docName
stringlengths
19
23
nameWell
stringclasses
23 values
nameWellbore
stringclasses
26 values
name
stringclasses
1 value
dTimStart
stringlengths
25
25
dTimEnd
stringlengths
25
25
versionKind
stringclasses
1 value
createDate
stringclasses
183 values
wellAlias
dict
wellboreAlias
listlengths
2
2
wellboreInfo
listlengths
1
1
statusInfo
listlengths
1
1
fluid
listlengths
0
6
porePressure
listlengths
0
6
surveyStation
listlengths
0
46
activity
listlengths
0
49
lithShowInfo
listlengths
0
7
15_9_F_12_2007_09_02
NO 15/9-F-12
NO 15/9-F-12
name
2007-09-01T00:00:00+02:00
2007-09-02T00:00:00+02:00
normal
2018-05-03T13:51:51+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-02T00:00:00+02:00", "dTimDiaHoleStart": "2007-08-30T23:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "0", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Troubleshoote leakage in tie-back casing.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3480", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "81", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Ran 10 3/4\" casing from 1141 m to 2262 m MD. Installed casing hanger and running tool. Ran in on landing string and stung tie-back casing into 9 5/8\" PBR at 2408 m MD. Set and tested MS seal -ok. POOH with landing string. Attempted to pressure test casing/sealstem - observed leakage.", "tightWell": "0", "tvd": "3106.6", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.7" } ]
[ { "dTim": "2007-09-01T00:00:00+02:00", "density": "1.01", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Seawater", "visFunnel": "-999.99", "yp": "-999.99" }, { "dTim": "2007-09-01T20:00:00+02:00", "density": "1.01", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Seawater", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Removed block hang off sling. Calibrated block.", "dTimEnd": "2007-09-01T00:45:00+02:00", "dTimStart": "2007-09-01T00:00:00+02:00", "md": "811", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior to recommencing casing running. Broke off and laid down casing swage.", "dTimEnd": "2007-09-01T01:30:00+02:00", "dTimStart": "2007-09-01T00:45:00+02:00", "md": "811", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to run 10 3/4\" casing from 811 m to 1141 m MD.", "dTimEnd": "2007-09-01T06:00:00+02:00", "dTimStart": "2007-09-01T01:30:00+02:00", "md": "1141", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran 10 3/4\" tie-back casing from 1141 m to 2262 m MD. Average running speed 8 jnts/hr.", "dTimEnd": "2007-09-01T18:30:00+02:00", "dTimStart": "2007-09-01T06:00:00+02:00", "md": "2262", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed from 10 3/4\" BX3 elevator to 5 1/2\" DP elevator.", "dTimEnd": "2007-09-01T19:00:00+02:00", "dTimStart": "2007-09-01T18:30:00+02:00", "md": "2262", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up and made up 10 3/4\" casing hanger complete with isolation sleeve and PADPRT tool", "dTimEnd": "2007-09-01T19:45:00+02:00", "dTimStart": "2007-09-01T19:00:00+02:00", "md": "2262", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed spider from rotary and installed bushings. Removed casing tong.", "dTimEnd": "2007-09-01T20:45:00+02:00", "dTimStart": "2007-09-01T19:45:00+02:00", "md": "2262", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 10 3/4\" casing/hanger on 5 1/2\" HWDP landing string. Strapped pipe on way in.", "dTimEnd": "2007-09-01T23:00:00+02:00", "dTimStart": "2007-09-01T20:45:00+02:00", "md": "2393", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up TDS. Took up/down weights 253/199 MT. Pumped at 450 lpm while running in slowly with landing string. Observed pressure bulid up and lost returns at 2406,4 m MD indicating seals engaging 9 5/8\" liner sealbore. Stopped pumps. Observed stinger shroud shearing some 1,20 m further in and got hanger landing depth 0,8 m (total of 1.2+0.8=2m) further in at 2408,4 m MD.", "dTimEnd": "2007-09-01T23:30:00+02:00", "dTimStart": "2007-09-01T23:00:00+02:00", "md": "2408", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed low pressure test of stinger seals to 70 bar / 10 min - ok.", "dTimEnd": "2007-09-02T00:00:00+02:00", "dTimStart": "2007-09-01T23:30:00+02:00", "md": "2408", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2007_09_03
NO 15/9-F-12
NO 15/9-F-12
name
2007-09-02T00:00:00+02:00
2007-09-03T00:00:00+02:00
normal
2018-05-03T13:51:51+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-03T00:00:00+02:00", "dTimDiaHoleStart": "2007-08-30T23:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "0", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "POOH with RTTS. Pull wearbushing. Pull casing. ", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3480", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "82", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Troubleshot leakage on sealstem. Retrieved MS seal in 10 3/4\" hanger. Ran Vetco jet and wash tool in 10 3/4\" hanger. Installed wearbushing. Ran RTTS to 1650 m MD and tested well with communication up annulus. Stepped up pressure and observed onset of leakage around 300 bar. ", "tightWell": "0", "tvd": "3106.6", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.7" } ]
[ { "dTim": "2007-09-02T20:00:00+02:00", "density": "1.01", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Seawater", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Marked pipe with 72 MT and 128 MT hookload. Applied 7 MT on PADPRT tool and rotated 4 1/4 turn clockwise to set tool. Pipe dropped 8,5\" as intended. Closed UPR.", "dTimEnd": "2007-09-02T01:00:00+02:00", "dTimStart": "2007-09-02T00:00:00+02:00", "md": "2408", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior to setting MS seal. Pressured up to 207 bar with cement unit through kill line for 10 mins to set the MS seal. Volume pumped 272 liters.", "dTimEnd": "2007-09-02T02:15:00+02:00", "dTimStart": "2007-09-02T01:00:00+02:00", "md": "2408", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened UPR and pulled 50 MT above landing string weight to unset PADPRT tool. Pressure tested MS seal to 35/345 bar 5/10 mins. Volumed pumped 447 liters.", "dTimEnd": "2007-09-02T03:00:00+02:00", "dTimStart": "2007-09-02T02:15:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with PADRT tool on 5 1/2\" HWDP. Laid down PADPRT tool.", "dTimEnd": "2007-09-02T04:00:00+02:00", "dTimStart": "2007-09-02T03:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed shear ram and lined up to pressure up underneath with cement unit. Pressured up with cement unit to 345 bar. Pumped a total of 2630 liter on 1st attempt, good correlation with theoretical volume. Observed trendline which did not stabilize - steady drop observed at around 1 bar/min. Pressured up twice to 345 bar - same trend observed. Total volume pumped 2860 liters Attempted to bleed pressure back to cement unit - nogo, kill line blocked for unknown reason. Bled back to trip tank and recovered 2500 liters. Decided to re-attempt pressure test up cement line.", "dTimEnd": "2007-09-02T05:00:00+02:00", "dTimStart": "2007-09-02T04:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up from cement unit pumping up cement line. Flushed through and performed line test to 345 bar - ok.", "dTimEnd": "2007-09-02T06:00:00+02:00", "dTimStart": "2007-09-02T05:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Troubleshot leakage in well. Pressured up on well to 345 bar from cement unit through cement line. Similar trendline observed with leakage rate of 0,5-1 bar/min. Pressured up on well twice more. Bled off pressure rapidly and lined back to cement unit. Pressure on cement unit rose from 2,8 bar to 7 bar over 2 hrs. Meanwhile discussed situation and way forward. Prepared for running MS seal retrieval tool.", "dTimEnd": "2007-09-02T09:00:00+02:00", "dTimStart": "2007-09-02T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Picked up MS seal retirevel tool and inspected seals. RIH with retrieval tool on 5 1/2\" HWDP landing string as per Vetco procedure. Engaged tool by 1/2\" turn lefthand. Set down landing string weight of 10 MT instead of the intended 3 MT. Adjusted string weight and string jumped approx 0,3 m, got sudden gain in trip tank of approx 250 liter. Closed annular and pulled MS seal free with 10 MT overpull. POOH with retireval tool and MS seal on 5 1/2\" HWDP. Backed off MS seal, re-set running tool and laid down same.", "dTimEnd": "2007-09-02T14:00:00+02:00", "dTimStart": "2007-09-02T09:00:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Inspected MS seal and found scores on seal. Discussed situation. Prepared hanger jet and wash tool.", "dTimEnd": "2007-09-02T15:00:00+02:00", "dTimStart": "2007-09-02T14:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Picked up and made ut Vetco jet and wash tool. RIH with tool on 5 1/2\" HWDP landing string. Tagged top of 10 3/4 casing hanger. Washed seal area, rotated with 3 rpm while pumping at 2200 lpm. POOH with jet and wash tool. Discussed way forward.", "dTimEnd": "2007-09-02T19:30:00+02:00", "dTimStart": "2007-09-02T15:00:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Prepared for running WBBRT w/10 3/4\" wearbushing. Picked up WBRRT, checked tool and installed 10 3/4\" wearbushing. RIH with tool WBRRT/wearbushing on 5 1/2\" HWDP landing string.", "dTimEnd": "2007-09-02T21:00:00+02:00", "dTimStart": "2007-09-02T19:30:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Set wearbushing at 140,2 m MD. POOH with WBRRT and laid down tool.", "dTimEnd": "2007-09-02T22:30:00+02:00", "dTimStart": "2007-09-02T21:00:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Hung off RTTS in rotary and made up to stand of 5 1/2\" HWDP. Installed automatic slips.", "dTimEnd": "2007-09-03T00:00:00+02:00", "dTimStart": "2007-09-02T22:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" } ]
[]
15_9_F_12_2007_09_04
NO 15/9-F-12
NO 15/9-F-12
name
2007-09-03T00:00:00+02:00
2007-09-04T00:00:00+02:00
normal
2018-05-03T13:51:51+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-04T00:00:00+02:00", "dTimDiaHoleStart": "2007-08-30T23:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "0", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Pull 9 5/8\" tie-back casing. Set 14\" wearbushing. Test BOP. RIH with TSP packer and new PBR.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3480", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "83", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "POOH with RTTS and laid down same. Pulled 10 3/4\" wearbushing. Ran in and latched casing hanger and pulled free casing. POOH with 9 5/8\" x 10 3/4\" tie-back casing from 2408 m to 822 m MD.", "tightWell": "0", "tvd": "3106.6", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.7" } ]
[ { "dTim": "2007-09-03T20:00:00+02:00", "density": "1.01", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Seawater", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "RIH with 9 5/8\" RTTS on 5 1/2\" DP/HWDP to 1650 m MD.", "dTimEnd": "2007-09-03T03:00:00+02:00", "dTimStart": "2007-09-03T00:00:00+02:00", "md": "1650", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Took up/down weights 132/117 MT. Roateted string to set RTTS packer. Slacked of 30 MT on the running string and set packer at 1650 m MD. Lined up to pump from cement unit up cement line and standpipe. Closed standpipe valve and performed line test to 345 bar - ok.", "dTimEnd": "2007-09-03T04:30:00+02:00", "dTimStart": "2007-09-03T03:00:00+02:00", "md": "1650", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Pressurised well below RTTS packer in 50 bar increments. Held each step for 10 mins. Good tests obtained at 50, 100, 150, 200, 250 bar - no gain in trip tank observed. Total volume pumped at 250 bar was 1129 liter.", "dTimEnd": "2007-09-03T05:30:00+02:00", "dTimStart": "2007-09-03T04:30:00+02:00", "md": "1650", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "At 300 bar leakage was observed, pressure dropped 7 bar / 10 min - also gained 40 liters in triptank over 10 mins. Volume pumped 1332 liter. Bled off pressure on well.", "dTimEnd": "2007-09-03T06:00:00+02:00", "dTimStart": "2007-09-03T05:30:00+02:00", "md": "1650", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Released RTTS. POOH on 5 1/2\" DP/HWDP with RTTS. Removed automatic slips and master bushing. Laid down RTTS.", "dTimEnd": "2007-09-03T10:00:00+02:00", "dTimStart": "2007-09-03T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Picked up WBRRT set in retrieval mode. RIH with WBRRT on 5 1/2\" HWDP landing string. Latched on to 10 3/4\" wearbushing at 140 m MD and pulled free with 40 MT overpull.", "dTimEnd": "2007-09-03T12:00:00+02:00", "dTimStart": "2007-09-03T10:00:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Picked up PADRT tool set in catch mode. RIH on 5 1/2\" HWDP landing string and latched on to 10 3/4\" hanger according to Vetco instructions.", "dTimEnd": "2007-09-03T13:15:00+02:00", "dTimStart": "2007-09-03T12:00:00+02:00", "md": "2408", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Picked up with 255 MT hookload and POOH with 9 5/8\" x 10 3/4\" tie back casing on 5 1/2\" HWDP landing string. Removed master bushing.", "dTimEnd": "2007-09-03T14:45:00+02:00", "dTimStart": "2007-09-03T13:15:00+02:00", "md": "2268", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held toolbox talk prior to rigging 10 3/4\" casing handling equipment. Installed casing tong, BX3 elevator and spider.", "dTimEnd": "2007-09-03T17:45:00+02:00", "dTimStart": "2007-09-03T14:45:00+02:00", "md": "2268", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held toolbox talk prior to laying down 10 3/4\" casing hanger / casing. Broke and laid down hanger and PADRT tool.", "dTimEnd": "2007-09-03T18:15:00+02:00", "dTimStart": "2007-09-03T17:45:00+02:00", "md": "2265", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "POOH with 10 3/4\" tie-back casing from 2265 m to 1670 m MD. Average pulling speed 11 jnts/hr.", "dTimEnd": "2007-09-04T00:00:00+02:00", "dTimStart": "2007-09-03T18:15:00+02:00", "md": "1670", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" } ]
[]
15_9_F_12_2007_09_05
NO 15/9-F-12
NO 15/9-F-12
name
2007-09-04T00:00:00+02:00
2007-09-05T00:00:00+02:00
normal
2018-05-03T13:51:51+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-05T00:00:00+02:00", "dTimDiaHoleStart": "2007-08-30T23:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "0", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "RIH with 9 5/8\" x 14\" TSP and set packer at 2405 m MD. POOH with TSP setting tool. Pull 14\" wearbushing. Rig up for running 9 5/8\" x 10 3/4\" tie-back casing.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3480", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "84", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "POOH with 9 5/8\" tie-back casing. Set 14\" wearbushing. Performed BOP test. POOH with WBRRT. Picked up 9 5/8\" x 14\" TSP and RIH with same to 100 m MD.", "tightWell": "0", "tvd": "3106.6", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.7" } ]
[ { "dTim": "2007-09-04T20:00:00+02:00", "density": "1.01", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "3520", "mudClass": "water based", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Seawater", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "POOH with 10 3/4\" casing from 1670 m to 822 m MD. Average pulling speed 13 jnts/hr.", "dTimEnd": "2007-09-04T06:00:00+02:00", "dTimStart": "2007-09-04T00:00:00+02:00", "md": "822", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Continued pulling 10 3/4\" casing from 822 m to 798 m MD. Hung off on x-over. Broke out and laid down 9 5/8\" x 10 3/4\" x-over. Changed to 9 5/8\" elevator.", "dTimEnd": "2007-09-04T08:00:00+02:00", "dTimStart": "2007-09-04T06:00:00+02:00", "md": "798", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "POOH with 9 5/8\" casing from 798 m to 550 m MD.", "dTimEnd": "2007-09-04T11:00:00+02:00", "dTimStart": "2007-09-04T08:00:00+02:00", "md": "550", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Changed dies in casing tong from 9 3/4\" to 9 5/8\" (arrived on boat).", "dTimEnd": "2007-09-04T11:15:00+02:00", "dTimStart": "2007-09-04T11:00:00+02:00", "md": "550", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Continued to POOH with 9 5/8\" casing from 550 m to 40 m MD.", "dTimEnd": "2007-09-04T16:00:00+02:00", "dTimStart": "2007-09-04T11:15:00+02:00", "md": "40", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Removed spider and installed master bushing. POOH from 40 m MD. Laid down seal stinger. Inspected seals, lower seals missing and significant damage to rest of seals.", "dTimEnd": "2007-09-04T17:00:00+02:00", "dTimStart": "2007-09-04T16:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held tolbox talk prior to breaking back up TSP assembly. Cleared and tidied drillfloor. Changed to 5 1/2\" inserts in elevator.", "dTimEnd": "2007-09-04T17:30:00+02:00", "dTimStart": "2007-09-04T17:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Picked up TSP assembly. Broke 9 5/8\" connection and installed by pass ball drop seat. Re-made 9 5/8\" connection and laid down tool on pipedeck.", "dTimEnd": "2007-09-04T19:30:00+02:00", "dTimStart": "2007-09-04T17:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Picked up WBRRT. Broke out jet sub and configured tool for BOP testing. RIH with WBRRT and 14\" wearbushing on 5 1/2\" HWDP landing and set same in wellhead.", "dTimEnd": "2007-09-04T22:00:00+02:00", "dTimStart": "2007-09-04T19:30:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Broke TDS connection and parked travelling block for maintenance.", "dTimEnd": "2007-09-04T22:30:00+02:00", "dTimStart": "2007-09-04T22:00:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Pressure tested BOP to 35/345 bar 5/10 min according to Mærsk USP.", "dTimEnd": "2007-09-05T00:00:00+02:00", "dTimStart": "2007-09-04T22:30:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- bop activities", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2007_09_06
NO 15/9-F-12
NO 15/9-F-12
name
2007-09-05T00:00:00+02:00
2007-09-06T00:00:00+02:00
normal
2018-05-03T13:51:51+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-06T00:00:00+02:00", "dTimDiaHoleStart": "2007-08-30T23:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Continue to lay out and tally rest of 10 3/4\" casing. Run 9 5/8\" x 10 3/4\" casing to 1400 m MD.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3480", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "85", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "RIH with TSP assy and set same with new top of PBR at 2399 m MD. POOH with TSP setting tool. Pulled 14\" wearbushing. Backloaded used casing and loaded new casing. Rigged up casing running equipment.", "tightWell": "0", "tvd": "3106.6", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2007-09-05T20:00:00+02:00", "density": "1.01", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "3520", "mudClass": "water based", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Seawater", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Pressure tested BOP to 35/345 bar 5/10 min according to Mærsk USP.", "dTimEnd": "2007-09-05T03:30:00+02:00", "dTimStart": "2007-09-05T00:00:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- bop activities", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Released WBRRT and POOH with same on 5 1/2\" HWDP landing string. Re-set tool on surface. Laid down WBRRT on pipe deck. Meanwhile function tested shear ram.", "dTimEnd": "2007-09-05T04:45:00+02:00", "dTimStart": "2007-09-05T03:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Picked up 9 5/8\" x 14\" TSP assembly with simultaneous lift on elevator and deck crane. Inspected seals. Hung off assy in rotary. Removed masterbushing and installed automatic slips. RIH with TSP on 5 1/2\" DP to 100 m MD.", "dTimEnd": "2007-09-05T06:00:00+02:00", "dTimStart": "2007-09-05T04:45:00+02:00", "md": "100", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "RIH with TSP assy on 5 1/2\" DP from 100 m to 2397 m MD. Running speed limited to 2 mins/std.", "dTimEnd": "2007-09-05T10:45:00+02:00", "dTimStart": "2007-09-05T06:00:00+02:00", "md": "2397", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Dropped 1 3/4\" aluminium ball. Took up/down weights 160/131 MT. Continued to RIH with TSP packer from 2397 m ti 2412 m MD. Applied 10 MT on TSP assy. Pressured up string to 230 bar / 440 lpm. Observed pressure for 5 mins. Increased pressure and observed shear at 268 bar.", "dTimEnd": "2007-09-05T11:30:00+02:00", "dTimStart": "2007-09-05T10:45:00+02:00", "md": "2412", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Pulled out 4 m and set packer by applying 40 MT on top of PBR. Adjusted weight to 10 MT. Verifed new top of PBR to 2398.05 m MD.", "dTimEnd": "2007-09-05T12:00:00+02:00", "dTimStart": "2007-09-05T11:30:00+02:00", "md": "2408", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Closed UPR, lined up from cement unit to BOP, and pressure tested TSP packer and annulus to 180 bar - ok. Volumed pumped 1632 liters.", "dTimEnd": "2007-09-05T12:30:00+02:00", "dTimStart": "2007-09-05T12:00:00+02:00", "md": "2408", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "POOH with TSP setting tool on 5 1/2\" DP from 2408 to 2350 m MD. Observed hydraulic leak on aft PRS.", "dTimEnd": "2007-09-05T12:45:00+02:00", "dTimStart": "2007-09-05T12:30:00+02:00", "md": "2350", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Repaired hydraulic leak on aft PRS.", "dTimEnd": "2007-09-05T13:45:00+02:00", "dTimStart": "2007-09-05T12:45:00+02:00", "md": "2350", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Continued to POOH with TSP setting tool on 5 1/2\" DP from 2350 m to 200 m MD.", "dTimEnd": "2007-09-05T17:30:00+02:00", "dTimStart": "2007-09-05T13:45:00+02:00", "md": "200", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held toolbox talk. Removed automatic slips from rotary.", "dTimEnd": "2007-09-05T18:00:00+02:00", "dTimStart": "2007-09-05T17:30:00+02:00", "md": "200", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Continued to POOH with TSP setting tool from 200 m MD to surface. Laid down tool in basket on main deck.", "dTimEnd": "2007-09-05T19:00:00+02:00", "dTimStart": "2007-09-05T18:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "RIH with WBRRT on 5 1/2\" HWDP landing string. Latched on to 14\" WB at 140 m MD and pulled free with 30 MT overpull. Washed across subsea wellhead with 3000 lpm. POOH with WB/WBRRT on 5 1/2\" HWDP landing string.", "dTimEnd": "2007-09-05T21:00:00+02:00", "dTimStart": "2007-09-05T19:00:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Laid down WBRRT. Installed swedge and tested IBOP valves on TDS and standpipe valve to 35/345 bar 5/10 mins. \n\nMeanwhile :\n-Backloaded used casing. Loaded, tallied and laid out new casing in stb pipedeck bays. \n-Repaired hydraulic hose on topdrive\n-Tested valves on kill manifold to 35/345 bar 5/10 mins.", "dTimEnd": "2007-09-06T00:00:00+02:00", "dTimStart": "2007-09-05T21:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" } ]
[]
15_9_F_12_2007_09_07
NO 15/9-F-12
NO 15/9-F-12
name
2007-09-06T00:00:00+02:00
2007-09-07T00:00:00+02:00
normal
2018-05-03T13:51:51+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-07T00:00:00+02:00", "dTimDiaHoleStart": "2007-08-30T23:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "0", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Change casing handling gear. Make up 9 5/8\" x 10 3/4\" x-over. Run 10 3/4\" tie-back casing. Sting into PBR and land 10 3/4 hanger in subsea wellhead. POOH with landing string.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3480", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "86", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Loaded, laid out and tallied 9 5/8\" x 10 3/4\" tie-back casing. Ran 9 5/8\" casing to 790 m MD.", "tightWell": "0", "tvd": "3106.6", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2007-09-06T20:00:00+02:00", "density": "1.01", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "3520", "mudClass": "water based", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Seawater", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Rigged up casing OWS casing tong. Changed inserts in elevator. Redressed PS-21 slips.\n\nMeanwhile :\n-Backloaded used casing. Loaded, tallied and laid out new casing in stb pipedeck bays. \n", "dTimEnd": "2007-09-06T03:00:00+02:00", "dTimStart": "2007-09-06T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Backloaded used casing. Loaded, tallied and laid out new casing in stb pipedeck bays. \n\nMeanwhile :\n-Barriered off drillfloor and commenced service on forward PRS", "dTimEnd": "2007-09-06T05:30:00+02:00", "dTimStart": "2007-09-06T03:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Had to halt loading casing temporarily. Supply boat Island Frontier reported trouble which could affect station keeping. Boat pulled away temporarily.", "dTimEnd": "2007-09-06T06:00:00+02:00", "dTimStart": "2007-09-06T05:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Loaded, tallied and laid out new 10 3/4\" casing in aft stb/port bays. Produced running tally. Counted joints on deck. \n\nMeanwhile :\n-Pressure tested choke manifold to 35/345 bar 5/10 mins\n-Pressure tested TIW and gray valve to 35/345 bar 5/10 mins", "dTimEnd": "2007-09-06T14:00:00+02:00", "dTimStart": "2007-09-06T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Broke down TIW and Gray valve after pressure testing same.", "dTimEnd": "2007-09-06T14:30:00+02:00", "dTimStart": "2007-09-06T14:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held toolbox talk prior to running 9 5/8\" x 10 3/4\" tie-back casing. Picked up seal stem assy. Commenced to run in hole with 9 5/8\" casing. Got problem closing/functioning elevator. Halted operations to remedy situation.", "dTimEnd": "2007-09-06T15:00:00+02:00", "dTimStart": "2007-09-06T14:30:00+02:00", "md": "7", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Changed hydraulic fitting on BX elevator.", "dTimEnd": "2007-09-06T15:45:00+02:00", "dTimStart": "2007-09-06T15:00:00+02:00", "md": "7", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "RIH with 9 5/8\" tie-back casing from surface to 374 m MD. Observed high thread torque on several joints.Observed some dry boxes. Had to lay out joint #57, #52 and #48 due to 70% thread torque on JAM unit and damaged threads. Used contingency dope LubeSeal API mod as required on pin end after joint #48. Average running speed less 4 jnts/hr.", "dTimEnd": "2007-09-07T00:00:00+02:00", "dTimStart": "2007-09-06T15:45:00+02:00", "md": "374", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" } ]
[]
15_9_F_12_2007_09_08
NO 15/9-F-12
NO 15/9-F-12
name
2007-09-07T00:00:00+02:00
2007-09-08T00:00:00+02:00
normal
2018-05-03T13:51:51+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-08T00:00:00+02:00", "dTimDiaHoleStart": "2007-08-30T23:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "0", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Test MS-seal. POOH with PADPRT tool. Test well and seal stinger. Run 10 3/4\" lock down sub. Drift well. Pick up GT plug.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3480", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "87", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "None", "tightWell": "0", "tvd": "2106.6", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2007-09-07T20:00:00+02:00", "density": "1.01", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "3520", "mudClass": "water based", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Seawater", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "RIH with 9 5/8\" tie-back casing from 374 m to 798 m MD. Washed pin ends and applied contingency dope as required. Average running speed 6 jnts/hr.", "dTimEnd": "2007-09-07T06:00:00+02:00", "dTimStart": "2007-09-07T00:00:00+02:00", "md": "798", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Changed to 10 3/4\" BX3 elevator. Picked up and made up 9 5/8\" x 10 3/4\" x-over.", "dTimEnd": "2007-09-07T06:45:00+02:00", "dTimStart": "2007-09-07T06:00:00+02:00", "md": "796", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held toolbox talk. Removed PS-21 slips and changed to 10 3/4\" inserts, put slips back in rotary. Repositioned rollers on HTS. Adjusted PDM head.", "dTimEnd": "2007-09-07T07:30:00+02:00", "dTimStart": "2007-09-07T06:45:00+02:00", "md": "796", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held toolbox meeting prior to running 10 3/4\" tie-back casing. Ran 10 3/4\" casing from 796 m to 1505 m MD. Average running speed 8 jnts/hr. Experienced problems with HTS conveyer belt.", "dTimEnd": "2007-09-07T14:45:00+02:00", "dTimStart": "2007-09-07T07:30:00+02:00", "md": "1505", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Repaired conveyer belt.", "dTimEnd": "2007-09-07T16:30:00+02:00", "dTimStart": "2007-09-07T14:45:00+02:00", "md": "1505", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Continued to run 10 3/4\" tie-back casing. Average running speed 10 jnts/hr. Monkey arm on HTS jammed in upper position.", "dTimEnd": "2007-09-07T20:00:00+02:00", "dTimStart": "2007-09-07T16:30:00+02:00", "md": "1920", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Mærsk ET techican fixed problem on software.", "dTimEnd": "2007-09-07T20:30:00+02:00", "dTimStart": "2007-09-07T20:00:00+02:00", "md": "1920", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Continued to run 10 3/4\" tie-back casing from 1920 m to 2253 m MD.", "dTimEnd": "2007-09-08T00:00:00+02:00", "dTimStart": "2007-09-07T20:30:00+02:00", "md": "2253", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" } ]
[]
15_9_F_12_2007_09_09
NO 15/9-F-12
NO 15/9-F-12
name
2007-09-08T00:00:00+02:00
2007-09-09T00:00:00+02:00
normal
2018-05-03T13:51:52+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-09T00:00:00+02:00", "dTimDiaHoleStart": "2007-09-08T11:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "0", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Remove BOP. Latch claxton tool in riser and tranfer tension to block. Disconnect riser and pull same.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3480", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "88", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Tested MS seal. POOH with PADPRT tool. Tested 9 5/8\" x 10 3/4\" tie-back casing and PBR/seal stem. Ran 10 3/4\" hanger lock down sub. Ran 10 3/4\" casing drift to 1590 m MD. Installed GTV plug at 641 m MD, tested same from below and above. Prepared for removing diverter and nippling down BOP.", "tightWell": "0", "tvd": "2106.6", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2007-09-08T14:00:00+02:00", "density": "1.01", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "3520", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Seawater", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Picked up 6,05 m 10 3/4\" pup joint made up and RIH with same. Changed elveator. Picked up 10 3/4\" casing hanger, washed, inspected and doped threads. Made up 10 3/4\" casing hanger. Checked tally and counted joints left on deck - ok.", "dTimEnd": "2007-09-08T02:15:00+02:00", "dTimStart": "2007-09-08T00:00:00+02:00", "md": "2258", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Rigged down casing tong. Removed casing slips. Checked PADPRT tool.", "dTimEnd": "2007-09-08T03:30:00+02:00", "dTimStart": "2007-09-08T02:15:00+02:00", "md": "2258", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "RIH with 9 5/8\" x 10 3/4\" tie-back casing, hanger and PADPRT tool on 5 1/2\" HWDP landing string. Set depth counter at 2385 m MD. Took up and down weights 250/200 MT.", "dTimEnd": "2007-09-08T04:00:00+02:00", "dTimStart": "2007-09-08T03:30:00+02:00", "md": "2385", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Brought pumps up to 350 lpm and ran in hole with tie-back casing. Observed pressure increase and loosing weight at 2399 m MD. Stung approx 1 m further in and PBR locator in sealstem sheard out. Total sting in 2,7 m. Landed hanger at 140,1 m MD as per Vetco datum.", "dTimEnd": "2007-09-08T04:30:00+02:00", "dTimStart": "2007-09-08T04:00:00+02:00", "md": "2402", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Lined up to pump from cement unit up kill line through TDS. Performed low pressure test on sealstinger to 70 bar/10 min - ok. Recorded on chart.", "dTimEnd": "2007-09-08T05:15:00+02:00", "dTimStart": "2007-09-08T04:30:00+02:00", "md": "2402", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Adjusted block weight to 73 MT. Rotated string 4 turns clockwise to activate PADPRT tool, observed 8,5\" drop as intended. Closed UPR and pressured up above PADRT tool to 207 bar to set MS seal - ok.", "dTimEnd": "2007-09-08T06:00:00+02:00", "dTimStart": "2007-09-08T05:15:00+02:00", "md": "2402", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "With UPR closed, pressure tested MS seal from above to 35/345 bar 5 /10 min - ok. Released PADPRT tool according to Vetco instructions and POOH with same on 5 1/2\" HWDP landing string.", "dTimEnd": "2007-09-08T07:30:00+02:00", "dTimStart": "2007-09-08T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Flushed lines. Closed Shear ram. Pressure tested 9 5/8\" x 10 3/4\" tie-back casing and sealstem/PBR to 35/345 bar 5/10 min - ok. Pumped and bled back a total of 2637 liter, good correspondance with theoretical volume.", "dTimEnd": "2007-09-08T08:45:00+02:00", "dTimStart": "2007-09-08T07:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up 10 3/4\" lock down sub and RIH on 5 1/2\" HWDP landing string to 140 m. Set same according to Vetco instruction. Closed UPR and pressure tested lock down sub to 345 bar/10 min.", "dTimEnd": "2007-09-08T10:30:00+02:00", "dTimStart": "2007-09-08T08:45:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with RT on 5 1/2\" HWDP landing string.", "dTimEnd": "2007-09-08T11:30:00+02:00", "dTimStart": "2007-09-08T10:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Tidied drillfloor and removed casing running equipment for backload.", "dTimEnd": "2007-09-08T11:45:00+02:00", "dTimStart": "2007-09-08T11:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk. Picked up special 9,567\" casing drift and RIH with same on 5 1/2\" DP to 200 m MD.", "dTimEnd": "2007-09-08T12:30:00+02:00", "dTimStart": "2007-09-08T11:45:00+02:00", "md": "200", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed automatic slip. RIH with drift on 5 1/2\" DP and drifted well down to 1590 m MD. Observed 1-3 MT drag from 1439 m to 1536 m MD.", "dTimEnd": "2007-09-08T17:15:00+02:00", "dTimStart": "2007-09-08T12:30:00+02:00", "md": "1590", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with casing drift on 5 1/2\" DP and laid down same.", "dTimEnd": "2007-09-08T20:00:00+02:00", "dTimStart": "2007-09-08T17:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Built stand of 5 1/2\" HWDP.", "dTimEnd": "2007-09-08T20:45:00+02:00", "dTimStart": "2007-09-08T20:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up 10 3/4\" GTV plug assembly. RIH with GTV plug on 5 1/2\" HWDP/DP to 641 m MD. Measured 2 stands while running in. Took up/down weights 102/98 MT. Set GTV plug by applying clockwise rotation and alernating up down loads. Plug setting depth 641 m MD (mid packer element).", "dTimEnd": "2007-09-09T00:00:00+02:00", "dTimStart": "2007-09-08T20:45:00+02:00", "md": "642", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2007_09_10
NO 15/9-F-12
NO 15/9-F-12
name
2007-09-09T00:00:00+02:00
2007-09-10T00:00:00+02:00
normal
2018-05-03T13:51:52+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-10T00:00:00+02:00", "dTimDiaHoleStart": "2007-09-09T04:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "0", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Skid BOP. Run and make up Claxton tool to HPDR. WOW. Work on FWD PRS. Release tie-back connector and start pulling HPDR.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3480", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "89", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Removed diverter. Worked on stuck lock ring on overshot joint. Pulled overshot joint. Prepared for skidding BOP.", "tightWell": "0", "tvd": "3106.6", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2007-09-09T14:00:00+02:00", "density": "1.01", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "3520", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Seawater", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Lined up from cement unit and performed line test to 345 bar/10 min - ok. Pressured up below GTV plug through DP and tested to 345 bar/10 min. Pumped 2150 liter with good correpsondance to theroretical volume. Recovered only 1800 liter. Discussed situation. Decided to move ahead with operations.", "dTimEnd": "2007-09-09T02:30:00+02:00", "dTimStart": "2007-09-09T00:00:00+02:00", "md": "642", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Released from GTV plug and pumped 10 m3 hi-vis on top of plug. POOH with GTV plug setting tool on 5 1/2\" HWDP/DP. Laid down setting tool.", "dTimEnd": "2007-09-09T04:00:00+02:00", "dTimStart": "2007-09-09T02:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed shear ram and lined up cement unit to pump in BOP. Pressure tested above GTV plug to 345 bar / 10 min - ok. Volume pumped / bled back 863/830 liters.", "dTimEnd": "2007-09-09T04:30:00+02:00", "dTimStart": "2007-09-09T04:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up stand of drillpipe. Emptied BOP for water by blowing air down the DP.", "dTimEnd": "2007-09-09T05:15:00+02:00", "dTimStart": "2007-09-09T04:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed elevator and prepared slings for pulling diverter.", "dTimEnd": "2007-09-09T06:00:00+02:00", "dTimStart": "2007-09-09T05:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued preparing for releasing and pulling diverter.", "dTimEnd": "2007-09-09T06:45:00+02:00", "dTimStart": "2007-09-09T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior to pulling diverter.", "dTimEnd": "2007-09-09T07:00:00+02:00", "dTimStart": "2007-09-09T06:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attempted to pull diverter - nogo - stuck in diverter housing. Removed lid to access lock dogs. Inspected locks and found chunks of metal in cavities, verified lock dogs free to move. Adjusted elevation. Worked diverter up and down. Diverter came free. Lifted out and set down on drillfloor.", "dTimEnd": "2007-09-09T11:30:00+02:00", "dTimStart": "2007-09-09T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleared drillfloor. Transferred Claxton tool to drillfloor.", "dTimEnd": "2007-09-09T12:00:00+02:00", "dTimStart": "2007-09-09T11:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox meeting prior to nippling BOP overshot. Meanwhile worked on FWD PRS.\n", "dTimEnd": "2007-09-09T12:15:00+02:00", "dTimStart": "2007-09-09T12:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attempted to release lock ring on overshot. Used, C-spanner, chain hoists slings", "dTimEnd": "2007-09-09T17:00:00+02:00", "dTimStart": "2007-09-09T12:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Sourced torque tool for relasing flange on top of annular BOP instead of lock ring. Attempted to break bolts on flange - negative. Reverted to plan for releasing lock ring. Meanwhile reinforced C-spanners in mechanical workshop and continued work on PRS.", "dTimEnd": "2007-09-09T18:00:00+02:00", "dTimStart": "2007-09-09T17:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Worked to release overshot lock ring. Used C-spanner, chain hoists and slings. Meanwhile worked on FWD PRS.", "dTimEnd": "2007-09-10T00:00:00+02:00", "dTimStart": "2007-09-09T18:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" } ]
[]
15_9_F_12_2007_09_11
NO 15/9-F-12
NO 15/9-F-12
name
2007-09-10T00:00:00+02:00
2007-09-11T00:00:00+02:00
normal
2018-05-03T13:51:52+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-11T00:00:00+02:00", "dTimDiaHoleStart": "2007-09-09T04:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "0", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Pull HPDR. Transfer 4 x tension cylinders to Centralizer deck and mount same in Tensioning deck roof. ", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3480", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "90", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Nippled down BOP and set back on test stump. Made up Claxton tool to HPDR. WOW. Transferred tension from tensioning cylinders to block. Disassembeled tensioner assembly. Deployed ROV hotstab on tugger line and engaged in TBC.", "tightWell": "0", "tvd": "3106.6", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2007-09-10T14:00:00+02:00", "density": "1.01", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "3520", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Seawater", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Worked to release overshot lock ring. Used C-spanner, chain hoist. Rigged up eagle clamp and sheave. Pulled on lock ring C-spanner with tugger. Lock ring came free and was unscrewed by hand. Total thight turns approx 2,5. Meanwhile worked on FWD PRS.", "dTimEnd": "2007-09-10T03:30:00+02:00", "dTimStart": "2007-09-10T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Removed tools and slings from BOP. Attached sling to overshot and lifted same to drillfloor with tugger. Installed masterbushing, bushings and hole cover.", "dTimEnd": "2007-09-10T05:00:00+02:00", "dTimStart": "2007-09-10T03:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared for skidding BOP. Released NT-2 connector and removed obstacles in moonpool. Cleared and tidied drillfloor.", "dTimEnd": "2007-09-10T06:00:00+02:00", "dTimStart": "2007-09-10T05:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued nippling down BOP. Prepared for skidding BOP. Got problems with hydraulics on BOP trolley.", "dTimEnd": "2007-09-10T06:30:00+02:00", "dTimStart": "2007-09-10T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Troubleshot problems with BOP trolley.", "dTimEnd": "2007-09-10T07:15:00+02:00", "dTimStart": "2007-09-10T06:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Skidded BOP on trolley and landed same on test stump.", "dTimEnd": "2007-09-10T08:00:00+02:00", "dTimStart": "2007-09-10T07:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Helt toolbox talk prior to running Claxton tool.", "dTimEnd": "2007-09-10T08:15:00+02:00", "dTimStart": "2007-09-10T08:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up Claxton tool and made up to stand of 5 1/2\" HWDP.", "dTimEnd": "2007-09-10T10:15:00+02:00", "dTimStart": "2007-09-10T08:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk. Landed Claxton tool i NT-2 connector on HPDR. Made up Claxton tool to NT-2 with Hytorq tool. Applied 2700 ft lbs on studs.\n\nWeather at 1430 :\nWind 19 m /s\nHs 3,8 / max 7,5", "dTimEnd": "2007-09-10T14:30:00+02:00", "dTimStart": "2007-09-10T10:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Watied on weather. Meanwhile worked on PRS.", "dTimEnd": "2007-09-11T00:00:00+02:00", "dTimStart": "2007-09-10T14:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2007_09_12
NO 15/9-F-12
NO 15/9-F-12
name
2007-09-11T00:00:00+02:00
2007-09-12T00:00:00+02:00
normal
2018-05-03T13:51:52+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-12T00:00:00+02:00", "dTimDiaHoleStart": "2007-09-09T04:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "0", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Dismount and mount tension cylinders in Tensioning deck roof. Run production riser.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3480", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "91", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "WOW. Disconnected and pulled HPDR. Transferred tension cylinders to Tensioning deck. Dismount/mount tension cylinders.", "tightWell": "0", "tvd": "3106.6", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2007-09-11T14:00:00+02:00", "density": "1.01", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "3520", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Seawater", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Watied on weather. Meanwhile prepared for tranferring tension to block. Removed scaffolding and secured hatches on Centralizer deck.\n\nWeather at 0100 :\nWind 9,7 m /s\nHs 2,8 / max 4,1", "dTimEnd": "2007-09-11T01:00:00+02:00", "dTimStart": "2007-09-11T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held prejob meeting on Centralizer deck. Bled off pressure on tension cylinders and transferred 60 MT tension to block. Disconnected tension cylinder 1 and 3. Landed tensioner assembly on wooden chucks.", "dTimEnd": "2007-09-11T02:00:00+02:00", "dTimStart": "2007-09-11T01:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Disconnected cylinder 2 and 4 from tensioner assembly. Dismantled tensioner assembly. Removed tension ring. Removed boat collision stool and centralizer. Installed protector guides on Centralizer deck and landed tension ring in same. Installed protector guide on Tensioning deck. Meanwhile deployed hotstab on tuggerline through slot F-1. Engaged hotstab in hydraulic receptacle on TBC.\n\nWeather at 0600 :\nWind 6,7 m /s\nHs 2,2 / max 3,4\n", "dTimEnd": "2007-09-11T06:00:00+02:00", "dTimStart": "2007-09-11T02:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed scaffolding on Weatherdeck due to potential clash with HPDR riser. Tidied Centralizer deck.", "dTimEnd": "2007-09-11T06:45:00+02:00", "dTimStart": "2007-09-11T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on weather.", "dTimEnd": "2007-09-11T07:45:00+02:00", "dTimStart": "2007-09-11T06:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior to disconnecting HPDR from wellhead.", "dTimEnd": "2007-09-11T08:15:00+02:00", "dTimStart": "2007-09-11T07:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Set valves on HPDR TBC. Set down weight to 55 MT. Pressurised primary unlock on TBC through minireel and hotstab. Lifted clear of wellhead/template in one continuos stroke. Hung of on handling sub, broke off and set back 5 1/2\" DP stand. No VX-ring observed on wellhead - assumed still contained in TBC.", "dTimEnd": "2007-09-11T09:30:00+02:00", "dTimStart": "2007-09-11T08:15:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior installing riser spider.", "dTimEnd": "2007-09-11T09:45:00+02:00", "dTimStart": "2007-09-11T09:30:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed bushings. Installed riser spider.", "dTimEnd": "2007-09-11T10:45:00+02:00", "dTimStart": "2007-09-11T09:45:00+02:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with Tension joint and BOP joint double. Hung off in riser spider. Broke connection according to Vetco/Bandak procedure. Attached soft sling. Observed damage on soft slings. Halted operation to assess situation.", "dTimEnd": "2007-09-11T13:00:00+02:00", "dTimStart": "2007-09-11T10:45:00+02:00", "md": "121", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Inspected and rejected both soft sling. Searched for alternative slings - none onboard with sufficient SWL/lenght.", "dTimEnd": "2007-09-11T16:00:00+02:00", "dTimStart": "2007-09-11T13:00:00+02:00", "md": "121", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Slung Tension joint with 50 mm steel sling. Lifted same from drillfloor using deck crane. Laid down Tension joint in make up cradle on pipedeck.", "dTimEnd": "2007-09-11T18:00:00+02:00", "dTimStart": "2007-09-11T16:00:00+02:00", "md": "121", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with 22\" HPDR. Removed fairrings while pulling out. Broke connections according to Vetco/Bandak procedure. Laid down doubles in port side storage rack.", "dTimEnd": "2007-09-12T00:00:00+02:00", "dTimStart": "2007-09-11T18:00:00+02:00", "md": "56", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2007_09_13
NO 15/9-F-12
NO 15/9-F-12
name
2007-09-12T00:00:00+02:00
2007-09-13T00:00:00+02:00
normal
2018-05-03T13:51:52+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-13T00:00:00+02:00", "dTimDiaHoleStart": "2007-09-09T04:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "0", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Make up tension joint. Make up DP landing stand and run in and land production riser. Make up tensioning assembly, centralizer and boat collision stool on tensioning joint. Disconnect DP running flange.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3480", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "92", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Dismounted and mounted tension cylinders. RIH with production riser to 100 m MD.", "tightWell": "0", "tvd": "3106.6", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2007-09-12T14:00:00+02:00", "density": "1.01", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "3520", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Seawater", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Broke last connection between last doble and TBC joint. Laid out last double and put in port side storage rack. Pulled TBC joint. Inspected lock cavity on TBC, no VX-ring recovered. Slung TBC joint with heavy lift sling and laid down same on pipedeck. Secured rotary. Tidied drillfloor.", "dTimEnd": "2007-09-12T02:30:00+02:00", "dTimStart": "2007-09-12T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Brought 4 tension cylinder to drillfloor. Prepared for mounting cherry picker.", "dTimEnd": "2007-09-12T02:30:00+02:00", "dTimStart": "2007-09-12T02:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Not allowed access in wellhead module due to ongoing pressure testing on gas lift system. Discussed situation and adjusted barriers accordingly. Meanwhile mounted cherry picker on drillfloor.", "dTimEnd": "2007-09-12T04:00:00+02:00", "dTimStart": "2007-09-12T03:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Transferred 4 tension cylinders from drillfloor to Tensioning deck. Meanwhile mounted cherry picker on drillfloor.", "dTimEnd": "2007-09-12T04:30:00+02:00", "dTimStart": "2007-09-12T04:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Dismounted/mounted cylinders on Centralizer deck with tugger support from moonpool. Meanwhile mounted cherry picker on drillfloor.", "dTimEnd": "2007-09-12T06:00:00+02:00", "dTimStart": "2007-09-12T04:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Continued to dismount/mount tension cylinders in Tensioning deck roof. Used tugger support from moonpool for lifting cylinders.", "dTimEnd": "2007-09-12T13:00:00+02:00", "dTimStart": "2007-09-12T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Prepared for running production riser. Made up Tension joint handling tool to 6 m pup joint. Configured riser spider for running production riser. Prepared tension ring and protector guide in wellhead module.", "dTimEnd": "2007-09-12T14:30:00+02:00", "dTimStart": "2007-09-12T13:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed SJA / toolbox talk prior to running production riser.", "dTimEnd": "2007-09-12T15:00:00+02:00", "dTimStart": "2007-09-12T14:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up TBC joint and hung off in spider. Removed handling tool. Picked up lower pup joint and landed same on TBC joint. Made up flanged connection according to Vetco/bandak procedure. Installed fairring accross connection.", "dTimEnd": "2007-09-12T17:00:00+02:00", "dTimStart": "2007-09-12T15:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Placed TBC in in level with scaffolding on Weatherdeck. Function tested TBC according to Vetco instruction. Installed dummy stabs. Oriented lock/unlock panel to 45 deg starboard aft.", "dTimEnd": "2007-09-12T21:00:00+02:00", "dTimStart": "2007-09-12T17:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed handling tool on production riser flange in riser spider. Lifted 1st double with dual lift on block and deckcrane. Made up flanged connection according to Vetco/Bandak procedure. Installed fairring on coupling. Ran in and placed TBC connector in level with Centralizer deck. Prepared guidewires in slot F-11 and F-13. Built scaffolding/barriers around deck openings.", "dTimEnd": "2007-09-13T00:00:00+02:00", "dTimStart": "2007-09-12T21:00:00+02:00", "md": "20", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2007_09_14
NO 15/9-F-12
NO 15/9-F-12
name
2007-09-13T00:00:00+02:00
2007-09-14T00:00:00+02:00
normal
2018-05-03T13:51:52+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-14T00:00:00+02:00", "dTimDiaHoleStart": "2007-09-09T04:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Install tension ring and cylinders, and tensioning up system. Completion suspended - operation on 15/9-F-7.", "hpht": "0", "md": "139", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "93", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "RIH with PR tensioner joint. MU PR landing stand, RIH and landed riser. Locked TBC connector. Waited on Simens rig ESD test. Pressure tested PR to 200 bar. Install centralizer and boat collision stool on centralizer deck. ", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2007-09-13T14:00:00+02:00", "density": "1.01", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "3520", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Seawater", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Attached ROV hooks to guide slings. Made rope loop for retrieval of ROV hooks and guide sling clamp. Hauled guidewires with ROV hooks through Centralizer deck, ran to sealevel. Landed 1 st double in riser spider. Ran guidewires individually to 20 m above seabed.", "dTimEnd": "2007-09-13T01:00:00+02:00", "dTimStart": "2007-09-13T00:00:00+02:00", "md": "52", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed handling tool. Lifted 2nd double to drillfloor with dual lift on block and deck crane. Made up flanged connection according to Vetco/Bandak procedure. RIH with 2nd double. Meanwhile hooked up hydraulics on tension cylinders.", "dTimEnd": "2007-09-13T03:00:00+02:00", "dTimStart": "2007-09-13T01:00:00+02:00", "md": "80", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted 3rd double to drillfloor with dual lift on block an deck crane. Removed handling joint. Made up flanged connection according to Vetco procedure. Meanwhile hooked up hydraulics on tension cylinders.", "dTimEnd": "2007-09-13T05:15:00+02:00", "dTimStart": "2007-09-13T03:00:00+02:00", "md": "80", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted tension joint to Horizontal position. Hoisted handling flange with 6 m pup joint to horizontal posistion with tuggers and made up to tension joint. RIH with 3rd double and landed in spider. Prepared for lifting tension joint to vertical position.", "dTimEnd": "2007-09-13T06:00:00+02:00", "dTimStart": "2007-09-13T05:15:00+02:00", "md": "100", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted tension joint to vertical position and MU tension joint flange to upper pup joint.", "dTimEnd": "2007-09-13T09:00:00+02:00", "dTimStart": "2007-09-13T06:00:00+02:00", "md": "100", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Split riser spider and removed same.", "dTimEnd": "2007-09-13T10:00:00+02:00", "dTimStart": "2007-09-13T09:00:00+02:00", "md": "100", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with tension joint and installed master bushing. MU 5 1/2\" landing stand to handling sub.", "dTimEnd": "2007-09-13T11:00:00+02:00", "dTimStart": "2007-09-13T10:00:00+02:00", "md": "100", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared ROV to assist landing of PR. Verified that the VX-ring had been installed and checked F-12 well head.", "dTimEnd": "2007-09-13T11:30:00+02:00", "dTimStart": "2007-09-13T11:00:00+02:00", "md": "100", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed guidewires and lined up to 18 3/4\" sub sea WH. Hook load prior to landing was 97 MT.", "dTimEnd": "2007-09-13T13:00:00+02:00", "dTimStart": "2007-09-13T11:30:00+02:00", "md": "100", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed hot stab in receptacle A and set valves on TBC locking panel to \"primary lock\" position using ROV. Landed TBC on 18 3/4\" WH and sat down 15 MT.", "dTimEnd": "2007-09-13T14:15:00+02:00", "dTimStart": "2007-09-13T13:00:00+02:00", "md": "139", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared to set TBC according to Vetco procedures. Pressurized the TBC to 2500 psi using pump and minireel in moonpool. Did not get alignment indicating proper locking of TBC.", "dTimEnd": "2007-09-13T15:30:00+02:00", "dTimStart": "2007-09-13T14:15:00+02:00", "md": "139", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Had shut down for Siemens \"shut down and fire pump logic\" (ESD tests).", "dTimEnd": "2007-09-13T17:30:00+02:00", "dTimStart": "2007-09-13T15:30:00+02:00", "md": "139", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Unlocked TBC and repeated connetion procedures according to Vetco instructions. Pressurized the TBC to 3000 psi using pump and minireel in moonpool. Got alignment indicating proper locking of TBC. Sat all valves on lock panel A into \"parking position\". Performed 20 MT overpull test on H4-MUSL connector (TBC) with TDS. Slacked off to 10 MT overpull. Sat TBC valves on flush panel B to \"lower dog flush\".", "dTimEnd": "2007-09-13T19:30:00+02:00", "dTimStart": "2007-09-13T17:30:00+02:00", "md": "139", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Had shut down for Siemens \"shut down and fire pump logic\" (ESD tests).", "dTimEnd": "2007-09-13T22:30:00+02:00", "dTimStart": "2007-09-13T19:30:00+02:00", "md": "139", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Installed centralizer and boat collision stool on centralizer deck. Prepared for skidding cantilever.", "dTimEnd": "2007-09-14T00:00:00+02:00", "dTimStart": "2007-09-13T22:30:00+02:00", "md": "139", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2007_09_15
NO 15/9-F-12
NO 15/9-F-12
name
2007-09-14T00:00:00+02:00
2007-09-15T00:00:00+02:00
normal
