document_id
stringclasses
687 values
document_type
stringclasses
9 values
document_original_url
stringclasses
674 values
line_number
int64
0
9.1k
raw_text
stringlengths
1
192k
left
float64
-1
0.99
height
float64
-1
55
bold
bool
2 classes
italic
bool
2 classes
is_title
bool
2 classes
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
227
<p align="justify">- 9,7 millions d'euros au titre l'extension en année pleine de l'augmentation du point d'indice intervenue au 1<sup>er </sup>février 2017 ;</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
228
<p align="justify">- 0,3 million d'euros au titre des mesures bas salaires<sup>10<a name="fnref10"></a>(<a href="#fn10">*</a>)</sup>.</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
229
<h6><a name="_Toc495909310"></a><a name="_Toc496168909"></a><a name="_Toc496269619"></a><a name="_Toc497828813"></a><a name="_Toc497828879"></a><a name="_Toc497896797"></a><a name="_Toc497896988"></a><a name="_Toc497900955"></a><a name="_Toc499037239"></a><a name="_Toc499120216"></a><a name="_Toc499226450"></a><a name="_Toc499280925"></a><a name="_Toc499286453"></a><a name="toc66"></a><a name="toc67"></a><a name="toc68"></a><a name="toc69"></a>b) Un volet « rémunération » complété par la mise en oeuvre d'un « Plan famille » en 2018</h6>
-1
-1
false
false
true
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
230
<p align="justify">Outre le volet concernant les rémunérations, <strong>le plan d'amélioration de la condition du personnel comprend</strong> <strong>différentes mesures d'action sociale</strong>. <strong>Sept millions d'euros</strong> sont ainsi prévus à ce titre dans le présent projet de loi de finances afin de financer des actions visant à : </p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
231
<p align="justify">- favoriser l'amélioration du cadre de vie en enceinte militaire ;</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
232
<p align="justify">- développer des actions sociales communautaires et culturelles, destinées notamment à faciliter l'insertion des familles ;</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
233
<p align="justify">- améliorer le soutien en cas d'absence prolongée du domicile afin de soutenir les familles des militaires absents.</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
234
<p align="justify">Par ailleurs, à l'occasion de son déplacement sur la base aérienne d'Istres le 20 juillet 2017, le Président de la République a annoncé la mise en oeuvre de mesures en faveur de la condition du personnel « <em>pour que la vie des familles soit davantage prise en compte dans les affectations, dans les décisions du quotidien, et pour que toutes celles et ceux qui peuvent être aidés dans leur quotidien le soient</em> ». </p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
235
<p align="justify"><strong>22,5 millions d'euros sont ainsi prévus au sein du présent projet de loi finances afin de financer un « Plan famille »</strong>. Ce plan s'articulera autour des axes suivants : </p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
236
<p align="justify">- une meilleure prise en compte des absences opérationnelles ;</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
237
<p align="justify">- l'amélioration de « <em>l'intégration des familles dans la communauté de défense </em>» ;</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
238
<p align="justify">- l'amélioration des conditions de mobilité ;</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
239
<p align="justify">- l'amélioration des conditions de logement familial ;</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
240
<p align="justify">- la simplification des procédures ;</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
241
<p align="justify">- l'amélioration des conditions d'hébergement pour les célibataires et les célibataires géographiques.</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
242
<p align="justify"><strong>Au total, sur la durée du quinquennat, 300 millions d'euros devraient être consacrés à ce plan.</strong></p>
0.005556
16
false
false
true
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
243
<h6><a name="_Toc495909312"></a><a name="_Toc496168910"></a><a name="_Toc496269620"></a><a name="_Toc497828814"></a><a name="_Toc497828880"></a><a name="_Toc497896798"></a><a name="_Toc497896989"></a><a name="_Toc497900956"></a><a name="_Toc499037240"></a><a name="_Toc499120217"></a><a name="_Toc499226451"></a><a name="_Toc499280926"></a><a name="_Toc499286454"></a><a name="toc70"></a><a name="toc71"></a><a name="toc72"></a><a name="toc73"></a>c) Des mesures indispensables pour faire face à l'enjeu de fidélisation du personnel</h6>
-1
-1
false
false
true
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
244
<p align="justify">Dans un rapport de septembre 2017, le Haut comité d'évaluation de la condition militaire<sup>11<a name="fnref11"></a>(<a href="#fn11">*</a>)</sup> souligne <strong>les difficultés rencontrées par le ministère des armées pour fidéliser ses personnels</strong>.</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
245
<p align="justify">Cette situation résulte de nombreux facteurs, parmi lesquels, <strong>une usure liée à la suractivité, des carrières qui peuvent apparaître moins attractives, notamment financièrement, que celles proposées dans le secteur privé, notamment pour certaines spécialités recherchées, une dégradation des conditions de travail</strong> (faible disponibilité de certains matériels hors Opex, enchaînement des opérations au détriment de l'entraînement) <strong>et de vie</strong> (vétusté de certaines infrastructures).</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
246
<p align="justify">Par ailleurs, selon le Haut comité, « <strong><em>la lassitude vis-à-vis des réformes est largement partagée par les militaires. Ils savent qu'ils sont, parmi les agents publics, ceux qui ont contribué le plus, et de loin, aux réorganisations et aux mesures d'optimisation de la dépense publique</em></strong><em>. Ces éléments affectent le moral des militaires et sont des facteurs structurels de dé-fidélisation. <strong>Le manque de moyens pour remplir les missions est un frein à rester dans l'institution pour 53 % des militaires tandis que l'insuffisance des moyens humains est le premier motif d'insatisfaction</strong> selon l'indicateur de mesure du moral (I2M). Les effets positifs de la remontée en puissance commencent toutefois à se faire ressentir et devraient améliorer les cycles de préparation opérationnelle, notamment dans l'armée de terre, même si la FOT reconstituée ne sera pleinement opérationnelle qu'en 2018 </em>».</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
247
<p align="center"><strong>Évolution des taux de résiliation et de non-renouvellement des contrats</strong></p>
0.332357
16
false
false
true
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
248
<p align="center"><em>(en %)</em></p>
0.485037
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
249
