilled 1 m new formation from 226 m to 227 m MD. Reamed hole and shoe track 3 times. No obstruction. Pulled through shoe track with no rotation. No obstruction. Pumped 10 m3 hi-vis and circulated BU while reciprocating 17 1/2\" BHA.\t\t\n", "dTimEnd": "2007-12-13T00:45:00+01:00", "dTimStart": "2007-12-13T00:00:00+01:00", "md": "227", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled 17 1/2\" hole from 227 m to 229 m MD. Drilling parameters : Flow 4500 lpm / SPP 184 bar / Rotation 80 rpm / Torque 1-3 kNm / WOB 0-1 MT.", "dTimEnd": "2007-12-13T01:15:00+01:00", "dTimStart": "2007-12-13T00:45:00+01:00", "md": "229", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Had oil leak in TDS. Reamed back on std and RB in derrick to have 17 1/2\" bit inside shoe at 195 m. Investigated oil leak and found leaking o-ring in alignement cylinder. Changed o-ring and reinstalled cylinder. Meanwhile cleaned up oil spill on drill floor.", "dTimEnd": "2007-12-13T06:00:00+01:00", "dTimStart": "2007-12-13T01:15:00+01:00", "md": "229", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Changed o-ring and reinstalled alignement cylinder in top drive. Meanwhile cleaned up oil spill on drill floor.", "dTimEnd": "2007-12-13T07:30:00+01:00", "dTimStart": "2007-12-13T06:00:00+01:00", "md": "195", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Drilled 17 1/2\" section from 229 m to 515 m MD. Drilling parameters : Flow 4400 lpm / SPP 191-195 bar / WOB 2-8 MT / Torque 1 - 5 kNm / String RPM 80/ Bit RPM 212. Average ROP 27,2 m/ hrs, max ROP 95 m/hr. Pumped 10 m3 hi-vis sweep for every singel drilled. Performed gMWD survey on connections. Used sling and tugger on centralizer deck on drillpipe to stabilize same before taking survey.", "dTimEnd": "2007-12-13T18:00:00+01:00", "dTimStart": "2007-12-13T07:30:00+01:00", "md": "515", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled 17 1/2\" section from 515 m to 652 m MD. Drilling parameters : Flow 3440 lpm / SPP 98-100 bar / WOB 2-8 MT / Torque 1-5 kNm / String RPM 40 / Bit RPM 143. ROP 30-50 m/hr, average ROP 22,8 m/ hrs. Pumped 10 m3 hi-vis sweep for every singel drilled. Performed gMWD survey on connections. Used sling and tugger on centralizer deck on drillpipe to stabilize same before taking survey until 555 m.\n\nSliding intervals: 515 - 535 m\n 555 - 565 m\n 595 - 610 m\n 635 - 653 m", "dTimEnd": "2007-12-14T00:00:00+01:00", "dTimStart": "2007-12-13T18:00:00+01:00", "md": "652", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_2007_12_15
NO 15/9-F-9
NO 15/9-F-9
name
2007-12-14T00:00:00+01:00
2007-12-15T00:00:00+01:00
normal
2018-05-03T13:53:14+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-12-15T00:00:00+01:00", "dTimDiaHoleStart": "2007-12-12T21:00:00+01:00", "diaHole": "17.5", "diaPilot": null, "distDrill": "267", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "MU and run 20 x 13 3/8\" csg. MU X-over and 18 3/4\" wellhead housing assembly. RIH and land 20 x 13 3/8\" csg. Circulate, pump and displace cement.", "hpht": "0", "md": "919", "mdCsgLast": "220.8", "mdDiaHoleStart": "226", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "7", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Drilled 17 1/2\" section from 784 m to TD at 919 m. Circulated well clean. Displaced open hole and conductor to 1.40 sg bentonite mud. POOH and RB 17 1/2\" BHA. RU for running 20 x 13 3/8\" csg. ", "tightWell": "0", "tvd": "913", "tvdCsgLast": "220.8", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-12-14T21:01:00+01:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "215", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "130", "yp": "-999.99" }, { "dTim": "2007-12-14T21:00:00+01:00", "density": "1.4", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "215", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "121", "yp": "-999.99" } ]
[ { "dTim": "2007-12-15T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "918", "readingKind": "estimated" } ]
[ { "azi": "79.17", "dTim": "2007-12-15T00:00:00+01:00", "incl": "11.17", "md": "782.6", "tvd": "780.3" }, { "azi": "73.46", "dTim": "2007-12-15T00:00:00+01:00", "incl": "11.4", "md": "823", "tvd": "819.9" }, { "azi": "68.27", "dTim": "2007-12-15T00:00:00+01:00", "incl": "11.61", "md": "863.3", "tvd": "859.4" }, { "azi": "74.43", "dTim": "2007-12-15T00:00:00+01:00", "incl": "10.03", "md": "902.6", "tvd": "898" } ]
[ { "comments": "Drilled 17 1/2\" section from 652 m to 784 m MD. Drilling parameters : Flow 3440 lpm / SPP 99-100 bar / WOB 2-8 MT / Torque 2-8 kNm / String RPM 40 / Bit RPM 143. ROP 30-50 m/hr, average ROP 22,0 m/ hrs. Pumped 10 m3 hi-vis sweep for every singel drilled. Performed gMWD survey on connections. \n\nSliding intervals: 676 - 696 m\n 716 - 736 m\n", "dTimEnd": "2007-12-14T06:00:00+01:00", "dTimStart": "2007-12-14T00:00:00+01:00", "md": "784", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled 17 1/2\" section from 784 m to 830 m MD. Drilling parameters : Flow 3440 lpm / SPP 101 bar / WOB 5-6 MT / Torque 2-8 kNm / String RPM 40 / Bit RPM 143. ROP 20-30 m/hr, average ROP 23,0 m/ hrs. Pumped 10 m3 hi-vis sweep for every singel drilled. Performed gMWD survey on connections.\n\nSliding interval: 815 - 830 m", "dTimEnd": "2007-12-14T08:00:00+01:00", "dTimStart": "2007-12-14T06:00:00+01:00", "md": "830", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled 17 1/2\" section from 830 m to 919 m MD. Drilling parameters : Flow 4000 lpm / SPP 124 bar / WOB 6-7 MT / Torque 5-7 kNm / String RPM 80 / Bit RPM 200. ROP 40-50 m/hr, average ROP 23,7 m/ hrs. Pumped 10 m3 hi-vis sweep for every singel drilled. Performed gMWD survey on connections. Up weight 125 MT / down weight 116 MT.\n", "dTimEnd": "2007-12-14T11:45:00+01:00", "dTimStart": "2007-12-14T08:00:00+01:00", "md": "919", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pumped 30 m3 hi-vis pill followed by 30 m3 SW and another 30 m3 hi-vis pill. Pulled up to 881 m while displacing pills out with SW. Circulation parameters : Flow 3500 lpm / SPP 119 bar / Torque 3-5 kNm / RPM 80. Took survey at TD.", "dTimEnd": "2007-12-14T13:00:00+01:00", "dTimStart": "2007-12-14T11:45:00+01:00", "md": "919", "phase": "fixed", "proprietaryCode": "drilling -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH to TD and displaced well to 1.40 sg bentonite mud. Staged up pump rate to 4000 lpm / 124 bar / 20 rpm / 1-3 kNm. Observed ECD level out at 1.28 sg at 5150 stks (113 m3).", "dTimEnd": "2007-12-14T13:45:00+01:00", "dTimStart": "2007-12-14T13:00:00+01:00", "md": "919", "phase": "fixed", "proprietaryCode": "drilling -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Took roadmap measurement, 200 lpm / 40 rpm / 1-3 kNm. Up weight 128 MT / down weight 118 MT. POOH with 17 1/2\" drilling BHA from 919 m MD to OOH. Worked through tight spots. Flushed through string with SW at 122 m with 2000 lpm. RB 17 1/2\" BHA and LD 17 1/2\" bit and motor assembly.\n\nTight spots: 660 m: 15 MT overpull\n 371 m: 15 MT overpull\n", "dTimEnd": "2007-12-14T23:00:00+01:00", "dTimStart": "2007-12-14T13:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "PU two joints HWDP, one pup joint and cmt head. MU and RB cmt stand.", "dTimEnd": "2007-12-15T00:00:00+01:00", "dTimStart": "2007-12-14T23:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_2007_12_16
NO 15/9-F-9
NO 15/9-F-9
name
2007-12-15T00:00:00+01:00
2007-12-16T00:00:00+01:00
normal
2018-05-03T13:53:14+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-12-16T00:00:00+01:00", "dTimDiaHoleStart": "2007-12-12T21:00:00+01:00", "diaHole": "17.5", "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Change to 5 1/2\" handling equipment. MU X-over and 18 3/4\" wellhead housing assembly. RIH and land 20 x 13 3/8\" csg. Circulate, pump and displace cement.", "hpht": "0", "md": "919", "mdCsgLast": "909.8", "mdDiaHoleStart": "226", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "8", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Changed to Odfjell casing tong. MU and ran 20 x 13 3/8\" csg to 754 m MD.", "tightWell": "0", "tvd": "913", "tvdCsgLast": "905.1", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-12-15T21:01:00+01:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "917", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "134", "yp": "-999.99" }, { "dTim": "2007-12-15T21:00:00+01:00", "density": "1.4", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "917", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "128", "yp": "-999.99" } ]
[ { "dTim": "2007-12-16T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "918", "readingKind": "estimated" } ]
[]
[ { "comments": "Continued MU and RB cmt stand.", "dTimEnd": "2007-12-15T00:15:00+01:00", "dTimStart": "2007-12-15T00:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box meeting prior to RU csg equipment. RU casing running equipment, 20 ft bails, elevators, csg tong, slips and FAC tool. Tested csg tong and checked torque/turn.", "dTimEnd": "2007-12-15T06:00:00+01:00", "dTimStart": "2007-12-15T00:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Troubleshot torque/turn fault on Mærsk casing tong. No sucess. RD Mærsk csg tong and RU Odfjell csg tong.", "dTimEnd": "2007-12-15T12:30:00+01:00", "dTimStart": "2007-12-15T06:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "PU and MU shoe joint, intermediate joint and float collar joint. Thread locked connections. Checked floats in shoe and float collar for flow through with SW.", "dTimEnd": "2007-12-15T14:00:00+01:00", "dTimStart": "2007-12-15T12:30:00+01:00", "md": "36", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 13 3/8\" csg from 36 m to 106 m MD. Filled every joint with SW. Average running speed 4 jnts/hr. \n", "dTimEnd": "2007-12-15T15:45:00+01:00", "dTimStart": "2007-12-15T14:00:00+01:00", "md": "106", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Sorted out PRS alignement problem.", "dTimEnd": "2007-12-15T16:15:00+01:00", "dTimStart": "2007-12-15T15:45:00+01:00", "md": "106", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "RIH with 13 3/8\" csg from 106 m to 405 m MD. Filled every joint with SW. Average running speed 5 jnts/hr. No tight spots encountered. Laid out 2 joints.\n\nStabbed csg into conductor assisted by ROV. Used chain tongs in well head area to limit csg string movement and ROV used C-tool for guiding.\n", "dTimEnd": "2007-12-16T00:00:00+01:00", "dTimStart": "2007-12-15T16:15:00+01:00", "md": "405", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_2007_12_17
NO 15/9-F-9
NO 15/9-F-9
name
2007-12-16T00:00:00+01:00
2007-12-17T00:00:00+01:00
normal
2018-05-03T13:53:14+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-12-17T00:00:00+01:00", "dTimDiaHoleStart": "2007-12-12T21:00:00+01:00", "diaHole": "17.5", "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Continue operation on F-5.", "hpht": "0", "md": "919", "mdCsgLast": "909.8", "mdDiaHoleStart": "226", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "9", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Changed to 5 1/2\" handling equipment. MU X-over and 18 3/4\" wellhead housing assembly. RIH and landed 20 x 13 3/8\" csg. Circulated, pumped and displaced cement. Released CART and POOH. RB landing string and LD CART. Cleared rig floor and prepared for skidding to F-5.", "tightWell": "0", "tvd": "913", "tvdCsgLast": "905.1", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-12-16T21:00:00+01:00", "density": "1.4", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "917", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "128", "yp": "-999.99" }, { "dTim": "2007-12-16T21:01:00+01:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "917", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "134", "yp": "-999.99" } ]
[ { "dTim": "2007-12-17T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "918", "readingKind": "estimated" } ]
[]
[ { "comments": "RIH with 13 3/8\" csg from 405 m to 754 m MD. Filled every joint with SW. Average running speed 6 jnts/hr. No tight spots encountered. Up weight 127 MT / down weight 108 MT.\n\nChanged worn dies on FJE on PRS.", "dTimEnd": "2007-12-16T06:00:00+01:00", "dTimStart": "2007-12-16T00:00:00+01:00", "md": "754", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RD 13 3/8\" csg handling equipment and RU 5 1/2\" handling equipment.", "dTimEnd": "2007-12-16T08:00:00+01:00", "dTimStart": "2007-12-16T06:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "PU 18 3/4\" WH housing/CART assembly and MU to 13 3/8\" casing. RIH with 18 3/4\" WH housing/CART assembly from 754 m to 758 m.", "dTimEnd": "2007-12-16T09:15:00+01:00", "dTimStart": "2007-12-16T08:00:00+01:00", "md": "758", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RD Odfjell casing tong and removed PS30 slips. Installed outer ring and master bushings.", "dTimEnd": "2007-12-16T11:15:00+01:00", "dTimStart": "2007-12-16T09:15:00+01:00", "md": "758", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 18 3/4\" WH housing/CART assembly from 758 m to 909 m.", "dTimEnd": "2007-12-16T12:30:00+01:00", "dTimStart": "2007-12-16T11:15:00+01:00", "md": "909", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attempted to land 18 3/4\" WH housing into 30\" conductor without sucess. Observed WH housing shoulder landing out on top of conductor.", "dTimEnd": "2007-12-16T14:15:00+01:00", "dTimStart": "2007-12-16T12:30:00+01:00", "md": "909", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with 18 3/4\" WH housing/CART assembly from 909 m to 795 m. Grinded off WH housing shoulder to enable stinging into 30\" conductor.", "dTimEnd": "2007-12-16T16:15:00+01:00", "dTimStart": "2007-12-16T14:15:00+01:00", "md": "795", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 18 3/4\" WH housing/CART assembly from 795 m to 909,8 m. Landed 18 3/4\" WH into 30\" conductor by setting down casing string weight + 5 MT to engage lock ring. Performed 25 MT overpull test. Slacked off and kept landing string in tension by an overpull of 3 MT.", "dTimEnd": "2007-12-16T17:15:00+01:00", "dTimStart": "2007-12-16T16:15:00+01:00", "md": "909.8", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Established circulation in steps with SW to 2300 lpm / 20 bar with returns on F-9 only. Kept landing string in tension by an overpull of 3 MT. Meanwhile held pre-job meeting prior to cement job.", "dTimEnd": "2007-12-16T18:30:00+01:00", "dTimStart": "2007-12-16T17:15:00+01:00", "md": "909.8", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up to pump from cement unit. Pressurized TDS to 20 bar and tested line up. Released 1 3/4\" preloaded ball for bottom wiper plug.", "dTimEnd": "2007-12-16T19:15:00+01:00", "dTimStart": "2007-12-16T18:30:00+01:00", "md": "909.8", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Mixed and pumped 40 m3 1.52 sg lead 1 slurry at 1200 lpm / 28 bar followed by 61,8 m3 1.52 sg lead 2 slurry at 1200 lpm / 28 bar and 15 m3 1.92 sg tail slurry at 900 lpm / 28 bar. Observed with ROV returns up F-9 only.", "dTimEnd": "2007-12-16T21:00:00+01:00", "dTimStart": "2007-12-16T19:15:00+01:00", "md": "909.8", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Released top dart. Displaced and sheared sub sea wiper plug by pumping 3 m3 SW with cement unit at 1200 lpm / 10 bar. Top plug sheared after 900 ltrs / 150 bar. Zeroed counters for mud pumps and lined up to displace cement with SW using mud pumps. Displaced cement with SW at 3000 lpm. Slowed down to 1200 lpm after 2250 stks. FCP was 40 bar. Bumped plug after 2505 strokes with 128 bar. Pump eff. 96.7%. Held pressure at 128 bar / 10 minutes to test casing. Observed with ROV returns up F-9 only.", "dTimEnd": "2007-12-16T21:45:00+01:00", "dTimStart": "2007-12-16T21:00:00+01:00", "md": "909.8", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Bled of pressure and checked for backflow to cement unit. Volume bled back was 850 ltr. Disconnected cement hose after pressure had been bled off.", "dTimEnd": "2007-12-16T22:30:00+01:00", "dTimStart": "2007-12-16T21:45:00+01:00", "md": "909.8", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Reduced overpull on landing string to neutral. Released CART by 5 right hand turns and observed wellhead with ROV. Pulled above top of wellhead. LD cmt head and 6 m pup joint. MU TDS and flushed through landing string with sponge balls. Flushed sub sea template as per ROV instructions.", "dTimEnd": "2007-12-16T23:30:00+01:00", "dTimStart": "2007-12-16T22:30:00+01:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "LO 2 x HWDP and RB landing string in derrick.", "dTimEnd": "2007-12-17T00:00:00+01:00", "dTimStart": "2007-12-16T23:30:00+01:00", "md": "120", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_2007_12_18
NO 15/9-F-9
NO 15/9-F-9
name
2007-12-17T00:00:00+01:00
2007-12-18T00:00:00+01:00
normal
2018-05-03T13:53:14+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-12-18T00:00:00+01:00", "dTimDiaHoleStart": "2007-12-12T21:00:00+01:00", "diaHole": "17.5", "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "None", "hpht": "0", "md": "919", "mdCsgLast": "909.8", "mdDiaHoleStart": "226", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "10", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "None", "tightWell": "0", "tvd": "913", "tvdCsgLast": "905.1", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[]
[]
[]
[ { "comments": "Continued RB landing string in derrick and LO 18 3/4\" CART. Cleared and cleaned rig floor area.\n\nPrepared for skidding rig to F-5.", "dTimEnd": "2007-12-17T01:30:00+01:00", "dTimStart": "2007-12-17T00:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_2008_08_27
NO 15/9-F-9
NO 15/9-F-9
name
2008-08-26T00:00:00+02:00
2008-08-27T00:00:00+02:00
normal
2018-05-03T13:53:14+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-08-27T00:00:00+02:00", "dTimDiaHoleStart": "2008-08-26T12:00:00+02:00", "diaHole": "17.5", "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Continue MU and RIH with production riser. Land riser and lock tie-back connector. Start installing tension system.", "hpht": "0", "md": "919", "mdCsgLast": "909.8", "mdDiaHoleStart": "919", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "11", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Skidded rig from F-5 to F-9. RU for running production riser. Installed riser spider. RIH with TBC and second riser double. Installed guide wires.", "tightWell": "0", "tvd": "913", "tvdCsgLast": "905.1", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[]
[]
[]
[ { "comments": "Prepared to skid rig. Skidded rig 2.25 m fwd and 1.5 m starboard to F-9.\n\nMeanwhile MU riser RT to DP std and RB same.", "dTimEnd": "2008-08-26T14:00:00+02:00", "dTimStart": "2008-08-26T12:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted riser spider in to rig floor. Changed 5 1/2\" handling equipment to long slings. Transported riser spider close to rotary, removed the master bushing and adapter ring. Installed the spider and hooked up hydraulic hoses and function tested same. Changed back to 5 1/2\" handling equipment.", "dTimEnd": "2008-08-26T17:15:00+02:00", "dTimStart": "2008-08-26T14:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up 1st joint - TBC and stress joint, with simultaneous lift by deck crane and TDS. Checked guidewire clamp. Landed TBC and stress joint in the spider.", "dTimEnd": "2008-08-26T18:15:00+02:00", "dTimStart": "2008-08-26T17:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up 1st double - lower pup joint and std joint #1 with simultaneous lift by deck crane and TDS. Removed handling flange on 1st joint. Made up connection using bolt tensioner tools. Tested flange to 3000 psi through test port - ok. Installed bolt caps and fairings. Attached guidewire slings and on TBC / stress joint.", "dTimEnd": "2008-08-26T21:30:00+02:00", "dTimStart": "2008-08-26T18:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with production riser to 20 m. Function trested TBC and performed pre-operational checks according to Vetco procedure.\n", "dTimEnd": "2008-08-26T23:00:00+02:00", "dTimStart": "2008-08-26T21:30:00+02:00", "md": "20", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Shut in F-4 and F-5 at 23:00. PU riser and TBC to rig floor and secured riser. Prepared for and opened hatch covers on all levels for F-8, F-9 and F-10.", "dTimEnd": "2008-08-27T00:00:00+02:00", "dTimStart": "2008-08-26T23:00:00+02:00", "md": "20", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_2008_08_28
NO 15/9-F-9
NO 15/9-F-9
name
2008-08-27T00:00:00+02:00
2008-08-28T00:00:00+02:00
normal
2018-05-03T13:53:14+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-08-28T00:00:00+02:00", "dTimDiaHoleStart": "2008-08-26T12:00:00+02:00", "diaHole": "17.5", "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Install tension cylinders. Cut and bevel riser. Install multibowl. Install surface riser and diverter.", "hpht": "0", "md": "919", "mdCsgLast": "909.8", "mdDiaHoleStart": "919", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "12", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Continued MU and RIH with production riser. Landed riser and locked tie-back connector. Installed centralizers, boat collision stool and tension ring.", "tightWell": "0", "tvd": "913", "tvdCsgLast": "905.1", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[]
[]
[]
[ { "comments": "Continued to open hatch covers on all levels for F-8, F-9 and F-10. \n", "dTimEnd": "2008-08-27T01:30:00+02:00", "dTimStart": "2008-08-27T00:00:00+02:00", "md": "20", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lowered boat collision stool down to centralizer deck. Prepared and lowered flow line hose down to XMT deck.", "dTimEnd": "2008-08-27T02:15:00+02:00", "dTimStart": "2008-08-27T01:30:00+02:00", "md": "20", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with production riser to put guidewire clamp in convenient working height at Centralizer deck. Caught guidewires and attached to ROV hooks/slings on guidewire clamp. Ran guidewires individually to 2 m above riser guide funnel at seabed. RIH to 37 m and hung off production riser in riser spider.", "dTimEnd": "2008-08-27T04:15:00+02:00", "dTimStart": "2008-08-27T02:15:00+02:00", "md": "37", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up 2nd double - 2 ea standard joints with simultaneous lift by deck crane and TDS. Removed handling tool type E from 1st double. Made up connection using bolt tensioner tools. Tested flange to 3000 psi through test port - ok. Installed bolt caps and fairings. \n\nMeanwhile installed guide wires on template fix between F-9 and F-10 and between F-3 and F-4 using ROV. Sea current is in direction of F-13.", "dTimEnd": "2008-08-27T06:00:00+02:00", "dTimStart": "2008-08-27T04:15:00+02:00", "md": "37", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with production riser to 66 m. Hung off production riser in riser spider. Removed handling flange type E.", "dTimEnd": "2008-08-27T06:30:00+02:00", "dTimStart": "2008-08-27T06:00:00+02:00", "md": "66", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up 3rd double - lower std joint and splash zone jnt with simultaneous lift by deck crane and TDS. Made up connection using bolt tensioner tools. Tested flange to 3000 psi through test port - ok. Installed bolt caps and fairings. RIH with production riser to 95 m. Hung off production riser in riser spider. Removed handling flange type E.", "dTimEnd": "2008-08-27T09:15:00+02:00", "dTimStart": "2008-08-27T06:30:00+02:00", "md": "95", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up 4th double - upper pup joint and tensioner joint with simultaneous lift by deck crane and TDS. Made up connection using bolt tensioner tools. Tested flange to 3000 psi through test port - ok. Installed bolt caps and fairings. RIH with production riser to 118 m. Hung off production riser with hang off plate in riser spider. Removed handling flange. Picked up stand with premade running flange. Made up flange to tensioner joint. Picked up weight and removed hang off plate.", "dTimEnd": "2008-08-27T12:15:00+02:00", "dTimStart": "2008-08-27T09:15:00+02:00", "md": "118", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH on 5 1/2\" DP stand to land TBC on wellhead. Observed with ROV in riser guide funnel window while coming down. Ran TBC to 10 cm above bottom of window.", "dTimEnd": "2008-08-27T12:45:00+02:00", "dTimStart": "2008-08-27T12:15:00+02:00", "md": "138", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Released 6 MT guidewire from template and ROV hook on riser guidewire clamp. Retrieved guidewire to surface. Released 10 MT guidewire. Hooked 10 MT guidewire on funnel. Removed RLGF.", "dTimEnd": "2008-08-27T13:45:00+02:00", "dTimStart": "2008-08-27T12:45:00+02:00", "md": "138", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Confirmed orientation of TBC ROV panels. Ran and established hotstab in TBC receptacle. Landed TBC/production riser on wellhead and set down 15 MT. Verified TBC fullly landed by oserving marker/band on TBC. Locked TBC connector by pressurising port A1 to 2500-3000 psi. Observed upwards movement on TBC upper body when locking TBC. Took 10 MT overpull on TBC to verify locked. Informed production to start up F-4 and F-5. Moved hotstab to port B1 and flushed lower dog cavity and upper piston cavity according to Vetco procedure.", "dTimEnd": "2008-08-27T16:15:00+02:00", "dTimStart": "2008-08-27T13:45:00+02:00", "md": "139", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up cmt unit to standpipe to fill riser with SW while venting air through valve on top of tension joint. Closed valve. Performed pressure test of PR to 20/70 bar for 5/10 min using SW. Dropped 0.3 bar/10 min (0.4%). 447 ltrs pumped and 400 ltrs bled back. Maintained 10 MT overpull on PR throughout the operation.", "dTimEnd": "2008-08-27T18:00:00+02:00", "dTimStart": "2008-08-27T16:15:00+02:00", "md": "139", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drained DP via needle valve on tensioner joint. Flushed TBC with corrosion inhibitor and retrieved hot stab to surface. Retrieved guidewires to surface and removed guidewire clamp from PR.\n", "dTimEnd": "2008-08-27T21:00:00+02:00", "dTimStart": "2008-08-27T18:00:00+02:00", "md": "139", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted Norse cutting equipment down to tensioner deck and prepared line-up for installing hatches.\n\nMeanwhile prepared equipment for installing tensioner system on centralizer deck.", "dTimEnd": "2008-08-27T22:45:00+02:00", "dTimStart": "2008-08-27T21:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Re-installed hatches on F-8 and F-10.", "dTimEnd": "2008-08-28T00:00:00+02:00", "dTimStart": "2008-08-27T22:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_2008_08_29
NO 15/9-F-9
NO 15/9-F-9
name
2008-08-28T00:00:00+02:00
2008-08-29T00:00:00+02:00
normal
2018-05-03T13:53:14+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-08-29T00:00:00+02:00", "dTimDiaHoleStart": "2008-08-26T12:00:00+02:00", "diaHole": "17.5", "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "MU and RIH with 12 1/4\" BHA. Drill out 13 3/8\" shoe using SW and hi-vis. Clean out rat hole. Displace to new 1.28 sg \"sized salt (Soludril-N)\" WBM.", "hpht": "0", "md": "919", "mdCsgLast": "909.8", "mdDiaHoleStart": "919", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "13", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Installed tension cylinders. Cut and beveled riser. Installed multibowl and surface riser. Installed diverter.", "tightWell": "0", "tvd": "913", "tvdCsgLast": "905.1", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2008-08-28T14:00:00+02:00", "density": "1.28", "filterCakeLtlp": null, "filtrateLtlp": "13.6", "locationSample": "Reserve pit", "md": "918", "mudClass": "water based", "presBopRating": "0", "pv": "28", "tempHthp": null, "type": "Soludril-N", "visFunnel": "-999.99", "yp": "17.5" }, { "dTim": "2008-08-28T22:00:00+02:00", "density": "1.28", "filterCakeLtlp": null, "filtrateLtlp": "14.6", "locationSample": "Reserve pit", "md": "918", "mudClass": "water based", "presBopRating": "0", "pv": "28", "tempHthp": null, "type": "Soludril-N", "visFunnel": "-999.99", "yp": "18" }, { "dTim": "2008-08-28T00:00:00+02:00", "density": "1.27", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "918", "mudClass": "water based", "presBopRating": "0", "pv": "37", "tempHthp": null, "type": "Soludril-N", "visFunnel": "75", "yp": "20.5" } ]
[]
[]
[ { "comments": "Measured and marked groves on tensioner joint. Installed centralizer and boat collision stool in Centralizer deck. Made up contact ring. Made up tensioner assembly half hubs. Raised tensioner assembly to contact ring using tensioner cylinders.", "dTimEnd": "2008-08-28T06:00:00+02:00", "dTimStart": "2008-08-28T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued raising tensioner assembly to contact ring using tensioner cylinders. Adjusted pressure to 90 bar and transferred tension from block to tension cylinders. Installed centralizer in Tensioner deck.", "dTimEnd": "2008-08-28T13:30:00+02:00", "dTimStart": "2008-08-28T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Measured and marked tensioner joint 136,0 cm above Tensioner deck. Rigged up, adjusted and dressed Norse cutting equipment on tensioner joint. Barriered off area. Adjusted block weight to put slight overpull at cut height. Drained riser through port on running flange.", "dTimEnd": "2008-08-28T14:45:00+02:00", "dTimStart": "2008-08-28T13:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cut riser according to Norse cutting procedure. Retrieved cut part of tensioner joint. Removed riser spider. Installed outer ring and masterbushing. Broke out landing stand. Laid out cut part of tensioner joint. Installed hole cover in rotary.\n\nMeanwhile put debris barrier inside tensioner joint. Re-configured cutting jig for making bevel. Cut bevel. Used handtools to dress cut and bevel. Removed cutting jig, cleared and tidied Tensioner deck.", "dTimEnd": "2008-08-28T16:45:00+02:00", "dTimStart": "2008-08-28T14:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed hatch cover on F-9. BO and LO riser running tool. RU to lay out riser spider and moved to main deck. Took TDS measurements for \"riser project\".", "dTimEnd": "2008-08-28T19:00:00+02:00", "dTimStart": "2008-08-28T16:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed 4 slings in pad-eys on surface riser for dual lift in order to avoid F-4/F-5 shut-in. Lifted surface riser into drillfloor with crane and drillfloor tugger. Hooked slings on to TDS bails and picked up surface riser with top drive. \n\nMeanwhile removed hatches on F-9 and lifted Norse cutting equipment from tension deck to moonpool.", "dTimEnd": "2008-08-28T20:30:00+02:00", "dTimStart": "2008-08-28T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted multibowl onto rotary using PRS. Installed bowl protector in multibowl and lowered surface riser to connect onto multibowl. RU 2 slings from surface riser to pad-eys on multibowl for dual lift.", "dTimEnd": "2008-08-28T21:30:00+02:00", "dTimStart": "2008-08-28T20:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled master bushings and outer ring. Lowered multibowl from drillfloor to well head. Slipped multibowl over tension joint and adjusted to correct orientation STB - against F-14.", "dTimEnd": "2008-08-28T22:30:00+02:00", "dTimStart": "2008-08-28T21:30:00+02:00", "md": "20", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Injected and energized plastic in upper and lower BT-seals. Tested BT seals to 70 bar / 10 min - ok. Energized multibowl slips by torquing up cap screws to 600 ft-lbs.", "dTimEnd": "2008-08-29T00:00:00+02:00", "dTimStart": "2008-08-28T22:30:00+02:00", "md": "20", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_2008_08_30
NO 15/9-F-9
NO 15/9-F-9
name
2008-08-29T00:00:00+02:00
2008-08-30T00:00:00+02:00
normal
2018-05-03T13:53:15+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-08-30T00:00:00+02:00", "dTimDiaHoleStart": "2008-08-26T12:00:00+02:00", "diaHole": "17.5", "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Drill 12 1/4\" hole from 919 m to 1083 m MD. Circulate well clean. Perform flow check and start POOH.", "hpht": "0", "md": "1085", "mdCsgLast": "909.8", "mdDiaHoleStart": "919", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "14", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "MU and RIH with 12 1/4\" BHA from surface to 862. Washed down with 12 1/4\" BHA to 879 m. Drilled out 13 3/8\" shoe and rat-hole using SW and hi-vis down to 919 m. ", "tightWell": "0", "tvd": "1075.9", "tvdCsgLast": "905.1", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2008-08-29T10:00:00+02:00", "density": "1.27", "filterCakeLtlp": null, "filtrateLtlp": "14.1", "locationSample": "Reserve pit", "md": "918", "mudClass": "water based", "presBopRating": "0", "pv": "29", "tempHthp": null, "type": "Soludril-N", "visFunnel": "-999.99", "yp": "17" }, { "dTim": "2008-08-29T22:00:00+02:00", "density": "1.28", "filterCakeLtlp": null, "filtrateLtlp": "13.9", "locationSample": "Reserve pit", "md": "918", "mudClass": "water based", "presBopRating": "0", "pv": "28", "tempHthp": null, "type": "Soludril-N", "visFunnel": "-999.99", "yp": "18.5" } ]
[]
[]
[ { "comments": "PU 7 MT overpull on riser/multibowl to ensure slips was locked. Released slings from TDS.", "dTimEnd": "2008-08-29T00:30:00+02:00", "dTimStart": "2008-08-29T00:00:00+02:00", "md": "20", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Secured surface riser with BOP horizontal tension system in moonpool. Removed handling slings from surface riser and installed split covers. \n\nMeanwhile removed rollers and trolly on HTS.", "dTimEnd": "2008-08-29T02:15:00+02:00", "dTimStart": "2008-08-29T00:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "PU and installed diverter onto surface riser. Installed outer ring and master bushings.", "dTimEnd": "2008-08-29T04:00:00+02:00", "dTimStart": "2008-08-29T02:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waiting on MWD to troubleshoot tools and get ready to run 12 1/4\" BHA.\n\nMeanwhile function tested diverter inserts and valves.", "dTimEnd": "2008-08-29T06:00:00+02:00", "dTimStart": "2008-08-29T04:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Waiting on MWD to troubleshoot tools and get ready to run 12 1/4\" BHA.\n\nMeanwhile prepared for function test of diverter. Could not operate diverter bag.", "dTimEnd": "2008-08-29T07:15:00+02:00", "dTimStart": "2008-08-29T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Investigated diverter operation. Pulled master bushings, installed fitting on hydraulic hose. Tested system and found another leaking fitting. Changed out fitting. Re-installed master bushings.", "dTimEnd": "2008-08-29T09:15:00+02:00", "dTimStart": "2008-08-29T07:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Function tested diverter. Ok. Removed 10\" diverter inserts and RB std in derrick.", "dTimEnd": "2008-08-29T10:00:00+02:00", "dTimStart": "2008-08-29T09:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop activities", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to PU 12 1/4\" BHA. Installed link adaptor on elevators. Prepared rig floor equipment and moved 5 HWDP in derrick.", "dTimEnd": "2008-08-29T10:30:00+02:00", "dTimStart": "2008-08-29T10:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "PU and MU 12 1/4\" BHA. RIH from surface to 8 m. Spinner on aft iron roughneck would not move.", "dTimEnd": "2008-08-29T11:15:00+02:00", "dTimStart": "2008-08-29T10:30:00+02:00", "md": "8", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Repaired aft iron rough neck spinner carriage.", "dTimEnd": "2008-08-29T12:30:00+02:00", "dTimStart": "2008-08-29T11:15:00+02:00", "md": "8", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "PU and MU 12 1/4\" BHA. RIH from 8 m to 17 m. Not able to MU collar to powerpulse tool.", "dTimEnd": "2008-08-29T12:45:00+02:00", "dTimStart": "2008-08-29T12:30:00+02:00", "md": "17", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Had to break out proper XO from back-up assembly to be able to cross over from powerpulse tool to drill collar.", "dTimEnd": "2008-08-29T13:15:00+02:00", "dTimStart": "2008-08-29T12:45:00+02:00", "md": "20", "phase": "fixed", "proprietaryCode": "interruption -- rig up/down", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "MU and RIH with 12 1/4\" BHA from 20 m to 29 m.", "dTimEnd": "2008-08-29T13:45:00+02:00", "dTimStart": "2008-08-29T13:15:00+02:00", "md": "29", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waiting on helicopter/crane.\n\nMeanwhile installed 10\" diverter inserts.", "dTimEnd": "2008-08-29T14:30:00+02:00", "dTimStart": "2008-08-29T13:45:00+02:00", "md": "29", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "MU and RIH with 12 1/4\" BHA from 29 m to 135 m.", "dTimEnd": "2008-08-29T16:00:00+02:00", "dTimStart": "2008-08-29T14:30:00+02:00", "md": "135", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed PS21 slips. RU auto pipe handling system.", "dTimEnd": "2008-08-29T16:30:00+02:00", "dTimStart": "2008-08-29T16:00:00+02:00", "md": "135", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 12 1/4\" BHA on 5 1/2\" DP from 135 m to 862 m. Average running speed was 9 stds/hr.", "dTimEnd": "2008-08-29T18:30:00+02:00", "dTimStart": "2008-08-29T16:30:00+02:00", "md": "862", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "MU TDS, established circulation and washed down from 862 m with 1250 lpm and 30 rpm. Tagged TOC at 879 m. Up weight 106 MT / down weight 98 MT.", "dTimEnd": "2008-08-29T20:30:00+02:00", "dTimStart": "2008-08-29T18:30:00+02:00", "md": "879", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled on cement/plug/float from 879 m to 895 m MD. Drilling parameters : Flow 3100 lpm / SPP 95 bar / String RPM 65 / WOB 0-4 MT / Torque 2-14 kNm / ECD 1.05 sg. Picked off bottom every 10-15 min to clean bit. Up weight 114 MT / down weight 104 MT (with pumpes off).\n\nMeanwhile RU and arranged hoses on csg tong.", "dTimEnd": "2008-08-30T00:00:00+02:00", "dTimStart": "2008-08-29T20:30:00+02:00", "md": "895", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_2008_08_31
NO 15/9-F-9
NO 15/9-F-9
name
2008-08-30T00:00:00+02:00
2008-08-31T00:00:00+02:00
normal
2018-05-03T13:53:15+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-08-31T00:00:00+02:00", "dTimDiaHoleStart": "2008-08-30T07:30:00+02:00", "diaHole": "12.25", "diaPilot": null, "distDrill": "164", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Continue RIH with clean out BHA on 5 1/2\" DP from 547 m to 1082 m. Circulate well while reciprocating string. Displace well to salt saturated 1.20 sg NaCl brine. Verify that well is stable. POOH and LD clean out BHA. RU for running 9 5/8\" sand screens. MU and RIH with 14 joints of Bakerweld screens. MU screen hanger.", "hpht": "0", "md": "1083", "mdCsgLast": "909.8", "mdDiaHoleStart": "919", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "15", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Drilled 12 1/4\" hole from 919 m to 1083 m MD. Circulated well clean using 3 x btms up. Performed flow check and POOH. LD 12 1/4\" BHA. MU and RIH with clean out BHA from surface to 547 m.", "tightWell": "0", "tvd": "1075.9", "tvdCsgLast": "905.1", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2008-08-30T04:00:00+02:00", "density": "1.27", "filterCakeLtlp": null, "filtrateLtlp": "13.5", "locationSample": "Reserve pit", "md": "918", "mudClass": "water based", "presBopRating": "0", "pv": "32", "tempHthp": null, "type": "Soludril-N", "visFunnel": "-999.99", "yp": "22" }, { "dTim": "2008-08-30T10:00:00+02:00", "density": "1.27", "filterCakeLtlp": null, "filtrateLtlp": "14.6", "locationSample": "Flowline", "md": "959", "mudClass": "water based", "presBopRating": "0", "pv": "30", "tempHthp": null, "type": "Soludril-N", "visFunnel": "-999.99", "yp": "19.5" }, { "dTim": "2008-08-30T13:00:00+02:00", "density": "1.27", "filterCakeLtlp": null, "filtrateLtlp": "14.6", "locationSample": "Flowline", "md": "1043", "mudClass": "water based", "presBopRating": "0", "pv": "27", "tempHthp": null, "type": "Soludril-N", "visFunnel": "-999.99", "yp": "17.5" }, { "dTim": "2008-08-30T14:00:00+02:00", "density": "1.27", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Flowline", "md": "1064", "mudClass": "water based", "presBopRating": "0", "pv": "25", "tempHthp": null, "type": "Soludril-N", "visFunnel": "-999.99", "yp": "17.5" }, { "dTim": "2008-08-30T22:00:00+02:00", "density": "1.27", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "1083", "mudClass": "water based", "presBopRating": "0", "pv": "25", "tempHthp": null, "type": "Soludril-N", "visFunnel": "-999.99", "yp": "16.5" } ]
[]