2018-05-03T13:51:52+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-09-15T00:00:00+02:00", "dTimDiaHoleStart": "2007-09-09T04:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Suspended operation to F-7.", "hpht": "0", "md": "0", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "94", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "MU tensioner ring assembly. POOH and LD PR RT. Installed hatch on F-12 and suspended operation to F-7.", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2007-09-14T14:00:00+02:00", "density": "1.01", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "3520", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Seawater", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Continued to install centralizer and boat collision stool on centralizer deck. Meanwhile had shut down for Siemens \"shut down and fire pump logic\" (ESD tests). Restarted all systems.", "dTimEnd": "2007-09-14T02:30:00+02:00", "dTimStart": "2007-09-14T00:00:00+02:00", "md": "139", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed bleed off valve on tension joint and lined up to fill riser. Held tool box meeting prior to filling riser and performing pressure test. Filled riser using CMT pump and venting air through valve on tension joint. Kept 10 MT overpull on PR.", "dTimEnd": "2007-09-14T04:00:00+02:00", "dTimStart": "2007-09-14T02:30:00+02:00", "md": "139", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed pressure test of PR to 20 bar/5 min. Volume pumped 70 ltr. Attempted to move TDS to keep tension in PR during pressure testing.", "dTimEnd": "2007-09-14T04:30:00+02:00", "dTimStart": "2007-09-14T04:00:00+02:00", "md": "139", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Software problem on TDS (drawworks).", "dTimEnd": "2007-09-14T05:00:00+02:00", "dTimStart": "2007-09-14T04:30:00+02:00", "md": "139", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Pressured up PR riser against well/GTV plug to 200 bar and compensated TDS to keep riser in tension. Performed pressure test of PR to 200 bar/10 min. Volume pumped 440 ltr.", "dTimEnd": "2007-09-14T05:30:00+02:00", "dTimStart": "2007-09-14T05:00:00+02:00", "md": "139", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared to pumpe corrosion inhibitor through port B1 on TBC using minireel and Vetco pump. Meanwhile finished installing centralizer and boat collision stool on centralizer deck", "dTimEnd": "2007-09-14T06:00:00+02:00", "dTimStart": "2007-09-14T05:30:00+02:00", "md": "139", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "MU tensioner ring assembly on centralizer deck. Meanwhile prepared rig for skidding and changed liners and piston fluid ends in MP2.", "dTimEnd": "2007-09-14T07:00:00+02:00", "dTimStart": "2007-09-14T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Commisioned all 4 new tension cylinders.", "dTimEnd": "2007-09-14T09:30:00+02:00", "dTimStart": "2007-09-14T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "MU tensioner ring assembly on centralizer deck. Meanwhile retrieved riser guide wires from wellhead template and performed area inspection for high wind forcast procedure.", "dTimEnd": "2007-09-14T19:00:00+02:00", "dTimStart": "2007-09-14T09:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed security bolt on RT from PR and POOH. LD RT and 20 ft pup joint. Installed hatch on F-12 and suspended operation to F-7.", "dTimEnd": "2007-09-14T20:45:00+02:00", "dTimStart": "2007-09-14T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2007_10_12
NO 15/9-F-12
NO 15/9-F-12
name
2007-10-11T00:00:00+02:00
2007-10-12T00:00:00+02:00
normal
2018-05-03T13:51:52+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-10-12T00:00:00+02:00", "dTimDiaHoleStart": "2007-10-11T03:15:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "0", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "None", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "96", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Skidded rig from F-12 to F-15. Changed wire on port aft crane big hook.", "tightWell": "0", "tvd": "0", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "Prepared Rig for skidding and skidded rig from F7 to F12.", "dTimEnd": "2007-10-11T05:00:00+02:00", "dTimStart": "2007-10-11T03:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Skidded the cantilever 1.5 metres to SB.", "dTimEnd": "2007-10-11T05:15:00+02:00", "dTimStart": "2007-10-11T05:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lowered down the well head valves.", "dTimEnd": "2007-10-11T06:00:00+02:00", "dTimStart": "2007-10-11T05:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2007_12_31
NO 15/9-F-12
NO 15/9-F-12
name
2007-12-30T00:00:00+01:00
2007-12-31T00:00:00+01:00
normal
2018-05-03T13:51:52+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-12-31T00:00:00+01:00", "dTimDiaHoleStart": "2007-10-11T03:15:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Run 10 3/4\" Tie Back casing to surface. Run primary bowl protector in surface wellhead. MU and RIH GTV pulling tool and DP.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "97", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Built scaffolding at the well head deck and in the moon pool. Installed surface riser, BOP and tension cylinders. ", "tightWell": "0", "tvd": "3107.8", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2007-12-30T22:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Seawater", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2007-12-31T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "3520", "readingKind": "estimated" } ]
[]
[ { "comments": "Prepared main deck for skidding.\n", "dTimEnd": "2007-12-30T12:15:00+01:00", "dTimStart": "2007-12-30T11:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to skidding of the cantilever.\n", "dTimEnd": "2007-12-30T12:30:00+01:00", "dTimStart": "2007-12-30T12:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Skidded cantilever from F-15 to F-12\n", "dTimEnd": "2007-12-30T14:15:00+01:00", "dTimStart": "2007-12-30T12:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed stairs to the cantilever. Removed well head hatches. \n", "dTimEnd": "2007-12-30T16:00:00+01:00", "dTimStart": "2007-12-30T14:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared for pick up the surface riser. \n", "dTimEnd": "2007-12-30T17:00:00+01:00", "dTimStart": "2007-12-30T16:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to pick up the surface riser.\n", "dTimEnd": "2007-12-30T17:15:00+01:00", "dTimStart": "2007-12-30T17:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up the surface riser, removed protector. Meanwhile built scaffolding in the moon pool.\n", "dTimEnd": "2007-12-30T18:15:00+01:00", "dTimStart": "2007-12-30T17:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed the master bushing, ran in with the surface riser. Meanwhile built scaffolding at the well head deck.\n", "dTimEnd": "2007-12-30T20:00:00+01:00", "dTimStart": "2007-12-30T18:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned the NT2 well head connector. Landed and made up the surface riser.\n", "dTimEnd": "2007-12-30T23:00:00+01:00", "dTimStart": "2007-12-30T20:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to nippling up the BOP.\n", "dTimEnd": "2007-12-30T23:15:00+01:00", "dTimStart": "2007-12-30T23:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared for nippling up the BOP, moved the BOP from the set back stump.\n", "dTimEnd": "2007-12-31T00:00:00+01:00", "dTimStart": "2007-12-30T23:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2008_01_01
NO 15/9-F-12
NO 15/9-F-12
name
2007-12-31T00:00:00+01:00
2008-01-01T00:00:00+01:00
normal
2018-05-03T13:51:53+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-01T00:00:00+01:00", "dTimDiaHoleStart": "2007-10-11T03:15:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Install 10 3/4\" Tie Back casing to surface. ", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "98", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Nippled up slick jnt, diverter and torqued up the BOP. RIH and installed the Bowl Protector at 20.9 m. Retrieved the Annulus Insert at 139.9 m. Retrieved the Bowl Protector.\n\n", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2007-12-31T22:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "3520", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-01-01T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "3520", "readingKind": "estimated" } ]
[]
[ { "comments": "Moved the tension cylinders aside to be able to move the BOP in position over the surface riser. Aligned the BOP and the surface riser and landed the BOP. Meanwhile picked up and prepared the diverter for installation.\n", "dTimEnd": "2007-12-31T03:30:00+01:00", "dTimStart": "2007-12-31T00:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed the tension cylinders. Pressure tested the stand pipe manifold 20/345 bar 5/10 mins.", "dTimEnd": "2007-12-31T06:00:00+01:00", "dTimStart": "2007-12-31T03:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Nippled up slick jnt, diverter and torqued up the BOP/Surface riser NT2 connector. Rigged down the diverter handling equipment. Pressure tested IBOP to 20/345 bars 5/10 mins.\n", "dTimEnd": "2007-12-31T12:45:00+01:00", "dTimStart": "2007-12-31T06:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to pressure test the BOP, surface riser and the well head connection against GT plug. Pressure tested same to 20/200 bars 5/10 mins.", "dTimEnd": "2007-12-31T13:45:00+01:00", "dTimStart": "2007-12-31T12:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop activities", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to installation of the Bowl Protector.\n", "dTimEnd": "2007-12-31T14:00:00+01:00", "dTimStart": "2007-12-31T13:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged 5½\" DP handling equipment and made up slick joint.\n", "dTimEnd": "2007-12-31T14:45:00+01:00", "dTimStart": "2007-12-31T14:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up Bowl Protector running tool.\n", "dTimEnd": "2007-12-31T15:30:00+01:00", "dTimStart": "2007-12-31T14:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH and installed the Bowl Protector at 20.9 m. Success on second attempt.\n", "dTimEnd": "2007-12-31T16:30:00+01:00", "dTimStart": "2007-12-31T15:30:00+01:00", "md": "20.9", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to retrieve the Annulus Insert in Subsea WH. Uncertainty with regards to length of landing string\n", "dTimEnd": "2007-12-31T16:45:00+01:00", "dTimStart": "2007-12-31T16:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up the Annulus Insert retrieving tool. RIH with the Annulus Insert retrieving tool on HWDP. Slow operation to get correct landing string lenght.\n", "dTimEnd": "2007-12-31T17:45:00+01:00", "dTimStart": "2007-12-31T16:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "RIH and tagged the Annulus Insert at 139.9 m. Pulled back 1.24 m took over pull of 40 MT. Attempted pass obstruction by turning the string 90º and 180º. Rotated the string with 2 RPM, passed obstruction. \n", "dTimEnd": "2007-12-31T19:30:00+01:00", "dTimStart": "2007-12-31T17:45:00+01:00", "md": "139.9", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with the Annulus insert retrieving tool for inspection.\n", "dTimEnd": "2007-12-31T21:00:00+01:00", "dTimStart": "2007-12-31T19:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Inspected the Annulus Insert retrieving tool. Found lock pin slightly bend but still operational. \n", "dTimEnd": "2007-12-31T21:15:00+01:00", "dTimStart": "2007-12-31T21:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with the Annulus Insert retrieving tool from surface to 122 m.\n", "dTimEnd": "2007-12-31T22:00:00+01:00", "dTimStart": "2007-12-31T21:15:00+01:00", "md": "122", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Took parameters prior to engage and retrieve the Annulus Insert. Open annular up/down weight 82/79 MT / 4 RPM / 400 Nm. Closed annular up/down weight 82/79 MT / 4 RPM / 400 Nm.\n", "dTimEnd": "2007-12-31T22:45:00+01:00", "dTimStart": "2007-12-31T22:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH from 122 m and tagged the Annulus Insert at 139.9 m, set down 2 MT.\n", "dTimEnd": "2007-12-31T23:15:00+01:00", "dTimStart": "2007-12-31T22:45:00+01:00", "md": "139.9", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rotated string and entered the J-slot. Set down 2 MT.\n", "dTimEnd": "2007-12-31T23:30:00+01:00", "dTimStart": "2007-12-31T23:15:00+01:00", "md": "139.9", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed annular and confirmed the engagement of the J-slot with 1 MT over pull. Marked string and turned string 3 turns to the left. Keeping the weight below 1½ MT set down weight and torque below 2 kNm. Marked string and measured 3 turns = 1¼\".\n", "dTimEnd": "2007-12-31T23:45:00+01:00", "dTimStart": "2007-12-31T23:30:00+01:00", "md": "139.9", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Monitored for possible annulus pressure.\n", "dTimEnd": "2008-01-01T00:00:00+01:00", "dTimStart": "2007-12-31T23:45:00+01:00", "md": "139.9", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2008_01_02
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-01T00:00:00+01:00
2008-01-02T00:00:00+01:00
normal
2018-05-03T13:51:53+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-02T00:00:00+01:00", "dTimDiaHoleStart": "2007-10-11T03:15:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Activate adjustable casing sub. Install Bowl Protector. MU Odfjell special drift and RIH and drift 10 3/4\" casing. Retrieve the GT plug. ", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "99", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "RIH with 10 3/4\" Tie Back and made up into sub sea well. Pressure tested Tie Back connector to 345 bars. Attempted to lock the Surface hanger, with the Adjustment sub. \n\n", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-01T22:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "3520", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-01-02T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "3520", "readingKind": "estimated" } ]
[]
[ { "comments": "Rotated the string 3 + ½ turn to the left, kept the weight below 1½ MT set down weight and torque below 2 kNm. Marked string and measured 3(½) turns = 1¼\". Total backed out with the Annulus Insert = 2½\". Corrected according to Vetco procedure.\n", "dTimEnd": "2008-01-01T00:45:00+01:00", "dTimStart": "2008-01-01T00:00:00+01:00", "md": "139.9", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled back from 139.9 m to 138 m. Took weight at 138.6 m 10 MT. Rotated the string and passed the obstruction.\n", "dTimEnd": "2008-01-01T01:00:00+01:00", "dTimStart": "2008-01-01T00:45:00+01:00", "md": "138", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Displaced the riser to completion fluid at 1000 lpm / 1.5 bars. Total volume pumped 30 m³.\n", "dTimEnd": "2008-01-01T01:30:00+01:00", "dTimStart": "2008-01-01T01:00:00+01:00", "md": "138", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with the Annulus Insert. Inspected the Annulus Insert. Found no damage.\n", "dTimEnd": "2008-01-01T02:45:00+01:00", "dTimStart": "2008-01-01T01:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up HWDP stand and measured from mark when engaged the Annulus Insert. Accumulated length 140.01 m.\n", "dTimEnd": "2008-01-01T03:30:00+01:00", "dTimStart": "2008-01-01T02:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to run and retrieve the Bowl Protector in surface WH.\n", "dTimEnd": "2008-01-01T03:45:00+01:00", "dTimStart": "2008-01-01T03:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up and made of the Bowl Protector retrieving tool.\n", "dTimEnd": "2008-01-01T04:15:00+01:00", "dTimStart": "2008-01-01T03:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with Bowl Protector retrieving tool and set down at 20 m. Attempted to work string down to 20.9 m as Bowl Protector was reported installed previous to day. POOH after 2 attempts.\n", "dTimEnd": "2008-01-01T05:15:00+01:00", "dTimStart": "2008-01-01T04:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "OOH with Bowl Protector retrieving tool. Inspected the tool found no marks. Measured length from landing shoulder to Bowl Protector retrieving tool nose = 0.8 m. Painted landing shoulder white. RIH with Bowl Protector retrieving tool. Tagged at 20 m. Turned one round to the right. POOH with Bowl Protector retrieving tool and retrieved the Bowl Protector.\n", "dTimEnd": "2008-01-01T05:30:00+01:00", "dTimStart": "2008-01-01T05:15:00+01:00", "md": "20", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with Jetting sub and commenced washing the surface well head area.", "dTimEnd": "2008-01-01T06:00:00+01:00", "dTimStart": "2008-01-01T05:30:00+01:00", "md": "20", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Washed the surface well head area. 2200 lpm used 20m³ completion fluid. POOH with Jet washing assy. and laid out same. \n", "dTimEnd": "2008-01-01T06:45:00+01:00", "dTimStart": "2008-01-01T06:00:00+01:00", "md": "20", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and cleared the rig floor.\n", "dTimEnd": "2008-01-01T07:00:00+01:00", "dTimStart": "2008-01-01T06:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to make up Spear assy. Made up Spear assy and racked back in derrick.\n", "dTimEnd": "2008-01-01T08:00:00+01:00", "dTimStart": "2008-01-01T07:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged up 10 3/4\" casing handling equipment.\n", "dTimEnd": "2008-01-01T10:00:00+01:00", "dTimStart": "2008-01-01T08:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Tool box talk prior to make up and run 10 3/4\" Tie- back assy.\n", "dTimEnd": "2008-01-01T10:30:00+01:00", "dTimStart": "2008-01-01T10:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "No crane available due to Helicopter. Meanwhile positioned the MST seal running tool on the rig floor. Inspected the MST running tool and confirmed leakages.\n", "dTimEnd": "2008-01-01T11:45:00+01:00", "dTimStart": "2008-01-01T10:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up Drillquip Tie Back connector to 10 3/4\" casing and ran in hole from surface to 108 m.\n", "dTimEnd": "2008-01-01T15:00:00+01:00", "dTimStart": "2008-01-01T11:45:00+01:00", "md": "108", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to pick/make up the 10 3/4\" hanger. Performed same.\n", "dTimEnd": "2008-01-01T15:45:00+01:00", "dTimStart": "2008-01-01T15:00:00+01:00", "md": "108", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed elevator to 5½\" DP elevator.\n", "dTimEnd": "2008-01-01T16:15:00+01:00", "dTimStart": "2008-01-01T15:45:00+01:00", "md": "108", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked/made up spear assy and connected same up to top drive. Drained the riser. String weight 12 MT.\n", "dTimEnd": "2008-01-01T17:00:00+01:00", "dTimStart": "2008-01-01T16:15:00+01:00", "md": "108", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with Tie Back string and set down 2 MT in Sub surface WH. \n", "dTimEnd": "2008-01-01T17:45:00+01:00", "dTimStart": "2008-01-01T17:00:00+01:00", "md": "140.1", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up Tie Back connection, turned the string 5 right hand turns. Applied 5000 ft/lbs to energize the metal seal. After 3 turns the spear released due to torque friction in Tie Back connector. Re-engaged spear and took over pull of 11 MT completed the 5 turns with final torque of 5000 ft/lbs. Verified space out by observing correct colour code through the surface WH B-annulus valve.", "dTimEnd": "2008-01-01T19:15:00+01:00", "dTimStart": "2008-01-01T17:45:00+01:00", "md": "104.1", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with the Spear assy. Racked back same in derrick.\n", "dTimEnd": "2008-01-01T20:15:00+01:00", "dTimStart": "2008-01-01T19:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box prior to rig down 10 3/4\" casing handling equipment. Rigged down same.\n", "dTimEnd": "2008-01-01T21:45:00+01:00", "dTimStart": "2008-01-01T20:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to RIH with Straddle cup tester. Made up and ran in with Straddle cup tester from surface to 138 m.\n", "dTimEnd": "2008-01-01T23:15:00+01:00", "dTimStart": "2008-01-01T21:45:00+01:00", "md": "138", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked/made up pump in sub and cement hose. Spaced out prior to test Tie-back connector 139 m.\n", "dTimEnd": "2008-01-02T00:00:00+01:00", "dTimStart": "2008-01-01T23:15:00+01:00", "md": "139", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2008_01_03
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-02T00:00:00+01:00
2008-01-03T00:00:00+01:00
normal
2018-05-03T13:51:53+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-03T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-02T22:15:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Retrieve the GTV plug. RIH with Clean out assy and wash the well. RIH and install the 10 3/4\" MS seal.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "100", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "RIH with Adjustment sub setting tool and made up the Adjustment sub. Installed the secondary Bowl protector. Picked/made up 9.567\"drift. RIH with 9.567\" drift from surface to 150 m. POOH with same. RIH with the GTV plug retrieving tool from surface and tagged GTV plug at 635.4 m. Circulated out the HI-vis pill over shakers.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-02T15:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "3520", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-01-03T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "3520", "readingKind": "estimated" } ]
[]
[ { "comments": "Flushed cement line and pressure tested line to 50/345 bars 5/10 mins. \n", "dTimEnd": "2008-01-02T00:45:00+01:00", "dTimStart": "2008-01-02T00:00:00+01:00", "md": "139", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressure tested Tie-Back connector to 50/345 bars 10/10 mins. Volume pumped 82 litres bled off 80 litres. Observed no pressure building up in B-annulus.\n", "dTimEnd": "2008-01-02T01:15:00+01:00", "dTimStart": "2008-01-02T00:45:00+01:00", "md": "139", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged down cement hose and pump in sub. POOH with Straddle cup tester from 139 m to surface. Hung up at 22 m. OOH with the Straddle cup tested. The lower cup tester had minor damaged. Changed out same. Laid out the Starddle cup test assy.\n", "dTimEnd": "2008-01-02T03:15:00+01:00", "dTimStart": "2008-01-02T01:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to making up the Adjustment sub setting tool.\n", "dTimEnd": "2008-01-02T03:30:00+01:00", "dTimStart": "2008-01-02T03:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked/made up the Adjustment sub setting tool. RIH from surface to 21 m. Took weight. Turned string 90º and passed obstruction. Continued RIH to 27.5 m.\n", "dTimEnd": "2008-01-02T04:30:00+01:00", "dTimStart": "2008-01-02T03:30:00+01:00", "md": "27.5", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Applied 140 bars to the Adjustment sub setting tool. Slowly pulled up to land in Latching ring groove and took over pull of 30 MT. String at ±27.1 m. Bled off the pressure in the string and kept the tension. Rotated the string at 2700 - 3000 Nm 17 turns. No travelling movement of the casing hanger. Observed through the B-annulus valve. When picked up the 30 MT over pull the casing hanger moved ± 2 cm up.\n", "dTimEnd": "2008-01-02T05:30:00+01:00", "dTimStart": "2008-01-02T04:30:00+01:00", "md": "27.1", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "POOH with Adjustment sub setting tool. Checked and function tested the Adjustment sub setting tool. No marks operated ok.", "dTimEnd": "2008-01-02T06:00:00+01:00", "dTimStart": "2008-01-02T05:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Changed out to back up Adjustment sub setting tool.\n", "dTimEnd": "2008-01-02T07:30:00+01:00", "dTimStart": "2008-01-02T06:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Evaluation meeting with onshore organisation. Meanwhile performed general maintenance on the rig floor.\n", "dTimEnd": "2008-01-02T11:30:00+01:00", "dTimStart": "2008-01-02T07:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held tool box talk prior to RIH with the Adjustment sub setting tool.\n", "dTimEnd": "2008-01-02T11:45:00+01:00", "dTimStart": "2008-01-02T11:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Attempted to turn the Adjustment sub setting tool string using chain tongs. Made up TDS: RIH with Adjustment sub setting tool. Engaged the Adjustment sub setting tool in the vertical key slots. Turned string 10 turns to the right using the TDS, with 6000 Nm torque. Landed off the casing hanger, verified the Adjustment sub travel of 17 cm. By observation through B-annulus at WH. Released torque.\nApplied 140 bars to the Adjustment sub setting tool. Picked up 30 MT over pull, bled off the pressure. Turned the Adjustment sub setting tool 4 turns with 2 - 3 kNm, unable to engage the vertical key slots to torque up the casing hanger. Retracted the Adjustment sub setting tool. POOH with the Adjustment sub setting tool.\n", "dTimEnd": "2008-01-02T13:00:00+01:00", "dTimStart": "2008-01-02T11:45:00+01:00", "md": "27", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Evaluation meeting with onshore organisation. Meanwhile performed general maintenance on the rig floor.\n", "dTimEnd": "2008-01-02T16:15:00+01:00", "dTimStart": "2008-01-02T13:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "RIH with Adjustment sub setting tool. Applied 140 bars to the Adjustment sub setting tool. Took 10 MT over pull. Bled off the pressure. Ran back in 1cm, and pulled up slowly with 2 RPM rotation and engaged the vertical key slots. Applied 140 bars to the Adjustment sub setting tool. Took 30 MT over pull, bled off the pressure. Turned the string 1 turn to the right, and made up the casing hanger sleeve to 9500 Nm, total 11 turns. Retracted the Adjustment sub setting tool. POOH with the Adjustment sub setting tool.\n", "dTimEnd": "2008-01-02T17:30:00+01:00", "dTimStart": "2008-01-02T16:15:00+01:00", "md": "27", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up the Straddle cup tester. RIH and positioned the straddle cup tester across the Adjustment sub. Pressure tested same 20/345 bars 5/10 mins.", "dTimEnd": "2008-01-02T19:00:00+01:00", "dTimStart": "2008-01-02T17:30:00+01:00", "md": "29", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to POOH with Straddle cup tester and lay out same. Performed same.", "dTimEnd": "2008-01-02T20:15:00+01:00", "dTimStart": "2008-01-02T19:00:00+01:00", "md": "29", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box prior to lay out Red Baron Spear assy. Performed same.\n", "dTimEnd": "2008-01-02T21:15:00+01:00", "dTimStart": "2008-01-02T20:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH and installed secondary Bowl protector at 20 m.\n", "dTimEnd": "2008-01-02T22:15:00+01:00", "dTimStart": "2008-01-02T21:15:00+01:00", "md": "20", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleared the rig floor. Held tool box talk prior to pick/make up 9.567\" drift.\n", "dTimEnd": "2008-01-02T22:45:00+01:00", "dTimStart": "2008-01-02T22:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked/made up 9.567\" drift. RIH with 9.567\" drift from surface to 45 m.", "dTimEnd": "2008-01-03T00:00:00+01:00", "dTimStart": "2008-01-02T22:45:00+01:00", "md": "45", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2008_01_04
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-03T00:00:00+01:00
2008-01-04T00:00:00+01:00
normal
2018-05-03T13:51:53+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-04T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-03T16:45:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "M/U 10 3/4\" scraper. Scrape and clean dedicated areas in the well and displace to packer fluid. POOH with clean out string. Wait for MS seal setting tool arriving on supply boat. Perform general maintenance.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3480", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "101", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Pulled GTV plug. Attempted to break MS-seal setting tool - nogo. Reinstalled nominal seat protector. Ran 7\" x 9 5/8\" x 10 3/4\" cleanout string to 1800 m MD.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-03T15:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "0", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-01-04T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "140", "readingKind": "estimated" } ]
[]
[ { "comments": "Continued RIH with 9.567\" drift from 45 m to 150 m.", "dTimEnd": "2008-01-03T00:30:00+01:00", "dTimStart": "2008-01-03T00:00:00+01:00", "md": "150", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with 9.567\" drift from 150 m to surface. Laid out the 9.567\" drift.", "dTimEnd": "2008-01-03T02:00:00+01:00", "dTimStart": "2008-01-03T00:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to make/pick up GTV plug retrieving tool. Performed same.\n", "dTimEnd": "2008-01-03T02:15:00+01:00", "dTimStart": "2008-01-03T02:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed to power slips.\n", "dTimEnd": "2008-01-03T02:30:00+01:00", "dTimStart": "2008-01-03T02:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with the GTV plug retrieving tool from surface to 630 m.\n", "dTimEnd": "2008-01-03T04:30:00+01:00", "dTimStart": "2008-01-03T02:30:00+01:00", "md": "630", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up to TDS and took up/down weight 93/88 MT neutral 91 MT. Rotated the string at 10 RPM with 2 kNm.\n", "dTimEnd": "2008-01-03T04:45:00+01:00", "dTimStart": "2008-01-03T04:30:00+01:00", "md": "630", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH and tagged plug at 635.4 m. Set down 12 MT picked up 20 MT over pull. Slacked off the neutral weight and turned the string ¼ turn to the left. Pulled up and the GTV plug retrieving tool had disengaged the GTV plug. \n", "dTimEnd": "2008-01-03T05:00:00+01:00", "dTimStart": "2008-01-03T04:45:00+01:00", "md": "635.4", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up and circulated down string with 200 lpm / 5 RPM / 1000 Nm, 0.5 m above the plug. Pulled out 2.5 m increased rate 1100 - 2400 lpm / 30 RPM. Washed out the Hi-vis pill over shakers.", "dTimEnd": "2008-01-03T05:45:00+01:00", "dTimStart": "2008-01-03T05:00:00+01:00", "md": "625", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with the GTV plug retrieving tool to engage the GTV plug at 635.4 m.\n", "dTimEnd": "2008-01-03T06:00:00+01:00", "dTimStart": "2008-01-03T05:45:00+01:00", "md": "634", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Latched GTV plug with LTCT retrieval tool according to BOT instructions. Released plug and allowed rubber element to relax for 15 mins prior to pulling plug.", "dTimEnd": "2008-01-03T07:15:00+01:00", "dTimStart": "2008-01-03T06:00:00+01:00", "md": "641", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with GTV plug from 641 m to 21 m MD on 5 1/2\" DP. Removed PS-21 slips and installed masterbushing.", "dTimEnd": "2008-01-03T11:15:00+01:00", "dTimStart": "2008-01-03T07:15:00+01:00", "md": "20", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled LTCT head/GTV plug to surface. Observed nominal seat protector caught with GTV plug. Prepared for working on MS-seal setting tool.", "dTimEnd": "2008-01-03T11:30:00+01:00", "dTimStart": "2008-01-03T11:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up 13 3/8\" MS-seal setting tool. Attempted to dismantle/split tool - nogo. Laid down MS-seal setting tool.", "dTimEnd": "2008-01-03T16:15:00+01:00", "dTimStart": "2008-01-03T11:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Picked up 13 3/8\" seat protector running tool. RIH and installed nominal seat protector in surface wellhead at 20 m MD.", "dTimEnd": "2008-01-03T16:45:00+01:00", "dTimStart": "2008-01-03T16:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior to making up 7\" x 9 5/8\" x 10 3/4\" clean out string.", "dTimEnd": "2008-01-03T17:00:00+01:00", "dTimStart": "2008-01-03T16:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed from 5 1/2\" to 3 1/2\" handling gear. Picked up clean out assy #1 comprising of 7\" scraper and magnet subs and hung off in rotary.", "dTimEnd": "2008-01-03T17:30:00+01:00", "dTimStart": "2008-01-03T17:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleared rigfloor. Prepared well control equipment.", "dTimEnd": "2008-01-03T18:00:00+01:00", "dTimStart": "2008-01-03T17:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior to picking up 3 1/2\" singles. Ran 3 1/2\" drillpipe to 425 m MD.", "dTimEnd": "2008-01-03T21:45:00+01:00", "dTimStart": "2008-01-03T18:00:00+01:00", "md": "425", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up kick joint with FOSV and tested same - ok.", "dTimEnd": "2008-01-03T22:30:00+01:00", "dTimStart": "2008-01-03T21:45:00+01:00", "md": "425", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed from 3 1/2\" to 5\" handling equipment. Picked up and made up clean out assy #2 comprising of X-over, PBR mill and liner top dress mill.", "dTimEnd": "2008-01-04T00:00:00+01:00", "dTimStart": "2008-01-03T22:30:00+01:00", "md": "432", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2008_01_05
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-04T00:00:00+01:00
2008-01-05T00:00:00+01:00
normal
2018-05-03T13:51:53+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-05T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-03T16:45:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Wait on weather for performing repair on FWD PRS. Repair FWD PRS. Clean well and displace well to packer fluid. POOH with cleaning string.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3480", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "102", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Made up 10 3/4\" scrapers and RIH with clean out string to 2290 m MD. Observed dropped object from FWD PRS, securing pins for vertical hose bundel had come loose and fallen off due to the strong winds. Waited on weather for performing repair on FWD PRS. Meanwhile performed housekeeping and maintenance.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-04T10:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-01-05T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "140", "readingKind": "estimated" } ]
[]
[ { "comments": "Picked up and made up clean out assy #3 comprising of 9 5/8\" scraper, magnet, drift and x-over. Cleared rigfloor. Checked dies on PRS. Moved 2 ea damaged 5 1/2\" drillpipe stands.", "dTimEnd": "2008-01-04T01:00:00+01:00", "dTimStart": "2008-01-04T00:00:00+01:00", "md": "443", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with clean out assemblies on 5\" DP from 443 m to 893 m MD.", "dTimEnd": "2008-01-04T02:30:00+01:00", "dTimStart": "2008-01-04T01:00:00+01:00", "md": "893", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed toolbox talk / handover meeting with new drilling crew.", "dTimEnd": "2008-01-04T03:00:00+01:00", "dTimStart": "2008-01-04T02:30:00+01:00", "md": "893", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to RIH with clean out assemblies on 5\" DP from 893 m to 1800 m MD.", "dTimEnd": "2008-01-04T06:00:00+01:00", "dTimStart": "2008-01-04T03:00:00+01:00", "md": "1800", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with clean out assemblies from 1800 m to 1885 m MD. Picked up and made up clean out assy#4 comprising of 10 3/4\" scraper, magnet and x-over to 5 1/2\" DP.", "dTimEnd": "2008-01-04T07:00:00+01:00", "dTimStart": "2008-01-04T06:00:00+01:00", "md": "1885", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with clean out assemblies from 1885 m to 1930 m MD on 5 1/2\" DP.", "dTimEnd": "2008-01-04T07:30:00+01:00", "dTimStart": "2008-01-04T07:00:00+01:00", "md": "1930", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Checked tugger lines and FWD PRS due to high winds in the range of 50-60 knots.", "dTimEnd": "2008-01-04T07:45:00+01:00", "dTimStart": "2008-01-04T07:30:00+01:00", "md": "1930", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to RIH with clean out assemblies from 1930 m to 2290 m MD on 5 1/2\" DP. Observed dropped object from FWD PRS vertical hose bundel. Halted operation for further investigation.", "dTimEnd": "2008-01-04T09:15:00+01:00", "dTimStart": "2008-01-04T07:45:00+01:00", "md": "2290", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Investigated situation. Found 3 ea hose bundle securing pins dropped to rigfloor. Each pin approx 20 cm / 220 grammes. Halted operation as it was impossible to repair the damage due to high winds.", "dTimEnd": "2008-01-04T09:45:00+01:00", "dTimStart": "2008-01-04T09:15:00+01:00", "md": "2290", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waiting on improved weather conditions to perform repair on FWD PRS. Wind speed 60 knots.\n\nMeanwhile :\n-Performed general maintenance on aft IR\n-Performed general housekeeping and cleaning in moonpool, rigfloor, shakers and pitroom\n-Put protectors on pin end of 7\" tubing laid out on deck\n", "dTimEnd": "2008-01-05T00:00:00+01:00", "dTimStart": "2008-01-04T09:45:00+01:00", "md": "2290", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" } ]
[]
15_9_F_12_2008_01_06
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-05T00:00:00+01:00
2008-01-06T00:00:00+01:00
normal
2018-05-03T13:51:53+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-06T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-03T16:45:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Build scaffolding for access to AFT PRS. Repair AFT PRS.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3480", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "103", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Waited on weather for inspecting FWD PRS. Inspected FWD PRS and found dragchain severely damaged. Prepared for building scaffolding for repair of AFT PRS. Waited for weather to build scaffolding. Waited on qualified rest for scaffolding crew.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-05T21:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-01-06T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "140", "readingKind": "estimated" } ]
[]
[ { "comments": "Waiting on improved weather conditions to perform repair on FWD PRS. Wind speed 60-70 knots.\n\nMeanwhile :\n-Performed general housekeeping \n-Secured drillstring and parked TDS for maintenance\n-Injected slop in F-12 annulus\n-Prepared spare parts and tools for performing PRS repair\n-Inspected and tested completion assemblies", "dTimEnd": "2008-01-05T06:00:00+01:00", "dTimStart": "2008-01-05T00:00:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Waitied on improved weather conditions to perform inspection and repair of FWD PRS.\n\nMeanwhile :\n-Performed general cleaning in moonpool, pitroom and shakers\n-Injected slop/overflush in F-12 annulus. Insufficient overflush due to exceeded pressure limit.", "dTimEnd": "2008-01-05T12:30:00+01:00", "dTimStart": "2008-01-05T06:00:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Performed derrick inspection after high winds.", "dTimEnd": "2008-01-05T14:00:00+01:00", "dTimStart": "2008-01-05T12:30:00+01:00", "md": "2334", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Inspected FWD PRS. Dragchain and hoses were severly twisted and partly torn down. Assessed situation and found damage to severe for immediate repair. Prepared for making repairs on AFT PRS instead.", "dTimEnd": "2008-01-05T17:00:00+01:00", "dTimStart": "2008-01-05T14:00:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held toolbox talk prior to using work basket.", "dTimEnd": "2008-01-05T17:15:00+01:00", "dTimStart": "2008-01-05T17:00:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Inspected FWD PRS dragchain for loose items, removed and secured accordingly.", "dTimEnd": "2008-01-05T18:15:00+01:00", "dTimStart": "2008-01-05T17:15:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Brought scaffolding material to drillfloor and prepared for buliding scaffolding in derrick. Found that scaffolding job could not commence due to high winds and working hours regulations.", "dTimEnd": "2008-01-05T20:00:00+01:00", "dTimStart": "2008-01-05T18:15:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Waited on improved weather condtions and/or qualified rest for scaffolding crew.\n\nMeanwhile :\n-Changed oil cooler on TDS\n-Performed general cleaning in moonpool, pitroom and shakers\n", "dTimEnd": "2008-01-06T00:00:00+01:00", "dTimStart": "2008-01-05T20:00:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" } ]
[]
15_9_F_12_2008_01_07
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-06T00:00:00+01:00
2008-01-07T00:00:00+01:00
normal
2018-05-03T13:51:53+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-07T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-03T16:45:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Repair AFT PRS.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3480", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "104", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Built scaffolding in derrick. Worked on aft PRS. Waited for qualified rest of scaffolding crews.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-06T21:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-01-07T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "140", "readingKind": "estimated" } ]
[]
[ { "comments": "Waited on qualified rest for scaffolding crew.\n\nMeanwhile :\n-Changed oil cooler on TDS\n-Brought scaffolding material to derrick\n-Emptied skimmer tank\n-Made measurements for spare parts on FWD PRS\n-Checked and measured completion assemblies\n", "dTimEnd": "2008-01-06T06:00:00+01:00", "dTimStart": "2008-01-06T00:00:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Seafastened AFT PRS.", "dTimEnd": "2008-01-06T07:45:00+01:00", "dTimStart": "2008-01-06T06:00:00+01:00", "md": "2235", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held toolbox talk prior to building scaffolding around AFT PRS. Built scaffolding. Prepared security net for installation underneath AFT PRS working area.", "dTimEnd": "2008-01-06T17:00:00+01:00", "dTimStart": "2008-01-06T07:45:00+01:00", "md": "2235", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held toolbox talk. Installed canvas around scaffolding. Prepared for installing security net. Had to abort manriding operations due to maintenance of Siemens system and risk of main power loss.", "dTimEnd": "2008-01-06T17:30:00+01:00", "dTimStart": "2008-01-06T17:00:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Performed upgrade of Siemens system. Meanwhile continued to install canvas around scaffolding. Prepared lights for installation on scaffolding work platform.", "dTimEnd": "2008-01-06T19:30:00+01:00", "dTimStart": "2008-01-06T17:30:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Installed security net around AFT PRS scaffolding platform. Transferred tools and equipment to derrrick.", "dTimEnd": "2008-01-06T22:15:00+01:00", "dTimStart": "2008-01-06T19:30:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Mechanics worked on AFT PRS.", "dTimEnd": "2008-01-06T23:30:00+01:00", "dTimStart": "2008-01-06T22:15:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held toolbox talk. Rigged down security net due to wrong allignment/position of PRS relative to scaffolding platform.", "dTimEnd": "2008-01-07T00:00:00+01:00", "dTimStart": "2008-01-06T23:30:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" } ]
[]
15_9_F_12_2008_01_08
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-07T00:00:00+01:00
2008-01-08T00:00:00+01:00
normal
2018-05-03T13:51:53+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-08T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-03T16:45:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Repair AFT PRS.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3480", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "105", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Performed repair work on AFT PRS upper drive. Meanwhile laid out TCP guns, tested Siemens/ESD system and lifted Xmas tree to moonpool.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-07T21:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-01-08T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "140", "readingKind": "estimated" } ]
[]
[ { "comments": "Waited on qualified rest for scaffolding crews.\n\nMeanwhile :\n-Continued rigging down security net\n-Performed service on TDS\n-Tested MS-seal setting tool\n-General houskeeipng in drilling areas", "dTimEnd": "2008-01-07T06:00:00+01:00", "dTimStart": "2008-01-07T00:00:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Prepared for removing scaffolding around AFT PRS.", "dTimEnd": "2008-01-07T07:30:00+01:00", "dTimStart": "2008-01-07T06:00:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Removed part of scaffolding around AFT PRS.", "dTimEnd": "2008-01-07T09:30:00+01:00", "dTimStart": "2008-01-07T07:30:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Turned AFT PRS 180 deg for better access to upper drive / shaft.", "dTimEnd": "2008-01-07T09:45:00+01:00", "dTimStart": "2008-01-07T09:30:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Installed security net underneath AFT PRS.", "dTimEnd": "2008-01-07T10:45:00+01:00", "dTimStart": "2008-01-07T09:45:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Rebuilt scaffolding around AFT PRS. Meanwhile laid out TCP guns on top of tubing in STB AFT bay.", "dTimEnd": "2008-01-07T12:30:00+01:00", "dTimStart": "2008-01-07T10:45:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Performed repair work on AFT PRS upper drive. Meanwhile tested Siemens/ESD system.", "dTimEnd": "2008-01-07T16:00:00+01:00", "dTimStart": "2008-01-07T12:30:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Not able to do effective/continuous repair of AFT PRS due to interruptions in power supply from ongoing test of Siemens/ESD system.", "dTimEnd": "2008-01-07T21:30:00+01:00", "dTimStart": "2008-01-07T16:00:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Finished testing of Siemens/ESD system. Worked on AFT PRS upper drive.", "dTimEnd": "2008-01-08T00:00:00+01:00", "dTimStart": "2008-01-07T21:30:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" } ]
[]
15_9_F_12_2008_01_09
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-08T00:00:00+01:00
2008-01-09T00:00:00+01:00
normal
2018-05-03T13:51:53+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-09T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-03T16:45:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Repair AFT PRS. Function test AFT PRS. Secure FWD PRS. Remove scaffolding from derrick.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3480", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "106", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Performed repair work on AFT PRS upper drive. Waited on improved weather condictions for continuing repair work. Meanwhile tested DCI hose, installed debris caps on wellheads and attempted to inject slop in F-12 annulus.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-08T15:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-01-09T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "140", "readingKind": "estimated" } ]
[]
[ { "comments": "Performed repair work on AFT PRS upper drive. Meanwhile removed cantilever hatch and prepared for lifting Xmas tree from transport basket to moonpool.", "dTimEnd": "2008-01-08T02:00:00+01:00", "dTimStart": "2008-01-08T00:00:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Function pipe rams and HCR's on BOP - ok. Function tested annular preventer - closing time 42 sec versus requirement of 30 s. Meanwhile performed repair work on AFT PRS upper drive.", "dTimEnd": "2008-01-08T02:30:00+01:00", "dTimStart": "2008-01-08T02:00:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "drilling -- bop activities", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed repair work on AFT PRS upper drive.\n\nMeanwhile :\n-Lifted Xmas tree from moonpool\n-Prepared hose from moonpool to wellhead\n-Laid out 7\" pup joints", "dTimEnd": "2008-01-08T06:00:00+01:00", "dTimStart": "2008-01-08T02:30:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Performed repair work on AFT PRS upper drive\n\nMeanwhile :\n-Cleaned cameras in derrick\n-Worked on dragchain for crane in moonpool\n-Tested new V-ICIS software for mudpumps\n-Reset V-ICIS control system after power shut down\n-Prepared subsea caps for wellheads/conductor", "dTimEnd": "2008-01-08T19:00:00+01:00", "dTimStart": "2008-01-08T06:00:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Performed repair work on AFT PRS upper drive. Halted repair work due to high winds above set limitations for working in heights. Winds > 40 knots.", "dTimEnd": "2008-01-08T22:00:00+01:00", "dTimStart": "2008-01-08T19:00:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Waited for weather condtions to improve for resuming AFT PRS repair work.\n\nMeanwhile :\n-Lifted subseas caps from main deck to Centralizer deck\n-ROV closed valve on DCI hose for pressure testing", "dTimEnd": "2008-01-09T00:00:00+01:00", "dTimStart": "2008-01-08T22:00:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" } ]
[]
15_9_F_12_2008_01_10
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-09T00:00:00+01:00
2008-01-10T00:00:00+01:00
normal
2018-05-03T13:51:53+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-10T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-03T16:45:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Repair AFT PRS. Function test AFT PRS. Secure FWD PRS. Remove scaffolding from derrick. Resume well cleaning operation.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3480", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "107", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Waited for weather condtions to improve for resuming AFT PRS repair work.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-09T21:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-01-10T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "140", "readingKind": "estimated" } ]
[]
[ { "comments": "Waited for weather condtions to improve for resuming AFT PRS repair work.\n\nMeanwhile :\n-Blinded pop off and tested DCI hose using cement unit to 200 bar / 10 min - ok\n-ROV opened valve on DCI hose\n-Installed debris caps on F-5, F-14 and F-15 wellheads\n-Removed temporary cap and installed debris cap on F-1 conductor\n-Attempted to inject slop in F-12 annulus. Pressure bulit up rapildly, 190 bar at approx 1 m3 pumped\n-Operated/functioned annular preventer to gain faster closing time\n", "dTimEnd": "2008-01-09T06:00:00+01:00", "dTimStart": "2008-01-09T00:00:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Waited for weather condtions to improve for resuming AFT PRS repair work.\n\nMeanwhile :\n-Removed lead target in cement unit test line\n-Performed general maintenance in drilling areas\n-Cleaned pits\n\nWinds :\n12:00 81 knots\n14:00 61 knots\n16:00 56 knots\n18:00 70 knots\n20:00 53 knots\n22:00 64 knots", "dTimEnd": "2008-01-10T00:00:00+01:00", "dTimStart": "2008-01-09T06:00:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" } ]
[]
15_9_F_12_2008_01_11
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-10T00:00:00+01:00
2008-01-11T00:00:00+01:00
normal
2018-05-03T13:51:54+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-11T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-03T16:45:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Calibrate AFT RPS. Calibrate block height. RIH, clean packer setting areas and dress off PBR. Displace well to packer fluid. POOH with clean out string.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3480", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "108", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Repaired AFT PRS. Secured FWD PRS. Removed scaffolding from derrick.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "Waited for weather condtions to improve for resuming AFT PRS repair work.\n\nMeanwhile :\n-Performed maintenance on BX elevators\n-Function tested annular preventer, 28 seconds to close (determined from readback pressure)\n-Drained mainfold line to wellhead\n-Performed derrick inspection prior to resume work on AFT PRS\n-Inspected scaffolding in derrick\n\nWinds :\n24:00 53 knots\n02:00 40 knots\n", "dTimEnd": "2008-01-10T03:00:00+01:00", "dTimStart": "2008-01-10T00:00:00+01:00", "md": "2235", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Performed derrick inspect after period of high winds. Inspected scaffolding work platform.", "dTimEnd": "2008-01-10T04:00:00+01:00", "dTimStart": "2008-01-10T03:00:00+01:00", "md": "2235", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Waited for weather condtions to improve for resuming AFT PRS repair work.\n\nWinds :\n04:00 40 knots\n06:00 39 knots", "dTimEnd": "2008-01-10T05:30:00+01:00", "dTimStart": "2008-01-10T04:00:00+01:00", "md": "2235", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Performed crown block inspection prior to accessing scaffolding platform for continued repair.", "dTimEnd": "2008-01-10T06:00:00+01:00", "dTimStart": "2008-01-10T05:30:00+01:00", "md": "2235", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Continued working on AFT PRS upper drive. \n\nMeanwhile :\n-Assisted in repairing AFT PRS\n-Cleaned pits\n-Functioned flowline isolation valve wih 1450 psi\n-Function tested AFT PRS", "dTimEnd": "2008-01-10T15:45:00+01:00", "dTimStart": "2008-01-10T06:00:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held toolbox talk prior to remvoing scaffolding.", "dTimEnd": "2008-01-10T16:00:00+01:00", "dTimStart": "2008-01-10T15:45:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Removed tools and equipment from AFT PRS scaffolding platform.", "dTimEnd": "2008-01-10T16:30:00+01:00", "dTimStart": "2008-01-10T16:00:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Assissted scaffolding crews in removing scaffolding from derrick.", "dTimEnd": "2008-01-10T19:00:00+01:00", "dTimStart": "2008-01-10T16:30:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held toolbox talk / handover meeting for continuation of removing scaffolding.", "dTimEnd": "2008-01-10T19:15:00+01:00", "dTimStart": "2008-01-10T19:00:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Waited on weather conditions to improve for continuing removing scaffolding.", "dTimEnd": "2008-01-10T21:30:00+01:00", "dTimStart": "2008-01-10T19:15:00+01:00", "md": "2335", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Waited on weather condictons to improve. Wind speed 56 knots.", "dTimEnd": "2008-01-10T22:30:00+01:00", "dTimStart": "2008-01-10T21:30:00+01:00", "md": "2235", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Checked FWD PRS for losse items. Secured FWD PRS by wrapping damaged parts with security net.", "dTimEnd": "2008-01-11T00:00:00+01:00", "dTimStart": "2008-01-10T22:30:00+01:00", "md": "2235", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" } ]
[]
15_9_F_12_2008_01_12
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-11T00:00:00+01:00
2008-01-12T00:00:00+01:00
normal
2018-05-03T13:51:54+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-12T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-03T16:45:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "POOH with cleaning string. Set and test seal assembly in 10 3/4\" hanger. Test BOP. ", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3480", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "109", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Calibrated rig equipment after power shut down(s). Resumed well claning operation and RIH with cleaning string. Scraped and cleaned packer setting areas as required. Dressed of 7\" liner PBR. Displaced well to 1,03 sg packer fluid. Flowchecked well. POOH with cleaning string to 3200 m MD.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-11T00:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-01-12T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "140", "readingKind": "estimated" } ]
[]
[ { "comments": "Continued to secure FWD PRS.", "dTimEnd": "2008-01-11T02:30:00+01:00", "dTimStart": "2008-01-11T00:00:00+01:00", "md": "2235", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held toolbox talk prior to removing scaffolding from derrick.", "dTimEnd": "2008-01-11T02:45:00+01:00", "dTimStart": "2008-01-11T02:30:00+01:00", "md": "2235", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Removed scaffolding from derrick.", "dTimEnd": "2008-01-11T05:45:00+01:00", "dTimStart": "2008-01-11T02:45:00+01:00", "md": "2235", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Calibrated block height after ESD power shut down.", "dTimEnd": "2008-01-11T06:00:00+01:00", "dTimStart": "2008-01-11T05:45:00+01:00", "md": "2235", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Calibrated crown block. Re-set I-VICIS software for rig equipment after power shut down(s).", "dTimEnd": "2008-01-11T09:15:00+01:00", "dTimStart": "2008-01-11T06:00:00+01:00", "md": "2235", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held toolbox talk prior to installing PS-21 automatic slips and RIH. Installed PS-21.", "dTimEnd": "2008-01-11T09:30:00+01:00", "dTimStart": "2008-01-11T09:15:00+01:00", "md": "2235", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "RIH with clean out assemblies on 5 1/2\" DP from 2235 m to 2376 m MD.", "dTimEnd": "2008-01-11T10:15:00+01:00", "dTimStart": "2008-01-11T09:30:00+01:00", "md": "2376", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up TDS to cleaning string. Scraped and cleaned FLX packer area from 500 m to 520 m MD with 10 3/4\" scraper. Pumped 80 m3 contamianted brine at 2500 lpm while reciprocating and rotating pipe at 60 RPM. Max torque 9 kNm. Up/down weights 146/117 MT.", "dTimEnd": "2008-01-11T11:00:00+01:00", "dTimStart": "2008-01-11T10:15:00+01:00", "md": "2407", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with clean out assemblies on 5 1/2\" DP from 2407 m to 2578 m MD. Could not release PS-21 slips after connection.", "dTimEnd": "2008-01-11T11:45:00+01:00", "dTimStart": "2008-01-11T11:00:00+01:00", "md": "2578", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Repaired on PS-21 slips. Released slips. Exchanged PS-21 with PS-30 slips.", "dTimEnd": "2008-01-11T17:00:00+01:00", "dTimStart": "2008-01-11T11:45:00+01:00", "md": "2578", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "RIH with scraper assemblies from 2578 m to 3080 m MD.", "dTimEnd": "2008-01-11T19:45:00+01:00", "dTimStart": "2008-01-11T17:00:00+01:00", "md": "3080", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up TDS to cleaning string. Scraped and cleaned gun hanger area from 3080 m to 3100 m MD with 7\" scraper. Pumped SW at 1500 lpm while reciprocating and rotating pipe at 60 RPM. Max torque 17 kNm. Up/down weights 144/125 MT. Made connection and observed U-tube from well due to overweight brine pumped at an earlier stage. Scraped and cleaned area from 3100 m to 3105 m MD. Total volume pumped approx 30 m3.", "dTimEnd": "2008-01-11T21:15:00+01:00", "dTimStart": "2008-01-11T19:45:00+01:00", "md": "3107", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with scraper assemblies from 3107 m to 3425 m mD.", "dTimEnd": "2008-01-11T23:00:00+01:00", "dTimStart": "2008-01-11T21:15:00+01:00", "md": "3425", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up TDS to cleaning string. Scraped and cleaned production packer setting area from 2980 m to 3000 m MD with 9 5/8\" scraper. Pumped 30 m3 of SW at 1500 lpm while reciprocating and rotating pipe at 60 RPM.", "dTimEnd": "2008-01-11T23:30:00+01:00", "dTimStart": "2008-01-11T23:00:00+01:00", "md": "3442", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Recorded parameters while circulating and rotating : Flow 1100 lpm / 50 RPM / Up weight 167 MT / Down weight 145 MT / Torque 25 kNm / SPP 72 bar. Took Up/down weight without circulation and rotation : Up weight 190 / Down weight 134 MT. Set torque limit to 27 kNm. RIH while circualting at 1100 LPM and rotating 50 RPM. Tagged top of PBR at 3026,2 m MD (bit depth 3457,9 m MD). String stalled out due to excessive torque, relaxed weight to regain rotation, which fluctuated between 20-50 RPM. Picked up above PBR. Ran back in to 3026 m (bit depth 3457,7 m MD) and dressed PBR for 1 min. Max torque 27 kNm.", "dTimEnd": "2008-01-12T00:00:00+01:00", "dTimStart": "2008-01-11T23:30:00+01:00", "md": "3458", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2008_01_13