<div align="center"><table border="2" cellpadding="2"><tbody><tr> <td align="left" valign="middle"> </td> <td align="left" valign="middle"> <p align="center"><strong>Catégorie</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>2014</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>2015</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>2016</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>Prévisions 2017</strong></p> </td> </tr> <tr> <td align="left" rowspan="3" valign="middle"> <p align="center">Taux de résiliation des contrats*</p> </td> <td align="left" valign="middle"> <p align="center">Officiers</p> </td> <td align="left" valign="middle"> <p align="center">1,04 %</p> </td> <td align="left" valign="middle"> <p align="center">0,83 %</p> </td> <td align="left" valign="middle"> <p align="center">1,15 %</p> </td> <td align="left" valign="middle"> <p align="center">0,62 %</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center">Sous-officiers</p> </td> <td align="left" valign="middle"> <p align="center">1,33 %</p> </td> <td align="left" valign="middle"> <p align="center">1,38 %</p> </td> <td align="left" valign="middle"> <p align="center">1,18 %</p> </td> <td align="left" valign="middle"> <p align="center">0,89 %</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center">Militaires du rang</p> </td> <td align="left" valign="middle"> <p align="center">0,98 %</p> </td> <td align="left" valign="middle"> <p align="center">0,80 %</p> </td> <td align="left" valign="middle"> <p align="center">0,77 %</p> </td> <td align="left" valign="middle"> <p align="center">0,59 %</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center"><strong>Total</strong></p> </td> <td align="left" valign="middle"> </td> <td align="left" valign="middle"> <p align="center"><strong>1,10 %</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>1,01 %</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>0,94 %</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>0,70 %</strong></p> </td> </tr> <tr> <td align="left" rowspan="3" valign="middle"> <p align="center">Taux de non-renouvellement des contrats**</p> </td> <td align="left" valign="middle"> <p align="center">Officiers</p> </td> <td align="left" valign="middle"> <p align="center">20,27 %</p> </td> <td align="left" valign="middle"> <p align="center">22,48 %</p> </td> <td align="left" valign="middle"> <p align="center">22,40 %</p> </td> <td align="left" valign="middle"> <p align="center">17,57 %</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center">Sous-officiers</p> </td> <td align="left" valign="middle"> <p align="center">15,61 %</p> </td> <td align="left" valign="middle"> <p align="center">14,92 %</p> </td> <td align="left" valign="middle"> <p align="center">15,84 %</p> </td> <td align="left" valign="middle"> <p align="center">14,44 %</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center">Militaires<br/> du rang</p> </td> <td align="left" valign="middle"> <p align="center">19,23 %</p> </td> <td align="left" valign="middle"> <p align="center">17,92 %</p> </td> <td align="left" valign="middle"> <p align="center">17,19 %</p> </td> <td align="left" valign="middle"> <p align="center">14,17 %</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center"><strong>Total</strong></p> </td> <td align="left" valign="middle"> </td> <td align="left" valign="middle"> <p align="center"><strong>18,21 %</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>17,23 %</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>17,03 %</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>14,37 %</strong></p> </td> </tr> </tbody></table></div>
0.470421
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
250
<p align="center">* Taux de résiliation des contrats = nombre de résiliation/nombre de contrats</p>
0.329557
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
251
<p align="center">** Taux de non-renouvellement des contrats = nombre de non-renouvellement/nombre de contrats avec un terme en N.</p>
0.235769
16
false
false
true
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
252
<p align="center"><em>Source : réponse au questionnaire budgétaire</em></p>
0.398622
16
false
false
true
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
253
<p align="justify">Malgré un manque de recul lié à l'absence de données antérieures à 2014, rendant impossible une analyse sur longue période, entre 2014 et 2016, <strong>une diminution des taux de résiliation (0,94 % en 2016 contre 1,10 % en 2014) et de non-renouvellement des contrats (17,03 % en 2016 contre 18,21 % en 2014) peut être constatée</strong>. Ce phénomène devrait en outre s'amplifier en 2017.</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
254
<p align="justify">Si, selon le ministère des armées, « <em>dans un contexte caractérisé par un niveau d'engagement élevé à l'origine de tensions sur les armées, <strong>ces évolutions traduisent les effets de la politique de fidélisation menée par le ministère ces dernières années</strong> </em>», un tel constat nécessite d'être vérifié dans les années à venir. </p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
255
<p align="justify">En particulier, <strong>ces données générales peuvent masquer des situations très hétérogènes</strong>. Les personnes entendues en audition ont ainsi indiqué à votre rapporteur spécial que <strong>certains métiers sont plus particulièrement confrontés à ce problème de fidélisation</strong> (personnels navigants, mécaniciens aéronautiques, fusiliers-commandos, etc.).</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
256
<p align="justify"><strong>En tout état de cause, les efforts menés ces dernières années par le ministère doivent être poursuivis dans la mesure où, d'une part, comme le relève le Haut comité, la fidélisation « <em>est recherchée par les armées pour rentabiliser les dispositifs de recrutement tout en limitant l'ampleur des recrutements à effectuer</em> »</strong> et, d'autre part, <strong>la formation de ces personnels à un coût qui ne peut être « rentabilisé » que sur plusieurs années</strong>.</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
257
<h5><a name="_Toc495919842"></a><a name="_Toc495920179"></a><a name="_Toc495927444"></a><a name="_Toc495931040"></a><a name="_Toc495931215"></a><a name="_Toc495933461"></a><a name="_Toc495933687"></a><a name="_Toc495935718"></a><a name="_Toc495935738"></a><a name="_Toc495937637"></a><a name="_Toc495937679"></a><a name="_Toc495937710"></a><a name="_Toc495937740"></a><a name="_Toc495939971"></a><a name="_Toc495939991"></a><a name="_Toc495948054"></a><a name="_Toc495948234"></a><a name="_Toc495998927"></a><a name="_Toc495998945"></a><a name="_Toc496000433"></a><a name="_Toc496001134"></a><a name="_Toc496002603"></a><a name="_Toc496005246"></a><a name="_Toc496005668"></a><a name="_Toc496168911"></a><a name="_Toc496199499"></a><a name="_Toc496204115"></a><a name="_Toc496263016"></a><a name="_Toc496269621"></a><a name="_Toc496269642"></a><a name="_Toc496274011"></a><a name="_Toc496275533"></a><a name="_Toc496350261"></a><a name="_Toc496350276"></a><a name="_Toc496427454"></a><a name="_Toc496451788"></a><a name="_Toc496451856"></a><a name="_Toc496451920"></a><a name="_Toc496629954"></a><a name="_Toc496630140"></a><a name="_Toc496696466"></a><a name="_Toc497385135"></a><a name="_Toc497828815"></a><a name="_Toc497828881"></a><a name="_Toc497896752"></a><a name="_Toc497896799"></a><a name="_Toc497896990"></a><a name="_Toc497900957"></a><a name="_Toc499037241"></a><a name="_Toc499120218"></a><a name="_Toc499226452"></a><a name="_Toc499280927"></a><a name="_Toc499286455"></a><a name="toc74"></a><a name="toc75"></a><a name="toc76"></a><a name="toc77"></a>4. Un projet de service national obligatoire dont les contours demeurent flous</h5>
-1
-1
false
false
true
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
258
<p align="justify">Dans son discours sur la défense prononcé le 18 mars 2017, Emmanuel Macron, alors candidat à l'élection présidentielle, appelait à <em>« renforcer le lien armées-nation, en permettant à l'ensemble de notre jeunesse de faire l'expérience de la vie militaire et d'être des acteurs à part entière de l'esprit de défense</em> » sous la forme d'« <strong><em>un service national de durée courte, obligatoire et universel</em> </strong>[...] <strong><em>encadré par les armées et la Gendarmerie nationale</em></strong> » et s'adressant « <em>aux jeunes femmes et hommes aptes de toute une classe d'âge - <strong>soit environ 600 000 jeunes par an </strong></em>». <strong>D'une durée d'un mois</strong>, « <strong><em>ce temps de service militaire universel devra intervenir dans les trois ans suivant le dix-huitième anniversaire de chacun</em> </strong>». </p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
259