[ { "azi": "74.43", "dTim": "2008-08-31T00:00:00+02:00", "incl": "10.03", "md": "902.6", "tvd": "898" }, { "azi": "74.93", "dTim": "2008-08-31T00:00:00+02:00", "incl": "9.52", "md": "968", "tvd": "962.5" }, { "azi": "75.46", "dTim": "2008-08-31T00:00:00+02:00", "incl": "9.41", "md": "1008.5", "tvd": "1002.4" }, { "azi": "76.13", "dTim": "2008-08-31T00:00:00+02:00", "incl": "9.61", "md": "1048.9", "tvd": "1042.2" } ]
[ { "comments": "Drilled on cement from 895 m to 909,3 m MD. Drilling parameters : Flow 3100 lpm / SPP 95 bar / String RPM 65 / WOB 2-3 MT / Torque 4-12 kNm / ECD 1.05 sg. Picked off bottom every 10-15 min to clean bit. Pumped 10 m3 hi-vis before connection at 902 m.\n\nMeanwhile MU and RB 9 5/8\" csg. stds.", "dTimEnd": "2008-08-30T04:00:00+02:00", "dTimStart": "2008-08-30T00:00:00+02:00", "md": "909.3", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled out shoe track from 909,3 m to 919,7 m MD. Drilling parameters : Flow 3100 lpm / SPP 97 bar / String RPM 65 / WOB 0-1 MT / Torque 4-6 kNm / ECD 1.05 sg. Cleaned out rathole in 2 m steps and reamed. \n\nMeanwhile MU and RB 9 5/8\" csg. stds. A total of 3 stds RB in derrick.", "dTimEnd": "2008-08-30T06:00:00+02:00", "dTimStart": "2008-08-30T04:00:00+02:00", "md": "919", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned out rathole from 919,7 m to 921 m MD. Drilling parameters : Flow 3100 lpm / SPP 97 bar / String RPM 65 / WOB 0-1 MT / Torque 4-6 kNm / ECD 1.05 sg. Pumped 30 m3 hi-vis pill and swept the hole clean. Pulled 12 1/4\" BHA into 13 3/8\" csg shoe and verified no restrictions in shoe track.", "dTimEnd": "2008-08-30T07:30:00+02:00", "dTimStart": "2008-08-30T06:00:00+02:00", "md": "921", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Displaced to 1.27 sg Soludril-N WBM (sized salt system) while drilling new formation. Drilled 12 1/4\" hole from 921 m to 1083 m MD. Drilling parameters : Flow 3300 lpm / SPP 125-127 bar / String RPM 140 / WOB 7-9 MT / Torque 8-12 kNm / ECD 1.32-1.35 sg. Surveys taken at 991.68 m and 1049 m. Found base Utsira at 1073 as predicted.\n\nMeanwhile MU and RB 9 5/8\" csg. stds. A total of 6 stds RB in derrick.", "dTimEnd": "2008-08-30T15:00:00+02:00", "dTimStart": "2008-08-30T07:30:00+02:00", "md": "1083", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Circulated 3 x btms up while reciprocating with bit inside shale formation from 1073 m to 1082 m. Circulating parameters : Flow 3000 lpm / SPP 127 bar / String RPM 120 / Torque 5-7 kNm. Upweight 118 MT / down weight 107 MT. After 3 x btms up torque was reduced to 3-7 kNm and ECD had dropped from 1.35 sg to 1.32 sg.\n\nMeanwhile checked out equipment for POOH.", "dTimEnd": "2008-08-30T16:30:00+02:00", "dTimStart": "2008-08-30T15:00:00+02:00", "md": "1082", "phase": "fixed", "proprietaryCode": "drilling -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flow checked well for 15 min. Well was static.\n\nMeanwhile held tool box meeting before POOH.", "dTimEnd": "2008-08-30T16:45:00+02:00", "dTimStart": "2008-08-30T16:30:00+02:00", "md": "1082", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Dropped 2.75\" drift and POOH wet with 12 1/4\" BHA from 1082 and into 13 3/8\" csg shoe at 897 m. No overpull observed. Flow checked well inside csg shoe. Well was static.", "dTimEnd": "2008-08-30T18:00:00+02:00", "dTimStart": "2008-08-30T16:45:00+02:00", "md": "897", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pumped 5 m3 1.40 sg brine slug and continued to POOH from 897 m to 135 m. Average pulling speed 381 m/hr.", "dTimEnd": "2008-08-30T20:00:00+02:00", "dTimStart": "2008-08-30T18:00:00+02:00", "md": "135", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled master bushings and removed 10\" diverter inserts and PS21. Re-installed master bushings. BO and LD 12 1/4\" BHA from 135 m to 2,7 m.", "dTimEnd": "2008-08-31T00:00:00+02:00", "dTimStart": "2008-08-30T20:00:00+02:00", "md": "2.7", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_2008_09_01
NO 15/9-F-9
NO 15/9-F-9
name
2008-08-31T00:00:00+02:00
2008-09-01T00:00:00+02:00
normal
2018-05-03T13:53:15+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-09-01T00:00:00+02:00", "dTimDiaHoleStart": "2008-08-31T20:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "MU screen hanger. RD screen running equipment. RIH with 9 5/8\" sand screens on 5 1/2\" DP to hanger setting depth. Drop ball and set screen hanger. Release setting tool. Set hanger packer. Pull above top of sand screen. POOH. LD screen running tool and wash pipe. RIH with swab cups. Pump citric acid and swab well.", "hpht": "0", "md": "1083", "mdCsgLast": "909.8", "mdDiaHoleStart": "1085", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "16", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Continued RIH with clean out BHA on 5 1/2\" DP from 547 m to 1082 m. Circulated well while reciprocating string. Displaced well to salt saturated 1.20 sg NaCl brine. Verified that well was stable. POOH and LD clean out BHA. RU for running 9 5/8\" sand screens. MU and RIH with 14 joints of Bakerweld screens and 3 joints of blank pipe. ", "tightWell": "0", "tvd": "1075.9", "tvdCsgLast": "905.1", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2008-08-31T12:10:00+02:00", "density": "1.2", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Flowline", "md": "1083", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "NaCl Brine", "visFunnel": "-999.99", "yp": "-999.99" }, { "dTim": "2008-08-31T20:30:00+02:00", "density": "1.2", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "1083", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "NaCl Brine", "visFunnel": "-999.99", "yp": "-999.99" }, { "dTim": "2008-08-31T09:15:00+02:00", "density": "1.27", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "1083", "mudClass": "water based", "presBopRating": "0", "pv": "25", "tempHthp": null, "type": "Soludril-N", "visFunnel": "-999.99", "yp": "17" } ]
[]
[]
[ { "comments": "BO and LD 12 1/4\" BHA from 135 m to OOH. Cleaned and cleared rig floor prior to PU clean out BHA.", "dTimEnd": "2008-08-31T01:15:00+02:00", "dTimStart": "2008-08-31T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Serviced top drive.", "dTimEnd": "2008-08-31T01:45:00+02:00", "dTimStart": "2008-08-31T01:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box meeting. PU and MU bullnose assembly. MU and RIH with 5 1/2\" DP from surface to 221 m.", "dTimEnd": "2008-08-31T03:30:00+02:00", "dTimStart": "2008-08-31T01:45:00+02:00", "md": "221", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "MU magnet and csg brush assembly. MU SABS circulation sub assembly. Pulled master bushings and installed 10\" diverter inserts and PS21 when assemblies was below rotary. Re-installed master bushings.", "dTimEnd": "2008-08-31T05:15:00+02:00", "dTimStart": "2008-08-31T03:30:00+02:00", "md": "236", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to RIH with clean up BHA on 5 1/2\" DP from 236 m to 547 m.", "dTimEnd": "2008-08-31T06:00:00+02:00", "dTimStart": "2008-08-31T05:15:00+02:00", "md": "547", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with clean up BHA on 5 1/2\" DP from 547 m to 1071 m. \n\nBroke circulation at 880 m with 500 lpm / SPP 4 bar. Upweight 98 MT / down weight 92 MT.", "dTimEnd": "2008-08-31T07:45:00+02:00", "dTimStart": "2008-08-31T06:00:00+02:00", "md": "1071", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "MU and RIH with 2 x 5 1/2\" pup- joints, TIW and air operated ball release sub. RIH and spaced out with ball drop sub in suitable position above rotary and bull nose at 1082 m.\n\nCirculated 3 x btms up while reciprocating with bit inside shale formation from 1073 m to 1082 m. Circulating parameters : Flow 3000 lpm / SPP 127 bar / String RPM 120 / Torque 5-7 kNm. Upweight 118 MT / down weight 107 MT.", "dTimEnd": "2008-08-31T08:30:00+02:00", "dTimStart": "2008-08-31T07:45:00+02:00", "md": "1082", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Circulated and increased pump rate in steps to 3000 LPM. String rotation 40 RPM. Reciprocated the string while circulating between 1073 m and 1082 m inside shale formation. Circulated 1.2 x btms up. Brushed hanger setting area from 848 m to 857 m.", "dTimEnd": "2008-08-31T10:30:00+02:00", "dTimStart": "2008-08-31T08:30:00+02:00", "md": "1082", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attached air control hose to ball release sub. Pumped 49 m3 of 1.20 SG saturated NaCl brine at 3000 lpm/127 bar. Displaced 1,28 SG Soludril-N mud from open hole and +/-150 m into 13 3/8\" casing. Reciprocated the string while circulating.\n\nReleased 2 1/8\" ball and pumped 400 lpm at 2 bar prior to shear the SABS sub. SABS sheared at 59 bar and pressure droppet back to 2 bar, confirming that ports were open. \n\nIncreased pump rate to 3000 lpm/22 bar after opening SABS and continued to circulate 120 m3 1.20 sg brine at 40 rpm while reciprocating string. Pumped the hi-vis soap train according to Halliburton procedure while reciprocating and rotating the string. Continued displacing the soap train with 115 m3 1.20 SG NaCl brine until the well was clean. NTU readings: 452/341/198/146/112.", "dTimEnd": "2008-08-31T12:15:00+02:00", "dTimStart": "2008-08-31T10:30:00+02:00", "md": "1082", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Observed well for 30 min, well static.", "dTimEnd": "2008-08-31T13:00:00+02:00", "dTimStart": "2008-08-31T12:15:00+02:00", "md": "1082", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "LO ball sub. Recorded up weight 105 MT / down weight 98 MT and 20 cm strech with no pumping or rotation. Rotated with 10 rpm and recorded free rotational weight 101 MT / free rotational torque 1.5-3.5 kNm. \n\nPOOH wet with clean out assembly from 1081 to 867 m.", "dTimEnd": "2008-08-31T14:30:00+02:00", "dTimStart": "2008-08-31T13:00:00+02:00", "md": "867", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Recorded up weight 97 MT / down weight 92 MT and 10 cm strech with no pumping or rotation. Rotated with 10 rpm and recorded free rotational weight 95 MT / free rotational torque 1-2 kNm. \n\nPumped slug brine. POOH with clean out assembly from 867 to 300 m.", "dTimEnd": "2008-08-31T16:15:00+02:00", "dTimStart": "2008-08-31T14:30:00+02:00", "md": "300", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Investigated and repaired oil leak on aft roughneck.", "dTimEnd": "2008-08-31T16:45:00+02:00", "dTimStart": "2008-08-31T16:15:00+02:00", "md": "300", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Continued POOH with clean out assembly from 300 to 250 m. Pulled PS21 and 10\" diverter inserts.", "dTimEnd": "2008-08-31T17:30:00+02:00", "dTimStart": "2008-08-31T16:45:00+02:00", "md": "250", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "LO circulation sub. LO and cleaned bristle back (no dope on brush). Cleaned 445 g of swarf off magnets and LO same.", "dTimEnd": "2008-08-31T18:15:00+02:00", "dTimStart": "2008-08-31T17:30:00+02:00", "md": "221", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with 5 1/2\" DP from 221 m to OOH.", "dTimEnd": "2008-08-31T19:00:00+02:00", "dTimStart": "2008-08-31T18:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and cleared rig floor.", "dTimEnd": "2008-08-31T19:30:00+02:00", "dTimStart": "2008-08-31T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed well control drill. Focused on how to set off the deluge system on rig floor and in cantiliver.", "dTimEnd": "2008-08-31T20:00:00+02:00", "dTimStart": "2008-08-31T19:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RU for running 9 5/8\" Bakerweld screens. Moved and re-installed Odfjell csg tong.", "dTimEnd": "2008-08-31T21:30:00+02:00", "dTimStart": "2008-08-31T20:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held pre job meeting prior to picking up 9 5/8\" sand screens.", "dTimEnd": "2008-08-31T22:00:00+02:00", "dTimStart": "2008-08-31T21:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "PU and RIH with 9 5/8\" 13%Cr Bakerweld 250 HD screens from surface to 36 m. Lifted screens from basket on cantilever onto HTS using soft slings. Removed screen protection on rig floor. Installed centralizer and stop collar on box end on each joint.", "dTimEnd": "2008-09-01T00:00:00+02:00", "dTimStart": "2008-08-31T22:00:00+02:00", "md": "36", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_2008_09_02
NO 15/9-F-9
NO 15/9-F-9
name
2008-09-01T00:00:00+02:00
2008-09-02T00:00:00+02:00
normal
2018-05-03T13:53:15+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-09-02T00:00:00+02:00", "dTimDiaHoleStart": "2008-08-31T20:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Set Screen Hanger. POOH with Sceen Hanger RT. RIH swab cups. Pump citric acid and swab well. POOH and L/D BHA. RIH, retrieve bore protector. ", "hpht": "0", "md": "1083", "mdCsgLast": "909.8", "mdDiaHoleStart": "1085", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "17", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "None", "tightWell": "0", "tvd": "1075.9", "tvdCsgLast": "905.1", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2008-09-01T22:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "1083", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "NaCl Brine", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "PU and RIH with 9 5/8\" 13%Cr Bakerweld 250 HD screens from 36 to 168 m. Lifted screens from basket on cantilever onto HTS using soft slings. Removed screen protection on rig floor. Installed centralizer and stop collar on box end on each joint.", "dTimEnd": "2008-09-01T05:00:00+02:00", "dTimStart": "2008-09-01T00:00:00+02:00", "md": "168", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "PU and RIH with 9 5/8\" blank pipe from 168 m to 204 m.", "dTimEnd": "2008-09-01T06:00:00+02:00", "dTimStart": "2008-09-01T05:00:00+02:00", "md": "204", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up Screen Hanger assembly to screen liner as per Weatherford procedure. Filled PBR with hi-vis pill. up/down 93/78 MT. Installed 5½\" DP slips inserts.\n", "dTimEnd": "2008-09-01T08:00:00+02:00", "dTimStart": "2008-09-01T06:00:00+02:00", "md": "218", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk and rigged down casing tong and cleaned rig floor.\n", "dTimEnd": "2008-09-01T08:45:00+02:00", "dTimStart": "2008-09-01T08:00:00+02:00", "md": "218", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued RIH with Screens on 5½\" HWDP to 365 m.\n", "dTimEnd": "2008-09-01T09:45:00+02:00", "dTimStart": "2008-09-01T08:45:00+02:00", "md": "365", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued RIH Screens on 5½\" DP from 365m to 1051m. \n", "dTimEnd": "2008-09-01T12:30:00+02:00", "dTimStart": "2008-09-01T09:45:00+02:00", "md": "1051", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "At 1064 m. up/down 123/105 MT. Rigged up ball drop sub control hose and panel.\n", "dTimEnd": "2008-09-01T13:00:00+02:00", "dTimStart": "2008-09-01T12:30:00+02:00", "md": "1064", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Spaced out and dropped ball. Lined up and circulated ball with 200 lpm. Attempeted to set Screen Hanger.\n", "dTimEnd": "2008-09-01T13:15:00+02:00", "dTimStart": "2008-09-01T13:00:00+02:00", "md": "1064", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ball landed. Pressured up to 107 bars and held pressure for 2 min. Bled down to 70 bars. Applied 30 MT on top of liner to verify that hanger was set (70 MT on weight indicator). Attempted to set Hanger.\nPulled up to leave 15 MT on running tool (85 MT on weight indicator) to shear ball seat. Started to pressure up to 233 bars to release running tool and shear ball seat. Ball seat sheared at 190 bars (7% below theoretical value 202 bars). Bled off pressure. Took pick up. New up weight 123 MT (peak at 130 MT). Up weight indicated that running tool still engaged to the hanger. Started emergency release procedure by first torqued up the drill pipe to 10k ftlbs while holding 15 MT on running tool (85 MT on weight indicator).\nDrill pipe started to rotate freely at approx. 2.5 kNm. Abandoned emergency release procedure.\nPulled up weight (123 MT) plus additional 2.5 m to activate packer setting dogs. Set down weight to set packer. Weight lost within 20 cm.\nLaid down 32 MT (68 MT on weight indicator) on top of PBR to set packer. No clear indications of shear seen.\n", "dTimEnd": "2008-09-01T14:45:00+02:00", "dTimStart": "2008-09-01T13:15:00+02:00", "md": "1064", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held tool box talk and laid out Ball drop assy, DPSV and the two DP pups.\n", "dTimEnd": "2008-09-01T15:30:00+02:00", "dTimStart": "2008-09-01T14:45:00+02:00", "md": "1057", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Made up to TDS and pulled up 18 m. Displaced 13 3/8\" casing to 1.03 SG. 67m³ and 2500 lpm, 48 bars.\n", "dTimEnd": "2008-09-01T16:15:00+02:00", "dTimStart": "2008-09-01T15:30:00+02:00", "md": "1039", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "POOH with landing string. Having Screens and Screen Hanger still attached. \n", "dTimEnd": "2008-09-01T19:00:00+02:00", "dTimStart": "2008-09-01T16:15:00+02:00", "md": "218", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Pulled up Hanger RT/ Screen Hanger and inspected same, RT sheared, no visible marks or damage.\n", "dTimEnd": "2008-09-01T20:15:00+02:00", "dTimStart": "2008-09-01T19:00:00+02:00", "md": "204", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held tool box talk and rigged up casing tong and picked up and laid out Screen Hanger with Hanger RT.\n", "dTimEnd": "2008-09-01T22:15:00+02:00", "dTimStart": "2008-09-01T20:15:00+02:00", "md": "204", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Picked up back-up Screen Hanger and waited for go ahead. Simultaneously cleared and cleaned rig floor.\n", "dTimEnd": "2008-09-01T23:00:00+02:00", "dTimStart": "2008-09-01T22:15:00+02:00", "md": "204", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held tool box talk and picked up and made up Screen Hanger. Rigged down casing tong.\n", "dTimEnd": "2008-09-02T00:00:00+02:00", "dTimStart": "2008-09-01T23:00:00+02:00", "md": "218", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" } ]
[]
15_9_F_9_2008_09_03
NO 15/9-F-9
NO 15/9-F-9
name
2008-09-02T00:00:00+02:00
2008-09-03T00:00:00+02:00
normal
2018-05-03T13:53:15+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-09-03T00:00:00+02:00", "dTimDiaHoleStart": "2008-08-31T20:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Pump 20 m³ 1.03 SG NaCl packer fluid. POOH and L/D BHA. RIH, retrieve bore protector. Prepare to run ESP assembly. Spot equipment on deck and on drill floor. Perform orientation run with tubing hanger. Commence MU ESP assemblies and connect cable.\n\n", "hpht": "0", "md": "1083", "mdCsgLast": "909.8", "mdDiaHoleStart": "1085", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "18", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Set Screen Hanger. POOH with Screen Hanger RT. RIH swab cups. Pumped citric acid and swabbed well. Loss rate from 700, 520, 320, 220, 110 and finally 80 lpm. Total losses during swabbing 93 m³. POOH to 890m. Located lower swab cup inside the blank pipe. ", "tightWell": "0", "tvd": "1075.9", "tvdCsgLast": "905.1", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2008-09-02T04:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "1083", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "NaCl Brine", "visFunnel": "-999.99", "yp": "-999.99" }, { "dTim": "2008-09-02T10:30:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "1083", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "NaCl Brine", "visFunnel": "-999.99", "yp": "-999.99" }, { "dTim": "2008-09-02T22:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "1083", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "NaCl Brine", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "RIH with 5 std 5½\" HWDP and 5½\" DP from 218m to 1050m\n", "dTimEnd": "2008-09-02T04:45:00+02:00", "dTimStart": "2008-09-02T00:00:00+02:00", "md": "1050", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Picked up and made up 6 and 3 m pups.\n", "dTimEnd": "2008-09-02T05:00:00+02:00", "dTimStart": "2008-09-02T04:45:00+02:00", "md": "1059", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held tool box talk and picked up and made up drop ball sub assy. \n", "dTimEnd": "2008-09-02T05:30:00+02:00", "dTimStart": "2008-09-02T05:00:00+02:00", "md": "1064", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Took up/down weight 125/107 MT. at 1064m.\n", "dTimEnd": "2008-09-02T05:45:00+02:00", "dTimStart": "2008-09-02T05:30:00+02:00", "md": "1064", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Dropped ball and chased same at 200 lpm.", "dTimEnd": "2008-09-02T06:00:00+02:00", "dTimStart": "2008-09-02T05:45:00+02:00", "md": "1064", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Continued chasing ball, landed after 100 stks, pressured up to 107 bars and held pressure for 2 mins. Bled down to 70 bars and applied 40 MT WOB on top of liner to verify that the hanger was set (73 MT on weight indicator) and marked pipe. Left 40 MT on running tool and pressured to 178 bars to release R/T, held for 3 mins and then bled off. P/U to 125 MT. No indication of R/T was released.\n", "dTimEnd": "2008-09-02T07:00:00+02:00", "dTimStart": "2008-09-02T06:00:00+02:00", "md": "1064", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Went back to setting depth and put hanger in tension 125 MT. Pressured up to 107 bars, set liner hanger and held for 3mins. Bled off pressure to 10 bars. Slacked off to 40 MT, WOB 70 MT on weight indicator to verify hanger was set, and held for 5mins. Increased pressure to 190 bars at a quicker rate and held for 3 mins. P/U to new up weight 107 MT, good indication of releasing the R/T. Slacked off to 15 MT WOB and pressured up to blow ball seat. Pressure dropped off @ 221 bars, theoretical pressure 217 bars. P/U to new up weight 107 MT and measured up 2.5 m. Slacked of 30 MT WOB. Set packer and observed 1st shear at 18 MT WOB and 2nd shear at 25 MT WOB, held for 5 mins.\n", "dTimEnd": "2008-09-02T08:00:00+02:00", "dTimStart": "2008-09-02T07:00:00+02:00", "md": "1064", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held tool box talk and laid out drop ball sub assembly, pups, TIW. Greased PS21 slips and commenced POOH from 845 to last stand HWDP. \n", "dTimEnd": "2008-09-02T10:15:00+02:00", "dTimStart": "2008-09-02T08:00:00+02:00", "md": "14", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed PS21 slips, 10\" diverter inserts and installed master bushings.\n", "dTimEnd": "2008-09-02T10:45:00+02:00", "dTimStart": "2008-09-02T10:15:00+02:00", "md": "14", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued POOH, inspect and laid out RT, cleared and cleaned rig floor.\n", "dTimEnd": "2008-09-02T11:30:00+02:00", "dTimStart": "2008-09-02T10:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up swab assemblies and RIH to 146m.\n", "dTimEnd": "2008-09-02T12:45:00+02:00", "dTimStart": "2008-09-02T11:30:00+02:00", "md": "146", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk and pulled master bushings and installed 10\" diverter inserts and ps-21 slips.\n", "dTimEnd": "2008-09-02T13:30:00+02:00", "dTimStart": "2008-09-02T12:45:00+02:00", "md": "146", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued RIH from 146m @ 2 mins STD, up weight 97 MT, down weight 91 MT, @ 845m continue to RIH to 1044m, picked up pup joint.\n", "dTimEnd": "2008-09-02T16:15:00+02:00", "dTimStart": "2008-09-02T13:30:00+02:00", "md": "1044", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up to TDS, RIH to 1050, pumped 16m³ of Citric Acid, 1.06 SG @ 1500 lpm, pressure 13.7bars, displaced with 12m³ 1.03 SG brine @ 1500 lpm. \n", "dTimEnd": "2008-09-02T17:00:00+02:00", "dTimStart": "2008-09-02T16:15:00+02:00", "md": "1050", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed STD pipe valve, monitored well on trip tank for losses. Loss rate 260lpm dropped to 118lpm.", "dTimEnd": "2008-09-02T18:00:00+02:00", "dTimStart": "2008-09-02T17:00:00+02:00", "md": "1050", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled the upper cup into the blank pipe and swabbed the well 2 times with 20 m strokes 30 m/min. Ran back to 1050 m. Opened the stand pipe valve. Pumped 0.5 m³ down DP and displaced clean acid into well bore. Closed stand pipe valve. Let Citric acid soak. Loss rate 50 lpm.", "dTimEnd": "2008-09-02T19:15:00+02:00", "dTimStart": "2008-09-02T18:00:00+02:00", "md": "1050", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled the upper cup into the blank pipe and swabbed the well 2 times with 20 m strokes 30 m/min. Ran back to 1050 m. Opened the stand pipe valve. Pumped 0.5 m³ down DP and displaced clean acid into well bore. Closed stand pipe valve. Let Citric acid soak. Loss rate 50 lpm.", "dTimEnd": "2008-09-02T20:30:00+02:00", "dTimStart": "2008-09-02T19:15:00+02:00", "md": "1050", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled the upper cup into the blank pipe and swabbed the well 3 times with 20 m strokes 40 m/min. Ran back to 1050 m. Opened the stand pipe valve. Pumped 0.5 m³ down DP and displaced clean acid into well bore. Closed stand pipe valve. Let Citric acid soak. Loss rate 50 lpm.", "dTimEnd": "2008-09-02T21:30:00+02:00", "dTimStart": "2008-09-02T20:30:00+02:00", "md": "1050", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled the upper cup into the blank pipe and swabbed the well 4 times with 20 m strokes 50 m/min. Ran back to 1050 m. Opened the stand pipe valve. Pumped 0.5 m³ down DP and displaced clean acid into well bore. Closed stand pipe valve. Let Citric acid soak. Loss rate 50 lpm.", "dTimEnd": "2008-09-02T22:15:00+02:00", "dTimStart": "2008-09-02T21:30:00+02:00", "md": "1050", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled the upper cup into the blank pipe and swabbed the well for 10mins, 11times with 20 m strokes 50 m/min. Ran back to 1050 m. Opened the stand pipe valve. Pumped 0.5 m³ down DP and displaced clean acid into well bore. Closed stand pipe valve. Let Citric acid soak. Loss rate 250lpm.", "dTimEnd": "2008-09-02T23:00:00+02:00", "dTimStart": "2008-09-02T22:15:00+02:00", "md": "1050", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled the upper cup into the blank pipe and swabbed the well for 10mins, 11times with 20 m strokes 50 m/min. Ran back to 1050 m. Opened the stand pipe valve. Pumped 0.5 m³ down DP and displaced clean acid into well bore. Closed stand pipe valve. Let Citric acid soak. Loss rate 700lpm dropped to 520lpm.", "dTimEnd": "2008-09-03T00:00:00+02:00", "dTimStart": "2008-09-02T23:00:00+02:00", "md": "1050", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_2008_09_04
NO 15/9-F-9
NO 15/9-F-9
name
2008-09-03T00:00:00+02:00
2008-09-04T00:00:00+02:00
normal
2018-05-03T13:53:15+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-09-04T00:00:00+02:00", "dTimDiaHoleStart": "2008-08-31T20:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Prepare to run ESP assembly. Spot equipment on deck and on drill floor. Commence MU ESP assemblies and connect cable. RIH with ESP.", "hpht": "0", "md": "1085", "mdCsgLast": "909.8", "mdDiaHoleStart": "1085", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "19", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Pumped 20 m³ 1.03 SG NaCl packer fluid. Took loss rate at 840m - 540 lpm. POOH and L/D BHA. RIH, retrieved bowl protector. Performed Tubing Hanger dummy run. Lost polypac seal \"O\" ring in well. Disconnected riser and verified no \"O\" in Well head. Made up Riser and diverter.", "tightWell": "0", "tvd": "1075.9", "tvdCsgLast": "905.1", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2008-09-03T10:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "1083", "mudClass": "other", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" }, { "dTim": "2008-09-03T22:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "1083", "mudClass": "other", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Loss rate 320lpm. Filled trip tanks.", "dTimEnd": "2008-09-03T00:30:00+02:00", "dTimStart": "2008-09-03T00:00:00+02:00", "md": "1050", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled the upper cup into the blank pipe and swabbed the well for 10mins, 8 times with 20 m strokes 50 m/min. Ran back to 1050 m. Opened the stand pipe valve. Pumped 0.5 m³ down DP and displaced clean acid into well bore. Closed stand pipe valve. Let Citric acid soak. Losses rate 220lpm.", "dTimEnd": "2008-09-03T01:30:00+02:00", "dTimStart": "2008-09-03T00:30:00+02:00", "md": "1050", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled the upper cup into the blank pipe and swabbed the well for 10mins, 11times with 20 m strokes 50 m/min. Change in drag as swabbing. Ran back to 1050 m. Opened the stand pipe valve. Pumped 0.5 m³ down DP and displaced clean acid into well bore. Closed stand pipe valve. Let Citric acid soak. Loss rate 110 lpm.", "dTimEnd": "2008-09-03T03:00:00+02:00", "dTimStart": "2008-09-03T01:30:00+02:00", "md": "1050", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled the upper cup into the blank pipe and swabbed the well for 10mins, 11times with 20 m strokes 50 m/min. Ran back to 1050 m. Opened the stand pipe valve. Pumped 0.5 m³ down DP and displaced clean acid into well bore. Closed stand pipe valve. Let Citric acid soak. Loss rate 80 lpm.", "dTimEnd": "2008-09-03T03:45:00+02:00", "dTimStart": "2008-09-03T03:00:00+02:00", "md": "1050", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up on 1.03 sg brine and attempted to pump down into formation. Had full return 400lpm. Total pumped 2.3m³.", "dTimEnd": "2008-09-03T04:15:00+02:00", "dTimStart": "2008-09-03T03:45:00+02:00", "md": "1050", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk, lined up and POOH to 890m. Located lower swab cup inside the blank pipe.", "dTimEnd": "2008-09-03T06:00:00+02:00", "dTimStart": "2008-09-03T04:15:00+02:00", "md": "890", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pumped 20 m³ 1.03 SG NaCl packer fluid at 440 - 450 lpm 1.4 bar.", "dTimEnd": "2008-09-03T07:15:00+02:00", "dTimStart": "2008-09-03T06:00:00+02:00", "md": "860", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH from 890m to 840m. Made up TDS\n", "dTimEnd": "2008-09-03T07:30:00+02:00", "dTimStart": "2008-09-03T07:15:00+02:00", "md": "840", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Established loss rate and monitored trip tank. Filled trip tank with packer fluid. Average loss rate 540 lpm.\n", "dTimEnd": "2008-09-03T08:30:00+02:00", "dTimStart": "2008-09-03T07:30:00+02:00", "md": "840", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke TDS, POOH from 840m to 172m. Filled with packer fluid via trip tank 90 m³. Pulled slowly due to U-tubing.\n", "dTimEnd": "2008-09-03T10:15:00+02:00", "dTimStart": "2008-09-03T08:30:00+02:00", "md": "172", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk and removed PS 21 slips and 10 inch. diverter inserts.\n", "dTimEnd": "2008-09-03T11:00:00+02:00", "dTimStart": "2008-09-03T10:15:00+02:00", "md": "172", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued POOH Swab assy from 172m to surface. Measured Swabs: upper 8.4\" lower 8.7\".\n", "dTimEnd": "2008-09-03T12:15:00+02:00", "dTimStart": "2008-09-03T11:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to pull bowl protector.\n", "dTimEnd": "2008-09-03T12:30:00+02:00", "dTimStart": "2008-09-03T12:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up bowl protector pull tool.\n", "dTimEnd": "2008-09-03T12:45:00+02:00", "dTimStart": "2008-09-03T12:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled master bushing and diverter inserts. Pulled bowl protector and laid out same.\n", "dTimEnd": "2008-09-03T14:00:00+02:00", "dTimStart": "2008-09-03T12:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up jet assy and jet well head 12-21 mtrs. 1500 lpm. 5 RPM. Pulled out and laid out jet assy.\n", "dTimEnd": "2008-09-03T15:00:00+02:00", "dTimStart": "2008-09-03T14:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk, picked up hanger assy and ran same. Verified position of orientation slot on TBG head. Pulled back to surface. \"O\" ring on TBG hanger missing.\n", "dTimEnd": "2008-09-03T17:30:00+02:00", "dTimStart": "2008-09-03T15:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Investigated and discoustednted further action with onshore orginsation.", "dTimEnd": "2008-09-03T19:30:00+02:00", "dTimStart": "2008-09-03T17:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held tool box talk and retrived diverter.", "dTimEnd": "2008-09-03T23:00:00+02:00", "dTimStart": "2008-09-03T19:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Hold tool box talk and rigged up to pull riser. Removed horizontal tensioning system. Attempted to pull riser.\n", "dTimEnd": "2008-09-04T00:00:00+02:00", "dTimStart": "2008-09-03T23:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" } ]
[]
15_9_F_9_2008_09_05
NO 15/9-F-9
NO 15/9-F-9
name
2008-09-04T00:00:00+02:00
2008-09-05T00:00:00+02:00
normal
2018-05-03T13:53:15+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-09-05T00:00:00+02:00", "dTimDiaHoleStart": "2008-09-04T07:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Continue RIH with ESP on 7 5/8\" tubing from 699m to 807m. Install the tubing hanger and release from same. N/D the diverter and the riser. Install the Tubing Bonnet, spacer spool and ball valve assembly. Leak test cable penetrator seals in tubing bonnet to 69 bar (1000 psi). Leak test the tubing bonnet cavity to 69 bar (1000 psi).\n", "hpht": "0", "md": "1085", "mdCsgLast": "1064", "mdDiaHoleStart": "1085", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "20", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "MU ESP assemblies and connected cable. RIH with ESP from surface to 699m.", "tightWell": "0", "tvd": "1075.9", "tvdCsgLast": null, "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2008-09-04T11:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "1083", "mudClass": "other", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Unable to release riser from well head. Trouble shoot problem. Worked snap ring several times. Found the 12 threaded holes of the riser connector to be damaged, re-cutted the threaded holes. Made up the 12 bolt to correct distance to be able to collapse snap ring probably.", "dTimEnd": "2008-09-04T04:15:00+02:00", "dTimStart": "2008-09-04T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Pulled surface riser from well head. No sign of \"O\" ring. Re-installed surface riser and horizontal tensioning system.", "dTimEnd": "2008-09-04T05:00:00+02:00", "dTimStart": "2008-09-04T04:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Rigged down riser handling gear. Nippled up diverter.\n", "dTimEnd": "2008-09-04T06:00:00+02:00", "dTimStart": "2008-09-04T05:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Installed diverter and master bushing.\n", "dTimEnd": "2008-09-04T07:00:00+02:00", "dTimStart": "2008-09-04T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Cleared and cleaned rig floor prior to ESP operation. \n", "dTimEnd": "2008-09-04T08:00:00+02:00", "dTimStart": "2008-09-04T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk, rigged up csg equipment and m/u swegde.\n", "dTimEnd": "2008-09-04T10:15:00+02:00", "dTimStart": "2008-09-04T08:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk, picked up and made up ESP assembly.\n", "dTimEnd": "2008-09-04T13:45:00+02:00", "dTimStart": "2008-09-04T10:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed inserts to 7 5/8\". Picked up and made up xo jnt. \n", "dTimEnd": "2008-09-04T15:30:00+02:00", "dTimStart": "2008-09-04T13:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed control line sheave in hang off wire.\n", "dTimEnd": "2008-09-04T16:15:00+02:00", "dTimStart": "2008-09-04T15:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Connected control lines to motor. Pumped oil into the motor by a hand pump. Serviced the motor and evacuated the air. Connected up the electrical cable to the motor and tested out same. Made up ¼\" hydraulic line from Multisensor gauge.\n", "dTimEnd": "2008-09-04T19:00:00+02:00", "dTimStart": "2008-09-04T16:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Leak tested ¼\" hydraulic line from the Multisensor gauge to discharge pressure assembly 207 bar (3000 psi) for 10 minutes.\n", "dTimEnd": "2008-09-04T19:45:00+02:00", "dTimStart": "2008-09-04T19:00:00+02:00", "md": "16", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleared rig floor of redundant equipment.\n", "dTimEnd": "2008-09-04T20:15:00+02:00", "dTimStart": "2008-09-04T19:45:00+02:00", "md": "16", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Hold tool box talk. Made up 1st 7 5/8\" stand of tubing from derrick to ESP assembly. Installed and function tested auto slips.\n\nParallel activity. Retrieved riser guide funnel.", "dTimEnd": "2008-09-04T22:00:00+02:00", "dTimStart": "2008-09-04T20:15:00+02:00", "md": "56", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with ESP on 7 5/8\" casing in stands from surface to 163m. Installed cable clamps every joint. Checked the Phoenix connection frequently. Running speed: 72 m/hr.\n", "dTimEnd": "2008-09-05T00:00:00+02:00", "dTimStart": "2008-09-04T22:00:00+02:00", "md": "163", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_2008_09_06
NO 15/9-F-9
NO 15/9-F-9
name
2008-09-05T00:00:00+02:00
2008-09-06T00:00:00+02:00
normal
2018-05-03T13:53:15+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-09-06T00:00:00+02:00", "dTimDiaHoleStart": "2008-09-04T07:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Install Tubing Bonnet, spacer spool and ball valve assembly. Leak test the tubing bonnet cavity to 69 bar (1000 psi). Skid Cantilever to F-15. Rig up for run drilling riser. Start to run Drilling riser. ", "hpht": "0", "md": "1085", "mdCsgLast": "1064", "mdDiaHoleStart": "1085", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "21", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Continued RIH with ESP on 7 5/8\" tubing from 699m to 806m. Made up Tubing Hanger and Penetrator. Installed the tubing hanger and released RT from same. Nippled down Diverter and surface riser.", "tightWell": "0", "tvd": "1075.9", "tvdCsgLast": null, "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2008-09-05T10:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "1083", "mudClass": "other", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" }, { "dTim": "2008-09-05T22:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "1083", "mudClass": "other", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Continued RIH with ESP on 7 5/8\" casing in stand from 163m to 699m. Installed cable clamps every joint. Checked the Phoenix connection frequently. Running speed: 90 m/hr.\n\nParallel activity: Injected slop in well F14.", "dTimEnd": "2008-09-05T06:00:00+02:00", "dTimStart": "2008-09-05T00:00:00+02:00", "md": "699", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box and continued RIH with ESP on 7 5/8\" casing, picked up singles from cantilever from 699m to 807m. Installed cable clamps every joint. Checked the Phoenix connection frequently.\n\nParallel activity: Injected slop in well F14.\n Derrick insp. Daily maintenance \n Worked on flow line hose on wellhead.\n Performed BOP test to 15 k.\n", "dTimEnd": "2008-09-05T09:30:00+02:00", "dTimStart": "2008-09-05T06:00:00+02:00", "md": "806", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed elevator inserts to 5½\"\n", "dTimEnd": "2008-09-05T09:45:00+02:00", "dTimStart": "2008-09-05T09:30:00+02:00", "md": "806", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to pick up and make up Tubing Hanger.\n", "dTimEnd": "2008-09-05T10:00:00+02:00", "dTimStart": "2008-09-05T09:45:00+02:00", "md": "806", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up complete Tubing Hanger/swivel sub assembly and made up to 7 5/8\" tubing. Attempted to brake FAST connection. Modified dies to brake FAST connection.\n", "dTimEnd": "2008-09-05T11:45:00+02:00", "dTimStart": "2008-09-05T10:00:00+02:00", "md": "806", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed big wheels to casing tong due to high stick up of FAST connection.\n", "dTimEnd": "2008-09-05T12:00:00+02:00", "dTimStart": "2008-09-05T11:45:00+02:00", "md": "806", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke FAST connection, Orientated hanger by rotating hanger assy in FAST connector according to Schlumberger procedure, and made up FAST connection.\n", "dTimEnd": "2008-09-05T12:30:00+02:00", "dTimStart": "2008-09-05T12:00:00+02:00", "md": "806", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk, removed slips, Master Bushing and disconnected casing tong.\n", "dTimEnd": "2008-09-05T13:15:00+02:00", "dTimStart": "2008-09-05T12:30:00+02:00", "md": "806", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed penetrator and performed cable test to 1100 psi (76 bars) 10 min.\n", "dTimEnd": "2008-09-05T14:00:00+02:00", "dTimStart": "2008-09-05T13:15:00+02:00", "md": "806", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Spaced out and measured for cutting length of control cable.", "dTimEnd": "2008-09-05T14:45:00+02:00", "dTimStart": "2008-09-05T14:00:00+02:00", "md": "812", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Checked electrical down hole system before cutting main cable. Cut main cable. Spliced cable to pigtail. Checked electrical system.\n\nParallel activity: Installed RLGF on F-15\n", "dTimEnd": "2008-09-05T19:00:00+02:00", "dTimStart": "2008-09-05T14:45:00+02:00", "md": "812", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk and checked equipment.\n", "dTimEnd": "2008-09-05T19:30:00+02:00", "dTimStart": "2008-09-05T19:00:00+02:00", "md": "812", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attached penetrator to tubing hanger. \n\nParallel activity: Continuing BOP test to 15k.\n Installed 4 tension cylinders F-15,\n", "dTimEnd": "2008-09-05T20:00:00+02:00", "dTimStart": "2008-09-05T19:30:00+02:00", "md": "812", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Leak tested penetrator \"O\"-rings in tubing hanger, to 69 bars for 10 minutes. Checked electrical system.\n", "dTimEnd": "2008-09-05T20:45:00+02:00", "dTimStart": "2008-09-05T20:00:00+02:00", "md": "812", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed Master bushing. RIH with Tubing Hanger and landed off at surface well head. 20.9m. \n", "dTimEnd": "2008-09-05T21:30:00+02:00", "dTimStart": "2008-09-05T20:45:00+02:00", "md": "834", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Checked electrical system. Cable resistance 2000 mega OHM. Released test lead. Installed master bushing. Backed off landing string, pulled out and laid down landing string.\n", "dTimEnd": "2008-09-05T22:30:00+02:00", "dTimStart": "2008-09-05T21:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed casing tong. Rigged down tubing handling equipment. Laid out running tool.\n", "dTimEnd": "2008-09-05T23:45:00+02:00", "dTimStart": "2008-09-05T22:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to rig down ESP electrical cable and sheave from derrick.\n", "dTimEnd": "2008-09-06T00:00:00+02:00", "dTimStart": "2008-09-05T23:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_2008_09_07