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-12T00:00:00+01:00
2008-01-13T00:00:00+01:00
normal
2018-05-03T13:51:54+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-13T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-03T16:45:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "POOH with clean out string. Lay down scrapers and top dress mill. Lay down 3 1/2\" DP. Pull nominal bowl protector. Set MS-seal and test upper tie-back. Run test plug and test BOP. Set nominal bowl protector.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3480", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "110", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "POOH with cleaning string to 2175 m MD. Halted operation due to ongoing ESD testing. Tested IBOPs. Performed ESD testing. Re-set rig equipment after power shut down. POOH with cleaning string from 2175 m to 735 m MD.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-12T00:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-01-13T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "140", "readingKind": "estimated" } ]
[]
[ { "comments": "Picked string 5 m above PBR and marked pipe for lowest reciprocation depth. \n", "dTimEnd": "2008-01-12T00:15:00+01:00", "dTimStart": "2008-01-12T00:00:00+01:00", "md": "3453", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed toolbox talk prior to displacing well from treated SW to 1,03 packer fluid.", "dTimEnd": "2008-01-12T00:30:00+01:00", "dTimStart": "2008-01-12T00:15:00+01:00", "md": "3453", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Added Oxygen scavenger and prepared for displacement.", "dTimEnd": "2008-01-12T00:45:00+01:00", "dTimStart": "2008-01-12T00:30:00+01:00", "md": "3453", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pumped 20 m3 hivis Soap pill followed by 20 m3 TSW spacer and 245 m3 1,03 sg packer fluid. Reciprocated and rotated pipe with 50 RPM. Pump rate 3300-3500 lpm. SPP 214-234 bar. Sampled returns and made consecutive NTU readings : 780/485/388/340/>1000/477/387/339/303 NTU.", "dTimEnd": "2008-01-12T02:30:00+01:00", "dTimStart": "2008-01-12T00:45:00+01:00", "md": "3453", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke off and set back 1 stand of 5 1/2\" DP. Observed U-tube from annulus to pipe.", "dTimEnd": "2008-01-12T02:45:00+01:00", "dTimStart": "2008-01-12T02:30:00+01:00", "md": "3453", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Mixed more 1,03 sg packer fluid for filling well when POOH. Meanwhile observed well.", "dTimEnd": "2008-01-12T04:15:00+01:00", "dTimStart": "2008-01-12T02:45:00+01:00", "md": "3453", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Emptied SW from trip tanks. Filled triptanks. Topped up welll with 1,2 m3 packer fluid.", "dTimEnd": "2008-01-12T04:30:00+01:00", "dTimStart": "2008-01-12T04:15:00+01:00", "md": "3453", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with cleaning assemblies from 3453 m to 3216 m MD on 5 1/2\" DP.", "dTimEnd": "2008-01-12T06:00:00+01:00", "dTimStart": "2008-01-12T04:30:00+01:00", "md": "3216", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with cleaning assemblies from 3216 m to 2175 m MD.", "dTimEnd": "2008-01-12T08:45:00+01:00", "dTimStart": "2008-01-12T06:00:00+01:00", "md": "2175", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior to moving PS-30 automatic slips.", "dTimEnd": "2008-01-12T09:00:00+01:00", "dTimStart": "2008-01-12T08:45:00+01:00", "md": "2175", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed PS-30 automatic slips and inserted masterbushing. Conducted kick drill. Secured well prior to ESD testing.", "dTimEnd": "2008-01-12T09:15:00+01:00", "dTimStart": "2008-01-12T09:00:00+01:00", "md": "2175", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed swedge on TDS for pressure testing IBOP.", "dTimEnd": "2008-01-12T09:30:00+01:00", "dTimStart": "2008-01-12T09:15:00+01:00", "md": "2175", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior to pressure testing TDS and manifold.", "dTimEnd": "2008-01-12T09:45:00+01:00", "dTimStart": "2008-01-12T09:30:00+01:00", "md": "2175", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Tested upper/lower IBOP to 30/345 bar 5/10 min. Progress intrerrupted by ESD testing.", "dTimEnd": "2008-01-12T10:30:00+01:00", "dTimStart": "2008-01-12T09:45:00+01:00", "md": "2175", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on ongoing Siemens/ESD testing. Meanwhile tested standpipe manifold valves to 30/345 bar 5/10 min.", "dTimEnd": "2008-01-12T15:30:00+01:00", "dTimStart": "2008-01-12T10:30:00+01:00", "md": "2175", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Got power shut down on rig. Waited on ongoing Siemens/ESD testing. Meanwhile removed scaffolding, cleaned and tidied in wellhead module.", "dTimEnd": "2008-01-12T19:00:00+01:00", "dTimStart": "2008-01-12T15:30:00+01:00", "md": "2175", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Re-set V-ICIS-system. Calibrated block. Meanwhile tested valves in standpipe manifold to 30/345 bar 5/10 min. Cleaned and tidied in wellhead module.", "dTimEnd": "2008-01-13T00:00:00+01:00", "dTimStart": "2008-01-12T19:00:00+01:00", "md": "2175", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" } ]
[]
15_9_F_12_2008_01_14
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-13T00:00:00+01:00
2008-01-14T00:00:00+01:00
normal
2018-05-03T13:51:54+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-14T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-03T16:45:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Test BOP. Mobilize equipment for identifying leakage.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3480", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "111", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "POOH with cleaning string. Broke out and laid down 3 1/2\" singles. Flushed C/K lines and manifold. Pulled bowl protector. Set 10 3/4\" MS seal and tested same. Tested tie-back casing - negative - observed excessive pressure drop. Troubleshot situation. Leak tested line up - ok. Pressurised well in stepwise manner and verified leak in tie-back string at around 200 bar. Started pressure test of 18 3/4\" surface BOP.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-13T00:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Broke off swedge on TDS. Held toolbox talk prior to continue pulling cleaning string.", "dTimEnd": "2008-01-13T00:30:00+01:00", "dTimStart": "2008-01-13T00:00:00+01:00", "md": "2175", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "POOH with cleaning assemblies on 5 1/2\" DP from 2175 m to 1870 m MD. Used manual slips.", "dTimEnd": "2008-01-13T01:30:00+01:00", "dTimStart": "2008-01-13T00:30:00+01:00", "md": "1870", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk. Removed bowl and masterbushing. Inserted PS-30 slips dressed for 5\" drillpipe. Attempted to run HTS to drillfloor, no-go due to lack of calibration. Broke out and laid down cleaning assy #4 with 10 3/4\" scraper/magnet on deck. Observed swarf on magnet. Broke out singel and laid down on drillfloor.", "dTimEnd": "2008-01-13T02:30:00+01:00", "dTimStart": "2008-01-13T01:30:00+01:00", "md": "1870", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Calibrated HTS after ESD shut down.", "dTimEnd": "2008-01-13T03:00:00+01:00", "dTimStart": "2008-01-13T02:30:00+01:00", "md": "1870", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "POOH with cleaning assemblies on 5\" DP from 1870 m to 735 m MD.", "dTimEnd": "2008-01-13T06:00:00+01:00", "dTimStart": "2008-01-13T03:00:00+01:00", "md": "735", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with cleaning assemblies on 5 1/2\" DP from 735 m to 440 m MD.", "dTimEnd": "2008-01-13T07:00:00+01:00", "dTimStart": "2008-01-13T06:00:00+01:00", "md": "440", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior to removing PS-30 slips. Observed falling object from derrick when attempting to lift out slips. Shackle and tag fell down on drillers cabin and deflected to drillfloor. Halted operation for investigation and derrick inspection.", "dTimEnd": "2008-01-13T07:15:00+01:00", "dTimStart": "2008-01-13T07:00:00+01:00", "md": "440", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Inspectred crown and TDS. Found source of shackle and tag to be from swivel between chain and wire on tugger.", "dTimEnd": "2008-01-13T08:00:00+01:00", "dTimStart": "2008-01-13T07:15:00+01:00", "md": "440", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Removed PS-30 slips from rotary and inserted master bushing.", "dTimEnd": "2008-01-13T08:15:00+01:00", "dTimStart": "2008-01-13T08:00:00+01:00", "md": "440", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Racked back last stand and 5\" drillpipe. Laid out 9 5/8\" scraper assy and 7\" top dress/polish mill. Observed swarf on magnet. Inspected top dress mill - ok. Found piece of metal jammed in polish mill.", "dTimEnd": "2008-01-13T09:00:00+01:00", "dTimStart": "2008-01-13T08:15:00+01:00", "md": "417", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior to changing handling gear. Changed from 5\" to 3 1/2\" handing equipment. Inserted PS-21 dressed for 3 1/2\" pipe in rotary.", "dTimEnd": "2008-01-13T09:45:00+01:00", "dTimStart": "2008-01-13T09:00:00+01:00", "md": "417", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with cleaning assembly on 3 1/2\" DP. Broke out and laid down 3 1/2\" singles. Had problems to unlatch from pipe due to overgauge pipe close to couplings.", "dTimEnd": "2008-01-13T15:00:00+01:00", "dTimStart": "2008-01-13T09:45:00+01:00", "md": "10", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Laid out 7\" scraper assembly.", "dTimEnd": "2008-01-13T15:15:00+01:00", "dTimStart": "2008-01-13T15:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk. Picked up Vetco bowl protector retrieval tool and RIH with same. Closed annular and flushed choke and kill line and manifolds from SW to 1,03 packer fluid at 1500 lpm.", "dTimEnd": "2008-01-13T16:30:00+01:00", "dTimStart": "2008-01-13T15:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with retrieval tool and latched bowl protector at 20,1 m MD. POOH with tool and racked back stand.", "dTimEnd": "2008-01-13T17:00:00+01:00", "dTimStart": "2008-01-13T16:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior to setting 10 3/4\" MS-seal.", "dTimEnd": "2008-01-13T17:15:00+01:00", "dTimStart": "2008-01-13T17:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up seal assembly to running tool. Made up control lines to running tools.", "dTimEnd": "2008-01-13T18:30:00+01:00", "dTimStart": "2008-01-13T17:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran MS-seal running tool and strapped control line to pipe. Landed MS seal over 10 3/4\" hanger at 20,8 m MD. Pressured up lock ring energizing line to 1500 psi and locked tool to WH. Took 7 MT overpull and verified tool set. Pressured up thorugh MS seal setting line to 4300 psi. Observed movement of string. Bled off pressure on control lines.", "dTimEnd": "2008-01-13T19:30:00+01:00", "dTimStart": "2008-01-13T18:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressure tested MS seal through test ports 3 and 4 on wellhead to 345 bar/10 min - ok.", "dTimEnd": "2008-01-13T20:15:00+01:00", "dTimStart": "2008-01-13T19:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Released MS setting tool with 5 turns clockwise rotations. POOH with MS seal setting tool. Laid out tool and cleared rigfloor.", "dTimEnd": "2008-01-13T21:00:00+01:00", "dTimStart": "2008-01-13T20:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior to leak testing surface tie back. Emptied SW on cement unit and filled tanks with drillwater. Verified B-annulus valves and test ports open. Lined up from cement unit to pump in kill line on BOP underneath shear ram. Pressurised line to 10 bar and opened HCR on BOP to verify line up. Closed shear ram.", "dTimEnd": "2008-01-13T22:15:00+01:00", "dTimStart": "2008-01-13T21:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed low pressure test of surface tie-back to 30 bar. Pressure dropped from 30,8 bar to 30,6 bar over 5 min - ok. Volume pumped 245 liter. Pressured up from 30 bar to 345 bar at 200 lpm. Total volume pumped 2408 liter. Observed pressure decline from 345 to 312 bar over 10 mimutes indicating a leakage rate of 21 l/min. Observed annulus which continued to flow after pressurising finished. Checked for leaks accross HCRs and shear ram - none observed. No increase in trip tank. Bled back pressure to zero. Recovered 2058 liter bled back volume. Checked pressure curve and found possible/neglible deflection around 300 bar.", "dTimEnd": "2008-01-13T23:15:00+01:00", "dTimStart": "2008-01-13T22:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Discussed situation. Meanwhile leak tested surface line to BOP to 345 bar / 10 min - ok.", "dTimEnd": "2008-01-14T00:00:00+01:00", "dTimStart": "2008-01-13T23:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2008_01_15
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-14T00:00:00+01:00
2008-01-15T00:00:00+01:00
normal
2018-05-03T13:51:54+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-15T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-03T16:45:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Run RTTS packer and test above and below lower tie-back stinger.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3480", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "112", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Tested BOP. Pulled test plug. RIH with cup tester and tested upper tie-back string. Fingerprinted trip tanks. Leak tested tie-back and recorded leakage rates. Set nominal bowl protector. Waited on RTTS to arrive on supply boat.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-14T00:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Discussed situation. Decided to do pressure test in steps to identify the onset of the leakage. Fitted B-annulus with pressure gauge.", "dTimEnd": "2008-01-14T01:00:01+01:00", "dTimStart": "2008-01-14T00:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressured up well in 50 bar increments:\n\n50 bar / 415 liter - Presssure drop 0,97 bar / 5 min\n100 bar / 775 liter - Pressure drop 0,8 bar / 5 min\n150 bar / 1099 liter - Pressure drop 1,8 bar / 5 min\n200 bar / 1451 liter - Pressure drop 5,3 bar / 5 min corresponding to a leakage rate of 7 l/min.", "dTimEnd": "2008-01-14T02:00:01+01:00", "dTimStart": "2008-01-14T01:00:01+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed B-annulus valves. Observed wrong placement of pressure gauge and unsuited scale on same. Bled back pressure to 150 bar. Changed pressure gauge. Pressure dropped from 150 bar to 142 bar over 30 min (1,8 l/min) while working on annulus. When opening inner B-annulus valve a pressure of 12 bar could be observed on the pressure gauge immediately.", "dTimEnd": "2008-01-14T02:30:01+01:00", "dTimStart": "2008-01-14T02:00:01+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressured up well to 200 bar and observed annulus pressure increase to 25 bar. Pressure fell on well and increased on annulus :\n\n5 min : well; 2,4 bar drop / annulus; 3 bar cummulative increase\n10 min : well; 4,6 bar drop / annulus; 6 bar cummulative increase\n15 min : well; 6,4 bar drop / annulus; 9 bar cummulative increase\n20 min : well; 7,5 bar drop / annulus; 11 bar cummulative increase\n\nIndication of leakage from tie-back casing to B-annulus confirmed. Leakage rate with closed annulus at approx 200 bar - 2,5 l/min.", "dTimEnd": "2008-01-14T03:15:01+01:00", "dTimStart": "2008-01-14T02:30:01+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Bled back pressure on casing and B-annulus.", "dTimEnd": "2008-01-14T03:30:01+01:00", "dTimStart": "2008-01-14T03:15:01+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared for testing BOP. Picked up BOP test plug and RIH with same. Set test plug in surface wellhead.", "dTimEnd": "2008-01-14T04:00:01+01:00", "dTimStart": "2008-01-14T03:30:01+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Tested 18 3/4\" surface BOP according to Mærsk procedure.", "dTimEnd": "2008-01-14T06:00:00+01:00", "dTimStart": "2008-01-14T04:00:01+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop activities", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Tested 18 3/4\" surface BOP.", "dTimEnd": "2008-01-14T10:30:00+01:00", "dTimStart": "2008-01-14T06:00:00+01:00", "md": "20", "phase": "fixed", "proprietaryCode": "drilling -- bop activities", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with BOP test plug and laid down same.", "dTimEnd": "2008-01-14T10:45:00+01:00", "dTimStart": "2008-01-14T10:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop activities", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Discussed further actions with town. Meanwhile picked up and made up 10 3/4\" cup tester.", "dTimEnd": "2008-01-14T12:30:00+01:00", "dTimStart": "2008-01-14T10:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Held toolbox talk prior to RIH with 10 3/4\" cup tester.", "dTimEnd": "2008-01-14T13:00:00+01:00", "dTimStart": "2008-01-14T12:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "RIH with 10 3/4\" cup tester on 5 1/2\" DP to 30,5 m MD. Closed UPR and verified lineup.", "dTimEnd": "2008-01-14T13:15:00+01:00", "dTimStart": "2008-01-14T13:00:00+01:00", "md": "30.5", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Pressure tested ASH and casing hanger against 10 3/4\" cup tester. Stepped up pressure in 50 bar increments from 100 bar and held each step for 5 min. Obtained good test at 345 bar. Pumped and bled back 79 l.", "dTimEnd": "2008-01-14T13:45:00+01:00", "dTimStart": "2008-01-14T13:15:00+01:00", "md": "30.5", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "RIH with 10 3/4\" cup tester on 5 1/2\" DP from 30,5 m to 132 m MD. Closed UPR.", "dTimEnd": "2008-01-14T14:00:00+01:00", "dTimStart": "2008-01-14T13:45:00+01:00", "md": "132", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Pressure tested upper tie-back string against 10 3/4\" cup tester. Stepped up pressure in 50 bar increments from 100 bar and held each step for 5 min. Obtained good test at to 345 bar. Pumped and bled back 172 liter.", "dTimEnd": "2008-01-14T14:45:00+01:00", "dTimStart": "2008-01-14T14:00:00+01:00", "md": "132", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "RIH with 10 3/4\" cup tester on 5 1/2\" DP from 132 m to 150 m MD. Closed UPR.", "dTimEnd": "2008-01-14T15:00:00+01:00", "dTimStart": "2008-01-14T14:45:00+01:00", "md": "150", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Pressure tested tie-back adaptor against 10 3/4\" cup tester. Stepped up pressure in 50 bar increments from 100 bar and held each step for 5 min. Obtained good tests at 345 bar. Entire upper tie-back string tested to 345 bar / 10 min - ok. Pumped and bled back 183 liter.", "dTimEnd": "2008-01-14T15:45:00+01:00", "dTimStart": "2008-01-14T15:00:00+01:00", "md": "150", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "POOH with 10 3/4\" cup tester on 5 1/2\" DP. Broke out and laid down cup tester.", "dTimEnd": "2008-01-14T16:15:00+01:00", "dTimStart": "2008-01-14T15:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Closed shear rams and performed fingerprinting of trip tank :\nAdded 20 l water above shear ram. Observed 20 l increase (driller/logger)\nAdded 10 l water above shear ram. Observed 10 l increase (driller/logger)", "dTimEnd": "2008-01-14T16:45:00+01:00", "dTimStart": "2008-01-14T16:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Lined up to pump down well and re-test the complete tie-back string.", "dTimEnd": "2008-01-14T17:00:00+01:00", "dTimStart": "2008-01-14T16:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Pressured up well to 101 bar at 100 lpm. Pumped 712 liter. Dropped from 101,6 bar to 100,7 bar in 5 min - ok.\n\nPressured further up to 200 bar at 100 lpm. Total pumped 1410 liter. Dropped from 200 bar to 195,6 bar in 5 min. Leaking at approx 6 l/min.\n\nPressured further up to 250 bar. Total pumped 1806 liter. Pressure drop 4 bar/5min.\n\nPressured further up to 300 bar. Total pumped 2184 liter. Pressure drop 4 bar/5 min. Measured leakage rate of 4 l/min on B-annulus. \n\nPressured further up to 346 bar. Pressure drop 0,5 bar/min. Measured leakage rate of 4 l/min on B-annulus.", "dTimEnd": "2008-01-14T18:15:00+01:00", "dTimStart": "2008-01-14T17:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Pressured up well to 345 bar every 15 min. Pressure dropped 0,5 bar/min. Measured a steady leakage rate of 4 l/min on B-annulus. Observed increase in leakage rate of approx 12 l/min each time the well was pressurised back to 345 bar. No significant change in leakage rates could be observed. Bled off pressure on well.", "dTimEnd": "2008-01-14T20:30:00+01:00", "dTimStart": "2008-01-14T18:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Picked up and RIH with nominal bowl protector at 20,8 m MD. Set bowl protector and pulled stand.", "dTimEnd": "2008-01-15T00:00:00+01:00", "dTimStart": "2008-01-14T20:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" } ]
[]
15_9_F_12_2008_01_16
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-15T00:00:00+01:00
2008-01-16T00:00:00+01:00
normal
2018-05-03T13:51:54+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-16T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-03T16:45:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Await plan of action from town. Meanwhile perform general rig manitenance and housekeeping.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3480", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "113", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Troubleshot leakage in tie-back string. Ran 9 5/8\" RTTS and tested above and below tie-back stinger - identified leakage to be in the sealstem/PBR. Established leakage rates. POOH with 9 5/8\" RTTS packer.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-15T00:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-01-16T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "140", "readingKind": "estimated" } ]
[]
[ { "comments": "Waited for RTTS to arrive with supply boat.\n\nMeanwhile :\n-Worked on IR\n-Serviced manrider winches\n-Changed centralizers for F-12 riser on Centralizer deck and tensioning deck\n-Functioned flow line valve\n", "dTimEnd": "2008-01-15T06:00:00+01:00", "dTimStart": "2008-01-15T00:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Picked up 1 stand of 5 1/2\" DP to put underneath 9 5/8\" RTTS packer. Received RTTS, checked and measured same.", "dTimEnd": "2008-01-15T07:15:00+01:00", "dTimStart": "2008-01-15T06:00:00+01:00", "md": "40", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Made up 9 5/8\" RTTS packer.", "dTimEnd": "2008-01-15T08:00:00+01:00", "dTimStart": "2008-01-15T07:15:00+01:00", "md": "45", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "RIH with 9 5/8\" RTTS packer on 5 1/2\" DP from 45 m to 2350 m MD.", "dTimEnd": "2008-01-15T13:45:00+01:00", "dTimStart": "2008-01-15T08:00:00+01:00", "md": "2350", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Set 9 5/8\" RTTS by righthand rotation and set down 3 MT. Packer element set +/- 50 m above 9 5/8\" seal stinger.", "dTimEnd": "2008-01-15T14:15:00+01:00", "dTimStart": "2008-01-15T13:45:00+01:00", "md": "2352", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Lined up to pump from cement unit down kill line on BOP. Closed pipe ram, verified line up. Pressure tested 9 5/8\" x 10 3/4\" tie-back stinger above the RTTS packer to 345 bar / 10 min - ok. Volume pumped/bled back 1330 liter. No returns observed on B-annulus.", "dTimEnd": "2008-01-15T15:15:00+01:00", "dTimStart": "2008-01-15T14:15:00+01:00", "md": "2352", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Opened pipe ram. Released 9 5/8\" RTTS packer. RIH from 2352 m to 2420 m MD. Struggled to pass PBR pocket with end of pipe at 2400 m MD. Picked up and slacked off several times and passed pocket.", "dTimEnd": "2008-01-15T16:45:00+01:00", "dTimStart": "2008-01-15T15:15:00+01:00", "md": "2352", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Set 9 5/8\" RTTS packer by righthand rotation and set down 3 MT. Packer element set +/-20 m into 9 5/8\" liner.", "dTimEnd": "2008-01-15T17:15:00+01:00", "dTimStart": "2008-01-15T16:45:00+01:00", "md": "2421", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Lined up to pump from cement unit down TDS and DP. Verified line up. Pressure tested 9 5/8\" x 7 \" liner below the RTTS packer to 345 bar / 10 min - ok. Volume pumped/bled back 1100 liter.", "dTimEnd": "2008-01-15T18:00:00+01:00", "dTimStart": "2008-01-15T17:15:00+01:00", "md": "2421", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Lined up to pump from cement unit down kill line on BOP. Closed pipe ram, verified line up. Pressured up to 170 bar in stepwise manner :\n30 bar / 10 min - ok. Cumulative pumped 145 liter\n100 bar / 5 min - ok. Cumulative pumped 400 liter\n171,5 bar. Cumulative pumped 712 liter - dropped 3 bar / 5 min. Leakage rate 2 l/min. Onset of leak from B-annulus could be observed at 165 bar.", "dTimEnd": "2008-01-15T18:30:00+01:00", "dTimStart": "2008-01-15T18:00:00+01:00", "md": "2421", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Allowed pressure to bleed off in attempt to establish leakage free pressure :\n\n160 bar - dropped 5,1 bar / 10 min (3,2%) - leakage 1,5 l/min\n150 bar - dropped 4,6 bar / 10 min (3,1%) - leakage 1,5 l/min\n140 bar - dropped 3,6 bar / 10 min (2,5%) - leakage 1,1 l/min\n130 bar - dropped 3,2 bar / 10 min (2,5%) - leakage 1,0 l/min\n120 bar - dropped 2,4 bar / 10 min (2,0%) - leakage 0,8 l/min\n110 bar - dropped 2,4 bar / 10 min (2,2%) - leakage 0,7 l/min\n100 bar - dropped 2,6 bar / 10 min (2,6%) - leakage 0,9 l/min\n90 bar - dropped 1,7 bar / 10 min (1,9%) - leakage 0,5 l/min\n80 bar - dropped 1,9 bar / 10 min (2,4%) - leakage 0,7 l/min\n70 bar - dropped 1,5 bar / 10 min (2,2%) - leakage 0,5 l/min\n\nBled pressure in well to zero.", "dTimEnd": "2008-01-15T22:00:00+01:00", "dTimStart": "2008-01-15T18:30:00+01:00", "md": "2420", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Released 9 5/8\" RTTS packer with 24 MT overpull according to Halliburton instructions. Allowed packer element to retract.", "dTimEnd": "2008-01-15T22:30:00+01:00", "dTimStart": "2008-01-15T22:00:00+01:00", "md": "2420", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "POOH with 9 5/8\" RTTS packer on 5 1/2\" DP from 2420 m to 2180 MD. Pulled carefully through PBR pocket - no addtional drag observed.", "dTimEnd": "2008-01-16T00:00:00+01:00", "dTimStart": "2008-01-15T22:30:00+01:00", "md": "2180", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" } ]
[]
15_9_F_12_2008_01_17
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-16T00:00:00+01:00
2008-01-17T00:00:00+01:00
normal
2018-05-03T13:51:54+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-17T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-16T05:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Run perforation guns to 3303 m MD. Correlate guns with PBR no-go. Set MAXR gun hanger. POOH with gun hanger setting tool. Pull nominal bowl protector. Rig up for running completion string.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "3480", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "114", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Waited on plan of action from town. WOW prior to picking up perforation guns. Ran 4 1/2\" perforation guns from surface to 252 m MD.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-16T00:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-01-17T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "140", "readingKind": "estimated" } ]
[]
[ { "comments": "Continued to POOH with 9 5/8\" RTTS packer on 5 1/2\" DP from 2180 m to 40 m MD.", "dTimEnd": "2008-01-16T04:00:00+01:00", "dTimStart": "2008-01-16T00:00:00+01:00", "md": "40", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Broke out an laid down 9 5/8\" RTTS packer. Racked back last stand.", "dTimEnd": "2008-01-16T05:00:00+01:00", "dTimStart": "2008-01-16T04:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Waited for plan of action from town. Meanwhile did routine testing of FOSV's and Gray valve.", "dTimEnd": "2008-01-16T06:00:00+01:00", "dTimStart": "2008-01-16T05:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Waited for plan of action from town. Meanwhile did routine testing of FOSV's and Gray valve.", "dTimEnd": "2008-01-16T07:00:00+01:00", "dTimStart": "2008-01-16T06:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Waited for instuctions from town.\n\nMeanwhile :\n-Pressure tested safety valves\n-Performed manitenance on rotary table lock\n-Performed general housekeeping and PM's on drillfloor\n-Removed BOP carrier from BOP", "dTimEnd": "2008-01-16T16:30:00+01:00", "dTimStart": "2008-01-16T07:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Recieved instruction from town to run guns. Waited on weather due to high winds, cranes down. Meanwhile rigged up casing tong, dressed PS-21 slips for 4 1/2\" and dressed BX elevator with 5\" inserts.", "dTimEnd": "2008-01-16T20:30:00+01:00", "dTimStart": "2008-01-16T16:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Laid out 4 1/2 perforation guns, firing heads and MAXR anchor on top of tubing in STB AFT bay. Made up FOSV with x-overs to perforation guns.", "dTimEnd": "2008-01-16T21:30:00+01:00", "dTimStart": "2008-01-16T20:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held pre-job meeting on drillfloor. Made up Gray valve to stand of 5 1/2\" DP and racked back.", "dTimEnd": "2008-01-16T22:30:00+01:00", "dTimStart": "2008-01-16T21:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran in hole with 4 1/2\" Orient exact weights/perforation guns from surface to 38 m MD.", "dTimEnd": "2008-01-17T00:00:00+01:00", "dTimStart": "2008-01-16T22:30:00+01:00", "md": "38", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2008_01_18
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-17T00:00:00+01:00
2008-01-18T00:00:00+01:00
normal
2018-05-03T13:51:54+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-18T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-16T05:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Test B-annulus to 220 bar. Establish further plans. Run perforation guns to 3303 m MD. Correlate guns with PBR no-go. Set MAXR gun hanger. POOH with gun hanger setting tool. ", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "115", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Ran 4 1/2\" perforation guns from 252 to 862 m MD. Discussed plan of action with town. POOH 4 1/2\" perforation guns from 862 m to surface. Flushed and tested lines for pressure testing 10 3/4\" x 14\" barrier envelope.", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-17T00:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-01-18T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "140", "readingKind": "estimated" } ]
[]
[ { "comments": "Ran in hole with 4 1/2\" Orient exact weights/spacers/perforation guns from 38 m MD to 195 m MD.", "dTimEnd": "2008-01-17T02:30:00+01:00", "dTimStart": "2008-01-17T00:00:00+01:00", "md": "195", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed PS-21 slips from rotary and inserted masterbushing and bowl. Removed and set back Odfjell casing tong. Took up weight 78 MT.", "dTimEnd": "2008-01-17T03:00:00+01:00", "dTimStart": "2008-01-17T02:30:00+01:00", "md": "195", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up and made up E-fire firing head. Made up firing head to swivel on top of gun section. Hung off in 3 1/2\" collar slips and secured with dog collar.", "dTimEnd": "2008-01-17T04:00:00+01:00", "dTimStart": "2008-01-17T03:00:00+01:00", "md": "200", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up and made up Pro-fire firing head. Made up firing head. Hung off in 3 1/2\" collar slips and secured with dog collar.", "dTimEnd": "2008-01-17T04:45:00+01:00", "dTimStart": "2008-01-17T04:00:00+01:00", "md": "206", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted in MAXR assembly complete with setting tool. Made up 3 1/2\" pup joint and X-over to assembly while laying on HTS. Picked up assembly and made up to Pro fire firing head. Checked adjustment of MAXR setting sleeve, removed transport studs and fitted shear pins. Hung off in 3 1/2\" DP slips.", "dTimEnd": "2008-01-17T05:30:00+01:00", "dTimStart": "2008-01-17T04:45:00+01:00", "md": "217.5", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 4 1/2\" Orient exact perforation gun assy on 3 1/2\" DP from 217 m to 252 m MD according to tally.", "dTimEnd": "2008-01-17T06:00:00+01:00", "dTimStart": "2008-01-17T05:30:00+01:00", "md": "252", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 4 1/2\" Orient exact perforation gun assy on 3 1/2\" DP from 252 m to 294 m MD according to tally. MU PBR no-go locator sub.", "dTimEnd": "2008-01-17T07:15:00+01:00", "dTimStart": "2008-01-17T06:00:00+01:00", "md": "294", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box meeting and changed to 5\" handling equipment.", "dTimEnd": "2008-01-17T08:15:00+01:00", "dTimStart": "2008-01-17T07:15:00+01:00", "md": "294", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 4 1/2\" Orient exact perforation gun assy on 5\" DP from 294 m to 862 m MD according to tally.", "dTimEnd": "2008-01-17T10:15:00+01:00", "dTimStart": "2008-01-17T08:15:00+01:00", "md": "862", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Stopped RIH. Discussed testing requirements and further plans for F-12 with town.", "dTimEnd": "2008-01-17T13:30:00+01:00", "dTimStart": "2008-01-17T10:15:00+01:00", "md": "862", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "POOH with 4 1/2\" Orient exact perforation gun assy on 5\" DP from 862 m to 300 m MD according to tally. \n", "dTimEnd": "2008-01-17T14:45:00+01:00", "dTimStart": "2008-01-17T13:30:00+01:00", "md": "300", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Held tool box meeting and changed to 3 1/2\" handling equipment.", "dTimEnd": "2008-01-17T16:15:00+01:00", "dTimStart": "2008-01-17T14:45:00+01:00", "md": "300", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "POOH with 4 1/2\" Orient exact perforation gun assy on 3 1/2\" DP from 300 m to 217 m MD according to tally.", "dTimEnd": "2008-01-17T17:30:00+01:00", "dTimStart": "2008-01-17T16:15:00+01:00", "md": "217", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Held tool box talk prior to handling guns on rig floor. POOH with 4 1/2\" Orient exact perforation gun assy from 217 m to OOH.", "dTimEnd": "2008-01-17T22:15:00+01:00", "dTimStart": "2008-01-17T17:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Flushed lines and pressure tested from pump room to lower kill on BOP 35/240 bar for 5 min.", "dTimEnd": "2008-01-18T00:00:00+01:00", "dTimStart": "2008-01-17T22:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "operation failed" } ]
[]
15_9_F_12_2008_01_19
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-18T00:00:00+01:00
2008-01-19T00:00:00+01:00
normal
2018-05-03T13:51:55+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-19T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-16T05:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Test B-annulus to 220 bar. Run perforation guns to 3303 m MD. Correlate guns with PBR no-go. Set MAXR gun hanger. POOH with gun hanger setting tool. ", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "116", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Waited for plan of action from town. Tested bultibowl BT-seals to 220 bar/10 min. WOW.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-18T00:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-01-19T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "140", "readingKind": "estimated" } ]
[]
[ { "comments": "Flushed lines and pressure tested from cement unit to outer manual valve on B-annulus 35/250 bar for 5 min.\n\nMeanwhile performed maintenance on TDS and rig floor equipment.", "dTimEnd": "2008-01-18T03:00:00+01:00", "dTimStart": "2008-01-18T00:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Waited for plan of action from town. Meanwhile performed maintenance on TDS and rig floor equipment.", "dTimEnd": "2008-01-18T06:00:00+01:00", "dTimStart": "2008-01-18T03:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Waited for plan of action from town. \n\nMeanwhile :\n-Performed 6 month maintenance on TDS\n-Installed centralizer ring on F-7\n-Transfered 7 m3 packer fluid from pit 3 to cmt unit with MP2\n-Installed back up BX elevator and function tested same\n-Disconnected winch on aft TDS working platform", "dTimEnd": "2008-01-18T22:00:00+01:00", "dTimStart": "2008-01-18T06:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Performed in-between test to 220 bar / 10 min on multibowl BT-seals.", "dTimEnd": "2008-01-18T22:30:00+01:00", "dTimStart": "2008-01-18T22:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Waited on weather due to high winds up to 87 knop and danger for people to be present in well head module.", "dTimEnd": "2008-01-19T00:00:00+01:00", "dTimStart": "2008-01-18T22:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2008_01_20
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-19T00:00:00+01:00
2008-01-20T00:00:00+01:00
normal
2018-05-03T13:51:55+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-20T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-16T05:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "RU WL equipment and RIH with tubing puncher. Punch holes in 9 5/8\" csg to get communication to 10 3/4\" x 14\" annulus. POOH. Run perforation guns to 3303 m MD.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "117", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Attempted to pressure test 10 3/4\" x 14\" annulus, but found blocked communication port in wellhead. Tested shear ram while waiting for tubing puncher equipment and schlumberger personnel to arrive on the rig.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-19T00:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-01-20T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "140", "readingKind": "estimated" } ]
[]
[ { "comments": "Waited on weather due to high winds up to 72 knop and danger for people to be present in well head module.", "dTimEnd": "2008-01-19T06:00:00+01:00", "dTimStart": "2008-01-19T00:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on weather due to high winds up to 60 knop and danger for people to be present in well head module.\n\nMeanwhile inspected AFT PRS and found damage on drag chain. Barried off rig floor.", "dTimEnd": "2008-01-19T08:15:00+01:00", "dTimStart": "2008-01-19T06:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- well control", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Held tool box talk for testing 10 3/4\" x 14\" annulus. Performed line test to 20 bar to verify correct line up. Closed shear ram.", "dTimEnd": "2008-01-19T08:45:00+01:00", "dTimStart": "2008-01-19T08:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Adjusted geoservices logging screen for documentation of test", "dTimEnd": "2008-01-19T09:45:00+01:00", "dTimStart": "2008-01-19T08:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Pressured up to 35 bar on B-annulus. Pressured up to 175 bar with MP2 using packer fluid on csg side. Observed 17 bar pressure increase on B-annulus due to ballooning (35-52 bar)\n\nAttempted to pressure up B-annulus to 220 bar with cmt unit. Stopped pumping at 97 bar and only 16 ltrs pumped (theoretical volume to 97 bar = 280 ltr).", "dTimEnd": "2008-01-19T10:45:00+01:00", "dTimStart": "2008-01-19T09:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Bled off B-annulus and csg to 0 bar and investigated surface lines. Disconnected 5K hose from cmt unit to surface wellhead and flushed through to verify no restrictions. Reconnected 5K hose to B-annulus and performed new line test 30/225 bar 5/10 min against closed outer valve on wellhead outlet. Pressured up to 50 bar on B-annulus with only 23 ltr pumped (23 ltr corresponds to pressuring up volume down to subsea wellhead, indicating blockage in 10 3/4\" hanger annulus ports).", "dTimEnd": "2008-01-19T11:45:00+01:00", "dTimStart": "2008-01-19T10:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Bled off pressure on B-annulus and had time-out to evaluate further action.", "dTimEnd": "2008-01-19T13:00:00+01:00", "dTimStart": "2008-01-19T11:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Held tool box talk for testing 10 3/4\" x 14\" annulus. Performed line test to 20 bar to verify correct line up for both BOP kill line and B-annulus. \n\nPressured up csg with MP2 to 50 bar/400 ltrs - Recorded 10 bar on B-annulus from cement unit.\nPressured up csg with MP2 to 70 bar/155 ltrs - Recorded 12,4 bar on B-annulus from cement unit. \nPressured up csg with MP2 to 156 bar/644 ltrs - Recorded 21 bar on B-annulus from cement unit.\n\nObserved leak into B-annulus at 156 bar, confirming communication through annulus ports in 10 3/4\" hanger from below (recorded pressure increase above ballooning effect). Recorded 1,9 bar/10min pressure increase on B-annulus with 135 bar differential pressure.", "dTimEnd": "2008-01-19T14:15:00+01:00", "dTimStart": "2008-01-19T13:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Had time-out to evaluate further action. Made arrangements for punching holes in 9 5/8\" csg.\n\nMeanwhile logged pressure on csg and B-annulus. Recorded 0,25 bar/10min pressure increase on B-annulus with 56 bar differential pressure.", "dTimEnd": "2008-01-19T18:00:00+01:00", "dTimStart": "2008-01-19T14:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Waited for tubing puncher equipment and schlumberger personnel to arrive on the rig. \n\nBled off pressure on B-annulus from 60 to 2 bar in preparation to test shear rams. Observed pressure on csg driopping from 116 bar to 106.4 bar while bleeding off on B-annulus (due to balloning effect).\n\nRIH with WBRT and pulled WB. RIH with 2 stds of 5\" DP and test plug to 100 m MD. Sat test plug.", "dTimEnd": "2008-01-20T00:00:00+01:00", "dTimStart": "2008-01-19T18:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" } ]
[]
15_9_F_12_2008_01_21
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-20T00:00:00+01:00
2008-01-21T00:00:00+01:00
normal
2018-05-03T13:51:55+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-21T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-16T05:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "RIH with tubing puncher. Punch holes in 9 5/8\" csg to get communication to 10 3/4\" x 14\" annulus. POOH. Pressure test 10 3/4\" x 14\" annulus and wellhead to 220 bar / 10 min. Run perforation guns to 3303 m MD. ", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "118", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Waited for tubing puncher equipment and personnel to arrive on the rig. Spotted and RU WL equipment. ", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-20T00:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-01-21T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "140", "readingKind": "estimated" } ]
[]
[ { "comments": "Waited for tubing puncher equipment and schlumberger personnel to arrive on the rig.\n\nTested shear rams 20/345 bar 10 min with packer fluid, 82 ltrs pumped and 78 ltrs in return. POOH with test plug and LO same. RIH with WB and sat same.", "dTimEnd": "2008-01-20T06:00:00+01:00", "dTimStart": "2008-01-20T00:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Waited for tubing puncher equipment and schlumberger personnel to arrive on the rig.\n\nMeanwhile:\n-Performed derrick inspection after high winds\n-Changed out encoder, replaced bended link on drag chain and calibrated AFT PRS.\n-Cleared future equipment room.\n-Performed maintenace on crew conveyer between CRI and STB transport conveyer\n-Cleared rig floor prior to running WL.", "dTimEnd": "2008-01-20T16:00:00+01:00", "dTimStart": "2008-01-20T06:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Placed wireline units on cantiliver and port leg and hooked them up electrically. RU umbilical from Schlumberger logging unit to Seawell wireline winch. Installed add-on drum with 7/16\" cable.\n", "dTimEnd": "2008-01-21T00:00:00+01:00", "dTimStart": "2008-01-20T16:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" } ]
[]
15_9_F_12_2008_01_22
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-21T00:00:00+01:00
2008-01-22T00:00:00+01:00
normal
2018-05-03T13:51:55+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-22T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-16T05:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Run perforation guns to 3303 m MD. Correlate guns with PBR no-go. Set MAXR gun hanger. POOH with gun hanger setting tool. Pull bowl protector and wash surface wellhead and BOP.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "119", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Continued to RU wireline equipment. RIH with tubing puncher. Punched holes in 9 5/8\" csg to get communication to 10 3/4\" x 14\" annulus. POOH. Pressure tested 10 3/4\" x 14\" annulus and wellhead to 220 bar / 10 min. MU perforation guns to 54 m MD. ", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-21T00:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-01-22T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "140", "readingKind": "estimated" } ]
[]
[ { "comments": "Prepared and loaded 1 11/16\" HNS Puncher. Changed to Schlumberger collector. MU MH-22 logging head for 7/16\" cable. RU sheave wheels on rig floor.", "dTimEnd": "2008-01-21T06:00:00+01:00", "dTimStart": "2008-01-21T00:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Continued RU wireline equipment and troubleshot power supply for wireline winch. Modified depth system on wireline winch drum. Function tested CCL tool.", "dTimEnd": "2008-01-21T14:30:00+01:00", "dTimStart": "2008-01-21T06:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "MU and RIH with toolstring to 2450 m. Correlated depth to tally using CCL and fired 1 11/16\" HNS Puncher at 2395-2392 m MD.", "dTimEnd": "2008-01-21T17:00:00+01:00", "dTimStart": "2008-01-21T14:30:00+01:00", "md": "2450", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "POOH with toolstring and LO gun assembly. Confirmed all 41 shots were fired.", "dTimEnd": "2008-01-21T19:00:00+01:00", "dTimStart": "2008-01-21T17:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Held pre job meeting with involved personnel. Lined up cement unit to pump down casing. Disconnected hose on B-annulus and observed flow due to U-tubing effect. Pumped down casing 300 lpm and observed full communication via holes punched in 9 5/8\" csg.", "dTimEnd": "2008-01-21T19:30:00+01:00", "dTimStart": "2008-01-21T19:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Hooked hose back up on B-annulus and performed a line test 35/220 bar 5/10 min. Bled off pressure to 20 bar, opened B-annulus valve and verified line-up. Lined up to monitor B-annulus on standpipe. Pressured B-annulus through punched holes in 9 5/8\" x 10 3/4\" tieback string to 220 bar / 10 min using 2196 ltrs drillwater from cement unit. Had 2.6 bar drop in 10 min.", "dTimEnd": "2008-01-21T20:45:00+01:00", "dTimStart": "2008-01-21T19:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Ivestigated leak by performing line tests against various valves. Isolated standpipe by closing valves on B-annulus wellhead. Unable to obtain pressure test within 1% pressure drop. Opened B-annulus valves and bled off pressure through stanpipe and into trip tank. Re-arranged line-up.", "dTimEnd": "2008-01-22T00:00:00+01:00", "dTimStart": "2008-01-21T20:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" } ]
[]
15_9_F_12_2008_01_23
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-22T00:00:00+01:00
2008-01-23T00:00:00+01:00
normal
2018-05-03T13:51:55+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-23T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-16T05:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Run perforation guns from 1311 m to 3303 m MD. Correlate guns with PBR no-go. Set MAXR gun hanger. POOH with gun hanger setting tool. Pull bowl protector and wash surface wellhead and BOP. Prepare for running completion string.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "120", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Ran TCP perforation guns to 173 m MD. POOH with TCP guns. Pressure tested 10 3/4\" x 14\" annulus and wellhead to 220 bar / 10 min. Ran TCP perforation guns to 1311 m MD. ", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-22T00:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-01-23T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "140", "readingKind": "estimated" } ]
[]
[ { "comments": "Re-tested B-annulus through punched holes in 9 5/8\" x 10 3/4\" tieback string to 220 bar / 10 min using packer fluid from cement unit. Observed 2.2 bar drop in 10 min. Pumped 2087 ltrs and bled back 1980 ltrs. \n\nBoth manual valves on wellhead B-annulus had been tested to 220 bar/10 min during line tests.", "dTimEnd": "2008-01-22T01:00:00+01:00", "dTimStart": "2008-01-22T00:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "RU for running TCP guns. Prepared firing heads and loaded batteries.", "dTimEnd": "2008-01-22T03:15:00+01:00", "dTimStart": "2008-01-22T01:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Held tool box meeting for RU and RIH with TCP guns.\n\nMeanwhile closed shear rams due to slow increase in trip tank of 150 ltrs/hr.", "dTimEnd": "2008-01-22T03:45:00+01:00", "dTimStart": "2008-01-22T03:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Investigated increase in trip tank. No pressure build up recorded. Observed well on trip tank. No gain observed.", "dTimEnd": "2008-01-22T05:15:00+01:00", "dTimStart": "2008-01-22T03:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "MU TCP guns and lowered each section into hole by BX elevators from surface to 54 m MD.", "dTimEnd": "2008-01-22T06:00:00+01:00", "dTimStart": "2008-01-22T05:15:00+01:00", "md": "27", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "MU 4 1/2\" TCP guns and lowered each section into hole by BX elevators from surface to 173 m MD.", "dTimEnd": "2008-01-22T10:00:00+01:00", "dTimStart": "2008-01-22T06:00:00+01:00", "md": "173", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "POOH and LO 4 1/2\" gun assembly from 173 to 48 m. Held last 9 joints standby in TDS.", "dTimEnd": "2008-01-22T12:45:00+01:00", "dTimStart": "2008-01-22T10:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Held tool box talk. Greased up valves and pressure tested kill manifold to 345 bar/10 min.", "dTimEnd": "2008-01-22T15:00:00+01:00", "dTimStart": "2008-01-22T12:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Performed two line tests to 345 bar/10 min. Tested B-annulus through punched holes in 9 5/8\" x 10 3/4\" tieback string against outer manual valve on B-annulus to 220 bar / 10 min using packer fluid from cement unit. Observed 0 bar drop in 10 min. Pumped 2193 ltrs and bled back 2200 ltrs. \n", "dTimEnd": "2008-01-22T16:15:00+01:00", "dTimStart": "2008-01-22T15:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Closed K-3 valve on on kill manifold and bleed off pressure down to cmt unit. Lined up cmt unit to B-annulus through hose from moonpool. Closed inner manual valve on B-annulus and equalized and opened outer valve. Bled off pressure on cmt unit down to 10 bar. Inflow tested inner manual valve on wellhead B-annulus to 220 bar/10 min. Bled off all pressures.", "dTimEnd": "2008-01-22T16:45:00+01:00", "dTimStart": "2008-01-22T16:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "MU 4 1/2\" TCP guns and lowered each section into hole by BX elevators from surface to 173 m MD. MU orient exact weight spacers from 173 m to 195 m MD. MU eFire firing head assembly and ProFire firing head assembly. MU MAXR assembly onto the HPA fill-sub assembly and RIH with TCP guns on 3 1/2\" DP from 217 to 285,5 m MD. MU PBR no-go locator sub.", "dTimEnd": "2008-01-23T00:00:00+01:00", "dTimStart": "2008-01-22T16:45:00+01:00", "md": "292", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2008_01_24
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-23T00:00:00+01:00
2008-01-24T00:00:00+01:00
normal
2018-05-03T13:51:55+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-24T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-16T05:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "POOH with MAXR setting tool on 5 1/2\" DP from 1802 to OOH. Pull bowl protector and wash surface wellhead and BOP. Prepare for running completion string. MU and RIH with completion assemblies.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "121", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Repaired PRS racking arm. Ran perforation guns from 1311 m to 3303 m MD. Correlated guns with PBR no-go. Sat MAXR gun hanger. POOH with MAXR setting tool on 5 1/2\" DP from 3305 to 1802 m MD. ", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-23T20:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "3520", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" }, { "dTim": "2008-01-23T00:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-01-24T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "140", "readingKind": "estimated" } ]
[]
[ { "comments": "RIH with 4 1/2\" TCP guns on 5 1/2\" DP to 1311 m MD.", "dTimEnd": "2008-01-23T05:15:00+01:00", "dTimStart": "2008-01-23T00:00:00+01:00", "md": "1311", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Had VFD-fault (electrical problem) on AFT PRS racking arm.", "dTimEnd": "2008-01-23T06:00:00+01:00", "dTimStart": "2008-01-23T05:15:00+01:00", "md": "1311", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "The upper racking arm on the AFT PRS could not move because brakes were locked.\n\nMeanwhile installed TIW on string and function tested BOP at low pressure.", "dTimEnd": "2008-01-23T11:00:00+01:00", "dTimStart": "2008-01-23T06:00:00+01:00", "md": "1311", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Removed TIW and installed XO to 5 1/2\" DP. Changed handling equipment to 5 1/2\". \n\nRIH with 4 1/2\" TCP guns on 5 1/2\" DP from 1311 m to 3310 m MD. Up weight 212 MT / down weight 129 MT.", "dTimEnd": "2008-01-23T22:30:00+01:00", "dTimStart": "2008-01-23T11:00:00+01:00", "md": "3310", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Tagged TOL at 3315.7 m MD and landed no-go locator on top of PBR. Sat down 5 MT. Pulled to up-weight and marked the string ( 1.9 m stretch in string). Reciprocated string 10 times to orientate the guns. \n\nTagged TOL again at 3315.6 m and landed no-go locator on top PBR. Sat down 5 MT. Pulled to up-weight and verified mark on string. \n\nPO 9 m with 4 1/2\" TCP guns to locate top shot at 3130 m MD. Slacked off weight by releasing 0.5 m stretch in string.\n\nHeld tool box meeting before pressuring up the well when reciprocating string.", "dTimEnd": "2008-01-24T00:00:00+01:00", "dTimStart": "2008-01-23T22:30:00+01:00", "md": "3315.7", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2008_01_25
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-24T00:00:00+01:00
2008-01-25T00:00:00+01:00
normal
2018-05-03T13:51:55+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-25T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-24T14:45:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "MU and test DHPG and chemical injection mandrel. Run 7\" tubing until DHSV assembly.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "122", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "POOH with MAXR setting tool on 5 1/2\" DP from 1802 to OOH. Pulled bowl protector and washed surface wellhead and BOP. Prepared for running completion string. MU and RIH with completion assemblies. WOW due to high winds up to 71 knots and crane not able to PU DHSV. ", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-24T20:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "3520", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-01-25T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "140", "readingKind": "estimated" } ]
[]
[ { "comments": "Checked line-up. Broke circulation by pumping 300 lpm at 5 bar. Closed annular BOP. \n\nPressured up annulus and DP simultaniously by pumping 800 lpm to 220 bar to activate MAXR setting tool. Held pressure for 2 min. Bled off pressure and verified that pressure was zero before opening annular BOP. Pumped 3100 ltrs and bled back 3000 l. One cycle used on ProFire.\n\nWaited 25 min, from activation, for MAXR to set. Sat down 2 MT to confirm that MAXR had been sat. Picked up 3 m and re-checked up/down weights to confirm that the hanger had been released from the running tool. String weight was reduced by 14 MT.", "dTimEnd": "2008-01-24T01:30:00+01:00", "dTimStart": "2008-01-24T00:00:00+01:00", "md": "3305.2", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with MAXR setting tool on 5 1/2\" DP from 3305 to 1802 m MD.", "dTimEnd": "2008-01-24T06:00:00+01:00", "dTimStart": "2008-01-24T01:30:00+01:00", "md": "1802", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with MAXR setting tool on 5 1/2\" DP from 1802 m to OOH. LO gun hanger setting tool and RD handling equipment.", "dTimEnd": "2008-01-24T14:45:00+01:00", "dTimStart": "2008-01-24T06:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH and pulled secondary bowl protector in surface wellhead at 20 m MD. MU jet sub and cleaned BOP and wellhead at 2000 lpm / 8 bar / 10 RPM. LO same.", "dTimEnd": "2008-01-24T17:00:00+01:00", "dTimStart": "2008-01-24T14:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "MU kick assembly. RU csg tong and prepared to run 7\" tubing. Lifted in place BOT and WellDynamics' cable drums. Installed FMS.", "dTimEnd": "2008-01-24T21:00:00+01:00", "dTimStart": "2008-01-24T17:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held pre-job meeting with involved personnel. MU and ran 7 1/2\" seal stem (no seals) with ratcheting muleshoe assembly. Function tested ratcheting muleshoe. MU joint with pre-installed NPR plug and pre-installed 1 3/4\" ball. MU and ran one 7\" tubing joint. MU and ran 7\"x 9 5/8\" Granite production packer. MU and ran one 7\" tubing joint. MU 7\" 20 ft PBR assembly with pups. Load tested PBR.", "dTimEnd": "2008-01-25T00:00:00+01:00", "dTimStart": "2008-01-24T21:00:00+01:00", "md": "73", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2008_01_26