<p align="justify">Dans sa réponse au questionnaire de votre rapporteur spécial, le ministère des armées indique que le service national obligatoire « <em>reste un enjeu fort du gouvernement et <strong>a fait à ce jour l'objet de diverses réflexions tant sur le mode opératoire que sur les coûts associés, ces derniers ne préjugeant pas du programme LOLF porteur</strong>. Une mission inter inspections a été diligentée pour établir un bilan des dispositifs existants, proposer des orientations et étudier les problèmes de mise en oeuvre notamment juridiques. Une commission indépendante va être mise en place pour effectuer des propositions. <strong>C'est pourquoi, il n'est pas encore possible de communiquer des informations précises tant sur les modalités d'exécution que sur les éventuelles conséquences budgétaires pour la mission « Défense »</strong></em>. </p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
260
<p align="justify"><strong>Les modalités de mise en place de ce service national restent donc pour le moins floues</strong>, comme l'a reconnu la ministre des armées lors de son audition par votre commission des finances.<strong> </strong></p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
261
<p align="justify">Or <strong>le coût de ce dispositif, hors investissements initiaux, serait compris entre 1,4 milliard d'euros et 1,8 milliard d'euros par an, selon l'Institut Montaigne, et entre 1,5 milliard d'euros et 3 milliards d'euros selon le programme présidentiel</strong>.</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
262
<p align="justify"><strong>Si cette dépense devait être financée sur le périmètre de la mission « Défense », un ajustement de la trajectoire prévue dans le projet de loi de programmation des finances publiques s'avèrerait indispensable et devrait être prise en compte dans la future loi de programmation militaire</strong>.</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
263
<h5><a name="_Toc495935719"></a><a name="_Toc495935739"></a><a name="_Toc495937638"></a><a name="_Toc495937680"></a><a name="_Toc495937711"></a><a name="_Toc495937741"></a><a name="_Toc495939972"></a><a name="_Toc495939992"></a><a name="_Toc495948055"></a><a name="_Toc495948235"></a><a name="_Toc495998928"></a><a name="_Toc495998946"></a><a name="_Toc496000434"></a><a name="_Toc496001135"></a><a name="_Toc496002604"></a><a name="_Toc496005247"></a><a name="_Toc496005669"></a><a name="_Toc496168912"></a><a name="_Toc496199500"></a><a name="_Toc496204116"></a><a name="_Toc496263017"></a><a name="_Toc496269622"></a><a name="_Toc496269643"></a><a name="_Toc496274012"></a><a name="_Toc496275534"></a><a name="_Toc496350262"></a><a name="_Toc496350277"></a><a name="_Toc496427455"></a><a name="_Toc496451789"></a><a name="_Toc496451857"></a><a name="_Toc496451921"></a><a name="_Toc496629955"></a><a name="_Toc496630141"></a><a name="_Toc496696467"></a><a name="_Toc497385136"></a><a name="_Toc497828816"></a><a name="_Toc497828882"></a><a name="_Toc497896753"></a><a name="_Toc497896800"></a><a name="_Toc497896991"></a><a name="_Toc497900958"></a><a name="_Toc499037242"></a><a name="_Toc499120219"></a><a name="_Toc499226453"></a><a name="_Toc499280928"></a><a name="_Toc499286456"></a><a name="toc78"></a><a name="toc79"></a><a name="toc80"></a><a name="toc81"></a>5. Un surcroît de crédits de 1,2 milliard d'euros en faveur des équipements indispensable pour faire face aux phénomènes de surintensité et de suractivité</h5>
-1
-1
false
false
true
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
264
<p align="justify">L'agrégat « équipement » comprend les dépenses consacrées aux opérations d'armement hors dissuasion, à la dissuasion, à l'entretien programmé du matériel, aux petits équipements, aux infrastructures et aux études hors dissuasion.</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
265
<p align="justify">En 2018, <strong>18,5 milliards d'euros seront consacrés aux équipements, contre 17,3 milliards d'euros en 2017</strong> (+ 7 %, soit une augmentation de 1,2 milliard d'euros). <strong>Les crédits consacrés à l'équipement représenteront ainsi 53,7 % des crédits de la mission hors pensions, contre un peu moins de 53 % en 2017</strong>. </p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
266
<p align="center"><strong>Évolution des crédits consacrés à l'équipement</strong></p>
0.389665
16
false
false
true
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
267
<p align="center"><em>(en milliards d'euros et en %)</em></p>
0.434261
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
268
<div align="center"><table border="2" cellpadding="2"><tbody><tr> <td align="left" valign="middle"> <p align="center"><strong> </strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>2017</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>2018</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>Évolution<br/>(en valeur)</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>Évolution<br/>(en %)</strong></p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center">Opérations d'armement hors dissuasion</p> </td> <td align="left" valign="middle"> <p align="left">6,69</p> </td> <td align="left" valign="middle"> <p align="left">6,79</p> </td> <td align="left" valign="middle"> <p align="left">0,1</p> </td> <td align="left" valign="middle"> <p align="center">1,49 %</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center">Dissuasion</p> </td> <td align="left" valign="middle"> <p align="left">3,87</p> </td> <td align="left" valign="middle"> <p align="left">4,04</p> </td> <td align="left" valign="middle"> <p align="left">0,17</p> </td> <td align="left" valign="middle"> <p align="center">4,39 %</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center">Entretien programmé du matériel</p> </td> <td align="left" valign="middle"> <p align="left">3,43</p> </td> <td align="left" valign="middle"> <p align="left">3,88</p> </td> <td align="left" valign="middle"> <p align="left">0,45</p> </td> <td align="left" valign="middle"> <p align="center">13,12 %</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center">Petits équipements</p> </td> <td align="left" valign="middle"> <p align="left">1,56</p> </td> <td align="left" valign="middle"> <p align="left">1,67</p> </td> <td align="left" valign="middle"> <p align="left">0,11</p> </td> <td align="left" valign="middle"> <p align="center">7,05 %</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center">Infrastructures</p> </td> <td align="left" valign="middle"> <p align="left">1,17</p> </td> <td align="left" valign="middle"> <p align="left">1,5</p> </td> <td align="left" valign="middle"> <p align="left">0,33</p> </td> <td align="left" valign="middle"> <p align="center">28,21 %</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center">Études hors dissuasion</p> </td> <td align="left" valign="middle"> <p align="left">0,58</p> </td> <td align="left" valign="middle"> <p align="left">0,59</p> </td> <td align="left" valign="middle"> <p align="left">0,01</p> </td> <td align="left" valign="middle"> <p align="center">1,72 %</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center"><strong>Total</strong></p> </td> <td align="left" valign="middle"> <p align="left"><strong>17,3</strong></p> </td> <td align="left" valign="middle"> <p align="left"><strong>18,47</strong></p> </td> <td align="left" valign="middle"> <p align="left"><strong>1,17</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>6,76 %</strong></p> </td> </tr> </tbody></table></div>
0.509163
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
269
<p align="center"><em>Source : commission des finances du Sénat, d'après des données ministère des armées</em></p>
0.309283
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
270
<h6><a name="_Toc496168913"></a><a name="_Toc496269623"></a><a name="_Toc497828817"></a><a name="_Toc497828883"></a><a name="_Toc497896801"></a><a name="_Toc497896992"></a><a name="_Toc497900959"></a><a name="_Toc499037243"></a><a name="_Toc499120220"></a><a name="_Toc499226454"></a><a name="_Toc499280929"></a><a name="_Toc499286457"></a><a name="toc82"></a><a name="toc83"></a><a name="toc84"></a><a name="toc85"></a>a) Des prévisions de livraisons et de commandes de matériels qui répondent aux besoins des forces mais dont il conviendra de s'assurer de la réalisation effective</h6>