NO 15/9-F-9
NO 15/9-F-9
name
2008-09-06T00:00:00+02:00
2008-09-07T00:00:00+02:00
normal
2018-05-03T13:53:15+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-09-07T00:00:00+02:00", "dTimDiaHoleStart": "2008-09-04T07:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Run HPDR Riser F-15", "hpht": "0", "md": "1085", "mdCsgLast": "1064", "mdDiaHoleStart": "1085", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "22", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Installed Tubing Bonnet. Leak tested Tubing Bonnet cavity to 69 bar 10 min. Pressure tested penetrator to 69 bar 10 min.", "tightWell": "0", "tvd": "1075.9", "tvdCsgLast": null, "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2008-09-06T10:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "1083", "mudClass": "other", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Rigged down ESP electrical cable and sheave from derrick.\n", "dTimEnd": "2008-09-06T01:15:00+02:00", "dTimStart": "2008-09-06T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk, removed redundant equipment from rig floor.\n", "dTimEnd": "2008-09-06T01:45:00+02:00", "dTimStart": "2008-09-06T01:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged up to nipple down diverter and surface riser. Bled off diverter insert and overshot pressure.\n", "dTimEnd": "2008-09-06T03:15:00+02:00", "dTimStart": "2008-09-06T01:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled diverter, parked and secured same at set back area.\n", "dTimEnd": "2008-09-06T03:45:00+02:00", "dTimStart": "2008-09-06T03:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged up to pull surface riser.\n", "dTimEnd": "2008-09-06T04:00:00+02:00", "dTimStart": "2008-09-06T03:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed horizontal tensioning system. Released the surface riser and pull out surface riser.", "dTimEnd": "2008-09-06T05:00:00+02:00", "dTimStart": "2008-09-06T04:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk and laid out surface riser.", "dTimEnd": "2008-09-06T06:00:00+02:00", "dTimStart": "2008-09-06T05:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared for run Tubing Bonnet/spacer spool.\n", "dTimEnd": "2008-09-06T07:00:00+02:00", "dTimStart": "2008-09-06T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to installation of Tubing bonnet/spacer spool.\n", "dTimEnd": "2008-09-06T07:15:00+02:00", "dTimStart": "2008-09-06T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up Tubing Bonnet/spacer spool and made up to dual lifting assy.\n", "dTimEnd": "2008-09-06T07:45:00+02:00", "dTimStart": "2008-09-06T07:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared Well head for landing off Tubing Bonnet/spacer spool. Vetco/Schlumberger\n", "dTimEnd": "2008-09-06T08:15:00+02:00", "dTimStart": "2008-09-06T07:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lowered down Tubing Bonnet/spacer spool. Installed same.\n", "dTimEnd": "2008-09-06T09:00:00+02:00", "dTimStart": "2008-09-06T08:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Leak tested Tubing Bonnet cavity to 69 bar 10 min.\n", "dTimEnd": "2008-09-06T09:45:00+02:00", "dTimStart": "2008-09-06T09:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressure tested penetrator to 69 bar 10 min.\n", "dTimEnd": "2008-09-06T10:00:00+02:00", "dTimStart": "2008-09-06T09:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Retrieved dual lifting assy slings from Tubing Bonnet/spacer spool. Installed Master bushing.\n", "dTimEnd": "2008-09-06T10:30:00+02:00", "dTimStart": "2008-09-06T10:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Signal tested Schlumberger connection. Laid out dual lifting assy slings.\n", "dTimEnd": "2008-09-06T10:45:00+02:00", "dTimStart": "2008-09-06T10:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lowered down flowline spool piece for F9. Installed hatches in moon pool. Installed BX elevator on TDS bails. P/U spider to rig floor. Pre-check prior to skidding of cantilever from F-9 to F-15.............Handed well over to Maersk Production.........\n", "dTimEnd": "2008-09-06T12:00:00+02:00", "dTimStart": "2008-09-06T10:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_2009_06_25
NO 15/9-F-9
NO 15/9-F-9
name
2009-06-24T00:00:00+02:00
2009-06-25T00:00:00+02:00
normal
2018-05-03T13:53:16+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2009-06-25T00:00:00+02:00", "dTimDiaHoleStart": "2009-06-24T06:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Pull 9 7/8\" tubing with ESP and cable. Rig up to perform cement bond log.", "hpht": "0", "md": "1085", "mdCsgLast": "1064", "mdDiaHoleStart": "1085", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "1", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Well handed over from production. Removed flowline. Pulled spacer spool and tubing bonnet. Installed surface riser and diverter. RU and pulled 7 5/8\" tubing with ESP and cable from 834 m to 746 m.", "tightWell": "0", "tvd": "1075.9", "tvdCsgLast": null, "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[]
[]
[]
[ { "comments": "Well handed over from production.", "dTimEnd": "2009-06-24T06:30:00+02:00", "dTimStart": "2009-06-24T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed pre job meeting with involved personnel. Prepared for and disconnected surface cable.", "dTimEnd": "2009-06-24T09:30:00+02:00", "dTimStart": "2009-06-24T06:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Disconnected flow line and secured same on XMT deck.", "dTimEnd": "2009-06-24T10:15:00+02:00", "dTimStart": "2009-06-24T09:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared for lifting of spacer spool.", "dTimEnd": "2009-06-24T10:45:00+02:00", "dTimStart": "2009-06-24T10:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT prior to continue work on wellhead, crewchange.", "dTimEnd": "2009-06-24T11:00:00+02:00", "dTimStart": "2009-06-24T10:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed blank cap on flowline hose. Opened annulus inlet, tested port and ball valve and verified no pressure or hydrocarbons.", "dTimEnd": "2009-06-24T12:15:00+02:00", "dTimStart": "2009-06-24T11:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT prior to dual lift operation of spacer spool.", "dTimEnd": "2009-06-24T12:30:00+02:00", "dTimStart": "2009-06-24T12:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Disconnected and lifted spacer spool and tubing bonnet with ball valve to drill floor. Used double lift slings for the lifting operation.", "dTimEnd": "2009-06-24T15:15:00+02:00", "dTimStart": "2009-06-24T12:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed masterbushing. Cleaned the pulled assembly, moved same to moonpool and laid down for inspection. Meanwhile inspected wellhead prior to picking up riser.", "dTimEnd": "2009-06-24T16:30:00+02:00", "dTimStart": "2009-06-24T15:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk with all involved personnel.", "dTimEnd": "2009-06-24T16:45:00+02:00", "dTimStart": "2009-06-24T16:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up riser. Removed master bushing and outer ring. Lowered riser and made up to wellhead.", "dTimEnd": "2009-06-24T17:45:00+02:00", "dTimStart": "2009-06-24T16:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Secured riser with BOP horizontal tension system in moonpool.", "dTimEnd": "2009-06-24T18:15:00+02:00", "dTimStart": "2009-06-24T17:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk. Rigged up to install diverter.", "dTimEnd": "2009-06-24T19:30:00+02:00", "dTimStart": "2009-06-24T18:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran diverter and landed off on riser. Installed master bushings.", "dTimEnd": "2009-06-24T20:30:00+02:00", "dTimStart": "2009-06-24T19:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk. Rigged up sheaves in derrick for ESP cables. Rigged down diverter handling equipment.", "dTimEnd": "2009-06-24T23:15:00+02:00", "dTimStart": "2009-06-24T20:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged up 5 1/2\" handling equipment.", "dTimEnd": "2009-06-24T23:45:00+02:00", "dTimStart": "2009-06-24T23:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up and MU hanger running tool to landing string.", "dTimEnd": "2009-06-25T00:00:00+02:00", "dTimStart": "2009-06-24T23:45:00+02:00", "md": "834", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_2009_06_26
NO 15/9-F-9
NO 15/9-F-9
name
2009-06-25T00:00:00+02:00
2009-06-26T00:00:00+02:00
normal
2018-05-03T13:53:16+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2009-06-26T00:00:00+02:00", "dTimDiaHoleStart": "2009-06-24T06:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "RIH to 890 m with DP to circulate a soap pill for cleaning the casing.\nDisplace the well to clean SW and POOH.\nRig up for wireline logging and run a USIT-CBL log to verify cement quality behind 13-3/8\" casing.", "hpht": "0", "md": "1085", "mdCsgLast": "1064", "mdDiaHoleStart": "1085", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "2", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Prior to pulling tubing out of the hole attempted to break circulation. Found tubing to be plugged and consequently pulled 7-5/8\" tubing wet. Retrieved 7-5/8\" tubing from 746 m to 21m, - disconnected clamps and spooled power cable back on spooling unit. Found tubing fluid to be gradually more solid filled by depth and finally being completely solid above the pump.\nDisconnected and laid out \"bolt on\" discharge head complete with XO assy, ESP pump, protector assy and motor c/w down hole gauge and multisensor.\nRigged down handling equipment and cleared/cleaned the rig floor.\nInstalled the wear bushing at 21,9 m.", "tightWell": "0", "tvd": "1075.9", "tvdCsgLast": null, "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[]
[]
[]
[ { "comments": "RIH to 20 m and engaged hanger. Picked up 36 ton to release hanger. Pulled up, marked landing string and racked back same.", "dTimEnd": "2009-06-25T00:30:00+02:00", "dTimStart": "2009-06-25T00:00:00+02:00", "md": "820", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Positioned and rigged up casing tong.", "dTimEnd": "2009-06-25T02:00:00+02:00", "dTimStart": "2009-06-25T00:30:00+02:00", "md": "820", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled hanger through rotary. Installed master bushing. Cut cable and removed penetrator.", "dTimEnd": "2009-06-25T03:00:00+02:00", "dTimStart": "2009-06-25T02:00:00+02:00", "md": "806", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke out tubing hanger and swivel sub and laid out same with running tool.", "dTimEnd": "2009-06-25T03:30:00+02:00", "dTimStart": "2009-06-25T03:00:00+02:00", "md": "806", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed to 7 5/8\" handling equipment. Installed PS30 slips.", "dTimEnd": "2009-06-25T04:45:00+02:00", "dTimStart": "2009-06-25T03:30:00+02:00", "md": "806", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH to 746 m and LD 7 5/8\" tubing.", "dTimEnd": "2009-06-25T06:00:00+02:00", "dTimStart": "2009-06-25T04:45:00+02:00", "md": "760", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Spliced rope to cable and fed same through banana sheave and back to cable spooler.Prepared DP pub and swedge.", "dTimEnd": "2009-06-25T07:00:00+02:00", "dTimStart": "2009-06-25T06:00:00+02:00", "md": "746", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Had TBT prior to making up DP pup and swedge to the tubing string. Made up swedge to 7-5/8\" tubing string.", "dTimEnd": "2009-06-25T07:45:00+02:00", "dTimStart": "2009-06-25T07:00:00+02:00", "md": "746", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attempted to break circulation, but got minimal/no flow. Continued to pressure up tubing to 67 bar. Observed no pressure drop indicating plugged tubing. Suspect pump to be plug with debris. Bled off pressure and rigged down swedge.", "dTimEnd": "2009-06-25T09:00:00+02:00", "dTimStart": "2009-06-25T07:45:00+02:00", "md": "746", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held TBT prior to continue pulling 7-5/8\" tubing. Pulled 7-5/8\" tubing wet from 746 m to 138 m. Disconnected cable clamps and spooled power cable back to the spooling unit.", "dTimEnd": "2009-06-25T19:00:00+02:00", "dTimStart": "2009-06-25T09:00:00+02:00", "md": "138", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk with crew", "dTimEnd": "2009-06-25T19:15:00+02:00", "dTimStart": "2009-06-25T19:00:00+02:00", "md": "138", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pull out of hole laying 7-5/8\" out tubing. Pulling wet. \nRecovered a total of 67 clamps - none left in the hole. \nThe muddy solid filled tubing fluid was gradually becoming thicker and finally became solid just above the pump.", "dTimEnd": "2009-06-25T20:15:00+02:00", "dTimStart": "2009-06-25T19:15:00+02:00", "md": "21", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk with crew", "dTimEnd": "2009-06-25T20:30:00+02:00", "dTimStart": "2009-06-25T20:15:00+02:00", "md": "21", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleared rig floor. Removed PS30 auto slipsand installed master bushing. Removed HTS power roller form rig floor.", "dTimEnd": "2009-06-25T21:15:00+02:00", "dTimStart": "2009-06-25T20:30:00+02:00", "md": "21", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Laid out last tubing joint. Pulled out ESP assemblies and removed clamps, power cable and instrument line to multi sensor. Disconnected power cable from motor.", "dTimEnd": "2009-06-25T23:00:00+02:00", "dTimStart": "2009-06-25T21:15:00+02:00", "md": "18", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box meeting with crew prior to manriding", "dTimEnd": "2009-06-25T23:15:00+02:00", "dTimStart": "2009-06-25T23:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Carried out man riding to remove power cable and rig down sheave from derrick. Spooled power cable back on spooling unit.", "dTimEnd": "2009-06-26T00:00:00+02:00", "dTimStart": "2009-06-25T23:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_2009_06_27
NO 15/9-F-9
NO 15/9-F-9
name
2009-06-26T00:00:00+02:00
2009-06-27T00:00:00+02:00
normal
2018-05-03T13:53:16+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2009-06-27T00:00:00+02:00", "dTimDiaHoleStart": "2009-06-24T06:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Run 9-5/8\" EZSV plug and set same at 878 m. \nRIH with RTTS and pressure test EZSV to 126 bar.\nRIH with cement stinger and set a cement plug from 850 m to 650 m.", "hpht": "0", "md": "1085", "mdCsgLast": "1064", "mdDiaHoleStart": "1085", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "3", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Ran in in hole with open ended 5-1/2\" DP to 850,1 m and hang up slightly on top of PBR. At 854,5 m took weight and had no further progress. Rotated and washed down from 854,5 m to 892 m. \nRigged up Seawell and Schlumberger surface equipment for WL logging. Picked up tool string and ran in hole with USIT - CBL logging string to 845 m. Commenced logging up from 845 m to surface. Due to poor data in riser made a repeat run in riser section from 170 m to surface. Ran in hole and made a repeat logging run from 845 m to surface. Rigged down wireline equipment.\nPicked up and made up EZSV plug and running tool. RIH to plug setting depth at 878 m.", "tightWell": "0", "tvd": "1075.9", "tvdCsgLast": null, "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[]
[]
[]
[ { "comments": "Run back in with ESP assemblies. Disconnect bolt on discharge head c/w XO assy, pump, protector assy and motor.", "dTimEnd": "2009-06-26T02:45:00+02:00", "dTimStart": "2009-06-26T00:00:00+02:00", "md": "17", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rig down Schlumberger handling equipment and Weatherford casing equipment", "dTimEnd": "2009-06-26T03:15:00+02:00", "dTimStart": "2009-06-26T02:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Clean and clear rig floor.", "dTimEnd": "2009-06-26T04:30:00+02:00", "dTimStart": "2009-06-26T03:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up wear bushing c/w running tool. RIH to 20,9 m MD and installed wear bushing. Pulled out of hole and laid down WBRT.", "dTimEnd": "2009-06-26T05:30:00+02:00", "dTimStart": "2009-06-26T04:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed PS-21 auto slips and commenced to run in the hole with 5-1/2\" open ended DP.", "dTimEnd": "2009-06-26T06:00:00+02:00", "dTimStart": "2009-06-26T05:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in hole from 604 m to 854,5 m MD. At 850,1 m MD hang up on 9-5/8\" PBR - sat down 5 tons and rotated, circulated and worked the string through PBR. At 854,5m took weight 5 tons and had no further progress. Racked back one stand.", "dTimEnd": "2009-06-26T08:00:00+02:00", "dTimStart": "2009-06-26T06:00:00+02:00", "md": "854.5", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed 2 x 3m DP pup joints and final stand. Removed PS-21 slips and outer split ring to wash rotary.", "dTimEnd": "2009-06-26T08:45:00+02:00", "dTimStart": "2009-06-26T08:00:00+02:00", "md": "854.5", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Washed string down from 854 m to 892 m MD. Max 2000 lpm, 5 rpm, 4-8 bar.\nObserved up to 9,6 % gas peak, while washing down. Reduced flow rate while filling sand traps and starting degasser and then staged up pumps. Circulated a total of 105 m3 SW prior to wash pill.\n", "dTimEnd": "2009-06-26T10:15:00+02:00", "dTimStart": "2009-06-26T08:45:00+02:00", "md": "892", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Circulated a 20 m3 soap pill around. Displaced with app. 160 m3 of SW. Parameters: Max. 4500 lpm/ 38 bar - 5 rpm. Returns clean at the end. Re-installed PS-21 slips.", "dTimEnd": "2009-06-26T11:45:00+02:00", "dTimStart": "2009-06-26T10:15:00+02:00", "md": "892", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pull out of hole from 892 m to surface. Picked up single and re-installed on stand no.1.", "dTimEnd": "2009-06-26T13:45:00+02:00", "dTimStart": "2009-06-26T11:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleared and cleaned rig floor.", "dTimEnd": "2009-06-26T14:00:00+02:00", "dTimStart": "2009-06-26T13:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk with involved personnel prior to rigging up for wireline logging.", "dTimEnd": "2009-06-26T14:15:00+02:00", "dTimStart": "2009-06-26T14:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged up wireline cable sheaves and picked up logging tool string.", "dTimEnd": "2009-06-26T16:00:00+02:00", "dTimStart": "2009-06-26T14:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Conducted surface functional tests on Schlumberger logging tools.", "dTimEnd": "2009-06-26T16:15:00+02:00", "dTimStart": "2009-06-26T16:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in hole with Schlumberger USIT-CBL logging string to 845 m", "dTimEnd": "2009-06-26T18:00:00+02:00", "dTimStart": "2009-06-26T16:15:00+02:00", "md": "845", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Correlated the tool and commenced to log from 845 m to surface. Got poor data in the production riser (low hydrostatic pressure). Forwarded data to onshore contact person for data interpretation. Rig personnel simultaneously carried out cleaning of header box, shakers pads, flow line and sand traps.", "dTimEnd": "2009-06-26T21:30:00+02:00", "dTimStart": "2009-06-26T18:00:00+02:00", "md": "660", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in to 170 m and made a repeat run to surface of the riser section.", "dTimEnd": "2009-06-26T22:15:00+02:00", "dTimStart": "2009-06-26T21:30:00+02:00", "md": "170", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in hole with Schlumberger USIT - CBL logging string to 845 m.", "dTimEnd": "2009-06-26T23:30:00+02:00", "dTimStart": "2009-06-26T22:15:00+02:00", "md": "845", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Carried out repeat logging pass from 845 m to 695 m.", "dTimEnd": "2009-06-27T00:00:00+02:00", "dTimStart": "2009-06-26T23:30:00+02:00", "md": "695", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_2009_06_28
NO 15/9-F-9
NO 15/9-F-9
name
2009-06-27T00:00:00+02:00
2009-06-28T00:00:00+02:00
normal
2018-05-03T13:53:16+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2009-06-28T00:00:00+02:00", "dTimDiaHoleStart": "2009-06-24T06:00:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Run in hole with 12-1/4\" drift assembly to 500 m to drift casing.\nWait for cement plug # 1 to set up.\nTest/tag cement plug # 1\nSet cement plug # 2 from 650 m to 590 m.", "hpht": "0", "md": "1085", "mdCsgLast": "1064", "mdDiaHoleStart": "1085", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "650", "mdStrengthForm": "0", "presTestType": null, "reportNo": "4", "ropCurrent": "-999.99", "strengthForm": "1.03", "sum24Hr": "Ran in hole with EZSV plug to 878 m and sat same. Pulled running out of the hole.\nRan in hole with RTTS test packer and sat same at 222 m. Tested the EZSV from above to 126 bar. Released and retrieve RTTS.\nMade up cement stinger and ran in hole to 875 m. Circulated btms up with 138 bar/4000 lpm.\nPumped 20 m3 of DW spacer ahead of cement. Mixed and pumped 16,8 m3 1,9 sg cement (800 lpm) and displaced same with 5,1m3 of DW. Cement plug #1 placed at 878 m to 650 m.\nPulled out of the hole with cement stinger. ", "tightWell": "0", "tvd": "1075.9", "tvdCsgLast": null, "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[]
[]
[]
[ { "comments": "Continued repeat logging pass from 695 m to surface.", "dTimEnd": "2009-06-27T03:30:00+02:00", "dTimStart": "2009-06-27T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Laid out logging string and rigged down wireline equipment. Discussed barrier situation with onshore. Log interpretation to be found in \"DBR 14. Logging remarks\".", "dTimEnd": "2009-06-27T04:45:00+02:00", "dTimStart": "2009-06-27T03:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed handling equipment for 5-1/2\" DP and rigged up for running EZSV. Pick up and made up EZSV with running tool.", "dTimEnd": "2009-06-27T05:45:00+02:00", "dTimStart": "2009-06-27T04:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in hole with EZSV plug on DP at 50 m..", "dTimEnd": "2009-06-27T06:00:00+02:00", "dTimStart": "2009-06-27T05:45:00+02:00", "md": "50", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in hole with EZSV plug on DP to 366 m.", "dTimEnd": "2009-06-27T07:00:00+02:00", "dTimStart": "2009-06-27T06:00:00+02:00", "md": "366", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Toolbox talk with new shift.\nRan in from 366 m to EZSV setting depth 878 m. Running speed 1,5 min/std, filling pipe every 5 stds.", "dTimEnd": "2009-06-27T08:45:00+02:00", "dTimStart": "2009-06-27T07:00:00+02:00", "md": "878", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Position EZSV plug at 878 m in neutral weight (=95 t). Sat EZSV and observed sleeve to shear at 117 ton. RIH and tagged the EZSV with 10 t - OK.", "dTimEnd": "2009-06-27T09:30:00+02:00", "dTimStart": "2009-06-27T08:45:00+02:00", "md": "878", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole with running tool from 878 m to 15 m.", "dTimEnd": "2009-06-27T10:30:00+02:00", "dTimStart": "2009-06-27T09:30:00+02:00", "md": "15", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed out PS-21 slips to master bushing and laid out EZSV running tool", "dTimEnd": "2009-06-27T11:00:00+02:00", "dTimStart": "2009-06-27T10:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Had Tool box talk prior to picking up RTTS\nMade up side entry sub assembly. PU and MU Halliburton RTTS assembly and confirmed same to be open.", "dTimEnd": "2009-06-27T13:30:00+02:00", "dTimStart": "2009-06-27T11:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in hole to 222 m. Flushed RTTS packer sealing interval with SW 400-800 lpm.\nPosition RTTS at 219 m and set same.", "dTimEnd": "2009-06-27T15:30:00+02:00", "dTimStart": "2009-06-27T13:30:00+02:00", "md": "219", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made a line test 200 bar OK. Pressure tested the RTTS to 126 bar/10 min. OK. Volume pumped/returned 349 l.", "dTimEnd": "2009-06-27T16:30:00+02:00", "dTimStart": "2009-06-27T15:30:00+02:00", "md": "219", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged down cement hose and released RTTS packer. Pulled out of the hole from 219 m to 11 m.", "dTimEnd": "2009-06-27T17:45:00+02:00", "dTimStart": "2009-06-27T16:30:00+02:00", "md": "11", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Laid out RTTS assembly. Cleared and cleaned rig floor.", "dTimEnd": "2009-06-27T18:15:00+02:00", "dTimStart": "2009-06-27T17:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk with crew prior to running in hole with 3-1/2\" DP", "dTimEnd": "2009-06-27T18:30:00+02:00", "dTimStart": "2009-06-27T18:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged up handling equipment for 3-1/2\" DP. Grease equipment.", "dTimEnd": "2009-06-27T19:15:00+02:00", "dTimStart": "2009-06-27T18:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up cement stinger to string and ran in hole to 319 m.", "dTimEnd": "2009-06-27T20:00:00+02:00", "dTimStart": "2009-06-27T19:15:00+02:00", "md": "319", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Change handling gear to 5-1/2\" DP and ran in hole from 319 m to 875 m. \nCirculated btms up at 4000 lpm and 138 bar.", "dTimEnd": "2009-06-27T22:15:00+02:00", "dTimStart": "2009-06-27T20:00:00+02:00", "md": "875", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk to crew prior to cement job", "dTimEnd": "2009-06-27T22:30:00+02:00", "dTimStart": "2009-06-27T22:15:00+02:00", "md": "875", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Laid out single and installed 3m pup, side entry sub and FOSV onto string. Made string up to TDS.\nConfirmed line up and conducted line test 200 bar/5 min.", "dTimEnd": "2009-06-27T23:30:00+02:00", "dTimStart": "2009-06-27T22:30:00+02:00", "md": "875", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pumped 20 m3 DW as a spacer. 2000 lpm/42 bar with mud pump.", "dTimEnd": "2009-06-28T00:00:00+02:00", "dTimStart": "2009-06-27T23:30:00+02:00", "md": "875", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_2009_06_29
NO 15/9-F-9
NO 15/9-F-9
name
2009-06-28T00:00:00+02:00
2009-06-29T00:00:00+02:00
normal
2018-05-03T13:53:16+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": ".7", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2009-06-29T00:00:00+02:00", "dTimDiaHoleStart": "2009-06-28T22:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Run in hole with 13-3/8\" whipstock and install same at 432 m - 190 deg azimuth\nMill 13-3/8\" window in 13-3/8\" casing", "hpht": "0", "md": "590", "mdCsgLast": "1064", "mdDiaHoleStart": "219", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "590", "mdStrengthForm": "0", "presTestType": null, "reportNo": "5", "ropCurrent": "-999.99", "strengthForm": "1.03", "sum24Hr": "Ran in hole with 12-1/4\" mill assembly to 480 m to drift the 13-3/8\" casing before whip stock installation. Observed no obstructions.\nPulled out of the hole and laid down assembly.\nRan in hole with cement stinger on 3-1/2\" and 5-1/2\" DP and load tested cement plug #1 at 878 - 650 m. Found solid cement at 655 m and load tested OK with 5 ton.\nMixed and pumped 5,1 m3 1,90 sg cement slurry (800 lpm) and displaced same with 4,6 m3 DW (1200 lpm) to position cement plug in the interval 654 - 590 m. Pulled slowly back to 460 m stabbed sponge balls and circulated 1,5 x string volume at 2000 lpm. Pulled out of hole with cement string.\nMade up Multi Cycle Bypass Tool and attempted to function test tool. Both primary and back-up tool failed to operate. ", "tightWell": "0", "tvd": "590", "tvdCsgLast": null, "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[]
[]
[]
[ { "comments": "Mixed and pumped 16,8 m3 1,9 sg slurry 800 lpm with cement unit. Displaced cement with 5,1 m3 of DW with cement pump (1200 lpm). Cement plug set in the interval 650-878 m.", "dTimEnd": "2009-06-28T00:45:00+02:00", "dTimStart": "2009-06-28T00:00:00+02:00", "md": "875", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed cement hose and racked back cementing assembly. Flushed lines.\nPulled out of hole from 875 m to 540 m. 3 min/std.", "dTimEnd": "2009-06-28T02:00:00+02:00", "dTimStart": "2009-06-28T00:45:00+02:00", "md": "540", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed 2 ea sponge balls in string and circulated 1,5 x string volume. 130bar/4000 lpm.", "dTimEnd": "2009-06-28T02:15:00+02:00", "dTimStart": "2009-06-28T02:00:00+02:00", "md": "540", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up cementing assembly. Ran in hole and laid out same. Made up single to string and racked back same.", "dTimEnd": "2009-06-28T03:00:00+02:00", "dTimStart": "2009-06-28T02:15:00+02:00", "md": "540", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole from 540 m to 319 m. Change handling equipment to 3-1/2\" DP.", "dTimEnd": "2009-06-28T03:45:00+02:00", "dTimStart": "2009-06-28T03:00:00+02:00", "md": "319", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole from 319 m to surface. Racked back cement stinger. Changed handling equuipment to 5-1/2\" DP.", "dTimEnd": "2009-06-28T06:00:00+02:00", "dTimStart": "2009-06-28T03:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed handling equipment and picked up 12-1/4\" mill assembly and ran in hole to 7m.", "dTimEnd": "2009-06-28T07:00:00+02:00", "dTimStart": "2009-06-28T06:00:00+02:00", "md": "7", "phase": "fixed", "proprietaryCode": "plug abandon -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Tool box talk with new crew prior to running 12-1/4\" mill assembly", "dTimEnd": "2009-06-28T07:15:00+02:00", "dTimStart": "2009-06-28T07:00:00+02:00", "md": "7", "phase": "fixed", "proprietaryCode": "plug abandon -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to make 12-1/4\" millling BHA. - changed out master bushing to PS-21 slips", "dTimEnd": "2009-06-28T10:00:00+02:00", "dTimStart": "2009-06-28T07:15:00+02:00", "md": "131", "phase": "fixed", "proprietaryCode": "plug abandon -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in to 480 m and observed no obstructions while running in.", "dTimEnd": "2009-06-28T10:45:00+02:00", "dTimStart": "2009-06-28T10:00:00+02:00", "md": "480", "phase": "fixed", "proprietaryCode": "plug abandon -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole from 480 m to 131 m - broke circulation and observed clean returns.", "dTimEnd": "2009-06-28T11:30:00+02:00", "dTimStart": "2009-06-28T10:45:00+02:00", "md": "131", "phase": "fixed", "proprietaryCode": "plug abandon -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed PS-21 slips to master bushing- laid out and rack milling BHA.\nNote: Cement fully set up at 13:30 hrs", "dTimEnd": "2009-06-28T13:30:00+02:00", "dTimStart": "2009-06-28T11:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior to handling 3-1/2\" DP - rigged up for 3-1/2\" DP", "dTimEnd": "2009-06-28T14:30:00+02:00", "dTimStart": "2009-06-28T13:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk and ran in to with cement stinger on 3-1/2\" DP to 319 m.", "dTimEnd": "2009-06-28T15:30:00+02:00", "dTimStart": "2009-06-28T14:30:00+02:00", "md": "319", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed handling gear from 3-1/2\" to 5-1/2\" and continued to run in from 319 m to 610 m", "dTimEnd": "2009-06-28T16:15:00+02:00", "dTimStart": "2009-06-28T15:30:00+02:00", "md": "610", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Washed down 2000 lpm from 610 m to 655 m.- tagged hard cement at 655 m and sat down 5 ton.", "dTimEnd": "2009-06-28T17:00:00+02:00", "dTimStart": "2009-06-28T16:15:00+02:00", "md": "655", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool ox talk prior to setting cement plug whilst re-calculating the space out for side entry sub\nSpaced out DP and installed side entry sub.", "dTimEnd": "2009-06-28T18:00:00+02:00", "dTimStart": "2009-06-28T17:00:00+02:00", "md": "655", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Circulated 10 m3 of DW with rig pumps and verified line up from cement unit", "dTimEnd": "2009-06-28T18:15:00+02:00", "dTimStart": "2009-06-28T18:00:00+02:00", "md": "654", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Mixed and pumped 5,1 m3 of 1,90 sg \"G\" cement slurry at 800 lpm. Displaced the cement with 4,6 m3 DW at 1200 lpm (cement pump). Cement plug placed in interval 655-590 m.\nBroke out cementing assembly.", "dTimEnd": "2009-06-28T19:15:00+02:00", "dTimStart": "2009-06-28T18:15:00+02:00", "md": "654", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled from 654 m to 469 m with 3 min/std. Pulled stds dry.", "dTimEnd": "2009-06-28T19:45:00+02:00", "dTimStart": "2009-06-28T19:15:00+02:00", "md": "469", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Inserted 2 ea sponge balls in string. Made up TDS and circulated 1,5 x string volume at 2500 lpm.", "dTimEnd": "2009-06-28T20:00:00+02:00", "dTimStart": "2009-06-28T19:45:00+02:00", "md": "469", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole from 469 m to 319 m. Change handling gear from 5-1/2\" DP to 3-1/2\" DP. Pulled out to surface and laid cement stinger.", "dTimEnd": "2009-06-28T21:30:00+02:00", "dTimStart": "2009-06-28T20:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleared rig floor and changed handling equipment from 3-1/2\" to 5-1/2\" DP. Broke down cement stinger.", "dTimEnd": "2009-06-28T22:30:00+02:00", "dTimStart": "2009-06-28T21:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk to discuss handling of whipstock and test of Multifunction Bypas Valve", "dTimEnd": "2009-06-28T22:45:00+02:00", "dTimStart": "2009-06-28T22:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up Multicycle Bypass valve. Installed XO on top and btm + TIW .", "dTimEnd": "2009-06-28T23:45:00+02:00", "dTimStart": "2009-06-28T22:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in hole Multi Cycle Bypass Valve on one stand. Attempted to function test the valve.", "dTimEnd": "2009-06-29T00:00:00+02:00", "dTimStart": "2009-06-28T23:45:00+02:00", "md": "40", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_2009_06_30
NO 15/9-F-9
NO 15/9-F-9
name
2009-06-29T00:00:00+02:00
2009-06-30T00:00:00+02:00
normal
2018-05-03T13:53:16+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": "1.4", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2009-06-30T00:00:00+02:00", "dTimDiaHoleStart": "2009-06-28T22:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "2.5", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Complete milling of 13-3/8\" window at 421,5 - 428,2 m and drilling open hole to 436,5 m.\nCirculate hole clean and displace to 1,20 sg KCL/polymer mud\nPOOH with and lay out Whipstock milling BHA.\nMake up 12-1/4\" BHA and commence milling 12-1/4\" hole.", "hpht": "0", "md": "590", "mdCsgLast": "1064", "mdDiaHoleStart": "219", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "590", "mdStrengthForm": "0", "presTestType": null, "reportNo": "6", "ropCurrent": "-999.99", "strengthForm": "1.03", "sum24Hr": "Due to operational problems with MultiCycle By-pass Valve held meeting with service contractors and town to agree on a modified Whipstock BHA and setting procedure.\nMade up and ran in hole TrackMaster Whipstock and 12-1/4\" mill BHA to final setting depth 432 m. Made two wireline/gyro runs and confirmed final toolface to be 187 deg after having worked torque out of the string.\nPressured string up to 253 bar/10 min to set the whipstock slips, confirmed correct setting and sheared bolt for 12-1/4\" FastTrack Tri Mill with 32 ton over pull.\nMilled 12-1/4\" sidetrack window from 421,5 m (top) to 424 m. Note:Bottom window will be 428,2 m.\n", "tightWell": "0", "tvd": "590", "tvdCsgLast": null, "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[ { "dTim": "2009-06-29T23:00:00+02:00", "density": "1.2", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "water based", "presBopRating": "0", "pv": "18", "tempHthp": null, "type": "KCl/Polymer/GEM", "visFunnel": "-999.99", "yp": "7" }, { "dTim": "2009-06-29T23:30:00+02:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "98", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Pumped 4,5bar/500 lpm, 4,5bar/1000 lpm, 12bar/1500 lpm, 26bar/2000 lpm. Tool failed to operate.\nRepeated pressure sequences a second time with no success. Made two pressure cycles with 26 bar/2000 lpm and 40bar/2500 lpm. Tool failed to operate.", "dTimEnd": "2009-06-29T01:15:00+02:00", "dTimStart": "2009-06-29T00:00:00+02:00", "md": "40", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Decided to change to back-up tool. Changed out primary to back-up Multi Cycle Bypass Valve.", "dTimEnd": "2009-06-29T02:00:00+02:00", "dTimStart": "2009-06-29T01:15:00+02:00", "md": "40", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Pumped 4,5bar/1000 lpm, 20bar/2500 lpm. Tool failed to operate.\nRepeated pressure sequences a several times with no success.", "dTimEnd": "2009-06-29T03:30:00+02:00", "dTimStart": "2009-06-29T02:00:00+02:00", "md": "40", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Ran in hole to 205,5m with Multi Cycle Bypass Tool", "dTimEnd": "2009-06-29T04:15:00+02:00", "dTimStart": "2009-06-29T03:30:00+02:00", "md": "205", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Attempted to cycle Multi Cycle Tool with 18 bar/2500 lpm. No go. Repeated cycles with 1 min intervals between dipping pumps rather than 3 min. Observed +10 bar pressure spike every 3 rd cycle, but tool is not closing/activating.", "dTimEnd": "2009-06-29T05:30:00+02:00", "dTimStart": "2009-06-29T04:15:00+02:00", "md": "205", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Discussed options with town. Carried out house keeping and PM projects.", "dTimEnd": "2009-06-29T06:00:00+02:00", "dTimStart": "2009-06-29T05:30:00+02:00", "md": "205", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Discussed Multi Cycle By-pass Valve (MCBV) operational problems with service companies and town.", "dTimEnd": "2009-06-29T07:00:00+02:00", "dTimStart": "2009-06-29T06:00:00+02:00", "md": "207", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Attempted several times to cycle MCBV. Pulled out of hole from 207 m to surface. Broke out and laid out MCBV.\nSimultaneously had discussion and meeting with town regarding modified procedure and BHA configuration. Decided to take out MCBV and orient Whipstock with gyro on wireline.", "dTimEnd": "2009-06-29T12:30:00+02:00", "dTimStart": "2009-06-29T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Tool box talk with crew prior to making up Whipstock assembly", "dTimEnd": "2009-06-29T12:45:00+02:00", "dTimStart": "2009-06-29T12:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up and made up 13-3/8\" TrackMaster Whipstock assembly with 12-1/4\" Mill BHA. Surface to 266 m.Verified UBHO toolface offset and whipstock scribe lines.", "dTimEnd": "2009-06-29T18:15:00+02:00", "dTimStart": "2009-06-29T12:45:00+02:00", "md": "266", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in hole with Whipstock assembly from 266 m to final setting depth 432 m. Took 2 ton weight at 274 m but dropping off.", "dTimEnd": "2009-06-29T19:30:00+02:00", "dTimStart": "2009-06-29T18:15:00+02:00", "md": "432", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk with crew prior to rigging up wireline.", "dTimEnd": "2009-06-29T19:45:00+02:00", "dTimStart": "2009-06-29T19:30:00+02:00", "md": "432", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged up wireline sheaves and picked up Gyro tool. Ran in hole with Gyro to 402 m (UBHO sub).\nFound tool face orientation to be 178 deg. Rotated string to 190 deg. Confirmed by Gyro.", "dTimEnd": "2009-06-29T20:45:00+02:00", "dTimStart": "2009-06-29T19:45:00+02:00", "md": "432", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out with wireline and confirmed tell tale ok on Gyro. Moved string up/down twice to work out torque. Up/down weight 108/104 ton.", "dTimEnd": "2009-06-29T21:30:00+02:00", "dTimStart": "2009-06-29T20:45:00+02:00", "md": "432", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in hole with gyro on wireline to 402m. Found tool face to be 187 deg. (target =190 deg +/- 5 deg). Pulled out wireline and gyro.", "dTimEnd": "2009-06-29T23:00:00+02:00", "dTimStart": "2009-06-29T21:30:00+02:00", "md": "432", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "On final position screwed in with TDS. Pressured up the string to 253 bar/10 min to set the Whipstock slips. Observe hook load decrease from 106 t to 99 t. Proper setting confirm by setting down 10 t and applying over pull 10 ton. Pulled 140 ton (32 ton overpull) to shear bolt for 12-1/4\" FastTrack mill. Confirmed mill to be free.", "dTimEnd": "2009-06-29T23:45:00+02:00", "dTimStart": "2009-06-29T23:00:00+02:00", "md": "432", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Laid out 2 ea 3 m pup joints and made up one stand to string\nMidnight depth 416 m.", "dTimEnd": "2009-06-30T00:00:00+02:00", "dTimStart": "2009-06-29T23:45:00+02:00", "md": "416", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_2009_07_01