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-25T00:00:00+01:00
2008-01-26T00:00:00+01:00
normal
2018-05-03T13:51:55+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-26T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-24T14:45:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Run 7\" tubing from 625 to 2000 m MD.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "123", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "MU and tested DHPG and chemical injection mandrel. Ran 7\" tubing from 110 m to 625 m MD.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-25T20:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "3520", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-01-26T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "140", "readingKind": "estimated" } ]
[]
[ { "comments": "Attempted to MU and run 7\" tubing joints. Had to LO out 2 joints.", "dTimEnd": "2008-01-25T01:00:00+01:00", "dTimStart": "2008-01-25T00:00:00+01:00", "md": "100", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOW due to high winds up to 71 knop. Crane was not able to lift DHPG on to drill floor and could not RU sheave weel for DHPG and chemical injection line in derrick.\n\nMeanwhile continued MU and run 3 x 7\" tubing joints. Had to LO out 1 joint.", "dTimEnd": "2008-01-25T06:00:00+01:00", "dTimStart": "2008-01-25T01:00:00+01:00", "md": "100", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOW due to high winds up to 60 knop. Crane was not able to lift DHPG on to drill floor and could not RU sheave weel for DHPG and chemical injection line in derrick.\n", "dTimEnd": "2008-01-25T07:00:00+01:00", "dTimStart": "2008-01-25T06:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed control line sheave in high strength wire in derrick. Held on to sheave with PRS racking arm to avoid it from moving in the wind.", "dTimEnd": "2008-01-25T09:00:00+01:00", "dTimStart": "2008-01-25T07:00:00+01:00", "md": "100", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH to check collar that was changed out on second joint below gauge carrier. Verified correct length on tubing compared to tally.", "dTimEnd": "2008-01-25T10:30:00+01:00", "dTimStart": "2008-01-25T09:00:00+01:00", "md": "100", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box meeting prior to PU gauge assembly. \n\nMU and RIH with DHPG/Asphalthene assembly. Installed one tubing joint above DHPG and positioned assembly in working hight. PU and terminated cable to DHPG. Function checked gauge. \n\nConnected chemical injection line. Tested line and installed protector clamps.", "dTimEnd": "2008-01-25T17:30:00+01:00", "dTimStart": "2008-01-25T10:30:00+01:00", "md": "110", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran 7\" tubing, cable and clamps from 110 m to 145 m MD. Maintained 100 bar pressure on chemical injection line while RIH.", "dTimEnd": "2008-01-25T20:15:00+01:00", "dTimStart": "2008-01-25T17:30:00+01:00", "md": "145", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed AFT rollers to HTS and function tested same.", "dTimEnd": "2008-01-25T20:45:00+01:00", "dTimStart": "2008-01-25T20:15:00+01:00", "md": "145", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran 7\" tubing, cable and clamps from 145 m to 286 m MD. Maintained 100 bar pressure on chemical injection line while RIH.", "dTimEnd": "2008-01-26T00:00:00+01:00", "dTimStart": "2008-01-25T20:45:00+01:00", "md": "286", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2008_01_27
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-26T00:00:00+01:00
2008-01-27T00:00:00+01:00
normal
2018-05-03T13:51:56+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-27T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-24T14:45:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Run 7\" tubing from 1620 to DHSV assembly. RIH with 7\" tubing to approx 3030 m MD. Pull back and install space-out pups.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "124", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Ran 7\" tubing from 625 to 1620 m MD.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-26T20:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "3520", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-01-27T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "140", "readingKind": "estimated" } ]
[]
[ { "comments": "Ran 7\" tubing, cable and clamps from 286 m to 625 m MD. Maintained 100 bar pressure on chemical injection line while RIH. Up weight 90 MT / down weight 85 MT at 500 m MD.", "dTimEnd": "2008-01-26T06:00:00+01:00", "dTimStart": "2008-01-26T00:00:00+01:00", "md": "625", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran 7\" tubing, cable and clamps from 625 m to 800 m MD. Maintained 100 bar pressure on chemical injection line while RIH.", "dTimEnd": "2008-01-26T10:30:00+01:00", "dTimStart": "2008-01-26T06:00:00+01:00", "md": "800", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOW due to unfavorable wind direction and high winds up to 70 knots.", "dTimEnd": "2008-01-26T12:30:00+01:00", "dTimStart": "2008-01-26T10:30:00+01:00", "md": "800", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran 7\" tubing, cable and clamps from 800 m to 881 m MD. Maintained 100 bar pressure on chemical injection line while RIH.", "dTimEnd": "2008-01-26T15:00:00+01:00", "dTimStart": "2008-01-26T12:30:00+01:00", "md": "881", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOW due to unfavorable wind direction and high winds up to 70 knots.", "dTimEnd": "2008-01-26T16:00:00+01:00", "dTimStart": "2008-01-26T15:00:00+01:00", "md": "881", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran 7\" tubing, cable and clamps from 881 m to 1322 m MD. Maintained 100 bar pressure on chemical injection line while RIH. LO 1 joint.", "dTimEnd": "2008-01-27T00:00:00+01:00", "dTimStart": "2008-01-26T16:00:00+01:00", "md": "1322", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2008_01_28
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-27T00:00:00+01:00
2008-01-28T00:00:00+01:00
normal
2018-05-03T13:51:56+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-28T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-24T14:45:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "RIH with 7\" tubing from 2528 m to 3033 m MD. Pull back and install space-out pups. MU TH and terminate CLs, chemical injection line and cable terminated at TH. MU communication collar and TH running tool. RIH and land and test the TH. ", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "125", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Ran 7\" tubing from 1620 to DHSV assembly. MU DHSV and connected and tested CL to 570 bar/10 min. ", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-27T20:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "3520", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-01-28T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "140", "readingKind": "estimated" } ]
[]
[ { "comments": "Ran 7\" tubing, cable and clamps from 1322 m to 1620 m MD. Maintained 100 bar pressure on chemical injection line while RIH. Average running speed is 5,5 joint/hr. Up weight 132 MT / down weight 111 MT at 1500 m MD.", "dTimEnd": "2008-01-27T06:00:00+01:00", "dTimStart": "2008-01-27T00:00:00+01:00", "md": "1620", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran 7\" tubing, cable and clamps from 1620 m to 1738 m MD. Pressure dropped from 100 to 25 bar on chemical injection line.", "dTimEnd": "2008-01-27T08:30:00+01:00", "dTimStart": "2008-01-27T06:00:00+01:00", "md": "1738", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Bled off pressure in chemical injection line and observed for pressure build up. No pressure increase observed. Pressured up to 50 bar and observed that it bled back to 25 bar.\n\nMeanwhile serviced PRS and TDS.", "dTimEnd": "2008-01-27T10:45:00+01:00", "dTimStart": "2008-01-27T08:30:00+01:00", "md": "1738", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran 7\" tubing, cable and clamps from 1738 m to 2428 m MD. Pressure increased from 25 bar to 35 bar on chemical injection line while RIH. Average running speed was 5,5 joint/hr. \n\nTook 4.5 MT weight when entering 9 5/8\" tieback hanger at 2412 m MD. PU 8 MT and continued to RIH at slow speed.", "dTimEnd": "2008-01-28T00:00:00+01:00", "dTimStart": "2008-01-27T10:45:00+01:00", "md": "2428", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2008_01_29
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-28T00:00:00+01:00
2008-01-29T00:00:00+01:00
normal
2018-05-03T13:51:56+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-29T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-24T14:45:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "MU communication collar and TH running tool. RIH and land and test the TH. Perform low pressure test and function test of DHSV. Set production packer and test tubing. Inflow test DHSV. RU wireline. RIH and retrieve NPR plug. POOH and RD. ", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "126", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "RIH with 7\" tubing from 2528 m to 3023 m MD. Landed tubing at 3030.6 m and performed space-out. Pulled back and installed space-out pup. MU TH and terminated CLs, chemical injection line and cable terminated at TH. Prepared for MU communication collar. ", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-28T20:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "3520", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-01-29T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "140", "readingKind": "estimated" } ]
[]
[ { "comments": "Ran 7\" tubing, cable and clamps from 2428 m to 2528 m MD. Pressure increased from 35 bar to 38 bar on chemical injection line while RIH. Average running speed was 5,5 joint/hr. Up weight 195 MT / down weight 130 MT.", "dTimEnd": "2008-01-28T02:00:00+01:00", "dTimStart": "2008-01-28T00:00:00+01:00", "md": "2528", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box meeting with involved personnel. PU and MU DHSV assembly.\n", "dTimEnd": "2008-01-28T03:00:00+01:00", "dTimStart": "2008-01-28T02:00:00+01:00", "md": "2528", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "DHSV got stuck in lower guiding plate on FMS while lowering DHSV assembly through slips. Managed to free slips.", "dTimEnd": "2008-01-28T03:30:00+01:00", "dTimStart": "2008-01-28T03:00:00+01:00", "md": "2528", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed FMS and lowered DHSV through rotary table. Re-installed FMS. Installed one joint above DHSV. Installed hole cover.", "dTimEnd": "2008-01-28T04:15:00+01:00", "dTimStart": "2008-01-28T03:30:00+01:00", "md": "2528", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RU sheave wheel for single CL to a tugger. Inserted and hoisted in position. \n\nPU, flushed and connected CL. Tested CL to 570 bar / 10 min. Bled down pressure to zero and got 210 ml back. Pumped up to 420 bar on control line to maintain DHSV open while RIH.", "dTimEnd": "2008-01-28T06:00:00+01:00", "dTimStart": "2008-01-28T04:15:00+01:00", "md": "2528", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran 7\" tubing, cable and clamps from 2528 m to 3023 m MD. Pressure increased from 38 bar to 45 bar on chemical injection line while RIH. Average running speed was 4 joint/hr due to increased drag. Up weight 227 MT / down weight 137 MT.", "dTimEnd": "2008-01-28T19:15:00+01:00", "dTimStart": "2008-01-28T06:00:00+01:00", "md": "3023", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed pre-job meeting. MU the last tubing joint and RIH slowly. Stung into top of liner with ratcheting muleshoe approx 4 m before landing out with no-go. Sat down 5 MT and marked pipe 7.69 m off btm of joint #19. Pulled up to up-weight and marked pipe 6.5 m off btm of joint #19.\n\nPOOH 8 m to confirm tagging depth. Up weight 215 MT / down weight 135 MT. Observed that up-weight was reduced by 12 MT. RIH slowly and verified landing depth.\n", "dTimEnd": "2008-01-28T20:30:00+01:00", "dTimStart": "2008-01-28T19:15:00+01:00", "md": "3030.6", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Discussed situation with town.", "dTimEnd": "2008-01-28T21:45:00+01:00", "dTimStart": "2008-01-28T20:30:00+01:00", "md": "3030.6", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with 3 tubing joints. Took up weight 225 MT / down weight 135 MT. RU to circulate down tubing.\n\nMeanwhile re-calculated casing design for production PBR being sheared prior to setting the production packer. Calculated space-out for production PBR.", "dTimEnd": "2008-01-29T00:00:00+01:00", "dTimStart": "2008-01-28T21:45:00+01:00", "md": "3000.5", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2008_01_30
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-29T00:00:00+01:00
2008-01-30T00:00:00+01:00
normal
2018-05-03T13:51:56+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-30T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-29T01:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Continue RU wireline. RIH and retrieve NPR plug. POOH and RD. Inflow test TRSCSSV.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "127", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "MU TH running tool. RIH and landed and tested the TH. Performed low pressure test and function tested of DHSV. Sat production packer and tested tubing. Inflow tested DHSV. Started RU wireline. ", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-29T20:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "3520", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-01-30T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "140", "readingKind": "estimated" } ]
[]
[ { "comments": "Performed line-up check. Attempted to circulate by pumping 100 lpm with cement unit up to 13 bar. No returns observed. Held pressure for 2 min. This confirmed that PBR had not been sheared. RD circulation equipment. \n\nPU and MU 6.038 m pup joint according to original space-out.\n", "dTimEnd": "2008-01-29T01:00:00+01:00", "dTimStart": "2008-01-29T00:00:00+01:00", "md": "3006.5", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "PU and MU tubing hanger with handling tool. Lowered the TH down to rotary. Cut the control lines 3 m above TH and fed the CL through the TH. Plugged off DHPG line. Plugged off spare penetration holes in TH with 1/4\" NPT blind plugs. Leak tested all fittings simultaneously through 1/8\" test ports to 448 bar /10 min.", "dTimEnd": "2008-01-29T05:00:00+01:00", "dTimStart": "2008-01-29T01:00:00+01:00", "md": "3007", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted TH to sufficient hight for handling master bushing. Removed FMS and installed master bushing. Installed C-plate and landed TH in same.", "dTimEnd": "2008-01-29T06:00:00+01:00", "dTimStart": "2008-01-29T05:00:00+01:00", "md": "3007", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "BO and LD TH landing tool. Wrapped control lines 3 times around hanger neck. Found broken gauge line.", "dTimEnd": "2008-01-29T07:00:00+01:00", "dTimStart": "2008-01-29T06:00:00+01:00", "md": "3007", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Dicussed situation with town and decided to re-splice the gauge line.", "dTimEnd": "2008-01-29T10:00:00+01:00", "dTimStart": "2008-01-29T07:00:00+01:00", "md": "3007", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Spliced gauge cable. Fed gauge line through hanger and installed clamp.", "dTimEnd": "2008-01-29T16:00:00+01:00", "dTimStart": "2008-01-29T10:00:00+01:00", "md": "3007", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Landed TH in C-plate. BO and LD TH hanger handling tool. Leak tested fitting through 1/8\" test port to 448 bar /10 min.", "dTimEnd": "2008-01-29T18:00:00+01:00", "dTimStart": "2008-01-29T16:00:00+01:00", "md": "3007", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Attempted to install TH running tool with BX-elevator. Changed to pick-up elevator and re-stabbed TH running tool. MU THRT to communication collar with 8 left hand turns. Connected chemical injection line and TRSCSSV control lines to 1/4\" communication ports on top of THRT. Leak tested TRSCSSV line to 570 bar/10 min. Bled off 510 ml. Pressured up and kept 570 bar on TRSCSSV line while RIH. BO THRT piston retaining screws.", "dTimEnd": "2008-01-29T20:30:00+01:00", "dTimStart": "2008-01-29T18:00:00+01:00", "md": "3007", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "PU TH running string and removed C-plate. Installed bushings. Drained riser down to wellhead using A-annulus overboard line. RIH while taping control lines to landing string and stung into liner PBR. Landed out on the landing shoulder in the tubing head. Stick-up 1.33 m.", "dTimEnd": "2008-01-29T22:30:00+01:00", "dTimStart": "2008-01-29T20:30:00+01:00", "md": "3028.4", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressure tested TH in port 1 on surface WH to 70 bar/5 min to verify correct landing. Pressured up function line on THRT to 207 bar to engage TH lock down ring. Pull tested TH to 236 MT to verify hanger lock down.", "dTimEnd": "2008-01-29T23:00:00+01:00", "dTimStart": "2008-01-29T22:30:00+01:00", "md": "3028.4", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressure tested TH seal through test port 1 on surface WH to 35/450 bar for 5/10 min. Bled down to zero bar when test was verified by StatoilHydro.\n\nMeanwhile changed elevator inserts and prepared to PU pumping/testing assembly.", "dTimEnd": "2008-01-30T00:00:00+01:00", "dTimStart": "2008-01-29T23:00:00+01:00", "md": "3028.4", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2008_01_31
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-30T00:00:00+01:00
2008-01-31T00:00:00+01:00
normal
2018-05-03T13:51:56+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-01-31T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-29T01:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "POOH with NPR plug on wireline. Inflow test TRSCSSV. WOW due crane for RD.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "128", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "RU wireline. RIH and retrieved NPR plug. POOH to 2970 m MDRKB.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-30T20:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "3520", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-01-31T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "140", "readingKind": "estimated" } ]
[]
[ { "comments": "MU pumping/testing assembly and confirmed line-up with cement unit. Filled tubing with drill water and performed line test to 345 bar/10 min. \n\nMeanwhile bled off pressure in chemical injection line and observed for back flow for 30 min.", "dTimEnd": "2008-01-30T01:00:00+01:00", "dTimStart": "2008-01-30T00:00:00+01:00", "md": "3028.4", "phase": "fixed", "proprietaryCode": "completion -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened A-annulus valve. Pressured up tubing against pre-installed NPR plug w/ball to 50 bar/10 min. Volume pumped 186 ltrs. \n\nMeanwhile observed no pressure build-up in chemical injection line for 10 min. Pressured up chemical injection line until pressure leveled out at 95 bar.", "dTimEnd": "2008-01-30T01:30:00+01:00", "dTimStart": "2008-01-30T01:00:00+01:00", "md": "3028.4", "phase": "fixed", "proprietaryCode": "completion -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed TRSCSSV and bled off pressure above to 5 bar. Inflow tested TRSCSSV for 10 min. Volume bled off was 30 ltrs. Pumped 44 ltrs, equalized and opened TRSCSSV. Pressured up control line to 570 bar and kept TRSCSSV open.", "dTimEnd": "2008-01-30T02:00:00+01:00", "dTimStart": "2008-01-30T01:30:00+01:00", "md": "3028.4", "phase": "fixed", "proprietaryCode": "completion -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to pressure up tubing to 300 bar. Held pressure for 15 min to set packer and test tubing. PBR sheared at 221.5 bar. Volume pumped was 774 ltrs (Total: 186 + 774 = 960 ltrs). No flow observed from A-annulus.\n\nMeanwhile performed a 300 bar/15 min leak-test on chemical injection line.", "dTimEnd": "2008-01-30T02:45:00+01:00", "dTimStart": "2008-01-30T02:00:00+01:00", "md": "3028.4", "phase": "fixed", "proprietaryCode": "completion -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Bled off pressure in tubing to 280 bar. Volume bled back was 50 ltrs. Closed TRSCSSV and bled off pressure above to 210 bar. Volume bled back was 40 ltrs. Inflow tested TRSCSSV to 70 bar/30 min. Bled off pressure above TRSCSSV to 10 bar. Volume bled back was 120 ltrs. Inflow tested TRSCSSV to 270 bar/30 min. Pumped 180 ltrs, equalized and opened TRSCSSV. Bled off pressure in tubing to zero. Volume bled back was 780 ltrs. Kept TRSCSSV open. Closed A-annulus valve. RD pumping/testing assembly.\n\nMeanwhile performed SJA with wireline crew.", "dTimEnd": "2008-01-30T04:30:00+01:00", "dTimStart": "2008-01-30T02:45:00+01:00", "md": "3028.4", "phase": "fixed", "proprietaryCode": "completion -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed pre-job meeting on rig floor. Spotted and RU WL equipment.", "dTimEnd": "2008-01-30T06:00:00+01:00", "dTimStart": "2008-01-30T04:30:00+01:00", "md": "3028.4", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed pre-job meeting and reviewed SJA with two different crews (crew change). MU 7\" Vam Top x 9\" 4 ACME crossover to top of landing string. Installed Seawell pump-in sub. Installed kill hose to pump-in sub. Lined up and pressure tested to 345/10 min against inner Lo-torque valve. Ok. Installed 6 1/2\" WL-BOP. Hooked up hydraulic connections to WL-BOP and function tested same.\n\nClosed WL-BOP. Performed connection test to 300 bar/5 min against NPR plug in tubing at 3014 m MD. Kept A-annulus vented and observed for fluid returns out A-annulus at surface WH. Volume pumped was 942 ltrs. Bled back 880 ltrs. No returns observed.", "dTimEnd": "2008-01-30T14:30:00+01:00", "dTimStart": "2008-01-30T06:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RU WL sheave with 7/32\" braided line in TDS and PU to sufficient hight. PU and installed lower WL lubricator section. PU upper WL lubricator section to above connection point. Lowered cable head down to WL-BOP and connected lubricator. Broke connection above WL-BOP and lifted lubricator section 1.5 m. Installed WL toolstring. Attempted to fill up lubricator using cement unit, but ended up using WL test pump. Leak tested rig-up to 25/300 bar for 5 /10 min.", "dTimEnd": "2008-01-30T22:00:00+01:00", "dTimStart": "2008-01-30T14:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Observed tugger wire and 7/32\" braided line was twined together at top of lubricator. Got acceptance from OIM and performed SJA for man-riding operation in derrick with wind speed 36-40 knots to be able to RIH.", "dTimEnd": "2008-01-30T23:00:00+01:00", "dTimStart": "2008-01-30T22:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Equalized and opened blind rams. RIH with WL toolstring to 450 m MDRKB and verified that TRSCSSV was fully open. Continued RIH with WL toolstring from 450 to 1500 m MDRKB.", "dTimEnd": "2008-01-31T00:00:00+01:00", "dTimStart": "2008-01-30T23:00:00+01:00", "md": "1500", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2008_02_01
NO 15/9-F-12
NO 15/9-F-12
name
2008-01-31T00:00:00+01:00
2008-02-01T00:00:00+01:00
normal
2018-05-03T13:51:56+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-02-01T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-29T01:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Perform drift run on WL down to 3080 m. RIH with optimized GS pulling string to retrieve NPR plug.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "129", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Worked NPR pulling string to be able to pass production PBR at 2972 m. Attempted to change seal stem position in sheared PBR by applying 100/200 bar on annulus. No sucess. Performed 35/345 bar 10 min pressure test of tubing and production packer from below. Worked NPR pulling string with 345 bar on tubing to change seal stem position in PBR. No sucess. RIH to TCP gun hanger at 3089 m and freed GS pulling tool from NPR plug. POOH and LD GS pulling tool.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-01-31T20:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "3520", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-02-01T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "140", "readingKind": "estimated" } ]
[]
[ { "comments": "RIH with WL toolstring from 1500 to 3000 m MDRKB. Pick up weight 670 kg / slack off weight 760 kg.", "dTimEnd": "2008-01-31T01:00:00+01:00", "dTimStart": "2008-01-31T00:00:00+01:00", "md": "3000", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressured up tubing to 10 bar with cement unit. Volume pumped was 40 ltrs. RIH and latched plug at 3014.8 m MDRKB. Observed for pressure drop for 15 min when equalizing the plug. No pressure drop observed. Jared plug free and waited for 30 min to let plug elements retract. Confirmed that plug was free. No pressure drop observed.", "dTimEnd": "2008-01-31T03:00:00+01:00", "dTimStart": "2008-01-31T01:00:00+01:00", "md": "3014.8", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with NPR plug from 3014.8 m to PBR at 2972 m. Made attempt to pass PBR with max overpull of 785 kg. Bled off pressure in tubing to zero and waited another 30 min to ensure that elements was released. Bled back 80 ltrs. No returns on A-annulus. Continued to attempt to pass PBR. Max overpull 900kg. Unable to pass restriction at 2972 m MDRKB, but free to go down.", "dTimEnd": "2008-01-31T06:00:00+01:00", "dTimStart": "2008-01-31T03:00:00+01:00", "md": "2972", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Worked to free NPR pulling string from 3020 m to 2972 m. PU weight was 950 kg. \n\nFilled tubing up to neddle valve on lubricator and checked for swabbing effect.", "dTimEnd": "2008-01-31T12:00:00+01:00", "dTimStart": "2008-01-31T06:00:00+01:00", "md": "3020", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Tensioned up cable to 1700 kg at 2972 m and waited 35 min. Continued to work to free NPR pulling string from 3068 m to 2972 m.", "dTimEnd": "2008-01-31T14:00:00+01:00", "dTimStart": "2008-01-31T12:00:00+01:00", "md": "3068", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Discussed situation with town and made plans for further operations.", "dTimEnd": "2008-01-31T20:00:00+01:00", "dTimStart": "2008-01-31T14:00:00+01:00", "md": "3000", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held pre job meeting with involved personnel. RU hose from cement unit to A-annulus and performed line test 200 bar/5 min. RIH with NPR pulling string to 3000 m. Reduced TRSCSSV CL pressure to 520 bar.", "dTimEnd": "2008-01-31T21:15:00+01:00", "dTimStart": "2008-01-31T20:00:00+01:00", "md": "3000", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressured up A-annulus to 100 bar using cement unit. Volume pumped 786 ltrs. Kept TRSCSSV CL pressure below 570 bar. Worked to free NPR pulling string from 3000 m to 2972.4 m. Observed that restriction had shifted 0.4 m deeper. Not able to pull NPR plug through PBR.", "dTimEnd": "2008-01-31T22:15:00+01:00", "dTimStart": "2008-01-31T21:15:00+01:00", "md": "3000", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressured up A-annulus to 200 bar using cement unit. Volume pumped 710 ltrs. Kept TRSCSSV CL pressure below 570 bar. Worked to free NPR pulling string from 3000 m to 2972.8 m. Observed that restriction had shifted 0.4 m deeper. Not able to pull NPR plug through PBR.", "dTimEnd": "2008-01-31T23:15:00+01:00", "dTimStart": "2008-01-31T22:15:00+01:00", "md": "3000", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed A-annulus valve. Moved hose from A to B-annulus. Pressured up to 200 bar to equalize pressure against B-annulus. Opened B-annulus valve and bled off pressure to zero. Bled back 1390 ltrs. Closed B-annulus.\n\nMenwhile adjusted TRSCSSV CL pressure and RU overboard line to A-annulus.", "dTimEnd": "2008-02-01T00:00:00+01:00", "dTimStart": "2008-01-31T23:15:00+01:00", "md": "3000", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2008_02_02
NO 15/9-F-12
NO 15/9-F-12
name
2008-02-01T00:00:00+01:00
2008-02-02T00:00:00+01:00
normal
2018-05-03T13:51:56+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-02-02T00:00:00+01:00", "dTimDiaHoleStart": "2008-01-29T01:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "POOH with Tbg Hgr running tool and landing string. Run BPV plug and set in tubing hanger. Nipple down diverter, BOP and surface riser. Install dart in BPV. Lift down coflex production lines (6\" & 2\") to X-mas tree deck.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "130", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Retrieved the NPR plug, No damage or marks on the NPR plug. RD wire line surface equipment.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-02-01T20:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "3520", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-02-02T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "3520", "readingKind": "estimated" } ]
[]
[ { "comments": "Lined up cement unit to pump-in sub on rig floor and performed line test to 345 bar. Prepared injection head for 345 bar test. Bled off chemical injection line to zero and inflow tested same.\n\nPressured up the tubing to 35 bar/10 min to test the production packer from below. Volume pumped was 117 ltrs. Kept 570 bar on TRSCSSV CL. Opened A-annulus. No backflow observed. Pressure dropped 0.17 bar.\n\nPressured up the tubing to 345 bar/10 min to test the production packer from below. Volume pumped was 1137 ltrs (total). Kept 570 bar on TRSCSSV CL. No backflow observed. Pressure dropped 1.0 bar. Inflow test of chemical injection line was ok.\n", "dTimEnd": "2008-02-01T01:15:00+01:00", "dTimStart": "2008-02-01T00:00:00+01:00", "md": "3000", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Worked to free NPR pulling string from 3000 m to 2971.0 m. Observed that restriction had shifted 1.0 m higher due to balloning. Not able to pull NPR plug through PBR. \n\nBled pressure back to zero. Volume bled back was 1390 ltrs.\n\nWorked to free NPR pulling string from 3000 m to 2972.0 m. Not able to pull NPR plug through PBR. \n", "dTimEnd": "2008-02-01T02:00:00+01:00", "dTimStart": "2008-02-01T01:15:00+01:00", "md": "3000", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with NPR pulling string to 3089 m and tagged TCP gun hanger. Up weight 1060 kg. Put NPR plug on top of TCP gun hanger and jared 10 times without lifting the plug from the hanger. Pulled up 2-3 m to 1200 kg tension and lost 500 kg, before upweight stabilized at 800 kg. Went down and verified tag at 3089 m.", "dTimEnd": "2008-02-01T02:30:00+01:00", "dTimStart": "2008-02-01T02:00:00+01:00", "md": "3089", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with NPR pulling tool. Passed PBR and TRSCSSV without any signs of hanging up. Hanged off toolstring in tool catcher.", "dTimEnd": "2008-02-01T04:00:00+01:00", "dTimStart": "2008-02-01T02:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Observed tugger wire and 7/32\" braided line was twined together at top of lubricator. Held tool box meeting. Had to man-ride to sort out wires in derrick. Broke connection above WL-BOP and lifted off lubricator section. LD WL toolstring.", "dTimEnd": "2008-02-01T06:00:00+01:00", "dTimStart": "2008-02-01T04:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Stabbed the WL lubricator. Waited on weather and WL tools to arrive from shore.\n", "dTimEnd": "2008-02-01T10:45:00+01:00", "dTimStart": "2008-02-01T06:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Untangled the WL wire from the shackle on the tugger line. Cut of 50 m of wire and made new rope socket. Took pull test on the rope socket to 1500 kg. Tested the up stroke on jar, worked at 500 kg.\n", "dTimEnd": "2008-02-01T14:30:00+01:00", "dTimStart": "2008-02-01T10:45:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held meeting with shore regarding running details.\n", "dTimEnd": "2008-02-01T15:15:00+01:00", "dTimStart": "2008-02-01T14:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Re-calibrated the WL BOP.\n", "dTimEnd": "2008-02-01T15:45:00+01:00", "dTimStart": "2008-02-01T15:15:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up new WL BHA and installed in lubricator. HW 240 kg.\n", "dTimEnd": "2008-02-01T16:45:00+01:00", "dTimStart": "2008-02-01T15:45:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Leak-tested rig-up to 25bar/5min and 240 bar/10min, against WL-BOP Blind Rams.", "dTimEnd": "2008-02-01T17:30:00+01:00", "dTimStart": "2008-02-01T16:45:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened the WL-BOP Blind Rams, and Shear Blind rams. RIH with the NPR plug GS retrieving tool. At 2950 m weight up/down 730/370 kg HW 670 kg. RIH to 3050 m weight up/down 750/370 kg HW 370 kg. Drifted back to 2963m without no obstruction.\n", "dTimEnd": "2008-02-01T19:45:00+01:00", "dTimStart": "2008-02-01T17:30:00+01:00", "md": "3050", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH and latch the NPR at 3094 m (WL depth). Pulled out with the NPR plug, had 200 kg extra pulling weight, Entered the Mule shoe, no obstruction. Kept steady pull of 12 m/min, took overpull of 400 kg at 2975 m, continued pull out of hole. Passed the DHSV with no overpull.\n", "dTimEnd": "2008-02-01T22:30:00+01:00", "dTimStart": "2008-02-01T19:45:00+01:00", "md": "3094", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Unable to latch with the tool catcher. HW 390 kg. Held tool talk prior to brake at the WL BOP.\n", "dTimEnd": "2008-02-01T23:30:00+01:00", "dTimStart": "2008-02-01T22:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Applied 150 bars to the grease injection head. Pressure up the well to 80 bars, 340 litres, closed the DHSV and bled of the pressure to 10 bars above the DHSV and inflow tested same for 10 min.\n", "dTimEnd": "2008-02-02T00:00:00+01:00", "dTimStart": "2008-02-01T23:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2008_02_03
NO 15/9-F-12
NO 15/9-F-12
name
2008-02-02T00:00:00+01:00
2008-02-03T00:00:00+01:00
normal
2018-05-03T13:51:56+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-02-03T00:00:00+01:00", "dTimDiaHoleStart": "2008-02-02T23:45:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Install XMT/spool assy and test same. Retrieve dart and BPV.\n", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "131", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Retrieved landing string. Installed BPV. Nippled down BOP and Riser. Installed dart in BPV. Terminated control lines. Installed extension spool. \n", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-02-02T20:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "3520", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Applied 80 bars to the well and opened the DHSV. Bled of the pressure of the well, same volume in return 340 litre. \n", "dTimEnd": "2008-02-02T00:30:00+01:00", "dTimStart": "2008-02-02T00:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke the lubricator and laid out the BHA with NPR plug, no damage to the NPR plug.\n", "dTimEnd": "2008-02-02T01:00:00+01:00", "dTimStart": "2008-02-02T00:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D the WL lubricator, the GIH, the WL BOP and disconnected the BCU.", "dTimEnd": "2008-02-02T04:45:00+01:00", "dTimStart": "2008-02-02T01:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to retrieve the TBG landing string. R/D the control lines.", "dTimEnd": "2008-02-02T06:00:00+01:00", "dTimStart": "2008-02-02T04:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged down control line sheave.\n", "dTimEnd": "2008-02-02T07:00:00+01:00", "dTimStart": "2008-02-02T06:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to L/O the 7\" landing string. Attempted same.\n", "dTimEnd": "2008-02-02T08:00:00+01:00", "dTimStart": "2008-02-02T07:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Problems with elevators malfunction, investigated same. Changed out elevators and function tested same.\n", "dTimEnd": "2008-02-02T09:00:00+01:00", "dTimStart": "2008-02-02T08:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held tool box talk prior to use tuggers to retrieve the 7\" landing string. Picked up and laid out 7\" landing sting.\n", "dTimEnd": "2008-02-02T09:30:00+01:00", "dTimStart": "2008-02-02T09:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleared rig floor, casing tong, Baker control line drum, Gauge/inj. Line drum and PS-30 slips.\n", "dTimEnd": "2008-02-02T11:30:00+01:00", "dTimStart": "2008-02-02T09:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- completion string", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to installation of the BPV. Picked up the PBV and ran in same on tugger and installed same.\n", "dTimEnd": "2008-02-02T14:30:00+01:00", "dTimStart": "2008-02-02T11:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to nipple down the stack. Nippled down BOP and set back into cradle, laid out riser.", "dTimEnd": "2008-02-02T20:30:00+01:00", "dTimStart": "2008-02-02T14:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed dart in BPV.", "dTimEnd": "2008-02-02T20:45:00+01:00", "dTimStart": "2008-02-02T20:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lowered down tension cylinder to centralizer deck.", "dTimEnd": "2008-02-02T21:30:00+01:00", "dTimStart": "2008-02-02T20:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to lower down the Co-flex hose onto the XMT deck.\n", "dTimEnd": "2008-02-02T22:00:00+01:00", "dTimStart": "2008-02-02T21:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lowered the Co-flex hose onto the XMT deck.", "dTimEnd": "2008-02-02T23:30:00+01:00", "dTimStart": "2008-02-02T22:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to terminate the control lines. \n", "dTimEnd": "2008-02-02T23:45:00+01:00", "dTimStart": "2008-02-02T23:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed the communication collar.\n", "dTimEnd": "2008-02-03T00:00:00+01:00", "dTimStart": "2008-02-02T23:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2008_02_04
NO 15/9-F-12
NO 15/9-F-12
name
2008-02-03T00:00:00+01:00
2008-02-04T00:00:00+01:00
normal
2018-05-03T13:51:56+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-02-04T00:00:00+01:00", "dTimDiaHoleStart": "2008-02-02T23:45:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Retrieve dart and BPV. Inflow test LMV and HMV. Commence commising XMT (offline activity). Skid cantiler to F4.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "132", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Installed the WH extension spool, Xmas tree and the production Co-flex hose.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-02-03T20:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "3520", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-02-04T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "3520", "readingKind": "estimated" } ]
[]
[ { "comments": "Terminated the control line in the well head.\n", "dTimEnd": "2008-02-03T04:30:00+01:00", "dTimStart": "2008-02-03T00:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed the spacer spool. Found the protection cover for hydraulic outlets at the master bushing laying on the well cover on XMT deck.\n", "dTimEnd": "2008-02-03T05:00:00+01:00", "dTimStart": "2008-02-03T04:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held time out regarding dropped object from drill floor to the well head: 20m, 5 kg. \n", "dTimEnd": "2008-02-03T05:30:00+01:00", "dTimStart": "2008-02-03T05:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to install the master bushing and installed same.", "dTimEnd": "2008-02-03T06:00:00+01:00", "dTimStart": "2008-02-03T05:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed master bushing.\n", "dTimEnd": "2008-02-03T06:30:00+01:00", "dTimStart": "2008-02-03T06:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed extension spool and torqued up same. Pressure tested void to 30/345 bars 5/10 min. Pressure tested VG 63 seal 35 bars 10 min. Installed gauge outlet. Meanwhile had time out with dayshift regarding dropped object.\n", "dTimEnd": "2008-02-03T15:30:00+01:00", "dTimStart": "2008-02-03T06:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to R/D scaffolding and removal of hatch cover. Performed same.\n", "dTimEnd": "2008-02-03T17:30:00+01:00", "dTimStart": "2008-02-03T15:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to pick up and installation of the X-mas tree.\n", "dTimEnd": "2008-02-03T17:45:00+01:00", "dTimStart": "2008-02-03T17:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up, landed, orientated and installed the X-mas tree. Installed WV spool outlet and production co-flex hose.\n", "dTimEnd": "2008-02-04T00:00:00+01:00", "dTimStart": "2008-02-03T17:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2008_02_05
NO 15/9-F-12
NO 15/9-F-12
name
2008-02-04T00:00:00+01:00
2008-02-05T00:00:00+01:00
normal
2018-05-03T13:51:56+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-02-05T00:00:00+01:00", "dTimDiaHoleStart": "2008-02-02T23:45:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Operation proceed on F-4", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "133", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Leak tested X-mas tree connections to 30/345 bars 5/10 min. Lined up and leak tested production line 50/180 bars 5/10 min. Inflow tested LMV and HMV against BPV.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-02-04T20:00:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "3520", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[ { "dTim": "2008-02-05T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "3520", "readingKind": "estimated" } ]
[]
[ { "comments": "Made up 2\" 1502 hose to the KWV outlet. Torqued up the PWV spool outlet and the production co-flex hose.\n", "dTimEnd": "2008-02-04T04:45:00+01:00", "dTimStart": "2008-02-04T00:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to pressure test the production line and the X-mas tree.\n", "dTimEnd": "2008-02-04T05:00:00+01:00", "dTimStart": "2008-02-04T04:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up and flushed the lines to the X-mas tree", "dTimEnd": "2008-02-04T06:00:00+01:00", "dTimStart": "2008-02-04T05:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Completed flushing of lines to the X-mas tree.\n", "dTimEnd": "2008-02-04T06:15:00+01:00", "dTimStart": "2008-02-04T06:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Leak tested X-mas tree connections to 30/345 bars 5/10 min.\n", "dTimEnd": "2008-02-04T07:00:00+01:00", "dTimStart": "2008-02-04T06:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to flush X-mas tree and production flow line prior to leak test of same.\n", "dTimEnd": "2008-02-04T07:45:00+01:00", "dTimStart": "2008-02-04T07:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Awaited confirmation of correct torqued up flow line.\n", "dTimEnd": "2008-02-04T09:15:00+01:00", "dTimStart": "2008-02-04T07:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Checked remote panel to operate X-mas tree valves. Found too low fluid level.\n", "dTimEnd": "2008-02-04T10:15:00+01:00", "dTimStart": "2008-02-04T09:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flushed production flow line into the separator.\n", "dTimEnd": "2008-02-04T11:00:00+01:00", "dTimStart": "2008-02-04T10:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up and leak tested production flow line 50/180 bars 5/10 min.\n", "dTimEnd": "2008-02-04T12:30:00+01:00", "dTimStart": "2008-02-04T11:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to inflow test LMV and HMV against BPV.\n", "dTimEnd": "2008-02-04T12:45:00+01:00", "dTimStart": "2008-02-04T12:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressured up to 240 bars against BPV. Inflow tested LMV and HMV, 230 bars diff.\n", "dTimEnd": "2008-02-04T15:00:00+01:00", "dTimStart": "2008-02-04T12:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to retrieve the dart and the BPV.", "dTimEnd": "2008-02-04T15:15:00+01:00", "dTimStart": "2008-02-04T15:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed tree cap, had to pump out same. Retrieved the dart and the BPV. Re-installed the tree cap.\n", "dTimEnd": "2008-02-04T18:15:00+01:00", "dTimStart": "2008-02-04T15:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Leak tested tree cap to 30/345 bars 5/10 min.", "dTimEnd": "2008-02-04T19:00:00+01:00", "dTimStart": "2008-02-04T18:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressure tested BOT control line exit blocks for DHSV to 570bars/15 min. Measured return fluids from control line 225 ml. Removed the Co-flex support frame at the X-mas tree, and transferred to the welders shop for modification. \n\nContinued operation on F-4", "dTimEnd": "2008-02-04T21:00:00+01:00", "dTimStart": "2008-02-04T19:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- bop/wellhead equipment", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2008_02_12
NO 15/9-F-12
NO 15/9-F-12
name
2008-02-11T00:00:00+01:00
2008-02-12T00:00:00+01:00
normal
2018-05-03T13:51:57+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2008-02-12T00:00:00+01:00", "dTimDiaHoleStart": "2008-02-11T09:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "None", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "134", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Sent firing command to E-Fire firing head in TCP guns and perforated well from 3130 to 3281 mMDRT.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2008-02-11T11:00:00+01:00", "density": "1.4", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "2993", "mudClass": "oil based", "presBopRating": "690", "pv": "29", "tempHthp": "120", "type": "OBM-Standard", "visFunnel": "-999.99", "yp": "7.5" }, { "dTim": "2008-02-11T22:45:00+01:00", "density": "1.4", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "2993", "mudClass": "oil based", "presBopRating": "690", "pv": "24", "tempHthp": "120", "type": "OBM-Standard", "visFunnel": "-999.99", "yp": "8" } ]
[]
[]
[ { "comments": "Held prejob meeting with all involved, including Maersk Production.", "dTimEnd": "2008-02-11T10:00:00+01:00", "dTimStart": "2008-02-11T09:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed lo-torq valve on kill valve on XMT. Hooked up 2\" HP-hose from lo-torq valve to cement pump kill line valve in moon pool.", "dTimEnd": "2008-02-11T10:30:00+01:00", "dTimStart": "2008-02-11T10:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flushed line from cement unit to XMT, observing for returns in needle valve on XMT cap.", "dTimEnd": "2008-02-11T11:00:00+01:00", "dTimStart": "2008-02-11T10:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed KV. Leak tested line from cement pump to KV to 250 bar/10 min. No leak observed through needle valve on XMT cap. Bled pressure down to 20 bar, to cement pump. Closed SV and needle valve on XMT cap. DHPG pressure = 277,1 bar.", "dTimEnd": "2008-02-11T11:30:00+01:00", "dTimStart": "2008-02-11T11:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened MMV. Opened HMV. Pressured up well to 30 bar with cement pump. Confirmed pressure increase on DHPG. Opened DHSV w/460 bar control line pressure.", "dTimEnd": "2008-02-11T12:00:00+01:00", "dTimStart": "2008-02-11T11:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to pressure up well to 240 bar (750 liter) with cement pump. Pressured up chemical injection line to 230 bar with Well Dynamics test pump. Leak tested termination block for chemcial injection line on wellhead to 230 bar/10 min.", "dTimEnd": "2008-02-11T12:30:00+01:00", "dTimStart": "2008-02-11T12:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed MMV. Bled off pressure above MMV to 10 bar. Inflow tested MMV to 230 bar/10 min. Equalized MMV with 240 bar. Opened MMV. Closed HMV. Bled off pressure above HMV to 10 bar. Inflow tested HMV to 230 bar/10 min. Equalized HMV with 240 bar. Opened HMV. Bled ppressure in well to 0 bar to cement pump. Bled back 710 liter. Counted 3 cycles on ProFire firing head on TCP guns.", "dTimEnd": "2008-02-11T13:30:00+01:00", "dTimStart": "2008-02-11T12:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Schlumberger TCP performed training pulses with cement pump. Schlumberger sent firing command ,with cement unit, to E-Fire firing head in TCP guns. Bled down well pressure to 0 bar to cement unit. Closed TKV and Lo-torq valve. The TCP guns fired after waiting the programmed time delay of 10 minutes. Wellhead pressure / DHPG pressure increased to 31/ 308 bar. Closed DHSV. Bled down pressure above DHSV to 0 bar to the flowline. Monitored WHP in XMT for 30 minutes to verify DHSV integrity. No pressure buildup observed.", "dTimEnd": "2008-02-11T15:00:00+01:00", "dTimStart": "2008-02-11T13:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed valve to cement pump kill line in moon pool to isolate 2\" HP-hose to KV on XMT.", "dTimEnd": "2008-02-11T15:15:00+01:00", "dTimStart": "2008-02-11T15:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed well hand over activiities. Verified that all valves on XMT and DHSV were closed. Handed well over to Maersk production at 17:00. ****************END OF OPERATIONS****************", "dTimEnd": "2008-02-11T17:00:00+01:00", "dTimStart": "2008-02-11T15:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "completion -- perforate", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2009_03_14
NO 15/9-F-12
NO 15/9-F-12
name
2009-03-13T00:00:00+01:00
2009-03-14T00:00:00+01:00
normal
2018-05-03T13:51:57+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2009-03-14T00:00:00+01:00", "dTimDiaHoleStart": "2009-03-13T15:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Install WL BOP and riser on XMT. Install combination toolstring in riser. MU lubricator. Leak test riser, BOP and lubricator. Equalize and open HMV and DHSV. RIH with combination toolstring to tag TCP guns at 3271 m. Perform correlation log in 7\" liner. POOH and LD toolstring. Install PLT toolstring in riser. MU lubricator and leak test at in-situ sub. Equalize and open HMV. RIH to perform shut-in station logs.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": null, "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "135", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Handed well over from Production. RU HMV and DHSV to local control panel. Installed test and bleed manifold on to XMT KWV. Performed line test from KWV to cmt unit. Attempted to leak tested XMT cross to 30/200 bar for 5/10 min.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2009-03-13T23:59:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Waited on Mærsk Production to hand over well to Volve D&W.\n\nMeanwhile performed 5-yearly maintenace on choke manifold.", "dTimEnd": "2009-03-13T18:30:00+01:00", "dTimStart": "2009-03-13T15:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on Mærsk Production to shut in well and inflow test HMV to 120-5 bar/10 min and DHSV to 120-5 bar/30 min. Had 2.3 bar drop/10 min on HMV and 0.2 bar drop/30 min on DHSV.\n\nMeanwhile performed 5-yearly maintenace on choke manifold and loosened bolts on kill ving valve on BOP in preparation for 5-yearly maintenance.", "dTimEnd": "2009-03-14T00:00:00+01:00", "dTimStart": "2009-03-13T18:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wait", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2009_03_15
NO 15/9-F-12
NO 15/9-F-12
name
2009-03-14T00:00:00+01:00
2009-03-15T00:00:00+01:00
normal
2018-05-03T13:51:57+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": ".7", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2009-03-15T00:00:00+01:00", "dTimDiaHoleStart": "2009-03-13T15:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Inflow test HMV to 81-5 bar/10 min. Break lubricator and LD toolstring. Install PLT toolstring in riser. MU lubricator and leak test at in-situ sub. Equalize and open HMV. RIH to perform shut-in station logs and 4 PLT tool calibration passes. Bean up well to 4500 Sm3/day. Perform station logs and 4 high rate flowing PLT passes. Choke back flow to 3000 Sm3/day.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": null, "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "136", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Operated and greased up leaking PWV. Leak tested XMT cross to 30/200 bar for 5/10 min. Installed WL BOP and riser on XMT. Tested shear seals on WL BOP. Installed combination toolstring in riser. MU lubricator. Leak test WL riser, BOP and lubricator. Equalize and open HMV and DHSV. RIH with combination toolstring and tagged TCP guns at 3260.5 m. Performed correlation log in 7\" liner. POOH and prepared for inflow test of HMV.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2009-03-14T23:59:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Bled off pressure to 0 bar above DHSV. Confirmed valve status and handed over well to drilling at 01:00.", "dTimEnd": "2009-03-14T01:00:00+01:00", "dTimStart": "2009-03-14T00:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Transferred HMV and DHSV to local controled panel (wireline lock-out mode). Connected Seawell pump and tested line up.", "dTimEnd": "2009-03-14T02:00:00+01:00", "dTimStart": "2009-03-14T01:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed test and bleed manifold from moonpool outlet to XMT KWV. Prepared bleed down hose and valves from KWV to closed drain.", "dTimEnd": "2009-03-14T03:00:00+01:00", "dTimStart": "2009-03-14T02:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flushed lines and attempted to perform line test to 30/200 bar for 5/10 min from cmt unit to KWV through test and bleed manifold. Had 8 bar increase on low pressure test. Investigated situation. Performed \"line test\" for cmt unit seperatly. Ok. Performed line test to 30/200 bar for 5/10 min from cmt unit to KWV through test and bleed manifold.", "dTimEnd": "2009-03-14T04:30:00+01:00", "dTimStart": "2009-03-14T03:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened KWV and attempted test XMT cross. Pressure dropped from 20 to 8 bar while pumping and from 26 bar to 11 bar on second attempt. Checked line-up for leaks. No leaks observed. Opened SV. Flushed through XMT through tree cap needle valve. Closed SV and re-attempted to test XMT cross. Pressure dropped from 30 to 8 bar. Closed LTV1 and performed a second line test to 30 bar/5 min. Ok. Opened LTV1 and re-attempted to test XMT cross without sucess.", "dTimEnd": "2009-03-14T06:00:00+01:00", "dTimStart": "2009-03-14T04:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed MMV to establish if it was HMV or PWV that was leaking. Re-attempted to test XMT cross without sucess.", "dTimEnd": "2009-03-14T06:30:00+01:00", "dTimStart": "2009-03-14T06:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Operated and greased up PWV.", "dTimEnd": "2009-03-14T09:00:00+01:00", "dTimStart": "2009-03-14T06:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Verified PWV, SV and HMV were closed. Leak tested XMT cross to 30/200 bar for 5/10 min using cmt unit and 100% MEG. Had 2.4 bar drop (1.2%)/10 min. Bled off pressure to 0 bar to platform closed drain. Verified no pressure below treee cap and removed same.", "dTimEnd": "2009-03-14T10:30:00+01:00", "dTimStart": "2009-03-14T09:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk for installing WL riser and lubricator and change elevator. Lifted WL riser sections and BOP with Top Drive using double lift arrangement. Lowered and stabbed on to XMT connection.", "dTimEnd": "2009-03-14T11:00:00+01:00", "dTimStart": "2009-03-14T10:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed elevators and PU lubricator.\n\nMeanwhile pressure tested shear ram on WL BOP to 30/200 bar for 5/10 min. Ok.", "dTimEnd": "2009-03-14T12:30:00+01:00", "dTimStart": "2009-03-14T11:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Man-rode to turn WL sheave wheel.", "dTimEnd": "2009-03-14T13:00:00+01:00", "dTimStart": "2009-03-14T12:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "MU combination toolstring in riser and stabbed on lubricator with in-situ sub.", "dTimEnd": "2009-03-14T15:00:00+01:00", "dTimStart": "2009-03-14T13:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Verified that toolstring was sitting in toolcatcher. Opened SV 10 turns and opened KWV. Filled riser with 100% MEG from cmt unit. Leak tested WL riser, BOP and lubricator to 30/200 bar for 5/10 min using cmt unit and 100% MEG. Ok. Bled off pressure to 0 bar. Closed SV and KWV.", "dTimEnd": "2009-03-14T16:15:00+01:00", "dTimStart": "2009-03-14T15:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed well control exercise with Seawell, Schlumberger and Mærsk crew.", "dTimEnd": "2009-03-14T16:30:00+01:00", "dTimStart": "2009-03-14T16:15:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened HMV, KWV and SV 10 turns. Filled well above DHSV with 7.7 m3 100% MEG. Equalized and opened DHSV at 93 bar. Closed KWV and bled off pressureto 0 bar in manifold.", "dTimEnd": "2009-03-14T18:15:00+01:00", "dTimStart": "2009-03-14T16:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened SV with 45 turns. RIH with combination toolstring on 7/16\" EWLL to 485 m and took pick up weight.", "dTimEnd": "2009-03-14T19:00:00+01:00", "dTimStart": "2009-03-14T18:15:00+01:00", "md": "485", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attempted to RIH through DHSV, but found solid hold up depth at 498 m.", "dTimEnd": "2009-03-14T19:15:00+01:00", "dTimStart": "2009-03-14T19:00:00+01:00", "md": "498", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed out MEG tanks and re-filled MEG on cmt unit.\n\nMeanwhile held tool box talk prior to equalizing and opening DHSV. Performed well control exercise with Seawell, Schlumberger and Mærsk crew.", "dTimEnd": "2009-03-14T20:45:00+01:00", "dTimStart": "2009-03-14T19:15:00+01:00", "md": "485", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened LTV1 and LTV2. Equalized pressure to 90 bar and opened KWV. Pumped 8.95 m3 100% MEG into well and observed pressure drop from 90 to 69 bar. This confirmed that DHSV was open/partly open.", "dTimEnd": "2009-03-14T21:30:00+01:00", "dTimStart": "2009-03-14T20:45:00+01:00", "md": "485", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attempted to RIH through DHSV, but found solid hold up depth at 498 m. Discussed further options.", "dTimEnd": "2009-03-14T23:15:00+01:00", "dTimStart": "2009-03-14T21:30:00+01:00", "md": "485", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Functioned DHSV closed/open twice to remove possible debris. Had 3.0 dl return when closing DHSV and pumped 4.25 dl when opening DHSV. Had good indication of DHSV being in open position.", "dTimEnd": "2009-03-15T00:00:00+01:00", "dTimStart": "2009-03-14T23:15:00+01:00", "md": "485", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2009_03_16