-1
-1
false
false
true
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
271
<p align="justify">Les principales livraisons et commandes de matériels prévues en 2018 sont rappelées dans les tableaux ci-après.</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
272
<p align="center"><strong>Les principales livraisons et commandes en 2018<br/>par systèmes de forces</strong></p>
0.385183
16
false
false
true
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
273
<p align="center"><em>Source : ministère des armées</em></p>
0.433447
16
false
false
true
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
274
<p align="justify">Les personnes entendues en audition ont indiqué que <strong>cette programmation correspond globalement aux besoins exprimés par les armées</strong>, sous réserve que celle-ci soit effectivement respectée. <strong>Le taux de réalisation des principaux équipements atteignait ainsi en 2016 67,2 %, soit un niveau inférieur à l'objectif inscrit dans le projet annuel de performances pour 2016 (85 %) et aux niveaux atteints en 2013, 2014 et 2015 (respectivement 75,4 %, 81,3 % et 67,2 %)</strong>.</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
275
<p align="center"><strong>Taux de réalisation des principaux équipements</strong></p>
0.387071
16
false
false
true
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
276
<p align="center"><em>(en %)</em></p>
0.485037
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
277
<div align="center"><table border="2" cellpadding="2"><tbody><tr> <td align="left" rowspan="3" valign="top"> </td> <td align="left" colspan="8" valign="top"> <p align="center"><strong>Réalisations</strong></p> </td> <td align="left" colspan="3" valign="top"> <p align="center"><strong>Prévisions</strong></p> </td> <td align="left" valign="top"> <p align="center"><strong>Cible</strong></p> </td> </tr> <tr> <td align="left" rowspan="2" valign="middle"> <p align="center"><strong>2009</strong></p> </td> <td align="left" rowspan="2" valign="middle"> <p align="center"><strong>2010</strong></p> </td> <td align="left" rowspan="2" valign="middle"> <p align="center"><strong>2011</strong></p> </td> <td align="left" rowspan="2" valign="middle"> <p align="center"><strong>2012</strong></p> </td> <td align="left" rowspan="2" valign="middle"> <p align="center"><strong>2013</strong></p> </td> <td align="left" rowspan="2" valign="middle"> <p align="center"><strong>2014</strong></p> </td> <td align="left" rowspan="2" valign="middle"> <p align="center"><strong>2015</strong></p> </td> <td align="left" rowspan="2" valign="middle"> <p align="center"><strong>2016</strong></p> </td> <td align="left" colspan="2" valign="top"> <p align="center"><strong>2017</strong></p> </td> <td align="left" rowspan="2" valign="middle"> <p align="center"><strong>2018</strong></p> </td> <td align="left" rowspan="2" valign="middle"> <p align="center"><strong>2019</strong></p> </td> </tr> <tr> <td align="left" valign="top"> <p align="center"><strong><em>PLF</em></strong></p> </td> <td align="left" valign="top"> <p align="center"><strong>Actualisation</strong></p> </td> </tr> <tr> <td align="left" valign="top"> <p align="left"><strong>Dissuasion</strong></p> </td> <td align="left" valign="middle"> <p align="center">67,2</p> </td> <td align="left" valign="middle"> <p align="center">100,0</p> </td> <td align="left" valign="middle"> <p align="center">100,0</p> </td> <td align="left" valign="middle"> <p align="center">100,0</p> </td> <td align="left" valign="middle"> <p align="center">100,0</p> </td> <td align="left" valign="middle"> <p align="center">100,0</p> </td> <td align="left" valign="middle"> <p align="center">100,0</p> </td> <td align="left" valign="middle"> <p align="center">100,0</p> </td> <td align="left" valign="middle"> <p align="center">90</p> </td> <td align="left" valign="middle"> <p align="center">90</p> </td> <td align="left" valign="middle"> <p align="center">90</p> </td> <td align="left" valign="middle"> <p align="center">90</p> </td> </tr> <tr> <td align="left" valign="top"> <p align="left"><strong>Commandement et</strong></p> <p align="left"><strong>maîtrise de l'information</strong></p> </td> <td align="left" valign="middle"> <p align="center">57,3</p> </td> <td align="left" valign="middle"> <p align="center">64,7</p> </td> <td align="left" valign="middle"> <p align="center">64,7</p> </td> <td align="left" valign="middle"> <p align="center">69,8</p> </td> <td align="left" valign="middle"> <p align="center">65,7</p> </td> <td align="left" valign="middle"> <p align="center">74,5</p> </td> <td align="left" valign="middle"> <p align="center">71,6</p> </td> <td align="left" valign="middle"> <p align="center">49,7</p> </td> <td align="left" valign="middle"> <p align="center">80</p> </td> <td align="left" valign="middle"> <p align="center">80</p> </td> <td align="left" valign="middle"> <p align="center">80</p> </td> <td align="left" valign="middle"> <p align="center">80</p> </td> </tr> <tr> <td align="left" valign="top"> <p align="left"><strong>Projection- mobilité-soutien</strong></p> </td> <td align="left" valign="middle"> <p align="center">53,8</p> </td> <td align="left" valign="middle"> <p align="center">72,9</p> </td> <td align="left" valign="middle"> <p align="center">72,9</p> </td> <td align="left" valign="middle"> <p align="center">58,7</p> </td> <td align="left" valign="middle"> <p align="center">75,7</p> </td> <td align="left" valign="middle"> <p align="center">94,0</p> </td> <td align="left" valign="middle"> <p align="center">85,0</p> </td> <td align="left" valign="middle"> <p align="center">93</p> </td> <td align="left" valign="middle"> <p align="center">80</p> </td> <td align="left" valign="middle"> <p align="center">80</p> </td> <td align="left" valign="middle"> <p align="center">80</p> </td> <td align="left" valign="middle"> <p align="center">80</p> </td> </tr> <tr> <td align="left" valign="top"> <p align="left"><strong>Engagement et combat</strong></p> </td> <td align="left" valign="middle"> <p align="center">78,1</p> </td> <td align="left" valign="middle"> <p align="center">57,8</p> </td> <td align="left" valign="middle"> <p align="center">57,8</p> </td> <td align="left" valign="middle"> <p align="center">63,6</p> </td> <td align="left" valign="middle"> <p align="center">87,9</p> </td> <td align="left" valign="middle"> <p align="center">79,4</p> </td> <td align="left" valign="middle"> <p align="center">69,8</p> </td> <td align="left" valign="middle"> <p align="center">84,4</p> </td> <td align="left" valign="middle"> <p align="center">85</p> </td> <td align="left" valign="middle"> <p align="center">85</p> </td> <td align="left" valign="middle"> <p align="center">85</p> </td> <td align="left" valign="middle"> <p align="center">85</p> </td> </tr> <tr> <td align="left" valign="top"> <p align="left"><strong>Protection et sauvegarde</strong></p> </td> <td align="left" valign="middle"> <p align="center">52,1</p> </td> <td align="left" valign="middle"> <p align="center">28,9</p> </td> <td align="left" valign="middle"> <p align="center">28,9</p> </td> <td align="left" valign="middle"> <p align="center">56,3</p> </td> <td align="left" valign="middle"> <p align="center">66,7</p> </td> <td align="left" valign="middle"> <p align="center">90,8</p> </td> <td align="left" valign="middle"> <p align="center">78,0</p> </td> <td align="left" valign="middle"> <p align="center">66,7</p> </td> <td align="left" valign="middle"> <p align="center">85</p> </td> <td align="left" valign="middle"> <p align="center">85</p> </td> <td align="left" valign="middle"> <p align="center">85</p> </td> <td align="left" valign="middle"> <p align="center">85</p> </td> </tr> <tr> <td align="left" valign="top"> <p align="left"><strong>Taux moyen pour les opérations d'armement principales</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>63,5</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>63,5</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>63,5</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>65,2</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>75,4</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>81,3</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>75,4</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>67,2</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>85</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>85</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>85</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>85</strong></p> </td> </tr> </tbody></table></div>