NO 15/9-F-9
NO 15/9-F-9
name
2009-06-30T00:00:00+02:00
2009-07-01T00:00:00+02:00
normal
2018-05-03T13:53:16+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": "2.2", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2009-07-01T00:00:00+02:00", "dTimDiaHoleStart": "2009-06-28T22:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Complete milling of 13-3/8\" window at 424,3 - 428,2 m and drilling open hole to 436,5 m.\nCirculate hole clean and displace to 1,20 sg KCL/polymer mud\nPOOH with and lay out Whipstock milling BHA.\nMake up 12-1/4\" BHA and commence drilling 12-1/4\" hole.", "hpht": "0", "md": "424.3", "mdCsgLast": "1064", "mdDiaHoleStart": "219", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "590", "mdStrengthForm": "0", "presTestType": null, "reportNo": "7", "ropCurrent": "-999.99", "strengthForm": "1.03", "sum24Hr": "Milled window from 423,8 m to 424,3 m with slow progress.\nObserved a 50 bar instant drop in SPP. Decided to pull out of hole and found 8-1/8\" XO had parted, leaving 7 m of BHA (12-1/4\" mill + watermelon mill) in hole. Top of fish at 417 m.\nPrepared and modified fishing tool (11-1/4\" overshot with extension sub and 9\" grapple). Ran in hole with overshot, latched fish at 417 m and pulled out same. 12-1/4\" TrackMaster mill + water melon mill was recovered. TrackMaster mill was completely worn out.\nCommenced to make 12-1/4\" TrackMaster milling BHA.", "tightWell": "0", "tvd": "424.3", "tvdCsgLast": null, "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[ { "dTim": "2009-06-30T22:00:00+02:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "109", "yp": "-999.99" }, { "dTim": "2009-06-30T20:00:00+02:00", "density": "1.2", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "water based", "presBopRating": "0", "pv": "18", "tempHthp": null, "type": "KCl/Polymer/GEM", "visFunnel": "-999.99", "yp": "7" } ]
[]
[]
[ { "comments": "Made up string to TDS. Took off bottom parameters up/down 105/102 tons. Tagged whipstock at 421,5 m. (=top of window). Commenced drilling window. Initially exprienced heavy vibration in string. Experienced an hydraulic leak on TDS.", "dTimEnd": "2009-06-30T01:15:00+02:00", "dTimStart": "2009-06-30T00:00:00+02:00", "md": "421.5", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Observed hydraulic leak on elevator. Pulled back to 417 m and fixed leak.", "dTimEnd": "2009-06-30T01:45:00+02:00", "dTimStart": "2009-06-30T01:15:00+02:00", "md": "422", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Milled window in 13-3/8\" casing according to instructions from Smith:\nFlow 1500 lpm / SPP 66 bar / String RPM 80 / WOB 1-2 MT / Torque 16-21 kNm", "dTimEnd": "2009-06-30T02:15:00+02:00", "dTimStart": "2009-06-30T01:45:00+02:00", "md": "422", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Milled window in 13-3/8\" casing 422,0-422,1m:\nFlow 2170 lpm / SPP 92 bar / String RPM 80 / WOB 3,5 MT / Torque 8-12 kNm", "dTimEnd": "2009-06-30T03:00:00+02:00", "dTimStart": "2009-06-30T02:15:00+02:00", "md": "422.1", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Milled window in 13-3/8\" casing 422,1-422,8 m:\nFlow 2170 lpm / SPP 93 bar / String RPM 90 / WOB 5,0 MT / Torque 8-15 kNm . Pumped Hi-vis sweep", "dTimEnd": "2009-06-30T04:00:00+02:00", "dTimStart": "2009-06-30T03:00:00+02:00", "md": "422.8", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Milled window in 13-3/8\" casing 422,8 - 423,0 m:\nFlow 2170 lpm / SPP 88 bar / String RPM 95 / WOB 5,0 MT / Torque 12-18 kNm", "dTimEnd": "2009-06-30T05:00:00+02:00", "dTimStart": "2009-06-30T04:00:00+02:00", "md": "423", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Milled window in 13-3/8\" casing 423,0 - 423,8 m:\nFlow 2170 lpm / SPP 88 bar / String RPM 100 / WOB 4,5 MT / Torque 11-14 kNm\nCirculate Hi-vis sweep and got 100% steel back (no formation)", "dTimEnd": "2009-06-30T06:00:00+02:00", "dTimStart": "2009-06-30T05:00:00+02:00", "md": "423.8", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Milled window in 13-3/8\" casing from 423,8 - 424,3 m as per Smith instructions:\nTime Depth (m) Flow (lpm) SPP (bar) RPM WOB (MT) Torque (kNm) \n07:00 423,8 1525 50,5 60 5-6 14-17\n09:00 424,2 1900 73,5 105 6 13-18\n10:00 424,3 1900 74,0 125 5-10 19-22\n10:30 424,3 1900 72,9 125 9-11 25-31", "dTimEnd": "2009-06-30T11:00:00+02:00", "dTimStart": "2009-06-30T06:00:00+02:00", "md": "424.3", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Observed instant drop on 50 bar in SPP. Pulled out of hole from 424,3 to 266 m.", "dTimEnd": "2009-06-30T11:45:00+02:00", "dTimStart": "2009-06-30T11:00:00+02:00", "md": "424.3", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Due to drilling with severe vibration inspected and serviced TDS for loose items. Carried out derrick inspection.", "dTimEnd": "2009-06-30T12:45:00+02:00", "dTimStart": "2009-06-30T11:45:00+02:00", "md": "266", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to pull out from 266 m to surface.", "dTimEnd": "2009-06-30T14:00:00+02:00", "dTimStart": "2009-06-30T12:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Found 8-1/8\" XO 6-5/8\" FH B x 6-5/8\" REG P parted 0,17m above pin end. (SN.03154H). 7,02 m fish (WIndow mill + water melon mill) left in hole. Top of fish 417,3 m.\nBroke out remaining BHA.", "dTimEnd": "2009-06-30T14:45:00+02:00", "dTimStart": "2009-06-30T14:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Spotted and prepared fishing tool (11-1/4\" overshot with extension sub and 9\" grapple). Welded and machined overshot lip guide. Simultaneously carried out further inspection and maintenance on TDS. DNV inspected Poorboy, degasser and tugger.", "dTimEnd": "2009-06-30T20:15:00+02:00", "dTimStart": "2009-06-30T14:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Observed loose die holder and worn dies on TDS pipe handler. Repaired same.", "dTimEnd": "2009-06-30T22:15:00+02:00", "dTimStart": "2009-06-30T20:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up XO to 11-1/4\" fishing overshot.", "dTimEnd": "2009-06-30T22:30:00+02:00", "dTimStart": "2009-06-30T22:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held tool box talk with crew", "dTimEnd": "2009-06-30T22:45:00+02:00", "dTimStart": "2009-06-30T22:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Continued making up fishing BHA including 11-1/4\" fishing overshot with 9\" grapple.\nMidnight depth = 0 m.", "dTimEnd": "2009-07-01T00:00:00+02:00", "dTimStart": "2009-06-30T22:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "equipment failure" } ]
[]
15_9_F_9_2009_07_02
NO 15/9-F-9
NO 15/9-F-9
name
2009-07-01T00:00:00+02:00
2009-07-02T00:00:00+02:00
normal
2018-05-03T13:53:16+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": "3.2", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2009-07-02T00:00:00+02:00", "dTimDiaHoleStart": "2009-06-28T22:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Pull out of the hole with milling BHA and check condition of string mills.\nMake up 12-1/4\" drilling BHA and run in hole to commence drilling 12-1/4\" hole to app. 996 m MD.", "hpht": "0", "md": "435", "mdCsgLast": "1064", "mdDiaHoleStart": "219", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "590", "mdStrengthForm": "0", "presTestType": null, "reportNo": "8", "ropCurrent": "-999.99", "strengthForm": "1.03", "sum24Hr": "Ran in hole with 12-1/4\" TrackMaster milling assembly and milled window from 424,3 m to 428,2 m. Continued to drill formation and mill window with string mills to 436, 5 m. Water melon mill 2 m out of window. Reamed and dressed the window from 421,5 m (top) to 428,2 m (bottom). Slided through window with milling assembly. Picking up a few tons of weight at 421 m and 425m.\nDisplaced the well to 1,20 sg KCl/polymer mud and flow checked. Pulled out of the hole from 436,5 m to 200 m\nExperienced a dropped object on the rig floor. A 0,17 kg bolt came loose on the TDS and dropped 30 m to rig floor (50 Joule). The incident was investigated. The bolt was re-installed and the TDS was further checked for loose items.", "tightWell": "0", "tvd": "435", "tvdCsgLast": null, "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[ { "dTim": "2009-07-01T11:30:00+02:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Flowline", "md": "424", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "87", "yp": "-999.99" }, { "dTim": "2009-07-01T22:00:00+02:00", "density": "1.2", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Flowline", "md": "0", "mudClass": "water based", "presBopRating": "0", "pv": "18", "tempHthp": null, "type": "KCl/Polymer/GEM", "visFunnel": "-999.99", "yp": "7" } ]
[]
[]
[ { "comments": "Made up fishing BHA and installed PS-21 slips and sensor on AR.", "dTimEnd": "2009-07-01T00:45:01+02:00", "dTimStart": "2009-07-01T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Ran in with overshot from surface to 410 m.", "dTimEnd": "2009-07-01T01:45:01+02:00", "dTimStart": "2009-07-01T00:45:01+02:00", "md": "410", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Made up TDS to string and took up/down weight 83/80 ton and free rotation 750 Nm. Ran in to 415 m and circulated 2000 lpm/4,4 bar over fish. Reduced flow rate to 1000 lpm and rotated 10 rpm. Moved down over fish at 417 m. Tagged fish and observed increase in pump pressure and torque.Stopped pumps and rotation. Sat down 10 ton.", "dTimEnd": "2009-07-01T02:30:01+02:00", "dTimStart": "2009-07-01T01:45:01+02:00", "md": "417", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Picked up and observed additional 2 ton pick up weight. Pulled out slowly from 424 m to 20 m.", "dTimEnd": "2009-07-01T04:15:01+02:00", "dTimStart": "2009-07-01T02:30:01+02:00", "md": "20", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held tool box talk with crew regarding laying out overshot with fish.", "dTimEnd": "2009-07-01T04:30:01+02:00", "dTimStart": "2009-07-01T04:15:01+02:00", "md": "20", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Retrieved overshot with attached fish. Transferred complete assembly including fish from vertical to horizontal. Decided to backload overshot and fish to town for disassembly. 12-1/4\" FastTrack TRI mill was completely worn out.", "dTimEnd": "2009-07-01T05:15:01+02:00", "dTimStart": "2009-07-01T04:30:01+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held Tool Box Talk with crew prior to making up milling BHA.", "dTimEnd": "2009-07-01T05:30:01+02:00", "dTimStart": "2009-07-01T05:15:01+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Commenced to make up 12-1/4\" TrackMaster milling assembly.", "dTimEnd": "2009-07-01T06:00:00+02:00", "dTimStart": "2009-07-01T05:30:01+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up 12-1/2\" TrackMaster milling BHA", "dTimEnd": "2009-07-01T07:00:00+02:00", "dTimStart": "2009-07-01T06:00:00+02:00", "md": "76", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in hole with TrackMaster mill from 76 m to 417 m.", "dTimEnd": "2009-07-01T08:45:00+02:00", "dTimStart": "2009-07-01T07:00:00+02:00", "md": "417", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared pit and surface flow system for displacment to milling mud. Flushed and cleaned pits and conditioned milling mud.", "dTimEnd": "2009-07-01T11:15:00+02:00", "dTimStart": "2009-07-01T08:45:00+02:00", "md": "417", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Displaced the well to milling mud with 2000 lpm / 29 bar.", "dTimEnd": "2009-07-01T11:45:00+02:00", "dTimStart": "2009-07-01T11:15:00+02:00", "md": "417", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Took parameters: Up/down weight 106/102 ton - RW 104 ton with 2kNm. Started milling from 424 m to 428 m as per Smith instructions:\nTime Depth (m) Flow (lpm) SPP (bar) RPM WOB (MT) Torque (kNm) \n12:00 424,3 1900 28,0 90 1 9-20\n13:00 424,5 2370 39,0 110 5-6 9-14\n14:00 426,3 2390 40,0 110 5-6 6-9\n", "dTimEnd": "2009-07-01T15:00:00+02:00", "dTimStart": "2009-07-01T11:45:00+02:00", "md": "427.5", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Milled out of casing at 428,2 m. Window = 421,5 m (top) and 428,2 m (btm). Reamed interval 428 m - 420 m.", "dTimEnd": "2009-07-01T15:30:00+02:00", "dTimStart": "2009-07-01T15:00:00+02:00", "md": "428.2", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "While reaming 428 m-420 m observed dropped object from derrick. Stopped rotation and pulled to 419 m. Circulated bottoms up at 3000 lpm / 59 bar. Bolt dropped down on rig floor from derrick.", "dTimEnd": "2009-07-01T16:00:00+02:00", "dTimStart": "2009-07-01T15:30:00+02:00", "md": "419", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Racked back stand - depth 416 m and investigated dropped object. Meanwhile monitored well on trip tank. A 0,17 kg bolt had loosened and unscrewed from the TDS and dropped 30 m to rig floor (50 Joule). Re-installed bolt and lock wire. Changed out other damaged lock wires. Further investigated for loose items and potential dropped objects.", "dTimEnd": "2009-07-01T21:00:00+02:00", "dTimStart": "2009-07-01T16:00:00+02:00", "md": "416", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Ran in from 416 m to 428 m.", "dTimEnd": "2009-07-01T21:15:00+02:00", "dTimStart": "2009-07-01T21:00:00+02:00", "md": "428", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled formation and opened window with 12-1/4\" string mills from 428 m to 435 m. \nTime Depth (m) Flow (lpm) SPP (bar) RPM WOB (MT) Torque (kNm) \n22:00 430,0 2390 44,0 110 0-1 7-9\n24:00 435,0 2370 46,0 110 0-1 6-9\n", "dTimEnd": "2009-07-02T00:00:00+02:00", "dTimStart": "2009-07-01T21:15:00+02:00", "md": "435", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_2009_07_03
NO 15/9-F-9
NO 15/9-F-9
name
2009-07-02T00:00:00+02:00
2009-07-03T00:00:00+02:00
normal
2018-05-03T13:53:16+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": "3.8", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2009-07-03T00:00:00+02:00", "dTimDiaHoleStart": "2009-06-28T22:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Operations continue on well 15/9-F-9A. ", "hpht": "0", "md": "435", "mdCsgLast": "1064", "mdDiaHoleStart": "219", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "9", "ropCurrent": "-999.99", "strengthForm": "1.03", "sum24Hr": "Pulled out of hole with milling assembly from 200 m to surface. Performed safety check on TDS. Made up and ran in hole with milling assembly and polished window. Pulled out of hole with milling assembly from 435 m to surface. LO milling assembly. Made up and ran in hole with 12 ¼\" BHA to 190 m. Repaired power slips. Ran in hole with 12 ¼\" BHA on 5 ½\" DP from 190 m to 430 m. Tested MWD. ", "tightWell": "0", "tvd": "435", "tvdCsgLast": null, "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[ { "dTim": "2009-07-02T14:00:00+02:00", "density": "1.2", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "430", "mudClass": "water based", "presBopRating": "0", "pv": "20", "tempHthp": null, "type": "KCl/Polymer/GEM", "visFunnel": "-999.99", "yp": "8" } ]
[]
[]
[ { "comments": "Continued to drill formation to 436,5 m and reamed window according to instructions from Smith Rep.\nReamed window several times from 421m to 436m - 2500 lpm - 42 bar -90 rpm - 5-9 kNm.\nStopped pumping and rotation and slided in from 421m. Taking weight and held up at 421 m and 425 m. Positioned water melon string mill in window and milled further in the interval 420 - 428 m.\nSlided through window with milling string, still picking up a few tons of weight at 421 m and 425 m, however a slight rotation (app. 90 deg) allowed the string to slide through window. \nIn total 14,4 kg has been recovered from the ditch magnets.", "dTimEnd": "2009-07-02T03:00:00+02:00", "dTimStart": "2009-07-02T00:00:00+02:00", "md": "436.5", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pumped 20 m3 SW spacer and displaced milling mud to 1.20 KCL/polymer mud. Circulated 74 m3 KCL mud. Filled trip tank.", "dTimEnd": "2009-07-02T04:45:00+02:00", "dTimStart": "2009-07-02T03:00:00+02:00", "md": "436", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flow checked the well. Simultaneously checked TDS for loose items.", "dTimEnd": "2009-07-02T05:15:00+02:00", "dTimStart": "2009-07-02T04:45:00+02:00", "md": "436", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole with milling assembly from 436 m to 200m", "dTimEnd": "2009-07-02T06:00:00+02:00", "dTimStart": "2009-07-02T05:15:00+02:00", "md": "200", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole with milling assembly from 200 m to 132 m.", "dTimEnd": "2009-07-02T07:00:00+02:00", "dTimStart": "2009-07-02T06:00:00+02:00", "md": "132", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole with BHA from 132 m to surface. Gauged mills: Starter mill 3/8\" under gauge, follow mill 3/4\" under gauge, melon mill ½\" under gauge. Laid out window milling assembly.", "dTimEnd": "2009-07-02T09:45:00+02:00", "dTimStart": "2009-07-02T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and tidied rig floor.", "dTimEnd": "2009-07-02T10:00:00+02:00", "dTimStart": "2009-07-02T09:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up 12-1/4\" Trackmaster milling BHA.", "dTimEnd": "2009-07-02T10:30:00+02:00", "dTimStart": "2009-07-02T10:00:00+02:00", "md": "20", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Inspected TDS for potential falling objects.", "dTimEnd": "2009-07-02T11:30:00+02:00", "dTimStart": "2009-07-02T10:30:00+02:00", "md": "20", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in hole with Trackmaster mill from 20 m to 266 m.", "dTimEnd": "2009-07-02T13:30:00+02:00", "dTimStart": "2009-07-02T11:30:00+02:00", "md": "266", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in hole with Trackmaster mill assembly on 5 ½\" DP from 266 m to 414 m.", "dTimEnd": "2009-07-02T14:00:00+02:00", "dTimStart": "2009-07-02T13:30:00+02:00", "md": "414", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Recorded parameters: Up weight 106 tons, down weight 103 tons, rotation weight 105 tons with 80 rpm and 2 kNm.", "dTimEnd": "2009-07-02T14:15:00+02:00", "dTimStart": "2009-07-02T14:00:00+02:00", "md": "414", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Washed down from 414 m to 425 m with 500 lpm, 6 bar. Took weight at 425 m. Rotated past obstruction with 10 rpm and 1-4 kNm from 425 m to 427 m. Washed down from 427 m to 433 m. Took weight at 433 m. Rotated past obstruction with 10 rpm and 1-4 kNm from 433 m to 435 m.", "dTimEnd": "2009-07-02T14:30:00+02:00", "dTimStart": "2009-07-02T14:15:00+02:00", "md": "435", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Polished the interval from 420 m to 435 m with 2000 lpm, 41 bars, 80 rpm and 1-4 kNm. Polished the interval two times.", "dTimEnd": "2009-07-02T16:15:00+02:00", "dTimStart": "2009-07-02T14:30:00+02:00", "md": "435", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Stopped rotation and washed the interval from 420 m to 435 m with 2000 lpm, 41 bars. Washed the interval two times.", "dTimEnd": "2009-07-02T16:45:00+02:00", "dTimStart": "2009-07-02T16:15:00+02:00", "md": "435", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Stopped pumping and slide mill assembly through window two times. Took 4-5 ton weight at 423, 5 m when moving downwards through window. (Whipstock fishing groove). Rotated through window with 1 rpm without taking weight.", "dTimEnd": "2009-07-02T17:15:00+02:00", "dTimStart": "2009-07-02T16:45:00+02:00", "md": "422", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole from 422 m to 266 m.", "dTimEnd": "2009-07-02T18:00:00+02:00", "dTimStart": "2009-07-02T17:15:00+02:00", "md": "266", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole with BHA from 266 m to surface. Gauged mills: Starter mill 1/8\" under gauge, follow mill 1/16\" under gauge, melon mill in gauge. Laid out window milling assembly.", "dTimEnd": "2009-07-02T21:15:00+02:00", "dTimStart": "2009-07-02T18:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and tidied rig floor.", "dTimEnd": "2009-07-02T21:45:00+02:00", "dTimStart": "2009-07-02T21:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held pre job meeting. Picked up and ran in hole with 12 ¼\" BHA to 32 m.", "dTimEnd": "2009-07-03T00:00:00+02:00", "dTimStart": "2009-07-02T21:45:00+02:00", "md": "32", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_2009_07_04
NO 15/9-F-9
NO 15/9-F-9
name
2009-07-03T00:00:00+02:00
2009-07-04T00:00:00+02:00
normal
2018-05-03T13:53:16+02:00
{ "name": "15/9-F-9", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9", "namingSystem": "NPD code" }, { "name": "5927", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-09T00:00:00+01:00", "dateDrillComplete": "2008-08-31", "daysBehind": "3.7", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2009-07-04T00:00:00+02:00", "dTimDiaHoleStart": "2009-06-28T22:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "None", "hpht": "0", "md": "435", "mdCsgLast": "436.5", "mdDiaHoleStart": "219", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "10", "ropCurrent": "-999.99", "strengthForm": "1.03", "sum24Hr": "None", "tightWell": "0", "tvd": "435", "tvdCsgLast": null, "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[ { "dTim": "2009-07-03T03:00:00+02:00", "density": "1.19", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "436", "mudClass": "water based", "presBopRating": "0", "pv": "20", "tempHthp": null, "type": "KCl/Polymer/GEM", "visFunnel": "90", "yp": "8" } ]
[]
[]
[ { "comments": "Ran in hole with 12 ¼\" BHA from 32 m to 190 m.", "dTimEnd": "2009-07-03T02:30:00+02:00", "dTimStart": "2009-07-03T00:00:00+02:00", "md": "190", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed hydraulic power slips. Found leak on hydraulic connection.", "dTimEnd": "2009-07-03T03:00:00+02:00", "dTimStart": "2009-07-03T02:30:00+02:00", "md": "190", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Repaired power slips.", "dTimEnd": "2009-07-03T03:30:00+02:00", "dTimStart": "2009-07-03T03:00:00+02:00", "md": "190", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Ran in hole with 12 ¼\" BHA on 5 ½\" DP from 190 m to 400 m. Filled pipe.", "dTimEnd": "2009-07-03T04:00:00+02:00", "dTimStart": "2009-07-03T03:30:00+02:00", "md": "400", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in hole from 402 m to 430 m. No weight taken when passing through window. Established circulation and tested the MWD with 2500 lpm, 73 bar. \n\t\t\t***End of operation for F - 09***\n", "dTimEnd": "2009-07-03T04:45:00+02:00", "dTimStart": "2009-07-03T04:00:00+02:00", "md": "430", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_A_2009_07_04
NO 15/9-F-9 A
NO 15/9-F-9 A
name
2009-07-03T00:00:00+02:00
2009-07-04T00:00:00+02:00
normal
2018-05-03T13:53:16+02:00
{ "name": "15/9-F-9 A", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9 A", "namingSystem": "NPD code" }, { "name": "6163", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2009-06-23T00:00:00+02:00", "dateDrillComplete": "2009-07-08", "daysBehind": "3.7", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2009-07-04T00:00:00+02:00", "dTimDiaHoleStart": "2009-07-03T04:45:00+02:00", "diaHole": "12.25", "diaPilot": null, "distDrill": "386", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Continue circulating hole clean until totally 1, 5 times BU. Drill/orient 12 ¼\" hole from 940 m to TD at +- 996 m. Spot LCM pill across the Utsira formation. Pull out of hole to 920 m. Circulate the hole clean. Displace well to 1, 40 sg WBM. Pull out of hole and lay down 12 ¼\" BHA. Rig up to run 9 5/8\" liner. Run 9 5/8\" liner. \n\n\nOperation target tomorrow at 06:00 hrs: Running 9 5/8\" liner at 500 m. \n", "hpht": "0", "md": "822", "mdCsgLast": "436.5", "mdDiaHoleStart": "436", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "1", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Drilled/oriented 12 1/4\" hole from 459 m to 500 m. Removed cuttings blocking auger in lower shakers. Drilled/oriented 12 1/4\" hole from 500 m to 511 m. Reamed from 511 m to 473 m to reduce dog leg from 7 deg to 3 deg. Drilled/oriented 12 1/4\" hole from 511 m to 553 m. Reamed from 553 m to 525 m to smoothen the well path. Drilled/oriented 12 1/4\" hole from 553 m to 714 m. Made several attempts to take GMWD survey without success. Took cluster survey. Drilled/oriented 12 1/4\" hole from 714 m to 940 m. Circulated hole clean prior to drill into Utsira formation. ", "tightWell": "0", "tvd": "787", "tvdCsgLast": null, "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[ { "dTim": "2009-07-03T20:30:00+02:00", "density": "1.2", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "730", "mudClass": "water based", "presBopRating": "0", "pv": "18", "tempHthp": null, "type": "KCl/Polymer/GEM", "visFunnel": "-999.99", "yp": "9" }, { "dTim": "2009-07-03T08:00:00+02:00", "density": "1.2", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "510", "mudClass": "water based", "presBopRating": "0", "pv": "15", "tempHthp": null, "type": "KCl/Polymer/GEM", "visFunnel": "-999.99", "yp": "7.5" }, { "dTim": "2009-07-03T14:00:00+02:00", "density": "1.2", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "615", "mudClass": "water based", "presBopRating": "0", "pv": "19", "tempHthp": null, "type": "KCl/Polymer/GEM", "visFunnel": "-999.99", "yp": "8" } ]
[]
[ { "azi": "199.58", "dTim": "2009-07-04T00:00:00+02:00", "incl": "8.93", "md": "497.7", "tvd": "497.4" }, { "azi": "193.34", "dTim": "2009-07-04T00:00:00+02:00", "incl": "14.03", "md": "537.6", "tvd": "536.4" }, { "azi": "197.74", "dTim": "2009-07-04T00:00:00+02:00", "incl": "4.66", "md": "454.9", "tvd": "454.9" }, { "azi": "191.85", "dTim": "2009-07-04T00:00:00+02:00", "incl": "18.07", "md": "578.3", "tvd": "575.6" }, { "azi": "186.14", "dTim": "2009-07-04T00:00:00+02:00", "incl": "25.01", "md": "659.3", "tvd": "650" }, { "azi": "182.17", "dTim": "2009-07-04T00:00:00+02:00", "incl": "28.67", "md": "686.3", "tvd": "674" }, { "azi": "183.06", "dTim": "2009-07-04T00:00:00+02:00", "incl": "30.48", "md": "727", "tvd": "709.4" }, { "azi": "185.48", "dTim": "2009-07-04T00:00:00+02:00", "incl": "33.77", "md": "767.7", "tvd": "743.8" }, { "azi": "187.45", "dTim": "2009-07-04T00:00:00+02:00", "incl": "37.83", "md": "807.8", "tvd": "776.4" }, { "azi": "189.89", "dTim": "2009-07-04T00:00:00+02:00", "incl": "41.28", "md": "848", "tvd": "807.4" }, { "azi": "189.17", "dTim": "2009-07-04T00:00:00+02:00", "incl": "46.52", "md": "888", "tvd": "836.2" }, { "azi": "189.21", "dTim": "2009-07-04T00:00:00+02:00", "incl": "50.33", "md": "928.4", "tvd": "863" }, { "azi": "190.58", "dTim": "2009-07-04T00:00:00+02:00", "incl": "54.27", "md": "968.1", "tvd": "887.3" }, { "azi": "189.74", "dTim": "2009-07-04T00:00:00+02:00", "incl": "24.92", "md": "618.3", "tvd": "612.7" } ]
[ { "comments": "Established circulation with 2800 lpm, 86 bar. Oriented tool face.", "dTimEnd": "2009-07-03T05:30:00+02:00", "dTimStart": "2009-07-03T04:45:00+02:00", "md": "430", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled/oriented 12 1/4\" hole from 436 m to 459 m with 2800 lpm, 89 bar, WOB 3-5 ton. ROP 45-60 m/hr.", "dTimEnd": "2009-07-03T06:00:00+02:00", "dTimStart": "2009-07-03T05:30:00+02:00", "md": "459", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled/oriented 12 1/4\" hole from 459 m to 500 m with 2800 lpm, 89-92 bar, WOB 4-7 ton. ROP 45 m/hr.", "dTimEnd": "2009-07-03T07:15:00+02:00", "dTimStart": "2009-07-03T06:00:00+02:00", "md": "500", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed cuttings blocking augers in lower shakers. Took survey. Reamed the interval from 485 m to 500 m with 3000 lpm, 100 bar, 38 rpm, 2-5 kNm.", "dTimEnd": "2009-07-03T07:45:00+02:00", "dTimStart": "2009-07-03T07:15:00+02:00", "md": "500", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled/oriented 12 1/4\" hole from 500 m to 511 m with 3000 lpm, 100-105 bar, 38 rpm, 4-7 kNm, WOB 4-6 ton. ROP 45 m/hr.", "dTimEnd": "2009-07-03T08:15:00+02:00", "dTimStart": "2009-07-03T07:45:00+02:00", "md": "511", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Reamed the interval from 511 m to 473 m due to high dog leg. Reduced dog leg from 7 deg to 3 deg.", "dTimEnd": "2009-07-03T09:00:00+02:00", "dTimStart": "2009-07-03T08:15:00+02:00", "md": "511", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed cuttings blocking augers in lower shakers.", "dTimEnd": "2009-07-03T09:15:00+02:00", "dTimStart": "2009-07-03T09:00:00+02:00", "md": "511", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled/oriented 12 1/4\" hole from 511 m to 553 m with 3000 lpm, 94-103 bar, 0-40 rpm, 3-5 kNm, WOB 4-6 ton. ROP 30-35 m/hr.", "dTimEnd": "2009-07-03T11:30:00+02:00", "dTimStart": "2009-07-03T09:15:00+02:00", "md": "553", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Reamed the interval from 553 m to 525 m to smoothen the well path.", "dTimEnd": "2009-07-03T11:45:00+02:00", "dTimStart": "2009-07-03T11:30:00+02:00", "md": "553", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled/oriented 12 1/4\" hole from 553 m to 714 m with 3250-3500 lpm, 115-140 bar, 0-40 rpm, 4-8 kNm, WOB 4-8 ton. ROP 40-50 m/hr. Unable to receive GMWD survey.", "dTimEnd": "2009-07-03T17:30:00+02:00", "dTimStart": "2009-07-03T11:45:00+02:00", "md": "714", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made several attempts to take GMWD survey without success.", "dTimEnd": "2009-07-03T18:30:00+02:00", "dTimStart": "2009-07-03T17:30:00+02:00", "md": "714", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Racked back stand. Took cluster shot survey.", "dTimEnd": "2009-07-03T19:30:00+02:00", "dTimStart": "2009-07-03T18:30:00+02:00", "md": "714", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled/oriented 12 1/4\" hole from 714 m to 822 m with 3500 lpm, 140 bar, 0-40 rpm, 4-8 kNm, WOB 4-8 ton. ROP 30-40 m/hr.", "dTimEnd": "2009-07-04T00:00:00+02:00", "dTimStart": "2009-07-03T19:30:00+02:00", "md": "822", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_A_2009_07_05
NO 15/9-F-9 A
NO 15/9-F-9 A
name
2009-07-04T00:00:00+02:00
2009-07-05T00:00:00+02:00
normal
2018-05-03T13:53:17+02:00
{ "name": "15/9-F-9 A", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9 A", "namingSystem": "NPD code" }, { "name": "6163", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2009-06-23T00:00:00+02:00", "dateDrillComplete": "2009-07-08", "daysBehind": "3.5", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2009-07-05T00:00:00+02:00", "dTimDiaHoleStart": "2009-07-03T04:45:00+02:00", "diaHole": "12.25", "diaPilot": null, "distDrill": "174", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Run 9 5/8\" liner from 330 m to 589 m. Install 13 3/8\" liner hanger. Ran in hole with 9 5/8\" liner on landing string to 995 m. Displace to 1, 11 sg polymer mud. Set liner hanger. Cement 9 5/8\" liner and set TSP. Circulate out excess cement. Pull out of hole with 9 5/8\" liner running tool. Prepare 8 ½\" BHA while WOC. \n\n\nOperation target tomorrow at 06:00 hrs: Waiting on cement. Preparing 8 ½\" BHA. \n", "hpht": "0", "md": "997", "mdCsgLast": "436.5", "mdDiaHoleStart": "436", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "2", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Circulated hole clean prior to drill into Utsira formation. Drilled/oriented 12 1/4\" hole from 940 m to 997 m. Spotted LCM pill across Utsira formation. Pulled out of hole to 915 m. Circulated the hole clean. Displaced well to 1, 40 sg WBM. Pulled out of hole from 915 m to 230 m. Flow checked well. Performed safety check on TDS. Pulled out of hole from 230 m to 190 m. Pulled out of hole and racked back 12 ¼\" BHA from 190 m to 80 m. Pulled out of hole and laid out 12 ¼\" BHA from 80 m to surface. Rigged up 9 5/8\" liner handling equipment. Made up and ran in hole with 9 5/8\" liner to 330 m. ", "tightWell": "0", "tvd": "903.3", "tvdCsgLast": null, "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[ { "dTim": "2009-07-04T03:00:00+02:00", "density": "1.22", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "850", "mudClass": "water based", "presBopRating": "0", "pv": "19", "tempHthp": null, "type": "KCl/Polymer/GEM", "visFunnel": "-999.99", "yp": "9.5" }, { "dTim": "2009-07-04T10:00:00+02:00", "density": "1.22", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "996", "mudClass": "water based", "presBopRating": "0", "pv": "18", "tempHthp": null, "type": "KCl/Polymer/GEM", "visFunnel": "-999.99", "yp": "9.5" }, { "dTim": "2009-07-04T16:00:00+02:00", "density": "1.4", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "960", "mudClass": "water based", "presBopRating": "0", "pv": "23", "tempHthp": null, "type": "KCl/Polymer/GEM", "visFunnel": "-999.99", "yp": "12" } ]
[]
[]
[ { "comments": "Drilled/oriented 12 1/4\" hole from 822 m to 940 m with 3500 lpm, 147-155 bar, 0-40 rpm, 6-12 kNm, WOB 4-10 ton. ROP 30-45 m/hr.", "dTimEnd": "2009-07-04T05:45:00+02:00", "dTimStart": "2009-07-04T00:00:00+02:00", "md": "940", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Circulated hole clean prior to drill into Utsira formation. 3500 lpm, 150 bar, 40 rpm, 6-10 kNm.", "dTimEnd": "2009-07-04T06:00:00+02:00", "dTimStart": "2009-07-04T05:45:00+02:00", "md": "940", "phase": "fixed", "proprietaryCode": "drilling -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Circulated hole clean prior to drill into Utsira formation. 3500 lpm, 150 bar, 40 rpm, 6-10 kNm. Circulated totally 2 times BU.", "dTimEnd": "2009-07-04T06:30:00+02:00", "dTimStart": "2009-07-04T06:00:00+02:00", "md": "940", "phase": "fixed", "proprietaryCode": "drilling -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled/oriented 12 1/4\" hole from 940 m to 997 m with 3500 lpm, 147-155 bar, 0-40 rpm, 6-12 kNm, WOB 4-10 ton. ROP 30-40 m/hr. Top Utsira formation found at 959 m MD/882 m TVD.", "dTimEnd": "2009-07-04T09:30:00+02:00", "dTimStart": "2009-07-04T06:30:00+02:00", "md": "997", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Recorded parameters at TD: Up weight 124 tons, down weight 95 tons, rotation weight 109 ton with 20 rpm and 5-10 kNm.", "dTimEnd": "2009-07-04T09:45:00+02:00", "dTimStart": "2009-07-04T09:30:00+02:00", "md": "997", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pumped 6, 2 M3 of 1, 40 sg LCM pill. Displaced pill with 10 M3 1, 19 sg mud to spot LCM pill across the Utsira formation. 1300 lpm, 26-30 bar.", "dTimEnd": "2009-07-04T10:00:00+02:00", "dTimStart": "2009-07-04T09:45:00+02:00", "md": "997", "phase": "fixed", "proprietaryCode": "drilling -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole from 997 to 915 m. Maximum over pull taken, 15 tons.", "dTimEnd": "2009-07-04T10:45:00+02:00", "dTimStart": "2009-07-04T10:00:00+02:00", "md": "915", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Circulated the hole clean with 3800 lpm, 165 bar, 40 rpm, 6-14 kNm. Reciprocated the string while circulating. Circulated totally 4 times BU.", "dTimEnd": "2009-07-04T11:45:00+02:00", "dTimStart": "2009-07-04T10:45:00+02:00", "md": "915", "phase": "fixed", "proprietaryCode": "drilling -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Displaced well to 1, 40 sg WBM. 3700 lpm, 155-170 bar, 40 rpm, 5-9 kNm.", "dTimEnd": "2009-07-04T12:45:00+02:00", "dTimStart": "2009-07-04T11:45:00+02:00", "md": "915", "phase": "fixed", "proprietaryCode": "drilling -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Dropped a 3\" drift into DP. Pumped drift down to dart sub. Pumped and displaced slug.", "dTimEnd": "2009-07-04T13:00:00+02:00", "dTimStart": "2009-07-04T12:45:00+02:00", "md": "915", "phase": "fixed", "proprietaryCode": "drilling -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole from 915 m to 395 m. Took maximum 15 ton over pull when pulling out from 915 m to 715 m. Slick hole seen above 715 m.", "dTimEnd": "2009-07-04T14:30:00+02:00", "dTimStart": "2009-07-04T13:00:00+02:00", "md": "395", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Recorded parameters above 13 3/8\" casing window at 395 m: Up weight 107 tons, down weight 90 tons, rotation weight 99 ton with 20 rpm and 5-8 kNm.", "dTimEnd": "2009-07-04T14:45:00+02:00", "dTimStart": "2009-07-04T14:30:00+02:00", "md": "395", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole from 395 m to 230 m.", "dTimEnd": "2009-07-04T15:15:00+02:00", "dTimStart": "2009-07-04T14:45:00+02:00", "md": "230", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flow checked well on trip tank OK.", "dTimEnd": "2009-07-04T15:30:00+02:00", "dTimStart": "2009-07-04T15:15:00+02:00", "md": "230", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed safety check on TDS.", "dTimEnd": "2009-07-04T16:15:00+02:00", "dTimStart": "2009-07-04T15:30:00+02:00", "md": "230", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole from 230 m to 190 m.", "dTimEnd": "2009-07-04T16:30:00+02:00", "dTimStart": "2009-07-04T16:15:00+02:00", "md": "190", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole with 12 ¼\" BHA from 190 m to 140 m.", "dTimEnd": "2009-07-04T17:00:00+02:00", "dTimStart": "2009-07-04T16:30:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed hydraulic power slips. Installed master bushing and bowls. Observed hydraulic leak on hydraulic elevator.", "dTimEnd": "2009-07-04T17:30:00+02:00", "dTimStart": "2009-07-04T17:00:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Repaired leak on hydraulic elevator.", "dTimEnd": "2009-07-04T17:45:00+02:00", "dTimStart": "2009-07-04T17:30:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Pulled out of hole with 12 ¼\" BHA from 140 m to 80 m (LO dart sub and accelerator).", "dTimEnd": "2009-07-04T19:00:00+02:00", "dTimStart": "2009-07-04T17:45:00+02:00", "md": "80", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole and laid out 12 ¼\" BHA from 80 m to surface.", "dTimEnd": "2009-07-04T21:15:00+02:00", "dTimStart": "2009-07-04T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and tidied rig floor.", "dTimEnd": "2009-07-04T21:45:00+02:00", "dTimStart": "2009-07-04T21:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged up 9 5/8\" liner handling equipment on rig floor; held pre-job meeting with involved personnel prior to run 9 5/8\" liner.", "dTimEnd": "2009-07-05T00:00:00+02:00", "dTimStart": "2009-07-04T21:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_A_2009_07_06
NO 15/9-F-9 A
NO 15/9-F-9 A
name
2009-07-05T00:00:00+02:00
2009-07-06T00:00:00+02:00
normal