NO 15/9-F-12
NO 15/9-F-12
name
2009-03-15T00:00:00+01:00
2009-03-16T00:00:00+01:00
normal
2018-05-03T13:51:57+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": ".9", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2009-03-16T00:00:00+01:00", "dTimDiaHoleStart": "2009-03-13T15:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Choke back flow to 1500 Sm3/day. Perform station logs and 4 low rate flowing PLT passes. Shut-in well. POOH with PLT toolstring. Inflow test DHSV, HMV and MMV for handover. LD toolstring. RD WL riser and BOP from XMT.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": null, "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "137", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Inflow tested HMV to 81-5 bar/10 min. Broke lubricator and LD toolstring. Installed PLT toolstring in riser. MU lubricator and leak tested at in-situ sub. Equalized and opened HMV. RIH with PLT toolstring on 7/16\" EWL from surface to 2929 m. Performed stationary logging at DHPG depth. Continued RIH from 2929 m to 3030 m to perform shut-in station logs and 4 PLT tool calibration passes in the interval 3030 m to 3255 m MD. Bean up well to 4500 Sm3/day. Performed station logs and 4 high rate flowing PLT passes in the interval 3030 m to 3255 m MD. Choked back flow to 3000 Sm3/day. Performed station logs and 4 medium rate flowing PLT passes in the interval 3030 m to 3255 m MD.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2009-03-15T23:59:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Attempted to RIH through DHSV and experienced a 1 m drop of the toolstring after initial hold up. Made several more attempts to run through DHSV.", "dTimEnd": "2009-03-15T00:30:00+01:00", "dTimStart": "2009-03-15T00:00:00+01:00", "md": "498", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with toolstring through DHSV to 515 m and pulled back up to ensure valve was fully open. Continued RIH with combination toolstring on 7/16\" EWL from 485 m to 3027 m (tally dyp). Hung up at 7\" liner PBR and made several attempts to enter 7\" liner. Continued RIH with combination toolstring from 3027 m to 3260.5 m (log dyp). RIH tension was 1900 lbs and PU tension was 5100 lbs at 3250 m MD. RIH speed was 30 m/min. RIH speed inside 7\" liner was 20 m/min. Tension inside 7\" liner was higher than simulated (60% of max safe pull to be able to break weakpoint).", "dTimEnd": "2009-03-15T03:00:00+01:00", "dTimStart": "2009-03-15T00:30:00+01:00", "md": "3260.5", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Tagged top of TCP guns at 3260.5 m (ref open hole log)/ at 3258.5 m (ref pip-tag in tally). Made GR-CCL correlation log from 3260.6 m to 3029 m (top of 7\" liner).", "dTimEnd": "2009-03-15T03:30:00+01:00", "dTimStart": "2009-03-15T03:00:00+01:00", "md": "3260.5", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with combination toolstring on 7/16\" EWL from 3029 m to OOH. Ran carefully through DHSV at 497 m MD. Pulled cable head into tool catcher.", "dTimEnd": "2009-03-15T05:30:00+01:00", "dTimStart": "2009-03-15T03:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed SV partly and verified toolstring out of hole. Recorded SIWHP 81 bar. Closed HMV and bled down pressure above to 5 bar.", "dTimEnd": "2009-03-15T06:00:00+01:00", "dTimStart": "2009-03-15T05:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Inflow tested HMV 81 -5 bar/10 min ok. Opened KWV and SV 10 turns. Bled off pressure to zero to closed drain and purged riser with Nitrogen. Closed KWV. Bled off remaining pressure in lubricator through needle valve. Closed SV.", "dTimEnd": "2009-03-15T07:30:00+01:00", "dTimStart": "2009-03-15T06:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke lubricator at in-situ sub and LD combination toolstring. Found centered circular impression on lead impression block confirms that part of running tool for TCP gun hanger was lost in hole and is sitting at the top of the TCP gun hanger.", "dTimEnd": "2009-03-15T08:00:00+01:00", "dTimStart": "2009-03-15T07:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed PLT toostring in riser and MU in-situ sub. Leak tested in-situ sub to 30/200 bar for 5/10 min. Ok.", "dTimEnd": "2009-03-15T08:30:00+01:00", "dTimStart": "2009-03-15T08:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened KWV. Equalized and opened HMV using cmt pump and 100% MEG. WHP was 85 bar. Closed KWV.", "dTimEnd": "2009-03-15T09:00:00+01:00", "dTimStart": "2009-03-15T08:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with PLT toolstring on 7/16\" EWL from surface to 2929 m MD. Ran carefully through DHSV at 492 m. Performed station log and checked readings against DHPG. Continued RIH with PLT toolstring on 7/16\" EWL from 2929 m to 3030 m MD.", "dTimEnd": "2009-03-15T11:30:00+01:00", "dTimStart": "2009-03-15T09:00:00+01:00", "md": "3030", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Logged PLT down/up and performed shut-in calibration passes from 3030 m to 3255 m MD.\n\nPass 1: Down/up speed: 10 m/min\nPass 2: Down/up speed: 20 m/min\nPass 3: Down/up speed: 30 m/min\nPass 4: Down/up speed: 40 m/min", "dTimEnd": "2009-03-15T14:00:00+01:00", "dTimStart": "2009-03-15T11:30:00+01:00", "md": "3255", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with PLT on 7/16\" EWL from 3030 m to 3255 m MD.\n\nTook stationary PLT readings at :\n3245 m MD\n3233 m MD\n3200 m MD\n3154 m MD\n\nPOOH with PLT toolstring from 3154 m to 3080 m MD. Spinner response appr 2.0 RPS. Moved even further up to 2915 m. Still spinner response 2.0 RPS. Decided to go down to 3080 m again.\n", "dTimEnd": "2009-03-15T16:30:00+01:00", "dTimStart": "2009-03-15T14:00:00+01:00", "md": "3255", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Beaned up well in increments to 4500 Sm3/d. Obtained stable FBHP ( less than 0.1 bar variance for 1 hr) of 276,6 bar at DHPG.", "dTimEnd": "2009-03-15T23:30:00+01:00", "dTimStart": "2009-03-15T16:30:00+01:00", "md": "3080", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Logged PLT down/up and performed high rate passes from 3030 m to 3255 m MD.\n\nPass 1: Down/up speed: 10 m/min\n", "dTimEnd": "2009-03-16T00:00:00+01:00", "dTimStart": "2009-03-15T23:30:00+01:00", "md": "3255", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2009_03_17
NO 15/9-F-12
NO 15/9-F-12
name
2009-03-16T00:00:00+01:00
2009-03-17T00:00:00+01:00
normal
2018-05-03T13:51:57+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2009-03-17T00:00:00+01:00", "dTimDiaHoleStart": "2009-03-13T15:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "RD BOP from XMT. Leak test XMT cross, KWV and tree cap. Hand well over to Mærsk Production. Continue with PRS-and 5-yearly class plan.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": null, "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "138", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Choked back flow to 1500 Sm3/day. Performed station logs and 4 low rate flowing PLT passes in the interval 3030 m to 3255 m MD. Shut-in well. POOH with PLT toolstring. Inflow tested DHSV, HMV and MMV for handover. BO lubricator and LD toolstring. LD lubricator. RD and LD WL riser.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2009-03-16T23:59:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Logged PLT down/up and performed high rate passes from 3030 m to 3255 m MD.\n\nPass 2: Down/up speed: 20 m/min\nPass 3: Down/up speed: 30 m/min\nPass 4: Down/up speed: 40 m/min", "dTimEnd": "2009-03-16T01:30:01+01:00", "dTimStart": "2009-03-16T00:00:00+01:00", "md": "3255", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with PLT on 7/16\" EWL from 3030 m to 3255 m MD.\n\nTook stationary PLT readings at :\n3245 m MD\n3233 m MD\n3200 m MD\n3154 m MD\n\nPOOH with PLT toolstring from 3154 m to 3080 m MD.", "dTimEnd": "2009-03-16T02:15:01+01:00", "dTimStart": "2009-03-16T01:30:01+01:00", "md": "3255", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Choked back on well in increments to 3000 Sm3/d. Obtained stable FBHP ( less than 0.1 bar variance for 1 hr) of 283,7 bar at DHPG.", "dTimEnd": "2009-03-16T03:45:01+01:00", "dTimStart": "2009-03-16T02:15:01+01:00", "md": "3080", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Logged PLT down/up and performed medium rate passes from 3030 m to 3255 m MD.\n\nPass 1: Down/up speed: 10 m/min\nPass 2: Down/up speed: 20 m/min\nPass 3: Down/up speed: 30 m/min\nPass 4: Down/up speed: 40 m/min", "dTimEnd": "2009-03-16T05:30:01+01:00", "dTimStart": "2009-03-16T03:45:01+01:00", "md": "3255", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with PLT on 7/16\" EWL from 3030 m to 3255 m MD.\n\nTook stationary PLT readings at :\n3245 m MD\n3233 m MD\n3200 m MD\n3154 m MD\n\nPOOH with PLT toolstring from 3154 m to 3080 m MD.", "dTimEnd": "2009-03-16T06:00:00+01:00", "dTimStart": "2009-03-16T05:30:01+01:00", "md": "3255", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Choked back on well in increments to 1500 Sm3/d. Obtained stable FBHP ( less than 0.1 bar variance for 1 hr) of 290,2 bar at DHPG.", "dTimEnd": "2009-03-16T09:45:00+01:00", "dTimStart": "2009-03-16T06:00:00+01:00", "md": "3080", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Logged PLT down/up and performed medium rate passes from 3030 m to 3255 m MD.\n\nPass 1: Down/up speed: 10 m/min\nPass 2: Down/up speed: 20 m/min\nPass 3: Down/up speed: 30 m/min\nPass 4: Down/up speed: 40 m/min", "dTimEnd": "2009-03-16T11:45:00+01:00", "dTimStart": "2009-03-16T09:45:00+01:00", "md": "3255", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with PLT toolstring on 7/16\" EWL from surface to 2929 m MD. Performed station log and checked readings against DHPG. Read 290.1 bar.", "dTimEnd": "2009-03-16T12:15:00+01:00", "dTimStart": "2009-03-16T11:45:00+01:00", "md": "2929", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Shut in well. Recorded SIWHP was 117 bar.", "dTimEnd": "2009-03-16T13:15:00+01:00", "dTimStart": "2009-03-16T12:15:00+01:00", "md": "2929", "phase": "wire line", "proprietaryCode": "workover -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with PLT toolstring on 7/16\" EWL from 2929 m to surface. Ran carefully through DHSV at 492 m. Pulled cable head into tool catcher. Closed SV using 45 turns to verify BHA OOH. Closed HMV.", "dTimEnd": "2009-03-16T15:30:00+01:00", "dTimStart": "2009-03-16T13:15:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened SV 10 turns. Opened KWV and bled off pressure in XMT, riser and lubricator to 5 bar to closed drain. Closed KWV and SV.", "dTimEnd": "2009-03-16T16:00:00+01:00", "dTimStart": "2009-03-16T15:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Inflow tested HMV 117 -5 bar/10 min. Had 1.14 bar (1%) drop/10 min. Opened KWV. Equalized and opened HMV using cmt pump and 100% MEG.", "dTimEnd": "2009-03-16T16:30:00+01:00", "dTimStart": "2009-03-16T16:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed DHSV using Seawell pump on drill floor. Bled off pressure to 113 bar above DHSV. Opened KWV. Bullheaded 3 m3 100% MEG into well using cmt pump.", "dTimEnd": "2009-03-16T17:30:00+01:00", "dTimStart": "2009-03-16T16:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Bled off pressure above closed DHSV from 113 bar to 63 bar.", "dTimEnd": "2009-03-16T18:00:00+01:00", "dTimStart": "2009-03-16T17:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed KWV. Closed MMV. Opened PWV and bled down XMT and flowline to 5 bar. Closed PWV. Inflow tested MMV to 63 -5 bar/10 min. Had 0.11 bar (0.2%) drop/10 min.", "dTimEnd": "2009-03-16T20:00:00+01:00", "dTimStart": "2009-03-16T18:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened KWV and PWV. Equalized and opened MMV using cmt unit and 100% MEG.", "dTimEnd": "2009-03-16T20:45:00+01:00", "dTimStart": "2009-03-16T20:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Bled off pressure in XMT/above DHSV through PWV and flowline to 5 bar. Closed PWV and KWV.", "dTimEnd": "2009-03-16T22:15:00+01:00", "dTimStart": "2009-03-16T20:45:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Inflow tested DHSV to 117 -5bar/30 min. Had 1.32 bar (1.1%) increase/30 min.\n\nMeanwhile had tool box talk prior to breaking down lubricator and toolstring.", "dTimEnd": "2009-03-16T22:45:00+01:00", "dTimStart": "2009-03-16T22:15:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened KWV. Bled off remaining 5 bar above DHSV to closed drain.", "dTimEnd": "2009-03-16T23:30:00+01:00", "dTimStart": "2009-03-16T22:45:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened SV. Bled off pressure/drained XMT, riser and lubricator to closed drain.", "dTimEnd": "2009-03-17T00:00:00+01:00", "dTimStart": "2009-03-16T23:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2009_03_18
NO 15/9-F-12
NO 15/9-F-12
name
2009-03-17T00:00:00+01:00
2009-03-18T00:00:00+01:00
normal
2018-05-03T13:51:57+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2009-03-18T00:00:00+01:00", "dTimDiaHoleStart": "2009-03-13T15:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Operation transferred to F-99.", "hpht": "0", "md": "3520", "mdCsgLast": "3519", "mdDiaHoleStart": null, "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "139", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "RD BOP from XMT. Leak test XMT cross, KWV and tree cap. Hand well over to Mærsk Production. Cleared and cleaned rig floor of remaining WL equipment. Transferred operation to F-99 for PRS-and 5-yearly BOP classification.", "tightWell": "0", "tvd": "3107.4", "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[ { "dTim": "2009-03-17T23:59:00+01:00", "density": "1.03", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "-999.99", "mudClass": "other", "presBopRating": "690", "pv": "-999.99", "tempHthp": null, "type": "Packer fluid", "visFunnel": "-999.99", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Continued bleeding off pressure/drained XMT, riser and lubricator to closed drain.", "dTimEnd": "2009-03-17T00:30:00+01:00", "dTimStart": "2009-03-17T00:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Purged XMT, riser and lubricator with nitrogen 3 times due to grease in lubricator. Closed KWV and SV.", "dTimEnd": "2009-03-17T01:30:00+01:00", "dTimStart": "2009-03-17T00:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke lubricator at in-situ sub. Lifted out and LD PLT toolstring. No marks or damage observed on tool. No obvious explanation why in-line spinner did not work. Cut cable.", "dTimEnd": "2009-03-17T02:30:00+01:00", "dTimStart": "2009-03-17T01:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "LD lubricator and RD sheave wheels. Split lubricator at drill floor, preserved and moved to cantiliver. Cleared rig floor of WL equipment.", "dTimEnd": "2009-03-17T04:30:00+01:00", "dTimStart": "2009-03-17T02:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed 10 mT lift cap on WL riser and installed manual elevator on riser section as part of double lift arrangement from TDS. Detached riser from BOP's and LO same.", "dTimEnd": "2009-03-17T06:00:00+01:00", "dTimStart": "2009-03-17T04:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted WL BOP's using double lift arrangement from TDS and transferred to moonpool overhead crane.", "dTimEnd": "2009-03-17T10:30:00+01:00", "dTimStart": "2009-03-17T06:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Disconnected and lifted out lower WL riser section and XO from XMT using double lift arrangement from TDS. Installed hatch on weather deck.", "dTimEnd": "2009-03-17T11:15:00+01:00", "dTimStart": "2009-03-17T10:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed XMT tree cap. Hooked up hose from Seawell test pump on drill floor to test cap on XMT.", "dTimEnd": "2009-03-17T11:45:00+01:00", "dTimStart": "2009-03-17T11:15:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Leak tested SV to 30/345 bar for 5/10 min. Good test. Bled off pressure to closed drain.", "dTimEnd": "2009-03-17T12:15:00+01:00", "dTimStart": "2009-03-17T11:45:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RD cmt test line and bleed off manifold from KWV.", "dTimEnd": "2009-03-17T13:00:00+01:00", "dTimStart": "2009-03-17T12:15:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Leak tested tree cap and XMT cross to 30/345 bar for 5/10 min using Seawell test pump and 100% MEG. Good test. Bled off pressure. Installed cap on KWV and removed 1/2\" plug. Leak tested KWV to 30/345 bar for 5/10 min using Seawell test pump and 100% MEG. Good test. Bled off pressure. Installed 1/2\" plug in KWV cap. Leak tested KWV cap to 30/345 bar for 5/10 min using Seawell test pump and 100% MEG. Good test. Bled off pressure. \n\nDisconnected Seawell test pump from XMT tree cap and closed needle valve. Disconnected local control panel for HMV and DHSV and re-established platform permanent control system.", "dTimEnd": "2009-03-17T14:45:00+01:00", "dTimStart": "2009-03-17T13:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Handed well over from Volve D&W to Mærsk Production.", "dTimEnd": "2009-03-17T15:00:00+01:00", "dTimStart": "2009-03-17T14:45:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleared rig floor off remaining WL equipment. Cleaned rigfloor with dedicated grease wash.", "dTimEnd": "2009-03-17T16:30:00+01:00", "dTimStart": "2009-03-17T15:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2010_09_21
NO 15/9-F-12
NO 15/9-F-12
name
2010-09-20T00:00:00+02:00
2010-09-21T00:00:00+02:00
normal
2018-05-03T13:51:57+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2010-09-21T00:00:00+02:00", "dTimDiaHoleStart": "2010-09-20T08:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "RU lubricator and install BHA. Run PLT.\n\nExpected status 06:00 tomorrow. Performing PLT logging.", "hpht": "0", "md": "-999.99", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "1", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Waited on access to well. Took over well. Rigged up WL riser and BOP.", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "Skidded rig to F-12.", "dTimEnd": "2010-09-20T12:00:00+02:00", "dTimStart": "2010-09-20T08:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed to workover hatch on F-12.", "dTimEnd": "2010-09-20T14:30:00+02:00", "dTimStart": "2010-09-20T12:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited for Production Department to bean up F-14 and shut in F-12 for leak testing and handover. Meanwhile built new cable head (4/3-2005 lbs) and leak tested cable rams in BOP.", "dTimEnd": "2010-09-20T19:00:00+02:00", "dTimStart": "2010-09-20T14:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on production department to prepere well for handover. Meanwhile held prejob meeting with all night shift personnel involved in operation.", "dTimEnd": "2010-09-21T00:00:00+02:00", "dTimStart": "2010-09-20T19:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wait", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2010_09_22
NO 15/9-F-12
NO 15/9-F-12
name
2010-09-21T00:00:00+02:00
2010-09-22T00:00:00+02:00
normal
2018-05-03T13:51:58+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2010-09-22T00:00:00+02:00", "dTimDiaHoleStart": "2010-09-20T08:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Finish PLT logging. Evaluate plug option. RD.\n\nExpected status 06:00 tomorrow: RD from well after plug run.", "hpht": "0", "md": "-999.99", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "2", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "RU WL equipment. Installed BHA into lubricator. RIH with PLT. Performed spinner calibration. Performed depth correlation with GR/CCL. Took stationary reading at 2929 m. Ran PLT shut in pass. Took stationary readings. Beaned up well. Waited for stable flow. ", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "Took over well. Checked valve status.", "dTimEnd": "2010-09-21T00:45:00+02:00", "dTimStart": "2010-09-21T00:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prod. department installed isolation certificate on remotly operated valves on well.", "dTimEnd": "2010-09-21T01:45:00+02:00", "dTimStart": "2010-09-21T00:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Leak tested x-mas tree cross. 20/170 bar for 5/10 min.", "dTimEnd": "2010-09-21T02:45:00+02:00", "dTimStart": "2010-09-21T01:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed KWV cap and rigged up chiksan valves. Leak tested bleed off hose against closed KWV. 20/180 bar for 5/10 min.", "dTimEnd": "2010-09-21T03:30:00+02:00", "dTimStart": "2010-09-21T02:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed tree cap and installed lower riser and BOP. Leak tested riser connections and BOP shear seal. 20/180 bar for 5/10 min. Installed upper riser. Prepared lubricator for lifting.", "dTimEnd": "2010-09-21T06:00:00+02:00", "dTimStart": "2010-09-21T03:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RU lubricator and GIH in elevator. Installed BHA #1 and stabbed on. Filled rig-up with MEG using platform MEG injection system. Checked toolstring.", "dTimEnd": "2010-09-21T09:30:00+02:00", "dTimStart": "2010-09-21T06:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held pre-job meeting with involved personnel.", "dTimEnd": "2010-09-21T10:30:00+02:00", "dTimStart": "2010-09-21T09:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Leak tested rig-up to 20/170 bar for 5/10 min. Opened HMV and equalized TRSCSSV with MEG using platform MEG injection system. SIWHP 82 bar. Equalized and opened SV.", "dTimEnd": "2010-09-21T13:30:00+02:00", "dTimStart": "2010-09-21T10:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with BHA #1, PLT logging string, to 1000 m MDRKB.", "dTimEnd": "2010-09-21T15:15:00+02:00", "dTimStart": "2010-09-21T13:30:00+02:00", "md": "1000", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed spinner calibration passes at 10/20/30/40 m/min up/down.", "dTimEnd": "2010-09-21T15:45:00+02:00", "dTimStart": "2010-09-21T15:15:00+02:00", "md": "1000", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued RIH to 3130 m.", "dTimEnd": "2010-09-21T17:00:00+02:00", "dTimStart": "2010-09-21T15:45:00+02:00", "md": "3130", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed depth correlation with GR/CCL. Radioactive marker at 3091.7 m. Pulled up to 2929 m (DHG) and took stationary reading. Temp. = 105 C deg. Press. = 311,98 bar.", "dTimEnd": "2010-09-21T17:30:00+02:00", "dTimStart": "2010-09-21T17:00:00+02:00", "md": "2929", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Ran PLT shut in passes from 3250 to 3080 m at speed 10/ 20/ 30/ 40 m/min. Up / Down. Took stationary readings at 3080, 3250, 3200 and 3155 m. Pulled up and placed PLT at 3080 m.", "dTimEnd": "2010-09-21T19:00:00+02:00", "dTimStart": "2010-09-21T17:30:00+02:00", "md": "3080", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Beaned up well to approx. 5000 Sm3/d against test separator.", "dTimEnd": "2010-09-21T23:00:00+02:00", "dTimStart": "2010-09-21T19:00:00+02:00", "md": "3080", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited for stable flow.", "dTimEnd": "2010-09-22T00:00:00+02:00", "dTimStart": "2010-09-21T23:00:00+02:00", "md": "3080", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2010_09_23
NO 15/9-F-12
NO 15/9-F-12
name
2010-09-22T00:00:00+02:00
2010-09-23T00:00:00+02:00
normal
2018-05-03T13:51:58+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2010-09-23T00:00:00+02:00", "dTimDiaHoleStart": "2010-09-20T08:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "RD wireline pressure control equipment. Hand over well to production department.\n\nExpected status 06:00 tomorrow: No operation.", "hpht": "0", "md": "-999.99", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "3", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Waited for stable flow aprox. 5050 Sm3/d with PLT at 3080 m. Attempted to RIH at various speed. No-go. Reduced flow rate to 3000 Sm3/d. Took stationary readings at 3080, 3155, 3200 and 3250 m. Logged flowing passes between 3030 and 3250 m, down at 40 m/min and up at 10/20/30/40 m/min. Reduced flow rate to 1500 Sm3/d. Logged flowing passes between 3000 and 3250 m, down at 40 m/min and up at 10/20/30/40 m/min. Unable to log down on both flowing rates at 10/20/30 m/min. POOH with PLT. Changed tool string. RIH with 5,72\" EVO bridge plug at 800 m.", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "Continued waiting for stable flow. Stabilized flow rate at approx. 5050 Sm³/d.", "dTimEnd": "2010-09-22T02:45:00+02:00", "dTimStart": "2010-09-22T00:00:00+02:00", "md": "3080", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Took stationary reading for 5 min at depth 3080 m. Attempted to RIH at various speeds. Max speed was 80 m/min. Stopped at various depths between 2985 and 3015 m.", "dTimEnd": "2010-09-22T05:15:00+02:00", "dTimStart": "2010-09-22T02:45:00+02:00", "md": "3080", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Reduced flow rate to 3000 Sm³/d.", "dTimEnd": "2010-09-22T06:00:00+02:00", "dTimStart": "2010-09-22T05:15:00+02:00", "md": "3080", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited for stable flow rate.", "dTimEnd": "2010-09-22T07:15:00+02:00", "dTimStart": "2010-09-22T06:00:00+02:00", "md": "3080", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Took stationary readings at 3080, 3155, 3200 and 3250 m.", "dTimEnd": "2010-09-22T07:45:00+02:00", "dTimStart": "2010-09-22T07:15:00+02:00", "md": "3080", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Logged flowing passes between 3030 and 3250 m. Logged down at 40 m/min and up at 10/20/30/40 m/min. Unable to log down passes at 10/20/30 m/min. Positioned toolstring at 3080 m.", "dTimEnd": "2010-09-22T09:15:00+02:00", "dTimStart": "2010-09-22T07:45:00+02:00", "md": "3080", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Reduced flow rate to 1500 Sm3/d and stabilized.", "dTimEnd": "2010-09-22T12:45:00+02:00", "dTimStart": "2010-09-22T09:15:00+02:00", "md": "3080", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Logged flowing passes between 3000 and 3250 m. Logged down at 40 m/min and up at 10/20/30/40 m/min. Unable to log down passes at 10/20/30 m/min. Positioned toostring at 3000 m. Shut in well.", "dTimEnd": "2010-09-22T15:15:00+02:00", "dTimStart": "2010-09-22T12:45:00+02:00", "md": "3080", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH.", "dTimEnd": "2010-09-22T17:15:00+02:00", "dTimStart": "2010-09-22T15:15:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed well. WHP = 89 bar. Bled down and inflow tested HMV. Bled down and flushed lubricator with N2. LD and inspected BHA #1.", "dTimEnd": "2010-09-22T19:30:00+02:00", "dTimStart": "2010-09-22T17:15:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared and checked BHA #2, CCL, DPU and 5,72\" EVO bridge plug. Lifted toolstring to rig floor.", "dTimEnd": "2010-09-22T22:00:00+02:00", "dTimStart": "2010-09-22T19:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box meeting on rig floor. Installed BHA #2 into lubricator. Added 25 ltr Ramex into riser. Leak tested QTS to 20/170 bar for 5/10 min. Equalized with N2 across HMV and opened well. WHP 98.6 bar.", "dTimEnd": "2010-09-22T23:15:00+02:00", "dTimStart": "2010-09-22T22:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with BHA #2, EVO bridge plug to 800 m.", "dTimEnd": "2010-09-23T00:00:00+02:00", "dTimStart": "2010-09-22T23:15:00+02:00", "md": "800", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2010_09_24
NO 15/9-F-12
NO 15/9-F-12
name
2010-09-23T00:00:00+02:00
2010-09-24T00:00:00+02:00
normal
2018-05-03T13:51:58+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2010-09-24T00:00:00+02:00", "dTimDiaHoleStart": "2010-09-20T08:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "-None.", "hpht": "0", "md": "-999.99", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "4", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Installed 5,72\" EVO bridge plug at 3210 m mid element. RD wireline pressure control equipment and handed well over to production department.", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "Continued RIH with 5,72\" EVO plug to 3220 m.", "dTimEnd": "2010-09-23T02:00:00+02:00", "dTimStart": "2010-09-23T00:00:00+02:00", "md": "3220", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed depth correlation passes. POOH to setting depth and activated DPU. Installed plug with mid element at 3210 m and top plug at 3209,3 m. Lost 400 lbs. WHP 98,7 bar.", "dTimEnd": "2010-09-23T03:00:00+02:00", "dTimStart": "2010-09-23T02:00:00+02:00", "md": "3210", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with BHA #2.", "dTimEnd": "2010-09-23T05:15:00+02:00", "dTimStart": "2010-09-23T03:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed well. WHP = 98.6 bar. Bled down and inflow tested HMV.", "dTimEnd": "2010-09-23T06:00:00+02:00", "dTimStart": "2010-09-23T05:15:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Bled off and flushed lubricator with N2.", "dTimEnd": "2010-09-23T07:30:00+02:00", "dTimStart": "2010-09-23T06:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "LD toolstring. Running tool OK.", "dTimEnd": "2010-09-23T07:45:00+02:00", "dTimStart": "2010-09-23T07:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened HMV and bled down pressure above DHSV against test separator to 1 bar. Pumped 200 litres of MEG into well. Inflow tested DHSV.", "dTimEnd": "2010-09-23T09:30:00+02:00", "dTimStart": "2010-09-23T07:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Leak tested x-mas tree cross. 20/100 bar for 5/10 min.", "dTimEnd": "2010-09-23T10:30:00+02:00", "dTimStart": "2010-09-23T09:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held prejob meeting regarding RD WL equipment with all personnel involved in operation. LD lubricator onto catwalk machine. (HTS)", "dTimEnd": "2010-09-23T11:45:00+02:00", "dTimStart": "2010-09-23T10:30:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Disconnected and lifted upper riser to rigfloor with top drive. Disconnected and lifted BOP away in moon pool area. Disconnect and lifted lower riser to rig floor.", "dTimEnd": "2010-09-23T14:00:00+02:00", "dTimStart": "2010-09-23T11:45:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed x-mas tree top cap and KWV cap. Leak tested both. 20/345 bar for 5/10 min.", "dTimEnd": "2010-09-23T15:00:00+02:00", "dTimStart": "2010-09-23T14:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned up in wellhead area. Transfered controll of DHSV and HMV to platform system. Handed well over to Maersk Prod. department. Meanwhile started to skid rig to next location.\n\n--------------------------------- END OF OPERATION---------------------------------------------", "dTimEnd": "2010-09-23T16:30:00+02:00", "dTimStart": "2010-09-23T15:00:00+02:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- rig up/down", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2014_11_23
NO 15/9-F-12
NO 15/9-F-12
name
2014-11-22T00:00:00+01:00
2014-11-23T00:00:00+01:00
normal
2018-05-03T13:51:58+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2014-11-23T00:00:00+01:00", "dTimDiaHoleStart": "2014-11-22T16:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Spot remaining equipment. Rig up wireline equipment on pipe deck. Rig up wireline equipment on well.", "hpht": "0", "md": "-999.99", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "1", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Spotted some equpment. Waited on weather, wind above 40 knots.", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "Stril Luna arrived Maersk Inspirer. Spotted some equipment. Wind picked up above 40 knots, had to wait for further spotting.", "dTimEnd": "2014-11-22T16:15:00+01:00", "dTimStart": "2014-11-22T16:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on weather prior to lift and spot containers from vessel.", "dTimEnd": "2014-11-23T00:00:00+01:00", "dTimStart": "2014-11-22T16:15:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2014_11_24
NO 15/9-F-12
NO 15/9-F-12
name
2014-11-23T00:00:00+01:00
2014-11-24T00:00:00+01:00
normal
2018-05-03T13:51:58+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": ".7", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2014-11-24T00:00:00+01:00", "dTimDiaHoleStart": "2014-11-22T16:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Complete spotting/checking equipment. Handover well from O&M to D&W. Rig up WL equipment.", "hpht": "0", "md": "-999.99", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "2", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Spotted WL equipment. Checked equipment together with rig electrician.", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "Waited on weather prior to spotting equipment.", "dTimEnd": "2014-11-23T01:00:00+01:00", "dTimStart": "2014-11-23T00:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk with all involved prior to spotting equipment. Meanwhile boat positioned longside rig.", "dTimEnd": "2014-11-23T01:30:00+01:00", "dTimStart": "2014-11-23T01:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Spotted Altus and Halliburton equipment on pipedeck.", "dTimEnd": "2014-11-23T07:00:00+01:00", "dTimStart": "2014-11-23T01:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Checked alignment on WL winch and fine tuned add on. Secured same to pipe deck. Pulled cables between the different containers.", "dTimEnd": "2014-11-23T12:00:00+01:00", "dTimStart": "2014-11-23T07:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Spotted wellhead pump and filled with correct fluid. Connected add on drum together with winch.\nMaersk electrician checked WL equipment due to punch list from onshore.", "dTimEnd": "2014-11-23T16:30:00+01:00", "dTimStart": "2014-11-23T12:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Maersk performed a thorough check of the Altus equipment due to the findings onshore. Meanwhile unpacked equipment from conatiners and prepared for BOP test.", "dTimEnd": "2014-11-23T19:00:00+01:00", "dTimStart": "2014-11-23T16:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "operation failed" }, { "comments": "Continued to prepare equipment and hoses for testing of BOP. \nMeanwhile continued to check equipment together with rig electrician.", "dTimEnd": "2014-11-23T20:30:00+01:00", "dTimStart": "2014-11-23T19:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed low pressure test of BOP.\nMeanwhile continued to check equipment together with rig electrician.", "dTimEnd": "2014-11-24T00:00:00+01:00", "dTimStart": "2014-11-23T20:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2014_11_25
NO 15/9-F-12
NO 15/9-F-12
name
2014-11-24T00:00:00+01:00
2014-11-25T00:00:00+01:00
normal
2018-05-03T13:51:58+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": ".7", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2014-11-25T00:00:00+01:00", "dTimDiaHoleStart": "2014-11-22T16:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Complete rig up. Install plug bha in riser. RIH and install plug. Prepare perforation toolstring.", "hpht": "0", "md": "-999.99", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "3", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Spotted equipment. Well handed over from Production dept. to D&W. Started to rig up on wellhead.", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "Continued with high pressure test on BOP. \nMeanwhile continued to check equipment together with rig electrician.", "dTimEnd": "2014-11-24T01:30:00+01:00", "dTimStart": "2014-11-24T00:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Function tested WL unit & winch. Hooked up logging container to power.\nMeanwhile performed area inspection on wellhead and discussed procedure for R/U WL riser on XMT.", "dTimEnd": "2014-11-24T03:00:00+01:00", "dTimStart": "2014-11-24T01:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Spotted parts for grease injection head and toolcatcher. Spotted riser parts for building same on drill floor.", "dTimEnd": "2014-11-24T04:30:00+01:00", "dTimStart": "2014-11-24T03:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed toolbox talk prior to start building riser and lubricator pieces.", "dTimEnd": "2014-11-24T05:00:00+01:00", "dTimStart": "2014-11-24T04:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Built the riser and lubricator sections horizontally on the pipe handling system.\nMeanwhile notified production dept to start shut in well F-12.", "dTimEnd": "2014-11-24T07:00:00+01:00", "dTimStart": "2014-11-24T05:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Hooked up remaining containers to fire and gas and completed check of Altus winch and logging unit.\nMeanwhile prepared correct fittings to be hooked up to HMV to DHSV on wellhead.", "dTimEnd": "2014-11-24T12:00:00+01:00", "dTimStart": "2014-11-24T07:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged up sheave wheel and prepared spreader beam for lubricator.", "dTimEnd": "2014-11-24T13:30:00+01:00", "dTimStart": "2014-11-24T12:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on production to obtain good test on XMT valves. Not able to obtain good test. Had to grease HMV and MMV.\nMeanwhile preapred cablehead and tested Halliburton toolstring.", "dTimEnd": "2014-11-24T19:30:00+01:00", "dTimStart": "2014-11-24T13:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Handed well over from Production department to Drilling and well.", "dTimEnd": "2014-11-24T20:15:00+01:00", "dTimStart": "2014-11-24T19:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed toolbox talk on drill floor prior start R/U on well. Work permit for start rigging on XMT not activated or prepared.", "dTimEnd": "2014-11-24T20:30:00+01:00", "dTimStart": "2014-11-24T20:15:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Had to wait for WP to be approved for rigging of WL equipment.\nMeanwhile prepared manifold and chicksan on wellhead.", "dTimEnd": "2014-11-24T22:15:00+01:00", "dTimStart": "2014-11-24T20:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held SJA for rigging of WL equipment on XMT.", "dTimEnd": "2014-11-24T22:30:00+01:00", "dTimStart": "2014-11-24T22:15:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged up chicsan and low torque on KWV.", "dTimEnd": "2014-11-25T00:00:00+01:00", "dTimStart": "2014-11-24T22:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2014_11_26
NO 15/9-F-12
NO 15/9-F-12
name
2014-11-25T00:00:00+01:00
2014-11-26T00:00:00+01:00
normal
2018-05-03T13:51:58+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": ".8", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2014-11-26T00:00:00+01:00", "dTimDiaHoleStart": "2014-11-22T16:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Install plug at 3150 m. Prepare and RIH with perforation canons.", "hpht": "0", "md": "-999.99", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "4", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Completed rigging up wireline equipment. Leak tested rig up to 20/345 bar. Run in hole with Halliburton EVO plug. Pulled out of hole after tool failure at 1400 m. Started to prepare back up toolstring.", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "Continued to rig up on wellhead. Completed rigging up manifold on KWV. Observed 35 bar pressure in XMT cross.", "dTimEnd": "2014-11-25T01:30:00+01:00", "dTimStart": "2014-11-25T00:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Checked valves and inlets into XMT cross for possible leaks, together with production operator. Found that valve for MEG pump was leaking into XMT cross. Closed another valve on the MEG inlet line. Bled off pressure.", "dTimEnd": "2014-11-25T02:00:00+01:00", "dTimStart": "2014-11-25T01:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed wireline hatch and disconnected top cap on XMT.", "dTimEnd": "2014-11-25T03:30:00+01:00", "dTimStart": "2014-11-25T02:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lowered bottom riser and X-over. Installed BOP and hooked up lines. Function tested BOP. Filled lower riser and BOP with MEG using MEG pump and closed upper ram for testing lower riser.", "dTimEnd": "2014-11-25T06:00:00+01:00", "dTimStart": "2014-11-25T03:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged riser from BOP up to drill floor.", "dTimEnd": "2014-11-25T06:30:00+01:00", "dTimStart": "2014-11-25T06:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged up lubricator and hoses on drill floor. Attached sheave wheel in spreader bar in top drive. Lifted up lubraicator.\nMeanwhile prepared Halliburton toolstring on drill floor.", "dTimEnd": "2014-11-25T09:15:00+01:00", "dTimStart": "2014-11-25T06:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed toolbox talk prior to picking up BHA.", "dTimEnd": "2014-11-25T09:30:00+01:00", "dTimStart": "2014-11-25T09:15:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed BHA#1 7\" EV0 plug into lubricator. Stabbed lubricator and tested communication with toolstring.", "dTimEnd": "2014-11-25T11:00:00+01:00", "dTimStart": "2014-11-25T09:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior to leak test the R/U.", "dTimEnd": "2014-11-25T11:20:00+01:00", "dTimStart": "2014-11-25T11:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Erected barriers for leak testing and got production department to fill riser with MEG using MEG pump. Leak tested R/U to 20/345 bar using Altus pump. Observed leak in the test hose from the pump during low pressure test.", "dTimEnd": "2014-11-25T12:15:00+01:00", "dTimStart": "2014-11-25T11:20:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed hose and continued with leak test.", "dTimEnd": "2014-11-25T12:45:00+01:00", "dTimStart": "2014-11-25T12:15:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Leak tested R/U and kill wing chicksan manifold to 20/345 bar for 5/10 minutes using 100% MEG. Equalized DHSV using MEG from production system. DHSV equalized and opened at 51 bar. Equalized and opened SV.", "dTimEnd": "2014-11-25T14:30:00+01:00", "dTimStart": "2014-11-25T12:45:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/BHA #1 (7\" EV0 plug) from surface to 1000 m. WHP 51 bar. Observed loss in communication with toolstring. Signal came back again. Continued to RIH. Pick up weights approx. 700 lbs higher than simulated values.", "dTimEnd": "2014-11-25T16:40:00+01:00", "dTimStart": "2014-11-25T14:30:00+01:00", "md": "1000", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to RIH from 1000 m to 1400 m. Lost commuincation with toolstring. Trouble shooted equipment. Observed communication on and off. Checked surface equipment and trollex. Observed cmmunication falling out when running in hole, but no clear pattern. Decision made to POOH.", "dTimEnd": "2014-11-25T17:00:00+01:00", "dTimStart": "2014-11-25T16:40:00+01:00", "md": "1400", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/BHA #1 from 1400 m to surface. WHP 50 bar.", "dTimEnd": "2014-11-25T18:15:00+01:00", "dTimStart": "2014-11-25T17:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Closed SV & HMV and inflow tested same. Purged riser with N2 prior to break lubricator.", "dTimEnd": "2014-11-25T20:30:00+01:00", "dTimStart": "2014-11-25T18:15:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held Toolbox talk prior to lift L/D BHA#1", "dTimEnd": "2014-11-25T20:40:00+01:00", "dTimStart": "2014-11-25T20:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Broke lubricator and L/D BHA#1.", "dTimEnd": "2014-11-25T21:00:00+01:00", "dTimStart": "2014-11-25T20:40:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Halliburton checked toolstring components and cablehead. Not able to detect any defects. Decision made to change cablehead and run complete back up string.", "dTimEnd": "2014-11-25T22:00:00+01:00", "dTimStart": "2014-11-25T21:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Re-buildt cable head.\nMeanwhile Altus checked tension head on WL winch:\nWinch weight Calibration weight \n1000 lbs 950 lbs\n2000 lbs 1800 lbs \n3000 lbs 2680 lbs\n4000 lbs 3500 lbs \nThe calibrated Halliburton weight will show correct tension", "dTimEnd": "2014-11-26T00:00:00+01:00", "dTimStart": "2014-11-25T22:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" } ]
[]
15_9_F_12_2014_11_27
NO 15/9-F-12
NO 15/9-F-12
name
2014-11-26T00:00:00+01:00
2014-11-27T00:00:00+01:00
normal
2018-05-03T13:51:58+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": "1", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2014-11-27T00:00:00+01:00", "dTimDiaHoleStart": "2014-11-22T16:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Rig down WL equipment, Skid rig to F-1C and rig up WL equipment.", "hpht": "0", "md": "-999.99", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "5", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "Installed 7\" EV0 plug with mid element at 3150 m. Perforated new zone from 3126,2 -3139,7 mMD. POOH with perforating gun. ", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "Continued to re-build cable head. Time consuming to build due to stiff cords on 7/16\" cable together with narrow holes in cablehead cone.", "dTimEnd": "2014-11-26T01:45:00+01:00", "dTimStart": "2014-11-26T00:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Lifted tools to rig floor for testing of toolstring through cablehead. \nMeanwhile held toolbox talk for installing the BHA into lubricator.", "dTimEnd": "2014-11-26T02:20:00+01:00", "dTimStart": "2014-11-26T01:45:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Installed toollstring into lubricator and Leak tested QTS to 20/345 bar for 5/10 min. \nMeanwhile held toolbox talk for the plug run.", "dTimEnd": "2014-11-26T03:30:00+01:00", "dTimStart": "2014-11-26T02:20:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Opened HMV and equalized acoss swab using well pressure.", "dTimEnd": "2014-11-26T04:00:00+01:00", "dTimStart": "2014-11-26T03:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "RIH w/BHA #2 7\" EVO plug from surface to 1400 m. WHP 51 bar.\nPerformed well control drill: Leakage in grease injection head.\nStopped each 300 meters to perform P/U weight.", "dTimEnd": "2014-11-26T05:40:00+01:00", "dTimStart": "2014-11-26T04:00:00+01:00", "md": "1400", "phase": "wire line", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Continued to RIH from 1400 meter to 3135 m. \nStopped each 300 meters to perform P/U weight.", "dTimEnd": "2014-11-26T07:45:00+01:00", "dTimStart": "2014-11-26T05:40:00+01:00", "md": "3135", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Correlated BHA across interval 3135 - 3050 m . Set plug with mid packer element at 3150 m. Observed 400 lbs drop in tension. WHP 47 bar.", "dTimEnd": "2014-11-26T08:40:00+01:00", "dTimStart": "2014-11-26T07:45:00+01:00", "md": "3150", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with BHA#2 from 3150 m to surface. Hung slightly up in the packer area. Continued to POOH.", "dTimEnd": "2014-11-26T10:45:00+01:00", "dTimStart": "2014-11-26T08:40:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed SV. Had to wait on production department for bleeding of, due to problems with a gas compressor.", "dTimEnd": "2014-11-26T11:30:00+01:00", "dTimStart": "2014-11-26T10:45:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Bled of lubricator and inflow tested SV & HMV. Purged lubricator with N2.", "dTimEnd": "2014-11-26T12:45:00+01:00", "dTimStart": "2014-11-26T11:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior to L/D toolstring.", "dTimEnd": "2014-11-26T12:55:00+01:00", "dTimStart": "2014-11-26T12:45:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke lubricator and L/D BHA #2.", "dTimEnd": "2014-11-26T13:10:00+01:00", "dTimStart": "2014-11-26T12:55:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted Halliburton perforating toolstring to drill floor and started to prepare guns.", "dTimEnd": "2014-11-26T15:00:00+01:00", "dTimStart": "2014-11-26T13:10:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior to arm the perforating guns.", "dTimEnd": "2014-11-26T15:20:00+01:00", "dTimStart": "2014-11-26T15:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed BHA #3 (4 5/8\" Perforating gun) into lubricator. Stabbed lubricator and tested QTS to 20/345 bar for 5/10 min. Equalized and opened SV and HMV. WHP 46 bar.", "dTimEnd": "2014-11-26T16:55:00+01:00", "dTimStart": "2014-11-26T15:20:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/BHA #3 (4 5/8\" Perforating gun) from surface to 3135 meters. WHP 46 bar.\nStopped each 500 meters and pulled up 50 meters.\nDepth P/U weight\n500 m 1410 lbs \n1000 m 2130 lbs \n1500 m 2950 lbs\n2000 m 3650 lbs\n2500 m 4400 lbs\n3000 m 4900 lbs", "dTimEnd": "2014-11-26T20:30:00+01:00", "dTimStart": "2014-11-26T16:55:00+01:00", "md": "3135", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed three correlation passes across interval 3135 - 3050 m. Positioned gun with top shot at 3126,2 m & bottom shot at 3130,7 mMD. WHP 45 bar.", "dTimEnd": "2014-11-26T21:05:00+01:00", "dTimStart": "2014-11-26T20:30:00+01:00", "md": "3135", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Activated perforation guns. Observed current increase and drop in tension of 200 lbs. No change in WHP at 45 bar. Started POOH.", "dTimEnd": "2014-11-26T21:25:00+01:00", "dTimStart": "2014-11-26T21:05:00+01:00", "md": "3131", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with BHA #3 from 3131 m to 480 m. WHP 45 bar.", "dTimEnd": "2014-11-26T23:30:00+01:00", "dTimStart": "2014-11-26T21:25:00+01:00", "md": "480", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior to take guns out of hole. Included toolbox talk for rigging down WL equipment.", "dTimEnd": "2014-11-27T00:00:00+01:00", "dTimStart": "2014-11-26T23:30:00+01:00", "md": "480", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2014_11_28
NO 15/9-F-12
NO 15/9-F-12
name
2014-11-27T00:00:00+01:00
2014-11-28T00:00:00+01:00
normal
2018-05-03T13:51:59+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": ".7", "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2014-11-28T00:00:00+01:00", "dTimDiaHoleStart": "2014-11-22T16:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Rigging up WL equipment on F-1C.", "hpht": "0", "md": "-999.99", "mdCsgLast": "3519", "mdDiaHoleStart": "3520", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "6", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "POOH with perfoartion gun. Inflow tested well barriers. Rigged down WL equipment. Operation completed.", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "Continued to POOH from 480 m to surface.", "dTimEnd": "2014-11-27T00:15:00+01:00", "dTimStart": "2014-11-27T00:00:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed SV & HMV and inflow tested for well handover. Purged riser with nitrogen.", "dTimEnd": "2014-11-27T01:45:00+01:00", "dTimStart": "2014-11-27T00:15:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke lubricator and L/D BHA#3.", "dTimEnd": "2014-11-27T02:10:00+01:00", "dTimStart": "2014-11-27T01:45:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed upper BOP ram. Opened HMV and closed DHSV for inflow test of same. Had 40 bar delta P. Test OK - 0 bar/30 min. Bled down pressure above DHSV to 0 and closed HMV.", "dTimEnd": "2014-11-27T03:30:00+01:00", "dTimStart": "2014-11-27T02:10:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- test scsssv", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Rigged down lubricator. Rigged down riser above BOP. Disconnected BOP and rigged down same. Disconnected lower riser from XMT.", "dTimEnd": "2014-11-27T05:40:00+01:00", "dTimStart": "2014-11-27T03:30:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Mounted top cap on XMT. Disconnected chickasn on kill wing cap and mounted kill wing cap. Pressure tested Top cap & KW cap to 20/345 bar for 5/10 min.\nChange WL hatch with permanent hatch. Prepared for skidding to F-1C.\n\n----------------------------------------- END OF OPERATION ------------------------------------------------", "dTimEnd": "2014-11-27T09:00:00+01:00", "dTimStart": "2014-11-27T05:40:00+01:00", "md": "0", "phase": "wire line", "proprietaryCode": "workover -- wire line", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2016_08_15
NO 15/9-F-12
NO 15/9-F-12
name
2016-08-14T00:00:00+02:00
2016-08-15T00:00:00+02:00
normal
2018-05-03T13:51:59+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-08-15T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-14T18:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Rig up WL well control equipment\n- Bullhead hydrocarbons into the well\n- RIH and install deep set barrier plug", "hpht": "0", "md": "-999.99", "mdCsgLast": "3519", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "1", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "- Skid rig from F-14 to F-12\n- Started rigging up WL pressure control equipment", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "Prepared to skid cantilever", "dTimEnd": "2016-08-14T20:00:00+02:00", "dTimStart": "2016-08-14T18:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to skid cantilever", "dTimEnd": "2016-08-14T20:30:00+02:00", "dTimStart": "2016-08-14T20:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed stairs and bridge to cantilever", "dTimEnd": "2016-08-14T21:00:00+02:00", "dTimStart": "2016-08-14T20:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Skidded cantilever to F-12 slot, 0.5m to port , 4.56m forward and 0.5m to starboard", "dTimEnd": "2016-08-14T21:45:00+02:00", "dTimStart": "2016-08-14T21:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed moon pool hatch on F-12 and confirmed cantilever position. Installed split hatches on F-12", "dTimEnd": "2016-08-14T23:45:00+02:00", "dTimStart": "2016-08-14T21:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting for rigging up wire line equipment in moon pool and drill floor", "dTimEnd": "2016-08-15T00:00:00+02:00", "dTimStart": "2016-08-14T23:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2016_08_16
NO 15/9-F-12
NO 15/9-F-12
name
2016-08-15T00:00:00+02:00
2016-08-16T00:00:00+02:00
normal
2018-05-03T13:51:59+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-08-16T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-14T18:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Inflow test deep set plug\n- Install and test shallow set plug\n- Remove Xtree and spacer spool\n- Start installing high pressure riser and BOP", "hpht": "0", "md": "-999.99", "mdCsgLast": "3519", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "2", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "- Rig up WL well control equipment, pressure tested same\n- Bullheaded washpill and sea water into the well\n- Set and pressure tested deepset plug\n", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "Removed well cap on F-12. Installed lower riser joint and WL BOP", "dTimEnd": "2016-08-15T01:45:00+02:00", "dTimStart": "2016-08-15T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Connect WL control lines and hoses to BOP. Function tested BOP\nRigged up kill hose to tree\nP/U upper WL riser joint\nLifted WL equipment to rig floor", "dTimEnd": "2016-08-15T03:45:00+02:00", "dTimStart": "2016-08-15T01:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting w/ new crew", "dTimEnd": "2016-08-15T04:00:00+02:00", "dTimStart": "2016-08-15T03:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed upper riser joint on top of BOP\nMeanwhile continued to open rig BOP for inspection", "dTimEnd": "2016-08-15T04:30:00+02:00", "dTimStart": "2016-08-15T04:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed BX inserts to 3.5in\nMeanwhile continued to open rig BOP for inspection", "dTimEnd": "2016-08-15T04:45:00+02:00", "dTimStart": "2016-08-15T04:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to R/U WL equipment above RKB \nMeanwhile continued to inspect and clean rig BOP. M/U WL lubricator on HTS and installed hoses on same. Filled A and B annulus.", "dTimEnd": "2016-08-15T07:45:00+02:00", "dTimStart": "2016-08-15T04:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted lubricator from HTS to TDS", "dTimEnd": "2016-08-15T08:00:00+02:00", "dTimStart": "2016-08-15T07:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Built cable head and tested same\nMeanwhile worked on flow line and cleaned BOP from cement", "dTimEnd": "2016-08-15T08:30:00+02:00", "dTimStart": "2016-08-15T08:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to P/U tool string w/ deep set plug BHA (run#4)", "dTimEnd": "2016-08-15T08:45:00+02:00", "dTimStart": "2016-08-15T08:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U tool string, installed kill hose onto the tree", "dTimEnd": "2016-08-15T10:00:00+02:00", "dTimStart": "2016-08-15T08:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to fill and pressure test WL rig up", "dTimEnd": "2016-08-15T10:15:00+02:00", "dTimStart": "2016-08-15T10:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flushed lines w/ 50/50 MEG. Filled WL riser and lubricator", "dTimEnd": "2016-08-15T11:00:00+02:00", "dTimStart": "2016-08-15T10:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressure tested WL rig up to 20/345bar for 5/10min", "dTimEnd": "2016-08-15T11:45:00+02:00", "dTimStart": "2016-08-15T11:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to bullhead the well", "dTimEnd": "2016-08-15T12:00:00+02:00", "dTimStart": "2016-08-15T11:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened MV and HMV. Observed pressure inside tree increased to 55 Bar. \nApplied 520 bar on control lines for DHSV. Performed line test and open KWV. \nPumped 3 m3 50/50 MEG/SW with cement unit @ 1100l/min - 83bar", "dTimEnd": "2016-08-15T12:30:00+02:00", "dTimStart": "2016-08-15T12:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pumped 10m3 Wash pill at 1300l/min - 91bar", "dTimEnd": "2016-08-15T12:45:00+02:00", "dTimStart": "2016-08-15T12:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Bullheaded well with sea water at 1300l/min, +/- 90 Bar. After pumped 40m3, standpipe pressure started to increase slowly. \nFinal circulation pressure 151bar", "dTimEnd": "2016-08-15T15:00:00+02:00", "dTimStart": "2016-08-15T12:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pumped 10m3 MEG/SW with cement unit at 1100l/min \nSIWHP when stopped pumping 55bar", "dTimEnd": "2016-08-15T15:15:00+02:00", "dTimStart": "2016-08-15T15:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Equalized and opened SV. \nRIH with WL to 3010m.", "dTimEnd": "2016-08-15T17:45:00+02:00", "dTimStart": "2016-08-15T15:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Correlated depth w/ BHA (run#4). Correlation interval 2850m-3005m", "dTimEnd": "2016-08-15T19:30:00+02:00", "dTimStart": "2016-08-15T17:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Trouble shoot winch after not able to achieve stable running speed with winch. Suspected overheating of hydraulic system", "dTimEnd": "2016-08-15T20:30:00+02:00", "dTimStart": "2016-08-15T19:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Set plug w/ mid packer element at 3003 m. Confirmed plug set w/ tagging", "dTimEnd": "2016-08-15T21:00:00+02:00", "dTimStart": "2016-08-15T20:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH from 3003 m to surface. Average pulling speed 22m/min\nMeanwhile performed TBT for pressure testing of plug", "dTimEnd": "2016-08-15T23:15:00+02:00", "dTimStart": "2016-08-15T21:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed SV and inflow tested same\nMeanwhile lined up cement unit for pressure test plug", "dTimEnd": "2016-08-16T00:00:00+02:00", "dTimStart": "2016-08-15T23:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2016_08_17