0.53087
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
278
<p align="center"><em>Source : réponse au questionnaire budgétaire</em></p>
0.398622
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
279
<p align="justify"><strong>Le projet annuel de performances pour 2018 maintient un objectif ambitieux fixé à 85 %, bien que celui-ci n'ait jamais été atteint depuis 2009</strong>. </p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
280
<p align="justify">Par ailleurs, <strong>il conviendra de mesurer l'impact de l'annulation de 850 millions d'euros en CP intervenue en juillet 2017 sur le programme 146 « Équipement des forces » sur les livraisons et les commandes en 2018 et au-delà</strong>.</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
281
<p align="justify">Votre rapporteur spécial sera par conséquent particulièrement attentif à l'évolution de cet indicateur lors de l'examen des projets de loi de règlement 2017 et 2018.</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
282
<h6><a name="_Toc495909315"></a><a name="_Toc496168914"></a><a name="_Toc496269624"></a><a name="_Toc497828818"></a><a name="_Toc497828884"></a><a name="_Toc497896802"></a><a name="_Toc497896993"></a><a name="_Toc497900960"></a><a name="_Toc499037244"></a><a name="_Toc499120221"></a><a name="_Toc499226455"></a><a name="_Toc499280930"></a><a name="_Toc499286458"></a><a name="toc86"></a><a name="toc87"></a><a name="toc88"></a><a name="toc89"></a>b) Une hausse de 450 millions d'euros des crédits consacrés à l'entretien programmé des matériels bienvenue dans un contexte d'usure accélérée des matériels</h6>
-1
-1
false
false
true
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
283
<p align="justify">Les matériels utilisés en opération sont soumis à <strong>deux phénomènes</strong> : <strong>la surintensité, liée aux conditions d'emploi plus difficiles qu'en métropole, et la suractivité, correspondant à une utilisation au-delà des prévisions des matériels</strong>. Ces deux phénomènes sont à l'origine d'<strong>une usure accélérée nécessitant un entretien plus fréquent</strong>.</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
284
<p align="justify">Le présent projet de loi de finances prévoit <strong>une augmentation des crédits consacrés à l'entretien programmé des matériels, qui passeront de</strong> <strong>3,43 milliards d'euros en 2017 à 3,88 milliards d'euros en 2018, soit une hausse de 450 millions d'euros (+ 13 %)</strong>.</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
285
<p align="justify"><strong>Cette hausse</strong>, indispensable pour permettre aux forces de mener les opérations dans lesquelles elles sont engagées, tant à l'extérieur qu'à l'intérieur de nos frontières, et de s'entraîner,<strong> fait suite à une première enveloppe de 500 millions d'euros supplémentaires </strong>prévue lors de l'actualisation de la loi de programmation militaire intervenue en 2015 et <strong>répartie à hauteur de 250 millions d'euros en 2016 et 250 millions d'euros en 2017</strong>.</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
286
<p align="justify">Selon les informations transmises par le ministère des armées à votre rapporteur spécial, <strong>l'intégralité des 500 millions d'euros a été engagée entre 2016 et 2017</strong>, selon la répartition figurant dans le tableau ci-après.</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
287
<p align="center"><strong>État des engagements des crédits supplémentaires consacrés<br/> à l'entretien programmé des matériels en 2016 et 2017</strong></p>
0.357829
16
false
false
true
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
288
<p align="center"><em>(en millions d'euros)</em></p>
0.454264
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
289
<div align="center"><table border="2" cellpadding="2"><tbody><tr> <td align="left" valign="middle"> <p align="center"><strong>Armée</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>Milieu </strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>Matériels</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>AE prévues </strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>AE inscrites en LFI 2016</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>AE inscrites en LFI 2017</strong></p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center">Air</p> </td> <td align="left" valign="middle"> <p align="center">Aérien</p> </td> <td align="left" valign="middle"> <p align="center">C160 C130</p> </td> <td align="left" valign="middle"> <p align="center">154,08</p> </td> <td align="left" valign="middle"> <p align="center">75,44</p> </td> <td align="left" valign="middle"> <p align="center">78,64</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center">Air</p> </td> <td align="left" valign="middle"> <p align="center">Aérien</p> </td> <td align="left" valign="middle"> <p align="center">Rafale</p> </td> <td align="left" valign="middle"> <p align="center">36,88</p> </td> <td align="left" valign="middle"> <p align="center">18,05</p> </td> <td align="left" valign="middle"> <p align="center">18,82</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center">Air</p> </td> <td align="left" valign="middle"> <p align="center">Aérien</p> </td> <td align="left" valign="middle"> <p align="center">M2000</p> </td> <td align="left" valign="middle"> <p align="center">3,5</p> </td> <td align="left" valign="middle"> <p align="center">1,71</p> </td> <td align="left" valign="middle"> <p align="center">1,79</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center">Marine</p> </td> <td align="left" valign="middle"> <p align="center">Aérien</p> </td> <td align="left" valign="middle"> <p align="center">C135</p> </td> <td align="left" valign="middle"> <p align="center">20</p> </td> <td align="left" valign="middle"> <p align="center">9,79</p> </td> <td align="left" valign="middle"> <p align="center">10,21</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center">Marine</p> </td> <td align="left" valign="middle"> <p align="center">Aérien</p> </td> <td align="left" valign="middle"> <p align="center">ATL2 E2C</p> </td> <td align="left" valign="middle"> <p align="center">43,6</p> </td> <td align="left" valign="middle"> <p align="center">17,16</p> </td> <td align="left" valign="middle"> <p align="center">26,44</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center">Marine</p> </td> <td align="left" valign="middle"> <p align="center">Aérien</p> </td> <td align="left" valign="middle"> <p align="center">Lynx Al3</p> </td> <td align="left" valign="middle"> <p align="center">17,8</p> </td> <td align="left" valign="middle"> <p align="center">7,01</p> </td> <td align="left" valign="middle"> <p align="center">10,8</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center">Marine</p> </td> <td align="left" valign="middle"> <p align="center">Aérien</p> </td> <td align="left" valign="middle"> <p align="center">NH 90</p> </td> <td align="left" valign="middle"> <p align="center">4</p> </td> <td align="left" valign="middle"> <p align="center">1,57</p> </td> <td align="left" valign="middle"> <p align="center">2,43</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center">Marine</p> </td> <td align="left" valign="middle"> <p align="center">Aérien</p> </td> <td