2018-05-03T13:53:17+02:00
{ "name": "15/9-F-9 A", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9 A", "namingSystem": "NPD code" }, { "name": "6163", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2009-06-23T00:00:00+02:00", "dateDrillComplete": "2009-07-08", "daysBehind": "3.5", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2009-07-06T00:00:00+02:00", "dTimDiaHoleStart": "2009-07-03T04:45:00+02:00", "diaHole": "12.25", "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Continue pull out of hole with 9 5/8\" liner running tool from 370 m. LD 12 1/4\" from derrick and make up 8 ½\" BHA while WOC. RIH with RTTS and pressure test TSP liner packer. Run in hole with 8 ½\" BHA. \n\n\nOperation target tomorrow at 06:00 hrs: RIH with 8 ½\" BHA. \n", "hpht": "0", "md": "996", "mdCsgLast": "996", "mdDiaHoleStart": "436", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "3", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Changed hose on hydraulic power slips. Made up and ran in hole with 9 5/8\" liner from 330 m to 375 m. Changed out joy stick on drillers chair. Made up and ran in hole with 9 5/8\" liner from 375 m to 589 m. (Rotated liner through casing window). Installed liner hanger. RIH with 9 5/8\" liner on 5 ½\" landing string from 589 m to 985 m. Circulated and conditioned mud. Set liner hanger. Cemented 9 5/8\" liner and set TSP liner packer. Circulated out possible excess cement and to clean landing string. Pulled out of hole with landing string from 400 m to 370 m. Continued circulating the hole clean due to water U-tube out of pipe. ", "tightWell": "0", "tvd": "903.3", "tvdCsgLast": "881", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[ { "dTim": "2009-07-05T10:00:00+02:00", "density": "1.27", "filterCakeLtlp": null, "filtrateLtlp": "16", "locationSample": "Reserve pit", "md": "0", "mudClass": "water based", "presBopRating": "0", "pv": "25", "tempHthp": null, "type": "Soludril-N", "visFunnel": "-999.99", "yp": "10" }, { "dTim": "2009-07-05T23:00:00+02:00", "density": "1.22", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "996", "mudClass": "water based", "presBopRating": "0", "pv": "18", "tempHthp": null, "type": "KCl/Polymer/GEM", "visFunnel": "-999.99", "yp": "10" } ]
[]
[]
[ { "comments": "Continued to rig up 9 5/8\" liner handling equipment on rig floor.", "dTimEnd": "2009-07-05T00:45:00+02:00", "dTimStart": "2009-07-05T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up 9 5/8\" liner shoe and filled same with 1.40 sg mud and verified integrity of float - OK. Made up and ran in hole with 9 5/8\" liner intermediate joint; tube-locked connection.", "dTimEnd": "2009-07-05T01:30:00+02:00", "dTimStart": "2009-07-05T00:45:00+02:00", "md": "25", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up and ran in hole with float collar joint; Filled liner with 1.40 sg mud and verified integrity of float - OK. Picked up and made up first standard 9 5/8\" liner joint. Tube-locked connections.", "dTimEnd": "2009-07-05T02:00:00+02:00", "dTimStart": "2009-07-05T01:30:00+02:00", "md": "40", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in hole with 9 5/8\" liner from 40 m to 330 m. Filled every 3rd liner joint with 1, 40 sg mud.", "dTimEnd": "2009-07-05T06:00:00+02:00", "dTimStart": "2009-07-05T02:00:00+02:00", "md": "330", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed hose on hydraulic power slips.", "dTimEnd": "2009-07-05T06:30:00+02:00", "dTimStart": "2009-07-05T06:00:00+02:00", "md": "330", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Ran in hole with 9 5/8\" liner from 330 m to 351 m. Filled every 3rd liner joint with 1.40 sg mud.", "dTimEnd": "2009-07-05T07:00:00+02:00", "dTimStart": "2009-07-05T06:30:00+02:00", "md": "351", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held pre job meeting with crew.", "dTimEnd": "2009-07-05T07:15:00+02:00", "dTimStart": "2009-07-05T07:00:00+02:00", "md": "351", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in hole with 9 5/8\" liner from 351 m to 375 m. Filled every 3rd liner joint with 1.40 sg mud. Unable to released draw work park bakes.", "dTimEnd": "2009-07-05T07:30:00+02:00", "dTimStart": "2009-07-05T07:15:00+02:00", "md": "375", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Troubleshot joystick on drillers operating chair. Installed joystick from assistant drillers chair on drillers operating chair.", "dTimEnd": "2009-07-05T09:45:00+02:00", "dTimStart": "2009-07-05T07:30:00+02:00", "md": "375", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Ran in hole with 9 5/8\" liner from 375 m to 423 Filled every 3rd liner joint with 1.40 sg mud.", "dTimEnd": "2009-07-05T10:15:00+02:00", "dTimStart": "2009-07-05T09:45:00+02:00", "md": "423", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up circulation swage and DP safety valve. Connected TDS. Circulated liner volume with 2000 lpm, 12 bars. BO circulation swedge and DP safety valve. Recorded weights prior to enter open hole: Up weight 94 tons, down weight 90 tons.", "dTimEnd": "2009-07-05T11:15:00+02:00", "dTimStart": "2009-07-05T10:15:00+02:00", "md": "423", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in hole with 9 5/8\" liner from 423 m to 424, 4 m. Took weight at 424, 4 m (Casing window). Maximum set down weight 17 tons. Made several attempts to pass through window with various orientations. BO last liner joint and installed same in hydraulic mouse hole. Installed circulation swage and DP safety valve. Stabbed liner joint and circulation assembly with PRS. Made up liner joint with casing tong. Connected TDS.", "dTimEnd": "2009-07-05T14:00:00+02:00", "dTimStart": "2009-07-05T11:15:00+02:00", "md": "424.4", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Established rotation with 5 rpm and 1-2 kNm. Ran liner through window with rotation from 424 m to 435 m. Broke out circulation swage.", "dTimEnd": "2009-07-05T14:15:00+02:00", "dTimStart": "2009-07-05T14:00:00+02:00", "md": "435", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in hole with 9 5/8\" liner from 435 m to 589 m. Filled every 3rd liner joint with 1,40 sg mud. Filled string. Confirmed remaining liner joints on deck-OK.", "dTimEnd": "2009-07-05T16:15:00+02:00", "dTimStart": "2009-07-05T14:15:00+02:00", "md": "589", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held pre job meeting prior to installing liner hanger.", "dTimEnd": "2009-07-05T16:30:00+02:00", "dTimStart": "2009-07-05T16:15:00+02:00", "md": "589", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed from 9 5/8\" to 5 ½\" handling equipment.", "dTimEnd": "2009-07-05T16:45:00+02:00", "dTimStart": "2009-07-05T16:30:00+02:00", "md": "589", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U 9 5/8\" liner hanger assembly from deck, made up MX ball seat/dual wiper plugs to running tool. Held pre-job safety meeting with involved personnel prior to operations. M/U and RIH with liner hanger assembly, set slips and filled liner PBR with drill water. Up/down weights = 117 / 99 tons.", "dTimEnd": "2009-07-05T18:15:00+02:00", "dTimStart": "2009-07-05T16:45:00+02:00", "md": "598", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged down casing tong.", "dTimEnd": "2009-07-05T19:00:00+02:00", "dTimStart": "2009-07-05T18:15:00+02:00", "md": "598", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 9 5/8\" liner on 5 ½\" landing string from 598 m to 984 m; took 13 ton weight at 670 m, 722 m and 852 m. Washed down from 984 m to 997 m. Tagged bottom with 5 tons. Picked to up weight + 1 m.", "dTimEnd": "2009-07-05T21:30:00+02:00", "dTimStart": "2009-07-05T19:00:00+02:00", "md": "996", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Displaced well to 1, 20 sg WBM with 2090 lpm, 46 bars.", "dTimEnd": "2009-07-05T22:30:00+02:00", "dTimStart": "2009-07-05T21:30:00+02:00", "md": "996", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U cementing head and connected surface line. Broke circulation with 500 lpm / 8 bar, washed down with 9 5/8\" liner string from 994 - 997 m. Took up/down weights = 132 /107 tons. Positioned 9 5/8\" liner shoe at 995 m.", "dTimEnd": "2009-07-05T23:15:00+02:00", "dTimStart": "2009-07-05T22:30:00+02:00", "md": "996", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Gradually increased pump rate to 2000 lpm / 45 bar, circulated open hole volume with 1.20 sg mud. Rotated the liner with 20 rpm and 10-19 kNm.", "dTimEnd": "2009-07-06T00:00:00+02:00", "dTimStart": "2009-07-05T23:15:00+02:00", "md": "996", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_A_2009_07_07
NO 15/9-F-9 A
NO 15/9-F-9 A
name
2009-07-06T00:00:00+02:00
2009-07-07T00:00:00+02:00
normal
2018-05-03T13:53:17+02:00
{ "name": "15/9-F-9 A", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9 A", "namingSystem": "NPD code" }, { "name": "6163", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2009-06-23T00:00:00+02:00", "dateDrillComplete": "2009-07-08", "daysBehind": "4.1", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2009-07-07T00:00:00+02:00", "dTimDiaHoleStart": "2009-07-03T04:45:00+02:00", "diaHole": "12.25", "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Pressure test TSP liner packer and 9 5/8\" liner to 90 bars with sea water. Release and pull out of hole with RTTS. Pick up and run in hole with 8 ½\" BHA. Displace well to 1.28 sg Soludrill-N WBM. Drill out shoe track and clean out rat hole. \n\n\nOperation target tomorrow at 06:00 hrs: Cleaning out rat hole at 996 m. \n", "hpht": "0", "md": "996", "mdCsgLast": "996", "mdDiaHoleStart": "436", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "4", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Pulled out of hole with liner running tool from 370 m to surface. Broke out and laid out liner hanger running tool. Waited on cement, meanwhile, LD 12 ¼\" BHA from derrick, PU and racked 8 1/2\" BHA, made up and ran in hole with RTTS to 219 m, performed maintenance and service on drilling and pipe handling equipment, cleaned and prepared pits for packer fluid. Set RTTS packer at 219 m.", "tightWell": "0", "tvd": "903.3", "tvdCsgLast": "881", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[ { "dTim": "2009-07-06T23:00:00+02:00", "density": "1.27", "filterCakeLtlp": null, "filtrateLtlp": "16", "locationSample": "Reserve pit", "md": "0", "mudClass": "water based", "presBopRating": "0", "pv": "25", "tempHthp": null, "type": "Soludril-N", "visFunnel": "-999.99", "yp": "10" } ]
[]
[]
[ { "comments": "Reduced pump rate to 200 lpm / 8 bar, dropped setting ball and pumped same down pipe until landed out in ball seat. Set 9 3/8\" liner hanger; pressured up to 165 bars for 2 min, than reduced pressure to 70 bars. Set down 25 tons and bled off pressure. Released liner hanger R/T according to Weatherford representative instructions; Pressured up on landing string to 240 bars, held pressure for 2 minutes and then bled off pressure. Pulled to up weight (97 tons) + 1 m to activate the MX ball seat. Set down 20 ton and sheared out ball seat.", "dTimEnd": "2009-07-06T00:30:00+02:00", "dTimStart": "2009-07-06T00:00:00+02:00", "md": "996", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Established circulation with 2000 lpm, 44 bar, verified stable returns. Reduced flow rate to 500 lpm, 10 bars and established rotation with 20 rpm, 10-19 kNm, Initial torque needed to establish rotation 39 kNm.", "dTimEnd": "2009-07-06T00:45:00+02:00", "dTimStart": "2009-07-06T00:30:00+02:00", "md": "996", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Circulated and conditioned mud prior to liner cementing job; broke circulation and gradually increased pump rate to 2000 lpm / 44 bar, circulated one open hole BU volume. Mud weights in/out = 1.20 sg, no losses seen. Meanwhile held pre-job cement meeting with involved personnel prior to liner cementing operations; reviewed check lists and relevant safety / operational issues. Leak tested surface cementing line to 300 bars for 10 min - OK.", "dTimEnd": "2009-07-06T01:30:00+02:00", "dTimStart": "2009-07-06T00:45:00+02:00", "md": "996", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pumped 20 m3 seawater followed by 20 M3 of 1, 35 sg spacer with rig pumps at 1550 lpm / 28-44 bars. Lined up to pump from cement unit, verified surface routing - OK.", "dTimEnd": "2009-07-06T02:00:00+02:00", "dTimStart": "2009-07-06T01:30:00+02:00", "md": "996", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Released lower SSR dart. Mixed and pumped 13, 27 m3 1.92 sg cement slurry with cement unit at 700-900 lpm. Displaced surface cementing lines with 0.89 m3 fresh water. Released top dart. Lined up to pump seawater with rig pumps. Sheared out bottom SSR plug after 2, 9 M3.", "dTimEnd": "2009-07-06T02:45:00+02:00", "dTimStart": "2009-07-06T02:00:00+02:00", "md": "996", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Displaced cement slurry in place with rig pumps: Started to pump at 800 lpm / 4 bars, observed bottom wiper plug shear. Increased pump rate to 2100 lpm / 21 - 80 bar, reduced to 600 lpm / 39 bar prior to bumping top plug. Bumped top wiper plug at 1074 strokes, corresponding to 97 % pump efficiency. No losses seen during the entire cementing and displacement operations.", "dTimEnd": "2009-07-06T03:00:00+02:00", "dTimStart": "2009-07-06T02:45:00+02:00", "md": "996", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Leak tested 9 5/8\" liner to 70 bar above final circulation pressure for 10 min - OK. (Observed a small visual leak on cement head swivel). Bled off pressure and verified float - OK.", "dTimEnd": "2009-07-06T03:15:00+02:00", "dTimStart": "2009-07-06T03:00:00+02:00", "md": "996", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Set 9 5/8\" TSP liner packer according to Weatherford representative instructions. Set down 28 ton and observed shear at 14 and 21 tons.", "dTimEnd": "2009-07-06T03:30:00+02:00", "dTimStart": "2009-07-06T03:15:00+02:00", "md": "996", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled liner hanger R/T out of liner hanger assembly; applied 50 bar pressure on pipe prior to operation, confirmed pressure drop. Circulated with 500 lpm, 6 bar while pulling out of PBR.", "dTimEnd": "2009-07-06T03:45:00+02:00", "dTimStart": "2009-07-06T03:30:00+02:00", "md": "400", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held pre job meeting. Laid out cement head with 1 single of DP below.", "dTimEnd": "2009-07-06T04:45:00+02:00", "dTimStart": "2009-07-06T03:45:00+02:00", "md": "400", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed 2 x sponge wiper balls in landing string. Circulated at 3100 lpm / 38 bar with sea water to clean out landing string and possible excess cement; no cement seen in returns.", "dTimEnd": "2009-07-06T05:30:00+02:00", "dTimStart": "2009-07-06T04:45:00+02:00", "md": "400", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole with landing string from 400 m to 370 m.", "dTimEnd": "2009-07-06T05:45:00+02:00", "dTimStart": "2009-07-06T05:30:00+02:00", "md": "370", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Water u-tube out of pipe. Connected TDS and continued circulating the hole clean with 3100 lpm, 40 bar.", "dTimEnd": "2009-07-06T06:00:00+02:00", "dTimStart": "2009-07-06T05:45:00+02:00", "md": "370", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole from 370 m to surface.", "dTimEnd": "2009-07-06T08:00:00+02:00", "dTimStart": "2009-07-06T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed hydraulic power slips. Broke out and laid out liner hanger running tool.", "dTimEnd": "2009-07-06T09:15:00+02:00", "dTimStart": "2009-07-06T08:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "While waiting on cement, cleaned and tidied rig floor. Aligned u-bolts on bails.", "dTimEnd": "2009-07-06T10:45:00+02:00", "dTimStart": "2009-07-06T09:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "While waiting on cement, BO and LD 11 ea 8 1/4\" drill collars, and jar.", "dTimEnd": "2009-07-06T13:30:00+02:00", "dTimStart": "2009-07-06T10:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "While waiting on cement, Changed handling equipment and BO and LD 3 ea 9 3/4\" drill collars.", "dTimEnd": "2009-07-06T15:00:00+02:00", "dTimStart": "2009-07-06T13:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "While waiting on cement, Held pre job meeting. Changed to 6 3/4\" handling equipment. Picked up and racked back 7 ea 6 3/4\" drill collars, accelerator and jar.", "dTimEnd": "2009-07-06T19:45:00+02:00", "dTimStart": "2009-07-06T15:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up RTTS assembly and ran in hole with same to 219 m. Installed pump in sub assembly.", "dTimEnd": "2009-07-06T21:45:00+02:00", "dTimStart": "2009-07-06T19:45:00+02:00", "md": "219", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on cement. Meanwhile performed maintenance and service on drilling and pipe handling equipment. Cleaned and prepared pits for packer fluid.", "dTimEnd": "2009-07-07T00:00:00+02:00", "dTimStart": "2009-07-06T21:45:00+02:00", "md": "219", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_A_2009_07_08
NO 15/9-F-9 A
NO 15/9-F-9 A
name
2009-07-07T00:00:00+02:00
2009-07-08T00:00:00+02:00
normal
2018-05-03T13:53:17+02:00
{ "name": "15/9-F-9 A", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9 A", "namingSystem": "NPD code" }, { "name": "6163", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2009-06-23T00:00:00+02:00", "dateDrillComplete": "2009-07-08", "daysBehind": "3.5", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2009-07-08T00:00:00+02:00", "dTimDiaHoleStart": "2009-07-07T22:30:00+02:00", "diaHole": "8.5", "diaPilot": null, "distDrill": "54", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Circulate the hole clean. Take cluster shot survey. Pull out of hole and lay out 8 ½\" BHA. Make up and run in hole with cleanout assembly. Displace well to 1.20 sg brine. Pump and displace wash train, circulate the well clean. Flow check well. Pull out of hole and LD cleanout assembly. \n\n\nOperation target tomorrow at 06:00 hrs: LD cleanout assembly. \n", "hpht": "0", "md": "1051", "mdCsgLast": "996", "mdDiaHoleStart": "997", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "5", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Pressure tested TSP liner packer and 9 5/8\" liner to 90 bars with sea water. Released and pulled out of hole with RTTS. Picked up and ran in hole with 8 ½\" BHA. Drilled out shoe track and cleaned out rat hole. Displaced well to 1.26 sg Soludrill-N WBM. Drilled 8 ½\" hole from 997 m to 1206 m. Circulated the hole clean. ", "tightWell": "0", "tvd": "930", "tvdCsgLast": "881", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[ { "dTim": "2009-07-07T10:00:00+02:00", "density": "1.27", "filterCakeLtlp": null, "filtrateLtlp": "14", "locationSample": "Reserve pit", "md": "996", "mudClass": "water based", "presBopRating": "0", "pv": "23", "tempHthp": null, "type": "Soludril-N", "visFunnel": "-999.99", "yp": "10" }, { "dTim": "2009-07-07T23:00:00+02:00", "density": "1.27", "filterCakeLtlp": null, "filtrateLtlp": "16", "locationSample": "Active pit", "md": "1030", "mudClass": "water based", "presBopRating": "0", "pv": "19", "tempHthp": null, "type": "Soludril-N", "visFunnel": "-999.99", "yp": "12.5" } ]
[]
[ { "azi": "191.16", "dTim": "2009-07-08T00:00:00+02:00", "incl": "58.83", "md": "1181", "tvd": "1000" }, { "azi": "189.96", "dTim": "2009-07-08T00:00:00+02:00", "incl": "59.07", "md": "1059.4", "tvd": "937.4" }, { "azi": "191.89", "dTim": "2009-07-08T00:00:00+02:00", "incl": "58.96", "md": "1140.7", "tvd": "979.2" } ]
[ { "comments": "Waited on cement. Meanwhile performed maintenance and service on drilling and pipe handling equipment. Cleaned and prepared pits for packer fluid.", "dTimEnd": "2009-07-07T05:00:00+02:00", "dTimStart": "2009-07-07T00:00:00+02:00", "md": "219", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Circulated with 400 lpm, 5 bar to clean RTTS setting area from 215 m to 220 m. Set RTTS at 219 m, installed cement hose. Pressure tested surface lines to 120 bars for 5 minutes.", "dTimEnd": "2009-07-07T06:00:00+02:00", "dTimStart": "2009-07-07T05:00:00+02:00", "md": "219", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressure tested TSP liner packer and 9 5/8\" liner to 90 bars for 10 minutes with sea water. Pumped 0.175 l and bled back same.", "dTimEnd": "2009-07-07T06:15:00+02:00", "dTimStart": "2009-07-07T06:00:00+02:00", "md": "219", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Released RTTS, waited for 5 minutes for packer element to relax. LO pump in sub assembly.", "dTimEnd": "2009-07-07T06:30:00+02:00", "dTimStart": "2009-07-07T06:15:00+02:00", "md": "219", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole with RTTS from 219 m to surface.", "dTimEnd": "2009-07-07T07:30:00+02:00", "dTimStart": "2009-07-07T06:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed to 5\" handling equipment. BO and LD RTTS.", "dTimEnd": "2009-07-07T08:00:00+02:00", "dTimStart": "2009-07-07T07:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and tidied rig floor. Held pre job meeting prior to PU 8 ½\" BHA.", "dTimEnd": "2009-07-07T08:30:00+02:00", "dTimStart": "2009-07-07T08:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up and ran in hole with 8 ½\" BHA to 180 m.", "dTimEnd": "2009-07-07T11:45:00+02:00", "dTimStart": "2009-07-07T08:30:00+02:00", "md": "180", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed from 5\" to 5 ½\" handling equipment. Picked up 1 single DP from deck and ran in hole to 205 m.", "dTimEnd": "2009-07-07T12:15:00+02:00", "dTimStart": "2009-07-07T11:45:00+02:00", "md": "205", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in hole with 8 ½\" BHA on 5 ½\" DP from 205 m to 921 m.", "dTimEnd": "2009-07-07T13:30:00+02:00", "dTimStart": "2009-07-07T12:15:00+02:00", "md": "921", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Filled pipe and established circulation with 1600 lpm, 54 bar, 30 rpm, 8 kNm. Washed down from 921 m to 967 m. Tagged top of float (Wiper plugs) at 967 m with 2 tons.", "dTimEnd": "2009-07-07T14:45:00+02:00", "dTimStart": "2009-07-07T13:30:00+02:00", "md": "967", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled out wiper plug, casing FC, shoe track and 9 5/8\" casing shoe from 967 m to 996 m with 1600 lpm, 55 bar, WOB 2 - 5 tons, 30 rpm, 8 - 13 kNm. Meanwhile held pre-job meeting with involved personnel prior to drill 8 ½\" section; reviewed check lists and relevant safety / operational issues.", "dTimEnd": "2009-07-07T19:15:00+02:00", "dTimStart": "2009-07-07T14:45:00+02:00", "md": "996", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned out rat hole below casing shoe with 1600 lpm, 55 bar, WOB 0 - 1 tons, 30 rpm, 8 kNm. Simultaneously: Held pre job meeting prior to displace well from SW to 1.28 sg Soludrill mud.", "dTimEnd": "2009-07-07T19:30:00+02:00", "dTimStart": "2009-07-07T19:15:00+02:00", "md": "997", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Swept hole with 20 M3 hi-vis pill; 1600 lpm, 45 bar, 30 rpm, 8-9 kNm.", "dTimEnd": "2009-07-07T20:15:00+02:00", "dTimStart": "2009-07-07T19:30:00+02:00", "md": "997", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pumped 20 M3 of spacer, Displaced well to 1.26 sg Soludrill mud, with 1600 lpm, 40-63 bar, 30 rpm, 8 kNm. Circulated 1 times BU after well displaced to condition mud.", "dTimEnd": "2009-07-07T22:30:00+02:00", "dTimStart": "2009-07-07T20:15:00+02:00", "md": "997", "phase": "fixed", "proprietaryCode": "drilling -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled/oriented 8 1/2\" hole from 997 m to 1051 m with 1600-1900 lpm, 80-105 bar, 30-60 rpm, 7-10 kNm, WOB 5-8 ton. ROP 45-50 m/hr. ECD 1.39-1.41 sg.", "dTimEnd": "2009-07-08T00:00:00+02:00", "dTimStart": "2009-07-07T22:30:00+02:00", "md": "1051", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_A_2009_07_09
NO 15/9-F-9 A
NO 15/9-F-9 A
name
2009-07-08T00:00:00+02:00
2009-07-09T00:00:00+02:00
normal
2018-05-03T13:53:17+02:00
{ "name": "15/9-F-9 A", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9 A", "namingSystem": "NPD code" }, { "name": "6163", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2009-06-23T00:00:00+02:00", "dateDrillComplete": "2009-07-08", "daysBehind": "3.1", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2009-07-09T00:00:00+02:00", "dTimDiaHoleStart": "2009-07-08T16:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "155", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Pull out of hole and lay out premade cleanout assemblies. RU for running 6 5/8\" sand screens. MU and run sand screen and blank pipe. MU screen hanger. Run in hole with 6 5/8\" sand screens on 5 1/2\" DP to setting depth. Set screen hanger. Release setting tool and set screen hanger packer.\n\nOperation target tomorrow at 06:00 hrs: Setting screen hanger packer. \n", "hpht": "0", "md": "1206", "mdCsgLast": "996", "mdDiaHoleStart": "1206", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "6", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Circulated the hole clean. Attempted to take cluster shot survey. Pulled out of hole and laid out 8 ½\" BHA. Made up and ran in hole with cleanout assembly. Displaced well to 1.20 sg brine. Pumped and displaced wash train, circulated the well clean. Flow checked well. Pulled out of hole with cleanout assembly from 1205 m to 817 m. LO cleanout assembly #3. Pulled out of hole from 817 m to 743 m. ", "tightWell": "0", "tvd": "1013", "tvdCsgLast": "881", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[ { "dTim": "2009-07-08T10:00:00+02:00", "density": "1.29", "filterCakeLtlp": null, "filtrateLtlp": "16", "locationSample": "Active pit", "md": "1206", "mudClass": "water based", "presBopRating": "0", "pv": "24", "tempHthp": null, "type": "Soludril-N", "visFunnel": "-999.99", "yp": "9" }, { "dTim": "2009-07-08T03:00:00+02:00", "density": "1.29", "filterCakeLtlp": null, "filtrateLtlp": "17", "locationSample": "Active pit", "md": "1161", "mudClass": "water based", "presBopRating": "0", "pv": "24", "tempHthp": null, "type": "Soludril-N", "visFunnel": "-999.99", "yp": "9.5" } ]
[]
[]
[ { "comments": "Drilled/oriented 8 1/2\" hole from 1051 m to 1206 m with 1900 lpm, 105-110 bar, 60 rpm, 8-10 kNm, WOB 5-9 ton. ROP 40-60 m/hr. ECD 1.41-1.43 sg.", "dTimEnd": "2009-07-08T04:45:00+02:00", "dTimStart": "2009-07-08T00:00:00+02:00", "md": "1206", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Racked back stand. Attempted to take cluster shot survey, Observed torque peaks up to 19 kNm and 20 ton over pull when moving string after 2nd survey.", "dTimEnd": "2009-07-08T05:30:00+02:00", "dTimStart": "2009-07-08T04:45:00+02:00", "md": "1200", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Circulated the hole clean with 1930 lpm, 100 bar, 100 rpm, 8-9 kNm. ECD 1.42-1.40 sg.", "dTimEnd": "2009-07-08T06:00:00+02:00", "dTimStart": "2009-07-08T05:30:00+02:00", "md": "1200", "phase": "fixed", "proprietaryCode": "drilling -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Circulated the hole clean with 1930 lpm, 100 bar, 100 rpm, 8-9 kNm. ECD 1.42-1.41 sg. Circulated totally 4 times BU.", "dTimEnd": "2009-07-08T06:45:00+02:00", "dTimStart": "2009-07-08T06:00:00+02:00", "md": "1200", "phase": "fixed", "proprietaryCode": "drilling -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole from 1200 m to 1192 m. Attempted to take cluster shot survey; surveys out of specification. Took max 30 ton over pull when moving string. Pumped out of hole from 1192 m to 1158 m with 1700 lpm, 81 bar.", "dTimEnd": "2009-07-08T08:00:00+02:00", "dTimStart": "2009-07-08T06:45:00+02:00", "md": "1192", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attempted to take cluster shot survey, surveys still out of specification.", "dTimEnd": "2009-07-08T08:45:00+02:00", "dTimStart": "2009-07-08T08:00:00+02:00", "md": "1192", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole from 1158 m to 1068 m.", "dTimEnd": "2009-07-08T09:15:00+02:00", "dTimStart": "2009-07-08T08:45:00+02:00", "md": "1068", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attempted to take cluster shot survey, surveys still out of specification.", "dTimEnd": "2009-07-08T10:00:00+02:00", "dTimStart": "2009-07-08T09:15:00+02:00", "md": "1068", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole from 1068 m to 962 m.", "dTimEnd": "2009-07-08T10:30:00+02:00", "dTimStart": "2009-07-08T10:00:00+02:00", "md": "962", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flow checked well with bit inside 9 5/8\" liner-OK.", "dTimEnd": "2009-07-08T10:45:00+02:00", "dTimStart": "2009-07-08T10:30:00+02:00", "md": "962", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole from 962 m to 195 m.", "dTimEnd": "2009-07-08T11:45:00+02:00", "dTimStart": "2009-07-08T10:45:00+02:00", "md": "195", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flow checked well-OK.", "dTimEnd": "2009-07-08T12:00:00+02:00", "dTimStart": "2009-07-08T11:45:00+02:00", "md": "195", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole from 195 m to 140 m.", "dTimEnd": "2009-07-08T12:45:00+02:00", "dTimStart": "2009-07-08T12:00:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed hydraulic power slips and installed master bushing.", "dTimEnd": "2009-07-08T13:00:00+02:00", "dTimStart": "2009-07-08T12:45:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole and racked back 8 ½\" BHA from 140 m to 43 m.", "dTimEnd": "2009-07-08T14:30:00+02:00", "dTimStart": "2009-07-08T13:00:00+02:00", "md": "43", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "BO and LD 8 ½\" BHA from 43 m to surface.", "dTimEnd": "2009-07-08T16:15:00+02:00", "dTimStart": "2009-07-08T14:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and tidied rig floor.", "dTimEnd": "2009-07-08T16:30:00+02:00", "dTimStart": "2009-07-08T16:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held pre-job meeting with involved personnel prior to pick up and run in hole with cleanout assembly; reviewed check lists and relevant safety / operational issues.", "dTimEnd": "2009-07-08T16:45:00+02:00", "dTimStart": "2009-07-08T16:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up and ran in hole with cleanout assembly to 825 m.", "dTimEnd": "2009-07-08T20:15:00+02:00", "dTimStart": "2009-07-08T16:45:00+02:00", "md": "825", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in hole with cleanout assembly on 5 ½\" DP from 825 m to 945 m. Broke circulation with 664 lpm, 8 bar. Up weight 102 tons and down weight 90 tons.", "dTimEnd": "2009-07-08T20:45:00+02:00", "dTimStart": "2009-07-08T20:15:00+02:00", "md": "945", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in hole with cleanout assembly on 5 ½\" DP from 945 m to 1202 m. Simultaneously: Held pre-job meeting with involved personnel prior to displace and clean well; reviewed check lists and relevant safety / operational issues.", "dTimEnd": "2009-07-08T22:00:00+02:00", "dTimStart": "2009-07-08T20:45:00+02:00", "md": "1202", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up kelly cock and air operated ball release sub. Positioned mule shoe at 1205 m.", "dTimEnd": "2009-07-08T22:30:00+02:00", "dTimStart": "2009-07-08T22:00:00+02:00", "md": "1205", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Established circulation and circulated 2 times bottoms up with 2000 lpm, 42 bar, 40 rpm, 4-6 kNm. Reciprocated string and scraped screen hanger setting area from 955 m to 946 m.", "dTimEnd": "2009-07-08T23:30:00+02:00", "dTimStart": "2009-07-08T22:30:00+02:00", "md": "1205", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Displaced 1.26 sg Soludrill mud from open hole and up in 9 5/8\" casing (1205 m to 746 m) by pumping 25 M3 of 1.20 NaCl brine with 2000 lpm, 40 bar.", "dTimEnd": "2009-07-09T00:00:00+02:00", "dTimStart": "2009-07-08T23:30:00+02:00", "md": "1205", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_A_2009_07_10
NO 15/9-F-9 A
NO 15/9-F-9 A
name
2009-07-09T00:00:00+02:00
2009-07-10T00:00:00+02:00
normal
2018-05-03T13:53:17+02:00
{ "name": "15/9-F-9 A", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9 A", "namingSystem": "NPD code" }, { "name": "6163", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2009-06-23T00:00:00+02:00", "dateDrillComplete": "2009-07-08", "daysBehind": "2.7", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2009-07-10T00:00:00+02:00", "dTimDiaHoleStart": "2009-07-09T08:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Cut and slip drill line. Make up and run in hole with swab cups. Circulate 1 time BU with 1.03 sg brine. Pump Citric acid and swab well. Monitor loss rate. Pull above top of sand screen. Displace to 1.03 sg NaCl. POOH with swab cups. \n\n\n\nOperation target tomorrow at 06:00 hrs: POOH with swab cups. \n\n", "hpht": "0", "md": "1206", "mdCsgLast": "1201", "mdDiaHoleStart": "1206", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "7", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Pulled out of hole with cleanout assembly from 743 m to surface. Rigged up liner handling equipment. Ran 6 5/8\" screens and liner to 263 m. Ran in hole with liner on 5 ½\" DP from 263 m to 1201 m. Set liner hanger and liner hanger packer. Pulled liner running tool out of PBR. Prepared 1.03 sg brine in pits. Displaced 9 5/8\" and 13 3/8\" casing to 1.03 sg NaCl brine. Pulled out of hole with liner running tool from 935 m to surface. BO and LD liner hanger running tool. ", "tightWell": "0", "tvd": "1013", "tvdCsgLast": "1012", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[ { "dTim": "2009-07-09T22:00:00+02:00", "density": "1.2", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "1206", "mudClass": "other", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Dropped 13/4\" SABS opening ball. Displaced ball down with 400 lpm, 10 bar. Observed 55 bar pressure increase when ball sheared out ball seat.", "dTimEnd": "2009-07-09T00:15:00+02:00", "dTimStart": "2009-07-09T00:00:00+02:00", "md": "1205", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued displacing well from 1.26 sg Soludrill to 1.20 sg NaCl brine. 3000 lpm, 38 bar, 40 rpm, 6 kNm.", "dTimEnd": "2009-07-09T00:30:00+02:00", "dTimStart": "2009-07-09T00:15:00+02:00", "md": "1205", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Swept well with 15 m3 soap pill, 5 M3 1.20 sg brine and 15 M3 soap pill. 2000 lpm, 20-24 bar, 20 rpm, 6 kNm. Continued pumping 1.20 sg NaCl until clean brine in return and NTU readings below 200.", "dTimEnd": "2009-07-09T01:45:00+02:00", "dTimStart": "2009-07-09T00:30:00+02:00", "md": "1205", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Emptied and cleaned trip tank. Filled trip tank with clean 1.20 sg brine.", "dTimEnd": "2009-07-09T02:15:00+02:00", "dTimStart": "2009-07-09T01:45:00+02:00", "md": "1205", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flow checked well on trip tank. Gained 0.1 M3 the first 15 minutes due to thermal expansion, then the well was static.", "dTimEnd": "2009-07-09T02:45:00+02:00", "dTimStart": "2009-07-09T02:15:00+02:00", "md": "1205", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Recorded parameters: Up weight 111 tons, down weight 94 tons, free rotation weight 103 tons, stretch 0.18 m and free rotation torque 5-7 kNm. BO kelly cock and air operated ball release sub.", "dTimEnd": "2009-07-09T03:45:00+02:00", "dTimStart": "2009-07-09T02:45:00+02:00", "md": "1205", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole with cleanout assembly from 1205 m to 817 m. Recorded parameters at 951 m (screen hanger setting depth): Up weight 105 tons, down weight 91 tons, free rotation weight 98 tons, stretch 0.12 m and free rotation torque 4-5.5 kNm.", "dTimEnd": "2009-07-09T05:00:00+02:00", "dTimStart": "2009-07-09T03:45:00+02:00", "md": "817", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held pre job meeting. Laid out cleanout assembly #3.", "dTimEnd": "2009-07-09T05:45:00+02:00", "dTimStart": "2009-07-09T05:00:00+02:00", "md": "817", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole from 817 m to 743 m.", "dTimEnd": "2009-07-09T06:00:00+02:00", "dTimStart": "2009-07-09T05:45:00+02:00", "md": "743", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole from 743 m to 266 m.", "dTimEnd": "2009-07-09T07:30:00+02:00", "dTimStart": "2009-07-09T06:00:00+02:00", "md": "266", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole and laid out cleanout assembly #1 and #2 from 266 m to 247 m.", "dTimEnd": "2009-07-09T07:45:00+02:00", "dTimStart": "2009-07-09T07:30:00+02:00", "md": "247", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole from 247 m to surface. BO and LD mule shoe.", "dTimEnd": "2009-07-09T08:15:00+02:00", "dTimStart": "2009-07-09T07:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and tidied rig floor.", "dTimEnd": "2009-07-09T08:30:00+02:00", "dTimStart": "2009-07-09T08:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held pre job meeting prior to rig up screen handling equipment.", "dTimEnd": "2009-07-09T08:45:00+02:00", "dTimStart": "2009-07-09T08:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged up screen handling equipment.", "dTimEnd": "2009-07-09T10:45:00+02:00", "dTimStart": "2009-07-09T08:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held pre job meeting prior to run 6 5/8\" sand screen.", "dTimEnd": "2009-07-09T11:00:00+02:00", "dTimStart": "2009-07-09T10:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up, made up and ran in hole with 6 5/8\" screens to 199 m.", "dTimEnd": "2009-07-09T15:00:00+02:00", "dTimStart": "2009-07-09T11:00:00+02:00", "md": "199", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up XO and ran in hole with blank 6 5/8\" liner from 199 m to 247 m.", "dTimEnd": "2009-07-09T16:00:00+02:00", "dTimStart": "2009-07-09T15:00:00+02:00", "md": "247", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held pre job meeting prior to pick up liner hanger. Changed handling equipment.", "dTimEnd": "2009-07-09T16:15:00+02:00", "dTimStart": "2009-07-09T16:00:00+02:00", "md": "247", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up made up and ran in hole with liner hanger assembly to 263 m. Filled PBR with drill water.", "dTimEnd": "2009-07-09T17:30:00+02:00", "dTimStart": "2009-07-09T16:15:00+02:00", "md": "263", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged down casing tong and installed hydraulic power slips.", "dTimEnd": "2009-07-09T18:30:00+02:00", "dTimStart": "2009-07-09T17:30:00+02:00", "md": "263", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in hole with 6 5/8\" liner screens on 5 ½\" DP from 263 m to 1204.5 m. Tagged bottom with 5 tons.", "dTimEnd": "2009-07-09T21:15:00+02:00", "dTimStart": "2009-07-09T18:30:00+02:00", "md": "1204.5", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Positioned string at 1201 m. Dropped 1 3/4\" liner hanger setting ball and chased ball with 450 lpm, 8 bar. Pressure increased to 150 bar when ball landed in ball seat. Observed shear at 150 bars. Attempted to increase pressure to 165 bars, but pressure stabilized at 150 bars when pumping with 440 lpm.", "dTimEnd": "2009-07-09T22:00:00+02:00", "dTimStart": "2009-07-09T21:15:00+02:00", "md": "1201", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Set down 30 tons to verify hanger set-OK.", "dTimEnd": "2009-07-09T22:15:00+02:00", "dTimStart": "2009-07-09T22:00:00+02:00", "md": "1201", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Adjusted down weight on hanger to 10 tons. Released running tool with 8 right hand turns. Attempted to pick up 1 meter but took full string weight. Pressured up to 165 bar and held pressure for 2 minutes. Set down 30 ton on hanger. Adjusted down weight on hanger to 10 tons. Bleed down pressure on string from 165 bars to 9 bars. Released running tool with 8 right hand turns. Pulled 1 m up and confirmed running tool free. Pressured up to shear out ball seat, ball seat sheared out at 255 bars.", "dTimEnd": "2009-07-09T22:45:00+02:00", "dTimStart": "2009-07-09T22:15:00+02:00", "md": "1201", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up 3.8 m to extend packer actuator dogs above the PBR. Sat down 30 ton on PBR to set liner hanger packer, observed booth 2 shears. Pulled running tool out of PBR.", "dTimEnd": "2009-07-09T23:00:00+02:00", "dTimStart": "2009-07-09T22:45:00+02:00", "md": "935", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared pit space and started mixing of 1.03 sg NaCl brine. Not done earlier due to pit capacity.", "dTimEnd": "2009-07-10T00:00:00+02:00", "dTimStart": "2009-07-09T23:00:00+02:00", "md": "935", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_A_2009_07_11
NO 15/9-F-9 A
NO 15/9-F-9 A
name
2009-07-10T00:00:00+02:00
2009-07-11T00:00:00+02:00
normal
2018-05-03T13:53:17+02:00