NO 15/9-F-12
NO 15/9-F-12
name
2016-08-16T00:00:00+02:00
2016-08-17T00:00:00+02:00
normal
2018-05-03T13:51:59+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-08-17T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-14T18:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Install BOP, perform connectot test\n- R/U csg handling equipment\n- RIH w/ THRT, release TH, displace well to SW\n- Pulled and L/D 500m of tbg", "hpht": "0", "md": "-999.99", "mdCsgLast": "3519", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "3", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "- Pressure tested and inflow tested deepset plug\n- Set and pressure tested from above shallow set plug \n- N/D Xtree and spacer spool\n- Installed HP riser\n- Started to N/U BOP", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "Pressure tested deep set plug to 20/260bar for 5/10 minutes. Good test", "dTimEnd": "2016-08-16T00:45:00+02:00", "dTimStart": "2016-08-16T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Bled off pressure above deep set plug to close drain to 10bar.\nPerformed inflow test of deep set plug. Good test", "dTimEnd": "2016-08-16T02:30:00+02:00", "dTimStart": "2016-08-16T00:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Bled down pressure from tubing. Closed HMV, confirmed SV and KWV closed\nL/D BHA", "dTimEnd": "2016-08-16T03:30:00+02:00", "dTimStart": "2016-08-16T02:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U shallow set plug BHA (run #5), installed same into lubricator. Leak tested lubricator/QTS to 20/345bar 5/10min.\nOpened HMV, SV", "dTimEnd": "2016-08-16T04:45:00+02:00", "dTimStart": "2016-08-16T03:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH shallow set plug to 256m", "dTimEnd": "2016-08-16T05:00:00+02:00", "dTimStart": "2016-08-16T04:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Correlated BHA across interval 200 - 300m . Set plug with mid packer element at 249m. Tagged plug. POOH w/ setting tool to lubricator", "dTimEnd": "2016-08-16T06:00:00+02:00", "dTimStart": "2016-08-16T05:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up cement pump and pressure tested shallow set plug to 20/230bar for 5/10min. Good test", "dTimEnd": "2016-08-16T06:30:00+02:00", "dTimStart": "2016-08-16T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed HMV,KWV and SV, verified no pressure in XT", "dTimEnd": "2016-08-16T06:45:00+02:00", "dTimStart": "2016-08-16T06:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Started R/D wireline equipment", "dTimEnd": "2016-08-16T07:00:00+02:00", "dTimStart": "2016-08-16T06:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting w/ oncoming crew to R/D WL equipment", "dTimEnd": "2016-08-16T07:15:00+02:00", "dTimStart": "2016-08-16T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D plug setting tool", "dTimEnd": "2016-08-16T07:45:00+02:00", "dTimStart": "2016-08-16T07:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D lubricator, moved same from the rig floor", "dTimEnd": "2016-08-16T09:00:00+02:00", "dTimStart": "2016-08-16T07:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D upper wire line riser joint", "dTimEnd": "2016-08-16T09:15:00+02:00", "dTimStart": "2016-08-16T09:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Disconnected control lines and hoses to WL BOP and pulled same to rig floor \nMeanwhile prepared to pull Fox hole", "dTimEnd": "2016-08-16T10:00:00+02:00", "dTimStart": "2016-08-16T09:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D WL BOP and lower riser joint. Lifted BOP to pipe deck", "dTimEnd": "2016-08-16T11:30:00+02:00", "dTimStart": "2016-08-16T10:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting for rearranging well hatches in moon pool", "dTimEnd": "2016-08-16T11:45:00+02:00", "dTimStart": "2016-08-16T11:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed hatches on F-12 and F-7 and beam between slots", "dTimEnd": "2016-08-16T13:00:00+02:00", "dTimStart": "2016-08-16T11:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed master bushing, installed chains to TDS and attached to XMT as per lifting plan, with double securing", "dTimEnd": "2016-08-16T13:45:00+02:00", "dTimStart": "2016-08-16T13:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued w/ attaching lifting arrangement to XMT\nMeanwhile performed BOP test No.2 (low pressure only) to 20bar", "dTimEnd": "2016-08-16T14:00:00+02:00", "dTimStart": "2016-08-16T13:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed high pressure test on BOP. Test No.2 to 345bar", "dTimEnd": "2016-08-16T14:15:00+02:00", "dTimStart": "2016-08-16T14:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to rig up to pull XMT. Took 1t tension with TDS and disconnected Greyloc clamp below XMT\nMeanwhile performed BOP test No 1 to 20/345bar for 5/10 min", "dTimEnd": "2016-08-16T15:15:00+02:00", "dTimStart": "2016-08-16T14:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted XMT to Moon pool and transported to skid according to lifting plan. \nMeanwhile lined up for BOP pressure test No. 3", "dTimEnd": "2016-08-16T16:00:00+02:00", "dTimStart": "2016-08-16T15:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to move/handle XMT to moon pool hatch\nMeanwhile performed BOP test No. 3 to 20/345bar 5/10 min, \nperformed BOP test No. 4 to 20/345bar 5/10 min", "dTimEnd": "2016-08-16T16:45:00+02:00", "dTimStart": "2016-08-16T16:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed beam between slots and hatch on F-7 slot. \nMeanwhile lined up for BOP pressure test No. 5", "dTimEnd": "2016-08-16T17:30:00+02:00", "dTimStart": "2016-08-16T16:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted spool spacer to the rig floor. \nMeanwhile performed BOP test No. 5, installed master bushing", "dTimEnd": "2016-08-16T18:30:00+02:00", "dTimStart": "2016-08-16T17:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared wellhead to install HP riser. \nMeanwhile performed BOP test No. 6, removed lifting tool for foxhole", "dTimEnd": "2016-08-16T19:15:00+02:00", "dTimStart": "2016-08-16T18:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleared rig floor and HTS, meanwhile carried out TBT for testing BOP.", "dTimEnd": "2016-08-16T19:30:00+02:00", "dTimStart": "2016-08-16T19:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued working on wellhead. measured RKB - WH 19.95m. \nMeanwhile continued pressure test on BOP. Prepared paperwork required for running HP Riser and man riding on TDS", "dTimEnd": "2016-08-16T20:30:00+02:00", "dTimStart": "2016-08-16T19:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed communication collar. Meanwhile isolated TDS, hydraulic mech investigated sweating connection on link tilt cylinder. Finished pressure testing BOP and rigged down equipment used for pressure testing", "dTimEnd": "2016-08-16T21:15:00+02:00", "dTimStart": "2016-08-16T20:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to P/U high pressure riser\nMeanwhile deisolated TDS, TBT", "dTimEnd": "2016-08-16T21:45:00+02:00", "dTimStart": "2016-08-16T21:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Connected all rigging equipment to TDS bails and picked up HP Riser. Removed master bushing and half-moon hatches. P/U and RIH with HP Riser, removed protector", "dTimEnd": "2016-08-16T23:00:00+02:00", "dTimStart": "2016-08-16T21:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued RIH w/ HP riser, cleaned and checked seal area and M/U NT2 connector", "dTimEnd": "2016-08-16T23:45:00+02:00", "dTimStart": "2016-08-16T23:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to skid BOP", "dTimEnd": "2016-08-17T00:00:00+02:00", "dTimStart": "2016-08-16T23:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2016_08_18
NO 15/9-F-12
NO 15/9-F-12
name
2016-08-17T00:00:00+02:00
2016-08-18T00:00:00+02:00
normal
2018-05-03T13:51:59+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-08-18T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-14T18:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Pull 500m of 7in tubing\n- Run USIT log in 9 5/8csg", "hpht": "0", "md": "-999.99", "mdCsgLast": "3519", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "4", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "- Finished N/U BOP. Performed connector test\n- RIH w/ THRT, locked to TH\n- Open shallow set barrier plug\n- Troubleshoot communication w/ DHSV\n", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "Installed halfmoon hatches and master bushing, released BOP NT2 connector from stump. \nContinued pressure testing Kill and Choke Manifold", "dTimEnd": "2016-08-17T00:30:00+02:00", "dTimStart": "2016-08-17T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Skidded BOP to well center, moved port and stb tension cylinders in order to land off BOP on HP Riser Stump. \nInstalled seal and land off BOPs. Meanwhile continued pressure testing Kill and Choke Manifold", "dTimEnd": "2016-08-17T01:15:00+02:00", "dTimStart": "2016-08-17T00:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to connect tension cylinders. Meanwhile continued pressure testing Kill and Choke Manifold", "dTimEnd": "2016-08-17T01:30:00+02:00", "dTimStart": "2016-08-17T01:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Connected all 4 tension cylinders to BOP carrier. Meanwhile continued pressure testing Kill and Choke Manifold", "dTimEnd": "2016-08-17T02:30:00+02:00", "dTimStart": "2016-08-17T01:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and run slick joint, retracted TDS. \nRemoved master bushing and outer ring, run down and landed off slick jnt and M/U 4x studs", "dTimEnd": "2016-08-17T03:15:00+02:00", "dTimStart": "2016-08-17T02:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and RIH w/ diverter and land off same. Continued to M/U rest of studs on slick jnt", "dTimEnd": "2016-08-17T04:45:00+02:00", "dTimStart": "2016-08-17T03:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to build scaffolding", "dTimEnd": "2016-08-17T05:00:00+02:00", "dTimStart": "2016-08-17T04:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Built scaffolding around HP Riser. \nMeanwhile removed lifting chains from TDS. Prepared and M/U test assembly for pressure testing TDS", "dTimEnd": "2016-08-17T06:15:00+02:00", "dTimStart": "2016-08-17T05:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Started M/U NT2 connector", "dTimEnd": "2016-08-17T07:00:00+02:00", "dTimStart": "2016-08-17T06:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to M/U NT2 connector w/ new crew", "dTimEnd": "2016-08-17T07:15:00+02:00", "dTimStart": "2016-08-17T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Finished M/U NT2 connector between BOP and riser. \nMeanwhile performed pressure test on TDS. Test NO.1 and Test NO. 2, Kelly hose, Upper IBOP", "dTimEnd": "2016-08-17T09:00:00+02:00", "dTimStart": "2016-08-17T07:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed load shift from BOP carriers to tension system and pressurized diverter system. \nMeanwhile continued TDS pressure test. Test NO. 3, Lower IBOP", "dTimEnd": "2016-08-17T09:30:00+02:00", "dTimStart": "2016-08-17T09:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Filled up riser and BOP with SW, closed BSR and pressure tested BOP/connector through Kill line to 20/345bar for 5/10min. Meanwhile performed TBT for rig up casing handling equipment", "dTimEnd": "2016-08-17T10:15:00+02:00", "dTimStart": "2016-08-17T09:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U casing tong and changed BX inserts to 7inch", "dTimEnd": "2016-08-17T11:45:00+02:00", "dTimStart": "2016-08-17T10:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and cleared rig floor", "dTimEnd": "2016-08-17T12:00:00+02:00", "dTimStart": "2016-08-17T11:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U THRT and make up to first joint of the landing string", "dTimEnd": "2016-08-17T12:15:00+02:00", "dTimStart": "2016-08-17T12:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Overtorqued connection between THRT and first joint due to wrong tong setting. \nTroubleshoot, broke out and inspected treads. Damaged. L/D damaged pup joint and THRT", "dTimEnd": "2016-08-17T13:15:00+02:00", "dTimStart": "2016-08-17T12:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke off 2x pup joints from first landing string joint", "dTimEnd": "2016-08-17T13:45:00+02:00", "dTimStart": "2016-08-17T13:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U backup THRT and first landing string joint", "dTimEnd": "2016-08-17T14:00:00+02:00", "dTimStart": "2016-08-17T13:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D back up THRT due to it not being able to communicate with DHSV", "dTimEnd": "2016-08-17T14:30:00+02:00", "dTimStart": "2016-08-17T14:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared to P/U primary landing string. \nMeanwhile perform maintenance on BOP control system", "dTimEnd": "2016-08-17T14:45:00+02:00", "dTimStart": "2016-08-17T14:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U primary THRT, broke off damaged pup joint and L/D same. \nReplaced with new pup joint and M/U to THRT", "dTimEnd": "2016-08-17T15:45:00+02:00", "dTimStart": "2016-08-17T14:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U primary landing string", "dTimEnd": "2016-08-17T16:00:00+02:00", "dTimStart": "2016-08-17T15:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U 3x pup joints and M/U to THRT, RIH to 22m", "dTimEnd": "2016-08-17T16:30:00+02:00", "dTimStart": "2016-08-17T16:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH landing string to surface. Prepared and connected control lines to THRT", "dTimEnd": "2016-08-17T16:45:00+02:00", "dTimStart": "2016-08-17T16:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with THRT and landed on the tubing. M/U THRT to TH", "dTimEnd": "2016-08-17T17:30:00+02:00", "dTimStart": "2016-08-17T16:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting for pumping open ME plug", "dTimEnd": "2016-08-17T17:45:00+02:00", "dTimStart": "2016-08-17T17:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Dropped 2in ball inside landing string and M/U swedge with 1502 weco to 7in tubing", "dTimEnd": "2016-08-17T18:00:00+02:00", "dTimStart": "2016-08-17T17:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up to line test. Go to low pressure 20bar. Cement pump tripped. Troubleshoot. Meanwhile lift remaining tubing handling equipment to rig floor. Reel and compact spider slips", "dTimEnd": "2016-08-17T19:00:00+02:00", "dTimStart": "2016-08-17T18:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued w/ line test. Meanwhile prepared rigfloor for second reel", "dTimEnd": "2016-08-17T19:15:00+02:00", "dTimStart": "2016-08-17T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Connected cement hose to pumping swedge and applied 20 bar to confirm line up. \nContinued to pressure up to 60 bar (unable to stop at 50 bar due to pressure building up to fast), no indication of opening of the Pump-open sub in ME plug. Bled off. Waited 5 min to let plug reset.\nNote: Plug supposed to open at 40 bar.", "dTimEnd": "2016-08-17T20:00:00+02:00", "dTimStart": "2016-08-17T19:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressured up well to 50 bar w/ cement unit. Did not observe signs of Pump-open sub in ME plug openning . Bled off pressure via choke\nMeanwhile: \n- Called and consulted Interwell duty support. Agreed to pump up to 100bar to try to open plug.\n- Continued to rig up reels.", "dTimEnd": "2016-08-17T20:30:00+02:00", "dTimStart": "2016-08-17T20:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Started to pressured up well with constant rate of 50 l/min. Observed clear change of pressure trend at 56 bar indicating openning of Pump-open sub in ME plug \nStopped pressuring up at 102 bar", "dTimEnd": "2016-08-17T20:45:00+02:00", "dTimStart": "2016-08-17T20:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Bled off pressure and monitor well on fully closed choke, no pressure build up.", "dTimEnd": "2016-08-17T21:15:00+02:00", "dTimStart": "2016-08-17T20:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pressured up well to equalize and open DHSV, applied 130 bar to string, observed DHSV equalizing and opening at 122bar. Pressured up control lines to 520 bar. Bled off tubing pressure to zero via choke to trip tank. Returns 60 liters indicating that DHSV closed after pressure above is pled off. \nRepeated equalizing and bleeding off sequence and observed same volume bled off", "dTimEnd": "2016-08-17T21:45:00+02:00", "dTimStart": "2016-08-17T21:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Confirmed 520 bar on control line and applied 140 bar to the well, 170 liters pumped and 90 liters returned. Meanwhile evaluated situation. Discussed situation w/ onshore organisation.", "dTimEnd": "2016-08-17T22:30:00+02:00", "dTimStart": "2016-08-17T21:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Applied 100 bar to tubing. Disconnected cement hose and bled off directly into a drum. 51 liters returned indicating that DHSV was closed", "dTimEnd": "2016-08-17T22:45:00+02:00", "dTimStart": "2016-08-17T22:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Reconnected cement hose to tubing. Meanwhile held TBT to swap hydraulic pump to pressure up control line for DHSV", "dTimEnd": "2016-08-17T23:00:00+02:00", "dTimStart": "2016-08-17T22:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Connected another hydraulic pump to control line, applied 520bar to control line. Started pressuring up tubing while monitoring gauge on the hydraulic pump for indications of DHSV sleeve movement. \nObserved DHSV equalized and opened at 146 bar and stop pressuring up at 152bar. No indication of DHSV sleeve movement. Bled off pressure, volume returned 60 liters. 152bar trapped below DHSV", "dTimEnd": "2016-08-18T00:00:00+02:00", "dTimStart": "2016-08-17T23:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2016_08_19
NO 15/9-F-12
NO 15/9-F-12
name
2016-08-18T00:00:00+02:00
2016-08-19T00:00:00+02:00
normal
2018-05-03T13:51:59+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-08-19T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-14T18:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- RIH w/ tubing on DP and place 200m balanced cement plug\n- while WOC pull 600m of 7in tubing\n- RIH w/ tbg on spear, tag TOC, leave tbg inwell, POOH", "hpht": "0", "md": "-999.99", "mdCsgLast": "3519", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "5", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "- Pulled TH to surface\n- Pulled 500m of tubing and L/D DHSV\n- RIH and performed CBL log\n- R/D WL", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "Evaluated situation. Discussed situation w/ onshore organisation, callled well integrity duty\nMeanwhile prepared papers and serviced/drops checked rig floor equipment", "dTimEnd": "2016-08-18T01:45:00+02:00", "dTimStart": "2016-08-18T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued discussing way forward. Discussed risks, barrier status, well control contingencies. Agreed to attempt to pull tubing hanger with 152bar trapped pressure below DHSV. Updated change log. \nMeanwhile applied 20 bar to tubing and inflow tested DHSV, Good. Continued with rig maintenance and pressure tested valves S1 and C26, good", "dTimEnd": "2016-08-18T03:30:00+02:00", "dTimStart": "2016-08-18T01:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting for pulling tubing hanger as per agreed new plan", "dTimEnd": "2016-08-18T03:45:00+02:00", "dTimStart": "2016-08-18T03:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D cementing hose, chiksans. Attempted to back off weco1502 swedge. Collar backing off together with swedge. Torqued up collar to 15000 ft*lbs and manage to break off swedge, L/D same", "dTimEnd": "2016-08-18T04:30:00+02:00", "dTimStart": "2016-08-18T03:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed circulating swedge for TDS. M/U TDS and unlock tubing hanger. \nPull tubing hanger free with 185t hook load (15ton overpull). Observed drop in Trip tank indicating that A-annulus was not 100% full. Waited for trip tank level to stabilize, total of 2 m3 lost", "dTimEnd": "2016-08-18T05:30:00+02:00", "dTimStart": "2016-08-18T04:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to pull landing string to TH. After pulling further 9m, observed gain in trip tank indicating seals pulled out of PBR. \nStopped and flowchecked, after 270l gain trip tank static. Gain volume corresponded to expected volume value due to trapped pressure below DHSV", "dTimEnd": "2016-08-18T07:00:00+02:00", "dTimStart": "2016-08-18T05:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to L/D THRT and to POOH 7in tubing w/ control lines", "dTimEnd": "2016-08-18T07:15:00+02:00", "dTimStart": "2016-08-18T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cut control lines. L/D TH and THRT + 2 pup joints from 2976m to 2962m", "dTimEnd": "2016-08-18T08:00:00+02:00", "dTimStart": "2016-08-18T07:15:00+02:00", "md": "2962", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Connected control lines to reel. Removed master bushing and installed compact spider slips. \nPull 1x joint while doing adjustment on slips and tong", "dTimEnd": "2016-08-18T08:45:00+02:00", "dTimStart": "2016-08-18T08:00:00+02:00", "md": "2951", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pull 7in tubing from liner 2951m to 2737m. Measured radioactivity every 10 joints. \nAverage pulling speed 6,8joints/hour", "dTimEnd": "2016-08-18T10:30:00+02:00", "dTimStart": "2016-08-18T08:45:00+02:00", "md": "2737", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed time out for safety w/ crew due to radioactivity recorded in 7in tubing. \n10-16 Bq/cm2 and 1-2uSv/h recorded", "dTimEnd": "2016-08-18T10:45:00+02:00", "dTimStart": "2016-08-18T10:30:00+02:00", "md": "2737", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to pull 7in tubing from 2737 to 2473m. DHSV assy in rotary. Average pulling speed 10joints/hour\nContinued to measure radioactivity at 9-12 Bq/cm2 and 1-2uSv/h on inside of tubing and 3-4 Bq/cm2 and 0.5uSv/h on the outside of the tubing", "dTimEnd": "2016-08-18T12:45:00+02:00", "dTimStart": "2016-08-18T10:45:00+02:00", "md": "2473", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D Compact spider, install master bushing", "dTimEnd": "2016-08-18T13:15:00+02:00", "dTimStart": "2016-08-18T12:45:00+02:00", "md": "2473", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U 1x joint and cut control line to avoid having control line across BOP during WL operation. \nRIH w/ same and L/D DHSV", "dTimEnd": "2016-08-18T13:30:00+02:00", "dTimStart": "2016-08-18T13:15:00+02:00", "md": "2473", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lifted WL equipment and tool string to rig floor. Meanwhile cleaned and cleared rig floor", "dTimEnd": "2016-08-18T14:15:00+02:00", "dTimStart": "2016-08-18T13:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to R/U WL equipment", "dTimEnd": "2016-08-18T14:30:00+02:00", "dTimStart": "2016-08-18T14:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U for WL and M/U logging tool string (run#9). \nPerformed surface check prior to RIH", "dTimEnd": "2016-08-18T16:30:00+02:00", "dTimStart": "2016-08-18T14:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with logging BHA on WL. From surface to 2960m. Checked pick up weights every 500m. \nAverage running speed 28m/min", "dTimEnd": "2016-08-18T18:15:00+02:00", "dTimStart": "2016-08-18T16:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Logged USIT across interval 2960 - 2506 m. Performed repeat pass across interval 2960 - 2860 m. Processed and uploaded data into Interact system. \nConfirmed quality of data with logging duty. Received confirmation from logging duty that following intervals had high cement quality: 2895-2960m, 2660-2671m \n", "dTimEnd": "2016-08-18T20:45:00+02:00", "dTimStart": "2016-08-18T18:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH from 2500 m to surface. Average pulling speed 42 m/min.", "dTimEnd": "2016-08-18T21:45:00+02:00", "dTimStart": "2016-08-18T20:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D WL equipment and change elevator inserts to 5,5in DP. Meanwhile function tested DHSV on deck. Observed indication of sleeve moving and flapper openning/closing", "dTimEnd": "2016-08-18T22:30:00+02:00", "dTimStart": "2016-08-18T21:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to R/D tubing tong", "dTimEnd": "2016-08-18T22:45:00+02:00", "dTimStart": "2016-08-18T22:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D tubing tong", "dTimEnd": "2016-08-19T00:00:00+02:00", "dTimStart": "2016-08-18T22:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2016_08_20
NO 15/9-F-12
NO 15/9-F-12
name
2016-08-19T00:00:00+02:00
2016-08-20T00:00:00+02:00
normal
2018-05-03T13:51:59+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-08-20T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-14T18:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Pull MS-T seal\n- Cut 10 3/4in surface tie-back csg\n- Pull and L/D 10 3/4in surface tie-back csg\n- Release tie-back adapter\n- Retrieve tie-back adapter", "hpht": "0", "md": "-999.99", "mdCsgLast": "3519", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "2775", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "6", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "- Circulated well to clean sea water\n- Set balance cement plug in 9 5/8in csg\n- Pulled and L/D 600m of 7in tubing\n- RIH w/ tubing on spear and tagged cement plug\n- Released spear from tubing and POOH", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "Removed master bushing and installed PS21s. \nRun down 1st std, observed back flow while running down", "dTimEnd": "2016-08-19T00:15:00+02:00", "dTimStart": "2016-08-19T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U 2x 5,5in pup joints for space out", "dTimEnd": "2016-08-19T00:30:00+02:00", "dTimStart": "2016-08-19T00:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued RIH with 5,5in DP from 2521m to 2962m restricted due to back flow. \nPerformed D1 kick drill", "dTimEnd": "2016-08-19T02:15:00+02:00", "dTimStart": "2016-08-19T00:30:00+02:00", "md": "2962", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U TDS and staged up pump rate to 3700 l/min - 178 bar. Observed increase in gas returns to 10%, stopped pump and lined up returns through gas traps", "dTimEnd": "2016-08-19T03:00:00+02:00", "dTimStart": "2016-08-19T02:15:00+02:00", "md": "2962", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued circulating with 2200 l/min - 65 bar, max gas 28% and 7ppm H2S in fluid. Circulated until gas dropped to 3% and zero H2S. Pumped through dump line with 2200 l/min to check clear.", "dTimEnd": "2016-08-19T04:45:00+02:00", "dTimStart": "2016-08-19T03:00:00+02:00", "md": "2962", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U pumping assembly, connected cement hose and 2x lo-torqs. Meanwhile held TBT for cementing job", "dTimEnd": "2016-08-19T05:15:00+02:00", "dTimStart": "2016-08-19T04:45:00+02:00", "md": "2962", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Positioned string at 2965m, lined up and pumped 20 m3 wash pill. 3700l/min - 180bar", "dTimEnd": "2016-08-19T05:30:00+02:00", "dTimStart": "2016-08-19T05:15:00+02:00", "md": "2965", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up to cement hose and performed connection test w/ 345 bar for 3 mins. Bled off pressure to 20 bar, closed IBOP and applied 20 bar behind. Open to cement hose and verified line up", "dTimEnd": "2016-08-19T06:00:00+02:00", "dTimStart": "2016-08-19T05:30:00+02:00", "md": "2965", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Balanced cement plug (2965 m - 2765 m ): Mixed and pumped 9,2 m3 of 1,9 SG cement slurry, 550 l/min. Displaced the cement to the rig floor with 2900 l of drill water. Zeroed volume counters. Displaced the cement with 44 m3 (1986 strokes) of SW, 3700 l/min/ 147 bar. Pulled out of cement to 2765m at 4 min/stand. Theoretical TOC 2765 m MD.", "dTimEnd": "2016-08-19T07:30:00+02:00", "dTimStart": "2016-08-19T06:00:00+02:00", "md": "2965", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed sponge ball. Pumped 10m3 hi-vis at 1350l/min / 35 bar. Circulated 3000 l/min/ 100 bar. Meanwhile removed PS21 slips and installed master bushing. Held TBT for P/U BOP wash tool", "dTimEnd": "2016-08-19T08:45:00+02:00", "dTimStart": "2016-08-19T07:30:00+02:00", "md": "2765", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH and R/B 1x stand from 2765m to 2722m", "dTimEnd": "2016-08-19T09:00:00+02:00", "dTimStart": "2016-08-19T08:45:00+02:00", "md": "2722", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed closed FOSV and BOP wash tool, make 10x passes in BOP and well head at 1500 LPM / 11 bar, operated rams and annular once", "dTimEnd": "2016-08-19T10:15:00+02:00", "dTimStart": "2016-08-19T09:00:00+02:00", "md": "2722", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/B stand and L/D wash tool and FOSV", "dTimEnd": "2016-08-19T10:30:00+02:00", "dTimStart": "2016-08-19T10:15:00+02:00", "md": "2722", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH from 2722 m to 2475 m", "dTimEnd": "2016-08-19T11:00:00+02:00", "dTimStart": "2016-08-19T10:30:00+02:00", "md": "2475", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to rig up casing tong", "dTimEnd": "2016-08-19T11:15:00+02:00", "dTimStart": "2016-08-19T11:00:00+02:00", "md": "2475", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed casing tong and removed X-over", "dTimEnd": "2016-08-19T12:15:00+02:00", "dTimStart": "2016-08-19T11:15:00+02:00", "md": "2475", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled 1x joint of 7in tubing from 2475m to 2463m , removed master bushing and installed compact spider slips", "dTimEnd": "2016-08-19T12:30:00+02:00", "dTimStart": "2016-08-19T12:15:00+02:00", "md": "2463", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting pull and L/D tubing w/ control lines", "dTimEnd": "2016-08-19T12:45:00+02:00", "dTimStart": "2016-08-19T12:30:00+02:00", "md": "2463", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Connected control line to reel", "dTimEnd": "2016-08-19T13:00:00+02:00", "dTimStart": "2016-08-19T12:45:00+02:00", "md": "2463", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled 7in tubing from 2463m to 2415m. Control line jammed into slips segment, lifted slips to release\nMeasured second joint for radioactivity at 10-30 Bq/cm2 and 1-2uSv/h on inside and 8-11 Bq/cm2 and 0.5 uSv/h on outside", "dTimEnd": "2016-08-19T13:45:00+02:00", "dTimStart": "2016-08-19T13:00:00+02:00", "md": "2415", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued pulling 7in tubing from 2415m to 2189m. Measuring for radioactivity 1-2 uSv/h on inside of tubing. Average pulling speed 11 joints/hour", "dTimEnd": "2016-08-19T15:30:00+02:00", "dTimStart": "2016-08-19T13:45:00+02:00", "md": "2189", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TOFS due to finger injury to floor man. Discussed what happened and preventative measures", "dTimEnd": "2016-08-19T16:00:00+02:00", "dTimStart": "2016-08-19T15:30:00+02:00", "md": "2189", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to pull 7in tubing from 2189m to 1877. Average pulling speed 12 joints/hour. Last joint laid down #111", "dTimEnd": "2016-08-19T18:00:00+02:00", "dTimStart": "2016-08-19T16:00:00+02:00", "md": "1877", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to R/D casing handling equipment", "dTimEnd": "2016-08-19T18:15:00+02:00", "dTimStart": "2016-08-19T18:00:00+02:00", "md": "1877", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled up 1x joint, cut and secured control line to avoid having control line in BOP during R/D. R/D compact spider, installed master bushing. Run down and set manual slips", "dTimEnd": "2016-08-19T18:30:00+02:00", "dTimStart": "2016-08-19T18:15:00+02:00", "md": "1877", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D casing tongs", "dTimEnd": "2016-08-19T19:30:00+02:00", "dTimStart": "2016-08-19T18:30:00+02:00", "md": "1877", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U spear assembly (run#11), greased pack off, grapple and set in catch", "dTimEnd": "2016-08-19T19:45:00+02:00", "dTimStart": "2016-08-19T19:30:00+02:00", "md": "1877", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH from 1876m to 1905m. Removed FOSV from liner swedge. Removed master bushings and installed PS21", "dTimEnd": "2016-08-19T20:15:00+02:00", "dTimStart": "2016-08-19T19:45:00+02:00", "md": "1905", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued RIH on 5,5in DP from 1905m to 2356m. Average running speed 450m/hour", "dTimEnd": "2016-08-19T21:15:00+02:00", "dTimStart": "2016-08-19T20:15:00+02:00", "md": "2356", "phase": "fixed", "proprietaryCode": "plug abandon -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Observed loose stand in derrick. Held TBT, recovered stand using forward PRS and returned to TDS. Held stand w/ aft PRS to lower down TDS to be able to inspect elevators. Elevators found to be damaged. Changed out elevators to spare set. \nPerformed drops check of aft PRS before continuing with operation.", "dTimEnd": "2016-08-19T23:15:00+02:00", "dTimStart": "2016-08-19T21:15:00+02:00", "md": "2356", "phase": "fixed", "proprietaryCode": "interruption -- fish", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued RIH from 2356m to 2712m. Average running speed 350 m/hour", "dTimEnd": "2016-08-20T00:00:00+02:00", "dTimStart": "2016-08-19T23:15:00+02:00", "md": "2712", "phase": "fixed", "proprietaryCode": "plug abandon -- trip", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2016_08_21
NO 15/9-F-12
NO 15/9-F-12
name
2016-08-20T00:00:00+02:00
2016-08-21T00:00:00+02:00
normal
2018-05-03T13:51:59+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-08-21T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-14T18:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Release tie-back adapter\n- Pull tie-back adapter on spear\n- Punch below 10 3/4in subsea csg hanger\n- Mill 10 3/4in subsea csg hanger", "hpht": "0", "md": "-999.99", "mdCsgLast": "3519", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "7", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "- Tagged cement plug\n- Left tubing in hole\n- Pulled MS-T seal\n- Cut 10 3/4in tie-back csg\n- Pull 10 3/4in surface csg hanger and tie-back above the cut\n- Attempted to release tie-back adapter", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "M/U TDS and pumped w/ 400 l/min - 3.5 bar, 550 l/m - 5 bar. \nUp/down weights 202t/126t. Washed down w/ 550 l/min from 2712m to 2768m", "dTimEnd": "2016-08-20T01:00:00+02:00", "dTimStart": "2016-08-20T00:00:00+02:00", "md": "2768", "phase": "fixed", "proprietaryCode": "plug abandon -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Tagged cement at 2768m w/ 10t, released spear by rotating 2x turns clockwise and observed torque dropped to 6kNm then increased to 9kNm. \nObserved hook load dropped to 90t. RIH slowly and located top of 7in tubing 7m lower or at 2775m. Set down 10t to repeat tagging of the cement", "dTimEnd": "2016-08-20T01:30:00+02:00", "dTimStart": "2016-08-20T01:00:00+02:00", "md": "899", "phase": "fixed", "proprietaryCode": "plug abandon -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Dropped drift and POOH w/ spear on 5,5in DP from 899 m to surface. Avg. tripping speed 730 m/hr\nRetrieved drift", "dTimEnd": "2016-08-20T03:15:00+02:00", "dTimStart": "2016-08-20T01:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled spear on surface. Inspected same, ok", "dTimEnd": "2016-08-20T03:30:00+02:00", "dTimStart": "2016-08-20T03:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed PS21s and installed master bushings", "dTimEnd": "2016-08-20T03:45:00+02:00", "dTimStart": "2016-08-20T03:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to P/U MS-T seal retrieval tool", "dTimEnd": "2016-08-20T04:00:00+02:00", "dTimStart": "2016-08-20T03:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U MS-T seal retrieval tool to 1x joint and 1x pup joint of 5,5in DP", "dTimEnd": "2016-08-20T04:15:00+02:00", "dTimStart": "2016-08-20T04:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled MS-T seal retrieval tool to surface and connected control lines, function tested tool", "dTimEnd": "2016-08-20T04:45:00+02:00", "dTimStart": "2016-08-20T04:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ MS-T seal retrieval tool and positioned tool stem in correct space out. Meanwhile bled off 5 bar from B-annulus.", "dTimEnd": "2016-08-20T05:00:00+02:00", "dTimStart": "2016-08-20T04:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Turned string counter clockwise using chain tongs, only able to get 1x turn. Backed out and attempted again, 1x turn only. Tried to turn w/ iron roughneck, no go", "dTimEnd": "2016-08-20T06:00:00+02:00", "dTimStart": "2016-08-20T05:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH and inspected tool, no damage found, observed some minor scratches", "dTimEnd": "2016-08-20T06:30:00+02:00", "dTimStart": "2016-08-20T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D MS-T seal retrieval tool on HTS", "dTimEnd": "2016-08-20T06:45:00+02:00", "dTimStart": "2016-08-20T06:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U jetting tool assembly to 5,5in DP stand", "dTimEnd": "2016-08-20T07:30:00+02:00", "dTimStart": "2016-08-20T06:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Jetted WH area with 2200 l/min - 60bar - 10 rpm", "dTimEnd": "2016-08-20T07:45:00+02:00", "dTimStart": "2016-08-20T07:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D wash tool and R/B DP stand", "dTimEnd": "2016-08-20T08:00:00+02:00", "dTimStart": "2016-08-20T07:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U MS-T retrieval tool assy", "dTimEnd": "2016-08-20T08:30:00+02:00", "dTimStart": "2016-08-20T08:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with MS-T seal retrieval tool. Rotated tool 4x turns counter clockwise to engage tool to seal. Released seal assembly w/ 80t overpull", "dTimEnd": "2016-08-20T10:30:00+02:00", "dTimStart": "2016-08-20T08:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ MS-T seal retrieval tool, removed seal assy.Disconnected control lines. L/D tool and landing string", "dTimEnd": "2016-08-20T11:15:00+02:00", "dTimStart": "2016-08-20T10:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and cleared rig floor", "dTimEnd": "2016-08-20T11:30:00+02:00", "dTimStart": "2016-08-20T11:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to P/U cutter BHA (run#14)", "dTimEnd": "2016-08-20T11:45:00+02:00", "dTimStart": "2016-08-20T11:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U premade cutter BHA (run#14), M/U to 5,5in DP and RIH to cutting depth of 124m", "dTimEnd": "2016-08-20T12:15:00+02:00", "dTimStart": "2016-08-20T11:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U TDS to string, checked and verified depth, filled pipe. Established parameters. 300 l/min - 30bar, 500l/min - 83bar, 100rpm, 1-5 kNm (pumps off), Weights: 73t - up, 69t - down, 70t - rotation", "dTimEnd": "2016-08-20T12:45:00+02:00", "dTimStart": "2016-08-20T12:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cut 10 3/4in surface tie-back at 124m. 80rpm, 300 l/min - 30bar. Observed shock on surface indicating successful cut", "dTimEnd": "2016-08-20T13:15:00+02:00", "dTimStart": "2016-08-20T12:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ cutter BHA (run#14) to surface and L/D same", "dTimEnd": "2016-08-20T13:45:00+02:00", "dTimStart": "2016-08-20T13:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and cleared rig floor", "dTimEnd": "2016-08-20T14:00:00+02:00", "dTimStart": "2016-08-20T13:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Serviced drilling equipment", "dTimEnd": "2016-08-20T14:30:00+02:00", "dTimStart": "2016-08-20T14:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to P/U spear assembly (run#15)", "dTimEnd": "2016-08-20T14:45:00+02:00", "dTimStart": "2016-08-20T14:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U spear assembly (run#15) from derrick, checked and serviced same", "dTimEnd": "2016-08-20T15:00:00+02:00", "dTimStart": "2016-08-20T14:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH and latched on to 10 3/4in tie-back. Pulled free same w/ 8t overpull", "dTimEnd": "2016-08-20T15:15:00+02:00", "dTimStart": "2016-08-20T15:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U casing tong for 10 3/4in csg", "dTimEnd": "2016-08-20T16:00:00+02:00", "dTimStart": "2016-08-20T15:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Set slips on fish and released spear. R/B spear in derrick", "dTimEnd": "2016-08-20T16:30:00+02:00", "dTimStart": "2016-08-20T16:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed to BX3 elevators", "dTimEnd": "2016-08-20T16:45:00+02:00", "dTimStart": "2016-08-20T16:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed elevator on hanger. Broke off and L/D same", "dTimEnd": "2016-08-20T17:00:00+02:00", "dTimStart": "2016-08-20T16:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH 10 3/4in csg tie-back from 104m to surface", "dTimEnd": "2016-08-20T18:15:00+02:00", "dTimStart": "2016-08-20T17:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D casing tong. Cleaned and cleared rig floor", "dTimEnd": "2016-08-20T19:15:00+02:00", "dTimStart": "2016-08-20T18:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to P/U torque tool BHA (run#16)", "dTimEnd": "2016-08-20T19:30:00+02:00", "dTimStart": "2016-08-20T19:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U torque tool to 3m. Removed FOSV from swedge", "dTimEnd": "2016-08-20T19:45:00+02:00", "dTimStart": "2016-08-20T19:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U 1x stand of 5,5in HWDP and M/U to X-over, RIH w/ 5,5in HWDP from 3m to 117m. Torqued all connections to 67500 kNm", "dTimEnd": "2016-08-20T20:30:00+02:00", "dTimStart": "2016-08-20T19:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U TDS to 5,5in DP, RIH to 140m, started pumping with 1450 l/m, rotated w/ 10rpm. Jetted tie-back adapter area", "dTimEnd": "2016-08-20T21:00:00+02:00", "dTimStart": "2016-08-20T20:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Stopped pumping and engaged to tie-back adapter at 141,5m. Attempted to back out Tie back adapter with 30k kNm, string backed out at Saver sub. M/U Saver sub to 50 kNm. Tried to break again up 40kNm, something broke below rotary table, after 2 turns measured distance travelled up of string +/-1in. Continued turning out further 4 turns, distance travelled further +/-2in. Assumed as good indication of Tie back adapter loose.", "dTimEnd": "2016-08-20T21:45:00+02:00", "dTimStart": "2016-08-20T21:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH from 141,5m, visually checked all connections. When reached end of last 5,5in HWDP stand observed no BHA. The connection backed out from X-over", "dTimEnd": "2016-08-20T22:30:00+02:00", "dTimStart": "2016-08-20T21:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 5,5in HWDP to fish BHA, from surface to 113m. M/U TDS to 5,5in DP and tagged top of fish at 138,5m. Rotate to screw into the fish, string stalled out at 6kNm", "dTimEnd": "2016-08-20T23:30:00+02:00", "dTimStart": "2016-08-20T22:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ BHA to surface, removed and inspect x-over, ok", "dTimEnd": "2016-08-20T23:45:00+02:00", "dTimStart": "2016-08-20T23:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U to X-over. All connections M/U to 67kNm, Saver sub M/U to 50kNm. RIH to 117m", "dTimEnd": "2016-08-21T00:00:00+02:00", "dTimStart": "2016-08-20T23:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2016_08_22
NO 15/9-F-12
NO 15/9-F-12
name
2016-08-21T00:00:00+02:00
2016-08-22T00:00:00+02:00
normal
2018-05-03T13:51:59+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-08-22T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-14T18:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Cut 10 3/4in csg at 890m\n- Release tieback adapter using left hand string\n- Pulled tieback adapter with spear\n- Mill 10 3/4in subsea csg hanger\n- Retrieve 10 3/4csg to surface w/ spear", "hpht": "0", "md": "-999.99", "mdCsgLast": "3519", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "2775", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "8", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "- Attempted to release tieback adapter several times w/ no success\n- Perforated below 10 3/4in subsea csg hanger\n- Circulated gas out", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "Continued to RIH w/ torque tool to 117m", "dTimEnd": "2016-08-21T00:15:00+02:00", "dTimStart": "2016-08-21T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U TDS and RIH, engaged to tie-back adapter. Marked pipe. Attempted to back out adapter counter clockwise. Broke at 39kNm. Measured distance 1,5in after 5 turns. Suspected broken at connection. M/U back to 1kNm. POOH, visually checked every connection. Observed connection above X-over broke.", "dTimEnd": "2016-08-21T01:15:00+02:00", "dTimStart": "2016-08-21T00:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned X-over connection and M/U to HWDP without applying pipe dope. All connections M/U to 67kNm, Saver sub M/U to 50kNm. \nRIH, engaged to tie-back adapter. Marked pipe. Attempted to back out adapter counter clockwise. Broke at +/-39kNm. Measured distance 1,5in after 5 turns. Suspected at connection. M/U back to 1kNm. POOH, visually checked every connection. Observed connection above X-over broke.\n", "dTimEnd": "2016-08-21T03:00:00+02:00", "dTimStart": "2016-08-21T01:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned X-over connection and M/U to HWDP to 74kNM without applying pipe dope. All DP connections M/U to 67kNm, Saver sub M/U to 50kNm. \nRIH, engaged to tie-back adapter. Marked pipe. Attempted to back out adapter counter clockwise. Broke at +/-39kNm. Observed Saver sub connection broke. M/U saver sub again to 50kNm and attempted to break. Observed Saver sub connection broke.", "dTimEnd": "2016-08-21T04:45:00+02:00", "dTimStart": "2016-08-21T03:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U manual tong and held TBT for use of manual tongs", "dTimEnd": "2016-08-21T05:00:00+02:00", "dTimStart": "2016-08-21T04:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Trapped 20 kNm in with shaft and applied TDS break. Put tong on and pulled 20 kNm, released brake and pulled with tong to 25k n/m. Applied TDS brake. Pulled up to max 30kNm with Rig tong, observed torq reduced on TDS Shaft. Took off Rig tong, rotated TDS counter clockwise to make sure free. Made string back up to 2kNm. POOH, visually checked all connections. No connections have been observed backed out", "dTimEnd": "2016-08-21T07:00:00+02:00", "dTimStart": "2016-08-21T05:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Started RIH w/ torque tool", "dTimEnd": "2016-08-21T07:30:00+02:00", "dTimStart": "2016-08-21T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Carried out weekly HSE drill, table top exercise regarding volumetric well control", "dTimEnd": "2016-08-21T07:45:00+02:00", "dTimStart": "2016-08-21T07:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued RIH w/ torque tool. Engaged to tie-back adapter. Marked pipe. Attempted to back out adapter counter clockwise. Applied 25kNm in steps before pipe started to rotate. Than rotated free at 2kNm. Measured distance 1,5in after 5 turns. POOH. Observed no torque tool/X/over on the drill pipe - left in hole", "dTimEnd": "2016-08-21T09:15:00+02:00", "dTimStart": "2016-08-21T07:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ DP from surface to 137 m. M/U TDS and latched on to fish. POOH from to surface. L/D torque tool", "dTimEnd": "2016-08-21T10:15:00+02:00", "dTimStart": "2016-08-21T09:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U Left hand Tie-back adapter torque tool and M/U to X/O", "dTimEnd": "2016-08-21T10:45:00+02:00", "dTimStart": "2016-08-21T10:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH torque tool on 5,5in left hand DP. From surface to 140. P/U singles from cantilever", "dTimEnd": "2016-08-21T12:00:00+02:00", "dTimStart": "2016-08-21T10:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Left hand X-over arrived on the rig. Inspected and discovered it was right hand X-over. Evaluated situation. Meanwhile performed hydraulic test on BX4.", "dTimEnd": "2016-08-21T12:45:00+02:00", "dTimStart": "2016-08-21T12:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U 1x more joint of DP and M/U to string. Attempted to break off Tie-Back adapter using rig tongs on DP. Pulled +/- 28kNm. Cathead fully stroked out. No success", "dTimEnd": "2016-08-21T14:00:00+02:00", "dTimStart": "2016-08-21T12:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Evaluated situation. Meanwhile performed tests on Aft iron roughneck", "dTimEnd": "2016-08-21T14:30:00+02:00", "dTimStart": "2016-08-21T14:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH from 140m to surface. L/D torque tool. Clean and clear rig floor", "dTimEnd": "2016-08-21T15:15:00+02:00", "dTimStart": "2016-08-21T14:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to P/U drill collars from deck", "dTimEnd": "2016-08-21T15:30:00+02:00", "dTimStart": "2016-08-21T15:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and RIH 8,25 DC from surface to 90m (9 joints). R/B same in derrick", "dTimEnd": "2016-08-21T17:45:00+02:00", "dTimStart": "2016-08-21T15:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to P/U guns", "dTimEnd": "2016-08-21T18:00:00+02:00", "dTimStart": "2016-08-21T17:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U to run guns", "dTimEnd": "2016-08-21T18:15:00+02:00", "dTimStart": "2016-08-21T18:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U TCP gun BHA from surface to 17m", "dTimEnd": "2016-08-21T19:00:00+02:00", "dTimStart": "2016-08-21T18:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to handle guns w/ new crew", "dTimEnd": "2016-08-21T19:15:00+02:00", "dTimStart": "2016-08-21T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to M/U guns BHA to 18m", "dTimEnd": "2016-08-21T19:30:00+02:00", "dTimStart": "2016-08-21T19:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ guns on 5,5in DP to 138m", "dTimEnd": "2016-08-21T20:30:00+02:00", "dTimStart": "2016-08-21T19:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U TDS and positioned guns at 151.7m, closed UPRs and applied 20 bar to IBOP, opened to confirm line up. Up/down weights 72t/68t, flushed ball seat with 222 l/min. Opened UPRs, broke out connection and dropped 1 3/8in ball. M/U connection and positioned guns at firing depth 144,5-147,5m (top-bottom shot), closed UPRs and lined up through fully open Choke", "dTimEnd": "2016-08-21T21:00:00+02:00", "dTimStart": "2016-08-21T20:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pumped down ball with 160 l/min, sheared ball seat at 150 bar. Indication of guns firing (sound, vibration on surface). Top shot at 144,5m, bottom shot at 147,5m. Continued pumping with 150 l/min until returns, increased to 770 l/min, observed slight gain of 500ltr and then losses of 60m3/hr. Pumped 1,5 times btms up, gas observed and still on losses", "dTimEnd": "2016-08-21T21:30:00+02:00", "dTimStart": "2016-08-21T21:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Stopped pumping, left choke open and opened UPRs, observed increase in flow. Close UPRs and closed choke, monitored for pressure on chole. Initially 1 bar, slowly increased to 2.9 bar then leveled out. Opened choke and slowly bled off pressure to 1 bar, closed choke and monitored for pressure build up, ok, no build up observed", "dTimEnd": "2016-08-21T22:15:00+02:00", "dTimStart": "2016-08-21T21:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened choke and circulateed with UPRs closed with 760 l/min, initially observed 60m3/hr losses. After confirmed returns increased flow rate to 890 l/min - 2,5 bar, max gas of 4.3%. Continued circulating until gas content curve showed downward trend. Total losses since punch 21m3", "dTimEnd": "2016-08-21T23:30:00+02:00", "dTimStart": "2016-08-21T22:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Stopped pumping and flowchecked through fully open choke, static. Opened UPRs and flowchecked on trip tanks, static", "dTimEnd": "2016-08-21T23:45:00+02:00", "dTimStart": "2016-08-21T23:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Started POOH from 147m", "dTimEnd": "2016-08-22T00:00:00+02:00", "dTimStart": "2016-08-21T23:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2016_08_23
NO 15/9-F-12
NO 15/9-F-12
name
2016-08-22T00:00:00+02:00
2016-08-23T00:00:00+02:00
normal
2018-05-03T13:52:00+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-08-23T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-14T18:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "None", "hpht": "0", "md": "-999.99", "mdCsgLast": "3519", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "2775", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "9", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "- POOH w/ guns\n- Cut 10 3/4in csg at 887m\n- Attempted to release tieback adapter w/ left hand string. No success\n- P/U cutter BHA ", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "POOH w/ guns from 147m to surface", "dTimEnd": "2016-08-22T00:30:00+02:00", "dTimStart": "2016-08-22T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D perforation guns BHA. All shots fired", "dTimEnd": "2016-08-22T00:45:00+02:00", "dTimStart": "2016-08-22T00:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to P/U cutter BHA", "dTimEnd": "2016-08-22T01:00:00+02:00", "dTimStart": "2016-08-22T00:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U cutter BHA", "dTimEnd": "2016-08-22T01:15:00+02:00", "dTimStart": "2016-08-22T01:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed master bushing and installed PS21", "dTimEnd": "2016-08-22T01:30:00+02:00", "dTimStart": "2016-08-22T01:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ cutter BHA on 5,5in DP from 9,2m to 892m. Average running speed 510 m/hour. Filled pipe at 1330l/min, 3 bar", "dTimEnd": "2016-08-22T03:15:00+02:00", "dTimStart": "2016-08-22T01:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U TDS. Positioned cutters to cutting depth of 887m. Up/down weights 97t/90t, took parameters 75rpm - 4-7kNM, 300l/min - 18bar, 400l/min - 35bar, 500l/min - 61bar. Cut csg at 887m w/ 300l/min - 21bar, 80rpm - 8-12kNm. Measured gap of more than 2.7m", "dTimEnd": "2016-08-22T04:15:00+02:00", "dTimStart": "2016-08-22T03:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flowchecked well. Observed instant gain of 300l, then loss of 3m3/hour. Then losses went to 0. Observed bubbling inside drill string and in the riser, smell of gas. M/U TDS to string and observed increase in trip tank", "dTimEnd": "2016-08-22T05:30:00+02:00", "dTimStart": "2016-08-22T04:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed UPR and started to circulate via fully open rig choke, performed 1x full circulation at 600-1000l/min max 6bar. Stopped pump and monitor via sample line. No flow", "dTimEnd": "2016-08-22T07:00:00+02:00", "dTimStart": "2016-08-22T05:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened UPR , line up trip tank and flow checked", "dTimEnd": "2016-08-22T07:15:00+02:00", "dTimStart": "2016-08-22T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ cutting BHA on 5,5in DP from 887 m to 6 m . Avg. tripping speed 705 m/hr.", "dTimEnd": "2016-08-22T08:30:00+02:00", "dTimStart": "2016-08-22T07:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed PS21 and installed master bushing", "dTimEnd": "2016-08-22T08:45:00+02:00", "dTimStart": "2016-08-22T08:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D cutting BHA. Cleaned and cleared rig floor", "dTimEnd": "2016-08-22T09:15:00+02:00", "dTimStart": "2016-08-22T08:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to M/U LH landing string for torque tool", "dTimEnd": "2016-08-22T09:30:00+02:00", "dTimStart": "2016-08-22T09:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U 1x joint of 5,5in LH DP, M/U to x-over and 1x pup joint, L/D same onto HTS. P/U and M/U tieback adapter torque tool to LH DP, RIH to 140m", "dTimEnd": "2016-08-22T10:30:00+02:00", "dTimStart": "2016-08-22T09:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U LH DP with x-over and pup joint, M/U TDS, engaged to tieback adapter. Applied 30 kNm clockwise torque to string and released brake in an attempt to shock tieback adapter free. No success", "dTimEnd": "2016-08-22T10:45:00+02:00", "dTimStart": "2016-08-22T10:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to use rig tongs", "dTimEnd": "2016-08-22T11:00:00+02:00", "dTimStart": "2016-08-22T10:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Applied 25kNm counterclockwise torque with TDS and applied brake. Latched onto pipe with rig tong and pulled to max 50kNm, observed connection above x-over broke out", "dTimEnd": "2016-08-22T11:45:00+02:00", "dTimStart": "2016-08-22T11:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting w/ oncoming crew", "dTimEnd": "2016-08-22T12:00:00+02:00", "dTimStart": "2016-08-22T11:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke out TDS from pup joint and layed out joint, x-over and pup onto HTS", "dTimEnd": "2016-08-22T12:15:00+02:00", "dTimStart": "2016-08-22T12:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Evaluated situation. Meanwhile cleaned and cleared drill floor", "dTimEnd": "2016-08-22T12:30:00+02:00", "dTimStart": "2016-08-22T12:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke out pup joint from x-over, cleaned threads and M/U dry back to x-over to 67 kNm", "dTimEnd": "2016-08-22T13:30:00+02:00", "dTimStart": "2016-08-22T12:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U joint, x-over and pup joint and M/U same to string at well center", "dTimEnd": "2016-08-22T14:00:00+02:00", "dTimStart": "2016-08-22T13:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U TDS and trapped 25kNm in string, latched rig tong and pulled to 42kNm then slowly increased to 52kNm", "dTimEnd": "2016-08-22T15:45:00+02:00", "dTimStart": "2016-08-22T14:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting for changes in the plan", "dTimEnd": "2016-08-22T16:00:00+02:00", "dTimStart": "2016-08-22T15:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attached ropes to rig tong, trapped 26kNm with TDS. Pulled w/ rig tong up to 75kNm on the string. Tieback adapter did not release. Meanwhile discussed with onshore organization way forward", "dTimEnd": "2016-08-22T20:00:00+02:00", "dTimStart": "2016-08-22T16:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH tieback adapter torque tool from 140 meter to surface. L/D same", "dTimEnd": "2016-08-22T20:30:00+02:00", "dTimStart": "2016-08-22T20:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Discussed way forward. Meanwhile performed drops check on TDS and serviced same. Troubleshoot on XP pilot pressure on BX elevator.\n", "dTimEnd": "2016-08-22T21:45:00+02:00", "dTimStart": "2016-08-22T20:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Started preparing milling BHA. Meanwhile continued to Troubleshoot on XP pilot pressure on BX-elevator", "dTimEnd": "2016-08-22T22:15:00+02:00", "dTimStart": "2016-08-22T21:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U milling BHA. L/D same", "dTimEnd": "2016-08-22T23:30:00+02:00", "dTimStart": "2016-08-22T22:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U cutter assembly", "dTimEnd": "2016-08-22T23:45:00+02:00", "dTimStart": "2016-08-22T23:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting for change in plans", "dTimEnd": "2016-08-23T00:00:00+02:00", "dTimStart": "2016-08-22T23:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2016_08_24