align="left" valign="middle"> <p align="center">Rafale</p> </td> <td align="left" valign="middle"> <p align="center">10,8</p> </td> <td align="left" valign="middle"> <p align="center">4,25</p> </td> <td align="left" valign="middle"> <p align="center">6,55</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center">Marine</p> </td> <td align="left" valign="middle"> <p align="center">Naval</p> </td> <td align="left" valign="middle"> <p align="center">SNA</p> </td> <td align="left" valign="middle"> <p align="center">28</p> </td> <td align="left" valign="middle"> <p align="center">21</p> </td> <td align="left" valign="middle"> <p align="center">7</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center">Marine</p> </td> <td align="left" valign="middle"> <p align="center">Naval</p> </td> <td align="left" valign="middle"> <p align="center">PHM CMT Patrouilleurs</p> </td> <td align="left" valign="middle"> <p align="center">12</p> </td> <td align="left" valign="middle"> <p align="center">9</p> </td> <td align="left" valign="middle"> <p align="center">3</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center">Terre</p> </td> <td align="left" valign="middle"> <p align="center">Terrestre</p> </td> <td align="left" valign="middle"> <p align="center">VBL AMX10 ERC90 VAB</p> </td> <td align="left" valign="middle"> <p align="center">93,12</p> </td> <td align="left" valign="middle"> <p align="center">46,88</p> </td> <td align="left" valign="middle"> <p align="center">46,24</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center">Terre</p> </td> <td align="left" valign="middle"> <p align="center">Terrestre</p> </td> <td align="left" valign="middle"> <p align="center">Camions</p> </td> <td align="left" valign="middle"> <p align="center">34</p> </td> <td align="left" valign="middle"> <p align="center">17,12</p> </td> <td align="left" valign="middle"> <p align="center">16,88</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center">Terre</p> </td> <td align="left" valign="middle"> <p align="center">Aérien</p> </td> <td align="left" valign="middle"> <p align="center">Tigre</p> </td> <td align="left" valign="middle"> <p align="center">10,57</p> </td> <td align="left" valign="middle"> <p align="center">5,26</p> </td> <td align="left" valign="middle"> <p align="center">5,31</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center">Terre</p> </td> <td align="left" valign="middle"> <p align="center">Aérien</p> </td> <td align="left" valign="middle"> <p align="center">NH 90</p> </td> <td align="left" valign="middle"> <p align="center">3,39</p> </td> <td align="left" valign="middle"> <p align="center">1,69</p> </td> <td align="left" valign="middle"> <p align="center">1,7</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center">Terre</p> </td> <td align="left" valign="middle"> <p align="center">Aérien</p> </td> <td align="left" valign="middle"> <p align="center">Cougar Puma</p> </td> <td align="left" valign="middle"> <p align="center">17,03</p> </td> <td align="left" valign="middle"> <p align="center">8,47</p> </td> <td align="left" valign="middle"> <p align="center">8,56</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center">Terre</p> </td> <td align="left" valign="middle"> <p align="center">Aérien</p> </td> <td align="left" valign="middle"> <p align="center">Gazelle</p> </td> <td align="left" valign="middle"> <p align="center">11,21</p> </td> <td align="left" valign="middle"> <p align="center">5,58</p> </td> <td align="left" valign="middle"> <p align="center">5,63</p> </td> </tr> <tr> <td align="left" valign="middle"> </td> <td align="left" valign="middle"> </td> <td align="left" valign="middle"> <p align="center"><strong>Total</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>500</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>250</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>250</strong></p> </td> </tr> </tbody></table></div>
0.244325
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
290
<p align="center"><em>Source : réponse au questionnaire de votre rapporteur spécial</em></p>
0.361746
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
291
<p align="justify">Le présent projet de loi de finances comprend ainsi 100 millions d'euros en CP destinés au paiement des premières factures.</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
292
<h6><a name="_Toc495909316"></a><a name="_Toc496168915"></a><a name="_Toc496269625"></a><a name="_Toc497828819"></a><a name="_Toc497828885"></a><a name="_Toc497896803"></a><a name="_Toc497896994"></a><a name="_Toc497900961"></a><a name="_Toc499037245"></a><a name="_Toc499120222"></a><a name="_Toc499226456"></a><a name="_Toc499280931"></a><a name="_Toc499286459"></a><a name="toc90"></a><a name="toc91"></a><a name="toc92"></a><a name="toc93"></a>c) Un enjeu en matière de disponibilité opérationnelle</h6>
-1
-1
false
false
true
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
293
<p align="justify"><strong>L'entretien et la régénération des matériels constituent des enjeux cruciaux dans un contexte où certains équipements affichent des taux de disponibilité très inférieurs aux besoins</strong>.</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
294
<p align="center"><strong>Disponibilité des matériels par rapport aux exigences<br/>des contrats opérationnels</strong></p>
0.374181
16
false
false
true
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
295
<p align="center"><em>(en %)</em></p>
0.485037
16
false
false
true
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
296
<p align="center"><em>Source : projet annuel de performances pour 2018</em></p>
0.387614
16
false
false
true
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
297
<p align="justify">S'agissant de l'armée de terre, le projet annuel de performances pour 2018 note que « <em>dans ce contexte de suremploi des matériels, induisant une augmentation du coût d'entretien, <strong>malgré une hausse notable des ressources 2018 mais dont les effets sont différés,</strong> <strong>les objectifs de disponibilité technique opérationnelle (DTO) sont revus à la baisse pour tous les équipements sauf pour les VBCI (véhicules blindés de combat d'infanterie) qui restent stables</strong> </em>». La disponibilité des hélicoptères apparaît toujours inquiétante (58 % pour les hélicoptères de manoeuvre et 66 % pour les hélicoptères d'attaque et de reconnaissance).</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
298
<p align="justify">Les matériels de la marine nationale affichent des taux globalement satisfaisants concernant les sous-marins nucléaires d'attaque (88 %) et les autres bâtiments (80 %). La disponibilité technique frégates est en revanche revue à la baisse (- 12 points par rapport à la prévision inscrite dans le projet annuel de performances pour 2017), « <em>suite à des problèmes de lignes propulsives <strong>de bâtiments vieillissants</strong> (frégates anti-sous-marines, frégates antiaériennes). En 2018, la situation ne devrait pas évoluer, en raison d'<strong>un parc trop faible et vieillissant pour assurer la pleine disponibilité des moyens honorant les contrats opérationnels </strong></em>». De même, le taux de disponibilité de la composante « hélicoptères » apparaît très faible du fait de « <em>la mauvaise performance du parc Caïman, notamment due au manque de maturité de son système de soutien, par la vétusté des parcs Alouette et Lynx, ainsi que par les difficultés de soutien industriel sur le parc Panther. La prévision 2018 et la cible 2019 sont en légère baisse, du fait du non remplacement des Alouette 316 et de la réalisation de révisions générales sur Panther, et ce malgré une amélioration attendue sur Caïman</em> ».</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
299
<p align="justify">Les taux de disponibilité technique opérationnelle des matériels de l'armée de l'air apparaissent globalement satisfaisants. Certains matériels doivent cependant faire l'objet d'une vigilance accrue, en particulier les avions de transport tactique et les avions d'appui opérationnel (en particulier les avions ravitailleurs C135 dont la flotte est vieillissante).</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