{ "name": "15/9-F-9 A", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9 A", "namingSystem": "NPD code" }, { "name": "6163", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2009-06-23T00:00:00+02:00", "dateDrillComplete": "2009-07-08", "daysBehind": "2.7", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2009-07-11T00:00:00+02:00", "dTimDiaHoleStart": "2009-07-09T08:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Pump 30 M3 of 1.03 sg NaCl brine. Pull lower cup into blank pipe and pump 20 M3 of 1.03 sg NaCl packer fluid. Pull above top of sand screen. Displace to 1.03 sg NaCl packer fluid. POOH with swab cups. Retrieve bore protector. Jet wash riser and wellhead. Make up ESP assemblies and connect cable.\n\n\n\nOperation target tomorrow at 06:00 hrs: Connecting ESP cable. \n", "hpht": "0", "md": "1206", "mdCsgLast": "1201", "mdDiaHoleStart": "1206", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "8", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "BO and LD liner hanger running tool. Ran in hole with swab cups. Circulated 1 time BU. Pumped citric acid and swabbed well. Monitored loss rate; 1.5 - 2.0 M3. Cut and slipped drill line. Repaired gear on dead mans anchor. Reset and tested anti-collision system after cut and slip. BO side entry sub and Kelly cock. Pulled upper cup into blank pipe. ", "tightWell": "0", "tvd": "1013", "tvdCsgLast": "1012", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[ { "dTim": "2009-07-10T22:00:00+02:00", "density": "103", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "1206", "mudClass": "other", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Continued mixing 1.03 sg NaCl brine. Meanwhile performed general rig maintenance.", "dTimEnd": "2009-07-10T02:00:00+02:00", "dTimStart": "2009-07-10T00:00:00+02:00", "md": "935", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Displaced 9 5/8\" and 13 3/8\" casing to 1.03 sg NaCl with 3000 lpm, 63 bars.", "dTimEnd": "2009-07-10T02:30:00+02:00", "dTimStart": "2009-07-10T02:00:00+02:00", "md": "935", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole from 935 m to 15 m. Tripped with reduced speed due to high friction in the well causing vibration in derrick.", "dTimEnd": "2009-07-10T05:15:00+02:00", "dTimStart": "2009-07-10T02:30:00+02:00", "md": "15", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed hydraulic power slips and installed master bushing. Racked back stand.", "dTimEnd": "2009-07-10T05:45:00+02:00", "dTimStart": "2009-07-10T05:15:00+02:00", "md": "15", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "BO and LD liner hanger running tool.", "dTimEnd": "2009-07-10T06:00:00+02:00", "dTimStart": "2009-07-10T05:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "BO and LD liner hanger running tool.", "dTimEnd": "2009-07-10T06:15:00+02:00", "dTimStart": "2009-07-10T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- sand control", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed dies in iron roughneck. Cleaned and tidied rig floor.", "dTimEnd": "2009-07-10T07:00:00+02:00", "dTimStart": "2009-07-10T06:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held pre job meeting prior to pick up swab cup assembly. Changed inserts in slips and elevator.", "dTimEnd": "2009-07-10T07:30:00+02:00", "dTimStart": "2009-07-10T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up swab assemblies and ran in hole to 267 m.", "dTimEnd": "2009-07-10T09:00:00+02:00", "dTimStart": "2009-07-10T07:30:00+02:00", "md": "267", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed handling equipment. Meanwhile changed fitting on iron roughneck.", "dTimEnd": "2009-07-10T09:30:00+02:00", "dTimStart": "2009-07-10T09:00:00+02:00", "md": "267", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in hole with swab cup assembly on 5 ½\" DP from 267 m to 1187 m.", "dTimEnd": "2009-07-10T14:15:00+02:00", "dTimStart": "2009-07-10T09:30:00+02:00", "md": "1187", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Circulated 1 time BU with 1500 lpm, 35-30 m.", "dTimEnd": "2009-07-10T14:45:00+02:00", "dTimStart": "2009-07-10T14:15:00+02:00", "md": "1187", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pumped 9.6 m³ of citric acid, 1.06 sg, displaced with 12.6 m³ 1.03 sg brine at 1500 lpm, 27 bars.", "dTimEnd": "2009-07-10T15:15:00+02:00", "dTimStart": "2009-07-10T14:45:00+02:00", "md": "1187", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Observed well on trip tank. Gained 0.36 M3/hr for the first half hour due to thermal expansion, then levelled of and stabilized.", "dTimEnd": "2009-07-10T16:15:00+02:00", "dTimStart": "2009-07-10T15:15:00+02:00", "md": "1187", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled the upper cup into the blank pipe and swabbed the well 11 times with 30 m strokes (1153-1123 m) 30 m/min. Ran back to 1187 m. Opened the stand pipe valve. Pumped 0.5 m³ down DP and displaced clean acid into well bore. Closed stand pipe valve. Pulled out of hole until upper swab cups above screens.", "dTimEnd": "2009-07-10T17:30:00+02:00", "dTimStart": "2009-07-10T16:15:00+02:00", "md": "1120", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Monitored well on trip tank for losses. Loss rate 1.5 - 2 M3/min.", "dTimEnd": "2009-07-10T18:00:00+02:00", "dTimStart": "2009-07-10T17:30:00+02:00", "md": "1120", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Stopped filling the hole from trip tank and let fluid level in annulus drop to equilibrium.", "dTimEnd": "2009-07-10T19:30:00+02:00", "dTimStart": "2009-07-10T18:00:00+02:00", "md": "1120", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in hole to 1159 m. Removed hydraulic power slips and installed master bushing. Ran in hole from 1159 m to 1187 m.", "dTimEnd": "2009-07-10T20:30:00+02:00", "dTimStart": "2009-07-10T19:30:00+02:00", "md": "1187", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pumped 6.2 m³ of citric acid, 1.06 sg, displaced with 12.8 m³ 1.03 sg brine at 1500 lpm, 29 bars. No return seen.", "dTimEnd": "2009-07-10T21:00:00+02:00", "dTimStart": "2009-07-10T20:30:00+02:00", "md": "1187", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Laid out double DP, installed side entry sub and Kelly cock on string.", "dTimEnd": "2009-07-10T21:30:00+02:00", "dTimStart": "2009-07-10T21:00:00+02:00", "md": "1170", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held pre job meeting. Performed cut and slip of drill line. Broke bolts on dead mans anchor gear box.", "dTimEnd": "2009-07-11T00:00:00+02:00", "dTimStart": "2009-07-10T21:30:00+02:00", "md": "1170", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_A_2009_07_12
NO 15/9-F-9 A
NO 15/9-F-9 A
name
2009-07-11T00:00:00+02:00
2009-07-12T00:00:00+02:00
normal
2018-05-03T13:53:17+02:00
{ "name": "15/9-F-9 A", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9 A", "namingSystem": "NPD code" }, { "name": "6163", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2009-06-23T00:00:00+02:00", "dateDrillComplete": "2009-07-08", "daysBehind": "2.8", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2009-07-12T00:00:00+02:00", "dTimDiaHoleStart": "2009-07-11T20:15:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Continue making up ESP assemblies. Run in hole with ESP on 7 5/8\" tubing. Install tubing hanger. Run in hole and land tubing hanger in wellhead. \n\n\nOperation target tomorrow at 06:00 hrs: Landing tubing hanger. ", "hpht": "0", "md": "1206", "mdCsgLast": "1201", "mdDiaHoleStart": "1206", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "9", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Pumped/bull-headed 30 M3 of 1.03 sg NaCl brine. Pulled lower cup into blank pipe and pumped/bull-headed 20 M3 of 1.03 sg NaCl packer fluid. Pulled above screen hanger and filled annulus with 1.03 sg packer fluid. Observed that loss rate decreased from 2 M3/min to 40 l/min. Ran in hole and re-swabbed the well. Pulled above screen hanger and observed losses; 1.2 M3/min. Pulled out of hole from 930 m to 270 m. Welded on new eye for safety chain on elevator insert. Trouble shot on PRS and fingerboard. Pulled out of hole and LO swab cup assemblies. Pulled wear bushing. Washed wellhead area. Made up and racked back tubing hanger assembly. RU and spot ESP equipment. Made up ESP assemblies and connected cable. ", "tightWell": "0", "tvd": "1013", "tvdCsgLast": "1012", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[ { "dTim": "2009-07-11T22:00:00+02:00", "density": "103", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "1206", "mudClass": "other", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Changed out broken bolts in gearbox on dead mans anchor.", "dTimEnd": "2009-07-11T02:30:00+02:00", "dTimStart": "2009-07-11T00:00:00+02:00", "md": "1170", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Continued cut and slip operation. Found lock pin on dead mans anchor to be broken.", "dTimEnd": "2009-07-11T03:15:00+02:00", "dTimStart": "2009-07-11T02:30:00+02:00", "md": "1170", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Repaired lock pin on dead mans anchor.", "dTimEnd": "2009-07-11T05:00:00+02:00", "dTimStart": "2009-07-11T03:15:00+02:00", "md": "1170", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Reset and tested anti collision system.", "dTimEnd": "2009-07-11T05:15:00+02:00", "dTimStart": "2009-07-11T05:00:00+02:00", "md": "1170", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "success" }, { "comments": "BO side entry sub and Kelly cock. Installed double DP. Placed upper cup into the blank pipe.", "dTimEnd": "2009-07-11T06:00:00+02:00", "dTimStart": "2009-07-11T05:15:00+02:00", "md": "1153", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pumped/bull-headed 30 M3 of 1.03 sg NaCl brine. 400 lpm, 4 bar. Increased flow rate to 1490 lpm, 28 bars after 15 M3 pumped.", "dTimEnd": "2009-07-11T07:00:00+02:00", "dTimStart": "2009-07-11T06:00:00+02:00", "md": "1153", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Located lower swab cup inside the blank pipe and pumped/bull-headed 20 M3 of 1.03 sg NaCl packer fluid. 1500 lpm, 22 bar.", "dTimEnd": "2009-07-11T08:00:00+02:00", "dTimStart": "2009-07-11T07:00:00+02:00", "md": "985", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole from 985 m to 930 m. (Bull nose above the screen hanger).", "dTimEnd": "2009-07-11T08:15:00+02:00", "dTimStart": "2009-07-11T08:00:00+02:00", "md": "930", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Mixed 90 M3 of 1.03 sg packer fluid. Not done earlier due to pit capacity.", "dTimEnd": "2009-07-11T10:00:00+02:00", "dTimStart": "2009-07-11T08:15:00+02:00", "md": "930", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Filled annulus with 85 M3 1.03 sg packer fluid. Loss rate decreased from 2 M3/min to 40 l/min after having displaced in 85 M3 of completion fluid.", "dTimEnd": "2009-07-11T11:00:00+02:00", "dTimStart": "2009-07-11T10:00:00+02:00", "md": "930", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Discussed further operation, could not find any surface reason causing the sudden decrease in loss rate. Decided to re-swab the well.", "dTimEnd": "2009-07-11T11:30:00+02:00", "dTimStart": "2009-07-11T11:00:00+02:00", "md": "930", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in hole from 930 m to 995 m. Filled pipe and observed communication to trip tank, indicating flow past upper cup in blank pipe.", "dTimEnd": "2009-07-11T12:15:00+02:00", "dTimStart": "2009-07-11T11:30:00+02:00", "md": "995", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Swabbed the well 10 times with 30 m strokes (991-961 m) 30 m/min. Pulled out of hole to 930 m. (Bull nose above the screen hanger). Loss rate 1.2 M3/min. Stopped filling the hole from trip tank and let fluid level in annulus drop to equilibrium.", "dTimEnd": "2009-07-11T12:45:00+02:00", "dTimStart": "2009-07-11T12:15:00+02:00", "md": "930", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled out of hole from 930 m to 270 m. Filled hole with 2 M3/10 stand pulled.", "dTimEnd": "2009-07-11T13:45:00+02:00", "dTimStart": "2009-07-11T12:45:00+02:00", "md": "270", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed inserts in hydraulic power slips. Discovered that eye for safety wire on elevator inserts was damaged.", "dTimEnd": "2009-07-11T14:00:00+02:00", "dTimStart": "2009-07-11T13:45:00+02:00", "md": "270", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Welded on new eye for safety wire on elevator insert. Meanwhile greased dolly.", "dTimEnd": "2009-07-11T15:30:00+02:00", "dTimStart": "2009-07-11T14:00:00+02:00", "md": "270", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Was not able to rack back 3 1/5\" DP in fingerboard. Initialized system-OK.", "dTimEnd": "2009-07-11T16:30:00+02:00", "dTimStart": "2009-07-11T15:30:00+02:00", "md": "270", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Continued pulling out of hole and lay out swab cup assemblies from 270 m to surface.", "dTimEnd": "2009-07-11T17:45:00+02:00", "dTimStart": "2009-07-11T16:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and tidied rig floor. Changed inserts in elevator.", "dTimEnd": "2009-07-11T18:00:00+02:00", "dTimStart": "2009-07-11T17:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up wear bushing running tool. Removed master bushing.", "dTimEnd": "2009-07-11T18:15:00+02:00", "dTimStart": "2009-07-11T18:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in hole. Engaged to wear bushing. Pulled out of hole with wear bushing. LO wear bushing and wear bushing running tool.", "dTimEnd": "2009-07-11T19:15:00+02:00", "dTimStart": "2009-07-11T18:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up riser/wellhead wash tool. Ran in hole and washed wellhead area with 1500 lpm, 5 bars. Past wellhead area 3 times. Pulled out and BO wellhead wash tool.", "dTimEnd": "2009-07-11T20:15:00+02:00", "dTimStart": "2009-07-11T19:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up and racked back tubing hanger assembly.", "dTimEnd": "2009-07-11T21:30:00+02:00", "dTimStart": "2009-07-11T20:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held pre job meeting prior to RU for running ESP. Rigged up and spot equipment.", "dTimEnd": "2009-07-12T00:00:00+02:00", "dTimStart": "2009-07-11T21:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_A_2009_07_13
NO 15/9-F-9 A
NO 15/9-F-9 A
name
2009-07-12T00:00:00+02:00
2009-07-13T00:00:00+02:00
normal
2018-05-03T13:53:17+02:00
{ "name": "15/9-F-9 A", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9 A", "namingSystem": "NPD code" }, { "name": "6163", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2009-06-23T00:00:00+02:00", "dateDrillComplete": "2009-07-08", "daysBehind": "2.5", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2009-07-13T00:00:00+02:00", "dTimDiaHoleStart": "2009-07-11T20:15:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Fit hanger penetrator and pigtail into the hanger. Leak test penetrator o-rings. Space out for the cable splice, cut the cable and splice cable to pigtail. Run in hole and land tubing hanger in wellhead. Rig down tubing handling equipment. Lay out tubing hanger running tool. Nipple down diverter and riser. Install tubing bonnet, spacer spool and ball valve assembly. Leak test tubing bonnet cavity and penetrator seals. Hand over well to production department. \n\n\nOperation target tomorrow at 06:00 hrs: Demobilizing equipment. ", "hpht": "0", "md": "1206", "mdCsgLast": "1201", "mdDiaHoleStart": "1206", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "10", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Made up ESP assemblies. Ran in hole with ESP assembly on 7 5/8\" tubing to 357 m. LO totally 8 joints due to bad connections. Installed and oriented tubing hanger. Removed hydraulic power slips and installed master bushing. ", "tightWell": "0", "tvd": "1013", "tvdCsgLast": "1012", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[ { "dTim": "2009-07-12T22:00:00+02:00", "density": "103", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "1206", "mudClass": "other", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Rigged up and spot ESP equipment.", "dTimEnd": "2009-07-12T00:15:00+02:00", "dTimStart": "2009-07-12T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up and made up ESP assembly 1 and 2. Connected control lines to motor. Made up ¼\" hydraulic line from Multisensor gauge. Pumped oil into the motor by a hand pump. Serviced the motor and evacuated the air. Connected up the electrical cable to the motor and tested out same. Installed protectolizer clamp on the base of the motor.", "dTimEnd": "2009-07-12T05:00:00+02:00", "dTimStart": "2009-07-12T00:15:00+02:00", "md": "14", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up and made up ESP assembly 3(ESP pump).", "dTimEnd": "2009-07-12T06:00:00+02:00", "dTimStart": "2009-07-12T05:00:00+02:00", "md": "14", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to make up ESP pump to protector. Installed clamp on ESP pump.", "dTimEnd": "2009-07-12T06:15:00+02:00", "dTimStart": "2009-07-12T06:00:00+02:00", "md": "16.7", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up and made up ESP assembly 4(ESP discharge pressure assembly).", "dTimEnd": "2009-07-12T07:00:00+02:00", "dTimStart": "2009-07-12T06:15:00+02:00", "md": "18", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held pre job meeting.", "dTimEnd": "2009-07-12T07:15:00+02:00", "dTimStart": "2009-07-12T07:00:00+02:00", "md": "18", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up and made up bolt-on discharge head XO joint.", "dTimEnd": "2009-07-12T08:30:00+02:00", "dTimStart": "2009-07-12T07:15:00+02:00", "md": "21", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up and made up first 7 5/8\" tubing joint. Adjusted and aligned casing tong. Held pre job meeting prior to install hydraulic power slips. Installed clamp on tubing for protection while installing hydraulic power slips. Installed hydraulic power slips. Removed clamp.", "dTimEnd": "2009-07-12T11:15:00+02:00", "dTimStart": "2009-07-12T08:30:00+02:00", "md": "33", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran 7 5/8\" tubing from 33 m to 93 m.", "dTimEnd": "2009-07-12T13:00:00+02:00", "dTimStart": "2009-07-12T11:15:00+02:00", "md": "93", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "LO 3 joints of tubing due to bad connections.", "dTimEnd": "2009-07-12T14:30:00+02:00", "dTimStart": "2009-07-12T13:00:00+02:00", "md": "81", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran 7 5/8\" tubing from 81 m to 105 m.", "dTimEnd": "2009-07-12T15:15:00+02:00", "dTimStart": "2009-07-12T14:30:00+02:00", "md": "105", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "LO 1 joint of tubing due to bad connection.", "dTimEnd": "2009-07-12T15:30:00+02:00", "dTimStart": "2009-07-12T15:15:00+02:00", "md": "105", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran 7 5/8\" tubing from 105 m to 117 m. LO 2 joints of tubing due to bad connections.", "dTimEnd": "2009-07-12T16:45:00+02:00", "dTimStart": "2009-07-12T15:30:00+02:00", "md": "105", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Discussed further operation. Decided to clean all pins and boxes, check threads and re-dope the tubing.", "dTimEnd": "2009-07-12T17:00:00+02:00", "dTimStart": "2009-07-12T16:45:00+02:00", "md": "105", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran 7 5/8\" tubing from 105 m to 176 m.", "dTimEnd": "2009-07-12T20:15:00+02:00", "dTimStart": "2009-07-12T17:00:00+02:00", "md": "176", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "LO 2 joints of tubing due to bad connections.", "dTimEnd": "2009-07-12T21:00:00+02:00", "dTimStart": "2009-07-12T20:15:00+02:00", "md": "164", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran 7 5/8\" tubing from 164 m to 273 m.", "dTimEnd": "2009-07-13T00:00:00+02:00", "dTimStart": "2009-07-12T21:00:00+02:00", "md": "273", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_A_2009_07_14
NO 15/9-F-9 A
NO 15/9-F-9 A
name
2009-07-13T00:00:00+02:00
2009-07-14T00:00:00+02:00
normal
2018-05-03T13:53:17+02:00
{ "name": "15/9-F-9 A", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9 A", "namingSystem": "NPD code" }, { "name": "6163", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2009-06-23T00:00:00+02:00", "dateDrillComplete": "2009-07-08", "daysBehind": "2.4", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2009-07-14T00:00:00+02:00", "dTimDiaHoleStart": "2009-07-11T20:15:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Remove riser. Install tubing bonnet assembly. Leak test connections to 69 bar.", "hpht": "0", "md": "1206", "mdCsgLast": "1201", "mdDiaHoleStart": "1206", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "11", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Installed penetrator incluning seals through hanger. Spaced out and spliced cable. Attached and pressure tested peneterator o-ring to 69 bar / 10 min. OK. RIH and landed hanger 20,92m in on landing string. L/D tubing hanger. Removed casing tong. Made several attempts to disconnect riser, no go.", "tightWell": "0", "tvd": null, "tvdCsgLast": "1012", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[ { "dTim": "2009-07-13T22:00:00+02:00", "density": "103", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "1206", "mudClass": "other", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Ran 7 5/8\" tubing from 273 m to 357 m.", "dTimEnd": "2009-07-13T02:30:00+02:00", "dTimStart": "2009-07-13T00:00:00+02:00", "md": "357", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed electrical check of down hole system. Changed inserts in elevator. Confirmed remaining liner joints on deck-OK.", "dTimEnd": "2009-07-13T02:45:00+02:00", "dTimStart": "2009-07-13T02:30:00+02:00", "md": "357", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up tubing hanger/swivel assembly.", "dTimEnd": "2009-07-13T03:15:00+02:00", "dTimStart": "2009-07-13T02:45:00+02:00", "md": "357", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke FAST connection. Oriented the tubing hanger. Made up FAST connection. Cleared rig floor of redundant equipment.", "dTimEnd": "2009-07-13T05:00:00+02:00", "dTimStart": "2009-07-13T03:15:00+02:00", "md": "357", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed clamps on tubing for protection while removing hydraulic power slips and installing master bushing. Removed hydraulic power slips.", "dTimEnd": "2009-07-13T06:00:00+02:00", "dTimStart": "2009-07-13T05:00:00+02:00", "md": "357", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed penetrator incluning seals through hanger.", "dTimEnd": "2009-07-13T07:00:00+02:00", "dTimStart": "2009-07-13T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Schlumberger prepared for electrical cable splice.", "dTimEnd": "2009-07-13T08:15:00+02:00", "dTimStart": "2009-07-13T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Spaced out and spliced cable.", "dTimEnd": "2009-07-13T12:00:00+02:00", "dTimStart": "2009-07-13T08:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attached peneterator to hanger.", "dTimEnd": "2009-07-13T12:15:00+02:00", "dTimStart": "2009-07-13T12:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressure tested peneterator o-ring to 69 bar / 10 min. OK.", "dTimEnd": "2009-07-13T12:30:00+02:00", "dTimStart": "2009-07-13T12:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Tested electric cable. TBT prior to pull mastrer bushing.", "dTimEnd": "2009-07-13T13:45:00+02:00", "dTimStart": "2009-07-13T12:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran hanger through rotary table. Had to remove master bushing.", "dTimEnd": "2009-07-13T14:00:00+02:00", "dTimStart": "2009-07-13T13:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH and landed hanger 20,92m in on landing string.", "dTimEnd": "2009-07-13T14:45:00+02:00", "dTimStart": "2009-07-13T14:00:00+02:00", "md": "20.9", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Checked electrical cable, OK.", "dTimEnd": "2009-07-13T15:00:00+02:00", "dTimStart": "2009-07-13T14:45:00+02:00", "md": "20.9", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Disconnected Tubing Hanger Running Tool and POOH with same.", "dTimEnd": "2009-07-13T15:15:00+02:00", "dTimStart": "2009-07-13T15:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "TBT prior to remove casing tong.", "dTimEnd": "2009-07-13T15:30:00+02:00", "dTimStart": "2009-07-13T15:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed casing tong.", "dTimEnd": "2009-07-13T16:00:00+02:00", "dTimStart": "2009-07-13T15:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "B/O and L/D Running Tool on deck.", "dTimEnd": "2009-07-13T16:30:00+02:00", "dTimStart": "2009-07-13T16:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleared and cleaned rigfloor.", "dTimEnd": "2009-07-13T17:00:00+02:00", "dTimStart": "2009-07-13T16:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "TBT / SJA and preparation to pull diverter.", "dTimEnd": "2009-07-13T18:15:00+02:00", "dTimStart": "2009-07-13T17:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled master bushing, installed handrails around rotary. Installed lifting equipment for diverter.", "dTimEnd": "2009-07-13T19:00:00+02:00", "dTimStart": "2009-07-13T18:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "TBT prior to pull diverter.", "dTimEnd": "2009-07-13T19:15:00+02:00", "dTimStart": "2009-07-13T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled diverter and L/D same on deck.", "dTimEnd": "2009-07-13T19:45:00+02:00", "dTimStart": "2009-07-13T19:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged up double set of slings for pulling riser, held TBT.", "dTimEnd": "2009-07-13T20:45:00+02:00", "dTimStart": "2009-07-13T19:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed slings and attempted to pull riser. No go.", "dTimEnd": "2009-07-14T00:00:00+02:00", "dTimStart": "2009-07-13T20:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_A_2009_07_15
NO 15/9-F-9 A
NO 15/9-F-9 A
name
2009-07-14T00:00:00+02:00
2009-07-15T00:00:00+02:00
normal
2018-05-03T13:53:17+02:00
{ "name": "15/9-F-9 A", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9 A", "namingSystem": "NPD code" }, { "name": "6163", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2009-06-23T00:00:00+02:00", "dateDrillComplete": "2009-07-08", "daysBehind": "2.8", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2009-07-15T00:00:00+02:00", "dTimDiaHoleStart": "2009-07-11T20:15:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Demobilice rig.", "hpht": "0", "md": "1206", "mdCsgLast": "1201", "mdDiaHoleStart": "1206", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "12", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Troubleshot problems with lock ring between riser and wellhead. Adjusted release bolts to press lock ring in centre. Took 3 ton over pull, slacked off to neutral. Continued to adjust stroke of bolts. Riser free. Installed spacer spool according to Vetco procedures. Took 1 ton overpull verification test. Leak tested cable peneterator seals in tubing bonnet to 69 bar / 10 min. OK. Meanwhile held TBT prior to disconnect Kelly hose. Leak tested bonnet cavity to 69 bar / 10 min. OK. Meanwhile started to disconnect kelly hose. END OF OPERATION F - 9A. WELL HANDED OVER TO PRODUCTION.", "tightWell": "0", "tvd": null, "tvdCsgLast": "1012", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[ { "dTim": "2009-07-14T22:00:00+02:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "1206", "mudClass": "other", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Continued attempts to pull riser. Moved riser, adjusted bolts, tried to re-position lock ring.", "dTimEnd": "2009-07-14T05:00:00+02:00", "dTimStart": "2009-07-14T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Could not disconnect riser from well head. Contacted town, trouble shot.", "dTimEnd": "2009-07-14T06:00:00+02:00", "dTimStart": "2009-07-14T05:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Troubleshot problems with lock ring between riser and wellhead. TBT with on comming crew.", "dTimEnd": "2009-07-14T07:15:00+02:00", "dTimStart": "2009-07-14T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Adjusted release bolts to press lock ring in centre. Took 3 ton over pull, slacked off to neutral. Continued to adjust stroke of bolts. Riser free.", "dTimEnd": "2009-07-14T11:15:00+02:00", "dTimStart": "2009-07-14T07:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Picked up riser, installed master bushing.", "dTimEnd": "2009-07-14T11:30:00+02:00", "dTimStart": "2009-07-14T11:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "TBT prior to L/D riser.", "dTimEnd": "2009-07-14T11:45:00+02:00", "dTimStart": "2009-07-14T11:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D riser on deck.", "dTimEnd": "2009-07-14T12:15:00+02:00", "dTimStart": "2009-07-14T11:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared wellhead for spacer spool.", "dTimEnd": "2009-07-14T15:45:00+02:00", "dTimStart": "2009-07-14T12:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Checked yellow tugger wire, OK. TBT prior to installation of spacer spool.", "dTimEnd": "2009-07-14T16:00:00+02:00", "dTimStart": "2009-07-14T15:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed flowhead and spacer spool according to Vetco procedures. Took 1 ton overpull verification test.", "dTimEnd": "2009-07-14T17:30:00+02:00", "dTimStart": "2009-07-14T16:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed and L/D lifting equipment. Cleaned rigfloor and wellhead area. Removed handrails on the weatherdeck.", "dTimEnd": "2009-07-14T19:00:00+02:00", "dTimStart": "2009-07-14T17:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Leak tested cable peneterator seals in tubing bonnet to 69 bar / 10 min. OK. Meanwhile held TBT prior to disconnect Kelly hose.", "dTimEnd": "2009-07-14T20:30:00+02:00", "dTimStart": "2009-07-14T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Leak tested bonnet cavity to 69 bar / 10 min. OK. Meanwhile started to disconnect kelly hose. END OF OPERATION F - 9A. WELL HANDED OVER TO PRODUCTION.", "dTimEnd": "2009-07-14T21:45:00+02:00", "dTimStart": "2009-07-14T20:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- test scsssv", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_A_2015_01_27
NO 15/9-F-9 A
NO 15/9-F-9 A
name
2015-01-26T00:00:00+01:00
2015-01-27T00:00:00+01:00
normal
2018-05-03T13:53:17+02:00
{ "name": "15/9-F-9 A", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9 A", "namingSystem": "NPD code" }, { "name": "6163", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2009-06-23T00:00:00+02:00", "dateDrillComplete": "2009-07-08", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2015-01-27T00:00:00+01:00", "dTimDiaHoleStart": "2015-01-26T15:30:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Hook up riser to divert. Pull and L/D TH, tubing and ESP assemblies. Install bore protector. R/U WL and log 13 3/8\" casing and production riser. R/D WL. RIH and install Timelock plug.", "hpht": "0", "md": "1206", "mdCsgLast": "1201", "mdDiaHoleStart": "1206", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "1", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Well handed over from production. Disconnected flowline. Removed ball valve from spacer spool. Prepared to lift spacer spool and tubing bonnet. ", "tightWell": "0", "tvd": null, "tvdCsgLast": "1012", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[]
[]
[]
[ { "comments": "Well handed over from production. Held pre-job meeting for removal of flowline and ball valve.\nLifted off F-9 hatch cover in moonpool.", "dTimEnd": "2015-01-26T16:00:00+01:00", "dTimStart": "2015-01-26T15:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Disconnected flowline from F-9. Secured same on XMT deck.", "dTimEnd": "2015-01-26T18:00:00+01:00", "dTimStart": "2015-01-26T16:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared to remove ball valve from flow head assembly.", "dTimEnd": "2015-01-26T19:00:00+01:00", "dTimStart": "2015-01-26T18:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared to pull diverter.", "dTimEnd": "2015-01-26T19:45:00+01:00", "dTimStart": "2015-01-26T19:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for pulling diverter and securing same to DP in derrick.", "dTimEnd": "2015-01-26T20:00:00+01:00", "dTimStart": "2015-01-26T19:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed master bushings and outer ring, installed handrails around rotary. Installed diverter lifting eyes and connected lifting bridle.", "dTimEnd": "2015-01-26T20:30:00+01:00", "dTimStart": "2015-01-26T20:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled diverter and secured same to DP in derrick.", "dTimEnd": "2015-01-26T21:00:00+01:00", "dTimStart": "2015-01-26T20:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for removing ball valve from spacer spool and pulling spacer spool and tubing bonnet to drill floor.", "dTimEnd": "2015-01-26T21:30:00+01:00", "dTimStart": "2015-01-26T21:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed ball valve from spacer spool and secured same on XMT deck.", "dTimEnd": "2015-01-26T22:00:00+01:00", "dTimStart": "2015-01-26T21:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged up to pull spacer spool and tubing bonnet to drill floor. Made up release bolts on tubing bonnet. Meanwhile Production dept shut-in nearby wells according to SimOps procedure.", "dTimEnd": "2015-01-26T23:00:00+01:00", "dTimStart": "2015-01-26T22:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attempted to lift spacer spool and tubing bonnet without success, +/- 3 ton overpull. Slacked off weight and retried several times. No movement.", "dTimEnd": "2015-01-27T00:00:00+01:00", "dTimStart": "2015-01-26T23:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_A_2015_01_28
NO 15/9-F-9 A
NO 15/9-F-9 A
name
2015-01-27T00:00:00+01:00
2015-01-28T00:00:00+01:00
normal
2018-05-03T13:53:18+02:00
{ "name": "15/9-F-9 A", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9 A", "namingSystem": "NPD code" }, { "name": "6163", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2009-06-23T00:00:00+02:00", "dateDrillComplete": "2009-07-08", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2015-01-28T00:00:00+01:00", "dTimDiaHoleStart": "2015-01-26T15:30:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Pull and L/D 7 5/8\" tubing and ESP assemblies. \nInstall bore protector. \nR/U WL and log 13 3/8\" casing and production riser. R/D WL. \nRIH and install Timelock plug. Pressure test casing and circulate well clean. Release Timelock plug and POOH with same.", "hpht": "0", "md": "1206", "mdCsgLast": "1201", "mdDiaHoleStart": "1206", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "2", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Removed spacer spool and tubing bonnet. Installed riser and diverter. RIH with tubing hanger RT and M/U same to tubing hanger neck. Released tubing hanger and pulled same above rotary.", "tightWell": "0", "tvd": null, "tvdCsgLast": "1012", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[]
[]
[]
[ { "comments": "Reconfigured rig up and installed a 5 ton chain hoist for better control over weight taken. Simultaneously loosened ALT-2 release bolts. Attempted to lift tubing bonnet and spacer spool, 4 ton overpull, little movement observed, but still not free.", "dTimEnd": "2015-01-27T01:30:00+01:00", "dTimStart": "2015-01-27T00:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed chain hoist and re-attached double slings to ensure straight-up lift. Pulled up, backed out release bolts and pulled tubing bonnet free. Covered tubing hanger with bucket.", "dTimEnd": "2015-01-27T01:45:00+01:00", "dTimStart": "2015-01-27T01:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted flow head assembly to drill floor, landed same on HTS. L/O assembly on deck. Meanwhile cleaned and greased wellhead.", "dTimEnd": "2015-01-27T02:15:00+01:00", "dTimStart": "2015-01-27T01:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for running riser", "dTimEnd": "2015-01-27T02:30:00+01:00", "dTimStart": "2015-01-27T02:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted riser to HTS. Installed shackles and slings for handling riser through rotary", "dTimEnd": "2015-01-27T02:45:00+01:00", "dTimStart": "2015-01-27T02:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Stop in operation due to call from Production dept regarding possible leak on well F-14. Waited until Production dept verified no leak.", "dTimEnd": "2015-01-27T03:00:00+01:00", "dTimStart": "2015-01-27T02:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted riser using TDS, tugger and crane. Tailed riser in to well center and disconnected crane and tugger.", "dTimEnd": "2015-01-27T03:30:00+01:00", "dTimStart": "2015-01-27T03:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran riser through rotary and landed off in WH. Took 8 ton overpull to confirm latch.", "dTimEnd": "2015-01-27T04:00:00+01:00", "dTimStart": "2015-01-27T03:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Build scaffholding in moonpool to remove handling slings from surface riser.", "dTimEnd": "2015-01-27T05:30:00+01:00", "dTimStart": "2015-01-27T04:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Disconnected and removed slings/shackles from riser and pulled same to rig floor. Removed slings from TDS chains.", "dTimEnd": "2015-01-27T05:45:00+01:00", "dTimStart": "2015-01-27T05:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D scaffholding in moonpool. Meanwhile prepared for lifting diverter.", "dTimEnd": "2015-01-27T07:00:00+01:00", "dTimStart": "2015-01-27T05:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT prior to attaching tension system to surface riser.", "dTimEnd": "2015-01-27T07:30:00+01:00", "dTimStart": "2015-01-27T07:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed tension system to riser in moonpool to allign riser with diverter. Meanwhile made canteliver ready for Schlumberger and planned for Schlumberger hang off point.", "dTimEnd": "2015-01-27T11:15:00+01:00", "dTimStart": "2015-01-27T07:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for installing diverter onto surface riser.", "dTimEnd": "2015-01-27T11:30:00+01:00", "dTimStart": "2015-01-27T11:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran diverter and landed off on surface riser. Installed overshot hose.", "dTimEnd": "2015-01-27T12:45:00+01:00", "dTimStart": "2015-01-27T11:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for installing banana sheaves in derrick", "dTimEnd": "2015-01-27T13:00:00+01:00", "dTimStart": "2015-01-27T12:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U sheave and slings in derrick for ESP cables.", "dTimEnd": "2015-01-27T14:30:00+01:00", "dTimStart": "2015-01-27T13:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Moved Schlumberger equipment to drill floor.", "dTimEnd": "2015-01-27T15:15:00+01:00", "dTimStart": "2015-01-27T14:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U diverter test tool and removed diverter bags.", "dTimEnd": "2015-01-27T16:30:00+01:00", "dTimStart": "2015-01-27T15:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and tidied drill floor.", "dTimEnd": "2015-01-27T17:00:00+01:00", "dTimStart": "2015-01-27T16:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT prior to P/U tubing hanger running tool.", "dTimEnd": "2015-01-27T17:15:00+01:00", "dTimStart": "2015-01-27T17:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U TH RT. P/U and M/U 5 1/2\" DP pup joint to same.", "dTimEnd": "2015-01-27T18:00:00+01:00", "dTimStart": "2015-01-27T17:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Problems with smart zone on drillfloor equipment. Stop in operation. Electrical technician investigated problems. Meanwhile performed TBT for running TH RT with new crew.", "dTimEnd": "2015-01-27T20:00:00+01:00", "dTimStart": "2015-01-27T18:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "P/U and M/U 1ea 5 1/2\" DP stand. RIH and landed out at 20.2 m.", "dTimEnd": "2015-01-27T20:30:00+01:00", "dTimStart": "2015-01-27T20:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attempted to engage threads. Turned string 1/4 turn, string dropped 20 cm. Unable to turn string in any direction. Took 2 ton overpull.", "dTimEnd": "2015-01-27T21:00:00+01:00", "dTimStart": "2015-01-27T20:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Moved Weatherford casing handling equipment to drill floor. Meanwhile studied drawings and discovered that bullnose had landed outside of tubing hanger.", "dTimEnd": "2015-01-27T21:15:00+01:00", "dTimStart": "2015-01-27T21:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U, 3.5 ton hookload, and made TH RT free using link tilt on TDS. Pulled RT to surface for inspection. Observed some damage in rubber on bullnose. Tool ok to be re-run.", "dTimEnd": "2015-01-27T22:00:00+01:00", "dTimStart": "2015-01-27T21:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH and landed out at 20.8 m. Engaged threads and M/U RT to TH neck by rotating landing string 9 1/2 turns left with chain tongs, depth after M/U 20.9 m.", "dTimEnd": "2015-01-27T22:15:00+01:00", "dTimStart": "2015-01-27T22:00:00+01:00", "md": "386", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and pulled hanger free, 18.3t hookload. Pulled hanger up below rotary.", "dTimEnd": "2015-01-27T22:45:00+01:00", "dTimStart": "2015-01-27T22:15:00+01:00", "md": "368", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed master bushings and pulled TH through rotary. Checked 1st tubing joint for radioactivity, not radioactive.", "dTimEnd": "2015-01-27T23:00:00+01:00", "dTimStart": "2015-01-27T22:45:00+01:00", "md": "358", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for L/D tubing hanger and R/U casing equipment", "dTimEnd": "2015-01-27T23:15:00+01:00", "dTimStart": "2015-01-27T23:00:00+01:00", "md": "358", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U casing handling equipment.", "dTimEnd": "2015-01-28T00:00:00+01:00", "dTimStart": "2015-01-27T23:15:00+01:00", "md": "358", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_A_2015_01_29