NO 15/9-F-12
NO 15/9-F-12
name
2016-08-23T00:00:00+02:00
2016-08-24T00:00:00+02:00
normal
2018-05-03T13:52:00+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-08-24T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-14T18:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Mill tieback adapter\n- Mill 10 3/4in subsea csg hanger\n- Pull 10 3/4in csg on surface w/ spear\n- Pull 10 3/4in csg\n- Cut 14in csg and install EZSV", "hpht": "0", "md": "-999.99", "mdCsgLast": "3519", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "2775", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "10", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "- Cut in the middle of tieback adapter\n- Attempted to fish top part of tieback adapter\n- Cut tieback adapter, second attempt\n- Fished top part of tieback adapter\n- Started milling tieback adapter", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "Broke connection above the cutter. Changed and adjusted knives to 12,25in size", "dTimEnd": "2016-08-23T01:30:00+02:00", "dTimStart": "2016-08-23T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U cutter BHA together w/ torque tool for spaceout verification. Remeasured BHA components and pups/DP below torque tool", "dTimEnd": "2016-08-23T02:30:00+02:00", "dTimStart": "2016-08-23T01:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ cutter BHA. Engaged torque tool in tieback adapter, P/U 21.44m up to position knives at cutting depth of 139,7m (ca middle of tieback adapter)", "dTimEnd": "2016-08-23T03:00:00+02:00", "dTimStart": "2016-08-23T02:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Took parameters 300l/min - 22bar, 400l/min - 49bar, 500l/min - 85bar. Cut tieback adapter at 139,7m w/ 300l/min - 19bar, 80rpm - 2-8kNm. As pressure decreased, increased pump rate to 400l/min - 7bar, 460l/min - 5bar, 530l/min - 2bar. This pressure drop indicated that knives fully retracted and tieback adapter cut", "dTimEnd": "2016-08-23T04:15:00+02:00", "dTimStart": "2016-08-23T03:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ cutting BHA", "dTimEnd": "2016-08-23T04:45:00+02:00", "dTimStart": "2016-08-23T04:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D cutting BHA", "dTimEnd": "2016-08-23T05:30:00+02:00", "dTimStart": "2016-08-23T04:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U fishing BHA (run#21)", "dTimEnd": "2016-08-23T05:45:00+02:00", "dTimStart": "2016-08-23T05:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH on 5,5in DP to 128 meter and latched on to 10 3/4in tieback fish", "dTimEnd": "2016-08-23T06:00:00+02:00", "dTimStart": "2016-08-23T05:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attempted to pull up to 80t overpull, worked the string several times up/down. No success", "dTimEnd": "2016-08-23T07:15:00+02:00", "dTimStart": "2016-08-23T06:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with spear BHA on 5,5in DP f/ 129m to 27m", "dTimEnd": "2016-08-23T07:30:00+02:00", "dTimStart": "2016-08-23T07:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/B spear BHA (run#21)", "dTimEnd": "2016-08-23T07:45:00+02:00", "dTimStart": "2016-08-23T07:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U torque tool and cutter assembly (run#22) and 1x joint of 5,5in DP, M/U to TDS. Tested knives with 300 l/min, ok. Broke out TDS, continued M/U BHA to 29m", "dTimEnd": "2016-08-23T08:45:00+02:00", "dTimStart": "2016-08-23T07:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ 5,5in DP and tagged top of Tie back adapter with 2T at 124m. Filled string. Evaluated new cutting depth", "dTimEnd": "2016-08-23T10:00:00+02:00", "dTimStart": "2016-08-23T08:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke out TDS and POOH with cutter BHA (run#22). Installed lifting nubbing and pulled out cutter BHA", "dTimEnd": "2016-08-23T10:45:00+02:00", "dTimStart": "2016-08-23T10:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed knives in cutter to 13,5in ones. M/U TDS and tested cutter knives w/ 310 l/min, ok", "dTimEnd": "2016-08-23T12:00:00+02:00", "dTimStart": "2016-08-23T10:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ 5,5DP and tagged top of Tie back adapter with 2T at 124m. Filled string and broke circulation w/ 310 l/min - 19 bar", "dTimEnd": "2016-08-23T13:00:00+02:00", "dTimStart": "2016-08-23T12:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Positioned knives at 139.7m. Increased flow rate to 500 l/min - 82 bar, started rotating w/ 100rpm, started cutting tieback adapter w/ 1-9kNm - 60 bar, increased to 140rpm - 1-7kNm, 495 l/min - 27bar, then 600l/min - 17bar. Good indication of cut, lifted fish on knives, then pumps off", "dTimEnd": "2016-08-23T14:00:00+02:00", "dTimStart": "2016-08-23T13:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ cutter BHA (run#22).", "dTimEnd": "2016-08-23T14:30:00+02:00", "dTimStart": "2016-08-23T14:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D torque tool and cutter BHA (run#22)", "dTimEnd": "2016-08-23T15:15:00+02:00", "dTimStart": "2016-08-23T14:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U Spear BHA (run#23), set spear in catch position. RIH to 26m", "dTimEnd": "2016-08-23T15:30:00+02:00", "dTimStart": "2016-08-23T15:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ spear to 106m. M/U TDS, took up/down weights 73t/70t. Continued in hole and latched onto fish at 128.5m, pulled free with 3t overpull", "dTimEnd": "2016-08-23T15:45:00+02:00", "dTimStart": "2016-08-23T15:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke-out TDS and POOH w/ spear BHA. Observed fish on spear. Released spear and L/D fish, R/B spear", "dTimEnd": "2016-08-23T16:30:00+02:00", "dTimStart": "2016-08-23T15:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and cleared rig floor", "dTimEnd": "2016-08-23T16:45:00+02:00", "dTimStart": "2016-08-23T16:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to P/U milling BHA (run#24)", "dTimEnd": "2016-08-23T17:00:00+02:00", "dTimStart": "2016-08-23T16:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Carried out PMs and dailys while waiting for crew change helicopters", "dTimEnd": "2016-08-23T17:45:00+02:00", "dTimStart": "2016-08-23T17:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U milling BHA (run#24). RIH same to 98m", "dTimEnd": "2016-08-23T19:00:00+02:00", "dTimStart": "2016-08-23T17:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting w/ oncoming crew", "dTimEnd": "2016-08-23T19:15:00+02:00", "dTimStart": "2016-08-23T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ milling BHA (run#24) from 98 to 135m", "dTimEnd": "2016-08-23T19:45:00+02:00", "dTimStart": "2016-08-23T19:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Took up/down weights 85t/82t, parameters: 80rpm - 1-5kNm, 2000l/min - 14bar", "dTimEnd": "2016-08-23T20:00:00+02:00", "dTimStart": "2016-08-23T19:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH and tagged tieback adapter cut at 139,7m, marked milling distance on pipe. P/U, started pumping and rotation 2000l/min - 13bar - 80rpm. RIH and started milling tieback adapter. Torque 2-7kNm, WOB 1t. Observed almost no vibration in the start and very noticeable vibration effects in the end of milling period. Totally milled ca 14cm down", "dTimEnd": "2016-08-23T23:15:00+02:00", "dTimStart": "2016-08-23T20:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Investigated water leak on TDS", "dTimEnd": "2016-08-24T00:00:00+02:00", "dTimStart": "2016-08-23T23:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2016_08_25
NO 15/9-F-12
NO 15/9-F-12
name
2016-08-24T00:00:00+02:00
2016-08-25T00:00:00+02:00
normal
2018-05-03T13:52:00+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-08-25T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-14T18:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Pull 10 3/4in csg fish on spear\n- Pull 750m of 10 3/4in csg and L/D same\n- Cut 14in csg and set EZSV in 14in csg\n- Perforate below 14in subsea csg hanger", "hpht": "0", "md": "-999.99", "mdCsgLast": "3519", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "2775", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "11", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "- Milled through tieback adapter and 10 3/4in subsea csg hanger\n- Dressed off csg stump\n- RIH w/ spear BHA to pull 10 3/4in csg fish", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "Identified leak on the wash pipe, re-tighten wash pipe, performed drops inspection on TDS. Put on hydraulic power and discovered hydraulic leak: loose connection from one of the hoses on TDS. Repaired leak.", "dTimEnd": "2016-08-24T04:15:00+02:00", "dTimStart": "2016-08-24T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Resumed milling. 2000l/min - 13bar - 80rpm. Observed noticeable vibration", "dTimEnd": "2016-08-24T04:30:00+02:00", "dTimStart": "2016-08-24T04:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Observed leak on TDS. Stopped milling. Repaired leak on the wash pipe", "dTimEnd": "2016-08-24T05:00:00+02:00", "dTimStart": "2016-08-24T04:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Resumed milling w/ reduced rpm. 2000l/min - 13bar - 60rpm. Observed noticeable vibration. Increased pump rate to 2500l/min - 20bar, 4-7kNm, WOB 1-3t. Totally milled 27cm down", "dTimEnd": "2016-08-24T09:30:00+02:00", "dTimStart": "2016-08-24T05:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Stopped milling and P/U off bottom due to leaking Pod on BOPs. Found and repaired leak in hard pipe for gauge", "dTimEnd": "2016-08-24T10:00:00+02:00", "dTimStart": "2016-08-24T09:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Resumed milling 60rpm - 2500l/min - 20bar, 2-10kNm, WOB 1-3t", "dTimEnd": "2016-08-24T12:30:00+02:00", "dTimStart": "2016-08-24T10:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held time out for safety meeting due to first aid incident on pipe deck", "dTimEnd": "2016-08-24T12:45:00+02:00", "dTimStart": "2016-08-24T12:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued milling 60rpm - 2500l/min - 21bar, 4-9kNm, WOB 5-10t. Observed WOB decreased, indicating that casing hanger was milled through. Totally milled 44cm including tieback adapter part", "dTimEnd": "2016-08-24T15:00:00+02:00", "dTimStart": "2016-08-24T12:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and stopped rotation, RIH and tagged csg stump with 5T at 144m, marked pipe", "dTimEnd": "2016-08-24T15:15:00+02:00", "dTimStart": "2016-08-24T15:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Dressed off csg stump w/ 80rpm - 1-6kNm - 2500 l/min - 16 bar, WOB - 3t, milled down 10 cm", "dTimEnd": "2016-08-24T16:00:00+02:00", "dTimStart": "2016-08-24T15:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Stopped rotation and P/U of bottom. Circulated 2x btms up with 3000 l/min", "dTimEnd": "2016-08-24T16:15:00+02:00", "dTimStart": "2016-08-24T16:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Carried out drops check of TDS and BOPs. Found loose solenoid valve on TDS, fixed and made safe. Meanwhile function tested BOPs", "dTimEnd": "2016-08-24T18:00:00+02:00", "dTimStart": "2016-08-24T16:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ milling BHA from 146m to 78m", "dTimEnd": "2016-08-24T19:00:00+02:00", "dTimStart": "2016-08-24T18:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to L/D milling BHA (run#24)", "dTimEnd": "2016-08-24T19:15:00+02:00", "dTimStart": "2016-08-24T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/B 2x stands 8,25in DC. L/D X-over. Cleaned magnets - 14,7kg of metal swarf recovered from magnet, Observed no 9,5in tapered mill in the bottom of BHA, lost in the well. Inspected pilot mill, tungstein carbide teeth almost worn out. Undergauged of 1/8in. L/D rest of BHA.", "dTimEnd": "2016-08-24T20:30:00+02:00", "dTimStart": "2016-08-24T19:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to P/U spear BHA. Meanwhile tested shear rams: to close - 23s/31,2gal, to open - 20s/29,8gal", "dTimEnd": "2016-08-24T20:45:00+02:00", "dTimStart": "2016-08-24T20:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U spear BHA (run#25). Rearranged the12in stab above 8,25in DC to be able to engage spear below perforations in 10 3/4in csg", "dTimEnd": "2016-08-24T22:15:00+02:00", "dTimStart": "2016-08-24T20:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ spear assy on 5,5in DP to 152m. Weight Up/Down: 74t/71 t", "dTimEnd": "2016-08-24T23:00:00+02:00", "dTimStart": "2016-08-24T22:15:00+02:00", "md": "152", "phase": "fixed", "proprietaryCode": "plug abandon -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Engage spear into the fish. Pulled csg fish free w/ 50t overpull", "dTimEnd": "2016-08-24T23:30:00+02:00", "dTimStart": "2016-08-24T23:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flowchecked well for 15 min", "dTimEnd": "2016-08-24T23:45:00+02:00", "dTimStart": "2016-08-24T23:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Started POOH w/ csg fish on spear", "dTimEnd": "2016-08-25T00:00:00+02:00", "dTimStart": "2016-08-24T23:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- trip", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2016_08_26
NO 15/9-F-12
NO 15/9-F-12
name
2016-08-25T00:00:00+02:00
2016-08-26T00:00:00+02:00
normal
2018-05-03T13:52:00+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-08-26T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-14T18:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Perforate below 14in subsea csg hanger\n- Ventilate C-annulus\n- Set 2nd EZSV above the cut in the 14in csg. Pressure test same\n- WOC\n ", "hpht": "0", "md": "-999.99", "mdCsgLast": "3519", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "2775", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "12", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "- Pulled 10 3/4in csg fish on spear\n- Pulled 750m of 10 3/4in csg and L/D same\n- Cut 14in csg and set EZSV in 14in csg\n- RIH w/ perforating assembly", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "POOH w/ csg fish on spear. Set fish in slips. Released spear and R/B same", "dTimEnd": "2016-08-25T00:45:00+02:00", "dTimStart": "2016-08-25T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to R/U csg handling equipment", "dTimEnd": "2016-08-25T01:00:00+02:00", "dTimStart": "2016-08-25T00:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U handling equipment for 10 3/4in casing", "dTimEnd": "2016-08-25T02:30:00+02:00", "dTimStart": "2016-08-25T01:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to pull and L/D casing", "dTimEnd": "2016-08-25T02:45:00+02:00", "dTimStart": "2016-08-25T02:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pull 10 3/4in casing from 730m to 410m. Average pulling speed 6,5 joints/hour, max pulling speed 9 joints/hour. Pulled 28joints totally", "dTimEnd": "2016-08-25T07:00:00+02:00", "dTimStart": "2016-08-25T02:45:00+02:00", "md": "410", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting w/ new crew", "dTimEnd": "2016-08-25T07:15:00+02:00", "dTimStart": "2016-08-25T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued pulling 10 3/4in casing from 410m to 150m. Average pulling speed 13,3 joints/hour. Pulled 48 joints totally", "dTimEnd": "2016-08-25T08:45:00+02:00", "dTimStart": "2016-08-25T07:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled FMS and installed master bushing due to low string weight", "dTimEnd": "2016-08-25T09:00:00+02:00", "dTimStart": "2016-08-25T08:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued to pull 10 3/4in casing from 150m to surface using manual slips and dog collar. Average pulling speed 8 joints/hour. Pulled totally 63 joints", "dTimEnd": "2016-08-25T10:30:00+02:00", "dTimStart": "2016-08-25T09:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Recovered last joint and discovered tapered mill stuck in the cut, photographed and secured prior to laying out", "dTimEnd": "2016-08-25T10:45:00+02:00", "dTimStart": "2016-08-25T10:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to R/D casing handling equipment", "dTimEnd": "2016-08-25T11:00:00+02:00", "dTimStart": "2016-08-25T10:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D casing handling equipment", "dTimEnd": "2016-08-25T12:00:00+02:00", "dTimStart": "2016-08-25T11:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed drop check and greased FWD PRS, no findings. Performed drop check and greased AFT PRS, no findings", "dTimEnd": "2016-08-25T13:00:00+02:00", "dTimStart": "2016-08-25T12:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- equipment recovery", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to P/U EZSV/cutter assembly (run#27)", "dTimEnd": "2016-08-25T13:15:00+02:00", "dTimStart": "2016-08-25T13:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and RIH EZSV/cutter assembly (run#27) to 14.7m", "dTimEnd": "2016-08-25T14:30:00+02:00", "dTimStart": "2016-08-25T13:15:00+02:00", "md": "14.7", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued RIH w/ EZSV/cutter assembly (run#27) to 175m. Run carefully through wellhead/casing hanger area", "dTimEnd": "2016-08-25T15:00:00+02:00", "dTimStart": "2016-08-25T14:30:00+02:00", "md": "175", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed master bushing and installed PS21", "dTimEnd": "2016-08-25T15:15:00+02:00", "dTimStart": "2016-08-25T15:00:00+02:00", "md": "175", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Contiuned RIH from 175m to 854m. Restricted RIH speed to 2min/std", "dTimEnd": "2016-08-25T16:30:00+02:00", "dTimStart": "2016-08-25T15:15:00+02:00", "md": "854", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U TDS and run down to 879m, filled pipe. Washed setting area with 300 l/min - 16 bar, set EZSV at 879m mid packer depth, tagged EZSV with 10t", "dTimEnd": "2016-08-25T17:15:00+02:00", "dTimStart": "2016-08-25T16:30:00+02:00", "md": "879", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Positioned cutter knives at 869m", "dTimEnd": "2016-08-25T17:30:00+02:00", "dTimStart": "2016-08-25T17:15:00+02:00", "md": "869", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Recorded parameters: 309 l/min - 18 bar, 100rpm, 1-7kNm. Cut 14in casing w/ 100rpm, 310l/min. Observed pressure drop and confirmed cut window of 20cm", "dTimEnd": "2016-08-25T17:45:00+02:00", "dTimStart": "2016-08-25T17:30:00+02:00", "md": "869", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up to trip tank and flowchecked well. Static", "dTimEnd": "2016-08-25T18:00:00+02:00", "dTimStart": "2016-08-25T17:45:00+02:00", "md": "869", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ EZSV running tool/cutter BHA (run#27) from 873m to 54m. Pulling wet using mud backet. Meanwhile carried out kick drill", "dTimEnd": "2016-08-25T19:45:00+02:00", "dTimStart": "2016-08-25T18:00:00+02:00", "md": "54", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Retrieved drift, flow checked well. Meanwhile held prejob meeting to L/D EZSV running tool/cutting BHA (run#27)", "dTimEnd": "2016-08-25T20:15:00+02:00", "dTimStart": "2016-08-25T19:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed PS 21, installed master bushing", "dTimEnd": "2016-08-25T20:30:00+02:00", "dTimStart": "2016-08-25T20:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/B last santd of drill pipe, L/D BHA. Cleared rig floor and prepared for running guns", "dTimEnd": "2016-08-25T22:00:00+02:00", "dTimStart": "2016-08-25T20:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cut", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to P/U perforation guns (run#28)", "dTimEnd": "2016-08-25T22:15:00+02:00", "dTimStart": "2016-08-25T22:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U gun assembly to 18 m", "dTimEnd": "2016-08-26T00:00:00+02:00", "dTimStart": "2016-08-25T22:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2016_08_27
NO 15/9-F-12
NO 15/9-F-12
name
2016-08-26T00:00:00+02:00
2016-08-27T00:00:00+02:00
normal
2018-05-03T13:52:00+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-08-27T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-14T18:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- WOC. Meanwhile: Perform maintenance\n- Pressure test annulus cement\n- Place cement plug inside 14\" casing\n- N/D BOP", "hpht": "0", "md": "-999.99", "mdCsgLast": "3519", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "2775", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "13", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "- Perforated 14\" casing below CH\n- Installed 14\" EZSV at 854 mMD\n- Attempted to RIH with RTTS and PT EZSV\n- Displaced annulus between 14\" and 20\" casing to clean SW\n- Pumped and displaced cement in annulus between 14\" and 20\" casing\n- Displaced well to SW\n- WOC. Meanwhile: Performed maintenance", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "RIH w/ perforating BHA to 149,3 m (Top shot @146 m)", "dTimEnd": "2016-08-26T00:30:00+02:00", "dTimStart": "2016-08-26T00:00:00+02:00", "md": "149", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to fire guns and circulate gas", "dTimEnd": "2016-08-26T00:45:00+02:00", "dTimStart": "2016-08-26T00:30:00+02:00", "md": "149", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed UPR, lined up to pump through choke and MGS, circulated w/ 300l/min - 0 Bar", "dTimEnd": "2016-08-26T01:00:00+02:00", "dTimStart": "2016-08-26T00:45:00+02:00", "md": "149", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke TDS, dropped 1 3/8in ball . M/U TDS. Took up/down weights: 72t/69t. Closed UPR. Pumped down ball w/ 160 l/min, pressured up to 135 bar to shear ball seat. Good indication of guns firing. Top shot @146 m, bottom shot @149m", "dTimEnd": "2016-08-26T01:30:00+02:00", "dTimStart": "2016-08-26T01:00:00+02:00", "md": "149", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued circulating w/ 160 l/min until stable returnes observed. Increased pump rate to 1000 l/min - 3,5bar. Max gas 3,6 % - H2S 1 ppm (in fluid). Circulated 3,5x bottoms up", "dTimEnd": "2016-08-26T02:15:00+02:00", "dTimStart": "2016-08-26T01:30:00+02:00", "md": "149", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flowchecked well through the choke. Ok. Opened UPR and flowchecked well. Ok", "dTimEnd": "2016-08-26T02:45:00+02:00", "dTimStart": "2016-08-26T02:15:00+02:00", "md": "149", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ perforating BHA from 149m", "dTimEnd": "2016-08-26T03:15:00+02:00", "dTimStart": "2016-08-26T02:45:00+02:00", "md": "10", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D perforating BHA", "dTimEnd": "2016-08-26T04:00:00+02:00", "dTimStart": "2016-08-26T03:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- perforate", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed handling equipment and prepared to P/U EZSV plug", "dTimEnd": "2016-08-26T04:30:00+02:00", "dTimStart": "2016-08-26T04:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed Pre-job Meeting to P/U EZSV", "dTimEnd": "2016-08-26T04:45:00+02:00", "dTimStart": "2016-08-26T04:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U EZSV plug and RT", "dTimEnd": "2016-08-26T05:15:00+02:00", "dTimStart": "2016-08-26T04:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ EZSV (run# 29) to 854 mMD. Average running speed 556 m/hr.", "dTimEnd": "2016-08-26T07:00:00+02:00", "dTimStart": "2016-08-26T05:15:00+02:00", "md": "834", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Established circulation and washed the setting area, 500 lpm/ 0,3 bar. Installed the 14\" EZSV mechanical plug at 854 mMD. Load tested the plug with 10 ton.", "dTimEnd": "2016-08-26T08:00:00+02:00", "dTimStart": "2016-08-26T07:00:00+02:00", "md": "854", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ EZSV RT on 5 1/2\" DP from 854 m to 645 mMD . Avg. tripping speed 418 m/hr.", "dTimEnd": "2016-08-26T08:30:00+02:00", "dTimStart": "2016-08-26T08:00:00+02:00", "md": "645", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed inserts in BX elevator to 5\" and P/U RTTS plug.\nRemoved PS-21 slips and installed master bushing.\nChanged inserts in BX elevator back to 5 1/2\"", "dTimEnd": "2016-08-26T09:00:00+02:00", "dTimStart": "2016-08-26T08:30:00+02:00", "md": "645", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ RTTS and safety joint on 5 1/2\" DP from 645 m to 788 m (RTTS plug depth at 143.6m).\nRTTS plug hung up at 143.6m. Pulled up and re-attempted to RIH. Unable to run RTTS plug past restriction in WH.", "dTimEnd": "2016-08-26T09:45:00+02:00", "dTimStart": "2016-08-26T09:00:00+02:00", "md": "788", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Evaluated situation.\nMeanwhile: Greased and checked dies on IRN.", "dTimEnd": "2016-08-26T10:00:00+02:00", "dTimStart": "2016-08-26T09:45:00+02:00", "md": "788", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ RTTS on 5 1/2\" DP from 788 m to 645 m.", "dTimEnd": "2016-08-26T10:15:00+02:00", "dTimStart": "2016-08-26T10:00:00+02:00", "md": "645", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed BX inserts to 5\".\nL/D the RTTS and safety joint.", "dTimEnd": "2016-08-26T11:00:00+02:00", "dTimStart": "2016-08-26T10:15:00+02:00", "md": "645", "phase": "fixed", "proprietaryCode": "plug abandon -- mechanical plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U 3m pup for space out.\nPulled master bushing and installed PS-21 slips.", "dTimEnd": "2016-08-26T11:30:00+02:00", "dTimStart": "2016-08-26T11:00:00+02:00", "md": "648", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ EZSV RT on 5 1/2\" DP from 648 m to 854 m . Avg. tripping speed 275 m/hr.\nTagged EZSV w/ 2 ton to confirm depth.", "dTimEnd": "2016-08-26T12:15:00+02:00", "dTimStart": "2016-08-26T11:30:00+02:00", "md": "854", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U pump-in sub. Stung into EZSV and set down 10 ton.\nConnected cement hose and installed lo-torque valve to pump-in sub.", "dTimEnd": "2016-08-26T12:45:00+02:00", "dTimStart": "2016-08-26T12:15:00+02:00", "md": "854", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed UPR\nLined up and pumped 10m3 push pill at 1000lpm / 12 bar.\nCirculated SW at 1000-1800 lpm / 12 bar until clean returns.\nMeanwhile: Performed TBT for cement job.", "dTimEnd": "2016-08-26T14:30:00+02:00", "dTimStart": "2016-08-26T12:45:00+02:00", "md": "854", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened UPR and flow checked well, static.", "dTimEnd": "2016-08-26T14:45:00+02:00", "dTimStart": "2016-08-26T14:30:00+02:00", "md": "854", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up and pumped 20m3 wash pill at 1285 lpm / 11.5 bar.\n\nClosed upper FOSV and trapped 20 bar behind. Applied 20 bar from cement unit to drill floor and confirmed line-up. Pumped 33 m3 1.90sg cement slurry at 600 lpm. Added well-life to the first 10m3 of cement slurry (11 kg/m3).\n\nChased cement by pumping SW at 1000 lpm / 12 bar. After catching up with cement, continued displacing cement with SW at 1000 lpm / 12 bar, then reduced rate to 800 lpm the last 1.7m3. Pumped totally 11.7m3 SW.\nPressure increased from 12 bar to 47 bar, indicating that cement entered annulus.\n\nRecorded 1.8m3 losses during displacement. Estimated TOC in annulus at 480 mMD.", "dTimEnd": "2016-08-26T16:45:00+02:00", "dTimStart": "2016-08-26T14:45:00+02:00", "md": "854", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Released from EZSV plug and rigged down cement hose.\nL/D pump-in sub.", "dTimEnd": "2016-08-26T17:15:00+02:00", "dTimStart": "2016-08-26T16:45:00+02:00", "md": "854", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ EZSV RT on 5 1/2\" DP from 854 m to 811 m.\nInstalled pup joint w/ pre-loaded sponge ball. Circulated with 3450 lpm / 31 bar until clean returns. Measured 10% gas, reduced rate to 1980 lpm.", "dTimEnd": "2016-08-26T18:00:00+02:00", "dTimStart": "2016-08-26T17:15:00+02:00", "md": "811", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ EZSV RT on 5 1/2\" DP from 811 m to 647 m. Avg. tripping speed 219 m/hr.", "dTimEnd": "2016-08-26T18:45:00+02:00", "dTimStart": "2016-08-26T18:00:00+02:00", "md": "647", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D 3m pup joint.", "dTimEnd": "2016-08-26T19:00:00+02:00", "dTimStart": "2016-08-26T18:45:00+02:00", "md": "644", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ EZSV RT on 5 1/2\" DP from 644 m to surface. Avg. tripping speed 970 m/hr.", "dTimEnd": "2016-08-26T19:30:00+02:00", "dTimStart": "2016-08-26T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed PS-21 slips and installed master bushing.\nL/D EZSV RT.", "dTimEnd": "2016-08-26T19:45:00+02:00", "dTimStart": "2016-08-26T19:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and cleared drill floor.", "dTimEnd": "2016-08-26T20:00:00+02:00", "dTimStart": "2016-08-26T19:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOC\nMeanwhile: Maintenance\n- Replaced alignment cylinders on TDS\n- Performed PM inspection on drawworks\n- Performed PM check on FWD PRS\n", "dTimEnd": "2016-08-27T00:00:00+02:00", "dTimStart": "2016-08-26T20:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2016_08_28
NO 15/9-F-12
NO 15/9-F-12
name
2016-08-27T00:00:00+02:00
2016-08-28T00:00:00+02:00
normal
2018-05-03T13:52:00+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-08-28T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-14T18:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- N/D BOP and diverter\n- Skid rig to well F-5", "hpht": "0", "md": "-999.99", "mdCsgLast": "3519", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "2775", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "14", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "- WOC. Meanwhile: Performed maintenance\n- Pressure tested cement in annulus between 14\" and 20\" csg\n- Placed cement plug inside 14\" casing", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "WOC\nMeanwhile: Performed maintenance\n- Inspected flowline cover\n- Performed maintenance and housekeeping in pump room and shakers\n- Flushed chiksan hoses on WH\n- Continued PMs on TDS\n- Prepared and started to check out points on skidding checklist\n- Prepared tools to N/D BOP", "dTimEnd": "2016-08-27T07:00:00+02:00", "dTimStart": "2016-08-27T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOC\nDe-isolated drawworks, TDS and both PRSs.\nMeanwhile: Prepared equipment and tools required to N/D BOP. DFO prepared pits for injection.", "dTimEnd": "2016-08-27T08:00:00+02:00", "dTimStart": "2016-08-27T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOC\nCarried out maintenance on TDS. Changed out alignment cylinder and aligned TDS to well center.\nVisually checked both PRSs for damages on hydraulic hoses and performed general inspection.\nMeanwhile: Continued with skidding checklist and prepared equipment required for next well.", "dTimEnd": "2016-08-27T13:15:00+02:00", "dTimStart": "2016-08-27T08:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U EZSV RT.", "dTimEnd": "2016-08-27T13:30:00+02:00", "dTimStart": "2016-08-27T13:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ EZSV RT on 5 1/2\" DP from surface to 42 m.", "dTimEnd": "2016-08-27T14:00:00+02:00", "dTimStart": "2016-08-27T13:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- wait", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH w/ EZSV RT on 5 1/2\" DP from 42 m to 764 m . Avg. tripping speed 481 m/hr.", "dTimEnd": "2016-08-27T15:00:00+02:00", "dTimStart": "2016-08-27T14:00:00+02:00", "md": "764", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "M/U TDS sub and positioned string at 804 m. Lined up to cement unit and confirmed line-up.\n\nAttempted to pressure test annulus cement and EZSV plug to 115 bar / 10 min. Pressure had decreasing trend due to possible air in the system.\n\nAttempted to pressure up well 6 times. Less pressure drop observed for each attempt.\nPressure tested annulus cement and EZSV plug to 115 bar / 10 min, bled off pressure.\n\nMeanwhile: B/O pup joints previously used for space out.", "dTimEnd": "2016-08-27T19:00:00+02:00", "dTimStart": "2016-08-27T15:00:00+02:00", "md": "804", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for placing cement plug in 14\" casing\nMeanwhile: Performed line-test.", "dTimEnd": "2016-08-27T19:15:00+02:00", "dTimStart": "2016-08-27T19:00:00+02:00", "md": "852", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Circulated 1 x B/U at 3300 lpm / 100 bar. Max 2,5 ppm HC concentration in return fluid.", "dTimEnd": "2016-08-27T20:15:00+02:00", "dTimStart": "2016-08-27T19:15:00+02:00", "md": "852", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pumped 10m3 wash pill.\n\nMixed and pumped 8,2 m3 1,93sg cement slurry at 600 lpm.\nDisplaced cement with cement unit by pumping 8 m3 FW (1m3 underdisplacement) at 1200 lpm.", "dTimEnd": "2016-08-27T21:00:00+02:00", "dTimStart": "2016-08-27T20:15:00+02:00", "md": "852", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/O pump-in sub.", "dTimEnd": "2016-08-27T21:25:00+02:00", "dTimStart": "2016-08-27T21:00:00+02:00", "md": "852", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flow checked well, static.", "dTimEnd": "2016-08-27T21:30:00+02:00", "dTimStart": "2016-08-27T21:25:00+02:00", "md": "852", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ EZSV RT on 5 1/2\" DP from 852 m to 644 m. Restricted pulling speed 2 min/std.", "dTimEnd": "2016-08-27T22:00:00+02:00", "dTimStart": "2016-08-27T21:30:00+02:00", "md": "644", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Circulated 1 x string volume prior to installing sponge ball due to backflow.\nR/B 1 std and M/U pup joint with pre-installed sponge ball.\nCirculated 1 x B/U, 50 rpm / 2-4 kNm, 1200 lpm / 1 bar.\nL/O pup joint.", "dTimEnd": "2016-08-27T23:45:00+02:00", "dTimStart": "2016-08-27T22:00:00+02:00", "md": "644", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH w/ EZSV RT on 5 1/2\" DP from 644 m to 413 m. Avg. tripping speed 924 m/hr.", "dTimEnd": "2016-08-28T00:00:00+02:00", "dTimStart": "2016-08-27T23:45:00+02:00", "md": "413", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2016_08_29
NO 15/9-F-12
NO 15/9-F-12
name
2016-08-28T00:00:00+02:00
2016-08-29T00:00:00+02:00
normal
2018-05-03T13:52:00+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-08-29T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-14T18:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Continue operations on well F-5", "hpht": "0", "md": "-999.99", "mdCsgLast": "3519", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "2775", "mdStrengthForm": "3116", "presTestType": "formation integrity test", "reportNo": "15", "ropCurrent": "-999.99", "strengthForm": "1.6", "sum24Hr": "- N/D BOP and diverter\n- Pulled HP riser\n- Installed hatch on well F-12", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": "2863", "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "Continued POOH w/ EZSV RT on 5 1/2\" DP from 413 m to 2 m. Avg. tripping speed 987 m/hr.", "dTimEnd": "2016-08-28T00:30:00+02:00", "dTimStart": "2016-08-28T00:00:00+02:00", "md": "2", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/D EZSV RT.\nPulled PS-21 slips and installed master bushing", "dTimEnd": "2016-08-28T00:45:00+02:00", "dTimStart": "2016-08-28T00:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and cleared drill floor.\nMeanwhile: Started to drain riser", "dTimEnd": "2016-08-28T01:30:00+02:00", "dTimStart": "2016-08-28T00:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- cement plug", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U handling equipment for pulling diverter.\nPrepared to pull diverter", "dTimEnd": "2016-08-28T02:15:00+02:00", "dTimStart": "2016-08-28T01:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for N/D diverter and BOP", "dTimEnd": "2016-08-28T02:30:00+02:00", "dTimStart": "2016-08-28T02:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed tension cylinders on BOP", "dTimEnd": "2016-08-28T03:30:00+02:00", "dTimStart": "2016-08-28T02:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed master bushing and outer ring. Installed lifting eyes for diverter.\nAttempted to pull diverter, 7 ton overpull. Installed shims for releasing the diverter lock ring.\nRe-attempted to pull diverter.\n\nInstalled tension cylinders and aligned BOP/slick joint with diverter.", "dTimEnd": "2016-08-28T07:00:00+02:00", "dTimStart": "2016-08-28T03:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT with ongoing drilling crew.", "dTimEnd": "2016-08-28T07:15:00+02:00", "dTimStart": "2016-08-28T07:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared to pull diverter. Removed 2 x shims from diverter housing.", "dTimEnd": "2016-08-28T07:30:00+02:00", "dTimStart": "2016-08-28T07:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed well controll table-top at drill floor.", "dTimEnd": "2016-08-28T08:00:00+02:00", "dTimStart": "2016-08-28T07:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled diverter and secured to 5 1/2\" DP in set-back.\nRemoved slick joint from BOP.\nDisconnected BOP tension cylinders.", "dTimEnd": "2016-08-28T10:00:00+02:00", "dTimStart": "2016-08-28T08:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke NT2 connector.\nPerformed TBT for skidding BOP onto test stump.", "dTimEnd": "2016-08-28T10:30:00+02:00", "dTimStart": "2016-08-28T10:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up BOP using BOP carrier. Skidded BOP and landed on stump. M/U NT2 bolt.", "dTimEnd": "2016-08-28T12:00:00+02:00", "dTimStart": "2016-08-28T10:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed scaffolding around riser.", "dTimEnd": "2016-08-28T12:30:00+02:00", "dTimStart": "2016-08-28T12:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for pulling riser.", "dTimEnd": "2016-08-28T12:45:00+02:00", "dTimStart": "2016-08-28T12:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Attached lifting arrangement to TDS bails. P/U 3 ton over pull on HP riser.", "dTimEnd": "2016-08-28T13:30:00+02:00", "dTimStart": "2016-08-28T12:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Loosened bolts on HP riser connector. 2 bolts stuck.", "dTimEnd": "2016-08-28T14:30:00+02:00", "dTimStart": "2016-08-28T13:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Worked on loosening bolts on HP riser connector.\nMeanwhile: Completed skidding checklist. Loosened bolts on hatch on well F-7. Installed kill wing manifold on XT on F-5.", "dTimEnd": "2016-08-28T15:00:00+02:00", "dTimStart": "2016-08-28T14:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled and L/O HP riser.\nPrepared hatches in moonpool.\n\nInstalled hatch on well F-12.\nP/U hatch on F-7 (swapping hatches between F-7 and F-9 for later operations).\nMeanwhile: Installed check valve in cement head.\n\n\n********* End of report **********", "dTimEnd": "2016-08-28T17:45:00+02:00", "dTimStart": "2016-08-28T15:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2016_10_20
NO 15/9-F-12
NO 15/9-F-12
name
2016-10-19T00:00:00+02:00
2016-10-20T00:00:00+02:00
normal
2018-05-03T13:52:00+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-10-20T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-14T18:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Lift equipment from WH deck to drill floor\n- Skid to well F-11 B\n- Pull riser on F-11 B\n- Skid to F-1 C", "hpht": "0", "md": "-999.99", "mdCsgLast": "3519", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": null, "presTestType": "leak off test", "reportNo": "15", "ropCurrent": "-999.99", "strengthForm": null, "sum24Hr": "- Skidded cantilever to well F-12\n- Cut riser at 134,9 m\n- Cut and L/O Multibowl and tensioner joint\n- Cut and pulled riser", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": null, "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "Performed TBT for skidding operations", "dTimEnd": "2016-10-19T11:15:00+02:00", "dTimStart": "2016-10-19T11:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed access stairs to cantilever\nSkidded cantilever to well F-12.", "dTimEnd": "2016-10-19T11:45:00+02:00", "dTimStart": "2016-10-19T11:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed access stairs to cantilever\nMeanwhile: Removed hatches.", "dTimEnd": "2016-10-19T12:15:00+02:00", "dTimStart": "2016-10-19T11:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Built scaffolding around hatches.\nInstalled hole covers on well F-14", "dTimEnd": "2016-10-19T12:30:00+02:00", "dTimStart": "2016-10-19T12:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lowered NT2 connector from drill floor. M/U same onto multibowl.\nMeanwhile: Installed master bushing and BX-elevator.", "dTimEnd": "2016-10-19T13:15:00+02:00", "dTimStart": "2016-10-19T12:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for M/U BHA and RIH with inner string.", "dTimEnd": "2016-10-19T13:30:00+02:00", "dTimStart": "2016-10-19T13:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and RIH with cutter BHA", "dTimEnd": "2016-10-19T14:45:00+02:00", "dTimStart": "2016-10-19T13:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U Multibowl RT. RIH and engaged RT to Multibowl.\nConfirmed by pulling 20 ton overpull.", "dTimEnd": "2016-10-19T15:00:00+02:00", "dTimStart": "2016-10-19T14:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Load shifted weight from tension cylinders to TDS.\nMeanwhile: Performed TBT for R/D tension cylinders", "dTimEnd": "2016-10-19T15:15:00+02:00", "dTimStart": "2016-10-19T15:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D tension cylinders", "dTimEnd": "2016-10-19T16:15:00+02:00", "dTimStart": "2016-10-19T15:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed boat collision stool and centralizers.", "dTimEnd": "2016-10-19T17:15:00+02:00", "dTimStart": "2016-10-19T16:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Built scaffolding around hole opening.", "dTimEnd": "2016-10-19T17:30:00+02:00", "dTimStart": "2016-10-19T17:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled 20 ton overpull.\nIncreased flow in steps to 2600 lpm / 87 bar. Cut riser.\nObserved loss of overpull, good indication of cut.", "dTimEnd": "2016-10-19T18:00:00+02:00", "dTimStart": "2016-10-19T17:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/D hoses and valve outlets from Multibowl.", "dTimEnd": "2016-10-19T19:00:00+02:00", "dTimStart": "2016-10-19T18:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT with ongoing crew.", "dTimEnd": "2016-10-19T19:15:00+02:00", "dTimStart": "2016-10-19T19:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled riser and inner string to drill floor.\nInstalled C-plate and landed off riser.\nR/B Multibowl RT", "dTimEnd": "2016-10-19T19:45:00+02:00", "dTimStart": "2016-10-19T19:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed false rotary. Pulled and R/B inner string. R/B cutter BHA.", "dTimEnd": "2016-10-19T20:15:00+02:00", "dTimStart": "2016-10-19T19:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "P/U and M/U Multibowl RT.\nR/D C-plate.", "dTimEnd": "2016-10-19T20:30:00+02:00", "dTimStart": "2016-10-19T20:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled tensioner joint above rotary table.\nLanded off riser onto elevator.", "dTimEnd": "2016-10-19T21:00:00+02:00", "dTimStart": "2016-10-19T20:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U cutting machine\nCut tensioner joint. Significant wave height 1,2 m\nR/D cutting machine.", "dTimEnd": "2016-10-19T22:00:00+02:00", "dTimStart": "2016-10-19T21:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed TBT for L/O Multibowl and tensioner joint.", "dTimEnd": "2016-10-19T22:15:00+02:00", "dTimStart": "2016-10-19T22:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/O Mutlibowl and tensioner joint (Lift #1).\nRemoved Multibowl and NT2 connector.", "dTimEnd": "2016-10-19T22:45:00+02:00", "dTimStart": "2016-10-19T22:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pulled upper pup joint and splash zone joint. Cleaned off marine growth on centralizer deck.", "dTimEnd": "2016-10-19T23:30:00+02:00", "dTimStart": "2016-10-19T22:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U cutting machine\nCut riser. Significant wave height 1,4 m", "dTimEnd": "2016-10-20T00:00:00+02:00", "dTimStart": "2016-10-19T23:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_12_2016_10_21
NO 15/9-F-12
NO 15/9-F-12
name
2016-10-20T00:00:00+02:00
2016-10-21T00:00:00+02:00
normal
2018-05-03T13:52:00+02:00
{ "name": "15/9-F-12", "namingSystem": "NPD code" }
[ { "name": "15/9-F-12", "namingSystem": "NPD code" }, { "name": "5599", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-03-15T00:00:00+01:00", "dateDrillComplete": "2007-08-26", "daysBehind": null, "operator": "Statoil", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2016-10-21T00:00:00+02:00", "dTimDiaHoleStart": "2016-08-14T18:30:00+02:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "- Pull riser on well F-11 B\n- Skid to F-1 C\n- Pull riser on well F-1 C\n- Skid to well F-7\n", "hpht": "0", "md": "-999.99", "mdCsgLast": "3519", "mdDiaHoleStart": "3500", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": null, "presTestType": "leak off test", "reportNo": "16", "ropCurrent": "-999.99", "strengthForm": null, "sum24Hr": "- Cut and pulled riser\n- Installed hatches\n- Skidded rig to well F-11 B", "tightWell": "0", "tvd": null, "tvdCsgLast": "3107.8", "tvdStrengthForm": null, "waterDepth": "91", "wellheadElevation": "138.6" } ]
[]
[]
[]
[ { "comments": "R/D cutting machine", "dTimEnd": "2016-10-20T00:15:00+02:00", "dTimStart": "2016-10-20T00:00:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/O upper pup and splash zone joint (Lift #2)\nPulled riser (Lift #3).", "dTimEnd": "2016-10-20T00:45:00+02:00", "dTimStart": "2016-10-20T00:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U cutting machine\nCut riser. Significant wave height 1 m.\nR/D cutting machine", "dTimEnd": "2016-10-20T01:15:00+02:00", "dTimStart": "2016-10-20T00:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/O riser joint (Lift #3).\nPulled riser (Lift #4), cleaned off marine growth on centralizer deck.\nRiser out of splash zone at 01:45", "dTimEnd": "2016-10-20T01:45:00+02:00", "dTimStart": "2016-10-20T01:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U cutting machine\nCut riser\nR/D cutting machine", "dTimEnd": "2016-10-20T02:15:00+02:00", "dTimStart": "2016-10-20T01:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/O riser joint (Lift #4).\nPulled riser (Lift #5), cleaned off marine growth on centralizer deck.", "dTimEnd": "2016-10-20T02:45:00+02:00", "dTimStart": "2016-10-20T02:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U cutting machine\nCut riser\nR/D cutting machine", "dTimEnd": "2016-10-20T03:15:00+02:00", "dTimStart": "2016-10-20T02:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/O riser joint (Lift #5).\nPulled riser (Lift #6), cleaned off marine growth on centralizer deck.", "dTimEnd": "2016-10-20T03:45:00+02:00", "dTimStart": "2016-10-20T03:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "R/U cutting machine\nCut riser\nR/D cutting machine", "dTimEnd": "2016-10-20T04:30:00+02:00", "dTimStart": "2016-10-20T03:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "L/O riser joint (Lift #6).\nPulled out with lower pup joint and stress joint (Lift #7).\nInstalled master bushing. L/O lower pup and stress joint.", "dTimEnd": "2016-10-20T05:15:00+02:00", "dTimStart": "2016-10-20T04:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned and cleared drill floor for excess equipment.", "dTimEnd": "2016-10-20T05:30:00+02:00", "dTimStart": "2016-10-20T05:15:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleared WH decks for excess equipment.\n\nMeanwhile: Performed skidding checks.", "dTimEnd": "2016-10-20T07:45:00+02:00", "dTimStart": "2016-10-20T05:30:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed hatch in moonpool\n\n**** END OF REPORT ****", "dTimEnd": "2016-10-20T08:15:00+02:00", "dTimStart": "2016-10-20T07:45:00+02:00", "md": "0", "phase": "fixed", "proprietaryCode": "plug abandon -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_14_2007_11_06
NO 15/9-F-14
NO 15/9-F-14
name
2007-11-05T00:00:00+01:00
2007-11-06T00:00:00+01:00
normal
2018-05-03T13:52:01+02:00
{ "name": "15/9-F-14", "namingSystem": "NPD code" }
[ { "name": "15/9-F-14", "namingSystem": "NPD code" }, { "name": "5351", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-04T00:00:00+01:00", "dateDrillComplete": "2008-06-15", "daysBehind": null, "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-11-06T00:00:00+01:00", "dTimDiaHoleStart": "2007-11-05T11:00:00+01:00", "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "0", "fixedRig": "false", "forecast24Hr": "WOW. MU CART stand. MU and RIH with 36\" hole opner BHA. Drill 36\" hole to 202 m MD using SW and hi-vis pills. ", "hpht": "0", "md": "0", "mdCsgLast": null, "mdDiaHoleStart": "0", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "1", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Skidded rig to F-14. Continued changing wires on aft PRS and attempted to change DCI hose, but operation postponed due to weather. Removed hatches and built scaffolding around hatches on all levels. Waited on weather for cranes to pick up CART and BHA.", "tightWell": "0", "tvd": null, "tvdCsgLast": null, "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-11-05T21:00:00+01:00", "density": "1.4", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "oil based", "presBopRating": "0", "pv": "30", "tempHthp": "120", "type": "OBM-Standard", "visFunnel": "-999.99", "yp": "10.5" }, { "dTim": "2007-11-05T21:01:00+01:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "111", "yp": "-999.99" } ]
[]
[]
[ { "comments": "Held tool box meeting with involved personnel. Prepared equipment for skidding. Skidded rig from F-4 to F-14. Removed hatch on F-14.", "dTimEnd": "2007-11-05T13:00:00+01:00", "dTimStart": "2007-11-05T11:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued changing wires on aft PRS. Meanwhile rigged tugger in moonpool for running DCI hose. Worked on releasing DCI hose connection. Came free at 19:00. Changed oil in TDS and cleaned pits. Stopped working on aft PRS due to high wind speed.", "dTimEnd": "2007-11-05T19:00:00+01:00", "dTimStart": "2007-11-05T13:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed hatches and built scaffolding/fence around open hatches on all levels on slot F-14. Recovered tugger for DCI hose.", "dTimEnd": "2007-11-05T22:00:00+01:00", "dTimStart": "2007-11-05T19:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "LD 8 1/4\" DC stand and jar.", "dTimEnd": "2007-11-06T00:00:00+01:00", "dTimStart": "2007-11-05T22:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- other", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_14_2007_11_07
NO 15/9-F-14
NO 15/9-F-14
name
2007-11-06T00:00:00+01:00
2007-11-07T00:00:00+01:00
normal
2018-05-03T13:52:01+02:00
{ "name": "15/9-F-14", "namingSystem": "NPD code" }
[ { "name": "15/9-F-14", "namingSystem": "NPD code" }, { "name": "5351", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-04T00:00:00+01:00", "dateDrillComplete": "2008-06-15", "daysBehind": ".6", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-11-07T00:00:00+01:00", "dTimDiaHoleStart": "2007-11-06T22:45:00+01:00", "diaHole": "36", "diaPilot": null, "distDrill": "3.5", "elevKelly": "0", "fixedRig": "false", "forecast24Hr": "Drill 36\" hole from 193 m to 204 m MD. Circulate well clean and displace to 1.40 sg bentonite mud. POOH and RB 36\" HO BHA. MU and RIH 30\" conductor. Install UWG top-up system on upper 35 m. RU C-plate and MU cement stinger and CART.", "hpht": "0", "md": "149.2", "mdCsgLast": null, "mdDiaHoleStart": "145.7", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "2", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "WOW. Changed wash pipe. Racked CART std. MU and RIH with 36\" HO BHA to 143 m. Stung into funnel assisted by ROV. Tagged sea btm and drilled 36\" hole from 145.7 m to 193 m MD using SW and hi-vis pills.", "tightWell": "0", "tvd": "149.2", "tvdCsgLast": null, "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-11-06T21:01:00+01:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "111", "yp": "-999.99" }, { "dTim": "2007-11-06T21:00:00+01:00", "density": "1.4", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "oil based", "presBopRating": "0", "pv": "30", "tempHthp": null, "type": "OBM-Standard", "visFunnel": "-999.99", "yp": "10.5" } ]
[ { "dTim": "2007-11-07T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "205", "readingKind": "estimated" } ]
[]
[ { "comments": "LD 8 1/4\" DC stand and jar.", "dTimEnd": "2007-11-06T01:00:00+01:00", "dTimStart": "2007-11-06T00:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOW due to noe crane operation. Wind 45-50 knop, with gust up to 65 knop.", "dTimEnd": "2007-11-06T06:00:00+01:00", "dTimStart": "2007-11-06T01:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOW due to noe crane operation. Wind 40-45 knop, with gusts up to 60 knop.\n\nMeanwhile changed oil in TDS, adjusted fingerboard for CART stand, cleaned pits and carried on with rig maintenance.", "dTimEnd": "2007-11-06T10:00:00+01:00", "dTimStart": "2007-11-06T06:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed wash pipe and serviced TDS.", "dTimEnd": "2007-11-06T13:00:00+01:00", "dTimStart": "2007-11-06T10:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- maintain", "state": "ok", "stateDetailActivity": "success" }, { "comments": "PU CART and MU to stand. RB in derrick.", "dTimEnd": "2007-11-06T15:00:00+01:00", "dTimStart": "2007-11-06T13:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "PU 36\" HO assembly. Removed master bushing and outer ring. RIH with 36\" HO assembly to 9 m and re-instated outer ring and bushing. MU and RIH with 36\" HO BHA from 9 m to 63 m.", "dTimEnd": "2007-11-06T19:15:00+01:00", "dTimStart": "2007-11-06T15:00:00+01:00", "md": "63", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed derrick inspection prior to spudding the hole. Special care were taken due to high winds of 40-50 knop.", "dTimEnd": "2007-11-06T20:15:00+01:00", "dTimStart": "2007-11-06T19:15:00+01:00", "md": "63", "phase": "fixed", "proprietaryCode": "drilling -- other", "state": "ok", "stateDetailActivity": "success" }, { "comments": "MU and RIH with 36\" HO BHA from 63 m to 93 m.", "dTimEnd": "2007-11-06T21:15:00+01:00", "dTimStart": "2007-11-06T20:15:00+01:00", "md": "93", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Stopped RIH due to power syncronisation interference with production/prosessmodul.", "dTimEnd": "2007-11-06T21:45:00+01:00", "dTimStart": "2007-11-06T21:15:00+01:00", "md": "93", "phase": "fixed", "proprietaryCode": "interruption -- other", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "MU 36\" BHA from 93 m to 143 m. Stung into funnel assisted by ROV. Observed fill in funnel and below. ROV had black-out on camera as soon as 17 1/2\" bit had entered funnel. ROV went to surface for repairs. Continued RIH slowly without pumps and with no rotation until positive tag at 145.7 m.", "dTimEnd": "2007-11-06T22:45:00+01:00", "dTimStart": "2007-11-06T21:45:00+01:00", "md": "145.7", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pumped SW at 550 lpm and washed down with no rotation to 148 m to allow centralizer drill bushing to land out in template guide-funnel.", "dTimEnd": "2007-11-06T23:30:00+01:00", "dTimStart": "2007-11-06T22:45:00+01:00", "md": "148", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled 36\" hole from 148 m to 150 m MD. Drilling parameters : Flow 550 lpm / SPP 4-5 bar / 5 RPM / Torque 1-2 kNm / WOB 1 MT. Reamed hole to ensure landing of centralizer drill bushing in template guide-funnel.", "dTimEnd": "2007-11-07T00:00:00+01:00", "dTimStart": "2007-11-06T23:30:00+01:00", "md": "150", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_14_2007_11_08
NO 15/9-F-14
NO 15/9-F-14
name
2007-11-07T00:00:00+01:00
2007-11-08T00:00:00+01:00
normal
2018-05-03T13:52:01+02:00
{ "name": "15/9-F-14", "namingSystem": "NPD code" }
[ { "name": "15/9-F-14", "namingSystem": "NPD code" }, { "name": "5351", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-04T00:00:00+01:00", "dateDrillComplete": "2008-06-15", "daysBehind": ".7", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-11-08T00:00:00+01:00", "dTimDiaHoleStart": "2007-11-06T22:45:00+01:00", "diaHole": "36", "diaPilot": null, "distDrill": "55", "elevKelly": "0", "fixedRig": "false", "forecast24Hr": "Continue MU and RIH 30\" conductor and installing UWG top-up system on upper 35 m. RU C-plate and MU cement stinger and CART. RIH with 30\" conductor on dedicated landing string and position conductor.", "hpht": "0", "md": "204", "mdCsgLast": "196.8", "mdDiaHoleStart": "145.7", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "3", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Drilled 36\" hole from 193 m to 204 m MD. Circulated well clean and displaced to 1.40 sg bentonite mud. POOH and LD 36\" HO BHA. WOW due to no crane operation. MU and RIH with 30\" conductor until x-over joint. Started to install UWG top-up system on upper 35 m. ", "tightWell": "0", "tvd": "204", "tvdCsgLast": "196.8", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-11-07T21:00:00+01:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "-999.99", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "111", "yp": "-999.99" }, { "dTim": "2007-11-07T21:01:00+01:00", "density": "1.4", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "204", "mudClass": "oil based", "presBopRating": "0", "pv": "30", "tempHthp": "120", "type": "OBM-Standard", "visFunnel": "-999.99", "yp": "10.5" } ]