300
<p align="justify">Au total, <strong>la hausse des crédits consacrés aux équipements devrait permettre de redonner des marges de manoeuvre. Elle devra cependant aussi s'accompagner de la poursuite des efforts entrepris ces dernières années en matière d'amélioration du maintien en condition opérationnelle (MCO)</strong>.</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
301
<h5><a name="_Toc495939973"></a><a name="_Toc495939993"></a><a name="_Toc495948056"></a><a name="_Toc495948236"></a><a name="_Toc495998929"></a><a name="_Toc495998947"></a><a name="_Toc496000435"></a><a name="_Toc496001136"></a><a name="_Toc496002605"></a><a name="_Toc496005248"></a><a name="_Toc496005670"></a><a name="_Toc496168916"></a><a name="_Toc496199501"></a><a name="_Toc496204117"></a><a name="_Toc496263018"></a><a name="_Toc496269626"></a><a name="_Toc496269644"></a><a name="_Toc496274013"></a><a name="_Toc496275535"></a><a name="_Toc496350263"></a><a name="_Toc496350278"></a><a name="_Toc496427456"></a><a name="_Toc496451790"></a><a name="_Toc496451858"></a><a name="_Toc496451922"></a><a name="_Toc496629956"></a><a name="_Toc496630142"></a><a name="_Toc496696468"></a><a name="_Toc497385137"></a><a name="_Toc497828820"></a><a name="_Toc497828886"></a><a name="_Toc497896754"></a><a name="_Toc497896804"></a><a name="_Toc497896995"></a><a name="_Toc497900962"></a><a name="_Toc499037246"></a><a name="_Toc499120223"></a><a name="_Toc499226457"></a><a name="_Toc499280932"></a><a name="_Toc499286460"></a><a name="_Toc495657132"></a><a name="toc94"></a><a name="toc95"></a><a name="toc96"></a><a name="toc97"></a>6. Un effort en faveur de l'immobilier qui devra se poursuivre dans les années à venir</h5>
-1
-1
false
false
true
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
302
<p align="justify"><strong>En 2018, les crédits consacrés à la politique immobilière du ministère des armées s'élèveront à 2,2 milliards d'euros en AE et 1,8 milliard d'euros en CP, soit une hausse de 414 millions d'euros en AE</strong> (+ 19 %) <strong>et de 421 millions d'euros en CP</strong> (+ 24 %).</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
303
<p align="justify">Hors dissuasion, les dépenses immobilières atteindront 2 milliards d'euros en AE (+ 418 millions d'euros) et 1,7 milliard d'euros en CP (+ 393 millions d'euros en CP).</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
304
<p align="center"><strong>Évolution des crédits totaux de la politique immobilière <br/>entre 2015 et 2017</strong></p>
0.368772
16
false
false
true
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
305
<p align="right"><em>(en millions d'euros et en %)</em></p>
0.866884
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
306
<div align="right"><table border="2" cellpadding="2"><tbody><tr> <td align="left" rowspan="3" valign="middle"> <p align="center"><strong> </strong></p> </td> <td align="left" colspan="2" rowspan="2" valign="middle"> <p align="center"><strong>Exécution 2015</strong></p> </td> <td align="left" colspan="2" rowspan="2" valign="middle"> <p align="center"><strong>Exécution 2016</strong></p> </td> <td align="left" colspan="2" rowspan="2" valign="middle"> <p align="center"><strong>LFI 2017</strong></p> </td> <td align="left" colspan="6" valign="middle"> <p align="center"><strong>Prévision 2018</strong></p> </td> </tr> <tr> <td align="left" colspan="3" valign="middle"> <p align="center"><strong>AE</strong></p> </td> <td align="left" colspan="3" valign="middle"> <p align="center"><strong>CP</strong></p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center"><strong>AE</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>CP</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>AE</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>CP</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>AE</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>CP</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>Montant AE prévu en PLF</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>Évolution 2018/2017<br/>(en valeur)</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>Évolution 2018/2017<br/>(en %)</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>Montant CP prévu en PLF</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>Évolution 2018/2017<br/>(en valeur)</strong></p> </td> <td align="left" valign="middle"> <p align="center"><strong>Évolution 2018/2017<br/>(en %)</strong></p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="left">Dissuasion</p> </td> <td align="left" valign="middle"> <p align="right">85</p> </td> <td align="left" valign="middle"> <p align="right">95</p> </td> <td align="left" valign="middle"> <p align="right">116</p> </td> <td align="left" valign="middle"> <p align="right">77</p> </td> <td align="left" valign="middle"> <p align="right">130</p> </td> <td align="left" valign="middle"> <p align="right">86</p> </td> <td align="left" valign="middle"> <p align="right">126</p> </td> <td align="left" valign="middle"> <p align="right">- 4</p> </td> <td align="left" valign="middle"> <p align="right">- 3,2 %</p> </td> <td align="left" valign="middle"> <p align="right">114</p> </td> <td align="left" valign="middle"> <p align="right">28</p> </td> <td align="left" valign="middle"> <p align="right">24,6 %</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="left">Infrastructure de défense</p> </td> <td align="left" valign="middle"> <p align="right">1 259</p> </td> <td align="left" valign="middle"> <p align="right">907</p> </td> <td align="left" valign="middle"> <p align="right">1 254</p> </td> <td align="left" valign="middle"> <p align="right">961</p> </td> <td align="left" valign="middle"> <p align="right">1 324</p> </td> <td align="left" valign="middle"> <p align="right">975</p> </td> <td align="left" valign="middle"> <p align="right">1 732</p> </td> <td align="left" valign="middle"> <p align="right">408</p> </td> <td align="left" valign="middle"> <p align="right">23,6 %</p> </td> <td align="left" valign="middle"> <p align="right">1 362</p> </td> <td align="left" valign="middle"> <p align="right">387</p> </td> <td align="left" valign="middle"> <p align="right">28,4 %</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="left">Fonctionnement et activités spécifiques</p> </td> <td align="left" valign="middle"> <p align="right">352</p> </td> <td align="left" valign="middle"> <p align="right">308</p> </td> <td align="left" valign="middle"> <p align="right">315</p> </td> <td align="left" valign="middle"> <p align="right">312</p> </td> <td align="left" valign="middle"> <p align="right">295</p> </td> <td align="left" valign="middle"> <p align="right">299</p> </td> <td align="left" valign="middle"> <p align="right">305</p> </td> <td align="left" valign="middle"> <p align="right">10</p> </td> <td align="left" valign="middle"> <p align="right">3,3 %</p> </td> <td align="left" valign="middle"> <p align="right">305</p> </td> <td align="left" valign="middle"> <p align="right">6</p> </td> <td align="left" valign="middle"> <p align="right">2,0 %</p> </td> </tr> <tr> <td align="left" valign="middle"> <p align="center"><strong>Total</strong></p> </td> <td align="left" valign="middle"> <p align="right"><strong>1 695</strong></p> </td> <td align="left" valign="middle"> <p align="right"><strong>1 310</strong></p> </td> <td align="left" valign="middle"> <p align="right"><strong>1 685</strong></p> </td> <td align="left" valign="middle"> <p align="right"><strong>1 350</strong></p> </td> <td align="left" valign="middle"> <p align="right"><strong>1 749</strong></p> </td> <td align="left" valign="middle"> <p align="right"><strong>1 360</strong></p> </td> <td align="left" valign="middle"> <p align="right"><strong>2 163</strong></p> </td> <td align="left" valign="middle"> <p align="right"><strong>414</strong></p> </td> <td align="left" valign="middle"> <p align="right"><strong>19,1 %</strong></p> </td> <td align="left" valign="middle"> <p align="right"><strong>1 781</strong></p> </td> <td align="left" valign="middle"> <p align="right"><strong>421</strong></p> </td> <td align="left" valign="middle"> <p align="right"><strong>23,6 %</strong></p> </td> </tr> </tbody></table></div>