NO 15/9-F-9 A
NO 15/9-F-9 A
name
2015-01-28T00:00:00+01:00
2015-01-29T00:00:00+01:00
normal
2018-05-03T13:53:18+02:00
{ "name": "15/9-F-9 A", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9 A", "namingSystem": "NPD code" }, { "name": "6163", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2009-06-23T00:00:00+02:00", "dateDrillComplete": "2009-07-08", "daysBehind": "1", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2015-01-29T00:00:00+01:00", "dTimDiaHoleStart": "2015-01-26T15:30:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Log 13 3/8\" casing. R/D WL equipment. Install boreprotector. RIH and install Timelock plug. Pressure test casing. Circulate and clean well. Release Timelock plug and POOH with same. Pull boreprotector. M/U and RIH with ESP assemblies on 7 5/8\" tubing.", "hpht": "0", "md": "1206", "mdCsgLast": "1201", "mdDiaHoleStart": "1206", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "3", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "L/D tubing hanger and RT to deck. POOH and L/D 5 7/8\" tubing with control line. Commenced L/D ESP assemblies.", "tightWell": "0", "tvd": null, "tvdCsgLast": "1012", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[]
[]
[]
[ { "comments": "Continued installing casing handling equipment. \nMeanwhile checked banana sheave in derrick. Removed clamp from first tubing joint and cut ESP control cable.", "dTimEnd": "2015-01-28T03:00:00+01:00", "dTimStart": "2015-01-28T00:00:00+01:00", "md": "358", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for L/D hanger and POOH with 7 5/8\" tubing.", "dTimEnd": "2015-01-28T03:15:00+01:00", "dTimStart": "2015-01-28T03:00:00+01:00", "md": "358", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "B/O tubing hanger assembly with RT. L/D and secured same on deck.", "dTimEnd": "2015-01-28T03:45:00+01:00", "dTimStart": "2015-01-28T03:15:00+01:00", "md": "358", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed BX inserts to 7 5/8\" tubing. Moved AFT HRN back to allow more room for TDS to pass casing tong.", "dTimEnd": "2015-01-28T04:15:00+01:00", "dTimStart": "2015-01-28T03:45:00+01:00", "md": "358", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with 7 5/8\" tubing with ESP assemblies and control cable from 358 m to 297 m. Disconnected cable clamps and spooled power cable to the spooling unit.", "dTimEnd": "2015-01-28T07:00:00+01:00", "dTimStart": "2015-01-28T04:15:00+01:00", "md": "297", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Troubleshot and function tested guide arm on HTS. Meanwhile repaired Weatherford casing guide; removed guide arm, checked and secured piston.", "dTimEnd": "2015-01-28T08:15:00+01:00", "dTimStart": "2015-01-28T07:00:00+01:00", "md": "297", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "POOH with 7 5/8\" tubing with ESP assemblies and control cable from 297 m to 225 m. Disconnected cable clamps and spooled power cable to the spooling unit.", "dTimEnd": "2015-01-28T11:00:00+01:00", "dTimStart": "2015-01-28T08:15:00+01:00", "md": "225", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Secured drillfloor. Stop in operation due to crew change.\nMeanwhile observed missing armor on ESP cable pulled out of hole.", "dTimEnd": "2015-01-28T15:30:00+01:00", "dTimStart": "2015-01-28T11:00:00+01:00", "md": "225", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT with new drilling crew for POOH.", "dTimEnd": "2015-01-28T15:45:00+01:00", "dTimStart": "2015-01-28T15:30:00+01:00", "md": "225", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with 7 5/8\" tubing with ESP assemblies and control cable from 225 m to 92 m. Disconnected cable clamps and spooled power cable to the spooling unit.", "dTimEnd": "2015-01-28T19:00:00+01:00", "dTimStart": "2015-01-28T15:45:00+01:00", "md": "92", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT with new drilling crew for POOH.", "dTimEnd": "2015-01-28T19:30:00+01:00", "dTimStart": "2015-01-28T19:00:00+01:00", "md": "92", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with 7 5/8\" tubing with ESP assemblies and control cable from 92 m to 21 m. Disconnected cable clamps and spooled power cable to the spooling unit. Recovered total 30 tubing clamps - none left in hole.", "dTimEnd": "2015-01-28T20:30:00+01:00", "dTimStart": "2015-01-28T19:30:00+01:00", "md": "21", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for changing handling equipment and L/D ESP assemblies.", "dTimEnd": "2015-01-28T21:00:00+01:00", "dTimStart": "2015-01-28T20:30:00+01:00", "md": "21", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Disconnected banana sheave from hang off line. Lowered sheave and cable to drill floor.", "dTimEnd": "2015-01-28T22:00:00+01:00", "dTimStart": "2015-01-28T21:00:00+01:00", "md": "21", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed Weatherford autoslips. Installed master bushings and Schlumberger stove table.", "dTimEnd": "2015-01-28T23:00:00+01:00", "dTimStart": "2015-01-28T22:00:00+01:00", "md": "21", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Commenced dismantling and L/D ESP assemblies.", "dTimEnd": "2015-01-29T00:00:00+01:00", "dTimStart": "2015-01-28T23:00:00+01:00", "md": "21", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_A_2015_01_30
NO 15/9-F-9 A
NO 15/9-F-9 A
name
2015-01-29T00:00:00+01:00
2015-01-30T00:00:00+01:00
normal
2018-05-03T13:53:18+02:00
{ "name": "15/9-F-9 A", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9 A", "namingSystem": "NPD code" }, { "name": "6163", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2009-06-23T00:00:00+02:00", "dateDrillComplete": "2009-07-08", "daysBehind": "1.1", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2015-01-30T00:00:00+01:00", "dTimDiaHoleStart": "2015-01-29T11:15:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Drift 9 5/8\" liner. POOH with Timelock plug. R/U WL and install ME plug in 6 5/8\" screens. Pull boreprotector. Run completion", "hpht": "0", "md": "1206", "mdCsgLast": "1201", "mdDiaHoleStart": "1206", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "4", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "L/D ESP assemblies. Performed multifinger caliper log. Installed boreprotector. RIH and set Timelock plug on DP. Attempted to pressure test casing.", "tightWell": "0", "tvd": null, "tvdCsgLast": "1012", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[]
[]
[]
[ { "comments": "Pulled out and L/D ESP assemblies. Removed power cable and instrument line to multi sensor. Disconnected power cable from motor. Recovered 4 ea Protectorlisers and 1 ea special XO-clamp - none left in hole.", "dTimEnd": "2015-01-29T02:30:00+01:00", "dTimStart": "2015-01-29T00:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed casing tong to set back area. Cleaned and cleared rig floor.", "dTimEnd": "2015-01-29T03:00:00+01:00", "dTimStart": "2015-01-29T02:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U recovered tubing hanger with RT from deck. B/O RT with chain tongs. Inspected seal areas on TH for damages - no damages observed. M/U RT to TH neck. L/D TH with RT to deck.", "dTimEnd": "2015-01-29T04:00:00+01:00", "dTimStart": "2015-01-29T03:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for wireline job. R/U WL equipment.", "dTimEnd": "2015-01-29T04:30:00+01:00", "dTimStart": "2015-01-29T04:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U BHA for multifinger caliper log. Performed operational check of tool string.", "dTimEnd": "2015-01-29T06:00:00+01:00", "dTimStart": "2015-01-29T04:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with WL toolstring and corrolated tool at logging depth.", "dTimEnd": "2015-01-29T07:30:00+01:00", "dTimStart": "2015-01-29T06:00:00+01:00", "md": "439", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened caliper at 439 m and started logging up at 10 m/min.", "dTimEnd": "2015-01-29T08:15:00+01:00", "dTimStart": "2015-01-29T07:30:00+01:00", "md": "18", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed caliper at 18 m. Pulled cable head to surface and hung off in C-plate.", "dTimEnd": "2015-01-29T08:30:00+01:00", "dTimStart": "2015-01-29T08:15:00+01:00", "md": "18", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waiting for approval of caliper log. Meanwhile performed TBT for R/D WL equipement.", "dTimEnd": "2015-01-29T10:00:00+01:00", "dTimStart": "2015-01-29T08:30:00+01:00", "md": "18", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D WL toolstring and R/D WL equipment.", "dTimEnd": "2015-01-29T11:00:00+01:00", "dTimStart": "2015-01-29T10:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and cleared rig floor.", "dTimEnd": "2015-01-29T11:15:00+01:00", "dTimStart": "2015-01-29T11:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for installing bore protector.", "dTimEnd": "2015-01-29T11:30:00+01:00", "dTimStart": "2015-01-29T11:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed master bushings. M/U running tool and bore protector. RIH on 5 1/2\" DP and installed boreprotector. POOH with running tool. R/B DP stand and installed master bushings.", "dTimEnd": "2015-01-29T13:30:00+01:00", "dTimStart": "2015-01-29T11:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for running Timelock plug.", "dTimEnd": "2015-01-29T13:45:00+01:00", "dTimStart": "2015-01-29T13:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U Timelock plug, RIH with same on 5 1/2\" DP to 45 m. Installed diverter inserts.", "dTimEnd": "2015-01-29T15:00:00+01:00", "dTimStart": "2015-01-29T13:45:00+01:00", "md": "45", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/Timelock plug on 5 7/8\" DP from 45 m to 369 m. Avg. tripping speed 162 m/hr.", "dTimEnd": "2015-01-29T17:00:00+01:00", "dTimStart": "2015-01-29T15:00:00+01:00", "md": "369", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for washing down and setting plug.", "dTimEnd": "2015-01-29T17:15:00+01:00", "dTimStart": "2015-01-29T17:00:00+01:00", "md": "369", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued RIH from 369 m to 395 m. Lined up to wash top of PBR, verified line up against closed IBOP. Bled off pressure.", "dTimEnd": "2015-01-29T18:00:00+01:00", "dTimStart": "2015-01-29T17:15:00+01:00", "md": "395", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Started to pump drill water at 300 lpm. Increased rate to 1100 lpm / 0 bar and washed top of PBR.", "dTimEnd": "2015-01-29T18:30:00+01:00", "dTimStart": "2015-01-29T18:00:00+01:00", "md": "395", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attempted to set Timelock plug according to Archer procedures. Made 3 attempts without sucess. Archer rep contacted onshore support for advice. Performed TBT with new crew. Observed that the plug was not at the required setting depth - attempted set in 13 3/8\" casing. RIH with Timelock plug from 395 m to 424 m.", "dTimEnd": "2015-01-29T20:30:00+01:00", "dTimStart": "2015-01-29T18:30:00+01:00", "md": "395", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Washed plug setting area and sat Timelock plug according to Archer instructions. Top of plug at 420,8 m. Positive indication of plug set. Closed ball valve and applied 30 bar to verify same closed. P/U and released running tool from plug.", "dTimEnd": "2015-01-29T21:30:00+01:00", "dTimStart": "2015-01-29T20:30:00+01:00", "md": "425.6", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up over shakers. Started pumping drill water from rig pumps. Increased pump rate to 2100 lpm / 0 bar and circulated 1 BU.", "dTimEnd": "2015-01-29T22:30:00+01:00", "dTimStart": "2015-01-29T21:30:00+01:00", "md": "415", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up cement unit to drillstring and performed line test against TDS IBOP to 100 bar. Bled back to 10 bar and opened TDS IBOP to confirm line-up.", "dTimEnd": "2015-01-29T23:00:00+01:00", "dTimStart": "2015-01-29T22:30:00+01:00", "md": "415", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed overboard valves. Lined up rig pumps and pumped drill water down string and up above diverter packer. Closed diverter packer. Line up to cement unit and attempted to pressure up well to 10 bar from cement unit. No success.", "dTimEnd": "2015-01-29T23:30:00+01:00", "dTimStart": "2015-01-29T23:00:00+01:00", "md": "415", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Checked line up and troubleshot loss of pressure.", "dTimEnd": "2015-01-30T00:00:00+01:00", "dTimStart": "2015-01-29T23:30:00+01:00", "md": "415", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "operation failed" } ]
[]
15_9_F_9_A_2015_01_31
NO 15/9-F-9 A
NO 15/9-F-9 A
name
2015-01-30T00:00:00+01:00
2015-01-31T00:00:00+01:00
normal
2018-05-03T13:53:18+02:00
{ "name": "15/9-F-9 A", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9 A", "namingSystem": "NPD code" }, { "name": "6163", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2009-06-23T00:00:00+02:00", "dateDrillComplete": "2009-07-08", "daysBehind": "2", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2015-01-31T00:00:00+01:00", "dTimDiaHoleStart": "2015-01-29T11:15:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Nipple down diverter and surface riser. Install tubing bonnet. R/U cement unit to tubing bonnet. Pressure test casing. \nNipple down tubing bonnet. Install surface riser and diverter.\n", "hpht": "0", "md": "1206", "mdCsgLast": "1201", "mdDiaHoleStart": "1206", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "5", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Attempted to pressure test casing to 34 bar without success. Released Timelock plug and RIH to top of screen hanger with same to drift 9 5/8\" liner. Re-set Timelock plug in 9 5/8\" liner. Made new attempt to pressure test casing. No good test. Released Timelock plug and POOH with same. M/U and RIH backup Timelock plug to 168 m. ", "tightWell": "0", "tvd": null, "tvdCsgLast": "1012", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[]
[]
[]
[ { "comments": "Continued troubleshoot loss off pressure. Narrowed causes to a open needle valve on surface wellhead. Closed needle valve.", "dTimEnd": "2015-01-30T01:15:00+01:00", "dTimStart": "2015-01-30T00:00:00+01:00", "md": "415", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Lined rig pumps down string and pumped drill water to above diverter packer and closed same.", "dTimEnd": "2015-01-30T01:45:00+01:00", "dTimStart": "2015-01-30T01:15:00+01:00", "md": "415", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Lined up cement unit to drill string. Pressured up well to 11 bar reference pressure. Pressured up to 34 bar using 101 litre. Pressure dropped and stabilized at 24 bar. \nRe-pressurized well to 34 bar using 34 litres 3 times while checking valves, diverter packer and well head for leaks. Pressure dropped and stabilized at 24 bar at every attempt.", "dTimEnd": "2015-01-30T02:45:00+01:00", "dTimStart": "2015-01-30T01:45:00+01:00", "md": "415", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Discussed situation with onshore duty. Meanwhile continued to check for possible leaking valves.", "dTimEnd": "2015-01-30T03:00:00+01:00", "dTimStart": "2015-01-30T02:45:00+01:00", "md": "415", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Opened diverter. Engaged and released Timelock plug.", "dTimEnd": "2015-01-30T03:30:00+01:00", "dTimStart": "2015-01-30T03:00:00+01:00", "md": "442", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Performed TBT for RIH with Timelock plug as drift using manual slips.", "dTimEnd": "2015-01-30T03:45:00+01:00", "dTimStart": "2015-01-30T03:30:00+01:00", "md": "442", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "RIH with Timelock plug from 442 m to 935 m to drift 9 5/8\" liner.", "dTimEnd": "2015-01-30T07:00:00+01:00", "dTimStart": "2015-01-30T03:45:00+01:00", "md": "935", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Performed TBT with new crew for drifting 9 5/8\" liner", "dTimEnd": "2015-01-30T07:30:00+01:00", "dTimStart": "2015-01-30T07:00:00+01:00", "md": "935", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Lined up manifold and shakers for washing down.", "dTimEnd": "2015-01-30T09:15:00+01:00", "dTimStart": "2015-01-30T07:30:00+01:00", "md": "935", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Started pumping drill water from rig pumps, 300 lpm. RIH to 938 m. Increased rate to 1100 lpm and washed from 938 m to 940 m.", "dTimEnd": "2015-01-30T10:00:00+01:00", "dTimStart": "2015-01-30T09:15:00+01:00", "md": "940", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Performed TBT prior to POOH.", "dTimEnd": "2015-01-30T10:15:00+01:00", "dTimStart": "2015-01-30T10:00:00+01:00", "md": "940", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "POOH with Timelock plug from 940 m to 572 m while filling pipe with trip tank pump. Pulled at restricted speed to prevent swabbing.", "dTimEnd": "2015-01-30T12:30:00+01:00", "dTimStart": "2015-01-30T10:15:00+01:00", "md": "572", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Lined up to perform line test from cement unit against IBOP. Tested same to 500psi, no good test. Troubleshot and re-tested line-up from cement unit. Not able to get good test through standpipe. Performed line test against valve K-1 on kill manifold, good test.", "dTimEnd": "2015-01-30T14:45:00+01:00", "dTimStart": "2015-01-30T12:30:00+01:00", "md": "572", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Performed TBT for setting Timelock plug. Recorded up/down weights prior to setting plug.", "dTimEnd": "2015-01-30T15:15:00+01:00", "dTimStart": "2015-01-30T14:45:00+01:00", "md": "572", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Sat Timelock plug at 600 m according to Archer procedures.", "dTimEnd": "2015-01-30T15:45:00+01:00", "dTimStart": "2015-01-30T15:15:00+01:00", "md": "602", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Closed ball valve and pressured up string to 35 bar to verify same closed. P/U and released RT from plug.", "dTimEnd": "2015-01-30T16:00:00+01:00", "dTimStart": "2015-01-30T15:45:00+01:00", "md": "595", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "R/U side-entry assy and TIW valve. Performed line test with cement unit. Test ok.", "dTimEnd": "2015-01-30T16:45:00+01:00", "dTimStart": "2015-01-30T16:00:00+01:00", "md": "595", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Filled well with drill water above diverter packer, closed same.", "dTimEnd": "2015-01-30T17:30:00+01:00", "dTimStart": "2015-01-30T16:45:00+01:00", "md": "595", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Pressure tested casing with drill water from cement unit through side entry in drill string. Pressured up to 10 bar reference pressure using 190 ltr. Pressured up to 24 bar using 65 ltr and held pressure for 5 minutes. Pumped up to 28 bar using 16 ltr and held pressure for 5 min. Continued pressuring up to 32 bar using 16 ltr. Pressure broke off and dropped to 22 bar, pressure stable at 22 bar.", "dTimEnd": "2015-01-30T18:00:00+01:00", "dTimStart": "2015-01-30T17:30:00+01:00", "md": "595", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Evaluated situation.", "dTimEnd": "2015-01-30T18:30:00+01:00", "dTimStart": "2015-01-30T18:00:00+01:00", "md": "595", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Bled off 22 bar pressure on casing. R/D side entry assembly. Performed TBT with new crew.", "dTimEnd": "2015-01-30T19:15:00+01:00", "dTimStart": "2015-01-30T18:30:00+01:00", "md": "595", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Opened diverter packer. Engaged and released Timelock plug according to Archer procedures.", "dTimEnd": "2015-01-30T19:45:00+01:00", "dTimStart": "2015-01-30T19:15:00+01:00", "md": "602", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "POOH with Timelock plug from 602 m to 425 m while filling pipe with trip tank pump. Pulled at restricted speed to prevent swabbing.", "dTimEnd": "2015-01-30T20:45:00+01:00", "dTimStart": "2015-01-30T19:45:00+01:00", "md": "425", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "POOH with Timelock plug from 425 m to 8 m. Pulled at restricted speed to avoid swabbing.", "dTimEnd": "2015-01-30T22:45:00+01:00", "dTimStart": "2015-01-30T20:45:00+01:00", "md": "8", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "L/D primary Timelock plug and inspected same. No damages observed on packer elements.", "dTimEnd": "2015-01-30T23:00:00+01:00", "dTimStart": "2015-01-30T22:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "P/U backup Timelock plug.", "dTimEnd": "2015-01-30T23:15:00+01:00", "dTimStart": "2015-01-30T23:00:00+01:00", "md": "8", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "RIH Timelock plug on 5 1/2\" DP from 8 m to 168 m. Avg. tripping speed 213 m/hr.", "dTimEnd": "2015-01-31T00:00:00+01:00", "dTimStart": "2015-01-30T23:15:00+01:00", "md": "168", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" } ]
[]
15_9_F_9_A_2015_02_01
NO 15/9-F-9 A
NO 15/9-F-9 A
name
2015-01-31T00:00:00+01:00
2015-02-01T00:00:00+01:00
normal
2018-05-03T13:53:18+02:00
{ "name": "15/9-F-9 A", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9 A", "namingSystem": "NPD code" }, { "name": "6163", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2009-06-23T00:00:00+02:00", "dateDrillComplete": "2009-07-08", "daysBehind": "3", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2015-02-01T00:00:00+01:00", "dTimDiaHoleStart": "2015-01-29T11:15:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "R/U wireline\nInstall ME-plug in 6-5/8\" screens\nR/D wireline\nRetrieve bore protector\nRIH with jetting sub and clean wellhead\nM/U and service the REDA ESP motor and seal\nInstall Phoenix xfer line, MLE and ESP\nRIH on 7-5/8\" 13Cr80 Vam Top SC-80 Tubing", "hpht": "0", "md": "1206", "mdCsgLast": "1201", "mdDiaHoleStart": "1206", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "6", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Installed back-up Timelock plug in 9 5/8\" liner. Attempted to pressure test casing without success. POOH with plug RT. Pulled diverter and surface riser. Installed and blinded off tubing bonnet. Lined up cement unit to WH and pressure test well against Timelock plug and tubing to 35 bar. Good test. ", "tightWell": "0", "tvd": null, "tvdCsgLast": "1012", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[]
[]
[]
[ { "comments": "Continued RIH with Timelock plug on 5 1/2\" DP from 168 m to 409 m. Avg. tripping speed 138 m/hr. Electrical Technician had to override/force singnal into control system to be able to operate PRS.", "dTimEnd": "2015-01-31T01:45:00+01:00", "dTimStart": "2015-01-31T00:00:00+01:00", "md": "409", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "M/U TDS and washed down to setting depth, 300 lpm. Recorded up/down weights: 78 t / 86 ton and free rotational torque / weight at 10 rpm: 1000 Nm / 80 ton. Sat Timelock plug and closed ball valve according to Archer procedure. Pressured up string to 45 bar to verify ball valve closed. Packer mid element at 434,67 m.", "dTimEnd": "2015-01-31T02:15:00+01:00", "dTimStart": "2015-01-31T01:45:00+01:00", "md": "436", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "M/U side entry assy.", "dTimEnd": "2015-01-31T02:45:00+01:00", "dTimStart": "2015-01-31T02:15:00+01:00", "md": "424", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Filled well with water with rig pumps. Closed kelly cock, opened LTV and flushed lines from cement unit. Closed flowline valve and filled water above diverter packer element.", "dTimEnd": "2015-01-31T03:00:00+01:00", "dTimStart": "2015-01-31T02:45:00+01:00", "md": "424", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Performed line-up test from cement, 100 bar / 5 min. Verified", "dTimEnd": "2015-01-31T03:30:00+01:00", "dTimStart": "2015-01-31T03:00:00+01:00", "md": "424", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Attempted to pressure tested well to 34 bar against Timelock plug and diverter packer. Pressured up well in steps and monitored:\n11 bar / 165 ltr\n24 bar / 56 ltr\n26 bar / 8 ltr\n28 bar / 7 ltr\n29 bar / 3 ltr\n30 bar / 5 ltr (pressure drop observed)\n31 bar / 9 ltr \n32 bar / 8 ltr \nAborted at 32 bar. Pressure dropped and stabilized at 23,5 bar. No good test. Bled off pressure to cement unit.", "dTimEnd": "2015-01-31T04:00:00+01:00", "dTimStart": "2015-01-31T03:30:00+01:00", "md": "424", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "R/D side entry assembly.", "dTimEnd": "2015-01-31T04:15:00+01:00", "dTimStart": "2015-01-31T04:00:00+01:00", "md": "424", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "POOH with Timelock RT on 5 1/2\" DP from 424 m to 0 m. Avg. tripping speed 340 m/hr. L/D RT to deck.", "dTimEnd": "2015-01-31T05:30:00+01:00", "dTimStart": "2015-01-31T04:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Cleaned and cleared rig floor.", "dTimEnd": "2015-01-31T06:00:00+01:00", "dTimStart": "2015-01-31T05:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "R/U for pulling diverter. Held TBT with new crew.", "dTimEnd": "2015-01-31T07:30:00+01:00", "dTimStart": "2015-01-31T06:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Installed lifting eyes and bridle. Pulled diverter inserts. 10\" diverter inserts released from interlock, fell out and landed off on top of the riser.", "dTimEnd": "2015-01-31T08:15:00+01:00", "dTimStart": "2015-01-31T07:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Evaluated situation. Troubleshot to recover 10\" inserts.", "dTimEnd": "2015-01-31T09:00:00+01:00", "dTimStart": "2015-01-31T08:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Planned and prepared retrieval tool to recover 10\" inserts.", "dTimEnd": "2015-01-31T11:00:00+01:00", "dTimStart": "2015-01-31T09:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Tested retrieval tool. Good test.", "dTimEnd": "2015-01-31T11:15:00+01:00", "dTimStart": "2015-01-31T11:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Installed remaining retrieval tools and prepared for lifting 10\" inserts.", "dTimEnd": "2015-01-31T11:45:00+01:00", "dTimStart": "2015-01-31T11:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Lifted 10\" diverter inserts and recovered same to drill floor. Performed AAR with involved personnel", "dTimEnd": "2015-01-31T12:15:00+01:00", "dTimStart": "2015-01-31T11:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Performed TBT for pulling diverter.", "dTimEnd": "2015-01-31T12:30:00+01:00", "dTimStart": "2015-01-31T12:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Pulled diverter and R/B same.", "dTimEnd": "2015-01-31T13:15:00+01:00", "dTimStart": "2015-01-31T12:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Re-installed master bushings and removed tension lines from riser in moonpool.", "dTimEnd": "2015-01-31T13:45:00+01:00", "dTimStart": "2015-01-31T13:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Build sacffolding in moonpool for installing shackles on riser. Meanwhile cleaned and cleared drill floor.", "dTimEnd": "2015-01-31T16:00:00+01:00", "dTimStart": "2015-01-31T13:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Installed lifting equipment onto riser. Removed scaffolding in moonpool. Drained the riser.", "dTimEnd": "2015-01-31T17:15:00+01:00", "dTimStart": "2015-01-31T16:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "R/U and prepared to disconnect and pull riser. Performed TBT for pulling riser. Meanwhile Production Dept shut-in adjacent wells according to SimOps procedure.", "dTimEnd": "2015-01-31T18:15:00+01:00", "dTimStart": "2015-01-31T17:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Nippled down riser and pulled same.", "dTimEnd": "2015-01-31T18:45:00+01:00", "dTimStart": "2015-01-31T18:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Performed TBT with new crew for laying out riser joint.", "dTimEnd": "2015-01-31T19:00:00+01:00", "dTimStart": "2015-01-31T18:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "L/D surface riser on HTS with crane assist.", "dTimEnd": "2015-01-31T20:00:00+01:00", "dTimStart": "2015-01-31T19:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Retrived bore protector, utilising tuggers in TDS.", "dTimEnd": "2015-01-31T20:15:00+01:00", "dTimStart": "2015-01-31T20:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Lowered tubing bonnet to XMT deck utilising TDS. Landed tubing bonnet according to Vetco instructions. Production Dept. re-stared production according to SimOps procedure after tubing bonnet landed.", "dTimEnd": "2015-01-31T20:45:00+01:00", "dTimStart": "2015-01-31T20:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Blinded off cable penetrator. Installed flange on tubing bonnet. Lined-up cement unit to well by connecting 1/2\" hose from moonpool manifold to WH.", "dTimEnd": "2015-01-31T21:15:00+01:00", "dTimStart": "2015-01-31T20:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Maersk and Halliburton cementer performed line walk to verify line-up. Performed TBT prior to pressure test casing.", "dTimEnd": "2015-01-31T21:45:00+01:00", "dTimStart": "2015-01-31T21:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Barried off moonpool and WH area. Filled up well from cement unit. Installed needle valve at WH.", "dTimEnd": "2015-01-31T22:00:00+01:00", "dTimStart": "2015-01-31T21:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Closed valve at WH and performed line-up test to 35 bar / 100 bar. Bled off pressure to cement unit after good test. Pressured up 10 bar, opened valve at WH and observed pressure drop.", "dTimEnd": "2015-01-31T22:30:00+01:00", "dTimStart": "2015-01-31T22:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Pressure tested well to 35 bar against Timelock plug and tubing bonnet. Pressured up well in steps and monitored:\n10 bar / 11 ltr\n28 bar / 33 ltr (observed instant pressure drop to 25,5 bar when stopping pumps)\n30 bar / 4 ltr (instant drop to 27,4 bar)\nContinued pressuring up at lowest possible rate to reduce pressure drop when stopping pumps due to the 1/2\" hose.\n32 bar / 2 ltr (instant drop to 31,2 bar)\n36 bar / 2 ltr (instant drop to 35,1 bar) \nTotal 41 ltr pumped from 10 bar to 35,1 bar. Bled back same volume to cement unit after good test.", "dTimEnd": "2015-01-31T23:00:00+01:00", "dTimStart": "2015-01-31T22:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Disconnect bonnet and prepared to pull same. Performed TBT for pulling tubing bonnet and running surface riser. Removed master bushings. Meanwhile Production Dept shut-in adjacent wells according to SimOps procedure.", "dTimEnd": "2015-02-01T00:00:00+01:00", "dTimStart": "2015-01-31T23:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" } ]
[]
15_9_F_9_A_2015_02_02
NO 15/9-F-9 A
NO 15/9-F-9 A
name
2015-02-01T00:00:00+01:00
2015-02-02T00:00:00+01:00
normal
2018-05-03T13:53:18+02:00
{ "name": "15/9-F-9 A", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9 A", "namingSystem": "NPD code" }, { "name": "6163", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2009-06-23T00:00:00+02:00", "dateDrillComplete": "2009-07-08", "daysBehind": "3.4", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2015-02-02T00:00:00+01:00", "dTimDiaHoleStart": "2015-02-01T13:30:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Change ESP assembly 5 (Bolt on discharge head). Run ESP on 7 5/8\" tubing. Install, land and test tubing hanger. ", "hpht": "0", "md": "1206", "mdCsgLast": "1201", "mdDiaHoleStart": "1206", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "7", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Installed surface riser and diverter. Installed boreprotector. Retrieved Timelock plug from 9 5/8\" liner. R/U WL and installed ME plug in 6 5/8\" screen section. Retrived boreprotector. R/U for running tubing and commenced M/U ESP assemblies.", "tightWell": "0", "tvd": null, "tvdCsgLast": "1012", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[]
[]
[]
[ { "comments": "Released tubing bonnet from wellhead ustilising slings in TDS bails. Pulled tubing bonnet to drill floor.", "dTimEnd": "2015-02-01T00:45:00+01:00", "dTimStart": "2015-02-01T00:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "P/U surface riser from HTS with assistance from crane. Tailed riser in to well centre. Lowered riser through rotary and landed off in WH. Took overpull to confirm latch. Production Dept re-started production from adjacenet wells according to SimOps procedure.", "dTimEnd": "2015-02-01T01:15:00+01:00", "dTimStart": "2015-02-01T00:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Disconnected slings from riser and R/U to lift diverter", "dTimEnd": "2015-02-01T01:45:00+01:00", "dTimStart": "2015-02-01T01:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Performed TBT for installing diverter. Lifted diverter from setback with TDS. Installed diverter in housing. Removed lifing eyes and slings from diverter. Energized diverter. Installed master bushings.", "dTimEnd": "2015-02-01T03:00:00+01:00", "dTimStart": "2015-02-01T01:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Removed chains from bails. Clean and cleared rig floor. Installed BX elevator.", "dTimEnd": "2015-02-01T03:30:00+01:00", "dTimStart": "2015-02-01T03:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Performed TBT for installing boreprotector. M/U RT to DP stand and attached boreprotector to same. RIH and installed boreprotector in WH. POOH with RT, B/O and L/D same.", "dTimEnd": "2015-02-01T04:15:00+01:00", "dTimStart": "2015-02-01T03:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Performed TBT for retrieving Timelock plug on 5 1/2\" DP. P/U and M/U Timelock RRT.", "dTimEnd": "2015-02-01T04:30:00+01:00", "dTimStart": "2015-02-01T04:15:00+01:00", "md": "5", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "RIH with Timelock RRT on 5 1/2\" DP from 5 m to 430 m. Avg. tripping speed 425 m/hr.", "dTimEnd": "2015-02-01T05:30:00+01:00", "dTimStart": "2015-02-01T04:30:00+01:00", "md": "430", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Engaged and released Timelock plug according to Archer procedures.", "dTimEnd": "2015-02-01T06:00:00+01:00", "dTimStart": "2015-02-01T05:30:00+01:00", "md": "430", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH Timelock plug on 5 1/2\" DP from 430 m to 241 m. Avg. tripping speed 189 m/hr.", "dTimEnd": "2015-02-01T07:00:00+01:00", "dTimStart": "2015-02-01T06:00:00+01:00", "md": "241", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT with new crew for POOH.", "dTimEnd": "2015-02-01T07:15:00+01:00", "dTimStart": "2015-02-01T07:00:00+01:00", "md": "241", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH Timelock plug on 5 1/2\" DP from 241 m to 8 m. Avg. tripping speed 186 m/hr.", "dTimEnd": "2015-02-01T08:30:00+01:00", "dTimStart": "2015-02-01T07:15:00+01:00", "md": "8", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D Timelock plug and RRT on deck.", "dTimEnd": "2015-02-01T08:45:00+01:00", "dTimStart": "2015-02-01T08:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted WL tools to drill floor and prepared same.", "dTimEnd": "2015-02-01T09:00:00+01:00", "dTimStart": "2015-02-01T08:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Performed TBT for R/U and run WL", "dTimEnd": "2015-02-01T09:15:00+01:00", "dTimStart": "2015-02-01T09:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "R/U WL equipment and P/U ME-plug toolstring", "dTimEnd": "2015-02-01T10:15:00+01:00", "dTimStart": "2015-02-01T09:15:00+01:00", "md": "10", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Tested toolstring and zeroed depth in RKB.", "dTimEnd": "2015-02-01T10:30:00+01:00", "dTimStart": "2015-02-01T10:15:00+01:00", "md": "10", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "RIH with ME-plug. Lost weight at 952 m. P/U to 900 m, RIH at higher speed and passed obstruction. Continued RIH. Lost weight at 1163 m. P/U to 1130 m, RIH at higher speed and passed obstruction. Continued RIH and tagged TD at 1195 m.", "dTimEnd": "2015-02-01T12:00:00+01:00", "dTimStart": "2015-02-01T10:30:00+01:00", "md": "1195", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "P/U until tension in string. Activated setting tool and set plug according to Interwell procedure. Observed tension drop from 1320 lbs to 790 lbs, indication of plug set. RIH and tagged plug. Top plug at 1187,81 m. Mid element at 1188,87 m.", "dTimEnd": "2015-02-01T12:30:00+01:00", "dTimStart": "2015-02-01T12:00:00+01:00", "md": "1190.1", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "POOH with WL toolstring. Simultaneously performed TBT for R/D WL equipment.", "dTimEnd": "2015-02-01T13:00:00+01:00", "dTimStart": "2015-02-01T12:30:00+01:00", "md": "8", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "L/D WL toolstring and R/D wireline equipment.", "dTimEnd": "2015-02-01T13:30:00+01:00", "dTimStart": "2015-02-01T13:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Performed TBT for pulling boreprotector and installing casing tong.", "dTimEnd": "2015-02-01T13:45:00+01:00", "dTimStart": "2015-02-01T13:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleared set back area for Weatherford casing tong.", "dTimEnd": "2015-02-01T14:45:00+01:00", "dTimStart": "2015-02-01T13:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U boreprotector RRT. RIH with same on DP to surface WH. Engaged boreprotector and pulled same to surface. L/D boreprotector RRT.", "dTimEnd": "2015-02-01T15:45:00+01:00", "dTimStart": "2015-02-01T14:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U Weatherford casing tong.", "dTimEnd": "2015-02-01T17:15:00+01:00", "dTimStart": "2015-02-01T15:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for R/U Schlumberger equipment and M/U ESP assemblies. Installed stovepipe above rotary.", "dTimEnd": "2015-02-01T17:30:00+01:00", "dTimStart": "2015-02-01T17:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U ESP assembly 1 - Multisensor and motor. Landed lifting clamp on stovepipe in rotary. Serviced motor according to Schlumberger procedures.", "dTimEnd": "2015-02-01T18:45:00+01:00", "dTimStart": "2015-02-01T17:30:00+01:00", "md": "10", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT with new crew. P/U and M/U ESP assembly 2 - Protector. RIH and landed off in stovepipe.", "dTimEnd": "2015-02-01T20:00:00+01:00", "dTimStart": "2015-02-01T18:45:00+01:00", "md": "14", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U ESP assembly 3 - ESP pump. RIH and landed off in stovepipe.", "dTimEnd": "2015-02-01T20:45:00+01:00", "dTimStart": "2015-02-01T20:00:00+01:00", "md": "17", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U Discharge pressure assembly (assy 4) to ESP pump.", "dTimEnd": "2015-02-01T21:15:00+01:00", "dTimStart": "2015-02-01T20:45:00+01:00", "md": "17", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed inserts in elevator to 7 5/8\". Installed rotating arm on elevator.", "dTimEnd": "2015-02-01T22:00:00+01:00", "dTimStart": "2015-02-01T21:15:00+01:00", "md": "17", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U ESP assembly 5 - Bolt on discharge and XO.", "dTimEnd": "2015-02-01T22:45:00+01:00", "dTimStart": "2015-02-01T22:00:00+01:00", "md": "17", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled back to Multisensor and connected hydraulic line to same. Pressure tested to 3000 psi / 15 min.", "dTimEnd": "2015-02-01T23:30:00+01:00", "dTimStart": "2015-02-01T22:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled ESP electrical cable to rig floor. Feed cable through banana sheave and installed sheave to PRS.", "dTimEnd": "2015-02-02T00:00:00+01:00", "dTimStart": "2015-02-01T23:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_A_2015_02_03
NO 15/9-F-9 A
NO 15/9-F-9 A
name
2015-02-02T00:00:00+01:00
2015-02-03T00:00:00+01:00
normal
2018-05-03T13:53:18+02:00