[ { "dTim": "2007-11-08T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "204", "readingKind": "estimated" } ]
[]
[ { "comments": "Drilled 36\" hole from 150 m to 158 m MD. Drilling parameters : Flow 550-3100 lpm / SPP 4-40 bar / 5-20 RPM / Torque 2-4 kNm / WOB 1-2 MT / ROP 5 m/hr. Pumped 20 m3 hi-vis pill prior to connection. Downlinked and performed survey at 145 m.\n\nSurvey at 145 m 0.3 inc\n", "dTimEnd": "2007-11-07T02:15:00+01:00", "dTimStart": "2007-11-07T00:00:00+01:00", "md": "158", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled 36\" hole from 158 m to 193 m MD. Drilling parameters : Flow 4550 lpm / SPP 80-82 bar / 90 RPM / Torque 4-10 kNm / WOB 1-6 MT / ROP 15-20 m/hr. Pumped 20 m3 hi-vis pills prior to connection. Downlinked and performed survey at 154, 164 and 174 m. Up weight 103 MT / Down weight 96 MT.\n\nSurvey at 154 m 0.21 inc\n at 164 m 0,26 inc \n at 174 m 0,37 inc\n", "dTimEnd": "2007-11-07T06:00:00+01:00", "dTimStart": "2007-11-07T02:15:00+01:00", "md": "193", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled 36\" hole from 193 m to 204 m 17 1/2\" bit depth / 201 m 36\" HO depth. Drilling parameters : Flow 4550 lpm / SPP 80-82 bar / 90 RPM / Torque 4-10 kNm / WOB 1-6 MT / ROP 15-20 m/hr. Pumped 20 m3 hi-vis pills prior to connection. Downlinked and performed survey at 184 m. \n\nSurvey at 184 m 0.43 inc\n", "dTimEnd": "2007-11-07T07:00:00+01:00", "dTimStart": "2007-11-07T06:00:00+01:00", "md": "204", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pumped 25 m3 hi-vis sweep and circulated btms up with SW. Displaced hole to 1.40 sg bentonite mud, Flow 5000 lpm / SPP 140 bar / 30 RPM / Torque 2 kNm.", "dTimEnd": "2007-11-07T07:30:00+01:00", "dTimStart": "2007-11-07T07:00:00+01:00", "md": "204", "phase": "fixed", "proprietaryCode": "drilling -- circulating conditioning", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with 36\" HO BHA from 204 m to 150 m. Topped up hole with 1.40 sg bentonite mud. Continued POOH with 36\" HO BHA from 150 m to 9 m.", "dTimEnd": "2007-11-07T11:00:00+01:00", "dTimStart": "2007-11-07T07:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Removed master bushing and outer ring. POOH with 36\" HO assembly and re-instated outer ring and bushing. LD 36\" HO assembly.", "dTimEnd": "2007-11-07T13:00:00+01:00", "dTimStart": "2007-11-07T11:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOW due to no crane operation. Wind 40 knop, with gusts up to 50 knop.\n\nMeanwhile serviced TDS, greased manifolds on BOP, K/C, stand pipe manifolds and performed fluid ends inspection on MP2.", "dTimEnd": "2007-11-07T20:45:00+01:00", "dTimStart": "2007-11-07T13:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed elevator and bails. Installed 30\" bushing. Prepared HTS.", "dTimEnd": "2007-11-08T00:00:00+01:00", "dTimStart": "2007-11-07T20:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_14_2007_11_09
NO 15/9-F-14
NO 15/9-F-14
name
2007-11-08T00:00:00+01:00
2007-11-09T00:00:00+01:00
normal
2018-05-03T13:52:01+02:00
{ "name": "15/9-F-14", "namingSystem": "NPD code" }
[ { "name": "15/9-F-14", "namingSystem": "NPD code" }, { "name": "5351", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-04T00:00:00+01:00", "dateDrillComplete": "2008-06-15", "daysBehind": "1.6", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-11-09T00:00:00+01:00", "dTimDiaHoleStart": "2007-11-06T22:45:00+01:00", "diaHole": "36", "diaPilot": null, "distDrill": "-999.99", "elevKelly": "0", "fixedRig": "false", "forecast24Hr": "WOW. Continue MU and RIH 30\" conductor and installing UWG top-up system on upper 35 m. RU C-plate and MU cement stinger and CART. RIH with 30\" conductor on dedicated landing string and position conductor.", "hpht": "0", "md": "204", "mdCsgLast": "196.8", "mdDiaHoleStart": "145.7", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "4", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Changed to 5 1/2\" handling equipment. MU 30\" conductor housing joint. WOW.", "tightWell": "0", "tvd": "204", "tvdCsgLast": "196.8", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-11-08T21:01:00+01:00", "density": "1.4", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "204", "mudClass": "oil based", "presBopRating": "0", "pv": "30", "tempHthp": "120", "type": "OBM-Standard", "visFunnel": "-999.99", "yp": "10.5" }, { "dTim": "2007-11-08T20:00:00+01:00", "density": "1.4", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "203", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "111", "yp": "-999.99" } ]
[ { "dTim": "2007-11-09T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "204", "readingKind": "estimated" } ]
[]
[ { "comments": "Cleared rig floor.", "dTimEnd": "2007-11-08T00:30:00+01:00", "dTimStart": "2007-11-08T00:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held pre-job meeting with all personnel involved. Prepared shoe joint and checked float for flow-through with SW. Painted shoe white. Continued to RIH with 30\" conductor as per tally.", "dTimEnd": "2007-11-08T05:30:00+01:00", "dTimStart": "2007-11-08T00:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 30\" conductor x-over joint and started installing cement top-up system with cement outlet 35 m below mud line. Aligned UWG top-up system to avoid conflict with the 3 hydraulic rams in the template well slot.", "dTimEnd": "2007-11-08T06:00:00+01:00", "dTimStart": "2007-11-08T05:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 30\" conductor x-over joint and installing cement top-up system with cement outlet 35 m below mud line.", "dTimEnd": "2007-11-08T07:00:00+01:00", "dTimStart": "2007-11-08T06:00:00+01:00", "md": "45", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Changed 30\" conductor bails and elevator to to 5 1/2\" DP handling equipment.", "dTimEnd": "2007-11-08T10:00:00+01:00", "dTimStart": "2007-11-08T07:00:00+01:00", "md": "45", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held pre-job meeting with involved personnel. Focused on weather conditions and running into splash zone. PU and installed 30\" conductor housing joint.", "dTimEnd": "2007-11-08T12:00:00+01:00", "dTimStart": "2007-11-08T10:00:00+01:00", "md": "55", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOW, due to high wind and waves. Wind 50-87 knop.", "dTimEnd": "2007-11-09T00:00:00+01:00", "dTimStart": "2007-11-08T12:00:00+01:00", "md": "55", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_14_2007_11_10
NO 15/9-F-14
NO 15/9-F-14
name
2007-11-09T00:00:00+01:00
2007-11-10T00:00:00+01:00
normal
2018-05-03T13:52:01+02:00
{ "name": "15/9-F-14", "namingSystem": "NPD code" }
[ { "name": "15/9-F-14", "namingSystem": "NPD code" }, { "name": "5351", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-04T00:00:00+01:00", "dateDrillComplete": "2008-06-15", "daysBehind": "2.4", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-11-10T00:00:00+01:00", "dTimDiaHoleStart": "2007-11-06T22:45:00+01:00", "diaHole": "36", "diaPilot": null, "distDrill": "-999.99", "elevKelly": "0", "fixedRig": "false", "forecast24Hr": "WOW. Continue MU and RIH 30\" conductor and installing UWG top-up system on upper 35 m. RU C-plate and MU cement stinger and CART. RIH with 30\" conductor on dedicated landing string and position conductor.", "hpht": "0", "md": "204", "mdCsgLast": "196.8", "mdDiaHoleStart": "145.7", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "5", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "WOW.", "tightWell": "0", "tvd": "204", "tvdCsgLast": "196.8", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-11-09T21:01:00+01:00", "density": "1.4", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "204", "mudClass": "oil based", "presBopRating": "0", "pv": "30", "tempHthp": "120", "type": "OBM-Standard", "visFunnel": "-999.99", "yp": "10.5" }, { "dTim": "2007-11-09T20:00:00+01:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "203", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "111", "yp": "-999.99" } ]
[ { "dTim": "2007-11-10T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "204", "readingKind": "estimated" } ]
[]
[ { "comments": "WOW, due to high wind, waves and hael. Wind 65-83 knop.", "dTimEnd": "2007-11-09T06:00:00+01:00", "dTimStart": "2007-11-09T00:00:00+01:00", "md": "55", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOW due to high wind and waves.", "dTimEnd": "2007-11-10T00:00:00+01:00", "dTimStart": "2007-11-09T06:00:00+01:00", "md": "55", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_14_2007_11_11
NO 15/9-F-14
NO 15/9-F-14
name
2007-11-10T00:00:00+01:00
2007-11-11T00:00:00+01:00
normal
2018-05-03T13:52:01+02:00
{ "name": "15/9-F-14", "namingSystem": "NPD code" }
[ { "name": "15/9-F-14", "namingSystem": "NPD code" }, { "name": "5351", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-04T00:00:00+01:00", "dateDrillComplete": "2008-06-15", "daysBehind": "3.2", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-11-11T00:00:00+01:00", "dTimDiaHoleStart": "2007-11-06T22:45:00+01:00", "diaHole": "36", "diaPilot": null, "distDrill": "-999.99", "elevKelly": "0", "fixedRig": "false", "forecast24Hr": "Wash down with the conductor pipe. Cement the 30\" conductor. Wait for cement to set.", "hpht": "0", "md": "204", "mdCsgLast": "196.8", "mdDiaHoleStart": "145.7", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "6", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "WOW. Made up cmt stinger inside 30\" conductor. Run 30\" conductor and stabbed same into template guide funnel. Run 30\" conductor to 169 m. Washed down from 169 m.", "tightWell": "0", "tvd": "204", "tvdCsgLast": "196.8", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-11-10T21:01:00+01:00", "density": "1.4", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "204", "mudClass": "oil based", "presBopRating": "0", "pv": "30", "tempHthp": "120", "type": "OBM-Standard", "visFunnel": "-999.99", "yp": "10.5" }, { "dTim": "2007-11-10T20:00:00+01:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "203", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "111", "yp": "-999.99" } ]
[ { "dTim": "2007-11-11T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "204", "readingKind": "estimated" } ]
[]
[ { "comments": "WOW due to high wind and waves.", "dTimEnd": "2007-11-10T06:00:00+01:00", "dTimStart": "2007-11-10T00:00:00+01:00", "md": "55", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOW. High wind and waves. Meanwhile performed rig maintenance.", "dTimEnd": "2007-11-10T13:00:00+01:00", "dTimStart": "2007-11-10T06:00:00+01:00", "md": "55", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held a tool box meeting. Run the 30\" conductor housing. Laid down the conductor running tool.", "dTimEnd": "2007-11-10T15:30:00+01:00", "dTimStart": "2007-11-10T13:00:00+01:00", "md": "55", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Run and made up the cementing stinger in the conductor.", "dTimEnd": "2007-11-10T16:45:00+01:00", "dTimStart": "2007-11-10T15:30:00+01:00", "md": "55", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picke up CART housing. Installed 2\" fill up valve. Installed inclinometer on CART.", "dTimEnd": "2007-11-10T18:30:00+01:00", "dTimStart": "2007-11-10T16:45:00+01:00", "md": "55", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Installed top up cement system on the 30\" conductor pipe whlie running down. Foot injury on centraliser deck.", "dTimEnd": "2007-11-10T21:00:00+01:00", "dTimStart": "2007-11-10T18:30:00+01:00", "md": "55", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Investigated incident involving a service hand.", "dTimEnd": "2007-11-10T22:15:00+01:00", "dTimStart": "2007-11-10T21:00:00+01:00", "md": "55", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "injury" }, { "comments": "Continued to install top up cement system on the 30\" conductor pipe whlie running down.", "dTimEnd": "2007-11-10T22:45:00+01:00", "dTimStart": "2007-11-10T22:15:00+01:00", "md": "55", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Run 30\" conductor on 5 1/2\" landing string.", "dTimEnd": "2007-11-11T00:00:00+01:00", "dTimStart": "2007-11-10T22:45:00+01:00", "md": "55", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_14_2007_11_12
NO 15/9-F-14
NO 15/9-F-14
name
2007-11-11T00:00:00+01:00
2007-11-12T00:00:00+01:00
normal
2018-05-03T13:52:01+02:00
{ "name": "15/9-F-14", "namingSystem": "NPD code" }
[ { "name": "15/9-F-14", "namingSystem": "NPD code" }, { "name": "5351", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-04T00:00:00+01:00", "dateDrillComplete": "2008-06-15", "daysBehind": "4", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-11-12T00:00:00+01:00", "dTimDiaHoleStart": "2007-11-06T22:45:00+01:00", "diaHole": "36", "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "WOW. Pull 30\" conductor to 157 m. Re-establish circulation and wash down to 197 m. Cement the 30\" conductor.", "hpht": "0", "md": "204", "mdCsgLast": "251.7", "mdDiaHoleStart": "145.7", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "7", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Run 30\" conductor, washed down from 169 m to TD at 196.8 m. Verified TD with digiquartz measurements. Circulated prior to cement job. Observed returns came up on 30\" x 13 3/8\" annulus on well F-7. Took time out to evaluate situation. WOW due to bad visibillity on sea bed.", "tightWell": "0", "tvd": "204", "tvdCsgLast": "251.7", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-11-11T21:01:00+01:00", "density": "1.4", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "204", "mudClass": "oil based", "presBopRating": "0", "pv": "30", "tempHthp": "120", "type": "OBM-Standard", "visFunnel": "-999.99", "yp": "10.5" }, { "dTim": "2007-11-11T20:00:00+01:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Active pit", "md": "203", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "111", "yp": "-999.99" } ]
[ { "dTim": "2007-11-12T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "204", "readingKind": "estimated" } ]
[]
[ { "comments": "Continued to run 30\" conductor on 5 1/2\" landing string. Problems with top drive torque wrench.", "dTimEnd": "2007-11-11T00:45:00+01:00", "dTimStart": "2007-11-11T00:00:00+01:00", "md": "55", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Problems with torque wrench on top drive. Not able to disconnect top drive from landing string.", "dTimEnd": "2007-11-11T02:45:00+01:00", "dTimStart": "2007-11-11T00:45:00+01:00", "md": "55", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Pulled back one single. Broke connection using the iron roughneck. Continued to RIH. Stabbed conductor into guide funnel at 03:30 hrs. Checked orientation of conductor shoe. Observed a broken connetion on the top up cement system. Continued to run the conductor to 160 m. Observed 20 tons weight. Worked conductor down to 169 m.", "dTimEnd": "2007-11-11T04:45:00+01:00", "dTimStart": "2007-11-11T02:45:00+01:00", "md": "169", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up the top drive and started to wash down from 169 m. Flow: 1000 ltr/min. SPP: 4 bar. Observed some of the cement top up piping no longer attached to the conductor pipe. Attempted to recover broken cement top up piping in the guide funnel.", "dTimEnd": "2007-11-11T06:00:00+01:00", "dTimStart": "2007-11-11T04:45:00+01:00", "md": "169", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Recovered broken off piece of top up cement piping.", "dTimEnd": "2007-11-11T07:00:00+01:00", "dTimStart": "2007-11-11T06:00:00+01:00", "md": "169", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box meeting with oncoming crew. Washed down with 30\" conductor from 169 to 180 m, 1000 lpm.", "dTimEnd": "2007-11-11T08:00:00+01:00", "dTimStart": "2007-11-11T07:00:00+01:00", "md": "180", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held a toolbox meeting. Rigged up tugger on centralizer deck and pulled conductor to starboard aft. Guided the conductor carefully through the guide funnel to 180.2 m to avoid further damage on top up cement piping. Washed down with 30\" conductor from 180.2 m to 190 m, 1000 lpm. Observed leakage in top up cement piping at approx. 11 m below top housing.", "dTimEnd": "2007-11-11T12:00:00+01:00", "dTimStart": "2007-11-11T08:00:00+01:00", "md": "190", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Laid down top single at 190 m. Made up the cement stand. Washed down with the conductor to approx 40 cm above TD, 1000 lpm. Took digiquartz measurements. RIH and set conductor at TD 196.8 m. Confirmed top of housing 43 cm lower than F-7.", "dTimEnd": "2007-11-11T14:00:00+01:00", "dTimStart": "2007-11-11T12:00:00+01:00", "md": "196.8", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared to activated the centralizers on the template using the ROV.", "dTimEnd": "2007-11-11T14:45:00+01:00", "dTimStart": "2007-11-11T14:00:00+01:00", "md": "196.8", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held a tool box meeting regarding the cementing of the 30\" conductor. Pressure tested the cementing line to 100 bar. Connected hot stab. Run centralizer sylinders on template and verified conductor position with ROV. Checked inclination: Roll 0.12, pitch 0.8.", "dTimEnd": "2007-11-11T19:00:00+01:00", "dTimStart": "2007-11-11T14:45:00+01:00", "md": "198.8", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Circulated 30 m3 of SW with 2500 lpm. Observed returns from slot F-14 came out of conductor annulus on slot F-7. Took time out, evaluated situation.", "dTimEnd": "2007-11-11T23:15:00+01:00", "dTimStart": "2007-11-11T19:00:00+01:00", "md": "196.8", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held a tool box meeting prior to rig down the cement line.", "dTimEnd": "2007-11-11T23:30:00+01:00", "dTimStart": "2007-11-11T23:15:00+01:00", "md": "196.8", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Retracted centralizer dogs on template. Picked up 0,5 m to confirm conductor free, free up weight 124 ton, no excess drag.", "dTimEnd": "2007-11-12T00:00:00+01:00", "dTimStart": "2007-11-11T23:30:00+01:00", "md": "196.3", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_14_2007_11_13
NO 15/9-F-14
NO 15/9-F-14
name
2007-11-12T00:00:00+01:00
2007-11-13T00:00:00+01:00
normal
2018-05-03T13:52:02+02:00
{ "name": "15/9-F-14", "namingSystem": "NPD code" }
[ { "name": "15/9-F-14", "namingSystem": "NPD code" }, { "name": "5351", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-04T00:00:00+01:00", "dateDrillComplete": "2008-06-15", "daysBehind": "4.9", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-11-13T00:00:00+01:00", "dTimDiaHoleStart": "2007-11-06T22:45:00+01:00", "diaHole": "36", "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Pump and displace 100 m3 of cement. Wait for the cement to set.", "hpht": "0", "md": "204", "mdCsgLast": "251.7", "mdDiaHoleStart": "145.7", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "8", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "WOW for visibility to improve on template. Engage hot-stab for centraliser system and operated the rams for F-14 and retracted same. Circulated SW at 250 lpm increased to 1000 lpm in 250 lpm steps. Still only returns coming out from F-7. Pumped 30 m³ 1.7 SG mud, 1000 lpm, 5.7 bars 85 MT string weight. Still only returns out from F-7. Picked up one meter with 120 MT and washed conductor back to setting depth, final string weight 76 MT. Total 20 m³ 1.7 SG mud pumped while washing down. Took digiquartz measurement to confirm correct setting depth of the 30\" conductor.", "tightWell": "0", "tvd": "204", "tvdCsgLast": "251.7", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-11-12T21:01:00+01:00", "density": "1.4", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "204", "mudClass": "oil based", "presBopRating": "0", "pv": "30", "tempHthp": "120", "type": "OBM-Standard", "visFunnel": "-999.99", "yp": "10.5" }, { "dTim": "2007-11-12T20:00:00+01:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "203", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "111", "yp": "-999.99" } ]
[ { "dTim": "2007-11-13T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "197", "readingKind": "estimated" } ]
[]
[ { "comments": "Attempted to confirm dogs fully retracted with ROV, not possible due to bad visibility.", "dTimEnd": "2007-11-12T01:00:00+01:00", "dTimStart": "2007-11-12T00:00:00+01:00", "md": "196.8", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOW for visibillity to improve on the template.", "dTimEnd": "2007-11-12T03:00:00+01:00", "dTimStart": "2007-11-12T01:00:00+01:00", "md": "196.3", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Washed back to TD with conductor, 800 lpm.", "dTimEnd": "2007-11-12T03:30:00+01:00", "dTimStart": "2007-11-12T03:00:00+01:00", "md": "196.8", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOW for visibility to improve on template.", "dTimEnd": "2007-11-12T06:00:00+01:00", "dTimStart": "2007-11-12T03:30:00+01:00", "md": "196.8", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOW for visibility to improve on template. Unable to engage hot-stab for centraliser rams. Damaged claw for ROV arm. Came to surface with ROV to repare claw, dived again with ROV.", "dTimEnd": "2007-11-12T21:30:00+01:00", "dTimStart": "2007-11-12T06:00:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOW for visibility to improve on template. Held meeting with essential personnel and went thought conductor cementing procedure.", "dTimEnd": "2007-11-12T22:00:00+01:00", "dTimStart": "2007-11-12T21:30:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOW for visibility to improve on template.", "dTimEnd": "2007-11-12T23:15:00+01:00", "dTimStart": "2007-11-12T22:00:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOW for visibility to improve on template. Meanwhile lined up and pressure tested the cement line to 100 bars. Stabbed hot-stab.\n", "dTimEnd": "2007-11-13T00:00:00+01:00", "dTimStart": "2007-11-12T23:15:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "interruption -- waiting on weather", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_14_2007_11_14
NO 15/9-F-14
NO 15/9-F-14
name
2007-11-13T00:00:00+01:00
2007-11-14T00:00:00+01:00
normal
2018-05-03T13:52:02+02:00
{ "name": "15/9-F-14", "namingSystem": "NPD code" }
[ { "name": "15/9-F-14", "namingSystem": "NPD code" }, { "name": "5351", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-04T00:00:00+01:00", "dateDrillComplete": "2008-06-15", "daysBehind": "5.6", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-11-14T00:00:00+01:00", "dTimDiaHoleStart": "2007-11-06T22:45:00+01:00", "diaHole": "36", "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Test top-up system and perform top-up cement if required. Release top-up line and CART tool. Continue top hole on F-5.", "hpht": "0", "md": "204", "mdCsgLast": "251.7", "mdDiaHoleStart": "145.7", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "9", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Positioned 30\" conductor at cementing depth at 196.8 m. Mixed and pumped 106 m³ 1.52 SG Tuned Light XL cement slurry. Got returns up F-7, but after 70 m3 pumped, had full returns up F-14. Displaced cement slurry with 6.5 m³ of SW. Waited on cement to set. Meanwhile performed general maintenance. LIned up for flushing of top-up line.", "tightWell": "0", "tvd": "204", "tvdCsgLast": "251.7", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-11-13T21:01:00+01:00", "density": "1.4", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "204", "mudClass": "oil based", "presBopRating": "0", "pv": "30", "tempHthp": "120", "type": "OBM-Standard", "visFunnel": "-999.99", "yp": "10.5" }, { "dTim": "2007-11-13T20:00:00+01:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "203", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "111", "yp": "-999.99" } ]
[ { "dTim": "2007-11-14T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "197.7", "readingKind": "estimated" } ]
[]
[ { "comments": "Worked with centralizer rams, rams were not working properlyy. Took out the hot-stab and flushed the lines, and stabbed the hot-stab back in, now the centralising rams worked properly. Retracted rams.", "dTimEnd": "2007-11-13T02:00:00+01:00", "dTimStart": "2007-11-13T00:00:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "WOW for visibility to improve on template.\n", "dTimEnd": "2007-11-13T03:15:00+01:00", "dTimStart": "2007-11-13T02:00:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to cementing of the 30\" conductor.", "dTimEnd": "2007-11-13T03:45:00+01:00", "dTimStart": "2007-11-13T03:15:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Circulated SW at 250 lpm increased to 1000 lpm in 250 lpm steps. Still only returns coming out from F-7, hook load came down with 10 MT to 92 MT while pumping at 1000 lpm.\n", "dTimEnd": "2007-11-13T04:15:00+01:00", "dTimStart": "2007-11-13T03:45:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pumped 30 m³ 1.7 SG mud, 1000 lpm, 5.7 bars, hookload dropped to 85 MT. Still only returns out from F-7. Picked up one meter with 120 MT and washed conductor back to setting depth, final hook load 76 MT. Total 20 m³ 1.7 SG mud pumped while washing down.\n", "dTimEnd": "2007-11-13T05:30:00+01:00", "dTimStart": "2007-11-13T04:15:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Started to take digiquartz measurement to confirm correct setting depth of the 30\" conductor.\n", "dTimEnd": "2007-11-13T06:00:00+01:00", "dTimStart": "2007-11-13T05:30:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up to original pick up weight of 120 MT 0.8 meter. Washed down conductor to correct setting depth at 196.8 meter, hook load 101 MT. Checked depth with digiquartz; 38 cm below F-7. Pumped 19 m³ of 1.7 SG mud, then 38 m³ sea water while washing down, return fluid up on nearby well, F-7.", "dTimEnd": "2007-11-13T09:45:00+01:00", "dTimStart": "2007-11-13T06:00:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Washed down 5 cm, and circulated/worked string until correct hookload, pumped a total of 216 m³ of sea water. Hook load 101 MT. Return fluid up on nearby well, F-7.", "dTimEnd": "2007-11-13T12:45:00+01:00", "dTimStart": "2007-11-13T09:45:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Closed the centraliser Rams and verified same with the ROV. Checked depth with digiquartz; 43 cm below F-7.", "dTimEnd": "2007-11-13T13:45:00+01:00", "dTimStart": "2007-11-13T12:45:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Pumped 15 m³ 1.65 SG mud and applied 20 bars back pressure to IBOP.", "dTimEnd": "2007-11-13T14:15:00+01:00", "dTimStart": "2007-11-13T13:45:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Mixed and pumped 106 m³ 1.52 SG Tuned Light XL cement slurry, experienced problems with plugged lines towards the end. Pumped first 20 m3 at 600 lpm, then increased rate to 1000 lpm. Checked returns on F-7, only minor returns after 70 m³ pumped, got returns up F-14. Displaced cement slurry with 6.5 m³ SW with mud pumps. Hook load dropped from 101 to 99 MT during cement job.\n", "dTimEnd": "2007-11-13T16:30:00+01:00", "dTimStart": "2007-11-13T14:15:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Bled off pressure and checked for back-flow. Removed cement hose and flushed through manifolds and hoses.\n", "dTimEnd": "2007-11-13T17:15:00+01:00", "dTimStart": "2007-11-13T16:30:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Waited on cement to set. Meanwhile performed general maintenance.", "dTimEnd": "2007-11-14T00:00:00+01:00", "dTimStart": "2007-11-13T17:15:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_14_2007_11_15
NO 15/9-F-14
NO 15/9-F-14
name
2007-11-14T00:00:00+01:00
2007-11-15T00:00:00+01:00
normal
2018-05-03T13:52:02+02:00
{ "name": "15/9-F-14", "namingSystem": "NPD code" }
[ { "name": "15/9-F-14", "namingSystem": "NPD code" }, { "name": "5351", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-04T00:00:00+01:00", "dateDrillComplete": "2008-06-15", "daysBehind": "6.2", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-11-15T00:00:00+01:00", "dTimDiaHoleStart": "2007-11-06T22:45:00+01:00", "diaHole": "36", "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Start operation on F-5 36\" top hole. Perpared the 36\" BHA. drill the 36\" hole.", "hpht": "0", "md": "204", "mdCsgLast": "251.7", "mdDiaHoleStart": "145.7", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "10", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Pressure tested UWG top-up system using the cement unit, rupture disk burst at 53 bars (769 psi). Performed cement top-up job, pumped 10.4 m³, 1.56 SG G-cement 82 bars at 500 lpm. Released with CART tool and POOH with the landing string. Prepared for measuring the double on top of the CART tool. Laser measuring device was dropped onto the rig floor. Racked back the CART tool in derrick. Laid out the aluminium inner string. Prepared for skidding of the cantilever from F-14 to F-5.\n\n", "tightWell": "0", "tvd": "204", "tvdCsgLast": "251.7", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-11-14T21:01:00+01:00", "density": "1.4", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "204", "mudClass": "oil based", "presBopRating": "0", "pv": "30", "tempHthp": "120", "type": "OBM-Standard", "visFunnel": "-999.99", "yp": "10.5" }, { "dTim": "2007-11-14T20:00:00+01:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "203", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "121", "yp": "-999.99" } ]
[ { "dTim": "2007-11-15T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "197", "readingKind": "estimated" } ]
[]
[ { "comments": "Waited on cement to set. Meanwhile performed general maintenance.", "dTimEnd": "2007-11-14T05:00:00+01:00", "dTimStart": "2007-11-14T00:00:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to pressure test of top-up system.", "dTimEnd": "2007-11-14T05:30:00+01:00", "dTimStart": "2007-11-14T05:00:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Lined up for flushing of top-up line.", "dTimEnd": "2007-11-14T06:00:00+01:00", "dTimStart": "2007-11-14T05:30:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flushed top-up system and surface lines. Pressure tested UWG top-up system using the cement unit, rupture disk burst at 53 bars (769 psi).\n", "dTimEnd": "2007-11-14T07:15:00+01:00", "dTimStart": "2007-11-14T06:00:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Opened centralizer rams on F-14. Retrieved the hot stab from bank # 4.\n", "dTimEnd": "2007-11-14T09:15:00+01:00", "dTimStart": "2007-11-14T07:15:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to perform top-up cement job. \n", "dTimEnd": "2007-11-14T10:00:00+01:00", "dTimStart": "2007-11-14T09:15:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Started to circulate with sea water 500 lpm. Performed cement top-up job, pumped 10.4 m³, 1.56 SG G-cement 82 bars at 500 lpm.", "dTimEnd": "2007-11-14T11:30:00+01:00", "dTimStart": "2007-11-14T10:00:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Flushed cement lines. Dropped 24 mm ball into the top-up hose, applied 240 bars to top-up to release the line NO-GO, bled down the pressure. Cut the hose using the ROV. Flushed lines and manifold on the rig floor and cement unit. \n", "dTimEnd": "2007-11-14T14:15:00+01:00", "dTimStart": "2007-11-14T11:30:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Checked inclinometer reading on the CART, opened the valve on the CART tool. Released the CART tool, slacked off to neutral weight = 76 MT, turned to the right 400/3000 Nm. Picked up the CART, tool weight 79 MT. Laid out the cement pump in sub.\n", "dTimEnd": "2007-11-14T15:15:00+01:00", "dTimStart": "2007-11-14T14:15:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box prior to laying out the landing string. Laid out pup jnts. and HWDP landing string and checked serial numbers. Measured length using a laser measure, racked back landing string in derrick.\n", "dTimEnd": "2007-11-14T16:00:00+01:00", "dTimStart": "2007-11-14T15:15:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Problems with the PRS investigated same.\n", "dTimEnd": "2007-11-14T16:30:00+01:00", "dTimStart": "2007-11-14T16:00:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Continued POOH with landing string, measured same with laser.\n", "dTimEnd": "2007-11-14T17:30:00+01:00", "dTimStart": "2007-11-14T16:30:00+01:00", "md": "167", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Due to unusual noise from forward PRS, stop operation and performed full inspection of same.\n", "dTimEnd": "2007-11-14T18:15:00+01:00", "dTimStart": "2007-11-14T17:30:00+01:00", "md": "167", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Continued POOH with landing string, measured same with laser.\n", "dTimEnd": "2007-11-14T18:45:00+01:00", "dTimStart": "2007-11-14T18:15:00+01:00", "md": "30", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk prior to pull the master bushing, removed same. Pulled out the CART tool and removed the inclinometer, installed the master bushing.", "dTimEnd": "2007-11-14T19:00:00+01:00", "dTimStart": "2007-11-14T18:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Function tested and preserved the CART tool.\n", "dTimEnd": "2007-11-14T19:30:00+01:00", "dTimStart": "2007-11-14T19:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk, prior to measuring the landing string, and laying out the aluminium inner string.\n", "dTimEnd": "2007-11-14T20:00:00+01:00", "dTimStart": "2007-11-14T19:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Cleaned the rig floor.\n", "dTimEnd": "2007-11-14T20:15:00+01:00", "dTimStart": "2007-11-14T20:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Prepared for measuring the double on top of the CART tool. Laser measuring device was drop down onto the rig floor\n", "dTimEnd": "2007-11-14T20:30:00+01:00", "dTimStart": "2007-11-14T20:15:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Operation was terminated and an investigating was established. A statement of the incident was put together.\n", "dTimEnd": "2007-11-14T21:45:00+01:00", "dTimStart": "2007-11-14T20:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held tool box talk, prior to measuring the landing string, and laying out the aluminium inner string. Measured the double.\n", "dTimEnd": "2007-11-14T22:30:00+01:00", "dTimStart": "2007-11-14T21:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Racked back the CART tool in derrick. Laid out the aluminium inner string.\n", "dTimEnd": "2007-11-15T00:00:00+01:00", "dTimStart": "2007-11-14T22:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- casing", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_14_2007_11_16
NO 15/9-F-14
NO 15/9-F-14
name
2007-11-15T00:00:00+01:00
2007-11-16T00:00:00+01:00
normal
2018-05-03T13:52:02+02:00
{ "name": "15/9-F-14", "namingSystem": "NPD code" }
[ { "name": "15/9-F-14", "namingSystem": "NPD code" }, { "name": "5351", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-04T00:00:00+01:00", "dateDrillComplete": "2008-06-15", "daysBehind": "6.3", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-11-16T00:00:00+01:00", "dTimDiaHoleStart": "2007-11-06T22:45:00+01:00", "diaHole": "36", "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "None", "hpht": "0", "md": "204", "mdCsgLast": "251.7", "mdDiaHoleStart": "145.7", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "11", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "None", "tightWell": "0", "tvd": "204", "tvdCsgLast": "251.7", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[]
[]
[]
[ { "comments": "Prepared for skidding of the cantilever from F-14 to F-5", "dTimEnd": "2007-11-15T04:30:00+01:00", "dTimStart": "2007-11-15T00:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_14_2007_12_04
NO 15/9-F-14
NO 15/9-F-14
name
2007-12-03T00:00:00+01:00
2007-12-04T00:00:00+01:00
normal
2018-05-03T13:52:02+02:00
{ "name": "15/9-F-14", "namingSystem": "NPD code" }
[ { "name": "15/9-F-14", "namingSystem": "NPD code" }, { "name": "5351", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-04T00:00:00+01:00", "dateDrillComplete": "2008-06-15", "daysBehind": "6.3", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-12-04T00:00:00+01:00", "dTimDiaHoleStart": null, "diaHole": null, "diaPilot": null, "distDrill": "-999.99", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Make up 26\" drilling BHA. RIH with BHA. Drill shoetrack and rathole. Set toolface and check gMWD survey with WL singleshot gyro.", "hpht": "0", "md": "204", "mdCsgLast": "251.7", "mdDiaHoleStart": null, "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "11", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Skidded rig from F-1 to F-14. Removed hatches. Broke down HWDP stand for inspection.", "tightWell": "0", "tvd": "204", "tvdCsgLast": "251.7", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-12-03T21:00:00+01:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "200", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "125", "yp": "-999.99" } ]
[]
[]
[]
[]
15_9_F_14_2007_12_05
NO 15/9-F-14
NO 15/9-F-14
name
2007-12-04T00:00:00+01:00
2007-12-05T00:00:00+01:00
normal
2018-05-03T13:52:02+02:00
{ "name": "15/9-F-14", "namingSystem": "NPD code" }
[ { "name": "15/9-F-14", "namingSystem": "NPD code" }, { "name": "5351", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-04T00:00:00+01:00", "dateDrillComplete": "2008-06-15", "daysBehind": "6.5", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-12-05T00:00:00+01:00", "dTimDiaHoleStart": "2007-12-04T01:00:00+01:00", "diaHole": "36", "diaPilot": null, "distDrill": "0", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "RIH to 206 m MD. Drill 26\" section to 211 m MD and initiate kick-off. Drill 26\" section to 700 m MD.", "hpht": "0", "md": "204", "mdCsgLast": "251.7", "mdDiaHoleStart": "258.9", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": "193", "mdStrengthForm": "0", "presTestType": null, "reportNo": "12", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Started running 26\" drilling BHA. ROV lost 3-finger claw in hole. Assessed situation. POOH with 26\" drilling BHA. RIH with 26\" junk removal BHA with rock bit. Drilled cement and rathole down to 206 m MD. POOH with 26\" junk removal BHA and laid down same. Found pieces of junk in bit. Broke bit and bitsub. RIH with 26\" drilling BHA from surface to 133 m MD.", "tightWell": "0", "tvd": "204", "tvdCsgLast": "251.7", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[]
[]
[]
[ { "comments": "Held toolbox talk prior to skidding rig from F-1 to F-14. Skidded rig 3 m starboard. Skidded rig/cantilever 6,5 m aft. Removed hatches in wellhead module on F-14. Ran stand of HWDP through rotary and made final adjustments.", "dTimEnd": "2007-12-04T04:00:00+01:00", "dTimStart": "2007-12-04T01:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "moving -- skid", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Broke down stand of 5 1/2\" HWDP and laid out three joints for backload and inspection. Rebuilt stand with 3 new joints of 5 1/2\" HWDP and racked back in derrick. Ran tugger from moonpool to seabed to help ROV clear CTS hose.", "dTimEnd": "2007-12-04T06:00:00+01:00", "dTimStart": "2007-12-04T04:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Picked up 26\" drilling BHA and brought to V-door. Meanwhile helped ROV to clear hose trapped below template using tugger.", "dTimEnd": "2007-12-04T07:00:00+01:00", "dTimStart": "2007-12-04T06:00:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Held toolbox talk prior to making up 26\" drilling BHA. Removed masterbushing and ran 26\" Bit / gMWD assy through rotary. Inserted gMWD probe in BHA as per Scientific instructions. Meanwhile ROV attempted to connect hose to CTS funnel. CTS hose was too short and the funnel had to be turned. ROV lost 3-finger claw when attempteing to turn CTS funnel.", "dTimEnd": "2007-12-04T08:15:00+01:00", "dTimStart": "2007-12-04T07:00:00+01:00", "md": "22", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Continued running BHA. Picked up and made up MWD/UBHO assy. Meanwhile pulled ROV to surface for repair.", "dTimEnd": "2007-12-04T09:00:00+01:00", "dTimStart": "2007-12-04T08:15:00+01:00", "md": "33", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Orientated UBHO sleeve as per Scientific instructions. Meanwhile repaired ROV manipulator claw.", "dTimEnd": "2007-12-04T09:30:00+01:00", "dTimStart": "2007-12-04T09:00:00+01:00", "md": "33", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Made up 3 x 9 1/2\" NM DC to BHA and ran in to 63 m MD. Repaired ROV and launched same. Assessed video recording from incident. Found 3-finger claw to be lost in hole. Assessed situation.", "dTimEnd": "2007-12-04T10:45:00+01:00", "dTimStart": "2007-12-04T09:30:00+01:00", "md": "63", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Laid out 1 x DC and made up hydro- mechanical jar to 8 1/4\" DC stand. Racked back in derrick. Discussed way forward with town.", "dTimEnd": "2007-12-04T11:45:00+01:00", "dTimStart": "2007-12-04T10:45:00+01:00", "md": "63", "phase": "fixed", "proprietaryCode": "drilling -- trip", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Awaited further instuctions. Discussed way forward with town. Decided to run in with 26\" rock bit BHA in attempt to remove junk in hole.", "dTimEnd": "2007-12-04T12:30:00+01:00", "dTimStart": "2007-12-04T11:45:00+01:00", "md": "63", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "POOH with 26\" drilling BHA. Racked back BHA in derrick. Laid out UBHO/MWD assy on deck.", "dTimEnd": "2007-12-04T15:45:00+01:00", "dTimStart": "2007-12-04T12:30:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Held toolbox talk prior to making up new 26\" junk removal BHA with rock bit.", "dTimEnd": "2007-12-04T16:00:00+01:00", "dTimStart": "2007-12-04T15:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Made up 26\" bit and bit sub to stand of 9 3/4\" drillcollars. Removed masterbushing, ran stand through, installed masterbushing and hung off assy in rotary table.", "dTimEnd": "2007-12-04T17:00:00+01:00", "dTimStart": "2007-12-04T16:00:00+01:00", "md": "30", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Made up jar and 8 1/4\" DC stand. Picked up single 8 1/4\" DC and made up same.", "dTimEnd": "2007-12-04T18:00:00+01:00", "dTimStart": "2007-12-04T17:00:00+01:00", "md": "70", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "RIH with 26\" junk removal BHA on 5 1/2\" HWDP from 70 m MD to 175 m MD. Stabbed into CTS on top of conductor housing while observing with ROV.", "dTimEnd": "2007-12-04T19:00:00+01:00", "dTimStart": "2007-12-04T18:00:00+01:00", "md": "140", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Washed down from 175 m to 183 m MD with 1000 lpm and tagged cement with 5 MT. Applied 4-6 MT WOB and rotated at 15 rpm down to 185 m MD.", "dTimEnd": "2007-12-04T19:45:00+01:00", "dTimStart": "2007-12-04T19:00:00+01:00", "md": "183", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "POOH with 26 junk removal BHA from 185 m to just above CTS funnel at 138 m MD. ROV inspected 26\" rock bit. No damage or junk could be observed.", "dTimEnd": "2007-12-04T20:30:00+01:00", "dTimStart": "2007-12-04T19:45:00+01:00", "md": "138", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Ran back in to 185 m MD to resume drilling cement. Connected CTS hose to ROV and started pumping with dredge pump.", "dTimEnd": "2007-12-04T20:45:00+01:00", "dTimStart": "2007-12-04T20:30:00+01:00", "md": "185", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Drilled cement from 185 m to 197 m MD. Drilling parameters : Flow 4400 lpm / SPP 62 bar / Rotation 45 rpm / Torque 1-3 kNm. Controlled penetration rate to 15 m/hrs. Observed higher WOB (autodrill 15 m/hr) from 193 m to 197 m MD indicating hard cement. 20 MT tonne WOB peak at 193 m MD and 3-10 MT downwards. Observed excessive rattling in string and WOB peaks around shoe depth at 197 m MD. Pumped 2 x 20 m3 hi-vis sweeps to clean hole.", "dTimEnd": "2007-12-04T23:30:00+01:00", "dTimStart": "2007-12-04T20:45:00+01:00", "md": "197", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled rathole and shoe from 197 m to 201 m MD. Drilling parameters : Flow 4400 lpm / SPP 62 bar / Rotation 45 rpm / Torque 1-2 kNm / WOB 1-2 MT. Reamed back inside shoe for every 2 m drilled.", "dTimEnd": "2007-12-05T00:00:00+01:00", "dTimStart": "2007-12-04T23:30:00+01:00", "md": "201", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_14_2007_12_06
NO 15/9-F-14
NO 15/9-F-14
name
2007-12-05T00:00:00+01:00
2007-12-06T00:00:00+01:00
normal
2018-05-03T13:52:02+02:00
{ "name": "15/9-F-14", "namingSystem": "NPD code" }
[ { "name": "15/9-F-14", "namingSystem": "NPD code" }, { "name": "5351", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-04T00:00:00+01:00", "dateDrillComplete": "2008-06-15", "daysBehind": "6.5", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-12-06T00:00:00+01:00", "dTimDiaHoleStart": "2007-12-05T07:00:00+01:00", "diaHole": "26", "diaPilot": null, "distDrill": "29", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Drill 26\" hole to 750 m MD.", "hpht": "0", "md": "233", "mdCsgLast": "251.7", "mdDiaHoleStart": "206", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "13", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Drilled 26\" hole from 206 m to 211 m MD. Pulled BHA to thighten UBHO sleeve. RIH with BHA. Waited for work on Siemens system. Drilled 26\" hole from 211 to 269 m MD, steered as required. Performed gyro single shot survey on each single drilled.", "tightWell": "0", "tvd": "233", "tvdCsgLast": "251.7", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-12-05T21:00:00+01:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "235", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "123", "yp": "-999.99" } ]
[ { "dTim": "2007-12-06T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "235", "readingKind": "estimated" } ]
[]
[ { "comments": "Drilled rathole and shoe from 197 m to 201 m MD. Drilling parameters : Flow 4400 lpm / SPP 62 bar / Rotation 45 rpm / Torque 1-6 kNm / WOB 1-8 MT. Reamed back inside shoe for every 2 m drilled.", "dTimEnd": "2007-12-05T00:15:00+01:00", "dTimStart": "2007-12-05T00:00:00+01:00", "md": "204", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled 2 m new formation from 204 m to 206 m MD. Drilling parameters : Flow 4400 lpm / SPP 62 bar / Rotation 45 rpm / Torque 1-2 kNm / WOB 1-2 MT. Pumped 20 m3 his-vis sweep to clean hole.", "dTimEnd": "2007-12-05T00:45:00+01:00", "dTimStart": "2007-12-05T00:15:00+01:00", "md": "206", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with 26\" junk removal BHA from 206 m MD to surface on 5 1/2\" HWDP. Laid down 1 x 8 1/4\" DC. Racked back jar/DC assy. Lifted UBHO/MWD assy to HTS due to wind speed limitations on crane. Pulled 9 3/4\" DC/bit stand to surface and inspected 26\" rock bit. Found 2 x pieces of junk trapped in roller cones. Removed 1 piece of 800 g. The other piece was jammed in middle of the bit and could not be removed easily. Also found several worn teeth on bit.", "dTimEnd": "2007-12-05T03:45:00+01:00", "dTimStart": "2007-12-05T00:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Broke 26\" bit and bit sub. Racked back stand of 9 3/4\" DC.", "dTimEnd": "2007-12-05T04:30:00+01:00", "dTimStart": "2007-12-05T03:45:00+01:00", "md": "0", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Ran 26\" drilling BHA from surface to 70 m MD.", "dTimEnd": "2007-12-05T05:30:00+01:00", "dTimStart": "2007-12-05T04:30:00+01:00", "md": "70", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Ran 26\" drilling BHA from 70 m to 133 m MD.", "dTimEnd": "2007-12-05T06:00:00+01:00", "dTimStart": "2007-12-05T05:30:00+01:00", "md": "133", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "RIH with 26\" drilling BHA from 133 m to 206 m MD. Stabbed into CTS funnel while observing with ROV.", "dTimEnd": "2007-12-05T07:00:00+01:00", "dTimStart": "2007-12-05T06:00:00+01:00", "md": "206", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Established drilling parameters. Drilled 26\" hole section from 206 m to 211 m MD. Drilling parameters : Flow 3100 lpm / SPP 62 bar / 1-2 MT WOB / Rotation 125 RPM / String torque 1-3 kNm. Pumped 20 m3 hi-vis to clean the hole at 211 m MD. Scientifc drilling reported that UBHO sleeve had not been fastened correctly in the carrier. Decided to pull BHA for remedial action.", "dTimEnd": "2007-12-05T08:45:00+01:00", "dTimStart": "2007-12-05T07:00:00+01:00", "md": "211", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "POOH with 26\" drilling BHA from 211 m MD to 63 m MD. No drag observed when pulling BHA through conductor shoe. Racked back DC/jar and NMDC stands to access UBHO sub.", "dTimEnd": "2007-12-05T10:00:00+01:00", "dTimStart": "2007-12-05T08:45:00+01:00", "md": "63", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Checked UBHO relative to scribeline. Checked and thightened UBHO sleeve. Inspected 26\" bit at Centralizer deck - no wear observed.", "dTimEnd": "2007-12-05T11:00:00+01:00", "dTimStart": "2007-12-05T10:00:00+01:00", "md": "63", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Made up and RIH with 26\" drilling BHA from 63 m to 196 m MD. Stabbed into CTS funnel while observing with ROV.", "dTimEnd": "2007-12-05T13:30:00+01:00", "dTimStart": "2007-12-05T11:00:00+01:00", "md": "196", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Washed down with 26\" drilling BHA from 196 m to 209 m MD pumping at 2000 lpm.", "dTimEnd": "2007-12-05T13:45:00+01:00", "dTimStart": "2007-12-05T13:30:00+01:00", "md": "209", "phase": "fixed", "proprietaryCode": "interruption -- repair", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Performed singel shot survey on WL with bit inside conductor shoe. Inclination 0,33 deg / Azimuth 306,1 deg / Toolface 050 deg. Halted drilling operation for software upgrade on Siemens F&G system.", "dTimEnd": "2007-12-05T15:15:00+01:00", "dTimStart": "2007-12-05T13:45:00+01:00", "md": "195", "phase": "fixed", "proprietaryCode": "drilling -- survey", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Stand-by for software upgrade of Siemens F&G system. At 18:15 hrs => Washed down to 209 m MD while pumping at 2000 lpm. Shut down pumps and waited for gMWD to reset.", "dTimEnd": "2007-12-05T18:45:00+01:00", "dTimStart": "2007-12-05T15:15:00+01:00", "md": "195", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "equipment failure" }, { "comments": "Pumped at 2000 lpm and obtained gMWD survey - rejected survey.", "dTimEnd": "2007-12-05T19:00:00+01:00", "dTimStart": "2007-12-05T18:45:00+01:00", "md": "209", "phase": "fixed", "proprietaryCode": "drilling -- survey", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Slided 26\" drilling BHA from 211 m to 217 m MD. Drilling parameters : Flow 3100 lpm / SPP 62 bar / 1-3 WOB / Rotation 95 RPM (bit rpm) / String torque 0-1 kNm. Pumped 10 m3 hi-vis sweep. Picked off bottom and hung off on slips.", "dTimEnd": "2007-12-05T20:00:00+01:00", "dTimStart": "2007-12-05T19:00:00+01:00", "md": "217", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed single shot survey on WL. Inclination 0,2 deg / Azimuth 243,9 deg / Toolface 112 deg. Pumped at 2000 lpm to obtain gMWD survey - rejected data.", "dTimEnd": "2007-12-05T21:15:00+01:00", "dTimStart": "2007-12-05T20:00:00+01:00", "md": "215", "phase": "fixed", "proprietaryCode": "drilling -- survey", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Slided 26\" drilling BHA from 217 m to 226 m MD. Drilling parameters : Flow 3100 lpm / SPP 62 bar / 2-6 WOB / Rotation 95 RPM (bit rpm) / String torque 0-1 kNm. Pumped 10 m3 hi-vis sweep. Picked off bottom and hung off on slips.", "dTimEnd": "2007-12-05T22:15:00+01:00", "dTimStart": "2007-12-05T21:15:00+01:00", "md": "226", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed single shot survey on WL. Inclination 0,37 deg / Azimuth 297,4 deg / Toolface 112 deg. Pumped at 2000 lpm to obtain gMWD survey - rejected data.", "dTimEnd": "2007-12-05T23:00:00+01:00", "dTimStart": "2007-12-05T22:15:00+01:00", "md": "226", "phase": "fixed", "proprietaryCode": "drilling -- survey", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Slided 26\" drilling BHA from 226 m to 233 m MD. Drilling parameters : Flow 3100 lpm / SPP 62 bar / 2-6 MT WOB / Rotation 95 RPM (bit rpm) / String torque 0-1 kNm.", "dTimEnd": "2007-12-06T00:00:00+01:00", "dTimStart": "2007-12-05T23:00:00+01:00", "md": "233", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" } ]
[]
15_9_F_14_2007_12_07
NO 15/9-F-14
NO 15/9-F-14
name
2007-12-06T00:00:00+01:00
2007-12-07T00:00:00+01:00
normal
2018-05-03T13:52:02+02:00
{ "name": "15/9-F-14", "namingSystem": "NPD code" }
[ { "name": "15/9-F-14", "namingSystem": "NPD code" }, { "name": "5351", "namingSystem": "NPD number" } ]
[ { "dTimSpud": "2007-11-04T00:00:00+01:00", "dateDrillComplete": "2008-06-15", "daysBehind": "6.5", "operator": "StatoilHydro", "rigAlias": [ { "name": "MÆRSK INSPIRER", "namingSystem": "NPD Name" }, { "name": "369304", "namingSystem": "NPD code" } ] } ]
[ { "avgPresBH": null, "avgTempBH": null, "dTim": "2007-12-07T00:00:00+01:00", "dTimDiaHoleStart": "2007-12-05T07:00:00+01:00", "diaHole": "26", "diaPilot": null, "distDrill": "297", "elevKelly": "54.9", "fixedRig": "false", "forecast24Hr": "Drill 26\" hole section to TD at 1081 m MD. Circulate hole clean.", "hpht": "0", "md": "530", "mdCsgLast": "251.7", "mdDiaHoleStart": "206", "mdKickoff": null, "mdPlanned": "-999.99", "mdPlugTop": null, "mdStrengthForm": "0", "presTestType": null, "reportNo": "14", "ropCurrent": "-999.99", "strengthForm": "0", "sum24Hr": "Drilled 26\" hole section from 269 m MD to 636 m MD. Steered according to planned wellpath.", "tightWell": "0", "tvd": "529", "tvdCsgLast": "251.7", "tvdStrengthForm": "0", "waterDepth": "91", "wellheadElevation": "0" } ]
[ { "dTim": "2007-12-06T21:00:00+01:00", "density": "1.05", "filterCakeLtlp": null, "filtrateLtlp": null, "locationSample": "Reserve pit", "md": "475", "mudClass": "water based", "presBopRating": "0", "pv": "-999.99", "tempHthp": null, "type": "Spud Mud", "visFunnel": "125", "yp": "-999.99" } ]
[ { "dTim": "2007-12-07T00:00:00+01:00", "equivalentMudWeight": "1.03", "md": "197", "readingKind": "estimated" } ]
[ { "azi": "24.15", "dTim": "2007-12-07T00:00:00+01:00", "incl": ".44", "md": "233.3", "tvd": "233.3" }, { "azi": "52.89", "dTim": "2007-12-07T00:00:00+01:00", "incl": "1.14", "md": "259.5", "tvd": "259.5" }, { "azi": "57.9", "dTim": "2007-12-07T00:00:00+01:00", "incl": "2.11", "md": "299.6", "tvd": "299.6" }, { "azi": "58.25", "dTim": "2007-12-07T00:00:00+01:00", "incl": "1", "md": "340.3", "tvd": "340.3" }, { "azi": "86.12", "dTim": "2007-12-07T00:00:00+01:00", "incl": "2.9", "md": "380.8", "tvd": "380.7" }, { "azi": "84.8", "dTim": "2007-12-07T00:00:00+01:00", "incl": "5.1", "md": "420.3", "tvd": "420.1" }, { "azi": "327.63", "dTim": "2007-12-07T00:00:00+01:00", "incl": ".29", "md": "196.8", "tvd": "196.8" }, { "azi": "334.05", "dTim": "2007-12-07T00:00:00+01:00", "incl": ".27", "md": "209", "tvd": "209" }, { "azi": "80.32", "dTim": "2007-12-07T00:00:00+01:00", "incl": "4.05", "md": "460.2", "tvd": "459.9" }, { "azi": "56.67", "dTim": "2007-12-07T00:00:00+01:00", "incl": "4.05", "md": "500.5", "tvd": "500.1" }, { "azi": "33.21", "dTim": "2007-12-07T00:00:00+01:00", "incl": "2.73", "md": "541", "tvd": "540.6" }, { "azi": "351.99", "dTim": "2007-12-07T00:00:00+01:00", "incl": "1.41", "md": "581.3", "tvd": "580.8" } ]
[ { "comments": "Continued sliding from 233 m to 239 m MD. Pumped 10 m3 hi-vis sweep. Picked off bottom and hung off in slips.", "dTimEnd": "2007-12-06T00:45:00+01:00", "dTimStart": "2007-12-06T00:00:00+01:00", "md": "239", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed single shot survey on WL. Inclination 0,25 deg / Azimuth 320,5 deg / Toolface 125 deg. Adjusted toolface to 114 deg. Secured drillstring using chain hoist on Centralizer deck. Pumped at 2000 lpm to obtain gMWD survey - obatined data but still 16 deg deviation on toolface.", "dTimEnd": "2007-12-06T01:45:00+01:00", "dTimStart": "2007-12-06T00:45:00+01:00", "md": "239", "phase": "fixed", "proprietaryCode": "drilling -- survey", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Slided 26\" drilling BHA from 229 m to 249 m MD. Drilling parameters : Flow 3100 lpm / SPP 68 bar / 8-10 MT WOB / Rotation 95 RPM (bit rpm)/ String torque 1-3 kNm. Pumped 10 m3 hi-vis sweep. Picked off bottom and hung off in slips.", "dTimEnd": "2007-12-06T03:00:00+01:00", "dTimStart": "2007-12-06T01:45:00+01:00", "md": "249", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Performed single shot survey on WL. Inclination 0,27 deg / Azimuth 334,1 deg / Toolface 076 deg. Secured drillstring using chain hoist at Centralizer deck. Pumped at 2000 lpm to obtain gMWD survey : Inclination 0,44 deg / Azimuth 024,1 deg / Toolface 076 deg - good match on toolface figure. Good match between realtime GTF and MTF.", "dTimEnd": "2007-12-06T04:00:00+01:00", "dTimStart": "2007-12-06T03:00:00+01:00", "md": "249", "phase": "fixed", "proprietaryCode": "drilling -- survey", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Slided 26\" drilling BHA from 249 m to 258 m MD. Drilling parameters : Flow 3100 lpm / SPP 68 bar / 1-3 MT WOB / Rotation 95 RPM (bit rpm)/ String torque 0-2 kNm.", "dTimEnd": "2007-12-06T04:45:00+01:00", "dTimStart": "2007-12-06T04:00:00+01:00", "md": "259", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled 26\" hole section from 258 m to 269 m MD. Drilling parameters : Flow 3100 lpm / SPP 68 bar / 1-3 MT WOB / Rotation 130 RPM (bit rpm) / String torque 6 kNm.", "dTimEnd": "2007-12-06T06:00:00+01:00", "dTimStart": "2007-12-06T04:45:00+01:00", "md": "269", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" }, { "comments": "Drilled 26\" hole section from 269 m to 530 m MD. Drilling parameters : Flow 3100-4400 lpm / SPP 68-125 bar / WOB 2-8 MT / Torque 1-11 kNm / String RPM 40 / Bit RPM 40-170. Average ROP 15 m /hrs. Pumped 10 m3 hi-vis sweep for every singel drilled. Performed gMWD survey on connections. Secured drillstring with sling/chainhoist on Centralizer deck while performing survey.\n\nSteered intervalls :\n268 - 287 m MD\n315 - 331 m MD\n356 - 377 m MD\n396 - 411 m MD\n435 - 450 m MD\n475 - 495 m MD\n515 - 535 m MD", "dTimEnd": "2007-12-07T00:00:00+01:00", "dTimStart": "2007-12-06T06:00:00+01:00", "md": "530", "phase": "fixed", "proprietaryCode": "drilling -- drill", "state": "ok", "stateDetailActivity": "success" } ]
[]