0.184836
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
307
<p align="center"><em>Source : commission des finances du Sénat, d'après les réponses au questionnaire budgétaire</em></p>
0.293121
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
308
<h6><a name="_Toc496168917"></a><a name="_Toc496269627"></a><a name="_Toc497828821"></a><a name="_Toc497828887"></a><a name="_Toc497896805"></a><a name="_Toc497896996"></a><a name="_Toc497900963"></a><a name="_Toc499037247"></a><a name="_Toc499120224"></a><a name="_Toc499226458"></a><a name="_Toc499280933"></a><a name="_Toc499286461"></a><a name="toc98"></a><a name="toc99"></a><a name="toc100"></a><a name="toc101"></a>a) Des besoins en infrastructure liés à l'accueil des nouveaux équipements globalement satisfaits</h6>
-1
-1
false
false
true
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
309
<p align="justify"><strong>Le lancement d'importants programmes d'équipements ces dernières années </strong>- acquisition de sous-marins nucléaires d'attaque de type Barracuda en remplacement des Rubis, de frégates multi-missions (FREMM), d'A400M, remplacement des VAB (véhicules de l'avant blindé) par 2 080 VBMR (véhicules blindé multi-rôles), montée en puissance de la flotte Rafale, etc. - s'est traduit par des besoins accrus en matière d'infrastructures d'accueil et de soutien.</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
310
<p align="justify"><strong>La liste des principaux programmes d'infrastructure adossés à des programmes d'acquisition d'armements majeurs</strong> figure dans le tableau ci-après.</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
311
<p align="center"><strong>Principales opérations d'infrastructure <br/>liées à l'accueil de nouveaux équipements</strong></p>
0.407514
16
false
false
true
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
312
<p align="center"><img alt="" src="l17-108-3915.gif"/><em>Source : réponse au questionnaire budgétaire</em></p>
0.398622
16
false
false
true
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
313
<p align="justify"><strong>En 2018, 400 millions d'euros seront consacrés aux programmes majeurs d'infrastructure, soit une augmentation de 7 % par rapport à la loi de finances pour 2017</strong> (373 millions d'euros).</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
314
<p align="justify">Lors de son contrôle budgétaire sur le parc immobilier des armées, votre rapporteur spécial a pu constater que <strong>le niveau de crédits consacrés à ces opérations, considérées comme prioritaires par le ministère des armées, répond globalement aux besoins</strong>. </p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
315
<p align="justify">Hormis quelques retards, concernant par exemple la phase 1 des travaux destinés à préparer l'accueil du sous-marin nucléaire d'attaque « Suffren », le calendrier de réalisation de ces infrastructures est globalement respecté.</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
316
<h6><a name="_Toc496168918"></a><a name="_Toc496269628"></a><a name="_Toc497828822"></a><a name="_Toc497828888"></a><a name="_Toc497896806"></a><a name="_Toc497896997"></a><a name="_Toc497900964"></a><a name="_Toc499037248"></a><a name="_Toc499120225"></a><a name="_Toc499226459"></a><a name="_Toc499280934"></a><a name="_Toc499286462"></a><a name="toc102"></a><a name="toc103"></a><a name="toc104"></a><a name="toc105"></a>b) Des crédits consacrés à l'entretien et à la maintenance en augmentation mais dont le niveau ne devrait pas permettre de répondre à l'ensemble des besoins </h6>
-1
-1
false
false
true
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
317
<p align="justify">Dans son rapport sur l'immobilier des armées précité, votre rapporteur spécial relevait que, <strong>hors programmes destinés à l'accueil et au soutien des programmes d'équipements, « <em>le contexte budgétaire contraint auquel a été soumis le ministère des armées l'a conduit à reporter voire annuler certaines opérations concernant des infrastructures considérées comme moins stratégiques, telles que les équipements de la vie quotidienne</em></strong><em> (infrastructures sportives, hébergement, restauration, etc.), et <strong>à accepter d'en sacrifier la maintenance, les laissant se détériorer au fil du temps</strong> </em>».<strong> </strong></p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
318
<p align="justify">Le présent projet de loi de finances prévoit un effort supplémentaire, s'inscrivant dans le cadre du « Plan famille », au profit de l'entretien et de la maintenance des infrastructures, en particulier celles de la vie courante.</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
319
<p align="justify"><strong>Les crédits consacrés à l'entretien des infrastructures devraient ainsi atteindre 333 millions d'euros en 2018</strong> (+ 162,5 millions d'euros par rapport à 2017).</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
320
<p align="justify">Par ailleurs, <strong>132 millions d'euros seront consacrés aux infrastructures de soutien commun et de casernement</strong>, soit un effort s'élevant à 70 millions d'euros.</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
321
<p align="justify">Si la prise en compte des besoins en matière d'infrastructures du quotidien était nécessaire, ainsi que l'ont rappelé les personnes entendues par votre rapporteur spécial, il apparaît indispensable que la poursuite de cet effort soit inscrite dans la future loi de programmation militaire.</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
322
<p align="justify"><strong>En effet, l'investissement nécessaire à la remise à un niveau de risque considéré comme acceptable de l'ensemble du patrimoine des armées est estimé à un montant compris entre 2,5 milliards d'euros et 3 milliards d'euros. En l'absence d'inflexion durable, ce montant serait doublé en dix ans.</strong></p>
0.005556
16
false
false
true
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
323
<h6><a name="_Toc496168919"></a><a name="_Toc496269629"></a><a name="_Toc497828823"></a><a name="_Toc497828889"></a><a name="_Toc497896807"></a><a name="_Toc497896998"></a><a name="_Toc497900965"></a><a name="_Toc499037249"></a><a name="_Toc499120226"></a><a name="_Toc499226460"></a><a name="_Toc499280935"></a><a name="_Toc499286463"></a><a name="toc106"></a><a name="toc107"></a><a name="toc108"></a><a name="toc109"></a>c) Des crédits complétés par des recettes exceptionnelles issues de cessions immobilières dont le montant apparaît incertain</h6>
-1
-1
false
false
true
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
324
<p align="justify">Ainsi que l'a déjà indiqué votre rapporteur spécial, le recours au ressources exceptionnelles pour équilibrer le budget de la défense lui semble par principe contestable. </p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
325
<p align="justify">En 2018, la part des REX (190 millions d'euros) dans le total des crédits de paiement du ministère des armées sera certes minime (0,6 % des CP hors pensions), mais celle-ci doit s'analyser au regard des seuls crédits consacrés à l'immobilier et non à l'ensemble des crédits de la mission « Défense ».</p>
0.005556
16
false
false
false
1752484833737292026
PREPARATORY_WORK_report_HTML
http://www.senat.fr/rap/l17-108-39/l17-108-39.html
326
<p align="justify"><strong>Ainsi, les recettes issues de cessions immobilières représenteront un montant de 140 millions d'euros sur un montant de CP consacrés à l'immobilier s'élevant à 1,9 milliard d'euros </strong>(recettes issues de cessions comprises),<strong> soit près de 7,5 %</strong>.</p>
0.005556
16
false
false
false