{ "name": "15/9-F-9 A", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9 A", "namingSystem": "NPD code" }, { "name": "6163", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2009-06-23T00:00:00+02:00", "dateDrillComplete": "2009-07-08", "daysBehind": "3.7", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2015-02-03T00:00:00+01:00", "dTimDiaHoleStart": "2015-02-02T18:45:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Land and test TH. Nipple down diverter and surface riser. Install surface equipment and handover well to production. ", "hpht": "0", "md": "1206", "mdCsgLast": "1201", "mdDiaHoleStart": "1206", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "8", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "RIH with ESP assemblies and cable on 7 5/8\" tubing. P/U tubing hanger, M/U and oriented same.", "tightWell": "0", "tvd": null, "tvdCsgLast": "1012", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[]
[]
[]
[ { "comments": "Connected pothead to ESP motor", "dTimEnd": "2015-02-02T02:00:00+01:00", "dTimStart": "2015-02-02T00:00:00+01:00", "md": "10", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Serviced seal on protector and filled with oil.", "dTimEnd": "2015-02-02T03:15:00+01:00", "dTimStart": "2015-02-02T02:00:00+01:00", "md": "14", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed protectolizer clamps and terminated hydraulic lines. Secured string with manual slips.", "dTimEnd": "2015-02-02T04:15:00+01:00", "dTimStart": "2015-02-02T03:15:00+01:00", "md": "21", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for running 7 5/8\" tubing with cable.", "dTimEnd": "2015-02-02T04:30:00+01:00", "dTimStart": "2015-02-02T04:15:00+01:00", "md": "21", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U first 7 5/8\" tubing joint from HTS. Attempted to M/U same to ESP assy. Not able to get good connection. Trouble to B/O connection. B/O and observed damaged threads. L/O tubing joint.", "dTimEnd": "2015-02-02T05:15:00+01:00", "dTimStart": "2015-02-02T04:30:00+01:00", "md": "21", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Evaluated situation.", "dTimEnd": "2015-02-02T06:00:00+01:00", "dTimStart": "2015-02-02T05:15:00+01:00", "md": "21", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "B/O and L/D Bolt on Discharge assembly (ESP assy #5) due to damaged threads.", "dTimEnd": "2015-02-02T07:00:00+01:00", "dTimStart": "2015-02-02T06:00:00+01:00", "md": "21", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT with new crew.", "dTimEnd": "2015-02-02T07:15:00+01:00", "dTimStart": "2015-02-02T07:00:00+01:00", "md": "21", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U the Bolt on Discharge assembly (ESP assy #5) retrieved from F-9 A.", "dTimEnd": "2015-02-02T08:15:00+01:00", "dTimStart": "2015-02-02T07:15:00+01:00", "md": "21", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U first 7 5/8\" tubing joint from HTS. M/U same to ESP assy. Pulled up and installed clamps.", "dTimEnd": "2015-02-02T09:00:00+01:00", "dTimStart": "2015-02-02T08:15:00+01:00", "md": "21", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for pulling master bushings and install spider slips.", "dTimEnd": "2015-02-02T09:15:00+01:00", "dTimStart": "2015-02-02T09:00:00+01:00", "md": "21", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Troubleshot fault on PRS.", "dTimEnd": "2015-02-02T09:45:00+01:00", "dTimStart": "2015-02-02T09:15:00+01:00", "md": "21", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Installed banana sheave onto hangoff wire.", "dTimEnd": "2015-02-02T10:15:00+01:00", "dTimStart": "2015-02-02T09:45:00+01:00", "md": "21", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed wire clamp. Pulled master bushings and installed spider slips on tugger.", "dTimEnd": "2015-02-02T11:30:00+01:00", "dTimStart": "2015-02-02T10:15:00+01:00", "md": "21", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with ESP assemblies on 7 5/8\" tubing from 21 m to 348 m. M/U control line clamp on every connection. Average 4,1 joints/hr. Schlumberger tested ESP and cable at 134 m, 212 m and 290 m.", "dTimEnd": "2015-02-02T18:45:00+01:00", "dTimStart": "2015-02-02T11:30:00+01:00", "md": "350", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT with new crew. Changed inserts in BX-elevator to 5 1/2\".", "dTimEnd": "2015-02-02T19:00:00+01:00", "dTimStart": "2015-02-02T18:45:00+01:00", "md": "350", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed to larger sized Weatherford tong.", "dTimEnd": "2015-02-02T21:15:00+01:00", "dTimStart": "2015-02-02T19:00:00+01:00", "md": "350", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U tubing hanger assembly from HTS. Tailed into well centre with crane assist. M/U tubing hanger to 7 5/8\" tubing.", "dTimEnd": "2015-02-02T21:45:00+01:00", "dTimStart": "2015-02-02T21:15:00+01:00", "md": "350", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with tubing hanger assembly. Check orientation of alignment key. Spaced out to break FAST connector with casing tong and set slips on tubing pup below FAST connector. Undid top flange on FAST swivel.", "dTimEnd": "2015-02-02T22:30:00+01:00", "dTimStart": "2015-02-02T21:45:00+01:00", "md": "360", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "B/O FAST connector with casing tong. Made several attempts. Had to change jaws and adjust rollers in tong. Adjusted casing tong torque and B/O at 20000-25000 ft-lbs.", "dTimEnd": "2015-02-02T23:30:00+01:00", "dTimStart": "2015-02-02T22:30:00+01:00", "md": "360", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Released and pulled up FAST sleeve. Oriented hanger according to Vetco instructions. Cleaned and doped threads.", "dTimEnd": "2015-02-03T00:00:00+01:00", "dTimStart": "2015-02-02T23:30:00+01:00", "md": "360", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_A_2015_02_04
NO 15/9-F-9 A
NO 15/9-F-9 A
name
2015-02-03T00:00:00+01:00
2015-02-04T00:00:00+01:00
normal
2018-05-03T13:53:18+02:00
{ "name": "15/9-F-9 A", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9 A", "namingSystem": "NPD code" }, { "name": "6163", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2009-06-23T00:00:00+02:00", "dateDrillComplete": "2009-07-08", "daysBehind": "3.6", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2015-02-04T00:00:00+01:00", "dTimDiaHoleStart": "2015-02-03T13:15:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "No operation on well F-9A\nESP workover on well F-7: N/D surface equipment. Install surface riser and diverter. Release tubing hanger and pull ESP assemblies on 7 5/8\" tubing", "hpht": "0", "md": "1206", "mdCsgLast": "1201", "mdDiaHoleStart": "1206", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "9", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Spliced ESP cable below tubing hanger. RIH, landed and tested TH. Pulled diverter and surface riser. Installed tubing bonnet, spacer spool and ball valve. Commenced nippling up flowline. ", "tightWell": "0", "tvd": null, "tvdCsgLast": "1012", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[]
[]
[]
[ { "comments": "M/U FAST sleeve to tubing hanger.", "dTimEnd": "2015-02-03T00:30:00+01:00", "dTimStart": "2015-02-03T00:00:00+01:00", "md": "355", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for removing compact spider.", "dTimEnd": "2015-02-03T00:45:00+01:00", "dTimStart": "2015-02-03T00:30:00+01:00", "md": "355", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed compact spider and parked same in set back.", "dTimEnd": "2015-02-03T01:00:00+01:00", "dTimStart": "2015-02-03T00:45:00+01:00", "md": "355", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with tubing hanger to working hight. Mounted penetrator in TH, measured cable cutting point. Disassembled penetrator and spaced out for cable splice.", "dTimEnd": "2015-02-03T01:45:00+01:00", "dTimStart": "2015-02-03T01:00:00+01:00", "md": "355", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Electrically checked downhole system. Cut main cable and spooled back remaining ESP cable. Spliced cable to penetrator pigtails. Electrically checked system after splicing.", "dTimEnd": "2015-02-03T07:00:00+01:00", "dTimStart": "2015-02-03T01:45:00+01:00", "md": "355", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for RIH with tubing hanger", "dTimEnd": "2015-02-03T07:45:00+01:00", "dTimStart": "2015-02-03T07:00:00+01:00", "md": "355", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D Weatherford casing tong and moved same to set back. Removed Weatherford 7 5/8\" tong from drill floor.", "dTimEnd": "2015-02-03T08:30:00+01:00", "dTimStart": "2015-02-03T07:45:00+01:00", "md": "355", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with TH. M/U power penetrator to hanger. Installed cable clamps and adjusted cable to take out slack in same.", "dTimEnd": "2015-02-03T09:00:00+01:00", "dTimStart": "2015-02-03T08:30:00+01:00", "md": "360", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Leak tested power penetrator to 69 bar / 10 min.", "dTimEnd": "2015-02-03T10:15:00+01:00", "dTimStart": "2015-02-03T09:00:00+01:00", "md": "360", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed master bushings and RIH with tubing hanger.", "dTimEnd": "2015-02-03T10:30:00+01:00", "dTimStart": "2015-02-03T10:15:00+01:00", "md": "366", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Troubleshot PRS. Repaired hydraulic fittings on forward PRS upper head.", "dTimEnd": "2015-02-03T12:00:00+01:00", "dTimStart": "2015-02-03T10:30:00+01:00", "md": "366", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Recorded up/down weight 86 ton / 82 ton. RIH and landed tubing hanger. Sat down 10 ton.", "dTimEnd": "2015-02-03T12:30:00+01:00", "dTimStart": "2015-02-03T12:00:00+01:00", "md": "380", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed electrical testing of ESP system through landing lead.", "dTimEnd": "2015-02-03T12:45:00+01:00", "dTimStart": "2015-02-03T12:30:00+01:00", "md": "380", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Disconnected tubing hanger RT. POOH and L/D same.", "dTimEnd": "2015-02-03T13:15:00+01:00", "dTimStart": "2015-02-03T12:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for pulling diverter.", "dTimEnd": "2015-02-03T13:30:00+01:00", "dTimStart": "2015-02-03T13:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed link adaptor and elevator. Installed chains and diverter bridle. Meanwhile bled down overshot.", "dTimEnd": "2015-02-03T14:30:00+01:00", "dTimStart": "2015-02-03T13:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleared drill floor. Pulled master bushings and prepared to pull diverter.", "dTimEnd": "2015-02-03T15:00:00+01:00", "dTimStart": "2015-02-03T14:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Stopped operation on drill floor due to exhaust fumes. Production switched over to generators and turned off turbines.", "dTimEnd": "2015-02-03T15:15:00+01:00", "dTimStart": "2015-02-03T15:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled diverter and landed same off on set back.", "dTimEnd": "2015-02-03T16:00:00+01:00", "dTimStart": "2015-02-03T15:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and attached slings from riser to chains. Removed tarp and nylon covers in moonpool. Meanwhile Production Dept shut-in adjacent wells according to SimOps procedure.", "dTimEnd": "2015-02-03T16:30:00+01:00", "dTimStart": "2015-02-03T16:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for pulling riser.", "dTimEnd": "2015-02-03T16:45:00+01:00", "dTimStart": "2015-02-03T16:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Disconnected riser. Pulled same to surface and L/D on HTS.", "dTimEnd": "2015-02-03T18:15:00+01:00", "dTimStart": "2015-02-03T16:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared for running tubing bonnet and spacer spool through rotary on TDS.", "dTimEnd": "2015-02-03T19:00:00+01:00", "dTimStart": "2015-02-03T18:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for lowering tubing bonnet.", "dTimEnd": "2015-02-03T19:30:00+01:00", "dTimStart": "2015-02-03T19:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lowered tubing bonnet with spacer spool through rotary and installed same on surface well head. Production Dept informed when heavy lift landed.", "dTimEnd": "2015-02-03T20:00:00+01:00", "dTimStart": "2015-02-03T19:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Leak tested penetrator seals in tubing bonnet to 69 bar / 10 min. Leak tested annulus insert valve to 69 bar / 10 min. Leak tested tubing bonnet cavety to 69 bar /10 min.", "dTimEnd": "2015-02-03T22:30:00+01:00", "dTimStart": "2015-02-03T20:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed ball valve. Commenced nippling up flowline.", "dTimEnd": "2015-02-04T00:00:00+01:00", "dTimStart": "2015-02-03T22:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_A_2015_02_05
NO 15/9-F-9 A
NO 15/9-F-9 A
name
2015-02-04T00:00:00+01:00
2015-02-05T00:00:00+01:00
normal
2018-05-03T13:53:18+02:00
{ "name": "15/9-F-9 A", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9 A", "namingSystem": "NPD code" }, { "name": "6163", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2009-06-23T00:00:00+02:00", "dateDrillComplete": "2009-07-08", "daysBehind": "3", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2015-02-05T00:00:00+01:00", "dTimDiaHoleStart": "2015-02-03T13:15:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "None", "hpht": "0", "md": "1206", "mdCsgLast": "1201", "mdDiaHoleStart": "1206", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "10", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Nippled up flowline. ESP workover on F-9 finalized. ", "tightWell": "0", "tvd": null, "tvdCsgLast": "1012", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[]
[]
[]
[ { "comments": "Continued nippling up flow line. Meanwhile installed hatches above F-9.\n\nESP workover on F-9 A finalized. Commisioning to be performed offline.", "dTimEnd": "2015-02-04T03:30:00+01:00", "dTimStart": "2015-02-04T00:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_A_2016_09_29
NO 15/9-F-9 A
NO 15/9-F-9 A
name
2016-09-28T00:00:00+02:00
2016-09-29T00:00:00+02:00
normal
2018-05-03T13:53:18+02:00
{ "name": "15/9-F-9 A", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9 A", "namingSystem": "NPD code" }, { "name": "6163", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2009-06-23T00:00:00+02:00", "dateDrillComplete": "2009-07-08", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-09-29T00:00:00+02:00", "dTimDiaHoleStart": "2016-09-28T16:15:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- N/D surface equipment\n- Install surface riser and diverter\n- Release TH, pull 275m of 7 5/8in tubing\n- Install EZSV in 13 3/8in casing\n\n", "hpht": "0", "md": "-999.99", "mdCsgLast": "1201", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": "leak off test", "reportNo": "1", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "- Started skidding the rig", "tightWell": "0", "tvd": null, "tvdCsgLast": "1012", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[]
[]
[]
[ { "comments": "Performed preparations for skidding, disconnected injection and bleed off hose to allow skidding. Meanwhile deck crew worked on unloading cargo boat. Performed 3 monthly PM on TDS. Deck crew worked w/ helicopter 18:25", "dTimEnd": "2016-09-28T19:00:00+02:00", "dTimStart": "2016-09-28T16:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to offload critical equipment from supply vessel. Meanwhile carried out maintenance on TDS and FWD PRS. Deck crew worked w/ helicopter 21:55", "dTimEnd": "2016-09-28T23:30:00+02:00", "dTimStart": "2016-09-28T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to skid cantilever", "dTimEnd": "2016-09-28T23:45:00+02:00", "dTimStart": "2016-09-28T23:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed stairs and bridge to Production module", "dTimEnd": "2016-09-29T00:00:00+02:00", "dTimStart": "2016-09-28T23:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_A_2016_09_30
NO 15/9-F-9 A
NO 15/9-F-9 A
name
2016-09-29T00:00:00+02:00
2016-09-30T00:00:00+02:00
normal
2018-05-03T13:53:18+02:00
{ "name": "15/9-F-9 A", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9 A", "namingSystem": "NPD code" }, { "name": "6163", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2009-06-23T00:00:00+02:00", "dateDrillComplete": "2009-07-08", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-09-30T00:00:00+02:00", "dTimDiaHoleStart": "2016-09-29T01:15:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Install 13 3/8in EZSV\n- Set 50m balanced cement plug\n- N/D diverter and surface riser\n\nREPORTING ON THE F-4", "hpht": "0", "md": "-999.99", "mdCsgLast": "1201", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": "leak off test", "reportNo": "2", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "- Skid the cantilever to F-9\n- N/D spacer spool and tubing bonnet\n- Installed surface riser and diverter\n- Released TH and pull 12joints of tubing. Accidently lost tubing string in the hole\n- Attempted to fish tubing string", "tightWell": "0", "tvd": null, "tvdCsgLast": "1012", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[]
[]
[]
[ { "comments": "Skidded cantilever to 1.5m port and 6.75m aft to F09", "dTimEnd": "2016-09-29T01:15:00+02:00", "dTimStart": "2016-09-29T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to N/D spacer spool and tubing bonnet", "dTimEnd": "2016-09-29T01:30:00+02:00", "dTimStart": "2016-09-29T01:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared for lifting of spacer spool and tubing bonnet w/ ball valve, using double lift slings from top drive. Opened ball valve. Released lock ring on tubing bonnet. Lifted assembly trough rotary and L/D. Removed C-ring. Meanwhile built scaffolding around F09", "dTimEnd": "2016-09-29T04:15:00+02:00", "dTimStart": "2016-09-29T01:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to run surface riser", "dTimEnd": "2016-09-29T04:30:00+02:00", "dTimStart": "2016-09-29T04:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Connected lifting bridle to surface riser, attached crane for tailing riser in. P/U riser, RIH, connected same to wellhead. Secured riser in moonpool and removed lifting bridle", "dTimEnd": "2016-09-29T05:30:00+02:00", "dTimStart": "2016-09-29T04:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to handle diverter", "dTimEnd": "2016-09-29T05:45:00+02:00", "dTimStart": "2016-09-29T05:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and run diverter, pressured up system. Installed outer rings, master bushing and BX elevators to bails", "dTimEnd": "2016-09-29T07:00:00+02:00", "dTimStart": "2016-09-29T05:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to spot casing tong", "dTimEnd": "2016-09-29T07:15:00+02:00", "dTimStart": "2016-09-29T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Spot casing tong and slips on rig floor. Meanwhile fill well with SW using trip tank, unable to keep well full", "dTimEnd": "2016-09-29T08:00:00+02:00", "dTimStart": "2016-09-29T07:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U TH running tool, RIH same and engage to TH", "dTimEnd": "2016-09-29T08:30:00+02:00", "dTimStart": "2016-09-29T08:00:00+02:00", "md": "20", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled TH with 20t overpull, POOH and racked DP stand", "dTimEnd": "2016-09-29T09:00:00+02:00", "dTimStart": "2016-09-29T08:30:00+02:00", "md": "346", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to R/U casing tong", "dTimEnd": "2016-09-29T09:15:00+02:00", "dTimStart": "2016-09-29T09:00:00+02:00", "md": "346", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U casing tong on the rig floor", "dTimEnd": "2016-09-29T10:45:00+02:00", "dTimStart": "2016-09-29T09:15:00+02:00", "md": "346", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed master bushing and pulled TH above RKB. L/D TH assembly to deck. Changed BX inserts and installed power slips", "dTimEnd": "2016-09-29T12:00:00+02:00", "dTimStart": "2016-09-29T10:45:00+02:00", "md": "346", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attempted to move TH to cantilever with PDM, too high winds", "dTimEnd": "2016-09-29T12:30:00+02:00", "dTimStart": "2016-09-29T12:00:00+02:00", "md": "346", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to move TH from HTS to starboard side of the rig floor", "dTimEnd": "2016-09-29T12:45:00+02:00", "dTimStart": "2016-09-29T12:30:00+02:00", "md": "346", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Moved TH from HTS and landed on starboard side of drill floor", "dTimEnd": "2016-09-29T13:00:00+02:00", "dTimStart": "2016-09-29T12:45:00+02:00", "md": "346", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled and L/D 7 5/8in tubing, spooled ESP cable at the same time. Average pulling speed 5,3joints/hour. Totally pulled 12 joints", "dTimEnd": "2016-09-29T15:15:00+02:00", "dTimStart": "2016-09-29T13:00:00+02:00", "md": "212", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Accidently dropped 212m of tubing string by operator error. Performed time out for safety conversation with all involved. Took pictures", "dTimEnd": "2016-09-29T16:00:00+02:00", "dTimStart": "2016-09-29T15:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D tubing joint from HTS, removed power slips and R/D casing tong. Meanwhile inspected PRS before further use. Problem with FWD PRS. Moved casing tong to forward IRN track.", "dTimEnd": "2016-09-29T18:00:00+02:00", "dTimStart": "2016-09-29T16:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U spear BHA to fish 7 5/8in tubing string. RIF and tagged top of the fish at 200m", "dTimEnd": "2016-09-29T19:00:00+02:00", "dTimStart": "2016-09-29T18:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- fish", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Worked string f/ 200.1m to 200.7m with up to 6t WOB while rotating at 5rpm CCW 5kNM. Not able to engage the fish", "dTimEnd": "2016-09-29T20:30:00+02:00", "dTimStart": "2016-09-29T19:00:00+02:00", "md": "200", "phase": "fixed", "proprietaryCode": "interruption -- fish", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ spear BHA from 200m to surface. Inspected spear. Observed bull nose missing in the well", "dTimEnd": "2016-09-29T21:00:00+02:00", "dTimStart": "2016-09-29T20:30:00+02:00", "md": "8", "phase": "fixed", "proprietaryCode": "interruption -- fish", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Evaluated situation. Discussed situation w/ onshore organisation. Meanwhile performed TBT to pick up junk mill BHA", "dTimEnd": "2016-09-29T21:45:00+02:00", "dTimStart": "2016-09-29T21:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U junk mill BHA", "dTimEnd": "2016-09-29T22:15:00+02:00", "dTimStart": "2016-09-29T21:45:00+02:00", "md": "30", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ junk mill BHA to 194m. M/U TDS, took up/down weights 80t/76t. Tagged top of fish at 200m w/ 5t", "dTimEnd": "2016-09-29T23:00:00+02:00", "dTimStart": "2016-09-29T22:15:00+02:00", "md": "200", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Evaluated situation. Discussed situation w/ onshore organisation. Agreed to carry on with setting EZSV and surface cement plug", "dTimEnd": "2016-09-29T23:15:00+02:00", "dTimStart": "2016-09-29T23:00:00+02:00", "md": "200", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ junk mill BHA. L/D same", "dTimEnd": "2016-09-30T00:00:00+02:00", "dTimStart": "2016-09-29T23:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_A_2016_10_01
NO 15/9-F-9 A
NO 15/9-F-9 A
name
2016-09-30T00:00:00+02:00
2016-10-01T00:00:00+02:00
normal
2018-05-03T13:53:19+02:00
{ "name": "15/9-F-9 A", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9 A", "namingSystem": "NPD code" }, { "name": "6163", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2009-06-23T00:00:00+02:00", "dateDrillComplete": "2009-07-08", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-10-01T00:00:00+02:00", "dTimDiaHoleStart": "2016-09-29T01:15:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "CONTINUE REPORTING ON 15/9-F-4", "hpht": "0", "md": "-999.99", "mdCsgLast": "1201", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "148", "mdStrengthForm": "0", "presTestType": "leak off test", "reportNo": "3", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "- Installed 13 3/8in EZSV plug\n- Set 50m surface cement plug\n- N/D diverter and surface riser\n\nCONTINUE REPORTING ON 15/9-F-4", "tightWell": "0", "tvd": null, "tvdCsgLast": "1012", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "20.9" } ]
[]
[]
[]
[ { "comments": "Performed Pre-job Meeting to run 13 3/8in EZSV plug", "dTimEnd": "2016-09-30T00:15:00+02:00", "dTimStart": "2016-09-30T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U 13 3/8in EZSV plug to stand of drill pipe. RIH. M/U 2x 3m pups for space out", "dTimEnd": "2016-09-30T01:00:00+02:00", "dTimStart": "2016-09-30T00:15:00+02:00", "md": "55", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ EZSV BHA on 5,5in DP. Tagged top of fish at 200m w/ 1t", "dTimEnd": "2016-09-30T01:15:00+02:00", "dTimStart": "2016-09-30T01:00:00+02:00", "md": "200", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Established circulation and washed the setting area, 550 l/min/ 4 bar. Installed the 13 3/8 EZSV plug at 199,2 m top of plug (35 right hand turns). Load tested the plug with 10t down weight", "dTimEnd": "2016-09-30T01:45:00+02:00", "dTimStart": "2016-09-30T01:15:00+02:00", "md": "200", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D single, P/U and M/U pump in sub and TDS", "dTimEnd": "2016-09-30T02:15:00+02:00", "dTimStart": "2016-09-30T01:45:00+02:00", "md": "196", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Circulated well to sea water at 3400 l/min - 11bar, 50 rpm until clean returns of below 30ppm OIW content. Totally circulated 20m3", "dTimEnd": "2016-09-30T02:30:00+02:00", "dTimStart": "2016-09-30T02:15:00+02:00", "md": "196", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U cement hose and confirmed line up", "dTimEnd": "2016-09-30T02:45:00+02:00", "dTimStart": "2016-09-30T02:30:00+02:00", "md": "199", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Balanced cement plug (148 m - 199 m ): Mixed and pumped 5,0 m3 of 1,95 SG cement slurry, 600 l/min. Displaced the cement with 1800 l of drill water 1000 l/min/ 14 bar. Pulled out of cement to 148m at 2 min/stand. Theoretical TOC 148 m", "dTimEnd": "2016-09-30T03:00:00+02:00", "dTimStart": "2016-09-30T02:45:00+02:00", "md": "199", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D cement hose and pump in sub", "dTimEnd": "2016-09-30T03:15:00+02:00", "dTimStart": "2016-09-30T03:00:00+02:00", "md": "148", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed pup with sponge ball. Staged up pumps to 3100 l/min - 18bar. Circulated 1,5BU. Diverted returns overboard. Observed cement in returns on shakers", "dTimEnd": "2016-09-30T04:00:00+02:00", "dTimStart": "2016-09-30T03:15:00+02:00", "md": "148", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ EZSV running tool. L/D same", "dTimEnd": "2016-09-30T04:45:00+02:00", "dTimStart": "2016-09-30T04:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Clean and cleared rig floor", "dTimEnd": "2016-09-30T05:00:00+02:00", "dTimStart": "2016-09-30T04:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to handle diverter", "dTimEnd": "2016-09-30T05:15:00+02:00", "dTimStart": "2016-09-30T05:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed BX elevators and connected chains to bails. Pulled master bushing and outer ring", "dTimEnd": "2016-09-30T05:45:00+02:00", "dTimStart": "2016-09-30T05:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Connected lifting chains to diverter, pulled and secured same in setback area", "dTimEnd": "2016-09-30T06:00:00+02:00", "dTimStart": "2016-09-30T05:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to L/D surface riser", "dTimEnd": "2016-09-30T06:15:00+02:00", "dTimStart": "2016-09-30T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Connected bridle to surface riser, pulled and L/D same", "dTimEnd": "2016-09-30T06:30:00+02:00", "dTimStart": "2016-09-30T06:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed hatch covers for F09 in moonpool", "dTimEnd": "2016-09-30T07:00:00+02:00", "dTimStart": "2016-09-30T06:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_A_2016_10_17
NO 15/9-F-9 A
NO 15/9-F-9 A
name
2016-10-16T00:00:00+02:00
2016-10-17T00:00:00+02:00
normal
2018-05-03T13:53:19+02:00
{ "name": "15/9-F-9 A", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9 A", "namingSystem": "NPD code" }, { "name": "6163", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2009-06-23T00:00:00+02:00", "dateDrillComplete": "2009-07-08", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-10-17T00:00:00+02:00", "dTimDiaHoleStart": "2016-09-29T01:15:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Pull production riser on well F-15 D\n- Skid to well F-14\n", "hpht": "0", "md": "-999.99", "mdCsgLast": "1201", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": null, "presTestType": "leak off test", "reportNo": "4", "ropCurrent": "-999.99", "strengthForm": null, "sum24Hr": "WOW to pull production riser on F-15 D\nMeanwhile:\nSkidded to F-9\nTagged TOC at 152m\nSkidded to well F-15 D", "tightWell": "0", "tvd": null, "tvdCsgLast": "1012", "tvdStrengthForm": null, "waterDepth": "91", "wellheadElevation": "20.9" } ]
[]
[]
[]
[ { "comments": "Waited on weather to pull production riser on F-15 D\n\nMeanwhile:\nPerformed TBT for skidding to F-9 A and tag TOC", "dTimEnd": "2016-10-16T16:00:00+02:00", "dTimStart": "2016-10-16T15:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on weather to pull production riser on F-15 D\n\nMeanwhile:\nSkidded cantilever to well F-9 A", "dTimEnd": "2016-10-16T17:00:00+02:00", "dTimStart": "2016-10-16T16:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on weather to pull production riser on F-15 D\n\nMeanwhile:\nPerformed TBT for removing hatches.", "dTimEnd": "2016-10-16T17:15:00+02:00", "dTimStart": "2016-10-16T17:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on weather to pull production riser on F-15 D\n\nMeanwhile:\nRemoved hatches. Installed masterbushing", "dTimEnd": "2016-10-16T17:45:00+02:00", "dTimStart": "2016-10-16T17:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on weather to pull production riser on F-15 D\n\nMeanwhile:\nRIH on 5 1/2\" DP open ended. Tagged TOC at 152 m.", "dTimEnd": "2016-10-16T19:00:00+02:00", "dTimStart": "2016-10-16T17:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on weather to pull production riser on F-15 D\n\nMeanwhile:\nPerformed TBT for manual handling", "dTimEnd": "2016-10-16T19:15:00+02:00", "dTimStart": "2016-10-16T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on weather to pull production riser on F-15 D\n\nMeanwhile:\nPOOH 5 1/2\" DP to surface.", "dTimEnd": "2016-10-16T19:30:00+02:00", "dTimStart": "2016-10-16T19:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on weather to pull production riser on F-15 D\n\nMeanwhile:\nInstalled hatches and hole covers.\nPerformed pre-skid checks", "dTimEnd": "2016-10-16T20:30:00+02:00", "dTimStart": "2016-10-16T19:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on weather to pull production riser on F-15 D\n\nMeanwhile:\nClosed doors on BOP.\nCleaned shaker pits.\nCleaned out dry bulk silos", "dTimEnd": "2016-10-17T00:00:00+02:00", "dTimStart": "2016-10-16T20:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_A_2016_10_18
NO 15/9-F-9 A
NO 15/9-F-9 A
name
2016-10-17T00:00:00+02:00
2016-10-18T00:00:00+02:00
normal
2018-05-03T13:53:19+02:00
{ "name": "15/9-F-9 A", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9 A", "namingSystem": "NPD code" }, { "name": "6163", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2009-06-23T00:00:00+02:00", "dateDrillComplete": "2009-07-08", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-10-18T00:00:00+02:00", "dTimDiaHoleStart": "2016-09-29T01:15:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "None", "hpht": "0", "md": "-999.99", "mdCsgLast": "1201", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": null, "presTestType": "leak off test", "reportNo": "5", "ropCurrent": "-999.99", "strengthForm": null, "sum24Hr": "WOW for pulling production riser on F-15 D\nMeanwhile:\nSkidded to well F-15 D", "tightWell": "0", "tvd": null, "tvdCsgLast": "1012", "tvdStrengthForm": null, "waterDepth": "91", "wellheadElevation": "20.9" } ]
[]
[]
[]
[ { "comments": "Waited on weather to pull production riser on F-15 D\n\nMeanwhile:\nClosed doors on BOP.\nCleaned shaker pits.\nCleaned out dry bulk silos\n\n**** END OF REPORT ****", "dTimEnd": "2016-10-17T01:30:00+02:00", "dTimStart": "2016-10-17T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_9_A_2016_10_24
NO 15/9-F-9 A
NO 15/9-F-9 A
name
2016-10-23T00:00:00+02:00
2016-10-24T00:00:00+02:00
normal
2018-05-03T13:53:19+02:00
{ "name": "15/9-F-9 A", "namingSystem": "NPD code" }
[ { "name": "15/9-F-9 A", "namingSystem": "NPD code" }, { "name": "6163", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2009-06-23T00:00:00+02:00", "dateDrillComplete": "2009-07-08", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-10-24T00:00:00+02:00", "dTimDiaHoleStart": "2016-09-29T01:15:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Demob work", "hpht": "0", "md": "-999.99", "mdCsgLast": "1201", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": null, "presTestType": "leak off test", "reportNo": "6", "ropCurrent": "-999.99", "strengthForm": null, "sum24Hr": "- Skidded to F-9 A\n- Cut riser on 134,5 m\n- Cut and pulled riser joints\n- Moved equipment from WH deck to drill floor\n- Installed hatches and hole covers.", "tightWell": "0", "tvd": null, "tvdCsgLast": "1012", "tvdStrengthForm": null, "waterDepth": "91", "wellheadElevation": "20.9" } ]
[]
[]
[]
[ { "comments": "Performed TBT for skidding", "dTimEnd": "2016-10-23T02:00:00+02:00", "dTimStart": "2016-10-23T01:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Skidded to STB. Lifted down deck covers from main deck to WH deck.\nSkidded AFT then PORT, to well center F-9 A.", "dTimEnd": "2016-10-23T03:00:00+02:00", "dTimStart": "2016-10-23T02:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed post-skid checks.\nInstalled stairs to cantiliver.", "dTimEnd": "2016-10-23T03:15:00+02:00", "dTimStart": "2016-10-23T03:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed hatch and installed scaffolding in moonpool and WH deck.", "dTimEnd": "2016-10-23T03:45:00+02:00", "dTimStart": "2016-10-23T03:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U Cutter BHA and inner string.\nP/U and M/U spear assy.\nEngaged spear, took 20 ton overpull to confirm.", "dTimEnd": "2016-10-23T04:30:00+02:00", "dTimStart": "2016-10-23T03:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Load shifted weight from tension cylinders to TDS", "dTimEnd": "2016-10-23T04:45:00+02:00", "dTimStart": "2016-10-23T04:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D tension cylinders.", "dTimEnd": "2016-10-23T05:45:00+02:00", "dTimStart": "2016-10-23T04:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D boat collision stool and tension ring. Upper centralizer stuck, unable to remove.\nInstalled diverter and hose on WH.", "dTimEnd": "2016-10-23T06:45:00+02:00", "dTimStart": "2016-10-23T05:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Staged up flow to 2400 lpm / 80 bar. Cut riser.\nObserved drop of overpull, good indication of cut.", "dTimEnd": "2016-10-23T07:00:00+02:00", "dTimStart": "2016-10-23T06:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT with ongoing crew", "dTimEnd": "2016-10-23T07:15:00+02:00", "dTimStart": "2016-10-23T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D diverter and hose from WH.\nR/U chain hoist for pulling upper centralizer.", "dTimEnd": "2016-10-23T07:45:00+02:00", "dTimStart": "2016-10-23T07:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled riser. Removed upper centralizer (pulled free centralizer with riser flange when pulling the riser).\nBuilt scaffolding around hole openings. Installed wooden blocks to reduce riser movement.", "dTimEnd": "2016-10-23T08:45:00+02:00", "dTimStart": "2016-10-23T07:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with riser and landed onto C-plate on drill floor.", "dTimEnd": "2016-10-23T09:00:00+02:00", "dTimStart": "2016-10-23T08:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U false rotary\nPOOH with inner string. R/B spear and cutter assy.", "dTimEnd": "2016-10-23T10:00:00+02:00", "dTimStart": "2016-10-23T09:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U spear assy and engaged in riser.\nR/D false rotary and C-plate.\nRemoved BX-elevator and R/U manual elevator on riser.\nLanded riser on manual elevator. Lached bails onto manual elevator.", "dTimEnd": "2016-10-23T10:45:00+02:00", "dTimStart": "2016-10-23T10:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with riser (Lift #1). Cleaned off marine growth on centralizer deck.\nMeanwhile: Emptied pit 6 (clean SW).", "dTimEnd": "2016-10-23T11:30:00+02:00", "dTimStart": "2016-10-23T10:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U cutting machine.\nCut tensioner joint. Significant wave height 1,5 m.\nR/D cutting machine.", "dTimEnd": "2016-10-23T13:00:00+02:00", "dTimStart": "2016-10-23T11:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/O tensioner joint.\nInstalled link tilt pins on elevator.", "dTimEnd": "2016-10-23T14:00:00+02:00", "dTimStart": "2016-10-23T13:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with riser (Lift #2). Cleaned off marine growth on centralizer deck.", "dTimEnd": "2016-10-23T14:30:00+02:00", "dTimStart": "2016-10-23T14:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U cutting machine.\nCut riser joint. Significant wave height 2,2 m.\nR/D cutting machine.", "dTimEnd": "2016-10-23T15:00:00+02:00", "dTimStart": "2016-10-23T14:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/O riser joint (Lift #2).\nPOOH with riser (Lift #3). Cleaned off marine growth on centralizer deck.", "dTimEnd": "2016-10-23T15:30:00+02:00", "dTimStart": "2016-10-23T15:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U cutting machine.\nCut riser joint. Significant wave height 2,1 m.\nR/D cutting machine.", "dTimEnd": "2016-10-23T16:00:00+02:00", "dTimStart": "2016-10-23T15:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/O riser joint (Lift #3).\nPOOH with riser (Lift #4). Cleaned off marine growth on centralizer deck.\nRiser out of splash zone at 16:30", "dTimEnd": "2016-10-23T16:30:00+02:00", "dTimStart": "2016-10-23T16:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U cutting machine.\nCut riser joint.\nR/D cutting machine.", "dTimEnd": "2016-10-23T17:00:00+02:00", "dTimStart": "2016-10-23T16:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/O riser joint (Lift #4).\nPOOH with riser (Lift #5). Cleaned off marine growth on centralizer deck.", "dTimEnd": "2016-10-23T17:30:00+02:00", "dTimStart": "2016-10-23T17:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U cutting machine.\nCut riser joint.\nR/D cutting machine", "dTimEnd": "2016-10-23T18:00:00+02:00", "dTimStart": "2016-10-23T17:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/O riser joint (Lift #5).\nPOOH with riser (Lift #6). Cleaned off marine growth on centralizer deck.", "dTimEnd": "2016-10-23T18:15:00+02:00", "dTimStart": "2016-10-23T18:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U cutting machine.\nCut riser joint.\nR/D cutting machine", "dTimEnd": "2016-10-23T18:45:00+02:00", "dTimStart": "2016-10-23T18:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/O riser joint (Lift #6).\nPOOH with riser (Lift #7).\nPOOH and L/O stress joint.", "dTimEnd": "2016-10-23T19:30:00+02:00", "dTimStart": "2016-10-23T18:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Clean and cleared drill floor.", "dTimEnd": "2016-10-23T19:45:00+02:00", "dTimStart": "2016-10-23T19:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed saddle and riser bucket from HTS.", "dTimEnd": "2016-10-23T20:00:00+02:00", "dTimStart": "2016-10-23T19:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/O cutting - and spear assy.", "dTimEnd": "2016-10-23T21:45:00+02:00", "dTimStart": "2016-10-23T20:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for installing hatches and hole covers.", "dTimEnd": "2016-10-23T22:00:00+02:00", "dTimStart": "2016-10-23T21:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted tension cylinders from WH to drill floor.", "dTimEnd": "2016-10-23T23:45:00+02:00", "dTimStart": "2016-10-23T22:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed hatches.\n\n**** END OF REPORT ****", "dTimEnd": "2016-10-24T00:00:00+02:00", "dTimStart": "2016-10-23T23:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]